1 City Market Los Angeles Technical Appendices to the Draft EIR Appendix F Preliminary Geotechnical Engineering Investigation SASSAN Geosciences, Inc., December 2012

2 MR. PETER M. FLEMING THE CITY MARKET OF LOS ANGELES 1057 SAN PEDRO STREET LOS ANGELES, CALIFORNIA PRELIMINARY GEOTECHNICAL ENGINEERING INVESTIGATION FOR THE CITY MARKET OF LOS ANGELES Prepared By SASSAN Geosciences, Inc North Lake Avenue, Suite 204 Pasadena, California December 27, 2012

3 SAS SASSAN Geosciences, Inc. December 27, 2012 Mr. Peter M. Fleming THE CITY MARKET OF LOS ANGELES 1057 San Pedro Street Los Angeles, CA Subject: Preliminary Geotechnical Engineering Investigation Project Address: THE CITY MARKET OF LOS ANGELES SAS File Number: 2FLE045 Dear Mr. Fleming: SASSAN Geosciences, Inc. (SAS) has completed the preliminary geotechnical engineering investigation for the subject property. Our investigation was performed to determine the nature of surface and subsurface soils and to evaluate their physical and engineering properties. The results were then analyzed, and recommendations for foundation design and related parameters were prepared. This report presents our findings and recommendations North Lake Avenue. Suite 204. Pasadena. California (626) Fax (626)

4 LOCATION AND SITE DESCRIPTION The subject property is located in Downtown section of the City of Los Angeles, California. The subject project includes all properties bounded by 9 th Street on the north, by 12 th Street on the south, by San Pedro Street on the east and by San Julian Street on the west, as well as two properties to the west of San Julian Street. A vicinity map is presented on Figure A-1 in Appendix A. This project site is located in a relatively level, commercial area, and is comprised of various one-story and two-story commercial and office buildings with associated parking lots. Most of the structures located between 9 th Street and 12 th Street are already demolished or are currently under demolition. A plot plan indicating the boundaries of the subject project and the locations of the existing improvements is presented on Figure A-2 in Appendix A. OBJECTIVE The owners wish to assess the geotechnical characteristics of the underlying ground in order to demolish the existing structures and construct a commercial and residential building complex. The complex will consist of various multi-story buildings with full subterranean parking structures. The review of the current architectural plans indicates that the proposed buildings are anticipated to be two (2) to eight (8) stories high with two residential towers up to twenty-eight (28) stories high. The proposed subterranean parking structures are anticipated to be up to three (3) levels below ground. A plot plan indicating the locations of the existing and proposed improvements is presented on Figure A-2 in Appendix A. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 2 of 24

5 FIELD INVESTIGATION Subsurface exploration was performed on August 18 through September 26, 2012 and involved drilling nine (9) boreholes (Boreholes B-1 through B-9) to a maximum depth of approximately seventy (70) feet. Additional exploration was performed on October 16 through 26, 2012 and involved drilling nine (9) boreholes (Test Holes TH-1 through TH- 9) to a maximum depth of approximately forty (40) feet. The drilling operation was performed utilizing a twenty-four (24)-inch diameter flight auger mounted on a drilling rig. Two and one-half-inch (2.5) diameter split spoon ring samples and standard penetration test (T) samples were obtained from the boreholes with a thirty (30) inch drop of a one-hundred-forty (140) pound hammer. Earth materials encountered were classified in accordance with the visual-manual procedures of the Unified Soil Classification System. A plot plan indicating the approximate borehole locations is presented on Figure A-2 in Appendix A. EARTH MATERIALS The earth materials encountered in the boreholes consist of up to approximately five (5) feet of fill underlain by alluvium, which extends to the depths explored. Detailed logs of the boreholes are presented on Figures B-1 through B-18 in Appendix B. A copy of a regional geologic map (Dibblee) is presented on Figure D-1 in Appendix D. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 3 of 24

6 The density of alluvium increases by depth, however, the conventional earth moving machinery should be able to handle the grading operation. We do not anticipate that ripability becomes an issue during the grading at the subject site. In addition, relatively clean sands will be encountered during the drilling of the friction piles. This may result in caving. As such, the contractor is advised to have steel casing ready to use when and if caving occurs. GROUNDWATER Groundwater seepage was not encountered in the boreholes to the depths explored, and is not anticipated to impact the proposed construction. In addition, Seismic Hazard Evaluation for the Hollywood Quadrangle by the State of California indicates that the highest historic water level in this area was recorded at approximately one-hundred (100) feet below ground surface. A copy of Highest Ground Water Levels map is presented on Figure C-2 in Appendix C. LABORATORY TESTING Moisture content (ASTM D 2216) and shear strength (ASTM D 3080) tests were performed for selected samples of soil considered to be representative of those encountered. The results of direct shear tests are presented on Figures B-19 through B-21 in Appendix B. Evaluation of the test data is reflected throughout this report. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 4 of 24

7 LIQUEFACTION The subject property is shown on the State of California Seismic Hazard Zones map presented on Figure C-1 in Appendix C. The site is located outside of the seismically induced liquefaction hazard zone. CONCLUSIONS AND RECOMMENDATIONS Discussion Architectural plans and/or construction concept plans are not completed at this time. The recommendations provided in this report are based on the current conceptual architectural plans. The shoring and foundation design recommendations, provided in this report, may change if significant changes are made to the size and locations of the proposed structures. General The referenced property is considered to be suitable for the proposed construction from a geotechnical engineering standpoint, provided that our recommendations are incorporated into the approved construction plans. The conclusions and recommendations presented here are based on our observations at the site during our investigation, engineering judgment, and analysis of the soil samples obtained from the boreholes. Minor variations of subsurface conditions are common, and major variations are possible. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 5 of 24

8 General Grading Grading areas must be stripped of all vegetation, debris and other deleterious material. All loose soil disturbed by the removal of structures must be removed and recompacted. The existing fill is up to approximately vive (5) feet thick and is not suitable for foundation support. At locations where new fill is proposed, the existing fill must be entirely removed and replaced with a certified engineered fill. The proposed new fill must be placed in horizontal layers, and must be benched into the competent alluvium. Temporary Excavations Architectural plans and/or construction concept plans are not completed at this time. However, the review of available architectural concept plans indicates that temporary excavations up to approximately thirty (30) feet in depth will be required during construction of the proposed subterranean parking structures. The temporary excavations along the streets will be surcharged by the street traffic. At other locations, the temporary excavations will be surcharged by the neighboring one-story and two-story structures located adjacent to the property lines. Shoring must be designed for the surcharged temporary excavations. The recommendations and necessary strength parameters needed in the design of temporary shoring elements are provided in the following sections of this report. Based on the integrity of the site earth materials, it is our opinion that unsurcharged temporary excavations may be performed continuously in accordance with the following table: SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 6 of 24

9 Maximum Maximum Depth of Cut Slope Ratio (ft) (H:V) 0-5 Vertical >5 1:1 The contractor must perform the temporary excavations over five (5) feet in depth and installation of the shoring under continuous monitoring of a Registered Grading Deputy Inspector who would ensure the quality of grading and presence of competent earth materials. The excavations may be left open for a temporary period of four (4) weeks. A grading inspector must be present when laborers are working within five (5) feet of the temporary cut area. Temporary Shoring Installation Based on current conceptual architectural plans, temporary excavations up to approximately thirty (30) feet in height will be required during the construction of the subterranean garage. The temporary shoring may consist of wide flange I-beams imbedded in concrete soldier piles and wooden lagging that spans between the I-beams. For shallow excavations, the shoring may be design with cantilevered soldier piles. For deeper excavations, where possible, the soldier piles may be secured with tie-backs (with or without post-grouting). Where using the tie-backs is not feasible, the soldier piles may be supported by rakers and a concrete deadman. The temporary excavations may commence only after installation of the soldier piles of the temporary shoring system. The final design of the shoring must be performed by the consulting civil engineer in SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 7 of 24

10 conjunction with this office. The recommendations for design of the soldier piles, tiebacks and deadman are provided in Shoring Design Recommendations section of this report. The installation of the temporary shoring must be performed in the following order: 1. The soldier piles must be drilled from the existing surface down to the required depth (to be determined by the consulting civil engineer). 2. Steel I-beams for temporary shoring must be installed. 3. The soldier piles must be filled with concrete up to six (6) inches below the bottom of the proposed footings. 4. The rest of the soldier pile must be filled with one-sack-slurry up to the existing surface. 5. The excavation may be performed up to five (5) feet below the existing grade. Due to granular nature of the underlying earth materials, this number may be reduced by the consulting soils engineer during the excavation process. 6. The wooden lagging must be installed between the I-beams up to the bottom of the excavation. 7. The lagging must be backfilled with incompressible material such as compacted construction sand or a half-sack-slurry. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 8 of 24

11 8. The excavation may be performed up to the design depth (bottom of the proposed footings or grade beams) in five-foot vertical intervals (or as instructed by the consulting soils engineer) repeating steps five through seven. 9. The wooden lagging may be installed up to the level of the top of the proposed footings or grade beams. 10. Where possible, tie-backs may be drilled and installed at the levels specified on the approved shoring plans. The tie-backs may be post-grouted. 11. The tie-backs must be tested per specifications provided on the approved shoring plans. 12. Where using the tie-backs is not feasible, the soldier piles of the temporary shoring system may be supported by rakers and a concrete deadman. The soldier piles must be supported by a temporary soil embankment, which may be removed only after the installation of the proposed rakers and concrete deadman per specifications provided on the approved shoring plans. 13. A Registered Grading Deputy Inspector approved by and responsible to this office will be required to provide continuous inspection during the drilling of the proposed soldier piles and installation of temporary shoring. Temporary Shoring Design Recommendations The temporary shoring may consist of wide flange I-beams imbedded in concrete soldier piles and wooden lagging that spans between the I-beams. The pressure distribution SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 9 of 24

12 diagrams for the design of the soldier piles of the temporary shoring is presented in Appendix E. The final design of the shoring must be performed by the consulting shoring engineer. The following minimums apply to the design of the shoring elements: 1. Soldier piles of the temporary shoring system must be founded at a minimum depth of eight (8) feet into undisturbed alluvium. The actual depth of soldier piles, however, must be determined by the consulting civil engineer in conjunction with this office. 2. Soldier piles must have a minimum diameter of twenty-four (24) inches. 3. The pile excavations must be covered if left overnight. 4. Soldier piles must be assumed fixed at two (2) feet into alluvium. 5. Active earth pressure increasing at minimum rate of 45 psf per foot of depth must be used in the design of shoring elements. The results of the active earth pressure analyses are presented in Appendix E. 6. Passive earth pressure increasing at a minimum rate of 300 psf per foot of depth, to a maximum of 3,000 psf, must be applied to portions of the soldier piles that are embedded a minimum two (2) feet into alluvium. 7. The suggested passive pressure may be doubled for an isolated pile condition (d>2.5d). 8. A side friction value of 500 psf in compression and 250 psf in tension may be utilized for the portion of the soldier piles that are penetrated into alluvium. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 10 of 24

13 9. The drilled tie-backs must have a minimum diameter of six (6) inches. 10. The tie-backs must have a minimum bonding length of twenty (20) feet beyond the active wedge. 11. The inclination of the failure plane of the active wedge may be assumed to be at 35 degrees, measured from the vertical. 12. A skin friction value of 1,440 psf (10 psi) with post-grouting and value of 600 psf (4 psi) without post-grouting may be utilized for the portions of the tie-backs within the bonding length. 13. The shoring elements must be designed such that only one-quarter (¼) of the total lateral load from the earth pressure is carried by the tie-backs, and three-quarters (¾) of the total lateral load is carried by the shoring columns. 14. An allowable bearing capacity of 2,000 psf must be used for a deadman twenty-four (24) inches wide and founded twenty-four (24) inches into undisturbed alluvium. The allowable bearing capacity may be increased by twenty (20) percent for every additional foot of width or depth to a maximum value of 4,000 psf. 15. Passive earth pressure increasing at the rate of 300 psf per foot of depth, to a maximum of 3,000 psf, must be used in the design of the deadman. 16. A coefficient of friction of 0.35 must be utilized for resisting lateral loads at the contact surface of the concrete deadman and foundation soils. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 11 of 24

14 17. The maximum allowable lateral deflection of 0.5 inch must be considered for the design of the shoring elements. Shoring Monitoring Program After completion of the installation, the shoring must be periodically monitored by a licensed surveyor for a lateral deflection of the vertical elements. The monitoring of the shoring must be performed not less than once every week. The first reading must be taken immediately after the completion of installation of the shoring, and consecutive readings must be taken on a weekly basis. The maximum lateral deflection of the shoring system must be limited to one half (½) of an inch. In the event that lateral movements of the shoring in excess of one half (½) of an inch are encountered, the consulting geotechnicalengineer-of-record and structural -engineer-of-record must be notified immediately. Foundations The review of the current architectural plans indicates that the proposed buildings are anticipated to be two (2) to eight (8) stories high with two residential towers up to twentyeight (28) stories high. The proposed subterranean parking structures are anticipated to be up to three (3) levels below the ground. The proposed structures up to ten-stories high may be supported by continuous footings, spread footings, or a combination of both. The proposed structures over ten-stories high must be supported on a grade beam/friction pile combination footing. Following are the recommendations for both: conventional footings and deep foundations. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 12 of 24

15 Due to the fact that all surcharged temporary excavations will be supported by soldier piles, the consulting structural engineer may elect to support all proposed structures on grade beam/friction pile combination footing. In this case, all shoring soldier piles must be designed per recommendations provided later in this section for deep foundations. Conventional Footings - The proposed structures up to ten-stories high may be supported by continuous footings, spread footings, or a combination of both. Footings must be founded into undisturbed alluvium. In addition, the bottoms of proposed footings must be below a plane with a slope of one horizontal to one vertical (1:1) projected upward from the bottom edge of adjacent existing footings. A bearing capacity of up to the maximum value of 2,000 psf may be used for footings twenty-four (24) inches wide and founded twenty-four (24) inches into undisturbed alluvium. The allowable bearing capacity may be increased by twenty (20) percent for every additional foot of width or depth to a maximum value of 4,000 psf. The allowable bearing value is for dead-plus-live loads and may be increased by thirty (30) percent for momentary wind and seismic loads. The following minimums apply to all footings: 1. Footings must be founded at a minimum depth of twenty-four (24) inches into undisturbed alluvium. 2. Footings must be reinforced with a minimum of four (4) #4 bars - two at the top and two at the bottom. The final design of the footings must be provided by a structural engineer in conjunction with this office. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 13 of 24

16 3. A coefficient of friction of 0.35 must be utilized for resisting lateral loads at the contact surface of concrete and foundation soils. 4. Active earth pressure increasing at minimum rate of 54 psf per foot of depth must be used in the design of cantilevered retaining walls. The results of the active earth pressure analyses are presented in Appendix F. Additional earth pressure increasing at a minimum rate of 10 psf per foot of depth due to seismic forces must be applied to cantilevered retaining walls that are equal or higher than twelve (12) feet in a form of an inverted triangle, and the resultant force due to seismic pressure must be applied at an elevation equal to 60 per cent of the retained height. The results of the seismic earth pressure analyses are presented in Appendix G. 5. At-rest earth pressure increasing at the rate of 80 psf per foot of depth must be used in the design of the retaining walls that are braced at the top and the bottom. The results of the at-rest earth pressure analyses are presented in Appendix F. 6. Passive earth pressure increasing at a maximum rate of 300 psf per foot of depth, to a maximum of 3,000 psf, may be used in calculations. Deep Foundations - The proposed structures over ten-stories high must be supported on a grade beam/friction pile combination footing. The following recommendations should be implemented. A side friction value of 500 psf in compression and 250 psf in tension must be utilized for the portion of the friction piles that are penetrated into undisturbed alluvium. The allowable side friction values may be increased by thirty (30) percent for momentary wind and seismic loads. The following minimums apply to the friction piles: SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 14 of 24

17 1. Friction piles must be founded at a minimum depth of eight (8) feet into undisturbed alluvium. The actual depth of friction piles, however, must be determined by the structural engineer in conjunction with this office. 2. Friction piles must have a minimum diameter of twenty-four (24) inches. 3. The pile excavations must be covered if left overnight. 4. A Registered Grading Deputy Inspector approved by and responsible to this office will be required to provide continuous inspection for the proposed friction pile drilling and installation. 5. Active earth pressure increasing at minimum rate of 54 psf per foot of depth must be used in the design of cantilevered retaining walls. The results of the active earth pressure analyses are presented in Appendix F. Additional earth pressure increasing at a minimum rate of 10 psf per foot of depth due to seismic forces must be applied to cantilevered retaining walls that are equal or higher than twelve (12) feet in a form of an inverted triangle, and the resultant force due to seismic pressure must be applied at an elevation equal to 60 per cent of the retained height. The results of the seismic earth pressure analyses are presented in Appendix G. 6. At-rest earth pressure increasing at the rate of 80 psf per foot of depth must be used in the design of the retaining walls that are braced at the top and the bottom. The results of the at-rest earth pressure analyses are presented in Appendix F. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 15 of 24

18 7. Passive earth pressure increasing at a maximum rate of 300 psf per foot of depth, to a maximum of 3,000 psf, must be applied to portions of the friction piles that are embedded a minimum two (2) feet into undisturbed alluvium. 8. The suggested passive pressure may be doubled for an isolated pile condition (d>2.5d). 9. Due to granular nature of underlying earth materials, caving may be encountered during the drilling of the friction piles. As such, the contractor is advised to have steel casing ready to use when and if caving occurs. In addition, if water is present in the drilled shafts, a tremie pipe must be used by the contractor to pump the concrete into the drilled shafts from the bottom under the standing water. Subdrain System The retaining walls must be provided with weep holes or perforated pipe and gravel subdrain to prevent entrapment of water in the backfill. The perforated pipe must consist of four-inch (4 ) minimum diameter PVC Schedule 40, or ABS SDR-35, with a minimum of sixteen (16) perforations per foot on the bottom one-third of the pipe. Every foot of the pipe should be embedded in three (3) cubic feet of three-quarter-inch (3/4 ) gravel wrapped in filter fabric (Mirafi 140N or equal). Placement of gravel and filter fabric is also required for weep holes. The subdrain system behind the basement retaining walls will be located below the street level and will not drain via gravity. The subdrain water must be collected in a concrete catch basin and pumped to the street via sump-pumps. Each level of the subterranean parking must have a subdrain installed. The perforated subdrain pipes at various levels may be connected via vertical solid pipes. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 16 of 24

19 In addition, the retaining walls of the basement must be provided with extensive dampproofing. The damp-proofing must be designed by a water proofing specialist. As an alternative, the subterranean garage retaining walls may be provided with 12 x12 x12 gravel pockets, consisting of ¾ size gravel, spaced at 8-feet center-tocenter. These gravel pockets need to be placed in such a way between the two piles that each bay of the shoring/retaining wall system will contain at least one 12 x 12 x 12 gravel pocket. The gravel pocket may discharge the pore-water (if any) thru a 3 diameter solid PVC pipes (outlets) connected to the gravel pockets behind the wood lagging. The outlets must discharge the subdrain water a minimum of 1 above the finish floor levels. Please be advised that the recommended sub-drain system 12 x12 x12 gravel pocket is also available in a pre-fabricated PVC box form, made commercially; that can be used in this project as well. The box may be filled with ¾ size gravel before its placement into location, with one end containing the 3 -diameter solid PVC pipe outlet. A cross-section of a typical subdrain system using the 12 x12 x12 gravel pocket system is presented in Appendix A of this report. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 17 of 24

20 Seismic Parameters The seismic parameters for the design of the proposed structure based on the 2010 California Building Code are as follows: Latitude 34 o N Longitude 118 o W Site Classification D Site Coefficient, F a 1.0 Site Coefficient, F v 1.5 Site Spectral Response Acceleration Parameters (g): Mapped Acceleration, S S (0.2 sec.) Mapped Acceleration, S 1 (1 sec.) Adjusted Maximum Acceleration, S MS (0.2 sec.) Adjusted Maximum Acceleration, S M1 (1 sec.) Design Acceleration, S DS (0.2 sec.) Design Acceleration, S D1 (1 sec.) Conformance with the above listed criteria for seismic design does not constitute any kind of warranty, guarantee, or assurance that significant structural damage or ground failure will not occur if a maximum level earthquake occurs. The primary goal of seismic design is to protect life and limb, and to prevent catastrophic failures, and not to avoid all damage, since such design may be economically prohibitive. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 18 of 24

21 Seismic Hazard The subject property is shown on the State of California Seismic Hazard Zones map presented in Appendix C. The site is located outside of the seismically induced landslide and liquefaction hazard zone. Settlement Maximum total and differential settlements are expected to be less than one (1) and onehalf (½) inches, respectively, provided that our recommendations are followed. Engineered Fill All fill earth materials must consist of clean soil that is free of vegetation and other debris. The fill must be placed in six- (6-) to eight- (8-) inch thick lifts at near optimum moisture content and compacted. Particles larger than three (3) inches in diameter must not be allowed in the backfill material. Earth materials must not be imported to the site without prior approval by the soil engineer. All engineered fill must be compacted to a minimum of ninety (90) percent of its maximum dry density (ASTM D 1557). Where cohesionless soil having less than fifteen (15) percent finer than millimeter is used for fill, it must be compacted to a minimum of ninety-five (95) percent of its maximum dry density. Neither jetting nor water tamping are permitted. Heavy construction equipment must be maintained at a minimum distance of three (3) feet from the existing structures. Hand-operated compaction equipment must be used to compact the backfill soils within this 3-foot-wide zone. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 19 of 24

22 Concrete Slabs-on-Grade The subgrade for the proposed concrete slabs-on-grade must consist of undisturbed alluvium or two (2) foot thick layer of certified compacted fill. The competent subgrade must be covered with four (4) inches of crushed miscellaneous aggregate (CMA) and compacted to ninety-five percent (95%) of its maximum dry density (ASTM D 1557). The CMA must be covered with one (1) inch of sand. The sand must be covered by a ten (10)- mil vapor barrier. The vapor barrier must be installed so that the edges of the sheet overlap at least twelve (12) inches onto any adjacent sheet. The vapor barrier must be covered with one (1) inch of sand. The sand must be covered with four (4) inches of nonexpansive hard rock concrete mix (3/4" max. rock size). The reinforcement must be a minimum of #4 bars at sixteen (16) inches on center in both directions. The reinforcement must be placed at the mid-depth of the concrete slab. The slab must be covered with a vapor barrier for at least two (2) days to slow the curing time, reduce the shrinkage crack potential and be self-watering. The consulting structural-engineer-of-record may decide to increase the slab thickness according to the proposed traffic loads. Driveway The subgrade for the proposed driveway must consist of undisturbed alluvium or two (2) foot thick layer of certified compacted fill. The competent subgrade must be covered with four (4) inches of crushed miscellaneous aggregate (CMA) and compacted to ninety-five percent (95%) of its maximum dry density (ASTM D1557). The CMA must be covered by asphalt concrete, concrete slab, stone pavers or equal. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 20 of 24

23 Pipe Bedding and Trench Backfill The pipe bedding must consist of sand or similar granular material having a minimum sand equivalent value of thirty (30). The sand must be placed in a zone that extends a minimum of six (6) inches below and twelve (12) inches above the pipe for the full trench width. The bedding material must be compacted. The trench backfill above the pipe bedding may consist of approved, on-site or imported soils, and it must be compacted. Where utility trenches are parallel to the footings, the bottom of the trench must be located above a plane with a slope of 1:1, projected downward from the adjacent bottom edge of the footing. Site Drainage Drainage devices such as sloping sidewalks and area drains must be provided around the buildings to collect and direct all water away from the structures. Neither rain nor excess irrigation water should be allowed to collect or pond against foundations. The collected water must be directed to the proper drainage system via non-erosive devices. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 21 of 24

24 DESIGN REVIEW We suggest that the geotechnical aspects of the project be reviewed by this firm during the design process. The scope of our services may include assistance to the design team by providing specific recommendations for special cases, reviewing the foundation design, reviewing the geotechnical portions of the project for possible cost savings through alternative approaches, and evaluating the overall applicability of our recommendations. Additional site-specific explorations may also be considered if significant foundation modifications are required using the above recommendations. INECTION All excavations must be inspected and approved. All fill placed for engineering purposes must be tested for compaction and moisture content and certified. The subdrain system must be observed and approved. Inspection of excavations and subdrain system may also be required by the appropriate reviewing governmental agencies. It is recommended that SAS be retained to verify compliance with the recommendations made in this report, to ensure compliance with the design concepts, specifications, and recommendations, and to allow design changes in the event that exposed subsurface conditions differ from those anticipated herein. A joint meeting among the parties involved in this project is recommended prior to the start of groundbreaking to discuss specific procedures and scheduling. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 22 of 24

25 Inspections performed by SAS are for verification purposes only and shall under no circumstance relieve other parties involved in the design and construction from their obligation to perform work in accordance with the approved plans. In the event that the recommendations contained herein are interpreted by others, SAS will not accept responsibility for such interpretations. INVESTIGATION LIMITATIONS The conclusions and recommendations presented in this report are based on the findings and observations in the field and the results of laboratory tests performed on representative samples. The soils encountered in the boreholes and test pits are believed to be representative of the total area; however, soil characteristics can vary throughout the site. SAS should be notified if subsurface conditions are encountered which differ from those described in this report. This report has not been prepared for use by parties or projects other than those named and described above. It may not contain sufficient information for other parties or other purposes. The conclusions and recommendations presented in this report are professional opinions. These opinions have been derived in accordance with current standards of geotechnical engineering practice, field observations and laboratory test results. No other warranty is expressed or implied. Samples secured for this investigation will be retained in our laboratory for a period of thirty (30) days from the date of this report and will be disposed after this period unless other arrangements are made. SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 23 of 24

26 This report should be reviewed and updated after a period of one year or if the project concept changes from that described herein. We appreciate the opportunity to be of service to you. If you have any questions, please call our office. Sincerely, SASSAN GEOSCIENCES, INC. Sassan A. Salehipour, G.E. President SASSAN A G E O T. SA LEHIPOUR No Exp REGISTERED PROFESSIONA L ENGINEER E C H N L STATE OF CA LIFORNIA I C A SAS:ak/2fle045a3.doc Appendices SAS SASSAN Geosciences, Inc. 2FLE045 December 27, 2012 Page 24 of 24

27 REFERENCES: 1. California Division of Mines and Geology, 1998, Seismic Hazard Evaluation for the Hollywood 7.5 Minute Quadrangle, Los Angeles County, California; OFR California Division of Mines and Geology, 1999, Seismic Hazard Zones Map for the Hollywood Quadrangle, Los Angeles County, California; Scale 1:24, California Division of Mines and Geology, 1986, Official Map of Special Studies Zones, Hollywood Quadrangle; Scale 1:24, Dibblee, T.W., 1991, Geologic Map of the Hollywood and Burbank (South ½) Quadrangles, Los Angeles County, California. Dibblee Geological Foundation, Santa Barbara, California; Map DF-30; Scale 1:24,000

28 APPENDIX A

29 Site SAS VICINITY MAP FIGURE THE CITY MARKET OF LOS ANGELES A-1

30 TH-7 B-7 B-6 TH-6 B TH-4 A B-4 BUILDING (demolished) B-9 CANOPY/SHED (removed) B-3 BUILDING (demolished) CANOPY/SHED (removed) TH-9 1-STORY BUILDING W/ BASEMENT (demolished) A B-5 TH-5 TH-8 TH-2 TH-1 BUILDING (demolished) B-8 CANOPY/SHED (removed) B-2 CANOPY/SHED (removed) BUILDING (demolished) B-1 TH-3 B LEGEND SCALE: 1" = 120' SITE PLAN B-9 BOREHOLE NUMBER AND LOCATION TH-9 TEST HOLE NUMBER AND LOCATION FIGURE A-1

31 C/L P/L P/L C/L SECTION A-A SCALE: 1" = 120' FIGURE A-2

32 C/L P/L P/L C/L SECTION B-B SCALE: 1" = 120' FIGURE A-3

33 APPENDIX B

34 Sample γ d Moisture Depth N Number ( pcf ) ( % ) ( ft ) 0 USCS R SM 5 Description Pavement: 10" thick asphalt concrete Alluvium: Gray, damp to moist, medium dense, silty fine to medium sand, trace coarse sand, trace fine, subrounded gravel Light gray to light grayish brown, damp, dense, fine to coarse sand with fine to coarse, subangular gravel R Light grayish brown, moist, dense, fine to coarse sand, trace fine to medium, subrounded gravel Light gray to light grayish brown, damp, dense, fine to coarse sand with fine to coarse, subangular gravel; minor caving from 13' Same as above, but gray (salt and pepper) R Light grayish brown, moist, dense, fine to coarse sand, cobbles up to 6", trace fine to medium, subrounded gravel Same as above, but cobbles up to 8"; caving 25 Light grayish brown, moist, dense, medium to coarse sand with fine to coarse, subrounded gravel, trace fine sand; one 8" cobble; caving from 23' 30 R Excavation Terminated at Depth of 31 Feet Water Seepage Was Not Encountered R = Ring Sample SAS 40 LOG OF BORE HOLE NUMBER ONE (B-1) THE CITY MARKET OF LOS ANGELES FIGURE B-1

35 Sample γ d Moisture Depth N Number ( pcf ) ( % ) ( ft ) 0 USCS SM R-1 Description Pavement: 9" thick asphalt concrete Alluvium: Gray, damp to moist, medium dense, silty fine to medium sand, trace coarse sand, trace fine, subrounded gravel R Light gray to light grayish brown, damp, dense, fine to coarse sand with fine to coarse, subangular gravel 15 Light grayish brown, moist, dense, fine to medium sand, trace silt R Light grayish brown, moist, dense, fine to coarse sand, trace fine to medium, subrounded gravel; minor caving 25 Light grayish brown, moist, dense, medium to coarse sand with fine to coarse, subrounded gravel, trace fine sand; heavy caving from 24' R Light grayish brown, moist, dense, medium to coarse sand with fine to coarse, subrounded gravel, cobbles up to 6", trace fine sand Terminated at 32 feet due to caving Excavation Terminated at Depth of 32 Feet Water Seepage Was Not Encountered R = Ring Sample SAS 40 LOG OF BORE HOLE NUMBER TWO (B-2) THE CITY MARKET OF LOS ANGELES FIGURE B-2

36 Sample γ d Moisture Depth N Number ( pcf ) ( % ) ( ft ) 0 USCS SM 5 Description Pavement: 4" thick concrete slab Alluvium: Gray, damp to moist, medium dense, silty fine to medium sand, trace coarse sand, trace fine, subrounded gravel Light gray to light grayish brown, damp, dense, fine to coarse sand with fine to coarse, subangular gravel R Light grayish brown, moist, dense, medium to coarse sand with fine to coarse, subrounded gravel, trace fine sand Light grayish brown, moist, dense, medium to coarse sand with fine to coarse, subrounded gravel, cobbles up to 6", trace fine sand R R Same as above, but more gravel and cobbles; heavy caving Terminated at 35 feet due to caving 35 Excavation Terminated at Depth of 35 Feet Water Seepage Was Not Encountered R = Ring Sample SAS 40 LOG OF BORE HOLE NUMBER THREE (B-3) THE CITY MARKET OF LOS ANGELES FIGURE B-3

37 Sample γ d Moisture Depth N Number ( pcf ) ( % ) ( ft ) 0 USCS SM R-1 15 Description Pavement: 7" thick concrete slab Alluvium: Gray, damp to moist, medium dense, silty fine to medium sand, trace coarse sand, trace fine, subrounded gravel Light gray to light grayish brown, damp, dense, fine to coarse sand with fine to coarse, subangular gravel Light gray to light grayish brown, damp, dense, medium to coarse sand with fine to coarse, subangular gravel; cobbles up to 4", one 8" cobble; trace fine sand Light gray, moist, dense, medium to coarse sand with fine to medium, subangular gravel, trace fine sand; one large boulder at 13' R-2 R Light grayish brown, moist, dense, medium to coarse sand with fine to medium, subrounded gravel; caving Same as above, with fine to coarse, subrounded gravel; caving Terminated at 26 feet due to caving Excavation Terminated at Depth of 26 Feet Water Seepage Was Not Encountered R = Ring Sample SAS 40 LOG OF BORE HOLE NUMBER FOUR (B-4) THE CITY MARKET OF LOS ANGELES FIGURE B-4

38 Sample γ d Moisture Depth Description N Number ( pcf ) ( % ) ( ft ) 0 0-8" Asphalt 4"thick over 4" of base USCS R-1 S SM 2.5' FILL: Gray brown, moist, fine sand, trace silt, trace coarse 5' ALLUVIUM: Brown, moist, medium - coarse sand, trace silt R-2 S ' 10' moist Brown, medium - coarse gravelly sand, Brown, medium - coarse gravelly sand, S ' Brown, medium - coarse gravelly sand changes to silty sand few gravel, moist S ' moist Brown, medium - coarse gravelly sand, S ' Brown, interbeds of medium - coarse gravelly sand, and fine - medium sand with few gravels, moist Excavation Terminated at Depth of 25 Feet Water Seepage Was Not Encountered 40 R = Ring Sample; S = T sample SAS LOG OF BORE HOLE NUMBER FIVE (B-5) FIGURE THE CITY MARKET OF LOS ANGELES B-5

39 Sample γ d Moisture Depth Description N Number ( pcf ) ( % ) ( ft ) 0 0-3" Concrete slab over sandy silt 2.5' FILL: Brown, moist, fine - medium sandy silt, trace coarse sand 94 8 R-1 5' ALLUVIUM: Brown, moist, fine ML S-1 medium sandy silt, trace coarse sand 7.5' Brown, sandy silt changes to gray R-2 brown, medium - coarse gravelly sand, few 10 cobbles, moist ' Gray brown, medium - coarse gravelly S-2 sand, moist S ' sand, moist Gray Brown, medium - coarse gravelly 20' Gray Brown, medium - coarse gravelly S-4 sand, moist, cobbly S ' Gray Brown, medium - coarse gravelly sand, moist, cobbly Excavation Terminated at Depth of 25 Feet Water Seepage Was Not Encountered R = Ring Sample; S = T sample SAS 40 LOG OF BORE HOLE NUMBER SIX (B-6) FIGURE THE CITY MARKET OF LOS ANGELES B-6

40 Sample γ d Moisture Depth Description N Number ( pcf ) ( % ) ( ft ) " Asphalt 3.5" thick over 6" of base 2.5' FILL: Brown, moist, fine sandy silt, trace gravel 93 9 R-1 5 5' ALLUVIUM: Gray brown, moist, S-1 fine - medium sand, trace silt 7.5' Gray brown, moist, fine - medium sand 98 4 R-2 10' Gray brown, medium - coarse gravelly S-2 sand, moist 15' S-3 sand, moist Gray Brown, medium - coarse gravelly 20' S-4 sand, moist Gray Brown, medium - coarse gravell y 25' Gray Brown, medium - coarse gravelly S-5 sand changes to fine sandy silt, moist Excavation Terminated at Depth of 25 Feet Water Seepage Was Not Encountered R = Ring Sample; S = T sample SAS 40 LOG OF BORE HOLE NUMBER SEVEN (B-7) FIGURE THE CITY MARKET OF LOS ANGELES B-7

41 Sample γ d Moisture Depth N Number ( pcf ) ( % ) ( ft ) 0 USCS ML S-1 Description 0-6" Concrete slab 6" thick over sandy silt ALLUVIUM: Gray brown, moist, fine sandy 5' Gray brown, moist, fine sandy silt changes to fine - medium sand 10' Gray brown, medium - coarse gravelly S-2 sand, moist, few cobbles R ' Gray Brown, fine - medium sand, moist 20' S-3 sand, moist Gray Brown, medium - coarse gravelly R ML/SM 25' Brown, wet, sandy silt changes to fine - medium silty sand, trace gravel S ' Gray Brown, medium - coarse gravelly sand, moist, rocky, difficult drilling R ' Gray Brown, medium - coarse gravelly sand, moist, rocky, difficult drilling 40 R = Ring Sample; S = T sample SAS LOG OF BORE HOLE NUMBER EIGHT (B-8) THE CITY MARKET OF LOS ANGELES FIGURE B-8(a)

42 Sample γ d Moisture Depth Description N Number ( pcf ) ( % ) ( ft ) /6" 40' Gray Brown, medium - coarse gravelly S-5 sand, moist, with cobbles, difficult drilling USCS 45 50' Brown, moist, clayey silt with gravel, /6" S-6 cobbly, very tight, diffcult to drill ML 55 S /6" 60' Greenish Brown, moist, sandy silt, trace clay; changes to medium - coarse gravelly sand, rocky, difficult drilling 65 S /6" 70' Gray Brown, medium - coarse gravelly sand, moist, rocky, difficult drilling 75 Excavation Terminated at Depth of 70 Feet Water Seepage Was Not Encountered 80 R = Ring Sample; S = T sample SAS LOG OF BORE HOLE NUMBER EIGHT (B-8) THE CITY MARKET OF LOS ANGELES FIGURE B-8(b)

43 Sample γ d Moisture Depth Description N Number ( pcf ) ( % ) ( ft ) 0 0-6" Asphalt 10" thick over sandy silt ALLUVIUM: Gray brown, moist, fine sandy silt changes to fine - medium sand USCS ML/SM 5' Gray brown, moist, fine sandy silt changes to fine - medium sand S ' Gray brown, medium - coarse gravelly sand, moist, few cobbles 15' R-1 trace silt Gray brown, fine - medium sand, moist, 20' S-2 moist Gray Brown, medium - coarse sand, R ' moist Gray Brown, medium - coarse sand, 30' S-3 sand, moist Gray Brown, medium - coarse gravelly R ' Gray Brown, medium - coarse gravelly sand, moist 40 R = Ring Sample; S = T sample SAS LOG OF BORE HOLE NUMBER NINE (B-9) THE CITY MARKET OF LOS ANGELES FIGURE B-9(a)

44 Sample γ d Moisture Depth Description N Number ( pcf ) ( % ) ( ft ) ' Gray Brown, medium - coarse gravelly S-4 sand, moist USCS 45 50' Gray Brown, medium - coarse gravelly /6" S-5 sand, moist, rocky, difficult to drill 55 60' Gray Brown, medium - coarse gravelly /6" S-6 sand, moist, rocky, difficult to drill 65 70' Gray Brown, medium - coarse gravelly /6" S-7 sand, moist, rocky, difficult drilling 75 Excavation Terminated at Depth of 70 Feet Water Seepage Was Not Encountered 80 R = Ring Sample; S = T sample SAS LOG OF BORE HOLE NUMBER NINE (B-9) THE CITY MARKET OF LOS ANGELES FIGURE B-9(b)

45 Sample γ d Moisture Depth N Number ( pcf ) ( % ) ( ft ) 0 USCS SM Description Pavement: 6" thick asphalt concrete Alluvium: Brown, moist, silty fine to medium sand SM 5 10 Light brown, moist, fine to medium sand, trace gravel Light brown, moist, gravelly medium to coarse sand with cobbles 4" to 6" 15 R R R Excavation Terminated at Depth of 33 Feet Water Seepage Was Not Encountered R = Ring Sample SAS 40 LOG OF TEST HOLE NUMBER ONE (TH-1) THE CITY MARKET OF LOS ANGELES FIGURE B-10

46 Sample γ d Moisture Depth N Number ( pcf ) ( % ) ( ft ) 0 USCS SM Description Pavement: 6" thick asphalt concrete Alluvium: Brown, moist, silty fine to medium sand SM/ 5 Interbedded silty sand and gravelly medium to coarse sand with cobbles, moist 10 Gravelly medium to coarse sand with cobbles, moist 15 R Same as above with cobbles 6" to 8" R R Excavation Terminated at Depth of 30 Feet Water Seepage Was Not Encountered R = Ring Sample SAS 40 LOG OF TEST HOLE NUMBER TWO (TH-2) THE CITY MARKET OF LOS ANGELES FIGURE B-11

47 Sample γ d Moisture Depth N Number ( pcf ) ( % ) ( ft ) 0 SM USCS SM 5 Description Pavement: 4" thick asphalt concrete Fill: Brown, moist, silty fine to medium sand Alluvium: Brown, moist, silty fine to medium sand Light brown, moist, gravelly medium to coarse sand with cobbles up to 9"; number of cobbles increasing with depth R Same as above with boulders 12" to 15" R R Excavation Terminated at Depth of 30 Feet Water Seepage Was Not Encountered R = Ring Sample SAS 40 LOG OF TEST HOLE NUMBER THREE (TH-3) THE CITY MARKET OF LOS ANGELES FIGURE B-12

48 Sample γ d Moisture Depth N Number ( pcf ) ( % ) ( ft ) 0 USCS SM Description Pavement: 8" thick asphalt concrete Fill: Brown, moist, silty fine to medium sand SM 5 Alluvium: Brown, moist, silty fine to medium sand SM 10 Light brown, moist, fine to medium sand with trace gravel and few cobbles Light brown, moist, gravelly medium to coarse sand 15 R ML 20 Layer of clayey silt/sandy silt Light brown, moist, gravelly medium to coarse sand R R Excavation Terminated at Depth of 32 Feet Water Seepage Was Not Encountered R = Ring Sample SAS 40 LOG OF TEST HOLE NUMBER FOUR (TH-4) THE CITY MARKET OF LOS ANGELES FIGURE B-13

49 Sample γ d Moisture Depth N Number ( pcf ) ( % ) ( ft ) 0 SM USCS SM 5 SM/ 10 Description Pavement: 6" thick asphalt concrete Fill: Brown, moist, silty fine to medium sand Alluvium: Brown, moist, silty fine to medium sand Interbedded silty sand and gravelly medium to coarse sand with cobbles, moist Gravelly medium to coarse sand with cobbles, moist 15 R R R Excavation Terminated at Depth of 36 Feet Water Seepage Was Not Encountered R = Ring Sample SAS 40 LOG OF TEST HOLE NUMBER FIVE (TH-5) THE CITY MARKET OF LOS ANGELES FIGURE B-14

50 Sample γ d Moisture Depth N Number ( pcf ) ( % ) ( ft ) 0 SM USCS SM 5 Description Pavement: 6" thick asphalt concrete Fill: Brown, moist, silty fine to medium sand Alluvium: Brown, moist, silty fine to medium sand Light brown, moist, gravelly medium to coarse sand R R R Medium to coarse sandy gravel with boulders GP 35 Excavation Terminated at Depth of 40 Feet Water Seepage Was Not Encountered R = Ring Sample SAS 40 LOG OF TEST HOLE NUMBER SIX (TH-6) THE CITY MARKET OF LOS ANGELES FIGURE B-15

51 Sample γ d Moisture Depth N Number ( pcf ) ( % ) ( ft ) 0 USCS ML Description Pavement: 6" thick asphalt concrete Fill: Brown, moist, fine to medium sandy silt ML 5 Alluvium: Brown, moist, fine to medium sandy silt Gravelly fine to coarse sand R R R Excavation Terminated at Depth of 35 Feet Water Seepage Was Not Encountered R = Ring Sample SAS 40 LOG OF TEST HOLE NUMBER SEVEN (TH-7) THE CITY MARKET OF LOS ANGELES FIGURE B-16

52 Sample γ d Moisture Depth N Number ( pcf ) ( % ) ( ft ) 0 USCS SM 5 Description Pavement: 6" thick asphalt concrete Fill: Brown, moist, fine to medium silty sand Alluvium: Light brown, moist, gravelly medium to coarse sand and sandy gravel 10 /GP 15 R R Light brown, wet, gravelly medium to coarse sand Excavation Terminated at Depth of 33 Feet Water Seepage Was Not Encountered R = Ring Sample SAS 40 LOG OF TEST HOLE NUMBER EIGHT (TH-8) THE CITY MARKET OF LOS ANGELES FIGURE B-17

53 Sample γ d Moisture Depth N Number ( pcf ) ( % ) ( ft ) 0 USCS SM 5 Description Pavement: 4" thick concrete slab Alluvium: Gray, damp to moist, silty fine to medium sand, trace gravel Light brown, damp, fine to coarse sand with gravel R Light brown, moist, fine to coarse sand with gravel, cobbles up to 6" R Excavation Terminated at Depth of 38 Feet Water Seepage Was Not Encountered R = Ring Sample SAS 40 LOG OF TEST HOLE NUMBER NINE (TH-9) THE CITY MARKET OF LOS ANGELES FIGURE B-18

54 APPENDIX C

55 Site SAS CALIFORNIA SEISMIC HAZARD ZONES MAP FIGURE THE CITY MARKET OF LOS ANGELES C-1

56 Site SAS Department of Conservation, Division of Mines And Geology Seismic Hazard Evaluation of The Hollywood 7.5-Minute Quadrangle, Los Angeles County, California, 1998, OFR HISTORICALLY HIGHEST GROUND WATER LEVELS FIGURE THE CITY MARKET OF LOS ANGELES C-1

57 APPENDIX D

58 Site SAS Dibblee, T.W., Jr., Dibblee Geological Foundation, Geologic Map of Hollywood and Burbank (South ½) Quadrangles, 1991, Map # DF-30 GEOLOGIC MAP FIGURE THE CITY MARKET OF LOS ANGELES D-1

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....

More information

Date: December 7, 2017 Project No.:

Date: December 7, 2017 Project No.: Date: December 7, 2017 Project No.: 608-5-2 Prepared For: Mr. Alberto Vasquez SAN FRANCISCO UNIFIED SCHOOL DISTRICT 135 Van Ness Avenue - Room 207a San Francisco, California 94102 Re: Geotechnical Consultation

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC. 1030 Washington Street Raleigh, NC 27605-1258 May 2, 2017 Re: Report of Subsurface Investigation Westfield Rehabilitation & Health Care Additions

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

Date: September 27, 2018 Project No.:

Date: September 27, 2018 Project No.: Date: September 27, 2018 Project No.: 307-23-2 Prepared For: Mr. Jonathan Stone PROMETHEUS REAL ESTATE GROUP 1900 S. Norfolk Street, Suite 150 San Mateo, California 94403 Re: Preliminary Shoring and Foundation

More information

APPENDIX F GEOTECHNICAL INVESTIGATION UPDATE CITY OF SANTA CRUZ D RAFT EIR L A B AHIA H OTEL JANUARY 2014

APPENDIX F GEOTECHNICAL INVESTIGATION UPDATE CITY OF SANTA CRUZ D RAFT EIR L A B AHIA H OTEL JANUARY 2014 GEOTECHNICAL INVESTIGATION UPDATE. CITY OF SANTA CRUZ D RAFT EIR L A B AHIA H OTEL JANUARY 2014 October 5, 2013 Project No. SCR-0720 SANTA CRUZ SEASIDE COMPANY Craig French 911 Center Street, Suite B Santa

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

SOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO

SOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO SOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO Prepared for: G.J. GARDNER HOMES ATTN: DAVE PAGANO 7660 RALEIGH STREET WESTMINSTER, COLORADO 80030 PROJECT NO. 1090

More information

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

File No Supplemental November Geotechnical and Environmental Consulting Engineers

File No Supplemental November Geotechnical and Environmental Consulting Engineers Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction

More information

SEPA Environmental Checklist Mercer Island Center for the Arts. Attachment F Geotechnical Supplemental Memo

SEPA Environmental Checklist Mercer Island Center for the Arts. Attachment F Geotechnical Supplemental Memo SEPA Environmental Checklist Mercer Island Center for the Arts Attachment F Geotechnical Supplemental Memo January 2017 MEMORANDUM DATE: May 6, 2015 TO: FROM: RE: CC: Katie Oman, Mercer Island Center for

More information

( KLEINFEL DER. November 17,2008 File No MARINA COAST WATER DISTRICT th Avenue Marina, California ATTENTION: Mr.

( KLEINFEL DER. November 17,2008 File No MARINA COAST WATER DISTRICT th Avenue Marina, California ATTENTION: Mr. ( KLEINFEL DER L Bright People. Right Solutions. November 17,2008 File No. 82142 40 Clark Street, Suite J Salinas, CA 93901 p1 831.755.7900 f 1831.755.7909 kleinfelder.com MARINA COAST WATER DISTRICT 2840

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

Misan University - College of Engineering Civil Engineering Department

Misan University - College of Engineering Civil Engineering Department CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s

More information

Pump Station Excavation

Pump Station Excavation Pump Station Excavation SPONSORED BY THE KIEWIT CORPORATION A capstone project for the The Department of Civil & Environmental Engineering in The Ira A. Fulton College of Engineering and Technology Brigham

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG.

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG. MEMORANDUM Levelton Consultants Ltd. 150-12791 Clarke Place Richmond, BC V6V 2H9 Canada Tel: 604 278-1411 Fax: 604 278-1042 E-Mail: rhillaby@levelton.com Web Site: www.levelton.com TO: STUART OLSON DOMINION

More information

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering DATE: August 31, 2000 Earth Mechanics, Inc. Geotechnical & Earthquake Engineering TECHNICAL MEMORANDUM EMI PROJECT NO: 99-136 PREPARED FOR: COPIES: PREPARED BY: Tayfun Saglam / Parsons Brinckerhoff Juan

More information

Typical Subsurface Profile. November 28, 2016

Typical Subsurface Profile. November 28, 2016 November 28, 2016 RSCCD Facility Planning, District Construction and Support Services 2323 N. Broadway, Suite 112, Santa Ana, CA 92706 Attn: Re: Ms. Allison Coburn Facilities Project Manager P: (714) 480-7530

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Nassau Reclaimed Water Main From Radio Avenue to Harts Road Nassau County, Florida CSI Geo Project No.: 71-17-329-04 Client Project No.: JEA 09302-049-01

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

Subsurface Investigation Report

Subsurface Investigation Report AGI Project No. 17-154 Subsurface Investigation Report For the Proposed New One-Story Building Addition 7030 West 111 th Street Worth, Illinois Prepared for T63 Development LLC 11052 Mayflow er Lane Orland

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

Upon speaking with the representatives with Technical Foundations as well as Walder Foundations, it was determined that:

Upon speaking with the representatives with Technical Foundations as well as Walder Foundations, it was determined that: As part of our analyses, we have considered the design and construction of the cantilever retaining wall that will be located along the north side of Lucks Lane, between Falling Creek and Gladstone Glen

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18) Page 1 of 8 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and

More information

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER CHAPTER 3 Site Preparation In preparation for constructing buildings on a property, the builder must consider a number of factors related to code requirements. The buildings must be located according to

More information

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL GEOTECHNICAL CONSULTANT Prepared by Checked by Approved by Mr. C Allen Dr. Derek Gay Dr. Derek Gay Signature Date Signature Date

More information

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE... 44.1 44-1.01 Description... 44.1 44-1.02 Materials... 44.1 44-1.03 Proportions...

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

August 13, Geotechnical Recommendations, New Physical Education Building, Chabot College, Hayward, California

August 13, Geotechnical Recommendations, New Physical Education Building, Chabot College, Hayward, California August 13, 2008 003-09176-17 Douglas Horner, AIA Chabot Las Positas Community College District 25555 Hesperian Boulevard Hayward, California 94545 Subject: Geotechnical Recommendations, New Physical Education

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE 44-1 44-1.01 Description 44-1 44-1.02 Materials 44-1 44-1.03 Proportions 44-1 44-1.04

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 November 2015 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT TABLE OF CONTENTS D 422.01 D 422.02 D 422.03

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT 58.6 ROAD (KIMBALL CREEK) 58.9 ROAD TO 58.7 ROAD MESA COUNTY, COLORADO February 9, 2018 Prepared By: Prepared For: Mr. Eric Krch, P.E. SGM, Inc. 744 Horizon Court, Suite

More information

Civil Geotechnical Surveying

Civil Geotechnical Surveying Civil Geotechnical Surveying Mr. David Burnett Cabarrus County Schools 4425 Old Airport Road Charlotte, North Carolina 28025 May 16, 2017 Reference: Geotechnical Engineering Evaluation Future PLC Site

More information

GUIDELINES FOR RETAINING WALLS 4-0 IN HEIGHT OR LESS

GUIDELINES FOR RETAINING WALLS 4-0 IN HEIGHT OR LESS GUIDELINES FOR RETAINING WALLS 4-0 IN HEIGHT OR LESS Version 2014-11-11 Prepared by: Building Development Division Department of Development Services 5 County Complex Ct. Suite 120 Prince William, VA 22192

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT Project: NW Bucklin Hill at Silverdale Way NW Project Number: 12023 Prepared for: Barber Development P.O. Box 473 Redmond, WA 98073 Prepared by: South Sound Geotechnical

More information

Lantz-Boggio Architects, P.C LBA Project No

Lantz-Boggio Architects, P.C LBA Project No SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF

More information

GEOTECHNICAL ENGINEERING REPORT PROPOSED RESIDENCE & DRIVEWAY IMPROVEMENTS 3835 WEST MERCER WAY MERCER ISLAND, WASHINGTON

GEOTECHNICAL ENGINEERING REPORT PROPOSED RESIDENCE & DRIVEWAY IMPROVEMENTS 3835 WEST MERCER WAY MERCER ISLAND, WASHINGTON GEOTECHNICAL ENGINEERING REPORT PROPOSED RESIDENCE & DRIVEWAY IMPROVEMENTS 3835 WEST MERCER WAY MERCER ISLAND, WASHINGTON Project No. 13-032 Credit: Google Earth Prepared for: Bradford & Jill Jackson 3213

More information

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS AFTER FEBRUARY 1, 2011 ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS 481.1 Description. This specification shall govern for the construction of monolithic, reinforced concrete box sewers of the size,

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 PREPARED FOR: AAA DEVELOPMENT AND CONSULTING, INC GREENFIELD, INDIANA

More information

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida

More information

SECTION RIPRAP, BOULDERS, AND BEDDING

SECTION RIPRAP, BOULDERS, AND BEDDING SECTION 31 37 00 RIPRAP, BOULDERS, AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil riprap, void-filled riprap, and

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

5.0 SITE CONDITIONS. 5.1 Surface Conditions

5.0 SITE CONDITIONS. 5.1 Surface Conditions 5.0 SITE CONDITIONS 5.1 Surface Conditions The project site is located at approximately along Ashdown Forest Road and Nichols Canyon Road in the Fiddlers Canyon Area of Cedar City, Utah. At the time of

More information

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS ACADEMIC OFFICE BUILDING COLORADO SPRINGS, COLORADO

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS ACADEMIC OFFICE BUILDING COLORADO SPRINGS, COLORADO PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS COLORADO SPRINGS COLORADO Prepared for: UNIVERSITY OF COLORADO AT COLORADO SPRINGS Facilities Services 1420 Austin Bluffs Parkway Colorado Springs Colorado 80918

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL... 18.1 18-2 ROADWAY EXCAVATION... 18.1 18-2.01 General... 18.1 18-2.02 Unsuitable Roadway Excavation and Backfill... 18.1 18-2.03 Surplus

More information

Geotechnical Investigation Report

Geotechnical Investigation Report Geotechnical Investigation Report Proposed,000-Gallon Water Storage Tank Fagasa Pass Tank Upper Pago Pago, American Samoa Prepared for: ASPA Water Engineering Division Tafuna, American Samoa PO Box PPB

More information

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL...18.1 18-2 ROADWAY EXCAVATION...18.1 18-2.01 General...18.1 18-2.02 Unsuitable Roadway Excavation and Backfill...18.1 18-2.03 Surplus

More information

LETTER OF TRANSMITTAL AS REQUESTED FOR REVIEW AND COMMENT FOR APPROVAL PLEASE RECYCLE

LETTER OF TRANSMITTAL AS REQUESTED FOR REVIEW AND COMMENT FOR APPROVAL PLEASE RECYCLE 199 Highland Vista Dr., Suite 170 (703) 726-8030 www.geoconcepts-eng.com TO: LETTER OF TRANSMITTAL Mr. Rob McGinnis FASLA FROM: Rebecca L. Smith-Zakowicz, CPG 108 Second Street, SW, Unit #36 Charlottesville,

More information

EXHIBIT G GEOTECHNICAL REPORT (DRAFT)

EXHIBIT G GEOTECHNICAL REPORT (DRAFT) EXHIBIT G GEOTECHNICAL REPORT (DRAFT) APPENDIX 1 PROJECT SITE 'B' B-1 B-2 I-2 B-3 B-4 B-5 I-1 PROJECT LOCATION LEGEND B-1 = APPROXIMATE BORING LOCATION I-1 = APPROXIMATE INFILTRATION

More information

GEOTECHNICAL EXPLORATION FOR PROPOSED PAVEMENT IMPROVEMENTS, SIERRA MIDDLE SCHOOL, 4950 CENTRAL AVENUE, CITY OF RIVERSIDE, CALIFORNIA.

GEOTECHNICAL EXPLORATION FOR PROPOSED PAVEMENT IMPROVEMENTS, SIERRA MIDDLE SCHOOL, 4950 CENTRAL AVENUE, CITY OF RIVERSIDE, CALIFORNIA. GEOTECHNICAL EXPLORATION FOR PROPOSED PAVEMENT IMPROVEMENTS, SIERRA MIDDLE SCHOOL, 4950 CENTRAL AVENUE, CITY OF RIVERSIDE, CALIFORNIA Prepared for: RIVERSIDE UNIFIED SCHOOL DISTRICT 3070 Washington Street

More information

BRENTWOOD CAPITAL PARTNERS

BRENTWOOD CAPITAL PARTNERS GEOTECHNICAL EXPLORATION REPORT FIRESTONE COMPLETE AUTO CARE NWC SILVERADO RANCH OULEVARD AND ERMUDA ROAD CLARK COUNTY, NEVADA PROJECT NO.: E-14-078 DATE: JUNE 23, 2014 Prepared for: RENTWOOD CAPITAL PARTNERS

More information

CITY OF ORANGE PUBLIC WORKS DEPARTMENT GRADING FIELD INSPECTION REQUIREMENTS

CITY OF ORANGE PUBLIC WORKS DEPARTMENT GRADING FIELD INSPECTION REQUIREMENTS REQUIRED INSPECTIONS FOR GRADING CITY OF ORANGE PUBLIC WORKS DEPARTMENT GRADING FIELD INSPECTION REQUIREMENTS The following is a list of normally required inspection to be made by the City Inspector: A.

More information

PRELIMINARY GEOTECHNICAL INVESTIGATION REPORT

PRELIMINARY GEOTECHNICAL INVESTIGATION REPORT PRELIMINARY GEOTECHNICAL INVESTIGATION REPORT HAMPTON INN 14 Geronimo Avenue Parker, Arizona Prepared For: Greens Group 14252 Culver Drive, A 358 Irvine, CA 92604 October 22, 2014 Project No.: 14238 Prepared

More information

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E. LD-0 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Revised Soil Survey Report November 2, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia

More information

10 EXTREME BASEMENT PANELS

10 EXTREME BASEMENT PANELS 10 EXTREME BASEMENT PANELS On Granular Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions. Soils are classified

More information

APPLICATION FOR A BUILDING PERMIT (Retaining Wall/Garden Wall Construction Details)

APPLICATION FOR A BUILDING PERMIT (Retaining Wall/Garden Wall Construction Details) APPLICATION FOR A BUILDING PERMIT (Retaining Wall/Garden Wall Construction Details) City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 951.487.7330 fax 951.654.9896 Must print legibly, submit

More information

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133 GEOTECHNICAL EXPLORATION AND ENGINEERING SERVICES REPORT CONDUCTED FOR: Immokalee Stormwater Master Plan Implementation Immokalee, Collier County, Florida PREPARED FOR: Mr. Marc Stonehouse, P. E. Project

More information

April 21, Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912

April 21, Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912 April 21, 2016 Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912 Re: GEOTECHNICAL ENGINEERING REPORT Proposed San Elizario Retail Center Socorro Road & Chicken

More information

SUBSURFACE SOIL INVESTIGATION

SUBSURFACE SOIL INVESTIGATION Architecture Forensic Civil/Planning SUBSURFACE SOIL INVESTIGATION The Overlook Subdivision Phase 3 S1/2 Sec. 2 & SE 1/4 Sec. 3, T6N, R67W of the 6th P.M. Severance, Colorado PREPARED FOR: Journey Homes,

More information

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES 1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all

More information

Temporary Structures. Excavations and Excavation Supports

Temporary Structures. Excavations and Excavation Supports UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Temporary Structures Excavations and Excavation Supports CM 420

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

RETAINING WALL LEVEL BACKFILL

RETAINING WALL LEVEL BACKFILL City of Poway Development Services Department Building Division (858) 668-4645 (858) 668-4646 (Inspection Line) building@poway.org RETAINING WALL LEVEL BACKFILL Construction of retaining walls, except

More information

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL... 18-2 18-2 ROADWAY EXCAVATION... 18-2 18-2.01 General... 18-2 18-2.02 Unsuitable Roadway Excavation and Backfill... 18-2 18-2.03 Surplus

More information

FIGURES Printed By: aday Print Date: 3/23/2011 12:48:08 PM File Name: \\geodesign.local\files\jobs\m-r\penskeauto\penskeauto-1\penskeauto-1-01\figures\cad\penskeauto-1-01-vm01.dwg Layout: FIGURE 1 VICINITY

More information

GEOTECHNICAL INVESTIGATION REPORT STAGE 1 RAS PUMP STATION UPGRADE SAN JOSE CREEK WATER RECLAMATION PLANT

GEOTECHNICAL INVESTIGATION REPORT STAGE 1 RAS PUMP STATION UPGRADE SAN JOSE CREEK WATER RECLAMATION PLANT GEOTECHNICAL INVESTIGATION REPORT STAGE RAS PUMP STATION UPGRADE SAN JOSE CREEK WATER RECLAMATION PLANT County Sanitation Districts of Los Angeles County Whittier, California Prepared for: County Sanitation

More information

Woodhaven Retirement Community Addition Wentworth Street Livonia, Michigan 48154

Woodhaven Retirement Community Addition Wentworth Street Livonia, Michigan 48154 Report of Geotechnical Investigation Woodhaven Retirement Community Addition 9 Wentworth Street Livonia, Michigan 81 Latitude.08 N Longitude 8.898 W Prepared for: Fusco, Shaffer & Pappas, Inc. 0 E. Nine

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 May 10, 2016 Banner Associates, Inc. 2307 W. 57 th Street, Suite

More information

GEOTECHNICAL INVESTIGATION

GEOTECHNICAL INVESTIGATION GEOTECHNICAL INVESTIGATION SHEETZ CONVENIENCE STORE FREEPORT ROAD AND CALIFORNIA AVENUE NATRONA HEIGHTS, PENNSYLVANIA Prepared For: Mr. David J. Mastrostefano, P.E. Sheetz Incorporated 817 Brookfield Drive

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

4 EXTREME FOUNDATION PANELS

4 EXTREME FOUNDATION PANELS 4 EXTREME FOUNDATION PANELS For Garages On Granular Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions. Soils

More information

August 3, 2018 TTL Project No Supplemental Test Borings Cleveland Bulk Terminal Cleveland, Ohio

August 3, 2018 TTL Project No Supplemental Test Borings Cleveland Bulk Terminal Cleveland, Ohio 1915 North 12 th Street Toledo, OH 43604-5305 T 419-324-2222 F 419-241-1808 www.ttlassoc.com August 3, 2018 TTL Project No. 1706701 Mr. Vito Melilli Coastal Engineer KS Associates, Inc. 260 Burns Road,

More information

A. Section includes temporary excavation support and protection systems.

A. Section includes temporary excavation support and protection systems. SECTION 31 50 00 - EXCAVATION SUPPORT AND PROTECTION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION BUILDING EARTHWORK

SECTION BUILDING EARTHWORK Conditions of Use/ Responsibility of Data Montgomery County Public Schools Facilities Guide DIVISION 2 - SITE WORK These guideline specifications are to be used by the A/E as a base document in the development

More information

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1 1.01 GENERAL A. The Contractor shall perform all excavation, backfilling, grubbing and grading required for construction and installation of pipelines, structures and appurtenances. Excavation shall include

More information

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission

More information

SECTION 500 STRUCTURES

SECTION 500 STRUCTURES SECTION 500 STRUCTURES 500.1 GENERAL This section defines the various construction items that are associated with the completion of a concrete, steel, timber, or masonry unit structures, or a combination

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT GRAND AVENUE PEDESTRIAN BRIDGE RELOCATION ROARING FORK RIVER GLENWOOD SPRINGS, COLORADO April 18, 2016 Prepared By: Prepared For: Mr. Bob Pattillo, P.E. Pattillo Associates

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

Northern Colorado Geotech

Northern Colorado Geotech GEOTECHNICAL ENGINEERING REPORT PROPOSED RESIDENTIAL DEVELOPMENT MORGAN COUNTY ROADS AND P WIGGINS, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 07- JANUARY 9, 06 Prepared for: Town of Wiggins 0 Central

More information

GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California

GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California Mr. Victor Garcia The Holt Group 1601 N. Imperial Ave. El Centro, California 92243 September 28, 2017 Project No. EC595 SUBJECT: REFERENCE: GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for

More information

Pulaski County, Virginia

Pulaski County, Virginia Pulaski County, Virginia Typical Retaining Wall Details Based on the 2009 International Residential Code CONTENTS Timber Retaining Wall... 2 General Requirements... 2 Wall Construction... 2 Deadmen...

More information

Results of Onsite Percolation Testing Ellis Commons Senior Housing Development APN City of Perris, California

Results of Onsite Percolation Testing Ellis Commons Senior Housing Development APN City of Perris, California Lansing Companies 12671 High Bluff Drive, Suite 150 San Diego, California 92130 April 18, 2017 Project No. 11607.001 Attention: Subject: References: Mr. Casey Malone Results of Onsite Percolation Testing

More information

Geotechnical Engineering Evaluation Campbell County Athletic Play Fields Campbell County High School South Campus Gillette, Wyoming

Geotechnical Engineering Evaluation Campbell County Athletic Play Fields Campbell County High School South Campus Gillette, Wyoming March 9, 2016 Proposal No. WYP16064 Campbell County School District Mr. Andy Mravlja 1000 W. 8 th Street Gillette, WY 82716 amravlja@ccsd.k12.wy.us RE: PROPOSAL Geotechnical Engineering Evaluation Campbell

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

Report of Exploratory Test Pits

Report of Exploratory Test Pits Report of Exploratory Test Pits UNF Transportation Projects Stockpile Investigation Osprey Ridge Road Extension Jacksonville, Florida CSI Geo Project No.: 71-17-135-20 Arcadis Project No.: JK017002.0001

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland