1 PRELIMINARY GEOTECHNICAL INVESTIGATION REPORT HAMPTON INN 14 Geronimo Avenue Parker, Arizona Prepared For: Greens Group Culver Drive, A 358 Irvine, CA October 22, 2014 Project No.: Prepared by: ABI Engineering Consultants, Inc E. Edinger Ave., Suite A9 Santa Ana, California Tel.: (888) Fax: (714)

2 A B I ENGINEERING CONSULTANTS, INC E. Edinger Ave., Suite A9 Santa Ana, California Tel.:(888) Fax: (714) October 22, 2014 Project No Greens Group Culver Drive, A 358 Irvine, CA Attention: Sharad Kadakia Subject: Preliminary Geotechnical Investigation for proposed 1140 Geronimo Avenue, Parker, Arizona Hampton Inn Development at Dear Mr. Kadakia: A B I Engineering Consultants, Inc. is pleased to present this report of our geotechnical investigation for the proposed commercial development to be constructed at the subject location. This report presents a review of the project information provided to us, a description of the surface and subsurface conditions, geotechnical recommendations for foundation design and construction, seismic information, and a summary of excavation and earthwork recommendations for soils encountered at the subject site. Attachments to the report include a site vicinity map, a soil boring location plan, soil boring logs, laboratory testing results and seismic analyses. We appreciate this opportunity to provide our services and look forward to assisting as your geotechnical consultant throughout this project. Please contact us if you have any questions or require additional information. Sincerely, ABI Engineering Consultants, Inc.

3 Report of Preliminary Geotechnical Investigation 14 Geronimo Ave., Parker, Arizona TABLE OF CONTENTS 1 INTRODUCTION PURPOSE SCOPE OF WORK SUBSURFACE AND LABORATORY INVESTIGATION SUBSURFACE INVESTIGATION GEOTECHNICAL LABORATORY TESTING SITE, GEOLOGY AND SUBSURFACE CONDITIONS SITE CONDITIONS AND PROPOSED PROJECT SUBSURFACE CONDITIONS GROUNDWATER EXPANSION POTENTIAL OF SOIL CORROSIVITY CONCLUSION AND RECOMMENDATIONS CONCLUSIONS GEOTECHNICAL RECOMMENDATIONS EARTHWORK AND SITE GRADING RECOMMENDATIONS OVER-EXCAVATION FOR BUILDING PAD PREPARATION SELECT FILL MATERIALS FILL AND COMPACTION FOUNDATION DESIGN RECOMMENDATIONS SLAB-ON-GRADE LATERAL RESISTANCE LATERAL EARTH LOADS SEISMIC DESIGN PARAMETERS CONCRETE AHALT CONCRETE (FLEXIBLE) PAVEMENT POOL DESIGN SITE GRADING FOR SURFACE DRAINAGE CONSTRUCTION OBSERVATIONS... 6 CONSTRUCTION PLANS AND ECIFICATION REVIEW LIMITATIONS FIGURES Figure 1 Site Vicinity Map Figure 2 Preliminary Site Plan APPENDICES Appendix A Boring Logs Appendix B Geotechnical Laboratory Test Results ABI Engineering Consultants, Inc. i October 22, 2014 ABI Project No

4 Report of Preliminary Geotechnical Investigation 14 Geronimo Ave., Parker, Arizona 1 INTRODUCTION ABI Engineering Consultants, Inc. (ABI) completed a preliminary geotechnical investigation for a commercial development at 14 Geronimo Avenue in the Town of Parker Arizona. This report presents results of subsurface and laboratory investigation and presents geotechnical recommendations for the proposed development. The site location is shown on Figure 1. The proposed development consists of construction of 3-story hotel building with maximum height of 40 feet. The preliminary site development plan is presented on Figure 2. The building will be wood-framed structure and be supported on conventional slab-on-grade foundation system with perimeter footings and isolated interior footings. The total floor area of building is 39,984 square feet which includes 61 guest rooms. The anticipated wall loading is in the order of 1 kip per foot. Other Improvements will consist of a swimming pool, asphalt/concrete pavement for driveways and parking, hardscape and landscape development. 1.1 Purpose The purpose of this geotechnical investigation is to understand the subsurface conditions at the site and to provide geotechnical recommendations for design of proposed construction. The geotechnical recommendations for earthwork, foundation design, concrete slab-on-grade, asphalt pavement, and seismic parameters. 1.2 Scope of Work The scope of work included the following Literature and map review of the region and vicinity; Review of Site Conditions; Subsurface and Geotechnical Laboratory Investigation; and Preparation of this Geotechnical Investigation report. The assessment of general site environmental conditions, the presence or absences of petroleum impact in the soil, groundwater, or surface water of the site were beyond the scope of this investigation. ABI Engineering Consultants, Inc. 1 October 22, 2014 ABI Project No

5 Report of Preliminary Geotechnical Investigation 14 Geronimo Ave., Parker, Arizona 2 SUBSURFACE AND LABORATORY INVESTIGATION A subsurface and geotechnical laboratory investigation was performed to assess subsurface conditions across the site. The subsurface investigation consisted of soil borings, and collection of soil samples for laboratory testing. 2.1 Subsurface Investigation The subsurface conditions beneath the site were explored on October 3, 2014 by drilling five (5) soil borings to depths ranging from 11 to 41 feet below the existing ground surface. The borings were drilled utilizing 8-inch diameter hollow stem augers. A truck mounted drill rig equipped with drilling equipment was used. Standard Penetration Test blow counts (T-N) were obtained during drilling at approximately 5-foot intervals. Relatively undisturbed soil samples were obtained by driving 3.0-inch outer diameter Modified California Sampler lined with 2.4-inch internal diameter brass rings. Bulk soil samples were collected from drill cuttings. The collected soil samples were stored in plastic containers or bags to retain the natural moisture content. After completion of logging and sampling, the boreholes were backfilled with on-site soils. The soils were visually classified in the field in accordance with the Unified Soil Classification System (USCS) in accordance with ASTM D2488 standard procedure. The logs of the soil borings are presented in appendix A. The logs represent our interpretations of the subsurface conditions based on our field observations, a visual examination of samples, and the indicated laboratory tests performed on selected samples. The line designating the interface between various strata on the soil boring log represents the approximate positions of the interface. The actual transition between strata may be gradual. Ground water was not encountered in any of the boreholes during boring drilled to the maximum depth of 41 feet at the site. 2.2 Geotechnical Laboratory Testing Selected soil samples obtained from the borings were tested for classification and physical properties. Based on the soil type encountered, relevant tests required to provide the geotechnical laboratory tests were performed in general accordance with applicable ASTM test standards. The following tests were performed: 1. In-situ Moisture and Density Test (ASTM D2216), 2. Grain Size Distribution (ASTM D 6913), 3. Direct Shear Test (ASTM D3080), 4. Compaction Test (ASTM D1557), and 5. Corrosion Tests: Resistivity Test and ph (CA 643), Sulfate Content (CA 417), Chloride Content (CA 422). The test results are included in Appendix B. ABI Engineering Consultants, Inc. 2 October 22, 2014 ABI Project No

6 Report of Preliminary Geotechnical Investigation 14 Geronimo Ave., Parker, Arizona 3 SITE, GEOLOGY AND SUBSURFACE CONDITIONS 3.1 Site Conditions and Proposed Project The project site is located at south west corner of 11 Th Street and Geronimo Avenue in the Town of Parker, Arizona. The site area is 45,000 square feet. The site is generally rectangular in shape in a northwest to southeast orientation. The site is bounded by West 11 th Street to the north, Geronimo Ave. to the east, and commercial property to the south and west. The site generally has flat topography. The approximate elevation of site is 424 feet respect to mean sea level (Source: google earth). The site is in developed area and consists of 3 single story buildings and paved parking lots. The existing buildings and other structures will be demolished. A new 3-story hotel building will be constructed on the western portion of the site, and eastern portion will have driveway and parking areas, with landscape improvements. A swimming pool, including a storage area, will be constructed at southwest corner of the property. 3.2 Subsurface Conditions The subsurface consists of fine to coarse grained Silty Sand (SM) and Sand () with gravel. The soils are in dry, and in medium to dense condition to the explored depth of 41 feet. 3.3 Groundwater Groundwater was not encountered in the boring drilled to maximum depth of 41 feet below the existing ground surface. Groundwater is not anticipated to adversely impact the proposed development. However, the depth to groundwater may fluctuate, depending on rainfall and possible groundwater recharge or pumping activity in the site vicinity. 3.4 Expansion Potential of Soil The subsurface soil is generally non-plastic granular materials. Based on soil type, the on-site soil is considered to have low to none expansion potential. 3.5 Corrosivity Corrosive soils may have an adverse impact on below ground concrete and buried metallic objects. The corrosion tests performed on representative on-site soil sample of the near surface soils obtained from the geotechnical exploration: Table 1: Corrosion Test Results Test Results Minimum Resistivity (per CA 532) 7,0 ohm-cm ph (per CA 643) 8.7 Sulfate Content (per CA 417) 78 ppm Chloride Content (per CA 422) 218 ppm Based on corrosion test result, the on-site soil would not be considered corrosive. ABI Engineering Consultants, Inc. 3 October 22, 2014 ABI Project No

7 Report of Preliminary Geotechnical Investigation 14 Geronimo Ave., Parker, Arizona 4 CONCLUSION AND RECOMMENDATIONS 4.1 CONCLUSIONS It is our opinion that the proposed development is feasible from geotechnical consideration. The proposed construction is not expected to adversely impact adjacent structures from a geotechnical perspective provided recommendations in this report are implemented during design and construction of the project. 4.2 GEOTECHNICAL RECOMMENDATIONS Earthwork and Site Grading recommendations Site Preparation and Grading Prior to grading operations, all existing buildings, including their foundations should be completely demolished and removed. All demolition debris and deleterious materials, including any remaining buried obstructions and underground utilities should be removed. Any undocumented fill should be removed and stockpiled for reuse. Surface vegetation should be stripped from areas of proposed construction. After clearing the site, the exposed soils should be carefully inspected to verify the removal of all unsuitable deposits, including, organic material consisting of vegetation and roots, top soil and loose or soft soil. The exposed excavations should be scarified to a depth of at least eight inches, brought to within than three percent optimum moisture content, and compacted to a minimum of 95 percent of the maximum dry density determined by Modified Proctor Compaction Test (ASTM D1557). The final bottom surface of all excavations should be observed and approved by the project soil engineer prior to placing any fill and/or structures. Based on these observations, removal of localized areas deeper than this recommendation may be required during grading. Therefore, some variations in depth and lateral extent of excavation recommended in this report should be anticipated. Temporary Excavation All excavations shall be made in accordance with the requirement of OSHA and other public agencies having jurisdiction. Any excavations over 5 feet high shall be sloped back at minimum gradient of 1:1 (horizontal to vertical) or be shored or braced for safety and should be protected from erosion during construction. The contractor is solely responsible for site safety during construction. The contractor should be aware the excavation height, slope should no case exceed those specified in local, state, and federal safety regulations. ABI Engineering Consultants, Inc. 4 October 22, 2014 ABI Project No

8 Report of Preliminary Geotechnical Investigation 14 Geronimo Ave., Parker, Arizona Over-excavation for building pad preparation Over-excavation and re-compaction below the building footprint is recommended to result in uniform subgrade conditions below the proposed building. We recommend over-excavation and compaction of near surface deposits in areas of building pad. We recommend minimum depth of overexcavation is 5 feet below adjacent grade and the over-excavation should extend a minimum horizontal distance of 5 feet outside the building footprint. The over-excavation shall be backfilled using suitable fill materials and compacted to a minimum of 95% of the maximum dry density determined by Modified Proctor Compaction Test (ASTM D1557) Select Fill Materials On-site soils are generally considered to be suitable fill materials provided the soils are free of deleterious materials and oversized rocks greater than 3-inches. If import material needs to be utilized, it should be granular and non-expansive soils, and free of deleterious materials and rocks larger than 3 inches in greatest dimension. Each source of proposed imported fill materials should be sampled, tested, and approved by project geotechnical engineer prior to delivery to site. A bulk sample of potential import material, weighing at least 35 pounds, should be submitted to the Geotechnical Consultant at least 48 hours before fill operations. All proposed import materials should be approved prior to their placement at the site Fill and Compaction The exposed excavations should be scarified to a depth of at least eight inches, brought to near optimum moisture content and compacted to a minimum of 90 percent of the maximum dry density determined by Modified Proctor Compaction Test (ASTM D1557). Fill should then be placed on the compacted natural soil in layers not exceeding 8-inches in loose lifts; moisture conditioned to near optimum moisture content. All structural fill should be compacted to at least 95 percent of the maximum dry density determined by Modified Proctor Compaction Test (ASTM D1557), and non-structural fill should be compacted to a minimum of 90 percent of the maximum dry density determined per modified proctor. The fill surface must be maintained during construction to achieve the recommended compaction. We recommend that the fill surface be sloped to provide drainage and to prevent water from ponding on the fill. If precipitation is expected, fill construction should be temporarily halted and the surface should be rolled with a steel drum or rubber-tire roller to improve surface runoff. If the surface soils become excessively wet, fill operations should be halted. The fill operations shall be continued after allowing sufficient time for soils to dry and upon approval by the Geotechnical Consultant Foundation Design Recommendations The proposed structure can be supported on a shallow foundation system established on competent native soil or certified compacted fill. The foundation may be conventional slab-ongrade foundation system with perimeter footings and interior continuous strip footings and/or ABI Engineering Consultants, Inc. 5 October 22, 2014 ABI Project No

9 Report of Preliminary Geotechnical Investigation 14 Geronimo Ave., Parker, Arizona isolated spread footings. The footings may be designed to impose a net dead plus live load pressure of 3,000 pounds per square foot (psf) when established on competent native soil or certified compacted fill. The allowable bearing value may also be increased by one-third for short-term live loads (e.g. seismic and wind loads). The bottoms of the strip footings should be embedded below the lowest adjacent grade or floor level to a minimum of 18 inches for interior and 24 inches for exterior footings. The width of strip footings should be at least 18 inches. Isolated spread footings should have a minimum width of 24 inches and should extend at least 24 inches below lowest adjacent grade or floor level. While the actual bearing value of the fill placed at the site will depend on the materials used and the compaction methods employed, the quoted bearing value will be applicable if acceptable soils are used and are compacted as recommended in this report. Steel reinforcement for footing should be designed by the project structural engineer. We recommend minimum reinforcement shall be 4 #4 bars, 2 at top and 2 at bottom for exterior footing; and 2 #4 bars, 1 at top and 1 at bottom for interior strip footings Slab-On-Grade Design of the slab-on-grade supported on firm and non-yielding subgrade may be designed based on a modulus of subgrade reaction of 150 pounds per cubic inch. Structural elements such as thickness, reinforcement, joint spacing should be selected based on the anticipated loading, the modulus of subgrade reaction, and minimum geotechnical requirements recommended below. We recommend the interior and exterior concrete slabs-on-grade to have a minimum thickness of 4 inches and be reinforced with equivalent to # 4 bars at 18 on-center each way. For interior slabs, it is recommended that a minimum 4-inch thick base layer of ½-inch or larger clean aggregate capillary break shall be installed underneath the concrete pavement. This base layer should be compacted and should exhibit a firm and unyielding condition prior to concrete placement. For interior concrete slab, a -mil thick polyethylene vapor retarder with joints lapped not less than 6 inches shall be placed between the base course and the concrete slab. The polyethylene sheet shall be protected from tears and rupture during the placement of rebar and formwork for concrete. The concrete slab should be allowed to cure properly before placing vinyl or other moisture-sensitive floor covering Lateral Resistance Lateral loading in foundation structures and retaining structures should be resisted by passive resistance of the soils, and by the soil friction. The passive earth pressure for the side of structures poured against undisturbed soil may be computed as an equivalent fluid pressure of 300 psf per foot of depth, to a maximum earth pressure of 3,500 psf. A coefficient of friction between soil and concrete of 0.35 may be used with dead load forces. When combining passive pressure and frictional resistance, the passive pressure component should be reduced by onethird. It is recommended to ignore the passive pressure of upper 12 inches of soil. ABI Engineering Consultants, Inc. 6 October 22, 2014 ABI Project No

10 Report of Preliminary Geotechnical Investigation 14 Geronimo Ave., Parker, Arizona Lateral Earth Loads The lateral earth pressure behind retaining structures depends primarily on the allowable movement, type of backfill materials, backfill slopes, wall inclination, surcharges, and any hydrostatic pressures. Lateral earth pressure for level backfill condition may be calculated using the values presented below in table 2. We recommend following lateral earth pressure parameters on the assumption that typical granular compacted fill will be used as structural backfill materials. These values should be verified once the material has been selected and may be altered based on the gradation of the actual material to be used for the construction. At rest pressure and active pressure should be used in the design of non-yielding and yielding walls respectively. Table 2: Allowable Lateral Load Parameter Active pressure (EFP) At rest pressure (EFP) Level Backfill 35 psf per foot of depth 55 psf per foot of depth If a functioning drainage system is not installed, then lateral earth pressures should be determined using the buoyant weight of the soil and hydrostatic pressures Settlement Provided that structure are founded on compacted fill soils as recommended, we estimate that the maximum settlement will be less than one inch, and that differential settlements will be less than 1/2 inch within a horizontal distance of 30 feet Seismic Design Parameters Seismically resistant structural design in accordance with local building ordinances should be followed during the design of all structures. Building Codes have been developed to reduce the potential for structural damage. However, some level of damage as the result of ground shaking generated by nearby earthquakes is considered likely in the general area. Table 3 provides the most recent seismic coefficients and seismic data in accordance with requirements included in the 2006 International Building Code of Regulations: ABI Engineering Consultants, Inc. 7 October 22, 2014 ABI Project No

11 Report of Preliminary Geotechnical Investigation 14 Geronimo Ave., Parker, Arizona Table 3: Seismic Coefficients ITEM VALUE Site Latitude (Decimal-degrees) Site Longitude (Decimal-degrees) Site Class D Seismic Design Category D Mapped Spectral Response Acceleration - Short Period (0.2 Sec) SS Mapped Spectral Response Acceleration - 1 Second Period S Short Period Site Coefficient Fa Long Period Site Coefficient Fv Adjusted Spectral Response 0.2 Sec. Period (SMS) Adjusted Spectral Response 1 Sec. Period (SM1) Design Spectral Response 0.2 Sec. Period (SDS) Design Spectral Response 1 Sec. Period (SD1) Concrete Based on the result of sulfate test performed previously on on-site soil, soluble sulfates on on-site soil is 78 ppm which indicates that sulfate attack on buried concrete is anticipated to be negligible. However, concrete should be designed in accordance with the 2006 IBC Section and ACI 318 Section Asphalt Concrete (Flexible) Pavement The pavement section for proposed development were determined based on an assumed R-value of 20 for on-site sandy soils. Table 4: Asphalt Pavement Design Types of Traffic Traffic Index Asphalt Thickness (in.) Base Course Thickness (in.) Parking Stalls Drive Areas Base course material shall consist of ¾ inch Aggregate Base, Class 2 material or equivalent and should be compacted to a minimum of 95 percent relative compaction as compared to the maximum value obtained from ASTM D1557 test method. ABI Engineering Consultants, Inc. 8 October 22, 2014 ABI Project No

12 Report of Preliminary Geotechnical Investigation 14 Geronimo Ave., Parker, Arizona Pool Design The swimming pool walls should be designed for lateral earth pressure recommended in Table 2. Any surcharge load, if applicable, should be considered in design of the pool walls. Groundwater is not likely to occur at shallow depth on site. Hydrostatic pressure on pool walls should be considered in design of pool walls if saturated subsurface condition is expected due to irrigation. Hydrostatic pressures calculated with the unit weight of water (62.4 pcf) should be added to earth pressures recommended in Table 2 to obtain the total stresses for design. The worst case loading condition is when the pool is empty during pool maintenance. A coefficient of friction between soil and concrete of 0.35 may be used along pool walls to resist buoyancy forces. A design factor of safety of 2.0 against uplift pressure is recommended Site Grading for Surface Drainage We recommend that the building/structures be placed at an elevated gradient within the site and that provisions for positive surface drainage be incorporated into the site grading plans. The construction of an elevated building pad may be required for achievement of site drainage. We recommend ground immediately adjacent to the foundation shall be sloped away from the building at a slope of not less than 2 percent for a minimum distance of feet measured perpendicular to the face of the wall. Impervious surfaces within feet of the building foundation shall be sloped a minimum of 1 percent away from the building. All roofs should be guttered and discharge away from the structure in non-erosive manner. It is recommended that trees should not be planted a minimum of one half their anticipated mature height from a footing. Alternatively, all planters adjacent to footings should be sealed. ABI Engineering Consultants, Inc. 9 October 22, 2014 ABI Project No

13 Report of Preliminary Geotechnical Investigation 14 Geronimo Ave., Parker, Arizona 5 CONSTRUCTION OBSERVATIONS The firm should also be retained to perform on-site construction observations and testing to ascertain that conditions correspond to the findings and conclusions presented herein and that construction generally conforms to the recommendations presented herein. If variations in subsurface soil conditions become evident during construction, the recommendations presented herein may warrant a revision. The geotechnical and geological consultants should be called for testing and observations as indicated in this report and at least for the following: 1. Foundation excavations should be observed by a representative of this firm prior to the placement of forms, reinforcement or concrete to verify embedment into the required bearing material. 2. Exposed subgrades in areas to receive fill and in areas where excavation has resulted in the desired finished subgrade. 3. Suitability of on-site and import soils for fill placement; collect and submit soil samples for required or recommended laboratory testing where necessary 4. Fill Placement and compaction. 5. Utility trenches backfilling beneath and adjacent to structures. 6. Retaining Structures backfilling. 7. Observation of the sand and vapor barrier placement prior to placement of reinforcement and concrete. The governmental agencies having jurisdiction over the project should be notified before commencement of the grading so that the necessary grading permits can be obtained and arrangements can be made for required inspection(s). The contractor should be familiar with the inspection requirements of the reviewing agencies. ABI Engineering Consultants, Inc. October 22, 2014 ABI Project No

14 Report of Preliminary Geotechnical Investigation 14 Geronimo Ave., Parker, Arizona 6 CONSTRUCTION PLANS AND ECIFICATION REVIEW We recommend that ABI Engineering Consultants, Inc. be retained to perform a review of the foundation and earthwork plans and specifications prepared from the recommendations presented in this report to determine if the plans and specifications are in compliance with the intent of our recommendations. Our report has been written in a guideline recommendation format and is not appropriate for use as a specification without being reworded into a specification-type format. ABI Engineering Consultants, Inc. 11 October 22, 2014 ABI Project No

15 Report of Preliminary Geotechnical Investigation 14 Geronimo Ave., Parker, Arizona 7 LIMITATIONS The recommendations provided in this report are based on our understanding of the proposed project development at the subject site at 14 Geronimo Avenue, Parker, Arizona, and on our interpretation of the data collected. We have made our recommendations based on experience with similar subsurface conditions under similar building conditions. These recommendations apply to the project site specifically discussed in this report; therefore, any changes in load conditions or site grades should be provided to us so that we may review our conclusions and recommendations and make any necessary modifications. The recommendations provided in this report are also based upon the assumption that the necessary geotechnical observations and testing during construction will be performed by qualified technical representatives. The field observation services are considered a continuation of the geotechnical investigation and essential to check that the actual soil conditions are as expected. This also provides for the procedure whereby the client can be advised of unexpected or changed conditions that would require modifications of our original recommendations. In addition, the presence of a qualified representative at the site provides the client with an independent professional opinion regarding the geotechnical related construction procedures. If a separate firm other than ABI is retained for the geotechnical observation services, our professional responsibility and liability would be limited to the extent that we would not be the geotechnical engineer of record. Our professional services have been performed using that degree of care and skill ordinarily exercised, under similar circumstances, by reputable geotechnical consultants practicing in this or similar localities. No other warranty, expressed or implied, is made as to the professional advice included in this report. The report has not been prepared for use by other parties, and may not contain sufficient information for purposes of other parties or other uses. ABI Engineering Consultants, Inc. 12 October 22, 2014 ABI Project No

16 Report of Preliminary Geotechnical Investigation 14 Geronimo Ave., Parker, Arizona FIGURES ABI Engineering Consultants, Inc. 1 October 22, 2014 ABI Project No

17 I Western Fark PROJECT SITE SITE VICINITY MAP NORTH PROJECT: HAMPTONINN gygfugggfug SWE GERONIMO AVENUE AND 11TH STREET FIGURE CONSUL TANTS, INC. PROJECT NO: PARKER, ARIZONA 1701 EAST EDINGER AVENUE, SUITE A9 SANTA ANA, CALIFORNIA TEL: (888) FAX: (714)

18 W. lithstreet HAMPTON INN 3 STORIES (40' MAX) 61 GUESTROOMS B (24K/2KMA/31eDO) 38,4..F. BLDG 62 PA KING 45,000 5.F. SITE 30 3 u d (1.03 ACRES) D s',b', 61'-5", " 14 GERONIMO AVE PARKER, AZ J_ AREA LEGEND: B-1 SOIL BORING LOCATION PRELIMINARY SITE PLAN 150 NOT TO SCALE PROJECT: HAMPTON INN SWE GERONIMO AVENUE AND 11TH STREET PARKER, ARIZONA PROJECT NO: CONSUL TANTS, INC. FIGURE 1701 EAST EDINGER AVENUE, SUITE A9 2 SANTA ANA, CALIFORNIA TEL: (888) FAX: (714)

19 Report of Preliminary Geotechnical Investigation 14 Geronimo Ave., Parker, Arizona APPENDIX A BORING LOGS ABI Engineering Consultants, Inc. 2 October 22, 2014 ABI Project No

20 Project Name: Project Location: Project Number: HAMPTON INN PARKER, AZ Boring Number B-1 Sheet 1 of 2 Date Drilled /03/2014 Drilling Method HSA Drill Rig Type CME-75 Groundwater Level and Date Measured Not Encountered Piezometer Construction Details (screen, seal, surface completion) Logged By Drill Bit Size/Type Drilling Contractor Sampling Method JCW 8" HSA Geomechanics Southwest Mod. Cal. Ring & T Checked By Total Depth of Borehole Approximate Surface Elevation Hammer Data DB 35.00FT. BGS N/A 140LB. 30-inch drop, autotrip SAMPLES Elevation, feet Depth, feet 0 Type Number B1@0-5 BULK Penetration Resistance, Blows/6 in. Graphic Log Unified Soil Classification MATERIAL DESCRIPTION REMARKS 5 B1@5 RING 5 9 SM Silty SAND, brown, moist, medium dense, fine to coarse grained, low plastic fines. B1@ T SAND, light gray, dry, very dense, fine grained. 15 B1@15 RING 50-1" No Recovery, very dense. 20 B1@20 T SAND, light brown, dry, medium dense, fine to medium grained. 25 B1@25 RING SM Silty SAND, brown, moist, dense, fine to medium grained, low plastic fines. 30

21 Project Name: Project Location: Project Number: HAMPTON INN PARKER, AZ Boring Number B-1 Sheet 2 of 2 Date Drilled /03/2014 Drilling Method HSA Drill Rig Type CME-75 Groundwater Level and Date Measured Not Encountered Piezometer Construction Details (screen, seal, surface completion) Logged By Drill Bit Size/Type Drilling Contractor Sampling Method JCW 8" HSA Geomechanics Southwest Mod. Cal. Ring & T Checked By Total Depth of Borehole Approximate Surface Elevation Hammer Data DB 35.00FT. BGS N/A 140LB. 30-inch drop, autotrip SAMPLES Elevation, feet Depth, feet 30 Type Number B1@30 T Penetration Resistance, Blows/6 in Graphic Log Unified Soil Classification MATERIAL DESCRIPTION SAND, brown, damp, medium dense to dense, fine to coarse grained, with 1" rocks. REMARKS 35 End of boring at 35.0' below ground surface due to refusal. Backfill borehole with soil cuttings

22 Project Name: Project Location: Project Number: HAMPTON INN PARKER, AZ Boring Number B-2 Sheet 1 of 2 Date Drilled /03/2014 Drilling Method HSA Drill Rig Type CME-75 Groundwater Level and Date Measured Not Encountered Piezometer Construction Details (screen, seal, surface completion) Logged By Drill Bit Size/Type Drilling Contractor Sampling Method JCW 8" HSA Geomechanics Southwest Mod. Cal. Ring & T Checked By Total Depth of Borehole Approximate Surface Elevation Hammer Data DB 41.00FT. BGS N/A 140LB. 30-inch drop, autotrip SAMPLES Elevation, feet Depth, feet 0 Type Number B2@0-5 BULK Penetration Resistance, Blows/6 in. Graphic Log Unified Soil Classification MATERIAL DESCRIPTION REMARKS 5 B2@5 T SM Silty SAND, brown, moist, dense, fine grained, low plastic fines. At 8.0' with 3/4" to 2" rocks. B2@ RING 6 18 SAND, brown, moist, medium dense, fine to coarse grained, with 3/4" to 2" rocks. 15 B2@15 T Become light grayish brown, dry, medium dense. 20 B2@20 RING 4 8 Become fine grained, medium dense. 25 B2@25 T

23 Project Name: Project Location: Project Number: HAMPTON INN PARKER, AZ Boring Number B-2 Sheet 2 of 2 Date Drilled /03/2014 Drilling Method HSA Drill Rig Type CME-75 Groundwater Level and Date Measured Not Encountered Piezometer Construction Details (screen, seal, surface completion) Logged By Drill Bit Size/Type Drilling Contractor Sampling Method JCW 8" HSA Geomechanics Southwest Mod. Cal. Ring & T Checked By Total Depth of Borehole Approximate Surface Elevation Hammer Data DB 41.00FT. BGS N/A 140LB. 30-inch drop, autotrip SAMPLES Elevation, feet Depth, feet 30 Type Number B2@30 RING Penetration Resistance, Blows/6 in. 12 Graphic Log Unified Soil Classification MATERIAL DESCRIPTION Become brown, medium dense, fine to medium grained. REMARKS 35 B2@35 T Become very dense. 40 B2@40 RING Become dense, at 40.0' with 2" rocks. End of boring at 41.0' below ground surface due to refusal. Backfill borehole with soil cuttings

24 Project Name: Project Location: Project Number: HAMPTON INN PARKER, AZ Boring Number B-3 Sheet 1 of 1 Date Drilled /03/2014 Drilling Method HSA Drill Rig Type CME-75 Groundwater Level and Date Measured Not Encountered Piezometer Construction Details (screen, seal, surface completion) Logged By Drill Bit Size/Type Drilling Contractor Sampling Method JCW 8" HSA Geomechanics Southwest Mod. Cal. Ring & T Checked By Total Depth of Borehole Approximate Surface Elevation Hammer Data DB 11.00FT. BGS N/A 140LB. 30-inch drop, autotrip SAMPLES Elevation, feet Depth, feet 0 Type Number B3@0-5 BULK Penetration Resistance, Blows/6 in. Graphic Log Unified Soil Classification MATERIAL DESCRIPTION REMARKS 5 B3@5 RING SM Silty SAND with 2" rocks, brown, moist, dense, fine to medium grained, low plastic fines. B3@ T SAND, light gray, dry, very dense, fine grained. End of boring at 11.0' below ground surface due to refusal. Backfill borehole with soil cuttings

25 Project Name: Project Location: Project Number: HAMPTON INN PARKER, AZ Boring Number B-4 Sheet 1 of 1 Date Drilled /03/2014 Drilling Method HSA Drill Rig Type CME-75 Groundwater Level and Date Measured Not Encountered Piezometer Construction Details (screen, seal, surface completion) Logged By Drill Bit Size/Type Drilling Contractor Sampling Method JCW 8" HSA Geomechanics Southwest Mod. Cal. Ring & T Checked By Total Depth of Borehole Approximate Surface Elevation Hammer Data DB 11.00FT. BGS N/A 140LB. 30-inch drop, autotrip SAMPLES Elevation, feet Depth, feet 0 Type Number B4@0-5 BULK Penetration Resistance, Blows/6 in. Graphic Log Unified Soil Classification MATERIAL DESCRIPTION REMARKS 5 B4@5 T SAND, light brown, dry, medium dense, fine to medium grained. B4@ RING Become dense. End of boring at 11.0' below ground surface due to refusal. Backfill borehole with soil cuttings

26 Project Name: Project Location: Project Number: HAMPTON INN PARKER, AZ Boring Number B-5 Sheet 1 of 2 Date Drilled /03/2014 Drilling Method HSA Drill Rig Type CME-75 Groundwater Level and Date Measured Not Encountered Piezometer Construction Details (screen, seal, surface completion) Logged By Drill Bit Size/Type Drilling Contractor Sampling Method JCW 8" HSA Geomechanics Southwest Mod. Cal. Ring & T Checked By Total Depth of Borehole Approximate Surface Elevation Hammer Data DB 41.00FT. BGS N/A 140LB. 30-inch drop, autotrip SAMPLES Elevation, feet Depth, feet 0 Type Number B5@0-5 BULK Penetration Resistance, Blows/6 in. Graphic Log Unified Soil Classification MATERIAL DESCRIPTION REMARKS 5 B5@5 RING SAND, light gray, dry, dense, fine to medium grained, with 3/4" to 2" rocks. B5@ T 8 18 Become medium dense. 15 B5@15 RING No Recovery, become medium dense to dense. 20 B5@20 T No Recovery, become dense. 25 B5@25 RING Become fine grained, medium dense. 30

27 Project Name: Project Location: Project Number: HAMPTON INN PARKER, AZ Boring Number B-5 Sheet 2 of 2 Date Drilled /03/2014 Drilling Method HSA Drill Rig Type CME-75 Groundwater Level and Date Measured Not Encountered Piezometer Construction Details (screen, seal, surface completion) Logged By Drill Bit Size/Type Drilling Contractor Sampling Method JCW 8" HSA Geomechanics Southwest Mod. Cal. Ring & T Checked By Total Depth of Borehole Approximate Surface Elevation Hammer Data DB 41.00FT. BGS N/A 140LB. 30-inch drop, autotrip SAMPLES Elevation, feet Depth, feet 30 Type Number B5@30 T Penetration Resistance, Blows/6 in Graphic Log Unified Soil Classification Become light brown, very dense. MATERIAL DESCRIPTION REMARKS 35 B5@35 RING Become dense. 40 B5@40 T " Become light gray, very dense. End of boring at 41.0' below ground surface due to refusal. Backfill borehole with soil cuttings

28 Report of Preliminary Geotechnical Investigation 14 Geronimo Ave., Parker, Arizona APPENDIX B GEOTECHNICAL LABORATORY TEST RESULTS ABI Engineering Consultants, Inc. 3 October 22, 2014 ABI Project No

29 MOISTURE AND DENSITY TEST RESULTS Tested By DS Date /14/2014 Checked By DB Date Sampled : /3/2014 Date /20/2014 Date Received : /3/2014 Boring Sample No. Depth (ft.) Moisture Content (%) Dry Density (pcf) B-1 B1@ B-1 B1@ B-2 B2@ B-2 B2@ B-2 B2@ B-2 B2@ B-3 B3@ B-4 B4@ B-5 B5@ B-5 B5@ B-5 B5@ PROJECT: HAMPTON INN PARKER, AZ PROJECT NO : DATE /20/2014

30 GRAIN SIZE DISTRIBUTION TEST REPORT ASTM D6913 GRAVEL COARSE SAND FINE COARSE MEDIUM FINE SILT AND CLAY U.S. STANDARD SIEVE SIZES 0 3/4" 1/2" 3/8" PERCENT FINER B-1@0-5 B-1@ GRAIN SIZE-mm Boring No. B-1 B-1 Depth Description % Gravel % Sand % Fines (ft.) Silty SAND (SM) 0-5' with some gravel 20' Sand () Boring No. Depth D (ft.) D 30 D 60 Cu C c B-1 0-5' N/A N/A N/A N/A N/A B-1 20' N/A N/A N/A N/A N/A PROJECT: HAMPTON INN PARKER, AZ PROJECT NO.: DATE /20/2014

31 GRAIN SIZE DISTRIBUTION TEST REPORT ASTM D6913 GRAVEL COARSE SAND FINE COARSE MEDIUM FINE SILT AND CLAY U.S. STANDARD SIEVE SIZES 0 3/4" 1/2" 3/8" PERCENT FINER B-5@0-5 B-5@ GRAIN SIZE-mm Boring No. Depth (ft.) Description % Gravel % Sand % Fines B-5 0-5' Sandy SILT(ML) B-5 ' Silty Sand (SM) Boring No. Depth D (ft.) D 30 D 60 Cu C c B-5 0-5' N/A N/A N/A N/A N/A B-5 ' N/A N/A N/A N/A N/A PROJECT: HAMPTON INN PARKER, AZ PROJECT NO.: DATE /20/2014

32 COMPACTION TEST REPORT ASTM D1557 Boring No.: B2 Tested By: DS Date: /14/2014 Sample No.: Depth: 0-5' Checked By: DB Date: /20/2014 Soil Description: Light gray silty SANd with gravel (SM) Date Sampled: /3/2014 Date Received: /3/2014 Method "B" 135 COMPACTION CURVE Curve No.: A COMPACTION CURVE ZAV Line for S.G.=2.70 ZAV Line for S.G.=2.65 ZAV Line for S.G.= Dry Density, pcf Water Content, % TEST RESULTS MAXIMUM DENSITY = pcf OPTIMUM MOISTURE = 7.0 % PROJECT: HAMPTON INN PARKER, AZ PROJECT NO.: DATE: /20/2014

33 COMPACTION TEST REPORT ASTM D1557 Boring No.: B5 Tested By: DS Date: /14/2014 Sample No.: Depth: 0-5' Checked By: DB Date: /20/2014 Soil Description: Light gray silty SANd with gravel (SM) Date Sampled: /3/2014 Date Received: /3/2014 Method "B" 130 COMPACTION CURVE Curve No.: A COMPACTION CURVE ZAV Line for S.G.=2.70 ZAV Line for S.G.=2.65 ZAV Line for S.G.= Dry Density, pcf Water Content, % TEST RESULTS MAXIMUM DENSITY = pcf OPTIMUM MOISTURE = 8.5 % PROJECT: HAMPTON INN PARKER, AZ PROJECT NO.: DATE: /20/2014

34 ANAHEIM TEST LAB, INC 3008 ORANGE AVENUE SANTA ANA, CALIFORNIA PHONE (714) ABI Engineering DATE: // E. Edinger Ave. Santa Ana, CA P.O. NO. Verbal LAB NO. B-7686 Attn: Daya ECIFICATION: CA-417/422/643 MATERIAL: Soil Project #: Hampton Inn Parker 0-5 ANALYTICAL REPORT CORROSION SERIES SUMMARY OF DATA ph SOLUBLE SULFATES SOLUBLE CHLORIDES MIN. RESISTIVITY per CA. 417 per CA. 422 per CA. 643 ppm ppm ohm-cm ,0 REECTFULLY SUBMITTED WES BRIDGER CHEMIST

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....

More information

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC. 1030 Washington Street Raleigh, NC 27605-1258 May 2, 2017 Re: Report of Subsurface Investigation Westfield Rehabilitation & Health Care Additions

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

( KLEINFEL DER. November 17,2008 File No MARINA COAST WATER DISTRICT th Avenue Marina, California ATTENTION: Mr.

( KLEINFEL DER. November 17,2008 File No MARINA COAST WATER DISTRICT th Avenue Marina, California ATTENTION: Mr. ( KLEINFEL DER L Bright People. Right Solutions. November 17,2008 File No. 82142 40 Clark Street, Suite J Salinas, CA 93901 p1 831.755.7900 f 1831.755.7909 kleinfelder.com MARINA COAST WATER DISTRICT 2840

More information

5.0 SITE CONDITIONS. 5.1 Surface Conditions

5.0 SITE CONDITIONS. 5.1 Surface Conditions 5.0 SITE CONDITIONS 5.1 Surface Conditions The project site is located at approximately along Ashdown Forest Road and Nichols Canyon Road in the Fiddlers Canyon Area of Cedar City, Utah. At the time of

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida

More information

August 13, Geotechnical Recommendations, New Physical Education Building, Chabot College, Hayward, California

August 13, Geotechnical Recommendations, New Physical Education Building, Chabot College, Hayward, California August 13, 2008 003-09176-17 Douglas Horner, AIA Chabot Las Positas Community College District 25555 Hesperian Boulevard Hayward, California 94545 Subject: Geotechnical Recommendations, New Physical Education

More information

Geotechnical Investigation Report

Geotechnical Investigation Report Geotechnical Investigation Report Proposed,000-Gallon Water Storage Tank Fagasa Pass Tank Upper Pago Pago, American Samoa Prepared for: ASPA Water Engineering Division Tafuna, American Samoa PO Box PPB

More information

REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY

REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY HERITAGE BAY MASTER PUMP STATION ISSUED FOR BID REPORT OF GEOTECHNICAL EXPLORATION PROPOSED INLINE WASTEWATER BOOSTER STATION Collier

More information

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink. JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT

More information

SOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO

SOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO SOIL AND FOUNDATION INVESTIGATION PROPOSED DUPLEX 3966 VRAIN STREET DENVER, COLORADO Prepared for: G.J. GARDNER HOMES ATTN: DAVE PAGANO 7660 RALEIGH STREET WESTMINSTER, COLORADO 80030 PROJECT NO. 1090

More information

April 21, Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912

April 21, Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912 April 21, 2016 Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912 Re: GEOTECHNICAL ENGINEERING REPORT Proposed San Elizario Retail Center Socorro Road & Chicken

More information

GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California

GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California Mr. Victor Garcia The Holt Group 1601 N. Imperial Ave. El Centro, California 92243 September 28, 2017 Project No. EC595 SUBJECT: REFERENCE: GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for

More information

Subsurface Investigation and Geotechnical Engineering Report Proposed Volvo Dealership 1022 Hingham Street Rockland, Massachusetts

Subsurface Investigation and Geotechnical Engineering Report Proposed Volvo Dealership 1022 Hingham Street Rockland, Massachusetts HML ASSOCIATES Geotechnical and Civil Engineers March 31, 17 19 Rockwood Road Hingham, MA 43 (Phone/Fax)781-74-9999 Mr. Joe Rose Prime Motor Group 42 Providence Highway Westwood, MA 9 RE: Subsurface Investigation

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

Civil Geotechnical Surveying

Civil Geotechnical Surveying Civil Geotechnical Surveying Mr. David Burnett Cabarrus County Schools 4425 Old Airport Road Charlotte, North Carolina 28025 May 16, 2017 Reference: Geotechnical Engineering Evaluation Future PLC Site

More information

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS ACADEMIC OFFICE BUILDING COLORADO SPRINGS, COLORADO

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS ACADEMIC OFFICE BUILDING COLORADO SPRINGS, COLORADO PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS COLORADO SPRINGS COLORADO Prepared for: UNIVERSITY OF COLORADO AT COLORADO SPRINGS Facilities Services 1420 Austin Bluffs Parkway Colorado Springs Colorado 80918

More information

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 PREPARED FOR: AAA DEVELOPMENT AND CONSULTING, INC GREENFIELD, INDIANA

More information

Geotechnical Engineering Evaluation Campbell County Athletic Play Fields Campbell County High School South Campus Gillette, Wyoming

Geotechnical Engineering Evaluation Campbell County Athletic Play Fields Campbell County High School South Campus Gillette, Wyoming March 9, 2016 Proposal No. WYP16064 Campbell County School District Mr. Andy Mravlja 1000 W. 8 th Street Gillette, WY 82716 amravlja@ccsd.k12.wy.us RE: PROPOSAL Geotechnical Engineering Evaluation Campbell

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

Geotechnical Engineering Report

Geotechnical Engineering Report BIG CYPRESS SEMINOLE INDIAN RESERVATION WATER TREATMENT FACILITY October 29, 2015 Terracon Project No. HD155065 Prepared for: REISS ENGINEERING, INC. 1016 Spring Villas Pt. Winter Springs, FL 32708 Prepared

More information

Geotechnical Investigation for Navajo Gallup Water Supply Project Reach 26.3

Geotechnical Investigation for Navajo Gallup Water Supply Project Reach 26.3 Geotechnical Investigation for Navajo Gallup Water Supply Project Reach 26.3 Geo-Test Geotechnical Engineering Services Report No. 1-718 for Reach 26.3 Tank Site Geo-Test Job No. 1-718, Addendum No. 1

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Nassau Reclaimed Water Main From Radio Avenue to Harts Road Nassau County, Florida CSI Geo Project No.: 71-17-329-04 Client Project No.: JEA 09302-049-01

More information

Northern Colorado Geotech

Northern Colorado Geotech GEOTECHNICAL ENGINEERING REPORT PROPOSED RESIDENTIAL DEVELOPMENT MORGAN COUNTY ROADS AND P WIGGINS, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 07- JANUARY 9, 06 Prepared for: Town of Wiggins 0 Central

More information

GEOTECHNICAL SUBSURFACE EXPLORATION GRIC CENTRAL SUBDIVISION SEC CHOLLA ROAD AND SEED FARM ROAD SCATON, ARIZONA

GEOTECHNICAL SUBSURFACE EXPLORATION GRIC CENTRAL SUBDIVISION SEC CHOLLA ROAD AND SEED FARM ROAD SCATON, ARIZONA GEOTECHNICAL SUBSURFACE EXPLORATION GRIC CENTRAL SUBDIVISION SEC CHOLLA ROAD AND SEED FARM ROAD SCATON, ARIZONA Prepared for: GRIC Property and Supply 312 W. Casa Blanca Rd., Post Box 97 Sacaton, AZ 84257

More information

SUBSURFACE SOIL INVESTIGATION

SUBSURFACE SOIL INVESTIGATION Architecture Forensic Civil/Planning SUBSURFACE SOIL INVESTIGATION The Overlook Subdivision Phase 3 S1/2 Sec. 2 & SE 1/4 Sec. 3, T6N, R67W of the 6th P.M. Severance, Colorado PREPARED FOR: Journey Homes,

More information

GEOTECHNICAL INVESTIGATION REPORT STAGE 1 RAS PUMP STATION UPGRADE SAN JOSE CREEK WATER RECLAMATION PLANT

GEOTECHNICAL INVESTIGATION REPORT STAGE 1 RAS PUMP STATION UPGRADE SAN JOSE CREEK WATER RECLAMATION PLANT GEOTECHNICAL INVESTIGATION REPORT STAGE RAS PUMP STATION UPGRADE SAN JOSE CREEK WATER RECLAMATION PLANT County Sanitation Districts of Los Angeles County Whittier, California Prepared for: County Sanitation

More information

Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No G

Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No G Geotechnical Investigation Page 4 Blythe Municipal Airport Project County of Riverside, California December 7, 2015 CTE Job No. 40-3264G Laboratory CBR Tests Laboratory CBR tests were performed on samples

More information

TABLE OF CONTENTS. Kumar & Associates, Inc.

TABLE OF CONTENTS. Kumar & Associates, Inc. TABLE OF CONTENTS SUMMARY... 2 PURPOSE AND SCOPE OF STUDY... 2 PROPOSED CONSTRUCTION... 2 SITE CONDITIONS... 3 SUBSURFACE CONDITIONS... 3 GEOTECHNICAL ENGINEERING CONSIDERATIONS... 6 SHALLOW SPREAD FOOTING

More information

B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form.

B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form. City of Casper Baler Building / MRF Expansion DOCUMENT 9113 ADDENDUM.1 ADDENDUM NUMBER: 1.2 PROJECT INFORMATION A. Project Name: Baler Building / MRF Expansion B. Owner: City of Casper C. Architect: Hein

More information

March 10, 2017 SITE AND PROJECT INFORMATION

March 10, 2017 SITE AND PROJECT INFORMATION March 10, 2017 Derek Hawkes, PE NASH COUNTY 120 W. Washington Street - Suite 2004 Nashville, NC 27856 Re: Report of Subsurface Investigation Middlesex Corporate Park, Lot 3 Middlesex, North Carolina GeoTechnologies

More information

March 28, Port of Kalama Mr. Jacobo Salan 380 West Marine Drive Kalama, Washington 98625

March 28, Port of Kalama Mr. Jacobo Salan 380 West Marine Drive Kalama, Washington 98625 11917 NE 95 th Street, Vancouver, Washington 98682 Phone: 360-823-2900, Fax: 360-823-2901 March 28, 2014 Port of Kalama Mr. Jacobo Salan 380 West Marine Drive Kalama, Washington 98625 Re: Construction

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT Project: NW Bucklin Hill at Silverdale Way NW Project Number: 12023 Prepared for: Barber Development P.O. Box 473 Redmond, WA 98073 Prepared by: South Sound Geotechnical

More information

Geotechnical Engineering Report

Geotechnical Engineering Report The Residence at Yukon Hills Cornwell Drive and Vandament Avenue Yukon, Oklahoma May 20, 2016 Terracon Project No. 03165108 Prepared for: Jones Gillam Renz Architects, Inc. Salina, Kansas Prepared by:

More information

FIGURES Printed By: aday Print Date: 3/23/2011 12:48:08 PM File Name: \\geodesign.local\files\jobs\m-r\penskeauto\penskeauto-1\penskeauto-1-01\figures\cad\penskeauto-1-01-vm01.dwg Layout: FIGURE 1 VICINITY

More information

Appendix D General Earthwork and Grading Specifications for Rough Grading

Appendix D General Earthwork and Grading Specifications for Rough Grading Appendix D General Earthwork and Grading Specifications for Rough Grading LEIGHTON AND ASSOCIATES, INC. General Earthwork and Grading Specifications 1.0 General 1.1 Intent These General Earthwork and Grading

More information

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146 GEOTECHNICAL EXPLORATION SERVICES REPORT CONDUCTED FOR: Collier Boulevard PREPARED FOR: Mr. Christopher L. Johnson Director of Land Development Stock Development, LLC Professional Circle, Suite 01 Naples,

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E. LD-0 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Revised Soil Survey Report November 2, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

Geotechnical Investigation

Geotechnical Investigation REVISED Geotechnical Investigation Pueblo Pintado Tank Site Includes NGWSP Reaches 26.1 & 26.2 Pueblo Pintado in New Mexico Prepared for: Souder, Miller & Associates Project No.: 15-1-057 June 9, 2016

More information

SUBSURFACE SOIL INVESTIGATION

SUBSURFACE SOIL INVESTIGATION Architecture Forensic Civil/Planning SUBSURFACE SOIL INVESTIGATION Raindance Subdivision - Filing 1 Windsor, Colorado PREPARED FOR: Journey Homes, LLC 721 W. th St., L-0 Greeley, CO 80634 JOB NO. 1612

More information

APPENDIX F GEOTECHNICAL INVESTIGATION UPDATE CITY OF SANTA CRUZ D RAFT EIR L A B AHIA H OTEL JANUARY 2014

APPENDIX F GEOTECHNICAL INVESTIGATION UPDATE CITY OF SANTA CRUZ D RAFT EIR L A B AHIA H OTEL JANUARY 2014 GEOTECHNICAL INVESTIGATION UPDATE. CITY OF SANTA CRUZ D RAFT EIR L A B AHIA H OTEL JANUARY 2014 October 5, 2013 Project No. SCR-0720 SANTA CRUZ SEASIDE COMPANY Craig French 911 Center Street, Suite B Santa

More information

BRENTWOOD CAPITAL PARTNERS

BRENTWOOD CAPITAL PARTNERS GEOTECHNICAL EXPLORATION REPORT FIRESTONE COMPLETE AUTO CARE NWC SILVERADO RANCH OULEVARD AND ERMUDA ROAD CLARK COUNTY, NEVADA PROJECT NO.: E-14-078 DATE: JUNE 23, 2014 Prepared for: RENTWOOD CAPITAL PARTNERS

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT 58.6 ROAD (KIMBALL CREEK) 58.9 ROAD TO 58.7 ROAD MESA COUNTY, COLORADO February 9, 2018 Prepared By: Prepared For: Mr. Eric Krch, P.E. SGM, Inc. 744 Horizon Court, Suite

More information

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505)

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505) CITY OF FARMINGTON 800 Municipal Drive Farmington, NM 87401-2663 (505) 599-1373 Fax (505) 599-1377 http://www.fmtn.org IMMEDIATE ATTENTION JOINT INTERVENTION PROJECT (JIP) BUILDING CONSTRUCTION BID #15-110586

More information

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION CHAPTER 23.105 GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION Sections 23.105.101 General... 1 23.105.102 Definitions... 1 23.105.103 Permits required... 3 23.105.104 Hazards.... 4 23.105.105 Permit

More information

Subsurface Investigation Report

Subsurface Investigation Report AGI Project No. 17-154 Subsurface Investigation Report For the Proposed New One-Story Building Addition 7030 West 111 th Street Worth, Illinois Prepared for T63 Development LLC 11052 Mayflow er Lane Orland

More information

PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT

PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT Converse Project No. 15-81-177-01 Prepared For: David Evans and Associates, Inc. 17782 17th Street, Suite 200 Tustin, California 92780 Prepared By: 10391

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

Results of Onsite Percolation Testing Ellis Commons Senior Housing Development APN City of Perris, California

Results of Onsite Percolation Testing Ellis Commons Senior Housing Development APN City of Perris, California Lansing Companies 12671 High Bluff Drive, Suite 150 San Diego, California 92130 April 18, 2017 Project No. 11607.001 Attention: Subject: References: Mr. Casey Malone Results of Onsite Percolation Testing

More information

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199 REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO. 3-6187-A CLIENT ID: 0199 Prepared for: JEA 1 West Church Street Jacksonville, Florida

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

GEOTECHNICAL INVESTIGATION

GEOTECHNICAL INVESTIGATION GEOTECHNICAL INVESTIGATION SHEETZ CONVENIENCE STORE FREEPORT ROAD AND CALIFORNIA AVENUE NATRONA HEIGHTS, PENNSYLVANIA Prepared For: Mr. David J. Mastrostefano, P.E. Sheetz Incorporated 817 Brookfield Drive

More information

Report of Geotechnical Exploration For Baymeadows Road/Old Still PUD 6 inch Reclaimed Water Main Jacksonville, FL

Report of Geotechnical Exploration For Baymeadows Road/Old Still PUD 6 inch Reclaimed Water Main Jacksonville, FL Report of Geotechnical Exploration For Baymeadows Road/Old Still PUD inch Reclaimed Water Main Jacksonville, FL MAE Project No. 0 000 June, 0 Prepared for: CPH, Inc. 00 Belfort Road, Suite 0 Jacksonville,

More information

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering DATE: August 31, 2000 Earth Mechanics, Inc. Geotechnical & Earthquake Engineering TECHNICAL MEMORANDUM EMI PROJECT NO: 99-136 PREPARED FOR: COPIES: PREPARED BY: Tayfun Saglam / Parsons Brinckerhoff Juan

More information

For. Report of Geotechnical Exploration. St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St.

For. Report of Geotechnical Exploration. St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St. Report of Geotechnical Exploration For St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St. Johns County, FL MAE Project No. 0106-0005 June 14, 2017 Prepared for: CPH, Inc.

More information

GEOTECHNICAL INVESTIGATION

GEOTECHNICAL INVESTIGATION GEOTECHNICAL INVESTIGATION 1 08 Railway Avenue South Milo, AB Prepared for: 108 Railway Avenue South Milo, Alberta TOL 1LO Date: File: 216-2883-001 GEOTECHNICAL INVESTIGATION 108 Railway Avenue South,

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER CHAPTER 3 Site Preparation In preparation for constructing buildings on a property, the builder must consider a number of factors related to code requirements. The buildings must be located according to

More information

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO. 15-945E TO VILLAGE OF TIKI ISLAND TIKI ISLAND, TEXAS BY SERVICING TEXAS, LOUISIANA, NEW MEXICO, OKLAHOMA

More information

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving. SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.

More information

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements. SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction

More information

REPORT OF GEOTECHNICAL EXPLORATION GLYNN COUNTY DETENTION CENTER GLYNN COUNTY, GEORGIA E&A PROJECT NO

REPORT OF GEOTECHNICAL EXPLORATION GLYNN COUNTY DETENTION CENTER GLYNN COUNTY, GEORGIA E&A PROJECT NO REPORT OF GEOTECHNICAL EXPLORATION GLYNN COUNTY DETENTION CENTER GLYNN COUNTY, GEORGIA E&A PROJECT NO. - Prepared for: IPG Architects, Inc. Northwood Park Drive Valdosta, Georgia Prepared by: Ellis & Associates,

More information

Date: December 7, 2017 Project No.:

Date: December 7, 2017 Project No.: Date: December 7, 2017 Project No.: 608-5-2 Prepared For: Mr. Alberto Vasquez SAN FRANCISCO UNIFIED SCHOOL DISTRICT 135 Van Ness Avenue - Room 207a San Francisco, California 94102 Re: Geotechnical Consultation

More information

PROPOSED SEGMENTAL RETAINING WALLS ARGONAUT RETAIL VILLAGE - PHASE I PENSACOLA, FLORIDA

PROPOSED SEGMENTAL RETAINING WALLS ARGONAUT RETAIL VILLAGE - PHASE I PENSACOLA, FLORIDA CERTIFICATE AUTHORIZATION: 2 24 ANCHOR WALL ENGINEERING, LLC MATERIAL NOTES. Concrete Retaining Wall Units: "Anchor Diamond Pro Retaining Wall Units" as manufactured by Block USA under license from Anchor

More information

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and

More information

Geotechnical Investigation Spring Filling Station Mantua, Utah

Geotechnical Investigation Spring Filling Station Mantua, Utah 8143 South 2775 East, South Weber, Utah Phone (801) 814-1714 Geotechnical Investigation Spring Filling Station Mantua, Utah Christensen Geotechnical Project No. 112-001 June 8, 2017 Prepared for: Brigham

More information

LETTER OF TRANSMITTAL AS REQUESTED FOR REVIEW AND COMMENT FOR APPROVAL PLEASE RECYCLE

LETTER OF TRANSMITTAL AS REQUESTED FOR REVIEW AND COMMENT FOR APPROVAL PLEASE RECYCLE 199 Highland Vista Dr., Suite 170 (703) 726-8030 www.geoconcepts-eng.com TO: LETTER OF TRANSMITTAL Mr. Rob McGinnis FASLA FROM: Rebecca L. Smith-Zakowicz, CPG 108 Second Street, SW, Unit #36 Charlottesville,

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION McIntosh County Fire Station Townsend, McIntosh County, Georgia March 12, 2018 Prepared For: Brennan Jones Engineering Associates, Inc. 751 Mason Falls Drive

More information

PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA

PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTETATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA Terracon Project No. 3105079, Revision 3 1.0 INTRODUCTION This report presents the results of

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Parking Lot Evaluation & Physical Plant Additions Rogers State University Claremore, Oklahoma May 20, 2015 Terracon Project No. 04155080 Prepared for: Rogers State University

More information

EXHIBIT G GEOTECHNICAL REPORT (DRAFT)

EXHIBIT G GEOTECHNICAL REPORT (DRAFT) EXHIBIT G GEOTECHNICAL REPORT (DRAFT) APPENDIX 1 PROJECT SITE 'B' B-1 B-2 I-2 B-3 B-4 B-5 I-1 PROJECT LOCATION LEGEND B-1 = APPROXIMATE BORING LOCATION I-1 = APPROXIMATE INFILTRATION

More information

REPORT OF SUBSURFACE EXPLORATION. Burn and Rescue Facility Spartanburg County Emergency Services Academy Duncan, SC GeoTrack Project No.

REPORT OF SUBSURFACE EXPLORATION. Burn and Rescue Facility Spartanburg County Emergency Services Academy Duncan, SC GeoTrack Project No. 3620 Pelham Road, PMB #292 Phone: 8643290013 Greenville, SC 296155044 FAX: 8643290014 REPORT OF SUBSURFACE EXPLORATION Burn and Rescue Facility Spartanburg County Emergency Services Academy Duncan, SC

More information

geotechnical and construction materials consultants

geotechnical and construction materials consultants geotechnical and construction materials consultants City of Dallas Public Works and Transportation Department 320 E. Jefferson Blvd, Room 307 Dallas, Texas 75203 ATTN: Mr. Vincent Lewis, P.E. Email: Vincent.lewis@dallascityhall.com

More information

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS PARKING GARAGE STANTON STREET AND AUSTIN BLUFFS PARKWAY COLORADO SPRINGS, COLORADO

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS PARKING GARAGE STANTON STREET AND AUSTIN BLUFFS PARKWAY COLORADO SPRINGS, COLORADO PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS PARKING GARAGE STANTON STREET AND AUSTIN BLUFFS PARKWAY COLORADO SPRINGS, COLORADO Prepared for: UNIVERSITY OF COLORADO AT COLORADO SPRINGS Facilities Services

More information

GEOTECHNICAL INVESTIGATION PROPOSED STORAGE BUILDING AND FUELING FACILTIY WARD ALTERNATIVE ENERGY 614 EAST VINE FORT COLLINS, COLORADO

GEOTECHNICAL INVESTIGATION PROPOSED STORAGE BUILDING AND FUELING FACILTIY WARD ALTERNATIVE ENERGY 614 EAST VINE FORT COLLINS, COLORADO GEOTECHNICAL INVESTIGATION PROPOSED STORAGE BUILDING AND FUELING FACILTIY 614 EAST VINE FORT COLLINS, COLORADO 3436 New Castle Drive Loveland, Colorado 80538 Attention: Corey Stinar Project No. FC07179-125

More information

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG.

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG. MEMORANDUM Levelton Consultants Ltd. 150-12791 Clarke Place Richmond, BC V6V 2H9 Canada Tel: 604 278-1411 Fax: 604 278-1042 E-Mail: rhillaby@levelton.com Web Site: www.levelton.com TO: STUART OLSON DOMINION

More information

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Parking Lot 47 Jacksonville, Florida MAE Project No. 0019-0009 April 5, 2017 Revised: April 6, 2017 Prepared for: Prepared by: Jacksonville,

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

File No Supplemental November Geotechnical and Environmental Consulting Engineers

File No Supplemental November Geotechnical and Environmental Consulting Engineers Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction

More information

Geotechnical Engineering Report South Shore Carter Lake Campground Expansion Northwest of CR 31 and Cougar Run Lane Larimer County, Colorado

Geotechnical Engineering Report South Shore Carter Lake Campground Expansion Northwest of CR 31 and Cougar Run Lane Larimer County, Colorado Geotechnical Engineering Report South Shore Carter Lake Campground Expansion Northwest of CR 31 and Cougar Run Lane Larimer County, Colorado July 15, 2016 Terracon Project No. 20165057 Prepared for: Larimer

More information

Lantz-Boggio Architects, P.C LBA Project No

Lantz-Boggio Architects, P.C LBA Project No SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely

More information

February 12, 2013 Calibre File No.: J

February 12, 2013 Calibre File No.: J February 12, 2013 Calibre File No.: J13-01795 260 Lake Avenue Kelowna, B.C. V1Y 5W7 Attention: Subject: Marianne Hill Geotechnical Assessment for a Proposed Residential Home Lot 5, Block D, DL 14, Plan

More information

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784 REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO. 35-55 CLIENT ID: 78 Prepared for: Construction & Engineering Services Consultants, Inc. 93 Baymeadows

More information

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL GEOTECHNICAL CONSULTANT Prepared by Checked by Approved by Mr. C Allen Dr. Derek Gay Dr. Derek Gay Signature Date Signature Date

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

PROJECT INFORMATION... 1 SITE AND SUBSURFACE CONDITIONS... 2 EVALUATION AND RECOMMENDATIONS... 4 CONSTRUCTION CONSIDERATIONS... 5

PROJECT INFORMATION... 1 SITE AND SUBSURFACE CONDITIONS... 2 EVALUATION AND RECOMMENDATIONS... 4 CONSTRUCTION CONSIDERATIONS... 5 TABLE OF CONTENTS Page No. PROJECT INFORMATION... 1 Project Authorization... 1 Project Description... 1 Purpose and Scope of Services... 1 SITE AND SUBSURFACE CONDITIONS... 2 Site Location and Description...

More information

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133 GEOTECHNICAL EXPLORATION AND ENGINEERING SERVICES REPORT CONDUCTED FOR: Immokalee Stormwater Master Plan Implementation Immokalee, Collier County, Florida PREPARED FOR: Mr. Marc Stonehouse, P. E. Project

More information

GEOTECHNICAL ENGINEERING REPORT PROPOSED HOLIDAY INN HOTEL BENTLEY CIRCLE AND EAST 2ND STREET CASPER, WYOMING

GEOTECHNICAL ENGINEERING REPORT PROPOSED HOLIDAY INN HOTEL BENTLEY CIRCLE AND EAST 2ND STREET CASPER, WYOMING GEOTECHNICAL ENGINEERING REPORT PROPOSED HOLIDAY INN HOTEL BENTLEY CIRCLE AND EAST 2ND STREET CASPER, WYOMING TERRACON PROJECT NO. A07002 February 19, 2007 Prepared for: Sweetwater Interest, LLC P.O. Box

More information

February 6, TO: Hector J. Bordas Design Division. Attention Nicole Mi. FROM: Greg Kelley 6^-1 i Geotechnical and Materials Engineering Division

February 6, TO: Hector J. Bordas Design Division. Attention Nicole Mi. FROM: Greg Kelley 6^-1 i Geotechnical and Materials Engineering Division February 6, 2018 TO: Hector J. Bordas Design Division Attention Nicole Mi FROM: Greg Kelley 6^-1 i Geotechnical and Materials Engineering Division GEOTECHNICAL INVESTIGATION GATES CANYON PARK REGIONAL

More information

GEOTECHNICAL ENGINEERING ENVIRONMENTAL CONSULTING CONSTRUCTION TESTING & OBSERVATION

GEOTECHNICAL ENGINEERING ENVIRONMENTAL CONSULTING CONSTRUCTION TESTING & OBSERVATION Geotechnical Investigation Report PROPOSED MULTI-FAMILY RESIDENTIAL DEVELOPMENT APN 156-38-011 1617 WEST COLTER STREET PHOENIX, ARIZONA Prepared for: Mr. Dan Pierce Trellis 1405 East McDowell Road Phoenix,

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT GRAND AVENUE PEDESTRIAN BRIDGE RELOCATION ROARING FORK RIVER GLENWOOD SPRINGS, COLORADO April 18, 2016 Prepared By: Prepared For: Mr. Bob Pattillo, P.E. Pattillo Associates