1 2 PROPOSED TERMS OF REFERENCE Proposed Terms of References (TORs) as prescrbed n Chapter 4, Secton 4(d), and Chapter 1, Secton 1(d), of Standard Terms of Reference for EIA/EMP Report for projects / acttes requrng Envronment Clearance under EIA Notfcaton, 2006 as publshed by Mnstry of Envronment, Forest & Clmate Change, Aprl, 2015 for the proposed project wth devatons / non applcablty s as tabulated below: Table 1: Proposed Terms of Reference Chlor Alkal 1 Execute Summary 2 Introducton Detals of the EIA Consultant ncludng NABET accredtaton Informaton about the project proponent Importance and benefts of the project 3 Project Descrpton Cost of project and tme of completon. Products wth capactes for the proposed project. If expanson project, detals of exstng products wth capactes and whether adequate land s avalable for expanson, reference of earler EC f any. v v v v Lst of raw materals requred and ther source along wth mode of transportaton. Other chemcals and materals requred wth quanttes and storage capactes Detals of Emsson, effluents, hazardous waste generaton and ther management. Requrement of water, power, wth source of supply, status of approval, water balance dagram, manpower requrement (regular and contract) Process descrpton along wth major equpment and machneres, process flow sheet (quantate) from raw materal to products to be provded x Hazard dentfcaton and detals of proposed safety systems. x a b Expanson/modernzaton proposals: Copy of all the Envronmental Clearance(s) ncludng Amendments thereto obtaned for the project from MOEF/SEIAA shall be attached as an Annexure. A certfed copy of the latest Montorng Report of the Regonal Offce of the Mnstry of Envronment and Forests as per crcular dated 30 th May, 2012 on the status of complance of condtons stpulated n all the exstng envronmental clearances ncludng Amendments shall be provded. In addton, status of complance of Consent to Operate for the ongong exstng operaton of the project from SPCB shall be attached wth the EIAEMP report. In case the exstng project has not obtaned envronmental clearance, reasons for not takng EC under the provsons of the EIA Notfcaton 1994 KADAM ENVIRONMENTAL CONSULTANTS OCTOBER,

2 and/or EIA Notfcaton 2006 shall be provded. Copes of Consent to Establsh/No Objecton Certfcate and Consent to Operate (n case of unts operatng pror to EIA Notfcaton 2006, CTE and CTO of FY ) obtaned from the SPCB shall be submtted. Further, complance report to the condtons of consents from the SPCB shall be submtted. 4 Ste Detals Locaton of the project ste coverng vllage, Taluka/Tehsl, Dstrct and State, Justfcaton for selectng the ste, whether other stes were consdered. A toposheet of the study area of radus of 10km and ste locaton on 1:50,000/1:25,000 scale on an A3/A2 sheet. (ncludng all ecosenste areas and envronmentally senste places) Detals w.r.t. opton analyss for selecton of ste Coordnates (latlong) of all four corners of the ste. v Google mapearth downloaded of the project ste. v Layout maps ndcatng exstng unt as well as proposed unt ndcatng storage area, plant area, greenbelt area, utltes etc. If located wthn an Industral area/estate/complex, layout of Industral Area ndcatng locaton of unt wthn the Industral area/estate. v v x x x x Photographs of the proposed and exstng (f applcable) plant ste. If exstng, show photographs of plantaton/greenbelt, n partcular. Landuse breakup of total land of the project ste (dentfed and acqured), government/ prate agrcultural, forest, wasteland, water bodes, settlements, etc shall be ncluded. (not requred for ndustral area) A lst of major ndustres wth name and type wthn study area (10 km radus) shall be ncorporated. Land use detals of the study area. Geologcal features and Geohydrologcal status of the study area shall be ncluded. Detals of Dranage of the project upto 5 km radus of study area. If the ste s wthn 1 km radus of any major rer, peak and lean season rer dscharge as well as flood occurrence frequency based on peak ranfall data of the past 30 years. Detals of Flood Level of the project ste and maxmum Flood Level of the rer shall also be provded. (mega green feld projects) Status of acquston of land. If acquston s not complete, stage of the acquston process and expected tme of complete possesson of the land. Not applcable. Ths beng expanson project wthn premses, no addtonal land s requred. x R&R detals n respect of land n lne wth state Government polcy. Not applcable. 5 Forest and wldlfe related ssues (f applcable): Not applcable. Permsson and approval for the use of forest land (forestry clearance), f any, and recommendatons of the State Forest Department. (f applcable) Landuse map based on Hgh resoluton satellte magery (GPS) of the proposed ste delneatng the forestland (n case of projects nvolvng forest land more than 40 ha) KADAM ENVIRONMENTAL CONSULTANTS OCTOBER,

3 v v Status of Applcaton submtted for obtanng the stage I forestry clearance along wth latest status shall be submtted. The projects to be located wthn 10 km of the Natonal Parks, Sanctuares, Bosphere Reserves, Mgratory Corrdors of Wld Anmals, the project proponent shall submt the map duly authentcated by Chef Wldlfe Warden showng these features vsàvs the project locaton and the recommendatons or comments of the Chef Wldlfe Wardenthereon. Wldlfe Conservaton Plan duly authentcated by the Chef Wldlfe Warden of the State Government for conservaton of Schedule I fauna, f any exsts n the study area. Copy of applcaton submtted for clearance under the Wldlfe (Protecton) Act, 1972, to the Standng Commttee of the Natonal Board for Wldlfe. 6 Envronmental Status v Determnaton of atmospherc nverson level at the project ste and stespecfc mcrometeorologcal data usng temperature, relate humdty, hourly wnd speed and drecton and ranfall. AAQ data (except monsoon) at 8 locatons for PM 10, PM 2.5, SO 2, NO X, CO and other parameters relevant to the project shall be collected. The montorng statons shall be based CPCB gudelnes and take nto account the predomnant wnd drecton, populaton zone and senste receptors ncludng reserved forests. Raw data of all AAQ measurement for 12 weeks of all statons as per frequency gen n the NAQQM Notfcaton of Nov along wth mn., max., average and 98% values for each of the AAQ parameters from data of all AAQ statons should be provded as an annexure to the EIA Report. Surface water qualty of nearby Rer (100 m upstream and downstream of dscharge pont) and other surface drans at eght locatons as per CPCB/MoEF&CC gudelnes. Whether the ste falls near to polluted stretch of rer dentfed by the CPCB/MoEF&CC, f yes ge detals. Data for Post Monsoon, 2018 shall be furnshed. Project specfc parameters lke PM 10, PM 2.5, SO 2, NO X, CO, HC, HCl & Cl 2 s collected and shall be furnshed. Not applcable. v Ground water montorng at mnmum at 8 locatons shall be ncluded. v Nose levels montorng at 8 locatons wthn the study area. v Sol Characterstc as per CPCB gudelnes. x x Traffc study of the area, type of vehcles, frequency of vehcles for transportaton of materals, addtonal traffc due to proposed project, parkng arrangement etc. Detaled descrpton of flora and fauna (terrestral and aquatc) exstng n the study area shall be gen wth specal reference to rare, endemc and endangered speces. If ScheduleI fauna are found wthn the study area, a Wldlfe Conservaton Plan shall be prepared and furnshed. x Socoeconomc status of the study area. 7 Impact and Envronment Management Plan Assessment of ground level concentraton of pollutants from the stack emsson based on stespecfc meteorologcal features. In case the project s located on a hlly terran, the AQIP Modellng shall be done usng nputs of the specfc terran characterstcs for determnng the potental mpacts KADAM ENVIRONMENTAL CONSULTANTS OCTOBER,

4 of the project on the AAQ. Cumulate mpact of all sources of emssons (ncludng transportaton) on the AAQ of the area shall be assessed. Detals of the model used and the nput data used for modellng shall also be provded. The ar qualty contours shall be plotted on a locaton map showng the locaton of project ste, habtaton nearby, senste receptors, f any. Water Qualty modellng n case of dscharge n water body. Not applcable Impact of the transport of the raw materals and end products on the surroundng envronment shall be assessed and provded. In ths regard, optons for transport of raw materals and fnshed products and wastes (large quanttes) by ral or ralcum road transport or conveyorcumral transport shall be examned. A note on treatment of wastewater from dfferent plant operatons, extent recycled and reused for dfferent purposes shall be ncluded. Complete scheme of effluent treatment. Characterstcs of untreated and treated effluent to meet the prescrbed standards of dscharge under E(P) Rules. v Detals of stack emsson and acton plan for control of emssons to meet standards. v Measures for fugte emsson control v v x x x Detals of hazardous waste generaton and ther storage, utlzaton and management. Copes of MOU regardng utlzaton of sold and hazardous waste n cement plant shall also be ncluded. EMP shall nclude the concept of wastemnmzaton, recycle/reuse/recover technques, Energy conservaton, and natural resource conservaton. Proper utlzaton of fly ash shall be ensured as per Fly Ash Notfcaton, A detaled plan of acton shall be provded. Acton plan for the green belt development plan n 33 % area.e. land wth not less than 1,500 trees per ha. Gng detals of speces, wdth of plantaton, plannng schedule etc. shall be ncluded. The green belt shall be around the project boundary and a scheme for greenng of the roads used for the project shall also be ncorporated. Acton plan for ranwater harvestng measures at plant ste shall be submtted to harvest ranwater from the roof tops and storm water drans to recharge the ground water and also to use for the varous acttes at the project ste to conserve fresh water and reduce the water requrement from other sources. Total captal cost and recurrng cost/annum for envronmental polluton control measures shall be ncluded. Snce, ths beng exstng unt, only ~15 % of total plot area wll be developed / mantaned as green belt, based on the avalablty of space. x Acton plan for postproject envronmental montorng shall be submtted. x Onste and Offste Dsaster (natural and Manmade) Preparedness and Emergency Management Plan ncludng Rsk Assessment and damage control. Dsaster management plan should be lnked wth Dstrct Dsaster Management Plan. 8 Occupatonal health Plan and fund allocaton to ensure the occupatonal health & safety of all contract and casual workers. KADAM ENVIRONMENTAL CONSULTANTS OCTOBER,

5 Detals of exposure specfc health status evaluaton of worker. If the workers' health s beng evaluated by pre desgned format, chest x rays, Audometry, Sprometry, Vson testng (Far & Near vson, color vson and any other ocular defect) ECG, durng preplacement and perodcal examnatons ge the detals of the same. Detals regardng last month analyzed data of above mentoned parameters as per age, sex, duraton of exposure and department wse. Detals of exstng Occupatonal & Safety Hazards. What are the exposure levels of hazards and whether they are wthn Permssble Exposure level (PEL). If these are not wthn PEL, what measures the company has adopted to keep them wthn PEL so that health of the workers can be preserved, Annual report of health status of workers wth specal reference to Occupatonal Health and Safety. 9 Corporate Envronment Polcy 10 Does the company have a well lad down Envronment Polcy approved by ts Board of Drectors? If so, t may be detaled n the EIA report. Does the Envronment Polcy prescrbe for standard operatng process / procedures to brng nto focus any nfrngement / devaton / volaton of the envronmental or forest norms / condtons? If so, t may be detaled n the EIA. What s the herarchcal system or Admnstrate order of the company to deal wth the envronmental ssues and for ensurng complance wth the envronmental clearance condtons? Detals of ths system may be gen. Does the company have system of reportng of noncomplances / volatons of envronmental norms to the Board of Drectors of the company and / or shareholders or stakeholders at large? Ths reportng mechansm shall be detaled n the EIA report. Detals regardng nfrastructure facltes such as santaton, fuel, restroom etc. to be provded to the labour force durng constructon as well as to the casual workers ncludng truck drers durng operaton phase. 11 Enterprse Socal Commtment (ESC) Adequate funds (at least 2.5 % of the project cost) shall be earmarked towards the Enterprse Socal Commtment based on Publc Hearng ssues and temwse detals along wth tme bound acton plan shall be ncluded. Socoeconomc development acttes need to be elaborated upon % of captal nvestment wll be earmarked as Corporate Envronment Responsblty funds as per CER polcy vde dated 1 st May Any ltgaton pendng aganst the project and/or any drecton/order passed by any Court of Law aganst the project, f so, detals thereof shall also be ncluded. Has the unt receed any notce under the Secton 5 of Envronment (Protecton) Act, 1986 or relevant Sectons of Ar and Water Acts? If so, detals thereof and complance/atr to the notce(s) and present status of the case. 13 A tabular chart wth ndex for pont wse complance of above TOR. KADAM ENVIRONMENTAL CONSULTANTS OCTOBER,

6 Thermal Power Plant 1 The proposed project shall be gen a unque name n consonance wth the name submtted to other Government Departments etc. for ts better dentfcaton and reference Vson document specfyng prospecte long term plan of the project shall be formulated and submtted. Latest complance report duly certfed by the Regonal Offce of MoEF&CC for the condtons stpulated n the envronmental and CRZ clearances of the prevous phase(s) for the expanson projects shall be submtted. The project proponent needs to dentfy mnmum three potental stes based on envronmental, ecologcal and economc consderatons, and choose one approprate ste havng mnmum mpacts on ecology and envronment. A detaled comparson of the stes n ths regard shall be submtted. Execute summary of the project ndcatng relevant detals along wth recent photographs of the proposed ste (s) shall be provded. Response to the ssues rased durng Publc Hearng and the wrtten representatons (f any), along wth a tme bound Acton Plan and budgetary allocatons to address the same, shall be provded n a tabular form, aganst each acton proposed. Harnessng solar power wthn the premses of the plant partcularly at avalable roof tops and other avalable areas shall be formulated and for expanson projects, status of mplementaton shall also be submtted. The geographcal coordnates (WGS 84) of the proposed ste (plant boundary), ncludng locaton of ash pond along wth topo sheet (1:50,000 scale) and IRS satellte map of the area, shall be submtted. Elevaton of plant ste and ash pond wth respect to HFL of water body/nallah/rer and hgh tde level from the sea shall be specfed, f the ste s located n proxmty to them. Layout plan ndcatng breakup of plant area, ash pond, green belt, nfrastructure, roads etc. Land requrement for the project shall be optmzed and n any case not more than what has been specfed by CEA from tme to tme. Item wse break up of land requrement shall be provded. Present land use (ncludng land class/ksm) as per the revenue records and State Govt. records of the proposed ste shall be furnshed. Informaton on land to be acqured ncludng coal transportaton system, layng of ppelne, ROW, transmsson lnes etc. shall be specfcally submtted. Status of land acquston and ltgaton, f any, should be provded. Snce the exstng project does not requre EC or CRZ clearance, latest complance report duly certfed by the Regonal Offce of PPCB for the condtons stpulated n the CTE shall be provded. Not Applcable, as the proposed project s for establshment of TPP wthn the exstng premses. KADAM ENVIRONMENTAL CONSULTANTS OCTOBER,

7 If the project nvolves forest land, detals of applcaton, ncludng date of applcaton, area appled for, and applcaton regstraton number, for derson under FCA and ts status should be provded along wth copes of relevant documents. The land acquston and R&R scheme wth a tme bound Acton Plan should be formulated and addressed n the EIA report. Satellte magery and authentcated topo sheet ndcatng dranage, croppng pattern, water bodes (wetland, rer system, stream, nallahs, ponds etc.), locaton of nearest habtatons (vllages), creeks, mangroves, rers, reservors etc. n the study area shall be provded. Locaton of any Natonal Park, Sanctuary, Elephant/Tger Reserve (exstng as well as proposed), mgratory routes / wldlfe corrdor, f any, wthn 10 km of the project ste shall be specfed and marked on the map duly authentcated by the Chef Wldlfe Warden of the State or an offcer authorzed by hm. Topography of the study area supported by Toposheet on 1:50,000 scale of Survey of Inda, along wth a large scale map preferably of 1:25,000 scale and the specfc nformaton whether the ste requres any fllng shall be provded. In that case, detals of fllng, quantty of requred fll materal; ts source, transportaton etc. shall be submtted. A detaled study on land use pattern n the study area shall be carred out ncludng dentfcaton of common property resources (such as grazng and communty land, water resources etc.) avalable and Acton Plan for ts protecton and management shall be formulated. If acquston of grazng land s nvolved, t shall be ensured that an equal area of grazng land be acqured and developed and detaled plan submtted. A mneralogcal map of the proposed ste (ncludng sol type) and nformaton (f avalable) that the ste s not located on potentally mneable mneral depost shall be submtted. Detals of fly ash utlzaton plan as per the latest fly ash Utlzaton Notfcaton of GOI along wth frm agreements / MoU wth contractng partes ncludng other usages etc. shall be submtted. The plan shall also nclude dsposal method / mechansm of bottom ash. The water requrement shall be optmzed (by adoptng measures such as dry fly ash and dry bottom ash dsposal system, concept of zero dscharge) and n any case not more than that stpulated by CEA from tme to tme, to be submtted along wth detals of source of water and water balance dagram. Detals of water balance calculated shall take nto account reuse and recrculaton of effluents. Water body/nallah (f any) passng across the ste should not be dsturbed as far as possble. In case any Nallah / dran s proposed to be derted, t shall be ensured that the derson does not dsturb the natural dranage Not Applcable, as no forest land s nvolved n the proposed expanson project. Not Applcable, as no R&R ssues envsaged n the proposed expanson project. Nangal Wldlfe Sanctuary s wthn 10 Km of the project ste. Locaton of the same wll be marked on the map duly authentcated by the Chef Wldlfe Warden of the State or an offcer authorzed by hm and provded n EIA report. No fllng s requred n the proposed project. No grazng land s nvolved, hence, detaled plan s not requred. Ste s not located on potentally mneable mneral depost. KADAM ENVIRONMENTAL CONSULTANTS OCTOBER,

8 21 22 pattern of the area. Detals of proposed derson shall be furnshed duly approved by the concerned Department of the State. It shall also be ensured that a mnmum of 500 m dstance of plant boundary s kept from the HFL of rer system / streams etc. and the boundary of ste should also be located 500 m away from ralway track and Natonal Hghways. Hydrogeologcal study of the area shall be carred out through an nsttute/ organzaton of repute to assess the mpact on ground and surface water regmes. Specfc mtgaton measures shall be spelt out and tme bound Acton Plan for ts mplementaton shall be submtted Detaled Studes on the mpacts of the ecology ncludng fsheres of the Rer/Estuary/Sea due to the proposed wthdrawal of water / dscharge of treated wastewater nto the Rer/Sea etc shall be carred out and submtted along wth the EIA Report. In case of requrement of marne mpact assessment study, the locaton of ntake and outfall shall be clearly specfed along wth depth of water drawl and dscharge nto open sea. Source of water and ts sustanablty even n lean season shall be provded along wth detals of ecologcal mpacts arsng out of wthdrawal of water and takng nto account nterstate shares (f any). Informaton on other competng sources downstream of the proposed project and commtment regardng avalablty of requste quantty of water from the Competent Authorty shall be provded along wth letter / document statng frm allocaton of water. Detaled plan for ranwater harvestng and ts proposed utlzaton n the plant shall be furnshed. Feasblty of near zero dscharge concept shall be crtcally examned and ts detals submtted. Optmzaton of Cycles of Concentraton (COC) along wth other water conservaton measures. Zero Lqud Dscharge concept wll be acheved, hence no dsposal of waste water on any water body s envsaged due to the proposed project. There s no sea n the near vcnty of the project. 28 Plan for recrculaton of ash pond water and ts mplementaton Detaled plan for conductng montorng of water qualty regularly wth proper mantenance of records shall be formulated. Detal of methodology and dentfcaton of montorng ponts (between the plant and dranage n the drecton of flow of surface / ground water) shall be submtted. It shall be ensured that parameter to be montored also nclude heavy metals. A provson for longterm montorng of ground water table usng Pezometer shall be ncorporated n EIA, partcularly from the study area. Socoeconomc study of the study area comprsng of 10 km from the plant ste shall be carred out havng detaled assessment of the mpact on lelhood of the local communtes. Acton Plan for dentfcaton of local employable youth for tranng n sklls, relevant to the project, for eventual employment n the project tself shall be formulated and numbers specfed durng constructon & operaton phases of the Project. If the area has trbal populaton t shall be ensured that the rghts of trbals are well protected. The project proponent shall accordngly dentfy trbal ssues under varous provsons of the law of the land. Not Applcable, as no trbal populaton s envsaged n the study area. KADAM ENVIRONMENTAL CONSULTANTS OCTOBER,

9 A detaled CSR plan along wth acttes wse break up of fnancal commtment. CSR component shall be dentfed consderng need based assessment study and Publc Hearng ssues. Sustanable ncome generatng measures whch can help n uplftment of affected secton of socety, whch s consstent wth the tradtonal sklls of the people shall be dentfed. Separate budget for communty development acttes and ncome generatng programmes shall be specfed. Whle formulatng CSR schemes t shall be ensured that an nbult montorng mechansm for the schemes dentfed are n place and mechansm for conductng annual socal audt from the nearest government nsttute of repute n the regon shall be prepared. The project proponent shall also provde Acton Plan for the status of mplementaton of the scheme from tme to tme and detals of the same wth any Govt. scheme(s). CSR detals done n the past should be clearly spelt out n case of expanson projects. R&R plan, as applcable, shall be formulated wheren mechansm for protectng the rghts and lelhood of the people n the regon who are lkely to be mpacted, s taken nto consderaton. R&R plan shall be formulated after a detaled census of populaton based on soco economc surveys who were dependent on land fallng n the project, as well as, populaton who were dependent on land not owned by them. Assessment of occupatonal health and endemc dseases of envronmental orgn n the study area shall be carred out and Acton Plan to mtgate the same shall be prepared. Occupatonal health and safety measures for the workers ncludng dentfcaton of work related health hazards shall be formulated. The company shall engage full tme qualfed doctors who are traned n occupatonal health. Health montorng of the workers shall be conducted at perodc ntervals and health records mantaned. Awareness programme for workers due to lkely adverse mpact on ther health due to workng n nonconduce envronment shall be carred out and precautonary measures lke use of personal equpment etc. shall be provded. Revew of mpact of varous health measures undertaken at ntervals of two to three years shall be conducted wth an excellent follow up plan of acton wherever requred. One complete season ste specfc meteorologcal and AAQ data (except monsoon season) as per latest MoEF&CC Notfcaton shall be collected and the dates of montorng shall be recorded. The parameters to be covered for AAQ shall nclude PM 10, PM 2.5, SO 2, NO x, CO and Hg. The locaton of the montorng statons should be so decded so as to take nto consderaton the upwnd drecton, predomnant downwnd drecton, other domnant drectons, habtaton and senste receptors. There should be at least one montorng staton each n the upwnd and n the pre domnant downwnd drecton at a locaton where maxmum ground level concentraton s lkely to occur. In case of expanson project, ar qualty montorng data of 104 observatons a year for relevant parameters at ar qualty montorng statons as dentfed/stpulated shall be submtted to assess for complance of AAQ Standards (annual average as well as 24 hrs). Not Applcable, as no R&R ssues envsaged n the proposed expanson project. Data for Post Monsoon, 2018 shall be furnshed. Not applcable as there s no expanson n thermal power plant. KADAM ENVIRONMENTAL CONSULTANTS OCTOBER,

10 40 A lst of exstng ndustres n the study area shall be furnshed Cumulate mpacts of all sources of emssons ncludng handlng and transportaton of exstng and proposed project on the envronment of the area shall be assessed n detal. Detals of the Model used and the nput data used for modelng shall also be provded. The ar qualty contours should be plotted on a locaton map showng the locaton of project ste, habtaton nearby, senste receptors, f any. The wnd rose and sopleths should also be shown on the locaton map. The cumulate study should also nclude mpacts on water, sol and socoeconomcs. Rado actty and heavy metal contents of coal to be sourced shall be examned and submtted along wth laboratory reports. Fuel analyss shall be provded. Detals of auxlary fuel, f any, ncludng ts quantty, qualty, storage etc. should also be furnshed. Quantty of fuel requred, ts source and characterstcs and documentary evdence to substantate confrmed fuel lnkage shall be furnshed. For the expanson projects, the complance of the exstng unts to the sad Notfcaton shall also be submtted. Detals of transportaton of fuel from the source (ncludng port handlng) to the proposed plant and ts mpact on ambent AAQ shall be sutably assessed and submtted. If transportaton entals a long dstance t shall be ensured that ral transportaton to the ste shall be frst assessed. Wagon loadng at source shall preferably be through slo/conveyor belt. For proposals based on mported coal, nland transportaton and port handlng and ral movement shall be examned and detals furnshed. The approval of the Port and Ral Authortes shall be submtted. Detals regardng nfrastructure facltes such as santaton, fuel, restrooms, medcal facltes, safety durng constructon phase etc. to be provded to the labour force durng constructon as well as to the casual workers ncludng truck drers durng operaton phase should be adequately catered for and detals furnshed. EMP to mtgate the adverse mpacts due to the project along wth tem wse cost of ts mplementaton n a tme bound manner shall be specfed. A Dsaster Management Plan (DMP) along wth rsk assessment study ncludng fre and exploson ssues due to storage and use of fuel should be carred out. The rsk contours should be plotted on the plant layout map clearly showng whch of the proposed acttes would be affected n case of an accdent takng place. Proposed safeguard measures & Measures to guard aganst fre hazards. Detals of Mock drlls carred out from tme to tme to check the effcency of the plans drawn. The DMP so formulated shall nclude measures aganst lkely Fres/Earthquakes etc, as applcable. It shall be ensured that DMP conssts of both Onste and Offste plans, complete wth detals of contanng lkely dsaster and shall specfcally menton personnel dentfed for the task. Smaller verson of the plan for dfferent possble dsasters shall be prepared both n Englsh and local languages and crculated wdely. Only nland transportaton detals wll be provded, as no port handlng / ral movement s envsaged n the proposed project. KADAM ENVIRONMENTAL CONSULTANTS OCTOBER,

11 15 16 Detaled scheme for rasng green belt of nate speces of approprate wdth (50 to 100 m) and consstng of at least 3 ters around plant boundary wth tree densty of 2000 to 2500 trees per ha wth a good surval rate of around 80% shall be submtted. Photographc evdence must be created and submtted perodcally ncludng NRSA reports n case of expanson projects. A shrub layer beneath tree layer would serve as an effecte seve for dust and snk for CO 2 and other gaseous pollutants and hence a stratfed green belt should be developed. Over and above the green belt, as carbon snk, plan for addtonal plantaton shall be drawn by dentfyng blocks of degraded forests, n close consultaton wth the Dstrct Forests Department. In pursuance to ths the project proponent shall formulate tme bound Acton Plans along wth fnancal allocaton and shall submt status of mplementaton to the Mnstry every sx months. Snce, ths beng exstng unt, only ~15 % of total plot area wll be developed / mantaned as green belt, based on the avalablty of space. Not applcable as there are no degraded forests dentfed n the study area Corporate Envronment Polcy a) Does the company has a well lad down Envronment Polcy approved by ts Board of Drectors? If so, t may be detaled n the EIA report. b) Does the Envronment Polcy prescrbe for standard operatng process / procedures to brng nto focus any nfrngement / devaton / volaton of the envronmental or forest norms / condtons? If so, t may be detaled n the EIA. c) What s the herarchcal system or Admnstrate order of the company to deal wth the envronmental ssues and for ensurng complance wth the envronmental clearance condtons. Detals of ths system may be gen. d) Does the company has complance management system n place wheren complance status along wth complances / volatons of envronmental norms are reported to the CMD and the Board of Drectors of the company and / or shareholders or stakeholders at large? Ths reportng mechansm should be detaled n the EIA report. Detals of ltgaton pendng or otherwse wth respect to project n any Court, Trbunal etc. shall nvarably be furnshed. 19 Addtonal TOR for Coastal based TPPs.. Not applcable, as there s no sea n the vcnty of the proposed expanson project. KADAM ENVIRONMENTAL CONSULTANTS OCTOBER,

2 PROPOSED TERMS OF REFERENCES

2 PROPOSED TERMS OF REFERENCES 2 PROPOSED TERMS OF REFERENCES 1 Executve summary 2 Introducton. Detals of the EIA Consultant ncludng NABET accredtaton. Informaton about the project proponent Importance and benefts of the project 3 Project

More information

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd 1. Executive Summary 2. Introduction STANDARD TERMS OF REFERENCE I. Details of the EIA Consultant including

More information

2 PROPOSED TERMS OF REFERENCE

2 PROPOSED TERMS OF REFERENCE 2 Proposed Terms of References (TORs) as prescribed in Chapter 4, Section 4(d), of Standard Terms of Reference for EIA/EMP Report for projects / activities requiring Environment Clearance under EIA Notification,

More information

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE 5(b):STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR PESTICIDES INDUSTRY AND PESTICIDE SPECIFIC INTERMEDIATES (EXCLUDING FORMULATIONS)AND INFORMATION TO BE INCLUDED IN

More information

PROPOSED TERMS OF REFERENCES. Standard Terms of Reference for Pesticides Industry and pesticide specific intermediates (excluding formulations) 5(b):

PROPOSED TERMS OF REFERENCES. Standard Terms of Reference for Pesticides Industry and pesticide specific intermediates (excluding formulations) 5(b): PROPOSED TERMS OF REFERENCES Standard Terms of Reference for Pesticides Industry and pesticide specific intermediates (excluding formulations) 5(b): ToR Points Details Remarks STANDARAD TERMS OF REFERENCE

More information

RULEBOOK on the manner of determining environmental flow of surface water

RULEBOOK on the manner of determining environmental flow of surface water Pursuant to Artcle 54 paragraph 2 of the Law on Waters (Offcal Gazette of the Republc of Montenegro 27/07 and Offcal Gazette of Montenegro 32/11 and 48/15), the Mnstry of Agrculture and Rural Development

More information

PROPOSED TERMS OF REFERENCE (TOR)

PROPOSED TERMS OF REFERENCE (TOR) PROPOSED TERMS OF REFERENCE (TOR) 4(a):STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR PETROLEUM REFINING INDUSTRIES PROJECTS AND INFORMATION TO BE INCLUDED IN EIA/EMP

More information

No.J-11011/132/2010-IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.J-11011/132/2010-IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.J-11011/132/2010-IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

No.J-11011/177/2016- IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.J-11011/177/2016- IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.J-11011/177/2016- IA II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

No.J-11011/60/2014-IA.II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.J-11011/60/2014-IA.II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.J-11011/60/2014-IA.II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New Delhi-110003

More information

No.J-11011/436/2005-IA II (I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.J-11011/436/2005-IA II (I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.J-11011/436/2005-IA II (I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA

DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA REPLY TO ATTENTON OF: DEPARTMENT OF THE ARMY U.S. ARMY ENGNEER DSTRCT, MOBLE CORPS OF ENGNEERS P.O. BOX 2288 MOBLE, ALABAMA 36628-0001 CESAM-RD-C PUBLC NOTCE NO. SAM-2013-00310-HEH June 17, 2013 JONT PUBLC

More information

No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

APPENDIX A CONCORDANCE TABLES

APPENDIX A CONCORDANCE TABLES MARY RIVER PROJECT 2016 QIA and NWB Annual Report for Operatons March 31, 2017 APPENDIX A CONCORDANCE TABLES Concordance Table - Type A Water Lcence 2AM -MRY1325 Condton No. Condton 2016 QIA and NWB Annual

More information

To manage leave, meeting institutional requirements and treating individual staff members fairly and consistently.

To manage leave, meeting institutional requirements and treating individual staff members fairly and consistently. Corporate Polces & Procedures People and Development - Document CPP216 Leave Management Frst Produced: Current Verson: Past Revsons: Revew Cycle: Apples From: 09/09/09 07/02/17 09/09/09, 26/10/12 3 years

More information

JOI NT PUBLIC NOTICE

JOI NT PUBLIC NOTICE JO NT PUBLC NOTCE CHARLESTON DSTRCT, CORPS OF ENGNEERS 69A Hagood Avenue Charleston, South Carolna 29403-5107 and THE S.C. DEPARTMENT OF HEALTH AND ENVRONMENTAL CONTROL Water Qualty Certfcaton and Wetlands

More information

No.IA-J-11011/116/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.IA-J-11011/116/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.IA-J-11011/116/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

COMMONWEALTH OF PENNSYLVANIA Department of Environmental Protection Southwest Regional Office

COMMONWEALTH OF PENNSYLVANIA Department of Environmental Protection Southwest Regional Office COMMONWEALTH OF PENNSYLVANA Department of Envronmental Protecton Southwest Regonal Offce TO FROM AQ Case Fle TV-32-00129 NoorNahar Ar Qualty Engneerng Specalst Ar Qualty Program THROUGH Thomas Joseph,

More information

CESAM-RD-A April 7, 2017 PUBLIC NOTICE NO. SAM LET

CESAM-RD-A April 7, 2017 PUBLIC NOTICE NO. SAM LET DEPARTMENT OF THE ARMY MOBLE DSTRCT, CORPS OF ENGNEERS P.O. BOX 2288 MOBLE, AL 36628-0001 CESAM-RD-A Aprl 7, 2017 PUBLC NOTCE NO. SAM-2017-00333-LET JONT PUBLC NOTCE U.S. ARMY CORPS OF ENGNEERS AND STATE

More information

LONGHOPE PARISH Neighbourhood Development Plan Submission Document Basic Conditions Statement

LONGHOPE PARISH Neighbourhood Development Plan Submission Document Basic Conditions Statement LONGHOPE PARISH Neghbourhood Development Plan 2016-2026 Submsson Document Basc Condtons Statement. e g a l l v 0ur. n o s v 0ur D O C U M E N T 3 of 7 1 1. Introducton 1.1 There s a requrement for Neghbourhood

More information

WHITLA WIND PROJECT. Public Open House. Project Description. Project Approvals Required. Technology

WHITLA WIND PROJECT. Public Open House. Project Description. Project Approvals Required. Technology Project Descrpton The Whtla Wnd Project (the Project s a nomnal 00 megawatt ( MW wnd power faclty that Captal Power s proposng to develop n two phases. The Project s located approxmately klometres south

More information

Logistics Management. Where We Are Now CHAPTER ELEVEN. Measurement. Organizational. Sustainability. Management. Globalization. Culture/Ethics Change

Logistics Management. Where We Are Now CHAPTER ELEVEN. Measurement. Organizational. Sustainability. Management. Globalization. Culture/Ethics Change CHAPTER ELEVEN Logstcs Management McGraw-Hll/Irwn Copyrght 2011 by the McGraw-Hll Companes, Inc. All rghts reserved. Where We Are Now Relatonshps Sustanablty Globalzaton Organzatonal Culture/Ethcs Change

More information

Suburban Infiniti Fa~ade Renovations JC

Suburban Infiniti Fa~ade Renovations JC C V C)F AJ"1?\ ~~fy NOV ctyofnovlorg Suburban nfnt Fa~ade Renovatons JC13.. 99 Suburban nfnt Facade Renovatons, JC13-99 Consderaton of the request of nfnt of Nov. Suburban Collecton for Prelmnary Ste Plan

More information

Managing Investigations Guidance Notes for Managers

Managing Investigations Guidance Notes for Managers Managng Investgatons Gudance Notes for Managers Managng Investgatons Gudance Notes for Managers Contents Page 1.0 Introducton. 3 2.0 Scope. 3 3.0 Benefts. 3 4.0 The Use of Internal Investgatons wthn the

More information

STANDARD TERMS OF REFERENCE

STANDARD TERMS OF REFERENCE Secretariat of State Level Expert Appraisal Committee (SEAC) Rajasthan 4, Institutional Area, Jhalana Doongri, Jaipur-302004 Phone: 0141-5159661;E-mail: seacseiaa2010@gmail.com F1 (4)/SEIAA/SEAC-Raj/Sectt/Project

More information

EOR Protocol SPECIFIED GAS EMITTERS REGULATION. Flagged. OCTOBER 2007 Version 1. Page i

EOR Protocol SPECIFIED GAS EMITTERS REGULATION. Flagged. OCTOBER 2007 Version 1. Page i SPECIFIED GAS EMITTERS REGULATION QUANTIFICATION PROTOCOL FOR ENHANCED OIL RECOVERY OCTOBER 2007 Verson 1 Page Dsclamer: The nformaton provded n ths document s ntended as gudance only and s subject to

More information

Honorable Kim Dunning Presiding Judge of the Superior Court 700 Civic Center Drive West Santa Ana, CA 92701

Honorable Kim Dunning Presiding Judge of the Superior Court 700 Civic Center Drive West Santa Ana, CA 92701 Mayor Gary Thompson Mayor Pro Tempore Jerry Holloway Councl Members L. Anthony Beall * -* - Nel C. Blas - James M. Thor Cty Manager Steven E. Hayman f September 10, 2009 Honorable Km Dunnng Presdng Judge

More information

Development and production of an Aggregated SPPI. Final Technical Implementation Report

Development and production of an Aggregated SPPI. Final Technical Implementation Report Development and producton of an Aggregated SPP Fnal Techncal mplementaton Report Marcus Frdén, Ulf Johansson, Thomas Olsson Servces Producer Prce ndces, Prce Statstcs Unt, Statstcs Sweden 2010 ntroducton

More information

1 Basic concepts for quantitative policy analysis

1 Basic concepts for quantitative policy analysis 1 Basc concepts for quanttatve polcy analyss 1.1. Introducton The purpose of ths Chapter s the ntroducton of basc concepts of quanttatve polcy analyss. They represent the components of the framework adopted

More information

WESTERN COALFIELDS LIMITED OFFICE OF THE SUB AREA MANAGER BALLARPUR SUB AREA

WESTERN COALFIELDS LIMITED OFFICE OF THE SUB AREA MANAGER BALLARPUR SUB AREA WESTERN COALFELDS LMTED OFFCE OF THE SUB AREA MANAGER BALLARPUR SUB AREA Ref.No. WCL/BA/SAM/BSA/Cvl/ q 8 2. Date:- 5 / }8 To Add. Prncpal Chef Conservator of Forests, Mnstry of Envronment, Forests & Clmate

More information

WILDLIFE SITING GUIDELINES FOR SASKATCHEWAN WIND ENERGY PROJECTS

WILDLIFE SITING GUIDELINES FOR SASKATCHEWAN WIND ENERGY PROJECTS WILDLIFE SITING GUIDELINES FOR SASKATCHEWAN WIND ENERGY PROJECTS Saskatchewan Mnstry of Envronment No. 2016-FWB 01 May 2017 Fsh and Wldlfe Branch Mnstry of Envronment 3211 Albert Street Regna, Saskatchewan

More information

Guidelines on Disclosure of CO 2 Emissions from Transportation & Distribution

Guidelines on Disclosure of CO 2 Emissions from Transportation & Distribution Gudelnes on Dsclosure of CO 2 Emssons from Transportaton & Dstrbuton Polcy Research Insttute for Land, Infrastructure and Transport June 2012 Contents 1. Introducton...- 3-1.1 Purpose and concept...- 3-1.2

More information

SHREE HARI FINE CHEM

SHREE HARI FINE CHEM Aprl 10, 2017 To, The Member Secretary,, Sector-10 A, Gandhnagar, Gujarat-382010 SHREE HARI FINE CHEM PLOT NO. C-1/9, PHASE-II, GIDC VATVA TAL DASCROI, DIST: AHMEDABAD, GUJARAT-382 445 (M) 9925243525,

More information

CONSUMER PRICE INDEX METHODOLOGY (Updated February 2018)

CONSUMER PRICE INDEX METHODOLOGY (Updated February 2018) CONSUMER PRCE NDEX METHODOLOGY (Updated February 208). Purpose, nature and use The purpose s to obtan country representatve data for the prces of goods and servces and to compute overall and group ndces

More information

A Guide to Climate Change

A Guide to Climate Change A Gude to Clmate Change What s clmate change and how wll t affect you? What s causng clmate change? What efforts are beng made to tackle clmate change? What s a carbon footprnt? What can you do to help

More information

Background Statement for SEMI Draft Document 4771B New Standard: TEST METHOD FOR EQUIPMENT FAN FILTER UNIT (EFFU) PARTICLE REMOVAL

Background Statement for SEMI Draft Document 4771B New Standard: TEST METHOD FOR EQUIPMENT FAN FILTER UNIT (EFFU) PARTICLE REMOVAL Background Statement for SEMI Draft Document 4771B New Standard: TEST METHOD FOR EQUIPMENT FAN FILTER UNIT (EFFU) PARTICLE REMOVAL Notce: Ths background statement s not part of the balloted tem. It s provded

More information

No.J-11011/887/2007-IA.II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.J-11011/887/2007-IA.II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.J-11011/887/2007-IA.II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

Ahmed E. Aljuaidi David E. Rosenbergg Jagath J. Kaluarachchi. AWRA Climate Change Conference Anchorage, Alaska

Ahmed E. Aljuaidi David E. Rosenbergg Jagath J. Kaluarachchi. AWRA Climate Change Conference Anchorage, Alaska Water Management g Wth Wastewater Treatment and Reuse, Desalnaton, and Conveyance to Counteract Clmate Change y g n the Gaza Strp Ahmed E. Aljuad Davd E. Rosenbergg Jagath J. Kaluarachch AWRA Clmate Change

More information

Numerical Analysis about Urban Climate Change by Urbanization in Shanghai

Numerical Analysis about Urban Climate Change by Urbanization in Shanghai Numercal Analyss about Urban Clmate Change by Urbanzaton n Shangha Hafeng L 1, Wejun Gao 2 and Tosho Ojma 3 1 Research Assocate, School of Scence and Engneerng, Waseda Unversty, Japan 2 Assocate Professor,

More information

Selected Economic Aspects of Water Quality Trading

Selected Economic Aspects of Water Quality Trading Selected Economc Aspects of Water Qualty Tradng Rchard N. Bosvert Gregory L. Poe Yukako Sado Cornell Unversty Passac Rver Tradng Project Kckoff Meetng Cook College, Rutgers Unversty, New Brunswck, NJ January

More information

An Analytical Model for Atmospheric Distribution. and Transport of Pollutants from Area Source

An Analytical Model for Atmospheric Distribution. and Transport of Pollutants from Area Source nt. J. Contemp. Math. Scences, Vol. 6, 0, no. 6, 97-30 An Analytcal Model for Atmospherc Dstrbuton and Transport of Pollutants from Area Source D.V.S. Kushwah, V. S. Dhakad and 3 Vandana Kushwah Department

More information

ECoP-1.0 Planning & Design

ECoP-1.0 Planning & Design ECoP-1.0 Plannng & Desgn 1.1 General 1.1.1 Ths code of practce detals the factors to be consdered durng project preparaton to avod/address envronmental concerns through modfcatons n project desgn and ncorporaton

More information

Draft General Guidelines and Criteria for mining operations in Papua New Guinea (PNG) involving Deep Sea Tailings Placement (DSTP)

Draft General Guidelines and Criteria for mining operations in Papua New Guinea (PNG) involving Deep Sea Tailings Placement (DSTP) Append x10 Dr af tgu del nesf ordeepseat a l ngspl ac ement Pr oj ec tnumber :8. ACP. PNG. 18B/15 Draft General Gudelnes and Crtera for mnng operatons n Papua New Gunea (PNG) nvolvng Deep Sea Talngs Placement

More information

THE STUDY OF GLOBAL LAND SUITABILITY EVALUATION: A CASE OF POTENTIAL PRODUCTIVITY ESTIMATION FOR WHEAT

THE STUDY OF GLOBAL LAND SUITABILITY EVALUATION: A CASE OF POTENTIAL PRODUCTIVITY ESTIMATION FOR WHEAT THE STUDY OF GLOBAL LAND SUITABILITY EVALUATION: A CASE OF POTENTIAL PRODUCTIVITY ESTIMATION FOR WHEAT Guoxn TAN, Ryosuke SHIBASAKI, K S RAJAN Insttute of Industral Scence, Unversty of Tokyo 4-6-1 Komaba,

More information

Experimental Validation of a Suspension Rig for Analyzing Road-induced Noise

Experimental Validation of a Suspension Rig for Analyzing Road-induced Noise Expermental Valdaton of a Suspenson Rg for Analyzng Road-nduced Nose Dongwoo Mn 1, Jun-Gu Km 2, Davd P Song 3, Yunchang Lee 4, Yeon June Kang 5, Kang Duc Ih 6 1,2,3,4,5 Seoul Natonal Unversty, Republc

More information

MODELING OF RIVER ICE BREAKUP DATE AND THICKNESS IN THE LENA RIVER

MODELING OF RIVER ICE BREAKUP DATE AND THICKNESS IN THE LENA RIVER Ice n the Envronment: Proceedngs of the 16th IAHR Internatonal Symposum on Ice Dunedn, New Zealand, 2nd 6th December 2002 Internatonal Assocaton of Hydraulc Engneerng and Research MODELING OF RIVER ICE

More information

SCI Assessment Steps

SCI Assessment Steps Appendx 4 Understandng FLA s Assessment Methodology FLA s Sustanable Complance methodology (SCI) dentfes root causes of noncomplance so that sustanable solutons can be developed and mplemented. SCI assessments

More information

Appendix 6.1 The least-cost theorem and pollution control

Appendix 6.1 The least-cost theorem and pollution control Appendx 6.1 The least-cost theorem and polluton control nstruments Ths appendx s structured as follows. In Part 1, we defne the notaton used and set the scene for what follows. Then n Part 2 we derve a

More information

EVALUATION METHODOLOGY OF BUS RAPID TRANSIT (BRT) OPERATION

EVALUATION METHODOLOGY OF BUS RAPID TRANSIT (BRT) OPERATION 200-203 JATIT & LL. All rghts reserved. IN: 992-864 www.att.org E-IN: 87-39 EVALUATION METHODOLOGY OF BU RAPID TRANIT (BRT) OPERATION WU HONGYANG A a Chna Urban ustanable Transport Research Center (CUTReC),

More information

A SIMULATION STUDY OF QUALITY INDEX IN MACHINE-COMPONF~T GROUPING

A SIMULATION STUDY OF QUALITY INDEX IN MACHINE-COMPONF~T GROUPING A SMULATON STUDY OF QUALTY NDEX N MACHNE-COMPONF~T GROUPNG By Hamd Sefoddn Assocate Professor ndustral and Manufacturng Engneerng Department Unversty of Wsconsn-Mlwaukee Manocher Djassem Assstant Professor

More information

M/s. Phillips Carbon Black Ltd. Survey No. 47, SH 46, Village: Mokha, Tal: Mundra, Dist: Kutchh , Gujarat

M/s. Phillips Carbon Black Ltd. Survey No. 47, SH 46, Village: Mokha, Tal: Mundra, Dist: Kutchh , Gujarat M/s. Phillips Carbon Black Ltd. Survey No. 47, SH 46, Village: Mokha, Tal: Mundra, Dist: Kutchh-370421, Gujarat FINAL ENVIRONMENTAL IMPACT & RISK ASSESSMENT REPORT FOR PROPOSED EXPANSION OF CARBON BLACK

More information

GEN _,._ tj ' Workforce Connections General Policies Eligible Training Providers

GEN _,._ tj ' Workforce Connections General Policies Eligible Training Providers workforce CONNECTONS f'hlfll 1'-'.:Rlr..R' ~U/'~ l'.;.1~.~lf.lllh'- Workforce Connectons General Polces Elgble Tranng Provders Supersedes polcy 3.6r#1 dated 02-10-10 Revsed: May 2016 Polcy Approved By:

More information

Driving Factors of SO 2 Emissions in 13 Cities, Jiangsu, China

Driving Factors of SO 2 Emissions in 13 Cities, Jiangsu, China Avalable onlne at www.scencedrect.com ScenceDrect Energy Proceda 88 (2016 ) 182 186 CUE2015-Appled Energy Symposum and Summt 2015: Low carbon ctes and urban energy systems Drvng Factors of SO 2 Emssons

More information

MODULE - 8 LECTURE NOTES 6 URBAN STORMWATER MANAGEMENT

MODULE - 8 LECTURE NOTES 6 URBAN STORMWATER MANAGEMENT Water Resources Systems Plannng and Management: Water Resources Systems Modelng Urban MODULE - 8 LECTURE NOTES 6 URBAN STORMWATER MANAGEMENT INTRODUCTION Urban stormwater management systems are meant to

More information

Application of Ant colony Algorithm in Cloud Resource Scheduling Based on Three Constraint Conditions

Application of Ant colony Algorithm in Cloud Resource Scheduling Based on Three Constraint Conditions , pp.215-219 http://dx.do.org/10.14257/astl.2016.123.40 Applcaton of Ant colony Algorthm n Cloud Resource Schedulng Based on Three Constrant Condtons Yang Zhaofeng, Fan Awan Computer School, Pngdngshan

More information

Experiments with Protocols for Service Negotiation

Experiments with Protocols for Service Negotiation PROCEEDINGS OF THE WORKSHOP ON APPLICATIONS OF SOFTWARE AGENTS ISBN 978-86-7031-188-6, pp. 25-31, 2011 Experments wth Protocols for Servce Negotaton Costn Bădcă and Mhnea Scafeş Unversty of Craova, Software

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2215802

More information

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala-147001. No. SEAC/80/37967 Dated 15/10/2008 Speed Post To M/s Green Planet Energy Pvt.

More information

Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland. Eli Lilly S.A., trading as Eli Lilly S.A. Irish Branch Location of

Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland. Eli Lilly S.A., trading as Eli Lilly S.A. Irish Branch Location of LCENCE REG NO. P0009-04 HAS BEEN TRANSFERRED. Please note that lcence Reg No. P0009-04 was transferred to El Llly Knsale Lmted on 30/05/207. For further nformaton on ths please refer to Transfer Notfcaton

More information

Fiber length of pulp and paper by automated optical analyzer using polarized light

Fiber length of pulp and paper by automated optical analyzer using polarized light T 27 om-2 PROVISIOA METHOD 99 OFFICIA METHOD 988 REVISED 2002 REVISED 2007 REVISED 202 202 TAPPI The nformaton and data contaned n ths document were prepared by a techncal commttee of the Assocaton. The

More information

A method for delineating restricted hazard areas due to debris flows

A method for delineating restricted hazard areas due to debris flows A method for delneatng restrcted hazard areas due to debrs flows K. Takanash Sabo Fronter Foundaton, Tokyo, Japan T. Mzuyama Kyoto Unversty, Kyoto, Japan Y. Nakano Mnstry of Land Infrastructure and Transport,

More information

GETTING STARTED CASH & EXPENSE PLANNING

GETTING STARTED CASH & EXPENSE PLANNING FINANCE TO SCALE Brex has partnered wth Hubspot for Startups to provde a fnancal plannng and expense management resource for your startup. These materals are a framework for fnancal plannng pror to scalng

More information

RESOLUTION A.648(16) adopted on 19 October 1989 GENERAL PRINCIPLES FOR SHIP REPORTING SYSTEMS AND SHIP REPORTING REQUIREMENTS, INCLUDING GUIDELINES

RESOLUTION A.648(16) adopted on 19 October 1989 GENERAL PRINCIPLES FOR SHIP REPORTING SYSTEMS AND SHIP REPORTING REQUIREMENTS, INCLUDING GUIDELINES NVOLVNG DANGEROUS GOODS, HARMFUL SUBSTANCES AND/OR MARNE A 16/Res.648 POLLUTANTS 27 October 1989 TE...TO AL,1. RTME Orgnal: ENGLSH R :ANZ. Tl JN ASSEMBLY - 16th sesson Agenda tem 10 MO RESOLUTON A.648(16)

More information

PREVENTION AND SAFETY MANUAL

PREVENTION AND SAFETY MANUAL Edton 10 Page 1 of 30 PREVENTION AND SAFETY MANUAL Verson 1 February 1996 Creaton Verson 2 Aprl 1998 General Revew Verson 3 Aprl 2002 General Revew Verson 4 June 2002 - Addton of PP.15. - Serous Accdents

More information

Research on the Evaluation of Corporate Social Responsibility under the Background of Low Carbon Economy

Research on the Evaluation of Corporate Social Responsibility under the Background of Low Carbon Economy http://jba.scedupress.com Internatonal Journal of Busness Admnstraton Vol. 7, No. 5; 2016 Research on the Evaluaton of Corporate Socal Responsblty under the Background of Low Carbon Economy Xaofang Zhang

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

Environmental Health 'Service Consultation Report. (As a Statutory Consultee (Planning and Development' Acts 2000, & Regs made thereunder)

Environmental Health 'Service Consultation Report. (As a Statutory Consultee (Planning and Development' Acts 2000, & Regs made thereunder) Fedhmeannacht na Serbhse Slnte Health Servce Executve R HSE South,.Communty Care Centre, Western Road, Clonmel, Co. Tpperary, ' reland. : 52 6177 : 52 6125337....-. :.... :.!............., HSE SUBMSSON

More information

North Wales Social Care and Community Health Workforce Strategy A summary

North Wales Social Care and Community Health Workforce Strategy A summary Our workforce North Wales Socal Care and Communty Health Workforce Strategy 2018-2021 A summary Hello Socal care and communty health servces are a bg part of communty lfe. They help people who need care

More information

Development and Evaluation of BOD DO Model for River Ghataprabha near Mudhol (India), using QUAL2K

Development and Evaluation of BOD DO Model for River Ghataprabha near Mudhol (India), using QUAL2K I.J. Engneerng and Manufacturng, 2015, 1, 15-25 Publshed Onlne March 2015 n MECS (http://www.mecs-press.net) DOI: 10.5815/jem.2015.01.02 Avalable onlne at http://www.mecs-press.net/jem Development and

More information

M/s. CRYSTAL CROP PROTECTION PVT. LTD. PLOT NO. D2/CH/14, GIDC INDUSTRIAL ESTATE, DAHEJ-2, TAL: VAGRA, DIST: BHARUCH (GUJ.)

M/s. CRYSTAL CROP PROTECTION PVT. LTD. PLOT NO. D2/CH/14, GIDC INDUSTRIAL ESTATE, DAHEJ-2, TAL: VAGRA, DIST: BHARUCH (GUJ.) M/s. CRYSTAL CROP PROTECTION PVT. LTD. PLOT NO. D2/CH/14, GIDC INDUSTRIAL ESTATE, DAHEJ-2, TAL: VAGRA, DIST: BHARUCH-392130 (GUJ.) ENVIRONMENTAL IMPACT & RISK ASSESMENT REPORT FOR PROPOSED AGROCHEMICALS

More information

Job Description. Department/School: Faculty of Humanities & Social Sciences Grade: 6 Department/Placements Office

Job Description. Department/School: Faculty of Humanities & Social Sciences Grade: 6 Department/Placements Office Job Descrpton Job ttle: Faculty Placements Offcer Department/School: Faculty of Humantes & Socal Scences Grade: 6 Locaton: Department/Placements Offce Purpose of the job: The postholder wll form part of

More information

RECEIVING WATER HYDRAULICS ASSIGNMENT 2

RECEIVING WATER HYDRAULICS ASSIGNMENT 2 RECEIVING WATER HYDRAULICS ASSIGNMENT 2 Desgn of wastewater dscharge from the cty of Göteborg. Example of a dffuser n a stratfed coastal sea Example of retenton tme calculatons Ths assgnment conssts of

More information

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given. PROPOSED TERMS OF REFERENCES (A) Suggested by the Applicant 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED

More information

CONFLICT RESOLUTION IN WATER RESOURCES ALLOCATION

CONFLICT RESOLUTION IN WATER RESOURCES ALLOCATION 7 th Internatonal Conference on Hydronformatcs HIC 2006, Nce, FRANCE CONFLICT RESOLUTION IN WATER RESOURCES ALLOCATION MASOUD ASADZADEH ESFAHANI Graduate Research Assstant, School of Cvl and Envronmental

More information

SAN FRANCISCO 1 PLANNING DEPARTMENT

SAN FRANCISCO 1 PLANNING DEPARTMENT o _s. COVN. SAN FRANCISCO 1 PLANNING DEPARTMENT 1650 Msson St. Sute 400 DATE May 22, 2013 San Francsco, CA 94103-2479 TO: Danel Frattn, Rueben, Junus and Rose, LLP Recepton FROM: Rck Cooper, Plannng Department

More information

GREEN PEAS. in the Columbia Basin

GREEN PEAS. in the Columbia Basin FOR FURTHER NFORMATON CONTACT GRANT- ADAMS AREA EXTENSON SERVCE EPHRATA, WASHrlGTON EM 2949 JUNE 1968 COST: a RETURNS GREEN PEAS n the Columba Basn COOPERATVE EXTENSON SERVCE COLLEGE OF AGRCULTURE WASHNGTON

More information

emissions in the Indonesian manufacturing sector Rislima F. Sitompul and Anthony D. Owen

emissions in the Indonesian manufacturing sector Rislima F. Sitompul and Anthony D. Owen Mtgaton optons for energy-related CO 2 emssons n the Indonesan manufacturng sector Rslma F. Stompul and Anthony D. Owen School of Economcs, The Unversty of New South Wales, Sydney, Australa Why mtgaton

More information

Water Poverty Index: a Tool for Integrated Water Management

Water Poverty Index: a Tool for Integrated Water Management Water Poverty Index: a Tool for Integrated Water Management Steven D. M. Mlote 1, Carolne Sullvan 2a and Jeremy Megh 2b 1 Tanzana Commsson for Scence and Technology, P. O. Box 4302, Dar es Salaam, Tanzana

More information

Consumption capability analysis for Micro-blog users based on data mining

Consumption capability analysis for Micro-blog users based on data mining Consumpton capablty analyss for Mcro-blog users based on data mnng ABSTRACT Yue Sun Bejng Unversty of Posts and Telecommuncaton Bejng, Chna Emal: sunmoon5723@gmal.com Data mnng s an effectve method of

More information

Request for D-B Proposals Page Rainier Vista Pedestrian Landbridge, Project No Capital Projects Office, University of Washington

Request for D-B Proposals Page Rainier Vista Pedestrian Landbridge, Project No Capital Projects Office, University of Washington Request for D-B Proposals Page 110-1 MANAGEMENT AND COORDINATION CHAPTER 110 DESIGN AND CONSTRUCTION PROCEDURES A. Coordnaton wth Landscape Restoraton Desgn and Unversty 1. The Landscape Restoraton of

More information

No 35034/3/2008-Estt (D) Government of lnd~a Shf3mwrn+?rnsijrm4. M~n~stry of Personnel. Publ~c Gr~evances and Pensions OFFICE MEMORANDUM

No 35034/3/2008-Estt (D) Government of lnd~a Shf3mwrn+?rnsijrm4. M~n~stry of Personnel. Publ~c Gr~evances and Pensions OFFICE MEMORANDUM No 35034/3/2008-Estt (D) mm m T Government of lnd~a Shf3mwrn+?rnsjrm4 M~n~stry of Personnel. Publ~c Gr~evances and Pensons ( ~ 3 t h ~ R ~ (Department of Personnel & Tra~n~ng) mmm (ET)Establ~shment (D)

More information

Environmental Impact Assessment of Development in the Southern Coast of the Caspian Sea (Northern Iran)

Environmental Impact Assessment of Development in the Southern Coast of the Caspian Sea (Northern Iran) Polsh Journal of Envronmental Studes Vol. 13, No. 3 (2004), 319-323 Envronmental Impact Assessment of Development n the Southern Coast of the Caspan Sea (Northern Iran) N. Safaan 1 *, M. Shokr 1, B. Jabbaran

More information

CITY OF LOS ANGELES OFFICE OF THE CITY CLERK LOS ANGELES, CALIFORNIA CALIFORNIA ENVIRONMENTAL QUALITY ACT

CITY OF LOS ANGELES OFFICE OF THE CITY CLERK LOS ANGELES, CALIFORNIA CALIFORNIA ENVIRONMENTAL QUALITY ACT ::~ J.J> ;:;:0 j Clm ~ ' -Q)!' \ ;;;:::;":; >- CTY OF LOS ANGELES ~ OFFCE OF THE CTY CLERK

More information

1. Introduction Definitions 4. -Turnover 4

1. Introduction Definitions 4. -Turnover 4 Aprl 2014 1 ndex 1. ntroducton 3 2. Defntons 4 -Turnover 4 3. Survey scope 5 3.1 Populaton scope 5 3.2 Tme scope 5 3.2.1 Base perod 5 3.2.2 Perodo de referenca 5 3.3. Geographcal scope 5 4. Features of

More information

LIFE CYCLE ENVIRONMENTAL IMPACTS ASSESSMENT FOR RESIDENTIAL BUILDINGS IN CHINA

LIFE CYCLE ENVIRONMENTAL IMPACTS ASSESSMENT FOR RESIDENTIAL BUILDINGS IN CHINA Proceedngs: Indoor Ar 2005 LIFE CYCLE ENVIRONMENTAL IMPACTS ASSESSMENT FOR RESIDENTIAL BUILDINGS IN CHINA DJ Gu 1,*, JJ Lu 1, LJ Gu 1 1 Department of Buldng Scence, School of Archtecture, Tsnghua Unversty,

More information

Reliability Analysis: A Case Study in Designing Power Distribution System of Tehran Oil Refinery

Reliability Analysis: A Case Study in Designing Power Distribution System of Tehran Oil Refinery Relablty Analyss: A Case Study n Desgnng Power Dstrbuton System of Tehran Ol Refnery A. B. Aran *, R. Shoaee**, and M. H. Abbaszade *** * Electrcal Engneerng Department Ol Desgn & Constructon Co., bouararan@gmal.com

More information

WBG OIL GAS AND MINING POLICY AND OPERATIONS UNIT (COCPO) BULGARIA: PILOT EITI PROCESS FOR GAS SECTOR AND TRANSIT REVENUES

WBG OIL GAS AND MINING POLICY AND OPERATIONS UNIT (COCPO) BULGARIA: PILOT EITI PROCESS FOR GAS SECTOR AND TRANSIT REVENUES WBG OIL GAS AND MINING POLICY AND OPERATIONS UNIT (COCPO) BULGARIA: PILOT EITI PROCESS FOR GAS SECTOR AND TRANSIT REVENUES DRAFT CONCEPT NOTE (ncludng possble elements of a EITI reportng template for gas

More information

Energy consumption of RC buildings during their life cycle

Energy consumption of RC buildings during their life cycle Energy consumpton of RC buldngs durng ther lfe cycle Ö. Bozdağ & M. Seçer Dokuz Eylül Unversty, Izmr, Turkey ABSTRACT: Studes on the total energy use durng the lfe cycle of renforced concrete buldngs are

More information

MULTIPLE FACILITY LOCATION ANALYSIS PROBLEM WITH WEIGHTED EUCLIDEAN DISTANCE. Dileep R. Sule and Anuj A. Davalbhakta Louisiana Tech University

MULTIPLE FACILITY LOCATION ANALYSIS PROBLEM WITH WEIGHTED EUCLIDEAN DISTANCE. Dileep R. Sule and Anuj A. Davalbhakta Louisiana Tech University MULTIPLE FACILITY LOCATION ANALYSIS PROBLEM WITH WEIGHTED EUCLIDEAN DISTANCE Dleep R. Sule and Anuj A. Davalbhakta Lousana Tech Unversty ABSTRACT Ths paper presents a new graphcal technque for cluster

More information

Research on the Process of Runoff and Sediment-production in the Shunjiagou Small Watershed by Applying Automatic Measurement System

Research on the Process of Runoff and Sediment-production in the Shunjiagou Small Watershed by Applying Automatic Measurement System Research on the Process of Runoff and -producton n the Shunjagou Small Watershed by Applyng Automatc Measurement System Zhou Janghong, Le Tngwu College of Hydraulc and Cvl Engneerng, Chna Agrcultural Unversty,

More information

Construction of Control Chart Based on Six Sigma Initiatives for Regression

Construction of Control Chart Based on Six Sigma Initiatives for Regression 2018 IJSRST Volume 4 Issue 2 Prnt ISSN: 2395-6011 Onlne ISSN: 2395-602X Themed Secton: Scence and Technology Constructon of Control Chart Based on Sx Sgma Intatves for Regresson ABSTRACT R. Radhakrshnan

More information