1 Term of Reference Consultancy Assignment for Waste Water Treatment Feasibility Study Purpose: Supervised by: Work location: Duration: for Pre-feasibility Study, including Environmental and Social Scoping for Myanmar Industrial Waste Water Treatment Frank Van Der Valk, Freshwater Programme and Policy Manager Myanmar (Based in Yangon with frequent travel to industrial zones in different cities) 15 May January 2020 (8 months) 1. Background WWF Myanmar was established in 2013 and is working to conserve the country s biodiversity and build a sustainable future for people and wildlife. The main focus is to promote green economy within national policies, engage the private sec on sustainable production, sustain and protect biodiversity and ecological connectivity of the transboundary Dawna Tenasserim Landscape (DTL) through an integrated landscape approach and the Ayeyarwady river basin through an integrated river basin approach. Myanmar s industry is developing rapidly, in particular through industries in industrial zones. So far, in most cases industries effluents are discharged without treatment into surface waters with devastating effects for local environment. In response, the Environmental Conservation Division (ECD) of the Ministry of Natural Resources and Environmental Conservation (MONREC) is implementing an ambitious programme to ensure compliance with environmental regulations. Industry, however faces significant challenges both in terms of technical capacity and in access to financing options, to realize such compliance. As a part of our water stewardship program WWF has been working with industrial zone committees in the country and has been assessing with companies in the Food and Beverage sec what actions need to be taken to address physical, reputational and regulay risks related to their current production practices. An important aspect thereof is wastewater treatment. Due to the recent issued Notifications by the government, obliging to develop Environmental Management Plans (EMP) and implementation of wastewater treatment systems, industries are need support to become compliant with prevailing regulations. In collaboration with the Myanmar Food Processors and Exporters Association (MFPEA), the existing 4-year project, Tha Bar Wa funded by the EU Switch Asia program, provides support through strengthening awareness and technical capacity building on wastewater treatment 1
2 2 technologies with F&B SMEs. However, a large challenge remains for cluster of industries, usually large scale, located inside industrial zones, to select appropriate treatment processes for discharged pollutants and to find appropriate financing mechanisms for the required investments. This pre-feasibility study aims to explore both the technical and financial pathways towards address those issues. Industrial zones, where a large part of the formal industrial development takes place, provide the best opportunity for an efficient approach, because of geographical concentration of activities and potential for benefits of scale. Local capacity, both technical and in terms of relevant invess is very limited so that external assistance is needed to ensure progress in resolving the significant issues for industry and the environment. 2. Consultancy Objective and Responsibilities The objective of the project is to analyze business opportunities and existing bottlenecks in order to promote private sec investment in green technologies particularly Waste Water Treatment Plants (WWTP). The will need to work in close coordination with the (see separate ToR) and WWF project staff. The project will look at the investment opportunities from two perspectives. a. Centralized WWTP Goal: To identify 2-4 investment opportunities and innovative mechanisms for centralized WWTP Activities: Conduct initial survey at 20 industrial zones to identify the ones with best potential of investable WWTP (one month): This would involve both desktop research and meeting with relevant stakeholders to identify and rank the geographies and industries zones based on a set of criteria such as willingness to invest and environmental impact. Finalize 2-4 industrial zone for in depth analysis (0.5 months): This would involve finalizing 2-4 industrial zones based on a set of criteria. The criteria will need to be developed with WWF team and other project related stakeholders Create a multi-stakeholder platform for each zone and sign letter of intent for investment (or sourcing) with the industrial zones (0.5 months): Based on above, agree on a preliminary intention from the industrial zones to invest in WWTP should the conditions of investments are met after in-depth analysis. Conduct in depth analysis (four months): Conduct in-depth analysis to identify and measure pollutant characteristics, volume, flow, physical space, use of land, potential revenue and other parameters. A different combination of facies may also need to be applied to identify the most technologically and financially viable solution. In this process, the willingness to pay of the facy owners will also need to be captured and the expectations will be communicated. This analysis can lead to potential opportunities and innovative mechanisms to build WWTPs. Present result to the multi-stakeholder platform and agree on the most appropriate investment model: Based on the analysis, present the result of the assessment to the relevant stakeholders and ensure smooth transition should there be a follow up
3 programme to implement WWTPs. b. Distributed WWTP: Goal: To identify 1-3 innovative financing models as well as the market size and priority secs for upscaling WWTP Activities Support the work of the financial expert. 3. Scope of work/ Major responsibility Identification of potential projects Surveys Identify technical solutions, ensuring compliance with IFC PS and EHS Guidelines and technologies that can be provided from the Netherlands Support market sounding in the Netherlands Preliminary project design including investment cost estimates and operation and maintenance cost estimates Support Socio-Economic cost benefit analysis Support Financial feasibility assessment Prepare an Environmental and Social Scoping Report. The report needs to follow the Performance Standards and guidelines of IFC and WB, and include the draft ToR for follow-up environmental and social assessment to be implemented in the feasibility phase. Reporting 4. List of Tasks and Deliverables of Performance The following deliverables are to be produced in collaboration with project manager, finance expert and/or national coordina. Brief inception report describing first findings in the field Mid-term review Environmental & Social Scoping Report (including draft ToR for ESIA) Final Report describing the findings of tasks 1-8 of the assignment The various tasks to be assigned to the consultants are further specified underneath for 1. institutional framework, 2. surveys, investigation and data collection, 3. opportunities for water and sludge reuse, 4. Cost estimates and advise on technology 5. Market sounding 6. Conceptual design, 7. economic and financial feasibility, 8. environmental and social scoping. TASK 1- Institutional Framework 1.1 Identify all stakeholders, including the industry, SME s, water utilities, the regula, other relevant government agencies and describe their specific roles and responsibilities 1.2 Identify local sponsor of the proposed project (incl. High level scan of 3
4 roles, responsibility and capabilities), 1.3 Laws and regulation in place regarding the discharge/treatment and reuse of industrial waste water and associated hazardous waste and level of enforcement 1.4 Existing industrial waste water treatment facilities and their operas 1.5 Any existing tariffs for discharge of industrial waste water into existing treatment facilities (if any) TASK 2 - Surveys, investigation and data collection 2.1 Conducting Stakeholder meeting(s) with various Government agencies and Industrial units and collection of secondary data 2.2 Conducting Industrial Door to Door Survey based on a geo reference to build map of all the industrial units that currently pollute the project area 2.3 Collection of current and future demand for fresh water for process water requirements and other potential users of treated water within the project area 2.4 Assess the quality of water required for process needs of the industries 2.5 Mapping of all existing industrial waste water treatment facilities (individual or centralized) in the project area 2.6 Collection of industrial waste water from the industries for analysis conforming to accredited laboray standards 2.7 Detailed analysis of industrial waste water from the various industrial stakeholders for ph, turbidity, conductivity, Biochemical Oxygen Demand, Chemical Oxygen Demand, heavy metals, anions and cations and other relevant parameters depending on the types of industry 2.8 Collection and laboray analysis of sludge from any existing industrial waste water treatment facilities 2.9 Collect and compile general information on the ongoing/ upcoming industry and investment trends 2.10 Assess current practices in disposal of industrial waste water, effluent and/or sludge within the project area inclusive of any existing industrial waste water treatment facilities and challenges faced by the industries,,,,, TASK 3 Opportunities for any wastewater Reuse Assessment of Demand, Supply and Gap 3.1 Review of relevant national and international regulations and 4
5 guidelines pertaining to water quality for wastewater reuse to industry such as the US Environmental Protection Authority 3.2 Case studies of successful international best practices in economic zones/clusters and industries that have undertaken wastewater reuse, 3.3 Assess the availability of treated wastewater for each industry / industrial zone based on wastewater from industries as well as domestic sewage from the entire area both current and future 3.4 Potential of tertiary treated water for reuse in industrial processes 3.5 Identification of demand/ supply gap for wastewater reuse (deficit/ excess) and makeup water requirements for both present and future 3.6 Assess present gaps in industrial waste water quality with respect to safe disposal quality levels as well as reuse parameters 3.7 Identify the cost of water reuse as an input for the OPEX estimations 3.8 Present options for treatment of sludge within the zones with a view for beneficial usage such as energy production, recycling etc. TASK 4 - Technology recommendations based on CAPEX and OPEX estimates 4.1 Assessment of technology options including technical feasibility ensuring compliance with IFC PS and EHS Guidelines, CAPEX, OPEX and life cycle cost considerations and recommendations for Technology option selection for each of the industries, existing Industrial waste water treatment facilities, and/or economic zones 4.2 Development of commercially viable solutions/ models for the above industries with necessary technical, commercial backup analysis and benefit analysis (including options for reuse of the treated water) 4.3 Present CAPEX per option 4.4 Present operating and maintenance costs per option 4.5 Assess earning capacity of the options in terms of reuse of treated water for industrial (or other) use 4.6 Assess resource recovery options from sludge 4.7 Propose CAPEX for sludge treatment and business case as well as potential earnings from the sludge 4.8 Recommendations on connection to infrastructure 4.9 Safety measures 4.10 Draft bill of quantities TASK 5 Market sounding for potential Dutch content 5.1 Assess the relevant technologies available among Dutch technology providers. In conducting this assessment, the consultant is to liaise Manager,, 5
6 6 closely with Netherlands technology providers for further validation of technology options. The Netherlands Water Partnership could be a suitable platform for engagement 5.2 Discuss the industrial waste water treatment challenges with the Dutch sec to find appropriate technological solutions 5.3 Gauge appetite of Dutch exporters and invess to enter into business in the country Manager Manager TASK 6 Locating Treatment options and any Reuse water network Alignment 6.1 Preliminary scoping around locations for the treatment units, nominal piping routes and other requirements and map current land ownership 6.2 Preliminary scoping for the routing of any reuse water network (if any), and ancillary facilities identifying most practical piping routes, taking into account land ownership, associated pump stations for the supply of treated wastewater to the major industrial users within the project area 6.3 Details of any metering and control mechanism proposed for any reused water TASK 7: Economic and financial feasibility 7.1 Socio-economic study for the public projects, including; o Description of socio-economic context of the project o Description of the do-nothing scenario o Evaluation of the demand (current demand and demand forecast) o Evaluation of any the existing supply in the project area; o Description of project options: identify investment alternatives to meet demand and prepare cost estimates per option. At least three options shall be compared: Do nothing Do minimum The current project 7.2 For all identified projects: financial analysis including: o amount of financing required per identified project (and thus Borrower), o how would the project potentially be financed, including international best practices of WWF in other emerging markets; o the indicative cost of finance, taken into account the strength of the identified borrower(s) o the cost-recovery potential of the project, o capex, operating and maintenance costs, o project cash-flow and o Net Present Value 7.3 Economic analysis, financial analysis enriched with broader effects on society leading to an Economic Net Present Value and Benefit/Cost ratio,,,,,,,
7 7.4 Risk assessment and sensitivity analysis 7.5 Comparison of options and selection of preferred options 7.6 Audit of potential borrower, including creditworthiness and capacity building needs assessment,, TASK 8 - Environmental and Social Scoping Following a positive decision on this pre-feasibility phase, environmental & social impact assessment (ESIA) will take place. The ESIA has to meet the requirements and Performance Standards of IFC, and applicable EHS guidelines of the WB. This is to make sure that the project is socially and environmentally sustainable. In preparation for this, during the pre-feasibility phase an environmental and social scoping will be carried out. This will include initial stakeholder consultation (surrounding communities). 8.1 Hisical land issues / resettlement (industrial zones) 8.2 Land acquisition for WWTP 8.3 Labour conditions (child labour, working hours) / health & safety at participating companies 8.4 Water use / availability 8.5 Nuisance (for instance odour) The Environmental & Social Scoping Report will include draft ToR for the ESIA.,, 5. Required profile: Knowledge/ise/Experience/Skills expertise in drafting an industrial waste water treatment design that fits the 7
8 needs of the local industries and complies with local regulation management skill to keep an eye on the day to day progress of the pre-feasibility study Sound coordination skill to build or strengthen relationship with local stakeholders resulting in a locally supported pre-feasibility study Demonstrated experience in the field of environmental & social assessment / scoping in developing countries Demonstrated experience in designing and costing industrial wastewater treatment systems in developing countries. This includes, but is not limited to, assessment of waste water characteristics, flow parameters, gradient, waste water compatibility, sludge management and experimentation physical chemical, aerobic, anaerobic Solid understanding of working in SE context, particularly with local companies, and managing stakeholders expectation Willingness to travel to different cities in Myanmar and get foot on the ground attitude Ability to communicate clearly and define value proposition to local stakeholders Experience in clean production practices Familiarity in facy visits Closing date: 26th April 2019 (Friday) Interested applicants may submit their proposal, clearly stating their fit for this assignment, together with expected consultancy fee and expenses (including breakdown) and CV to vacancy.mm@wwf.org.mm or deliver to WWF Myanmar office at 15C Than Taman Street, Dagon Township, Yangon. While separate proposals need to be submitted for the technical and the financial experts sought for this project, proposals for one may indicate a proposed collabora for the other expert. Such proposals, however, need to explicitly accept that the expert is prepared to work with another expert, whoever WWF decides to select. For additional information or clarification you can to frank.vandervalk@wwf.org.mm. Only shortlisted applicants will be contacted. 8
JOB DESCRIPTION. Project Manager Sustainable Production (Re-announced), Sustainable Business Programme Manager, WWF Myanmar
JOB DESCRIPTION Position title: Project Manager Sustainable Production (Re-announced), WWF Myanmar Directly reports to: Supervises: Validity: Location: Sustainable Business Programme Manager, WWF Myanmar
More informationEvaluation of scope for water saving options through re use of water and desalination in the Nile Basin
Strategic Water Resources Analysis Phase II Evaluation of scope for water saving options through re use of water and desalination in the Nile Basin Terms of Reference for in Individual Consultant Terms
More informationPotable Water Supply, Wastewater & Reuse Element
Potable Water Supply, Wastewater & Reuse Element GOAL ONE: HIGH QUALITY AND AFFORDABLE POTABLE WATER WILL BE AVAILABLE TO MEET THE EXISTING AND PROJECTED DEMANDS OF PINELLAS COUNTY UTILITY CUSTOMERS. 1.1.
More informationUNICEF/EAPRO, Bangkok
UNICEF/EAPRO, Bangkok TERMS OF REFERENCE - LONG TERM ARRANGEMENT ********************************************************************************** 1. Background As a joint contribution towards the achievement
More informationActivities of Water Environment Management by Yangon Regional ECD. Daw Khin Thida Tin Director Environmental Conservation Department Yangon Region
Activities of Water Environment Management by Yangon Regional ECD Daw Khin Thida Tin Director Environmental Conservation Department Yangon Region Outlines Background Environmental Policy and Legislation
More information1. Introduction. Projection of Municipal and Industrial Water demands for the Nile Basin
Projection of Municipal and Industrial Water demands for the Nile Basin Terms of reference for an individual consultant Water Demand Forecaster 1. Introduction The Nile Basin Initiative (NBI) is a partnership
More informationEXPERT GROUP (EG) MEETINGS & BASELINE WORKSHOPS + CONFLICT 2 ND AG MEETING FRIDAY, 13 TH JANUARY 2017
EXPERT GROUP (EG) MEETINGS & BASELINE WORKSHOPS + CONFLICT 2 ND AG MEETING FRIDAY, 13 TH JANUARY 2017 Expert Group Meetings 6 Expert Group Meetings were held during the week of December 13-16, 2016. 1)
More information1. Introduction. Projection of Municipal and Industrial Water demands for the Nile Basin. Terms of reference for an individual consultant Team Leader
Projection of Municipal and Industrial Water demands for the Nile Basin Terms of reference for an individual consultant Team Leader 1. Introduction The Nile Basin Initiative (NBI) is a partnership of the
More informationManager Wastewater Treatment
POSITION DESCRIPTION Manager Wastewater Treatment 1 POSITION DETAILS Position Title: Reports to: Department: Location: Manager Wastewater Treatment General Manager Operations Operations Traralgon Date:
More informationCDP. Module: Introduction. Page: W0. Introduction. CDP 2014 Water 2014 Information Request W0.1. Introduction
CDP CDP 2014 Water 2014 Information Request Target Corporation Module: Introduction Page: W0. Introduction W0.1 Introduction Please give a general description and introduction to your organization. Minneapolis-based
More informationMining Environmental Impact Assessment Guidelines. May 2018
Mining Sector Environmental and Social Impact Assessment Guidelines Mining Environmental Impact Assessment Guidelines May 2018 Background Mining EIA Guidelines Working Group established by Minister of
More informationNational Water Demand Management Policy
National Water Demand Management Policy Introduction In 1997, the Ministry of Water and Irrigation developed Jordan s Water Strategy and the following four policies, which include: Water Utility Policy;
More informationSTANDARD. Document information. Version: v4.8 Dec Date: Dec (c) 2012 European Water Partnership. All rights reserved.
STANDARD Document information Version: v4.8 Dec 2012 Language: English Date: Dec 2012 (c) 2012 European Water Partnership. All rights reserved. PAGE LEFT BLANK ON PURPOSE European Water Stewardship (EWS)
More informationCDP. Module: Introduction. Page: W0. Introduction. CDP 2017 Water 2017 Information Request W0.1. Introduction
CDP CDP 2017 Water 2017 Information Request Target Corporation Module: Introduction Page: W0. Introduction W0.1 Introduction Please give a general description and introduction to your organization Minneapolis-based
More informationChapter 7: Quality Project Review
Chapter 7: Quality Project Review Focus: This discussion addresses the quality project review, a scheduled, formal review that centers on project performance and quality metrics and which raises broad
More informationWhat are WSSC s conservation objectives? How is conservation linked to WSSC s environmental protection, resource management, sustainability goals?
What are WSSC s conservation objectives? How is conservation linked to WSSC s environmental protection, resource management, sustainability goals? What are WSSC customers expectations about water conservation?
More informationUzbekenergo: Talimarjan Thermal Power Plant 2, Uzbekistan Environmental and Social Action Plan (ESAP)
Uzbekenergo: Talimarjan Thermal Power Plant 2, Uzbekistan Environmental and Social Action Plan (ESAP) No Action Environmental Risks, Liability/ Benefits Legislative Requirement / EBRD Performance Requirement
More informationRe-use of waste Recycling of waste Recovery of waste Use of waste as source of energy Incineration without energy recovery
2.9 THE FRAMEWORK DIRECTIVE ON WASTE Official Title: Council Directive 75/442/EEC on waste, as amended by Council Directive 91/156/EEC. 2.9.1 INTRODUCTION Page 1 The Framework Directive on Waste establishes
More informationChapter 6 Objective: Protect and Enhance the Environment
Chapter 6 Objective: Protect and Enhance the Environment 49 Irish Water Water Services Strategic Plan Our Strategic Aims Ensure that Irish Water services are delivered in a sustainable manner which contributes
More informationGold Coast Waterways. Access Needs Study. Terms of Reference
Gold Coast Waterways Access Needs Study Terms of Reference Queensland Transport Integrated Transport Planning Division Boating Infrastructure Branch Level 4, 200 Mary Street BRISBANE QLD 4000 Telephone:
More informationCommemoration of World Water Day 2017 and the Regional Launch of the World Water Development Report 2017 on Waste Water: the Untapped Resources
Commemoration of World Water Day 2017 and the Regional Launch of the World Water Development Report 2017 on Waste Water: the Untapped Resources Dr. Wah Wah Maung Director-General Central Statistical Organization
More informationINDIVIDUAL CONSULTANT PROCUREMENT NOTICE. 2018/UNDP-MMR/PN/087 Date: 17 September Finance Management
INDIVIDUAL CONSULTANT PROCUREMENT NOTICE 2018/UNDP-MMR/PN/087 Date: 17 September 2018 Country: Description of the assignment: Duty Station: Period of assignment/services: Myanmar International- Development
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5812 Project Name. Vietnam Industrial Pollution Control Project Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5812 Project Name Vietnam
More informationCORE AREA SEWAGE AND RESOURCE RECOVERY SYSTEM 2.0. Phase 2: Analysis, Options Costing and Public Engagement. Project Charter - FINAL
CORE AREA SEWAGE AND RESOURCE RECOVERY SYSTEM 2.0 Phase 2: Analysis, Options Costing and Public Engagement Project Charter - FINAL Approved: October 2, 2015 (updated on November 2, 2015) TABLE OF CONTENTS
More informationBecoming a Processor: Policy, Requirements, Process, Steps & Fees
Becoming a Processor: Policy, Requirements, Process, Steps & Fees Contents I POLICY...1 A. Background... 1 II APPLICANT REQUIREMENTS...2 A. Applicant Qualifications... 2 B. Performance Requirements...
More informationMinistry of Environment & Forests (C.P. Division) Revised Guidelines for the Centrally Sponsored Scheme of Common Effluent Treatment Plants (CETPs)
Ministry of Environment & Forests (C.P. Division) ++ Revised Guidelines for the Centrally Sponsored Scheme of Common Effluent Treatment Plants (CETPs) 1. Introduction: Under the Water (Prevention and Control
More informationEnvironmental Performance Plan !
Environmental Performance Plan 2011 2016! Version Date Author / Reviewers Issued Description of changes 3.0 16 March Editing clarifications 2011 Drafted by Julia Callaghan, Sustainability Coordinator and
More informationEast Asia Urban Sanitation Review
EAP REGION URBAN SANITATION REVIEW East Asia Urban Sanitation Review Presentation prepared by Bank Team September 2013 Outline Sector Overview Issues Recommendations 1. Sector Overview PURPOSE OF THE STUDY
More informationImproving energy efficiency in waste water treatment: What emerging countries can learn from experience gained in the developed world
Improving energy efficiency in waste water treatment: What emerging countries can learn from experience gained in the developed world Water Week 2009 Dr. Mark Husmann, Pöyry Environment GmbH, Germany 1
More informationCurrent and Future Challenges of Water Environment and Wastewater Management in Myanmar
Water and Sanitation Division Department of Building, Ministry of Construction Watershed Management for Controlling Municipal Wastewater in South East Asia Current and Future Challenges of Water Environment
More informationPre Submission Meeting Construction Manager at Risk. August 23, 2016
Pre Submission Meeting Construction Manager at Risk August 23, 2016 Health and Safety Hard hats and safety vests are required for today s site tour If you did not bring them, we have extras at the plant
More informationChapter 13 Management and Implementation
Chapter 13 Management and Implementation TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Overview of AGT Region Operating Management System... 13-1 13.3 Construction
More informationDate: January 19, 2018
Vinton Communications Utility Request for Information (RFI) For Potential Partners to Provide Cost-Competitive, Reliable, High-Capacity, Gigabit Speed Broadband Services Date: January 19, 2018 Vinton Communications
More informationRisk analysis. Appendix 14. This appendix is divided into two parts: Appendix 14 (A) Risks within management control
Risk analysis Appendix 14 Risk analysis This appendix is divided into two parts: Appendix 14 (A) Risks within management control Appendix 14 (B) Risks outside management control PAGE 361 Appendix 14 Risk
More informationPublic Private Partnership Procurement and Opportunities.
Public Private Partnership Procurement and Opportunities. C.J. Liebenberg. CJL Consult, Pretoria, 0039, South Africa, cliebenberg@cjlconsult.co.za ABSTRACT Pressure to improve waste management and to comply
More informationS/N POSITION NUMBER KEY ROLES & REQUIREMENTS. 1 Chief Financial Officer
RE-ADVERTISEMENT The management of Energy Utility Corporation Limited (EUCL) informs the public that it is recruiting competent, qualified and experienced staff to fill the following positions: S/N POSITION
More informationEskom Management Systems to avoid or mitigate the Biodiversity impacts of Wind energy projects. Rudi Kruger Corporate Specialist Eskom South Africa
Eskom Management Systems to avoid or mitigate the Biodiversity impacts of Wind energy projects Rudi Kruger Corporate Specialist Eskom South Africa 1 November 2012 Roadmap of the presentation Eskom s environmental
More informationWater Devon Energy Corporation. Module: Introduction. Page: W0. Introduction W0.1. Introduction
Water 2017 - Devon Energy Corporation Module: Introduction Page: W0. Introduction W0.1 Introduction Please give a general description and introduction to your organization Devon Energy Corp. (NYSE: DVN)
More informationRFP No: WB/MOF/MINIS/CS/CQS/1.1.14/2014
Terms of Reference for a Cumulative Impacts Assessment in Tavan Tolgoi Coal Mine Region in Mongolia to be financed by Mining Infrastructure Investment Support Project (MINIS) RFP No: WB/MOF/MINIS/CS/CQS/1.1.14/2014
More informationINDIVIDUAL CONSULTANT PROCUREMENT NOTICE. Date: 17 August 2016
INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Date: 17 August 2016 Country: Home-based with 2 missions to Bangkok, Thailand Description of the assignment: Knowledge Management Consultant Project name: UNDP
More informationDATE: July 10, 2018 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration
DATE: July 10, 2018 REPORT NO. PW2018-046 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger, General Manager Public Works Commission 1.0 TYPE OF REPORT
More informationNational Water Policy for Palestine
Palestinian National Authority Palestinian Water Authority National Water Policy for Palestine Final Draft Water Policy 2013-2032 1 1. Background 1.1 National Water Policy The purpose of this document
More informationWorking for Better Water Quality The State of Water Quality Management in WEPA Partner Countries
Water Environment Partnership in Asia Policy Brief Series 6 March 2013 Working for Better Water Quality The State of Water Quality Management in WEPA Partner Countries Low water quality is one of the most
More informationMemorandum of Understanding
Memorandum of Understanding between the NSW Ministry of Health and Sydney Water Corporation July 2016 MoU between Sydney Water and NSW Ministry of Health - July 2016 Page 1 of 11 1. Introduction and purpose
More informationCorporate governance. Dutch Corporate Governance Code. Dutch Banking Code. Rabobank Group Code of Conduct
Corporate governance Rabobank Group is comprised of autonomous local member Rabobanks; their central organisation, Rabobank Nederland, and a number of specialised subsidiaries. As a bank that uses its
More informationINTERNATIONAL LABOUR ORGANIZATION THE OFFICE OF THE ILO LIAISON OFFICER
INTERNATIONAL LABOUR ORGANIZATION THE OFFICE OF THE ILO LIAISON OFFICER Call for Expression of Interest ILO/YGN/18/27 19 July 2018 Post Title: National Consultant for feasibility study for the establishment
More informationAWS INTERNATIONAL WATER STEWARDSHIP STANDARD
AWS INTERNATIONAL WATER STEWARDSHIP STANDARD DRAFT REVISED STANDARD FOR CONSULTATION WITH NOTES ON PROPOSED CHANGES REVISED DRAFT 2-0, SEPTEMBER 2018 ALLIANCE FOR WATER STEWARDSHIP (SCIO) 2 Quality Street,
More informationThe Future of Water in Asia
The Future of Water in Asia The Future of Water 3 rd Karachi International Water Conference 2017 Dr. Claudia Sadoff, Director General International Water Management Institute Great global concern over
More information2012/13. Ministry of Education Output Plan. between. the Minister for Tertiary Education, Skills and Employment. and. the Secretary for Education
Te Tiilwlm ole Miitaura11ga 2012/13 Ministry of Education Output Plan between the Minister for Tertiary Education, Skills and Employment and the Secretary for Education 30 June 2012 Te Ttilmlm o tc Miifmmmga
More informationNotice of Public Hearing. Notice of Public Hearing
2015 URBAN WATER MANAGEMENT PLAN Table 8-2: Notification to Cities and Counties Retail: Notification to Cities and Counties City Name 60 Day Notice Notice of Public Hearing Dana Point Mission Viejo County
More informationChapter 8 Objective: Invest in Our Future. 69 Irish Water Water Services Strategic Plan
Chapter 8 Objective: Invest in Our Future 69 Irish Water Water Services Strategic Plan Our Strategic Aims Manage our assets and investments in accordance with best practice asset management principles
More informationPOSITION DESCRIPTION BUSINESS ANALYST / TESTER
Team Classification Position Objective Information Technology Strategy & Planning Western Water Enterprise Agreement Band 6 Level A C Provision of business analysis and testing services across all Western
More informationImplementation Status of Myanmar for the Basel Convention
Implementation Status of Myanmar for the Basel Convention Workshop 2016 of the Asian Network for Prevention of Illegal Transboundary Movements of Hazardous Wastes Dr. Tin Aung Win Assistant Director Environmental
More informationPort Moresby, Papua New Guinea Application Deadline: 4 th August, 2017 Support in the Design of an integrated Environment Title:
ANNEX 1- TERMS OF REFERENCES (TOR) Location: Port Moresby, Papua New Guinea Application Deadline: 4 th August, Support in the Design of an integrated Environment Title: Information Management System for
More informationTITLE OF CONSULTANT: Individual Consultant (IC) to Develop a Strategic Plan and Implementation Program for Business Botswana
INDIVIDUAL CONSULTANT PROCUREMENT NOTICE 19 th December 2017 TITLE OF CONSULTANT: Individual Consultant (IC) to Develop a Strategic Plan and Implementation Program for Business Botswana COUNTRY: BOTSWANA
More informationToR. Consultancy Firm to undertake Strategic Environmental Assessment (SEA) for the new Mining and Minerals Policy
ToR Consultancy Firm to undertake Strategic Environmental Assessment (SEA) for the new Mining and Minerals Policy 1. Strategic Background Rwanda s has achieved a sustained economic growth over the past
More informationApplication type: External vacancy International/Regional/ National Expert on. Environment and Biodiversity Finance
Terms of Reference for the Recruitment of an International/National Expert on Biodiversity Expenditure Review The Biodiversity Finance Initiative BIOFIN - Rwanda Application type: External vacancy Job
More informationCBA Forum meeting on Environment sectors
1 CBA Forum meeting on Environment sectors Focus topics of discussion in water sector Nikolay Kolev Brussels, 12 May 2017 Regulation 2015/207 Compliance with the full-cost recovery principle includes that:
More informationRequest for Qualifications
Request for Qualifications For Newport School District Proposals Due July 16, 2018 2:00 p.m. Request for Qualifications: Energy Performance Contracting Services Page 2 of 14 Table of Contents REQUEST FOR
More informationEnvironmental Officer
POSITION DESCRIPTION Officer 1 POSITION DETAILS Position Title: Reports to: Department: Location: Officer Environment and Sustainability Coordinator Environment / Operations Traralgon Date: November 2018
More informationTERMS OF REFERENCE FOR CONSULTANCY
TERMS OF REFERENCE FOR CONSULTANCY Identification of Market Opportunities for Fresh Agriculture and Fisheries Commodities and Value Added Products SVGRACP-C-IC-05 BACKGROUND Project Background The Government
More informationEthical Sourcing. March 4, 2014 Seafood Processors Association, Seattle WA
March 4, 2014 Seafood Processors Association, Seattle WA 1 Scheme Organization Ethical Code, 2 nd edition - Social, Environmental, OH&S Appendices: 1. Certification Assessment Requirements 2. Implementation
More informationConsultancy Hydrogeological Investigation and Assessments in Baidoa Terms of Reference (ToR)
Consultancy Hydrogeological Investigation and Assessments in Baidoa Terms of Reference (ToR) 1. PURPOSE The purpose of this consultancy is to complete an assessment of IDP locations in Baidoa, South West
More informationHanoi, Vietnam. Please read this document carefully as applications that vary from the specified requirements may not be accepted.
Information for Applicants Investing in Women (IW) Position Title: Position Location: Country Manager, Vietnam Hanoi, Vietnam Position Type: Contractor, to June 2019 Estimated Start Date: September 2017
More informationGaza Central Desalination Plant And Associated Works Program
State of Palestine Palestinian Water Authority دولة فلسطين سلطة المياه الفلسطينية Gaza Central Desalination Plant And Associated Works Program PWA and the Palestinian Water Sector are supported by the
More informationPROJECT INFORMATION FORM - WATER Part A General Information
PROJECT INFORMATION FORM - WATER Part A General Information Country UNMIK Kosovo Sector Water Project Submission Date Project Title 2003 (updated as regional WWTP in June 2005) Project Code (filled by
More informationFINANCING IMPLEMENTATION OF WATER-RELATED SDGS 12 DECEMBER 2017, YANGON, MYANMAR
FINANCING IMPLEMENTATION OF WATER-RELATED SDGS 12 DECEMBER 2017, YANGON, MYANMAR *EGM can contribute to understanding of mechanisms of effective implementation of water-and sanitation-related SDGs and
More informationThe PSM Consultant will work in close collaboration with UNDP Country Office staff, governments, UN agencies in the areas of their expertise.
The United Nations Development Programme (UNDP) is the UN s global development network, advocating for change and connecting countries to knowledge, experience and resources to help people build a better
More informationCOMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE 2017
COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE 2017 As a member of the International Counsel on Mining and Metals (ICMM), Anglo American adheres to the ICMM Assurance
More informationModule 5: Project Evaluation in
Module 5: Project Evaluation in IUCN 5-1 Module 5: Project Evaluation in IUCN 5-2 Module 5: Project Evaluation in IUCN Table of contents 1. THE ROLE OF PROJECT EVALUATION IN IUCN... 6 1.1. THE PURPOSE
More informationSpecific Terms of Reference for the in-depth review of the cycle of the Government of Ghana/UNFPA Sixth Country Programme (GoG/UNFPA CP6)
Specific Terms of Reference for the in-depth review of the 2012-2017 cycle of the Government of Ghana/UNFPA Sixth Country Programme (GoG/UNFPA CP6) Title : Purpose Location Application Categories SUMMARY
More informationINTERNATIONAL LABOUR ORGANIZATION THE OFFICE OF THE ILO LIAISON OFFICER
INTERNATIONAL LABOUR ORGANIZATION THE OFFICE OF THE ILO LIAISON OFFICER Call for Expression of Interest ILO/YGN/9/7 24 January 209 Position Title: National Consultant for Provision of Agricultural Trainings
More informationMekong River Commission
Mekong River Commission 184 Fa Ngoum Road, P.O. Box 6101, 184 Fa Ngoum Road, Unit 18 Ban Sithane Neua, Sikhottabong District, Vientiane 01000, Lao PDR Telephone: (856-21) 263 263. Facsimile: (856-21) 263
More informationEnvironmental and Social Policy
Environmental and Social Policy Contents Foreword 2 Purpose 2 Commitments 2 Environmental and Social Assessment 3 Operations financed directly 4 Operations financed through Financial Intermediaries 4 Environmental
More informationINCHEM Tokyo Current Status and Implementation Approach for Industrial Zones Wastewater Management In Yangon Region
INCHEM Tokyo 2017 Current Status and Implementation Approach for Industrial Zones Wastewater Management In Yangon Region Than Than Thwe Director, Ministry of Construction Joint Secretary-1, Thilawa SEZ
More informationOverview and highlights
This country profile was compiled by the OECD Secretariat and reflects information available as of March 2015. Further information and analysis can be found in the publication: OECD (2015) Water Resources
More informationRFP Restructuring Advisory Committee: Water and Sewer Question and Answer. Question Cut-Off 2/13/17
RFP 2017-0007 Restructuring Advisory Committee: Water and Sewer Question and Answer Question Cut-Off 2/13/17 1. What is the estimated value of the sewer system? Determining an appropriate valuation of
More informationEU PROJECT MANAGER (FULL-TIME) LOCAL ENTERPRISE OFFICE (36 MONTH CONTRACT)
COMHAIRLE CATHRACH CHORCAÍ CORK CITY COUNCIL CANDIDATE INFORMATION BOOKLET Please Read Carefully EU PROJECT MANAGER (FULL-TIME) LOCAL ENTERPRISE OFFICE (36 MONTH CONTRACT) DETAILS OF QUALIFICATIONS AND
More informationLOCAL GOVERNANCE MAPPING EXERCISE IN MYANMAR
TERMS OF REFERENCE FOR COMMUNICATIONS AND KNOWLEDGE MANAGEMENT CONSULTANT FOR LOCAL GOVERNANCE MAPPING EXERCISE IN MYANMAR UNDP MYANMAR (PILLAR 1: LOCAL GOVERNANCE) APRIL-31 SEPTEMBER 2014 1) GENERAL BACKGROUND
More informationQUILTER PLC ( Quilter or the Company ) BOARD RISK COMMITTEE TERMS OF REFERENCE
QUILTER PLC ( Quilter or the Company ) BOARD RISK COMMITTEE TERMS OF REFERENCE Version approved by the Quilter Board (the Board ) on 15 February 2018. 1. Role The role of the Board Risk Committee (the
More informationAPPENDIX C. Public Consultation Centre (PCC) Displays. Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3
APPENDIX C Public Consultation Centre (PCC) Displays Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3 Appendix C1 PCC#1 Appendix C2 PCC#2 Township of Red Rock Class Environmental
More informationRequest for Proposals For Wastewater Treatment Plant Expansion and other Plant Improvements
For Wastewater Treatment Plant Expansion and other Plant Improvements By the City of Tracy April 31, 2017 Response Due: Wednesday, May 31, 2017 @ 3:00 PM City of Tracy Development Services Attention: Ripon
More informationDemand Side Engagement Strategy. Version 2.0 Effective Date: 08/02/18
Demand Side Engagement Strategy Version 2.0 Effective Date: 08/02/18 Document management Version control Date Version Description Author 16/07/2013 0.1 Initial Draft. Y. Jayathilaka 23/07/2013 0.2 Revised
More informationENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan
ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL
More information2017 Corporate Social Responsibility Report EXECUTIVE SUMMARY
2017 Corporate Social Responsibility Report https://csr.eqt.com EXECUTIVE SUMMARY EQT Corporation is pleased to announce our sixth annual Corporate Social Responsibility report, Bridging Growth & Success,
More informationEnvironmental and Social Action Plan Adjaristskali Hydropower Plants
Environmental and Social Plan Adjaristskali Hydropower Plants The International Finance Corporation (IFC), the Asian Development Bank (ADB), and the European Bank for Reconstruction and Development (EBRD)
More informationCHEMICALLY ENHANCED PRIMARY TREATMENT AN ALTERNATE PARADIGM FOR BASIN-WIDE RIVER WATER QUALITY IMPROVEMENT
CHEMICALLY ENHANCED PRIMARY TREATMENT AN ALTERNATE PARADIGM FOR BASIN-WIDE RIVER WATER QUALITY IMPROVEMENT Asit Nema 1 and Dr. Vinod Tare 2 ABSTRACT In view of limited resources available for water pollution
More informationTerms of Reference (TOR)
Annex 4 Terms of Reference (TOR) Conducting Simplified Economic Appraisals for proposed labour intensive public infrastructure projects contributing to local economic development. 1. Project title: Simplified
More informationComprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014
Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014 Application type Agency Review Comments Applicable Plan Sections Staff Planner Staff Recommendation Publicly
More informationINDIVIDUAL CONSULTANT PROCUREMENT NOTICE
INDIVIDUAL CONSULTANT PROCUREMENT NOTICE 2018/UNDP-MMR/PN/130 Date: 30 October 2018 Country: Description of the assignment: Duty Station: Period of assignment/services: Myanmar Consultant, Solid Waste
More informationTerms of Reference to conduct a socio-economic study and energy access baseline in Arua and Masindi Districts
Terms of Reference to conduct a socio-economic study and energy access baseline in Arua and Masindi Districts Background The World Wide Fund for Nature (WWF), the global conservation organization, has
More informationEnvironmental Policy and Guide December 2010
Environmental Policy and Guide December 2010 Page 1 of 11 ENVIRONMENTAL POLICY A responsible and forward-looking approach to environmental issues is an important factor in Intu Properties plc s continuing
More informationWater Reuse Cost Benefit Analysis
Water Reuse Cost Benefit Analysis The Morocco Example Claire Kfouri Water Week 2009 Water Availability in 2020 WORLD WATER RESOURCES AT THE BEGINNING OF THE 21ST CENTURY IHP UNESCO, March-2000 Units: 1000
More informationREQUEST FOR EXPRESSIONS OF INTEREST. AFRICAN DEVELOPMENT BANK Avenue Joseph Anoma, 01 B.P. 1387, Abidjan, CÔTE d'ivoire
REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK Avenue Joseph Anoma, 01 B.P. 1387, Abidjan, CÔTE d'ivoire Corporate IT Services Department (CHIS) E-mail: IT_Recruitment@afdb.org Telephone:
More information2019/UNDP-MMR/PN/005 Date: 18 January Proposal (Risk Assessment) Home based, with travel to Naypyitaw and Mawlamyaing District, Myanmar
United Nations Development Programme INDIVIDUAL CONSULTANT PROCUREMENT NOTICE 2019/UNDP-MMR/PN/005 Date: 18 January 2019 Country: Myanmar Description of the assignment: Duty Station: Period of assignment/services:
More informationJOB DESCRIPTION. Roving Regional Finance Manager, WWF-Greater Mekong
JOB DESCRIPTION Position title: Directly reports to: Technically reports to: Supervises: Roving Regional Finance Manager, WWF-Greater Mekong Finance Director, WWF-Greater Mekong N/A None Validity: July
More informationTeam Leader Asset Information
POSITION DESCRIPTION Team Leader Information 1 POSITION DETAILS Position Title: Reports to: Department: Location: Team Leader Information Manager / s Traralgon Date: November 2018 Document Reference: COR/18/21140
More informationINFRASTRUCTURE ELEMENT SANITARY SEWER SUB-ELEMENT
INFRASTRUCTURE ELEMENT SANITARY SEWER SUB-ELEMENT GOALS, OBJECTIVES & POLICIES GOAL, OBJECTIVES & POLICIES GOAL SS. SANITARY SEWER PUBLIC SERVICE. It is the goal of the City of Casselberry to provide,
More informationChallenge. Solution. Benefits
Water recycling plant in China 01 As water shortage in urban areas in China is becoming a serious problem due to growing population in such areas, effective use of treated water is needed as a countermeasure
More information