SIZING WATER SERVICE LINES AND METERS

Size: px
Start display at page:

Download "SIZING WATER SERVICE LINES AND METERS"

Transcription

1 SIZING WATER SERVICE LINES AND METERS COUNTY OF CURRITUCK Water Customer Data Sheet Customer: Address: Building Address: 2 Lark Drive Zip Code: Subdivision: Lot #: Block #: Type of Occupancy: FIXTURE FIXTURE VALUE 6 psi NUMBER OF FIXTURES TOTAL FIXTURE VALUE Bathtub 8 x 3 = 24 Bedpan Washers x = Bidet 2 x = Dental Unit 2 x = Drinking Fountain Public 2 x 2 = 4 Kitchen Sink 2.2 x = 2.2 Lavatory.5 x = Shower Head (Shower Only) 2.5 x = Service Sink 4 x = 4 Urinal Ped. Flush Valve 35 x = Wall Flush Valve 6 x = Wash Sink (Each Set of Faucets) 4 x 3 = 2 Water Closet - Toilet Flush Valve 35 x = Tank Type 4 x 3 = 2 Dishwasher /2" Connection 2 x = Washing Machine /2" Connection 6 x = Hose (5' Wash Down) /2" Connection 5 x 3 = 5 5/8" Connection 9 x = 3/4" Connection 2 x = Combined Fixture Value Total: 73.2 Customer Peak Demand (from Figure 4-2 or 4-3 x Pressure Factor) 47 gpm Add Irrigation Squares gpm Hose Bibs gpm Add Fixed Load gpm TOTAL FIXED DEMAND 47 gpm WATER METER SIZE inch Water - AWWA (25)

2

3

4 Major Stormwater Plan Form SW-2 Review Process Contact Information Currituck County Phone: Planning and Community Development Fax: Courthouse Road, Suite Currituck, NC Website: General Currituck County Phone: Engineering Department 53 Courthouse Road, Suite 32 Currituck, NC Major stormwater plan approval is required for: o Major subdivisions. o Major site plans - development or expansion on a nonresidential, multi-family, or mixed use lot by 5, square feet or more of impervious coverage or resulting in % or more total impervious coverage. Step : Application Submittal The applicant must submit a complete application packet consisting of the following: Completed Currituck County Minor Stormwater Plan Form SW-2 (unless submitting a major subdivision or major site plan). Completed Rational Method Form SW-3 or NRCS Method Form SW-4. Stormwater management plan drawn to scale. The plan shall include the items listed in the major stormwater plan design standards checklist. Alternative stormwater runoff storage analysis and/or downstream drainage capacity analysis, if applicable. NCDENR permit applications, if applicable. Number of Copies Submitted: 3 Copies of required plans 3 Hard copies of ALL documents PDF digital copy (ex. Compact Disk not acceptable) of all plans AND documents. On receiving an application, staff shall determine whether the application is complete or incomplete. A complete application contains all the information and materials listed above, and is in sufficient detail to evaluate and determine whether it complies with appropriate review standards. An application for major stormwater plan must be submitted and approved prior altering an existing drainage system, performing any land disturbing activity or, before construction documents are approved. Step 2: Staff Review and Action Once an application is determined complete staff shall approve, approve subject to conditions or disapprove the application. Major Stormwater Plan SW-2 Page of 4

5 Major Stormwater Plan Form SW-2 OFFICIAL USE ONLY: Permit Number: Date Filed: Date Approved: Contact Information APPLICANT: Name: Address: PROPERTY OWNER: Name: Address: Telephone: Address: Telephone: Address: Property Information Physical Street Address: Parcel Identification Number(s): FEMA Flood Zone Designation: Request Project Description: Total land disturbance activity: sf Calculated volume of BMPs: sf Maximum lot coverage: sf Proposed lot coverage: sf TYPE OF REQUEST Major subdivision (-year, 24-hour rate) Major site plan (5-year, 24-hour rate) METHOD USED TO CALCULATE PEAK DISCHARGE Rational Method NRCS Method (TR-55 and TR-2) Simple volume calculation for small sites (less than acres) Alternative stormwater runoff storage analysis Downstream drainage capacity analysis I hereby authorize county officials to enter my property for purposes of determining compliance. All information submitted and required as part of this process shall become public record. Property Owner(s)/Applicant Date Major Stormwater Plan SW-2 Page 2 of 4

6 Major Stormwater Plan Design Standards Checklist The table below depicts the design standards of the major stormwater plan application. Please make sure to include all applicable listed items to ensure all appropriate standards are reviewed. Major Stormwater Plan Design Standards Checklist Date Received: _ Project Name: Applicant/Property Owner: Minor Stormwater Plan Design Standards Checklist General Property owner name and address. 2 Site address and parcel identification number. 3 North arrow and scale to be = or larger. Site Features 4 Scaled drawing showing existing and proposed site features: Property lines with dimensions, acreage, streets, easements, structures (dimensions and square footage), fences, bulkheads, septic area (active and repair), utilities, vehicular use areas, driveways, and sidewalks. 5 Approximate location of all designated Areas of Environmental Concern (AEC) or other such areas which are environmentally sensitive on the property, such as Maritime Forest, CAMA, 44, or 4 wetlands as defined by the appropriate agency. 6 Existing and proposed ground elevations shown in one foot intervals. All elevation changes within the past six months shall be shown on the plan. 8 Limits of all proposed fill, including the toe of fill slope and purpose of fill. 9 Square footage of all existing and proposed impervious areas (structures, sidewalks, walkways, vehicular use areas regardless of surface material), including a description of surface materials. Existing and proposed drainage patterns, including direction of flow. Location, capacity, design plans (detention, retention, infiltration), and design discharge of existing and proposed stormwater management features. 2 Elevation of the seasonal high water level as determined by a licensed soil scientist. 3 Plant selection. Permits and Other Documentation 4 NCDENR stormwater permit application (if,sf or more of built upon area). 5 NCDENR erosion and sedimentation control permit application (if one acre or more of land disturbance). 6 NCDENR coastal area management act permit application, if applicable. 7 Stormwater management narrative with supporting calculations. 8 Rational Method Form SW-3 or NRCS Method Form SW-4 9 Alternative stormwater runoff storage analysis and/or downstream drainage capacity analysis, if applicable 2 Design spreadsheets for all BMPs (Appendix F Currituck County Stormwater Manual). 2 Detailed maintenance plan for all proposed BMPs. Major Stormwater Plan SW-2 Page 3 of 4

7 Certificate 22 The major stormwater plan shall contain the following certificate: I,, owner/agent hereby certify the information included on this and attached pages is true and correct to the best of my knowledge. On the plan entitled, stormwater drainage improvements shall be installed according to these plans and specifications and approved by Currituck County. Yearly inspections are required as part of the stormwater plan. The owner is responsible for all maintenance required. Currituck County assumes no responsibility for the design, maintenance, or performance of the stormwater improvements. Date: Owner/Agent: Major Stormwater Plan Submittal Checklist Staff will use the following checklist to determine the completeness of your application. Please make sure all of the listed items are included. Staff shall not process an application for further review until it is determined to be complete. Major Stormwater Plan Form SW-2 Submittal Checklist Date Received: _ Project Name: Applicant/Property Owner: Major Stormwater Plan Form SW-2 Submittal Checklist Completed Major Stormwater Plan Form SW-2 2 Completed Rational Method Form SW-3 or NRCS Method Form SW-4 3 Stormwater plan 4 NCDENR permit applications, if applicable 5 3 copies of plans 6 3 hard copies of ALL documents 7 PDF digital copy of all plans AND documents (ex. Compact Disk not acceptable) Comments Major Stormwater Plan SW-2 Page 4 of 4

8 NRCS Method Peak Flow Form SW-4 Project Information Project Location: Parcel Identification Number(s): Check One: Pre-Development Post-Development Calculations Runoff Curve Number and Runoff. Runoff Curve Number (CN) Soil Type Cover Description CN (Table 2-6) Area (acres) CN*A Totals CNWeighted = SCN*A = SA Use CN = 2. Runoff Frequency Yr Rainfall, P (24-hour) (Use Table 2-7) In Runoff, Q In Storm # Storm #2 Storm #3 NRCS Peak Flow SW-4 Page of 3

9 NRCS Method Peak Flow Form SW-4 Project Information Project Location: Parcel Identification Number(s): Check One: Pre-Development Post-Development Calculations Runoff Curve Number and Runoff. Runoff Curve Number (CN) Soil Type Cover Description CN (Table 2-6) Area (acres) CN*A Totals CNWeighted = SCN*A = SA Use CN = 2. Runoff Frequency Yr Rainfall, P (24-hour) (Use Table 2-7) In Runoff, Q In Storm # Storm #2 Storm #3 NRCS Peak Flow SW-4 Page of 3

10 Time of Concentration (Tc) NOTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments Sheet flow (Applicable to Tc only) Segment ID Pre Post. Surface description 2. Manning's roughness coeff., n (Table 2-9) 3. Flow Length, L (total L<= 3 ft) ft hr rainfall, P in Land Slope, s ft / ft 6. Tt =.42(nL).8 / P2.5 s.4 min + = Shallow concentrated flow Segment ID 7. Surface Description: paved (P) or unpaved (U)? 8. Flow Length, L ft 9. Watercourse slope, s ft / ft. Average velocity, V (Table 2-8) ft / sec. Tt = L / V min + = Channel flow Segment ID Pipe (P) or Channel (C)? If pipe, enter D (in): If channel, enter bottom width: If channel, enter side slopes (_:): 2. Cross sectional flow area, a sq ft 3. Wetted perimeter, wp ft 4. Hydraulic radius, r = a / wp ft 5. Channel slope, s ft / ft 6. Manning's roughness coeff., n 7. V =.49 r.67 s.5 / n ft / sec 8. Flow length, L ft 9. Tt = L / 6V min + = 2. Watershed or subarea Tc or Tt (add Tt in steps 6,, 9) min NRCS Peak Flow SW-4 Page 2 of 3

11 Graphical Peak Discharge. Data: Drainage Area, Am = sq mi (acres/64) Runoff Curve Number, CN = (From Runoff Curve Number Worksheet) Time of Concentration, Tc = hr (From Time of Concentration Worksheet) Rainfall Distribution = Type III Pond and swamp areas spread throughout watershed = % of Am ( acres covered) Storm # Storm #2 Storm #3 2. Frequency yr 3. Rainfall, P (24-hour) in 4. Initial abstraction, Ia in (Use CN) 5. Compute Ia/P Unit peak discharge, qu csm/in (use Tc and Ia/P with Figure 2-9) 7. Runoff, Q in (From Runoff Curve Number Worksheet) 8. Pond and swamp adjustment factor, Fp..... (Use Table 2-) 9. Peak discharge, Qp cfs (Where Qp = qu Am Q Fp) Applicant Date NRCS Peak Flow SW-4 Page 3 of 3

12 Graphical Peak Discharge. Data: Drainage Area, Am = sq mi (acres/64) Runoff Curve Number, CN = (From Runoff Curve Number Worksheet) Time of Concentration, Tc = hr (From Time of Concentration Worksheet) Rainfall Distribution = Type III Pond and swamp areas spread throughout watershed = % of Am ( acres covered) Storm # Storm #2 Storm #3 2. Frequency yr 3. Rainfall, P (24-hour) in 4. Initial abstraction, Ia in (Use CN) 5. Compute Ia/P Unit peak discharge, qu csm/in (use Tc and Ia/P with Figure 2-9) 7. Runoff, Q in (From Runoff Curve Number Worksheet) 8. Pond and swamp adjustment factor, Fp..... (Use Table 2-) 9. Peak discharge, Qp cfs (Where Qp = qu Am Q Fp) Applicant Date NRCS Peak Flow SW-4 Page 3 of 3

13 Precipitation Frequency Data Server Page of 4 8/27/28 NOAA Atlas 4, Volume 2, Version 3 Location name: Moyock, North Carolina, USA* Latitude: , Longitude: Elevation: 7.63 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF_tabular PF_graphical Maps_&_aerials Duration 5-min -min 5-min 3-min 6-min 2-hr 3-hr 6-hr 2-hr 24-hr 2-day 3-day 4-day 7-day -day 2-day 3-day 45-day 6-day PF tabular PDS-based point precipitation frequency estimates with 9% confidence intervals (in inches) Average recurrence interval (years) ( ).699 ( ).874 ( ).2 (.9-.32).49 ( ).75 ( ).88 (.69-2.) 2.25 ( ) 2.64 ( ) 3.5 ( ) 3.55 ( ) 3.77 ( ) 3.99 ( ) 4.67 ( ) 5.29 ( ) 7.9 ( ) 8.86 ( ). (.4-.7) 3.2 (2.5-4.).5 ( ).86 ( ).3 ( ).42 ( ).78 (.6-.97) 2.9 ( ) 2.24 (2.-2.5) 2.68 (2.4-3.) 3.5 ( ) 3.72 ( ) 4.3 ( ) 4.56 ( ) 4.83 ( ) 5.63 ( ) 6.34 ( ) 8.56 ( ).5 ( ) 3. ( ) 5.6 ( ).573 ( ).98 ( ).6 (.5-.29).65 ( ) 2.2 ( ) 2.54 ( ) 2.73 ( ) 3.26 ( ) 3.85 ( ) 4.79 ( ) 5.5 ( ) 5.83 ( ) 6.5 ( ) 7.8 ( ) 7.86 ( ).4 (9.78-.) 2.7 (2.-3.4) 5.6 ( ) 8.4 ( ).66 ( ).6 ( ).34 (.2-.48).94 ( ) 2.52 ( ) 3.7 ( ) 3.33 ( ) 3.98 ( ) 4.72 ( ) 5.7 ( ) 6.56 (6.-7.6) 6.9 ( ) 7.25 ( ) 8.27 ( ) 9. ( ).9 (.2-2.7) 4.4 ( ) 7.6 ( ) 2.7 ( ).743 ( ).9 (.6-.3).5 ( ) 2.22 ( ) 2.96 ( ) 3.68 ( ) 4.3 ( ) 4.84 ( ) 5.79 ( ) 7.5 ( ) 8.3 ( ) 8.49 ( ) 8.84 ( ) 9.99 (9.2-.8).9 (.-.7) 4. (3.-5.) 6.7 ( ) 2.6 ( ) 23.7 ( ).82 ( ).3 (.7-.44).65 ( ) 2.49 ( ) 3.38 ( ) 4.27 ( ) 4.72 ( ) 5.7 ( ) 6.86 ( ) 8.2 ( ) 9.49 ( ) 9.84 (8.9-.7).2 (9.27-.).4 (.5-2.3) 2.4 (.4-3.3) 5.8 ( ) 8.6 ( ) 22.9 ( ) 26. ( ).889 ( ).4 ( ).79 ( ) 2.74 ( ) 3.77 ( ) 4.85 ( ) 5.42 ( ) 6.55 ( ) 7.95 ( ) 9.48 ( ). (9.8-2.).3 (.-2.3).6 (.5-2.6) 3. (.8-4.) 4. (2.8-5.) 7.7 ( ) 2.5 (9.-2.9) 25.4 ( ) 28.6 ( ).956 ( ).52 ( ).9 (.69-2.) 2.98 ( ) 4.8 ( ) 5.46 ( ) 6.7 ( ) 7.49 ( ) 9.6 ( ).9 (9.6-.9) 2.7 (.2-3.8) 3. (.5-4.) 3.2 (.8-4.3) 4.6 (3.-5.8) 5.7 ( ) 9.6 (7.9-2.) 22.5 ( ) 28. ( ) 3. ( ).4 (.9-.5).64 ( ) 2.6 ( ) 3.28 ( ) 4.7 ( ) 6.28 ( ) 7.2 ( ) 8.79 ( ).9 (9.9-2.) 3. (.3-4.2) 5.2 (3.-6.7) 5.4 ( ) 5.6 (3.6-7.) 7. (5.-8.5) 8. ( ) 22.3 (2.-24.) 25.2 ( ) 3.5 ( ) 34.4 ( ).2 ( ).76 ( ) 2.2 ( ) 3.58 ( ) 5.22 ( ) 7.7 ( ) 8.2 (7.-9.2). ( ) 2.5 (.5-4.) 4.8 ( ) 7.4 ( ) 7.6 (5.-9.3) 7.8 ( ) 9. ( ) 2. ( ) 24.5 ( ) 27.3 ( ) 34.4 ( ) 37. ( ) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 9% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 4 document for more information. Back to Top

14 Precipitation Frequency Data Server Page 2 of 4 8/27/28 PF graphical Back to Top

15 Precipitation Frequency Data Server Page 3 of 4 8/27/28 Maps & aerials Small scale terrain 3km + 2mi Large scale terrain km + 6mi km + 6mi

16 Precipitation Frequency Data Server Page 4 of 4 8/27/28 km + 6mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 325 East West Highway Silver Spring, MD 29 Questions?: HDSC.Questions@noaa.gov Disclaimer

17 76 ' 26'' W Hydrologic Soil Group Currituck County, North Carolina ( - Moyock NC) 76 ' 8'' W ' 8'' N Soil Map may not be valid at this scale ' 8'' N 36 3' 3'' N 36 3' 3'' N ' 26'' W N Map Scale: :94 if printed on A landscape (" x 8.5") sheet. Meters Feet Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 8N WGS84 76 ' 8'' W Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/28/28 Page of 4

18 Hydrologic Soil Group Currituck County, North Carolina ( - Moyock NC) MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at :2,. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Currituck County, North Carolina Survey Area Data: Version 6, Sep 26, 27 Soil map units are labeled (as space allows) for map scales :5, or larger. Date(s) aerial images were photographed: Dec 3, 29 Oct 4, 27 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/28/28 Page 2 of 4

19 Hydrologic Soil Group Currituck County, North Carolina - Moyock NC Hydrologic Soil Group Ro Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Roanoke fine sandy loam C/D.4.% Totals for Area of Interest.4.% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/28/28 Page 3 of 4

20 Hydrologic Soil Group Currituck County, North Carolina - Moyock NC Tie-break Rule: Higher Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/28/28 Page 4 of 4

21 S 4L 5R Pre-Developed Site Total Post-Development Site Flow 5" RCP Pipe 2S Area A 3S Area A2 Subcat Reach Pond Link Drainage Diagram for,

22 Page 2 Area (acres) CN Description (subcatchment-numbers) Area Listing (all nodes) >75% Grass cover, Good, HSG C (S,2S,3S) Asphalt Parking Area (2S,3S) Building Area (2S). 98 Concrete Parking Area (2S,3S) Sidewalk Area (2S,3S) 2.66 TOTAL AREA

23 Page 3 Area (acres) Soil Goup Subcatchment Numbers. HSG A. HSG B.44 HSG C S, 2S, 3S. HSG D.652 Other 2S, 3S 2.66 TOTAL AREA Soil Listing (all nodes)

24 Type III 24-hr 2-Year Rainfall=3.72" Page 4 Time span=.-36. hrs, dt=. hrs, 36 points Runoff by SCS TR-2 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment S: Pre-Developed Site Runoff Area=44,994 sf.% Impervious Runoff Depth=.39" Flow Length=28' Slope=.43 '/' Tc=2.7 min CN=74 Runoff=.3 cfs.2 af Subcatchment 2S: Area A Subcatchment 3S: Area A2 Runoff Area=27,573 sf 65.58% Impervious Runoff Depth=2.65" Flow Length=229' Tc=5.2 min CN=9 Runoff=.99 cfs.4 af Runoff Area=7,42 sf 59.2% Impervious Runoff Depth=2.47" Flow Length=4' Tc=8.9 min CN=88 Runoff=.4 cfs.82 af Reach 5R: 5" RCP Pipe Avg. Depth=.5' Max Vel=2.8 fps Inflow=.4 cfs.82 af D=5." n=.3 L=34.' S=.2 '/' Capacity=2.93 cfs Outflow=.4 cfs.82 af Link 4L: Total Post-Development Site Flow Inflow=2.9 cfs.222 af Primary=2.9 cfs.222 af Total Runoff Area = 2.66 ac Runoff Volume =.342 af Average Runoff Depth =.99" 68.44% Pervious =.44 ac 3.56% Impervious =.652 ac

25 Type III 24-hr 2-Year Rainfall=3.72" Page 5 Summary for Subcatchment S: Pre-Developed Site Runoff = hrs, Volume=.2 af, Depth=.39" Runoff by SCS TR-2 method, UH=SCS, Time Span=.-36. hrs, dt=. hrs Type III 24-hr 2-Year Rainfall=3.72" Area (sf) CN Description 44, >75% Grass cover, Good, HSG C 44,994 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) Sheet Flow, Segement AB Grass: Short n=.5 P2= 3.72" Subcatchment S: Pre-Developed Site Hydrograph Flow.3 cfs Type III 24-hr 2-Year Rainfall=3.72" Runoff Area=44,994 sf Runoff Volume=.2 af Runoff Depth=.39" Flow Length=28' Slope=.43 '/' Tc=2.7 min CN=74 Runoff Time (hours)

26 Type III 24-hr 2-Year Rainfall=3.72" Page 6 Hydrograph for Subcatchment S: Pre-Developed Site Time (hours) Precip. Excess Runoff Time (hours) Precip. Excess Runoff

27 Type III 24-hr 2-Year Rainfall=3.72" Page 7 Summary for Subcatchment 2S: Area A Runoff = hrs, Volume=.4 af, Depth= 2.65" Runoff by SCS TR-2 method, UH=SCS, Time Span=.-36. hrs, dt=. hrs Type III 24-hr 2-Year Rainfall=3.72" Area (sf) CN Description * 9,6 98 Building Area * 4,99 98 Asphalt Parking Area * 2, Concrete Parking Area * Sidewalk Area 9,49 74 >75% Grass cover, Good, HSG C 27,573 9 Weighted Average 9,49 Pervious Area 8,82 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) Sheet Flow, Segment AB Smooth surfaces n=. P2= 3.72" Sheet Flow, Segment BC Smooth surfaces n=. P2= 3.72" Trap/Vee/Rect Channel Flow, Segment CD Bot.W=2.5' D=.76' Z= 3. '/' Top.W=3.6' n= Circular Channel (pipe), Segment DE Diam= 24." Area= 3. sf Perim= 6.3' r=.5' n= Trap/Vee/Rect Channel Flow, Segment EF Bot.W=2.5' D=.76' Z= 3. '/' Top.W=3.6' n= Total

28 Type III 24-hr 2-Year Rainfall=3.72" Page 8 Subcatchment 2S: Area A Hydrograph Flow 2.99 cfs Type III 24-hr 2-Year Rainfall=3.72" Runoff Area=27,573 sf Runoff Volume=.4 af Runoff Depth=2.65" Flow Length=229' Tc=5.2 min CN=9 Runoff Time (hours)

29 Type III 24-hr 2-Year Rainfall=3.72" Page 9 Hydrograph for Subcatchment 2S: Area A Time (hours) Precip. Excess Runoff Time (hours) Precip. Excess Runoff

30 Type III 24-hr 2-Year Rainfall=3.72" Page Summary for Subcatchment 3S: Area A2 Runoff = hrs, Volume=.82 af, Depth= 2.47" Runoff by SCS TR-2 method, UH=SCS, Time Span=.-36. hrs, dt=. hrs Type III 24-hr 2-Year Rainfall=3.72" Area (sf) CN Description * 7, Asphalt Parking Area * 2,2 98 Concrete Parking Area * Sidewalk Area 7,5 74 >75% Grass cover, Good, HSG C 7,42 88 Weighted Average 7,5 Pervious Area,35 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) Sheet Flow, Segment AB Smooth surfaces n=. P2= 3.72" Sheet Flow, Segment BC Grass: Short n=.5 P2= 3.72" Shallow Concentrated Flow, Segement CD Paved Kv= 2.3 fps Total Subcatchment 3S: Area A2 Hydrograph Flow.4 cfs Type III 24-hr 2-Year Rainfall=3.72" Runoff Area=7,42 sf Runoff Volume=.82 af Runoff Depth=2.47" Flow Length=4' Tc=8.9 min CN=88 Runoff Time (hours)

31 Type III 24-hr 2-Year Rainfall=3.72" Page Hydrograph for Subcatchment 3S: Area A2 Time (hours) Precip. Excess Runoff Time (hours) Precip. Excess Runoff

32 Type III 24-hr 2-Year Rainfall=3.72" Page 2 Summary for Reach 5R: 5" RCP Pipe Inflow Area =.4 ac, 59.2% Impervious, Inflow Depth = 2.47" for 2-Year event Inflow = hrs, Volume=.82 af Outflow = hrs, Volume=.82 af, Atten= %, Lag=.4 min Routing by Stor-Ind+Trans method, Time Span=.-36. hrs, dt=. hrs Max. Velocity= 2.8 fps, Min. Travel Time=.3 min Avg. Velocity =.77 fps, Avg. Travel Time=.7 min Peak Storage= hrs, Average Depth at Peak Storage=.5' Bank-Full Depth=.25', Capacity at Bank-Full= 2.93 cfs 5." Diameter Pipe, n=.3 Length= 34.' Slope=.2 '/' Inlet Invert= 6.9', Outlet Invert= 6.2' Reach 5R: 5" RCP Pipe Hydrograph Flow.4 cfs.4 cfs Inflow Area=.4 ac Avg. Depth=.5' Max Vel=2.8 fps D=5." n=.3 L=34.' S=.2 '/' Capacity=2.93 cfs Inflow Outflow Time (hours)

33 Type III 24-hr 2-Year Rainfall=3.72" Page 3 Reach 5R: 5" RCP Pipe Stage-Discharge Primary Depth (feet) Discharge 2 3 Reach 5R: 5" RCP Pipe Stage-Storage Storage Depth (feet) Storage (cubic-feet)

34 Type III 24-hr 2-Year Rainfall=3.72" Page 4 Hydrograph for Reach 5R: 5" RCP Pipe Time (hours) Inflow Storage (cubic-feet) Elevation (feet) Outflow

35 Type III 24-hr 2-Year Rainfall=3.72" Page 5 Stage-Discharge for Reach 5R: 5" RCP Pipe Elevation (feet) Velocity (ft/sec) Discharge Elevation (feet) Velocity (ft/sec) Discharge Elevation (feet) Velocity (ft/sec) Discharge

36 Type III 24-hr 2-Year Rainfall=3.72" Page 6 Stage-Area-Storage for Reach 5R: 5" RCP Pipe Elevation (feet) End-Area (sq-ft) Storage (cubic-feet) Elevation (feet) End-Area (sq-ft) Storage (cubic-feet)

37 Type III 24-hr 2-Year Rainfall=3.72" Page 7 Summary for Link 4L: Total Post-Development Site Flow Inflow Area =.33 ac, 63.% Impervious, Inflow Depth = 2.58" for 2-Year event Inflow = hrs, Volume=.222 af Primary = hrs, Volume=.222 af, Atten= %, Lag=. min Primary outflow = Inflow, Time Span=.-36. hrs, dt=. hrs Link 4L: Total Post-Development Site Flow Hydrograph cfs 2.9 cfs Inflow Area=.33 ac Inflow Primary 2 Flow Time (hours)

38 Type III 24-hr 2-Year Rainfall=3.72" Page 8 Hydrograph for Link 4L: Total Post-Development Site Flow Time (hours) Inflow Elevation (feet) Primary Time (hours) Inflow Elevation (feet) Primary

39 Type III 24-hr 5-Year Rainfall=4.79" Page 9 Time span=.-36. hrs, dt=. hrs, 36 points Runoff by SCS TR-2 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment S: Pre-Developed Site Runoff Area=44,994 sf.% Impervious Runoff Depth=2.2" Flow Length=28' Slope=.43 '/' Tc=2.7 min CN=74 Runoff=2.2 cfs.89 af Subcatchment 2S: Area A Subcatchment 3S: Area A2 Runoff Area=27,573 sf 65.58% Impervious Runoff Depth=3.67" Flow Length=229' Tc=5.2 min CN=9 Runoff=2.7 cfs.94 af Runoff Area=7,42 sf 59.2% Impervious Runoff Depth=3.47" Flow Length=4' Tc=8.9 min CN=88 Runoff=.44 cfs.6 af Reach 5R: 5" RCP Pipe Avg. Depth=.62' Max Vel=2.38 fps Inflow=.44 cfs.6 af D=5." n=.3 L=34.' S=.2 '/' Capacity=2.93 cfs Outflow=.44 cfs.6 af Link 4L: Total Post-Development Site Flow Inflow=3.98 cfs.39 af Primary=3.98 cfs.39 af Total Runoff Area = 2.66 ac Runoff Volume =.499 af Average Runoff Depth = 2.9" 68.44% Pervious =.44 ac 3.56% Impervious =.652 ac

40 Type III 24-hr 5-Year Rainfall=4.79" Page 2 Summary for Subcatchment S: Pre-Developed Site Runoff = hrs, Volume=.89 af, Depth= 2.2" Runoff by SCS TR-2 method, UH=SCS, Time Span=.-36. hrs, dt=. hrs Type III 24-hr 5-Year Rainfall=4.79" Area (sf) CN Description 44, >75% Grass cover, Good, HSG C 44,994 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) Sheet Flow, Segement AB Grass: Short n=.5 P2= 3.72" Subcatchment S: Pre-Developed Site Hydrograph Flow cfs Type III 24-hr 5-Year Rainfall=4.79" Runoff Area=44,994 sf Runoff Volume=.89 af Runoff Depth=2.2" Flow Length=28' Slope=.43 '/' Tc=2.7 min CN=74 Runoff Time (hours)

41 Type III 24-hr 5-Year Rainfall=4.79" Page 2 Hydrograph for Subcatchment S: Pre-Developed Site Time (hours) Precip. Excess Runoff Time (hours) Precip. Excess Runoff

42 Type III 24-hr 5-Year Rainfall=4.79" Page 22 Summary for Subcatchment 2S: Area A Runoff = hrs, Volume=.94 af, Depth= 3.67" Runoff by SCS TR-2 method, UH=SCS, Time Span=.-36. hrs, dt=. hrs Type III 24-hr 5-Year Rainfall=4.79" Area (sf) CN Description * 9,6 98 Building Area * 4,99 98 Asphalt Parking Area * 2, Concrete Parking Area * Sidewalk Area 9,49 74 >75% Grass cover, Good, HSG C 27,573 9 Weighted Average 9,49 Pervious Area 8,82 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) Sheet Flow, Segment AB Smooth surfaces n=. P2= 3.72" Sheet Flow, Segment BC Smooth surfaces n=. P2= 3.72" Trap/Vee/Rect Channel Flow, Segment CD Bot.W=2.5' D=.76' Z= 3. '/' Top.W=3.6' n= Circular Channel (pipe), Segment DE Diam= 24." Area= 3. sf Perim= 6.3' r=.5' n= Trap/Vee/Rect Channel Flow, Segment EF Bot.W=2.5' D=.76' Z= 3. '/' Top.W=3.6' n= Total

43 Type III 24-hr 5-Year Rainfall=4.79" Page 23 Subcatchment 2S: Area A Hydrograph Flow cfs Type III 24-hr 5-Year Rainfall=4.79" Runoff Area=27,573 sf Runoff Volume=.94 af Runoff Depth=3.67" Flow Length=229' Tc=5.2 min CN=9 Runoff Time (hours)

44 Type III 24-hr 5-Year Rainfall=4.79" Page 24 Hydrograph for Subcatchment 2S: Area A Time (hours) Precip. Excess Runoff Time (hours) Precip. Excess Runoff

45 Type III 24-hr 5-Year Rainfall=4.79" Page 25 Summary for Subcatchment 3S: Area A2 Runoff = hrs, Volume=.6 af, Depth= 3.47" Runoff by SCS TR-2 method, UH=SCS, Time Span=.-36. hrs, dt=. hrs Type III 24-hr 5-Year Rainfall=4.79" Area (sf) CN Description * 7, Asphalt Parking Area * 2,2 98 Concrete Parking Area * Sidewalk Area 7,5 74 >75% Grass cover, Good, HSG C 7,42 88 Weighted Average 7,5 Pervious Area,35 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) Sheet Flow, Segment AB Smooth surfaces n=. P2= 3.72" Sheet Flow, Segment BC Grass: Short n=.5 P2= 3.72" Shallow Concentrated Flow, Segement CD Paved Kv= 2.3 fps Total Subcatchment 3S: Area A2 Hydrograph Flow.44 cfs Type III 24-hr 5-Year Rainfall=4.79" Runoff Area=7,42 sf Runoff Volume=.6 af Runoff Depth=3.47" Flow Length=4' Tc=8.9 min CN=88 Runoff Time (hours)

46 Type III 24-hr 5-Year Rainfall=4.79" Page 26 Hydrograph for Subcatchment 3S: Area A2 Time (hours) Precip. Excess Runoff Time (hours) Precip. Excess Runoff

47 Type III 24-hr 5-Year Rainfall=4.79" Page 27 Summary for Reach 5R: 5" RCP Pipe Inflow Area =.4 ac, 59.2% Impervious, Inflow Depth = 3.47" for 5-Year event Inflow = hrs, Volume=.6 af Outflow = hrs, Volume=.6 af, Atten= %, Lag=.4 min Routing by Stor-Ind+Trans method, Time Span=.-36. hrs, dt=. hrs Max. Velocity= 2.38 fps, Min. Travel Time=.2 min Avg. Velocity =.83 fps, Avg. Travel Time=.7 min Peak Storage= hrs, Average Depth at Peak Storage=.62' Bank-Full Depth=.25', Capacity at Bank-Full= 2.93 cfs 5." Diameter Pipe, n=.3 Length= 34.' Slope=.2 '/' Inlet Invert= 6.9', Outlet Invert= 6.2' Reach 5R: 5" RCP Pipe Hydrograph Flow.44 cfs.44 cfs Inflow Area=.4 ac Avg. Depth=.62' Max Vel=2.38 fps D=5." n=.3 L=34.' S=.2 '/' Capacity=2.93 cfs Inflow Outflow Time (hours)

48 Type III 24-hr 5-Year Rainfall=4.79" Page 28 Reach 5R: 5" RCP Pipe Stage-Discharge Primary Depth (feet) Discharge 2 3 Reach 5R: 5" RCP Pipe Stage-Storage Storage Depth (feet) Storage (cubic-feet)

49 Type III 24-hr 5-Year Rainfall=4.79" Page 29 Hydrograph for Reach 5R: 5" RCP Pipe Time (hours) Inflow Storage (cubic-feet) Elevation (feet) Outflow

50 Type III 24-hr 5-Year Rainfall=4.79" Page 3 Stage-Discharge for Reach 5R: 5" RCP Pipe Elevation (feet) Velocity (ft/sec) Discharge Elevation (feet) Velocity (ft/sec) Discharge Elevation (feet) Velocity (ft/sec) Discharge

51 Type III 24-hr 5-Year Rainfall=4.79" Page 3 Stage-Area-Storage for Reach 5R: 5" RCP Pipe Elevation (feet) End-Area (sq-ft) Storage (cubic-feet) Elevation (feet) End-Area (sq-ft) Storage (cubic-feet)

52 Type III 24-hr 5-Year Rainfall=4.79" Page 32 Summary for Link 4L: Total Post-Development Site Flow Inflow Area =.33 ac, 63.% Impervious, Inflow Depth = 3.59" for 5-Year event Inflow = hrs, Volume=.39 af Primary = hrs, Volume=.39 af, Atten= %, Lag=. min Primary outflow = Inflow, Time Span=.-36. hrs, dt=. hrs Link 4L: Total Post-Development Site Flow Hydrograph cfs 3.98 cfs Inflow Area=.33 ac Inflow Primary 3 Flow Time (hours)

53 Type III 24-hr 5-Year Rainfall=4.79" Page 33 Hydrograph for Link 4L: Total Post-Development Site Flow Time (hours) Inflow Elevation (feet) Primary Time (hours) Inflow Elevation (feet) Primary

54 Type III 24-hr -Year Rainfall=5.7" Page 34 Time span=.-36. hrs, dt=. hrs, 36 points Runoff by SCS TR-2 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment S: Pre-Developed Site Runoff Area=44,994 sf.% Impervious Runoff Depth=2.93" Flow Length=28' Slope=.43 '/' Tc=2.7 min CN=74 Runoff=2.86 cfs.253 af Subcatchment 2S: Area A Subcatchment 3S: Area A2 Runoff Area=27,573 sf 65.58% Impervious Runoff Depth=4.55" Flow Length=229' Tc=5.2 min CN=9 Runoff=3.33 cfs.24 af Runoff Area=7,42 sf 59.2% Impervious Runoff Depth=4.34" Flow Length=4' Tc=8.9 min CN=88 Runoff=.79 cfs.45 af Reach 5R: 5" RCP Pipe Avg. Depth=.7' Max Vel=2.5 fps Inflow=.79 cfs.45 af D=5." n=.3 L=34.' S=.2 '/' Capacity=2.93 cfs Outflow=.78 cfs.45 af Link 4L: Total Post-Development Site Flow Inflow=4.9 cfs.385 af Primary=4.9 cfs.385 af Total Runoff Area = 2.66 ac Runoff Volume =.637 af Average Runoff Depth = 3.7" 68.44% Pervious =.44 ac 3.56% Impervious =.652 ac

55 Type III 24-hr -Year Rainfall=5.7" Page 35 Summary for Subcatchment S: Pre-Developed Site Runoff = hrs, Volume=.253 af, Depth= 2.93" Runoff by SCS TR-2 method, UH=SCS, Time Span=.-36. hrs, dt=. hrs Type III 24-hr -Year Rainfall=5.7" Area (sf) CN Description 44, >75% Grass cover, Good, HSG C 44,994 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) Sheet Flow, Segement AB Grass: Short n=.5 P2= 3.72" Subcatchment S: Pre-Developed Site Hydrograph Flow cfs Type III 24-hr -Year Rainfall=5.7" Runoff Area=44,994 sf Runoff Volume=.253 af Runoff Depth=2.93" Flow Length=28' Slope=.43 '/' Tc=2.7 min CN=74 Runoff Time (hours)

56 Type III 24-hr -Year Rainfall=5.7" Page 36 Hydrograph for Subcatchment S: Pre-Developed Site Time (hours) Precip. Excess Runoff Time (hours) Precip. Excess Runoff

Stormwater Analysis Report

Stormwater Analysis Report Stormwater Analysis Report Solar Panel Array Temple Street (Rt. 14) West Boylston, MA February 24, 216 SITE Prepared for: West Boylston Municipal Lighting Plant 4 Crescent Street West Boylston, MA 1583

More information

THE CITY OF THE VILLAGE PLANNED UNIT DEVELOPMENT DESIGN STATEMENT FOR MULFORD ESTATES

THE CITY OF THE VILLAGE PLANNED UNIT DEVELOPMENT DESIGN STATEMENT FOR MULFORD ESTATES THE CITY OF THE VILLAGE PLANNED UNIT DEVELOPMENT DESIGN STATEMENT FOR MULFORD ESTATES Revised August 18, 2016, August 10, 2016, September 19,2016 Prepared By: Isch and Associates, Inc. 14848 Bristol Park

More information

STORMWATER MANAGEMENT REPORT FOR THE BORGATA OUTDOOR EVENT AREA POOL ADDITION

STORMWATER MANAGEMENT REPORT FOR THE BORGATA OUTDOOR EVENT AREA POOL ADDITION STORMWATER MANAGEMENT REPORT FOR THE BORGATA OUTDOOR EVENT AREA POOL ADDITION City of Atlantic City, Atlantic County, New Jersey Prepared For: Marina District Development Company, LLC One Borgata Way Atlantic

More information

Run-on and Run-off Control System Plan

Run-on and Run-off Control System Plan Run-on and Run-off Control System Plan J.H. CAMPBELL GENERATING FACILITY DRY ASH LANDFILL RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN West Olive, Michigan Pursuant to 4 CFR 257.81 Submitted To: Consumers Energy

More information

REFERENCE MAPS FEMA FIRM MAP NRCS SOILS MAP

REFERENCE MAPS FEMA FIRM MAP NRCS SOILS MAP REFERENCE MAPS FEMA FIRM MAP NRCS SOILS MAP Hydrologic Soil Group-Hillsborough County, Florida (Independence Parkway) 27' 58' 56" 27" 58' 57" 2r 58' 32" 27" 58' 33" Map Scale: 1:5,290 if printed on A size

More information

Inflow Design Flood Control System Plan

Inflow Design Flood Control System Plan Inflow Design Flood Control System Plan For Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Valmont Station - CCR Surface Impoundments Public Service Company of Colorado Denver, Colorado

More information

Inflow Design Flood Control System Plan

Inflow Design Flood Control System Plan Inflow Design Flood Control System Plan Scrubber Ponds Lewis and Clark Station Prepared for Montana-Dakota Utilities Co. October 2016 Paul T. Swenson 2016.10.14 17:54:29-05'00' 234 West Century Avenue

More information

Site Description. CCR Rule Initial Inflow Design Flood Control System Plan (cont.) 2

Site Description. CCR Rule Initial Inflow Design Flood Control System Plan (cont.) 2 Site Description Kentucky Utilities Company (KU) owns and operates Ghent Gypsum Stack, a CCR surface impoundment, at the Ghent Generating Station in Carroll County, Kentucky. The impoundment is permitted

More information

Run-on and Run-off Control System Plan

Run-on and Run-off Control System Plan Run-on and Run-off Control System Plan CCR Temporary Storage Pad Lewis and Clark Station Prepared for Montana-Dakota Utilities Co. October 2016 Paul T. Swenson 2016.10.13 18:30:03-05'00' 234 West Century

More information

UPDATED SITE DESIGN NARRATIVE AND CALCULATIONS

UPDATED SITE DESIGN NARRATIVE AND CALCULATIONS UPDATED SITE DESIGN NARRATIVE AND CALCULATIONS Burlington Summit The Gutierrez Company One Wall Street, Burlington, MA July, Prepared by, Symmes Maini & McKee Associates Cambridge, MA SMMA No. PROJECT

More information

CCR Certification: Initial Inflow Design Flood Control System Plan for the

CCR Certification: Initial Inflow Design Flood Control System Plan for the Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 4778 Submitted by AECOM 94 Amberglen Boulevard Austin, Texas 78729 October

More information

Green Station CCR Surface Impoundment

Green Station CCR Surface Impoundment Green Station CCR Surface Impoundment Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule Hydrologic and Hydraulic Capacity Assessment and Initial Inflow Design Flood Control

More information

APPENDIX K OPERATIONS AND FINAL COVER SURFACE WATER MANAGEMENT SYSTEM DESIGN

APPENDIX K OPERATIONS AND FINAL COVER SURFACE WATER MANAGEMENT SYSTEM DESIGN ONONDAGA LAKE SEDIMENT CONSOLIDATION AREA CIVIL & GEOTECHNICAL FINAL DESIGN APPENDIX K OPERATIONS AND FINAL COVER SURFACE WATER MANAGEMENT SYSTEM DESIGN PARSONS P:\Honeywell -SYR\44483 - Lake Detail Design\9

More information

Drainage Letter for Falcon High School Building Expansion

Drainage Letter for Falcon High School Building Expansion August 11, 2017 El Paso County Planning and Community Development Department 2880 International Circle, Suite 110 Colorado Springs, CO 80910 ATTN: RE: Mr. Jeff Rice Drainage Letter for Falcon High School

More information

SITE DESIGN ENGINEERING, LLC. 11 Cushman Street, Middleboro, MA P: F:

SITE DESIGN ENGINEERING, LLC. 11 Cushman Street, Middleboro, MA P: F: INTRODUCTION This drainage report was prepared for the proposed site re-development at in Burlington, Massachusetts. The project site is approximately 1.05± acres consisting of approximately 70% impervious

More information

North Omaha Ash Landfill Run-on and Run-off Control System Plan

North Omaha Ash Landfill Run-on and Run-off Control System Plan North Omaha Ash Landfill Run-on and Run-off Control System Plan Omaha Public Power District North Omaha Station Omaha, Nebraska October 17, 216 OPPD North Omaha Ash Landfill Run-On and Run-Off Control

More information

NC2 Ash Disposal Area Run-on and Run-off Control System Plan

NC2 Ash Disposal Area Run-on and Run-off Control System Plan NC2 Ash Disposal Area Run-on and Run-off Control System Plan Omaha Public Power District Nebraska City Station Nebraska City, Nebraska October 17, 2016 OPPD NC2 Ash Disposal Area Run-On and Run-Off Control

More information

Environmental Design Group

Environmental Design Group SEDIMENT CONTROL DURING CONSTRUCTION, STORMWATER MANAGEMENT AND POST CONSTRUCTION BMP REPORT for Hudson Salt Storage and Bus Garage 5810 Hudson Drive HUDSON, OHIO SUMMIT COUNTY Prepared by Environmental

More information

STORMWATER MANAGEMENT REPORT

STORMWATER MANAGEMENT REPORT 3 Industrial Way Tyngsborou STORMWATER MANAGEMENT REPORT Common Driveway at 105 Vaughn Hill Rd. Bolton, MA October 19, 2017 Prepared For: Whitehorse Builders 456 Newtown Rd. Littleton, MA 01460 Prepared

More information

Module 3: Rainfall and Hydrology for Construction Site Erosion Control

Module 3: Rainfall and Hydrology for Construction Site Erosion Control Module 3: Rainfall and Hydrology for Construction Site Erosion Control Robert Pitt Department of Civil, Construction, and Environmental Engineering University of Alabama Tuscaloosa, AL Rainfall and Hydrology

More information

Initial Inflow Design Flood Control System Plan Holding Pond

Initial Inflow Design Flood Control System Plan Holding Pond Submitted to: Submitted by: Marquette Board of Light and Power AECOM Shiras Steam Plant Marquette, Michigan Marquette, Michigan Project No. 60445171 October 2016 Initial Inflow Design Flood Control System

More information

FINAL DRAINAGE REPORT CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 CITY OF THORNTON, COUNTY OF ADAMS, STATE OF COLORADO

FINAL DRAINAGE REPORT CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 CITY OF THORNTON, COUNTY OF ADAMS, STATE OF COLORADO FINAL DRAINAGE REPORT CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 CITY OF THORNTON, COUNTY OF ADAMS, STATE OF COLORADO PREPARED FOR: Thornton Cornerstone LLC 558 Castle Pines Parkway Suite B4-321 Castle

More information

Web Soil Survey National Cooperative Soil Survey

Web Soil Survey National Cooperative Soil Survey 99 52' 37'' W Yields of Irrigated Crops (Component): Cotton lint (Lbs) Haskell County, Texas 99 51' 40'' W 33 21' 4'' N 418500 418600 418700 418800 418900 419000 419100 419200 419300 419400 419500 419600

More information

DRAINAGE STUDY. 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 4 Eagle County, Colorado. November 4, Project No.

DRAINAGE STUDY. 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 4 Eagle County, Colorado. November 4, Project No. DRAINAGE STUDY 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 4 Eagle County, Colorado November 4, 2014 Project No. 14-2953 Prepared for Mr. Robert Myers Caribbean Group P.O. Box N 1968

More information

Inflow Design Flood Control System Plan

Inflow Design Flood Control System Plan Inflow Design Flood Control System Plan For Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Cherokee Station - CCR Surface Impoundments Public Service Company of Colorado Denver, Colorado

More information

Inflow Design Flood Control System Plan

Inflow Design Flood Control System Plan Inflow Design Flood Control System Plan Scrubber Ponds Lewis & Clark Station Prepared for Montana-Dakota Utilities Co. November 2018 234 West Century Avenue Bismarck, ND 58503 701.255.5460 www.barr.com

More information

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228 Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA 30534 (706) 344-3500 x 42228 DAWSON COUNTY STORM WATER REVIEW CHECKLIST Project Name: Property Address: Engineer: Fax #/Email: Date:

More information

Soil Map Lewis County, Kentucky (Denham Farm, Sand Hill/Trinity, Lewis Co., KY) Web Soil Survey National Cooperative Soil Survey

Soil Map Lewis County, Kentucky (Denham Farm, Sand Hill/Trinity, Lewis Co., KY) Web Soil Survey National Cooperative Soil Survey 83 37' 43'' W (Denham Farm, Sand Hill/Trinity, Lewis Co., KY) 83 36' 18'' W 38 40' 37'' N 271500 271700 271900 272100 272300 272500 272700 272900 273100 273300 38 40' 37'' N 38 39' 54'' N 4282900 4283100

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater

More information

526 & 528 Boston Post Road Redevelopment Sudbury, MA

526 & 528 Boston Post Road Redevelopment Sudbury, MA PRELIMINARY STORMWATER MANAGEMENT MASTER PLAN 526 & 528 Boston Post Road Redevelopment Sudbury, MA PREPARED FOR BPR Sudbury Development LLC c/o National Development 2310 Washington Street Newton Lower

More information

Proposed Retail Development

Proposed Retail Development Drainage Report Proposed Retail Development Rochester, New Hampshire Prepared for G.B. New England 2, LLC 14 Breakneck Hill Road, Suite 101 Lincoln, Rhode Island 02865 401 721 1600 Prepared by /Vanasse

More information

Drainage Analysis. Appendix E

Drainage Analysis. Appendix E Drainage Analysis Appendix E The existing and proposed storm drainage systems have been modeled with Bentley CivilStorm V8 computer modeling software. The peak stormwater discharge was determined for

More information

DRAINAGE STUDY. 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 1 Eagle County, Colorado. November 25, Project No.

DRAINAGE STUDY. 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 1 Eagle County, Colorado. November 25, Project No. DRAINAGE STUDY 645 Beard Creek Trail Lot 8, Cordillera Valley Club Filing No. 1 Eagle County, Colorado November 25, 2014 Project No. 14-2953 Prepared for Mr. Robert Myers Caribbean Group P.O. Box N 1968

More information

GENERAL AND FLOODING STANDARDS SUBMISSION BRUNSWICK LAYOVER FACILITY BRUNSWICK, MAINE PREPARED FOR:

GENERAL AND FLOODING STANDARDS SUBMISSION BRUNSWICK LAYOVER FACILITY BRUNSWICK, MAINE PREPARED FOR: APPENDIX H GENERAL AND FLOODING STANDARDS SUBMISSION BRUNSWICK LAYOVER FACILITY BRUNSWICK, MAINE PREPARED FOR: NORTHERN NEW ENGLAND PASSENGER RAIL AUTHORITY (NNEPRA) 75 WEST COMMERCIAL STREET, SUITE 104

More information

Appendix C.1. Design Example 1 Shallow Wetland (W-1)

Appendix C.1. Design Example 1 Shallow Wetland (W-1) Appendix C.1 Design Example 1 Shallow Wetland (W-1) Design Example 1 Shallow Wetland (W-1) The following example demonstrates the process for the design of a shallow wetland (W-1) BMP. Site Specific Data

More information

STORMWATER HYDROLOGY

STORMWATER HYDROLOGY ..CHAPTER.. STORMWATER HYDROLOGY 3.1 Introduction to Hydrologic Methods Hydrology is the science dealing with the characteristics, distribution, and movement of water on and below the earth's surface and

More information

Chapter Introduction. 5.2 Computational Standard Methods HYDROLOGY

Chapter Introduction. 5.2 Computational Standard Methods HYDROLOGY Chapter 5. HYDROLOGY 5.1 Introduction The definition of hydrology is the scientific study of water and its properties, distribution, and effects on the earth s surface, in the soil and the atmosphere.

More information

Runoff Calculations. Time of Concentration (T c or t c ) from one location to another within a watershed. Travel

Runoff Calculations. Time of Concentration (T c or t c ) from one location to another within a watershed. Travel Runoff Calculations Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Time of Concentration and Travel Time (based on Chapter 3 of TR-55) Time of Concentration (T c ): time required

More information

Initial Inflow Design Flood Control System Plan

Initial Inflow Design Flood Control System Plan Initial Inflow Design Flood Control System Plan Brunner Island Ash Basin No. 6 Prepared for: Brunner Island, LLC October 11, 2016 This page intentionally left blank. Initial Inflow Design Flood Control

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

LAKE COUNTY HYDROLOGY DESIGN STANDARDS LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide

More information

Design of Stormwater Wetlands

Design of Stormwater Wetlands Hydraulic & Hydrologic Stormwater Engineering Design of Stormwater Wetlands Jon Hathaway, EI Extension Associate NCSU Bio. And Ag. Engineering 6 Step Process 1. Watershed Analysis (Runoff Volume and Peak

More information

City of Fort Collins. Spring Creek Place (2105 South College Avenue) Preliminary Drainage Report

City of Fort Collins. Spring Creek Place (2105 South College Avenue) Preliminary Drainage Report City of Fort Collins Spring Creek Place (2105 South College Avenue) Preliminary Drainage Report OCTOBER 2016 VERSION 3 Prepared By: 4582 South Ulster Street, Suite 1500 Denver, CO 80237 Daniel L. Skeehan,

More information

Alapaha Tract. Alapaha Tract. Berrien County GA Acres Par LL 320 LD 5. Date: 6/6/2017. TractName

Alapaha Tract. Alapaha Tract. Berrien County GA Acres Par LL 320 LD 5. Date: 6/6/2017. TractName The 996 Planted Slash was st thinned in 0 TractName Alapaha inch equals 74 miles in = 44,786 ft 0 0 60 Miles :,77,40 The 996 Planted Slash was st thinned in 0 TractName Alapaha inch equals miles in = 6,7

More information

Peak discharge computation

Peak discharge computation Ia/P 4 Peak Dischage Method Graphical Peak Discharge Method This chapter presents the Graphical Peak Discharge method for computing peak discharge from rural and urban areas. The Graphical method was developed

More information

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) Hydromodification design criteria for the North Orange County permit area are based on the 2- yr, 24-hr

More information

Stormwater Review Part 2. Rainfall and Runoff. Tom Seybert, PE and Andy Bennett, PE. Pennsylvania Surveyors Conference 2019

Stormwater Review Part 2. Rainfall and Runoff. Tom Seybert, PE and Andy Bennett, PE. Pennsylvania Surveyors Conference 2019 Stormwater Review Part 2 Rainfall and Runoff Tom Seybert, PE and Andy Bennett, PE Pennsylvania Surveyors Conference 2019 1 Topics Covered 1. Rainfall characteristics and sources 2. Watershed characteristics

More information

Watershed Delineation Techniques

Watershed Delineation Techniques Watershed Delineation Techniques Stacy D. Dehne DATCP Engineer February 2008 1 What Is a Watershed? An Area of Land that Drains to a given location February 2008 2 Contour Map Features Contour Maps: Represent

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

DRAINAGE DESIGN REPORT

DRAINAGE DESIGN REPORT Scannell Properties Development Sales Distribution Center Drainage Design Report DRAINAGE DESIGN REPORT JUNE 2018 SALES DISTRIBUTION CENTER SCHODACK, NEW YORK RENSSELAER COUNTY 1 Scannell Properties Development

More information

Rational Method Hydrological Calculations with Excel COURSE CONTENT

Rational Method Hydrological Calculations with Excel COURSE CONTENT Rational Method Hydrological Calculations with Excel Harlan H. Bengtson, PhD, P.E. COURSE CONTENT 1. Introduction Calculation of peak storm water runoff rate from a drainage area is often done with the

More information

This page intentionally left blank

This page intentionally left blank REFERENCE DOCUMENTS This page intentionally left blank TABLE OF CONTENTS REFERENCE DOCUMENTS REFERENCE DOCUMENT A: MEAN SEASONAL PRECIPITATION MAP R 1 REFERENCE DOCUMENT B: K FACTOR R 2 REFERENCE DOCUMENT

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT BOWEN PRIVATE INDUSTRY SOLID WASTE DISPOSAL FACILITY (ASH LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 HUFFAKER ROAD (PLANT HAMMOND) PRIVATE INDUSTRIAL LANDFILL (HUFFAKER ROAD LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion

More information

Design Example Residential Subdivision

Design Example Residential Subdivision Design Example Residential Subdivision Rhode Island Stormwater Design and Installation Standards Manual December 2010 Public Training March 22, 2010 Richard Claytor, P.E. 508-833-6600 Appendix D: Site

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part 257.82 PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part

More information

Introduction to Storm Sewer Design

Introduction to Storm Sewer Design A SunCam online continuing education course Introduction to Storm Sewer Design by David F. Carter Introduction Storm sewer systems are vital in collection and conveyance of stormwater from the upstream

More information

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40

More information

AG-LAND Investment Brokers 275 Sale Lane Red Bluff, CA Fax Paradox Seed Mother Orchard Red Bluff, CA

AG-LAND Investment Brokers 275 Sale Lane Red Bluff, CA Fax Paradox Seed Mother Orchard Red Bluff, CA AG-LAND Investment Brokers 275 Sale Lane Red Bluff, CA 96080 530-529-4400 Fax 530-527-5042 Paradox Seed Mother Orchard Red Bluff, CA AG-LAND INVESTMENT BROKERS 275 Sale Lane / P. O. Box 896 Red Bluff,

More information

MOODY FLATS QUARRY STORMWATER, EROSION CONTROL, AND DRAINAGE PLAN SHASTA COUNTY, CALIFORNIA. Prepared by:

MOODY FLATS QUARRY STORMWATER, EROSION CONTROL, AND DRAINAGE PLAN SHASTA COUNTY, CALIFORNIA. Prepared by: MOODY FLATS QUARRY STORMWATER, EROSION CONTROL, AND DRAINAGE PLAN SHASTA COUNTY, CALIFORNIA Prepared by: Trevor Crawford, Civil Engineer 3M Facilities Engineering St. Paul, Minnesota Dr. Andrew A. Kopania,

More information

APPENDIX F RATIONAL METHOD

APPENDIX F RATIONAL METHOD 7-F-1 APPENDIX F RATIONAL METHOD 1.0 Introduction One of the most commonly used procedures for calculating peak flows from small drainages less than 200 acres is the Rational Method. This method is most

More information

January 20, Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO (303)

January 20, Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO (303) January 20, 2017 Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7694 RE: Riverdale Five Retail Drainage Conformance Letter

More information

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation Stormwater Engineering Bioretention Design Bill Hunt, PE, Ph.D. Extension Specialist & Assistant Professor NCSU-BAE www.bae.ncsu.edu/stormwater Bioretention Design Six Step Process 1 Determine Volume to

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management Online ECode Available on Cheltenham Township Website at: http://ecode360.com/14477578 For all regulated

More information

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY PRELIMINARY DRAINAGE REPORT FOR THE NEWCASTLE FIRE STATION OLD STATE HIGHWAY PREPARED FOR THE NEWCASTLE FIRE PROTECTION DISTRICT JULY 2014 BY ROSEVILLE DESIGN GROUP, INC. ROSEVILLE DESIGN GROUP, Inc Established

More information

Inflow Design Flood Control System Plan

Inflow Design Flood Control System Plan Inflow Design Flood Control System Plan B.C. COBB GENERATING FACILITY BOTTOM ASH POND INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN Muskegon, Michigan Pursuant to 40 CFR 257.82 Submitted To: Consumers Energy

More information

Run-on and Run-off Control System Plan

Run-on and Run-off Control System Plan Run-on and Run-off Control System Plan For Compliance with the Coal Combustion Residuals Rule (40 CFR 257.81) Pawnee Station CCR Landfill Public Service Company of Colorado Denver, Colorado October 17,

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Module 3 and Module 4 Watershed Analysis and RUSLE Calculation. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control

Module 3 and Module 4 Watershed Analysis and RUSLE Calculation. Noboru Togawa. Presented to: Dr. Pitt Construction Site Erosion Control Module 3 and Module 4 Watershed Analysis and RUSLE Calculation by Presented to: Dr. Pitt Construction Site Erosion Control Department of Civil, Construction, and Environmental Engineering The University

More information

Drainage Report. PDC Energy Metcalf Soil Treatment Facility. OA Project No

Drainage Report. PDC Energy Metcalf Soil Treatment Facility. OA Project No Drainage Report PDC Energy Metcalf Soil Treatment Facility OA Project No. 013-0036 760 Horizon Drive, Suite 102 Grand Junction, CO 81506 TEL 970.263.7800 FAX 970.263.7456 DRAINAGE REPORT PDC METCALF CENTRALIZED

More information

Civil Engineering Land Surveying Wetland Science

Civil Engineering Land Surveying Wetland Science Civil Engineering Land Surveying Wetland Science July 5, 2017 Town of Littleton Conservation Commission c/o Amy Green, Conservation Coordinator Shattuck Street Municipal Building 37 Shattuck Street Littleton,

More information

RETENTION BASIN EXAMPLE

RETENTION BASIN EXAMPLE -7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

Summary of Detention Pond Calculation Canyon Estates American Canyon, California July 15, 2015 Bellecci & Associates, Inc Summary of Detention Pond Calculation Canyon Estates American Canyon, California 1. Methodology: Method: Unit Hydrograph Software: Bentley Pond Pack Version 8i

More information

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY LOW IMPACT DEVELOPMENT HYDROLOGIC CONSIDERATIONS 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY May 18, 2011 PRESENTATION AGENDA Introduction Definitions Discuss Impacts to Hydrologic

More information

SAMPLE DRAINAGE STATEMENT

SAMPLE DRAINAGE STATEMENT Firm Name & Logo Hidalgo County Drainage District No. 1 Drainage Statement Subdivision Name Hidalgo County, Texas Prepared By: Firm's Name Address City, State, Zip Telephone Fax Email Date SAMPLE DRAINAGE

More information

FINAL DRAINAGE REPORT FOR: LOT 1 BLOCK 1 ROLLINS SUBDIVISION FILING #5. Prepared for:

FINAL DRAINAGE REPORT FOR: LOT 1 BLOCK 1 ROLLINS SUBDIVISION FILING #5. Prepared for: 215063FD1 2014-3046 01J FINAL DRAINAGE REPORT FOR: LOT 1 BLOCK 1 ROLLINS SUBDIVISION FILING #5 Prepared for: Mr. Hari Sach RV America 3640 N. Chambers Road Aurora, Co. 80011 Phone: 303-360-0252 Email:

More information

WinTR-55 Small Watershed Hydrology

WinTR-55 Small Watershed Hydrology WinTR-55 Small Watershed Hydrology Modeling Single Sub-area Watersheds (Part 2) We ve looked at the minimum data entry requirements and how we can enter curve numbers and times of concentration directly

More information

Background. October 7, American Electric Power 1 Riverside Plaza, 22nd Floor Columbus, Ohio 43215

Background. October 7, American Electric Power 1 Riverside Plaza, 22nd Floor Columbus, Ohio 43215 October 7, 2016 American Electric Power 1 Riverside Plaza, 22nd Floor Columbus, Ohio 43215 Attention: Reference: Mr. Brian G. Palmer Ash Pond Complex CCR Surface Impoundment Inflow Design Flood Assessment

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or

More information

Red Barn R.V. and Boat Storage Weld County, Colorado. Final Drainage Report

Red Barn R.V. and Boat Storage Weld County, Colorado. Final Drainage Report Red Barn R.V. and Boat Storage Weld County, Colorado Final Drainage Report Prepared for Kevin Moore Project No. 1318-001 February 27, 2017 Prepared By: KETTERLING, BUTHERUS AND NORTON ENGINEERS, LLC. 820

More information

November 21, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

November 21, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report November 21, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report

More information

Hydrologic Soil Group Knowledge Matrix

Hydrologic Soil Group Knowledge Matrix Hydrologic Soil Group Knowledge Matrix Refinement Of Soils Parameter For MPCA s Minimum Impact Design Standards Calculator and Stand-Alone Hydrologic Soil Group Determination Funding for this project was

More information

Water Resources Management Plan

Water Resources Management Plan P L Y M O U T H M I N N E S O T A Appendix D: The developed a to analyze and minimize the impact of existing and future development on the City s natural resources. It is important to the City to have

More information

Pinheiro Ranch 55+/- Acres Orchard Development Ground Orland, CA. Presented By:

Pinheiro Ranch 55+/- Acres Orchard Development Ground Orland, CA. Presented By: Pinheiro Ranch 55+/- Acres Orchard Development Ground Orland, CA Presented By: Pinheiro Ranch 55+/- Acres Orchard Development Ground Orland, CA Location: This property is located on the SE corner of Road

More information

Web Soil Survey National Cooperative Soil Survey

Web Soil Survey National Cooperative Soil Survey 289300 289700 290100 290500 83 12' 5'' W 83 13' 37'' W Farmland Classification Ben Hill and Irwin Counties, Georgia 290900 291300 31 46' 8'' N 3514000 3514000 3514400 3514400 3514800 3514800 3515200 3515200

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021 Hydrology Study For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021 Prepared for Daryl Priest - Priest Development Corporation 124 West Main Street,

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

0.0. Pervious CN = 40. (Unconnected impervious) (Total impervious) Total impervious area (percent) Composite CN

0.0. Pervious CN = 40. (Unconnected impervious) (Total impervious) Total impervious area (percent) Composite CN Figure 2-3 Composite CN with connected impervious area. 100 Composite CN 90 80 70 60 Pervious CN = 90 80 70 60 50 40 50 40 0 10 20 30 40 50 60 70 80 90 100 Connected impervious area (percent) Figure 2-4

More information

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves

More information

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES DIVISION OF ENGINEERING & CONSTRUCTION MANAGEMENT PLAN REVIEW DEPARTMENT WASHINGTON COUNTY SOIL CONSERVATION DISTRICT 1260 Maryland Avenue, Suite 101 Hagerstown, MD 21740 Telephone: (301) 797-6821, Ext.

More information

HYDROLOGY CHECKLIST FOR LAND DISTURBANCE PERMITS

HYDROLOGY CHECKLIST FOR LAND DISTURBANCE PERMITS HYDROLOGY CHECKLIST FOR LAND DISTURBANCE PERMITS Project Name: Project Number: Reviewed By: Date: Telephone: Email: Address all items marked with an X Minimum Submittal Requirements 1. Conceptual Review

More information

Grass Channel STORMWATER MANAGEMENT SUITABILITY KEY CONSIDERATIONS

Grass Channel STORMWATER MANAGEMENT SUITABILITY KEY CONSIDERATIONS 4.0 Structural Stormwater Control Description: Vegetated open channels designed to filter stormwater runoff and meet velocity targets for the water quality design storm and the Streambank Protection storm

More information

CHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF

CHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF CHAPTER 3 STORMWATER HYDROLOGY Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF 3.1.1 Introduction to Hydrologic Methods...3.1-1 3.1.2 Symbols and Definitions...3.1-3 3.1.3 Rainfall

More information

Arvada Plaza Redevelopment. Walmart Store # (Lot 1) Industrial Realty Group, LLC (Lot 2)

Arvada Plaza Redevelopment. Walmart Store # (Lot 1) Industrial Realty Group, LLC (Lot 2) Drainage Analysis Arvada, CO Arvada Plaza Redevelopment Including: Walmart Store #4734-00 (Lot 1) & Industrial Realty Group, LLC (Lot 2) (W 58 th Ave & Independence Street) Arvada, Colorado Preliminary

More information

Technical Memorandum

Technical Memorandum Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Kathy Arnold From: Greg Hemmen, P.E. Company: Rosemont Copper Company Date:

More information