FINAL DRAINAGE REPORT FOR: LOT 1 BLOCK 1 ROLLINS SUBDIVISION FILING #5. Prepared for:

Size: px
Start display at page:

Download "FINAL DRAINAGE REPORT FOR: LOT 1 BLOCK 1 ROLLINS SUBDIVISION FILING #5. Prepared for:"

Transcription

1 215063FD J FINAL DRAINAGE REPORT FOR: LOT 1 BLOCK 1 ROLLINS SUBDIVISION FILING #5 Prepared for: Mr. Hari Sach RV America 3640 N. Chambers Road Aurora, Co Phone: hsach@rvamerica.co Prepared by: 1950 W. Littleton Blvd., Suite 109 Littleton, CO Phone: Contact: Scott A Pease, P.E. APPROVED FOR ONE YEAR FROM THIS DATE MAY 18, /7/2015 City Engineer Date 5/11/15 Aurora Water Department Date February 13,

2 ENGINEER S CERTIFICATION This report for the drainage design of Rollins Subdivision Filing No. 5 was prepared by me (or under my supervision) in accordance with the provisions of City of Aurora Drainage Design Criteria, and was designed to comply with the provisions thereof. I understand that the City of Aurora does not, and will not, assume liability for drainage facilities designed by others. Scott A Pease P.E. Colorado Registered Professional Engineer No

3 TABLE OF CONTENTS INTRODUCTION... 4 Location Proposed Development HISTORIC DRAINAGE... 5 Overall Basin Description Drainage Patterns through Property Outfalls Downstream from Property DESIGN CRITERIA References Hydrologic Criteria Hydraulic Criteria DRAINAGE PLAN General Concept Specific Details CONCLUSIONS... 8 Compliance with Standards Summary of Concepts REFERENCES... 8 APPENDIX A HYDROLOGIC COMPUTATIONS 9-15 Composite C and I Values Standard Form SF-1 2, 5, 10, 100-Year Standard Form SF-2 APPENDIX B HYDRAULIC COMPUTATIONS Required 100-YR Volume (Full Spectrum) Extended Detention Basin (EDB) WQCV Outlet Restrictor Plate StormCAD Analysis Spillway Design/Rip-Rap Calculations APPENDIX C GRAPHS AND TABLES Soils Map FIRM Urban Drainage Tables RO-3, RO-5 COA C&I Standard Table 1 APPENDIX D REFERENCED REPORTS Peterson Subdivision Vicinity Master Drainage Report 3

4 A. INTRODUCTION 1. Location a. The proposed development is located in the Northwest ¼ of section 29, Township 3 South, Range 66 West of the 6 th Principal Meridian, in the City of Aurora, County of Adams, and State of Colorado. More specifically, the site is bounded on the north by RV America, on the West by N. Chambers Rd., on the East by Helena St., and lies approximately 300 feet north of E. 35 th Ave. b. Vicinity Map: c. The site is bounded to the north by Rollins Subdivision Filing No. 4, within a portion of Lot 1, Block 1 and is currently the existing RV America sales facility. To the south the site is bounded by Chambers Road Exchange Subdivision Filing No. 1 and is an undeveloped parcel of land covered in native grasses, weeds, and light vegetation. To the east is asphalt paved Helena St. and to the west by Chambers Rd. 2. Proposed Development a. The site is currently vacated and is covered by native grasses, weeds and light vegetation. The on-site surface soil is entirely made of Ascalon sandy loam and is considered as Hydrologic Soil Type B. The soil consists of mostly silty, clayey sands, from fine to medium grained, with low swell potential and good drainage characteristics. The existing ground surface drains both to the West and Northeast at approximately a 1% slope. The project proposal is to develop 256 recreation vehicle parking storage spaces. 4

5 The parking area will be made of gravel and a small fire access road made of asphalt. The total imperviousness of the site is 41.9%. b. The purpose of this report is to present the Final Drainage Report for the Rollins Subdivision Filing No. 5 in relation to the addition of the southerly 5.31 acres of land to Lot 1, Block 1 and to be comprised of a gravel parking lot, a fire access road, and landscaped buffers. B. HISTORIC DRAINAGE 1. Overall Basin Description a. Previously approved studies for this property include the Peterson Subdivision Vicinity Master Drainage Report, City of Aurora Engineering Control Section., March 1982 and the Peterson Subdivision Master Drainage Report, City of Aurora Engineering Design Section, July, 1986 (The Peterson Master Report C.O.A. #860268). The development in consideration is within basin B-6 and B-9 of the Peterson Master Drainage Report, which restricts the discharge from the site to 0.5 cfs/acre. b. The 5.31 acre development (South portion of Lot 1) is located in the Sand Creek Drainage Basin and according to FIRM panel 0043K, located in Appendix C, the site does not lie within a FEMA floodplain. 2. Drainage Patterns Through Property a. The site currently slopes to the West and Northeast at approximately 1%. Currently, overland flow to the west is intercepted by an existing 24 FES storm pipe located on the southwest corner of the site. The 24 FES conveys storm water North through an existing 27 storm pipe under the sidewalk of N. Chambers Rd. Overland flow to the northwest bypassing the 24 FES overtops the curb along N. Chambers Rd. and travels north in the east gutter of N. Chambers Rd to an inlet in the said gutter. Overland flow to the northeast is captured by a drainage swale on the east side of the existing RV America property and travels north to an existing inlet. 3. Outfalls Downstream from Property a. Off-site drainage comes from the undeveloped property to the south and drains to the existing 27 RCP on the southwest corner of the proposed development and travels north along N. Chamber Rd. along with all overland drainage from the proposed development. All overland flow on-site and offsite drains to a 29 x 45 HERCP where flow exits the limits of the Peterson drainage analysis. The site is ultimately tributary to Barnamor Ditch and Sand Creek. C. DESIGN CRITERIA 1. References a. October 2012 City of Aurora Storm Drainage Design and Technical Criteria Manual. b. Urban Drainage and Flood Control District Storm Drainage Criteria Manual (UDFCD). c. Peterson Subdivision Vicinity Master Drainage Report, City of Aurora Engineering Control Section., March 1982 and the Peterson Subdivision Master Drainage Report, City of Aurora Engineering Design Section, July, 1986 (The Peterson Master Report C.O.A. #860268). 5

6 2. Hydrologic Criteria a. The 1-Hour Design Point Rainfall Values from Figures RA-1 and RA-6 of the Urban Drainage Flood Control District Manuel, Volume 1 used for this report are: P1, 2 Yr = 0.96 in/hr P1, 5 Yr = 1.36 in/hr P1, 10 Yr = 1.65 in/hr P1, 100 Yr = 2.61 in/hr b. The rational method was used to calculate peak flows and runoff volumes throughout the development site. c. The Full Spectrum method was used to calculate the required storage volume. The spread sheet UD-Detention_v2.34 supplied by UDFCD was used for the computation and can be found in Appendix A. To determine the total required volume ½ the EURV is added to the 100-year detention volume and the WQCV, this method establish the required major storage volume (100-year storage) to be.520 acre-ft (22,651 cubic feet). The Full Spectrum method was utilizes because the site is greater than 5 acres. As stated above the Peterson Subdivision Master Drainage Report allows a discharge of 0.5 cfs/acre, a correction factor of 0.78 was applied to the allowable discharge to account for the site being within 2 sub basins of the Peterson study. The calculated 100-yr allowable release rate of 0.39 cfs/acre will conservatively satisfy allowable 100-yr discharge to the proposed single point of outfall, being the NW corner of the proposed 5.31 acre expansion of Lot 1. It can also be noted that the City of Aurora allows a maximum release rate of 0.85 cfs/acre for a site consisting of Type B soil during the 100-yr event. 3. Hydraulic Criteria a. On-site drainage improvement are designed for both the 2-year and 100-year storm events and in conjunction with manning s equation all drainage improvements are adequately designed. To control the flow that passes the orifice plate, a restrictor plate bolted to the 18 outlet pipe will be utilized. The restrictor plate calculation can be found in Appendix B. D. DRAINAGE PLAN 1. General Concepts a. Offsite drainage coming from the south is controlled by a 24 FES on the Southwest corner of the site. Flow captured by the 24 FES is conveyed to the existing 27 storm infrastructure analyzed with StormCAD, see Appendix B for StormCAD calculations. Drainage to the east of the site is conveyed through 1 foot drainage swale bordering the east side of the site along Helena St. The swale drains to an existing inlet approximately 145 north of the existing RV America property line. That inlet conveys storm water under the RV America parking lot with a 27 storm pipe to the existing storm infrastructure analyzed using StormCAD, see Appendix B. Ultimately all overland flow on-site and off-site drains to a 29 x 45 HERCP where flow exits the limits of the Peterson drainage analysis. b. The entire property, excluding a small portion to the South and East, drains to design point 1, Northwest corner of the property, where two 6

7 interconnected detention ponds are located. The two ponds have a combined detention volume of.560 acre-ft (24,394 cubic ft). At the outlet of the furthest West pond a forebay and micro pool will control excess urban runoff and sediment from leaving the property. RV America is responsible for all maintenance of the drainage facility. 2. Specific Details a. Sub-Basin A, which comprises 5.01 acres, the majority of the site, drains entirely into the detention facility at design point 1. This basin consists of the gravel parking lot, the asphalt fire lane, and the landscaping buffer having a composite imperviousness of 44.3 percent, with a 2-yr flow of 2.3 cfs and a 100-yr flow of 21.1 cfs. Sub-Basin B, comprised entirely of the landscape buffer to the south of the site covering 0.17 acres of the site having a composite imperviousness of 2 percent, being all landscaped area. This basin has a 2-yr flow of 0.08 cfs and a 100-yr flow of 0.29 cfs. All the flow leaving Sub-Basin B is captured by the 24 FES described above. Sub-Basin C, comprised entirely of a 25 foot landscape buffer to the east covers 0.14 and has a composite imperviousness of also 2 percent. This basin has a 2-yr flow of just over 0.07 cfs and a 100-yr flow of 0.24 cfs. All flow leaving Sub-Basin C enters the 1 foot drainage swale described above. b. The two interconnected detention ponds located on the North & west section of the property will capture the required volume of.520 acre-ft (22,651 cubic feet) as calculated by the Full Spectrum method. The pond to the Northeast will have a maximum depth of 2 feet and storage volume of.464 acre-ft (20,2115 cubic feet) it will drain through a 15 RCP culvert under the fire lane access road to the second pond located on the furthest Northwest corner of the site. The second pond on the Northwest corner has a maximum depth of 2 feet and a storage volume of.067 acre-ft (2,919 cubic feet). The pond also is comprised of 2 concrete trickle channels, a forebay, the UDFCD orifice plate to control sediment leaving the property, and a restrictor plate controlling the 100-yr flow. The circular forebay has a radius of 16, a wall height of 8 and a sediment storage volume of 128 cubic feet, 3 percent of the water quality control volume. The 2 trickle channels connected by the circular forebay have a width of 2 feet and a wall height of 2. The UDFCD outlet structure captures any sediment escaping the forebay and conveys all onsite runoff through a 3 x 1.25 restrictor plate from the site to existing storm infrastructure under the sidewalk of N. Chambers Rd. c. For events that exceed the 100-yr event, the east pond will overtop the fire access road and flow into the northwest pond. The northwest pond will over top the curb-and-gutter along N. Chambers Rd. 7

8 E. CONCLUSION 1. Compliance with Standards a. All proposed drainage facilities are designed in compliance with the City of Aurora Storm Drainage Criteria and the Urban Drainage and Flood Control District s Urban Storm Drainage Criteria Manual. No adverse impacts are expected to downstream drainage facilities 2. Summary of Concepts a. The drainage design included herein will control damage to existing and proposed structures. The proposed improvements do not negatively affect any upstream or downstream drainage facilities or other structures. The detention/water quality management ponds detain more than sufficient volume for Rollins Subdivision Filing No. 5 improvements and may require modifications upon future development. F. REFERENCES Storm Drainage Design and Technical Criteria Manual, October Natural Resources Conservation Service, Web soil Survey March 16, 2012 April 13, Reviewed November 6, Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, June 2001, Revised December

9 APPENDIX A HYDROLOGIC COMPUTATIONS 9

10 COMPOSITE "C" AND "I" VALUES Subdivision: Rollins Subdivision Filing No. 5 Project Name: RV America Location: City of Aurora Project No Calculated By: JRS Checked By: Date: 11/6/2014 Total Area Area Gravel Area Grass Area Roofs Area Pavement B Soil Composite Composite Composite Composite Composite Basin (acres) (acres) (acres) (acres) (acres) (acres) C 2 C 5 C 10 C 100 I A B C Overall

11 STANDARD FORM SF-1 TIME OF CONCENTRATION Subdivision Rollins Subdivision Filing No. 5 Project Name: RV America Location City of Aurora Project No NOTES: Calculated By: JRS T i = (0.395*(1.1 - C 5 )*(L)^0.5)/(S^0.33) Checked By: T t =L/60V (Velocity From Fig. RO-1) T c Check = 10+L/180 SUB-BASIN INITIAL/OVERLAND TRAVEL TIME Tc CHECK DATA (T i ) (T t ) (URBANIZED BASINS) FINAL BASIN D.A. C 5 L S T i L S VEL. T t COMP. T c TOTAL MIN. T c T c ID (AC) (FT) (%) (MIN) (FT) (%) (FPS) (MIN) (MIN) LENGTH(FT) (MIN) (MIN) A B C Date: 11/6/

12 STANDARD FORM SF-2 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) Project Name: RV America Subdivision Rollins Subdivision Filing No. 5 Project No Location City of Aurora Calculated By: JRS Design Storm 2-Year Checked By: Date: 11/6/2014 DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME INLET TYPE Design Point Area Desig. Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Interception (cfs) Street flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) Remarks UDFCD Outlet Structure 1 A Pond Inflow=2.3 cfs South B East C

13 STANDARD FORM SF-2 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) Project Name: RV America Subdivision Rollins Subdivision Filing No. 5 Project No Location City of Aurora Calculated By: JRS Design Storm 5-Year Checked By: Date: 11/6/2014 DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME INLET TYPE Design Point Area Desig. Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Interception (cfs) Street flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) Remarks UDFCD Outlet Structure 1 A Pond Inflow=4.9 cfs South B East C

14 STANDARD FORM SF-2 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) Project Name: RV America Subdivision Rollins Subdivision Filing No. 5 Project No Location City of Aurora Calculated By: JRS Design Storm 10-Year Checked By: Date: 11/6/2014 DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME INLET TYPE Design Point Area Desig. Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Interception (cfs) Street Flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) Remarks UDFCD Outlet Structure 1 A Pond Inflow=7.8 cfs South B East C

15 STANDARD FORM SF-2 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) Project Name: RV America Subdivision Rollins Subdivision Filing No. 5 Project No Location City of Aurora Calculated By: JRS Design Storm 100-YEAR Checked By: Date: 11/6/2014 DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME INLET TYPE Design Point Area Desig. Area (Ac) Runoff Coeff. Tc (min) C*A (Ac) I (in/hr) Q (cfs) Tc (min) C*A (Ac) I (in/hr) Q (cfs) Interception (cfs) Street flow (cfs) Design Flow (cfs) Slope (%) Pipe Size (inches) Length (ft) Velocity (fps) Tt (min) Remarks UDFCD Outlet Structure 1 A Pond Inflow=21.1 cfs South B East C

16 APPENDIX B HRDRAULIC COMPUTATIONS 16

17 ACTUAL 100-YR VOLUME (Full Spectrum) Subdivision Rollins Subdivision Filing No. 5 Project Name: RV America Location Combined Ponds Project No By: JRS Volume=1/3 x Depth x (A+B+(A*B)^0.5) Checked By: A - Upper Surface Date: 2/13/2015 B - Lower Surface ACTUAL 100-YR VOLUME Elevation Surface Area A+B+(A*B)^0.5 1/3 Depth Volume Cum. Volume Cum.Volume (square feet) (feet) (cubic feet) (cubic feet) (acre-feet) ELEV'S Below Derived from combined North Pond and West pond volumes 100-YR+WQCV+1/2 EURV= 0.52 AC-FT (22,651 CU. FT.)= ELEV FT EURV=0.24 AC-FT (10,454 CU. FT.)= ELEV FT 17

18 ACTUAL 100-YR VOLUME (Full Spectrum) Subdivision Project Name: Location West Pond Project No. By: Volume=1/3 x Depth x (A+B+(A*B)^0.5) Checked By: A - Upper Surface Date: 2/13/2015 B - Lower Surface ACTUAL 100-YR VOLUME Elevation Surface Area A+B+(A*B)^0.5 1/3 Depth Volume Cum. Volume Cum.Volume (square feet) (feet) (cubic feet) (cubic feet) (acre-feet)

19 ACTUAL 100-YR VOLUME (Full Spectrum) Subdivision Project Name: Location North Pond Project No. By: Volume=1/3 x Depth x (A+B+(A*B)^0.5) Checked By: A - Upper Surface Date: 2/13/2015 B - Lower Surface ACTUAL 100-YR VOLUME Elevation Surface Area A+B+(A*B)^0.5 1/3 Depth Volume Cum. Volume Cum.Volume (square feet) (feet) (cubic feet) (cubic feet) (acre-feet)

20 Actual 100 YR Volume Cum. Volume (acre feet) Elevation (feet) 20

21 DETENTION VOLUME BY THE FULL SPECTRUM METHOD Project: Basin ID: Area of Watershed (acres) Subwatershed Imperviousness Level of Minimizing Directly Connected Impervious Area (MDCIA) Effective Imperviousness 1 Hydrologic Soil Type Type A Type B Type C or D % % Percentage of Area Area (acres) % * User input data shown in blue. Excess Urban Runoff Volume 4 Recommended Horton's Equation Parameters for CUHP Infiltration (inches per hour) Decay Initial--f i Final--fo Coefficient (watershed inches) Detention Volumes 2,5 (acre-feet) Maximum Allowable Release Rate, cfs 3 Design Oulet to Empty EURV in 72 Hours year Detention Volume Including WQCV yr Vol Type A Soil Runoff Voume - Inches yr Vol Type B, C & D Soils EURV Type A Soil EURV Type B Soil EURV Type C/D Soil 100-yr Storage Volume 0.50 EURV Storage Volume Percent Total Imperviousness Notes: 1) Effective imperviousness is based on Figure ND-1 of the Urban Storm Drainage Criteria Manual (USDCM). 2) Results shown reflect runoff reduction from Level 1 or 2 MDCIA and are plotted at the watershed's total imperviousness value; the impact of MDCIA is reflected by the results being below the curves. 3) Maximum allowable release rates for 100-year event are based on Table SO-1. Outlet for the Excess Urban Runoff Volume (EURV) to be designed to empty out the EURV in 72 hours. Outlet design is similar to one for the WQCV outlet of an extended detention basin (i.e., perforated plate with a micro-pool) and extends to top of EURV water surface elevation. 4) EURV approximates the difference between developed and pre-developed runoff volume. 5) 100-yr detention volume includes EURV. No need to add more volume for WQCV or EURV UD-Detention_v /6/2014, 10:49 AM

22 Design Procedure Form: Extended Detention Basin (EDB) Designer: Company: Date: Project: Location: November 6, 2014 Sheet 1 of 4 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, I a I a = 41.9 % B) Tributary Area's Imperviousness Ratio (i = I a / 100 ) i = C) Contributing Watershed Area Area = ac D) For Watersheds Outside of the Denver Region, Depth of Average d 6 = in Runoff Producing Storm Choose One E) Design Concept (Select EURV when also designing for flood control) Water Quality Capture Volume (WQCV) Excess Urban Runoff Volume (EURV) F) Design Volume (1.2 WQCV) Based on 40-hour Drain Time V DESIGN = ac-ft (V DESIGN = (1.0 * (0.91 * i * i * i) / 12 * Area * 1.2) G) For Watersheds Outside of the Denver Region, V DESIGN OTHER = ac-ft Water Quality Capture Volume (WQCV) Design Volume (V WQCV OTHER = (d 6 *(V DESIGN /0.43)) H) User Input of Water Quality Capture Volume (WQCV) Design Volume V DESIGN USER = ac-ft (Only if a different WQCV Design Volume is desired) Choose One I) Predominant Watershed NRCS Soil Group A J) Excess Urban Runoff Volume (EURV) Design Volume For HSG A: EURVA = (0.1878i )*Area EURV = ac-f t For HSG B: EURV B = (0.1178i )*Area For HSG C/D: EURV C/D = (0.1043i )*Area B C / D 2. Basin Shape: Length to Width Ratio L : W = : 1 (A basin length to width ratio of at least 2:1 will improve TSS reduction.) 3. Basin Side Slopes A) Basin Maximum Side Slopes Z = ft / ft (Horizontal distance per unit vertical, 4:1 or flatter preferred) 4. Inlet A) Describe means of providing energy dissipation at concentrated inflow locations: UD-BMP_v3.03, EDB 22 11/6/2014, 2:48 PM

23 STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Project: Basin ID: WQCV Design Volume (Input): Catchment Imperviousness, Ia = 41.9 percent Catchment Area, A = 5.31 acres Diameter of holes, D = inches Depth at WQCV outlet above lowest perforation, H = 2 feet Number of holes per row, N = 1 Vertical distance between rows, h = 4.00 inches OR Number of rows, NL = 5.00 Orifice discharge coefficient, Co = 0.65 Height of slot, H = inches Slope of Basin Trickle Channel, S = ft / ft Width of slot, W = inches Time to Drain the Pond = 72 hours Watershed Design Information (Input): 1.82 Percent Soil Type A = % Percent Soil Type B = 100 % Percent Soil Type C/D = % Outlet Design Information (Output): Excess Urban Runoff Volume (From 'Full-Spectrum Sheet') watershed inches X N/A 0.00 Excess Urban Runoff Volume (From 'Full-Spectrum Sheet') acre-feet Outlet area per row, Ao = 0.39 square inches Total opening area at each row based on user-input above, Ao = 0.39 square inches Total opening area at each row based on user-input above, Ao = square feet 3 Central Elevations of Rows of Holes in feet Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row Flow Collection Capacity for Each Row of Holes in cfs Override Area Row 1 Override Area Row 2 Override Area Row 3 Override Area Row 4 Override Area Row 5 Override Area Row 6 Override Area Row 7 Override Area Row 8 Override Area Row 9 Override Area Row 10 Override Area Row 11 Override Area Row 12 Override Area Row 13 Override Area Row 14 Override Area Row 15 Override Area Row 16 Override Area Row 17 Override Area Row 18 Override Area Row 19 Override Area Row 20 Override Area Row 21 Override Area Row 22 Override Area Row 23 Override Area Row 24 UD-Detention_v2.34, WQCV 23 2/11/2015, 5:32 PM

24 RESTRICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES Project: RV America Basin ID: X 1 #1 Vertical #2 Vertical Sizing the Restrictor Plate for Circular Vertical Orifices or Pipes (Input) Orifice Orifice Water Surface Elevation at Design Depth Elev: WS = 5, feet Pipe/Vertical Orifice Entrance Invert Elevation Elev: Invert = 5, feet Required Peak Flow through Orifice at Design Depth Q = 2.07 cfs Pipe/Vertical Orifice Diameter (inches) Dia = 18.0 inches Orifice Coefficient C o = 0.65 Full-flow Capacity (Calculated) Full-flow area Af = 1.77 sq ft Half Central Angle in Radians Theta = 3.14 rad Full-flow capacity Qf = 14.3 cfs Percent of Design Flow = 691% Calculation of Orifice Flow Condition Half Central Angle (0<Theta<3.1416) Theta = 0.90 rad Flow area A o = 0.23 sq ft Top width of Orifice (inches) T o = inches Height from Invert of Orifice to Bottom of Plate (feet) Y o = 0.28 feet Elevation of Bottom of Plate Elev Plate Bottom Edge = 5, feet Resultant Peak Flow Through Orifice at Design Depth Q o = 2.1 cfs Width of Equivalent Rectangular Vertical Orifice Equivalent Width = 0.82 feet UD-Detention_v2.34.xlsm, Restrictor Plate 24 11/18/2014, 8:42 AM

25 25

26 P-6 P-1 Scenario: 100-YR O-1 P-10 I-3 P-9 J-3 P-8 J-5 P-7 I-2 J-2 J-1 P-4 Title: Chambers Road Storm Sewer x:\ rv america\drainage\stormcad\project.stm Engineering 26 Partners, Inc. Project Engineer: Scott Pease StormCAD v5.5 [5.5005] 02/11/15 04:16:19 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT USA Page 1 of 1 I-1

27 Scenario: 100-YR Junction Report Label Rim Elevation (ft) StructureInvert In Elevation Invert 1 Out Elevation Diameter (ft) (ft) (ft) Hydraulic Grade Line In (ft) Hydraulic Grade Line Out (ft) Total System Flow (cfs) J-1 5, , , , , J-2 5, , , , , J-3 5, , , , , J-5 5, , , , , Title: Chambers Road Storm Sewer x:\ rv america\drainage\stormcad\project.stm Engineering 27 Partners, Inc. Project Engineer: Scott Pease StormCAD v5.5 [5.5005] 02/11/15 04:17:07 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT USA Page 1 of 1

28 Scenario: 100-YR Pipe Report Label UpstreamDownstream Node Node Section Size Length (ft) ConstructedUpstreamDownstream Slope (ft/ft) Invert Elevation (ft) Invert Elevation (ft) Total System Flow (cfs) Full Capacity (cfs) Hydraulic Grade Line In (ft) Hydraulic Grade Line Out (ft) Average Velocity (ft/s) P-1 J-1 J-2 27 inch , , , , P-4 I-1 J-1 27 inch , , , , P-6 J-2 J-3 27 inch , , , , P-7 I-2 J-5 18 inch , , , , P-8 J-5 J-3 18 inch , , , , P-9 J-3 I-3 36 inch , , , , P-10 I-3 O-1 36 inch , , , , Title: Chambers Road Storm Sewer x:\ rv america\drainage\stormcad\project.stm Engineering 28 Partners, Inc. Project Engineer: Scott Pease StormCAD v5.5 [5.5005] 02/11/15 04:17:40 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT USA Page 1 of 1

29 Scenario: 100-YR Inlet Report Label Rim Elevation (ft) Invert Out Elevation (ft) Total System Flow (cfs) Hydraulic Grade Line In (ft) Hydraulic Grade Line Out (ft) I-1 5, , , , I-2 5, , , , I-3 5, , , , Title: Chambers Road Storm Sewer x:\ rv america\drainage\stormcad\project.stm Engineering 29 Partners, Inc. Project Engineer: Scott Pease StormCAD v5.5 [5.5005] 02/11/15 04:16:49 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT USA Page 1 of 1

30 30

31 31

32 APPENDIX C GRAPHS AND TABLES 32

33 104 48' 37'' W Custom Soil Resource Report Map Hydrologic Soil Group ' 25'' W ' 3'' N 39 45' 57'' N ' 3'' N 39 45' 57'' N ' 37'' W N Map Scale: 1:1,310 if printed on A landscape (11" x 8.5") sheet. Meters Feet Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS ' 25'' W

34 Custom Soil Resource Report MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:20,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Adams County Area, Parts of Adams and Denver Counties, Colorado Survey Area Data: Version 11, Sep 23, 2014 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 16, 2012 Apr 13, 2012 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident

35 Custom Soil Resource Report Table Hydrologic Soil Group Hydrologic Soil Group Summary by Map Unit Adams County Area, Parts of Adams and Denver Counties, Colorado (CO001) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI AsB Ascalon sandy loam, 0 to 3 percent slopes B % Totals for Area of Interest % Rating Options Hydrologic Soil Group Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher 18 35

36 36

37 DRAINAGE CRITERIA MANUAL (V. 1) RAINFALL Figure RA-1 Rainfall Depth-Duration-Frequency: 2-Year, 1-Hour Rainfall Rev. 01/2004 Urban Drainage and Flood Control District 37 RA-13

38 RAINFALL DRAINAGE CRITERIA MANUAL (V. 1) Figure RA-2 Rainfall Depth-Duration-Frequency: 5-Year, 1-Hour Rainfall RA-14 01/2004 Urban Drainage and Flood Control District 38

39 DRAINAGE CRITERIA MANUAL (V. 1) RAINFALL Figure RA-3 Rainfall Depth-Duration-Frequency: 10-Year, 1-Hour Rainfall Rev. 01/2004 Urban Drainage and Flood Control District 39 RA-15

40 RAINFALL DRAINAGE CRITERIA MANUAL (V. 1) Figure RA-6 Rainfall Depth-Duration-Frequency: 100-Year, 1-Hour Rainfall RA-18 01/2004 Urban Drainage and Flood Control District 40

41 TABLE 1 RUNOFF COEFFICIENTS AND PERCENTS IMPERVIOUS LAND USE OR SURFACE CHARACTERISTICS Business: Commercial Areas Neighborhood Areas Residential: Single-Family (**) Multi-Unit (detached) Multi-Unit (attached) 1/2 Acre Lot or Larger Apartments Industrial: Light Areas Heavy Areas PERCENT IMPERVIOUS (*) (*) 80 FREQUENCY Parks, Cemeteries Playgrounds Schools Railroad Yard Areas Undeveloped Areas: Historic Flow Analysis, Greenbelts, Agricultural 2 (See "Lawns") Off-Site Flow Analysis (when land use not defined)

42 TABLE 1 (continued) RUNOFF COEFFICIENTS AND PERCENTS IMPERVIOUS LAND USE OR SURFACE CHARACTERISTICS PERCENT IMPERVIOUS FREQUENCY Streets: Paved Gravel Concrete Drive and Walks Roofs Lawns, Sandy Soil (A and B Soils): 2 2% Slope 2-7% Slope >7% Slope Lawns, Clay Soil (C and D Soils): 2% Slope 2-7% Slope >7% Slope NOTE: These Rational Formula coefficients may not be valid for large basins (*)See Figures RO-3 through RO-5 of USDCM Volume 1 for percent impervious. (**)Up to 5 units per acre. Single-family with more than 5 units per acre, use values for multiunit/detached

43 APPENDIX D REFERENCED REPORTS 43

44 44

45 45

46 46

47 47

48 48

49 49

50 50

51 51

52 52

53 53

Section 600 Runoff Table of Contents

Section 600 Runoff Table of Contents Section 600 Runoff Table of Contents 601 INTRODUCTION...600-1 602 RATIONAL METHOD...600-1 602.1 Rational Method Formula...600-2 602.2 Time of Concentration...600-2 602.3 Intensity...600-4 602.4 Runoff

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

THE CITY OF THE VILLAGE PLANNED UNIT DEVELOPMENT DESIGN STATEMENT FOR MULFORD ESTATES

THE CITY OF THE VILLAGE PLANNED UNIT DEVELOPMENT DESIGN STATEMENT FOR MULFORD ESTATES THE CITY OF THE VILLAGE PLANNED UNIT DEVELOPMENT DESIGN STATEMENT FOR MULFORD ESTATES Revised August 18, 2016, August 10, 2016, September 19,2016 Prepared By: Isch and Associates, Inc. 14848 Bristol Park

More information

Red Barn R.V. and Boat Storage Weld County, Colorado. Final Drainage Report

Red Barn R.V. and Boat Storage Weld County, Colorado. Final Drainage Report Red Barn R.V. and Boat Storage Weld County, Colorado Final Drainage Report Prepared for Kevin Moore Project No. 1318-001 February 27, 2017 Prepared By: KETTERLING, BUTHERUS AND NORTON ENGINEERS, LLC. 820

More information

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016 April 12, 2016 Mr. Craig Perl, P.E. Senior Engineer City of Aurora Public Works Department 15151 E. Alameda Parkway Aurora, CO 80012 RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

More information

Table of Contents. Overview... 1

Table of Contents. Overview... 1 Chapter 3 Chapter 3 Table of Contents Overview... 1 Rainfall... 2 3-2-1 Rainfall Depths and Intensities... 2 3-2-2 Design Storm Distribution for Colorado Urban Hydrograph Procedure (CUHP)... 5 3-2-3 Temporal

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021 Hydrology Study For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021 Prepared for Daryl Priest - Priest Development Corporation 124 West Main Street,

More information

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY PRELIMINARY DRAINAGE REPORT FOR THE NEWCASTLE FIRE STATION OLD STATE HIGHWAY PREPARED FOR THE NEWCASTLE FIRE PROTECTION DISTRICT JULY 2014 BY ROSEVILLE DESIGN GROUP, INC. ROSEVILLE DESIGN GROUP, Inc Established

More information

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1 CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1

More information

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements 4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for

More information

Chapter 3 Calculating the WQCV and Volume Reduction

Chapter 3 Calculating the WQCV and Volume Reduction Contents 1.0 Introduction... 1 2.0 Hydrologic Basis of the WQCV... 1 2.1 Development of the WQCV... 1 2.2 Optimizing the Capture Volume... 3 2.3 Attenuation of the WQCV (BMP Drain Time)... 4 2.4 Excess

More information

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

Summary of Detention Pond Calculation Canyon Estates American Canyon, California July 15, 2015 Bellecci & Associates, Inc Summary of Detention Pond Calculation Canyon Estates American Canyon, California 1. Methodology: Method: Unit Hydrograph Software: Bentley Pond Pack Version 8i

More information

TECHNICAL MEMORANDUM. SUBJECT: Determination of watershed historic peak flow rates as the basis for detention basin design

TECHNICAL MEMORANDUM. SUBJECT: Determination of watershed historic peak flow rates as the basis for detention basin design TECHNICAL MEMORANDUM FROM: Ken MacKenzie and Ryan Taylor SUBJECT: Determination of watershed historic peak flow rates as the basis for detention basin design DATE: June 7, 2012 The purpose of this memorandum

More information

DIVISION 5 STORM DRAINAGE CRITERIA

DIVISION 5 STORM DRAINAGE CRITERIA DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the

More information

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification 7. Introduction This chapter summarizes methods to evaluate runoff conveyance in various street cross sections and curb types in the Town of Castle Rock and identifies acceptable upper limits of street

More information

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Hydrology Study Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Prepared for San Mateo Real Estate & Construction March 9, 21 Rev. 1 11-8-211 Rev.

More information

Activity Calculating Property Drainage

Activity Calculating Property Drainage Page 1 of 5 Activity 2.3.11 Calculating Property Drainage Introduction When a property is developed, it is important to understand that changes to watershed characteristics (i.e., land use, slope, soil

More information

Drainage Report. PDC Energy Metcalf Soil Treatment Facility. OA Project No

Drainage Report. PDC Energy Metcalf Soil Treatment Facility. OA Project No Drainage Report PDC Energy Metcalf Soil Treatment Facility OA Project No. 013-0036 760 Horizon Drive, Suite 102 Grand Junction, CO 81506 TEL 970.263.7800 FAX 970.263.7456 DRAINAGE REPORT PDC METCALF CENTRALIZED

More information

DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF

DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Section CONTENTS Page RO- 1.0 OVERVIEW... 1 2.0 RATIONAL METHOD... 3 2.1 Rational Formula... 3 2.2 Assumptions... 4 2.3 Limitations... 4 2.4 Time of Concentration... 5 2.4.1 Initial Flow Time... 5 2.4.2

More information

HYDROLOGY STUDY PREPARED FOR: MARKHAM PERRIS LLC 302 WEST FIFTH STREET, SUITE 103 SAN PEDRO, CA (310) FOR THE PROJECT:

HYDROLOGY STUDY PREPARED FOR: MARKHAM PERRIS LLC 302 WEST FIFTH STREET, SUITE 103 SAN PEDRO, CA (310) FOR THE PROJECT: HYDROLOGY STUDY PREPARED FOR: MARKHAM PERRIS LLC 302 WEST FIFTH STREET, SUITE 103 SAN PEDRO, CA 90731 (310) 241-2992 FOR THE PROJECT: PERRIS VALLEY COMMERCE CENTER BUILDING PERRIS, CALIFORNIA PROJECT NUMBER:

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

APPENDIX G HYDRAULIC GRADE LINE

APPENDIX G HYDRAULIC GRADE LINE Storm Drainage 13-G-1 APPENDIX G HYDRAULIC GRADE LINE 1.0 Introduction The hydraulic grade line is used to aid the designer in determining the acceptability of a proposed or evaluation of an existing storm

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR 1 INTRODUCTION 1.1 Project Description and Location Isabella Ocean Residences is a residential development to be constructed

More information

Table of Contents. 5-5 Release Rates Year Allowable Release Rate WQCV Release Rate EURV Release Rate...

Table of Contents. 5-5 Release Rates Year Allowable Release Rate WQCV Release Rate EURV Release Rate... Chapter 5 Table of Contents 5-1 Introduction... 1 5-1-1 Stormwater Quality Considerations... 1 5-1-2 Stormwater Volume Considerations... 2 5-1-3 Downstream Impacts... 2 5-2 Requirements... 2 5-2-1 General

More information

TxDOT Houston District Permit Requirements (Information contained herein is subject to change)

TxDOT Houston District Permit Requirements (Information contained herein is subject to change) Houston District Permit Requirements (Information contained herein is subject to change) Access Driveway for Commercial / Industrial Developments; or Street Tie-In / Drainage-Only 1) Complete the three

More information

iswm TM Technical Manual Hydrology:

iswm TM Technical Manual Hydrology: : 1.0 2.0 Downstream Assessment 3.0 Streambank Protection 4.0 Water Balance 5.0 Rainfall Tables 6.0 Hydrologic Soils Data Table of Contents 1.0... HO-1 1.1 Estimating Runoff... HO-1 1.1.1 Introduction

More information

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY LOW IMPACT DEVELOPMENT HYDROLOGIC CONSIDERATIONS 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY May 18, 2011 PRESENTATION AGENDA Introduction Definitions Discuss Impacts to Hydrologic

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

16.0 Water Quality Management Criteria for Developed Land

16.0 Water Quality Management Criteria for Developed Land October 2003, Revised February 2005 Criteria for Developed Land Page 1 16.1 Introduction 16.0 Water Quality Management Criteria for Developed Land Stormwater quality control is an integral part of any

More information

Appendix I OFFICE OF THE MORGAN COUNTY SURVEYOR STORMWATER DESIGN MANUAL 7/1/2008

Appendix I OFFICE OF THE MORGAN COUNTY SURVEYOR STORMWATER DESIGN MANUAL 7/1/2008 Appendix I OFFICE OF THE MORGAN COUNTY SURVEYOR This Page Left Intentionally Blank OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX I PAGE 1 Appendix II OFFICE OF THE MORGAN COUNTY SURVEYOR This Page Left

More information

Project Drainage Report

Project Drainage Report Design Manual Chapter 2 - Stormwater 2A - General Information 2A-4 Project Drainage Report A. Purpose The purpose of the project drainage report is to identify and propose specific solutions to stormwater

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

Chapter 12 Storage. Contents. Overview... 1

Chapter 12 Storage. Contents. Overview... 1 Chapter 12 Storage Contents Overview... 1 Implementation of Regional, Sub-regional, and On-site Detention Facilities... 2 Regional Detention... 2 Subregional Detention... 5 Onsite Detention... 6 Detention

More information

III. INVENTORY OF EXISTING FACILITIES

III. INVENTORY OF EXISTING FACILITIES III. INVENTORY OF EXISTING FACILITIES Within the Growth Management Boundary, the existing storm drainage facilities are largely associated with development that has historically occurred in the ten drainage

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Preliminary Drainage Analysis

Preliminary Drainage Analysis Preliminary Drainage Analysis Tanimura and Antle Employee Housing Town of Spreckels County of Monterey, California LIB150205 May 29, 2015 Prepared For: Tanimura and Antle Produce Prepared By: 9699 Blue

More information

Constructed Wetland Pond T-8

Constructed Wetland Pond T-8 Constructed Wetland Pond T-8 Description A constructed wetlands pond is a shallow retention pond designed to permit the growth of wetland plants such as rushes, willows, and cattails. Constructed wetlands

More information

Hydrologic Study Report for Single Lot Detention Basin Analysis

Hydrologic Study Report for Single Lot Detention Basin Analysis Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page

More information

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Urban Runoff Background How we got here What Problem?? Provenance of the Problem Unified Sizing Criteria What

More information

Appendix G Preliminary Hydrology Study

Appendix G Preliminary Hydrology Study Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014

More information

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Storm Sewer Design Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Major floods are dramatic and water flow routes must be recognized when minor drainage systems fail. These types

More information

CHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF

CHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF CHAPTER 3 STORMWATER HYDROLOGY Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF 3.1.1 Introduction to Hydrologic Methods...3.1-1 3.1.2 Symbols and Definitions...3.1-3 3.1.3 Rainfall

More information

REFERENCE MAPS FEMA FIRM MAP NRCS SOILS MAP

REFERENCE MAPS FEMA FIRM MAP NRCS SOILS MAP REFERENCE MAPS FEMA FIRM MAP NRCS SOILS MAP Hydrologic Soil Group-Hillsborough County, Florida (Independence Parkway) 27' 58' 56" 27" 58' 57" 2r 58' 32" 27" 58' 33" Map Scale: 1:5,290 if printed on A size

More information

Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual. for: Located at: Prepared for: Prepared by:

Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual. for: Located at: Prepared for: Prepared by: Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual for: Insert Development Name Located at: Insert Address Prepared for: Insert Property Owner Name, Address, and Phone Number

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

LAWRENCE, KANSAS STORMWATER MANAGEMENT CRITERIA

LAWRENCE, KANSAS STORMWATER MANAGEMENT CRITERIA LAWRENCE, KANSAS STORMWATER MANAGEMENT CRITERIA FEBRUARY 1996 CITY OF LAWRENCE, KANSAS STORMWATER MANAGEMENT CRITERIA TABLE OF CONTENTS Pg 1.0 GENERAL 1.1 Introduction... 1 1.2 Applicability... 1 1.3 General

More information

CONSISTENCY BETWEEN CUHP AND RATIONAL METHODS James C.Y. Guo, PhD, P.E., and Ben Urbonas, P.E., D.WRD 08/04/2008

CONSISTENCY BETWEEN CUHP AND RATIONAL METHODS James C.Y. Guo, PhD, P.E., and Ben Urbonas, P.E., D.WRD 08/04/2008 CONSISTENCY BETWEEN CUHP AND RATIONAL METHODS James C.Y. Guo, PhD, P.E., and Ben Urbonas, P.E., D.WRD 08/04/2008 When estimating runoff for a storm event it is assumed that the storm runoff occurs from

More information

Chapter 8. Inlets. 8.0 Introduction. 8.1 General

Chapter 8. Inlets. 8.0 Introduction. 8.1 General . Introduction This chapter provides criteria and design guides for evaluating and designing storm sewer inlets in the City of Centennial. The review of all planning submittals will be based on the criteria

More information

IBS Site Drainage: Senior Design Project

IBS Site Drainage: Senior Design Project IBS Site Drainage: Senior Design Project Len Wright, Ph.D., PE Lecturer, CEAE Wright.Len@gmail.com September 11, 2008 mwsw204i1.ppt/1 OUTLINE Motivation for Stormwater Management Quantity (both onsite,

More information

Volume 2, Chapter 10 - Storage

Volume 2, Chapter 10 - Storage Volume 2, Chapter 10 - Storage Users Guidance: If a UDFCD Section number in this chapter is skipped: It was adopted as is; please refer to that Section in the corresponding UDFCD Manual, Volume, Chapter

More information

Constructed Wetland Channel T-9

Constructed Wetland Channel T-9 Description A constructed wetland channel is a conveyance BMP that is built, in part, to enhance stormwater quality. Constructed wetland channels use dense vegetation to slow down runoff and allow time

More information

STORM DRAINAGE DESIGN CRITERIA

STORM DRAINAGE DESIGN CRITERIA BWM Orig. 01/01/05 Revised 01/01/10 LUCAS COUNTY ENGINEERS OFFICE STORM DRAINAGE DESIGN CRITERIA Drainage The design of storm sewer systems will be based upon the Rational Method using the equation Q=CiA

More information

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development City of Redwood City Stormwater Pollution Prevention Program Drainage Guidelines for Residential Development General Requirements A. Plot & Finished Grading Plan must be submitted with Building Permit

More information

City of Saint John. Storm Drainage Design Criteria Manual

City of Saint John. Storm Drainage Design Criteria Manual Storm Drainage Design Criteria Manual March 7, 2016 LIST OF 2016 REVISIONS PAGES SECTION TITLE iii, iv, v, vi All Table of Contents 31-35 3 SUBMISSION REQUIREMENTS March 7, 2016 Page i DISCLAIMER The material

More information

GENERAL AND FLOODING STANDARDS SUBMISSION BRUNSWICK LAYOVER FACILITY BRUNSWICK, MAINE PREPARED FOR:

GENERAL AND FLOODING STANDARDS SUBMISSION BRUNSWICK LAYOVER FACILITY BRUNSWICK, MAINE PREPARED FOR: APPENDIX H GENERAL AND FLOODING STANDARDS SUBMISSION BRUNSWICK LAYOVER FACILITY BRUNSWICK, MAINE PREPARED FOR: NORTHERN NEW ENGLAND PASSENGER RAIL AUTHORITY (NNEPRA) 75 WEST COMMERCIAL STREET, SUITE 104

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation Stormwater Engineering Bioretention Design Bill Hunt, PE, Ph.D. Extension Specialist & Assistant Professor NCSU-BAE www.bae.ncsu.edu/stormwater Bioretention Design Six Step Process 1 Determine Volume to

More information

Chapter 11 Culverts and Bridges

Chapter 11 Culverts and Bridges Chapter 11 Culverts and Bridges Contents 1.0 Introduction... 1 2.0 General Design... 1 2.1 Design Criteria... 1 2.2 Design Flows... 1 2.3 Permitting and Regulations... 1 2.4 Aesthetics and Safety... 2

More information

Appendix B. Storm Drain System Data

Appendix B. Storm Drain System Data MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendix Appendix B. Storm Drain System Data June 2017 MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO

More information

CRITERIA FOR STORMWATER DESIGN

CRITERIA FOR STORMWATER DESIGN ..CHAPTER.. CRITERIA FOR STORMWATER DESIGN 2.1 Integrated Site Design Approach 2.1.1 Introduction This chapter represents the requirements, policies and other guidance for stormwater management design

More information

V. DRAINAGE IMPROVEMENTS

V. DRAINAGE IMPROVEMENTS V. DRAINAGE IMPROVEMENTS 5.1 Formulation of Drainage Improvements As indicated in Chapter 4, following the completion of the hydrologic analysis associated with future land use conditions, drainage improvements

More information

Water Quality Management Plan

Water Quality Management Plan Water Quality Management Plan For El Centro Aquatic Center Park Avenue between 4 th Street and 6 th Street August 5, 216 Prepared by Arsalan Dadkhah, Ph.D., PE (RCE 4156) D-MAX Engineering, Inc. 722 Trade

More information

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan TR-20 is a computer program for the simulation of runoff occurring from a single storm event. The program develops flood hydrographs from runoff and routes

More information

CACHE VALLEY STORM WATER DESIGN STANDARDS. As Amended by Logan City November 2010

CACHE VALLEY STORM WATER DESIGN STANDARDS. As Amended by Logan City November 2010 CACHE VALLEY STORM WATER DESIGN STANDARDS As Amended by Logan City November 2010 Updated November 2010 Table of Contents A. Definitions... 3 B. Design Requirements... 5 1. Storm Event... 5 2. Allowable

More information

Module 10b: Gutter and Inlet Designs and Multiple Design Objectives

Module 10b: Gutter and Inlet Designs and Multiple Design Objectives Module 10b: Gutter and Inlet Designs and Multiple Design Objectives Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Evening traffic plows through high water at the intersection of

More information

3.0 Planning and Submittal Requirements

3.0 Planning and Submittal Requirements October 2003, Revised February 2005 Chapter 3.0, Planning and Submittal Requirements Page 1 3.0 Planning and Submittal Requirements 3.1 Drainage Studies and Drawings The City of Greenwood Village (Village)

More information

Drainage Report. Pueblo, Colorado. December 18, Prepared for: City of Pueblo Public Works Department 211 E. D Street Pueblo, CO 81003

Drainage Report. Pueblo, Colorado. December 18, Prepared for: City of Pueblo Public Works Department 211 E. D Street Pueblo, CO 81003 Drainage Report Dillon/Eden and I-25 Interchange Improvements SEH Project No. 103325-PUEBL City of Pueblo Project No. 07-054 (DT0802) CDOT Project No. HPP 0251-331 (16640) December 18, Prepared By: Short

More information

Location Drainage Study

Location Drainage Study Location Drainage Study PROJECT ROUTE: LIMITS: MUNICIPALITY/COUNTY: JOB NUMBER: IL 47 at Burlington Road 750ft NW to 750ft SE of IL 47(Burlington), & 1000ft S to 1000ft N of Burlington (IL47) Kane County

More information

Article 20: Erosion Control and Stormwater Management

Article 20: Erosion Control and Stormwater Management Article 20: Erosion Control and Stormwater Management Section 360: Purpose, Scope of Authority, Performance Guarantee and Approvals A. Purpose. The purpose of this document is to set forth minimum requirements

More information

Inflow Design Flood Control System Plan

Inflow Design Flood Control System Plan Inflow Design Flood Control System Plan For Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Cherokee Station - CCR Surface Impoundments Public Service Company of Colorado Denver, Colorado

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN 4. Drainage Plan a. Drainage Plan Description The Specific Plan area drains naturally into two separate watersheds: approximately 6 percent of the Specific

More information

ARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS

ARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS ARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS Section 501: Purpose An adequate drainage system including necessary ditches, pipes, culverts, drains, inlets, bridges, detention ponds, etc. shall

More information

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON 6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON STORM WATER MANAGEMENT DESIGN BRIEF NEW DEVELOPMENT DRAINAGE SYSTEM REV 0 August 29, 2017 PREPARED BY: HALLEX PROJECT #170532 HALLEX NIAGARA HALLEX HAMILTON

More information

City Plaza Residential (TPM ) Preliminary Hydrology Report

City Plaza Residential (TPM ) Preliminary Hydrology Report Hydrology Study City Plaza Residential (TPM 2016-127) Preliminary Hydrology Report Orange, Orange County, California Prepared For: Greenlaw Partners 18301 Von Karman Avenue, Suite 250 Irvine, CA 92612

More information

City of Wheat Ridge Site Drainage Requirements

City of Wheat Ridge Site Drainage Requirements City of Wheat Ridge Site Drainage Requirements I. INTRODUCTION Purpose The City of Wheat Ridge ( the City ) has specific Site Drainage Requirements that must be followed by proposed developments or re-developments.

More information

AG-LAND Investment Brokers 275 Sale Lane Red Bluff, CA Fax Corning Eucalyptus Farm

AG-LAND Investment Brokers 275 Sale Lane Red Bluff, CA Fax Corning Eucalyptus Farm AG-LAND Investment Brokers 275 Sale Lane Red Bluff, CA 96080 530-529-4400 Fax 530-527-5042 Corning Eucalyptus Farm Tehama County,, California 1 of 6 deep irrigation wells Drip tubing rolled at the edge

More information

Sand Filter T-6. Description. Site Selection

Sand Filter T-6. Description. Site Selection Description A sand filter is a filtering or infiltrating BMP that consists of a surcharge zone underlain by a sand bed with an underdrain system (when necessary). During a storm, accumulated runoff collects

More information

Appendix J: Storm Conveyance Design Parameters

Appendix J: Storm Conveyance Design Parameters Appendix J: Storm Conveyance Design Parameters Drain Commissioner 39 February 2005 STORM DRAINAGE DESIGN CRITERIA A. STORM SEWERS 1. The required discharge capacity shall be determined by the Rational

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition STANDARD FOR SLOPE PROTECTION STRUCTURES Definition Structures to safely conduct surface runoff from the top of a slope to the bottom of the slope. Purpose The purpose of this practice is to convey storm

More information

the 2001 season. Allison brought high winds and street flooding to Houston, after

the 2001 season. Allison brought high winds and street flooding to Houston, after Module 10b: Gutter and Inlet Designs and Multiple Design Objectives Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Evening traffic plows through high water at the intersection of

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

SAN GORGONIO PASS CAMPUS - PHASE I

SAN GORGONIO PASS CAMPUS - PHASE I SAN GORGONIO PASS CAMPUS - PHASE I Banning, CA DRAINAGE STUDY June 16, 2010 Reference 106-195 PREPARED BY: Encompass Associates, Inc. 5699 Cousins Place Rancho Cucamonga, CA 91737 909-684-0093 Fax-909-586-6979

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

Stormwater Drainage Criteria Manual. City Of Clearwater Engineering Department Effective July 1, 2015

Stormwater Drainage Criteria Manual. City Of Clearwater Engineering Department Effective July 1, 2015 Stormwater Drainage Criteria Manual City Of Clearwater Engineering Department Effective July 1, 2015 Engineering Department STORMWATER DRAINAGE CRITERIA MANUAL Table of Contents STORMWATER DRAINAGE CRITERIA

More information

HYDROLOGY STUDY LA MIRADA BOULEVARD La Mirada, California

HYDROLOGY STUDY LA MIRADA BOULEVARD La Mirada, California HYDROLOGY STUDY 12000 LA MIRADA BOULEVARD La Mirada, California TTM 73119 Prepared for: The Olson Company 3010 Old Ranch Parkway, Suite 100 Seal Beach, CA 90740 Contact: Mr. Aaron Orenstein (562) 370-9531

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

10.0 Storm Sewer Systems

10.0 Storm Sewer Systems October 2003 Chapter 10.0, Storm Sewer Systems Page 1 10.0 Storm Sewer Systems 10.1 Introduction A storm sewer system consists of a system of inlets, pipes, manholes, junctions, cleanouts, outlets, and

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL () September 2017 Page Chapter 1 Acronyms and Definitions 1.01 Purpose 1 1.02 Acronyms 1 1.03 Definitions 3 Chapter 2 Introduction 2.01 Purpose 1 2.02 Applicability

More information

PRELIMINARY HYDROLOGY STUDY

PRELIMINARY HYDROLOGY STUDY PRELIMINARY HYDROLOGY STUDY FOR Tentative Tract Map West Side of Loma Alta Drive City of Oceanside, CA Prepared For: EMERALD HILLS LLC 4272 Dogwood Avenue Seal Beach, CA 90740 Contact: Mr. Jimmy Chen Ph:

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

PUNTA GORDA AIRPORT CONSTRUCT TAXIWAY A EXTENSION DRAINAGE REPORT

PUNTA GORDA AIRPORT CONSTRUCT TAXIWAY A EXTENSION DRAINAGE REPORT PUNTA GORDA AIRPORT CONSTRUCT TAIWAY A ETENSION DRAINAGE REPORT Prepared for the Charlotte County Airport Authority Prepared By: 7650 West Courtney Campbell Causeway Tampa, Florida 33607-1462 May 2015

More information