Town of Normal Building Energy and Asset Master Planning

Size: px
Start display at page:

Download "Town of Normal Building Energy and Asset Master Planning"

Transcription

1 Update to the 2014 Plan Town of Normal Building Energy and Asset Master Planning July May 2016 November 2016

2 Report Index Master Plan Update Facility Condition & Energy Assessment Beaufort Street Marriott Parking Deck Broadview Mansion Children s Discovery Museum City Hall Annex College Avenue Parking Deck Community Activity Center Engineering Building Normal Theater Police Department Public Works Building Uptown Station Uptown Station Parking Deck Update to the 2014 Facility Master Plan

3 Master Plan Update Facility Condition & Energy Assessment Project Overview Farnsworth Group conducted a facility assessment update as part of an ongoing effort by the Town of Normal (TON) to proactively address facility upgrades and reduce energy usage. In 2014, facility assessments were conducted on eleven buildings owned by the Town of Normal as part of a significant master planning effort. In 2015, the twelfth building, Broadview Mansion, was assessed and added to the master plan portfolio. The master planning process is an interactive cycle with four distinct phases, as shown below. Facility Assessment Verification Detailed Review & Retro-Cx Implementation of Improvements The scope of this project was a high level review of the facilities updated financial information for calculating the Facility Conditions Index (FCI) as well as a review of current utility energy use information comparing the Energy Utilization Index (EUI) and Energy Star Numbers established in the 2014 report. Town facility staff provided necessary documentation, such as utility billing history and updated work order values and insured values. The update findings were compared to the 2014 Master Plan benchmarks. It is worth noting that the updated utility bill information was used in this report was noted be slightly skewed from the original report, this is due to the energy provider changing over to a digital system that monitors the usage closely. 1 P a g e Update to the 2014 Facility Master Plan

4 Condition and Energy Assessment Update Building Beaufort Street Marriott Parking Deck (BMPD) Broadview Mansion Children s Discovery Museum (CDM) City Hall Annex (CHA) College Avenue Parking Deck (CAPD) Community Activity Center (CAC) Engineering (ENG) Normal Theater (NT) Police Department (PD) Public Works (PW) Uptown Station (UTS) Uptown Parking Deck (USPD) Condition and Energy Assessment Update Summary Facility Condition Index 2014 Good (0.0010) Poor (0.2300) Good (0.0120) Good (0.0370) Good (0.0010) Poor (0.1300) Good (0.0240) Poor (0.1080) Good (0.0300) Good (0.0040) Good (0.0050) Facility Condition Index 2016 Good (0.0024) Fair (0.0860) Good (0.0004) Good (0.0346) Good (0.0023) Good (0.0648) Good (0.0146) Good (0.0280) Good (0.0299) Good (0.0033) Good (0.0043) Energy Star 2014 Energy Star EUI (kbtu/sqft) 2016 EUI (kbtu/sqft) NA 3 NA NA 3 NA NA 3 NA NA 3 NA NA 3 NA See UTS See UTS NA 3 NA Utility billing for the Uptown Station and the Uptown Parking Deck are combined. The data (Total usage Parking Deck usage) used to generate the performance ratings was an estimated value based on present site conditions. 2 Utility billing for the Police Department and the City hall Annex are combined for the Natural gas. The data (Total usage /square foot percentage) used to generate the performance ratings was an estimated value based on present site conditions. 3 Energy Star does not currently have a building category for this facility. The Energy Star score is undefined. The previous report included energy star numbers manipulated by changing the category to Office for these, however we do not feel this is a fair comparison and have not included a score for buildings not in the system. All new utility bills were provided to develop the 2014 and 2016 energy star and EIU numbers. The Facility Condition Index in blue shows the most improved buildings. The smaller the number the better the rating. Condition Assessment Update The overall general condition of the buildings reviewed is good. Work orders and preventative maintenance issues are being thoroughly identified by the FM staff and effectively tracked in the Computerized Maintenance Management System (CMMS). Major components that are in poor condition have been identified, and they are in the process of being systematically repaired or replaced, which is reflected in the improved FCI numbers above. Facility Condition Index Insured Value of All Facilities $81,053,024 Work Orders $1,117, Facility Condition Index Good (0.014) 2 P a g e Update to the 2014 Facility Master Plan

5 Next Steps The Town would ultimately like to develop a strategy to link quantifiable data from facility assessments directly to budgetary numbers. In order to accomplish this, all major building assets need to be tracked in the CMMS, which is currently in progress, and include data such as remaining service life (RSL) and estimated cost of replacement. Further developing RSL information would provide the Town with metrics to make decisions regarding capital expenses, energy improvements, or possibly deference of upgrades or repairs in order to pick up an unforeseen or emergency cost. Another important next step would be for the Town of Normal to develop an order of importance for buildings as a whole and for components within the buildings themselves. Again, this is valuable information that could add to the Town s decision making criteria and allow budgeting flexibility. Facility Condition Assessments should be considered as a next step as well. The condition of a building is a dynamic state, and it should be monitored and periodically re-assessed. Farnsworth has worked closely with the Facility Management staff throughout the 2014 assessment process, and the system developed is reproducible and sustainable. The component rating definitions are applicable to anything that is tangible, and the FM staff can continue this process throughout the remainder of the facilities. Condition assessment is the first step in a sustained management system, and it is also a process that should be reiterated. Re-assessing assets ensures your forecasting and budget inputs are valid and reassessment can indicate areas of opportunities in the maintenance program as well. Energy Assessment Update The following table is a summary of the Energy Use Intensity (EUI) calculated for each building utilizing the current utility billing and usage data. Energy Use Intensity (EUI) EUI(kBTU/Sq.Ft.) P a g e Update to the 2014 Facility Master Plan

6 Total Energy Usage (kbtu) by building Beaufort Street Parking Broadview Mansion Childrens Discovery City Hall Annex College Avenue Parking Community Activity Center Engineering Normal Theater Police Department Public Works Uptown Parking Deck Uptown Station 0 2,000,000 4,000,000 6,000,000 8,000, There is an overall energy reduction of 10% when comparing 2014 to 2016 data. This is believed to be due to the improvements in the operation of the Uptown Station Controls system, but also somewhat due to the less extreme weather which can be seen in the individual building comparisons to the Heating Degree and Cooling Degree Days. Next Steps Implement the Energy Conservation Measures (ECM)s identified in 2014, in order of importance that aligns with the Town of Normal s overall goals. Review the parking deck illuminance levels by conducting a photometric study is ongoing. If lighting levels greatly exceed the requirements set forth by IES / DOE (Illuminating Engineering Society/Department of Energy), the number of light fixtures in the parking decks can be reduced. Conduct a more thorough energy audit (ASHRAE Level Two) for the Normal Theater and Children s Discovery Museum. Re-commission the Beaufort Street Marriott Parking Deck, Children s Discovery Museum, Engineering, Public Works, and City Hall Annex to identify programming issues with the HVAC system, misaligned setpoints, faulty sensors, and other specific energy efficiency opportunities. 4 P a g e Update to the 2014 Facility Master Plan

7 Potential ECM Energy Savings Summary Building Potential Savings Beaufort Street Marriott Parking Deck $2,200/yr. Broadview Mansion - Children s Discovery Museum City Hall Annex College Avenue Parking Deck Community Activity Center $500/yr. $325/yr. $2,200/yr. $8,000/yr. Engineering - Normal Theater Police Station Public Works Uptown Station $1,400/yr. $650/yr. $1,200/yr. $1,000/yr. Uptown Parking Deck - Combined Potential ECM Energy Savings (All Facilities) ECM Projects Potential Savings Exit and Emergency Light Upgrade Local Lighting Control (occupancy sensors and daylight harvesting) HVAC systems (CAC and Theater) High Efficient Exterior lights (including parking deck) Summary The accomplishments shown with this update are as follows: $900/yr. $3,800/yr. $8,000/yr. $2,400/yr. Reduction of energy usage across TON-owned facilities. Full scale implementation of a CMMS (computerized maintenance management system) for tracking and logging work orders. Consistent quantification of facility and equipment condition, utilizing industry standards. Implementation of a predictive maintenance program that will proactively assess equipment condition and assign risks and needs; avoidance of last minute labor and budget emergencies. The overall condition of the buildings is good and improving accordingly to the FCI metric. The reduction of energy use is a substantial improvement, and one, with further prudence and diligence, can be improved upon. For reference and current list of the Department of Commerce and Economic Opportunity quick reference guide to energy improvement incentives has been included in the following pages. 5 P a g e Update to the 2014 Facility Master Plan

8 IMPORTANT INFORMATION This is a general guide to energy efficiency incentives available through the Illinois Department of Commerce and Economic Opportunity's Illinois Energy Now program. This page is intended as a quick reference guide only - please refer to the incentive application to see the exact values. All incentive Pre-approval Applications are due by April 1, 2015 and Final Applications (and Incentive Application: Boiler Tune- Up Most Up-to-Date version of this guide: Contact DCEO illinois.energy@illinois.gov (217) The Smart Energy Design Assistance Center (SEDAC) is available to help with completing DCEO applications. Contact us for assistance! info@sedac.org Sweet Deal Double-Up Natural Gas Bonus PROMOTIONS An extra 10% on projects completed and Final Applications submitted by October 31, 2014 An extra 5% on projects completed and Final Applications submitted by February 14, 2015 Incentives for many natural gas projects were doubled from their values at the start of the 2012 program year (June 2012). Individual incentives highlighted in red below are listed at their doubled values. The values for these projects are expected to go down in the future, so act now to get the most funding possible. Clean Water Energy Efficiency Initiative Custom incentives for Turbo Blowers can receive up to 100 percent of the project cost, at the rate of $0.36/kWh. Use special addendum application forms found at Partner Bonus Partner Bonus: organizations attending a SEDAC training, Trade Ally training, or participating in the MEEA STEP program can get a 15% bonus on projects and final applications completed by April 1, ELECTRIC INCENTIVES HVAC - Electric Unitary, Split Syst AC and Air Source Heat Pumps Air Cond. Room Air Conditioners PTAC/ PTHP Replacement PTAC / PTHP PTAC/PTHP New Water-Cooled Chillers (Level 1) Water-Cooled Chillers (Level 2) Chillers Air-Cooled Chillers (Level 1) Air-Cooled Chillers (Level 2) Variable Speed Drive (VSD) on chiller Low Flow Pre-Rinse Spray Valve, for Elec. WH Water Heaters Low Flow Faucet Aerators, for Elec. WH Air Comp. Compressed Air Low Pressure Drop Filters Compressed Air No-Loss Condensate Drain $100/ton $83/ton $50/ton $50/ton $33/ton $66/ton $50/ton $100/ton $92/hp $32/valve $8/valve $120/unit $5/hp $150/drain Misc. VFD Retrofit (DCEO HVAC VFD only, other types of pumps are custom) $92/hp 6 P a g e Update to the 2014 Facility Master Plan

9 ELECTRIC INCENTIVES Lighting CFL Screw-In CFL Hard-Wired T12 to T8 HP T8 to RW T8 26 W or less $1.50/lamp 27 W or more $2/lamp 29 W or less $45/fixture 30 W or more $82/fixture (8ft) HP lamp and ballast retrofit $22/lamp (4ft) HP lamp and ballast retrofit $13/lamp (3ft) lamp and ballast retrofit $12/lamp (2ft) lamp and ballast retrofit $7/lamp U-tube lamp and ballast retrofit $7/lamp (8ft) lamp and ballast $2.50/lamp (4ft) lamp and ballast $1.50/lamp T8, T5 (includes highbay) New fixture, new ballast $0.75/W reduced Permanent Delamp Induction Lighting Cold Cathode Lighting Exit Signs LED Traffic Signals Interior Sensors Solar Light Tubes (8ft) with reflector (4ft) with reflector (8ft) No reflector (4ft) No reflector New Exterior Induction Fixture New Induction Wall Pack Cold Cathode Interior Fixtures Cold Cathode Exterior Fixtures New LED, T-1, or Electroluminescent Exit Signs LED Exit Sign Retrofit Kit <6W LED Lamp or Fixture <20W LED Lamp or Fixture >20W New LED Wall Pack New Exterior LED Fixture $29/lamp $22/lamp $15/lamp $12/lamp $1.30/ W reduced (<4,380 hours operation) or $0.30/kWh reduced (>4.380 hours operation) $50-$100/fixture $0.60/W reduced $0.60/W reduced $1.30/ W reduced (<4,380 hours operation) or $0.30/kWh reduced (>4.380 hours operation) $25/sign $25/sign $15/Lamp $0.60/W reduced $50-$100/fixture $1.30/ W reduced (<4,380 hours operation) or $0.30/kWh reduced (>4.380 hours operation) 8" Traffic LED Signal Head $50/lamp 12" Traffic LED Signal Head $50/lamp 8" Arrow LED Module or Single Ball $50/lamp 12" Arrow LED Module or Single Ball $50/lamp 12" Pedestrian LED Module $50/lamp Lighting Occupancy/Vacancy Sensor Bilevel sensor (ComEd-stairwell/hall/garage) Multi-level switch $0.16/Watt $70/fixture $0.05/Watt <= 10" diameter $70/fixture >10" diameter and <21" diameter $100/fixture >=21" diameter $130/fixture 7 P a g e Update to the 2014 Facility Master Plan

10 ELECTRIC INCENTIVES Kitchen Equipment - Electric Refrigerators/ Freezers Misc. Dishwashing & Water Conservation Solid Door Freezer Glass Door Freezer, Refrigerator Anti-Sweat Heater Controls EC Motor for Walk-In Cooler, Freezer EC Motor for Reach-In Cooler, Freezer Evaporator Fan Controls on Shaded Pole Motor Refrigeration Economizer Auto Door Closer for Walk-Ins LED Refrigeration Case Lighting (Closed) LED Refrigerated Display Case (Open) Steam Cookers, 3 to 6 pan, > 50% eff High-Efficiency Ice Maker Electric Griddle Hot Food Holding Cabinet Demand Controlled Ventilation, New Exhaust Hood Demand Controlled Ventilation, Retrofit ENERGY STAR Dishwasher Low-Flow Pre-Rinse Spray Valve Faucet Aerators $5/ft3 $6/ft3 $35/linear ft $75/motor $52/motor $90/motor $120/compressor hp $100/door $60/door $60/door $450-$600/unit $225-$600/unit $50/Linear ft width $240-$600/unit $450/hp $600/hp $475-$1,800/unit $32/unit $8/unit Specialty Equipment Custom Refrigerated Vending Machine $150/unit Vending Beverage Machine, Snack Controls $110/unit; $45/unit GSHP Ground Source Heat Pump (All Electric) See Application Custom Custom Electric Incentives $0.12/kWh 8 P a g e Update to the 2014 Facility Master Plan

11 HVAC Furnace Boiler Steam Water Heater Misc. DCV NATURAL GAS INCENTIVES Furnace, Furnace, 94% AFUE Furnace, HW Condensing, < 1,000 MBH, AFUE > 90% HW Condensing, 1,000 MBH, TE > 90% Boiler Reset Hot Water Boiler Pipe Insulation Parallel Positioning Control System Steam Boiler Pipe Insulation Steam Trap Repair/Replace Infrared Heater, Low intensity heater Natl Gas Heat, Elec or Natl Gas Absorp. AC Natl Gas Heat, No AC $10/MBH $12/MBH $14/MBH $7/MBH $14/MBH $8/MBH $0.50/MBH ($1,500max) $0.75/MBH $8-$20/linear ft $3/therm saved $8-$20/linear ft $200-$600/trap $600/unit $1500/unit $850/unit $3/MBH $40/1,000 sf $40/1,000 sf Kitchen Equipment Ovens Cookers Convection Oven Combination Oven Infrared Rotisserie Oven Infrared Upright Broiler Infrared Charbroiler Conveyer Oven Rack Oven, Double Oven Pasta cooker with infrared burner Infrared Salamander Broiler Fryer Griddle Steam Cooler, 3-6 pan, eff 38% $650/unit $1250/unit $650/unit $780/unit $420/unit $950/unit $650/unit $300/unit $240/unit $350/unit $50/linear ft (width) $500-$800/unit Vent. Hoods DCV for Kitchen Vent Hoods $ /hp Washing Equip. Specialty Equipment Misc. Dishwasher, No Booster/With Booster Pre-Rinse Spray Valve (Gas Water Heater) Faucet aerators Low-flow showerheads $475-$1800/unit $64/unit or FREE $16/unit $6/unit Ground Source Heat Pump (natural gas heating) See Application Custom Custom Custom Natural Gas Incentive $3/therm 9 P a g e Update to the 2014 Facility Master Plan

12 Beaufort Street Marriott Parking Deck Beaufort Street Marriott Parking Deck Building Background The auditing team reviewed the Beaufort Street Marriott Parking Deck (BMPD) for the Town of Normal. The BMPD construction was completed in There are 5 levels including space allowed for future development of retail spaces. The deck areas and estimated-average number of people that use the facility is shown in the table below. Space Total Area (SF) Visitors Equivalent to Full Time Parking 162, Stairwells 4, Mech/Elec 1, Total 168, Summary of Key Metrics This report is arranged around the following main sections: 1. Summary of Key Metrics 2. Energy Assessment Detailed Findings Facility Condition Index: Facility Condition Index Facility's insured value $10,088,708 Work Orders $25,000 Facility Condition Index Good (0.0024) The Good rating of the facility is a representation of the work orders that are anticipated at this point in time. It is important to note that the FCI can change significantly based on the identified work orders or capital costs. The identified work orders and capital costs cover a five year budgeting cycle and consist of capital costs related to site components (update lighting, lighting controls and lighting levels) of the facility. The town has identified a number of improvements critical to the facility s purpose, thereby making the FCI a representation of the entire site. Energy Utilization Index (EUI): In comparing the 2016 Beaufort Street Marriott Parking Deck EUI to 2014 EUI, in 2016 the Parking Deck is consuming less energy per square foot than the 2014 property (approximately -6.5% less than median). This information is primarily driven by the fact that the property is not fully or consistently occupied. In comparing the current 2016 Beaufort Street Marriott Parking Deck EUI with a median property of similar usage, the EPA does not have a nationally representative data on this type of building. 1 P a g e Update to the 2014 Facility Master Plan

13 Beaufort Street Marriott Parking Deck Metric % Diff (2016/2014) Median % Diff (2016/Median) E-STAR score N/A N/A N/A 50 N/A EUI (kbtu/ft²) % N/A N/A Energy Star Rating: The Farnsworth team received the Beaufort Street Marriott Parking Deck utility usage for the past 3 years and entered the data into the Energy Star program. The BMPD is not eligible to apply for Energy Star. In order to attain a benchmark Energy Use Intensity (EUI) rating, the BMPD was entered in as a 168,611 SqFt, Occupancy 100%, and Partially Enclosed Parking Garage. Note that the Energy Star system is continuously evolving with the US Department of Energy adding building energy usage information to their database routinely. Energy Assessment Detailed Findings A comparison of the past 3 years worth of utility data was included as an update to the 2014 Energy and Asset Master Plan This process identified electrical usage mostly indicative of a parking deck influenced by environmental/ weather conditions as it relates to the small amount of electric heat in the stairwells, however most of the electrical usage is related to lighting with a base load of around 30,000-35,000 kwh. This can be seen in the following charts showing the rise and fall of electrical usage following the rise and fall of Heating Degree Days (HDD). While the overall annual gas usage looks typical, there are a few anomalies that the TON should investigate further. There are a couple of months, May of year 1 and March of year 2 that drop significantly in the kwh usage, it is unclear what would have caused these dips, as it does not appear to be related to weather patterns in any way. We have also included a comparison of electrical usage and cooling degree days, however this is just for reference and shows due to no cooling equipment there is no rise in usage over the summer months when compared to the cooling degree days. 2 P a g e Update to the 2014 Facility Master Plan

14 Beaufort Street Marriott Parking Deck Beaufort Street Marriott Parking Deck Totals Total kbtu Usage (annual) 1,349, Site EUI 8.70 Total Cost Utilities $ 28, Average $/kbtu $ % Consumption Electric 100% % Consumption Natural Gas 0% % Cost Electric 100% % Cost Natural Gas 0% $$ paid for Electric over Gas/kBtu $ P a g e Update to the 2014 Facility Master Plan

15 Beaufort Street Marriott Parking Deck Utility Consumption % 0% Electric Natural Gas 100% Utility Cost % 27% 73% Electric Natural Gas 4 P a g e Update to the 2014 Facility Master Plan

16 Beaufort Street Marriott Parking Deck 2014 Site Energy Survey Update The Farnsworth team identified Energy Conservation Measures (ECM) in The site survey was a non-invasive site inspection of the building and its services. The team developed following ECMs for recommendation of implementation based on the information that was provided and the site visit. See the following summary table and the more detailed explanation in the paragraphs below. BMPD 01 Energy Improvement Opportunities Description Daylight sensors for the exterior and interior lighting in areas with windows. Feasibility Potential savings Recommended priority Status Proj. $1,400 /yr. High Incomplete BMPD 02 Lighting retro-fit for parking area lighting. Proj. $1000/yr. Med Incomplete BMPD 03 Upgrade Exit signs to LED s Proj. $160/yr. Med Incomplete BMPD 04 Investigate lumen levels throughout the structure. Proj. - High Incomplete The listed ECMs represent great opportunities for the Town of Normal to achieve some of their goals and objectives: being good stewards of taxpayer money, providing value-added services to the community, maintaining the community s assets to a definable, acceptable level. ECM BMPD 01: Daylight sensors for the exterior and interior lighting in areas with windows. Status Update: No work to date. ECM BMPD 02: Lighting retro-fit for parking area lighting. Status Update: No work to date. ECM BMPD 03: Upgrade Exit signs to LED s. Status Update: No work to date. ECM BMPD 04: Investigate lumen levels throughout the structure. Status Update: No work to date. 5 P a g e Update to the 2014 Facility Master Plan

17 Broadview Mansion Broadview Mansion Building Background The Van Leer family originally built the stately Edwardian Style Arts and Crafts, 7,300 square foot Broadview Mansion in 1906 after achieving considerable success in managing the hardware store in Downtown Bloomington. Upon her husband s death in 1940, Mrs. Van Leer built an 80 foot carillon tower in his memory, adding to the historic 4-acre property. In 1949, the property was used primarily for institutional use by the Immanuel Bible Foundation, with a residence of the Foundation s director on the second floor until the early 2000 s. Today, the Town of Normal is in a joint agreement with the Foundation to maintain and manage the property. The building is being used for performances and lessons associated with the Van Leer Academy of Music and Art, fundraisers, study groups, and other nonprofit and planning sessions. The building and tower total area and estimated-average full-time equivalent staff and visitors are shown in the following table. The mansion and the tower and the site are considered one entity for one facility condition index. Space Total Area (SF) Visitors Equivalent to Full Time Basement First Floor Second Floor/ Living quarters Attic Total Mansion 7, Total Tower 1, Summary of Key Metrics This report is arranged around the following main sections: 1. Summary of Key Metrics 2. Energy Assessment Detailed Findings Facility Condition Index: Facility Condition Index Facility's Insured Value $3,319,068 Work Orders $285,500 Facility Condition Index Fair (0.086) The fair rating of the facility is a representation of the work orders that are anticipated at this point in time. It is important to note that the FCI can change significantly based on the identified work orders or capital costs. The identified work orders and capital costs cover a five year budgeting cycle and consist of capital costs related to site components (pavement, historic fencing and walls) and the overall goal of maintaining the historic value of the facility. The town and Foundation have identified a number of improvements critical to the facility s historic purpose, such as renovations to the kitchen and restoration to wall coverings, thereby making the FCI a representation of the entire site in the context of its historic purpose within the town. Energy Utilization Index (EUI): 1 P a g e Update to the 2014 Facility Master Plan

18 Broadview Mansion In comparing the Broadview Mansion EUI to the 2014 EUI, the Mansion is consuming less energy per square foot than the median property (approximately -17.2% less than median). This information is primarily driven by the fact that the property is not fully or consistently occupied. In addition, it appears the building staff are diligent in keeping temperature setpoints for the HVAC consistent with an unoccupied building, thereby saving significant energy costs. Despite the low energy use per square foot, or EUI, the facility has potential to save further energy dollars. Details of possible energy efficiency measures and savings are in the detailed energy assessment section. When comparing the current 2016 Broadview Mansion EUI to a median property of similar usage, the Community Activity Center is consuming less energy per square foot than the median property (approximately 45% less than median). Metric % Diff (2016/2014) Median % Diff (2016/Median) E-STAR score N/A N/A N/A 50 N/A EUI (kbtu/ft²) % % Energy Star Rating: The Farnsworth team received the Broadview Mansion s utility usage for the past 2 years and entered the data into the Energy Star program. The Broadview Mansion was entered using the closest Energy Star building type, which was a retail store. It was assumed to have one main shift worker, with 16 hr. / wk., 1 computer, and 1 refrigeration unit. However, the Energy Star rating produced N/A, primarily due to Energy Star not having a comparable property in their database yet. Note that the Energy Star system is continuously evolving with the US Department of Energy adding building energy usage information to their database routinely. Energy Assessment Detailed Findings The energy assessment for the Broadview Mansion included a Preliminary Energy-Use Analysis (PEA). During the PEA, the utility bills were reviewed to identify any efficiency or usage modification opportunities before conducting the walk-through. A comparison of the past 2 years worth of utility data was included as an update to the 2014 Energy and Asset Master Plan This process identified natural gas usage indicative of a building influenced by environmental/ weather conditions. This can be seen in the following chart for the Mansion is showing the rise and fall of gas usage following the rise and fall of Heating Degree Days (HDD). The overall annual gas usage looks typical, and an overall reduction in usage appears to follow the reduction in Heating Degree Days in year 2 and 3. 2 P a g e Update to the 2014 Facility Master Plan

19 Broadview Mansion In the following chart showing electrical consumption from the Mansion compared to CDD, there is a consistent base load of around 750 kwh / month. This is believed to be due to mainly lighting loads. The electrical usage peaks during the summer months, as expected, due to air conditioning and rises slightly in the winter due to fan and pumping energy for heating. 3 P a g e Update to the 2014 Facility Master Plan

20 Broadview Mansion The following charts show the electrical use of the Tower that is on the property, which in 2014 was noted to only have some decorative lighting installed at the top and no heating or cooling equipment. There is very little electric data from previous years and it is unclear if this usage is normal, but believed to be related to decorative lighting. These charts are included for reference of the usage compared to the time of year, however no conclusions should be drawn when compared to the HDDs or CDDs. 4 P a g e Update to the 2014 Facility Master Plan

21 Broadview Mansion Mansion Totals Total kbtu Usage (annual) 272, Site EUI Total Cost Utilities $ 2, Average $/kbtu $ % Consumption Electric 12% % Consumption Natural Gas 88% % Cost Electric 55% % Cost Natural Gas 45% $$ paid for Electric over Gas $ (315.78) $$ paid for Electric over Gas/kBtu $ 0.05 Utility Consumption % 12% 88% Electric Natural Gas Utility Cost % 58% 42% Electric Natural Gas 5 P a g e Update to the 2014 Facility Master Plan

22 Broadview Mansion Tower Totals Total kbtu Usage (annual) Site EUI 0.01 Total Cost Utilities $ Average $/kbtu $ % Consumption Electric 100% % Consumption Natural Gas 0% % Cost Electric 100% % Cost Natural Gas 0% $$ paid for Electric over Gas/kBtu $ Utility Consumption % 0% Electric Natural Gas 100% Utility Cost % 0% Electric Natural Gas 100% 6 P a g e Update to the 2014 Facility Master Plan

23 Broadview Mansion 2015 Site Energy Survey The Farnsworth team identified Energy Conservation Measures (ECM) in The site survey was a non-invasive site inspection of the building and its services. The team developed following ECMs for recommendation of implementation based on the information that was provided and the site visit. See the following summary table and the more detailed explanation in the paragraphs below. Energy Improvement Opportunities ECM # Description Class Mansion 01 Replacing fixtures and bulbs with LED fixtures and bulbs. Proj. Potential Savings $542/yr. Recommended Priority Mansion 02 Adding lighting controls. Proj. $30/yr. Med. Mansion 03 * Update temperature controls. Proj. $217/yr. Med. Tower 04 Remove tower meter Proj. $288/yr. Med. Mansion 05 Mansion 06 Updating domestic hot water heater to tankless water heater Air sealing windows, doors, dryer/ bathroom vents, fire place flues & misc. penetrations. Med. Proj. $42/yr. Med. Proj. - Med. Mansion 07 Evaluate envelope insulation Proj. - High Mansion 08 Educating end users and occupied/ unoccupied scheduling. *If a BAS controller is not an option, a WIFI programmable thermostat is recommended. O&M $600/yr. Med. Status Incomplete Incomplete Incomplete Incomplete Incomplete Incomplete Incomplete Incomplete The listed ECMs represent great opportunities for the Town of Normal to achieve some of their goals and objectives: being good stewards of taxpayer money, providing value-added services to the community, maintaining the community s assets to a definable, acceptable level. ECM Mansion 01: Assumptions for this ECM include and average usage of the basement lights for 16 hours a week and the main lighting for the upper floors used for 14 hours a week. Bulbs would be replaced with LED type bulbs equivalent to the original wattage as currently installed in most areas. In addition, it is assumed that the basement fluorescent lighting could be reduced by half of the currently installed fixtures and provide the same lighting levels, due to more efficient fixtures. Closets and accent lights were excluded from these calculations and the calculated usage was compared with electrical use in the mild seasons (assuming very little if any effect of lighting on heating and cooling). Update: No work to date. Status Update: No work to date. ECM Mansion 02: This ECM accounts for putting a daylight photocell or timer to control the single light fixture between the house and the garage which is currently assumed to be on 24/7 at an assumed 60 Watts, however if any other lights could be placed on a timer to reduce usage the potential savings could be increased, however it appears that none of the other lights were on and there were daylight photocells on many of the exterior lights already. Status Update: No work to date. ECM Mansion 03: This ECM is based on an ASHRAE savings calculator for programmable thermostat installation. It is apparent that the town desires to install a networked thermostat and building automation controls for monitoring of this facility; however it is assumed that this would give the ability to input schedules and setback temperatures similar to a programmable thermostat. Status Update: No work to date. ECM Tower 04: It is apparent that the lighting and electricity in the tower is currently not being used. In the past year there was only one month that actually showed any electrical usage. Considering this low usage and the current deteriorated state of the electrical system in the tower, it is recommended to 7 P a g e Update to the 2014 Facility Master Plan

24 Broadview Mansion remove the service all together and eliminate the meter charges. Alternative solar-powered accent lighting could be explored if desired in the future and would provide an attractive payback to the town compared to paying monthly meter charges. Status Update: No work to date. ECM Mansion 05: This ECM utilized a savings calculator provided by a prominent manufacturer of tankless water heaters. With no one actually living in the mansion it is assumed that the hot water gets used very little, other than hand washing and the occasional set of dishes or laundry. The savings would be realized though installing a tankless water heater, which means it would only run when hot water is needed. Currently, the tank type water heater in the basement continuously heats the tank of water, whether there is any need for hot water in the building. Status Update: No work to date. ECM Mansion 06 & 07: These ECMs are identified as a greater capital project and are beyond the simple calculations of the low cost/ no cost items, as part of an ASHRAE Level 1 audit. A more thorough analysis and engineering calculation would be required to identify potential savings figures and should also including cost analysis and payback numbers beyond the scope of this evaluation. That being said, there are numerous areas of potential improvements including insulation of additional envelope areas, sealing air penetrations, etc. Status Update: No work to date. ECM Mansion 08: This ECM is simply educating users of the space about the HVAC systems and controls and increasing the user s awareness of energy usage. For example, receiving an with the utility bill and month s usage compared to previous years / baseline, will help the mansion s staff identify energy reduction opportunities, such as keeping windows closed while the HVAC is running and turning off lighting when a space isn t occupied, etc. This value is calculated from the difference in July usage between 2014 and 2015, since this additional energy was not related to weather. There are opportunities to combine ECMs 8 and 3 by using a programmable thermostat that is set to the occupancy patterns of the facility. Status Update: No work to date 8 P a g e Update to the 2014 Facility Master Plan

25 Children s Discovery Museum Children s Discovery Museum Building Background The FGI team audited the Children s Discovery Museum for the Town of Normal. The CDM is a museum where touching and interacting with the exhibits is for all ages. The CDM is a three-story 29,517 sq. ft. LEED building built in The building areas and estimated-average number of people that use the facility is shown in the table below. Space Total Area (SF) Visitors Equivalent to Full Time Office 1, Classroom 1, Storage 2, Exhibits/Activity 19, Retail 1, Other 3, Totals 29, Summary of Key Metrics This report is arranged around the following main sections: 1. Summary of Key Metrics 2. Energy Assessment Detailed Findings Facility Condition Index: Facility Condition Index Facility's Insured Value $6,142,551 Work Orders $2,651 Facility Condition Index Good (0.0004) The Good rating of the facility is a representation of the work orders that are anticipated at this point in time. It is important to note that the FCI can change significantly based on the identified work orders or capital costs. The identified work orders and capital costs cover a five year budgeting cycle and consist of capital costs related to site components (update lighting, lighting sensors and air balancing) of the facility. The town has identified a number of improvements critical to the facility s purpose, thereby making the FCI a representation of the entire site. Energy Utilization Index (EUI): In comparing the Children s Discovery Museum EUI to 2014 property EUI, the Museum is consuming less energy per square foot than the 2014 property (approximately 5.3% less than median). This information is primarily driven potentially by the air needing to be balanced, lighting sensor needing to be installed, and installing efficient lighting. Details of possible energy efficiency measures and savings are in the detailed energy assessment section. 1 P a g e Update to the 2014 Facility Master Plan

26 Children s Discovery Museum When comparing the current 2016 Children s Discovery Museum EUI to a median property of similar usage, the Community Activity Center is consuming less energy per square foot than the median property (approximately 2.9% less than median). Metric % Diff (2016/2014) Median % Diff (2016/Median) E-STAR score % % EUI (kbtu/ft²) % % Energy Star Rating: The Farnsworth team received the Children s Discovery Museum utility usage for the past 3 years and entered the data into the Energy Star program. The CDM Energy Star rating is 52. In order to attain a benchmark Energy Star rating, the CDM was entered in as a 29,517 SqFt retail store with 25 main shift workers operating 50hrs/wk. with 50 computers, 2 cash registers, and 100% building conditioned and heated. Note that the Energy Star system is continuously evolving with the US Department of Energy adding building energy usage information to their database routinely. Energy Assessment Detailed Findings A comparison of the past 3 years worth of utility data was included as an update to the 2014 Energy and Asset Master Plan. Note there were a few data points missing which were filled in by averaging corresponding month in the other years or averaging the previous and following months. This process identified natural gas usage indicative of a building influenced by environmental/ weather conditions. This can be seen in the following chart showing the rise and fall of gas usage following the rise and fall of Heating Degree Days (HDD). An overall reduction in usage appears to follow the reduction in Heating Degree Days in year 2 and 3. 2 P a g e Update to the 2014 Facility Master Plan

27 Children s Discovery Museum In the following chart showing electrical consumption compared to CDD, there is a consistent base load of around 35,000 kwh / month. This is believed to be due to mainly lighting loads, however there are many interactive exhibits and displays which contribute to the year round electrical usage. The electrical usage peaks during the summer months, as expected, due to air conditioning. Community Activity Center Totals Total kbtu Usage (annual) 2,249, Site EUI Total Cost Utilities $ 39, Average $/kbtu $ % Consumption Electric 73% % Consumption Natural Gas 27% % Cost Electric 92% % Cost Natural Gas 8% $$ paid for Electric over Gas $ (33,011.68) $$ paid for Electric over Gas/kBtu $ P a g e Update to the 2014 Facility Master Plan

28 Children s Discovery Museum Utility Consumption % 27% 73% Electric Natural Gas Utility Cost % 8% 92% Electric Natural Gas 4 P a g e Update to the 2014 Facility Master Plan

29 Children s Discovery Museum 2014 Site Energy Survey The Farnsworth team identified Energy Conservation Measures (ECM) in The site survey was a non-invasive site inspection of the building and its services. The team developed following ECMs for recommendation of implementation based on the information that was provided and the site visit. See the following summary table and the more detailed explanation in the paragraphs below. CDM 01 Energy Improvement Opportunities Description Installing miser on vending machines and look into installing on floor exhibits. Feasibility Potential savings Recommended priority Status Proj. $150/yr. High Incomplete CDM 02 Retrofit T-12 lighting to T-8 lighting Proj. $15/yr. Medium Incomplete CDM 03 Lighting controls Proj. $100/yr. High Incomplete CDM 04 Timer for recirculation pump O&M - High Incomplete CDM 05 Air balancing Proj. - High Incomplete CDM 06 Relocation the thermostat that is above copier O&M - High Incomplete CDM 07 Sectioning out the basement with ceiling Occ. sensors Proj. $200/yr. High Incomplete The listed ECMs represent great opportunities for the Town of Normal to achieve some of their goals and objectives: being good stewards of taxpayer money, providing value-added services to the community, maintaining the community s assets to a definable, acceptable level. ECM CMD 01: Installing miser on vending machines and investigate in-stalling on floor exhibits. Status Update: Investigated with vendor and they were unable to upgrade machines. Will be considered in future procurement of vending services. ECM CDM 02: Retrofit T-12 lighting to T-8 lighting. Status Update: No work to date. ECM CDM 03: Lighting Control. Status Update: Vendor has been contacted and visited site to update controls and review operational parameters. Work in Progress ECM CDM 04: Timer for recirculation pump. Status Update: No work to date. ECM CDM 05: Air Balancing. Status Update: No work to date. ECM CDM 06: Relocation of thermostat that is above copier. Status Update: Equipment placement has been reviewed to coordinate with stat locations in general. ECM CDM 07: Sectioning out the basement with ceiling occupancy sensors. Status Update: No work to date. 5 P a g e Update to the 2014 Facility Master Plan

30 City Hall Annex City Hall Annex Building Background The FGI team audited the City Hall Annex for the Town of Normal. The CHA is a two-story 16,760 sq. ft. building built in The building areas and estimated-average number of people that use the facility is shown in the table below. Space Total Area (SF) Visitors Equivalent to Full Time Office 6, Storage 6, Other 3, Total 16, Summary of Key Metrics This report is arranged around the following main sections: 1. Summary of Key Metrics 2. Energy Assessment Detailed Findings Facility Condition Index: Facility Condition Index Facility's Insured Value $3,865,302 Work Orders $133,840 Facility Condition Index Good (0.0346) The Good rating of the facility is a representation of the work orders that are anticipated at this point in time. It is important to note that the FCI can change significantly based on the identified work orders or capital costs. The identified work orders and capital costs cover a five year budgeting cycle and consist of capital costs related to site components (update lighting, lighting sensors and Investigate lumen levels) of the facility. The town has identified a number of improvements critical to the facility s purpose, thereby making the FCI a representation of the entire site. Energy Utilization Index (EUI): In comparing the City Hall Annex EUI to the 2014 EUI, the CHA is consuming less energy per square foot than the median property (approximately -13.3% less than median). This information is primarily driven by the fact that the property could use some lighting upgrades and lighting sensors. Details of possible energy efficiency measures and savings are in the detailed energy assessment section. When comparing the current 2016 City Hall Annex EUI to a median property of similar usage, the Community Activity Center is consuming less energy per square foot than the median property (approximately 25.3% less than median). 1 P a g e Update to the 2014 Facility Master Plan

31 City Hall Annex Metric % Diff (2016/2014) Median % Diff (2016/Median) E-STAR score % 50 48% EUI (kbtu/ft²) % % Energy Star Rating: The Farnsworth team received the City Hall Annex utility usage for the past 3 years and entered the data into the Energy Star program. The CHA Energy Star rating is 74. In an effort to create an Energy Star benchmark, we entered the City Hall Annex in as a 16,760 SqFt office building that operates 50 hours per week with 20 main shift workers and 35 computers. Also, the natural gas for the Police Department and City Hall Annex are franchised, so we had to divide the utility totals by the area of each building. [Total usage x % of area of PD (PD area / total area of PD and CHA Energy Assessment Detailed Findings The energy assessment for the City Hall Annex included a Preliminary Energy-Use Analysis (PEA). During the PEA, the utility bills were reviewed to identify any efficiency or usage modification opportunities before conducting the walk-through. A comparison of the past 3 years worth of utility data was included as an update to the 2014 Energy and Asset Master Plan This process identified natural gas usage mostly indicative of a building influenced by environmental/ weather conditions. This can be seen in the following chart showing the rise and fall of gas usage following the rise and fall of Heating Degree Days (HDD). While the overall annual gas usage looks typical, there are a few anomalies that the TON should investigate further, however an overall reduction in usage appears to follow the reduction in Heating Degree Days in year 2 and 3. There is missing data for February of 2016 and the following two months show a usage above the HDDs which appears to be abnormally high when compared to the previous years. In the following chart showing electrical consumption compared to CDD. The electrical usage peaks during the summer months, as expected, due to air conditioning, however there is also a rise over the winter months, which is believed to be related to the fan and pumping energy used for heating. 2 P a g e Update to the 2014 Facility Master Plan

32 City Hall Annex City Hall Annex Totals Total kbtu Usage (annual) 756, Site EUI Total Cost Utilities $ 12, Average $/kbtu $ % Consumption Electric 67% % Consumption Natural Gas 33% % Cost Electric 91% % Cost Natural Gas 9% $$ paid for Electric over Gas $ (10,367.71) $$ paid for Electric over Gas/kBtu $ P a g e Update to the 2014 Facility Master Plan

33 City Hall Annex Utility Consumption % 33% 67% Electric Natural Gas Utility Cost % 9% 91% Electric Natural Gas 4 P a g e Update to the 2014 Facility Master Plan

34 City Hall Annex 2014 Site Energy Survey The Farnsworth team identified Energy Conservation Measures (ECM) in The site survey was a non-invasive site inspection of the building and its services. The team developed following ECMs for recommendation of implementation based on the information that was provided and the site visit. See the following summary table and the more detailed explanation in the paragraphs below. CHA 01 CHA 02 CHA 03 CHA 04 Energy Improvement Opportunities Description Photo cells an occupancy sensors for the remaining non-automated interior lighting. Exterior building light fixtures to be replaced with high efficient fixtures. Replace old battery packs and exit lights with LED fixtures. Replace the degraded insulation on the condenser lines. Feasibility Potential savings Recommended priority Status Proj. $100/yr. High Incomplete Proj. $125/yr. Medium Complete Proj. $100/yr. High Incomplete O&M - High Incomplete The listed ECMs represent great opportunities for the Town of Normal to achieve some of their goals and objectives: being good stewards of taxpayer money, providing value-added services to the community, maintaining the community s assets to a definable, acceptable level. ECM CHA 01: Photo cells an occupancy sensors for the remaining non-automated interior lighting. Status Update: No work to date. ECM CHA 02: Exterior building light fixtures to be replaced with high efficient fixtures. Status Update: Completed in ECM CHA 03: Replace old battery packs and exit lights with LED fixtures. Status Update: No work to date. ECM CHA 04: Replace the degraded insulation on the condenser lines. Status Update: No work to date. 5 P a g e Update to the 2014 Facility Master Plan

35 College Avenue Parking Deck College Avenue Parking Deck Building Background The auditing team reviewed the College Avenue Parking Deck (CAPD) for the Town of Normal. The CAPD construction was completed in There are 5 levels including space allowed for future development of retail spaces. The deck areas and estimated-average number of people that use the facility is shown in the table below. Space Total Area (SF) Visitors Equivalent to Full Time Parking 197, Office Mech/Elec 1,734 - Stair/Elev/Storage 8, Storage 4, Future Development 10, Totals 222, Summary of Key Metrics This report is arranged around the following main sections: 1. Summary of Key Metrics 2. Energy Assessment Detailed Findings Facility Condition Index: Facility Condition Index Facility's Insured Value $12,400,703 Work Orders $30,000 Facility Condition Index Good(0.0023) The Good rating of the facility is a representation of the work orders that are anticipated at this point in time. It is important to note that the FCI can change significantly based on the identified work orders or capital costs. The identified work orders and capital costs cover a five year budgeting cycle and consist of capital costs related to site components (update lighting, lighting controls and lighting levels) of the facility. The town has identified a number of improvements critical to the facility s purpose, thereby making the FCI a representation of the entire site. Energy Utilization Index (EUI): In comparing the 2016 College Avenue Parking Deck EUI to 2014 property of similar usage, in 2016 parking deck is consuming more energy per square foot than the 2014 property (approximately 23.1% less than median). This information is primarily driven potentially by the need to investigate lumen levels, lighting sensor needing to be installed, and installing efficient lighting. Details of possible energy efficiency measures and savings are in the detailed energy assessment section. 1 P a g e Update to the 2014 Facility Master Plan

36 College Avenue Parking Deck In comparing the current 2016 College Avenue Parking Deck EUI with a median property of similar usage, the EPA does not have a nationally representative data on this type of building. Metric % Diff (2016/2014) Median % Diff (2016/Median) E-STAR score N/A N/A N/A 50 N/A EUI (kbtu/ft²) % N/A N/A Energy Star Rating: The Farnsworth team received the College Deck utility usage for the past 3 years and entered the data into the Energy Star program. The College Deck is not eligible to apply for Energy Star. In order to attain a benchmark Energy Use Intensity (EUI) rating, the College Deck was entered in as a 222,876 SqFt, Occupancy 100%, and Partially Enclosed Parking Garage. Note that the Energy Star system is continuously evolving with the US Department of Energy adding building energy usage information to their database routinely. Energy Assessment Detailed Findings The energy assessment for the College Deck included a Preliminary Energy-Use Analysis (PEA). During the PEA, the utility bills were reviewed to identify any efficiency or usage modification opportunities. A comparison of the past 3 years worth of utility data was included as an update to the 2014 Energy and Asset Master Plan This process identified electrical usage mostly indicative of a parking deck influenced by environmental/ weather conditions as it relates to the small amount of electric heat in the stairwells, however most of the electrical usage is related to lighting with a base load of around 30,000 kwh. This can be seen in the following charts showing the rise and fall of electrical usage following the rise and fall of Heating Degree Days (HDD). While the overall annual electrical usage looks typical, there are a few anomalies that the TON should investigate further. There are a couple of months, May of year 1 and January and March of year 2 that drop significantly in the kwh usage, it is unclear what would have caused these dips, as it does not appear to be related to weather patterns in any way. 2 P a g e Update to the 2014 Facility Master Plan

37 College Avenue Parking Deck We have also included a comparison of electrical usage and cooling degree days, however this is just for reference and shows due to very little cooling equipment there is no rise in usage over the summer months when compared to the cooling degree days. College Deck Totals Total kbtu Usage (annual) 1,626, Site EUI 8.00 Total Cost Utilities $ 34, Average $/kbtu $ % Consumption Electric 100% % Consumption Natural Gas 0% % Cost Electric 100% % Cost Natural Gas 0% $$ paid for Electric over Gas/kBtu $ P a g e Update to the 2014 Facility Master Plan

38 College Avenue Parking Deck Utility Consumption % 0% Electric Natural Gas 100% Utility Cost % 0% Electric Natural Gas 100% 4 P a g e Update to the 2014 Facility Master Plan

39 College Avenue Parking Deck 2014 Site Energy Survey The Farnsworth team identified Energy Conservation Measures (ECM) in The site survey was a non-invasive site inspection of the building and its services. The team developed following ECMs for recommendation of implementation based on the information that was provided and the site visit. See the following summary table and the more detailed explanation in the paragraphs below. CAPD 01 Energy Improvement Opportunities Description Daylight sensors for the exterior and interior lighting in areas with windows. Feasibility Potential savings Recommended priority Status Proj. $1,422.22/yr. High Incomplete CAPD 02 Lighting retro-fit for parking area lighting. Proj. $997.59/yr. High Incomplete CAPD 03 Upgrade Exit signs to LED s Proj. $160/yr. High Complete CAPD 04 Investigate lumen levels throughout the structure. Proj. - High Incomplete CAPD 05 Review controls and operation of electric heat. Proj. - High Complete The listed ECMs represent great opportunities for the Town of Normal to achieve some of their goals and objectives: being good stewards of taxpayer money, providing value-added services to the community, maintaining the community s assets to a definable, acceptable level. ECM CAPD 01: Daylight sensors for the exterior and interior lighting in areas with windows. Status Update: No work to date. ECM CAPD 02: Lighting retro-fit for parking area lighting. Status Update: No work to date. ECM CAPD 03: Upgrade Exit signs to LED s. Status Update: All exit sings have been replaced throughout the deck with LED type. Completed 2015 ECM CAPD 04: Investigate lumen levels throughout the structure. Status Update: No work to date. ECM CAPD 05: Review controls and operation of electric heat. Status Update: Electric heater in mechanical room has been replaced. Completed Controls are work in progress. 5 P a g e Update to the 2014 Facility Master Plan

40 Community Activity Center Community Activity Center Building Background The FGI team audited the Community Activity Center for the Town of Normal. The building was originally part of the State run children s home complex, which it served as a school facility within the complex. The building was purchased by the Town of Normal and subsequently renovated in 1997 for its present use as a community activity center. The building areas and estimated-average number of people that use the facility is shown in the table below. Space Total Area (SF) Visitors Equivalent to Full Time Office 1, School 6, Theater 2,500 - Social/activity 6, Garage 2, Other 4, Total 23, Summary of Key Metrics This report is arranged around the following main sections: 1. Summary of Key Metrics 2. Energy Assessment Detailed Findings Facility Condition Index: Facility Condition Index Facility's insured value $4,118,505 Work Orders $266,859 Facility Condition Index Good (0.0648) The Good rating of the facility is a representation of the work orders that are anticipated at this point in time. It is important to note that the FCI can change significantly based on the identified work orders or capital costs. The identified work orders and capital costs cover a five year budgeting cycle and consist of capital costs related to site components (update lighting, Boiler replacement and insulating) of the facility. It was noted that the Roof section C and H will be completed in The town has identified a number of improvements critical to the facility s purpose, thereby making the FCI a representation of the entire site. 1 P a g e Update to the 2014 Facility Master Plan

41 Community Activity Center Energy Utilization Index (EUI): In comparing the current 2016 Community Activity Center EUI to the 2014 property, the Community Activity Center is consuming less energy per square foot than the 2014 property (approximately -3.7% less than the 2014 property). This information is primarily driven by the fact that the property is not fully or consistently occupied. In addition, it appears the building staff is diligent in keeping temperature setpoints for the HVAC consistent with an unoccupied building, thereby saving significant energy costs. Despite the low energy use per square foot, or EUI, the facility has potential to save further energy dollars. Details of possible energy efficiency measures and savings are in the detailed energy assessment section. When comparing the current 2016 Community Activity Center EUI to a median property of similar usage, the Community Activity Center is consuming less energy per square foot than the median property (approximately 26% less than median). Metric % Diff (2016/2014) Median % Diff (2016/Median) E-STAR score % 50 26% EUI (kbtu/ft²) % % Energy Star Rating: The Farnsworth team received the Community Activity Center utility usage for the past 3 years and entered the data into the Energy Star program. The CAC Energy Star rating is 37. In order to attain an Energy Star benchmark, the CAC was entered into the program as 23,478 SqFt office building operating 50hrs/wk. with 10 main shift workers and 2 computers. Energy Assessment Detailed Findings A comparison of the past 3 years worth of utility data was included as an update to the 2014 Energy and Asset Master Plan This process identified natural gas usage mostly indicative of a building influenced by environmental/ weather conditions. This can be seen in the following chart showing the rise and fall of gas usage following the rise and fall of Heating Degree Days (HDD). While the overall annual gas usage looks typical, there are a few anomalies that the TON should investigate further, however an overall reduction in usage appears to follow the reduction in Heating Degree Days in year 2 and 3. The usage does not show a similar pattern from year 2 and 3, possibly indicating a difference in building use or number of occupants. For example, February through May of year 2 shows a reduction of usage as compared to year 1 with similar HDD and year 3 shows some unusual usage for the months of May and June when compared to almost little to no HDD. 2 P a g e Update to the 2014 Facility Master Plan

42 Community Activity Center In the following chart showing electrical consumption compared to CDD, there is a consistent base load of around 10,000 kwh / month. This is believed to be due to mainly lighting loads. The electrical usage peaks during the summer months, as expected, due to air conditioning. A few anomalies for the TON to investigate further: Comparing electrical usage for Year 1 against 2 and 3, there is an increase in usage compared to CDD for the peak times, however this may be due to the buildings change in occupancy or usage, as this is a community activity center and number of occupants and hours of operation may vary from year to year. 3 Page Update to the 2014 Facility Master Plan

43 Community Activity Center Community Activity Center Totals Total kbtu Usage (annual) 2,058, Site EUI Total Cost Utilities $ 19, Average $/kbtu $ % Consumption Electric 31% % Consumption Natural Gas 69% % Cost Electric 73% % Cost Natural Gas 27% $$ paid for Electric over Gas $ (9,097.61) $$ paid for Electric over Gas/kBtu $ 0.02 Utility Consumption % 69% 31% Electric Natural Gas Utility Cost % 27% 73% Electric Natural Gas 4 P a g e Update to the 2014 Facility Master Plan

44 Community Activity Center 2014 Site Energy Survey The Farnsworth team identified Energy Conservation Measures (ECM) in The site survey was a non-invasive site inspection of the building and its services. The team developed following ECMs for recommendation of implementation based on the information that was provided and the site visit. See the following summary table for a summary list and current status of each. See 2014 report for more detailed descriptions. CAC 01 CAC 02 Energy Improvement Opportunities Description Photo cells and occupancy sensors for the remaining non-automated interior lighting. Time clock and photo eyes for the parking lot/exterior pole lighting. CAC 03 Exterior building light fixtures to be replaced with high efficient fixtures. CAC 04 Replace old battery packs and Exit lights with LED fixtures. Feasibility Potential savings Recommended priority Status Proj. $700/yr. High Incomplete Proj. $260/yr. High Incomplete Proj. $100/yr. High Incomplete Proj. $250/yr. High Incomplete CAC 05 Update heating plant to a high efficient boiler. Proj. $3100/yr. Medium Incomplete CAC 06 Update temperature controls. Proj. $900/yr. Medium Incomplete CAC 07 CAC 08 Update air handling equipment to variable volume units. Update pumps for HW and CHW to variable speed units. Proj. $1000/yr. Medium Incomplete Proj. $900/yr. Medium Incomplete CAC 09 Update chilled water plant to high efficient chiller. Proj. $1000/yr. Low Incomplete CAC 10 Insulate existing garage door and provide weather strip/seal for jambs. CAC 11 Re-caulk windows and doors. Existing caulk is past its life expectancy. Proj. - Low Incomplete Proj. - Low Incomplete CAC 12 Replace exterior windows. Proj. - Low Incomplete The listed ECMs represent great opportunities for the Town of Normal to achieve some of their goals and objectives: being good stewards of taxpayer money, providing value-added services to the community, maintaining the community s assets to a definable, acceptable level. ECM CAC 01: Photo cells and occupancy sensors for the remaining non-automated interior lighting. Status Update: Some lighting and controls have been replaced and associated controls. Lighting in aerobics area and main lobby have been replaced with higher efficiency lighting as well as LED bulb conversions. Work in progress. ECM CAC 02: Time clock and photo eyes for the parking lot/exterior pole lighting. Status Update: No work to date. ECM CAC 03: Exterior building light fixtures to be replaced with high efficient fixtures. Status Update: Wall packs on the front entrance have been replaced. Work in progress. ECM CAC 04: Replace old battery packs and Exit lights with LED fixtures. Status Update: No work to date. 5 P a g e Update to the 2014 Facility Master Plan

45 Community Activity Center ECM CAC 05: Update heating plant to a high efficient boiler. Status Update: Boiler replacement project in progress. To be complete October ECM CAC 06: Update temperature controls. Status Update: Temperature controls update in progress as part of the boiler project scope of work. To be complete October ECM CAC 07: Update air handling equipment to variable volume units. Status Update: No work to date. ECM CAC 08: Update pumps for HW and CHW to variable speed units. Status Update: Heating water pump update in progress as part of the boiler project scope of work. To be completed October ECM CAC 09: Update chilled water plant to high efficient chiller. Status Update: No work to date. ECM CAC 10: Insulate existing garage door and provide weather strip/seal for jambs. Update: No work to date. ECM CAC 11: Re-caulk windows and doors. Existing caulk is past its life expectancy. Status Update: Windows overlooking Social Area have been repaired in conjunction with Section B roof replacement project to be complete in September of Work in progress. ECM CAC 12: Replace exterior windows. Status Update: No work to date. 6 P a g e Update to the 2014 Facility Master Plan

46 Engineering Building Engineering Building Building Background The FGI team audited the Engineering Building for the Town of Normal. The engineering department only occupies half of the 12,000 SqFt brick building. The building areas and estimated-average number of people that use the facility is shown in the table below. Space Total Area (SF) Visitors Equivalent to Full Time Office 5, Other Total 5, Summary of Key Metrics This report is arranged around the following main sections: 1. Summary of Key Metrics 2. Energy Assessment Detailed Findings Facility Condition Index: Facility Condition Index Facility's Insured Value $963,850 Work Orders $14,093 Facility Condition Index Good (0.0146) The Good rating of the facility is a representation of the work orders that are anticipated at this point in time. It is important to note that the FCI can change significantly based on the identified work orders or capital costs. The identified work orders and capital costs cover a five year budgeting cycle and consist of capital costs related to site components (reduce space heating, lighting sensors and adjusting baseboard heating) of the facility. The town has identified a number of improvements critical to the facility s purpose, thereby making the FCI a representation of the entire site. Energy Utilization Index (EUI): In comparing the 2016 Engineering Building EUI to the 2014 property of similar usage, the Engineering Building is consuming more energy per square foot than the median property (approximately 8.9% greater than median). This information is potentially driven by the use of space heaters and the baseboard heater not being kept at an acceptable temp. Details of possible energy efficiency measures and savings are in the detailed energy assessment section. When comparing the current 2016 Engineering Building EUI to a median property of similar usage, the Community Activity Center is consuming less energy per square foot than the median property (approximately 26.6% less than median). Metric % Diff (2016/2014) Median % Diff (2016/Median) E-STAR score % 50-50% EUI (kbtu/ft²) % % Energy Star Rating: 1 P a g e Update to the 2014 Facility Master Plan

47 Engineering Building The Farnsworth team received the Engineering Building utility usage for the past 3 years and entered the data into the Energy Star program. The ENG Energy Star rating is 56. In order to attain a benchmark Energy Star rating, the ENG was entered in as a 5,880 SqFt office building with 10 main shift workers operating 50hrs/wk. and 10 computers. Note that the Energy Star system is continuously evolving with the US Department of Energy adding building energy usage information to their database routinely. Energy Assessment Detailed Findings A comparison of the past 3 years worth of utility data was included as an update to the 2014 Energy and Asset Master Plan. This process identified natural gas usage indicative of a building influenced by environmental/ weather conditions. This can be seen in the following chart showing the rise and fall of gas usage following the rise and fall of Heating Degree Days (HDD). An overall increase in usage does not appears to follow the reduction in Heating Degree Days in year 2 and 3. Also note that the use of electric heat in the form of baseboard heaters and personal heaters was noted in the previous report and can be seen by the rise in electrical use on the second chart during the winter months. In the following chart showing electrical consumption compared to CDD, there is a possible base load of around 1,200 kwh / month, however as electricity is being used for both heating and cooling it is only noted in a few months with little heating or cooling load. The electrical usage peaks during the winter months due to electric heaters and increases in the summer months due to air conditioning. 2 Page Update to the 2014 Facility Master Plan

48 Engineering Building Engineering Building Totals Total kbtu Usage (annual) 302, Site EUI Total Cost Utilities $ 33, Average $/kbtu $ % Consumption Electric 34% % Consumption Natural Gas 66% % Cost Electric 97% % Cost Natural Gas 03% $$ paid for Electric over Gas $ (32,182.32) $$ paid for Electric over Gas/kBtu $ 0.02 Utility Consumption % 66% 34% Electric Natural Gas Utility Cost % 3% 97% Electric Natural Gas 3 P a g e Update to the 2014 Facility Master Plan

49 Engineering Building 2014 Site Energy Survey The Farnsworth team identified Energy Conservation Measures (ECM) in The site survey was a non-invasive site inspection of the building and its services. The team developed following ECMs for recommendation of implementation based on the information that was provided and the site visit. See the following summary table and the more detailed explanation in the paragraphs below. Energy Improvement Opportunities Description Feasibility Potential savings Recommended priority Status ENG 01 ENG 02 ENG 03 Photo cells and occupancy sensors for the remaining non-automated interior lighting. Adjust and balance HVAC airflow if possible to provide more heating in deficient areas to reduce space heater usage. Maintain foyer baseboard heater thermostat setting at an acceptable level. Proj. $50/yr. low Incomplete O&M - low Complete O&M - low Complete The listed ECMs represent great opportunities for the Town of Normal to achieve some of their goals and objectives: being good stewards of taxpayer money, providing value-added services to the community, maintaining the community s assets to a definable, acceptable level. ECM ENG 01: Photo cells and occupancy sensors for the remaining non-automated interior lighting. Update: No work to date. ECM ENG 02: Adjust and balance HVAC airflow if possible to provide more heating in deficient areas to reduce space heater usage. Update: Work complete Limited opportunities for improvement due to existing conditions. ECM ENG 03: Maintain foyer baseboard heater thermostat setting at an acceptable level. Update: Complete P a g e Update to the 2014 Facility Master Plan

50 Normal Theater Normal Theater Building Background The FGI team audited the Normal Theater for the Town of Normal. The theater originally opened in 1937 and was built specifically for sound films. The Theater has been completely restored to its original condition. The building is still being used to show movies and available for rentals where assembly seating is required. The building areas and estimated-average number of people that use the facility is shown in the table below. Space Total Area (SF) Visitors Equivalent to Full Time Auditorium 4, Lobby/RR/Other 2, Mechanical Projections Total 7, Summary of Key Metrics This report is arranged around the following main sections: 1. Summary of Key Metrics 2. Energy Assessment Detailed Findings Facility Condition Index: Facility Condition Index Facility's insured value $1,294,718 Work Orders $36,200 Facility Condition Index Good (0.0280) The Good rating of the facility is a representation of the work orders that are anticipated at this point in time. It is important to note that the FCI can change significantly based on the identified work orders or capital costs. The identified work orders and capital costs cover a five year budgeting cycle and consist of capital costs related to site components (update lighting, lighting sensors and update temperature controls) of the facility. It was noted that the HVAC upgrade including high efficiency condensing boilers will be completed in The Town has identified a number of improvements critical to the facility s purpose, thereby making the FCI a representation of the entire site. Energy Utilization Index (EUI): In comparing the Normal Theater EUI to the2014eui, the Theater is consuming less energy per square foot than the median property (approximately -15.2% less than median). This information is primarily driven by the fact that the property could use some lighting upgrades and lighting sensors. Details of possible energy efficiency measures and savings are in the detailed energy assessment section. 1 P a g e Update to the 2014 Facility Master Plan

51 Normal Theater In comparing the current 2016 Normal Theater EUI with a median property of similar usage, the EPA does not have a nationally representative data on this type of building. Metric % Diff (2016/2014) Median % Diff (2016/Median) E-STAR score N/A N/A N/A 50 N/A EUI (kbtu/ft²) % N/A N/A Energy Star Rating: The Farnsworth team received the Normal Theater utility usage for the past 3 years and entered the data into the Energy Star program. The Energy Star cannot develop a rating number for this theater, so in an effort to create a benchmark, we enter the Theater in as a 5,635 SqFt retail store operating 30 hours per week with two main shift workers, one computer, and one cash register. Note that the Energy Star system is continuously evolving with the US Department of Energy adding building energy usage information to their database routinely. Energy Assessment Detailed Findings The energy assessment for the Theater included a Preliminary Energy-Use Analysis (PEA). During the PEA, the utility bills were reviewed to identify any efficiency or usage modification opportunities before conducting the walk-through. A comparison of the past 3 years worth of utility data was included as an update to the 2014 Energy and Asset Master Plan This process identified natural gas usage mostly indicative of a building influenced by environmental/ weather conditions. This can be seen in the following chart showing the rise and fall of gas usage following the rise and fall of Heating Degree Days (HDD). While the overall annual gas usage looks typical, there is an anomaly that the TON should investigate further, however an overall reduction in usage appears to follow the reduction in Heating Degree Days in year 2 and 3. There appears to be an anomaly noted for November showing a drastic spike in usage. In the following chart showing electrical consumption compared to CDD, there is a consistently high base load of around 6,000 kwh / month. As previously stated this is believed to be due to several factors. The theater has a built up inefficient air handling system that is uninsulated and exposed to the exterior basement walls of the building. There are a large number of lights in use while the building is open, specifically the over 400 incandescent light bulbs in the marquee. It was also noted that the theater 2 P a g e Update to the 2014 Facility Master Plan

52 Normal Theater projection computer equipment cannot be turned off, which directly affects energy use along with adding heat load to the space. Envelope considerations such as leaky doors, roof insulation, etc. are most likely contributing factors as well. Normal Theater Totals Total kbtu Usage (annual) 912, Site EUI Total Cost Utilities $ 9, Average $/kbtu $ % Consumption Electric 32% % Consumption Natural Gas 68% % Cost Electric 73% % Cost Natural Gas 27% $$ paid for Electric over Gas $ (4,307.31) $$ paid for Electric over Gas/kBtu $ P a g e Update to the 2014 Facility Master Plan

53 Normal Theater Utility Consumption % 68% 32% Electric Natural Gas Utility Cost % 27% 73% Electric Natural Gas 4 P a g e Update to the 2014 Facility Master Plan

54 Normal Theater 2014 Site Energy Survey The Farnsworth team identified Energy Conservation Measures (ECM) in The site survey was a non-invasive site inspection of the building and its services. The team developed following ECMs for recommendation of implementation based on the information that was provided and the site visit. See the following summary table and the more detailed explanation in the paragraphs below. Theater 01 Theater 02 Theater 03 Theater 04 Theater 05 Theater 06 Theater 07 Theater 08 Theater 09 Theater 10 Theater 11 Theater 12 Theater 13 Energy Improvement Opportunities Description Feasibility Potential savings Recommended priority Status Installing photo cells and occupancy sensors. Proj. $47.17 Medium Incomplete Bathroom Toilets flush valves to be replaced with high efficient flush valves. Exterior building marquee lights to be replaced with high efficient LED lights. Replace old light fixtures with retro fitted T-5 light fixtures. Replace old battery packs and Exit lights with LED fixtures. Proj. - Medium Incomplete Proj. - High Incomplete Proj. $15.29 Medium Incomplete Proj. $ High Incomplete Update heating plant to a high efficient boiler. Proj. - High Incomplete Update temperature controls. Proj. - High Incomplete Update air handling equipment. Proj. - High Incomplete Evaluate thermostat placement for concession area if it affects thermostat. O&M - High Incomplete Close Gaps in doors O&M - High Complete Piping insulation throughout the building. O&M - High Incomplete Replace Roof with a more sustainable roof. Proj. - High Complete Evaluate Roof insulation O&M - High Complete The listed ECMs represent great opportunities for the Town of Normal to achieve some of their goals and objectives: being good stewards of taxpayer money, providing value-added services to the community, maintaining the community s assets to a definable, acceptable level. ECM Theater 01: Installing photo cells and occupancy sensors. Status Update: No work to date. ECM Theater 02: Bathroom Toilets flush valves to be replaced with high efficient flush valves. Status Update: No work to date. Hand sinks retrofitted with water conserving, touchless fixtures in ECM Theater 03: Exterior building marquee lights to be replaced with high efficient LED lights. Status Update: Magnetic ballasts for backlighting replaced with electronic ballast type for fluorescent backlights in Work in progress. ECM Theater 04: Replace old light fixtures with retro fitted T-5 light fixtures. Status Update: Lighting update in progress as part of the upgrade project scope of work. To be complete in ECM Theater 05: Replace old battery packs and Exit lights with LED fixtures. Status Update: Lighting update in progress as part of the upgrade project scope of work. To be complete in P a g e Update to the 2014 Facility Master Plan

55 Normal Theater ECM Theater 06: Update heating plant to a high efficient boiler. Status Update: HVAC system upgrade in progress. Bidding and work to be complete in ECM Theater 07: Update temperature controls. Status Update: HVAC system upgrade in progress. Bidding and work to be complete in Controls were upgraded in 2015 to maximize efficiency potential of existing equipment. Upgrades will support new HVAC work in ECM Theater 08: Update air handling equipment. Status Update: HVAC system upgrade in progress. Bidding and work to be complete in ECM Theater 09: Evaluate thermostat placement for concession area if it affects thermostat. Status Update: HVAC system upgrade in progress. Bidding and work to be complete in ECM Theater 10: Close Gaps in doors Status Update: Exterior doors and hardware replaced in 2015 and ECM Theater 11: Piping insulation throughout the building. Status Update: HVAC system upgrade in progress. Bidding and work to be complete in ECM Theater 12: Replace Roof with a more sustainable roof. Status Update: New white EPDM roof installed July of ECM Theater 13: Evaluate Roof insulation. Status Update: New white EPDM roof installed July of As part of the design process it was found that the attic is ventilated. Insulation is present in attic. 6 P a g e Update to the 2014 Facility Master Plan

56 Police Department Police Department Building Background The FGI team audited the Police Department for the Town of Normal The PD is three-story 25,140 sq. ft. building built in The building areas and estimated-average number of people that use the facility is shown in the table below. Space Total Area (SF) Visitors Equivalent to Full Time Office 18, Storage 1, Other 4, Total 25, Summary of Key Metrics This report is arranged around the following main sections: 1. Summary of Key Metrics 2. Energy Assessment Detailed Findings Facility Condition Index: Facility Condition Index Facility's insured value $5,797,952 Work Orders $173,870 Facility Condition Index Good (0.0299) The Good rating of the facility is a representation of the work orders that are anticipated at this point in time. It is important to note that the FCI can change significantly based on the identified work orders or capital costs. The identified work orders and capital costs cover a five year budgeting cycle and consist of capital costs related to site components (update lighting and lighting sensors) of the facility. The town has identified a number of improvements critical to the facility s purpose, thereby making the FCI a representation of the entire site. Energy Utilization Index (EUI): In comparing the Police Department EUI to the 2014 EUI, the PD is consuming less energy per square foot than the median property (approximately -13.9% less than median). This information is primarily driven by the fact that the property could use some lighting upgrades and lighting sensors. Details of possible energy efficiency measures and savings are in the detailed energy assessment section. When comparing the current 2016 Police Department EUI to a median property of similar usage, the Community Activity Center is consuming less energy per square foot than the median property (approximately 15.2% less than median). Metric % Diff (2016/2014) Median % Diff (2016/Median) E-STAR score N/A N/A N/A 50 N/A EUI (kbtu/ft²) % % Energy Star Rating: 1 P a g e Update to the 2014 Facility Master Plan

57 Police Department The Farnsworth team received the Police Department utility usage for the past 3 years and entered the data into the Energy Star program. The Energy Star program cannot develop a rating number for this police station, so in an effort to create a benchmark, we entered the Police Department in as a 25,140 SqFt office building that operates 168 hours per week with 40 main shift workers and 65 operating computers. Also, the natural gas for the Police Department and City Hall Annex are franchised, so we had to divide the utility totals by the area of each building. Note that the Energy Star system is continuously evolving with the US Department of Energy adding building energy usage information to their database routinely. [Total usage x % of area of PD (PD area / total area of PD and CHA Energy Assessment Detailed Findings A comparison of the past 3 years worth of utility data was included as an update to the 2014 Energy and Asset Master Plan This process identified natural gas usage mostly indicative of a building influenced by environmental/ weather conditions. This can be seen in the following chart showing the rise and fall of gas usage following the rise and fall of Heating Degree Days (HDD). While the overall annual gas usage looks typical, there are a few anomalies that the TON should investigate further, however an overall reduction in usage appears to follow the reduction in Heating Degree Days in year 2 and 3. There is missing data for February of 2016 and the following two months show a usage above the HDDs which appears to be abnormally high when compared to the previous years. In the following chart showing electrical consumption compared to CDD, there is a consistent base load of around 17,000 kwh / month. This is believed to be due to mainly lighting/computer loads. The electrical 2 Page Update to the 2014 Facility Master Plan

ILLINOIS ENERGY NOW Energy Efficiency Incentives for State Facilities. December 2016

ILLINOIS ENERGY NOW Energy Efficiency Incentives for State Facilities. December 2016 ILLINOIS ENERGY NOW Energy Efficiency Incentives for State Facilities December 2016 1 ILLINOIS OFFICE OF ENERGY & RECYCLING Business Development Community Development Illinois Department of Commerce &

More information

2019 MA Commercial & Industrial Energy Efficiency Offerings & Incentives

2019 MA Commercial & Industrial Energy Efficiency Offerings & Incentives 2019 MA Commercial & Industrial Energy Efficiency Offerings & Incentives P a g e 2 The Massachusetts Program Administrators (PAs) offer their business customers a wide array of financial incentives (1)

More information

Pepco & Delmarva Power. Commercial & Industrial Energy Savings Program Hotels and Restaurants October 18, 2012

Pepco & Delmarva Power. Commercial & Industrial Energy Savings Program Hotels and Restaurants October 18, 2012 Pepco & Delmarva Power Commercial & Industrial Energy Savings Program Hotels and Restaurants October 18, 2012 Housekeeping The presentation will be emailed to you after the webinar. If you have technical

More information

SUMMARY OF SERVICES & INCENTIVES

SUMMARY OF SERVICES & INCENTIVES SMALL BUSINESS PROGRAM 2017 SUMMARY OF SERVICES & INCENTIVES Effective through December 31, 2017 Last updated February 1, 2017 EFFICIENCY INCENTIVES SUMMARY The Focus on Energy Small Business Program offers

More information

Customer Benefits. Why Energy Efficiency? Consumers Energy Business Solutions. What Business Solutions Incentives Are Available?

Customer Benefits. Why Energy Efficiency? Consumers Energy Business Solutions. What Business Solutions Incentives Are Available? Why an Energy Efficiency Program? Business Solutions Energy Efficiency Incentive Program MPSC 21st Century Electric Energy Plan More electricity is needed as soon as practicable. One way of achieving this

More information

LIBRARY ENERGY WALK- THROUGH. Andy Robinson, Training and Education, SEDAC

LIBRARY ENERGY WALK- THROUGH. Andy Robinson, Training and Education, SEDAC LIBRARY ENERGY WALK- THROUGH Andy Robinson, Training and Education, SEDAC ILLINOIS ENERGY NOW University of Illinois 360 Energy Group 2 WHAT WE DO SEDAC Free Services Outreach and Training Energy Assistance

More information

Implementing Low-Cost Energy Savings Projects & Conducting Energy Audits

Implementing Low-Cost Energy Savings Projects & Conducting Energy Audits AEP Ohio Customer Seminar Implementing Low-Cost Energy Savings Projects & Conducting Energy Audits Presented by: Julie Birchfield Customer Manager Energy Optimizers, USA May, 2018 Test your Energy IQ 11

More information

Energy Efficiency Programs and Incentives

Energy Efficiency Programs and Incentives Energy Efficiency Programs and Incentives ABOUT OUR ENERGY EFFICIENCY PROGRAMS Programs began in June 2008 Who Qualifies for the Programs? Ameren Illinois Electric and/or Gas Customers Programs funded

More information

05/14/2012. How to Get Started with the Ameren Illinois ActOnEnergy Program. How to Get Started with ActOnEnergy Program

05/14/2012. How to Get Started with the Ameren Illinois ActOnEnergy Program. How to Get Started with ActOnEnergy Program How to Get Started with the Ameren Illinois ActOnEnergy Program Eric Kruzan, CEM How to Get Started with ActOnEnergy Program Getting Started... 1. Start with Where you use Energy your Systems 2. Where

More information

Incentives and Financing help to get your project paid for

Incentives and Financing help to get your project paid for Incentives and Financing help to get your project paid for Greg Swiss Building Energy Specialist Smart Energy Design Assistance Center (SEDAC), University of Illinois at Urbana Champaign Providing effective

More information

Ameren Illinois Energy Efficiency Programs and Incentives. Helping public sector buildings and communities save energy and money.

Ameren Illinois Energy Efficiency Programs and Incentives. Helping public sector buildings and communities save energy and money. Ameren Illinois Energy Efficiency Programs and Incentives Helping public sector buildings and communities save energy and money. 1 Why Energy Efficiency? Save money Reduce environmental impact Increase

More information

Ameren Illinois Energy Efficiency Business Program. PROGRAM OVERVIEW November 2017

Ameren Illinois Energy Efficiency Business Program. PROGRAM OVERVIEW November 2017 Ameren Illinois Energy Efficiency Business Program PROGRAM OVERVIEW November 2017 Today s Presenters: Bob Baumgartner Business Program Manager Leidos Inc. an Ameren Illinois Contractor Ron Ingram Energy

More information

PARK DISTRICT ENERGY WALK-THROUGH. Andy Robinson, Training and Education, SEDAC

PARK DISTRICT ENERGY WALK-THROUGH. Andy Robinson, Training and Education, SEDAC PARK DISTRICT ENERGY WALK-THROUGH Andy Robinson, Training and Education, SEDAC ILLINOIS ENERGY NOW University of Illinois 360 Energy Group 2 WHAT WE DO SEDAC Free Services Outreach and Training Energy

More information

Funding and Assistance

Funding and Assistance Funding and Assistance Greg Swiss SEDAC Building Energy Specialist Smart Energy Design Assistance Center (SEDAC), University of Illinois at Urbana Champaign 1. Sources of Funding Incentives Grants 2. Sources

More information

New Jersey Board of Public Utilities Clean Energy Program Opportunities for Commercial, Industrial and Institutional Buildings

New Jersey Board of Public Utilities Clean Energy Program Opportunities for Commercial, Industrial and Institutional Buildings New Jersey Board of Public Utilities Clean Energy Program Opportunities for Commercial, Industrial and Institutional Buildings Gary E Finger Ombudsman June 2013 NJ Clean Energy Program Background Introduced

More information

FirstEnergy s Pennsylvania Utilities. Energy Efficiency Programs for Business

FirstEnergy s Pennsylvania Utilities. Energy Efficiency Programs for Business FirstEnergy s Pennsylvania Utilities Energy Efficiency Programs for Business 2018 TODAY S AGENDA Introduction to Sodexo Summary of Pennsylvania Act 129 Overview of program website Overview of Application

More information

GreenStep Cities Workshop Xcel Energy Rebates: Commercial Program Overview

GreenStep Cities Workshop Xcel Energy Rebates: Commercial Program Overview GreenStep Cities Workshop Xcel Energy Rebates: Commercial Program Overview Mike Meyers, Xcel Energy Commitment from Leadership Our energy conservation programs are especially valuable because they give

More information

DTE Energy Commercial & Industrial Energy Optimization Program. Trade Ally Meeting. Guardian Plumbing & Heating January 20, 2011

DTE Energy Commercial & Industrial Energy Optimization Program. Trade Ally Meeting. Guardian Plumbing & Heating January 20, 2011 DTE Energy Commercial & Industrial Energy Optimization Program Trade Ally Meeting Guardian Plumbing & Heating January 20, 2011 Agenda Introduction DTE Energy Your Energy Savings Program Overview 2011 Program

More information

Exhibit A Program Descriptions, Historical Changes and Proposed Changes

Exhibit A Program Descriptions, Historical Changes and Proposed Changes Exhibit A Program Descriptions, Historical Changes and Proposed Changes Exhibit A Program Descriptions, Historical Changes and Changes Reflected in Forecasts Home Energy Savings The Home Energy Savings

More information

Electric Association Annual Conference January 25, 2018

Electric Association Annual Conference January 25, 2018 Electric Association Annual Conference January 25, 2018 Teri Lewand CEM, LEED AP ComEd, Business Programs Mgr. C O N F I D E N T I A L Origin of Energy Efficiency Programs Illinois energy legislation passed

More information

Welcome. Boston Green Tourism March 9, 2017

Welcome. Boston Green Tourism March 9, 2017 Welcome Boston Green Tourism March 9, 2017 Agenda Welcome PA 2016 Results Customer Facing Teams 2017 Program Priorities Enhancing the Energy Efficiency Experience Program & Application Highlights Closing

More information

LRF Complex Custom MV & Cape

LRF Complex Custom MV & Cape 1. If a vendor is chosen as the C&I QA/QC vendor, will this exclude them from work in other CLC programs? Not necessarily. This contract(s) is considered a technical assistance contract, rather than an

More information

Do-It-Yourself Energy Audit. Bob Furgeson, PE CEM CBCP GBE CEA Shive-Hattery Architects+Engineering

Do-It-Yourself Energy Audit. Bob Furgeson, PE CEM CBCP GBE CEA Shive-Hattery Architects+Engineering Do-It-Yourself Energy Audit Bob Furgeson, PE CEM CBCP GBE CEA Shive-Hattery Architects+Engineering Agenda» Basic Terminology» Background» Benchmarking» Audit Types/ASHRAE Standard» Building Audit Systems

More information

Illinois Public Sector Energy Efficiency Programs. Helping public sector buildings and communities save energy and money.

Illinois Public Sector Energy Efficiency Programs. Helping public sector buildings and communities save energy and money. Illinois Public Sector Energy Efficiency Programs Helping public sector buildings and communities save energy and money. 1 Goal: Reduce Energy Footprint of Illinois Utility public sector energy efficiency

More information

Energy Benchmarking Report for Mt. Pleasant Elementary School. Millville, NJ

Energy Benchmarking Report for Mt. Pleasant Elementary School. Millville, NJ Energy Benchmarking Report for Mt. Pleasant Elementary School Millville, NJ (for the period: June 1, 2008 through May 31, 2009) Prepared by: Background & Findings: The New Jersey Clean Energy Program (NJCEP)

More information

The Greenest Little Schools in the Midwest

The Greenest Little Schools in the Midwest The Greenest Little Schools in the Midwest And what we can do to get there Andy Robinson LEED AP, Energy Engineer Smart Energy Design Assistance Center Overview Introduction A Little About SEDAC The Language

More information

Exhibit # MH-142 Transcript Page #5761. Manitoba Hydro to provide spreadsheet analysis performed comparing Xcel Energy's Programs to MH s Programs.

Exhibit # MH-142 Transcript Page #5761. Manitoba Hydro to provide spreadsheet analysis performed comparing Xcel Energy's Programs to MH s Programs. Exhibit # MH-142 Transcript Page #5761 Manitoba Hydro Undertaking #135 Manitoba Hydro to provide spreadsheet analysis performed comparing Xcel Energy's Programs to MH s Programs. Please see attached internal

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Hamilton Bus Garage Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents of

More information

South Carolina Society for Hospital Engineers

South Carolina Society for Hospital Engineers South Carolina Society for Hospital Engineers Selecting Energy Partners: Criteria & Pitfalls and the Top 10 Ways to Reduce Energy in a Hospital Presented by Jon Dierking, PE, CEM, LEED AP Director of Energy

More information

PECO Smart Ideas for Your Business

PECO Smart Ideas for Your Business PECO Smart Ideas for Your Business April 2015 Agenda PECO Smart Ideas incentive programs Program measures and process Tools and Trade Allies 2 1 PECO Smart Ideas PA Act 129 Program incentives designed

More information

New Jersey Board of Public Utilities Clean Energy Program Incentives and Proposed Hurricane Sandy Storm Response

New Jersey Board of Public Utilities Clean Energy Program Incentives and Proposed Hurricane Sandy Storm Response New Jersey Board of Public Utilities Clean Energy Program Incentives and Proposed Hurricane Sandy Storm Response Energy Efficient Equipment and Building Upgrades February 2013 Program Goals Save energy

More information

REGIONAL DEVELOPMENT SUMMIT: ENERGIZING TOMORROW S ECONOMY

REGIONAL DEVELOPMENT SUMMIT: ENERGIZING TOMORROW S ECONOMY REGIONAL DEVELOPMENT SUMMIT: ENERGIZING TOMORROW S ECONOMY Donald Fournier Illinois Association of County Board Members Lake Carroll IL August 15, 2014 FUNDING STRUCTURE ComEd Ameren Illinois Electric

More information

Local Government Energy Audit: Energy Audit Report

Local Government Energy Audit: Energy Audit Report Local Government Energy Audit: Energy Audit Report Abraham Clark High School Roselle Borough Board of Education Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of

More information

2015 FOCUS ON ENERGY PROGRAM UPDATES TRADE ALLY WEBINAR

2015 FOCUS ON ENERGY PROGRAM UPDATES TRADE ALLY WEBINAR 2015 FOCUS ON ENERGY PROGRAM UPDATES TRADE ALLY WEBINAR 12.18.14 AGENDA Introduction Residential Program Updates Business Program Updates Renewable Energy Updates Marketing Overview Outreach INTRODUCTION

More information

Natural Gas Energy Efficiency Opportunities. The Hotel/Lodging Industry

Natural Gas Energy Efficiency Opportunities. The Hotel/Lodging Industry Natural Gas Energy Efficiency Opportunities The Hotel/Lodging Industry 1 Agenda Welcome Successful 2015, New 3-Year Plan Approved by DPU Natural Gas C&I Energy Efficiency Offerings Gas Equipment & End

More information

Existing Building Upgrades

Existing Building Upgrades Existing Building Upgrades Shawn Maurer SEDAC Building Energy Specialist Smart Energy Design Assistance Center (SEDAC), University of Illinois at Urbana Champaign SEDAC ILLINOIS K-12 SCHOOL ENERGY USE

More information

Energy Benchmarking Report for Bacon Elementary School. Millville, NJ

Energy Benchmarking Report for Bacon Elementary School. Millville, NJ Energy Benchmarking Report for Bacon Elementary School Millville, NJ (for the period: June 1, 2008 through May 31, 2009) Prepared by: Background & Findings: The New Jersey Clean Energy Program (NJCEP)

More information

Energy Auditing for Schools. Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007

Energy Auditing for Schools. Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007 Energy Auditing for Schools Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007 Schools Consumption breakdown 19% 6% 9% Space Heating 46% Water Heating Lighting Cooling 20%

More information

Consumers Energy Business Solutions. Commercial and Industrial Energy Efficiency Program January 15, 2013

Consumers Energy Business Solutions. Commercial and Industrial Energy Efficiency Program January 15, 2013 Consumers Energy Business Solutions Commercial and Industrial Energy Efficiency Program January 15, 2013 1 David MacDonald Senior Marketing Manager TODAY S PRESENTER 2 3 Today s Topics Program Summary

More information

Business Energy Savings. Standard Energy Rebates

Business Energy Savings. Standard Energy Rebates Business Energy Savings Standard Energy Rebates Business Energy Savings Standard Rebates Standard Energy Rebates Earn rebates for installing energy-efficient equipment and facility upgrades. KCP&L offers

More information

Clean Energy Ally Program Orientation

Clean Energy Ally Program Orientation Clean Energy Ally Program Orientation PRESENTED BY Lisa Harmon B USINESS A L L IANCES M ANAGER 2 WHAT WE DO Help you make smart energy choices. Because smart energy choices reduce energy use save money

More information

Energy Assessment Report Clayville Elementary School DRAFT October George Washington Highway, Clayville, RI DRAFT

Energy Assessment Report Clayville Elementary School DRAFT October George Washington Highway, Clayville, RI DRAFT Report Clayville Elementary School October 2016 3 George Washington Highway, Clayville, RI 02815 Clayville Elementary School Summary of Findings On behalf of the School Building Authority at Rhode Island

More information

Energy. Efficiency Guide. for Minnesota Colleges and Universities. Tips to make you even smarter about saving energy

Energy. Efficiency Guide. for Minnesota Colleges and Universities. Tips to make you even smarter about saving energy Energy Efficiency Guide for Minnesota Colleges and Universities Tips to make you even smarter about saving energy Building on strong energy knowledge Along with technologies and scientific breakthroughs

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Abbott and Costello Center Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents

More information

Energy Upgrade California

Energy Upgrade California Energy Upgrade California Layering Programs and Incentives for Deeper Energy Savings in Multifamily Properties Introductions The Heschong Mahone Group, Inc (HMG) Consulting on energy efficiency for buildings

More information

Tennessee Valley Authority

Tennessee Valley Authority Tennessee Valley Authority Technical Resource Manual Version 4 Prepared by DNV KEMA Energy & Sustainability October 2015 Copyright 2015, DNV GL (KEMA, Inc.) This document, and the information contained

More information

Energy Efficiency in Multi-Tenant Office Buildings

Energy Efficiency in Multi-Tenant Office Buildings Energy Efficiency in Multi-Tenant Office Buildings Presented by David Herman, PE, LEED AP Principal, EnerG Associates, LLC 3/10/2015 1 Learning Objectives 1. List the principal sources and uses of energy

More information

is consciousness and action

is consciousness and action Kaua`i Renewable Energy Conference Miles Kubo President/COO September 8, 28 Energy Conservation is consciousness and action Turn off a light Walk a flight of stairs Shut down computers Unplug phantom loads

More information

PSE Efficiency Programs Sheryl Anayas

PSE Efficiency Programs Sheryl Anayas PSE Efficiency Programs Sheryl Anayas Program Manager May 6, 2014 Safety Moment Call 811 before you dig It s the LAW and it s FREE! A service that will mark the location of underground utility lines. Use

More information

Local Government Energy Audit: Energy Audit Report

Local Government Energy Audit: Energy Audit Report Local Government Energy Audit: Energy Audit Report Panzer Athletic Center Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents

More information

ANNUAL STAKEHOLDER MEETING

ANNUAL STAKEHOLDER MEETING ANNUAL STAKEHOLDER MEETING 2015 Technical Reference Manual High Impact C&I Measure Updates July 11, 2014 Presented by the Statewide Evaluation Team: MEETING AGENDA MEETING AGENDA Weather Mapping Lighting

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: i Energy Audit Report Lift Station #1, 3, 5, 6, 7, 8, and 9 Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part

More information

Energy Efficiency in Restaurants and Grocery Stores. CARD, EECBG, and Climate Change Grants for Minneapolis and White Bear Lake

Energy Efficiency in Restaurants and Grocery Stores. CARD, EECBG, and Climate Change Grants for Minneapolis and White Bear Lake Energy Efficiency in Restaurants and Grocery Stores CARD, EECBG, and Climate Change Grants for Minneapolis and White Bear Lake Why Small Restaurants and Grocery Stores? Independently-owned food service

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Bohn Hall Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents of this document

More information

New Jersey Board of Public Utilities Clean Energy Incentive Program

New Jersey Board of Public Utilities Clean Energy Incentive Program New Jersey Board of Public Utilities Clean Energy Incentive Program Passaic County Division of Economic Development Gary E Finger Business Ombudsman June 15, 2015 Program Goals Save energy and lower operating

More information

Saving Energy on a Tight Budget

Saving Energy on a Tight Budget IASB * IASA * IASBO JOINT ANNUAL CONFERENCE Chicago, Illinois November 19, 2011 Saving Energy on a Tight Budget Jean Ascoli Registered Architect, Energy Analyst Greg Swiss Energy Engineer SEDAC University

More information

Pepco C&I Energy Savings Program. AOBA Briefing April 27, 2011

Pepco C&I Energy Savings Program. AOBA Briefing April 27, 2011 Pepco C&I Energy Savings Program AOBA Briefing April 27, 2011 Program Eligibility Pepco s Maryland commercial and industrial customers are eligible for CASH incentives for projects that reduce electric

More information

Commercial & Industrial Energy Optimization Programs

Commercial & Industrial Energy Optimization Programs SP Energy and Water Work Group Breakfast Meeting Commercial & Industrial Energy Optimization Programs May 2, 2011 Agenda Introduction DTE Energy Your Energy Savings Program Overview 2011 Program Changes

More information

Energy Solutions for Your Business

Energy Solutions for Your Business Energy Solutions for Your Business business customers can take advantage of our award-winning suite of energy conservation, renewable energy, energy management and billing programs. The programs can help

More information

Deep Energy Retrofit Modeling and Cost Effectiveness Study: A Technical Policy Brief. January 2013

Deep Energy Retrofit Modeling and Cost Effectiveness Study: A Technical Policy Brief. January 2013 Deep Energy Retrofit Modeling and Effectiveness Study: A Technical Policy Brief January 2013 Table of Contents EXECUTIVE SUMMARY... 3 INTRODUCTION... 4 BUILDING 1... 7 BUILDING 2... 9 BUILDING 3... 11

More information

Minnesota Conservation

Minnesota Conservation Program Information MN Minnesota Conservation Programs Summary We offer solutions for business customers in a suite of energy conservation and energy management products that will help you increase your

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Mystic Island Volunteer Fire Company Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of

More information

Building Operator Certification Level I

Building Operator Certification Level I Building Operator Certification Level I A Partnership of the CUNY Institute for Urban Systems Building Performance Lab, the CUNY School of Professional Studies, and the New York State Energy Research &

More information

Grays Harbor PUD Energy Services. Commercial, Industrial, Agricultural Incentive Program Catalog IT S YOUR PUD!

Grays Harbor PUD Energy Services. Commercial, Industrial, Agricultural Incentive Program Catalog IT S YOUR PUD! Grays Harbor PUD Energy Services Commercial, Industrial, Agricultural Incentive Program Catalog IT S YOUR PUD! This catalog outlines the available incentives for making energy efficient improvements at

More information

LOGO. Trivium Level II Energy Audit

LOGO. Trivium Level II Energy Audit LOGO Trivium Level II Energy Audit Submission Date: 9/16/2016 Table of Contents 1.0 EXECUTIVE SUMMARY 3 2.0 SITE ENERGY CONSUMPTION 5 3.0 BACKGROUND INFORMATION 6 3.1 Description of the Client 6 3.2 Description

More information

BEYOND O&M. Shawn Maurer SEDAC Building Energy Specialist. Smart Energy Design Assistance Center (SEDAC), University of Illinois at Urbana Champaign

BEYOND O&M. Shawn Maurer SEDAC Building Energy Specialist. Smart Energy Design Assistance Center (SEDAC), University of Illinois at Urbana Champaign BEYOND O&M Shawn Maurer SEDAC Building Specialist Smart Design Assistance Center (SEDAC), University of Illinois at Urbana Champaign PRESENTATION OVERVIEW and Take away: Regular costs less over the long

More information

Local Government Energy Audit: Energy Audit Report

Local Government Energy Audit: Energy Audit Report Local Government Energy Audit: Energy Audit Report Montclair High School Montclair Board of Education 100 Chestnut Street Montclair, New Jersey 07402 Copyright 2019 TRC Energy Services. All rights reserved.

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents of this document without

More information

for Main Street Businesses Eileen Westervelt, PE CEM SEDAC

for Main Street Businesses Eileen Westervelt, PE CEM SEDAC Practical Energy Savings for Main Street Businesses Eileen Westervelt, PE CEM SEDAC University of Illinois at Urbana-Champaign SEDAC Client Profile Medium Sized Small Businesses o o 8,000 sf floor space

More information

Incentives & Resources for Small Customers. Adam B. Fields I Leidos

Incentives & Resources for Small Customers. Adam B. Fields I Leidos Incentives & Resources for Small Customers Adam B. Fields I Leidos Project Incentives Scott's Estimated Savings Energy-efficient lighting $19,339.91 $16,271.50 per year, 232,450 kwh Contents» Resources

More information

Existing Building Upgrades

Existing Building Upgrades Existing Building Upgrades Greg Swiss - Building Energy Specialist Smart Energy Design Assistance Center (SEDAC), University of Illinois at Urbana Champaign Providing effective strategies for public and

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report West Cape May Elementary School West Cape May Board of Education Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Machuga Heights and Dinallo Heights Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of

More information

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST ENVELOPE REQUIREMENTS Project: Date: Instructions RECOMMENDED: List performance values, note exceptions that were applied, or provide other

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Alexander Kasser Theater Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents

More information

WAKE TECHNICAL COMMUNITY COLLEGE SUSTAINABLE ENERGY PLAN. Energy Plan

WAKE TECHNICAL COMMUNITY COLLEGE SUSTAINABLE ENERGY PLAN. Energy Plan Energy Plan 1 EXECUTIVE SUMMARY SCORECARD RESULTS An assessment of current energy management efforts was performed; current performance falls into all categories on the SEP-Performance Scorecard (Appendix

More information

SCHOOL ENERGY WALK- THROUGH. Andy Robinson, Training and Education, SEDAC

SCHOOL ENERGY WALK- THROUGH. Andy Robinson, Training and Education, SEDAC SCHOOL ENERGY WALK- THROUGH Andy Robinson, Training and Education, SEDAC ILLINOIS ENERGY NOW University of Illinois 360 Energy Group 2 WHAT WE DO SEDAC Free Services Outreach and Training Energy Assistance

More information

ADDENDUM NO. 01. Include this signed and dated addendum to your proposal.

ADDENDUM NO. 01. Include this signed and dated addendum to your proposal. ADDENDUM NO. 01 To City of College Park RFP FIN 012716 - LEASE ADVERTISEMENT for LEASE for TAX-EXEMPT FINANCING Please note the following additions/changes to this bid. Include this signed and dated addendum

More information

Fifteen Year Plan for Energy Efficiency and Conservation Projects

Fifteen Year Plan for Energy Efficiency and Conservation Projects Fifteen Year Plan for Energy Efficiency and Conservation Projects Presented to the Board of Trustees of the Northeastern Ohio Universities Colleges of Medicine and Pharmacy, December, 2008, in accordance

More information

Interim report 2016 progress on the 5-Year Energy Management Plan

Interim report 2016 progress on the 5-Year Energy Management Plan Waypoint Centre for Mental Health Care 500 Church Street, Penetanguishene ON L9M 1G3 705-549-3181 www.waypointcentre.ca Interim report 2016 progress on the 5-Year Energy Management Plan Waypoint Centre

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Lake Riviera Middle School Brick Township Board of Education Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: Energy Audit Report Firehouse Copyright 2016 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents of this document

More information

Local Government Energy Audit: Energy Audit Report

Local Government Energy Audit: Energy Audit Report Local Government Energy Audit: Energy Audit Report Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents of this document without

More information

Application of Advanced Energy Technologies

Application of Advanced Energy Technologies GLOBALCON 2002 Philadelphia, Pennsylvania March 27, 2002 Application of Advanced Energy Technologies Michael K. West, Ph.D., P.E. Building Systems Scientist Advantek Consulting, Inc. www.advantekinc.com

More information

Instant discount of 33% off improvement cost, up to $1,250 Plus, potential savings bonus of up to $250 (**)

Instant discount of 33% off improvement cost, up to $1,250 Plus, potential savings bonus of up to $250 (**) RESIDENTIAL PROGRAM HOME PERFORMANCE with ENERGY STAR IMPROVE YOUR HOME'S COMFORT. SAVE MONEY. REDUCE ENERGY. EARN S. Home Performance with ENERGY STAR offers homeowners instant discounts for making recommended

More information

2018 ENERGY REPORT. Mark J. Ferguson, P.E. Campus Operations & Plant Manager

2018 ENERGY REPORT. Mark J. Ferguson, P.E. Campus Operations & Plant Manager 2018 ENERGY REPORT Mark J. Ferguson, P.E. Campus Operations & Plant Manager Table of Contents Executive Summary... 2 Utilities Overview... 3 Avoided Cost... 4 Carbon Footprint... 5 Benchmarking Colorado

More information

Section 2: Estimating Energy Savings and Incentives

Section 2: Estimating Energy Savings and Incentives Section 2: Estimating Energy and Incentives 2.1 Estimating Energy and Incentives... 2 2.2 Customized Measures - Estimation Software... 2 2.2.1 AC&R I - High Efficiency Chiller... 4 2.2.2 AC&R I - Split/Packaged

More information

NEWMOA June 30, Fran Boucher LEED AP, Certified Energy Manager Senior Energy Engineer

NEWMOA June 30, Fran Boucher LEED AP, Certified Energy Manager Senior Energy Engineer NEWMOA June 30, 2009 Fran Boucher LEED AP, Certified Energy Manager Senior Energy Engineer Utility Incentives MA, RI, NH, VT, ME, CT, Long Island NY, Gas in NYC New construction and gas in Upstate NY.

More information

3% Energy Savings 4.5% Peak Demand Reduction

3% Energy Savings 4.5% Peak Demand Reduction 2 3% Energy Savings 4.5% Peak Demand Reduction May 31, 2013 3 Incentive Equipment Cost 4 Non-Standard Lighting Program Street Lighting Program, OAL, Traffic Lights Motors & Drives Program HVAC Program

More information

BOMA s Energy Efficiency Program BEEP Course 4. No- and Low Cost Operational Adjustments to Improve Energy Performance

BOMA s Energy Efficiency Program BEEP Course 4. No- and Low Cost Operational Adjustments to Improve Energy Performance BOMA s Energy Efficiency Program BEEP Course 4 No- and Low Cost Operational Adjustments to Improve Energy Performance Agenda Review ENERGY STAR's Energy Performance Rating System Identify specific areas

More information

Hawaii Energy Policy Forum and Energy Industries Energy by Example Audit Awards Status Report October 2006-November 2007

Hawaii Energy Policy Forum and Energy Industries Energy by Example Audit Awards Status Report October 2006-November 2007 Hawaii Energy Policy Forum and Energy Industries Energy by Example Audit Awards Status Report October 2006-November 2007 Introduction In August 2006, the Hawaii Energy Policy Forum (Forum) invited over

More information

PacifiCorp Annual Review of DSM Programs California

PacifiCorp Annual Review of DSM Programs California PacifiCorp 2009 Annual Review of DSM Programs California PacifiCorp Demand Side Management Team 3/15/2010 Table of Contents Introduction... 2 2009 Performance and Activity... 3 Stakeholder Meetings, Communications

More information

Local Government Energy Audit: Energy Audit Report

Local Government Energy Audit: Energy Audit Report Local Government Energy Audit: Energy Audit Report Copyright 2017 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part of the contents of this document without

More information

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection Slab on Grade & Basements: A capillary break is installed on top of all footings Slab / Pre-Drywall / Thermal Inspection A minimum of 4" of clean or washed gravel (0.5" diameter or greater) is placed over

More information

Energy Solutions for Your Business

Energy Solutions for Your Business Energy Solutions for Your Business business customers can take advantage of our award-winning suite of energy conservation, renewable energy, energy management and billing programs. Our programs are design

More information

Uniform Construction Code

Uniform Construction Code Uniform Construction Code When the UCC Requires Permits and Inspections (A Zoning Certificate may be required even though the project does not require a UCC Building Permit.) As a general rule, the UCC

More information

Energy Reduction Strategy Through 2020

Energy Reduction Strategy Through 2020 Through 2020 Revised: August 2017 Executive Summary Auburn University is a land, sea and space grant university established in 1856. The university consists of 11,629,000 square feet on 1,840 acres and

More information

Energy Strategies That Work

Energy Strategies That Work Energy Strategies That Work Emmy Presenter s Riley, Building name Professional Energy Specialist Title (eg. architect/energy Illini Center specialist..) 10-10-12 Smart Energy Design Assistance Center (SEDAC),

More information

Energy Audit. Town of Charlemont. Town Hall. 157 Main Street Charlemont, MA August 31, 2018

Energy Audit. Town of Charlemont. Town Hall. 157 Main Street Charlemont, MA August 31, 2018 Energy Audit Town of Charlemont Town Hall 157 Main Street Charlemont, MA 01339 August 31, 2018 Prepared by: Bowman Engineering, Inc. PO Box 410 Greenfield, MA 01302 (413) 303-0238 Preparer: Thomas Bowman,

More information

Overview 7/24/2018. BOMA Chicago July 11, 2018

Overview 7/24/2018. BOMA Chicago July 11, 2018 2018 ComEd Business Programs & FEJA Overview for BOMA Chicago July 11, 2018 C O N F I D E N T I A L Overview Future Energy Jobs Act (FEJA) passed in December 2016 Legislation is a Win for Illinois RENEWABLES

More information