ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 12/06/2012 BUILDING SURVEY DATE

Size: px
Start display at page:

Download "ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 12/06/2012 BUILDING SURVEY DATE"

Transcription

1 WEST PEABODY DRIVE URBANA, ILLINOIS SYSTEM CONDITION INDEX.540 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 3,238,100 CLASSROOMS / LIBRARY BUILDING GROSS SQUARE FEET 47,541 NUMBER OF BUILDING STORIES 3 BUILDING SURVEY DATE CCJM: Matt Wickstrom (M), Mike Johnson (E) ORIGINAL YEAR OF CONSTRUCTION /06/2012 B U I L D I N G D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y TRADE E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR ($) GOOD ($) (5-10 YEARS) (10-20 YEARS) POOR ($) (1-5 YEARS) EXCELLENT ($) (20+ YEARS) TOTAL ($) $/GSF PERCENT OF BUILDING TOTAL (%) MECHANICAL 665, ,500 84, , , PLUMBING 530, , , FIRE PROTECTION 92, , , ELECTRICAL 421, , , COMMUNICATIONS 39, , , TOTAL % OF TOTAL 1,750, , , ,100 3,238, CRITICAL ITEM REMEDIATION COST: $573,600 REFER TO CRITICAL ITEM SUMMARY ON FOLLOWING PAGE. NOTE: Cost Estimates are Construction Costs are in 2013 dollars to Replace in Kind unless otherwise noted PAGE 1

2 A R T - E A S T A N N E X, S T U D I O 1 C R I T I C A L I S S U E S S U M M A R Y CODE RELATED ITEMS REPAIR COST REPLACEMENT COST REPAIR/ REPLACEMENT % REMAINING LIFE REPAIR OR REPLACE MECHANICAL Ventilation System - Toilet Exhaust System ELECTRICAL Low Voltage System - Northeast - Switchboard The buildings exhaust is currently in violation of building code. The front of the main distribution panel, for the Low Voltage Distribution System, is located within 36 inches away from the adjacent panels. According to NEC it is required that a minimum 36 inches is required for working spaces. 38,000 38, Exceeded Replace 29,800 29, Exceeded Replace CODE RELATED ITEMS COST 67,800 67, SYSTEM/COMPONENT FAILURE ITEMS REPAIR COST REPLACEMENT COST REPAIR/ REPLACEMENT % REMAINING LIFE REPAIR OR REPLACE MECHANICAL Heating Systems - Steam and Condensate System Steam hammer has been noted throughout the building. Incorrect pitch of condensate return, bent pipes, etc. are all contributors to the pipe hammer. 73,100 73, Exceeded Replace HVAC Controls - HVAC Control System Building staff noted that only parts and pieces of the existing 336, , Exceeded Replace pneumatic system is still operational. The building overheats on a semi-regular basis, and most equipment is operated by hand. PLUMBING Domestic Water Distribution - Domestic Cold Water System The domestic water piping is rusted and is close to total failure. 96,300 96, Exceeded Replace SYSTEM/COMPONENT FAILURE ITEMS COST 505, , NOTE: Cost Estimates are Construction Costs are in 2013 dollars to remediate noted issue. CRITICAL ISSUES COST 573, , PAGE 2

3 Text106 M E C H A N I C A L D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y STEAM AND CONDENSTATE SYSTEM SUPPLY AIR SYSTEM AIR HANDLER TOILET EXHAUST SYSTEM LABORATORY EXHAUST SYSTEM DUST COLLECTION SYSTEM HVAC CONTROLS SYSTEM SYSTEM/COMPONENT Heating Systems - Steam and Condensate System Ventilation System - Ventilation System Ventilation System - AHU serving Architecture Lab Ventilation System - AS-1 Ventilation System - AS-2 Ventilation System - Toilet Exhaust System Ventilation System - Laboratory Exhaust Ventilation System - Laboratory Exhaust EF-1 Ventilation System - Laboratory Exhaust EF-2 Ventilation System - Laboratory Exhaust EF-3 Ventilation System - Laboratory Exhaust EF-4 Ventilation System - Laboratory Exhaust EF-5 Ventilation System - Laboratory Exhaust EF-6 Ventilation System - Dust Collection System HVAC Controls - HVAC Control System MECHANICAL TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 73,100 73, , ,000 59,500 59,500 73,200 73,200 84,100 84,100 38,000 38,000 38,500 38,500 5,000 5,000 5,000 5,000 5,000 5,000 5,000 5,000 4,800 4,800 5,000 5, , , , , , ,500 84, , , PAGE 3

4 Text6 H E A T I N G S Y S T E M S - S T E A M A N D C O N D E N S A T E S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1930 Equipment Tag Manufacturer Model Number HP/kW Material Recommendation Item ID Comments Critical Issues Critical Repair Estimate $73,100 The building is fed by campus steam, and an approximately 5" service main in the basement. The piping is insulated with ACM and the piping material is assumed to be welded black iron. The entrance is low pressure <15 PSI, and is original to the building. The steam piping feeds unit heaters, perimeter radiators, air handling units, and the steam to domestic hot water heat exchanger. The condensate return piping appears to be a gravity system as no condensate pumps could be located during the site visit. The piping is original to the building. There is an antiquated condensate return meter located near the condensate return main that discharges back to the campus system. Poor Remaining Useful Life Exceeded Nominal Useful Life: 30 Years Serial Number Size/Capacity Voltage Replacement Cost $73, Replace all steam piping and condensate return throughout facility. Steam supply and condensate return piping run throughout the 48k square foot facility. The steam system and condensate return are antiquated, rusted, and has numerous issues noted by building staff. Steam hammer has been noted throughout the building. Incorrect pitch of condensate return, bent pipes, etc. are all contributors to the pipe hammer PAGE 4

5 Text6 H E A T I N G S Y S T E M S - S T E A M A N D C O N D E N S A T E S Y S T E M S U R V E Y P H O T O G R A P H S Condensate Return Meter and Steam Supply Main Steam Supply and Condensate Return Piping at Domestic Hot Water Heat Exchanger Supplemental Steam Unit Heater in Studio PAGE 5

6 Text6 V E N T I L A T I O N S Y S T E M - V E N T I L A T I O N S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1980 Equipment Tag Manufacturer Model Number HP/kW Material Recommendation Item ID Comments The mechanical ventilation system is comprised of (3) AHUs that each serve portions of the building. The AHUs vary in age and distribution. AHU AS-1 is located in the attic space of the 3rd floor. The unit provides make-up air for the lab exhausts located throughout the building. The AHU is steam heating only, and was installed in AHU AS-2 is located in the attic space of the 3rd floor. The unit provides ventilation air for the 2nd floor of the building. There were no heating or cooling coils connected on the unit; however, the unit was running at time of visit. It appears that there is an existing steam coil within the unit, but the piping has been disconnected from the system. The ductwork is exposed, and routed in the building light well to the spaces below. The ductwork is original, and appears to be in poor condition. AS-2 appears in fair visible condition, but no information could be found regarding the age, or equipment information. AHU AS-3 serves the large open architectural studio on the 1st floor. The unit is a ceiling hung unit and is steam heating only. The unit was installed in the 1980s per staff. The ductwork is exposed, lined ductwork serving only the architectural studio. Individual window mounted air conditioning units provide cooling for many of the spaces throughout the building. Poor Remaining Useful Life Exceeded Nominal Useful Life: 30 Years Serial Number Size/Capacity Voltage Replacement Cost $159, Replace all existing exposed ductwork from AS-2 throughout 2nd floor. There is an abandoned unit in the 3rd floor annex near AS PAGE 6

7 Text6 V E N T I L A T I O N S Y S T E M - V E N T I L A T I O N S Y S T E M S U R V E Y P H O T O G R A P H S Typical Window AC Unit for Building Cooling AS-2 Supply and Return Ducts into Light Well from AS-2 Exposed Supply and Return Ductwork in Lightwell PAGE 7

8 Text6 V E N T I L A T I O N S Y S T E M - A H U S E R V I N G A R C H I T E C T U R E L A B A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1980 Equipment Tag Manufacturer Model Number HP/kW Material Recommendation Item ID Comments A ceiling mounted, steam heating only, AHU serves the open architecture lab on the 1st floor. The unit appears to be installed in the 1980s. The ductwork is exposed throughout the lab spaces Poor Remaining Useful Life Exceeded Nominal Useful Life: 30 Years Serial Number Size/Capacity Voltage Not Available Trane Not Available M89A21081 Not Available 7.5 HP 208 V Galvanized Replacement Cost $59, Replace the unit with similar. No operational issues were reported with this unit, but the unit was not running while onsite PAGE 8

9 PAGE 9

10 Text6 V E N T I L A T I O N S Y S T E M - A S - 1 A S S E S S M E N T D A T A Item ID Description AS-1 is a steam heating only unit, installed in 1991 to serve as make-up air for the lab exhausts on the 2nd floor. Overall Condition Fair Date Installed 01/01/1991 Remaining Useful Life 8 Years Nominal Useful Life: 30 Years Equipment Tag AS-1 Manufacturer Witt Model Number LHL-17F Serial Number A92 Size/Capacity Not Available HP/kW 7.5 HP Voltage 208 V Material Galvanized Recommendation None Replacement Cost $73,200 Comments No operational issues were reported with this unit PAGE 10

11 PAGE 11

12 Text6 V E N T I L A T I O N S Y S T E M - A S - 2 A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1999 Equipment Tag Manufacturer Model Number HP/kW Material Recommendation Item ID Comments AS-2 is 100% OA unit that provides ventilation air to the 2nd and 1st floor spaces. The unit has steam coils within the unit, but they have been disconnected and are no longer in service. It is unclear all of the areas that this unit serves. The ductwork is routed through a window in the light well, and is run exposed in the graduate studio below on the 2nd floor. There are no unit tags, but the unit appears to have been installed within the last 15 years, although there is no indication via drawings. Good Remaining Useful Life 16 Years Nominal Useful Life: 30 Years Serial Number Size/Capacity Voltage AS-1 Carrier Not Available Not Available Not Available Not Available 208 V Galvanized Replacement Cost $84, Provide new connections to source of re-heat. No operational issues were reported with this unit PAGE 12

13 PAGE 13

14 Text6 V E N T I L A T I O N S Y S T E M - T O I L E T E X H A U S T S Y S T E M A S S E S S M E N T D A T A Item ID Description The toilets currently have transfer grills that open into the occupied spaces, with no direct exhaust. This is a code violation. Overall Condition Poor Date Installed 06/14/1961 Remaining Useful Life Exceeded Nominal Useful Life: 30 Years Equipment Tag Manufacturer Model Number Serial Number Size/Capacity HP/kW Voltage Material Recommendation 1. Provide a new direct exhaust from each of the toilets. Provide a dedicated fan to serve the stacks. Replacement Cost $38,000 Comments The buildings exhaust is currently in violation of building code. Critical Issues The buildings exhaust is currently in violation of building code. Critical Repair Estimate $38, PAGE 14

15 Text6 V E N T I L A T I O N S Y S T E M - T O I L E T E X H A U S T S Y S T E M S U R V E Y P H O T O G R A P H S Exhaust Transfer Opening to Occupied Studio PAGE 15

16 Text6 V E N T I L A T I O N S Y S T E M - L A B O R A T O R Y E X H A U S T A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1991 Equipment Tag Manufacturer Model Number HP/kW Material Recommendation Item ID Comments There are approximately (17) lab hoods throughout the 2nd floor which are served by (6) vent-set type exhaust fans located in the attic space. The exhaust fans discharge ductwork combines, and is routed through the roof to a vent. Not all of the lab hoods could be verified due to occupants in the spaces, and locked rooms. The hoods and fans were installed in 1991, and the distribution ductwork is galvanized. Fair Remaining Useful Life 8 Years Nominal Useful Life: 30 Years Serial Number Size/Capacity Voltage None Replacement Cost $38,500 The lab exhaust fans were running while onsite, and there were no reported issues PAGE 16

17 Text6 V E N T I L A T I O N S Y S T E M - L A B O R A T O R Y E X H A U S T S U R V E Y P H O T O G R A P H S Laboratory Exhaust Fan (Typical) Laboratory Exhaust Fan Ductwork PAGE 17

18 Text6 V E N T I L A T I O N S Y S T E M - L A B O R A T O R Y E X H A U S T E F - 1 A S S E S S M E N T D A T A Item ID Description EF-1 serves the graduate studio on the 2nd floor. The fan was is a TCB and was installed in Overall Condition Fair Date Installed 01/01/1991 Remaining Useful Life 8 Years Nominal Useful Life: 30 Years Equipment Tag EF-1 Manufacturer Twin City Blower Model Number Not Available Serial Number Not Available Size/Capacity Not Available HP/kW 1/2 HP Voltage 120V Material Recommendation None Replacement Cost $5,000 Comments No operational issues were reported with this fan PAGE 18

19 PAGE 19

20 Text6 V E N T I L A T I O N S Y S T E M - L A B O R A T O R Y E X H A U S T E F - 2 A S S E S S M E N T D A T A Item ID Description EF-2 serves the introduction studio on the 2nd floor. The fan was is a TCB and was installed in Overall Condition Fair Date Installed 01/01/1991 Remaining Useful Life 8 Years Nominal Useful Life: 30 Years Equipment Tag EF-2 Manufacturer Twin City Blower Model Number Not Available Serial Number Not Available Size/Capacity Not Available HP/kW 3/4 HP Voltage 208V Material Recommendation None Replacement Cost $5,000 Comments No operational issues were reported with this fan PAGE 20

21 PAGE 21

22 Text6 V E N T I L A T I O N S Y S T E M - L A B O R A T O R Y E X H A U S T E F - 3 A S S E S S M E N T D A T A Item ID Description EF-3 serves the BFA studio on the 2nd floor (RM 209). The fan was is a TCB and was installed in Overall Condition Fair Date Installed 01/01/1991 Remaining Useful Life 8 Years Nominal Useful Life: 30 Years Equipment Tag EF-3 Manufacturer Twin City Blower Model Number Not Available Serial Number Not Available Size/Capacity Not Available HP/kW 1/2 HP Voltage 120V Material Recommendation None Replacement Cost $5,000 Comments No operational issues were reported with this fan PAGE 22

23 PAGE 23

24 Text6 V E N T I L A T I O N S Y S T E M - L A B O R A T O R Y E X H A U S T E F - 4 A S S E S S M E N T D A T A Item ID Description EF-4 serves the Chemical and Enamel Rooms on the 2nd floor. The fan was is a TCB and was installed in Overall Condition Fair Date Installed 01/01/1991 Remaining Useful Life 8 Years Nominal Useful Life: 30 Years Equipment Tag EF-4 Manufacturer Twin City Blower Model Number Not Available Serial Number Not Available Size/Capacity Not Available HP/kW 3 HP Voltage 208V Material Recommendation None Replacement Cost $5,000 Comments No operational issues were reported with this fan PAGE 24

25 PAGE 25

26 Text6 V E N T I L A T I O N S Y S T E M - L A B O R A T O R Y E X H A U S T E F - 5 A S S E S S M E N T D A T A Item ID Description EF-5 serves the Machine Rooms on the 2nd floor. The fan was is a TCB and was installed in Overall Condition Fair Date Installed 01/01/1991 Remaining Useful Life 8 Years Nominal Useful Life: 30 Years Equipment Tag EF-5 Manufacturer Twin City Blower Model Number Not Available Serial Number Not Available Size/Capacity Not Available HP/kW 1 HP Voltage 208V Material Recommendation None Replacement Cost $4,800 Comments No operational issues were reported with this fan PAGE 26

27 PAGE 27

28 Text6 V E N T I L A T I O N S Y S T E M - L A B O R A T O R Y E X H A U S T E F - 6 A S S E S S M E N T D A T A Item ID Description EF-6 serves the Dark Room on the 2nd floor. The fan was is a TCB and was installed in Overall Condition Fair Date Installed 01/01/1991 Remaining Useful Life 8 Years Nominal Useful Life: 30 Years Equipment Tag EF-6 Manufacturer Twin City Blower Model Number Not Available Serial Number Not Available Size/Capacity Not Available HP/kW 1/2 HP Voltage 120V Material Recommendation None Replacement Cost $5,000 Comments No operational issues were reported with this fan PAGE 28

29 PAGE 29

30 Text6 V E N T I L A T I O N S Y S T E M - D U S T C O L L E C T I O N S Y S T E M A S S E S S M E N T D A T A Item ID Description The dust collection system was installed in the 1st floor woodworking lab in 2008 and serves only the woodworking lab. Overall Condition Excellent Date Installed 01/01/2008 Remaining Useful Life 26 Years Nominal Useful Life: 30 Years Equipment Tag Dust Collection System Manufacturer Dantherm Model Number NFP-S750-THREE PHASE Serial Number Size/Capacity Not Available HP/kW Not Available Voltage 208V/3P Material Recommendation None Replacement Cost $102,100 Comments No issues were reported at time of visit PAGE 30

31 Text6 V E N T I L A T I O N S Y S T E M - D U S T C O L L E C T I O N S Y S T E M S U R V E Y P H O T O G R A P H S Dust Collection Equipment Dust Collection Equipment Dust Collection Equipment PAGE 31

32 Text6 H V A C C O N T R O L S - H V A C C O N T R O L S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1991 Equipment Tag Manufacturer Model Number HP/kW Material Recommendation Item ID Comments Critical Issues Critical Repair Estimate $336,400 The existing HVAC control system is pneumatic, with an older model compressor located in the basement mechanical room. The compressor feeds the various control components at air handling units, control valves, etc. Poor Remaining Useful Life Exceeded Nominal Useful Life: 18 Years Serial Number Size/Capacity Voltage Replacement Cost $336, Replace the pneumatic system controls throughout the building. The building is 48K square feet. Only parts and pieces of the existing pneumatic controls system are still functional. Building staff noted that only parts and pieces of the existing pneumatic system is still operational. The building overheats on a semi-regular basis, and most equipment is operated by hand PAGE 32

33 Text6 H V A C C O N T R O L S - H V A C C O N T R O L S Y S T E M S U R V E Y P H O T O G R A P H S HVAC Controls Air Compressor PAGE 33

34 Text106 P L U M B I N G D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y DOMESTIC COLD WATER SYSTEM SYSTEM/COMPONENT Domestic Water Distribution - Domestic Cold Water System DOMESTIC HOT WATER SYSTEM Domestic Water Distribution - Domestic Hot Water System PLUMBING FIXTURES SYSTEM SANITARY WASTE AND VENT SYSTEM STORM DRAINAGE SYSTEM Domestic Water Distribution - Plumbing Fixtures Sanitary Drainage - Sanitary Waste and Vent Building Support Plumbing Systems - Stormwater Drainage System PLUMBING TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 96,300 96, , ,000 53,100 53, , , , , , , , PAGE 34

35 Text6 D O M E S T I C W A T E R D I S T R I B U T I O N - D O M E S T I C C O L D W A T E R S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1907 Equipment Tag Manufacturer Model Number HP/kW Material Recommendation Item ID Comments Critical Issues Critical Repair Estimate $96,300 The existing cold water distribution system enters the building in the basement mechanical room with a 2" main water service. The main piping is original to the building, and is distributed throughout the 47K square foot building. The piping is a combination of black iron and galvanized, and copper throughout the building. The main runs are typically original to the building, while the galvanized and copper additions were added later. There are no booster pumps, and the cold water system is run on city pressure which is typically between 55 and 65 PSI. Poor Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Serial Number Size/Capacity Voltage Replacement Cost $96, Replace all domestic cold water throughout the entire 47K square foot building with new. The system is in poor condition throughout, and a complete replacement should be considered due to age and condition. The domestic water piping is rusted and is close to total failure PAGE 35

36 PAGE 36

37 Text6 D O M E S T I C W A T E R D I S T R I B U T I O N - D O M E S T I C H O T W A T E R S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1907 Equipment Tag Manufacturer Model Number HP/kW Material Recommendation Item ID Comments The domestic hot water system consists of an old steam to hot water heat exchanger, storage tank, and return pump located in a room near the basement mechanical room. The steam to domestic hot water heat exchanger is very old, possibly original to the building. It provides hot water to a new storage tank, with a new return pump. The hot water piping between the heat exchanger and the new storage tank has been replaced with copper, however, much of the original system remains galvanized. Poor Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Serial Number Size/Capacity Voltage Replacement Cost $167, Replace all domestic hot water piping throughout the 47K square foot building with new copper. The existing hot water distribution piping downstream of the storage tank is galvanized. Staff noted that there have been a number of patches made in the last few years of the domestic hot water piping system PAGE 37

38 Text6 D O M E S T I C W A T E R D I S T R I B U T I O N - D O M E S T I C H O T W A T E R S Y S T E M S U R V E Y P H O T O G R A P H S Steam to Domestic Hot Water Heat Exchanger Domestic Hot Water Storage Tank Existing Domestic Hot Water Piping and HX PAGE 38

39 Text6 D O M E S T I C W A T E R D I S T R I B U T I O N - P L U M B I N G F I X T U R E S A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1960 Equipment Tag Manufacturer Model Number HP/kW Material Recommendation Item ID Comments The plumbing fixtures throughout the building have been installed at varying times throughout the building history. All fixtures have manual flush valves, and are wall mounted type fixtures. There are (6) WCs; (7) Lavs; (4) Water Fountains; and (2) Urinals throughout the building. Poor Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Serial Number Size/Capacity Voltage Replacement Cost $53, Replace all plumbing fixtures throughout the building. Building staff noted that many of the fixtures are requiring regular maintenance PAGE 39

40 Text6 D O M E S T I C W A T E R D I S T R I B U T I O N - P L U M B I N G F I X T U R E S S U R V E Y P H O T O G R A P H S Typical Plumbing Fixture PAGE 40

41 Text6 S A N I T A R Y D R A I N A G E - S A N I T A R Y W A S T E A N D V E N T A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1974 Equipment Tag Manufacturer Model Number HP/kW Material Recommendation Item ID Comments The sanitary waste piping has (2) mains the feed out to the city main. Each is a 4" main, and is cast-iron, welded piping. The sanitary waste and vent piping has been partially replaced over the years due to renovations and modifications, but the main may be original to the building as it does not appear to have been replaced. The vent piping has several mains located within existing walls that could not be viewed while onsite. There are (5) vents on the flat roof. The vents have been modified and replaced over the years due to additions and space modifications. Good Remaining Useful Life 11 Years Nominal Useful Life: 50 Years Serial Number Size/Capacity Voltage Replacement Cost $195, Replace all sanitary waste and vent piping throughout the 47K square foot building. Sanitary waste and vent piping have many changes and modifications that have been added over the years due to space renovations, and additions. The main piping appears to be original, and does not appear to have been replaced PAGE 41

42 Text6 S A N I T A R Y D R A I N A G E - S A N I T A R Y W A S T E A N D V E N T S U R V E Y P H O T O G R A P H S Sanitary Piping to Main PAGE 42

43 Text6 B U I L D I N G S U P P O R T P L U M B I N G S Y S T E M S - S T O R M W A T E R D R A I N A G E S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1907 Equipment Tag Manufacturer Model Number HP/kW Material Recommendation Item ID Comments The flat roof is has roof drains and black iron piping routed through the building. The piping is discharged by gravity out of the building to the street. There are also gutters and downspouts on the pitched roof. All stormwater drainage piping and equipment appears to be original to the building, and there are no drawings or indications otherwise onsite. Poor Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Serial Number Size/Capacity Voltage Replacement Cost $213, Replace all storm drainage piping, and all gutters and downspouts serving building. Roof drains leak into the attic space on a semi-regular basis. The drains get power-rodded, and left alone until the problem arises again PAGE 43

44 PAGE 44

45 Text106 F I R E P R O T E C T I O N D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y FIRE ALARM SYSTEM SPRINKLER SYSTEM SYSTEM/COMPONENT Fire Alarm System Fire Suppression - Fire Protection System FIRE PROTECTION TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 92,800 92, , ,500 92, , , PAGE 45

46 Text6 F I R E A L A R M S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1991 Equipment Tag Manufacturer Model Number Item ID HP/kW Material The fire alarm system consists of a Cerberus Pyrotronics addressable system located adjacent to the main entrance. The system is configured with notification devices, including horns and strobes. The indication devices include smoke and heat detectors with pull stations at points of egress. The single story structure is not connected to the main fire alarm control panel. Poor Remaining Useful Life Exceeds 20 Years Nominal Useful Life: 20 Years Serial Number Size/Capacity Not Available Cerberus Pyrotronics MXL Not Available Voltage 120/208V Replacement Cost $92, PAGE 46

47 Text6 F I R E A L A R M S Y S T E M S U R V E Y P H O T O G R A P H S Cerberus Pyrotronics fire alarm system Pull station Notification device PAGE 47

48 Text6 F I R E S U P P R E S S I O N - F I R E P R O T E C T I O N S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1970 Equipment Tag Manufacturer Model Number HP/kW Material Recommendation Item ID Comments The existing building is sprinkled, and has distribution piping throughout the building. It is not known when this system was installed, and the piping is black-iron throughout. The existing main is an 8" main located in the basement mechanical room. The sprinkler heads were noted to be corroded throughout the building. Fair Remaining Useful Life 7 Years Nominal Useful Life: 50 Years Serial Number Size/Capacity Voltage Replacement Cost $488, Replace all sprinkler heads throughout the 47k square foot building. 2. Replace all piping throughout the building. Many heads are corroded and may no longer be functional PAGE 48

49 Text6 F I R E S U P P R E S S I O N - F I R E P R O T E C T I O N S Y S T E M S U R V E Y P H O T O G R A P H S Typical Sprinkler Head PAGE 49

50 Text106 E L E C T R I C A L D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y MEDIUM VOLTAGE SYSTEM LOW VOLTAGE SYSTEM EMERGENCY POWER SYSTEM INTERIOR LIGHTING EMERGENCY LIGHTING SYSTEM EXIT LIGHTING SYSTEM LIGHTING CONTROL SYSTEM EXTERIOR LIGHTING SYSTEM SYSTEM/COMPONENT Medium Voltage System Northeast Medium Voltage System Southeast Low Voltage System - Northeast Low Voltage System - Northeast - Switchboard Low Voltage System - Southeast Low Voltage System - Southeast - Switchboard Emergency Power System Interior Lighting System Emergency Lighting System Exit Lighting System Lighting Control System Exterior Lighting System ELECTRICAL TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 20,500 20,500 19,400 19,400 73,100 73,100 29,800 29,800 71,700 71,700 28,400 28,400 59,400 59, , ,200 19,900 19,900 11,900 11,900 76,100 76,100 11,300 11, , , , PAGE 50

51 Text6 M E D I U M V O L T A G E S Y S T E M N O R T H E A S T A S S E S S M E N T D A T A Description Overall Condition Date Installed 03/10/1965 Equipment Tag Manufacturer Model Number Item ID HP/kW Material Comments The first Medium Voltage Distribution System that supplies power to the entire building enters the building from (3) single phase transformers, located outside on the Northeast side of the building. The transformers have a primary voltage of 4160V, and a secondary voltage of 120/208V, 3 phase, and 4 wire to a switchboard located in the first floor carpentry shop. The switchboard supplies power to additional panels located throughout the building. Poor Remaining Useful Life Exceeded Nominal Useful Life: 40 Years Serial Number Size/Capacity Not Available Not Available Not Available Not Available 75kVA, 100kVA Voltage 4160V - 120/208V Replacement Cost $20,500 There is a fence surrounding the 5kV switchgear and the 3 single phase transformers. The distance from the fence to the live parts on the transformers is 4 feet. This is not adequate space requires as outlined in NEC for medium voltage. For safety reasons the model numbers were not obtained in the field because of the live medium voltage PAGE 51

52 Text6 M E D I U M V O L T A G E S Y S T E M N O R T H E A S T S U R V E Y P H O T O G R A P H S First Medium Voltage System First Medium Voltage System - Substation First Medium Voltage System - Comment PAGE 52

53 Text6 M E D I U M V O L T A G E S Y S T E M S O U T H E A S T A S S E S S M E N T D A T A Description Overall Condition Date Installed 03/10/1970 Equipment Tag Manufacturer Model Number Item ID HP/kW Material Comments The second Medium Voltage Distribution System that supplies power to the building addition enters the building from an 112.5kVA pad mounted transformer, located outside on the Southeast side of the building. The transformers has a primary voltage of 4160V, and a secondary voltage of 120/208V, 3 phase, and 4 wire to a switchboard located in a room adjacent to a stair case. The switchboard supplies power to additional panels located throughout the building addition. Poor Remaining Useful Life Exceeded Nominal Useful Life: 40 Years Serial Number Size/Capacity Not Available Not Available Not Available Not Available kva Voltage 4160V - 120/208V Replacement Cost $19, PAGE 53

54 Text6 M E D I U M V O L T A G E S Y S T E M S O U T H E A S T S U R V E Y P H O T O G R A P H S Second Medium Voltage Transformer Second Medium Voltage Utility Meter PAGE 54

55 Text6 L O W V O L T A G E S Y S T E M - N O R T H E A S T A S S E S S M E N T D A T A Description Overall Condition Date Installed 03/18/1965 Equipment Tag Manufacturer Model Number Item ID HP/kW Material Comments The first Low Voltage Distribution System that supplies power to the multi-floor building enters the building from 3 single phase transformers, located outside on the Northeast side of the building. The distribution panel is located in the first floor carpentry shop in a metal cage. The distribution panel is manufactured by Kinney and is 120/208V and has a 500A main disconnect breaker. The distribution panel supplies power to additional panels located throughout the building. Poor Remaining Useful Life Exceeded Nominal Useful Life: 40 Years Serial Number Size/Capacity Not Available Not Available Not Available Not Available 500A Voltage 120/208V Replacement Cost $73, PAGE 55

56 PAGE 56

57 Text6 L O W V O L T A G E S Y S T E M - N O R T H E A S T - S W I T C H B O A R D A S S E S S M E N T D A T A Description Overall Condition Date Installed 03/10/1965 Equipment Tag Manufacturer Model Number Item ID HP/kW Material Comments Critical Issues Critical Repair Estimate $29,800 The first Low Voltage Distribution System that supplies power to the multi-floor building enters the building from 3 single phase transformers, located outside on the Northeast side of the building. The distribution panel is located in the first floor carpentry shop in a metal cage. The distribution panel is manufactured by Kinney and is 120/208V and has a 500A main disconnect breaker. The distribution panel supplies power to additional panels located throughout the building. Poor Remaining Useful Life Exceeded Nominal Useful Life: 40 Years Serial Number Size/Capacity Not Available Kinney Not Available Not Available 500A Voltage 120/208V Replacement Cost $29,800 The Dean of Architecture inquired about electrical capacity for electric car charging stations. At this time if any additions or modifications are made the low voltage electrical distribution will have to be redesigned to accommodate the addition and to bring it up to Code. The front of the main distribution panel, for the Low Voltage Distribution System, is located within 36 inches away from the adjacent panels. According to NEC it is required that a minimum 36 inches is required for working spaces PAGE 57

58 Text6 L O W V O L T A G E S Y S T E M - N O R T H E A S T - S W I T C H B O A R D S U R V E Y P H O T O G R A P H S Low Voltage System - Northeast - Switchboard Low Voltage System - Northeast - Critical Issue # PAGE 58

59 Text6 L O W V O L T A G E S Y S T E M - S O U T H E A S T A S S E S S M E N T D A T A Description Overall Condition Date Installed 06/22/1965 Equipment Tag Manufacturer Model Number Item ID HP/kW Material Comments The second Low Voltage Distribution System that supplies power to the building addition is located in a room adjacent to a stair case. The low voltage distribution panel is manufactured by Square D, catalog number QY A. It is rated for 400A, 120/208V, 3 phase, and 4 wire. There are 7 distribution breakers on this distribution panel that supply power to panels in the building addition. Poor Remaining Useful Life Exceeded Nominal Useful Life: 40 Years Serial Number Size/Capacity Not Available Not Available Not Available Not Available 400A Voltage 120/208V Replacement Cost $71, PAGE 59

60 PAGE 60

61 Text6 L O W V O L T A G E S Y S T E M - S O U T H E A S T - S W I T C H B O A R D A S S E S S M E N T D A T A Description Overall Condition Date Installed 03/10/1965 Equipment Tag Manufacturer Model Number Item ID HP/kW Material Comments The second Low Voltage Distribution System that supplies power to the building addition is located in a room adjacent to a stair case. The low voltage distribution panel is manufactured by Square D, catalog number QY A. It is rated for 400A, 120/208V, 3 phase, and 4 wire. There are 7 distribution breakers on this distribution panel that supply power to panels in the building addition. Poor Remaining Useful Life Exceeded Nominal Useful Life: 40 Years Serial Number Size/Capacity Not Available Square D QY A Not Available 400A Voltage 120/208V Replacement Cost $28, PAGE 61

62 Text6 L O W V O L T A G E S Y S T E M - S O U T H E A S T - S W I T C H B O A R D S U R V E Y P H O T O G R A P H S Low Voltage System - Switchboard Low Voltage System - Switchboard - Label PAGE 62

63 Text6 E M E R G E N C Y P O W E R S Y S T E M A S S E S S M E N T D A T A Item ID Description The building does not have a central emergency power system. All of the emergency lights and exit signs are configured with battery backup. Overall Condition Poor Date Installed 01/01/1991 Remaining Useful Life 4 Years Nominal Useful Life: 25 Years Equipment Tag Not Available Manufacturer Not Available Model Number Not Available Serial Number Not Available Size/Capacity HP/kW Voltage 120/208V Material Replacement Cost $59, PAGE 63

64 Text6 I N T E R I O R L I G H T I N G S Y S T E M A S S E S S M E N T D A T A Description The campus initiative for energy has replaced the existing T12 florescent lamps and ballast with T8 florescent lamps and new electronic ballast within the last 2 years. There are no occupancy sensors or lighting control systems, all of the light fixtures are switched by zone. Overall Condition Date Installed 01/01/2010 Equipment Tag Manufacturer Model Number Item ID HP/kW Material Good Remaining Useful Life 18 Years Nominal Useful Life: 25 Years Serial Number Size/Capacity Not Available Not Available Not Available Voltage 120/208V Replacement Cost $285, PAGE 64

65 Text6 I N T E R I O R L I G H T I N G S Y S T E M S U R V E Y P H O T O G R A P H S Interior Lighting Interior Lighting - Lamp PAGE 65

66 Text6 E M E R G E N C Y L I G H T I N G S Y S T E M A S S E S S M E N T D A T A Item ID Description The building does not have a central emergency power system. All of the emergency lights are configured with battery backup. Overall Condition Poor Date Installed 01/01/1991 Remaining Useful Life 4 Years Nominal Useful Life: 25 Years Equipment Tag Not Available Manufacturer Not Available Model Number Not Available Serial Number Not Available Size/Capacity HP/kW Voltage 120/208V Material Replacement Cost $19, PAGE 66

67 Text6 E X I T L I G H T I N G S Y S T E M A S S E S S M E N T D A T A Item ID Description Most of the exit lights are configured with battery backup. Overall Condition Poor Date Installed 01/01/1991 Remaining Useful Life 4 Years Nominal Useful Life: 25 Years Equipment Tag Not Available Manufacturer Not Available Model Number Not Available Serial Number Not Available Size/Capacity HP/kW Voltage 120/208V Material Replacement Cost $11,900 Comments Not all exit lights are configured with battery backup PAGE 67

68 Text6 E X I T L I G H T I N G S Y S T E M S U R V E Y P H O T O G R A P H S Exit Lighting Exit Lighting - 2 Exit Lighting PAGE 68

69 Text6 L I G H T I N G C O N T R O L S Y S T E M A S S E S S M E N T D A T A Item ID Description The building does not have a separate lighting control system. The building uses zoned switching. Overall Condition Poor Date Installed 01/01/1991 Remaining Useful Life Exceeded Nominal Useful Life: 20 Years Equipment Tag Manufacturer Not Available Model Number Serial Number Size/Capacity HP/kW Voltage 120/208V Material Replacement Cost $76, PAGE 69

70 Text6 E X T E R I O R L I G H T I N G S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 03/10/1992 Equipment Tag Manufacturer Model Number Item ID HP/kW Material The building exterior lights are wall mounted metal halide fixtures. The building exterior lights are controlled by a photocell. The parking lot lights are on the campus loop and are not associated with the building. Poor Remaining Useful Life 4 Years Nominal Useful Life: 25 Years Serial Number Size/Capacity Not Available Not Available Not Available Not Available Voltage 120/208V Replacement Cost $11, PAGE 70

71 Text6 E X T E R I O R L I G H T I N G S Y S T E M S U R V E Y P H O T O G R A P H S Exterior Lighting PAGE 71

72 Text106 C O M M U N I C A T I O N S D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y DATA SYSTEM PHONE SYSTEM SECURITY ACCESS CONTROL SYSTEM SYSTEM/COMPONENT Communication Infrastructure System Phone System Security Access Control COMMUNICATIONS TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 172, ,900 18,100 18,100 39,800 39,800 39, , , PAGE 72

73 Text6 C O M M U N I C A T I O N I N F R A S T R U C T U R E S Y S T E M A S S E S S M E N T D A T A Item ID Description The building is fed with 12 strands of single mode fiber and 200 copper pairs with each pair grounded and individually protected by a fuse/surge arrestor. Fiber and copper originate from Node #5. The building IDF is located in room 4 on the lower level. Fiber distributes from the building IDF to the hub room (telecommunication room) to within 100 meters of end-use equipment and lands at rack mounted fiber switches within the hub room. Overall Condition There is 1 hub room (HA) located within the building in room 235. The hub room is equipped with 3 free standing rack(s), wire management, and overhead basket cable tray. The hub room has a technology ground bar tied into the building grounding system as well as a dedicated electrical panel. The hub room does not have dedicated cooling systems but is conditioned/exhausted by the base building system. Outlet standards typically have 1"C stubbed to cable management. Standard outlet consists of two network cables and two data jacks. Station cable consists of Cat 6e (Mohawk Advancenet). The building is typically equipped with WIFI throughout (coverage not noted). Good Date Installed UIUC network upgrade complete (date range 2006 to 2012) Remaining Useful Life 20 Years Nominal Useful Life: 20 Years Replacement Cost $172, PAGE 73

74 Text6 C O M M U N I C A T I O N I N F R A S T R U C T U R E S Y S T E M S U R V E Y P H O T O G R A P H S Bldg 18 IDF HA racks HA ground bar HA electrical panel PAGE 74

75 Text6 P H O N E S Y S T E M A S S E S S M E N T D A T A Item ID Description Room 235 was locked and access to this system was not available at time of site visit. Overall Condition Good Date Installed 06/14/2006 Remaining Useful Life 15 Years Nominal Useful Life: 20 Years Equipment Tag Not Available Manufacturer Not Available Model Number Not Available Serial Number Not Available Size/Capacity Not Available HP/kW Voltage Material Replacement Cost $18, PAGE 75

76 Text6 S E C U R I T Y A C C E S S C O N T R O L A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1991 Equipment Tag Manufacturer Model Number Item ID HP/kW Material The building is equipped with security access control. In the building interior, there is a Schlage card reader on the entrance to room 101. The building exterior has an ADA card swipe on the Northwest exterior door. Poor Remaining Useful Life Exceeds 20 Years Nominal Useful Life: 20 Years Serial Number Size/Capacity Voltage Not Available Schlage Not Available Not Available Not Available Replacement Cost $39, PAGE 76

77 Text6 S E C U R I T Y A C C E S S C O N T R O L S U R V E Y P H O T O G R A P H S Schlage card reader ADA card swipe PAGE 77

78 Text6 L E G A C Y A S S E T D E S C R I P T I O N : A R T - E A S T A N N E X, S T U D I O 1 The Art-East Annex, Studio 1 contains three floors and a basement. The building consists of mechanical and electrical rooms, building service storage, classroom and research laboratories, administrative offices, shops, a lounge, and a mercantile area. The Life Safety Code classifies the building as Business Occupancy.The Art-East Annex, Studio 1 has a manual and automatic fire alarm system. Manual pull stations are located on the second floor (Stair 1) and first floor (Stair 1). Automatic fire detection is located in the second floor (Corridor 200 near Elevator 1) and the first floor (Room 126, 128, S010, S009, and 126 near Elevator 1). The occupant notification for the building is audible/visual alarms. The audible/visual alarms are located in the second floor (Corridor 200). The fire alarm control panel for the building, located on the ground floor Vestibule 103, is Cerebus Pyrotronics model XL3.The Art-East Annex, Studio 1 has battery-operated emergency lights located in the west portion of the first floor. There exists no emergency power system.the Art-East Annex, Studio 1 is a partially sprinklered building with a wet system located in all floors except the east portion of the first floor. The building contains a Class II standpipe system. The fire department connection is located on the northwest side of the building near Room 104. OCCUPANT LOAD/EXITING Third Floor: 43 occupants; two exits required (2 exit provided); the exit width including stairs/doors provides capacity for 328 occupants. Door and stair widths are sufficient for occupants served. Second Floor: 110 occupants; two exits required (2 exits provided); the exit width including stairs/doors provides capacity for 363 occupants. Door and stair widths are sufficient for occupants served. First Floor (LED): 289 occupants; two exits required (5 exits provided); 58" exit door width required (173" provided); door and corridor widths are sufficient for occupants served. Basement: 36 occupants; two exits required (1 exit provided); the exit width including stairs/doors provides capacity for 113 occupants. Door and stair widths are sufficient for occupants served PAGE 78

79 A R T - E A S T A N N E X, S T U D I O 1 L E G A C Y A S S E S S M E N T S U M M A R Y Item ID REQUIREMENT NUMBER INSPECTION DATE IDENTIFIED ISSUE LEGACY VALUE PERCENT COMPLETE POOR FAIR CODE TOTAL GENERAL LEGACY ITEMS ITEMS REQ /8/2002 ADA: Lacking Detectable Warning Strips 3, ,200 3, REQ /8/2002 ADA Signage: Existing Signs are Not Braille 20, ,700 20,700 Type REQ /8/2002 Doors: Replace Non ADA Compliant Hardware 15, ,000 15, REQ /1/2006 Ceilings: Deteriorated Paint - Floor Basement 10, ,800 10, REQ /1/2006 Interior Walls: Paint - Floor Basement 12, ,200 12, REQ /1/2006 Interior Walls: Paint - Floor 3 12, ,200 12, REQ /1/2006 Flooring: Sand Wood Strip Flooring - Floor 2 89, ,900 89, REQ /1/2006 Ceilings: Deteriorated Paint - Floor 1 10, ,800 10, REQ /1/2006 Interior Walls: Paint - Floor 2 12, ,200 12, REQ /1/2006 Ceilings: Deteriorated Paint - Floor 2 10, ,800 10, REQ /1/2006 Ceilings: Deteriorated Paint - Floor 3 10, ,800 10, REQ /1/2006 Interior Walls: Paint - Floor 1 12, ,200 12, REQ /1/2006 Skylights - Replace 30, ,200 30, REQ /17/2005 Doors: Install Safety Glazing 38, ,200 38, REQ /1/2006 Flooring: Replace Worn VAT - Floor 1 47, ,500 47, REQ /1/2006 Flooring: Replace Worn VAT - Floor 2 47, ,500 47, REQ /1/2006 Roof: Commission further study 40, ,500 40, REQ /1/2006 Roof: Replace Built-Up 259, , , REQ /1/2006 Roof: Deteriorated Slate 98, ,200 98, REQ /1/2006 Exterior Doors: Aged 21, ,700 21, REQ /1/2006 Ceiling Finish: Efflorescence- Water Damage - Floor 1 8, ,900 8, REQ /29/2006 Storm Drain: Building Drainage Poor 535, , , REQ /17/2005 Means of Egress: Impediments to Egress REQ /17/2005 Means of Egress: Stair Enclosure 42, ,700 42, REQ /17/2005 Means of Egress: Stair Width 192, , , REQ /17/2005 Means of Egress: Common Path of Travel (1st Floor, No A/S) 1, ,200 1, PAGE 79

80 A R T - E A S T A N N E X, S T U D I O 1 L E G A C Y A S S E S S M E N T S U M M A R Y Item ID REQUIREMENT NUMBER REQ REQ REQ INSPECTION DATE IDENTIFIED ISSUE LEGACY VALUE PERCENT COMPLETE 6/17/2005 Fire Barrier: Unprotected Penetrations 3, ,700 3,700 6/17/2005 Means of Egress: Number of Exits (Basement) 38, ,000 38,000 12/1/2006 General: Structural Engineering Study 74, ,100 74,100 POOR FAIR CODE TOTAL GENERAL LEGACY ITEMS TOTALS 1,701, ,088, ,200 38,200 1,701,200 TOTALS 1,701, ,088, ,200 38,200 1,701,200 % OF LEGACY VALUE Poor = VFA Priorities 1,2, and 3; Fair VFA Priority 4; and Code VFA Priority PAGE 80

81 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Stairs and hazardous vehicular areas are required to have a detectable warning surface per ADAAG and Requirement Category Requirement Name Condition Accessibility ADA: Lacking Detectable Warning Strips (Legacy) Fair Percent Complete 0.0 Recommendation ADAAG & 5 require a detectable warning strip at stairs and vehicular entrance areas. At stair landings install adhesive detectable strips. At sidewalks, saw cut reliefs per ADAAG A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 3, Estimated Remaining Cost: 3, Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Requirement Category Requirement Name Condition The signs, which designate permanent rooms and spaces, do not comply with requirements for raised or brailled characters, mounting locations or heights. See BOCA section under room identification and ADAAG section (7). Accessibility ADA Signage: Existing Signs are Not Braille Type (Legacy) Fair Percent Complete 0.0 Recommendation Add or replace room signs to comply with BOCA and ADAAG regulations. Each sign is approximately $75.00 x the number of rooms. Note: Type of sign selected for budgetary purposes only. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 20, Estimated Remaining Cost: 20, PAGE 81

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/04/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/04/2013 BUILDING SURVEY DATE 0026 1409 WEST GREEN STREET URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.644 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 4,734,000 CLASSROOMS / LIBRARY BUILDING GROSS

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 04/08/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 04/08/2013 BUILDING SURVEY DATE 0331 501 EAST DANIEL STREET CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.342 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 3,361,900 OFFICE BUILDING GROSS SQUARE FEET

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/11/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/11/2013 BUILDING SURVEY DATE 0021 1402 WEST SPRINGFIELD AVENUE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.859 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 2,934,700 RECREATION BUILDING GROSS SQUARE

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/04/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/04/2013 BUILDING SURVEY DATE 0025 1305 WEST GREEN STREET URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.170 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 2,642,200 OFFICE BUILDING GROSS SQUARE FEET 33,189

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/06/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/06/2013 BUILDING SURVEY DATE 0067 1110 WEST GREEN STREET URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.810 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 18,640,900 OFFICE BUILDING GROSS SQUARE FEET 175,513

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/08/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/08/2013 BUILDING SURVEY DATE 0193 601 EAST JOHN STREET CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.535 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 4,182,100 OFFICE BUILDING GROSS SQUARE FEET 33,805

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/12/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/12/2013 BUILDING SURVEY DATE 0007 709 SOUTH MATHEWS AVENUE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.600 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 4,379,700 LECTURE HALL BUILDING GROSS SQUARE

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/07/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/07/2013 BUILDING SURVEY DATE 0066 104 SOUTH GOODWIN AVENUE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.860 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 14,711,600 LABORATORY BUILDING GROSS SQUARE

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls

More information

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION OFFICIAL USE ONLY Date: Permit #: Received by: For Staff Use Only: OFD ELEC Planning SITE LOCATION Site Address: Tax Parcel Number: TYPE OF WORK Building

More information

Administrative Offices

Administrative Offices CUYAHOGA COUNTY PUBLIC LIBRARY EXISTING FACILITY ASSESSMENT December 2009 Administrative Offices 2111 Snow Road, Parma, Ohio 44134 Location Entry Site View of Staff Entrance ADM Administrative Offices

More information

Administration Building Needs Assessment

Administration Building Needs Assessment Town Hall Meeting with the Habersham County Board of Commissioners Administration Building Needs Assessment JUNE 13, 2016 Detailed Evaluation Performed in 2015 Engineering Evaluation Site/Civil Architectural

More information

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 2.0 2.0 0.30 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 1.0 3.0 0.22 Four fewer stalls

More information

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT SPARTANBURG COUNTY BUILDING CODES DEPARTMENT PLAN REVIEW CHECK LIST REQUIREMENTS FOR COMMERCIAL BUILDING PERMITS Plan Review Coordinator Kris Brannon 864-596-3180 366 N. Church St Room 500 Spartanburg,

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Timberglen Recreation Center Summary

Timberglen Recreation Center Summary Timberglen Recreation Center Summary Address Building Purpose 3810 Timberglen Road Dallas, TX 75287 Recreation Center Original Year of Construction 2003 Building Area 15,000 SF Inspection Date August 2,

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

Building Permit Application

Building Permit Application Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:

More information

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist

More information

Exhibit A Library Shell Construction

Exhibit A Library Shell Construction Exhibit A Library Shell Construction Library Component Building Requirements Approximately 15,000-17,000 square feet plus 900 square feet for mechanical room and additional space on roof for installation

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018 G2 Gordon + Gordon Architecture. LLC Dr. Edward Livingston Trudeau Building 118 Main Street, Saranac Lake, NY Building Systems Report June 24, 2018 Harry Gordon, FAIA 164 Otter Slide Road Saranac Lake

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

COOLIDGE SENIOR HIGH SCHOOL

COOLIDGE SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1940 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1240 ENROLLMENT 2008 652 WARD 4 PROPOSED PROGRAM CAPACITY 1100 Site Plan COOLIDGE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information Anderson Central 100B, PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 I DATE: May 9-11, 2017 ****************************************************************************** SUBJECT: SDSU Harding Hall Renovation

More information

Charles H Wacker Elementary School

Charles H Wacker Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/12/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/12/2013 BUILDING SURVEY DATE 0052 500 SOUTH GOODWIN AVENUE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.721 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 34,169,800 PARKING STRUCTURE BUILDING GROSS

More information

Common Plan Review Rejection Reasons

Common Plan Review Rejection Reasons Common Plan Review Rejection Reasons Submitted plans must contain sufficient information for plan reviewers to be able to verify that the proposed construction complies with the Virginia Uniform Statewide

More information

Common Plan Review Rejection Reasons

Common Plan Review Rejection Reasons (CPHD) (ISD) Common Plan Review Rejection Reasons Submitted plans must contain sufficient information for plan reviewers to be able to verify that the proposed construction complies with the Virginia Uniform

More information

Village of Gurnee Construction Documents Submittal Requirements

Village of Gurnee Construction Documents Submittal Requirements Commercial New Construction 4 sets of complete plans Commercial Alterations 2 sets of complete plans Residential New Construction, Remodel and/or Addition 2 sets of complete plans DETAILED PLAN REQUIREMENTS

More information

Draft Feasibility Study for the Expansion of Southeast Library

Draft Feasibility Study for the Expansion of Southeast Library DC public Library KH KEAST & HOOD METROPOLITAN E N G I N E E R I N G I N C S H A P I RO-O BRIEN Draft Feasibility Study for the Expansion of Southeast Library Draft Submission: November 4, 2016 1 OVERVIEW

More information

2 Main Building BLDG-959A Building Purpose Building Area Bus Terminal 14,890 SF Inspection Date August 18, 2016 Inspection Conditions Facility Conditi

2 Main Building BLDG-959A Building Purpose Building Area Bus Terminal 14,890 SF Inspection Date August 18, 2016 Inspection Conditions Facility Conditi 1 Site Summary Address 7105 Berkman Drive Austin, TX 78752 Number of Permanent Campus Facilities 1 Original Year of Construction 1995 Total Campus Building Area (combined) 14,890 SF Introduction is located

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...

More information

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205 5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1951 3,813 Page 1 of 25 1. Architectural / Structural & Site Exec Summary Hillcrest Public School is a two storey structure of masonry

More information

POWELL ELEMENTARY SCHOOL

POWELL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1925 BUILDING AREA 38,500 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 319 WARD 4 PROPOSED PROGRAM CAPACITY 325 Site Plan POWELL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-3

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Warnica PS, 9283

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Warnica PS, 9283 5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1964 3,035 Page 1 of 27 1. Architectural / Structural & Site Exec Summary Warnica Public School is a one storey structure of masonry construction

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

Lake Highlands North Recreation Center Summary

Lake Highlands North Recreation Center Summary Lake Highlands North Recreation Center Summary Address Building Purpose 9940 White Rock Trail Dallas, TX 75238 Recreation Center Original Year of Construction 1971 Building Area 33,036 SF Inspection Date

More information

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements % 8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior

More information

TEXAS A&M ENGINEERING

TEXAS A&M ENGINEERING TEXAS A&M ENGINEERING 312 Jack K. Williams Administration Building I 3126 TAMU I College Station, Texas 77843-3126 M. Katherine Banks, Ph.D., P.E. Vice Chancellor and Dean of Engineering Director, Texas

More information

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,

More information

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment Summary of Findings The Laurence G. Paquin Building Facility located at 2200 SINCLAIR LANE in Baltimore, Maryland, was built in 1975. It comprises 65,666 gross square feet. The total current deficiencies

More information

MAURY ELEMENTARY SCHOOL

MAURY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1886 BUILDING AREA 46,800 SF CURRENT PROGRAM CAPACITY 276 ENROLLMENT 2008 238 WARD 6 PROPOSED PROGRAM CAPACITY 325 Site Plan MAURY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS ADDENDUM #1 PERFORMANCE WORK STATEMENT

186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS ADDENDUM #1 PERFORMANCE WORK STATEMENT 186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS PROJECT NUMBER MDVL092051 Renovate Vehicle Maintenance Facility Bldg 200 23 June 2017 ADDENDUM #1 PERFORMANCE WORK STATEMENT 1.0 SCOPE. This addendum to

More information

CONSTRUCTION DOCUMENTS NECESSARY FOR PLAN REVIEW

CONSTRUCTION DOCUMENTS NECESSARY FOR PLAN REVIEW 2012 International Residential Code 2012 International Building Code 2012 International Fire Code 2014 NFPA 70 National Electrical Code 2012 International Existing Building Code 2012 International Plumbing

More information

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW 27 September 2007 prepared by: J. CHRIS EVANS ARCHITECT 3220 E. Terra Alta Blvd. No. 9 Tucson, Arizona 85716 520.319.8835 evansarch@hotmail.com

More information

Telecommunication Spaces

Telecommunication Spaces Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137

More information

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2 School and Site Level Deficiencies Site K Play Area Requires Impact Resistant Material 1320 1 Ea. 2 Exterior Basketball Goals Are Damaged And Require Replacement 1322 1 Ea. 4 Bus drop-off area does not

More information

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California PROGRAM COST MODEL for PEER Tall Buildings Study Concrete Structural Option Los Angeles, California March 8, 2010 PEER Tall Buildings Study Concrete Structural Option March 8, 2010 CONTENTS Page Nos. Overall

More information

Building Inspection Report

Building Inspection Report Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941

More information

FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY

FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY DATE: November 20, 2012 SDSU requests approval of this Facility Design Plan to continue planning the

More information

KEY ELEMENTARY SCHOOL

KEY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1925 BUILDING AREA 52,000 SF CURRENT PROGRAM CAPACITY 320 ENROLLMENT 2008 328 WARD 3 PROPOSED PROGRAM CAPACITY 325 Site Plan KEY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 Page 1 of 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General

More information

School Without Walls

School Without Walls INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

REHABILITATION STANDARDS CHECKLIST

REHABILITATION STANDARDS CHECKLIST Project Name Date Built Date Last Rehabilitated (If applicable) EXTERIORS REHABILITATION STANDARDS CHECKLIST ROOF Age (Yrs) Poor Fair Good Excellent Roof /Pitch/Flat # of Layers Substrate Material Insulation

More information

RENTAL INSPECTION CHECKLIST. Helpful Definitions: Egress: the free and unobstructed access to the exterior of a habitable space.

RENTAL INSPECTION CHECKLIST. Helpful Definitions: Egress: the free and unobstructed access to the exterior of a habitable space. CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street, Room 201, Manassas, VA 20110 P.O. Box 560 Manassas, VA 20108 Phone: 703-257-8278 Fax: 703-257-5831

More information

How to Prepare Your LSE Report

How to Prepare Your LSE Report LSE Rule Category Required Documentation Information Comments / Applicable Code Sections/ 10.1 Building Height Provide the Building height in Feet Provide the number of stories above grade Helpful Hints

More information

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3 School and Site Level Deficiencies Site Concrete Walks Are Damaged And Require Replacement 5539 4,000 SF 3 Bus drop-off area does not have a canopy. 14005 250 LF 5 Paved Play Requires Recoating And Resurfacing

More information

Thurgood Marshall Recreation Center Summary

Thurgood Marshall Recreation Center Summary Thurgood Marshall Recreation Center Summary Address Building Purpose 5150 Mark Trail Way Dallas, TX 75232 Recreation Center Original Year of Construction 1970 Building Area 21,300 SF Inspection Date August

More information

0B MAGNOLIA HALL. Scale: 1:110. Date: Feb Time: 7:40 pm. User: brady. 10 ft

0B MAGNOLIA HALL. Scale: 1:110. Date: Feb Time: 7:40 pm. User: brady. 10 ft 0B 2 m 1:110 7:40 pm. 01 5 m 1:230 7:38 pm. 02 5 m 1:230 7:38 pm. 03 5 m 1:230 7:45 pm. Facility Profile ( FP-1 ) City: State: Country: Address: Stories: Attic: Basement: Glassboro New Jersey United States

More information

Velma F Thomas Early Childhood Center

Velma F Thomas Early Childhood Center Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

SEATON ELEMENTARY SCHOOL

SEATON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1969 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 428 ENROLLMENT 2008 280 WARD 2 PROPOSED PROGRAM CAPACITY 325 Site Plan SEATON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Reilly Elementary School Site Summary

Reilly Elementary School Site Summary 1 Reilly Elementary School Site Summary Address 405 Denson Drive Austin, TX 78752 Number of Permanent Campus Facilities 1 Original Year of Construction 1954 Total Campus Building Area (combined) 41,622

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Deferred Maintenance Plan

Deferred Maintenance Plan Deferred Maintenance Plan 2012-2015 1/5/2012 1 Table of Contents Title Page Introduction 3 Wallace Hall Deferred Maintenance 4 Wallace Hall Building Assessment 6 Wilson Hall Deferred Maintenance 7 Wilson

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES... DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements

More information

Piping system (steam, hot water, chilled water system) including pipe and duct insulation needs replacement.

Piping system (steam, hot water, chilled water system) including pipe and duct insulation needs replacement. NW Corridor Transit Planning Union Station Existing Conditions Technical Memorandum (Physical and Operational Assessments) Executive Summary Capitol Region Council of Governments Prepared in cooperation

More information

SHEPHERD ELEMENTARY SCHOOL

SHEPHERD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1932 BUILDING AREA 79,700 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 355 WARD 4 PROPOSED PROGRAM CAPACITY 400 Site Plan SHEPHERD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

Carter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications

Carter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications Carter's Oshkosh (SIS) #1185 - The Center at Pearland Parkway - Pearland, TX 77581 - Scope Of Work / Bid Qualifications Please fill out the blanks associated with your trade scope or work with the words

More information

Uniform Construction Code

Uniform Construction Code Uniform Construction Code When the UCC Requires Permits and Inspections (A Zoning Certificate may be required even though the project does not require a UCC Building Permit.) As a general rule, the UCC

More information

Frederic Chopin Elementary School

Frederic Chopin Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

K.B. Polk Recreation Center Summary

K.B. Polk Recreation Center Summary K.B. Polk Recreation Center Summary Address Building Purpose 6801 Roper Street Dallas, TX 75209 Recreation Center Original Year of Construction 1988 Building Area 14,305 SF Inspection Date July 20, 2016

More information

Cheldelin Middle School

Cheldelin Middle School Facility Information Address: 987 NE Conifer Blvd Corvallis Site Size: Building Area: Construction Date: Improved Parking: Grade Levels Served: Regular Classrooms: Portable Classrooms: Sept. 2007 Enrollment:

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: Southside Early Childhood Observed By: Cannon/Carter Principal: Grade

More information

1 data PIC location (with 2 ports) typically asf for multiple staff members

1 data PIC location (with 2 ports) typically asf for multiple staff members 1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new

More information

Facility Improvements

Facility Improvements AL-SI-02 ASPHALT PLAY AREA UPGRADE AL-SI-09 CURB RAMP ADDITIONS Asphalt improvements needed around building and playshed to provide a safe play area. Curb ramps needed to provide wheelchair access and

More information

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE STAFF USE ONLY RECEIVED BY: DATE: Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE Applicant must complete numbered items

More information

DESIGN & CONSTRUCTION GUIDELINES

DESIGN & CONSTRUCTION GUIDELINES DESIGN & CONSTRUCTION GUIDELINES EDITION: USF FACILITIES MANAGEMENT - DC 5 DCG FACILITIES MANAGEMENT DESIGN & CONSTRUCTION PHONE: (813) 974-2845 4202 E. FOWLER AVENUE, OPM 1000 TAMPA, FLORIDA 33620-7550

More information

Inspection Report. Prepared for: Yossi Berg. Property Address: 4925 Diggers Way Sugar Hill, GA. Date: July 20, 2011

Inspection Report. Prepared for: Yossi Berg. Property Address: 4925 Diggers Way Sugar Hill, GA. Date: July 20, 2011 Inspection Report Prepared for: Yossi Berg Property Address: Sugar Hill, GA. Date: July 20, 2011 Inspector: Charles Mann (770) 594-2222 www.edificeinspections.com Page 1 INSPECTION CONDITIONS CLIENT &

More information

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) Construction Criteria The unit costs for the Physical Fitness Center (Exercise Room) space type are based on the construction quality and design features in

More information

Mills Elementary School Site Summary

Mills Elementary School Site Summary 1 Mills Elementary School Site Summary Address 6201 Davis Lane Austin, TX 78749 Number of Permanent Campus Facilities 1 Original Year of Construction 1998 Total Campus Building Area (combined) 81,368 SF

More information

Village of Glen Ellyn Basement Remodeling Project Guidelines

Village of Glen Ellyn Basement Remodeling Project Guidelines Village of Glen Ellyn Basement Remodeling Project Guidelines Existing unfinished basement space is often remodeled to create more habitable (living, sleeping, eating, dining) space in a home. Building

More information

Communications Page 1 of 9

Communications Page 1 of 9 Page 1 of 9 Last Update: April 23 rd, 2014 Introduction Design In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a

More information

Certificate of Use Application Package

Certificate of Use Application Package Certificate of Use Application Package Steps for Obtaining a Certificate of Use All Business must obtain a Certificate of Use prior to occupying or doing business within the space. Home Businesses do not

More information

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7 TABLE OF CONTENTS ( = Rev 11/15) Update #7 INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-4 International Suite of Codes (New) B-9 Record Drawings B-10 Variance Procedure

More information

DRAFT. Carruth Administration Center Site Summary. Address West 6 th Street Austin, TX Number of Permanent Campus Facilities 6

DRAFT. Carruth Administration Center Site Summary. Address West 6 th Street Austin, TX Number of Permanent Campus Facilities 6 1 Site Summary Address 1111 West 6 th Street Austin, TX 78703 Number of Permanent Campus Facilities 6 Original Year of Construction 1985 Total Campus Building Area (combined) 134,403 SF Introduction The

More information

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

Facilities Feasibility Study Frederick Douglass HS Condition Assessment Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies

More information

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8 TABLE OF CONTENTS ( = Rev 04/17) Update #8 INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-4 International Suite of Codes B-9 As-Builts and Record Drawings B-10 Variance

More information

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following:

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following: New buildings or renovations to existing buildings for which an application for a permit was made to the Department or a municipality before April 9, 2004. New buildings or renovations to existing buildings

More information

Division 00 Procurement and Contracting Requirements

Division 00 Procurement and Contracting Requirements SECTION 00 01 10 TABLE OF CONTENTS Division SECTION NO. VOLUME ONE Title SECTION TITLE Division 00 Procurement and Contracting Requirements 00 11 00 Invitation to Bidders 00 21 00 Instructions to Bidders

More information

Columbia County Health Care Center Added Amenities

Columbia County Health Care Center Added Amenities Columbia County Health Care Center Added Amenities Columbia County Board Meeting on January 16th, 2013 Building Exterior Added Amenities 1. Upgraded nail-base roofing insulation to 3 thickness on Center

More information

Amos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621

Amos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621 2 S Morgan St Chicago, IL 21 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information