Frederic Chopin Elementary School

Size: px
Start display at page:

Download "Frederic Chopin Elementary School"

Transcription

1 Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. : The item/system requires general cleaning and/or routine maintenance. : The item/system requires repairs and has not reached the end of its serviceable life. : The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. 1: The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CHIMNEY Brick Chimney - Concrete/ Mortar Liner CORNICE 1 GRE LF $27,027 $27,027 Cornice - Cast Stone 1 7 GRE LF Assessment Date: 7/20/2012 Page 1 of 14

2 DOORS Exterior FRP Door Exterior Steel Door Overhead Rolling / Garage Door Transom Lite GRE EA 5 EA $1, EA $1,652 ENTRANCE Concrete Exterior Stairs Concrete Ramp Entrance Controls - Audio Entrance Controls - Audio and Video Power Door Operator and Controls Stair Handrails 1 GRE 6 45 GRE GRE LF $4, LF $3, LF $8,451 FOUNDATION Concrete Foundation 1 7 GRE LF LIGHTING Exterior Lights - Wall Mounted 1 7 GRE EA $3,146 $3,146 LINTELS Lintels - Steel 1 7,190 1,190 LF Assessment Date: 7/20/2012 Page 2 of 14

3 PARAPET Coping - Stone Parapet < 16" Height ROOF SYSTEM 1 GRE GRE LF 904 LF $140,777 $140,777 Asphalt Gravel Ballast Roof Exterior Downspouts Roof Structure: Steel with Clay Tile Arch 1 ORA 3 36,292 GRE GRE 7 36,292 36,292 SF $924, LF $3,718 36,292 SF $928,533 SUPERSTRUCTURE Steel with Clay Tile Arch 1 7 GRE 7 93,600 93,600 SF WALLS Brick WINDOWS 1 GRE 6 47, ,005 SF $310,543 $310,543 Window - Guards perforated Window - Guards wire guard Windows - Sash Aluminum Double-pane EXTERIOR 1 GRE 6 1,432 7,300 GRE 6 12,500 1,432 SF 1,300 SF 12,500 SF $107,250 $107,250 $1,527,379 Assessment Date: 7/20/2012 Page 3 of 14

4 ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - Intrusion detection MAIN SERVICE 1 YEL 4 1 GRE 6 5,146 GRE 6 25,690 GRE 6 2,952 GRE 6 42 GRE 6 5 GRE 6 32 GRE 6 16 YEL 4 1 GRE 6 93,600 7 $8,866 5,146 SF $6,991 25,690 SF $11,021 2,952 SF $1, EA $4,505 5 EA $ EA $7, EA $3,729 $17,160 93,600 SF $331,943 93,600 SF $87,001 $480,773 Main Electrical service 2000 A 120/208/3PH 1 7 POWER DISTRIBUTION Lighting and power panels Main distribution panels amp Main distribution panels above 600 amp ELECTRICAL 1 GRE BLU EA $16,159 3 EA $18,590 $34,749 $515,522 Assessment Date: 7/20/2012 Page 4 of 14

5 FIRE PROTECTION FIRE ALARM 1 7 Fire Alarm System 93,600 SF $330,605 $330,605 FIRE PROTECTION $330,605 MECHANICAL AIR CONDITIONING Window A/C 1 7 GRE EA $6,221 $6,221 AIR HANDLING SYSTEMS Air Intake - Built Up Air Handling Multi Zone Built Up Air Handling - Steam 25,001 to 35,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam 25,001 to 35,000 cfm Multi Zone Double Delivery Built Up Air Handling Auxiliaries - Steam 45,001 to 60,000 cfm Return Duct Work - Masonry and Ducts - Existing or Missing Exterior Shaft BOILER SYSTEMS Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler HP Boiler Auxiliary - Steam Boiler HP Chemical Feed System (Steam Boilers) Combustion Dampers Feed Water Pumps and Tank - Steam Boilers 1 YEL YEL 4 1 YEL 4 1 ORA 3 2 BLU BLU 5 2 BLU 5 2 GRE 6 2 GRE 6 2 GRE EA $27,599 $128,700 $40,040 2 EA $108, LF $25,740 $330,759 2 EA $125,840 2 EA $22,880 2 EA $4,290 2 EA $572 $8,437 $162,019 Assessment Date: 7/20/2012 Page 5 of 14

6 HEATING DEVICES Heater - Gas Wall Heater - Electric 1 7 GRE YEL EA $4, EA $14,620 $18,910 MECHANICAL PLUMBING Condensate Assembly - Pumps and Tank Piping - Condensate - Steel or Galvanized Piping - Steam - Steel or Galvanized TEMPERATURE CONTROL 1 GRE 6 2 GRE GRE EA $1, LF $2, LF $3,103 $6, Pneumatic System ORA 3 93,600 93,600 SF $669,240 Thermostats - Pneumatic ORA EA $36,179 Zone Dampers ORA $43,029 $748,448 VENTILATION Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 500 to 1,500 cfm Type I Exhaust Hood - Kitchen or Culinary Arts MECHANICAL 1 7 GRE YEL 4 2 ORA EA $5,577 2 EA $4,576 $26,884 $37,037 $1,310,329 Assessment Date: 7/20/2012 Page 6 of 14

7 PLUMBING HOT WATER Hot Water Heater - Gas more than 300,000 BTU/HR PIPING 1 GRE $6,721 $6, Domestic Piping - Cold Water from Risers to Fixtures 93,600 SF $30,785 Domestic Piping - Cold Water Risers 93,600 SF $60,232 Domestic Piping - Hot Water from Riser to fixtures 93,600 SF $20,077 Domestic Piping - Hot Water Return Risers 93,600 SF $42,831 Domestic Piping - Hot Water Risers 93,600 SF $50,862 Domestic Piping Cold Water Horizontal lines 93,600 SF $223,526 Domestic Piping Hot Water Horizontal lines 93,600 SF $184,710 Domestic Piping Hot Water Return Lines 93,600 SF $107,078 Sanitary Piping ORA 3 93,600 93,600 SF $89,678 Storm Piping BLU 5 93,600 93,600 SF $44,170 Vent Piping BLU 5 93,600 93,600 SF $33,462 $887,412 PUMPS 1 7 Domestic Booster Pump simplex YEL 4 1 $17,160 $17,160 PLUMBING $911,293 INTERIOR ADMINISTRATIVE SUITES Ceiling - Plaster/Drywall 1 GRE 6 3, ,874 SF $10,969 Assessment Date: 7/20/2012 Page 7 of 14

8 Flooring - Tile/Sheet Flooring - Wood Lighting - Pendant/Surface Walls - Plaster/Drywall AUDITORIUM - DEDICATED GRE 6 1,081 GRE 6 2,793 YEL 4 61 GRE 6 10,072 1,081 SF $1,546 2,793 SF $21, SF $401 10,072 SF $23,765 $57,769 Balcony Seating Main Floor Seating Sound System Stage Curtains Stage Lighting System Stage Platform 1 BLU BLU GRE 7 2 GRE 6 1, EA $70, EA $88,062 2 EA 1,200 SF $5,097 $163,364 CORRIDOR Ceiling - Plaster/Drywall Flooring Asphalt Flooring Tile/ Sheet Lighting - Pendant/ Surface Stair Handrails Stairs - Tile Walls - Plaster/Drywall DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Transom Window 1 GRE 6 25,690 GRE 6 21,586 GRE 6 4,104 GRE 6 25,690 GRE GRE GRE 6 45,572 1 GRE 6 2 GRE GRE ,690 SF $72,739 21,586 SF $30,868 4,104 SF $5,869 25,690 SF $18, LF 376 LF $2,839 45,572 SF $107,527 $238,210 2 EA $ EA $43, SF $11,991 $55,594 Assessment Date: 7/20/2012 Page 8 of 14

9 DRINKING FOUNTAINS Double Fountain GYMNASIUM / AUDITORIUM Flooring - Wood Lighting - Metal Halide/Sodium Vapor Walls - Plaster/Drywall KITCHEN Ceiling - Plaster/Drywall Flooring - Tile/Sheet Lighting - Pendant/Surface Wall - Plaster/Drywall LIBRARY Casework Flooring Carpet Lighting - Pendant/ Surface Walls - Plaster/Drywall LUNCHROOM Ceiling - Plaster/Drywall Flooring - Tile/Sheet 1 GRE GRE 6 2,952 GRE 6 16 BLU 5 4,874 1 GRE GRE GRE 6 15 GRE 6 1,236 1 GRE 6 56 GRE 6 1,536 GRE 6 1,536 GRE 6 2,407 1 GRE 6 1,570 GRE 6 1, EA $9,209 $9,209 2,952 SF $22, EA $2,860 4,874 SF $69,698 $94, SF $3, SF $1, SF $11 1,236 SF $2,916 $7, LF $1,718 1,536 SF $2,196 1,536 SF $1,098 2,407 SF $5,679 $10,692 1,570 SF $4,445 1,570 SF $2,245 Assessment Date: 7/20/2012 Page 9 of 14

10 Lighting - Lay-In Serving Line Wall - Plaster/Drywall MDF/IDF GRE GRE 6 2, SF $17 18 LF 2,152 SF $5,078 $11,785 Finishes Ventilation and Cooling MECHANICAL/SERVICE ROOMS Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room STAFF RESTROOM 1 GRE GRE BLU 5 1,634 GRE 6 3 GRE 6 4,724 GRE SF $408 $1,401 $1,810 1,634 SF $18,506 3 SF $14 4,724 SF $22, SF $3,030 $43,842 Accessories Ceiling - Lay-In Ceiling - Plaster/Drywall Floor Drain Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Lavatory Lighting - Pendant/ Surface Partitions Urinals Wall - Plaster/Drywall Wall - Structural Glazed Tile 1 GRE 6 2,481 GRE GRE 6 2, GRE GRE 6 2,281 GRE GRE 6 26 GRE GRE 6 37 GRE 6 23 GRE 6 1,464 GRE 6 2,880 2,481 SF $19, SF $97 2,365 SF $6,294 7 EA $1,802 2,281 SF $5, SF $ EA $9, SF $24 37 EA $6, EA $8,551 1,464 SF $3,454 2,880 SF $20,592 Assessment Date: 7/20/2012 Page 10 of 14

11 Wall - Tile Ceramic/ Porcelain Water Closet THEATER Ceiling - Plaster/Drywall Flooring - Wood Lighting - Lay-In Wall - Plaster/Drywall INTERIOR ROOM CASEWORK Casework CEILING GRE 6 1,484 GRE GRE 6 5,146 GRE 6 5,146 GRE 6 52 GRE 6 7,958 1 GRE ,484 SF $3, EA $15,987 $102,131 5,146 SF $44,006 5,146 SF $38, SF $59 7,958 SF $68,280 $151,199 $948, LF $9,116 $9,116 Ceiling Plaster/Drywall 1 BLU GRE 6 7,074 12,051 6, SF $4,927 25,298 SF $74,180 $79,106 CHALK BOARD 1 7 Chalk Board YEL LF $104,047 $104,047 Assessment Date: 7/20/2012 Page 11 of 14

12 FLOOR Wood 1 7 GRE 6 22,136 4,032 26,168 SF $167,136 $167,136 GYM_CEILING Gymnasia Ceiling LIGHTING 1 GRE 6 2, ,952 SF $25,244 $25,244 Lay-In Lighting Pendant/Surface 1 GRE GRE GRE EA $ EA $1, EA $19,162 $21,665 MARKER BOARD Marker Board 1 7 GRE LF $1,659 $1,659 RESTROOM_CEILING Restroom Ceiling 1 7 GRE SF WALL Wall 1 GRE 6 1,158 39, ,635 SF $98,611 $98,611 Assessment Date: 7/20/2012 Page 12 of 14

13 ROOM $506,583 SITE CIVIL/DRAINAGE Catch Basin Site Manhole 1 7 GRE 7 2 GRE EA 6 EA FENCING Chain Link Iron and Concrete Post LANDSCAPE 1 GRE GRE 6 1, LF $9,036 1,089 LF $30,834 $39,870 Asphalt Play Area/Hardscape Benches Hardscape - Concrete Parkway trees Trash Receptacles 1 YEL 4 46,942 GRE 6 2 GRE 6 6,940 7 GRE ,942 SF $402,762 2 EA $472 6,940 SF $13, EA $416,334 PARKING LOT Asphalt PLAYGROUND Playground Equipment - School Age GRE 6 21,760 1 GRE ,760 SF $18,670 $18,670 3 EA Assessment Date: 7/20/2012 Page 13 of 14

14 Playground Surfacing - Square Rubber Mats SIDEWALKS YEL 4 4,705 4,705 SF $104,286 $104,286 Perimeter Sidewalks SIGNAGE 1 GRE 6 1, ,220 SF $2,303 $2,303 Flag Pole Marquee - Free Standing Back Lighted SITE Campus Need ² ³ 1 7 $581,463 $6,631,385 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 7/20/2012 Page 14 of 14

Charles H Wacker Elementary School

Charles H Wacker Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Louis A Agassiz Elementary School

Louis A Agassiz Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Velma F Thomas Early Childhood Center

Velma F Thomas Early Childhood Center Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Amos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621

Amos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621 2 S Morgan St Chicago, IL 21 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Stephen Decatur Classical Elementary School 7030 N Sacramento Ave Chicago, IL 60645

Stephen Decatur Classical Elementary School 7030 N Sacramento Ave Chicago, IL 60645 030 Sacramento Ave Chicago, IL 04 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Charles H Wacker Elementary School 9746 S Morgan St Chicago, IL 60643

Charles H Wacker Elementary School 9746 S Morgan St Chicago, IL 60643 9 S Morgan St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Perkins Bass Elementary School 1140 W 66th St Chicago, IL 60621

Perkins Bass Elementary School 1140 W 66th St Chicago, IL 60621 0 W th St Chicago, IL 02 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Harold Washington Elementary School 9130 S University Ave Chicago, IL 60619

Harold Washington Elementary School 9130 S University Ave Chicago, IL 60619 930 S University Ave Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This

More information

Inter-American Elementary Magnet School 851 W Waveland Ave Chicago, IL 60613

Inter-American Elementary Magnet School 851 W Waveland Ave Chicago, IL 60613 8 W Waveland Ave Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

James E McDade Elementary Classical School 8801 S Indiana Ave Chicago, IL 60619

James E McDade Elementary Classical School 8801 S Indiana Ave Chicago, IL 60619 880 S Indiana Ave Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619 E 8th St Chicago, IL 19 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Henry R Clissold Elementary School 2350 W 110th Pl Chicago, IL 60643

Henry R Clissold Elementary School 2350 W 110th Pl Chicago, IL 60643 30 W 0th Pl Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Walter Q Gresham Elementary School

Walter Q Gresham Elementary School Facility Assessment Detail This report contains the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Donald Morrill Math & Science Elementary School 6011 S Rockwell St Chicago, IL 60629

Donald Morrill Math & Science Elementary School 6011 S Rockwell St Chicago, IL 60629 0 S Rockwell St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

Minnie Mars Jamieson Elementary School 5650 N Mozart St Chicago, IL 60659

Minnie Mars Jamieson Elementary School 5650 N Mozart St Chicago, IL 60659 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

Walter S Christopher Elementary School 5042 S Artesian Ave Chicago, IL 60632

Walter S Christopher Elementary School 5042 S Artesian Ave Chicago, IL 60632 42 S Artesian Ave Chicago, IL 2 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

John D Shoop Math-Science Technical Academy ES S Bishop St Chicago, IL 60643

John D Shoop Math-Science Technical Academy ES S Bishop St Chicago, IL 60643 S Bishop St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

George Armstrong International Studies ES 2110 W Greenleaf Ave Chicago, IL 60645

George Armstrong International Studies ES 2110 W Greenleaf Ave Chicago, IL 60645 W Greenleaf Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Jane Addams Elementary School S Avenue H Chicago, IL 60617

Jane Addams Elementary School S Avenue H Chicago, IL 60617 00 S Avenue H Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630 Linder Ave Chicago, IL 030 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Edgar Allan Poe Elementary Classical School S Langley Ave Chicago, IL 60628

Edgar Allan Poe Elementary Classical School S Langley Ave Chicago, IL 60628 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

Thomas J Higgins Elementary Community Academy S Morgan St Chicago, IL 60643

Thomas J Higgins Elementary Community Academy S Morgan St Chicago, IL 60643 Facility Assessment Report Thomas J Higgins Elementary Community Academy This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors

More information

Eugene Field Elementary School 7019 N Ashland Ave Chicago, IL 60626

Eugene Field Elementary School 7019 N Ashland Ave Chicago, IL 60626 79 Ashland Ave Chicago, IL 6626 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each

More information

Ole A Thorp Elementary Scholastic Academy 6024 W Warwick Ave Chicago, IL 60634

Ole A Thorp Elementary Scholastic Academy 6024 W Warwick Ave Chicago, IL 60634 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630 544 Linder Ave Chicago, IL 60630 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate

More information

Horace Greeley Elementary School 832 W Sheridan Rd Chicago, IL 60613

Horace Greeley Elementary School 832 W Sheridan Rd Chicago, IL 60613 832 W Sheridan Rd Chicago, IL 3 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each

More information

Paul Laurence Dunbar Career Academy High School 3000 S King Dr Chicago, IL 60616

Paul Laurence Dunbar Career Academy High School 3000 S King Dr Chicago, IL 60616 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 2.0 2.0 0.30 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 1.0 3.0 0.22 Four fewer stalls

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls

More information

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2 School and Site Level Deficiencies Site K Play Area Requires Impact Resistant Material 1320 1 Ea. 2 Exterior Basketball Goals Are Damaged And Require Replacement 1322 1 Ea. 4 Bus drop-off area does not

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

Facilities Feasibility Study Frederick Douglass HS Condition Assessment Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies

More information

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment Summary of Findings The Laurence G. Paquin Building Facility located at 2200 SINCLAIR LANE in Baltimore, Maryland, was built in 1975. It comprises 65,666 gross square feet. The total current deficiencies

More information

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3 School and Site Level Deficiencies Site Concrete Walks Are Damaged And Require Replacement 5539 4,000 SF 3 Bus drop-off area does not have a canopy. 14005 250 LF 5 Paved Play Requires Recoating And Resurfacing

More information

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Hillcrest PS (Barrie), 9205 5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1951 3,813 Page 1 of 25 1. Architectural / Structural & Site Exec Summary Hillcrest Public School is a two storey structure of masonry

More information

POWELL ELEMENTARY SCHOOL

POWELL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1925 BUILDING AREA 38,500 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 319 WARD 4 PROPOSED PROGRAM CAPACITY 325 Site Plan POWELL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-3

More information

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California PROGRAM COST MODEL for PEER Tall Buildings Study Concrete Structural Option Los Angeles, California March 8, 2010 PEER Tall Buildings Study Concrete Structural Option March 8, 2010 CONTENTS Page Nos. Overall

More information

COOLIDGE SENIOR HIGH SCHOOL

COOLIDGE SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1940 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1240 ENROLLMENT 2008 652 WARD 4 PROPOSED PROGRAM CAPACITY 1100 Site Plan COOLIDGE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment Summary of Findings The Matthew A. Henson ES Facility located at 1600 N. Payson Street in Baltimore, Maryland, was built in 1964. It comprises 75,228 gross square feet. The total current deficiencies for

More information

GFW Schools Task Force Meeting 1/23/19 R.A. MORTON & ASSOCIATES GLT ARCHITECTS 1

GFW Schools Task Force Meeting 1/23/19 R.A. MORTON & ASSOCIATES GLT ARCHITECTS 1 GFW Schools Task Force Meeting 1/23/19 1 AGENDA 1. Introductions 2. Review of building tours Primary Needs 3. Review Space Programs 4. Review Concept Options District and Facility needs 5. Review Concept

More information

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017 Chenango Bridge Elementary School Phase 1 Asphalt Pavement Reconstruction Reconstruct asphalt parking located on west side of building including access drive. Sidewalk Replacement Replace cracked sections

More information

RAYMOND EDUCATION CAMPUS

RAYMOND EDUCATION CAMPUS INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

Timberglen Recreation Center Summary

Timberglen Recreation Center Summary Timberglen Recreation Center Summary Address Building Purpose 3810 Timberglen Road Dallas, TX 75287 Recreation Center Original Year of Construction 2003 Building Area 15,000 SF Inspection Date August 2,

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

NALLE ELEMENTARY SCHOOL

NALLE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1950 BUILDING AREA 83,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 372 WARD 7 PROPOSED PROGRAM CAPACITY 400 Site Plan NALLE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Lake Highlands North Recreation Center Summary

Lake Highlands North Recreation Center Summary Lake Highlands North Recreation Center Summary Address Building Purpose 9940 White Rock Trail Dallas, TX 75238 Recreation Center Original Year of Construction 1971 Building Area 33,036 SF Inspection Date

More information

Hinsdale Township High School District 86 Referendum Project Listing April 2, Approved

Hinsdale Township High School District 86 Referendum Project Listing April 2, Approved Hinsdale Township High School District 86 Referendum Project Listing April 2, 2019 - Approved 1-12-2019 Project Category and Description Central South Total Security Replace Intercom System Install a completely

More information

SEATON ELEMENTARY SCHOOL

SEATON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1969 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 428 ENROLLMENT 2008 280 WARD 2 PROPOSED PROGRAM CAPACITY 325 Site Plan SEATON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

BALLOU SENIOR HIGH SCHOOL

BALLOU SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1960 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1565 ENROLLMENT 2008 9-12 (1,252) STAY (753) WARD 8 PROPOSED PROGRAM CAPACITY 1200 Site Plan BALLOU - 1 PROPOSED PROGRAM PROFILE

More information

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Warnica PS, 9283

Simcoe County District School Board. 5yr Condition Assessment 2006/07 to 2010/11. Warnica PS, 9283 5yr Condition Assessment 2006/07 to 2010/11 Construction Year Area 1964 3,035 Page 1 of 27 1. Architectural / Structural & Site Exec Summary Warnica Public School is a one storey structure of masonry construction

More information

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012 Existing Site Aerial Building Developmental History 1981 1966 1939 1977 1978 1955 1966 Exterior Roof: Most of existing roof has multi ply built up roofing. Some areas have gravel ballast, others have cap

More information

PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016

PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 WORK LEGEND OVERALL WORK TO BOTH BUILDINGS 1 2 3 4 Existing corridors will receive new

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

Delco Activity Center Site Summary

Delco Activity Center Site Summary 1 Site Summary Address 4601 Pecan Brook Austin, TX 78724 Number of Permanent Campus Facilities 1 Original Year of Construction 2003 Total Campus Building Area (combined) 60,294 SF Introduction The is located

More information

Alabama Home Inspections

Alabama Home Inspections Cover Page Property Inspection Report 1000 Sample Dr., Sampletown USA Inspection prepared for: Report Sample Inspection Date: 1/21/2010 Time: 400pm Size: Approx. 2,200sf Weather: Cloudy 62 Inspector: Bobby

More information

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School

HERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School HERITAGE MIDDLE SCHOOL Overview: The is located at 20 Foxcroft Drive and consists of a three-story building with Three-Story Classroom and Multi-Purpose Room Additions completed in 2002. The building has

More information

SHEPHERD ELEMENTARY SCHOOL

SHEPHERD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1932 BUILDING AREA 79,700 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 355 WARD 4 PROPOSED PROGRAM CAPACITY 400 Site Plan SHEPHERD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Reilly Elementary School Site Summary

Reilly Elementary School Site Summary 1 Reilly Elementary School Site Summary Address 405 Denson Drive Austin, TX 78752 Number of Permanent Campus Facilities 1 Original Year of Construction 1954 Total Campus Building Area (combined) 41,622

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

Mills Elementary School Site Summary

Mills Elementary School Site Summary 1 Mills Elementary School Site Summary Address 6201 Davis Lane Austin, TX 78749 Number of Permanent Campus Facilities 1 Original Year of Construction 1998 Total Campus Building Area (combined) 81,368 SF

More information

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 65 - BROOKLYN, 158 RICHMOND STREET, New York, 11208 Inspection Id Inspection Type Time In Last Edited Architectural - Senior 2018-05-15 11:22 AM 2018-06-12

More information

BARNARD ELEMENTARY SCHOOL

BARNARD ELEMENTARY SCHOOL INITIAL YEAR BUILT 2002 BUILDING AREA 67,000 SF CURRENT PROGRAM CAPACITY 520 ENROLLMENT 2008 329 WARD 4 PROPOSED PROGRAM CAPACITY 450 Site Plan BARNARD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades $300,000 C. Tilden Entrance Upgrades $50,000 D. Door and Glass Improvements $500,000 E. Alert Systems $800,000

More information

Analysis 4: Building Reuse

Analysis 4: Building Reuse Analysis 4: Building Reuse Introduction The existing was built in 1954 and has clearly outlived its original construction. Current codes and program requirements are no longer met and it was clear that

More information

KEY ELEMENTARY SCHOOL

KEY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1925 BUILDING AREA 52,000 SF CURRENT PROGRAM CAPACITY 320 ENROLLMENT 2008 328 WARD 3 PROPOSED PROGRAM CAPACITY 325 Site Plan KEY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements % 8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior

More information

Facility Improvements

Facility Improvements CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation

More information

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI BCA Report Porfolio Development Size Construction TCHC - All Op Units Scattered Units (CHU 20),005 Sq.Ft. 925 Floor Above Grade 2 Divisional Units Page of 43 Description This dwelling unit is a detached

More information

6 Holub Middle School Overall Site Plan Gymnasium Floor Plan Exterior Perspective Before Exterior Perspective - After

6 Holub Middle School Overall Site Plan Gymnasium Floor Plan Exterior Perspective Before Exterior Perspective - After Contents 1 Program Outline Gymnasium Restrooms Storage rooms IDF 2 Finish Outline Walls Flooring Ceiling Roof 3 MEP Outline Plumbing Mechanical Electrical 4 Communication and Security Guideline Communication

More information

HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014

HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014 HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014 1. Upgrade Video Security and Surveillance Systems - Replace with New a. Existing

More information

2016 BOND INFORMATION

2016 BOND INFORMATION 2016 BOND INFORMATION This publication is provided as a public service by the offices of Operations and Maintenance, Communications and Financial Services. www.svvsd.org @svvsd 395 South Pratt Parkway,

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S.372 ANNEX - K, 215 FIRST STREET, New York, 11215 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-03-06

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

NYC Department of Education

NYC Department of Education Asset: Building Assessment Survey 2017-2018 PRE-K CENTER @ 132-10 JAMAICA AVENUE - QUEENS, 132-10 JAMAICA AVENUE, New York, 11418 Inspection Id Inspection Type Time In Last Edited SA : Architectural -

More information

NYC Department of Education

NYC Department of Education NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 81 ANNEX (OLD 75) - QUEENS, 511 SENECA AVENUE, New York, 11385 Inspection Id Inspection Type Time In

More information

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School HILLSIDE ELEMENTARY SCHOOL Overview: The is located at 98 Belmont Drive and consists of a two-story building which has had a number of additions added to it over the years, the latest of which was a two-story

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 207 - QUEENS, 159-15 88 STREET, New York, 11414 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-03-23

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: SAINT FRANCIS COLLEGE - BROOKLYN, 180 REMSEN STREET, New York, 11201 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-02-05

More information

CODE COMPLIANCE PLAN REVIEW PROCEDURES

CODE COMPLIANCE PLAN REVIEW PROCEDURES CODE COMPLIANCE PLAN REVIEW PROCEDURES 1. All construction for state agencies on state-owned or state leased-purchased properties or facilities are to submit design documents for code compliance plan reviews

More information

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018 G2 Gordon + Gordon Architecture. LLC Dr. Edward Livingston Trudeau Building 118 Main Street, Saranac Lake, NY Building Systems Report June 24, 2018 Harry Gordon, FAIA 164 Otter Slide Road Saranac Lake

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Building Permit Application

Building Permit Application Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

BVSC BVSC. Midwest Technical Inspections Survey Worksheet. Account / Account Code: Insured: Policy #: Building Data - Section 1

BVSC BVSC. Midwest Technical Inspections Survey Worksheet. Account / Account Code: Insured: Policy #: Building Data - Section 1 Midwest Technical Inspections Survey Worksheet BVSC BVSC Account / Account Code: Agency: Insured: Policy #: Telephone: Alt. Phone: Building Data - Section 1 Building Name (Entire Valuation) Section Name

More information

March 2018 Progress. Work Completed, Week Ending 3/23/18:

March 2018 Progress. Work Completed, Week Ending 3/23/18: March 2018 Progress Work Completed, Week Ending 3/23/18: Continued draft curtains and liner panels. Continued running power to hangar doors. Continued installation of bath accessories in the gang bathrooms.

More information

GARFIELD ELEMENTARY SCHOOL

GARFIELD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1910 BUILDING AREA 58,908 SF CURRENT PROGRAM CAPACITY 446 ENROLLMENT 2008 278 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan GARFIELD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements SECTION A CM INSTRUCTIONS TO BIDDERS SECTION B BID CATEGORY DESCRIPTIONS & BID FORMS BC-07: Building HVAC and Plumbing BC-08: Building Electric BC-09: General Trades BC-10: Masonry BC-11: Precast Structural

More information

Harry Stone Recreation Center Summary

Harry Stone Recreation Center Summary Harry Stone Recreation Center Summary Address Building Purpose 2400 Millmar Drive Dallas, TX 75228 Recreation Center Original Year of Construction 1957 (Expansion 2013) Building Area 22,281 SF Inspection

More information

STUART-HOBSON MIDDLE SCHOOL

STUART-HOBSON MIDDLE SCHOOL INITIAL YEAR BUILT 1927 BUILDING AREA 105,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 399 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan STUART-HOBSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

General Building Information

General Building Information Software Module s Description Page 1 General Building Information BUILDING AREA AND HEIGHT - This module designed to determine the height and area of buildings on the basis of occupancy group classification

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 39 - BROOKLYN, 417 6TH AVENUE, New York, 11215 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-03-12

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Asset: Building Assessment Survey 2017-2018 NYC SCHOOL CONSTR. AUTHORITY - QUEENS, 30-30 THOMSON AVE, New York, 11101 Inspection Id Inspection Type Time In Last Edited SA : Architectural

More information

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 98 - QUEENS, 40-20 235 STREET, New York, 11363 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-01-02

More information

Deferred Maintenance Plan

Deferred Maintenance Plan Deferred Maintenance Plan 2012-2015 1/5/2012 1 Table of Contents Title Page Introduction 3 Wallace Hall Deferred Maintenance 4 Wallace Hall Building Assessment 6 Wilson Hall Deferred Maintenance 7 Wilson

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: MIDWOOD HS ADDITION - BROOKLYN, 2886 BEDFORD AVENUE, New York, 11210 Inspection Id Inspection Type Time In Last Edited SA : Architectural

More information