APPENDIX D STORMWATER MANAGEMENT POND SIZING CALCULATIONS

Size: px
Start display at page:

Download "APPENDIX D STORMWATER MANAGEMENT POND SIZING CALCULATIONS"

Transcription

1 APPENDIX D STORMWATER MANAGEMENT POND SIZING CALCULATIONS

2

3 PERMANENT POOL AND EXTENDED DETENTION SIZING Ontario Limited NW Paris Project Number: 1505 Date: September 2014 Designer: M.M.L.B. PERMANENT POOL Level of Protection = 1 (Enhanced) Weighted Impervious = 58 % Drainage Area = ha SWMP Type = 4. Wet Pond Required Permanent Pool (including 40m /ha for extended detention)= Required Permanent Pool (minus 40m /ha for extended detention)= 197 m /ha 157 m /ha Required Permanent Pool = 21 m Protection Level Enhanced (Level 1) Normal (Level 2) Basic (Level ) TABLE.2 - WATER QUALITY STORAGE REQUIREMENTS (FROM MOE SWM PLANNING AND DESIGN MANUAL - 200) SWMP Type Storage Volume (m /s) for Impervious Level 5% 55% 70% 85% 1. Infiltration Wetlands Hybrid Wet Pond/Wetland Wet Pond Infiltration Wetlands Hybrid Wet Pond/Wetland Wet Pond Infiltration Wetlands Hybrid Wet Pond/Wetland Wet Pond Dry Pond (ContinuousFlow) EXTENDED DETENTION Using the 25mm - 4 hour Chicago Storm Erosion Control Volume (V) = Runoff Depth (mm) x Drainage Area (ha) x 10 (m ) / (mm)(ha) Erosion Control Volume (V) = 1.97 mm x ha x 10 m / mm ha Erosion Control Volume (V) = 2064 m Using 40m /ha Extended Detention Volume (V) = Extended Detention Volume (V) = 40m /ha x Drainage Area (ha) 40 m /ha x ha Extended Detention Volume (V) = 591 m Governing Volume (V) = 2064 m Peak Flowrate (Q p ) = Extended Detention Volume (m ) / Detention Time (hr) x 1 (hr) / 600 (s) x 1.5 (peaking factor) Peak Flowrate (Q p ) = 2064 m / 24 hr x 1 (hr) / 600 (s) x 1.5 (peaking factor) Peak Flowrate (Q p ) = 0.06 m /s P:\1505 Nischal Paris\Design\SWM\FSP\Design Calculations\SWM Pond Design\HDR-Ext Det & Stage Storage.xls

4

5 Outlet Design Ontario Limited NW Paris Project Number: 1505 Date: September 2014 Designer: M.M.L.B. Normal Water Level (m) = Elevation Increment (m) = Ext. Det. Upstream Orifice Weir 1 Stage Total Storage Detention Elevation Outflow Outflow Flow Time (m) (cms) (cms) (m) (cms) (m ) (hrs) P:\1505 Nischal Paris\Design\SWM\FSP\Design Calculations\SWM Pond Design\1505-HDR-Multiple outlet design - stage storage discharge-etck.xls

6 Outlet Design Ontario Limited NW Paris Project Number: 1505 Date: September 2014 Designer: M.M.L.B. Normal Water Level (m) = Elevation Increment (m) = Ext. Det. Upstream Orifice Weir 1 Stage Total Storage Detention Elevation Outflow Outflow Flow Time (m) (cms) (cms) (m) (cms) (m ) (hrs) Ext. Det P:\1505 Nischal Paris\Design\SWM\FSP\Design Calculations\SWM Pond Design\1505-HDR-Multiple outlet design - stage storage discharge-etck.xls

7 Outlet Design Ontario Limited NW Paris Project Number: 1505 Date: September 2014 Designer: M.M.L.B. Normal Water Level (m) = Elevation Increment (m) = Ext. Det. Upstream Orifice Weir 1 Stage Total Storage Detention Elevation Outflow Outflow Flow Time (m) (cms) (cms) (m) (cms) (m ) (hrs) yr yr P:\1505 Nischal Paris\Design\SWM\FSP\Design Calculations\SWM Pond Design\1505-HDR-Multiple outlet design - stage storage discharge-etck.xls

8 Outlet Design Ontario Limited NW Paris Project Number: 1505 Date: September 2014 Designer: M.M.L.B. Normal Water Level (m) = Elevation Increment (m) = Ext. Det. Upstream Orifice Weir 1 Stage Total Storage Detention Elevation Outflow Outflow Flow Time (m) (cms) (cms) (m) (cms) (m ) (hrs) yr yr yr P:\1505 Nischal Paris\Design\SWM\FSP\Design Calculations\SWM Pond Design\1505-HDR-Multiple outlet design - stage storage discharge-etck.xls

9 Outlet Design Ontario Limited NW Paris Project Number: 1505 Date: September 2014 Designer: M.M.L.B. Normal Water Level (m) = Elevation Increment (m) = Ext. Det. Upstream Orifice Weir 1 Stage Total Storage Detention Elevation Outflow Outflow Flow Time (m) (cms) (cms) (m) (cms) (m ) (hrs) yr P:\1505 Nischal Paris\Design\SWM\FSP\Design Calculations\SWM Pond Design\1505-HDR-Multiple outlet design - stage storage discharge-etck.xls

10 APPENDIX E PRELIMINARY GEOTECHNICAL REPORT

11 REPORT ON PRELIMINARY GEOTECHNICAL INVESTIGATION PROPOSED RESIDENTIAL SUBDIVISION DEVELOPMENT PARTS OF LOTS 2 AND, CONCEION 2 TOWN OF PARIS, COUNTY OF BRANT, ONTARIO Prepared For: Ontario Limited SPL Project No: Report Date: August 1, 2014 SPL CONSULTANTS ED 51 STEELCASE RD WEST, UNIT 10-12, MARKHAM, ON LR 4H9 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

12 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario Table of Contents 1. INTRODUCTION FIELD AND LABORATORY WORK SITE AND SUBSURFACE CONDITIONS Soil and Groundwater Conditions....2 Groundwater Conditions PRELIMINARY GEOTECHNICAL DISCUION AND RECOMMENDATIONS General Comments Slope Stability Study Preliminary Geotechnical Input for Proposed SWM Pond (in the Vicinity of BH14-08) CLOSURE Drawings, Enclosures and Figures BOREHOLE LOCATION PLAN 1 EXPLANATION OF TERMS USED IN THE RECORD OF BOREHOLES 2A NOTES ON SAMPLE DESCRIPTIONS 2B BOREHOLE LOGS - 1 PARTICLE SIZE DISTRIBUTION REPORT TYPICAL PROFILE OF CRO SECTION A-A 19 GLOBAL STATIC STABILITY ANALYSES FOR CROING SECTION A-A 20 i APPENDIX A: PHOTOGRAPHS 1-6 APPENDIX B: GENERAL REQUIREMENTS FOR ENGINEERED FILL 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

13 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario 1. INTRODUCTION SPL Consultants Limited (SPL) was retained by Ontario Limited to undertake a preliminary geotechnical investigation for the proposed residential subdivision development located at parts of Lots 2 and, Concession 2, Town of Paris, Ontario. The site is known as the Nischal Property and is currently used as farmland. The site (approximately 44.5 ha.) will be developed as a residential subdivision consisting of housing units, roads, watermains, sewers and a Storm Water Management (SWM) pond. The purpose of this preliminary geotechnical investigation was to obtain information about the subsurface conditions by means of a limited number of boreholes and based on the findings provide preliminary recommendations pertaining to the geotechnical design of underground utilities, subdivision roads and SWM pond as well as to comment on house foundations and slope stability. This report is provided on the basis of the terms of reference presented in SPL s Proposal No. P dated April 14, 2014 and on the assumption that the design will be in accordance with the applicable codes and standards. If there are any changes in the design features relevant to the geotechnical analyses, or if any questions arise concerning the geotechnical aspects of the codes and standards, this office should be contacted to review the design. It then may be necessary to carry out additional borings and reporting before the recommendations of this office can be relied upon. The site investigation and recommendations follow generally accepted practice for geotechnical consultants in Ontario. This report has been prepared for Ontario Limited and its designers to assist them in the preliminary design and planning of the proposed residential development of the site as described in the report. Third party use of this report without SPL s consent is prohibited. The limitation conditions presented in this report form an integral part of the report and they must be considered in conjunction with this report. 2. FIELD AND LABORATORY WORK The field work for the preliminary geotechnical investigation was carried out on May 22 and 2, 2014, during which time eleven (11) boreholes (BH14-01 to BH14-11) were advanced to depths ranging from 5.0 m to 8.1 m below the existing ground surface at the approximate locations shown on Borehole Location Plan, Drawing 1. Boreholes BH14-01 to BH14-07 and BH14-09 to BH14-11 were drilled in the areas where the proposed subdivision will be developed; Borehole BH14-08 was advanced at the proposed SWM pond area. 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

14 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario The boreholes were advanced using a track mounted drilling rig supplied and operated by a drilling subcontractor under the direction and full time supervision of SPL personnel. Samples were retrieved at regular intervals of borehole depth with a 50 mm O.D. split-barrel sampler driven with a hammer weighing 624 N and dropping 760 mm in accordance with the Standard Penetration Test (SPT) ASTM D 1586 method. The number of blows required to drive the sampler 00 mm into the ground after an initial penetration of 150 mm is recorded as the SPT N value. The N value, in turn, provides an indirect measure of the compactness condition of cohesionless, granular soils, or the consistency of cohesive soils. The samples were visually described and logged in the field and brought to SPL s laboratory for detailed examination by the project engineer and for laboratory testing. In addition to the visual examination in the laboratory, all soil samples were tested for water contents. Five (5) selected soil samples retrieved from the 50 mm O.D. sampler were subjected to grain size analysis the results of which are presented on Figures 14 to 18. Water level observations were made in the boreholes during drilling and upon the completion of drilling operations. To monitor groundwater levels, seven (7) 19 mm diameter piezometers were installed in Boreholes BH14-01 to BH14-0, BH14-05, BH14-06, BH14-09 and BH14-10 and one (1) 50 mm diameter monitoring well was installed in Borehole BH Water levels in these piezometers/monitoring well were measured on June 4, The borehole locations were staked in the field by SPL. The corresponding ground surface elevations and coordinates of the boreholes were obtained from the Global Positioning System (GPS). Since the elevations and coordinates were not surveyed by a professional surveyor, they should be considered to be approximate. It is understood that the ground surface elevations are referenced to the geodetic datum.. SITE AND SUBSURFACE CONDITIONS The subject site is located south of Watts Pond Road and east of Oak Avenue, approximately 0.16 km west of the intersection of Woodslee Avenue and Oak Avenue, in Town of Paris, County of Brant, Ontario. The site is bounded by farm lands to the west and east, by the existing residential houses to the southeast, by the existing wetland to the southwest and north, as shown on the Borehole Location Plan, Drawing 1. The site consists of an irregular-shaped parcel of farmland. A farmhouse and its associated facilities were present in the northeast corner of the site. At the time of the field investigation, the site was covered with crops. The terrain at the borehole locations is gently rolling with ground surface varying from Elev m to Elev m. The existing ground surface elevations of the site generally blend into the surrounding lands except some areas where the ground generally slopes. 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

15 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario Explanation of the terms used in the record of boreholes and notes on sample descriptions are presented on Drawings 2A and 2B. The subsurface conditions at the boreholes are presented in the individual borehole logs (Enclosures Nos. to 1 inclusive). The following is a summarized account of the subsurface conditions encountered in the boreholes, followed by more detailed descriptions of the major soil strata and the groundwater conditions..1 Soil and Groundwater Conditions Underlying 90 mm to 210 mm topsoil, a shallow layer of reworked soils consisting of clayey silt or occasional silty sand were encountered to depths ranging from 0.7 m to 1.4 m below the existing ground surface in the majority of the boreholes except for Boreholes BH14-1 to BH14-. The native soils encountered below topsoil and/or reworked soil generally consisted of fine to medium sand and sand and gravel. On June 4, 2014, twelve (12) days after drilling, groundwater levels measured in the piezometers/monitoring well installed in the boreholes ranged from 2.2 m to 5.7 m below the existing ground surface. However, the piezometer installed in Borehole BH14-6 was dry at a depth about 4.5 m below the existing ground surface. Topsoil Topsoil with thicknesses ranging from 90 mm to 210 mm was encountered in all boreholes. The thickness of the topsoil in each borehole is shown in the individual borehole log. It should be noted that the thickness of the topsoil may not be representative for the site and should not be relied on to calculate the amount of topsoil at the site. Reworked Soils Reworked soils were encountered in Boreholes BH14-04 to BH14-11 and extended to depths ranging from 0.7 m to 1.4 m below the existing ground surface. Reworked soils consisted mainly of clayey silt and occasional silty sand. SPT carried out within the cohesive clayey soils gave N values ranging from 2 to 9 blows per 00 mm penetration, indicating a very soft to stiff consistency. The cohesionless silty sand soil was found in a very loose compactness condition with a measured SPT N value of 2 blows. The in-situ water content of the soil samples ranged from approximately 5 to 19 %. The result of one (1) grain size analysis of a sample retrieved from the 50 mm O.D. sampler is shown on the borehole log and on Figure 18. They are also summarized on the following table: Grain Size Distribution BH No. Sample No. % Gravel %Sand %Silt %Clay BH Steelcase Rd, Unit Markham, ON Tel: Fax:

16 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario Sand and Gravel Sand and gravel deposit was encountered in all boreholes with the exception of Borehole BH14-10 and extended to depths ranging from 5 m to 8.1 m below the existing ground surface. All boreholes with the exception of Borehole BH14-10 were terminated in the sand and gravel deposit. SPT N values ranging from 7 to greater than 100 blows indicated a loose to very dense compactness conditions but typically in dense compactness condition with the average SPT N value of 5. The natural water content of the samples ranged from about 2 to 11 %. The results of two (2) grain size analyses of the soil samples retrieved from the 50 mm O.D. sampler are shown on the borehole logs and on Figures 15 and 17. They are also summarized on the following table: Grain Size Distribution BH No. Sample No. % Gravel %Sand %Silt %Clay BH BH Fine to Medium Sand Fine to medium sand deposit was encountered in all boreholes with the exception of Boreholes BH14-02 to BH14-04 and extended to depths ranging from 2.1 m to 6.6 m below the existing ground surface. The sand deposit was fully penetrated in the boreholes and its inferred thickness ranged from about 1.4 m to 4.1 m. SPT N values ranging from 7 to 2 blows indicated a loose to compact compactness condition. The natural water content of the samples ranged from about 2 to 18 %. The results of two (2) grain size analyses of the soil samples retrieved from the 50 mm O.D. sampler are shown on the borehole logs and on Figures 14 and 16. They are also summarized on the following table: BH No. Sample No. Grain Size Distribution % Gravel %Sand %Silt %Clay BH BH Sandy Silt/Silt Localized sandy silt/silt was encountered at various depths in Boreholes BH14-07 and BH The silt was found between sand and sand and gravel deposits in BH14-07 with a thickness of about 0.1 m. The sandy silt was encountered below the sand deposit and extended to the borehole terminal depth of 5 m 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

17 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario below the existing ground surface. SPT N values of 12 and 17 indicated a compact compactness condition. The natural water content of the samples was about 21 and 22 %..2 Groundwater Conditions During drilling, groundwater was encountered in all boreholes with the exception of Boreholes BH14-06 and BH14-11 at depths ranging from 2. m to 6.4 m below the existing ground surface. Seven (7) 19 mm diameter piezometers and one (1) 50 mm diameter monitoring well were installed to permit the monitoring of the groundwater table. Details of the installation of these piezometers and monitoring well are presented in the borehole logs. The groundwater depths/elevations measured in the piezometers and monitoring well on June 4, 2014 are shown on the following table. BH No. Date of observation Groundwater Depths/Elevations Measured in Piezometers Depth of Groundwater below Grade (m) Elevation of Groundwater (m) BH14-01 June 4, mm diameter piezometer BH14-02 June 4, mm diameter piezometer BH14-0 June 4, mm diameter piezometer BH14-05 June 4, mm diameter piezometer BH14-06 June 4, 2014 Dry - 19 mm diameter piezometer BH14-08 June 4, mm diameter monitoring well BH14-09 June 4, mm diameter piezometer BH14-10 June 4, mm diameter piezometer Note It should be noted that the groundwater levels can vary and are subject to seasonal fluctuations in response to weather events. 4. PRELIMINARY GEOTECHNICAL DISCUION AND RECOMMENDATIONS 4.1 General Comments This section of the report presents preliminary geotechnical recommendations for the preliminary design and planning of the proposed subdivision development. The recommendations included in this section are intended to provide the designer with the preliminary information required to complete the preliminary design of the various components of the project and are considered not sufficient for the 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

18 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario detailed design of the proposed subdivision. A detailed geotechnical investigation should be carried out once detailed subdivision design information is available. It is understood that the subject site is proposed to be a residential subdivision development. The site will be serviced by a network of roads and municipal services. The following preliminary geotechnical information is provided for the planning and preliminary design of residential houses, underground services and paved roads at the site: Reworked soils were encountered below topsoil in Boreholes BH14-4 to Bh14-11 and extended to depths ranging from 0.7 m to 1.4 m below the existing ground surface at the site. The reworked soils are considered unsuitable for supporting the residential houses (with or without basement) and any other settlement sensitive structures. Based on the preliminary grading plan provided by SCS Consulting Group Ltd. via an dated July 0, 2014 (Preliminary Grading Plan, Project No. 1505, Figure No. 5.1). It is understood that cut and fill operations would be required to establish appropriate subgrade levels throughout the site. In the areas where earth fill is required for site grading purposes, engineered fill may be utilized to support house foundations, roads, utilities, etc. Prior to the placement of the engineered fill, the existing construction debris, all of the topsoil, existing fill materials and surficially softened native soils must be removed and the exposed surface proof rolled. Any soft spots revealed during proof rolling must be sub-excavated and reengineered. The fill materials must be subexcavated and completely removed prior to the engineered fill placement. Materials for reuse as engineered fill must be approved by a geotechnical engineer from SPL prior to placement. Excavated native soils and the existing fills are considered to be suitable for reuse provided they are free of organics and debris. However, in consideration of the poorly graded nature of the native materials and the anticipated cobbles and boulders, some difficulties should be anticipated in using these soils for compaction. These materials will likely require some adjustments in their water content (wetting or drying) prior to engineered fill placement and compaction. It should be noted that the cobbles and boulders are not considered suitable for reuse as engineered fill materials. The approved materials for engineered fill should be placed in maximum 00 mm loose lifts and be uniformly compacted to 98 percent of standard Proctor Maximum Dry Density (SPMDD) throughout. The placement of engineered fill must be monitored by qualified geotechnical personnel on a full-time basis. The top surface of the engineered fill should be protected as necessary from construction traffic, and should be sloped to provide positive drainage for surface water during the construction period. The upper surface of the engineered fill should extend to at least 2 m outside of the outer edge of the exterior building foundation envelope (in all directions), and should be temporarily sloped (i.e. during construction period), if required, down and away at an inclination no steeper than 1 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

19 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario horizontal to 1 vertical (1H:1V). The guidelines related to typical engineered fill construction are included in Appendix B. The native subsoils at the site are considered to be suitable for supporting conventional residential houses (with or without basements). A preliminary allowable bearing pressure of 100 kpa may be assumed for conventional shallow spread and/or strip footings bearing in the native, undisturbed competent subsoils. Footings founded on approved engineered fill, if utilized at the site, may be designed using a preliminary allowable bearing pressure in the range of 100 to 150 kpa. The type of foundation drainage system required (perimeter drains and/or underslab drains; damp-proofing or water-proofing) depends upon founding elevations, soil types in the area and actual stabilized groundwater levels. It is suggested that the basement floor elevations should be set above the water table. Underfloor drains and upgraded level of water-proofing would be necessary in areas of the site where basements are proposed to be located close to or below the groundwater table. In any event, the type of foundation drainage should be confirmed by the geotechnical engineer once the site grading plans are available, as part of the final design process. All exterior footings and footings in unheated areas should be protected with a minimum of 1.2 m of earth cover for frost protection. Based on the design information provided by SCS via an dated June 12, 2014, it is anticipated that the sewer and watermain installations will require excavations between about 2 m and 5 m below the finish grade at which depth they will be generally below or near the ground water table. Groundwater control during excavation above the water table can be handled, as required, by pumping from properly constructed and filtered sumps located within the excavations. Perched groundwater may be expected in the reworked soils and native cohesionless soils above the groundwater tables at various depths. Where the proposed service pipes are laid below the prevailing groundwater levels in the cohesionless sand/sand and gravel deposits, significant groundwater seepage should be expected. Depending upon the thickness and extent of these soils, the prevailing groundwater level at the time of construction and the pipe invert levels, some form of positive groundwater control such as deep wells, well-points, or eductors, in addition to pumping from sumps, would be required to lower the groundwater table to at least 1 m below the base of the excavation to maintain the stability of the base and side slopes of the trench excavations in these areas. In this regard, further investigation of the native soil types and stabilized groundwater levels should be carried out as part of the followup, site specific detailed geotechnical investigation at the site. The need for and type of groundwater control measures can then be reviewed by the geotechnical engineer as part of the final design process. It should be noted that groundwater control measures that extract more than 50,000 L/day of water are subject to a Permit to Take Water (PTTW), as regulated by the MOE. A hydrogeological study is recommended for this project. 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

20 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario It is anticipated that the trench excavations will consist of conventional temporary open cuts with side slopes not steeper than 1H:1V. However, some local flattening of the slopes may be required, especially in loose/soft zones (i.e. in reworked soils or wet cohesionless deposits) or where localized seepage is encountered. Care should be taken to direct surface runoff away from the open excavations and all excavations should be carried out in accordance with the Occupational Health and Safety Act and Regulations for Construction Projects. According to the Act, the existing reworked soils, native sand/sand and gravel would be classified as Type soils above the groundwater tables; the native sand/sand and gravel below groundwater level would be classified as Type 4 soils. It should be noted that cobbles and boulders would be encountered throughout the site. The excavated materials at suitable water contents may be reused as trench backfill provided they are free of topsoil, organics or other deleterious materials. The cobbles and boulders are not considered suitable for reuse as backfill materials. Complete removal of the existing residential septic systems, wells, old foundations, etc. would likely be required as part of the site redevelopment. Based on the subsurface conditions encountered at the site and in accordance with the County of Brant s standards and the assumed traffic usage for residential local streets, the following pavement designs are recommended for the subdivision streets: MATERIAL THICKNE OF PAVEMENT ELEMENTS (MM) LOCAL COLLECTOR Asphaltic Material (OP 1150) Granular Material (OP 1010) HL Surface Course HL 4 Binder Course mm Crusher Run Limestone Base 50 mm Crusher Run Limestone Type II Subbase Prepared and Approved Subgrade 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

21 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario 4.2 Slope Stability Study Slope Conditions and Profiles A site reconnaissance was carried out on June 4, The following section provides a summary of observations related to the slopes at the site: Based on the site measurements and observations made during the site reconnaissance and the topographic drawing provided by SCS, the inclinations of the existing slopes at the site are generally flatter than 5.0 horizontal to 1 vertical (5H: 1V) and the slope heights are generally less than 4 m. The majority of the slopes are currently used as farm land as shown on Photograph 1, Appendix A; one slope at the northeast corner of site is currently covered by grass and scattered mature trees, as shown on Photographs 2 to 4. Surficial erosion was not noted on the slope surface. Indications of surficial creep and shallow slumping/sloughing of the near-surface slope materials were not observed along the slope faces. Tension cracks and/or other indicators of deep seated movement of the slope were not observed at or beyond the crests of the slopes. The slope at the northeast corner of site (vicinity of BH14-02), a hydro pole and possible septic tank are noted in the middle portion and at the crest of the slope, as show on Photographs 4 and 5. The infiltration trenches of the septic system may have an impact to the long term slope stability. It is anticipated that the septic system will be removed as part of the new development. Should the septic system be left on the site, a slope stability analysis should be carried out at the cross-section thorough the location of the septic system based on the actual soil and groundwater conditions as well as the as-built septic system design drawings. In summary, no signs of deep-seated slope instability were noted during the visual reconnaissance for the slopes at the site Slope Stability Analysis One typical slope profile derived from the topographic drawing at Cross - Section A-A (vicinity of BH14-02, see Drawing 1 for location) is presented on Drawing 19. Soil strength parameters selected for the soil strata have been estimated based on Borehole BH14-02 drilled near the slope, previously published information and from our experience on similar projects. A static slope stability analysis was carried out for the soil stratigraphy using effective stress strength parameters as shown on the following table: 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

22 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario Soil Parameters for Slope Stability Analysis Soil Type Soil Density (kn/m ) Effective Cohesion c' (kpa) Effective Friction Angle φ' (degree) Compact to Very Dense Sand and Gravel Slope stability analysis of the existing slope at Cross Section A-A was carried out with the computer program SLIDE (Version 6.0) using the Simplified Bishop method. The calculated minimum Factor of Safety (FOS) of the slope failure surfaces of the existing slope Section A-A is.85, as shown on Drawing 20, which is considered to be stable from a geotechnical perspective. Considering the remaining sections of the existing slopes encountered at the site are generally flatter than the slope section in the vicinity of BH14-2 and the heights of the remaining slopes are generally less than 4 m and therefore, these slope sections are also considered to be stable from a geotechnical perspective Erosion Considerations A setback from a geotechnical perspective is not considered warranted as the Factor of Safety (FOS) against overall (i.e. deep-seated) slope instability are greater than 1.5. As the existing wet lands are more than 15 m away from the toe of the slope an erosion setback component is not applicable and therefore, it is our opinion that no erosion allowance for the slope toe is required for the analyses of the long term stable slope in accordance with the Provincial Guidelines entitled Understanding Natural Hazards. Based on the analysis results and the site conditions, it should be concluded that the existing crest of the slope can be considered as the Long Term Stable Top of Slope. 4. Preliminary Geotechnical Input for Proposed SWM Pond (in the Vicinity of BH14-08) Based on the preliminary conceptual design information provided by SCS, the currently proposed geodetic elevation of SWM pond bottom is Elev m. The permanent pool level is at Elev m, and the top of pond elevation is at approximately Elev m Subsurface Soil and Groundwater Conditions in the Area of SWM Pond Borehole BH14-08 was advanced in the area of the proposed SWM pond. The soils encountered in this borehole consisted of 100 mm of topsoil overlying approximately 1. m thick reworked soil which were 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

23 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario underlain by compact fine to medium sand deposit. The sand deposit was underlain by compact to dense sand and gravel which extended to the borehole termination depth. On June 4, 2014, the groundwater level measured in the monitoring well installed in BH14-08 was found at a depth of about 2.2 m below the existing ground surface, corresponding to about Elev m, indicating that the local groundwater level is approximately 1.6 m above the proposed pond base elevation and is about 0.5 m below the proposed permanent pool level Preliminary Geotechnical Recommendations for the Proposed SWM Pond Design The following comments and recommendations are considered to be preliminary and should be further reviewed and amended once the detailed design of the pond is available. Based on the preliminary design information provided, the base of the proposed SWM Pond is at Elev m. Based on the soil conditions encountered in Borehole BH14-08, the pond excavation is anticipated to be carried out through the reworked soil (about 1. m thick), fine to medium sand (about 2. m thick) and possible sand and gravel deposit to the design pond base level. The excavation is anticipated to be about 1.6 m below the local water table, based on the groundwater levels recorded in the monitoring well on June 4, Groundwater control during pond excavation within the reworked soil and fine to medium sand above the groundwater table can be handled, as required, by pumping from properly constructed and filtered sumps located within the excavations. Significant groundwater seepage and soil instability should be expected in the fine to medium sand below the groundwater level. It should be noted that the fine to medium grained sand deposit is very susceptible to disturbance by construction activity. Some form of positive groundwater control (well points or eductors) would be required to maintain the stability of the base and side slopes of the proposed SWM pond excavation, in addition to pumping from sumps. The dewatering measures should lower the groundwater levels to at least 1 m below the excavations during construction. It should be noted that groundwater control measures that extract more than 50,000 L/day of water are subject to a Permit to Take Water (PTTW), as regulated by the MOE. Based on the preliminary pond base elevation and the size of the proposed pond, a PTTW is likely to be required. The application to a PTTW will require a hydrogeological study to support the application. It is noted that the existing wet land is located to the west of the proposed SWM pond. The sand/sand and gravel deposits within the proposed SWM pond are likely hydraulically conducted to the water in the wet land, therefore, the potential of the impact of dewatering to the vicinity wet land should be evaluated by the engineers. Pond side slopes above the permanent water level in the pond should be no steeper than horizontal to 1 vertical (:1). Pond side slopes below the permanent pond water level should be 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

24 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario at least 4H:1V or flatter. The minimum pond slope inclination should follow the design guidelines of the local municipality. The sand deposit which is anticipated at the base and side slopes of the proposed pond below about Elev m has a high permeability. To maintain the permanent pond level at the design elevation of Elevation m, which is above the measured groundwater table at Elev m, it would be necessary to construct a hydraulic barrier, i.e. impervious liner to reduce the communication between local groundwater and pond storm water through the pond side slopes and base. The installed permanent impervious liner, however, will be subject to uplift pressures at times when the water level in the pond drops below the exterior ground water level, as well as when the pond is drained for maintenance or the ground water level rises above its present recorded level. The uplift pressure could be resisted by the weight of the soil that is placed above the liner or by installing a series of subdrains below the liner which can be used to draw down the water levels during the maintenance. Consideration may be given to installing a geosynthetic clay liner (GCL) over the pond side slopes and base as necessary to maintain the design pond water levels. The GCL should be placed at the entire pond bottom and side slopes and extend to approximately 0.5 m above the permanent pool level. A minimum 2.5 m thickness of compacted locally available soils should be placed on top of the GCL at the pond bottom and side slopes both as a protection of the liner from damage and to counterbalance the uplift pressures. The soil above the liner should be placed and compacted in a manner to minimize disturbance and to prevent damage of the GCL liner. The soil should be placed in a maximum loose lift of 0.5 m immediately above the GCL with appropriate equipment without damaging the GCL and maximum loose lifts of 0. m thereafter, and it should be compacted to a minimum of 95 percent of the material s standard Proctor maximum dry density (SPMDD). As an alternative to GCL as noted above, consideration may be given to constructing a pond liner using approved clayey soils. Since predominantly sandy deposits were encountered at the site, imported clayey materials would be required to construct the liner. The clay liner should be at least 2.5 m thick and be constructed using clayey soils approved by the geotechnical engineer. It should be placed in maximum 00 mm thick lifts at suitable water contents and compacted to at least 95 percent of SPMDD. It should be noted that the required thickness of the clay liner to counterbalance the uplifting pressure is highly dependent on the groundwater levels at the proposed pond area. Further frequent monitoring of the installed well should be carried out. Additional boreholes and monitoring wells should be carried out at the proposed pond area during the detailed design stage. 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

25 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario Sufficient dewatering measures should be used to lower the groundwater levels to at least 1 m below the final excavation level to provide a stable work surface for the installation of the GCL or clay liner. The recommendations provided above should be regarded as preliminary. Additional borehole(s) should be carried out to provide sufficient information of the soil and groundwater conditions at the proposed pond location. 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

26

27 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario Drawings, Figures and Enclosures 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

28

29 Drawing 2A: Explanation of Terms Used in the Record of Boreholes Sample Type AS Auger sample BS Block sample CS Chunk sample DO Drive open DS Dimension type sample FS Foil sample NR No recovery RC Rock core SC Soil core Spoon sample SH Shelby tube Sample ST Slotted tube TO Thin-walled, open TP Thin-walled, piston WS Wash sample Penetration Resistance Standard Penetration Resistance (SPT), N: The number of blows by a 6.5 kg (140 lb) hammer dropped 760 mm (0 in) required to drive a 50 mm (2 in) drive open sampler for a distance of 00 mm (12 in). WH Samples sinks under weight of hammer Dynamic Cone Penetration Resistance, Nd: The number of blows by a 6.5 kg (140 lb) hammer dropped 760 mm (0 in) to drive uncased a 50 mm (2 in) diameter, 60 o cone attached to A size drill rods for a distance of 00 mm (12 in). Textural Classification of Soils Classification Boulders Cobbles Gravel Sand Silt Clay Particle Size > 200 mm 75 mm mm 4.75 mm - 75 mm mm 4.75 mm mm mm <0.002 mm Coarse Grain Soil Description (50% greater than mm) Terminology Proportion Trace 0-10% Some 10-20% Adjective (e.g. silty or sandy) 20-5% And (e.g. sand and gravel) > 5% Soil Description a) Cohesive Soils(*) Consistency Undrained Shear SPT N Value Strength (kpa) Very soft < Soft Firm Stiff Very stiff Hard >200 >0 (*) Hierarchy of Shear Strength prediction 1. Lab triaxial test 2. Field vane shear test. Lab. vane shear test 4. SPT N value 5. Pocket penetrometer b) Cohesionless Soils Density Index (Relative Density) Very loose <4 Loose 4-10 Compact 10-0 Dense 0-50 Very dense >50 Soil Tests SPT N Value w Water content wp Plastic limit wl Liquid limit C Consolidation (oedometer) test CID Consolidated isotropically drained triaxial test CIU consolidated isotropically undrained triaxial test with porewater pressure measurement DR Relative density (specific gravity, Gs) DS Direct shear test ENV Environmental/ chemical analysis M Sieve analysis for particle size MH Combined sieve and hydrometer (H) analysis MPC Modified proctor compaction test SPC Standard proctor compaction test OC Organic content test U Unconsolidated Undrained Triaxial Test V Field vane (LV-laboratory vane test) γ Unit weight

30 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario Drawing 2B: Notes On Sample Descriptions 1. All sample descriptions included in this report generally follow the Unified Soil Classification. Laboratory grain size analyses provided by SPL also follow the same system. Different classification systems may be used by others, such as the system by the International Society for Soil Mechanics and Foundation Engineering (IMFE). Please note that, with the exception of those samples where a grain size analysis and/or Atterberg Limits testing have been made, all samples are classified visually. Visual classification is not sufficiently accurate to provide exact grain sizing or precise differentiation between size classification systems. 2. Fill: Where fill is designated on the borehole log it is defined as indicated by the sample recovered during the boring process. The reader is cautioned that fills are heterogeneous in nature and variable in density or degree of compaction. The borehole description may therefore not be applicable as a general description of site fill materials. All fills should be expected to contain obstruction such as wood, large concrete pieces or subsurface basements, floors, tanks, etc., none of these may have been encountered in the boreholes. Since boreholes cannot accurately define the contents of the fill, test pits are recommended to provide supplementary information. Despite the use of test pits, the heterogeneous nature of fill will leave some ambiguity as to the exact composition of the fill. Most fills contain pockets, seams, or layers of organically contaminated soil. This organic material can result in the generation of methane gas and/or significant ongoing and future settlements. Fill at this site may have been monitored for the presence of methane gas and, if so, the results are given on the borehole logs. The monitoring process does not indicate the volume of gas that can be potentially generated nor does it pinpoint the source of the gas. These readings are to advise of the presence of gas only, and a detailed study is recommended for sites where any explosive gas/methane is detected. Some fill material may be contaminated by toxic/hazardous waste that renders it unacceptable for deposition in any but designated land fill sites; unless specifically stated the fill on this site has not been tested for contaminants that may be considered toxic or hazardous. This testing and a potential hazard study can be undertaken if requested. In most residential/commercial areas undergoing reconstruction, buried oil tanks are common and are generally not detected in a conventional preliminary geotechnical site investigation.. Till: The term till on the borehole logs indicates that the material originates from a geological process associated with glaciation. Because of this geological process the till must be considered heterogeneous in composition and as such may contain pockets and/or seams of material such as sand, gravel, silt or clay. Till often contains cobbles (60 to 200 mm) or boulders (over 200 mm). Contractors may therefore encounter cobbles and boulders during excavation, even if they are not indicated by the borings. It should be appreciated that normal sampling equipment cannot differentiate the size or type of any obstruction. Because of the horizontal and vertical variability of till, the sample description may be applicable to a very limited zone; caution is therefore essential when dealing with sensitive excavations or dewatering programs in till materials. 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

31 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION TOPSOIL: (160mm) SAND AND GRAVEL: brown, compact STRATA PLOT NUMBER 1 SAMPLES TYPE "N" BLOWS 0. m 11 GROUND WATER CONDITIONS ELEVATION DRILLING DATA Method: Hollow Stem Auger Diameter: 150 mm Date: May/2/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL FINE TO MEDIUM SAND: trace to some gravel, trace silt, brown to grey, moist, loose to compact bentonite SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/ SAND AND GRAVEL: trace to some silt, containing cobbles and boulders, brown, compact to dense. Continued Next Page GROUNDWATER ELEVATIONS GRAPH NOTES 261, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

32 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION SAND AND GRAVEL: trace to some silt, containing cobbles and boulders, brown, compact to dense.(continued) STRATA PLOT NUMBER SAMPLES TYPE "N" BLOWS 0. m GROUND WATER CONDITIONS ELEVATION sand screen DRILLING DATA Method: Hollow Stem Auger Diameter: 150 mm Date: May/2/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL W. L m END OF BOREHOLE Notes: 1). Water encountered at a depth of 6.1 m during drilling. 2). Water at a depth of 5.5 m upon completion of drilling. ). 19mm dia. piezometer was installed in borehole upon completion of drilling. Water Level Readings: Date W. L. Depth (m) June cutting SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/14 GROUNDWATER ELEVATIONS GRAPH NOTES, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

33 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION TOPSOIL: (210mm) SAND AND GRAVEL: trace to some silt, containing cobbles and boulders, brown, loose to very dense. STRATA PLOT NUMBER 1 SAMPLES TYPE "N" BLOWS 0. m 7 GROUND WATER CONDITIONS ELEVATION 265 DRILLING DATA Method: Hollow Stem Auger Diameter: 150 mm Date: May/2/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 4 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL bentonite SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/14 4 Continued Next Page GROUNDWATER ELEVATIONS GRAPH NOTES sand, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

34 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION SAND AND GRAVEL: trace to some silt, containing cobbles and boulders, brown, loose to very dense.(continued) STRATA PLOT NUMBER SAMPLES TYPE "N" BLOWS 0. m GROUND WATER CONDITIONS ELEVATION 260 DYNAMIC CONE PENETRATION RESISTANCE PLOT W. L m DRILLING DATA Method: Hollow Stem Auger Diameter: 150 mm Date: May/2/2014 SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 4 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL screen END OF BOREHOLE Notes: 1). Water encountered at a depth of 6.1 m during drilling. 2). Water at a depth of 5.8 m upon completion of drilling. ). 19mm dia. piezometer was installed in borehole upon completion of drilling. Water Level Readings: Date W. L. Depth (m) June cutting SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/14 GROUNDWATER ELEVATIONS GRAPH NOTES, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

35 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION TOPSOIL: (120mm) SAND AND GRAVEL: trace to some silt, containing cobbles and boulders, brown, loose to very dense. STRATA PLOT NUMBER 1 SAMPLES TYPE "N" BLOWS 0. m 7 GROUND WATER CONDITIONS ELEVATION DRILLING DATA Method: Solid Stem Auger Diameter: 115 mm Date: May/22/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 5 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL bentonite SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/14 4 Continued Next Page GROUNDWATER ELEVATIONS GRAPH NOTES 259 W. L m screen sand 258, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

36 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION SAND AND GRAVEL: trace to some silt, containing cobbles and boulders, brown, loose to very dense.(continued) STRATA PLOT NUMBER SAMPLES TYPE "N" BLOWS 0. m GROUND WATER CONDITIONS ELEVATION DRILLING DATA Method: Solid Stem Auger Diameter: 115 mm Date: May/22/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 5 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL cutting END OF BOREHOLE Notes: 1). Cave-in at a depth of 4.6 m bgs upon completion of drilling 2). Water encountered at a depth of 4.6 m during drilling ). Water at a depth of 4.6 m upon completion of drilling 4). 19mm dia. piezometer was installed in borehole upon completion of drilling. Water Level Readings: Date W. L. Depth (m) June 04.9 SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/14 GROUNDWATER ELEVATIONS GRAPH NOTES, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

37 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION TOPSOIL: (100mm) FILL: clayey silt, some sand, trace gravel, brown, moist to wet, soft. STRATA PLOT NUMBER 1 SAMPLES TYPE "N" BLOWS 0. m GROUND WATER CONDITIONS ELEVATION 261 DRILLING DATA Method: Solid Stem Auger Diameter: 115 mm Date: May/22/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 6 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL SAND AND GRAVEL: trace silt, containing cobbles and boulders, brown, loose to dense SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/ Continued Next Page GROUNDWATER ELEVATIONS 5 6 AS 0 GRAPH NOTES , : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

38 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION 5.0 END OF BOREHOLE Notes: 1). Cave-in at a depth of 1.5 m bgs upon completion of drilling. 2). Water encountered at a depth of 2. m during drilling. STRATA PLOT NUMBER SAMPLES TYPE "N" BLOWS 0. m GROUND WATER CONDITIONS ELEVATION DRILLING DATA Method: Solid Stem Auger Diameter: 115 mm Date: May/22/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 6 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/14 GROUNDWATER ELEVATIONS GRAPH NOTES, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

39 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION TOPSOIL: (120mm) FILL: clayey silt, some sand, trace gravel, brown, moist to wet, firm. STRATA PLOT NUMBER 1 SAMPLES TYPE "N" BLOWS 0. m 7 GROUND WATER CONDITIONS ELEVATION DRILLING DATA Method: Solid Stem Auger Diameter: 115 mm Date: May/2/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 7 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL FINE TO MEDIUM SAND: trace silt, trace gravel, brown, loose bentonite SAND AND GRAVEL: trace silt, containing cobbles and boulders, brown, compact to very dense SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/14 4 Continued Next Page GROUNDWATER ELEVATIONS GRAPH NOTES 260 sand screen 259, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

40 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION SAND AND GRAVEL: trace silt, containing cobbles and boulders, brown, compact to very dense.(continued) STRATA PLOT NUMBER SAMPLES TYPE "N" BLOWS 0. m GROUND WATER CONDITIONS ELEVATION DYNAMIC CONE PENETRATION RESISTANCE PLOT W. L m DRILLING DATA Method: Solid Stem Auger Diameter: 115 mm Date: May/2/2014 SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 7 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL cutting END OF BOREHOLE Notes: 1). Cave-in at a depth of 5.2 m bgs upon completion of drilling. 2). Water encountered at a depth of 6.4 m during drilling. ). Water at a depth of 6.4 m upon completion of drilling. 4). 19mm dia. piezometer was installed in borehole upon completion of drilling. Water Level Readings: Date W. L. Depth (m) June SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/14 GROUNDWATER ELEVATIONS GRAPH NOTES, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

41 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION TOPSOIL: (150mm) FILL: clayey silt, some sand, trace gravel, brown, moist to wet, firm. STRATA PLOT NUMBER 1 SAMPLES TYPE "N" BLOWS 0. m 5 GROUND WATER CONDITIONS ELEVATION 265 DRILLING DATA Method: Solid Stem Auger Diameter: 115 mm Date: May/2/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 8 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL FINE TO MEDIUM SAND: trace silt, trace to some gravel, brown, loose to compact bentonite SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/ SAND AND GRAVEL: trace to some silt, containing cobbles and boulders, brown, compact Continued Next Page GROUNDWATER ELEVATIONS GRAPH NOTES 262 sand screen 261 cutting, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

42 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION 5.0 END OF BOREHOLE Notes: 1). Borehole was open and dry upon completion of drilling. 2). 19mm dia. piezometer was installed in borehole upon completion of drilling. Water Level Readings: Date W. L. Depth (m) June 04 dry STRATA PLOT NUMBER SAMPLES TYPE "N" BLOWS 0. m GROUND WATER CONDITIONS ELEVATION DRILLING DATA Method: Solid Stem Auger Diameter: 115 mm Date: May/2/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 8 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/14 GROUNDWATER ELEVATIONS GRAPH NOTES, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

43 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION TOPSOIL: (120mm) FILL: clayey silt, some sand, trace gravel, brown, moist to wet, firm. STRATA PLOT NUMBER 1 SAMPLES TYPE "N" BLOWS 0. m 5 GROUND WATER CONDITIONS ELEVATION 260 DRILLING DATA Method: Solid Stem Auger Diameter: 115 mm Date: May/22/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 9 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL SAND AND GRAVEL: trace silt, trace organic, brown, compact FINE TO MEDIUM SAND: trace silt, trace to some gravel, containing cobbles and boulders, brown, compact to dense mm thin silt layer encountered approximately at a depth of 2.6 m. SAND AND GRAVEL: trace to some silt, containing cobbles and boulders, brown, dense to very dense. 4A 4B 12 SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/ Continued Next Page GROUNDWATER ELEVATIONS >79 GRAPH NOTES , : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

44 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION 5.0 END OF BOREHOLE Notes: 1). Cave-in at a depth of.7 m bgs upon completion of drilling. 2). Water encountered at a depth of.0 m during drilling. ). Water at a depth of.5 m upon completion of drilling. STRATA PLOT NUMBER SAMPLES TYPE "N" BLOWS 0. m GROUND WATER CONDITIONS ELEVATION DRILLING DATA Method: Solid Stem Auger Diameter: 115 mm Date: May/22/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 9 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/14 GROUNDWATER ELEVATIONS GRAPH NOTES, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

45 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION TOPSOIL: (100mm) FILL: clayey silt, some sand to sandy, trace clay, trace gravel, brown, moist, soft to stiff. STRATA PLOT NUMBER 1 SAMPLES TYPE "N" BLOWS 0. m GROUND WATER CONDITIONS ELEVATION 260 DRILLING DATA Method: Hollow Stem Auger Diameter: 150 mm Date: May/22/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 10 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL FINE TO MEDIUM SAND: trace to some silt, brown, loose to compact bentonite W. L m SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/ SAND AND GRAVEL: trace silt, containing cobbles and boulders, brown, compact to dense. Continued Next Page GROUNDWATER ELEVATIONS GRAPH NOTES , : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

46 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION SAND AND GRAVEL: trace silt, containing cobbles and boulders, brown, compact to dense.(continued) STRATA PLOT NUMBER SAMPLES TYPE "N" BLOWS 0. m GROUND WATER CONDITIONS ELEVATION DRILLING DATA Method: Hollow Stem Auger Diameter: 150 mm Date: May/22/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 10 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL sand screen SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/ END OF BOREHOLE Notes: 1). Water encountered at a depth of 2. m during drilling. 2). 50mm dia. monitoring well was installed in borehole upon completion of drilling. Water Level Readings: Date W. L. Depth (m) June cutting GROUNDWATER ELEVATIONS GRAPH NOTES, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

47 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION TOPSOIL: (100mm) FILL: clayey silt, sandy, brown, moist to wet, soft. STRATA PLOT NUMBER 1 SAMPLES TYPE "N" BLOWS 0. m 2 GROUND WATER CONDITIONS ELEVATION DRILLING DATA Method: Solid Stem Auger Diameter: 115 mm Date: May/22/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 11 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL FINE TO MEDIUM SAND: trace silt, trace gravel, brown, compact. bentonite SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/ SAND AND GRAVEL: trace to some silt, containing cobbles and boulders, trace silt, brown, compact to dense. Continued Next Page GROUNDWATER ELEVATIONS GRAPH NOTES sand W. L m 258 screen 257, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

48 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION SAND AND GRAVEL: trace to some silt, containing cobbles and boulders, trace silt, brown, compact to dense.(continued) STRATA PLOT NUMBER SAMPLES TYPE "N" BLOWS 0. m GROUND WATER CONDITIONS ELEVATION DRILLING DATA Method: Solid Stem Auger Diameter: 115 mm Date: May/22/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 11 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL 256 cutting END OF BOREHOLE Notes: 1). Cave-in at a depth of 4.9 m bgs upon completion of drilling. 2). Water encountered at a depth of.0 m during drilling. ). Water at a depth of.0 m upon completion of drilling. 4). 19mm dia. piezometer was installed in borehole upon completion of drilling. Water Level Readings: Date W. L. Depth (m) June 04.2 SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/14 GROUNDWATER ELEVATIONS GRAPH NOTES, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

49 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION TOPSOIL: (100mm) FILL: silty sand, trace clay, trace gravel, brown, moist, loose. STRATA PLOT NUMBER 1 SAMPLES TYPE "N" BLOWS 0. m 2 GROUND WATER CONDITIONS ELEVATION DRILLING DATA Method: Solid Stem Auger Diameter: 115 mm Date: May/22/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 12 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL FINE TO MEDIUM SAND: trace to some silty clay, trace gravel, brown, loose to compact bentonite screen SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/ SANDY SILT: trace clay, brown, compact Continued Next Page GROUNDWATER ELEVATIONS 5 6A 6B GRAPH NOTES sand W. L m cutting, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

50 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION 5.0 END OF BOREHOLE Notes: 1). Cave-in at a depth of.7 m bgs upon completion of drilling. 2). Water encountered at a depth of.0 m during drilling. ). Water at a depth of.5 m upon completion of drilling. 4). 19mm dia. piezometer was installed in borehole upon completion of drilling. Water Level Readings: Date W. L. Depth (m) June 04.2 STRATA PLOT NUMBER SAMPLES TYPE "N" BLOWS 0. m GROUND WATER CONDITIONS ELEVATION DRILLING DATA Method: Solid Stem Auger Diameter: 115 mm Date: May/22/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 12 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/14 GROUNDWATER ELEVATIONS GRAPH NOTES, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

51 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION TOPSOIL: (90mm) FILL: clayey silt, sandy, some gravel, brown, moist to wet, soft. STRATA PLOT NUMBER 1 SAMPLES TYPE "N" BLOWS 0. m GROUND WATER CONDITIONS ELEVATION DRILLING DATA Method: Solid Stem Auger Diameter: 115 mm Date: May/22/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 1 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL FINE TO MEDIUM SAND: trace silt, trace to some gravel, brown, moist, loose to compact SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/ SAND AND GRAVEL: trace to some silt, containing cobbles and boulders, brown, very dense Continued Next Page GROUNDWATER ELEVATIONS GRAPH NOTES , : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

52 LOG OF BOREHOLE BH OF 2 PROJECT: Proposed Residential Subdivision Development CLIENT: Ontario Limited c/o SCS Consulting Group Ltd. PROJECT LOCATION: Town of Paris, County of Brant, Ontario DATUM: Geodetic BH LOCATION: See Borehole Location Plan N E (m) ELEV DEPTH SOIL PROFILE DESCRIPTION 5.0 END OF BOREHOLE Note: 1). Borehole was open and dry upon completion of drilling. STRATA PLOT NUMBER SAMPLES TYPE "N" BLOWS 0. m GROUND WATER CONDITIONS ELEVATION DRILLING DATA Method: Solid Stem Auger Diameter: 115 mm Date: May/22/2014 DYNAMIC CONE PENETRATION RESISTANCE PLOT SHEAR STRENGTH (kpa) PLASTIC FIELD VANE UNCONFINED & Sensitivity QUICK TRIAXIAL LAB VANE WATER CONTENT (%) w P NATURAL MOISTURE CONTENT w REF. NO.: ENCL NO.: 1 LIQUID w L POCKET PEN. (Cu) (kpa) NATURAL UNIT WT (Mg/m ) REMARKS AND GRAIN SIZE DISTRIBUTION (%) GR SA SI CL SPL SOIL LOG NISCAL PROPERTY, PARIS.GPJ SPL.GDT 6/24/14 GROUNDWATER ELEVATIONS GRAPH NOTES, : Numbers refer to Sensitivity =% Strain at Failure Shallow/ Single Installation Deep/Dual Installation

53 Particle Size Distribution Report 100 Granular B, Type I PERCENT FINER GRAIN SIZE - mm. % Gravel Coarse Fine % +" Coarse SIEVE PERCENT SPEC.* PA? SIZE FINER PERCENT (X=NO) 1.2mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm. 0.0 * Granular B, Type I Location: BH Sample Number: MM-0669 % Sand Medium 42.2 Fine % Fines Silt Clay Soil Description Sand,trace gravel,trace silt PL= X Atterberg Limits LL= D90= D50= D10= Coefficients D85= D0= Cu=.79 USCS= Classification AASHTO= PI= D60= D15= Cc= 1.66 Remarks Sampled by Sarah on MAy 22, 2014 Date: Client: Ontario Limited C/O SCS Consulting Group Ltd. Project: Proposed Residential Subdivision Development, Town of Paris, County of Brant, Ontario. Project No: Figure 14

54 Particle Size Distribution Report 100 Granular B, Type I PERCENT FINER GRAIN SIZE - mm. % Gravel Coarse Fine % +" Coarse SIEVE PERCENT SPEC.* PA? SIZE FINER PERCENT (X=NO) 26.5mm 19mm 16mm 1.2mm 9.5mm 4.75mm 2.00mm 0.850mm 0.425mm 0.250mm 0.106mm 0.075mm mm mm mm mm mm mm mm mm Fine % Fines Silt Clay Soil Description Sand & Gravel,trace silt PL= % Sand Medium X Atterberg Limits LL= D90= D50= D10= Coefficients D85= D0= Cu= USCS= Classification AASHTO= PI= D60= D15= Cc= 0.4 Remarks Sampled by Sarah on May 22, 2014 * Granular B, Type I Location: BH Sample Number: MM-0670 Date: Client: Ontario Limited C/O SCS Consulting Group Ltd. Project: Proposed Residential Subdivision Development, Town of Paris, County of Brant, Ontario. Project No: Figure 15

55 Particle Size Distribution Report 100 Granular B, Type I PERCENT FINER GRAIN SIZE - mm. % Gravel Coarse Fine % +" Coarse SIEVE PERCENT SPEC.* PA? SIZE FINER PERCENT (X=NO) 4.75mm 2.00mm 0.850mm 0.425mm 0.250mm 0.106mm 0.075mm mm mm mm mm mm mm mm mm % Sand Medium 18.1 % Fines Silt Fine Clay 0.4 Soil Description Sand,some silt PL= X Atterberg Limits LL= D90= D50= D10= Coefficients D85= D0= Cu= 4.75 USCS= Classification AASHTO= PI= D60= 0.4 D15= Cc= 2.45 Remarks Sampled by Sarah on May 22, 2014 * Granular B, Type I Location: BH14-8 Sample Number: MM-0667 Date: Client: Ontario Limited C/O SCS Consulting Group Ltd. Project: Proposed Residential Subdivision Development, Town of Paris, County of Brant, Ontario. Project No: Figure 16

56 Particle Size Distribution Report 100 Granular B, Type I PERCENT FINER GRAIN SIZE - mm. % Gravel Coarse Fine % +" Coarse SIEVE PERCENT SPEC.* PA? SIZE FINER PERCENT (X=NO) 7.5mm 26.5mm 19mm 16mm 1.2mm 9.5mm 4.75mm 2.00mm 0.850mm 0.425mm 0.250mm 0.106mm 0.075mm mm mm mm mm mm mm mm mm % Sand Medium 12.9 Fine % Fines Silt Clay Soil Description Sand & gravel,trace silt PL= Atterberg Limits LL= D90= D50= D10= Coefficients D85= D0= Cu= USCS= Classification AASHTO= PI= D60= D15= Cc= 0.64 Remarks Sampled by Sarah on May 22, 2014 * Granular B, Type I Location: BH Sample Number: MM-0666 Date: Client: Ontario Limited C/O SCS Consulting Group Ltd. Project: Proposed Residential Subdivision Development, Town of Paris, County of Brant, Ontario. Project No: Figure 17

57 Particle Size Distribution Report 100 Granular B, Type I PERCENT FINER GRAIN SIZE - mm. % Gravel Coarse Fine % +" Coarse SIEVE PERCENT SPEC.* PA? SIZE FINER PERCENT (X=NO) 26.5mm 19mm 16mm 1.2mm 9.5mm 4.75mm 2.00mm 0.850mm 0.425mm 0.250mm 0.106mm 0.075mm mm mm mm mm mm mm mm mm X % Fines Silt Fine Clay 11.2 Soil Description Clayey silt,sandy,some gravel PL= % Sand Medium Atterberg Limits LL= D90= D50= D10= Coefficients D85= D0= Cu= USCS= Classification AASHTO= PI= D60= D15= Cc= 4. Remarks Sampled by Sarah on May 22, 2014 * Granular B, Type I Location: BH Sample Number: MM-0668 Date: Client: Ontario Limited C/O SCS Consulting Group Ltd. Project: Proposed Residential Subdivision Development, Town of Paris, County of Brant, Ontario. Project No: Figure 18

58

59 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario Drawing 20 Slope Stability Analysis, Cross Section A-A 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

60 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario APPPENDIX A PHOTOGRAPHS OF SLOPEs PHOTOGRAPHS 1-6 WERE TAKEN ON JUEN 4, Steelcase Rd, Unit Markham, ON Tel: Fax:

61 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario i Photograph 1 - Slope overview (BH14-1), standing at the toe of slope, looking south Photograph 2 - Slope overview (BH14-2), standing at the toe of slope, looking south 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

62 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario ii Photograph Slope overview (BH14-1), standing at the top of slope, looking north Photograph 4 - Overview of slope crest (BH14-2), looking west 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

63 Project: Preliminary Geotechnical Investigation, Proposed Residential Subdivision Development Parts of Lots 2 and, Town of Paris, Ontario iii Photograph 5 - Possible septic tank at the top of slope (BH14-2), looking north Photograph 6 Hydro pole in the middle of slope (BH14-2), looking north 51 Steelcase Rd, Unit Markham, ON Tel: Fax:

June i TABLE OF CONTENTS

June i TABLE OF CONTENTS June 2005 - i - 05-526 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 1.1 Purpose of the Investigation... 1 1.2 Description of the Project and Scope of Work... 1 1.3 Site Geology... 1 1.4 Site Description

More information

Preliminary Geotechnical Investigation

Preliminary Geotechnical Investigation Preliminary Geotechnical Investigation Urban Centre Wastewater Servicing Class Environmental Assessment Study Town of Erin, Ontario Prepared For: Ainley Group GeoPro Project No.: 16-1 Report Date: January,

More information

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing GEOTECHNICAL INVESTIGATION PROPOSED HOME FARM RESIDENTIAL DEVELOPMENT TOWN OF THE BLUE MOUNTAINS,

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT SHAD 髂髂 July 15, 2011 Attention: Re: 獒獒獒獒 Reference No. : T11284 Royal Park Homes and Century Grove Homes c/o Urbantech Consulting 25 Royal Crest Court, Unit 201 Markham, Ontario L3R 9X4 Dear Mr. Leighton,

More information

August 1, 2013 Reference No S048 Page 1 of 5

August 1, 2013 Reference No S048 Page 1 of 5 August 1, 2013 Reference No. 1201-S048 Page 1 of 5 Caledon Villas Corp. 55 Blue Willow Drive Woodbridge, Ontario L4L 9E8 Attention: Mr. John Spina Re: Addendum to Soil Investigation for Proposed Residential

More information

Preliminary Geotechnical Investigation

Preliminary Geotechnical Investigation Preliminary Geotechnical Investigation Lakeview Boulevard Improvements Town of Ajax, Ontario Prepared For: Dionne Bacchus & Associates Consulting Engineers Ltd. GeoPro Project No.: 16-1296-01 Revised Report

More information

Appendix F: Geotechnical Investigation

Appendix F: Geotechnical Investigation Appendix F: Geotechnical Investigation PRELIMINARY GEOTECHNICAL INVESTIGATION CLASS EA PHASE 3 AND 4 FOR BAYVIEW DRIVE AND BIG BAY POINT ROAD IMPROVEMENTS BARRIE, ONTARIO for C.C. TATHAM & ASSOCIATES LTD.

More information

Appendix E: Geotechnical Investigation

Appendix E: Geotechnical Investigation Appendix E: Geotechnical Investigation PRELIMINARY GEOTECHNICAL INVESTIGATION CLASS EA PHASE 3 AND 4 FOR BAYVIEW DRIVE AND BIG BAY POINT ROAD IMPROVEMENTS BARRIE, ONTARIO for C.C. TATHAM & ASSOCIATES LTD.

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Proposed Residential Development 10 Louisa Street West, Thornbury, Ontario Prepared For: Masongsong Associates GeoPro Project No.: 17-2051GE Report Date: December 4, 2017 GeoPro

More information

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida

More information

REPORT ON GEOTECHNICAL INVESTIGATION 1251 MAIN STREET NORTH. STITTSVILLE, ONTARIO REPORT NO.: G-CPR-A REPORT DATE: SEPTEMBER 24, 2015

REPORT ON GEOTECHNICAL INVESTIGATION 1251 MAIN STREET NORTH. STITTSVILLE, ONTARIO REPORT NO.: G-CPR-A REPORT DATE: SEPTEMBER 24, 2015 REPORT ON GEOTECHNICA INVETIGATION 1251 MAIN TREET NORTH. TITTVIE, ONTARIO REPORT NO.: 4186-15-G-CPR-A REPORT DATE: EPTEMBER 24, 2015 PREPARED FOR CHOICE PROPERTIE REIT 22 T. CAIR AVENUE EAT TORONTO, ONTARIO

More information

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....

More information

GEOTECHNICAL INVESTIGATION. Submitted to: GCSJ Hillsdale Development Inc Steeles Avenue East, Suite 300 Markham, Ontario L3R 1G9

GEOTECHNICAL INVESTIGATION. Submitted to: GCSJ Hillsdale Development Inc Steeles Avenue East, Suite 300 Markham, Ontario L3R 1G9 March 17, 017 GEOTECHNICAL INVESTIGATION SARJEANT LANDS DEVELOPMENT HILLSDALE, ONTARIO Submitted to: GCSJ Hillsdale Development Inc. 3190 Steeles Avenue East, Suite 300 Markham, Ontario L3R 1G9 Attention:

More information

It is our understanding that a three storey residential building is being proposed for the aforementioned site and will have one basement level.

It is our understanding that a three storey residential building is being proposed for the aforementioned site and will have one basement level. patersongroup June 21, 2016 File: PG3838-LET.01 Claridge Homes 2001-210 Gladstone Avenue Ottawa, Ontario K2P 0Y6 Attention: Subject: Mr. Neil Malhotra Geotechnical Desktop Review Proposed Residential Building

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

patersongroup Geotechnical Investigation Proposed Development Palladium Drive at Huntmar Drive Ottawa, Ontario Prepared For Ontario Inc.

patersongroup Geotechnical Investigation Proposed Development Palladium Drive at Huntmar Drive Ottawa, Ontario Prepared For Ontario Inc. Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Archaeological Services Proposed Development Palladium Drive at Huntmar

More information

patersongroup 1.0 Method of Investigation Consulting Engineers July 23, 2013 File: PG3024-LET.01 Sherbrooke Urban Developments 43 Okanagan Drive

patersongroup 1.0 Method of Investigation Consulting Engineers July 23, 2013 File: PG3024-LET.01 Sherbrooke Urban Developments 43 Okanagan Drive July 23, 2013 Sherbrooke Urban Developments 43 Okanagan Drive Ottawa, Ontario K2H 7E9 Attention: Subject: Geotechnical Investigation Proposed Residential Buildings 1111 North River Road - Ottawa Consulting

More information

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG.

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG. MEMORANDUM Levelton Consultants Ltd. 150-12791 Clarke Place Richmond, BC V6V 2H9 Canada Tel: 604 278-1411 Fax: 604 278-1042 E-Mail: rhillaby@levelton.com Web Site: www.levelton.com TO: STUART OLSON DOMINION

More information

patersongroup Geotechnical Investigation Proposed Commercial Development 573 and 605 Industrial Avenue Ottawa, Ontario Prepared For

patersongroup Geotechnical Investigation Proposed Commercial Development 573 and 605 Industrial Avenue Ottawa, Ontario Prepared For Geotechnical Engineering Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Commercial Development 57 and 605 Industrial Avenue Ottawa, Ontario Archaeological

More information

J.L. Richards & Associates Limited 864 Lady Ellen Place Ottawa, Ontario K1Z 5M2. April 6, 2015 Project:

J.L. Richards & Associates Limited 864 Lady Ellen Place Ottawa, Ontario K1Z 5M2. April 6, 2015 Project: Houle Chevrier Engineering Ltd. 180 Wescar Lane Ottawa, Ontario K0A 1L0 tel: 613.836.1422 fax: 613.836.9731 info@hceng.ca www.hceng.ca J.L. Richards & Associates Limited 864 Lady Ellen Place Ottawa, Ontario

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

210 Prescott Street, Unit 1 (613) P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) May 5,

210 Prescott Street, Unit 1 (613) P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) May 5, Civil Geotechnical Structural Environmental Hydrogeology 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 May 5, 2014 140208 Alium Investments Ltd.

More information

patersongroup Geotechnical Investigation Proposed Residential Buildings 1800 Baseline Road Ottawa, Ontario Prepared For Minto Communities

patersongroup Geotechnical Investigation Proposed Residential Buildings 1800 Baseline Road Ottawa, Ontario Prepared For Minto Communities Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Residential Buildings 1800 Baseline Road Ottawa, Ontario

More information

GEOTECHNICAL INVESTIGATION PROPOSED STONEBROOK RESIDENTIAL DEVELOPMENT 105 MARGARET ELIZABETH AVENUE MARKDALE, ONTARIO FOR ONTARIO INC.

GEOTECHNICAL INVESTIGATION PROPOSED STONEBROOK RESIDENTIAL DEVELOPMENT 105 MARGARET ELIZABETH AVENUE MARKDALE, ONTARIO FOR ONTARIO INC. GEOTECHNICAL INVESTIGATION PROPOSED STONEBROOK RESIDENTIAL DEVELOPMENT 105 MARGARET ELIZABETH AVENUE MARKDALE, ONTARIO FOR 2544540 ONTARIO INC. PETO MacCALLUM LTD. 25 SANDFORD FLEMING DRIVE UNIT 2 COLLINGWOOD,

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Nassau Reclaimed Water Main From Radio Avenue to Harts Road Nassau County, Florida CSI Geo Project No.: 71-17-329-04 Client Project No.: JEA 09302-049-01

More information

patersongroup 1.0 Field Investigation Consulting Engineers December 14, 2015 PG3700-LET.01

patersongroup 1.0 Field Investigation Consulting Engineers December 14, 2015 PG3700-LET.01 December 14, 2015 1828486 Ontario Limited 277 Kirchoffer Avenue Ottawa, ON K2A 1Y1 Attention: Subject: Mr. Rolf Bauman Geotechnical Investigation Proposed Residential Buildings 890 Greenbriar Avenue -

More information

patersongroup Geotechnical Investigation Proposed Residential Development 2710 Draper Avenue Ottawa, Ontario Prepared For Greatwise Developments

patersongroup Geotechnical Investigation Proposed Residential Development 2710 Draper Avenue Ottawa, Ontario Prepared For Greatwise Developments Geotechnical Engineering Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Archaeological Services Proposed Residential Development 0 Draper Avenue Prepared

More information

NATIONAL HOMES (PLAINS ROAD) LP GEOTECHNICAL INVESTIGATION PROPOSED MIXED-USE DEVELOPMENT PLAINS ROAD EAST, BURLINGTON, ONTARIO

NATIONAL HOMES (PLAINS ROAD) LP GEOTECHNICAL INVESTIGATION PROPOSED MIXED-USE DEVELOPMENT PLAINS ROAD EAST, BURLINGTON, ONTARIO NATIONAL HOMES (PLAINS ROAD) LP GEOTECHNICAL INVESTIGATION PROPOSED MIXED-USE DEVELOPMENT - 90 PLAINS ROAD EAST, BURLINGTON, ONTARIO OCTOBER, 017 Report GEOTECHNICAL INVESTIGATION PROPOSED MIXED-USE DEVELOPMENT

More information

patersongroup Geotechnical Investigation Proposed Commercial Building 1989 Merivale Road Ottawa, Ontario Prepared For Zic s Holdings June 30, 2016

patersongroup Geotechnical Investigation Proposed Commercial Building 1989 Merivale Road Ottawa, Ontario Prepared For Zic s Holdings June 30, 2016 Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Commercial Building 989 Merivale Road Ottawa, Ontario Archaeological

More information

patersongroup Consulting Engineers August 25, 2008 File: PG1716-LET.01 Construction Junic 8 Boulevard du Plateau Gatineau, Québec J9A 3K7

patersongroup Consulting Engineers August 25, 2008 File: PG1716-LET.01 Construction Junic 8 Boulevard du Plateau Gatineau, Québec J9A 3K7 patersongroup August 25, 2008 File: PG1716-LET.01 Consulting Engineers 154 Colonnade Road South Ottawa, Ontario Canada, K2E 7J5 Tel: (613) 226-7381 Fax: (613) 226-6344 Construction Junic 8 Boulevard du

More information

Geotechnical Investigation And Slope Stability Assessment 3455 Milton Road Navan, Ontario

Geotechnical Investigation And Slope Stability Assessment 3455 Milton Road Navan, Ontario Geotechnical Investigation And Slope Stability Assessment 3455 Milton Road Navan, Ontario Houle Chevrier Engineering Ltd. 180 Wescar Lane Ottawa, Ontario K0A 1L0 www.hceng.ca Submitted to: 3223701 Canada

More information

Geotechnical Investigation Report Recreation Centre Building Braeside, Ontario

Geotechnical Investigation Report Recreation Centre Building Braeside, Ontario Geotechnical Investigation Report Recreation Centre Building Braeside, Ontario Cambium Reference No.: 6031-001 Prepared for: Greenview Environmental Management Cambium Inc. P.O. Box 325 52 Hunter Street

More information

patersongroup 1.0 Field Observations Consulting Engineers June 9, 2010 File: PG2122-LET.01 Mar Gard Builders 92 Bentley Avenue Ottawa, Ontario K2E 6T9

patersongroup 1.0 Field Observations Consulting Engineers June 9, 2010 File: PG2122-LET.01 Mar Gard Builders 92 Bentley Avenue Ottawa, Ontario K2E 6T9 patersongroup June 9, 2010 Mar Gard Builders 92 Bentley Avenue Ottawa, Ontario K2E 6T9 Attention: Subject: Mr. Tony Miriani Geotechnical Investigation Proposed Commercial Development 4471 to 4487 Innes

More information

GEOTECHNICAL INVESTIGATION REPORT - REVISED PROPOSED KEG RESTAURANT 15 HUNTMAR DRIVE KANATA (OTTAWA), ONTARIO. Submitted to:

GEOTECHNICAL INVESTIGATION REPORT - REVISED PROPOSED KEG RESTAURANT 15 HUNTMAR DRIVE KANATA (OTTAWA), ONTARIO. Submitted to: GEOTECHNICAL INVESTIGATION REPORT - REVISED PROPOSED KEG RESTAURANT 15 HUNTMAR DRIVE KANATA (OTTAWA), ONTARIO Submitted to: Keg Restaurants and Bar 529 Richmond Road Ottawa, Ontario, K2A 0G3 Canada Submitted

More information

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133 GEOTECHNICAL EXPLORATION AND ENGINEERING SERVICES REPORT CONDUCTED FOR: Immokalee Stormwater Master Plan Implementation Immokalee, Collier County, Florida PREPARED FOR: Mr. Marc Stonehouse, P. E. Project

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

6019 HAMLYN STREET, LONDON PROPOSED RESIDENTIAL DEVELOPMENT

6019 HAMLYN STREET, LONDON PROPOSED RESIDENTIAL DEVELOPMENT 019 HAMLYN STREET, LONDON PROPOSED RESIDENTIAL DEVELOPMENT Geotechnical Investigation Report Project Location: 019 Hamyln Street London, ON Prepared for: Sifton Properties Limited Suite 300, 195 Riverbend

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Proposed New Watermain Installation Sandspring Cres., Berwick Cres., Larkdale Cres. and Ashburton Cres. Robson Subdivision, Angus, Township of Essa, Ontario Prepared For: Ainley

More information

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH JULY 2013 DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald,

More information

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS FIGURE 3 Geotechnical Report (2) REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS RIVER TOWER RESTORATION RIVER TOWER PARK TAMPA, FLORIDA AREHNA PROJECT NO. B-13-002 February 22, 2013 Prepared

More information

Bernard Benoit Project Management Inc. August DST File No.: GS-OT

Bernard Benoit Project Management Inc. August DST File No.: GS-OT FINAL REPORT GEOTECHNICAL INVESTIGATION REPORT 2720 RICHMOND ROAD OTTAWA, ONTARIO Bernard Benoit Project Management Inc August 2012 DST File No.: GS-OT-015122 2150 Thurston Dr., Suite 203 Phone: 613.748.1415

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

Submitted to: Michael Walters Tomlinson Environmental Services Ltd Power Road Ottawa, Ontario K1G 3N4

Submitted to: Michael Walters Tomlinson Environmental Services Ltd Power Road Ottawa, Ontario K1G 3N4 REPORT REPORT ON Geotechnical Investigation Tomlinson Environmental Services Ltd. Resource Recovery Centre - Carp, Ontario Submitted to: Michael Walters Tomlinson Environmental Services Ltd. 5597 Power

More information

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146 GEOTECHNICAL EXPLORATION SERVICES REPORT CONDUCTED FOR: Collier Boulevard PREPARED FOR: Mr. Christopher L. Johnson Director of Land Development Stock Development, LLC Professional Circle, Suite 01 Naples,

More information

PRELIMINARY GEOTECHNICAL INVESTIGATION PROPOSED DEVELOPMENT 1520 NOTION ROAD PICKERING, ONTARIO. Prepared for: DILLON CONSULTING LIMITED.

PRELIMINARY GEOTECHNICAL INVESTIGATION PROPOSED DEVELOPMENT 1520 NOTION ROAD PICKERING, ONTARIO. Prepared for: DILLON CONSULTING LIMITED. PRELIMINARY GEOTECHNICAL INVESTIGATION PROPOSED DEVELOPMENT 0 NOTION ROAD PICKERING, ONTARIO Prepared for: DILLON CONSULTING LIMITED Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED Project: SP-98-0

More information

patersongroup Geotechnical Investigation Proposed Commercial Development Earl Armstrong Road and Limebank Road Ottawa, Ontario Prepared For

patersongroup Geotechnical Investigation Proposed Commercial Development Earl Armstrong Road and Limebank Road Ottawa, Ontario Prepared For Geotechnical Engineering Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Archaeological Services Proposed Commercial Development Earl Armstrong Road and

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

patersongroup Geotechnical Investigation Proposed Commercial Building 1454 Merivale Road Ottawa, Ontario Prepared For

patersongroup Geotechnical Investigation Proposed Commercial Building 1454 Merivale Road Ottawa, Ontario Prepared For Geotechnical Engineering Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Archaeological Services 1454 Merivale Road Ottawa, Ontario Prepared For First Capital

More information

GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY

GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA 73171 JANUARY 06 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT I-15

More information

Site Location. Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe County, Michigan

Site Location. Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe County, Michigan Site Location 0606 1771 North Dixie Highway Monroe, Michigan 48162 Tel: 734-289-2200 Fax: 734-289-2345 www.manniksmithgroup.com Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe

More information

patersongroup 1.0 Field Investigation 2.0 Field Observations Consulting Engineers December 6, 2012 File: PG2823-LET.01

patersongroup 1.0 Field Investigation 2.0 Field Observations Consulting Engineers December 6, 2012 File: PG2823-LET.01 patersongroup December 6, 0 File: P8-LET.0 Taggart Realty 708-5 Metcalfe Street Ottawa, Ontario KP P9 Attention: Subject: Mr. Jeff Parkes Preliminary eotechnical Investigation Proposed Commercial Development

More information

patersongroup Geotechnical Investigation Proposed Residential Development 5721, 5731 and 5741 Manotick Main Street Ottawa (Manotick), Ontario

patersongroup Geotechnical Investigation Proposed Residential Development 5721, 5731 and 5741 Manotick Main Street Ottawa (Manotick), Ontario Geotechnical Engineering Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Residential Development 5721, 5731 and 5741 Manotick Main Street Ottawa

More information

patersongroup Geotechnical Investigation Proposed Residential Development 2020 Dorima Street Ottawa, Ontario Prepared For Longwood Corporation

patersongroup Geotechnical Investigation Proposed Residential Development 2020 Dorima Street Ottawa, Ontario Prepared For Longwood Corporation Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science 2020 Dorima Street Ottawa, Ontario Prepared For Longwood Corporation

More information

GEOTECHNICAL INVESTIGATION PREPARED FOR PREPARED BY PROPOSED MCLEVIN INDUSTRIAL PARK SUBDIVISION NW W4M LACOMBE COUNTY, ALBERTA

GEOTECHNICAL INVESTIGATION PREPARED FOR PREPARED BY PROPOSED MCLEVIN INDUSTRIAL PARK SUBDIVISION NW W4M LACOMBE COUNTY, ALBERTA GEOTECHNICAL INVESTIGATION PROPOSED MCLEVIN INDUSTRIAL PARK SUBDIVISION NW 21-39-27-W4M LACOMBE COUNTY, ALBERTA PREPARED FOR PIDHERNEY S TRUCKING LTD. C/O STANTEC CONSULTING LTD. 600 4808 50 STREET RED

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT 58.6 ROAD (KIMBALL CREEK) 58.9 ROAD TO 58.7 ROAD MESA COUNTY, COLORADO February 9, 2018 Prepared By: Prepared For: Mr. Eric Krch, P.E. SGM, Inc. 744 Horizon Court, Suite

More information

GEOTECHNICAL INVESTIGATION REPORT PROPOSED RESIDENTIAL DEVELOPMENT 786 WILLIAM STREET, MIDLAND

GEOTECHNICAL INVESTIGATION REPORT PROPOSED RESIDENTIAL DEVELOPMENT 786 WILLIAM STREET, MIDLAND GEOTECHNICAL INVESTIGATION REPORT PROPOSED RESIDENTIAL DEVELOPMENT 786 WILLIAM STREET, MIDLAND Prepared for: 786 William Street Inc. Tom Jarvis 27 Coldwater St. East Orillia, ON L3V 1W4 This report was

More information

patersongroup 1.0 Field Investigation Consulting Engineers October 18, 2017 PG4273-LET.01

patersongroup 1.0 Field Investigation Consulting Engineers October 18, 2017 PG4273-LET.01 patersongroup October 18, 217 PG273-LET.1 Choice Properties 22 St. Clair Avenue East, Suite 5 Toronto, Ontario MT 2S5 Attention: Subject: Ms. Kathy Kakish Geotechnical Investigation Proposed Commercial

More information

REFERENCE NO S168 AUGUST 2016

REFERENCE NO S168 AUGUST 2016 A REPORT TO HIGH LEVEL CONSTRUCTION LTD. A SOIL INVESTIGATION FOR RESIDENTIAL DEVELOPMENT 3879 TOWN LINE CITY OF ORILLIA REFERENCE NO. 1606-S168 AUGUST 2016 DISTRIBUTION 3 Copies - High Level Construction

More information

patersongroup Geotechnical Investigation Proposed Commercial Development Earl Armstrong Road and Limebank Road Ottawa, Ontario Prepared For

patersongroup Geotechnical Investigation Proposed Commercial Development Earl Armstrong Road and Limebank Road Ottawa, Ontario Prepared For Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Archaeological Services Geotechnical Investigation Proposed Commercial

More information

The approximate test pit locations were located by Paterson field personnel on-site and is presented on Drawing PG Test Hole Location Plan.

The approximate test pit locations were located by Paterson field personnel on-site and is presented on Drawing PG Test Hole Location Plan. patersongroup March 16, 2016 TC United Group 800 Industrial Avenue, Suite 9 Ottawa, ON K1G 4B8 Attention: Subject: Mr. Ryan Rutherford Geotechnical Investigation Proposed Low-Rise Residential Building

More information

Subsurface Investigation Report

Subsurface Investigation Report AGI Project No. 17-154 Subsurface Investigation Report For the Proposed New One-Story Building Addition 7030 West 111 th Street Worth, Illinois Prepared for T63 Development LLC 11052 Mayflow er Lane Orland

More information

5.0 SITE CONDITIONS. 5.1 Surface Conditions

5.0 SITE CONDITIONS. 5.1 Surface Conditions 5.0 SITE CONDITIONS 5.1 Surface Conditions The project site is located at approximately along Ashdown Forest Road and Nichols Canyon Road in the Fiddlers Canyon Area of Cedar City, Utah. At the time of

More information

April 18, 2016 File:

April 18, 2016 File: April 18, 2016 File: 2016-2179 QuantumPlace Developments Ltd. Suite 203, 1026 16 th Avenue NW Calgary, Alberta T2M 0K6 Attention: Mr. Mitch Braun Re: Geotechnical Investigation Hamptons Golf Course Redevelopment

More information

GEOTECHNICAL INVESTIGATION

GEOTECHNICAL INVESTIGATION GEOTECHNICAL INVESTIGATION SHEETZ CONVENIENCE STORE FREEPORT ROAD AND CALIFORNIA AVENUE NATRONA HEIGHTS, PENNSYLVANIA Prepared For: Mr. David J. Mastrostefano, P.E. Sheetz Incorporated 817 Brookfield Drive

More information

patersongroup 1.0 Field Observations Consulting Engineers November 25, 2015 File: PG3677-LET.01 Habitat for Humanity 768 Belfast Road Ottawa, Ontario

patersongroup 1.0 Field Observations Consulting Engineers November 25, 2015 File: PG3677-LET.01 Habitat for Humanity 768 Belfast Road Ottawa, Ontario November 5, 5 File: P677-LET. Habitat for Humanity 768 Belfast Road K Z5 5 Colonnade Road South KE 7J5 Tel: (6) 6-78 Fax: (6) 6-6 eotechnical Engineering Environmental Engineering Hydrogeology eological

More information

LIVING ARTS DRIVE EXTENSION MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT. Appendix J Geotechnical Report GEOTECHNICAL REPORT J.1

LIVING ARTS DRIVE EXTENSION MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT. Appendix J Geotechnical Report GEOTECHNICAL REPORT J.1 LIVING ARTS DRIVE EXTENSION MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT Appendix J Geotechnical Report GEOTECHNICAL REPORT J.1 Geotechnical Investigation Living Arts Drive Extension From Rathburn Road West

More information

patersongroup Geotechnical Investigation Proposed Residential Development Fernbank Road Ottawa, Ontario Prepared For CRT Developments January 14, 2011

patersongroup Geotechnical Investigation Proposed Residential Development Fernbank Road Ottawa, Ontario Prepared For CRT Developments January 14, 2011 Geotechnical Engineering Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Residential Development Fernbank Road Ottawa, Ontario Prepared For CRT

More information

GEOTECHNICAL INVESTIGATION PROPOSED RESIDENTIAL DEVELOPMENT PART OF LOT 5 CONCESSION 2 (OTTAWA FRONT) BEING PART 2 OF REGISTERED PLAN 4R-19358

GEOTECHNICAL INVESTIGATION PROPOSED RESIDENTIAL DEVELOPMENT PART OF LOT 5 CONCESSION 2 (OTTAWA FRONT) BEING PART 2 OF REGISTERED PLAN 4R-19358 GEOTECHNICAL INVESTIGATION PROPOSED RESIDENTIAL DEVELOPMENT PART OF LOT 5 CONCESSION 2 (OTTAWA FRONT) BEING PART 2 OF REGISTERED PLAN 4R-19358 FORMERLY IN GEOGRAPHIC TOWNSHIP OF GLOUCESTER NOW IN THE CITY

More information

patersongroup 1.0 Field Investigation Consulting Engineers February 12, 2016 File: PG3498-LET Ontario Inc. 64 Cleopatra Drive

patersongroup 1.0 Field Investigation Consulting Engineers February 12, 2016 File: PG3498-LET Ontario Inc. 64 Cleopatra Drive patersongroup February 12, 2016 File: P3498-LET.01 2336925 Ontario Inc. 64 Cleopatra Drive Ottawa, Ontario K2 0B4 Consulting Engineers 154 Colonnade Road South Ottawa, Ontario K2E 7J5 Tel: (613) 226-7381

More information

patersongroup Geotechnical Investigation Proposed Residential Development 3071 Riverside Drive Ottawa, Ontario Prepared For Canoe Bay Development Inc.

patersongroup Geotechnical Investigation Proposed Residential Development 3071 Riverside Drive Ottawa, Ontario Prepared For Canoe Bay Development Inc. Geotechnical Engineering Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Archaeological Services Proposed Residential Development 3071 Riverside Drive Ottawa,

More information

GEOTECHNICAL INVESTIGATION REPORT MOUNTBATTEN EXTENSION PHASE 2 NEW STORM AND SANITARY SEWERS AND RESIDENTIAL DEVELOPMENT WINDSOR, ONTARIO

GEOTECHNICAL INVESTIGATION REPORT MOUNTBATTEN EXTENSION PHASE 2 NEW STORM AND SANITARY SEWERS AND RESIDENTIAL DEVELOPMENT WINDSOR, ONTARIO GEOTECHNICAL INVESTIGATION REPORT MOUNTBATTEN EXTENSION PHASE 2 NEW STORM AND SANITARY SEWERS AND RESIDENTIAL DEVELOPMENT WINDSOR, ONTARIO Submitted to: The Corporation of the City of Windsor Engineering

More information

SITE INVESTIGATION. Foundation Engineering

SITE INVESTIGATION. Foundation Engineering SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface

More information

patersongroup Consulting Engineers March 2, 2017 PH2948-LET.01R1 Phoenicia Development 4100 Albion Road Ottawa, Ontario K1T 3W1

patersongroup Consulting Engineers March 2, 2017 PH2948-LET.01R1 Phoenicia Development 4100 Albion Road Ottawa, Ontario K1T 3W1 Consulting Engineers March 2, 2017 154 Colonnade Road Ottawa, Ontario Canada, K2E 7J5 Tel: (613) 226-7381 Fax: (613) 226-6344 Phoenicia Development 4100 Albion Road Ottawa, Ontario K1T 3W1 Attention: Subject:

More information

Subsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015

Subsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015 Subsurface Investigations PDCA Professor s Driven Pile Institute Loren R. Anderson Utah State University June 25, 2015 Ralph B. Peck (1962) Subsurface engineering is an art; soil mechanics is an engineering

More information

Submitted to: Dehart Properties Limited Partnership th Street Langley, BC V2Y 0E2

Submitted to: Dehart Properties Limited Partnership th Street Langley, BC V2Y 0E2 0 March 07 GEOTECHNICAL AND HYDROGEOLOGICAL ASSESSMENTS Proposed Residential Subdivision, 984 Dehart Road, Kelowna, BC Submitted to: Dehart Properties Limited Partnership 03-8047 99th Street Langley, BC

More information

patersongroup 1.0 Field Investigation Consulting Engineers February 8, 2016 Report: PG Doran Contractors Limited 3187 Albion Road South

patersongroup 1.0 Field Investigation Consulting Engineers February 8, 2016 Report: PG Doran Contractors Limited 3187 Albion Road South February 8, 016 Report: PG717-1 Doran Contractors Limited 187 Albion Road South Ottawa, Ontario K1V 8Y Attention: Subject: Mr. Sean Montgomery Geotechnical Investigation Proposed Commercial Development

More information

Geotechnical Investigation Proposed Commercial Development 571 Lacolle Way Ottawa, Ontario

Geotechnical Investigation Proposed Commercial Development 571 Lacolle Way Ottawa, Ontario Geotechnical Investigation Proposed Commercial Development 571 Lacolle Way Ottawa, Ontario Prepared for: Morley Hoppner Limited 1818 Bradley Side Road Ottawa, ON K0A 1L0 Attention: Brian Morley Vice President

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Engineering, Inspection & Testing

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Engineering, Inspection & Testing Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Engineering, Inspection & Testing August 9, 07 File No. 7--0090- Stoney Creek Office City of Hamilton Waterfront Development

More information

GEOTECHNICAL INVESTIGATION AND PAVEMENT DESIGN REPORT

GEOTECHNICAL INVESTIGATION AND PAVEMENT DESIGN REPORT Square One Drive Extension Municipal Class Environmental Assessment Environmental Study Report Appendix J Geotechnical Investigation and Pavement Design report GEOTECHNICAL INVESTIGATION AND PAVEMENT DESIGN

More information

FIGURES Printed By: aday Print Date: 3/23/2011 12:48:08 PM File Name: \\geodesign.local\files\jobs\m-r\penskeauto\penskeauto-1\penskeauto-1-01\figures\cad\penskeauto-1-01-vm01.dwg Layout: FIGURE 1 VICINITY

More information

CONTRACT 5E-2 APPENDIX A - TEST HOLE LOGS DYREGROV ROBINSON INC. PORTAGE AVE WINSTON DR BOURKEVALE CAVELL PARKSIDE DR ASSINIBOINE AVE

CONTRACT 5E-2 APPENDIX A - TEST HOLE LOGS DYREGROV ROBINSON INC. PORTAGE AVE WINSTON DR BOURKEVALE CAVELL PARKSIDE DR ASSINIBOINE AVE APPENDIX A - TEST HOLE LOGS PORTAGE AVE TH -9 CONTRACT E- DR DR BOURKEVALE CAVELL WINSTON DR PARKSIDE DR ASSINIBOINE AVE AUTHORIZED BY: DATE: CONSULTING GEOTECHNICAL ENGINEERS AUTHORIZED /0/ CLIENT DRAWING

More information

GEOTECHNICAL INVESTIGATION. 20th Street Connection, Vernon, BC

GEOTECHNICAL INVESTIGATION. 20th Street Connection, Vernon, BC 4 August 2016 GEOTECHNICAL INVESTIGATION 20th Street Connection, Vernon, BC Submitted to: Ministry of Transportation and Infrastructure 447 Columbia Street Kamloops, BC V2C 2T3 Attention: Tom Kneale, PEng

More information

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Parking Lot 47 Jacksonville, Florida MAE Project No. 0019-0009 April 5, 2017 Revised: April 6, 2017 Prepared for: Prepared by: Jacksonville,

More information

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink. JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT

More information

patersongroup Geotechnical Investigation Proposed Commercial Building - Mr. Lube Shops of Tenth Line Development 2272 Tenth Line Road Ottawa, Ontario

patersongroup Geotechnical Investigation Proposed Commercial Building - Mr. Lube Shops of Tenth Line Development 2272 Tenth Line Road Ottawa, Ontario Geotechnical Engineering patersongroup Environmental Environmental Engineering Engineering Hydrogeology Hydrogeology Geological Engineering Geological Engineering Materials Testing Materials Testing Building

More information

REFERENCE NO C037 AUGUST 2017

REFERENCE NO C037 AUGUST 2017 A REPORT TO DREAMWOOD DEVELOPMENTS INC. A GEOTECHNICAL INVESTIGATION FOR PROPOSED 4-STOREY APARTMENT BUILDING WITH 1-LEVEL UNDERGROUND PARKING GARAGE 60-90 RIVER ROAD EAST TOWN OF WASAGA BEACH REFERENCE

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

Report on Geotechnical Investigation

Report on Geotechnical Investigation Report on Geotechnical Investigation Meadowvale North Pumping Station and Reservoir Standby Power Upgrade and Miscellaneous Station Upgrade Region of Peel Prepared For: Region of Peel 10 Peel Centre Drive,

More information

March 19, 2018 Ref. No.: T Mattamy Willmott Limited 433 Steeles Ave. E., Suite #110 Milton, Ontario L9T 8Z4. Mr. Evan Kernaghan.

March 19, 2018 Ref. No.: T Mattamy Willmott Limited 433 Steeles Ave. E., Suite #110 Milton, Ontario L9T 8Z4. Mr. Evan Kernaghan. March 9, 20 Ref. No.: T72 433 Steeles Ave. E., Suite #0 Milton, Ontario L9T Z4 Attention: Mr. Evan Kernaghan Dear Sir: RE: Geotechnical Investigation Report Proposed Residential Condominium Development

More information

patersongroup Geotechnical Investigation Proposed Residential Development 3143 Navan Road - Ottawa Prepared For Domicile Developments

patersongroup Geotechnical Investigation Proposed Residential Development 3143 Navan Road - Ottawa Prepared For Domicile Developments Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Geotechnical Investigation Proposed Residential Development 3143

More information

patersongroup Geotechnical Investigation Clarke Lands - Stage 1 Residential Development Strandherd Road at Kennedy Burnett Drain Ottawa, Ontario

patersongroup Geotechnical Investigation Clarke Lands - Stage 1 Residential Development Strandherd Road at Kennedy Burnett Drain Ottawa, Ontario Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Clarke Lands - Stage 1 Residential Development Strandherd Road at

More information

McWhirter-Horvath Properties Inc.

McWhirter-Horvath Properties Inc. McWhirter-Horvath Properties Inc. Slope Assessment and Geotechnical Investigation Project Name New Residential Development Project Location 71-89 Princess Avenue St. Thomas, ON Project Number LON-00015517-GE

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

GEOTECHNICAL DUE DILIGENCE INVESTIGATION REPORT PROPOSED RETAIL FUEL OUTLET 1622 ROGER STEVENS DRIVE KARS, ONTARIO K0A 2E0

GEOTECHNICAL DUE DILIGENCE INVESTIGATION REPORT PROPOSED RETAIL FUEL OUTLET 1622 ROGER STEVENS DRIVE KARS, ONTARIO K0A 2E0 geotechnics construction materials testing GEOTECHNICAL DUE DILIGENCE INVESTIGATION REPORT PROPOSED RETAIL FUEL OUTLET 6 ROGER STEVENS DRIVE KARS, ONTARIO K0A E0 REPORT REF. NO. CB057.00 April 5, 08 Prepared

More information

Appendix A - Vicinity Map Vicinity Map: Palm Beach Gardens City Hall Additions, 000 N Military Trail, Palm Beach Gardens, FL Proposed Location of Police Dept. Attached Addition Proposed Location of New

More information

patersongroup Geotechnical Investigation Proposed Residential Development 1098 Ogilvie Road and 1178 Cummings Avenue Ottawa, Ontario Prepared For

patersongroup Geotechnical Investigation Proposed Residential Development 1098 Ogilvie Road and 1178 Cummings Avenue Ottawa, Ontario Prepared For Geotechnical Engineering Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Residential Development 1098 Ogilvie Road and 1178 Cummings Avenue Ottawa,

More information