1 FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED Ford Motor Private Limited- Conceptual Plan 1
2 Contents 1 INTRODUCTION BACKGROUND PROJECT LOCATION PROJECT FEATURES Sustainability Features 8 2 UTILITIES WATER REQUIREMENT WASTE WATER MANAGEMENT SOLID WASTE MANAGEMENT Domestic Solid Waste Hazardous Wastes Generation and Disposal POWER REQUIREMENT TRAFFIC AND PARKING ARRANGEMENTS Road Connectivity Traffic and Parking Arrangement FIRE PROTECTION AND DETECTION SYSTEM : SITE DRAINAGE PLAN LANDSCAPE PLAN 27 2
3 1 INTRODUCTION 1.1 BACKGROUND Ford Motor Private Limited (FMPL) is is a Private Company incorporated on 02 September It provides support services to Ford offices around the world for, accounting, book-keeping and auditing activities; tax consultancy; market research and public opinion polling; business and management consultancy. FMPL proposes to develop a Global Technology and Business Center at ELCOSEZ Park, Shollinganalur village in Tambaram tehsil in Kanchipuram district in the state of Tamil Nadu. 1.2 PROJECT LOCATION The proposed project site is located off Old Mahabalipuram Road(OMR), ELCOT SEZ in Shollinganallur in Chennai. The proposed facility is approximately 20 kms away from Chennai Central Business District (CBD) and 9.9 kms away from Chennai International Airport. The proposed site is accessed by a 60 mw ide road on the northern side and 45m wide SEZ road on the western side. It is approximately 33 km from Ford India Private Limited manufacturing plant and 11.8 km from Ford s Regional Office in RMZ Millenia Business Park. 1.3 PROJECT FEATURES The total area of the proposed project site is 28 acres or m 2. The Open space reservation for the proposed project is 10 % of the total site area, which is 2.8 acres or m 2. The project will be developed in two phases. The total built up of the proposed project is m 2. The area statement has been provided in Table 1.1 and Table 1.2. Map showing project location has been presented in Figure 1.1, Figure 1.2 provides the contour map of the project site and Figure 1.3 shows the site plan approval. Proposed Construction Plan includes o Office buildings (Office bldg. 1 & 2), o Learning & Development Centre, o Canteen & Amenities Block, o Product Development facility, o Service building (Chiller Plant room, Electrical room and PHE / Fire sump, Other requirements such as GIS / Switchyard, HSD Yard, Gas banks, STP, OWC & Security blocks. o Basement floors (combined basement) with site development. Long Term Construction Plan includes o 2 Office buildings (Office bldg. 3 & 4), o MLCP with the extension of existing o 2 Basement floors (combined basement) 3
4 Figure 1.1 Map showing project location 4
5 Figure 1.2 Project Site Contour Map with surrounding project features 5
6 Figure 1.3 Site Plan 6
7 Figure 1.4 Photographs of Project Site General view looking towards the East (from Cognizant to opposite) General view looking towards the North General view looking towards the West -Cognizant at the background Corridor at South Boundary 7
8 Table 1.1 Area statement for Proposed Plan SN. Proposed Plan Built up-area (m2) A Office Spaces B Product Development Test Center C Supporting facilities D Covered Parking Area Built Up Area Table 1.2 Area statement for Long Term Plan SN. Long Term Plan Built up-area (m2) A Office Spaces B Supporting facilities C Covered Parking Area Total Built Up Area Sustainability Features LEED Platinum rating for L&D Centre and Gold rating for office blocks Energy Saving through : o 100% internal & external light fixtures are proposed with LED light fixtures; o Daylight sensors are proposed to control lighting levels using the daylight near windows in office buildings; o Timer control is for External street lighting and landscape lighting control; o Occupancy sensors are proposed for meeting rooms; o Harvesting solar energy for water heating ; o Orientation of building carried to optimize use of shadow path and reduce electricity consumption by using day light, reducing heat load; o Energy efficient double walled glazing for office building; o Hybrid chiller plant for energy conservation; o Air cooled chiller and Cooling Tower; o Variable Frequency drives for HVAC equipment, AHU etc.; o Variable Air Volume air distribution system with low pressure drop for office buildings; o Extra low voltage systems for sustainable ecology; o Balancing of environment through Building Management Systems; and o Harvest Solar energy via grid-connected solar panels without battery backup. The Master Plan of the proposed project has been provided in Figure
9 Figure 1.5 Master Plan 9
10 2 UTILITIES 2.1 WATER REQUIREMENT The total fresh Water requirement for the proposed project will be 421 m3/day for domestic requirement (drinking, canteen ) Water requirement for the project will be fulfilled through water supply from ELCOT, The Tamil Nadu Water Supply and Drainage Board (TWAD), rooftop rainwater harvesting (during monsoon) and recycling of treated wastewater. The raw water supplied from TWAD and ELCOT and rooftop rain water will be treated in pre-treatment facility before being supplied for different uses. The break-up of daily water requirement for operation phase of the proposed project is given in Table 2.1. Table 2.1 Break up of daily water requirement during operation phase SN. Area Water requirement for proposed project ( m3 /day) during non-rainy season) Total water requirement Recycled water from STP Net fresh water requirement 1 Domestic Water Flushing water Drinking water Cooking water Ro reject 28 6 Landscape development HVAC make up water Total
11 Figure 2.1 Water Balance Diagram 11
12 Water Treatment Plant The raw water supplied from TWAD and rooftop rainwater will be treated in the pre-treatment facility before supplied for different uses. The pre-treatment facility will include Reverse osmosis plant. A WTP comprises of Ultra filtration unit followed by disinfection proposed. The capacity of WTP is 450 cum/day. A solar water heater of 2000LPD (proposed plan) will be considered for canteen kitchen cooking requirements as a pre heating facility. Figure 2.2 Water Distribution and Treatment System 2.2 WASTE WATER MANAGEMENT Total sewage generation during operation phase of the proposed project would be 840 Cu.m/day. A Sewage Treatment Plant of 850 Cu.m/day capacity has been proposed on the ground-floor next to the OWC to cater to the sewage disposal and treatment at the site. Treated wastewater from STP would meet the standards prescribed by the Tamil Nadu State Pollution Control Board (TNSPCB). The treated wastewater would be reused for gardening, flushing toilets and HVAC makeup purposes. 12
13 Design of STP The STP would be designed with the influent and effluent characteristics as tabulated below: Table 2.2 Influent and effluent characteristics of STP SN. Characteristics Influent Parameters Effluent parameters 1. ph BOD mg/l < 20 mg/l 3. COD mg/l < 100 mg/l 4. Suspended Solids mg/l < 10 mg/l 5. Oil & Grease 20 mg/l <5 mg/l Process Description The raw sewage generated will be passed through the Bar Screen Chamber wherein removal of large floating, suspended and settle able solids manually will be carried out. The screened effluent will be passing through grit chamber whereas fine suspended particle will be removed. The effluent will then flow by gravity and will be collected in the Equalization Tank wherein wastewater quality and quantity variation will be absorbed. The equalized effluent will be pumped at constant rate into the aeration tank wherein the Moving Media will be provided. The attached growth, aerobic microbes will be developed on the media which will utilize the pollutant in presence of oxygen thereby reducing The dead biomass will be separated in the settling tank. The solids separated will be collected in the hopper and clear supernatant will flow by gravity into clarified water tank. The treated effluent from clarified effluent tank will be pumped through pressure sand filter and activated carbon filter for further polishing of treated waste water prior to reuse for gardening / toilet flush. The dead biomass separated will be taken as STP sludge. 13
14 Figure 2.3 Process Flowchart of STP 14
15 Figure 2.4 Schematic Drawing the Plumbing system 15
16 2.3 SOLID WASTE MANAGEMENT Domestic Solid Waste The detail of hazardous waste generation is provided in Table 2.3 as follows: Table 2.3 Domestic Solid Waste Generation during Operation Phase SN. Waste Type Proposed Quantity Method of Disposal 1 Solid domestic waste 0.2 kg/day/capita (18000 person)= 3.60 tons/day 2 Biodegradable waste ( organic such as food waste) 3 Non-biodegradable waste 1.44 tons/day To be treated in organic waste converter onsite and used for gardening purposes tons/day Non bio degradable waste would be segregated as recyclable and non recyclable and disposed through to recyclers and MSW sites respectively. 4. Sludge 130 kg /day To be used for gardening purposes Hazardous Wastes Generation and Disposal The detail of hazardous waste generation is provided in Table 2.4 as follows: Table 2.4 Hazardous Waste Generation during Operation Phase SN. Waste Type Source Method of Disposal 1 Waste/used oil DG sets To TNSPCB approved recyclers 2 Jute/rags containing oil and grease residues Cleaning of any spillage To TNSPCB approved recyclers The e-waste generated would be contracted with a third party through a buy-back policy and accordingly shall be disposed of by the sub-contractor and authorized recycler Packing wastes and other wastes from testing activity like metals, plastics and rubber would be disposed through recyclers. A flowchart showing the proposed waste management system has been presented in Figure
17 Figure 2.5 Waste Management for the proposed site 2.4 POWER REQUIREMENT Connected load during operation phase would be kw, which will be met through 110 Kv supply from Electricity board. The power supply would be through Tamil Nadu Transmission Corporation Limited (TNTCL and ELCOT) and maximum power demand would be kw. As a power backup arrangement, 9 number of 11kV Diesel Generator sets of 2 MVA capacity each will be provided. At any point of time only 8 no. of diesel generators will be operative and 1 will be kept as a standby arrangement. Stack Height 30 meter from Ground Level would be provided. 5% of the entire campus demand is generated by roof mounted solar PV cells. Installed capacity of 620 KVA is proposed for the entire campus. The total number of LPG cylinders proposed to be stored on site shall be 208 cylinders for canteen cooking purposes. 17
18 2.5 TRAFFIC AND PARKING ARRANGEMENTS Road Connectivity The site is bounded by a 45 m wide road on the western boundary and 60 m wide road alongside the northern boundary. 8 m access way is provided all around the building Traffic and Parking Arrangement During operation phase, daily traffic to be generated due to the proposed traffic is provided as follows: Table 2.5 Vehicles during Operation Phase SN. Type of Vehicle Proposed Plan Long Term Plan 1 Cars Two wheelers Parking calculations will be done as per Chennai Metropolitan Development Authority (CMDA) Rules. 18
19 Figure 2.6 Vehicular Movement Plan 19
20 Figure 2.7 Pedestrian Movement Plan 20
21 Figure 2.8 Service Vehicle Movement Plan 21
22 2.6 FIRE PROTECTION AND DETECTION SYSTEM : As per National Building Code (NBC) 2005 guidelines, the proposed project has been classified as business buildings, Group-E (IT/ITES space), only office building-1,2, 3& 4 is more than 30 m in height. Other buildings such as canteen and amenities, L&D, PD facility are less than 30 m in height. The building classification and height is provided below: Table 2.6 Building Classification and Height Buildings Protected Office Building 1 & 2 Learning and Development Center PD Facility Canteen & Amenities Service Building Classification of Building based on Occupancy as per NBC-2005 Part-IV Fire and Life safety Business Building Group E 1 & E-3, Computer Installations, Offices etc., (Moderate Hazard) Above 30m in height Business Building Group E 1 & E-3, Computer Installations, Offices etc., (Moderate Hazard) Above 10m but not exceeding 15m in height Business Building Group E 1 & E-3, Computer Installations, Offices etc., (Moderate Hazard) Less than 10m in height Assembly Building Group D-3, (Moderate Hazard) Above 15m but not exceeding 24m in height. Moderate Hazard,Less than 15m in height The National Building Code (NBC),2005, part IV ( Fire and Life safety) and NFPA together form the basis for the fire protection design of the proposed building and include water based fire suppression systems that are designed to protect occupant and also to suppress fire and smoke development. Following Systems have been proposed to be designed to curtain or suppress fire: External Hydrant System; Internal Hydrant System; Sprinkler System; Fire Water curtain system for compartmentation; Water mist fire protection system for MDF room-1 & Datacenter; High velocity water spray system for Oil cooled transformers; Other Fire protection system: o Analogue Addressable type Fire detection and Alarm System o Aspiration smoke detection system for MDF room-1 & Datacenter o Fire exit signages Fire Water Sump: Description Total for Proposed Plan Total for Fire water curtain system Total for Future Plan NBC-2005 Part-IV Fire and Life safety 600 Cu.m 690 Cu.m 600 Cu.m Codes and Standards: 22
23 NBC 2005 FPEB NFPA National Building Code 2005, Part IV, Fire and Life Safety. Amendment no.2 September 2015 to National Building Code of India 2005 (SP 7:2005) FORD Fire Protection Engineering Bulletin National Fire Protection Association The schematic drawing of the fire tender movement has been presented in Figure
24 Figure 2.9 Fire Tender Movement Plan 24
25 2.7 SITE DRAINAGE PLAN The total runoff from the Project site is estimated to be 7416 m3/hr considering rainfall intensity of 100 mm/hr. The design of rainwater harvesting has been done for 15 minutes of peak intensity of rainfall from roof top. The rainwater from roof top (2030 m3/hr) will be collected in rainwater collection sump of 500 m3 capacity and shall be reused for domestic purposes after necessary treatment. There are no recharge pits considered/proposed due to high ground water level. The excess storm water (6916 m3/hr ) will be discharged through internal storm water drain (of 1200 mm width) into external existing public drains. The proposed site is located in a marshy land with the ground water table depth of 0.2 m to 1.2 m around the site boundary. As per the geo technical investigation report, clay is encountered at an average depth of about 1.5m. Due to shallow ground water table, if bore wells/recharge pits are drilled there is a chance of ground water entry to the surface. The rainwater from the roofs shall be collected by the rainwater down take pipes and same shall be connected to Rain water chambers at ground level. The Rain water chambers/drains around each building shall be interconnected by RCC hume pipes and finally routed to the nearest rainwater harvesting sump. The rainwater harvesting sumps have been designed to cater for the rainfall intensity of 100mm/hr (as per IRC SP 42 & Manual on norms & standards for environmental clearance of large construction projects - MOEF). The landscape area and roads shall be sloped towards the storm water drains so that the runoff gets collected. The overflow from the rainwater harvesting sumps shall be guided to the existing drain outside the site boundary through the storm water drainage network inside the campus. The design calculation for the rainwater harvesting system is as follows: It has been proposed to provide two nos. of rainwater harvesting sumps, each of capacity 250 cum respectively. Hence, total storage considered for the rainwater from roof tops is 500 cum. Filter media is proposed to be provided for trapping the leafs and other floating suspended materials from the rainwater, before entering into the sump. From the rainwater tank, water is pumped to the underground water tank for reuse for domestic, flushing & landscape irrigation purpose. 25
26 Figure 2.10 Site Drainage Plan for Proposed Project site 26
27 2.8 LANDSCAPE PLAN The project is being planned with an organized open and green area. For the proposed project, provision has been made for total green belt development area as 25 %, with trees, shrubs, ground covers and grass pavers and lawns. The Landscape Plan has been provided as below : 27
28 Figure 2.11 Landscape Plan for Proposed Project site 28
ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan
ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL
More information5. ENVIRONMENT MANAGEMENT PLAN
5. ENVIRONMENT MANAGEMENT PLAN The environmental management plan consist of the set of mitigation measures, management and, monitoring measures to be taken during construction and operation phase to eliminate
More informationCONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT
CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT ABOUT PROJECT M/s. DAR Housing Ltd. Proposed Group Housing Project ATS Rhapsody, At Plot No. GH-12/1, Sector-01, Greater Noida (U.P.), having Plot
More informationThe Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT
CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT ABOUT PROJECT The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In earlier project planning the total plot area
More informationWater Management. How do we reduce and recycle our wastewater?
How do we reduce and recycle our wastewater? SRM IST has a long-term commitment for conservation for water. The Institute of Science and Technology will regularly monitor the use of water with frequent
More informationENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors
1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction
More informationENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)
ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation
More informationMax. building height (m)
Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project
More informationCONCEPTUAL PLAN. for. Submitted to: State Level Environmental Impact Assessment Authority (SEIAA), MoEF&CC, Telangana State.
CONCEPTUAL PLAN for Proposed IT Office Building - 1 Million sft Building in Survey No 124/P, Gopanapally Village, Serilingampally Mandal, Ranga Reddy District, Hyderabad, Telangana Submitted to: State
More informationCONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016
CONECPTUAL PLAN w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire at of J.V.P.D scheme of Vile Parle (W), by December, 2016 GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified
More informationExpansion of Calcutta Riverside (An Integrated Township)
CONCEPTUAL PLAN Expansion of Calcutta Riverside (An Integrated Township) Project of Riverbank Developers Private Limited at Maheshtala, Batanagar, West Bengal. Project Proponent: Riverbank Developers Private
More informationFeasibility Report of Proposed ETP cum STP. M/s. Zakiya Healthcare Plot No.39, Pharmacity Selaqui, Dehradun (Uttarakhand)
Feasibility Report of Proposed ETP cum STP M/s. Zakiya Healthcare Plot No.39, Pharmacity Selaqui, Dehradun (Uttarakhand) 1.0 Introduction M/S Zakiya Healthcare is planning to install an Effluent cum Sewage
More informationTABLE OF CONTENTS. Para No. Contents Page No
TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report
More informationExisting vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.
Project name:- Project Code :- Registration Category :- General Comments :- Drawings Feedback:- 1st feedback No Dwg Name Dwg Description Recommendation 1 Site survey plan Site plan showing following in
More informationSIX MONTHLY COMPLIANCE REPORT JUNE- 2015
SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,
More informationMunicipal solid / hazardous waste
(10) ENVIRONMENTAL MANAGEMENT PLAN The mitigation measures for reducing the adverse environmental impacts together constitute a part of EMP. The environmental issues, which need management, plan for the
More informationCheck list for construction Project of EC [Category 8(a)]:
Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist
More informationSIX MONTHLY COMPLIANCE REPORT JUNE- 2015
Six Monthly Compliance Report June-2015 M/s Mahagun Real Estate Pvt. Ltd SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex Mahagunpuram AT VILLAGE Mehrauli, Dasna, Ghaziabad, U.P. Being developed
More informationPRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR
PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR PROPOSED CONSTRUCTION BUILDING PROJECT OF NILA INFRASTRUCTURES LTD (25988.59 m 2 Built up Area)
More informationGUIDELINES ON ENERGY CONSERVATION IN SEZs
1 GUIDELINES ON ENERGY CONSERVATION IN SEZs SEZs are special enclaves aimed at creating world class infrastructure. The guidelines and certification for SEZs is to be implemented as follows: Entire SEZ
More informationHealth and safety norms of CPWD should be followed during construction.
Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"
More informationsqm. 123 kld (Landscaping - 31 kld, Dual Flushing 73 kld Car Washing - 19 kld) Quantity Of Wastewater Discharge
DETAILS OF PROJECT The project proponent wants to develop a Residential Building with all modern amenities Premises No. 116, Roy Bahadur Road (previously known as 352, Roy Bahadur Road), Kolkata - 700053
More informationCONCEPTUAL PLAN FOR INTEGRATED TOWNSHIP MIXED USE DEVELOPMENT AT SURYA NAGAR GWALIOR OF. Gwalior
PLAN FOR INTEGRATED TOWNSHIP MIXED USE DEVELOPMENT AT SURYA NAGAR GWALIOR OF Gwalior AT Village Baretha & Laxangarh, Tehsil & District Gwalior (M.P.) Proponent Mr. P.K. Hedau Executive Engineer MPH&IDB,
More informationTABLE-1 PROJECT AT A GLANCE. Location S. F. Nos. 442/1, 442/3, 442/5, 443/1, 443/2, 443/3, 443/4, 443/5, 434/7, 434/8, 434/9 of Kolappalur Village
TABLE-1 PROJECT AT A GLANCE Registered Address M/s. Pallavada Technical Textiles Park Private Limited, No. 78, Greams Road, Thousand Lights, Chennai-600006. Communication Address of M/s. Pallavada Technical
More informationPOTABLE WATER SUPPLY DEFINITIONS
Definitions POTABLE WATER SUPPLY DEFINITIONS AQUIFER. A porous, water-bearing geologic formation. Generally restricted to materials capable of yielding an appreciable supply of water. BASIN. A natural
More informationOnsite Sewage Treatment Program. Presented by: Ed Melzark SR Environmental Technician / Zoning Administrator Pine County
Onsite Sewage Treatment Program Presented by: Ed Melzark SR Environmental Technician / Zoning Administrator Pine County Understanding Your Septic System Why Are Septic Systems Necessary? Over 25 percent
More informationDetails of the proposed project as presented before the committee are tabulated below:
Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated
More informationDetails of Project. Underground source
Details of Project The project proponent wants to develop a Residential complex with all modern amenities at R.S./L.R. Dag No - (442,447,453,454, 443,444), J.LNo-29 Of Khamar Mouja & R.S./L.R. Dag No-(99(P),101,102(P),103,105,106,107,108,109,110,111,112,113(P),114(P),115,125,126,
More informationSr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)
Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in
More informationFEASIBILITY REPORT OF 250 KLD SEWAGE TREATMENT PLANT
FEASIBILITY REPORT OF 250 KLD SEWAGE TREATMENT PLANT FOR Proposed Residential Apartment project by M/s. DS-Max Properties Pvt Ltd, at Sy No. 27/2 & 27/3 at Valagerahalli Village, Kengeri Hobli, Bangalore
More informationFEASIBILITY REPORT ON SEWAGE TREATMENT PLANT ARCHITECTS PHE CONSULTANTS
Uttarahalli village, FEASIBILITY REPORT ON SEWAGE TREATMENT PLANT FOR M/s. PRESTIGE ESTATES PROJECTS LTD, BENGALURU PROJECT : DEVELOPMENT OF RESIDENTIAL APARTMENT BEARING SY. Nos. 115,116 & 117 AT UTTARAHALLI
More informationNo.D.12/30/2009-SEZ Government of India Ministry of Commerce & Industry Department of Commerce
No.D.12/30/2009-SEZ Government of India Ministry of Commerce & Industry Department of Commerce Udyog Bhawan, New Delhi Dated the 11 th December, 2009 To 1. All Development Commissioners 2. DG, EPCES Subject:
More informationDescription of the Work
Description of the Work Construction,Supplying of Electro Mechanical equipment, pipe fittings, erection, installation, testing and commissioning MBBR technology Sewage Treatment Plant ( 300 KLD) at kh.no.54,city
More informationFeasibility Report on Sewage Treatment Plant (STP)
Feasibility Report on Sewage Treatment Plant (STP) FOR Proposed Commercial Building project Commercial Office Building by M/s. Bhagavath Sannidhi Estates Pvt Ltd.at Sy No 55/1 of Devarabeesanahalli Village,
More informationUPGRADING GAZA WASTEWATER TREATMENT PLANT. Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population.
Gaza City Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population. Gaza City has the oldest wastewater system in Gaza Strip; it consists of some of 280 kilometers
More informationConceptual plan. Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: -
Conceptual plan Table 1:Area Statement for proposed Corporate Office Complex AREA STATEMENT: - Area of plot= 5293SQM, Sanctioned FAR = 10586SQM as per earlier sanctioned.(2) Sanctioned Built up Area=19480.63
More informationSPRINGWOOD COMMUNITY & CULTURAL FACILITIES
SPRINGWOOD COMMUNITY & CULTURAL FACILITIES REPORT ON PROPOSED HYDRAULIC AND FIRE SERVICES Issue Date Revision Author Status A September 2011 Preliminary G. Barnes Current Prepared by: Prepared for: WARREN
More informationP WER OF DESIGN. by SANDEEP SHIKRE, leed AP
P WER OF DESIGN by SANDEEP SHIKRE, leed AP Green Architecture is an intelligent and integrated solution of providing the Content of functional requirements respecting the Context. architecture engineering
More informationF.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.
20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee
More informationCertified 55 to 65 Points, Silver 66 to 76 Points, Gold 77 to 87 Points, Platinum 88 to 110 Points
IGBC GREEN SCHOOLS RATING SSTEM - SCORECARD THE PUPIL SAVEETHA ECO SCHOOL, CHENNAI RATING ACHIEVED: PLATINUM Registration No.: GS 6 06 Date: 5 September 07 90 0 8 Certified 55 to 65 Points, Silver 66 to
More informationHAZOP Checklist for Sewage Treatment Plant
HAZOP Checklist for Sewage Treatment Plant CHECKLIST 1.0 Overall Layout of Treatment Plant 1.1 General Layout Property are fenced and gated and the fence height. State where these problems/impacts occur
More informationMauritius Green Building Handbook. Water. Introduction. Water and buildings. Llewellyn van Wyk Principal Researcher Built Environment CSIR
Mauritius Green Building Handbook Water Llewellyn van Wyk Principal Researcher Built Environment CSIR Introduction Water scarcity is without doubt one of the greatest threats to the human species and has
More informationLesson W9 Wastewater and CSOs
Lesson W9 Wastewater and CSOs Where Does our Water Go When We Flush it Down the Drain? When you flush your toilet or wash your dishes, where does the water go? We learned that only 2-3% of the water used
More informationECO Smart Aerobic Waste Water Treatment System. Optimising the re-use and recycling of waste water
Optimising the re-use and recycling of waste water The ECO Smart aerobic wastewater treatment system is a selfcontained wastewater treatment system that utilizes a combination of anaerobic as well as aerobic
More informationFrequently Asked Questions for Septic Tank and other Wastewater Treatment Systems
Frequently Asked Questions for Septic Tank and other Wastewater Treatment Systems 1. What happens to wastewater from my home? 2. How should a septic tank wastewater treatment system work? 3. What is a
More informationA.B.A. Well and Septic Services Inc. P.O. Box 35 Ivor, VA (757) A Homeowner s Guide to Septic Systems
A.B.A. Well and Septic Services Inc. P.O. Box 35 Ivor, VA 23866 (757) 859-9494 A Homeowner s Guide to Septic Systems The Main Components of a Septic System Septic Tank The septic tank is a buried, watertight
More informationPLANNING DEPARTMENT 701 OCEAN STREET, 4 TH FLOOR, SANTA CRUZ, CA (831) FAX: (831)
COUNTY OF SANTA CRUZ PLANNING DEPARTMENT 701 OCEAN STREET, 4 TH FLOOR, SANTA CRUZ, CA 95060 (831) 454-2580 FAX: (831) 454-2131 Rooftop Rainwater Harvesting Permit Application & Inspection Checklist A building
More informationBELLARY THERMAL POWER PROJECT PROJECT INFORMATION
BELLARY THERMAL POWER PROJECT PROJECT INFORMATION 1.0 Owner / BHEL : Karnataka Power Corpn. Ltd., Shakthi Bhavan No. 82 Race Course Road, Bangalore 560 001, Karnataka, India. 2.0 Owner / BHEL s Consultant
More informationPoint wise reply. There is no change in water requirement and wastewater generation. However, water balance enclosed as Annexure-I.
Mohammadpur Korji, P.S.- Phulwarisharif, District- Patna, Bihar by M/s Balprada Built Pvt. Ltd. Point wise reply Point 1: Submit revised water balance for the Project There is no change in water and wastewater
More informationPre-Feasibility Report
PROJECT PREFEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENTAL CLEARENCE IN TERMS OF PROVISIONS OF EIA NOTIFICATION-2006 1.0 EXECUTIVE SUMMARY OF THE PROJECT Sr. No Description Details 1 Proposed project
More informationCERTIFYING DRAINLAYER
Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 9198 REGISTRATION EXAMINATION, JUNE 2013 CERTIFYING DRAINLAYER INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time
More informationPRICE BID FOR. Processing zone of Special Economic Zone, MAHINDRA WORLD CITY (JAIPUR) LIMITED, JAIPUR MWCJL/HR/INFRA/HC ZONE/STP/ /T-32
PRICE BID FOR DESIGN, SUPPLY, CONSTRUCTION, ERECTION, COMMISSIONING AND OPERATING OF (PHASE I) 3000 M3/DAY CAPACITY SEWAGE TREATMENT PLANT BASED ON ADVANCED SEQUENTIAL BATCH REACTOR TECHNOLOGY AT MAHINDRA
More informationSTATE UNIVERSITY CONSTRUCTION FUND
STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant
More information1 Construction The sewage treatment plant (STP) is to be an Icon-Septech Pty Ltd Turbojet 5000 as described below and as shown on the drawings.
1 Construction The sewage treatment plant (STP) is to be an Icon-Septech Pty Ltd Turbojet 5000 as described below and as shown on the drawings. 2 Design Parameters Domestic sewage will be collected from
More information1 Construction The sewage treatment plant (STP) is to be an Icon-Septech Pty Ltd Turbojet 4000 as described below and as shown on the drawings.
1 Construction The sewage treatment plant (STP) is to be an Icon-Septech Pty Ltd Turbojet 4000 as described below and as shown on the drawings. 2 Design Parameters Domestic sewage will be collected from
More informationCOMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER TO MARCH-2017
COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER - 2016 TO MARCH-2017 F.No. SEIAA 281/2014/EC/110 SUBMITTED BY- M/S. TERON CONSTRUCTION PVT. LTD MAA PADMA COMMERCIAL COMPLEX, H/N-
More informationCompact Waste Water Treatment MBR /MBBR Technology
Compact Waste Water Treatment MBR /MBBR Technology 1 Minimal Operation and Maintenance Costs and use of Chemicals 2 Recycle and Reuse water for Irrigation and Recreation 3 Save Water, Energy, Money and
More informationGENERAL CONDITIONS. 7. The Applicant will adopt the prescribed norms, and standards provided in the national Building Code of India 2005.
GENERAL CONDITIONS 1. The Project Proponent shall comply with all the conditions stipulated in the building approval letter. 2. The applicant (Project proponent) will take necessary measures for preventions,
More informationSEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS
Annexure No - 13 SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS File No : Name of the Project: Proposed Commercial project called Bagmane Tech Park RIO Campus of M/s. Bagmane Developers
More informationNo construction activity started
Sr. Particulars Details No. 1. Proposal is for New Project 2. Type of Project Residential Flats and Shops 3. Project / Activity No. 8(a) [8(a) or 8(b)] 4. Name of the project Kaveri Soham Vistara 5. Name
More information1 Construction The sewage treatment plant (STP) is to be an Icon-Septech Pty Ltd Turbojet 2000 as described below and as shown on the drawings.
1 Construction The sewage treatment plant (STP) is to be an Icon-Septech Pty Ltd Turbojet 2000 as described below and as shown on the drawings. 2 Design Parameters Domestic sewage will be collected from
More informationTRIL INFOPARK LTD. Presentation for Environmental Clearance Amendment. 13 th May 2016
TRIL INFOPARK LTD Presentation for Environmental Clearance Amendment 13 th May 2016 RAMANUJAN IT CITY TRIL Infopark is a SPV created to execute the Ramanujan IT SEZ project This SPV is a joint venture
More informationSCHEME 2 PUBLIC HEALTH AYA NAGAR DEVELOPMENT PROJECT
SCHEME 2 PUBLIC HEALTH AYA NAGAR DEVELOPMENT PROJECT 19 th August 2009 GREHA Registered under the Societies Act XXI of 1860, number 16677 of 1986 11 Eco Options, Mandir Marg, A2, Aya Nagar, Phase 5, New
More informationFORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS
FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT QUERY 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? Attach Maps
More informationSEWAGE TREATMENT PLANT TECHNOLOGY BY COMPLETE WATER SOLUTION BHALERAO HEIGHTS, AKURDI, PUNE
SEWAGE TREATMENT PLANT TECHNOLOGY BY COMPLETE WATER SOLUTION BHALERAO HEIGHTS, AKURDI, PUNE 411 033. INTRODUCTION SEWAGE TREATMENT FACILITIES ARE LIMITED IN OUR COUNTRY AND MANY OF THE TREATMENT FACILITIES
More informationClient : First & Foremost Hotels & Resort - Maldives Technology Green STP AD+
Client : First & Foremost Hotels & Resort - Maldives Technology Green STP AD+ Zero Discharge Sewage Treatment Plant Reuse of treated water for Landscape & Irrigation Date: 08 th April 2017 Mumbai [INDIA]
More informationTotal Built Up Area. Quantum Of Water Required Quantity Of Wastewater Generation 332kld
DETAILS OF PROJECT The project proponent, P N Memorial Neurocentre & Research Institute Limited, is developing a Hospital Building at Premises No.-720, Anandapur, Ward. Kolkata- 700 107, KMC, Ward No.
More informationTATA STEEL LIMITED. Environment Compliance Report (Oct 2017 to Mar 2018)
TATA STEEL LIMITED Construction of Residential Complex For Tata Steel Plant located at Kalinganagar Industrial Complex, at Environment Compliance Report (Oct 2017 to Mar 2018) Environment Department Tata
More informationSOLAR PACKAGE SEWAGE TREATMENT PLANTS. ( Using NTS technology)
SOLAR PACKAGE SEWAGE TREATMENT PLANTS ( Using NTS technology) Summary of Technology: (Anoxic Aerobic Absorption Separation Sewage Treatment Unit) The technology used to treat the sewage is a combination
More informationEnvironmental Management Plan
Environmental Management Plan Of Dr. Mittal Laboratories Pvt. Ltd. Plot No. C-10/2, SARA Industrial Estate Ltd., Village Rampur, Dehradun - Chakrata Road, Selaqui, Dehradun, Uttrakhand For Manufacturing
More informationZero Discharge for Textile Industry
Zero Discharge for Textile Industry C K Sandeep, General Manager Corporate Marketing, Ion Exchange (India) Ltd. Introduction The post liberalization period has led to the rapid growth of industrial output
More information(See Rule 14) Environment Statement for the financial year ending the 31 st March PART-A
1 [FORM-V] (See Rule 14) Environment Statement for the ending the 31 st March 2012. PART-A (i) Name and address of the owner / occupier of the industry, operation or process: Guali Iron Ore Mines Shri
More informationPRODUCER STATEMENT SYSTEMS (T.P.58) DESIGN: ON-SITE EFFLUENT DISPOSAL
Form~BCA~TP58 Statement B0005101 PRODUCER STATEMENT DESIGN: ON-SITE EFFLUENT DISPOSAL SYSTEMS (T.P.58) ISSUED BY: (approved qualified design professional) TO: (owner) TO BE SUPPLIED TO: Far North District
More informationINDIAN INSTITUTE OF TECHNOLOGY HYDERABAD
INDIAN INSTITUTE OF TECHNOLOGY HYDERABAD SUSTAINABLE ARCOP LARGE ASSOCIATES DEVELOPMENT PRIVATE LIMITED SUSTAINABILITY AND THE CITY WHAT ARE WE TALKING ABOUT THE LINK KNOWN COMPONENTS OF AN URBAN FABRIC
More informationPlanning & Development Services. Septic Smart
7 Creswell Drive Trenton, Ontario K8V 5R6 www.quintewest.ca Tel: 613-392-2841 Toll Free: 1-866-485-2841 Fax: 613-392-7151 building@quintewest.ca Planning & Development Services Septic Smart What Is A Septic
More informationWastewater treatment for single houses. D. O Dowd
Wastewater treatment for single houses 1 * In rural settings, connection to the local authority main sewer is not always possible, so each house has its own separate wastewater treatment system for the
More informationTreatability Study for Castor Oil Unit
Treatability Study for Castor Oil Unit Ms. Seema A. Nihalani Assistant Professor, Department of Civil Engineering Parul Institute of Engineering and Technology, Waghodia, Vadodara31760 ABSTRACT: Ever increasing
More information3. DATA COLLECTION 3.1 DATA COLLECTION 3.2 DATA COLLECTION AGENCIES
3. DATA COLLECTION 3.1 DATA COLLECTION Systematic data collection helps for effective outcome of research work. Record of the data helps to identify the characteristics of the selected plant. In the present
More informationENVIRONMENTAL MANAGEMENT PLAN
INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the
More informationLEED Credits. How FieldTurf Can Contribute To Obtaining
How FieldTurf Can Contribute To Obtaining LEED Credits AlternaScapes, Inc. 2231 Whitfield Park Ave Sarasota, FL 34243 Phone: 941-753-3312 Toll Free: 800-445-2944 Fax: 941-753-3314 Email: info@justlikegrass.com
More informationSEPTIC TANK CONSTRUCTION GUIDELINES
SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic
More informationEARTHSAFE OWNERS MANUAL WASTEWATER TREATMENT SYSTEMS. All information contained within this manual is the property of EcoWater (QLD) Pty Ltd.
All information contained within this manual is the property of EcoWater (QLD) Pty Ltd. Any duplication, alteration and/or redistribution is forbidden without written expressed permission of EcoWater (QLD)
More informationSTATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA
OPERATING GUIDELINES FOR PROCESSING OF CONSENT TO ESTABLISH APPLICATION FOR ESTABLISHMENT OF COAL WASHERIES IN THE STATE OF ORISSA STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII,
More informationStormwater Harvesting in the Bronx 2013 SESWA Annual Conference Charlotte, NC October 24, 2013
Stormwater Harvesting in the Bronx 2013 SESWA Annual Conference Charlotte, NC October 24, 2013 Steve Kingsland (508) 344-4333 Steve.kingsland@oldcastle.com 1 Agenda Background Definition of Rainwater Harvesting
More informationProducer Statement. Design: On-Site Effluent Disposal Systems (AS/NZS 1547:2000)
Updated 04/09/13 Producer Statement Design: On-Site Effluent Disposal Systems (AS/NZS 1547:2000) Issued by : To : To be supplied to: Property Location:. (approved qualified design professional) (owner)
More informationSanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview
Sanitary Sewer Systems General Overview Sewage Collection System Pipes Pumping stations Maintenance entry points manholes Types of Sewage Sanitary Domestic sewage: human wastes and washwater from public
More informationFORM I as per APPENDIX I (paragraph-6) of EIA Notification 2006 as amended till date
FORM I as per APPENDIX I (paragraph-6) of EIA tification 2006 as amended till date (I) Basic Information S.N Item Details 1 Name of the project/s Construction of Ford Global Technology and Business Centre
More informationSample Questions for Paper 4 Building Services & Environmental Controls
Basic Principle 1. Which of the following is fundamental in preventing the spread of legionnaires disease in building services installations? A. Using CFC refrigerants for chiller plants B. Using single-stack
More information[FORM-V] PART-A PART-B
[FORM-V] (See Rule 14) Environment Statement for the financial year ending the 31 st March 2015 PART-A (1) Name and address of the owner - M/s. Serajuddin and Co. / Occupier of the industry, Balda Block
More informationINFRASTRUCTURE & OPERATION
SECTION C: INFRASTRUCTURE & OPERATION Advice on completing this section is provided in the accompanying Guidance Note. C.1 Operational Information Requirements Provide a description of the plant, process
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN For SOWPARNIKA SAMETHANA M/s SOWPARNIKA PROJECTS AND INFRASTRUCTURE PVT LTD Sy No.57/1,57/2 & 277 of Anugondanahalli hobli, Samethanahalli village,hoskote Taluk, Bangalore
More informationBuilding Services / MEPF Scopes
Building Services / MEPF Scopes Mechanical Air conditioning Refrigerant Plant Compression Chillers Absorption Chillers Heat Pumps (Chilled water and Hot Water) Cooling Towers Chemical Treatment Air Conditioning
More informationGrey Water Treatment Plant
Grey Water Treatment Plant Greywater is water that has been used for washing dishes, laundering clothes, or bathing. Essentially, any water, other than toilet wastes, draining from a household is greywater.
More informationGreenCo BANGALORE INTERNATIONAL AIRPORT LIMITED, BENGALURU
GreenCo Experience @ BANGALORE INTERNATIONAL AIRPORT LIMITED, BENGALURU ABOUT BIAL Public limited company under Indian Companies Act Private Public Partnership BOOT project transferred after 60 years (30
More informationSECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION
SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION Analytical Environmental Services 2-1 Jamul Indian Village Wastewater Treatment Plant Analytical Environmental Services 2-2 Jamul
More informationBRIEF SUMMARY OF THE PROJECT
BRIEF SUMMARY OF THE PROJECT Office Complex at Plot No. 5A & 5B, Shopping Mall, Vasant Kunj Phase - II, New Delhi Developed by M/s Oil and Natural Gas Corporation Limited BRIEF DESCRIPTION OF THE PROJECT
More informationPROJECT REPORT FOR AMMENDMENT IN ENVIRONMENT CLEARANCE
1.1 TYPE OF PROJECT The project of IOTL is a green field POL terminal with storage capacity 1,90,570 KL. 1.2 NEED FOR THE PROJECT Chhattisgarh was carved out of Madhya Pradesh on the 1 st November, 2000.
More informationPhase II (BIA Phase-II),
PROJECT PREFEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENTAL CLEARENCE IN TERMS OF PROVISIONS OF EIA NOTIFICATION-2006 1.0 EXECUTIVE SUMMARY OF THE PROJECT Sr. No Description Details 1 Proposed project
More informationBest Practice in Sewage and Effluent Treatment Technologies
Best Practice in Sewage and Effluent Treatment Technologies Contents 1 Wastewater - Introduction 1 1.1 Earth s ecological system 1 1.1.1 Water effect on ecology 2 1.1.2 Wastewater generation 3 1.2 Wastewater
More informationROOF TOP RAIN WATER HARVESTING. Manohar Patil
ROOF TOP RAIN WATER HARVESTING Manohar Patil Why harvest rainwater To arrest ground water To beneficiate water quality in aquifers To conserve surface water runoff To reduce soil erosion What is Rainwater
More information