1 Brief Summary of Project Project Name: 1) Acrylics/Oxo Alcohol Project at Dumad near Gujarat Refinery. 2) Creation of necessary facility for origination of Koyali-Ahmednagar-Sholapur Pipeline (KAhPL) & installation of Tank truck loading facility (TTL) for Linear Alkyl Benzene at Dumad near Gujarat Refinery. The project also includes laying of 9 piggable, dedicated hydrocarbon service cross country pipelines (including LPG supply and return) between Refinery and Dumad in the existing Right of Way (ROW). Project Details: 1) Acrylics/Oxo Alcohol Project at Dumad near Gujarat Refinery: a) Background: Butyl Acrylate (acrylate predominantly used in India) has significant growth potential in the Indian Market with its demand expected to grow at ~11% in the next five years. Currently, there is no producer of Butyl Acrylate (BA) in India with the entire domestic requirement (~170 KTA in year 2013) being met through imports. Oxo alcohols are primarily used as inputs for Acrylates production with other small applications like solvents. As part of integrating IOC s Petrochemicals value chain, Indian Oil has planned to manufacture Acrylic Acid/Acrylates and Oxo alcohols near Gujarat Refinery. Based on findings of project configuration evaluation study, the subject project is proposed to be located at IOCL owned land at Dumad next to its Marketing terminal (~ 15 kms away from Gujarat Refinery). Moreover, Western and Northern India being the major demand centers for and proximity to Kandla/Dahej and JNPT, Mumbai ports for accessing the export market, location of the Project at Gujarat will help minimize the logistics cost for product movement. b) Project Configuration: Following project configuration has been considered for the project. Sr. No. New Unit Capacity, KTA 1. Propylene Recovery 120 Unit (PRU) 2. Syn Gas Unit 9300 Nm3/hr Nm3/hr of H2 3. Acrylic Acid Unit (AA 90 Unit) 4. n- Butanol Unit Butyl Acrylate Unit 153 (BA Unit
2 A. Raw material - Propylene, 121 KTA B. Intermediate Acrylic Acid production: 90 KTA N-Butanol: 92 KTA (entirely for captive consumption for Butyl Acrylate production) C. Finished Product Butyl Acrylate (BA): 153 KTA Iso-Butanol (IBA): 9 KTA c) Utilities and Offsite: Following product storage facilities have been considered: Product N-butanol I-butanol Acrylic Acid Glacial Acrylic Acid Butyl Acrylate Propylene at Dumad (Note-1) Naphtha (for Syn Gas Unit) Working Capacity (m3) 1025 x 1 tank 232 x 2 tanks 1583 x 1 tank -NA x 2 tanks 1410 x 1 bullet 1770 x 2 bullets 468 x 2 tanks A piping corridor already exists between refinery and Dumad marketing terminal. The new pipelines can be routed through the existing piping corridor for which the Right of Way already exists with IOCL. Details of new utility facilities required for Dumad Site are as follows: Item Demand Remarks Power(MW) 17 A petcoke based captive power plant (CPP) of Steam (TPH) 17 MW power and 200 T/hr steam production HP 90 Tons/hr capacity (One 200 TPH CFBC boiler and one MP 10 Tons/hr 17 MW STG with grid power backup) has been LP 49 Tons/hr envisaged. Cooling Water Instrument air (Nm3/hr): Plant air: (Nm3/hr) Nitrogen (Nm3/hr) Raw Water Cooling water system of m3/hr capacity (5*4200 m3/hr cells, 4 working + 1 Standby) with associated facilities will be provided. New plant and instrument air system envisaged. 800 New unit of 900 Nm3/hr N2 generation capacity envisaged. 400 To be sourced from existing IOCL jack wells in Mahi river (through new pipeline, pump and
3 associated facilities). Fire Water 1700 New system comprising of fire water storage, fire water pumps and distribution piping network considered for fighting two fires simultaneously. Flare (Nm3/hr) (equivalent to 11 TPH) New flare system envisaged. Capacity will be assessed during DFR stage Effluent (T/hr) 130 New Zero Liquid Discharge (ZLD) ETP of 155 T/hr capacity envisaged. Final sludge after treatment in ZLD plant can be either sent to incinerator or for land-filling. d) Project Cost: Rs crores. 2) Koyali-Ahmednagar-Sholapur Pipeline (KAhPL) & Tank truck loading facility for Linear Alkyl Benzene at Dumad, near Gujarat Refinery: a) Background: Indian Oil Corporation Limited is planning to lay a new Koyali- Ahmednagar Sholapur pipeline, that can feed products from Gujarat Refinery to more economically linked locations in Maharashtra and Karnataka, which are otherwise dependent on exchanges with other OMCs or rail input from distant sources for product supply. Board approval for the project has also been obtained and it has been decided that necessary infrastructure/facilties shall be constructed at Dumad along with necessary modification at Gujarat Refinery for origination of KAhPL from Dumad. Similarly, Gujarat Refinery is also planning to shift Tank Truck Lorry (TTL) loading facility of Low Molecular Weight (LMW) and High Molecular Weight (HMW) Linear Alkyl Benzene (LAB) product to Dumad area as the existing TTL gantry is unsafe. There is no scope for shifting the Tank Truck (TT) gantry to alternate location in the refinery with existing loading volumes. Excluding Low Molecular Weight (LMW) and High Molecular Weight (HMW), other specialty products loading facility can be shifted to alternate location within refinery due to lower number of TT s involved. In addition to the above, TTL shifting would also lead to decongestion and enhanced safety aspects of JR along with sparing of 5 acres of land approximately which can be utilized for future projects. b) Project Configuration: No new manufacturing/production units are envisaged in this project. Only construction of additional tanks, pipelines as well as installation of pumps envisaged both at Gujarat Refinery as well as project site (Dumad).
4 i) Facilities envisaged at Gujarat Refinery end: Additional PLT pumps in existing pump house at Refinery along with necessary suction piping from product tanks like MS/HSD/SKO/ATF/LMW/HMW. Necessary electrical facilities for the new pumps like substation, feeder panel, cables, transformer, Pig launching barrel & receiving barrel provision for above dedicated products lines located at extreme north end of refinery & ISBL of Dumad respectively. 9 Piggable cross country Koyali-Dumad dedicated product pipeline are to be installed in existing ROW for transfer of products to proposed Dumad tanks. ii) Facilities envisaged at Dumad end: Installation of additional product tanks as well as utility tanks. Details have been mentioned below: Sr No Description Capacity Nos. 1 HSD Tanks 30,000kl 4 2 MS Tanks 20,000kl 3 3 ATF Tanks 10,000kl 3 4 PCK Tanks 10,000kl 2 5 SKO Tanks 5,000kl 2 6 Fire Water Tanks 6,000kl 3 7 Service Water Tanks 6,000kl 1 8 LMW 15000kl 3 9 HMW 5000kl 1 Additional pumps for Fire Water, Service water, booster pumps, TT loading dedicated pumps along with circulation system for LMW and HMW. Necessary pipings from the new tanks. TTL loading bays (5 bays with dual loading) along with all necessary associated instrumentation facilities for custody transfer metering and invoicing system. Fire water network, hydrant, HVLR, fire tender, gas and smoke detector system in control rooms and associated safety items. Fire protection facilities for TT Loading gantry. c) Utilities: Details of new utility facilities required for Dumad Site are as follows
5 Item Power Raw Water Fire Water Effluent (T/hr) Facilities envisaged Power requirement: 6 MW. No new facility for power generation considered in project. Existing refinery captive power generation facilities will be sufficient for supplying the same. Existing underground 33 KV dual lines may be sufficient, which were laid from Gujarat Refinery to Dumad Approx. 40 m3/hr of raw water from Bore well. Details of new fire water tanks have already been mentioned under Project Configuration. New ETP of design capacity 120 m3/hr has been envisaged to treat hydrocarbon generated during Maintenance & Inspection. d) Project Cost: Necessary facility for origination of Koyali-Ahmednagar-Sholapur Pipeline (KAhPL): Rs 707 crores. TTL shifting: Rs crores.
GLOBAL EXPRESSION OF INTEREST ( EOI ) For CONSULTANCY SERVICES TO PROVIDE BASIC ENGINEERING AND PROCESS FOR LUBE OIL BLENDING PLANT
GLOBAL EXPRESSION OF INTEREST ( EOI ) For CONSULTANCY SERVICES TO PROVIDE BASIC ENGINEERING AND PROCESS FOR LUBE OIL BLENDING PLANT At BHARAT PETROLEUM CORPORATION LTD,Uran, Distt. Raigarh, Maharashtra.,India
More informationVISAKHA VIJAYAWADA SECUNDERABAD PIPELINE GREENCO BEST PRACTICES
VISAKHA VIJAYAWADA SECUNDERABAD PIPELINE GREENCO BEST PRACTICES HPCL VVSPL - BEST PRACTICES MATERIAL CONSERVATION 1. INTRODUCTION OF HPCK IN PIPELINE 2. EX-VIJAYWADA PUMPING FOR CAPACITY UTILIZATION CORPORATE
More informationRELIANCE INDUSTRIES LIMITED Vadodara Manufacturing Division Vadodara (Gujarat)
First Prize Petrochemicals RELIANCE INDUSTRIES LIMITED Vadodara Manufacturing Division Vadodara (Gujarat) Unit Profile The Reliance Group, founded by Dhirubhai H. Ambani (1932-2002), is Indias largest
More informationRELIANCE INDUSTRIES LIMITED NAGOTHANE MANUFACTURING DIVISION
First Prize Petrochemicals RELIANCE INDUSTRIES LIMITED NAGOTHANE MANUFACTURING DIVISION Raigad (Maharashtra) Unit Profile Nagothane Manufacturing Division (NMD) is one of the six major manufacturing sites
More informationSCOPE OF WORK TECHNICAL SPECIFICATIONS
SCOPE OF WORK & TECHNICAL SPECIFICATIONS HAZOP STUDY, DISASTER MANAGEMENT PLAN & RISK ANALYSIS AT AMBALA NEW DEPOT PROJECT SITE BRIEF DESCRIPTION OF JOB: New storage depot is to be constructed near our
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF HPCL, LPG BOTTLING PLANT Capacity: 3 X 500 MT At Plot No.499 Kota-Jhalawar Road (NH-12) Village- Mandana, Tehsil-
More informationFEASILBLITY REPORT. CONVERSION OF PAPL Facility to produce POLYOLS
FEASILBLITY REPORT CONVERSION OF PAPL Facility to produce POLYOLS Petro Araldite Pvt. Ltd (PAPL) was set up in the year 1996 as joint venture between Ciba India Limited (part of the Swiss Ciba Geigy group
More informationWhiting Business Unit
Whiting Business Unit ENVIRONMENTAL STATEMENT FOR YEAR 2015 (Review of Y2014 performance) Introduction Recognizing the complex nature of petroleum refining operations and to ensure that we meet our stated
More informationENCON IN THERMAL SYSTEM
ENCON IN THERMAL SYSTEM Orchid chemicals & Pharmaceuticals ltd. Bulk API Alathur facility Bulk API Aurangabad facility OHC (Formulations) Alathur facility R&D Centre Corporate Office OHC (Formulations)
More informationMLNG DUA DEBOTTLENECKING PROJECT
MLNG DUA DEBOTTLENECKING PROJECT Yahya Ibrahim Senior General Manager Malaysia LNG Malaysia yahyai@petronas.com.my Tariq Shukri LNG Consultant Foster Wheeler Energy Limited Reading, U.K. Tariq_shukri@fwuk.fwc.com
More informationEnvironmental Improvement Plan. Sohar Refinery
Environmental Improvement Plan Sohar Refinery Feb 2014 Page 1 of 18 Waste Water Treatment Plant Improvements Background The treatment of the waste water of the Refinery was malfunctioning for a long period.
More informationPresentation on Excellence in Energy Management-2017
Presentation on Excellence in Energy Management-2017 Company Profile Kuantum Papers is in the business of production and marketing of writing & printing paper, while conserving precious resources & protecting
More informationProblems at the Cumene Production Facility, Unit 800
Problems at the Cumene Production Facility, Unit 800 Background Cumene (isopropyl benzene) is produced by reacting propylene with benzene. During World War II, cumene was used as an octane enhancer for
More informationHINDUSTAN PETROLEUM CORPORATION LIMITED ADDL. TANKAGE PROJECT- MUNDRA TERMINAL
NOTICE FOR INVITATION OF BIDS (DOMESTIC) FOR AUTOMATION TENDER FOR MUNDRA ADDL. TANAKGE PROJECT MUNDRA TERMINAL 1.0 BRIEF SCOPE OF SUPPLY Hindustan Petroleum Corporation Limited (HPCL) intends to augment
More informationPRE FEASIBILITY REPORT
VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,
More informationSilvol India Pvt. Ltd Mumbai
Silvol India Pvt. Ltd Mumbai About Us Silvol India Pvt Ltd is a Mumbai based, ISO 9001-2008 Certified Organization established in 2000 Formulates, Manufactures and Market Industrial Oil, Automotive Oil,
More informationDESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3
DESCRIPTION OF THE GOURIKWA POWER STATION & TRANSMISSION INTEGRATION PROJECT CHAPTER 3 This chapter provides details regarding the scope of the proposed Gourikwa Power Station and Transmission Integration
More informationCogeneration. Rangan Banerjee. Department of Energy Science and Engineering. IIT Bombay
Cogeneration Rangan Banerjee Department of Energy Science and Engineering IIT Bombay Lecture in KIC-TEQIP programme on Energy Management and Energy Efficiency - IITG - 24 th May 2016 Utility options Fuel
More informationA COMPLICATED PROJECT FOR POWER AND WATER CO- GENERATION: THE RAF SITE
A COMPLICATED PROJECT FOR POWER AND WATER CO- GENERATION: THE RAF SITE Authors: Presenter: M. Garzoglio, L. Riccardo M. Garzoglio [Process Senior Eng. Fisia Italimpianti Italy] Abstract The Ras Abu Fontas
More informationCarbon of 7. IS-CMS-MUC/Mu Javier Castro. Telefax:
TÜV SÜD Industrie Service GmbH 80684 Munich Germany CDM Executive Board DAP-PL-2885.99 DAP-IS-2886..00 DAP-PL-3089.00 DAP-PL-27222 DAP-IS-3516..01 DPT-ZE-3510.02 ZLS-ZE-219/99 ZLS-ZE-246/99 Your reference/letter
More informationDetailed Feasibility Report on Ennore-Trichy-Madurai LPG Pipeline
FOR RESTRICTED CIRCULATION ONLY Detailed Feasibility Report on Ennore-Trichy-Madurai LPG Pipeline Ennore Chengalpet Pondicherry Trichy Madurai Pipelines Division January 2013 CONTENT Chapter No. Executive
More informationBharat Oman Refineries Limited (BORL)
18 th National Award for Excellence in Energy Management 2017 Bharat Oman Refineries Limited (BORL) Bina, Madhya Pradesh Nilesh Zode, Nitin Tripathi, Ashish Rai BORL Facilities at a Glance 1 Single Point
More informationAppendix A: Project Characteristics
Gorgon Fourth Train Expansion Proposal Appendix A: Project Characteristics Appendices Project Characteristics A Key Characteristics table has been prepared to describe the elements of the Foundation Project
More informationA. INTRODUCTION PREFEASIBILITY REPORT
A. INTRODUCTION a. BRIEF DESCRIPTION OF PROJECT M/s Bharat Petroleum Corporation Limited has set up the Haldia Coastal Installation at HAL-733, Patikhali, Durgachak, Haldia 721602, West Bengal. The Depot
More informationABOUT EIL. more than 5000 projects including over 400 major projects worth USD 200 Billion in total cost.
ABOUT EIL Engineers India Ltd. (EIL) is a leading global engineering consultancy and EPC company. The Company has a diverse portfolio comprising Hydrocarbon, Chemicals & Fertilizers, Mining & Metallurgy,
More informationCooling Tower Blowdown Treatment and Reuse in a Coal Fired Power Plant in India - Reducing the water footprint in coal fired power plants -
Powergen Bangkok 3 rd October 2103 Session 5 Intake, Cooling and Blowdown Treatment Considerations Cooling Tower Blowdown Treatment and Reuse in a Coal Fired Power Plant in India - Reducing the water footprint
More informationEvolution of an LNG Terminal: Senboku Terminal of Osaka Gas
23 rd World Gas Conference, Amsterdam 2006 Evolution of an LNG Terminal: Senboku Terminal of Osaka Gas Main author Toshiro Otsuka Japan TABLE OF CONTENTS 1. Abstract 2. Body of Paper 3. List Tables 4.
More informationPROJECT REPORT FOR MANUFACTURING THINQ PHARMA CRO LTD PITHAMPUR -3 BADGAON MADHYA PRADESH
PROJECT REPORT FOR MANUFACTURING THINQ PHARMA CRO LTD PITHAMPUR -3 BADGAON MADHYA PRADESH CONTENTS 1. INTRODUCTION 2. GENERAL SECTION 3. PARTICULARS OF PROJECT 4. COST OF PROJECT AND MEANS OF FINANCING
More informationIRISH CEMENT PLATIN INVESTING IN OUR FUTURE
IRISH CEMENT PLATIN INVESTING IN OUR FUTURE INTRODUCTION Investing in our future. The next phase of investment in Platin will see further energy efficiency improvements with on site electricity generation
More informationTill date, Rotary has built more than 60% of independent storage tanks in Singapore.
ROTARY Till date, Rotary has built more than 60% of independent storage tanks in Singapore. 2 Our Track Record Terminals/Depot Client Project Title Year of Completion United Arab Emirates, Fujairah Star
More informationPRE FEASIBILITY REPORT
DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS III PLOT NO.116, 116A, 116B & 126C, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY
More informationCO-GENERATION PLANT KUSHA INDUSTRY CO.
CO-GENERATION PLANT History EDON was responsible for the design and construction management of two plants, which came into commercial operation in 1996, and operated and managed them for first two years.
More informationINDIAN OIL CORPORATION LTD Panipat Naphtha Cracker, Panipat, India
INDIAN OIL CORPORATION LTD Panipat Naphtha Cracker, Panipat, India Pre-Feasibility Report for Expansion of NCU,MEG,HDPE & PP Units and Catalyst Manufacturing unit JUNE 2016 1 CONTENTS 1. INTRODUCTION 3
More informationPRELIMINARY FEASIBILITY REPORT (PFR) POLYOL/PROPYLENE GLYCOL/MONO ETHYLENE GLYCOL PETROCHEMICAL PROJECT
PRELIMINARY FEASIBILITY REPORT (PFR) POLYOL/PROPYLENE GLYCOL/MONO ETHYLENE GLYCOL PETROCHEMICAL PROJECT 1 1. EXECUTIVE SUMMARY... 3 2. Objectives... 7 2.1 Background... 7 2.2 Project Confurigation... 8
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,
More informationStratus Development in Joint Venture with Middle East Petroleum Services (Offshore) SAL
Stratus Development in Joint Venture with Middle East Petroleum Services (Offshore) SAL Stratus Development in Joint Venture with Middle East Petroleum Services (Offshore) SAL is a service, general trading
More informationDR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA)
DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA) Email: sv.patil@vsisugar.org.in AIDA Technical Seminar www.vsisugar.com
More informationNavin Kumar
Container Shipping in India: Mapping the cargo Containers India 2014 Navin Kumar Email: thakur@drewry.co.uk 20 Aug 2014 Presentation outline 2 India s international trade Cargo / hinterland mapping Trade
More informationCO 2 Capture Utilization and Sequestration (CCUS)
Siemens AG - Energy Sector CO 2 Capture Utilization and Sequestration (CCUS) Copyright Answers for energy. Drivers of CCUS Development Global electricity market : demand for (fossil) electricity still
More informationLatest Development of Lurgi s MPG-technology Update on Hydrogen Unit for NWU Project
Latest Development of Lurgi s MPG-technology Update on Unit for NWU Project U. Wolf, H. Schlichting, S. Walter, Lurgi AG J. Quinn, North West Upgrading Inc. Gasification Technologies Conference 2007 October
More informationGT-LPG Max SM. Maximizing LPG Recovery from Fuel Gas Using a Dividing Wall Column. Engineered to Innovate
GTC Technology White Paper GT-LPG Max SM Maximizing LPG Recovery from Fuel Using a Dividing Wall Column Engineered to Innovate GT-LPG Max SM Maximizing LPG Recovery from Fuel Using a Dividing Wall Column
More informationMECTHROLEUM NIG LTD READ + THINK + ACT = SOLUTION
MECTHROLEUM NIG LTD READ + THINK + ACT = SOLUTION MECTHROLEUM NIG LTD is a fast growing engineering, procurement, manufacturing, construction, commissioning, Operations & Maintenance, technology and project
More informationPipeline Integrity. QuestIntegrity.com CHALLENGE CONVENTION
Pipeline Integrity Solutions Pipeline Integrity Management Services (PIMS) InVista Ultrasonic In-Line Inspection Technology Engineering Assessment and Consulting QuestIntegrity.com CHALLENGE CONVENTION
More informationSustainable Solutions In Energy & Environment
Sustainable Solutions In Energy & Environment Thermax Group, a billion dollar company, provides a range of engineering solutions to the energy and environment sectors. Our presence spans 75 countries across
More informationINVITATION OF TENDER FOR TERMINAL AUTOMATION SYSTEM (TLF + TFMS) & SAFETY PLC RELATED AUTOMATION JOB AT SEVEN LOCATIONS (BATHINDA, MUGHALSARAI,
1 INVITATION OF TENDER FOR TERMINAL AUTOMATION SYSTEM (TLF + TFMS) & SAFETY PLC RELATED AUTOMATION JOB AT SEVEN LOCATIONS (BATHINDA, MUGHALSARAI, PANIPAT, JALLANDHAR, KANPUR, BATHINDA & REWARI) Bharat
More informationDESIGN BASIS FOR AIR CONDITIONING AND VENTILATION SYSTEM FOR SUBSTATION AND CONTROL BUILDING HINDUSTAN PETROLEUM CORPORATION LTD.
CONDITIONING AND VENTILATION FOR SUBSTATION AND CONTROL BUILDING HINDUSTAN PETROLEUM CORPORATION LTD. VISAKH REFINERY DHT PROJECT TEIL JOB NO.: 6261 DOCUMENT NO.: 6261-HVAC-PKG-300 TEIL SPECIFICATION NO.:---
More informationOPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM
CONFERENCE ON WATER OPTIMISATION IN THERMAL POWER PLANTS OPTIMISATION OF WATER USAGES IN THERMAL POWER PLANTS AND A STUDY ON DRY COOLING SYSTEM S. K. Thakur, Dr. L. D. Papney, Chief Engineer (I/C), TE&TD
More informationShale Gas Revolution
Dr. Kuhlmann International Shale Gas Revolution Its Impact on the Chemical Industry and Global Shipping Trends 7 th Chemical & Product Tanker Conference London, March 18 th, 2015 Chemical value chain impacts
More informationPrefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC
Prefeasibility Report For 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC of Alkyl Amines Chemicals Limited 401-407 Nirman Vyapar Kendra, Plot No. 10, Sector 17, Vashi,
More informationChallenges and Opportunities
LPG Logistics and Infrastructure In India Challenges and Opportunities Pradip Kumar Jha Chief General Manager (LPG-Operations) Indian Oil Corporation Limited, India The International LP Gas Seminar 2018
More informationBharat Petroleum Corporation Limited Supply Chain (Lubricants) Mumbai. Vendor Data For Registration
Bharat Petroleum Corporation Limited Supply Chain (Lubricants) Mumbai Vendor Data For Registration 1 Registered Name of the Firm 2 Legal Status of the firm - Proprietor / Partnership / Public / Private.
More informationLeaders in Energy conservation & Environment preservation
THERMAX PRODUCT PORTFOLIO BOILERS & HEATERS ABSORPTION COOLING THERMAX LIMITED CHEMICALS WATER & WASTE SOLUTIONS COGENERATION AIR POLLUTION CONTROL SOLAR ENERGY Subsidiaries & JVs THERMAX BABCOCK & WILCOX
More informationEssar Steel (I) Ltd. Hazira
Essar Steel (I) Ltd. Hazira Presentation on : Technological conjunction of Iron & Steel Making at Essar Steel India Ltd. By : Mr. Hitesh Sheth (Hitesh.Sheth@essar.com) Ms. Neeru Singh (Neeru.Singh@essar.com)
More informationPPP in Ports: Indian Experience
PPP in Ports: Indian Experience Commonwealth and BOI Workshop on PPP for Infrastructure Development in Sri Lanka India Country Office World Bank 14 August 2006 Presentation Structure India s Ports Sector
More informationGAS-TO-LIQUIDS - «GTL»
Plant by production synthetic liquid fuel (SLF) of natural Gas Gas-To-Liquids (GTL). GTL is a fully integrated project, including the processing natural gas production and implementation end products.
More informationAKAKUS OIL OPERATIONS- LIBYA Gas Utilization& Flare Emission Reduction Project
Tripoli, Libya 2010 AKAKUS OIL OPERATIONS- LIBYA Gas Utilization& Flare Emission Reduction Project Presented by: Mohamed Amari Project Location Tripoli, Libya 2010 N Tunisia Tripoli Mediterranean Sea Benghazi
More informationTVU CCS Pre FEED Study Outline Execution Strategy for delivery of SSI Anchor Project including CO 2 Transportation & Storage Infrastructure
TVU CCS Pre FEED Study Outline Execution Strategy for delivery of SSI Anchor Project including CO 2 Transportation & Storage Infrastructure Additional Information Regarding The Implementation Programme
More informationOIL RECORD BOOK INSTRUCTIONS
OIL RECORD BOOK INSTRUCTIONS Oil Record Book, Part I - Machinery space operations (All Ships) The following pages of this section show a comprehensive list of items of machinery space operations which
More informationKurnell Refinery Conversion Project
Kurnell Refinery Conversion Project Contamination Management Plan CALTEX REFINERIES (NSW) PTY LTD January 2014 Page 1 1 INTRODUCTION Caltex propose to convert the petroleum refinery in Kurnell (the Site
More informationPlease register PDF Splitter and Merger. Feasibility Report. Conversion of Epichlorohydrin (ECH) Plant to Propylene Oxide (PO) Plant
Feasibility Report Conversion of Epichlorohydrin (ECH) Plant to Propylene Oxide (PO) Plant Preamble To effectively utilize the excess chlorine produced from TPL HCD, the Epichlorohydrin plant was set up
More informationJanice T. DeVelasco, P.E.
Janice T. DeVelasco, P.E., Page 1 Janice T. DeVelasco, P.E. Summary Over 31 years of diverse professional health, safety and environmental experience in industry, encompassing refining, petrochemicals,
More informationLURGI S HP-POX DEMONSTRATION UNIT A MILESTONE TO IMPROVED SYNGAS PRODUCTION
LURGI S HP-POX DEMONSTRATION UNIT A MILESTONE TO IMPROVED SYNGAS PRODUCTION Gasification Technologies 2004 Washington, DC, October 3 6, 2004 Ulrich Wolf, Holger Schlichting - Lurgi Oel Gas Chemie GmbH,
More informationConnecting. markets. you to key
Essar Ports Ltd. Essar House, Keshavrao Khadye Marg Mahalaxmi Mumbai - 400 034 Maharashtra, India Telephone: (+9 22) - 50000 / 666000 Fax: (+9 22) - 6660809 Email: eptlbdm@essar.com www.essarports.com
More informationTHE UGAR SUGAR WORKS LIMITED. A Corporate Profile
THE UGAR SUGAR WORKS LIMITED A Corporate Profile About Us The Ugar Sugar Works is the largest sugar manufacturing company in Southern India It is located in the state of Karnataka in a small township (Ugar),
More informationPittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager
Pittsburgh Water Treatment Plant Projects by Jay R. Lucas, P.E. Senior Project Manager Who Is American Water We are the largest publicly traded water and wastewater utility in the United States Broad national
More informationGreen Initiatives at UPL
Green Initiatives at UPL DOING THINGS BETTER Ashish Dagade 8th Dec-13 Ashish Dagade UPL 1 Outline Initiatives Outside UPL Infrastructure Pathway Implemented Projects Ashish Dagade UPL 2 Group companies
More informationCooling Tower Blowdown Treatment and Reuse in a Coal Fired Power Plant in India Reducing the water footprint in coal fired power plants
Cooling Tower Blowdown Treatment and Reuse in a Coal Fired Power Plant in India Reducing the water footprint in coal fired power plants Author name Deepak Kachru Company Aquatech Systems (Asia) Pvt. Ltd.
More informationINTRODUCTION OF EFB TREATMENT MACHINES
SRI SINACO ENGINEERING WORKS SDN BHD (0-X) Sales & Marketing Office 2A (Ground Floor), Tiara Square, Jalan Tiara, Taman Perindustrian Sime UEP, 00 Subang Jaya, Selangor Darul Ehsan, Malaysia. Tel (0)-022
More informationAn Update On Shell Licensed Gasification Projects and the Performance of Pernis IGCC
An Update On Shell Licensed Gasification Projects and the Performance of Pernis IGCC 2000 Gasification Technologies Conference 8-11 October, San Francisco J.D. de Graaf Summary Introduction Shell Gasification
More informationPRE-FEASIBILITY REPORT. M/s. NUVOCO VISTAS CORPORATION LTD. ( Formerly Lafarge India Limited) At-Jojobera, Jamshedpur, Dist East Singhbhum Jharkhand
PRE-FEASIBILITY REPORT On Proposed Installation of 1 X 27 MW Coal Based Captive Power Plant in the Existing 4.6 MTPA Cement Grinding Unit at Jojobera, Dist-East Singhbhum, Jharkhand OF M/s. NUVOCO VISTAS
More informationDevelopment of HK Electric Gas Receiving Facilities at
April 2013 Development of HK Electric Gas Receiving Facilities at Lamma Presentation for How does Natural Gas Re shape the Low Carbon Presentation for How does Natural Gas Re-shape the Low Carbon Economy
More informationAEGIS LOGISTICS LIMITED
AEGIS LOGISTICS LIMITED Investor Presentation June 2014 Safe Harbour This presentation and the accompanying slides (the Presentation ), which have been prepared by Aegis Logistics Limited (the Company
More informationNATIONAL CODES ON PUMPSETS. By D K Das Bureau of Indian Standards, New Delhi
NATIONAL CODES ON PUMPSETS By D K Das Bureau of Indian Standards, New Delhi BIS is National Standard body engaged in formulation of Indian Standards. Standard formulation activity of Bureau is functioning
More informationGREEN ELEPHANT GROUP BIOGAS AND BIOGAS UP-GRADATION AN EMERGING ALTERNATIVE FUEL
GREEN ELEPHANT GROUP BIOGAS AND BIOGAS UP-GRADATION AN EMERGING ALTERNATIVE FUEL Technology Congress - 2013 GREEN ELEPHANT - WASTE TO ENERGY SOLUTIONS Large Biogas Plants Medium Biogas Plants Small Biogas
More informationYour partner for the right solution
Your partner for the right solution Project engineering of power stations Environment protection in energy sector Equipment supplying Supervision of installation of the equipment supplied Commissioning
More informationKozienice Power Plant - ENEA Group
Kozienice Power Plant - ENEA Group - Basic engineering, Construction Permit Designs (substitutes), detailed design (cooling water system, raw water system, coal supply and power output system) and as-built
More informationPRE-FEASIBILITY REPORT. for
PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared
More informationEXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,
More informationADVANCES IN HIGH PRESSURE COGENERATION
ADVANCES IN HIGH PRESSURE COGENERATION BATTERY IN SESHASAYEE PAPER PLANT T. G. Sundara Raman & R. Thirumurugan Seshasayee Paper and Boards Limited 9 th ENERGY EFFICIENCY SUMMIT 2 EnCon in Thermal Systems
More informationImproving Natural Gas Liquefaction Plant Performance with Process Analyzers
Process Analytics Improving Natural Gas Liquefaction Plant Performance with Process Analyzers LNG is natural gas in its liquid state with high energy density, which makes it useful for storage and transportation
More informationCAIRN INDIA LTD Rajasthan Site Visit
CAIRN INDIA LTD Rajasthan Site Visit February 2009 2 Disclaimer These materials contain forward-looking statements regarding Cairn India, our corporate plans, future financial condition, future results
More informationWe are looking for associate(s) / partner(s) for construction / execution (including allied local services) of
Dear Sirs, Sub : CMEI work for Banjarsari 2x100 MW BHEL is one of the largest engineering and manufacturing enterprises in India and is one of the leading international companies in the field of power,
More informationJSW STEEL COATED PRODUCTS LTD Kalmeshwar (Maharashtra)
Second Prize Steel Re-Rolling Mills JSW STEEL COATED PRODUCTS LTD Kalmeshwar (Maharashtra) Unit Profile JSW Steel Coated Products Limited Kalmeshwar is the part of JSW Group, a major player in steel industry
More informationPinch Analysis for Power Plant: A Novel Approach for Increase in Efficiency
Pinch Analysis for Power Plant: A Novel Approach for Increase in Efficiency S. R. Sunasara 1, J. J. Makadia 2 * 1,2 Mechanical Engineering Department, RK University Kasturbadham, Rajkot-Bhavngar highway,
More informationHDPE LUBE OIL CONTAINER 5 LTR. CAP.
HDPE LUBE OIL CONTAINER 5 LTR. CAP. 1. INTRODUCTION HDPE Containers have emerged as the primary and dominant choice for packaging of the lube oil due to its unique properties. HDPE containers are preferred
More informationvapour leaving from the top and routed to gas treatment diluted bitumen leaving from the middle produced water leaving from the bottom
Section 6.2 APPLICATION FOR APPROVAL OF THE CARMON CREEK PROJECT VOLUME 1: PROJECT DESCRIPTION CPF PROCESSES 6.2.1 INLET FACILITIES AND EMULSION TREATING The bitumen, water and gas produced from the field
More informationNuclear installations at Jaslovské Bohunice. Annex No. 1
Nuclear installations at Jaslovské Bohunice Annex No. 1 THE LIST OF STRUCTURES OF JADROVÁ A VYRAĎOVACIA SPOLOČNOSŤ, A.S. A1 NPP 28 GAS MANAGEMENT 30 REACTOR BUILDING 32 CONNECTING TURBINE HALL 32/A SWITCHBOARD
More informationPort of Algoma. Focal Point of the Great Lakes Region
Port of Algoma Focal Point of the Great Lakes Region Overview Essar Global Fund Ltd s Investments ENERGY PORTS & INFRASTRUCTURE METALS & MINING SERVICES Oil & Gas #2 largest single location refineries
More informationRenewable Chemicals from the Forest Biorefinery
11 th Annual Congress on Industrial Biotechnology May 12 15, 2014 Philadelphia, PA Renewable Chemicals from the Forest Biorefinery François Zasieczny, Mariya Marinova, Tom Browne, Michel Perrier The Forest
More informationA World of Solutions Visit Product Storage Terminals for Bulk Liquids
A World of Solutions Visit www.cbi.com Product Storage Terminals for Bulk Liquids United Arab Emirates The most global experience of any tank company CB&I has more than eight decades of experience designing
More informationPURPOSE PROCESS PAYOFF
Water Reuse 4/04/13 PURPOSE PROCESS PAYOFF Water Water Everywhere but not a drop to drink! Seawater versus Water Reuse UF - RO for brackish waste water streams: 0.81.2 kw h/m3 MBR RO for brackish waste
More informationEnergy East Pipeline. Project Overview. Kevin Maloney Manager, New Build Pipeline AB, NB, JV Irving and Cromer September, 2014
Energy East Pipeline Project Overview Kevin Maloney Manager, New Build Pipeline AB, NB, JV Irving and Cromer September, 2014 TransCanada: Leading North American Energy Infrastructure Company ENERGY EAST
More informationCarrington Power Station
Carrington Power Station INTRODUCTION 01 Welcome to Carrington Power Station Carrington Power Station is a 884.2MW plant that generates enough electricity to power more than one million homes and businesses.
More informationHigh voltage gas-insulated switchgear and hybrid switchgear, PASS
Factory portrait Savli, India High voltage gas-insulated switchgear and hybrid switchgear, PASS ABB is a leader in power and automation technologies that enable utility and industry customers to improve
More informationFor Safe and Delicious Water
RESIDUAL CHLORINE ANALYZER 400G NON-REAGENT FREE CHLORINE ANALYZER FC400G 400G RESIDUAL CHLORINE ANALYZER FC400G NON-REAGENT FREE CHLORINE ANALYZER Bulletin 12F01A01-01E www.yokogawa.com/an/ For Safe and
More informationNadeem Shakir Qatar Petroleum. The 2nd Joint Qatar Japan Environmental Symposium, QP JCCP The 21st Joint GCC Japan Environmental Symposium
Nadeem Shakir Qatar Petroleum Scheme of Presentation General Overview of QP Refinery, Mesaieed. Challenges in Treatment Existing Waste Water Treatment Facilities Capacity Expansion and Upgradation of WWTP
More information1. Information Required
1. Information Required 1.1 Job Specification Job specification contains design criteria, agreed between Company and Client, affecting pipe rack design: Battery limit, valving and spade requirements. Catwalk,
More informationSocial and Environmental Assessment Report July 3 rd 2012
Social and Environmental Assessment Report July 3 rd 2012 1 1. Policy, legal, and administrative framework (page 3) 2. Project description (page 3) 3. Baseline data (page 4) 4. Social and Environmental
More informationMAHAN ALUMINIUM Dist. Singrauli (Madhya Pradesh)
19 First Prize Aluminium MAHAN ALUMINIUM Dist. Singrauli (Madhya Pradesh) Unit Profile A US $41 billion corporation, the Aditya Birla Group is in the League of Fortune 500. It is anchored by an extraordinary