A. INTRODUCTION PREFEASIBILITY REPORT

Size: px
Start display at page:

Download "A. INTRODUCTION PREFEASIBILITY REPORT"

Transcription

1 A. INTRODUCTION a. BRIEF DESCRIPTION OF PROJECT M/s Bharat Petroleum Corporation Limited has set up the Haldia Coastal Installation at HAL-733, Patikhali, Durgachak, Haldia , West Bengal. The Depot receives petroleum product through rail tank wagons and ship tankers, which are unloaded & stored in above ground and underground tanks. The products are dispatched to the end consumers by contracted Tank Lorries through road. MS, HSD, Naphtha, FO & SKO are stored in 20 tanks of various capacities. Total existing capacity of the Haldia Coastal Installation is KL. Proposed project envisages expansion of capacity by installation of two aboveground storage tanks for Biodiesel (1 X 858 KL) and Ethanol (1 X 250 KL). After expansion the storage capacity will increase to KL. The current proposal has been submitted to MoEF for issuance of Environmental Clearance for the expansion of storage capacity (95468 KL) through addition of two aboveground storage tanks. b. NATURE OF PROJECT The proposed project is an expansion project for increasing storage capacity of the existing Depot by 1108 KL. After implementation of the project, capacity of the Haldia Coastal Installation will increase to KL from the present capacity of KL. Hence, the present proposal is classified under Schedule 6(b) & Category A Haldia is a Critically Polluted Area (CPA). Project within 5 Km, of CPA attracts General Conditions, Hence this project requires Environmental Clearance from MoEF&CC according to EIA Notification 2006 & subsequent amendments. c. PROFILE OF PROJECT PROPONENT Bharat Petroleum Corporation Limited (BPCL) is a fortune 500 oil refining, exploration and marketing PSU with Navratna status. BPCL has multiple refinery units in Mumbai, Kochi, Numaligarh and Bina. Bharat Petroleum s Mumbai Refinery is one of the most versatile Refineries in India. With successful implementation of various projects and de-bottlenecking, our Refineries currently process about 12 Million Metric Tons of crude oil per annum. Page 1

2 Kochi Refinery, a unit of Bharat Petroleum Corporation Limited, commissioned in 1966 with a capacity of 50,000 barrels per day. Formerly known as Cochin Refineries Limited and renamed as Kochi Refineries Limited, the refinery was originally established in collaboration with Phillips Petroleum Corporation, USA. Today it is a frontline entity as the unit of the Fortune 500 Company, BPCL. Numaligarh Refinery Limited is a public sector oil company set up in the year 1993, with its 3 MMT refinery situated in Numaligarh, Assam. The Refinery is one of the most technologically advanced and environment friendly refineries in the country. BPCL is the major share holder with 61.65% of the Company s paid up equity capital. Moreover, Bharat Oman Refineries Limited (BORL), a company promoted by Bharat Petroleum Corporation Limited (BPCL) and Oman Oil Company Limited (OOCL), has set up a 6 MMTPA grass root refinery at Bina, Madhya Pradesh along with crude supply system consisting of a Single Point Mooring system (SPM), Crude Oil Storage Terminal (COT) at Vadinar, District Jamnagar, Gujarat and 935 km long cross country crude pipeline from Vadinar to Bina. BPCL has also many POL Terminals spread across the country. BPCL now proposes to expand the capacity of the existing POL Terminal at Haldia, West Bengal by adding two aboveground storage tanks. d. NEED FOR THE PROJECT & ITS IMPORTANCE Demand of petroleum products has increased with urbanization of the places around Haldia. In order to meet the demand and to meet ministry guideline in 10% ethanol doping criteria, BPCL proposes to increase the storage capacity of their existing depot at Haldia. The proposed project is meant for improving supply position of POL products in the villages and small towns around Haldia. e. DESCRIPTION OF CURRENT PROPOSAL The current proposal has been submitted to MoEF for issuance of Environmental Clearance for the expansion of storage capacity from KL to KL through addition of two aboveground storage tanks. Page 2

3 B. SITE ANALYSIS M/s. Bharat petroleum Corporation Ltd has set up the POL Depot at HAL-733, Patikhali, Durgachak, Haldia , West Bengal. The Google map showing the project site is given in Figure 1. The general location of the project area is shown in Figure 2. FIGURE 1 - GOOGLE IMAGE OF PROJECT SITE Page 3

4 FIGURE 2 - LOCATION MAP OF PROJECT SITE Page 4

5 a. CONNECTIVITY The project site is well connected by road and rail network. The project site is located at 1.5 km away from Haldia Railway station on north and 7 km away from Haldia Township on East Northeast. The Coastal Installation terminal is well connected to NH41 in 5 km (W). Kolkata International Airport is located at the distance of 61 km (NNE). Map showing the road network around the site is given in Figure 3. FIGURE 3 - CONNECTIVITY MAP b. SITE CHARACTERISTICS Table 1 - Environmental Settings of the Project Site S. No. Particulars Details 1 Latitude 22 3'25.46"N 2 Longitude 88 8'13.81"E 3 Site Elevation above MSL 8 m 4 Topography Plain 5 Present land use at the site Industrial 6 Nearest highway National Highway 41 5 km (W) 7 Nearest railway station Haldia Railway Station 1.5 km Page 5

6 S. No. Particulars Details 8 Nearest airport Kolkata International Airport 61 km(nne) 9 Nearest town / city Haldia township 7 km (ENE) 10 Water body Hoogly River 100 m (S) 11 Nearest Port Haldia Port 45 km (SSW) 12 Hills / valleys Nil in 10km radius 13 Archaeologically important places Nil in 10km radius National parks / Wildlife 14 Sanctuaries/ Eco sensitive zones Nil in 10km radius as per Wild Life Protection Act, Reserved / Protected Forests Nil in 10km radius 16 Seismicity Zone III according to the Indian Standard Seismic Zoning Map 17 Defense Installations Nil in 10km radius c. RAINFALL & CLIMATE RAINFALL Normal rainfall of the district is 1640mm of which monsoon rainfall for 4 months from June to September contributes 71.5%. Normal monsoon rainfall is 1173mm and normal nonmonsoon rainfall is 467mm. CLIMATE The district experiences a humid sub-tropical type of climate with minimum and maximum temperature varying from 9 C in the winter to 38 C in summer respectively. Highest temperature recorded in June 1998 was 40 C and lowest temperature recorded in January 2001 was 8 C. Relative humidity varies from 52-88%, its being high in the month of August. d. GEOMORPHOLOGY The district is characterized by gently sloping flat alluvial terrain, which gradually merges to deltaic plain towards south. The elevation of land mass ranges from 10m AMSL in northern part to 3-4m AMSL in the coast, after that the land gradually dips into the Bay of Bengal. In the vicinity of coast falling in Ramnagar and blocks a series of sand dunes stretching ENE- WSW direction of present, which are indicative of palaeo shoreline. Page 6

7 e. SOIL Major part of the district is covered by alluvial soil except a narrow belt along the sea coast in the extreme south where saline soil, saline alkali soil, non saline alkali soil and degraded alkali soils developed. f. INFRASTRUCTURE Since the proposed Project is expansion project within the premises of the Coastal Installation it will use all the infrastructural facilities of the existing Haldia Coastal Installation. INDUSTRIAL WASTE MANAGEMENT Following waste management measures which are in line with the existing practice is conceived in the design to meet the environmental standards and environmental operating conditions for the project: AIR POLLUTION MANAGEMENT The air Pollution mitigative measures conceived for the project is summarized below: Water spraying is conceived to minimize dust Pollution during excavation and earth work (during construction phase). Hydrocarbon is stored in Floating Roof (FR) / Cone Roof to minimize vapour loses. The DG sets have tall stack as specified by CPCB. Greenbelt is also developed along plant boundary to restrict air Pollution. WATER POLLUTION MANAGEMENT Wastewater Management philosophy is based on the following: The wastewater management philosophy is based on Zero Discharge concept. All oily effluents are diverted to Oil Water Separator (OWS). The wastewater from OWS after removal of oil & after testing is used for green Belt development within the Depot. The collected slop oil is disposed off to third party for off-site recovery or recycling. Domestic Sewage generated at the terminal is treated in septic tank and disposed via soak pit. Separate storm water drainage system is provided at the facility. The non-contaminated rain water is discharged directly to rain water harvesting pit within the facility. However, particularly during the monsoon, any oil-contaminated rain water is led to the OWS for treatment prior to discharge. Page 7

8 NOISE POLLUTION MANAGEMENT The following noise abatement measures are practiced for the Haldia Depot: The equipment, which is the source of noise, has built-in type noise control abatement technology. Greenbelt is already developed around plant boundary and other strategic locations to reduce noise Pollution SOLID WASTE MANAGEMENT Following measure is followed for management of solid waste in Haldia Depot: Tank bottom sludge is generated while cleaning of oil storage tanks. The cleaning of oil storage tanks is done once in five years as per practice of Oil Industry. Total tank bottom sludge along with filters contaminated with oil thus generated is kept in secured, covered impermeable sludge pit located within terminal at a central place earmarked for the purpose prior to disposal via incineration or bio-remediation. The spent or used oil will be stored at a specific location prior to safe disposal through MoEF/ State PCB approved registered recycler. Other hazardous wastes if any like spent batteries, waste oil, empty drums of oil/chemicals, fluorescent tubing etc. is disposed off in accordance with approved safe procedures. C. PROJECT DESCRIPTION M/s Bharat Petroleum Corporation Limited has set up the POL Depot at HAL-733, Patikhali, Durgachak, Haldia , West Bengal. The current proposal has been submitted to MoEF for issuance of Environmental Clearance for the expansion of storage capacity (94360 to KL) through addition of two aboveground storage tanks. a. LAYOUT OF PROJECT SITE The total land area available in Haldia Depot is around 44 acres. The total land is under possession of BPCL. The Depot layout is represented in Figure 4. Page 8

9 FIGURE 4 - SITE LAYOUT Page 9

10 b. DETAILS OF ALTERNATE SITES CONSIDERED Siting of the Project No alternative site is considered, as it is an expansion of an existing Coastal Installation in which all infrastructure facilities exist. The site has been selected mainly with the following considerations: Availability of existing infrastructural facilities for Coastal Installation No additional land acquisition is required for the expansion project. The total land is under possession of BPCL. Availability of water Technology / Process The project site will only deal with receipt, storage and distribution of petroleum product (viz. MS, HSD, SKO and Ethanol). Thus from technology / process point of view, there is no scope of consideration for alternatives. a. SIZE & MAGNITUDE OF OPERATION Present storage capacity of Haldia Coastal Installation is total KL. After expansion the storage capacity will increase by 1108 KL Aggregate capacity after expansion will be KL. Table 2 - Tank Details S.No. Tank No. Tank Type Product Capacity (KL) 1. TK01 FR MS III TK02 FR MS III TK03 CR SKO TK04 CR HSD TK05 CR HSD TK06 CR FO TK07 CR FO TK08 UG SPEED TK09 UG HSO/SKO TK10 UG SLOP TK11 IFR MS IV TK12 IFR HSD TK13 CR SKO TK14 CR SKO TK15 CR FO TK16 CR FO TK17 FR NAPTHA TK18 UG HI-SPEED TK19 AG ETHANOL TK20 AG BIO-DIESEL 858 Page 10

11 b. PROCESS DESCRIPTION The Coastal Installation Terminal at Haldia near Haldia Railway Station is operated by BPCL. The terminal functions primarily as Petroleum products storage and distribution facility. The depot operations are categorized as, 1. The Product are received through rail tank wagons and ship tankers 2. Unloading of different products in their designated tanks through TWD Pumps 3. Storage in Aboveground & Underground Tanks 4. Loading in Tank Trucks through TLF and TWF Pumps 1. Receipt of product Petroleum products are received through: Rail tank wagons and Ship tankers. 2. Unloading and Storage Products are unloaded from Tank Wagons through TWD pumps and store in designated above ground and Underground tanks. 3. Loading & Dispatch Empty tank Lorries which report to the depot are sent to tank lorry filling bays. They are filled through loading arms fitted in the bays. Products come to the loading arm from the products tank through pump provided in pump house. The quantity filled in the tank lorry is measured by flow meters fitted in the bay. After Checking the right quantity the tank lorry is sent to retail outlets. e. PROCESS DESCRIPTION Figure 5 - Process flow chart Page 11

12 f. RAW MATERIAL REQUIREMENT & MATERIAL BALANCE Depot is only for Storage and Distribution of POL and no processing is carried out, hence no Raw material is required. g. POWER REQUIREMENT & SOURCE The power requirement for depot operations is HT power of 11 KV comes to BPCL Haldia from WBSEB. In absence of supply from the grid, power requirement is met through captive DG sets only. D.G sets are used & their specifications are detailed below, Table 3 - Details on D.G sets Capacity Stack height Stack S. No. Number Fuel used (KVA) (m) diameter (in) HSD BS III HSD BS III HSD BS III HSD BS III 6 h. MANPOWER REQUIREMENT Total manpower available in present depot is 50 Nos. No additional manpower is required for Expansion. i. WATER REQUIREMENT, SOURCE & WASTEWATER GENERATION The maximum consumption of water for the existing project will be 4.25m 3 /day. Capacity expansion of the plant is as follows: The maximum water consumption (m 3 /day) during operation (considering) Sl. No. Particulars Quantity (m 3 /day) 1 Domestic Use (Drinking & Flushing) Canteen 2.0 Total 4.25 Greenery / landscape Development (canteen water will be reused for Green belt) 2 Total water requirement for the Depot is 4.25 KLD. Water balance table & diagram for the Depot are given in below Table and Figure. This includes domestic consumption, washing., etc No additional water requirement is envisaged for the proposed expansion. Page 12

13 S. No. Domestic water requirement (KLD) Table 4 - Water balance table Canteen water requirement (KLD) Domestic sewage generation (KLD) Total 4.25 Septic tank Soak Pit * Note Wastewater generated from tank farm if any will be primarily oily water with suspended solids. After flow through OWS, this water will be released to Strom Water Drain. Total water requirement (4.25KLD) Domestic requirement 2.25 KLD Canteen requirement 2 KLD 2 KLD Septic Tank/Soak Pit Greenery / landscape 2 KLD Figure 6 - Water balance chart 2 KLD e. INDUSTRIAL WASTE GENERATION & DISPOSAL METHODS Tank bottom sludge will be generated while cleaning of oil storage tanks. The cleaning of oil storage tanks will be done once in five years as per practice of Oil Industry. Sludge thus generated will be kept in secured, covered impermeable sludge pit located within Haldia Coastal Installation at earmarked place for the purpose prior to safe disposal through MoEF/ State PCB approved registered recycler. Other hazardous wastes like spent batteries, waste oil, empty drums of oil/chemicals, fluorescent tubing etc. will be disposed off in accordance with approved safe procedures. All biodegradable waste (food and kitchen waste) at the Haldia Coastal Installation will be collected and disposed off into vermin culture pits within the installation area as per well- established practice. Page 13

14 B. INFRASTRUCTURE REQUIREMENTS The lists of equipments present at the Haldia Coastal Installation are Table 5 - List of equipments / facilities & number S. No Equipment Total Number Capacity 1 HSD TLF Pump SKO TLF Pump MS TLF Pump HSD TWF Pump SKO TWF Pump MS TWF Pump NAPTHA Pump FO TLF Pump FO TWF Pump HSD TLF Pump SKO TWD Pump HSD TWD Pump MS TWD Pump Naphtha TWD Pump a. AIR POLLUTION CONTROL MEASURES No emissions will be generated during the operations as the entire process will be carried out through close circuit piping from storage area to TLF gantry. The only point source of emissions is D.G sets. D.G sets have been fitted with stacks of adequate height to disperse the pollutants. Table 6 - Details on existing APCs S. No. Source of emission Control measure Material of construction Top diameter (m) Height above GL (m) 1 1 x 1250 KVA 1 x 350 KVA 1 x 250 KVA 1 x 125 KVA Stack height as per CPCB guidelines MS Pipe 12 & Page 14

15 b. WASTEWATER TREATMENT METHOD From the Depot, 2 KLD sewage will be generated, which will be disposed through septic tanks & soak pits having dimensions 2 m x 1.5 m x 1.5 m. Washing water generated from tank farm washing will be diverted to oil water separator and clarified waste water will be reused for gardening etc. FIRE FIGHTING & PROTECTION SYSTEM The list of fire protection equipments is shown in Table 7 and fire hydrant layout is shown in Figure 2.7. Table 7 - Fire Protection System at Storage Tanks S.NO. TANK NO. TYPE FOAM SYSTEM COOLING SYSTEM RIM SEAL 1. T1 FR EXISTING EXISTING EXISTING 2. T2 FR EXISTING EXISTING EXISTING 3. T3 CR EXISTING EXISTING NA 4. T4 CR EXISTING EXISTING NA 5. T5 CR EXISTING EXISTING NA 6. T6 CR NA EXISTING NA 7. T7 CR NA EXISTING NA 8. T11 IFR EXISTING EXISTING NA 9. T12 IFR EXISTING EXISTING NA 10. T13 CR EXISTING EXISTING NA 11. T14 CR EXISTING EXISTING NA 12. T15 CR NA EXISTING NA 13. T16 CR NA EXISTING NA 14. T17 FR EXISTING EXISTING EXISTING TANK FARM WISE FIRE FIGHTING EQUIPMENT LIST S.NO. TANK FARM NO DH WFM HVLR MEFG FIXED PORTABLE 1. TANK FARM-A TANK FARM-B TANK FARM-C Page 15

16 LIST OF EXTINGUISHER S. TYPE OF NO. OF LOCATION/AREA NO. EXTINGUISHER EXTINGUISHER 1. Lube godown 10kg-DCP 02 PPH at site-1 Up to 50HP (7Nos.) 10kg-DCP Beyond 100HP (8Nos.) 25kg-DCP 02 Above 50HP (4Nos.) 25kg-DCP FO Barge Loading Pump house at site -1 Beyond 100 HP (2Nos.) 25kg-DCP TL Unloading Pump House upto 50HP (2 Nos.) 10kg-DCP Blending unit PH at site-1 Pumps for Class- Excluded Petroleum (2Nos.) 10kg-DCP OWS Pump House at Site-1 upto 50HP (3Nos.) 10kg-DCP VT Pump House at site-1 upto 50HP (3Nos.) 10kg-DCP RWH Pump Site-1 upto 50HP (1No.) 10kg-DCP Fire Water PH at Site-1, Fire Pumps-8Nos. & Jockey Pump-2Nos. 10kg-DCP TWD Pump House at Site-2 Beyond 100 HP, (10Nos.) 25kg-DCP 03 10kg-DCP TWD Pump House at Site-2 Beyond 50 HP, (1Nos.)TTL & Unloading gantry 10kg-DCP 75kg-DCP Tank Wagon Loading & Unloading Gantry 10kg-DCP 75kg-DCP Tank Farm A 10kg-DCP 08 25kg-DCP Tank Farm B 10kg-DCP 10 25kg-DCP Tank Farm C 10kg-DCP 10 25kg-DCP UG Tank Farm 10kg-DCP Admin Building 10kg-DCP DG Room 10kg-DCP kg-CO Store House 10kg-DCP Substation/Main switch Room 02kg-CO ltr sand buckets OCB Room 02kg-CO ltr sand buckets Security Cabin 10kg-DCP Workshop 10kg-DCP 01 02kg-CO Canteen 10kg-DCP Laboratory 10kg-DCP kg-CO Oil Sample Storage Room 10kg-DCP Car Parking 10kg-DCP Transformer 10kg-DCP UPS/Charger Room 02kg-CO Engineering Store 10kg-DCP Haldia Installation Foam compound Trolley Capacity 200/210ltr. 03 Page 16

17 Figure 7 - Fire Fighting Layout Page 17

18 C. CORPORATE SOCIAL RESPONSIBILITY As BPCL strongly believes that it is a part of the larger community where it operates, the company has, therefore, taken cognizance of the cultural ethos and socio economic environment of the locality where its plants are located. With this approach, BPCL shall consider the following general measures for the socio economic upliftment of the nearby villages Providing Job Opportunity Vocational Training to Local Youth Education Providing Medical Assistance Infrastructure Development Social Afforestration Games, Sports and Culture D. Project Cost The total project cost for the proposed expansion is around Rs. 624 Lakhs. Page 18

PROJECT REPORT FOR AMMENDMENT IN ENVIRONMENT CLEARANCE

PROJECT REPORT FOR AMMENDMENT IN ENVIRONMENT CLEARANCE 1.1 TYPE OF PROJECT The project of IOTL is a green field POL terminal with storage capacity 1,90,570 KL. 1.2 NEED FOR THE PROJECT Chhattisgarh was carved out of Madhya Pradesh on the 1 st November, 2000.

More information

Pre-Feasibility Report for Construction of Additional Tankage at POL Terminal Partapur, Meerut, M/s IOCL PRE-FEASIBILITY REPORT

Pre-Feasibility Report for Construction of Additional Tankage at POL Terminal Partapur, Meerut, M/s IOCL PRE-FEASIBILITY REPORT PREAMBLE Pre-Feasibility Report for Construction of Additional PRE-FEASIBILITY REPORT Indian Oil Corporation Limited (IOCL) is India's largest commercial enterprise, with a sales turnover of Rs. 4,38,710

More information

ANNEXURE. Annexure 1: Production Details. Annexure 2: Site Location Map. Annexure 3: Site Layout Map & Area breakup for Terminal

ANNEXURE. Annexure 1: Production Details. Annexure 2: Site Location Map. Annexure 3: Site Layout Map & Area breakup for Terminal ANNEXURE Annexure 1: Production Details Annexure 2: Site Location Map Annexure 3: Site Layout Map & Area breakup for Terminal Annexure 4: Operation Philosophy Annexure 5: Copy of Consent to Operate Annexure

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF HPCL, LPG BOTTLING PLANT Capacity: 3 X 500 MT At Plot No.499 Kota-Jhalawar Road (NH-12) Village- Mandana, Tehsil-

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR Conversion of Existing Product Storage Tanks TK-16(HSD) of 6000 KL to MS and TK-6(MS) of 1000 KL to Ethanol AT HPCL Bulk POL Depot, Mansa Road, Phoos Mandi, Bhatinda-151001.

More information

ANNEXURE. Annexure 1: Production Details. Annexure 2: Site Location Map. Annexure 3: Site Layout Map & Area breakup for Terminal

ANNEXURE. Annexure 1: Production Details. Annexure 2: Site Location Map. Annexure 3: Site Layout Map & Area breakup for Terminal ANNEXURE Annexure 1: Production Details Annexure 2: Site Location Map Annexure 3: Site Layout Map & Area breakup for Terminal Annexure 4: Operation Philosophy Annexure 5: Copy of Consent to Operate Annexure

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT M/S INDIAN OIL CORPORATION LIMITED PREFEASIBILITY REPORT FOR THE PROPOSED CAPACITY EXPANSION OF MADURAI TERMINAL AT SURVEY NOS. 159 & 160, SIDCO INDUSTRIAL ESTATE, KAPPALUR VILLAGE, TIRUMANGALAM TALUK

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT For EC FOR INCREASING STORAGE CAPACITY OF ETHANOL BY 6000 KL At Indian Oil Corporation Limited (IOCL), Panipat marketing Complex, Village-Baholi, P.O.-Panipat Refinery, Tehsil Panipat,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT 2016 Expansion of POL Terminal In Magalia, Indore, Madhya Pradesh PRE FEASIBILITY REPORT 1 P a g e Prefeasibility Report 1 EXECUTIVE SUMMARY... 4 1.1 INDUSTRIAL AREA (PROCESSING AREA)... 5 1.2 RESIDENTIAL

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

1.1 SALIENT FEATURES OF THE PROJECT Pipeline extension from VVSPL Vijayawada to the proposed Dharmapuri Storage Terminal

1.1 SALIENT FEATURES OF THE PROJECT Pipeline extension from VVSPL Vijayawada to the proposed Dharmapuri Storage Terminal 1.0 EXECUTIVE SUMMARY Hindustan Petroleum Corporation Limited (HPCL) is one of the major Public Sector Navratna Oil Company engaged in refining, marketing and distribution of Petroleum Products in India.

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Brief Summary of Project

Brief Summary of Project Brief Summary of Project Project Name: 1) Acrylics/Oxo Alcohol Project at Dumad near Gujarat Refinery. 2) Creation of necessary facility for origination of Koyali-Ahmednagar-Sholapur Pipeline (KAhPL) &

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For DEVELOPMENT OF LPG BOTTLING PLANT AT RASAYANI, DISTRICT-RAIGAD, MAHARASTRA Proposed By M/s. BHARAT PETROLEUM CORPORATION LTD. ******************************************** Prepared

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan Of Dr. Mittal Laboratories Pvt. Ltd. Plot No. C-10/2, SARA Industrial Estate Ltd., Village Rampur, Dehradun - Chakrata Road, Selaqui, Dehradun, Uttrakhand For Manufacturing

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

PRE-FEASIBILITY REPORT OF AUGMENTATION OF KOYALI-SANGANER PIPELINE PROJECT PROPONENT M/S. INDIAN OIL CORPORATION LTD., PIPELINE DIVISION NOIDA

PRE-FEASIBILITY REPORT OF AUGMENTATION OF KOYALI-SANGANER PIPELINE PROJECT PROPONENT M/S. INDIAN OIL CORPORATION LTD., PIPELINE DIVISION NOIDA PRE-FEASIBILITY REPORT OF AUGMENTATION OF KOYALI-SANGANER PROJECT PROPONENT M/S. INDIAN OIL CORPORATION LTD., DIVISION NOIDA-201301 M.2015/ Dec, 2015 Prepared By MANTEC CONSULTANTS PVT. LTD. QCI/NABET

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

KL) Proposed capacity of the. No change similar as existing i.e KL (MS KL, HSD KL & SKO KL) Terminal

KL) Proposed capacity of the. No change similar as existing i.e KL (MS KL, HSD KL & SKO KL) Terminal 1.0 EXECUTIVE SUMMARY Hindustan Petroleum Corporation Limited (HPCL) is one of the major Public Sector Navratna Oil Company engaged in refining, marketing and distribution of Petroleum Products in India.

More information

TABLE OF CONTENTS. Para No. Contents Page No

TABLE OF CONTENTS. Para No. Contents Page No TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

CHAPTER REHABILITATION AND RESETTLEMENT (R&R) PLAN (I) POLICY TO BE ADOPTED (CENTRAL / STATE)... 32

CHAPTER REHABILITATION AND RESETTLEMENT (R&R) PLAN (I) POLICY TO BE ADOPTED (CENTRAL / STATE)... 32 CONTENTS CHAPTER 1... 1 1.0 PROJECT SUMMARY... 1 CHAPTER 2... 2 2.0 INTRODUCTION... 2 (I) IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 2 (II) BRIEF DESCRIPTION OF NATURE OF THE PROJECT... 2 (III)

More information

DEVELOPMENT of. LPG Storage & Bottling Plant. Haldia. Project Feasibility Report

DEVELOPMENT of. LPG Storage & Bottling Plant. Haldia. Project Feasibility Report Hindustan Aegis LPG Limited DEVELOPMENT of LPG Storage & Bottling Plant Haldia Project Feasibility Report August 2017 1 Amendment Record: Amendment Inserted by (Name printed) Date Signature Remarks 2 Table

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT FOR ORDINARY SAND PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS

More information

5. ENVIRONMENT MANAGEMENT PLAN

5. ENVIRONMENT MANAGEMENT PLAN 5. ENVIRONMENT MANAGEMENT PLAN The environmental management plan consist of the set of mitigation measures, management and, monitoring measures to be taken during construction and operation phase to eliminate

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management ANNEXURES Annexure No. Description 1 Google image showing proposed project site 2 Plant Lay-Out 3 Manufacturing process details 4 Details of hazardous waste management 5 Details of Effluent Treatment Plant

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project Of MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS of 850 MT/Month By PASHUPATI INDUSTRIES 169/1/A2, Phase 1, Opposite Telephone Exchange, GIDC Naroda, Ahmedabad-382330

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10

More information

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT LG Polymers India Pvt. Ltd. Sy. No.s

More information

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan Report on 1. PROJECT LOCATION & LAND USE The Ganesh Park 3 is a residential building project constructed on plot 608 to 613/5 Vil: GIDC Ankleshwar in Bharuch district of Gujarat state. The project land

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT OCTOBER 2017 Page 1 of 29 INDEX 1.1 EXECUTIVE SUMMARY...5 1.2 SALIENT FEATURES OF THE PROJECT...6 1.3 PROPOSED PLANNING...8 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION...8

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

M/S. Dain Colour Chem

M/S. Dain Colour Chem PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS

More information

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Compliance Report for Environmental Clearance No.11.63/2005.1A.III dated 19.12.2005 Specific Conditions

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVESUMMARY 1.1 Introduction Road Metal of M/s. Venkata Ramana Stone Crusher covering an extent of 0.89 Ac is located at Sy.No.379/1 of Perecherla Village, Medikonduru Mandal, Guntur District,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT By Sugna Metals Limited [Expansion of Steel Plant] At Sy. Nos. 142 & 143 of NarayanpurVillage, Pargi Mandal, Vikarabad District (formerly Ranga Reddy), Telangana INDEX S.No Item

More information

PRE-FEASIBILITY REPORT OF JAIPUR-PANIPAT NAPHTHA PIPELINE PROJECT PROPONENT M/S. INDIAN OIL CORPORATION LTD., PIPELINE DIVISION NOIDA

PRE-FEASIBILITY REPORT OF JAIPUR-PANIPAT NAPHTHA PIPELINE PROJECT PROPONENT M/S. INDIAN OIL CORPORATION LTD., PIPELINE DIVISION NOIDA PRE-FEASIBILITY REPORT OF JAIPUR-PANIPAT NAPHTHA PIPELINE PROJECT PROPONENT M/S. INDIAN OIL CORPORATION LTD., PIPELINE DIVISION NOIDA-201301 M.2015/ Nov, 2015 Prepared By MANTEC CONSULTANTS PVT. LTD. QCI/NABET

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016 CONECPTUAL PLAN w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire at of J.V.P.D scheme of Vile Parle (W), by December, 2016 GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

Check list for construction Project of EC [Category 8(a)]:

Check list for construction Project of EC [Category 8(a)]: Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist

More information

PRE FEASIBILTY REPORT

PRE FEASIBILTY REPORT PRE FEASIBILTY REPORT FOR ENVIRONMENT CLEARANCE OF PROPOSED NEW PROJECT S. O. CHEMICALS (5 f Category) Proposed By: COREL PHARMA CHEM PVT. LTD. SURVEY NO. 473 & 481, BORISANA, KADI THOL ROAD, KADI, DIST

More information

Municipal solid / hazardous waste

Municipal solid / hazardous waste (10) ENVIRONMENTAL MANAGEMENT PLAN The mitigation measures for reducing the adverse environmental impacts together constitute a part of EMP. The environmental issues, which need management, plan for the

More information

Expansion of Calcutta Riverside (An Integrated Township)

Expansion of Calcutta Riverside (An Integrated Township) CONCEPTUAL PLAN Expansion of Calcutta Riverside (An Integrated Township) Project of Riverbank Developers Private Limited at Maheshtala, Batanagar, West Bengal. Project Proponent: Riverbank Developers Private

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

Hence, the present proposal is classified under Schedule 6(b) & Category B according to EIA Notification 2006 & subsequent amendments.

Hence, the present proposal is classified under Schedule 6(b) & Category B according to EIA Notification 2006 & subsequent amendments. 1. INTRODUCTION 1.1BRIEF DESCRIPTION OF PROJECT M/s Indian Oil Corporation Limited has proposed to set up an LPG Bottling Plant at Khasra no: 3, Jodhpur District, Rajasthan State. LPG from M/s Indian Oil

More information

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT 1.0 INTRODUCTION OF THE PROJECT Pannageshwar Sugar Mills Ltd. (PSML), At: Pangaon, Tal.: Renapur, Dist.: Latur, Maharashtra was registered vide registration no. 11-130803 dated 01.01.2001.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.

More information

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II)

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II) BRIEF SUMMARY OF THE PROJECT for PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT of M/s. BASF INDIA LTD. (UNIT-II) PLOT NO. 8001 & 8001A, PHASE-VI, G.I.D.C., ANKLESHWAR, DIST: BHARUCH-393002,

More information

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant PRE FEASIBILITY REPORT FOR Silica Sand Beneficiation Plant BY Shree Silicaam Minerals LLP VILLAGE : CHOKI TALUKA : JAGADIA DIST : BHARUCH GUJARAT (INDIA) PRE-FEASIBILITY REPORT: SILICA SAND BENIFICIATION

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT PREPARED FOR SHIV SHANTHI CEMENT PRIVATE LIMITED Sy. Nos. 92, 93 & 94, Tatiguda Village, Garividi Mandal, Vizianagaram District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell) ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation

More information

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS Annexure No - 13 SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS File No : Name of the Project: Proposed Commercial project called Bagmane Tech Park RIO Campus of M/s. Bagmane Developers

More information

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD.

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. FOR THE PROPOSED EXPANSION PROJECT FOR THE MANUFACTURING OF KETONIC RESINS Category: 5(f) OF RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. Located at: Plot No. C-1/46, 100 SHED AREA, GIDC, Vapi,

More information

Details of the proposed project as presented before the committee are tabulated below:

Details of the proposed project as presented before the committee are tabulated below: Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Six Monthly Compliance Report June-2015 M/s Mahagun Real Estate Pvt. Ltd SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex Mahagunpuram AT VILLAGE Mehrauli, Dasna, Ghaziabad, U.P. Being developed

More information

ENVIRONMENTAL MONITORING REPORT

ENVIRONMENTAL MONITORING REPORT ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM APRIL 2018 SEPTEMBER 2018 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT

More information

SCOPE OF WORK TECHNICAL SPECIFICATIONS

SCOPE OF WORK TECHNICAL SPECIFICATIONS SCOPE OF WORK & TECHNICAL SPECIFICATIONS HAZOP STUDY, DISASTER MANAGEMENT PLAN & RISK ANALYSIS AT AMBALA NEW DEPOT PROJECT SITE BRIEF DESCRIPTION OF JOB: New storage depot is to be constructed near our

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information