1 PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat (Guj.) Prepared By: NABL Accredited Testing Laboratory ISO 9001:2008 Certified Company Aqua-Air Environmental Engineers P. Ltd. 403, Centre Point, Nr. Kadiwala School, Ring Road, Surat

2 CONTENTS Sr. No. Description Page No. 1. Executive Summary 2 2. Introduction of the Project/Background information 4 3. Project Description 6 4. Site Analysis Planning Brief Proposed Infrastructure Rehabilitation and resettlement (R & R) Plan Project Schedule & Cost Estimates Analysis of Proposal (Final Recommendations) 15 1

3 1.0 EXECUTIVE SUMMARY 1.1 Company Profile M/s. Vikashtex Envirotech CETP Pvt. Ltd. proposes common effluent treatment plant (CETP) located at Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat , Gujarat. 1.2 Project Details Sr. No. Treatment Facility Industry Type Water Jet Looms (Capacity) Yarn Dyeing (Capacity) Phase-I Phase-II Phase-I Phase-II 1 Common Effluent 3.5 MLD 3.5 MLD 1.5 MLD 1.5 MLD Treatment Plant (CETP) Total 7.0 MLD 3.0 MLD Grand Total 10 MLD Details of treatment process/scheme of proposed CETP & treated effluent disposal mode: Reference - Form-I, Annexure Raw Materials to be used Sr. No. Raw Material CETP (Yarn Dyeing) 1 Lime 50 2 Alum 70 3 Poly Electrolyte Poly Electrolyte DAP Urea 0.1 CETP (Water Jet Looms) 7 Poly Aluminium Chloride (PAC) 0.1 Qty. (Mt/Month) 2

4 1.4 Raw Water Consumption When CETP will be operating at peak capacity, total raw water requirement will be 86.0 KL/day which will meet through ground water - bore well (1 no.). 1.5 Air Pollution Source and Control Management Sr. No. Stack attached to 1 D.G. Set-1* (250 KVA) 2 D.G. Set-2* (250 KVA) Stack Height (meter) * To be used in emergency only. Stack Diameter (meter) Fuel name & Quantity Diesel 50 Liters/hr Diesel 50 Liters/hr. Type of Emission PM SO 2 NOx PM SO 2 NOx APCM Adequate Stack height with Stack Monitoring Facility 1.6 Hazardous/Solid Waste Generation and Disposal Mode Three categories of Hazardous Wastes will be generated. Treatment, storage & disposal mode for the same is and will be followed as per Hazardous & Other Wastes (Management & Trans-boundary Movement) Rules, TYPE OF WASTE CETP Sludge Used Oil Discarded Containers/Bags/Drums CATEGORY NO Quantity Phase-I 200 MT/Month 10 Liters/Month 100 Nos./Month Phase-II 200 MT/Month 10 Liters/Month 100 Nos./ Month *Total 400 MT/Month 20 Liters/Month 200 Nos./Month Mode of Disposal Collection, Storage in HWSA and send to Common TSDF Stores HWSA and finally sold to GPCB registered Collection, Storage, Decontamination & given to GPCB 3

5 site of M/s. SEPPL for disposal. reprocessor. authorized Vendor. * Total quantity of solid/hazardous waste while CETP will be operating at peak capacity. 1.7 Green Belt Total 9,632 m 2 land area is available at site; out of this area about 1300 m 2 (13.5 %) area shall be covered as greenbelt and other forms of greenery. 1.8 Power & Fuel Requirements Power Requirement Sr. No. Phase-wise Requirement (KVA) & Source DGVCL (GEB) D.G. Set (To be used in emergency only) 1 Phase-I 250 KVA 250 KVA 2 Phase-II 250 KVA 250 KVA Total *500 KVA 500 KVA Fuel Requirement Sr. No. Phase-wise Diesel Requirement (Liter/hr.) (to be used in emergency only) 1 Phase-I 50 2 Phase-II 50 *Total 100 * Total Power and Fuel requirement while CETP will be operating at peak capacity. 2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION 2.1 Identification of the project and project proponent. In case of mining project, a copy of mining lease/letter of intent should be given. Identification of the project Proposed common effluent treatment plant (CETP). 4

6 Identification of the project proponent The Board of directors of the company is very experienced industrialists. They are: 1. Mr. Pankajkumar Agrawal 2. Mr. Dipak Shekhalia 3. Mr. Himmatbhai Sojitra 4. Mr. Praffulbhai Bhanderi 5. Mr. Manoj Agarwal 2.2 Brief description of nature of the Project Proposed common effluent treatment plant (CETP). 2.3 Need for the project and its importance to the country and or region Proposed CETP is to be located adjacent to upcoming park named M/s. Deeptex Ecotextile Park in which nos. of Yarn Dyeing and Water Jet Looms industries will likely to come in existence in very near future that lead to effluent generation which needs adequate treatment and final disposal of treated effluent. Also there are other industrial areas i.e. Kim industrial area, Pipodra industrial area, Panoli GIDC, Ankleshwar GIDC, etc. developed by Gujarat Industrial Development Corporation (GIDC) having myriad of small, medium and large scale industrial units located at some distance from proposed project site and there is good demand by this industries for common effluent treatment facility. Thus, due to this reason and scenario, M/s. Vikashtex Envirotech CETP Pvt. Ltd. plans for a new CETP. 2.4 Demands-Supply Gap There is good demand by industries and inquiries are increasing day by day. 2.5 Imports vs. Indigenous production Raw materials available from local sources/surrounding area or industries. 2.6 Export possibility Not applicable as company will provide service of effluent treatment come from its member industries and final disposal of treated effluent. 5

7 2.7 Domestic/Export Markets Not applicable as company will provide service of effluent treatment come from its member industries and final disposal of treated effluent. 2.8 Employment Generation (Direct and Indirect) due to project. Company will give direct employment to local people based on qualification and requirement. In addition to direct employment, indirect employment shall generate ancillary business to some extent for the local population. 3.0 Project Description 3.1 Type of Project including interlinked and interdependent projects, if any. No interlinked project has been submitted. 3.2 Location (map showing general location, specific location and project boundary & project site layout) with coordinates. Map showing Project Site location 6

8 7

9 Plot Layout 8

10 3.3 Details of alternate sites considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted. Major factors involved in the selection of site are listed below: Site is very well connected by road Proximity to effluent generating industries Availability of sufficient land free from cultivation Availability of power evacuation facilities Availability of water for industrial use Efficient transport facilities within the industrial estate and to & fro the city area. Environment-friendly zone. Uninterrupted power supply. 3.4 Size or Magnitude of Operation Refer: Section-1.0, Sub-section 1.2, Page No. 2 of this report. 3.5 Project Description with process details (a schematic diagram/flow chart showing the project layout, components of the project, etc. should be given) Refer: Form-1, Annexure Raw Material required along with estimated quantity, likely source, marketing area of final product/s, mode of transport of raw material and Finished product. For raw materials - Refer: Section-1.0, Sub-section 1.3, Page No. 2 of this report. We will procure raw material/s as much as possible from domestic market. 3.7 Resource optimization/recycling and reuse envisaged in the project, if any, should be briefly outlined. Resource optimization/recycling and reuse shall be envisaged. 3.8 Availability of water, its source, energy/power requirement and source should be given. Raw water requirement will be met through ground water - bore well (1 no). 9

11 Power & Fuel Requirement Reference: Section-1.0, sub-section 1.8, Page No. 4 in this report. 3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their management/disposal. Refer: Form-I, Annexure-2 & Schematic representations of the feasibility drawing which give information of EIA purpose. ACTIVITIES OVERVIEW OF E. I. A. STUDIES SOURCE OF INFORMATION RECONNAISSANCE SURVEY OF EXISTING PLANT MONITORING OF AIR, WATER & SOIL QUALITY & NOISE LEVELS. DATA ON METEOROLOGY SOCIO-ECONOMIC STATUS & BASIC AMENITIES. SITE VISITS BY AND INTERVIEWS WITH LOCALS INTRODUCTION BASELINE ENVIRONMENTAL STATUS SOCIOECONOMIC STATUS & INFRASTRUCTURE PROPOSED PLANT ANNUAL REPORT MARKET ASSESSMENT FINANCIAL REPORT PROJECT REPORT ENVIRONMENTAL INFORMATION CENTRE CENTRAL GROUND WATER BOARD GUJARAT POLLUTION CONTROL BOARD (GPCB) PUBLIC HEALTH ENGINEERING DEPT. AGRICULTURE DEPARTMENT FOREST DEPARTMENT IRRIGATION DEPARTMENT EMPLOYMENT EXCHANGE HEALTH CENTER CENSUS DEPT. INDIAN METEOROLOGICAL DEPT. IDENTIFICATION & ASSESSMENT OF IMPACTS EVALUATION OF IMPACTS BY MATRIX METHOD DESCRIPTION OF EFFLUENT TREATMENT PLAN, AIR POLLUTION CONTROL, HAZARDOUS WASTE MANAGEMENT, GREEN BELT DEVELOPMENT MONITORING PROGRAM 4.0 Site Analysis IMPACTS METHODOLOGY OF IMPACT ASSESSMENT ENVIRONMENTAL MANAGEMENT PLAN FACILITY DESCRIPTION CONSEQUENCE ANALYSIS PREPARATION OF DISASTER MANAGEMENT PLAN RISK ANALYSIS STUDIES & DISASTER MANAGEMENT PLAN SAFETY, HEALTH & ENVIRONMENTAL POLICY, GUIDELINES BY DIRECTOR GENERAL OF FACTORY SAFETY, MINISTRY OF LABOR. 10

12 4.1 Connectivity Site is very well connected by road Availability of water, power, etc. 4.2 Land Form, Land Use and Land Ownership Land from and land use data will be incorporated in EIA Report. 4.3 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ)), shortest distances from the periphery of the project to periphery of the forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from HFL of the river), CRZ. In case of the notified industrial area, a copy of the Gazette notification should be given. Existing land use pattern data will be incorporated in EIA Report. CRZ Clearance is not applicable. 4.4 Existing Infrastructure Site is very well connected by road Efficient transport facilities within the industrial estate and to & fro the city area. Availability of water for industrial use Availability of power evacuation facilities Uninterrupted power supply. Proximity to effluent generating industries 4.5 Soil Classification Soil Characteristics data will be incorporated in EIA Report. 4.6 Climatic data from secondary sources. Climatic data from primary & secondary sources will be incorporated in EIA Report. 11

13 4.7 Social infrastructure available. Depending on the growth of the company, required social infrastructure will be provided. 5.0 Planning Brief 5.1 Planning Concept (type of industries, facilities, transportation etc.) Town and Country planning/development authority classification. Proposed common effluent treatment plant (CETP). 5.2 Population Projection Population data will be incorporated in EIA report. 5.3 Land use planning (breakup along with green belt, etc.) Industrial Area (Processing Area) Processing Area (Plant facilities, R&D, ETP Area and Engineering/Utility Services): 7000 m 2 (approx.) Residential Area (Non Processing Area) Non Processing Area (Green belt, Raw material storage area, finished storage area, Administration Building, Parking, road and open area): 2632 m 2 (approx.) 5.4 Assessment of Infrastructure Demand (Physical& Social) Employment will be as per prevailing norms of state government for skilled and unskilled people. Social Welfare shall be done. Cordial relation with the industry shall be established and representation shall be made to villagers for help for creation of facilities related to health, education, etc. 5.5 Amenities/Facilities Details of amenities will be incorporated in EIA report. 12

14 6.0 Proposed Infrastructure 6.1 Industrial Area (Processing Area) Processing Area (Plant facilities, R&D, ETP Area and Engineering/Utility Services): 7000 m 2 (approx.) 6.2 Residential Area (Non Processing Area) Non Processing Area (Green belt, Raw material storage area, finished storage area, Administration Building, Parking, road and open area): 2632 m 2 (approx.) 6.3 Green Belt Total 9,632 m 2 land area is available at site; out of this area about 1400 m 2 (14.53 %) area shall be covered as greenbelt and other forms of greenery. 6.4 Social Infrastructure Ground Water Supply through bore well (1 no.) Power supply by DGVCL and D.G. Sets (emergency standby) 6.5 Connectivity (Traffic and Transportation Road/ Rail/Metro/ Water ways, etc.) Major factors involved in the selection of site are listed below: Site is very well connected by road Proximity to effluent generating industries Availability of sufficient land free from cultivation Availability of power facilities Availability of water for industrial use 6.6 Drinking water Management (Source & Supply of water) Total water requirement shall meet through ground water - bore well (1 no.). 13

15 6.7 Sewerage System Sewage pipes will be laid in entire premises for the removal and disposal of mainly nonharmful liquid wastes from the offices, canteen and domestic waste coming from different sections of CETP. These liquid wastes will be sent to septic tank & soak pit or CETP for treatment and final disposal. 6.8 Solid Waste Management Reference: Section-1.0, sub-section 1.6, Page No. 3-4 in this report. 6.9 Power Requirement & Supply/Source Reference: Section-1.0, sub-section 1.8, Page No. 4 in this report. 7.0 Rehabilitation and Resettlement (R& R) Plan 7.1 Policy to be adopted (central/state) in respect of the project affected including home oustees, land oustees and landless laborers (a brief outline to be given) There is no habitation on the proposed project land. It non-agricultural land. Thus, R & R policy is not applicable to this project. There shall not be displacement of any population in proposed project land. The execution of CETP will boost the commercial and economical status of the locality up to some extent. 8. Project Schedule & Cost Estimates 8.1 Likely date of start of construction and likely date of completion (Time schedule for the project to be given). We shall start construction after getting EC and CTE (NOC) and shall start operation after applying for CC&A. 8.2 Estimated Project cost along with analysis in terms of economic viability of the project. Total capital investment for the proposed project activities is Rs. 15 crores. 14

16 9. Analysis of Proposal (Final Recommendations) 9.1 Financial and social benefits with special emphasis on the benefit to be local people including tribal population, if any, in the area. Employment will be as per prevailing norms of state government for skilled and unskilled people for the proposed project. Social Welfare shall be done. Cordial relation with the industry shall be established and representation shall be made to villagers for help for creation of facilities related to health, education, etc. 15

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED EXPANSION OF DISTILLERY of M/s. SHREE GANESH KHAND UDYOG SAHKARI MANDLI LTD. Shri Harisinhji Mahida Bhavan, At & Po: Vataria, Tal: Valia, Dist: Bharuch, Gujarat-393001

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

PRE - FEASIBILITY REPORT PROPOSED SPECIALTY CHEMICALS MANUFACTURING UNIT M/S. NIC BIOSCIENCE PVT. LTD.

PRE - FEASIBILITY REPORT PROPOSED SPECIALTY CHEMICALS MANUFACTURING UNIT M/S. NIC BIOSCIENCE PVT. LTD. PRE - FEASIBILITY REPORT For PROPOSED SPECIALTY CHEMICALS MANUFACTURING UNIT Of M/S. NIC BIOSCIENCE PVT. LTD. PLOT NO. 907/5, GIDC ESTATE, PANOLI 394116, TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT Prepared

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For EXISTING MINING ACTIVITY CATEGARY B2 UNDER THE EIA NOTIFICATION 2006 AMENDED ON 31/05/2012 TO PIRABHAI VALABHAI NANDASANIYA LOCATED

More information

M/s.Aarti Industries Limited (Apple Organics Division), Vapi.

M/s.Aarti Industries Limited (Apple Organics Division), Vapi. EXECUTIVE SUMMARY M/s. Aarti Industries Limited (Apple Organics Division) first obtained CCA order 3431, issued on 16/08/2004. Further it was extended by CCA order no. AWH-73091 dated 14/09/2015 for manufacturing

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (BUILT UP AREA: 77420.15 SQ. M) BY AMC EWS HOUSING PROJECT RESIDENTIAL BUILDING & COMMERCIAL PROJECT F. P. NO. 174, T.P. NO. 32, GOTA,

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Summary For Ria Organics Private Limited, D-26/2, Kurkumbh - MIDC, Taluka - Daund Dist. Pune, Maharashtra, India. Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited by QCI NABET Lab. Recognized

More information

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Stone Quarry (Area 1.00 ha) Survey No: - 526, 527 & 528 (Part) Village Raimoha, Taluka Shirur (Kasar), Dist - Beed (M.S). Owner & Lessee Shri. Chakradhar Subhash Dhakane Prepared

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC Prefeasibility Report For 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC of Alkyl Amines Chemicals Limited 401-407 Nirman Vyapar Kendra, Plot No. 10, Sector 17, Vashi,

More information

Telefax : 011: Dated 1 st March, 2013

Telefax : 011: Dated 1 st March, 2013 F. No. J-11011/263/2012- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 To, Shri Jigar Shah, Director M/s

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Stone Quarry (Area 2.01 ha) Survey No: - 161/2 & 162 (Part) Village Mandavghorad,Taluka Hingana, Dist - Nagpur (M.S). Owner & Lessee M/s Saikrupa Stone Crusher (LLP) Through Partner

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

For. Coal Washery. Promoter. : Budbud & Kerajharia. Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012

For. Coal Washery. Promoter. : Budbud & Kerajharia. Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012 Pre-feasibility Report For Coal Washery at Village Tehsil District : Budbud & Kerajharia : Pali : Korba [C.G.] Promoter Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012 Contents 1.0 Executive

More information

FOR SPECTRUM DYES AND CHEMICALS PVT.LTD.

FOR SPECTRUM DYES AND CHEMICALS PVT.LTD. TECHNO ECONOMIC FEASIBILITY REPORT FOR EXPANSION OF DYES AND CHEMICALS MANUFACTURING UNIT AT SPECTRUM DYES AND CHEMICALS PVT.LTD. BLOCK NO-484, 502, 503-A, 504 & 505, N.H.NO.8, PALSANA-394315, DIST.: SURAT,

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY INTRODUCTION M/s. Ion Exchange (India) Ltd. will engage for manufacturing of Cation & Anion Resins at Plot No. 5811-12-13, GIDC Estate, Ankleshwar, Gujarat. As per EIA notification

More information

MIDC, Nagpur Expansion of Existing Butibori Industrial Area (BIA Phase II) - Form-1

MIDC, Nagpur Expansion of Existing Butibori Industrial Area (BIA Phase II) - Form-1 ANNEXURE I SITE LOCATION MAP Building Environment (India) Pvt. Ltd 1 ANNEXURE II LAYOUT PLAN Building Environment (India) Pvt. Ltd 2 ANNEXURE III LAND DETAILS Sr. No. LAND DETAILS (In Ha.) 1. LARGE SIZE

More information

No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** No.IA-J-11011/363/2017-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division *** Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New

More information

PRE FEASIBILITY REPORT FOR THE PROPOSED KRAFT PAPER MANUFACTURING INDUSTRY

PRE FEASIBILITY REPORT FOR THE PROPOSED KRAFT PAPER MANUFACTURING INDUSTRY PRE FEASIBILITY REPORT FOR THE PROPOSED KRAFT PAPER MANUFACTURING INDUSTRY Plot No.97/P1, Survey No. 214, 216 and 219 Humnabad Industrial Area, Humnabad Taluk, Bidar At Project Proponents, Plot No.97/P1,

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

M/s ARYAN ENERGY (P) LTD.

M/s ARYAN ENERGY (P) LTD. Application for Environmental Clearance (EC) PRE-FEASIBILITY REPORT For Expansion of Coal Washery Plant from 2.34 Million TPA to 5.00 Million TPA M/s ARYAN ENERGY (P) LTD. at IDCO s Industrial Estate at

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

Phase II (BIA Phase-II),

Phase II (BIA Phase-II), PROJECT PREFEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENTAL CLEARENCE IN TERMS OF PROVISIONS OF EIA NOTIFICATION-2006 1.0 EXECUTIVE SUMMARY OF THE PROJECT Sr. No Description Details 1 Proposed project

More information

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations. 1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad

More information

Pre-Feasibility Report. for. Proposed Construction project of Santnagari

Pre-Feasibility Report. for. Proposed Construction project of Santnagari Pre-Feasibility Report for Proposed Construction project of Santnagari at Survey No. 1439, Near Dharoi Dam, Village Mahor, Taluka Vadali, District Sabarkantha, Gujarat By Gujarat Pavitra Yatradham Vikas

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1. P. G. D. E. M. (Semester - I) Examination

Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1. P. G. D. E. M. (Semester - I) Examination Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1 P. G. D. E. M. (Semester - I) Examination - 2009 ENVIRONMENTAL MANAGEMENT TECHNIQUES - I (1) Answer any four questions. (3) Use of calculator

More information

Monitoring the Implementation of Environmental Safeguards

Monitoring the Implementation of Environmental Safeguards Monitoring the Implementation of Environmental Safeguards Ministry of Environment & Forest Western Region, Regional Office, Bhopal MONITORING REPORT PART I DATA SHEET RASHTRIYA CHEMICAS AND FERTILISERS

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

LIST OF PRODUCTS (PROPOSED) Existing Quantity (MT/Month)

LIST OF PRODUCTS (PROPOSED) Existing Quantity (MT/Month) LIST OF PRODUCTS (PROPOSED) Sr.No. Name of Product Existing Total after expansion 1 Benzyl Acetate 20 50 2 Benzyl Benzoate 20 50 3 Benzyl Alcohol 20 50 4 Benzyl Cyanide 20 50 5 Phenyl Acetic Acid 20 50

More information

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016)

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016) Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated 06.09.2012 (Period April 2016 to September 2016) Sr. No. Conditions Compliance status A. Specific Conditions A.1 Water 1. The fresh

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

M/S HERCULES PIGMENTS PVT. LIMITED

M/S HERCULES PIGMENTS PVT. LIMITED ON PROPOSED PROJECT FOR THE MANUFACTURE OF ORGANIC AZO PIGMENTS Category 5 (f) By M/S HERCULES PIGMENTS PVT. LIMITED Located at: Plot No. 1704, Chemical Zone GIDC Notified Industrial Area, GIDC Sarigam,

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

M/s. Pest Control (India) Pvt. Ltd.

M/s. Pest Control (India) Pvt. Ltd. Prefeasibility Report of Pest Control (India) Pvt. Ltd. at, Plot no. 38 and 39, MIDC Taloja, Taluka Panvel, District Raigad, Maharashtra Prepared by, Sadekar Enviro Engineers Pvt. Ltd. QCI-NABET Accredited

More information

PRE FEASIBILITY REPORT JOJOBERA CEMENT PLANT

PRE FEASIBILITY REPORT JOJOBERA CEMENT PLANT PRE FEASIBILITY REPORT Of JOJOBERA CEMENT PLANT (STAND-ALONE CEMENT GRINDING UNIT) FOR ENVIRONMENTAL CLEARANCE FOR CHANGE IN PRODUCT MIX OF 4.6 MILLION TONNES PER ANNUM CEMENT PRODUCTION (NO INCREASE IN

More information

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29)

No. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29) 1 By: Speed-Post State Level Expert Appraisal Committee (Formed as per S.O. no. 1533 dated 14 th Sept 2006 of Government of India, Ministry of Environment & Forests) PARYAWARAN PARISAR, E-5, ARERA COLONY,

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

M/S. LEVIN DÉCOR LLP.

M/S. LEVIN DÉCOR LLP. M/S. LEVIN DÉCOR LLP. (New Proposed Project for RESIN Production) (Phenol Formaldehyde Resin-300 MT/month Melamine Formaldehyde Resin -150 MT/month Phenol Urea Formaldehyde Resin -100 MT/month) Survey

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.

More information

STATE OF ENVIRONMENT ATLAS OF INDIA-OUTLINE

STATE OF ENVIRONMENT ATLAS OF INDIA-OUTLINE STATE OF ENVIRONMENT ATLAS OF INDIA-OUTLINE Sl. No. Maps Themes Features Data Source I: GENERAL CHARACTERISTICS I. Administrative Divisions International, States, Districts Survey of Boundaries with State

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR PROPOSED 30 KLD GRAIN BASED DISTILLERY PROJECT WITH 5 MW POWER CO-GENERATION PLANT At Vill. Kirna Tehisl : Mungeli Dist. Bilaspur 495335 (Chattisgarh) Proposed By :- AEGIS BEVERAGES

More information

SCOPE OF WORK TECHNICAL SPECIFICATIONS

SCOPE OF WORK TECHNICAL SPECIFICATIONS SCOPE OF WORK & TECHNICAL SPECIFICATIONS PROJECT DESCRIPTION/ SITE INFORMATION New storage depot is to be constructed at Bokaro in the state of Jharkhand. This tender envisages carrying out HAZOP Study,

More information

Demand Potential of Indian Spun Pipes

Demand Potential of Indian Spun Pipes Demand Potential of Indian Spun Pipes An Analytical Review uctile iron spun pipes and cast iron spun pipes both find Dusages in water supply, sanitation and housing. Cast iron spun pipes have traditionally

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Capacity enhancement of Sugar Plant at crush rate of 4500 TCD expandable to 8000 TCD For DUDHGANGA VEDHGANGA SAHAKARI SAKHAR KARKHANA LTD. At Bidri, Mouninagar, Tal. Kagal, Dist.

More information

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project FORM I I. BASIC INFORMATION. Item Details 1 Name of the project Proposed Mixed Use Development Project SPR Binny 2 no. in the schedule 8 (b) 3 Proposed area Area Details: Total land area: 200243.50 Sqm

More information

Measuring Disparities in Access to Sanitation in India: Findings from National Sample Survey. Aditya Bhol Centre for Policy Research, New Delhi

Measuring Disparities in Access to Sanitation in India: Findings from National Sample Survey. Aditya Bhol Centre for Policy Research, New Delhi Measuring Disparities in Access to Sanitation in India: Findings from National Sample Survey Aditya Bhol Centre for Policy Research, New Delhi Key Discussion Points Latest urban sanitation statistics in

More information

INDUSTRIAL HYGIENE SERVICES

INDUSTRIAL HYGIENE SERVICES INDUSTRIAL HYGIENE SERVICES Survey of: Vibration Noise & Mapping Illumination Asbestos Containing Material (ACM) Volatile Organic Compounds (VOC) Hazardous Substances Indoor Air Quality Workplace Monitoring

More information

ZZH/CLAB-KSPCB/04/ Environmental Officer,

ZZH/CLAB-KSPCB/04/ Environmental Officer, ZZH/CLAB-KSPCB/04/ 21273 08-12-2014 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16 th Cross Near Hari Om Trust, Habbuwada

More information

BASIC INFORMATION QUESTIONNAIRE

BASIC INFORMATION QUESTIONNAIRE Application No. Central Environmental Authority BASIC INFORMATION QUESTIONNAIRE Essential information to determine the environmental approval requirement of projects (Note Use separate sheets as and when

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

Infrastructure Development and Environment

Infrastructure Development and Environment Infrastructure Development and Environment Few Stories Lift irrigation from Chambal River No Development Zone around Numaligarh Refinery NH - 31 C passing through Jaldapara, Mahananda and Buxa Nh-72 cutting

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

Jayendrasinh Bharatsinh Jadeja

Jayendrasinh Bharatsinh Jadeja Minor Mineral Ordinary Sand Mine (Proposed Project) Village : Jodiya, Taluka : Jodiya, Dist. Jamnagar (Gujarat) Production Capacity : 30,600 TPM Area : 04-90-00 Ha. Proposal For Environmental Clearance

More information

OIL AND GAS SUPPLEMENT

OIL AND GAS SUPPLEMENT Santa Barbara County Oil and Gas Supplement Page 1 OIL AND GAS SUPPLEMENT The purpose of this supplement is to ensure that sufficient information is provided at the application submittal stage per Section

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT for Change in technology from DRY to WET type of coal washery Hind Energy & Coal Beneficiation (India) Pvt. Ltd. at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh

More information

Sustainable Industrial Waste Water Management for a Industrial development cooperation in Thane, Maharashtra

Sustainable Industrial Waste Water Management for a Industrial development cooperation in Thane, Maharashtra Sustainable Industrial Waste Water Management for a Industrial development cooperation in Thane, Maharashtra Pratik Patil #, Oshmi Ghosh*and H. Jeswani** # Graduate Student, Civil Engineering Dept., Sardar

More information

Project Proponent: Shri Kuldeep Pratap Singh Bhati Page - 11

Project Proponent: Shri Kuldeep Pratap Singh Bhati Page - 11 1.0 EXECUTIVE SUMMARY This is a new mining lease of Ball Clay Silica Sand, M.L. No.- 48/2011, located near Village- Indo Ka Bala, Tehsil-Kolayati, District Bikaner (Rajasthan) over an area of 4.2464 hectares.

More information

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report Status of Compliance of stipulated conditions of the Environment Clearance J- 01 It is noted that total water consumption will increase from 1000-1200 m 3 /day to 1200-1300 m 3 /day. Fresh water requirement

More information

Wastewater treatment and reuse in Bangalore: complexities and challenges

Wastewater treatment and reuse in Bangalore: complexities and challenges Wastewater treatment and reuse in Bangalore: complexities and challenges Priyanka Jamwal Fellow, Center for Environment and Development, ATREE (based on joint work with Bejoy K Thomas, Sharachchandra Lele

More information

Sandipbhai Shankarbhai Patel

Sandipbhai Shankarbhai Patel Minor Mineral Ordinary Sand Mine (Existing Project) Village : Oze, Ta : Karjan, Dist : Vadodara (Gujarat) Production Capacity : 9000 TPM Area : 04-33-52 Ha. Proposal For Environmental Clearance (Category

More information

Provincial Policy Statement 2014 Training Aid

Provincial Policy Statement 2014 Training Aid This job aid has been developed for education and training purposes as a high-level summary of the policy changes in the PPS 2014. It should not be relied upon as a substitute for specialized legal or

More information

Article 1: Article 2:

Article 1: Article 2: Regulation on Controlling Air Pollutants (MD118/2004) Issued by Ministry of Regional Municipalities, Environment & Water Resources, (August 7, 2004) Article 1: The rules and regulations specified hereunder

More information

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in

More information

UrbanSAT- Urban System Analysis Tool : For delivering urban water balancing and reporting

UrbanSAT- Urban System Analysis Tool : For delivering urban water balancing and reporting 19th International Congress on Modelling and Simulation, Perth, Australia, 12 16 December 2011 http://mssanz.org.au/modsim2011 UrbanSAT- Urban System Analysis Tool : For delivering urban water balancing

More information

New connection to a public sewer

New connection to a public sewer New connection to a public sewer Application form You can go to our website thameswater.co.uk/buildover and apply online or complete this form and return to Thames Water, Developer Services, Clearwater

More information

Executive Summary 1. 1 Project Background 6

Executive Summary 1. 1 Project Background 6 Contents Executive Summary 1 1 Project Background 6 Page 1.1 Project Overview 6 1.2 Hotel Concept 6 1.3 Justification of the Project 8 1.3.1 Foreign Currency Earnings 8 1.3.2 Tourism Developments in Mauritius

More information

CHAPTER-1 INTRODUCTION

CHAPTER-1 INTRODUCTION CHAPTER-1 INTRODUCTION PREAMBLE: The Ministry of Environment & Forest has recently amended its Environmental Impact Assessment Notification vide S.O. 60(E) dated 27.01.1994, covering the following Projects:

More information

A. INTRODUCTION PREFEASIBILITY REPORT

A. INTRODUCTION PREFEASIBILITY REPORT A. INTRODUCTION a. BRIEF DESCRIPTION OF PROJECT M/s Bharat Petroleum Corporation Limited has set up the Haldia Coastal Installation at HAL-733, Patikhali, Durgachak, Haldia 721602, West Bengal. The Depot

More information

Total 155 files quick download in editable form by e delivery

Total 155 files quick download in editable form by e delivery Chapter-1.0 CONTENTS OF ISO 9001:2015 (MANUFACTURING) DOCUMENT KIT (More than 155 document files) 6. A. The Total Editable Document kit has 9 main directories as below. Sr. No. List of Directory Document

More information

EIA for Proposed Additional Butibori Industrial Area, Tehsil and District Nagpur, State Maharashtra.

EIA for Proposed Additional Butibori Industrial Area, Tehsil and District Nagpur, State Maharashtra. PUBLIC CONSULTATION PUBLIC HEARING According to EIA Notification 2006 and its subsequent amendments, the proposed project comes under the project activity of 7 (c) & (a), Industrial estates /parks, complexes/area

More information

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT QUERY 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? Attach Maps

More information

(SIDE EVENT) Toward the Establishment the Bilateral Offset Credit Mechanism (BOCM) Utilisation to Support the NAMA Implementation

(SIDE EVENT) Toward the Establishment the Bilateral Offset Credit Mechanism (BOCM) Utilisation to Support the NAMA Implementation (SIDE EVENT) Toward the Establishment the Bilateral Offset Credit Mechanism (BOCM) Utilisation to Support the NAMA Implementation Strategy on Climate Change Of the Lao PDR (SCC) Mr. Immala Inthaboualy

More information

Total 155 files quick download in editable form by e delivery

Total 155 files quick download in editable form by e delivery Chapter-1.0 CONTENTS OF ISO 9001:2015 (MANUFACTURING) DOCUMENT KIT (More than 155 document files) 6. A. The Total Editable Document kit has 9 main directories as below. Sr. No. List of Directory Document

More information

Towards Sustainable Mining Industries in India Challenges

Towards Sustainable Mining Industries in India Challenges Towards Sustainable Mining Industries in India Challenges 1. Introduction Dr. Sukumar Devotta Director National Environmental Engineering Research Institute Nagpur 440020 director@neeri.res.in The mining

More information

Sub: Advisory on establishment of Gobar Banks for management of cattle waste in cities

Sub: Advisory on establishment of Gobar Banks for management of cattle waste in cities D.O. No. DR/SBM/05/2016 Date: 28 th December, 2016 Sub: Advisory on establishment of Gobar Banks for management of cattle waste in cities Dear Sir/Ma am, As you are aware, one of the major components of

More information

OSHA 1994 AND FMA Chapter 4 (cont.)

OSHA 1994 AND FMA Chapter 4 (cont.) OSHA 1994 AND FMA 1967 Chapter 4 (cont.) OSHA 1994 The aims of this Act are to secure the safety, health and welfare of persons at work against risks to safety or health arising out of the activities of

More information

INFRASTRUCTURE PROJECTS IN PIPELINE

INFRASTRUCTURE PROJECTS IN PIPELINE Now Available INFRASTRUCTURE PROJECTS IN PIPELINE Sector Analysis and Outlook; Opportunities and Projections Report (PDF) Data-set (Excel) 3 Quarterly Updates India Infrastructure Research Table of Contents

More information

THE PLASTICS MANUFACTURE, SALE AND USAGE RULES, 1999

THE PLASTICS MANUFACTURE, SALE AND USAGE RULES, 1999 THE PLASTICS MANUFACTURE, SALE AND USAGE RULES, 1999 MINISTRY OF ENVIRONMENT AND FORESTS NOTIFICATION New Delhi, the 2nd September, 1999 1 [S. 0.705 (E-).-Whereas draft rules in exercise of the powers

More information

Total 127 files quick download in editable form by e delivery

Total 127 files quick download in editable form by e delivery Sr. No. A. The Total Editable Document kit has 9 main directories as below. List of Directory Document of Details 1. Environmental Manual 14 files in Ms. word 2. Environmental Procedures 07 procedures

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity

More information

This unofficial translation of. Ministerial Decision No 421/1998. was downloaded from METS is not the copyright owner.

This unofficial translation of. Ministerial Decision No 421/1998. was downloaded from  METS is not the copyright owner. Disclaimer This unofficial translation of Ministerial Decision No 421/1998 was downloaded from www.mets-oman.com. METS is not the copyright owner. METS is not responsible for the content of this document.

More information

Maximizing the benefit by revival, mordenisation and rejuvenation of water harvesting sturcture (check Dam) in Dahod District of Gujarat

Maximizing the benefit by revival, mordenisation and rejuvenation of water harvesting sturcture (check Dam) in Dahod District of Gujarat Maximizing the benefit by revival, mordenisation and rejuvenation of water harvesting sturcture (check Dam) in Dahod District of Gujarat Lukhawada Check dam across River hadaf, Taluka : Limkheda Funded

More information

FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED

FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED FORD GLOBAL TECHNOLOGY AND BUSINESS CENTRE FORD MOTOR PRIVATE LIMITED Ford Motor Private Limited- Conceptual Plan 1 Contents 1 INTRODUCTION 3 1.1 BACKGROUND 3 1.2 PROJECT LOCATION 3 1.3 PROJECT FEATURES

More information

HAZARDOUS WASTES (MANAGEMENT AND HANDLING) RULES, 1989

HAZARDOUS WASTES (MANAGEMENT AND HANDLING) RULES, 1989 HAZARDOUS WASTES (MANAGEMENT AND HANDLING) RULES, 1989 1. Short title and commencement 2. Application 3. Definitions 4. Responsibility of the occupier for handling of wastes 5. Grant of authorisation for

More information