1 Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Operation Name: Benin Emergency Urban Env. Project (P113145) Project Stage: Implementation Seq.No: 5 Status: ARCHIVED Archive : 14-Dec-2013 Country: Benin Approval FY: 2011 Product Line: IBRD/IDA Region: AFRICA Lending Instrument: Emergency Recovery Loan Implementing Agency(ies): Key s Board Approval Original Closing Planned Mid Term Review 15-May-2014 Last Archived ISR 07-Jun-2013 Effectiveness 13-Dec-2011 Revised Closing Actual Mid Term Review Project Development Objectives Project Development Objective (from Project Appraisal Document) To improve infrastructure and mitigate the negative environmental impact of floods in Cotonou Agglomeration and to increase Benin level of preparedness for future flooding. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) losure Authorized Public Disclosure Authorized Component Name Component Cost 1. Drainage Improvement and Rehabilitation Municipal Solid Waste Management Improved Municipal Wastewater Management and Sanitation Flooding and Disaster Risk Preparedness and Management Project Management 2.89 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Low Low Implementation Status Overview The Project implementation is satisfactory. The disbursement rate is 40% and this is expected to be 65% by Mid Term Review (MTR). Most of the technical and safeguards studies have been completed. These studies covers civil works associated with the drainage channels, and the Fifadji Bridge, and the contracts are about to be signed with the selected firms Page 1 of 7

2 and it is expected that civil works will commence in the first quarter of 2014.The studies (technical and safeguards) for the construction of solid wastes collection points and transfer stations are ongoing. Currently civil works on the opening of a new cell at the Ouesse landfill site and the paving of the road leading to the landfill site are ongoing, after the clearance of the safeguards documents (ESIA and Environmental audits) by the Regional Safeguards Adviser. The Technical Assistance for improved wastewater management has been in place since Febuary 28, It is this assistance that will assist Government define guidelines and standards for municipal wastewater discharge. It will also assist Government establish an effective regulatory structure for municipal wastewater treatment services and develop an M&E system for the implementation of master plans for municipal sanitation. The technical assistance and the executing agency (AGETUR) have just finalized the recruitment of the consultants that will prepare the wastewater master plans for Cotonou and Porto Novo; and are in the process of selecting sites for the sanitation and wastewater pilots. In ensuring compliance with the Financing Agreement, the following municipalities have paid their counterpart contribution: Ouidah, Abomey-Calavi and Seme-Kpodji. The funds for Cotonou and Porto Novo have been approved, but not paid to the project accounts due to treasury problems. The project reacted to the 2013 flood alert at karimana and malanville by recruiting an NGO to work with the national agency of civil protection in order to sensitize the population on flood management and the sanitation practices during floods. The consultant mapping areas liable to floods have been selected and contract is about being signed Locations Country First Administrative Division Location Planned Actual Benin Not Entered Porto-Novo Benin Not Entered Ouidah Benin Not Entered Ouesse Benin Not Entered Lac Nokoue Benin Not Entered Cotonou Benin Not Entered Abomey-Calavi Benin Not Entered Porto-novo Benin Not Entered AguZguZs Benin Not Entered Seme-kpodji Benin Not Entered Cotonou Benin Not Entered Sainte-Rita Benin Not Entered Fifadji Benin Not Entered Fidjrosse-Kpota Benin Not Entered Fiyegnon Benin Not Entered Avotrou Page 2 of 7

3 Country First Administrative Division Location Planned Actual Benin Not Entered Akpakpa Benin Not Entered Seme-Podji Benin Not Entered Abomey-Calavi Benin Not Entered So-ava Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Percentage reduction of households vulnerable Percentage Value to flooding in the targeted municipalities as a result of improved infrastructure 70% of households vulnerable to flooding in the targeted municipalities due to clogged drainage infrastructure. Number of alerts on flood risks issued per year using the Flood Early Warning System Intermediate Results Indicators technical and safeguards studies have been completed especially for the clogged drainage infrastructures. The contract has also been signed with the technical company. Commencement if civil works is awaiting the clearance of the safeguards instruments by the RSA. Number Value There are no alerts on flood risks due to lack of Flood Early Warning System. The study for the early warning systems revealed that the cost of the installation of the system was underestimated. This will be addressed in the MTR planned for May 15. By project end, there will be 30% reduction of households vulnerable to flooding in the targeted municipalities as a result of improved drainage infrastructure. By project end, 20 alerts on flood risks would have been issued per year using the Flood Early Warning System. Page 3 of 7

4 Indicator Name Core Unit of Measure Baseline Current End Target Length of drainage network rehabilitated Kilometers Value Clogged drainage networks in the targeted areas. Technical and safeguards studies have been completed. The contract has also been signed. Civil works will start once the RSA clearsthe safeguards instruments of ESIA and RAP. Rehabilitation of Fifadji Bridge Yes/No Value No No Yes The Fifadji bridge in a bad state and not rehabilitated Number of municipal solid waste collection points and/or transfer stations constructed and operational The EIA and technical studies has been completed. The contract has also been signed. Civil works will commence after the RSA clearance of the safeguards instruments. Number Value operational collection points constructed by PGUD-2 and CIDA available in the 5 municipalities. The economic and technical feasibility study has been completed and the five municipalities has been divided into zones. Presently the ESIA for the collection points and transfer stations are ongoing Direct project beneficiaries Number Value At baseline direct project beneficiaries are estimated at , out of which (52%) are female. For now, not much has been done as civil works have not commenced yet. However about 8000 persons benefited from the sensitization workshops on behavior change before and after flooding. Female beneficiaries Percentage Value By project end, 8.6 kilometers of drainage network rehabilitated. By end of project, the Fifadji bridge has been rehabilitated By project end, 40 solid waste collection points and/or transfer stations constructed and operational in the 5 adjoining municipalities. By project end, beneficiaries will have benefited from the project, out of which (52%) are females. Page 4 of 7

5 Sub Type Supplemental Wastewater master plan developed for Cotonou Agglomeration (composed of Cotonou, Abomey-Calavi and Seme-Podji) and Porto Novo Pilot low-cost small scale sanitation project implemented and operational Targeted municipalities with Communal Flood Contingency Plans Installation of Flood Early Warning System (FEWS) Yes/No Value No No Yes There are no wastewater master plans for Cotonou agglomeration and Porto Novo. The technical assistance is already in place since February 28, 2013 and have finalized the recruitment of the consultants that will prepare the wastewater master plans for Cotonou agglomeration and Porto Novo. Yes/No Value No No Yes Absence of operational sanitation project (even smalll-scale). The technical assistance is already in place since February 28, 2013, and will assist in the recruitment of the consultants that will prepare the sanitation pilots By project end, the wastewater master plan for Cotonou Agglomeration and Porto Novo will be available. By project end, there will be pilot low-cost small scale sanitation project that has been implemented and is operational. Number Value Communal flood contingency plans funded by the UNDP in two communities in the targeted municipalities The following contracts are are ongoing: (i) sensitization of the grand public on inundations; and (ii) proximity sensitization, pair educators and implementation of contingency plans. workshops has been held on communal floods in the different 21 communes. Yes/No Value No No Yes Lack of FEWS in the country. The GTZ has done some feasibility studies on the Mono River. The process of the purchase of 25 hydro-metric stations has been finalized. The study for the installation of the early warning system has been finalized and the stakeholder workshop held. It was By project end, 22 communal flood contingency plans would have been prepared and operationalized in the targeted municipalities. By project end, there will be installation of Flood Early Warning System (FEWS) on the Oueme River. Page 5 of 7

6 Data on Financial Performance (as of 30-Oct-2013) Financial Agreement(s) Key s discovered that the cost was under-estimated; this will be addressed in the MTR planned for May Project Ln/Cr/Tf Status Approval Signing Effectiveness Original Closing Revised Closing P IDA Effective 07-Jun Dec-2011 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IDA Effective XDR Disbursement Graph Key Decisions Regarding Implementation The Project implementation is satisfactory. The disbursement rate is 40% and this is expected to increase with the commencement of major civil works by the first quarter of The project team has a target of 65% disbursement rate by MTR, scheduled for May Restructuring History Page 6 of 7

7 There has been no restructuring to date. Related Projects P Benin Emergency Urban Env. Additional Financing Page 7 of 7

The World Bank. Key Dates. Project Development Objectives. Component(s) Public Disclosure Copy Overall Ratings

The World Bank. Key Dates. Project Development Objectives. Component(s) Public Disclosure Copy Overall Ratings Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Operation Name: Benin Emergency Urban Env. Project (P113145) Project Stage: Implementation Seq.No: 3 Status: ARCHIVED

More information

Implementation Status & Results Haiti Disaster Risk Management and Reconstruction (P126346)

Implementation Status & Results Haiti Disaster Risk Management and Reconstruction (P126346) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Disaster Risk Management and Reconstruction

More information

Implementation Status & Results Samoa Samoa Agriculture & Fisheries Cyclone Response Project (P145938)

Implementation Status & Results Samoa Samoa Agriculture & Fisheries Cyclone Response Project (P145938) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Samoa Samoa Agriculture & Fisheries Cyclone Response Project (P145938) Operation Name: Samoa Agriculture

More information

Implementation Status & Results Honduras Barrio-Ciudad Project (P088319)

Implementation Status & Results Honduras Barrio-Ciudad Project (P088319) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras Barrio-Ciudad Project (P88319) Operation

More information

Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966)

Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966)

More information

Implementation Status & Results Benin Support to Protected Areas Management (P122419)

Implementation Status & Results Benin Support to Protected Areas Management (P122419) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Support to Protected Areas Management (P122419) Operation Name: Support to Protected Areas

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429)

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase

More information

Implementation Status & Results Mauritania MAURITANIA: TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT (P089672)

Implementation Status & Results Mauritania MAURITANIA: TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT (P089672) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mauritania MAURITANIA: TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT

More information

Implementation Status & Results Mozambique Health Commodity Security Project (P121060)

Implementation Status & Results Mozambique Health Commodity Security Project (P121060) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Health Commodity Security Project (P121060) Operation Name: Health Commodity Security

More information

Implementation Status & Results Benin Support to Protected Areas Management (P122419)

Implementation Status & Results Benin Support to Protected Areas Management (P122419) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Support to Protected Areas Management (P122419) Operation Name: Support to Protected Areas

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719)

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Operation Name: Uzbekistan

More information

Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523)

Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523) Operation Name: Haiti Transport

More information

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719)

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Operation Name: Uzbekistan

More information

Implementation Status & Results Africa Central African Backbone - APL2 (P117652)

Implementation Status & Results Africa Central African Backbone - APL2 (P117652) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa Central African Backbone - APL2 (P117652) Operation Name: Central African Backbone - APL2

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077)

Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077) Operation Name: URBAN WATER SUPPLY AND WASTEWATER

More information

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Operation Name: CORRIDOR X HIGHWAY PROJECT (P108005) Project Stage:

More information

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Operation Name: Second National

More information

Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989)

Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989) Operation Name: Nicaragua

More information

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Report : ISR1437 Operation Name: CORRIDOR X HIGHWAY

More information

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Operation Name: Western

More information

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Operation Name: CORRIDOR X HIGHWAY PROJECT (P108005) Project Stage:

More information

Implementation Status & Results Benin Increased Access to Modern Energy (P110075)

Implementation Status & Results Benin Increased Access to Modern Energy (P110075) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Increased Access to Modern Energy (P110075) Operation Name: Increased Access to Modern Energy

More information

The World Bank Stormwater Mgt. and Climate Change Adaptation Project (P122841)

The World Bank Stormwater Mgt. and Climate Change Adaptation Project (P122841) Public Disclosure Authorized AFRICA Senegal Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 9 ARCHIVED on 30-Jun-2017 ISR26846 Implementing

More information

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991)

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Operation Name: ID-Urban Water Supply and

More information

The World Bank Samoa Agriculture & Fisheries Cyclone Response Project (P145938)

The World Bank Samoa Agriculture & Fisheries Cyclone Response Project (P145938) Public Disclosure Authorized EAST ASIA AND PACIFIC Samoa Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 15-Jun-2016 ISR23304 Implementing Agencies: Ministry

More information

Implementation Status & Results Azerbaijan Highway 2 (P094488)

Implementation Status & Results Azerbaijan Highway 2 (P094488) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Azerbaijan Highway 2 (P094488) Operation Name: Highway 2 (P094488) Project Stage: Implementation

More information

Implementation Status & Results Pakistan Water Sector Capacity Buildling and Advisory Services Project (WCAP) (P110099)

Implementation Status & Results Pakistan Water Sector Capacity Buildling and Advisory Services Project (WCAP) (P110099) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Pakistan Water Sector Capacity Buildling and Advisory Services Project (WCAP) (P110099) Operation

More information

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results South Africa Development, Empowerment and Conservation

More information

Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916)

Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Operation Name: WAPP APL 2 - OMVS

More information

Implementation Status & Results Vietnam VIETNAM WATER RESOURCES ASSISTANCE (P065898)

Implementation Status & Results Vietnam VIETNAM WATER RESOURCES ASSISTANCE (P065898) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Vietnam VIETNAM WATER RESOURCES ASSISTANCE (P065898) Operation Name: VIETNAM WATER RESOURCES ASSISTANCE (P065898)

More information

The World Bank Stormwater Mgt. and Climate Change Adaptation Project (P122841)

The World Bank Stormwater Mgt. and Climate Change Adaptation Project (P122841) Public Disclosure Authorized AFRICA Senegal Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 10 ARCHIVED on 26-Dec-2017 ISR30717

More information

Implementation Status & Results Ghana Ghana Urban Transport Project (P100619)

Implementation Status & Results Ghana Ghana Urban Transport Project (P100619) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Ghana Ghana Urban Transport Project (P100619) Operation Name: Ghana Urban Transport Project (P100619) Project Stage:

More information

Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722)

Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Operation Name: Development

More information

Implementation Status & Results Africa WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) (P075994)

Implementation Status & Results Africa WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) (P075994) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Africa WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) (P075994) Operation Name: WAPP APL 1 (1st Phase -

More information

Implementation Status & Results Indonesia Integrating Environment and Forest Protection into the Recovery and Future Development of Aceh (P098052)

Implementation Status & Results Indonesia Integrating Environment and Forest Protection into the Recovery and Future Development of Aceh (P098052) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Integrating Environment and Forest Protection into the Recovery and Future Development

More information

Implementation Status & Results China SECOND SHANDONG ENVIRONMENT PROJECT (P077752)

Implementation Status & Results China SECOND SHANDONG ENVIRONMENT PROJECT (P077752) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results China SECOND SHANDONG ENVIRONMENT PROJECT (P077752) Operation Name: SECOND SHANDONG ENVIRONMENT

More information

Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152)

Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152) Operation

More information

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Operation Name: Bahia Integrated

More information

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Operation Name: Western

More information

Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910)

Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910) Operation Name: IQ-TF EMERG. WATER, SANITATION

More information

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165)

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Operation Name: Market

More information

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165)

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Operation Name: Market

More information

Implementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038)

Implementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038) Operation Name: BR São Paulo Trains and Signalling

More information

Implementation Status & Results Armenia Yerevan Water & Wastewater Project (P087641)

Implementation Status & Results Armenia Yerevan Water & Wastewater Project (P087641) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Armenia Yerevan Water & Wastewater Project (P087641)

More information

Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635)

Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635) o C Operation

More information

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021)

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Operation Name: Andhra Pradesh Road Sector Project

More information

Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722)

Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Operation Name: Development

More information

Implementation Status & Results Vietnam Customs Modernization Project (P085071)

Implementation Status & Results Vietnam Customs Modernization Project (P085071) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam Customs Modernization Project (P085071) Operation Name: Customs Modernization Project (P085071)

More information

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375)

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Operation

More information

KENYA: NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (P126321)

KENYA: NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (P126321) Public Disclosure Authorized AFRICA Kenya Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 07-Sep-2018 ISR33423 Implementing Agencies:

More information

Implementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635)

Implementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635) Operation Name:

More information

Implementation Status & Results Philippines ARMM Social Fund Project (P073488)

Implementation Status & Results Philippines ARMM Social Fund Project (P073488) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Philippines ARMM Social Fund Project (P073488) Operation Name: ARMM Social Fund Project (P073488)

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name Parent Project Name Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name Parent Project Name Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument

More information

Implementation Status & Results Mexico Mexico Forests and Climate Change Project (P123760)

Implementation Status & Results Mexico Mexico Forests and Climate Change Project (P123760) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mexico Mexico Forests and Climate Change Project (P123760) Operation Name: Mexico Forests and Climate Change Project

More information

Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414)

Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414) Operation Name:

More information

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021)

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Operation Name: Andhra Pradesh Road Sector Project

More information

Implementation Status & Results Albania Energy Community of South East Europe APL Program - APL 5 for Albania DAM SAFETY (P110481)

Implementation Status & Results Albania Energy Community of South East Europe APL Program - APL 5 for Albania DAM SAFETY (P110481) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Albania Energy Community of South East Europe APL

More information

Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329)

Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329) Operation Name: Rajasthan Rural Livelihoods

More information

Public Disclosure Copy. Public Disclosure Copy. The World Bank

Public Disclosure Copy. Public Disclosure Copy. The World Bank Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Sustainable Integrated Ecosystem

More information

Implementation Status & Results Africa West Africa Agricultural Productivity Program (WAAPP) (P094084)

Implementation Status & Results Africa West Africa Agricultural Productivity Program (WAAPP) (P094084) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa West Africa Agricultural Productivity Program

More information

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Geothermal Power Generation Development

More information

Implementation Status & Results Africa West Africa Agricultural Productivity Program (WAAPP) (P094084)

Implementation Status & Results Africa West Africa Agricultural Productivity Program (WAAPP) (P094084) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa West Africa Agricultural Productivity Program

More information

AR B.A.URB.TSP (P039584)

AR B.A.URB.TSP (P039584) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR B.A.URB.TSP (P39584) Operation Name: AR B.A.URB.TSP (P39584) Project Stage: Implementation

More information

Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD) (P117243)

Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD) (P117243) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD)

More information

Implementation Status & Results Ghana Ghana: Statistics Development Program (MDTF) (P118585)

Implementation Status & Results Ghana Ghana: Statistics Development Program (MDTF) (P118585) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ghana Ghana: Statistics Development Program (MDTF) (P118585) Operation Name: Ghana: Statistics Development

More information

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Operation Name: Bahia Integrated

More information

Implementation Status & Results Indonesia Barefoot Engineers III (P131387)

Implementation Status & Results Indonesia Barefoot Engineers III (P131387) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Barefoot Engineers III (P131387) Operation

More information

Implementation Status & Results Honduras HN Rural Infrastructure Project (P086775)

Implementation Status & Results Honduras HN Rural Infrastructure Project (P086775) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras HN Rural Infrastructure Project (P086775) Operation Name: HN Rural Infrastructure Project

More information

Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931)

Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931) Operation Name: Ministry

More information

Implementation Status & Results Bangladesh Bangladesh Central Bank Strengthening Project (P062916)

Implementation Status & Results Bangladesh Bangladesh Central Bank Strengthening Project (P062916) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bangladesh Bangladesh Central Bank Strengthening Project (P062916) Operation Name: Bangladesh Central

More information

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045)

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Operation Name: Rural Productivity Project (GEF)

More information

Implementation Status & Results Croatia Coastal Cities Pollution Control Project 2 (P102732)

Implementation Status & Results Croatia Coastal Cities Pollution Control Project 2 (P102732) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Croatia Coastal Cities Pollution Control Project 2 (P102732) Operation Name: Coastal Cities Pollution

More information

Urban Local Government Strengthening Program

Urban Local Government Strengthening Program losure Authorized Tab 1: Overview and Performance Basic Information Urban Local Government Strengthening Program Operation Name Urban Local Government Strengthening Program (ULGSP) Project Stage Implementation

More information

Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719)

Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719) Operation Name:

More information

Implementation Status & Results Argentina AR-GEF Sustainable and Transport and Air Quality Project (P114008)

Implementation Status & Results Argentina AR-GEF Sustainable and Transport and Air Quality Project (P114008) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR-GEF Sustainable and Transport and Air Quality Project (P114008) Operation Name: AR-GEF

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy AFRICA Malawi Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 13 ARCHIVED on 04-Nov-2015 ISR21002 Implementing Agencies:

More information

Implementation Status & Results India Uttar Pradesh Water Sector Restructuring Project (P050647)

Implementation Status & Results India Uttar Pradesh Water Sector Restructuring Project (P050647) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Uttar Pradesh Water Sector Restructuring Project (P050647) Operation Name: Uttar Pradesh Water

More information

The World Bank Nigeria - Public/Private Partnership Program (P115386)

The World Bank Nigeria - Public/Private Partnership Program (P115386) Public Disclosure Authorized AFRICA Nigeria Trade & Competitiveness Global Practice IBRD/IDA Adaptable Program Loan FY 2011 Seq No: 9 ARCHIVED on 31-Dec-2015 ISR22159 Implementing Agencies: Coordinating

More information

The World Bank Vietnam Livestock Competitiveness and Food Safety (P090723)

The World Bank Vietnam Livestock Competitiveness and Food Safety (P090723) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 10 ARCHIVED on 12-May-2016 ISR23483 Implementing Agencies: LIFSAP

More information

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996)

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996) Operation Name: Rio de Janeiro Mass Transit

More information

Implementation Status & Results Philippines Climate Change Adaptation Program (P101076)

Implementation Status & Results Philippines Climate Change Adaptation Program (P101076) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Philippines Climate Change Adaptation Program (P101076) Operation Name: Climate Change Adaptation

More information

Public Disclosure Copy

Public Disclosure Copy MIDDLE EAST AND NORTH AFRICA West Bank and Gaza Water Global Practice Special Financing Emergency Recovery Loan FY 2005 Seq No: 26 ARCHIVED on 24-May-2016 ISR23293 Implementing Agencies: Key Dates Key

More information

Implementation Status & Results Armenia Public Sector Modernization Project (P060786)

Implementation Status & Results Armenia Public Sector Modernization Project (P060786) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Armenia Public Sector Modernization Project (P060786) Operation Name: Public Sector Modernization

More information

Implementation Status & Results Macedonia, former Yugoslav Republic of Second Trade and Transport Facilitation Project (P091723)

Implementation Status & Results Macedonia, former Yugoslav Republic of Second Trade and Transport Facilitation Project (P091723) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Macedonia, former Yugoslav Republic of Second Trade and Transport Facilitation Project (P091723) Operation Name:

More information

Implementation Status & Results Africa Nyika Transfrontier Conservation Area Project (P108879)

Implementation Status & Results Africa Nyika Transfrontier Conservation Area Project (P108879) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa Nyika Transfrontier Conservation Area Project

More information

Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719)

Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture

More information

Implementation Status & Results Azerbaijan Water Users Association Development Support Project (P107617)

Implementation Status & Results Azerbaijan Water Users Association Development Support Project (P107617) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Azerbaijan Water Users Association Development Support Project (P107617) Operation Name: Water Users

More information

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Operation Name: QUALITY PROTECT (GEF) (P085112)

More information

Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural Development Project (P088799)

Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural Development Project (P088799) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural

More information

Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources Management (P089929)

Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources Management (P089929) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources

More information

Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384)

Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS)

More information

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Operation Name: QUALITY PROTECT (GEF) (P085112)

More information

The World Bank Bangladesh Weather and Climate Services Regional Project (P150220)

The World Bank Bangladesh Weather and Climate Services Regional Project (P150220) Public Disclosure Authorized SOUTH ASIA Bangladesh Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 15-Jun-2018 ISR32873

More information

Implementation Status & Results China Changjiang/Pearl River Watershed Rehabilitation Project (P081255)

Implementation Status & Results China Changjiang/Pearl River Watershed Rehabilitation Project (P081255) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results China Changjiang/Pearl River Watershed Rehabilitation Project (P081255) Operation Name: Changjiang/Pearl

More information

Implementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218)

Implementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218) Operation

More information

Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

More information

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045)

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Operation Name: Rural Productivity Project (GEF)

More information