1 Introduction to Substation Design TADP 542 Design Principles- General Framework Instructor: Richard Snell Transmission & Distribution Program
2 Module 2 Outline Presentation 1: General Framework Presentation 2: Defining a Project Presentation 3: Project Authorization Presentation 4: Substation Site Issues Presentation 5: Time Issues
3 General A substation is an integral part of the overall power system. Its design should minimize adverse impacts to substation equipment, transmission and distribution system, and also to customers. The design should minimize costs while providing the required functionality.
4 General (cont.) A substation can be a very complex facility as can be seen in this picture of the transmission bus in an existing substation.
5 General (cont.) A substation is analogous to a large commercial or small industrial facility in complexity. It has several subsystems and can have hundreds or thousands of different parts. A substation is usually operated and maintained while it is in service.
6 General (cont.) Drawings used to depict site development, equipment and structure placement; physical and/or electrical characteristics of structures and equipment and electrical interconnections between and within equipment. The number of drawings for a substation can range from a few to several hundred.
7
8 General (cont.) Substations may be owned by exempt wholesale generators; electric transmission companies; integrated, transmission and/or distribution electric utility companies; large commercial facilities or industrial complexes. A substation design must conform to applicable electrical codes as well as some federal, state and local laws and regulations.
9 General (cont.) Most substation projects are for additions or modifications to existing substations. The number of new substations constructed nationally each year is less than five percent of the total number of existing substations. In rapidly growing areas, the number of new substations being constructed annually may be greater with respect to the number of existing substations in that area than the national average.
10 General
11 Design Personnel A substation project should be designed by one or more professional engineers. This is usually a legal requirement set by the state or province where the project is located for the protection of the public. Those engineers may supervise others in the design of all or portions of the project. However, the professional engineers are legally responsible for the design.
12 National Electrical Safety Code National Electrical Safety Code-ANSI C2 (NESC) establishes minimum requirements for construction, operation and maintenance of electric and communications facilities. Purpose is the safety of persons during installation, operation, or maintenance of electric supply and communication lines and associated equipment.
13 National Electrical Safety Code (cont.) NESC developed as a voluntary standard. A majority of states have adopted some form the NESC as either law or regulations. A 2007 IEEE survey shows which edition or parts of the NESC has been adopted by each state. The survey results can be seen at:
14 National Electrical Safety Code (cont.) Section 9, Grounding Methods for Electric Supply and Communication Facilities covers substation grounding. Part 1, Rules for the Installation and Maintenance of Electric Supply Stations and Equipment covers generating plant and substations.
15 National Electrical Safety Code (cont.) Part 2, Safety Rules for the Installation and Maintenance of Overhead Electric Supply and Communication Lines covers overhead lines entering, leaving, and within a substation. Part 3, Safety Rules for the Installation and Maintenance of Underground Electric Supply and Communication Lines addresses underground lines entering, leaving and within a substation.
16 National Electrical Safety Code (cont.) Part 4 Rules for Operation of Electric Supply and Communications Lines and Equipment is applicable to operation and maintenance of the supply and communications lines within a substation.
17 National Electric Code The National Electric Code NFPA 70 (NEC), a modified version of it or a similar code has been adopted by states to regulate the installation of electrical systems and equipment in buildings and structures. Many states exempt low voltage wiring in substations from meeting the NEC or equivalent when it is covered by the NESC.
18 National Electric Code NEC requirements for medium and high voltage installations are those of the NESC which are included by reference to the NESC.
19 Federal Regulations Environmental Protection Agency (EPA) has implemented regulations for controlling and preventing effluents from flowing into waterways. Primary effluent in a substation is the insulating oil in power transformers and/or other oil-insulated equipment.
20 Federal Regulations (cont.) Substation will require containment structures or devices if distance to waterway is less than proscribed by regulations and effluent could flow into waterway. Includes oil sumps near or impenetrable berms around oil-filled equipment, fence curbing around a crushed rock surface or other containment methods.
21 Federal Regulations (continued)
22 Federal Regulations (cont.) FCC Part 15 regulations requires incidental radio frequency radiators to maintain their radio frequency emissions to levels that do not adversely impact other FCC regulated services. A substation will become an incidental radiator if its design or construction creates a corona discharge on its transmission voltage conductors, connectors or equipment.
23 Federal Regulations (cont.) Corona occurs when an electric field at a point on the surface of an energized conducting object exceeds the breakdown voltage of the air. Corona is most prevalent at transmission voltages of 230 kv and above. See EPRI AC Transmission Line Reference Book 200 kv and Above for further corona information.
24 Corona
25 State Laws and Regulations Some states have regulations for control of storm water runoff both during construction of a substation and after its completion. Catch Basins
26 State Laws and Regulations (cont.) Many states have implemented audible noise limits for substations. Purchasing power transformers with lower sound levels is one method of reducing substation audible noise. Installation of sound reducing barriers is another method of reducing substation audible noise.
27 State Laws and Regulations (cont.) State laws may require substations be designed to withstand anticipated seismic forces at their locations.
28 Local Ordinances and Regulations Local jurisdictions may require building permits for substations and/or substation control houses. Local zoning ordinances or decisions may specify requirements for the substation enclosure and/or the landscaping.
29 Design Software Currently, there is no commercially available software for designing a complete substation. There are software products available to design portions of a substation.
30 Design Software (cont.) Most substations designs are created by copying existing substation designs and modifying them as needed. Substation designs are mostly presented graphically using drawings. CAD software is used to create, copy and modify substation drawings.
31 Design Software (cont.) Many utilities and engineers have developed software and/or spreadsheets to accomplish certain tasks. Word processing software can be used to create specifications and contracts related to the substation design. Materials management software can be used for ordering materials for a substation project.
32 Image Acknowledgements Transmission Bus 115kV Richard Snell Example Drawing List Public Utility District of Grant County Circuit Breaker Addition One-line Diagram Public Utility District of Grant County Corona Discharge Public Utility District of Grant County Catch Basins Public Utility District of Grant County
PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
More informationEIGHT POINT WIND ENERGY CENTER
EIGHT POINT WIND ENERGY CENTER Case No. 16 F 0062 1001.11 Exhibit 11 Preliminary Design Drawings Contents Exhibit 11: Preliminary Design Drawings... 1 11(a) Site Plan... 1 11(b) Construction Operations
More informationSubstation Bus Design: Current Methods Compared with Field Results
Electrical Transmission and Substation Structures Conference 2009 ASCE 143 Substation Bus Design: Current Methods Compared with Field Results Keith Malmedal Ph.D. P.E. P.Eng. 1 and John Wendelburg P.E.
More informationCUSTOMER SERVICE POLICIES
Resolution U-10670 Effective December 18, 2013 Section Title Page No. 1.0 Statement of General Policy... 2 2.0 Electrical Service... 3 2.1 Electrical Service Availability and Characteristics... 3 2.2 Large-Load
More informationELECTRICAL INSPECTION BULLETIN (Effective )
ELECTRICAL INSPECTION BULLETIN (Effective 2009-02-01) Rule 36-000 Customer Owned High Voltage Installations With the increase in customer own high voltage equipment there appears to be confusion over which
More informationCHAPTER 7. ERRATA. 1) Chapter 1 Introduction and Summary:
7 Errata CHAPTER 7. ERRATA This chapter addresses errors and corrections to the text of the Phase 1 Draft EIS and is organized by Draft EIS chapter, section, and page number. 1) Chapter 1 Introduction
More information5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS
To Wit: To see if the Town will vote to amend the Town of Westborough Zoning Bylaws, Article 2, District Regulations, Section 2300, Use Regulations Schedule; and to amend Article 4, Special Regulations
More informationDOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES
Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating
More informationInformation Document Protection System Information ID# R
Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between the Information Document and the related authoritative document(s)
More informationReview Zone Application for D&R Canal Commission Decision
Review Zone Application for D&R Canal Commission Decision MEETING DATE: December 21, 2016 DRCC #: 16-4345 Latest Submission Received: December 7, 2016 Applicant: Robert McCarthy, PE PSE&G 4000 Hadley Road,
More information69/12KV SUBSTATION DESIGN
69/12KV SUBSTATION DESIGN ISU SENIOR DESIGN GROUP: MAY 15-01 Matt Backes Faran Malik Ryan Jerve Bhargav Gouni Kiran Rane Sohail Suryavanshi Team Leader Communication Leader Communication Leader Key Concept
More informationPOTOMAC ELECTRIC POWER COMPANY
POTOMAC ELECTRIC POWER COMPANY FERC Form 715 (Part 4) - Transmission Planning Study Guidelines Transmission Reliability Guidelines 1. General Overview The reliability guidelines used to plan the transmission
More informationSECTION SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION
SECTION 16-372 SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION 1. GENERAL SPECIFICATIONS The work of this Section includes furnishing all labor, equipment, materials (unless specifically identified as Owner-furnished)
More informationInspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)
TOOLKIT DOCUMENT #7 Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) This document has two sections. Neither section is all-inclusive
More informationSECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number
MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and
More informationMinimum Transmission Design Standards f or Competitive Upgrades Rev 2
Minimum Transmission Design Standards f or Competitive Upgrades Rev 2 December, 2016 Minimum Design Standards Task Force Revision History Date or Version Number 12/17/2014 Revision IR Author Change Description
More informationFacility Interconnection Requirements
Facility Interconnection Effective 1/1/2016 1. Purpose Facility Interconnection Facility Interconnection (FAC-001-2) To avoid adverse impacts on the reliability of the Bulk Electric System (BES), RPU documents
More informationPublic Utility District Number 1 of Snohomish County
Public Utility District Number 1 of Snohomish County Facility Connection Requirements September 29, 2011 1 Revision History: Number Date Description Original Sept. 29, 2011 Document Origination Compilation
More informationProposals and Process 2017 National Electrical Code
Proposals and Process 2017 National Electrical Code for Solar America Board for Codes and Standards Stakeholder Meeting; October 23, 2014 Ward Bower Ward Bower Innovations LLC Introduction The New NFPA
More informationElectrical Networks Principles and Performance
Engineering Standard Electrical Networks Electrical Networks Principles and Performance Version: 1 Issued: January 2015 Owner: Chief Engineer Approved By: Paul O Halloran Chief Engineer PRINTOUT MAY NOT
More informationPublic Utility District Number 1 of Snohomish County. Facility Connection Requirements February 9, 2018
Public Utility District Number 1 of Snohomish County Facility Connection Requirements February 9, 2018 1 Revision History: Number Date Description By Reviewed by Approved by: Original Sept. 29, 2011 Document
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards
Date Description of Change Pages / Sections Modified ID 6/15/16 Updated format, division title, and removed references to other sections. - mgl44 A. Summary This section contains design criteria for the
More informationOntario ENGINEERING STANDARD SPECIFICATION 1/10 REV. ELECTRICAL DISTRIBUTION HIGH VOLTAGE SUBSTATION GROUNDING AND BONDING. Approved by.
/0 Rev Description Revision by Approved by Issue Date YYYY/MM/DD New Format Replaces 5322-0.0. T.C. 206/02/09 T.C. 206/03/02 206/03/02 2/0.0 PURPOSE This specification describes the minimum requirements
More informationSECTION BASIC ELECTRICAL REQUIREMENTS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies
More informationARTICLE XXIII SMALL WIND ENERGY SYSTEMS 85
ARTICLE XXIII SMALL WIND ENERGY SYSTEMS 85 Section 1. Purpose and Intent The purpose of this article is to regulate the placement, construction and modification of small wind energy systems while promoting
More informationApplications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments
Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on December
More informationPhotovoltaic System Inspector Job Task Analysis Guide April 2017
Photovoltaic System Inspector Job Task Analysis Guide April 2017 V. 04.17 www.nabcep.org Raising Standards. Promoting Confidence. NABCEP mission is to establish and operate high quality Credentialing programs
More informationTransmission Interconnection Requirements. Table of Contents
Transmission Interconnection Requirements Table of Contents I. Introduction II. Interconnection Agreement III. Facility Requirements IV. Interconnection Initiation I. Introduction A. Purpose and Scope
More informationAudit Approach to FAC Transmission Vegetation Management FRCC Webinar
Audit Approach to FAC-003-2 Transmission Vegetation Management FRCC Webinar September 2013 Ground Rules All participants will be muted upon sign-on Please keep your phone on mute unless asking a question
More informationWhat Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin?
What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin? How to compare apples-to-apples bids. By R. Dee Jones, P.E., AVO Training Institute Electrical Engineering Division Manager/Principal
More informationFacilities Study. For. XXXXXXXXXXXX Wind Park Interconnection Switching Station
Facilities Study For XXXXXXXXXXXX Wind Park Interconnection Switching Station Prepared For: Randy Harlas, Substation Manager El Paso Electric Company El Paso, TX September 2010 Table of Contents CERTIFICATION...
More informationStrength & Loading. Of Wood Utility Poles. Webinar
Strength & Loading Of Wood Utility Poles. Webinar Overview Benefits of Wood as a Utility Pole Material Defining Wood Pole Strength Loading Criteria In-Service Analysis Upcoming NESC 2017 Changes Pole Material
More informationPosition Description
Date: April 17, 2015 Position Description Position Title: Apprentice Lineman 1A, 1B, 2 and 3 Reports To: Region Line Manager Revision Date: May 2015; May 2016 Performance Factors Level: Safety 2 Innovation
More informationStandard of Practice - Campus Electrical Distribution System
A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all
More informationWIND ENERGY CONVERSION SYSTEMS
CHAPTER 159 WIND ENERGY CONVERSION SYSTEMS 159.01 Purpose and Intent 159.05 Location 159.02 Definitions 159.06 Design and Technical Standards 159.03 General Regulations 159.07 Abandonment and Removal Procedure
More informationWork Performed On or Near Overhead Lines Work Performed On or Near Overhead Lines
Work Performed On or Near Overhead Lines Work Performed On or Near Overhead Lines 1910.269(p) and (q) of Electric Power Generation, Transmission, and Distribution Note: The below information applies only
More informationMECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement
MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement Draft 11/17/08 Utility transformer issues began surfacing last year with questions of enforcement responsibilities due to utility
More information4. GENERAL REQUIREMENTS
4. GENERAL REQUIREMENTS 4.1 APPLICATION FOR SERVICE Application for service must be made to, and accepted by, the Company before service will be furnished. At the time of application, the Customer shall
More informationSECTION MEDIUM VOLTAGE TRANSFORMERS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the
More informationRequirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014
Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014 1040 O Street, P.O. Box 80869 p: 402.475.4211 Lincoln, NE 68501-0869 www.les.com
More information(Condensed from National Electric Code)
WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,
More informationApplications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments
Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on June
More information3. GENERAL INFORMATION AND REQUIREMENTS
3. 3.1 Application for Service 3.1.1 Application for service may be made by fax, mail, e-mail, or by personal visit to any PSEG Long Island office, but the required application form furnished by PSEG Long
More informationNip / Tuck Method A Solution to Providing Additional Conductor-to-Ground Clearances for Transmission Lines
Nip / Tuck Method A Solution to Providing Additional Conductor-to-Ground Clearances for Transmission Lines Michael E Belanger, P.E., M.ASCE Garrett E Luszczki, E.I., A.M.ASCE TRC Augusta, Maine Presented
More informationTEMPORARY METER POLE INSTALLATION
TEMPARY METER POLE INSTALLATION MEMBER PROVIDED Location to be made by REMC within 50' of our transformer or existing service Temporary pole to be properly braced 24" 3 wire weatherhead (located 24" from
More informationTransmission Competitive Solicitation Questions Log Question / Answer Matrix Delaney to Colorado River 2014
No. Comment Submitted ISO Response Date Q&A Posted 1 Can the CAISO provide a line rating methodology (similar to a NERC FAC-008 standard) or include a requirement of using any The ISO does not provide
More informationClearances and conductor spacings and a safe access for a.c. switchyards
Clearances and conductor spacings and a safe access for a.c. switchyards T R A N S P O W E R APPROVED S T A N D A R D Implementation date: March 2009 COPYRIGHT 2009 TRANSPOWER NEW ZEALAND LIMITED. ALL
More informationContact Clark Public Utilities Construction Services department at (360) to initiate a request for service.
CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation
More informationORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND
ORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND APPROVAL FOR THE CONSTRUCTION AND MAINTENANCE OF WIND ENERGY
More informationSECTION GROUNDING AND BONDING
SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and
More informationMember Service Electric Wiring Guidelines
Member Service Electric Wiring Guidelines Table of Contents A. Definitions... 2 B. Member Service Wiring Guidelines... 2 C: Meter located on the house from an underground source - pad transformer or j-box....
More informationWILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY
WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY (ADD TO ARTICLE 2) WIND ENERGY DEFINITIONS: Ambient: Ambient is defined as the sound pressure level exceeded ninety (90) percent of the time. Anemometer:
More informationTRC Solutions. Cost and Feasibility Analysis of a Third Converter Station for the Champlain Hudson Power Express Project
TRC Solutions Cost and Feasibility Analysis of a Third Converter Station for the Champlain Hudson Power Express Project October 2013 Table of Contents: I. Executive Summary II. Cost Estimate and Physical
More informationCONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING, NETWORK SYSTEMS SECTION
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING, NETWORK SYSTEMS SECTION SPECIFICATION EO-2113 REVISION 4 DECEMBER, 2012 TRANSFER OF LOAD FROM COMPANY'S
More informationCONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 48-05 Van Dam Street Long Island City, NY 11101 ELECTRIC METER SHOP DEPARTMENT METER ENGINEERING SPECIFICATION MES-350 REVISION 3 June 2016 EFFECTIVE DATE
More informationELECTRICAL BULLETIN
PO Box 697 Halifax, Nova Scotia B3J 2T8 ELECTRICAL BULLETIN 2015-01 From: David MacLeod, C.E.I., P.Eng. Pg. 1 of 7 Provincial Chief Electrical Inspector Date: March 10, 2015 Subject: Adoption of the 2015
More information2017 NEC Changes for Renewable Energy Systems Session one by Christopher LaForge
2017 NEC Changes for Renewable Energy Systems Session one 2017 by Christopher LaForge Christopher LaForge IREC Certified Master Trainer NABCEP Certified Photovoltaic Installation Professional 30 years
More informationA. This section includes building wire and cable rated 600V and less Full Short Circuit Device, Coordination and Arc Fault Study
PART 1: GENERAL 1.01 Underground Ducts and Manholes A. The work included in this section of the construction standards consists of the design requirements for the complete layout and installation of a
More informationJoint Use. Guidelines and Construction Standards
Joint Use Guidelines and Construction Standards July 7, 2017 Table of Contents Page Definitions...3 Purpose and Scope...5 General Requirements...6 Joint Use Attachment Application Process...9 Pole Attachment
More informationOrdinance Number AN ORDINANCE REPEALING AND REPLACING CHAPTER 172 OF THE NORTH LIBERTY CODE OF ORDINANCES, COMMUNICATION TOWERS AND ANTENNAS
Tower Ordinance Ordinance Number 12-03 AN ORDINANCE REPEALING AND REPLACING CHAPTER 172 OF THE NORTH LIBERTY CODE OF ORDINANCES, COMMUNICATION TOWERS AND ANTENNAS BE IT ORDAINED BY THE CITY COUNCIL OF
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationRevisions for the 2011 National Electrical Code - Part 2
PDHonline Course E356 (3 PDH) Revisions for the 2011 National Electrical Code - Part 2 Instructor: Patrick Ouillette 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone &
More informationPermitting and Inspecting PV Systems. PV Codes and Standards 101. Photovoltaic System Basics
Permitting and Inspecting PV Systems Presented by Bill Brooks, PE Brooks Engineering PV Codes and Standards 101 What are the applicable codes and standards for PV systems? Electrical codes - NEC Article
More informationSECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph
More informationEugene Water & Electric Board
The following terms, when used in EWEB Policies and Procedures, rate schedules, or in the application or contract for utility services, have the following meanings, unless specifically indicated otherwise:
More informationWithlacoochee River Electric Cooperative, Inc. P.O. Box 278 Dade City, FL Billy E. Brown, Executive V.P.
Wednesday, February 25, 2015 PSC 25 6.0343 Municipal Electric Utility and Rural Electric Cooperative Reporting Requirements Withlacoochee River Electric Cooperative, Inc. P.O. Box 278 Dade City, FL 33526-0278
More informationTemporary Wiring Practices And Guidelines For NECA. National Electrical Contractors Association Omaha, Nebraska
Temporary Wiring Practices And Guidelines For NECA National Electrical Contractors Association Omaha, Nebraska Table of Contents I. Planning II. Lighting and Power III. Maintenance IV. Inspections V. Routing
More informationELECTRICAL SERVICE EXTENSION POLICY
I. OBJECTIVE A. To provide a fair and consistent method of extending, upgrading and downgrading power lines and other service facilities within the Mason County PUD No.1 (PUD 1) service area. B. To encourage
More informationNOVA Chemicals Corporation
Decision 2013-426 NOVA Chemicals Corporation Industrial System Designation Amendment November 29, 2013 The Alberta Utilities Commission Decision 2013-426: NOVA Chemicals Corporation Industrial System Designation
More informationV. Design, Application, Maintenance & Operation Technical Requirements
V. Design, Application, Maintenance & Operation Technical Requirements V.A PJM Design & Application of Overhead Transmission Lines 69 kv & Above These design criteria have been established to assure acceptable
More informationC O M M E R C I A L W I N D E N E R G Y R E G U L A T I O N S - R E V I S E D : 3 / 3 0 / 1 6
C O M M E R C I A L W I N D E N E R G Y R E G U L A T I O N S - R E V I S E D : 3 / 3 0 / 1 6 6.6 Small and Commercial Wind Energy Conversion Systems 6.61 Intent: In order to balance the need for clean,
More informationSPP at a Glance. Located in Little Rock. Approximately 600 employees
SPP at a Glance Located in Little Rock Approximately 600 employees Primary jobs electrical engineering, operations, settlements, and IT 24 x 7 operation Full redundancy and backup site 2 Regulatory Environment
More informationB. Accept materials on site in original factory packaging, labeled with manufacturer s identification.
SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,
More informationPLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015
PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 NAME SUBDIVISION NAME CC Williams Plant Subdivision CC Williams Plant Subdivision LOCATION CITY COUNCIL DISTRICT
More informationCOUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT PHOTOVOLTAIC PERMITTING GUIDELINES
COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT Mike Lara Building Official PHOTOVOLTAIC PERMITTING GUIDELINES PLANS AND PERMITS In order to minimize installation problems, plans must be provided that
More informationDISTRIBUTION STORM HARDENING AND RESILIENCY. Matt Shellenberger, P.E. American Electric Power
DISTRIBUTION STORM HARDENING AND RESILIENCY Matt Shellenberger, P.E. American Electric Power AMERICAN ELECTRIC POWER DEFINITIONS» Hardening: improves the durability and stability of infrastructure to withstand
More informationCanadian Niagara Power Inc. International Power Line Rebuild Project Fact Sheet
Canadian Niagara Power Inc. International Power Line Rebuild Project Fact Sheet Project Description Canadian Niagara Power Inc. ( CNP ) proposes to replace two existing lattice steel towers (Queen Street
More informationMicrogrids in New England Technical Challenges & Opportunities
Microgrids in New England Technical Challenges & Opportunities October 10, 2012 Agenda I. What is a Microgrid? Examples Elements to Consider II. Why a Microgrid? Improved Reliability Utility Guiding Principals
More informationUnit Substation Transformer Construction Checklist (under 500 kva)
Unit Substation Transformer Checklist (under 500 kva) Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.
More informationSection ARMORED MEDIUM VOLTAGE CABLES SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR
PART 1 - GENERAL Section 26 05 15 SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR 1.1 Cable shall be 15 kv, shielded, three conductor with ground, stranded copper, with continuously welded and corrugated
More informationCanadian Electrical Code, Part I Full Impact Assessment
Copyright CSA Group 2015 Canadian Electrical Code, Part I Full Impact Assessment Subject 3644 Polarity identification for photovoltaic (PV) dc system conductors & Subject 3694 Photovoltaic (PV) dc arc-fault
More informationFor the 2008 Code, the minimum clear distances were revised to reflect an accurate metric conversion (also known as a soft conversion).
II. 600 Volts, Nominal, or Less 110.26 Spaces About Electrical Equipment. Sufficient access and working space shall be provided and maintained about all electrical equipment to permit ready and safe operation
More informationTS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS
TORONTO TRANSPORTATION January 2012 TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS 1. DRAWINGS TTD 801.001 ELECTRICAL ABBREVIATIONS AND SYMBOLS TTD 801.005 ELECTRICAL LEGEND I TTD 801.006 ELECTRICAL
More informationELECTRICAL BULLETIN
PO Box 697 Halifax, Nova Scotia B3J 2T8 Labour and Advanced Education ELECTRICAL BULLETIN 2012-01 From: David MacLeod,C.E.I.,P.Eng. Pg 1 of 8 Provincial Chief Electrical Inspector Date : March 1, 2012
More informationXXXXXXXXXXX Solar (XXX) Generation Interconnection
Facility Study For XXXXXXXXXXX Solar (XXX) Generation Interconnection Prepared For: Randy Harlas, Substation Manager El Paso Electric Company El Paso, TX September 2010 Table of Contents 1. GENERAL...
More informationAddition to Section 4 - Special Use Regulations
Large-Scale Ground-Mounted Solar Photovoltaic Installations Addition to Section 4 - Special Use Regulations 4.4 Large Scale Ground-Mounted Solar Photovoltaic Installations 4.4.1 Purpose The purpose of
More informationCity of Tacoma Surface Water Management Manual
City of Tacoma Surface Water Management Manual Volume IV Source Control BMPs Prepared by: Tacoma Public Works Environmental Services January 2003 Table of Contents Chapter 1 Introduction to Volume IV...
More informationPanel 7 Proposals For 2005 NEC Articles 320, 322, 324, 326, 328, 330, 332, 334, 336, 338, 340, 382, 394, 396 and 398
Panel 7 Proposals For 2005 NEC Articles 320, 322, 324, 326, 328, 330, 332, 334, 336, 338, 340, 382, 394, 396 and 398 The National Electrical Code Technical Correlating Committee Identified concerns with
More informationCivil Engineering and Architecture Detailed and Performance Objective Outline
Civil Engineering and Architecture Detailed and Performance Objective Outline Deadlines Unit 1: 11 Blocks 1/20/2015 Unit 2: 27 Blocks 2/27/2015 Unit 3: 28 Blocks 4/15/2015 Unit 4: 17 Blocks 5/8/2015 Unit
More informationLINDSEY EMERGENCY RESTORATION SYSTEM
LINDSEY EMERGENCY RESTORATION SYSTEM Technical Feasibility Study Information and Data Worksheet After completely filling out this 6-page information and data worksheet, return this by E-mail or facsimile
More informationHazards. Hazards. Hazards. Effects on the Body. GA Tech Electrical Safety Presentation
Hazards The direct result can be electrocution. SHOCK. Electric shock occurs when the human body becomes part of the path through which current flows. The indirect result can be injury resulting from a
More informationA SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS
A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS Willy LORD SwedPower AB Sweden willy.lord@swedpower.com Lennart AHNLUND Vattenfall Eldistribution AB Sweden B. WALLBING-LÖVGREN Vattenfall Eldistribution
More informationSession 9: Photovoltaic System Case Studies And Electric Distribution Planning for DER October 21, 2015 Santiago, Chile
Session 9: Photovoltaic System Case Studies And Electric Distribution Planning for DER October 21, 2015 Santiago, Chile Michael Coddington National Renewable Energy Laboratory Golden, Colorado, U.S.A.
More informationARTICLE 16 - WIND ENERGY CONVERSION FACILITIES
ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES SECTION 1601 Wind Energy Installation In any zoning district, a conditional use permit or building permit may be granted to allow a wind energy conversion
More informationELECTRIC METERING GENERAL
1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 EQUIPMENT 5.0 METER REQUIREMENTS 6.0 METER FACILITIES 7.0 ELECTRICAL CONNECTIONS 2.0 SCOPE This guide covers general requirements and codes for
More informationELECTRICITY at WORK REGULATIONS
ELECTRICITY at WORK REGULATIONS COURSE 380: 1 DAY: Max 8 Candidates What makes a person legally competent to do electrical work? In what way is the requirement for competency in electrical work more stringent
More informationENGINEERING & ECONOMIC PLANNING FOR ELECTRIC POWER GENERATION, TRANSMISSION AND DISTRIBUTION
ENGINEERING & ECONOMIC PLANNING FOR ELECTRIC POWER GENERATION, TRANSMISSION AND DISTRIBUTION BY Engr. Otis Anyaeji B.Sc.MechE, FNSE, F. Val, FCostE., AEcon @ the 2011 NATIONAL CONFERENCE OF INSTITUTE OF
More informationPower Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features
DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International
More information