Introduction to Substation Design TADP 542

Size: px
Start display at page:

Download "Introduction to Substation Design TADP 542"

Transcription

1 Introduction to Substation Design TADP 542 Design Principles- General Framework Instructor: Richard Snell Transmission & Distribution Program

2 Module 2 Outline Presentation 1: General Framework Presentation 2: Defining a Project Presentation 3: Project Authorization Presentation 4: Substation Site Issues Presentation 5: Time Issues

3 General A substation is an integral part of the overall power system. Its design should minimize adverse impacts to substation equipment, transmission and distribution system, and also to customers. The design should minimize costs while providing the required functionality.

4 General (cont.) A substation can be a very complex facility as can be seen in this picture of the transmission bus in an existing substation.

5 General (cont.) A substation is analogous to a large commercial or small industrial facility in complexity. It has several subsystems and can have hundreds or thousands of different parts. A substation is usually operated and maintained while it is in service.

6 General (cont.) Drawings used to depict site development, equipment and structure placement; physical and/or electrical characteristics of structures and equipment and electrical interconnections between and within equipment. The number of drawings for a substation can range from a few to several hundred.

7

8 General (cont.) Substations may be owned by exempt wholesale generators; electric transmission companies; integrated, transmission and/or distribution electric utility companies; large commercial facilities or industrial complexes. A substation design must conform to applicable electrical codes as well as some federal, state and local laws and regulations.

9 General (cont.) Most substation projects are for additions or modifications to existing substations. The number of new substations constructed nationally each year is less than five percent of the total number of existing substations. In rapidly growing areas, the number of new substations being constructed annually may be greater with respect to the number of existing substations in that area than the national average.

10 General

11 Design Personnel A substation project should be designed by one or more professional engineers. This is usually a legal requirement set by the state or province where the project is located for the protection of the public. Those engineers may supervise others in the design of all or portions of the project. However, the professional engineers are legally responsible for the design.

12 National Electrical Safety Code National Electrical Safety Code-ANSI C2 (NESC) establishes minimum requirements for construction, operation and maintenance of electric and communications facilities. Purpose is the safety of persons during installation, operation, or maintenance of electric supply and communication lines and associated equipment.

13 National Electrical Safety Code (cont.) NESC developed as a voluntary standard. A majority of states have adopted some form the NESC as either law or regulations. A 2007 IEEE survey shows which edition or parts of the NESC has been adopted by each state. The survey results can be seen at:

14 National Electrical Safety Code (cont.) Section 9, Grounding Methods for Electric Supply and Communication Facilities covers substation grounding. Part 1, Rules for the Installation and Maintenance of Electric Supply Stations and Equipment covers generating plant and substations.

15 National Electrical Safety Code (cont.) Part 2, Safety Rules for the Installation and Maintenance of Overhead Electric Supply and Communication Lines covers overhead lines entering, leaving, and within a substation. Part 3, Safety Rules for the Installation and Maintenance of Underground Electric Supply and Communication Lines addresses underground lines entering, leaving and within a substation.

16 National Electrical Safety Code (cont.) Part 4 Rules for Operation of Electric Supply and Communications Lines and Equipment is applicable to operation and maintenance of the supply and communications lines within a substation.

17 National Electric Code The National Electric Code NFPA 70 (NEC), a modified version of it or a similar code has been adopted by states to regulate the installation of electrical systems and equipment in buildings and structures. Many states exempt low voltage wiring in substations from meeting the NEC or equivalent when it is covered by the NESC.

18 National Electric Code NEC requirements for medium and high voltage installations are those of the NESC which are included by reference to the NESC.

19 Federal Regulations Environmental Protection Agency (EPA) has implemented regulations for controlling and preventing effluents from flowing into waterways. Primary effluent in a substation is the insulating oil in power transformers and/or other oil-insulated equipment.

20 Federal Regulations (cont.) Substation will require containment structures or devices if distance to waterway is less than proscribed by regulations and effluent could flow into waterway. Includes oil sumps near or impenetrable berms around oil-filled equipment, fence curbing around a crushed rock surface or other containment methods.

21 Federal Regulations (continued)

22 Federal Regulations (cont.) FCC Part 15 regulations requires incidental radio frequency radiators to maintain their radio frequency emissions to levels that do not adversely impact other FCC regulated services. A substation will become an incidental radiator if its design or construction creates a corona discharge on its transmission voltage conductors, connectors or equipment.

23 Federal Regulations (cont.) Corona occurs when an electric field at a point on the surface of an energized conducting object exceeds the breakdown voltage of the air. Corona is most prevalent at transmission voltages of 230 kv and above. See EPRI AC Transmission Line Reference Book 200 kv and Above for further corona information.

24 Corona

25 State Laws and Regulations Some states have regulations for control of storm water runoff both during construction of a substation and after its completion. Catch Basins

26 State Laws and Regulations (cont.) Many states have implemented audible noise limits for substations. Purchasing power transformers with lower sound levels is one method of reducing substation audible noise. Installation of sound reducing barriers is another method of reducing substation audible noise.

27 State Laws and Regulations (cont.) State laws may require substations be designed to withstand anticipated seismic forces at their locations.

28 Local Ordinances and Regulations Local jurisdictions may require building permits for substations and/or substation control houses. Local zoning ordinances or decisions may specify requirements for the substation enclosure and/or the landscaping.

29 Design Software Currently, there is no commercially available software for designing a complete substation. There are software products available to design portions of a substation.

30 Design Software (cont.) Most substations designs are created by copying existing substation designs and modifying them as needed. Substation designs are mostly presented graphically using drawings. CAD software is used to create, copy and modify substation drawings.

31 Design Software (cont.) Many utilities and engineers have developed software and/or spreadsheets to accomplish certain tasks. Word processing software can be used to create specifications and contracts related to the substation design. Materials management software can be used for ordering materials for a substation project.

32 Image Acknowledgements Transmission Bus 115kV Richard Snell Example Drawing List Public Utility District of Grant County Circuit Breaker Addition One-line Diagram Public Utility District of Grant County Corona Discharge Public Utility District of Grant County Catch Basins Public Utility District of Grant County

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

EIGHT POINT WIND ENERGY CENTER

EIGHT POINT WIND ENERGY CENTER EIGHT POINT WIND ENERGY CENTER Case No. 16 F 0062 1001.11 Exhibit 11 Preliminary Design Drawings Contents Exhibit 11: Preliminary Design Drawings... 1 11(a) Site Plan... 1 11(b) Construction Operations

More information

Substation Bus Design: Current Methods Compared with Field Results

Substation Bus Design: Current Methods Compared with Field Results Electrical Transmission and Substation Structures Conference 2009 ASCE 143 Substation Bus Design: Current Methods Compared with Field Results Keith Malmedal Ph.D. P.E. P.Eng. 1 and John Wendelburg P.E.

More information

CUSTOMER SERVICE POLICIES

CUSTOMER SERVICE POLICIES Resolution U-10670 Effective December 18, 2013 Section Title Page No. 1.0 Statement of General Policy... 2 2.0 Electrical Service... 3 2.1 Electrical Service Availability and Characteristics... 3 2.2 Large-Load

More information

ELECTRICAL INSPECTION BULLETIN (Effective )

ELECTRICAL INSPECTION BULLETIN (Effective ) ELECTRICAL INSPECTION BULLETIN (Effective 2009-02-01) Rule 36-000 Customer Owned High Voltage Installations With the increase in customer own high voltage equipment there appears to be confusion over which

More information

CHAPTER 7. ERRATA. 1) Chapter 1 Introduction and Summary:

CHAPTER 7. ERRATA. 1) Chapter 1 Introduction and Summary: 7 Errata CHAPTER 7. ERRATA This chapter addresses errors and corrections to the text of the Phase 1 Draft EIS and is organized by Draft EIS chapter, section, and page number. 1) Chapter 1 Introduction

More information

5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS

5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS To Wit: To see if the Town will vote to amend the Town of Westborough Zoning Bylaws, Article 2, District Regulations, Section 2300, Use Regulations Schedule; and to amend Article 4, Special Regulations

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

Information Document Protection System Information ID# R

Information Document Protection System Information ID# R Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between the Information Document and the related authoritative document(s)

More information

Review Zone Application for D&R Canal Commission Decision

Review Zone Application for D&R Canal Commission Decision Review Zone Application for D&R Canal Commission Decision MEETING DATE: December 21, 2016 DRCC #: 16-4345 Latest Submission Received: December 7, 2016 Applicant: Robert McCarthy, PE PSE&G 4000 Hadley Road,

More information

69/12KV SUBSTATION DESIGN

69/12KV SUBSTATION DESIGN 69/12KV SUBSTATION DESIGN ISU SENIOR DESIGN GROUP: MAY 15-01 Matt Backes Faran Malik Ryan Jerve Bhargav Gouni Kiran Rane Sohail Suryavanshi Team Leader Communication Leader Communication Leader Key Concept

More information

POTOMAC ELECTRIC POWER COMPANY

POTOMAC ELECTRIC POWER COMPANY POTOMAC ELECTRIC POWER COMPANY FERC Form 715 (Part 4) - Transmission Planning Study Guidelines Transmission Reliability Guidelines 1. General Overview The reliability guidelines used to plan the transmission

More information

SECTION SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION

SECTION SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION SECTION 16-372 SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION 1. GENERAL SPECIFICATIONS The work of this Section includes furnishing all labor, equipment, materials (unless specifically identified as Owner-furnished)

More information

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) TOOLKIT DOCUMENT #7 Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) This document has two sections. Neither section is all-inclusive

More information

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and

More information

Minimum Transmission Design Standards f or Competitive Upgrades Rev 2

Minimum Transmission Design Standards f or Competitive Upgrades Rev 2 Minimum Transmission Design Standards f or Competitive Upgrades Rev 2 December, 2016 Minimum Design Standards Task Force Revision History Date or Version Number 12/17/2014 Revision IR Author Change Description

More information

Facility Interconnection Requirements

Facility Interconnection Requirements Facility Interconnection Effective 1/1/2016 1. Purpose Facility Interconnection Facility Interconnection (FAC-001-2) To avoid adverse impacts on the reliability of the Bulk Electric System (BES), RPU documents

More information

Public Utility District Number 1 of Snohomish County

Public Utility District Number 1 of Snohomish County Public Utility District Number 1 of Snohomish County Facility Connection Requirements September 29, 2011 1 Revision History: Number Date Description Original Sept. 29, 2011 Document Origination Compilation

More information

Proposals and Process 2017 National Electrical Code

Proposals and Process 2017 National Electrical Code Proposals and Process 2017 National Electrical Code for Solar America Board for Codes and Standards Stakeholder Meeting; October 23, 2014 Ward Bower Ward Bower Innovations LLC Introduction The New NFPA

More information

Electrical Networks Principles and Performance

Electrical Networks Principles and Performance Engineering Standard Electrical Networks Electrical Networks Principles and Performance Version: 1 Issued: January 2015 Owner: Chief Engineer Approved By: Paul O Halloran Chief Engineer PRINTOUT MAY NOT

More information

Public Utility District Number 1 of Snohomish County. Facility Connection Requirements February 9, 2018

Public Utility District Number 1 of Snohomish County. Facility Connection Requirements February 9, 2018 Public Utility District Number 1 of Snohomish County Facility Connection Requirements February 9, 2018 1 Revision History: Number Date Description By Reviewed by Approved by: Original Sept. 29, 2011 Document

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Date Description of Change Pages / Sections Modified ID 6/15/16 Updated format, division title, and removed references to other sections. - mgl44 A. Summary This section contains design criteria for the

More information

Ontario ENGINEERING STANDARD SPECIFICATION 1/10 REV. ELECTRICAL DISTRIBUTION HIGH VOLTAGE SUBSTATION GROUNDING AND BONDING. Approved by.

Ontario ENGINEERING STANDARD SPECIFICATION 1/10 REV. ELECTRICAL DISTRIBUTION HIGH VOLTAGE SUBSTATION GROUNDING AND BONDING. Approved by. /0 Rev Description Revision by Approved by Issue Date YYYY/MM/DD New Format Replaces 5322-0.0. T.C. 206/02/09 T.C. 206/03/02 206/03/02 2/0.0 PURPOSE This specification describes the minimum requirements

More information

SECTION BASIC ELECTRICAL REQUIREMENTS

SECTION BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies

More information

ARTICLE XXIII SMALL WIND ENERGY SYSTEMS 85

ARTICLE XXIII SMALL WIND ENERGY SYSTEMS 85 ARTICLE XXIII SMALL WIND ENERGY SYSTEMS 85 Section 1. Purpose and Intent The purpose of this article is to regulate the placement, construction and modification of small wind energy systems while promoting

More information

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on December

More information

Photovoltaic System Inspector Job Task Analysis Guide April 2017

Photovoltaic System Inspector Job Task Analysis Guide April 2017 Photovoltaic System Inspector Job Task Analysis Guide April 2017 V. 04.17 www.nabcep.org Raising Standards. Promoting Confidence. NABCEP mission is to establish and operate high quality Credentialing programs

More information

Transmission Interconnection Requirements. Table of Contents

Transmission Interconnection Requirements. Table of Contents Transmission Interconnection Requirements Table of Contents I. Introduction II. Interconnection Agreement III. Facility Requirements IV. Interconnection Initiation I. Introduction A. Purpose and Scope

More information

Audit Approach to FAC Transmission Vegetation Management FRCC Webinar

Audit Approach to FAC Transmission Vegetation Management FRCC Webinar Audit Approach to FAC-003-2 Transmission Vegetation Management FRCC Webinar September 2013 Ground Rules All participants will be muted upon sign-on Please keep your phone on mute unless asking a question

More information

What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin?

What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin? What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin? How to compare apples-to-apples bids. By R. Dee Jones, P.E., AVO Training Institute Electrical Engineering Division Manager/Principal

More information

Facilities Study. For. XXXXXXXXXXXX Wind Park Interconnection Switching Station

Facilities Study. For. XXXXXXXXXXXX Wind Park Interconnection Switching Station Facilities Study For XXXXXXXXXXXX Wind Park Interconnection Switching Station Prepared For: Randy Harlas, Substation Manager El Paso Electric Company El Paso, TX September 2010 Table of Contents CERTIFICATION...

More information

Strength & Loading. Of Wood Utility Poles. Webinar

Strength & Loading. Of Wood Utility Poles. Webinar Strength & Loading Of Wood Utility Poles. Webinar Overview Benefits of Wood as a Utility Pole Material Defining Wood Pole Strength Loading Criteria In-Service Analysis Upcoming NESC 2017 Changes Pole Material

More information

Position Description

Position Description Date: April 17, 2015 Position Description Position Title: Apprentice Lineman 1A, 1B, 2 and 3 Reports To: Region Line Manager Revision Date: May 2015; May 2016 Performance Factors Level: Safety 2 Innovation

More information

Standard of Practice - Campus Electrical Distribution System

Standard of Practice - Campus Electrical Distribution System A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all

More information

WIND ENERGY CONVERSION SYSTEMS

WIND ENERGY CONVERSION SYSTEMS CHAPTER 159 WIND ENERGY CONVERSION SYSTEMS 159.01 Purpose and Intent 159.05 Location 159.02 Definitions 159.06 Design and Technical Standards 159.03 General Regulations 159.07 Abandonment and Removal Procedure

More information

Work Performed On or Near Overhead Lines Work Performed On or Near Overhead Lines

Work Performed On or Near Overhead Lines Work Performed On or Near Overhead Lines Work Performed On or Near Overhead Lines Work Performed On or Near Overhead Lines 1910.269(p) and (q) of Electric Power Generation, Transmission, and Distribution Note: The below information applies only

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement Draft 11/17/08 Utility transformer issues began surfacing last year with questions of enforcement responsibilities due to utility

More information

4. GENERAL REQUIREMENTS

4. GENERAL REQUIREMENTS 4. GENERAL REQUIREMENTS 4.1 APPLICATION FOR SERVICE Application for service must be made to, and accepted by, the Company before service will be furnished. At the time of application, the Customer shall

More information

SECTION MEDIUM VOLTAGE TRANSFORMERS

SECTION MEDIUM VOLTAGE TRANSFORMERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014

Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014 Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014 1040 O Street, P.O. Box 80869 p: 402.475.4211 Lincoln, NE 68501-0869 www.les.com

More information

(Condensed from National Electric Code)

(Condensed from National Electric Code) WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,

More information

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on June

More information

3. GENERAL INFORMATION AND REQUIREMENTS

3. GENERAL INFORMATION AND REQUIREMENTS 3. 3.1 Application for Service 3.1.1 Application for service may be made by fax, mail, e-mail, or by personal visit to any PSEG Long Island office, but the required application form furnished by PSEG Long

More information

Nip / Tuck Method A Solution to Providing Additional Conductor-to-Ground Clearances for Transmission Lines

Nip / Tuck Method A Solution to Providing Additional Conductor-to-Ground Clearances for Transmission Lines Nip / Tuck Method A Solution to Providing Additional Conductor-to-Ground Clearances for Transmission Lines Michael E Belanger, P.E., M.ASCE Garrett E Luszczki, E.I., A.M.ASCE TRC Augusta, Maine Presented

More information

TEMPORARY METER POLE INSTALLATION

TEMPORARY METER POLE INSTALLATION TEMPARY METER POLE INSTALLATION MEMBER PROVIDED Location to be made by REMC within 50' of our transformer or existing service Temporary pole to be properly braced 24" 3 wire weatherhead (located 24" from

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Delaney to Colorado River 2014

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Delaney to Colorado River 2014 No. Comment Submitted ISO Response Date Q&A Posted 1 Can the CAISO provide a line rating methodology (similar to a NERC FAC-008 standard) or include a requirement of using any The ISO does not provide

More information

Clearances and conductor spacings and a safe access for a.c. switchyards

Clearances and conductor spacings and a safe access for a.c. switchyards Clearances and conductor spacings and a safe access for a.c. switchyards T R A N S P O W E R APPROVED S T A N D A R D Implementation date: March 2009 COPYRIGHT 2009 TRANSPOWER NEW ZEALAND LIMITED. ALL

More information

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service. CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation

More information

ORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND

ORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND ORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND APPROVAL FOR THE CONSTRUCTION AND MAINTENANCE OF WIND ENERGY

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and

More information

Member Service Electric Wiring Guidelines

Member Service Electric Wiring Guidelines Member Service Electric Wiring Guidelines Table of Contents A. Definitions... 2 B. Member Service Wiring Guidelines... 2 C: Meter located on the house from an underground source - pad transformer or j-box....

More information

WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY

WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY WILSON TOWNSHIP ZONING ORDINANCE AMENDMENT: WIND ENERGY (ADD TO ARTICLE 2) WIND ENERGY DEFINITIONS: Ambient: Ambient is defined as the sound pressure level exceeded ninety (90) percent of the time. Anemometer:

More information

TRC Solutions. Cost and Feasibility Analysis of a Third Converter Station for the Champlain Hudson Power Express Project

TRC Solutions. Cost and Feasibility Analysis of a Third Converter Station for the Champlain Hudson Power Express Project TRC Solutions Cost and Feasibility Analysis of a Third Converter Station for the Champlain Hudson Power Express Project October 2013 Table of Contents: I. Executive Summary II. Cost Estimate and Physical

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING, NETWORK SYSTEMS SECTION

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING, NETWORK SYSTEMS SECTION CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING, NETWORK SYSTEMS SECTION SPECIFICATION EO-2113 REVISION 4 DECEMBER, 2012 TRANSFER OF LOAD FROM COMPANY'S

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 48-05 Van Dam Street Long Island City, NY 11101 ELECTRIC METER SHOP DEPARTMENT METER ENGINEERING SPECIFICATION MES-350 REVISION 3 June 2016 EFFECTIVE DATE

More information

ELECTRICAL BULLETIN

ELECTRICAL BULLETIN PO Box 697 Halifax, Nova Scotia B3J 2T8 ELECTRICAL BULLETIN 2015-01 From: David MacLeod, C.E.I., P.Eng. Pg. 1 of 7 Provincial Chief Electrical Inspector Date: March 10, 2015 Subject: Adoption of the 2015

More information

2017 NEC Changes for Renewable Energy Systems Session one by Christopher LaForge

2017 NEC Changes for Renewable Energy Systems Session one by Christopher LaForge 2017 NEC Changes for Renewable Energy Systems Session one 2017 by Christopher LaForge Christopher LaForge IREC Certified Master Trainer NABCEP Certified Photovoltaic Installation Professional 30 years

More information

A. This section includes building wire and cable rated 600V and less Full Short Circuit Device, Coordination and Arc Fault Study

A. This section includes building wire and cable rated 600V and less Full Short Circuit Device, Coordination and Arc Fault Study PART 1: GENERAL 1.01 Underground Ducts and Manholes A. The work included in this section of the construction standards consists of the design requirements for the complete layout and installation of a

More information

Joint Use. Guidelines and Construction Standards

Joint Use. Guidelines and Construction Standards Joint Use Guidelines and Construction Standards July 7, 2017 Table of Contents Page Definitions...3 Purpose and Scope...5 General Requirements...6 Joint Use Attachment Application Process...9 Pole Attachment

More information

Ordinance Number AN ORDINANCE REPEALING AND REPLACING CHAPTER 172 OF THE NORTH LIBERTY CODE OF ORDINANCES, COMMUNICATION TOWERS AND ANTENNAS

Ordinance Number AN ORDINANCE REPEALING AND REPLACING CHAPTER 172 OF THE NORTH LIBERTY CODE OF ORDINANCES, COMMUNICATION TOWERS AND ANTENNAS Tower Ordinance Ordinance Number 12-03 AN ORDINANCE REPEALING AND REPLACING CHAPTER 172 OF THE NORTH LIBERTY CODE OF ORDINANCES, COMMUNICATION TOWERS AND ANTENNAS BE IT ORDAINED BY THE CITY COUNCIL OF

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Revisions for the 2011 National Electrical Code - Part 2

Revisions for the 2011 National Electrical Code - Part 2 PDHonline Course E356 (3 PDH) Revisions for the 2011 National Electrical Code - Part 2 Instructor: Patrick Ouillette 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone &

More information

Permitting and Inspecting PV Systems. PV Codes and Standards 101. Photovoltaic System Basics

Permitting and Inspecting PV Systems. PV Codes and Standards 101. Photovoltaic System Basics Permitting and Inspecting PV Systems Presented by Bill Brooks, PE Brooks Engineering PV Codes and Standards 101 What are the applicable codes and standards for PV systems? Electrical codes - NEC Article

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

Eugene Water & Electric Board

Eugene Water & Electric Board The following terms, when used in EWEB Policies and Procedures, rate schedules, or in the application or contract for utility services, have the following meanings, unless specifically indicated otherwise:

More information

Withlacoochee River Electric Cooperative, Inc. P.O. Box 278 Dade City, FL Billy E. Brown, Executive V.P.

Withlacoochee River Electric Cooperative, Inc. P.O. Box 278 Dade City, FL Billy E. Brown, Executive V.P. Wednesday, February 25, 2015 PSC 25 6.0343 Municipal Electric Utility and Rural Electric Cooperative Reporting Requirements Withlacoochee River Electric Cooperative, Inc. P.O. Box 278 Dade City, FL 33526-0278

More information

Temporary Wiring Practices And Guidelines For NECA. National Electrical Contractors Association Omaha, Nebraska

Temporary Wiring Practices And Guidelines For NECA. National Electrical Contractors Association Omaha, Nebraska Temporary Wiring Practices And Guidelines For NECA National Electrical Contractors Association Omaha, Nebraska Table of Contents I. Planning II. Lighting and Power III. Maintenance IV. Inspections V. Routing

More information

ELECTRICAL SERVICE EXTENSION POLICY

ELECTRICAL SERVICE EXTENSION POLICY I. OBJECTIVE A. To provide a fair and consistent method of extending, upgrading and downgrading power lines and other service facilities within the Mason County PUD No.1 (PUD 1) service area. B. To encourage

More information

NOVA Chemicals Corporation

NOVA Chemicals Corporation Decision 2013-426 NOVA Chemicals Corporation Industrial System Designation Amendment November 29, 2013 The Alberta Utilities Commission Decision 2013-426: NOVA Chemicals Corporation Industrial System Designation

More information

V. Design, Application, Maintenance & Operation Technical Requirements

V. Design, Application, Maintenance & Operation Technical Requirements V. Design, Application, Maintenance & Operation Technical Requirements V.A PJM Design & Application of Overhead Transmission Lines 69 kv & Above These design criteria have been established to assure acceptable

More information

C O M M E R C I A L W I N D E N E R G Y R E G U L A T I O N S - R E V I S E D : 3 / 3 0 / 1 6

C O M M E R C I A L W I N D E N E R G Y R E G U L A T I O N S - R E V I S E D : 3 / 3 0 / 1 6 C O M M E R C I A L W I N D E N E R G Y R E G U L A T I O N S - R E V I S E D : 3 / 3 0 / 1 6 6.6 Small and Commercial Wind Energy Conversion Systems 6.61 Intent: In order to balance the need for clean,

More information

SPP at a Glance. Located in Little Rock. Approximately 600 employees

SPP at a Glance. Located in Little Rock. Approximately 600 employees SPP at a Glance Located in Little Rock Approximately 600 employees Primary jobs electrical engineering, operations, settlements, and IT 24 x 7 operation Full redundancy and backup site 2 Regulatory Environment

More information

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification. SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,

More information

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 NAME SUBDIVISION NAME CC Williams Plant Subdivision CC Williams Plant Subdivision LOCATION CITY COUNCIL DISTRICT

More information

COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT PHOTOVOLTAIC PERMITTING GUIDELINES

COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT PHOTOVOLTAIC PERMITTING GUIDELINES COUNTY OF RIVERSIDE BUILDING AND SAFETY DEPARTMENT Mike Lara Building Official PHOTOVOLTAIC PERMITTING GUIDELINES PLANS AND PERMITS In order to minimize installation problems, plans must be provided that

More information

DISTRIBUTION STORM HARDENING AND RESILIENCY. Matt Shellenberger, P.E. American Electric Power

DISTRIBUTION STORM HARDENING AND RESILIENCY. Matt Shellenberger, P.E. American Electric Power DISTRIBUTION STORM HARDENING AND RESILIENCY Matt Shellenberger, P.E. American Electric Power AMERICAN ELECTRIC POWER DEFINITIONS» Hardening: improves the durability and stability of infrastructure to withstand

More information

Canadian Niagara Power Inc. International Power Line Rebuild Project Fact Sheet

Canadian Niagara Power Inc. International Power Line Rebuild Project Fact Sheet Canadian Niagara Power Inc. International Power Line Rebuild Project Fact Sheet Project Description Canadian Niagara Power Inc. ( CNP ) proposes to replace two existing lattice steel towers (Queen Street

More information

Microgrids in New England Technical Challenges & Opportunities

Microgrids in New England Technical Challenges & Opportunities Microgrids in New England Technical Challenges & Opportunities October 10, 2012 Agenda I. What is a Microgrid? Examples Elements to Consider II. Why a Microgrid? Improved Reliability Utility Guiding Principals

More information

Unit Substation Transformer Construction Checklist (under 500 kva)

Unit Substation Transformer Construction Checklist (under 500 kva) Unit Substation Transformer Checklist (under 500 kva) Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.

More information

Section ARMORED MEDIUM VOLTAGE CABLES SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR

Section ARMORED MEDIUM VOLTAGE CABLES SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR PART 1 - GENERAL Section 26 05 15 SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR 1.1 Cable shall be 15 kv, shielded, three conductor with ground, stranded copper, with continuously welded and corrugated

More information

Canadian Electrical Code, Part I Full Impact Assessment

Canadian Electrical Code, Part I Full Impact Assessment Copyright CSA Group 2015 Canadian Electrical Code, Part I Full Impact Assessment Subject 3644 Polarity identification for photovoltaic (PV) dc system conductors & Subject 3694 Photovoltaic (PV) dc arc-fault

More information

For the 2008 Code, the minimum clear distances were revised to reflect an accurate metric conversion (also known as a soft conversion).

For the 2008 Code, the minimum clear distances were revised to reflect an accurate metric conversion (also known as a soft conversion). II. 600 Volts, Nominal, or Less 110.26 Spaces About Electrical Equipment. Sufficient access and working space shall be provided and maintained about all electrical equipment to permit ready and safe operation

More information

TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS

TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS TORONTO TRANSPORTATION January 2012 TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS 1. DRAWINGS TTD 801.001 ELECTRICAL ABBREVIATIONS AND SYMBOLS TTD 801.005 ELECTRICAL LEGEND I TTD 801.006 ELECTRICAL

More information

ELECTRICAL BULLETIN

ELECTRICAL BULLETIN PO Box 697 Halifax, Nova Scotia B3J 2T8 Labour and Advanced Education ELECTRICAL BULLETIN 2012-01 From: David MacLeod,C.E.I.,P.Eng. Pg 1 of 8 Provincial Chief Electrical Inspector Date : March 1, 2012

More information

XXXXXXXXXXX Solar (XXX) Generation Interconnection

XXXXXXXXXXX Solar (XXX) Generation Interconnection Facility Study For XXXXXXXXXXX Solar (XXX) Generation Interconnection Prepared For: Randy Harlas, Substation Manager El Paso Electric Company El Paso, TX September 2010 Table of Contents 1. GENERAL...

More information

Addition to Section 4 - Special Use Regulations

Addition to Section 4 - Special Use Regulations Large-Scale Ground-Mounted Solar Photovoltaic Installations Addition to Section 4 - Special Use Regulations 4.4 Large Scale Ground-Mounted Solar Photovoltaic Installations 4.4.1 Purpose The purpose of

More information

City of Tacoma Surface Water Management Manual

City of Tacoma Surface Water Management Manual City of Tacoma Surface Water Management Manual Volume IV Source Control BMPs Prepared by: Tacoma Public Works Environmental Services January 2003 Table of Contents Chapter 1 Introduction to Volume IV...

More information

Panel 7 Proposals For 2005 NEC Articles 320, 322, 324, 326, 328, 330, 332, 334, 336, 338, 340, 382, 394, 396 and 398

Panel 7 Proposals For 2005 NEC Articles 320, 322, 324, 326, 328, 330, 332, 334, 336, 338, 340, 382, 394, 396 and 398 Panel 7 Proposals For 2005 NEC Articles 320, 322, 324, 326, 328, 330, 332, 334, 336, 338, 340, 382, 394, 396 and 398 The National Electrical Code Technical Correlating Committee Identified concerns with

More information

Civil Engineering and Architecture Detailed and Performance Objective Outline

Civil Engineering and Architecture Detailed and Performance Objective Outline Civil Engineering and Architecture Detailed and Performance Objective Outline Deadlines Unit 1: 11 Blocks 1/20/2015 Unit 2: 27 Blocks 2/27/2015 Unit 3: 28 Blocks 4/15/2015 Unit 4: 17 Blocks 5/8/2015 Unit

More information

LINDSEY EMERGENCY RESTORATION SYSTEM

LINDSEY EMERGENCY RESTORATION SYSTEM LINDSEY EMERGENCY RESTORATION SYSTEM Technical Feasibility Study Information and Data Worksheet After completely filling out this 6-page information and data worksheet, return this by E-mail or facsimile

More information

Hazards. Hazards. Hazards. Effects on the Body. GA Tech Electrical Safety Presentation

Hazards. Hazards. Hazards. Effects on the Body. GA Tech Electrical Safety Presentation Hazards The direct result can be electrocution. SHOCK. Electric shock occurs when the human body becomes part of the path through which current flows. The indirect result can be injury resulting from a

More information

A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS

A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS Willy LORD SwedPower AB Sweden willy.lord@swedpower.com Lennart AHNLUND Vattenfall Eldistribution AB Sweden B. WALLBING-LÖVGREN Vattenfall Eldistribution

More information

Session 9: Photovoltaic System Case Studies And Electric Distribution Planning for DER October 21, 2015 Santiago, Chile

Session 9: Photovoltaic System Case Studies And Electric Distribution Planning for DER October 21, 2015 Santiago, Chile Session 9: Photovoltaic System Case Studies And Electric Distribution Planning for DER October 21, 2015 Santiago, Chile Michael Coddington National Renewable Energy Laboratory Golden, Colorado, U.S.A.

More information

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES SECTION 1601 Wind Energy Installation In any zoning district, a conditional use permit or building permit may be granted to allow a wind energy conversion

More information

ELECTRIC METERING GENERAL

ELECTRIC METERING GENERAL 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 EQUIPMENT 5.0 METER REQUIREMENTS 6.0 METER FACILITIES 7.0 ELECTRICAL CONNECTIONS 2.0 SCOPE This guide covers general requirements and codes for

More information

ELECTRICITY at WORK REGULATIONS

ELECTRICITY at WORK REGULATIONS ELECTRICITY at WORK REGULATIONS COURSE 380: 1 DAY: Max 8 Candidates What makes a person legally competent to do electrical work? In what way is the requirement for competency in electrical work more stringent

More information

ENGINEERING & ECONOMIC PLANNING FOR ELECTRIC POWER GENERATION, TRANSMISSION AND DISTRIBUTION

ENGINEERING & ECONOMIC PLANNING FOR ELECTRIC POWER GENERATION, TRANSMISSION AND DISTRIBUTION ENGINEERING & ECONOMIC PLANNING FOR ELECTRIC POWER GENERATION, TRANSMISSION AND DISTRIBUTION BY Engr. Otis Anyaeji B.Sc.MechE, FNSE, F. Val, FCostE., AEcon @ the 2011 NATIONAL CONFERENCE OF INSTITUTE OF

More information

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International

More information