INNISFIL WATER AND WASTEWATER MASTER SERVICING PLAN UPDATE. Needs and Potential Solutions Public Information Centre No. 1 November 14, 2017

Size: px
Start display at page:

Download "INNISFIL WATER AND WASTEWATER MASTER SERVICING PLAN UPDATE. Needs and Potential Solutions Public Information Centre No. 1 November 14, 2017"

Transcription

1 INNISFIL WATER AND WASTEWATER MASTER SERVICING PLAN UPDATE Needs and Potential Solutions Public Information Centre No. 1 November 14, 2017

2 1 MSP Update Key Objectives Short and long-term strategies to service population and employment growth, and intensification Develop opportunities for servicing existing lots within settlement areas Plan for beyond 2031, to 2041 Maximize number of benefitting users per project Maximize use / optimize / rehabilitate existing infrastructure Coordinate with Transportation Master Plan Update and Official Plan

3 2 Master Plan Class EA Master Plan Class EA (Phases 1 and 2) Phase 1: Serviced population projections Development of design criteria Water and wastewater servicing needs Preliminary list of alternative solutions Phase 2: Evaluate servicing alternatives Recommend servicing solutions Prepare Master Plan Report

4 3 Innisfil Plans for Growth Existing Population Approx. 36,000 9 settlement areas Existing Employment: Approx. 8,700 jobs Expect 2-3% growth over next 20 years Expect will exceed Growth Plan target of 56,000 residents Mostly in Alcona, Lefroy-Belle Ewart and Big Bay Point Expect increase to 13,800 jobs In Innisfil Heights (Hwy 400) And population-related jobs

5 Areas of Potential Future Growth 5

6 5 Estimated Serviced Population Community 2017 Serviced Populations Projected Serviced Population Water Wastewater 2031 Beyond 2031 Cookstown 1,253 1,253 2,017 3,172 Fennell s Corners Gilford ,505 1,505 Lefroy Belle-Ewart & Degrassi Point 835 3,490 7,269 7,269 Big Cedar Point Alcona 17,071 16,801 33,636 39,135 Sandy Cove 419 3,093 7,666 9,476 Big Bay Point & Friday Harbour 0 0 6,832 6,832 Stroud 1, ,988 1,988 Churchill Innisfil Heights TOTAL 22,564 24,934 62,374 70,838

7 Design Criteria Water Consumption 6 Community Innisfil Eng. Standard 2012 MSP Historical Data ( ) Range Average New Developments Proposed Criteria Existing Residential - Average Daily Water Consumption per Person (L/p/day) Alcona, Lefroy Churchill Stroud Industrial Average Daily Water Consumption per ha (L/ha/day) All 20 NA NA 20 10

8 Design Criteria Wastewater Generation 7 System Innisfil Eng. Standard 2012 MSP Historical Data ( ) Range Average New Developments Proposed Criteria Existing Residential - Average Day Wastewater Generation per Person, incl. infiltration (L/p/day) Lakeshore Cookstown Industrial/Commercial Average Day Wastewater Generation per ha (L/ha/day) All 20 NA NA Residential Peak Inflow and Infiltration Allowance (L/p/day) Lakeshore 20 L/ha/d Cookstown 20 L/ha/d

9 8 Existing Water Infrastructure Lakeshore water system Lakeshore WTP - expansion under construction Two reservoirs (Alcona and Lefroy) Two Zone 2 BPS Water distribution system extends to Big Bay Point, Gilford, Cookstown, and Town Campus Water transmission main to Bradford West Gwillimbury 3 municipal groundwater systems Innisfil Heights, extending to 5 th Line OnRoute Stroud Churchill Total population with municipal water servicing: approx. 63% Limited municipal water servicing in Lefroy-Belle Ewart, Sandy Cove and Big Bay Point

10 9 Water System Needs and Issues Planned expansion of Lakeshore WTP & water storage: adequate for projected demands of Innisfil and BWG Needs for Alcona Increase capacity of the trunk watermain from WTP to Alcona reservoir Increase capacity of the Town Campus water supply, storage and distribution system Meet increasing water demands for growth, development and intensification Booster pumping capacity for growth in pressure zones 2 and 3 Improve fire flows in some existing areas and for higher density/commercial Improve range of operating pressures Needs for Sandy Cove and Big Bay Point Extend municipal water system to existing properties on individual wells Needs for Stroud Replace groundwater supply and treatment system due to issues with supply wells Needs for Lefroy-Belle Ewart Extend municipal water system to: existing properties on individual wells new developments Increase capacity of Lefroy BPS and reservoir for new developments and intensification

11 10 Water System Needs and Issues Needs for Gilford and Fennell s Corners Improve municipal water supply for fire protection Needs for Churchill New reservoir and BPS to be constructed in 2018 Needs for Cookstown Replace west standpipe Provide mixing systems in both standpipes Replace small diameter and old watermains Improve operating pressures Needs for Innisfil Heights Increase water supply for expansion of employment area For BWG Supply Expand Water Transmission Main and BPS (design underway)

12 11 Water System Alternatives to be Considered Most needs can be met by extending Lakeshore water system to: Town Campus, Innisfil Heights and Stroud - via new Innisfil Beach Road watermain Lefroy-Belle Ewart and Gilford - via south extension of Lakeshore watermain Big Bay Point and Sandy Cove -via 25 th Sideroad watermain

13 12 Additional Water System Alternatives to be Considered For Alcona North and South growth areas Expand or build new Alcona PZ 2 BPS Build new PZ3 BPS at Alcona reservoir (multi function) Build multiple/local PZ3 BPS Expand the Lefroy PZ 2 BPS For Town Campus expansion Expand MRF reservoir and BPS capacity For Big Bay Point Existing properties remain on private systems For Stroud Refurbish existing municipal groundwater system Supply water from City of Barrie water system For Innisfil Heights Increase Innisfil Heights groundwater supply Supply water from City of Barrie water system For Cookstown Replace standpipe and equipment Build new BPS at standpipe, and add PRVs in low elevation areas Install individual booster pumps and PRVs For Gilford Add a storage tank For Fennell s Corners Add a fire pump

14 13 Existing Wastewater Infrastructure Lakeshore wastewater system Lakeshore Water Pollution Control Plant; Class EA for expansion completed 8 sewage pumping stations Sewers extending from Lefroy to Big Bay Point Cookstown wastewater system Cookstown Water Pollution Control Plant Total population with municipal wastewater servicing: approx. 69% Other settlement areas on individual septic systems

15 14 Wastewater System Needs and Issues Planned expansion of Lakeshore WPCP: adequate for projected needs, but will be needed in short term For Alcona and Lefroy-Belle Ewart Expansion of SPS #3, SPS #4 and SPS #6 Refurbish SPS #5 Increase capacity of some sewers Extend municipal servicing to: existing properties on septic systems new developments and intensification For Sandy Cove and Big Bay Point Extend municipal servicing to existing properties on septic systems, including on lakefront For Stroud and Churchill No projected servicing needs For Innisfil Heights Municipal sewer system would facilitate expansion of employment area For Gilford Extend municipal servicing to existing properties on septic systems, including on lakefront For Cookstown Increase wastewater treatment and disposal capacity for planned growth Increase capacity of some sewers

16 15 Wastewater System Alternatives to be Considered Most needs can be met by extending the Lakeshore wastewater system to: Areas of planned growth in existing serviced areas Un-sewered areas along the lakeshore: North to Big Bay Point South to Degrassi Point and Gilford Un-sewered communities: Innisfil Heights Stroud and Churchill (future) Area currently serviced by the Cookstown WPCP

17 16 Additional Wastewater Alternatives to be Considered For Alcona Options for expansion and/or upgrades to SPS #3, SPS #4, SPS #5 and SPS #6 For Big Bay Point, Sandy Cove, Lefroy, Big Cedar Point, Degrassi Point, Gilford, Churchill, Stroud Existing properties remain on septic systems For Innisfil Heights Route options for connecting to Lakeshore WPCP: by others For Cookstown Class EA study underway: by others

18 17 Next Steps in Class EA Phase 1 Review all input received from public, review agencies and other stakeholders Revise issues and needs and list of servicing alternatives Phase 1 Report: December 2017 Phase 2 Develop and assess alternatives and integrate analysis of options by others PIC No. 2 - January 2018 Finalize assessment and recommendations MSP Update Report February 2018 Notice of Completion of MSP Update Please fill in a Comment Sheet and submit it by November 30, 2017 Public review period

19 18 Questions

WATER SYSTEM MASTER PLAN 11. STORAGE CAPACITY EVALUATION

WATER SYSTEM MASTER PLAN 11. STORAGE CAPACITY EVALUATION WATER SYSTEM MASTER PLAN 11. STORAGE CAPACITY EVALUATION The District uses water supplied from both storage and wells to help meet peak demands. In this section District operational, emergency, and fire

More information

Prepared By: George Shaparew Prepared on May 30, Energy Conservation and Demand Management Plan

Prepared By: George Shaparew Prepared on May 30, Energy Conservation and Demand Management Plan Energy Conservation and Demand Management Plan Prepared By: George Shaparew Prepared on May 30, 2014 Town of Innisfil Energy Conservation and Demand Management Plan 1 Table of Contents Page 1. Introduction

More information

Public Information Centre No. 2

Public Information Centre No. 2 Public Information Centre No. 2 Wednesday April 20, 2011 4:00 pm to 7:00 pm City of Welland City Hall Area 2 Welland, Pelham, and Port Colborne Welcome to Public Information Centre No. 2 Please sign in

More information

Development in the City of Toronto

Development in the City of Toronto Development in the City of Toronto Water Infrastructure Challenges and Opportunities Graham Harding, P.Eng. Toronto Water, City of Toronto Urban Land Institute Leadership Program February 16, 2017 Toronto

More information

Town of Sewall s Point Septic Tank to Sanitary Sewer. History

Town of Sewall s Point Septic Tank to Sanitary Sewer. History November 15, 2016 History In 2015, Martin County Utilities completed a Septic to Sewer conversion study which illustrated the need to remove septic tanks from the Indian River Lagoon and St. Lucie Estuary.

More information

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by Milwaukee Metropolitan Sewerage District Conveyance and Treatment System MACRO made available by Eric Loucks,, CDM MMSD Collection System Operations MMSD operates an extensive system of sanitary sewers

More information

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies CORPORATE REPORT NO: R236 COUNCIL DATE: November 15, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: November 10, 2010 FROM: General Manager, Engineering FILE: 6520-20 (GH#2) SUBJECT: Sunnyside Heights

More information

Water supply components

Water supply components Water supply components Water sources structures (Dams, wells, reservoirs) Surface water Groundewater Pipelines from source Water treatment plant components Pumping stations Storage (elevated tanks) Distribution

More information

Table 5-1: Availability of Public Sanitary Sewer. Are plans underway to provide Public Sewer?

Table 5-1: Availability of Public Sanitary Sewer. Are plans underway to provide Public Sewer? CHAPTER 5: PUBLIC SANITARY SEWER AND PRIVATE WASTEWATER DISPOSAL; PUBLIC WATER SERVICE AND PRIVATE WELLS Public Sanitary Sewer The presence or absence of public sanitary sewer service is a major factor

More information

NIAGARA REGION. Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System

NIAGARA REGION. Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System Welcome to the NIAGARA REGION Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT Public Information Centre Please

More information

SEWAGE TREATMENT AND DISPOSAL

SEWAGE TREATMENT AND DISPOSAL SEWAGE TREATMENT AND DISPOSAL QUANTITY OF SANITARY SEWAGE AND STORM WATER Zerihun Alemayehu Unpolluted cooling water Intercept or sewer Sources of Sewage Residential and commercial sewage Industrial wastewater

More information

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview Sanitary Sewer Systems General Overview Sewage Collection System Pipes Pumping stations Maintenance entry points manholes Types of Sewage Sanitary Domestic sewage: human wastes and washwater from public

More information

Sustainable Halton Water & Wastewater Master Plan. Public Information Centre #1

Sustainable Halton Water & Wastewater Master Plan. Public Information Centre #1 Sustainable Halton Water & Wastewater Master Plan Public Information Centre #1 Welcome to Public Information Centre #1 Please sign in on the sheet provided. Our representatives will be pleased to discuss

More information

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008 ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6 BEST PRACTICE SUMMARY REPORT February, 2008 Water and Wastewater PROJECT APPROACH The focus of the

More information

City of Brantford Water Pressure District #1 Storage Class Environmental Assessment Study. Council Presentation - April 19, 2016

City of Brantford Water Pressure District #1 Storage Class Environmental Assessment Study. Council Presentation - April 19, 2016 City of Brantford Water Pressure District #1 Storage Class Environmental Assessment Study Council Presentation - April 19, 2016 Project Chronology Class EA Process Schedule B Timing Phase 1 Problem or

More information

TOWN OF LONDONDERRY, NEW HAMPSHIRE WASTEWATER FACILITIES PLAN UPDATE TABLE OF CONTENTS

TOWN OF LONDONDERRY, NEW HAMPSHIRE WASTEWATER FACILITIES PLAN UPDATE TABLE OF CONTENTS 6%34(6%4(2 )%&+-+4+(3 1-%/ 51 %4( :=>?;9 406/ 0) -0/ 0/ (227! /(6 *%.13*+2(,8A #""$ TOWN OF LONDONDERRY, NEW HAMPSHIRE WASTEWATER FACILITIES PLAN UPDATE TABLE OF CONTENTS SECTION DESCRIPTION PAGE ES

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF Mutchmor Public School Addition 185 Fifth Avenue Ottawa, Ontario Report No. 12073-SB February 15, 2013 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage

More information

SANITARY SEWER FEASIBILITY STUDY AND REPORT NORTH SEBASTIAN AREA

SANITARY SEWER FEASIBILITY STUDY AND REPORT NORTH SEBASTIAN AREA SANITARY SEWER FEASIBILITY STUDY AND REPORT FOR THE NORTH SEBASTIAN AREA INDIAN RIVER COUNTY, FLORIDA November 2013 Prepared for: Indian River County Utilities Prepared by: MASTELLER & MOLER, INC. ~ CONSULTING

More information

Regional District of Okanagan-Similkameen 101 Martin Street Penticton, BC V2A 5J9. November 2008 Project No

Regional District of Okanagan-Similkameen 101 Martin Street Penticton, BC V2A 5J9. November 2008 Project No Sawmill Road Area Sanitary Sewer Feasibility Study Regional District of Okanagan-Similkameen 101 Martin Street Penticton, BC V2A 5J9 November 2008 Project No. 104258 Table of Contents SECTION TITLE PAGE

More information

TOWN OF BEEKMAN DOVER RIDGE WATER AND SEWER SYSTEMS. Overview and Recommendations

TOWN OF BEEKMAN DOVER RIDGE WATER AND SEWER SYSTEMS. Overview and Recommendations TOWN OF BEEKMAN DOVER RIDGE WATER AND SEWER SYSTEMS Overview and Recommendations WATER SYSTEM Water System Background Central water system constructed in 1960 s as part of the subdivision. Only 67 lots

More information

Proposed Residential Development Snow Valley Uplands Cameron Estates Township of Springwater Functional Servicing Report

Proposed Residential Development Snow Valley Uplands Cameron Estates Township of Springwater Functional Servicing Report 453211 Ontario Ltd. Proposed Residential Development Snow Valley Uplands Cameron Estates Township of Springwater Functional Servicing Report Prepared by: AECOM 55 Cedar Pointe Drive, Suite 620 705 721

More information

6. INFRASTRUCTURE CHARGES

6. INFRASTRUCTURE CHARGES 6.1 Overview 6. INFRASTRUCTURE CHARGES Aquatera currently uses infrastructure charges to recover the capital cost of construction related to Water and Wastewater services. The Infrastructure Charge is

More information

SEPTIC VS. SEWER: A COST COMPARISON FOR COMMUNITIES IN SARASOTA COUNTY, FLORIDA

SEPTIC VS. SEWER: A COST COMPARISON FOR COMMUNITIES IN SARASOTA COUNTY, FLORIDA ABSTRACT SEPTIC VS. SEWER: A COST COMPARISON FOR COMMUNITIES IN SARASOTA COUNTY, FLORIDA Daniel G. Burden, Ph.D., P.E., and Damann L. Anderson, P.E. Hazen and Sawyer, P.C. Patrick Zoeller, P.E. Sarasota

More information

Large Decentralized Systems a Sustainable Wastewater Solution

Large Decentralized Systems a Sustainable Wastewater Solution Large Decentralized Systems a Sustainable Wastewater Solution Agenda The Good Fight Centralized Exposed in the Real World Decentralized Model System Examples Dennis F. Hallahan, P.E. Technical Director

More information

Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study

Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study Welcome to the Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study September 23, 2009 Please Sign In and take an Information Brief

More information

CHAPTER 4 HYDRAULIC ANALYSIS

CHAPTER 4 HYDRAULIC ANALYSIS CHAPTER 4 HYDRAULIC ANALYSIS This chapter presents information on the computer hydraulic model of the City s water system and the results of hydraulic analyses. The purpose of the hydraulic analysis is

More information

Ml/d. Ml/d. Ml/d. Ml/d

Ml/d. Ml/d. Ml/d. Ml/d Block A Raw water Line 1 Raw water abstracted from own sources The volume of raw water abstracted from Scottish Water's boreholes, rivers and impounding reservoirs in the report year. Block A Raw water

More information

#613 Planning Basics Chapter 1: Sewage Facilities Planning

#613 Planning Basics Chapter 1: Sewage Facilities Planning CHAPTER OBJECTIVES: After completing this chapter, you will be able to... Explain the purpose and importance of sewage facilities planning. List the parties who are involved in the planning process. Explain

More information

Modified FY ,100, ,329,791

Modified FY ,100, ,329,791 Retail/North Andrews Gardens Neighborhood Improvement Program Expenses Through FY 4 Modified FY 5 Budget FY 26-21 North Andrews Gardens Neighborhood Improvement Project 21,524,34 22,75,757 --- 6,1, 6 ---

More information

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008 ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6 BEST PRACTICE SUMMARY REPORT February, 2008 Water and Wastewater INFLOW AND INFILTRATION DOWNSPOUT

More information

23 CORPORATE ASSET MANAGEMENT POLICY

23 CORPORATE ASSET MANAGEMENT POLICY Clause No. 23 in Report No. 6 of the Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting on November 21, 2013. 23 CORPORATE ASSET MANAGEMENT

More information

Potable Water Supply, Wastewater & Reuse Element

Potable Water Supply, Wastewater & Reuse Element Potable Water Supply, Wastewater & Reuse Element GOAL ONE: HIGH QUALITY AND AFFORDABLE POTABLE WATER WILL BE AVAILABLE TO MEET THE EXISTING AND PROJECTED DEMANDS OF PINELLAS COUNTY UTILITY CUSTOMERS. 1.1.

More information

4 Desired Levels of Service (LOS)

4 Desired Levels of Service (LOS) 4 Desired Levels of Service (LOS) LOS are a key business driver and influence all asset management decisions. LOS statements describe the outputs Halton intends to deliver to its residents and commonly

More information

CAPACITY MANAGEMENT OPERATIONS & MAINTENANCE

CAPACITY MANAGEMENT OPERATIONS & MAINTENANCE CAPACITY MANAGEMENT OPERATIONS & MAINTENANCE LOCAL LAW Joanne M. Mahoney County Executive Issues Created by Inflow/Infiltration Creates sanitary sewer overflows in the environment which is prohibited by

More information

Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan

Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan Municipality of Kincardine Kincardine Business Park (KBP) Servicing Master Plan Public Meeting and Open-House March 27, 2013 Agenda The Master Plan Process History of the Area Draft Servicing Strategy

More information

Subsequent to these early efforts, the complexities associated with potable water provision have increased significantly.

Subsequent to these early efforts, the complexities associated with potable water provision have increased significantly. 10.1 INTRODUCTION The reliable supply, treatment and distribution of potable water is vital to the health, safety and welfare of urban areas. The citizens and officials of the have long been involved with

More information

Review of Trinidad and Tobago Water and Sewerage Authority Capital Expenditure Plans and Asset Valuation

Review of Trinidad and Tobago Water and Sewerage Authority Capital Expenditure Plans and Asset Valuation T +1 (202) 466 6790 F +1 (202) 466 6797 1700 K Street NW WASHINGTON DC 20006 United States of America Review of Trinidad and Tobago Water and Sewerage Authority Capital Expenditure Plans and Asset Valuation

More information

Greater Dublin Drainage Project

Greater Dublin Drainage Project Greater Dublin Drainage Project The Wastewater Treatment Process: How Does it Work? June 2013 The Greater Dublin Drainage initiative aims to provide the drainage infrastructure needed to allow the Greater

More information

The Don River and Central Waterfront are among the most degraded waterways in the City of Toronto.

The Don River and Central Waterfront are among the most degraded waterways in the City of Toronto. This document was put together following the fourth round of public consultation for the Class Environmental Assessment study for this Project. In June 2011, the Project Team consulted with stakeholders

More information

Planning Justification Report. 70 Pioneer Trail Fernbrook Homes (Parkside) Ltd. Official Plan Amendment Zoning By-law Amendment.

Planning Justification Report. 70 Pioneer Trail Fernbrook Homes (Parkside) Ltd. Official Plan Amendment Zoning By-law Amendment. 70 Pioneer Trail Fernbrook Homes (Parkside) Ltd Planning Justification Report Official Plan Amendment Zoning By-law Amendment September 2016 The Jones Consulting Group Ltd. #1-229 Mapleview Drive East,

More information

PRELIMINARY ENGINEERING DESIGN REPORT WATER AND SANITATION

PRELIMINARY ENGINEERING DESIGN REPORT WATER AND SANITATION JOHANNESBURG EMALAHLENI 128 Beyers Naudé Dr. Cnr. Mendelssohn Rd. Roosevelt Park, 2195 Johannesburg, Gauteng PO Box 48550 Roosevelt Park, 2129 Johannesburg Gauteng Tel: 011 888 1425 Fax: 011 888 1075 joburg@scip.co.za

More information

CHAPTER 9: SANITARY SEWER INTRODUCTION FORECASTS CHAPTER 9: SANITARY SEWER 9-1

CHAPTER 9: SANITARY SEWER INTRODUCTION FORECASTS CHAPTER 9: SANITARY SEWER 9-1 CHAPTER 9: SANITARY SEWER INTRODUCTION The Metropolitan Land Planning Act (amended 1995) requires local governments to prepare comprehensive plans and submit them to the Metropolitan Council to determine

More information

4 Water Distribution System

4 Water Distribution System 4 Water Distribution System 4.1 Introduction 4.1.1 Overview The Former CFB Rockcliffe site is located north of Montreal Road between the Aviation Parkway and the NRC lands, and generally south of the Rockcliffe

More information

WESTMORELAND COUNTY A SUCCESSFUL MASTER SEWER SYSTEM PLAN FOLLOWED TO COMPLETION

WESTMORELAND COUNTY A SUCCESSFUL MASTER SEWER SYSTEM PLAN FOLLOWED TO COMPLETION WESTMORELAND COUNTY A SUCCESSFUL MASTER SEWER SYSTEM PLAN FOLLOWED TO COMPLETION Written by Charles Riedlinger, P.E. and Norm Risavi, County Administrator INTRODUCTION In 1995, Resource International,

More information

City of Portsmouth. Water System History and Overview Updated: October Portsmouth, NH - Water System Overview

City of Portsmouth. Water System History and Overview Updated: October Portsmouth, NH - Water System Overview City of Portsmouth Water System History and Overview Updated: October 2017 Portsmouth Regional Water System Service Area Newington ~ 8,000 Accounts Portsmouth New Castle & New Castle Water District Rye

More information

April 7, Mayor Mark Reeves City of Cave Springs P.O. Box 36 Cave Springs, Arkansas RE: Cave Springs Wastewater Treatment Plant #1

April 7, Mayor Mark Reeves City of Cave Springs P.O. Box 36 Cave Springs, Arkansas RE: Cave Springs Wastewater Treatment Plant #1 April 7, 2010 Mayor Mark Reeves City of Cave Springs P.O. Box 36 Cave Springs, Arkansas 72718 RE: Cave Springs Wastewater Treatment Plant #1 AFIN: 04-01642 Permit #: 4893-WR-1 Dear Mayor Reeves: On March

More information

Miami-Dade Water & Sewer Department. Miami-Dade Water and Sewer Department 1

Miami-Dade Water & Sewer Department. Miami-Dade Water and Sewer Department  1 Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department www.miamidade.gov/water 1 Miami-Dade Water and Sewer Department (WASD) Largest Water & Sewer Utility in the Southeastern United

More information

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT 346 362 LAKESHORE ROAD WEST TOWN OF OAKVILLE PROJECT 2016-4442 JULY 2017 REVISED: APRIL 2017 C O N S U L T I N G E N G I N E E R S 64 Jardin

More information

Section 5 - Planning Criteria. Section 5

Section 5 - Planning Criteria. Section 5 Section 5 - Planning Criteria Section 5 SECTION 5 PLANNING CRITERIA This section presents the design criteria and methodologies for analysis used to evaluate the existing distribution system and its facilities

More information

4.1 This directive is issued under the authority of the Assistant Deputy Minister, Socio-Economic Policy and Programming and Program Re-design.

4.1 This directive is issued under the authority of the Assistant Deputy Minister, Socio-Economic Policy and Programming and Program Re-design. Indian Programs Volume 1 Capital Facilities and Maintenance Water and Sewage Systems 1.0 Purpose 1.1 This directive states the policy of the Department of Indian Affairs and Northern Development (DIAND)

More information

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and Impact

More information

Sewage Collection System and Treatment Facility in Brgy.Sabang, Puerto Galera. A project of the Municipality of Puerto Galera

Sewage Collection System and Treatment Facility in Brgy.Sabang, Puerto Galera. A project of the Municipality of Puerto Galera Sewage Collection System and Treatment Facility in Brgy.Sabang, Puerto Galera A project of the Municipality of Puerto Galera Why do we need a sewage system? Brgy. SABANG, PUERTO GALERA, 2006 FECAL COLIFORM

More information

Water, Wastewater and Stormwater 2017 Budget 2018 Plan

Water, Wastewater and Stormwater 2017 Budget 2018 Plan Executive Summary Water, Wastewater and Stormwater In May 2000, the E.coli outbreak and water contamination events in the Town of Walkerton led to an inquiry under Justice Dennis O Conner. The recommendations

More information

Evaluation of Collection System Design Standards

Evaluation of Collection System Design Standards Wastewater Master Plan DWSD Project No. CS-1314 Evaluation of Collection System Design Standards Technical Memorandum Original Date: August 9, 2001 Revision Date: September 2003 Author: CDM Table of Contents

More information

BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE

BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE On April 29, 2013 the District of North Vancouver adopted a new DCC bylaw containing new rates that become effective November 1, 2013.

More information

Infiltration and Inflow. Michael Sassaman Phone

Infiltration and Inflow. Michael Sassaman Phone Infiltration and Inflow Michael Sassaman msassaman@entecheng.com Phone 610-373-3345 Inflow and Infiltration PA DEP Learning Objectives Do you have Excessive I/I? Sources of Inflow and Infiltration I/I

More information

Development Cost Charge (DCC) Update

Development Cost Charge (DCC) Update Development Cost Charge (DCC) Update Purpose Provide developers and other professionals with an overview of Development Cost Charges (DCCs) Review highlights of 2016 DCC program Projected growth and projects

More information

MEMO I N T E O F F I C E

MEMO I N T E O F F I C E I N T E R O F F I C E MEMO To: Diana Mikula, Interim-Village Manager From: Scott Shirley, Director of Public Works Thomas F. Kuehne, Finance Director/Treasurer Date: August 15, 2014 Subject: PROPOSED FIVE-YEAR

More information

Module 2 : System of Sanitation. Lecture 2 : System of Sanitation

Module 2 : System of Sanitation. Lecture 2 : System of Sanitation 1 P age Module 2 : System of Sanitation Lecture 2 : System of Sanitation 2 P age 2.1 BACKGROUND For safe disposal of the sewage generated from a locality efficient collection, conveyance, adequate treatment

More information

Water Operations. Annual Summary Report ~ Innisfil Lake Simcoe Drinking Water System ~ ~ Town of Innisfil ~

Water Operations. Annual Summary Report ~ Innisfil Lake Simcoe Drinking Water System ~ ~ Town of Innisfil ~ Water Operations Annual Summary Report ~ Innisfil Lake Simcoe Drinking Water System ~ ~ Town of Innisfil ~ Reporting Year - 2016 Prepared: March 2017 by Karel Kamerman Sr. Regulatory Compliance Officer

More information

Wastewater Treatment & Water Supply Alternatives Analysis

Wastewater Treatment & Water Supply Alternatives Analysis Wastewater Treatment & Water Supply Alternatives Analysis Lake Sallie & Lake Melissa Chain of Lakes Prepared for Pelican River Watershed District February 2008 Table of Contents 1.0 EXECUTIVE SUMMARY...

More information

Charlotte County Utilities

Charlotte County Utilities Charlotte County Utilities Past, Present, and Future Board Workshop - April 16, 2013 Past CHARLOTTE COUNTY UTILITIES ESTABLISHED 1991 CCU Beginnings General Development Utilities (GDU) A Florida Corporation

More information

TOWN OF EAST GWILLIMBURY WATER AND WASTEWATER CONSERVATION STRATEGY

TOWN OF EAST GWILLIMBURY WATER AND WASTEWATER CONSERVATION STRATEGY TOWN OF EAST GWILLIMBURY WATER AND WASTEWATER CONSERVATION STRATEGY George Zukovs 1, Wayne Hunt 2 1. XCG Consultants Ltd, Oakville Ontario, Canada georgez@xcg.com 2. Town of East Gwillimbury Ontario, Canada

More information

State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area

State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area Thaddeus L. Cohen, AIA Secretary November 2006 CONTENTS Part 1 - Summary

More information

DWSD Strategies to Reduce Water Loss and Energy Use MARCH 14, 2013

DWSD Strategies to Reduce Water Loss and Energy Use MARCH 14, 2013 DWSD Strategies to Reduce Water Loss and Energy Use MARCH 14, 2013 Presented by: PJ Dada City of Detroit Water and Sewerage Department Great Lakes Great Challenges Forum 2013 Oakland University Detroit

More information

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Environmental Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Sustainable, Reliable, Affordable Stormwater Attenuation Systems Sustainable Drainage

More information

Wastewater Management Sources of Authority. John C. Kolb

Wastewater Management Sources of Authority. John C. Kolb Wastewater Management Sources of Authority John C. Kolb 888-899-7600 Rinke-Noonan, Ltd jkolb@rnoon.com St. Cloud, Minnesota www.rnoon.com 1 General State Regulation MPCA statutes chapter 115 regulates

More information

CITY OF NEWPORT PLANNING COMMISSION WORKSHOP MEETING NEWPORT CITY HALL JUNE 8, 2017 IMMEDIATELY FOLLOWING THE PLANNING COMMISSION MEETING

CITY OF NEWPORT PLANNING COMMISSION WORKSHOP MEETING NEWPORT CITY HALL JUNE 8, 2017 IMMEDIATELY FOLLOWING THE PLANNING COMMISSION MEETING CITY OF NEWPORT PLANNING COMMISSION WORKSHOP MEETING NEWPORT CITY HALL JUNE 8, 2017 IMMEDIATELY FOLLOWING THE PLANNING COMMISSION MEETING Chairperson: Kevin Haley City Administrator: Deb Hill Vice-Chair:

More information

Clackamas County Septic Systems 101. Brannon Lamp, REHS

Clackamas County Septic Systems 101. Brannon Lamp, REHS Clackamas County Septic Systems 101 Brannon Lamp, REHS What is a Septic System? Definition of Septic : Infected with Bacteria. Hmmm What does a Septic System Do? Treatment Disposal Dispersal Recycling

More information

PLAN SUMMARY HARBORCREEK TOWNSHIP SEWER AUTHORITY ACT 537 SEWAGE FACILITIES PLAN

PLAN SUMMARY HARBORCREEK TOWNSHIP SEWER AUTHORITY ACT 537 SEWAGE FACILITIES PLAN PLAN SUMMARY HARBORCREEK TOWNSHIP SEWER AUTHORITY ACT 537 SEWAGE FACILITIES PLAN I. INTRODUCTION The Act 537 Program is administered by the PA Department of Environmental Protection (PA DEP) and their

More information

DESIGNING PRESSURE SEWER SYSTEMS FOR TOPOGRAPHICALLY CHALLENGING CATCHMENTS: AN ACCOUNT OF THE OPUA PRESSURE SEWER SCHEME

DESIGNING PRESSURE SEWER SYSTEMS FOR TOPOGRAPHICALLY CHALLENGING CATCHMENTS: AN ACCOUNT OF THE OPUA PRESSURE SEWER SCHEME DESIGNING PRESSURE SEWER SYSTEMS FOR TOPOGRAPHICALLY CHALLENGING CATCHMENTS: AN ACCOUNT OF THE OPUA PRESSURE SEWER SCHEME Graeme Salmon GHD Ltd, New Zealand ABSTRACT This paper will present the challenges

More information

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan TES Industrial Development Lacombe County Outline Plan 112849297 June 2012 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc i Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE... 1

More information

SEWRPC Staff Memorandum RESPONSE TO REQUESTS BY THE CITY OF NEW BERLIN TO DELINEATE THE 20-YEAR PLANNED WATER SUPPLY SERVICE AREA FOR THE UTILITY

SEWRPC Staff Memorandum RESPONSE TO REQUESTS BY THE CITY OF NEW BERLIN TO DELINEATE THE 20-YEAR PLANNED WATER SUPPLY SERVICE AREA FOR THE UTILITY SEWRPC Staff Memorandum RESPONSE TO REQUESTS BY THE CITY OF NEW BERLIN TO DELINEATE THE 20-YEAR PLANNED WATER SUPPLY SERVICE AREA FOR THE UTILITY INTRODUCTION AND BACKGROUND By letter of January 12, 2009,

More information

Tax Increment Financing (TIF) Durham NH

Tax Increment Financing (TIF) Durham NH Tax Increment Financing (TIF) Durham NH What is a TIF? It s a financing / investment tool to provide funding for public improvements that are intended to stimulate positive economic development activity

More information

Application for Gas Exploration and Production

Application for Gas Exploration and Production 1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for

More information

Pressure Sewer Systems. Why Use a Barnes Pressure Sewer System?

Pressure Sewer Systems. Why Use a Barnes Pressure Sewer System? Pressure Sewer Systems Why Use a Barnes Pressure Sewer System? Why Use a Presssure Sewer System? Pressure sewer systems are an effective method to move residential wastewater through small diameter pipes

More information

HOMOSASSA WASTEWATER COLLECTION SYSTEM

HOMOSASSA WASTEWATER COLLECTION SYSTEM HOMOSASSA WASTEWATER COLLECTION SYSTEM Project Purpose To improve the water quality of the Homosassa River by removing septic tanks and package wastewater treatment plants from environmentally sensitive

More information

GRAND NIAGARA Proposed Secondary Plan

GRAND NIAGARA Proposed Secondary Plan GRAND NIAGARA Proposed Secondary Plan Public Open House #3 January 17. 2017 scope + process BUILT Grand Niagara Secondary Plan The Grand Niagara Secondary Plan will establish a framework for the future

More information

SCOPE OF WORK (Last amendment 9/18/08) Update: Signed agreement in hand Work to proceed March 15, 2009 June 30, 2010

SCOPE OF WORK (Last amendment 9/18/08) Update: Signed agreement in hand Work to proceed March 15, 2009 June 30, 2010 SCOPE OF WORK (Last amendment 9/18/08) Update: Signed agreement in hand Work to proceed March 15, 2009 June 30, 2010 TITLE: IDENTIFICATION OF ILLICIT DISCHARGES TO STORM DRAIN SYSTEM PROBLEM/NEED: The

More information

Julia Bahen, Urban Strategies Inc.

Julia Bahen, Urban Strategies Inc. THE MUNICIPAL INFRASTRUCTURE GROUP LTD. 8800 Dufferin Street, Suite 200 Vaughan, Ontario L4K 0C5 T 905.738.5700 F 905.738.0065 www.tmig.ca TECHNICAL MEMORANDUM DATE June 13, 2017 TO CC SUBJECT FROM PROJECT

More information

Wastewater Master Facility Report. (Project Name) (Project Basin Location)

Wastewater Master Facility Report. (Project Name) (Project Basin Location) Wastewater Master Facility Report For (Project Name) (Project Basin Location) The Wastewater Master Facility Report for (Project name) dated (Date); located in the (Basin Name) Basin has been completed

More information

10 Inflow and Infiltration Reduction Strategy Update

10 Inflow and Infiltration Reduction Strategy Update Clause 10 in Report No. 4 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on March 24, 2016. 10 Inflow and Infiltration

More information

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN PRESSURIZED IRRIGATION SYSTEM MASTER PLAN (HAL Project No.: 314.04.100) FINAL REPORT January 2009 ACKNOWLEDGMENTS Successful completion of this study was made possible by the cooperation and assistance

More information

WATER AND WASTEWATER MASTER PLAN

WATER AND WASTEWATER MASTER PLAN WATER AND WASTEWATER MASTER PLAN PRINCE GEORGE COUNTY ENGINEERING AND UTILITIES DEPARTMENT DEI Project No.: 50068442 January 2016 SUBMITTED BY: Dewberry 4805 Lake Brook Drive, Suite 200 Glen Allen, Virginia

More information

Commonwealth of Massachusetts Title 5 Official Inspection Form Subsurface Sewage Disposal System Form - Not for Voluntary Assessments

Commonwealth of Massachusetts Title 5 Official Inspection Form Subsurface Sewage Disposal System Form - Not for Voluntary Assessments Inspection results must be submitted on this form. Inspection forms may not be altered in any way. Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use

More information

CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT

CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT EXHIBIT B CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT PROPOSED AMENDMENTS Table of Contents Objective Page Sanitary Sewer Sub-Element 3A.1 Secure reserve capacity at the South Central Regional

More information

Accounting Separation Methodology Statement. Upstream Services YW 2014/15

Accounting Separation Methodology Statement. Upstream Services YW 2014/15 Accounting Separation Methodology Statement Upstream Services YW 2014/15 Upstream Services YW 2014/15 Accounting Separation Methodology Statement Upstream Services Split - Yorkshire Water 2014/15 Yorkshire

More information

Town of Petawawa Infrastructure Study Update 2013

Town of Petawawa Infrastructure Study Update 2013 2013 TABLE OF CONTENTS Chapter 1 Overview Chapter 2 Sanitary Sewer System Chapter 3 Storm Drainage System Chapter 4 Road System Chapter 5 Water Distribution System Chapter 6 Comprehensive Plan Appendix

More information

REGIONAL GROUND-WATER STUDY TOWN OF WOODBURY ORANGE COUNTY, NEW YORK INTRODUCTION

REGIONAL GROUND-WATER STUDY TOWN OF WOODBURY ORANGE COUNTY, NEW YORK INTRODUCTION WB- INTRODUCTION The Town of 's municipal water system consists of the and the Water District (District 6), which was previously a small private system acquired by the Town in 978. EXISTING WATER SUPPLY

More information

CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA

CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA A. EXISTING FACILITIES 1. Westtown-Chester Creek Plant Westtown Township acquired the Westtown-Chester Creek Treatment Plant (WCC Plant)

More information

What is a stormwater utility fee?

What is a stormwater utility fee? What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville

More information

PROJECT INFORMATION FORM Part A - General information

PROJECT INFORMATION FORM Part A - General information PROJECT INFORMATION FORM Part A - General information Country Project submission Date Serbia and Montenegro, Republic of Montenegro February 2003 1 (updated June 2005) Sector Project Code (filled by the

More information

Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities

Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities Diane W. Duva, Office of Energy Demand May 6, 2015 Connecticut Department of Energy and Environmental Protection Benefits of

More information

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Discourage future development of rural residential patterns

More information

Decentralized Domestic Wastewater Treatment in Rural Areas in China Efforts of the Japan- China Water Environment Partnership Project

Decentralized Domestic Wastewater Treatment in Rural Areas in China Efforts of the Japan- China Water Environment Partnership Project Decentralized Domestic Wastewater Treatment in Rural Areas in China Efforts of the Japan- China Water Environment Partnership Project Motoyuki MIZUOCHI*, Hideaki KOYANAGI**, Tetsuo KUYAMA**, Hirokazu IWASAKI***

More information

Wastewater System Financial Plan. For the Corporation of the City of Thunder Bay

Wastewater System Financial Plan. For the Corporation of the City of Thunder Bay Wastewater System Financial Plan For the Corporation of the City of Thunder Bay Prepared January 2015 City of Thunder Bay 500 Donald Street East PO Box 800 Thunder Bay, Ontario, Canada P7C 5K4 Contents

More information

Adopted Projects at Priority List Meeting August 9, 2017

Adopted Projects at Priority List Meeting August 9, 2017 Adopted Projects at Priority List Meeting August 9, 2017 Drinking Water State Revolving Fund Recipient Amount Project Big Bend Water $30,000 Planning for a water distribution system replacement project.

More information

Provincial Policy Statement 2014 Training Aid

Provincial Policy Statement 2014 Training Aid This job aid has been developed for education and training purposes as a high-level summary of the policy changes in the PPS 2014. It should not be relied upon as a substitute for specialized legal or

More information

PRESENTED BY: IR. TAI LEE YOON JURUTERA JASA (SARAWAK) SDN BHD

PRESENTED BY: IR. TAI LEE YOON JURUTERA JASA (SARAWAK) SDN BHD PRESENTED BY: IR. TAI LEE YOON JURUTERA JASA (SARAWAK) SDN BHD PRE-PROJECT SITUATION Black water is partially treated by septic tanks. Grey water is directly discharged into the drains and river system

More information

GAS. POWER. WATER. TELCO. WATER

GAS. POWER. WATER. TELCO. WATER GAS. POWER. WATER. TELCO. WATER Roof construction, Oddie Reservoir Who is Zinfra? Zinfra is a leading water, gas, power and telco infrastructure service provider. We offer a comprehensive range of engineering,

More information