1 EXHIBIT B PROJECT OPERATIONS HOLT HYDROELECTRIC PROJECT FERC NO DRAFT LICENSE APPLICATION Alabama Power Company Birmingham, Alabama Prepared by: July 2012

2 EXHIBIT B PROJECT OPERATIONS HOLT HYDROELECTRIC PROJECT FERC NO DRAFT LICENSE APPLICATION ALABAMA POWER COMPANY BIRMINGHAM, ALABAMA Prepared by: July 2012

3 EXHIBIT B PROJECT OPERATIONS HOLT HYDROELECTRIC PROJECT FERC NO ALABAMA POWER COMPANY BIRMINGHAM, ALABAMA DRAFT LICENSE APPLICATION TABLE OF CONTENTS 1.0 INTRODUCTION HOLT HYDROELECTRIC PROJECT PROJECT OPERATIONS PROJECT OPERATIONS PROTECTION, MITIGATION, AND ENHANCEMENT (PME) MEASURES EXHIBIT G MAP REVISIONS CONDUCT WATER QUALITY MONITORING TO COMPLY WITH THE REQUIREMENTS OF THE 401 WATER QUALITY CERTIFICATION CONTINUE LIGHT MAINTENANCE OF THE OVERLOOK PARK AND CONTINUE DISCUSSIONS WITH USACE AND ADCNR MAINTENANCE OF THE TRANSMISSION LINE ESTIMATE OF CAPACITY AND GENERATION DEPENDABLE CAPACITY AND AVERAGE ANNUAL GENERATION PROJECT FLOWS FLOW DURATION CURVES AREA CAPACITY RELATIONSHIP POWER PLANT HYDRAULIC CAPACITY TAILWATER CURVE PLANT CAPABILITY APPLICANT S PLANS FOR FUTURE DEVELOPMENT LITERATURE CITED...10 LIST OF FIGURES FIGURE B-1 BEFORE HOLT CONSTRUCTION...4 FIGURE B-2 HOLT AFTER CONSTRUCTION...4 FIGURE B-3 HOLT AFTER CONSTRUCTION...7 FIGURE B-4 TAILWATER RATING CURVE...8 FIGURE B-5 PLANT CAPACITY CURVE i -

4 TABLE OF CONTENTS (CONT D.) TABLE B-1 LIST OF TABLES MEAN, MAXIMUM AND MINIMUM MONTHLY FLOW STATISTICS FOR THE BLACK WARRIOR RIVER IN THE PROJECT AREA...6 APPENDIX A FIGURES LIST OF APPENDICES J:\535\016\Docs\Exhibits\Exhibit B doc - ii -

5 EXHIBIT B PROJECT OPERATIONS HOLT HYDROELECTRIC PROJECT FERC NO ALABAMA POWER COMPANY BIRMINGHAM, ALABAMA DRAFT LICENSE APPLICATION 1.0 INTRODUCTION The Holt Hydroelectric Project (Project) is comprised of an existing, licensed hydroelectric facility owned and operated by Alabama Power Company (Alabama Power) and is located on the Black Warrior River at the U. S. Army Corps of Engineers (USACE) Holt Lock and Dam in Tuscaloosa County, Alabama. The Project has an electric generating capacity of 46.9 megawatts (MW). This exhibit provides a detailed description of Project operations in accordance with Federal Energy Regulatory (FERC) requirements at C.F.R. Section 5.6 and 4.51(c). The Project is an important component of Alabama Power s power generation system. Project generation is necessary in both the short and long term to maintain electric system reliability, operational flexibility, black start ability, and low cost electricity for Alabama Power customers. Project generation represents a valuable portion of Alabama Power s total generation production and power generated by the Project is transmitted and sold to Alabama Power's customers

6 2.0 HOLT HYDROELECTRIC PROJECT 2.1 PROJECT OPERATIONS PROJECT OPERATIONS Alabama Power operates the Project based on the USACE s management of Holt Lake. USACE s first priority at the Holt Lock and Dam is to support river navigation. Alabama Power operates the Project using excess water provided by USACE. Since the electrical generation at the Project is considered secondary to the USACE s navigation use, the Project has operational restrictions from the USACE to which Alabama Power must adhere, as described below: POOL LEVEL Limiting elevations for reservoir operation are a maximum of 187 ft msl and a minimum of 186 ft msl, and the reservoir will normally be maintained between these levels. Because of navigation requirements, based on channel depths in the upper end of the reservoir, the pool must not be drawn down below elevation 186 ft msl. The upper limit of 187 ft msl will not be exceeded, except during floods when inflows exceed the full discharge capacity of the project, unless otherwise directed by the Reservoir Regulation Section. OPERATION FOR NAVIGATION The reservoir will be operated to provide 9-foot depths in the navigation channel which extends approximately 19 miles upstream to Bankhead Lock and Dam. It is expected that very little maintenance dredging will be required and in general the 9-foot depth will be provided by controlling the reservoir level at or above elevation 186 ft msl, the lower limit of drawdown. FLOOD CONTROL OPERATIONS There is no flood control in the Project; the USACE does implement flood control operations. During floods, the Holt reservoir will be held at maximum operating pool, elevation 187 ft msl, by passing the inflow through the spillway gates and/or the power plant until the full discharge capacity of the spillway is reached. When the full capacity of the spillway is reached, free - 2 -

7 overflow with all gates fully opened will prevail until the reservoir peaks and recedes to elevation 187 ft msl PROTECTION, MITIGATION, AND ENHANCEMENT (PME) MEASURES EXHIBIT G MAP REVISIONS The existing Holt Project Boundary map, formerly Exhibit K, is being revised to file as Exhibit G, to reflect what actually occurred in erecting the Holt-Holt (Holt) Transmission Line (TL) during initial construction. Figure B-1 (Before Holt Construction) shows the original proposal to erect the Holt TL in red (the proposed towers are marked as red circles). The existing Holt- Gorgas (Gorgas) TL is shown in black and the existing towers are marked as black circles. During the initial construction of the Holt TL, Alabama Power suspected that that there may be high voltage interference with the proposed Holt TL as it intersected with the existing Gorgas TL. To resolve the high voltage interference, Alabama Power placed the Holt TL on the existing Gorgas towers (marked as black circles) in Figure B-2 (Holt After Construction). The Holt- Gorgas line was actually placed where the initial proposed Holt TL is depicted (red circles). The placement of the Holt TL was not updated on the Exhibit K maps after construction; therefore, Alabama Power proposes to correct and file revised Exhibit G maps to reflect the existing Holt TL. Correcting the Project Boundary will involve removing 3.8 acres and adding 7.3 acres. The removed and added lands are privately owned and Alabama Power has retained the necessary rights to use these lands for Project purposes

8 FIGURE B-1 BEFORE HOLT CONSTRUCTION FIGURE B-2 HOLT AFTER CONSTRUCTION CONDUCT WATER QUALITY MONITORING TO COMPLY WITH THE REQUIREMENTS OF THE 401 WATER QUALITY CERTIFICATION Alabama Power proposes to collect dissolved oxygen (DO) and temperature data for two years following issuance of the new FERC license in accordance with a water quality monitoring plan. If the monitoring results do not indicate substantial compliance with the state water quality standard for DO (maintenance of a DO concentration of 4.0 mg/l or greater in turbine releases), Alabama Power will develop and implement additional measures to increase DO in the releases from the Project through structural or operational modifications. These measures provide reasonable assurance that the DO standard of 4.0 mg/l will be met at the Project

9 Alabama Power will record DO concentrations and water temperature at 60-minute intervals during periods of generation following one continuous hour of generation beginning June 1 and extending through September 30 each year. During flood events, the monitoring may be temporarily discontinued until tailrace elevations return to normal. The turbine aeration system will be automatically activated when the intake DO concentration declines to less than or equal to 4.5 mg/l or less. When the DO concentration rises to 5.0 mg/l or greater, the aeration system will automatically terminate. The DO in the Holt tailrace will be calculated as the sum of the incoming DO concentration plus the increase in DO concentration by the turbine aeration system when it is activated (+0.25 mg/l). Annual DO monitoring reports will be submitted with appropriate certifications to the Alabama Department of Environmental Management (ADEM) 90 days following the cessation of monitoring. Following the final year of monitoring, the complete set of data will be submitted to ADEM for review and comment prior to submittal to the FERC CONTINUE LIGHT MAINTENANCE OF THE OVERLOOK PARK AND CONTINUE DISCUSSIONS WITH USACE AND ADCNR Alabama Power proposes to continue operating and maintaining the recreation area (Overlook Park and picnic tables) at the Scenic Overlook near the powerhouse. Alabama Power will mow the grass at the Overlook Park, empty the trash cans, maintain the picnic tables, and preserve the security (lock the gates) of the Overlook Park. In addition, Alabama Power will continue discussions with the USACE and ADCNR regarding opportunities to provide additional recreation access in the tailrace area MAINTENANCE OF THE TRANSMISSION LINE Alabama Power will maintain the transmission lines at the Project. Alabama Power will remove dangerous trees, trim the side of the area, mow the grass, and apply herbicide as needed in accordance with applicable application guidelines

10 2.2 ESTIMATE OF CAPACITY AND GENERATION DEPENDABLE CAPACITY AND AVERAGE ANNUAL GENERATION The Project has a dependable capacity of 46.9 MW. The 10 yr historical average annual energy production is 158,629,700 KWh. The Project will consume approximately 394,000 KWh annually in station service PROJECT FLOWS Maximum monthly flow in the Black Warrior River has historically occurred in March, while the minimum monthly flow has historically occurred in October. Mean, maximum, and minimum monthly flow statistics for the Project, as recorded at the Holt Lock and Dam gage, are presented in Table B-1. The peak instantaneous daily flow at the Holt Lock and Dam gage was 178,000 cfs on April 13, 1979 (United States Geological Survey (USGS), 2012). TABLE B-1 MEAN, MAXIMUM AND MINIMUM MONTHLY FLOW STATISTICS FOR THE BLACK WARRIOR RIVER IN THE PROJECT AREA (Source: USGS Gage No Holt Lock and Dam (Period of Record: , 2012)) MONTH MEAN DISCHARGE MAXIMUM DISCHARGE MINIMUM DISCHARGE (CFS) (CFS) (CFS) January 12,400 26, February 13,400 46,480 2,869 March 15,300 38,490 2,560 April 11,500 26, May 7,490 33, June 4,160 24, July 3,490 17,140 1,244 August 2,210 4,800 1,203 September 2,970 11, October 2,700 19, November 4,670 20, December 8,520 27,

11 2.2.3 FLOW DURATION CURVES Monthly flow duration curves are provided in Appendix A AREA CAPACITY RELATIONSHIP Figure B-3 shows the area-capacity relationship for the Holt reservoir, which is operated by the USACE. FIGURE B-3 HOLT AFTER CONSTRUCTION POWER PLANT HYDRAULIC CAPACITY Holt Project has one 6-blade vertical diagonal flow design turbine. The flow off the turbine has a diagonal pattern, and is also referred to as a mixed-flow turbine. A diagonal flow turbine is somewhat of a mix between a Francis turbine and a propeller turbine. The diagonal flow turbine has longer blades than a propeller, which results in the blades overlapping. The turbine has a - 7 -

12 rated minimum hydraulic capacity of 1,000 cfs, and rated maximum hydraulic capacity of 11,200 cfs 1. Between 1984 and 2010, daily inflow into Holt Lake has exceeded maximum hydraulic capacity approximately 16 % of the time. The total spillway capacity of the dam is 393,000 cfs at pool elevation 187 ft msl, and 639,500 cfs at pool elevation ft msl TAILWATER CURVE Figure B-4 shows the tailwater rating curve for the Project. FIGURE B-4 TAILWATER RATING CURVE PLANT CAPABILITY The plant capability is the plant output, in megawatts, over a range of gross heads. A curve depicting the Project power plant capability in MW versus head is provided below (Figure B-5). 1 The actual minimum hydraulic capacity is 9,451 cfs (due to vibration) and actual maximum hydraulic capacity is 11,

13 Maximum (64 ft), normal (60 ft), and minimum (58 ft) heads are specified. The new turbine was tested at the normal head of 60 ft (Figure B-5). FIGURE B-5 PLANT CAPACITY CURVE APPLICANT S PLANS FOR FUTURE DEVELOPMENT Alabama Power does not have any plans to develop any additional capacity at the Project

14 3.0 LITERATURE CITED U.S. Geological Survey (USGS) = , accessed April 20, U.S. Geological Survey (USGS) , USGS Gage No Holt Lock and Dam (Period of Record: , ( accessed April

15 APPENDIX A FIGURES

16 A-1

17 THE MONTHLY FLOW DURATION CURVES A-2

18 A-3

19 A-4

20 A-5

21 A-6

22 A-7

PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012

PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012 PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No. 1894 - SC SEPTEMBER 19, 2012 PARR AND FAIRFIELD LOCATIONS Lockhart Neal Shoals Monticello

More information

TOLEDO BEND PROJECT FERC NO FINAL LICENSE APPLICATION EXHIBIT B - PROJECT OPERATIONS AND RESOURCE UTILIZATION

TOLEDO BEND PROJECT FERC NO FINAL LICENSE APPLICATION EXHIBIT B - PROJECT OPERATIONS AND RESOURCE UTILIZATION TOLEDO BEND PROJECT FERC NO. 235 FINAL LICENSE APPLICATION EXHIBIT B - PROJECT OPERATIONS AND RESOURCE UTILIZATION September 211 Copyright 211. Sabine River Authority of Texas and Sabine River Authority,

More information

PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013

PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013 PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No. 1894 - SC JANUARY 2013 PARR Relicensing Project PARR AND FAIRFIELD LOCATIONS FFPS PARR

More information

Mark Twain Lake Water Control Manual Update

Mark Twain Lake Water Control Manual Update Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control US Army Corps of Engineers WATER CONTOL PLAN Overall Objectives Project Purposes Flood Control Hydroelectric Power

More information

Prospect No. 3 Hydroelectric Project FERC Project No. P-2337 Initial Study Report: Ramping May 2015

Prospect No. 3 Hydroelectric Project FERC Project No. P-2337 Initial Study Report: Ramping May 2015 Prospect No. 3 Hydroelectric Project FERC Project No. P-2337 Initial Study Report: Ramping May 2015 Prepared by: PacifiCorp Hydro Resources 925 South Grape Street Medford, OR 97501 For Public Review TABLE

More information

SOUTH FORK AMERICAN RIVER (CHILI BAR), CALIFORNIA

SOUTH FORK AMERICAN RIVER (CHILI BAR), CALIFORNIA Hydropower Project Summary SOUTH FORK AMERICAN RIVER (CHILI BAR), CALIFORNIA CHILI BAR HYDROELECTRIC PROJECT (P-2155) Photo Credit: PG&E This summary was produced by the Hydropower Reform Coalition and

More information

WEST ROSEBUD CREEK, MONTANA

WEST ROSEBUD CREEK, MONTANA Hydropower Project Summary WEST ROSEBUD CREEK, MONTANA MYSTIC LAKE HYDROELECTRIC PROJECT (P-2301) Photo: PPL Montana This summary was produced by the Hydropower Reform Coalition and River Management Society

More information

KANAWHA RIVER, WEST VIRGINIA

KANAWHA RIVER, WEST VIRGINIA Hydropower Project License Summary KANAWHA RIVER, WEST VIRGINIA LONDON-MARMET HYDROELECTRIC PROJECT (P-1175) Photo: US Army Corps of Engineers This summary was produced by the Hydropower Reform Coalition

More information

TURBINE VENTING FOR DISSOLVED OXYGEN IMPROVEMENTS AT BULL SHOALS, NORFORK, AND TABLE ROCK DAMS

TURBINE VENTING FOR DISSOLVED OXYGEN IMPROVEMENTS AT BULL SHOALS, NORFORK, AND TABLE ROCK DAMS TURBINE VENTING FOR DISSOLVED OXYGEN IMPROVEMENTS AT BULL SHOALS, NORFORK, AND TABLE ROCK DAMS Introduction E. Dean 1, M. ASCE Bethel Herrold 2 George Robbins 3, M. ASCE James C. Carter 4 The Southwestern

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 80 119 27 252 174.59 110 135 120 112 92 56 IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

More information

SUMMARY OF 2010 WATER QUALITY MONITORING RESULTS WITHIN THE PRIEST RAPIDS HYDROELECTRIC PROJECT

SUMMARY OF 2010 WATER QUALITY MONITORING RESULTS WITHIN THE PRIEST RAPIDS HYDROELECTRIC PROJECT Priest Rapids Hydroelectric Project (P-2114) SUMMARY OF 2010 WATER QUALITY MONITORING RESULTS WITHIN THE PRIEST RAPIDS HYDROELECTRIC PROJECT By Carson Keeler for Public Utility District No. 2 of Grant

More information

Water Quality Monitoring During Turbine Venting Tests at the Iron Gate Powerhouse, Klamath Hydroelectric Project

Water Quality Monitoring During Turbine Venting Tests at the Iron Gate Powerhouse, Klamath Hydroelectric Project Final Report Quality Monitoring During Turbine Venting Tests at the Iron Gate Powerhouse, Klamath Hydroelectric Project Prepared by Ken Carlson (CH2M HILL) Kaylea Foster (MB&G) Prepared for PacifiCorp

More information

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216)

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216) John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216) Wilmington District, Corps of Engineers Stakeholder Update Presentation January 24, 2014 Authorized under Section 216 of Public

More information

WATER CONTROL MANUAL

WATER CONTROL MANUAL Mobile District WATER CONTROL MANUAL APPENDIX E WEST POINT DAM AND LAKE CHATTAHOOCHEE RIVER, GEORGIA AND ALABAMA U.S. ARMY CORPS OF ENGINEERS MOBILE DISTRICT MOBILE, ALABAMA JUNE 97 Revised August 98 and

More information

OSAGE RIVER BASIN OPERATIONS WATER MANAGEMENT

OSAGE RIVER BASIN OPERATIONS WATER MANAGEMENT OSAGE RIVER BASIN OPERATIONS WATER MANAGEMENT An Overview of Basin Operations Water Management Section Hydrologic Engineering Branch Kansas City District Northwestern Division US Army Corps of Engineers

More information

STUDY 4.0 WATER TEMPERATURE IN THE LOUP RIVER BYPASS REACH...4-1

STUDY 4.0 WATER TEMPERATURE IN THE LOUP RIVER BYPASS REACH...4-1 STUDY 4.0 WATER TEMPERATURE IN THE LOUP RIVER BYPASS REACH...4-1 1. GOALS AND OBJECTIVES OF STUDY...4-1 2. RELEVANT RESOURCE MANAGEMENT GOALS...4-2 3. BACKGROUND AND EXISTING INFORMATION...4-2 4. PROJECT

More information

Water-Energy Nexus: Economics of Hydropower

Water-Energy Nexus: Economics of Hydropower Water-Energy Nexus: Economics of Hydropower George F. McMahon, Ph.D., PE, D.WRE ARCADIS-US, Atlanta GA 1 2014 NWRA Annual Conference Efficiency and Optimization Session February 6, 2014 8 February 2014

More information

EXHIBIT B PROJECT OPERATION AND RESOURCE UTILIZATION

EXHIBIT B PROJECT OPERATION AND RESOURCE UTILIZATION EXHIBIT B PROJECT OPERATION AND RESOURCE UTILIZATION EXHIBIT B PROJECT OPERATION AND RESOURCE UTILIZATION B.1 ALTERNATIVE SITES CONSIDERED In developing the proposed configuration of the Project the following

More information

Hydropower Project License Summary PIT RIVER, CA PIT 1 HYDROELECTRIC PROJECT (P-2687) Pit River below Pit 1 Powerhouse

Hydropower Project License Summary PIT RIVER, CA PIT 1 HYDROELECTRIC PROJECT (P-2687) Pit River below Pit 1 Powerhouse Hydropower Project License Summary PIT RIVER, CA PIT 1 HYDROELECTRIC PROJECT (P-2687) Pit River below Pit 1 Powerhouse Photo: Hydropower Reform Coalition This summary was produced by the Hydropower Reform

More information

TECHNICAL MEMORANDUM Summerhill Rd Texarkana, Texas fax

TECHNICAL MEMORANDUM Summerhill Rd Texarkana, Texas fax TECHNICAL MEMORANDUM 5930 Summerhill Rd Texarkana, Texas 75503 903 838 8533 fax 903 832 4700 TO: Becky Griffith, Jon Jarvis FROM Spandana Tummuri SUBJECT: Technical Memorandum on IP Analysis PROJECT: Sulphur

More information

ND Detention Project Development Update

ND Detention Project Development Update ND Detention Project Development Update Upper Red River Basin Halstad, MN = 8 Upstream Subwatersheds Fargo, ND = 3 Upstream Subwatersheds Halstad, MN Fargo, ND Wild Rice Otter Tail Bois de Sioux Upstream

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

2.0 Scope of Work. 3.0 Stream Discharge Measurements. Technical Memorandum City of Farmers Branch Page 2

2.0 Scope of Work. 3.0 Stream Discharge Measurements. Technical Memorandum City of Farmers Branch Page 2 Technical Memorandum City of Farmers Branch Page 2 over the No. 1 dam. Discharge of commingled water from the reservoirs must be of sufficient quality to meet the Surface Water Quality Standards of Segment

More information

The Dalles East Fish Ladder Auxiliary Water System Emergency Operation Backup System Alternatives Columbia River, Oregon-Washington

The Dalles East Fish Ladder Auxiliary Water System Emergency Operation Backup System Alternatives Columbia River, Oregon-Washington U.S. Army Corps of Engineers, Portland District (Contract No. W9127N-08-D-0006) Task Order No. 0026 DRAFT Brainstorming Meeting Report The Dalles East Fish Ladder Auxiliary Water System Emergency Operation

More information

Northwest Power and Conservation Council

Northwest Power and Conservation Council Northwest Power and Conservation Council Pumped Storage GRAC Meeting Banks Lake Pumped Storage Project (North Dam) FERC Project No. 14329 Portland, Oregon January 27, 2015 Presented by: Lloyd Reed and

More information

Appendix J Hydrology and Hydraulics

Appendix J Hydrology and Hydraulics Appendix J Hydrology and Hydraulics Marsh Lake Dam Ecosystems Restoration Feasibility Study Hydraulics & Hydrology Appendix January 2011 Contents List of Figures iii List of Tables iii I. General 1 II.

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Fargo-Moorhead Metropolitan Area Flood Risk Management Project

Fargo-Moorhead Metropolitan Area Flood Risk Management Project Fargo-Moorhead Metropolitan Area Flood Risk Management Project 52ND ANNUAL IOWA ASCE ENVIRONMENTAL & WATER RESOURCES CONFERENCE 03 April 2014 Aaron W. Buesing Senior Hydraulic Engineer Corps of Engineers,

More information

Appendix VI: Illustrative example

Appendix VI: Illustrative example Central Valley Hydrology Study (CVHS) Appendix VI: Illustrative example November 5, 2009 US Army Corps of Engineers, Sacramento District Prepared by: David Ford Consulting Engineers, Inc. Table of contents

More information

Impoundment Fluctuation, Assessment of Littoral Zone Habitat, Mapping of Wild Rice Beds, and Assessment of River Shoreline Erosion

Impoundment Fluctuation, Assessment of Littoral Zone Habitat, Mapping of Wild Rice Beds, and Assessment of River Shoreline Erosion Impoundment Fluctuation, Assessment of Littoral Zone Habitat, Mapping of Wild Rice Beds, and Assessment of River Shoreline Erosion Grandfather Falls and Tomahawk Hydroelectric Projects FERC Project Nos.

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN Bremo Power Station CCR Surface Impoundment: North Ash Pond Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo

More information

AQUATIC PLANT MANAGEMENT PLAN FOR U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT WATER RESOURCES PROJECTS SOUTH CAROLINA AND GEORGIA

AQUATIC PLANT MANAGEMENT PLAN FOR U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT WATER RESOURCES PROJECTS SOUTH CAROLINA AND GEORGIA AQUATIC PLANT MANAGEMENT PLAN FOR U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT WATER RESOURCES PROJECTS SOUTH CAROLINA AND GEORGIA Appendix A CY 2018 Update Annual Aquatic Plant Treatment Plan and Summary

More information

Inflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company

Inflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company Control System Plan for Louisa Generating Station CCR Impoundment MidAmerican Energy Company October 10, 2016 Control System Plan for Louisa Generating Station CCR Impoundment Prepared for MidAmerican

More information

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES SECTION 1601 Wind Energy Installation In any zoning district, a conditional use permit or building permit may be granted to allow a wind energy conversion

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District. Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas

Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District. Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas March 2016 1. PURPOSE AND REQUIREMENTS 1.1 PURPOSE This

More information

SURFACE WATER PUMPS TO IMPROVE DISSOLVED OXYGEN CONTENT OF HYDROPOWER RELEASES

SURFACE WATER PUMPS TO IMPROVE DISSOLVED OXYGEN CONTENT OF HYDROPOWER RELEASES SURFACE WATER PUMPS TO IMPROVE DISSOLVED OXYGEN CONTENT OF HYDROPOWER RELEASES Abstract Mark 1, Willola Tyson 2, Joe Webb 3, and Gary Brock 4 This paper describes the development, installation, and performance

More information

Presentation Overview

Presentation Overview Little Dry Creek Restoration Deep River Flood Risk Management Final Presentation to LCRBDC June 10, 2015 Presentation Overview Project Overview & Background Information Data Collection Model Development

More information

PANAMA CANAL RESERVOIR WATER QUALITY EVALUATION STUDY

PANAMA CANAL RESERVOIR WATER QUALITY EVALUATION STUDY PANAMA CANAL RESERVOIR WATER QUALITY EVALUATION STUDY Billy E. Johnson, PhD, PE Research Civil Engineer Engineer Research and Development Center U.S. Army Corps of Engineers Vicksburg, MS. USA Barry W.

More information

PEND OREILLE RIVER, WASHINGTON

PEND OREILLE RIVER, WASHINGTON Hydropower Project Summary PEND OREILLE RIVER, WASHINGTON BOUNDARY HYDROELECTRIC PROJECT (P-2144) Photo: Rich Bowers, HRC This summary was produced by the Hydropower Reform Coalition and River Management

More information

2 Hydrology Studies. 2.1 Introduction

2 Hydrology Studies. 2.1 Introduction 2 Hydrology Studies Report by: C. Cadou, P. Eng. 2.1 Introduction The objective of this analysis was to review the hydrological/hydraulic and energy production components of studies carried out to date

More information

Executive Summary. Tennessee Valley Authority Reservoir Operations Study Final Programmatic EIS

Executive Summary. Tennessee Valley Authority Reservoir Operations Study Final Programmatic EIS Executive Summary Operations Study Final Programmatic EIS This page intentionally left blank. Executive Summary ES.1 Introduction The (TVA) has conducted a comprehensive Operations Study (ROS) to determine

More information

Hoover Dam Hydropower and River Operations Electric Market Forecasting Conference. Mark Cook, PE Manager, Hoover Dam

Hoover Dam Hydropower and River Operations Electric Market Forecasting Conference. Mark Cook, PE Manager, Hoover Dam Hoover Dam Hydropower and River Operations Electric Market Forecasting Conference Mark Cook, PE Manager, Hoover Dam Hoover Dam Type of Operation Impacts of Drought Mitigating Drought Impacts through Major

More information

ANNUAL PLATTE RIVER SURFACE WATER FLOW SUMMARY

ANNUAL PLATTE RIVER SURFACE WATER FLOW SUMMARY ANNUAL PLATTE RIVER SURFACE WATER FLOW SUMMARY 4/3/213 Platte River Recovery Implementation Program 213 ANNUAL SURFACE WATER FLOW SUMMARY DRAFT Prepared by staff of the Platte River Recovery Implementation

More information

Preliminary Analysis of Potential Vibration Impact to Old Hickory Lock & Dam from Proposed Quarry Operations

Preliminary Analysis of Potential Vibration Impact to Old Hickory Lock & Dam from Proposed Quarry Operations Technical Paper U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Preliminary Analysis of Potential Vibration Impact to Old Hickory Lock & Dam from Proposed Quarry Operations Old Hickory Lock and Dam, located

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp Geneva Dam Design of a Steep, Temporary, Riprap Ramp A Run-of of-river Dam Analysis for Geneva Dam Credit to: Yu-Chun Su, Ph.D., P.E., CFM David T. Williams. Ph.D., P.E, CFM Presentation Purpose History

More information

INITIAL CONSULTATION DOCUMENT

INITIAL CONSULTATION DOCUMENT INITIAL CONSULTATION DOCUMENT YADKIN-PEE DEE RIVER PROJECT FERC NO. 2206 Submitted by: PROGRESS ENERGY Raleigh, North Carolina FEBRUARY 2003 Initial Consultation Document Yadkin-Pee Dee River Project FERC

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

CONTENTS LIST OF TABLES LIST OF FIGURES

CONTENTS LIST OF TABLES LIST OF FIGURES CONTENTS 1.0 PURPOSE OF ACTION AND NEED FOR POWER... 1-1 1.1 PURPOSE OF THE ACTION... 1-1 1.2 NEED FOR PROJECTS... 1-3 1.2.1 PacifiCorp Operations... 1-3 1.2.2 Cowlitz PUD Operations... 1-5 1.2.3 Regional

More information

Eska Creek Preliminary Feasibility Analysis

Eska Creek Preliminary Feasibility Analysis Introduction Eska Creek Preliminary Feasibility Analysis This report examines the feasibility issues of energy and economics for a 1.8 MW hydroelectric project on Eska Creek (project). The Project is located

More information

Phase II Report on Hydrology, Hydraulics, and Low Water Dams

Phase II Report on Hydrology, Hydraulics, and Low Water Dams Phase II Report on Hydrology, Hydraulics, and Low Water Dams Arkansas River Corridor Tulsa, OK May 2005 Submitted To: U. S. Army Corps of Engineers Tulsa District Prepared by: The GUERNSEY Team 5555 N.

More information

Water Balance and Regulation Alternative Analysis for Kajakai Reservoir using HEC-ResSim

Water Balance and Regulation Alternative Analysis for Kajakai Reservoir using HEC-ResSim US Army Corps of Engineers Hydrologic Engineering Center Water Balance and Regulation Alternative Analysis for Kajakai Reservoir using HEC-ResSim Phase I and II Final Report December 2007 Approved for

More information

Annex 5 - Hydropower Model Vakhsh

Annex 5 - Hydropower Model Vakhsh Annex 5 - Hydropower Model Vakhsh 1. The Vakhsh Cascade The construction of dams on the Vakhsh River started in the late 1950s with the construction of the Perepadnaya diversion and power station. Until

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Water Development Plan Template

Water Development Plan Template Water Development Plan Template (Updated September 2005) Water Development Plan Template Note: For any application with a proposed diversion rate of over 25,000 gallons a day, a development plan must be

More information

Update on Development of Auto-Venting Turbine Technology

Update on Development of Auto-Venting Turbine Technology Update on Development of Auto-Venting Turbine Technology Paul Hopping 1, Patrick 2, Thomas Brice 3, and Joseph Cybularz 4 Abstract Since the 1970s, the Tennessee Valley Authority (TVA) has been active

More information

Prospect No. 3 Hydroelectric Project FERC Project No. P-2337 Updated Study Report: Fish Passage Facilities May 2016

Prospect No. 3 Hydroelectric Project FERC Project No. P-2337 Updated Study Report: Fish Passage Facilities May 2016 Prospect No. 3 Hydroelectric Project FERC Project No. P-2337 Updated Study Report: Fish Passage Facilities May 2016 Prepared by: Alden Research Laboratory, Inc. 9521 Willows Road NE Redmond, WA 98052 And

More information

PROJECT BRIEF for the John Hart Generating Station Replacement Project

PROJECT BRIEF for the John Hart Generating Station Replacement Project PROJECT BRIEF for the John Hart Generating Station Replacement Project Issue Date: March 13, 2012 TABLE OF CONTENTS John Hart Generating Station Replacement Project Page ii of 17 1. INTRODUCTION... 3 1.1

More information

Instream Flow Study for the Proposed Lower Bois d Arc Creek Reservoir, Texas

Instream Flow Study for the Proposed Lower Bois d Arc Creek Reservoir, Texas 450,000 400,000 350,000 300,000 250,000 200,000 150,000 Instream Flow Study for the Proposed Lower Bois d Arc Creek Reservoir, Texas 100,000 50,000 0 Jan-48 Jan-51 Jan-54 Jan-57 Jan-60 Jan-63 Jan-66 Jan-69

More information

Presentation Outline. Review of CEATI Background Conventional Hydro Program Update

Presentation Outline. Review of CEATI Background Conventional Hydro Program Update Presented to: Presentation Outline Review of CEATI Background Conventional Hydro Program Update CEATI Interest Groups: CEATI currently operates 14 focused Interest Groups Generation & Utilization Hydraulic

More information

134 FERC 61,195 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

134 FERC 61,195 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 134 FERC 61,195 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Southern

More information

Status Report. Work to Date on the Development of the VARQ Flood Control Operation at Libby Dam and Hungry Horse Dam. January 1999.

Status Report. Work to Date on the Development of the VARQ Flood Control Operation at Libby Dam and Hungry Horse Dam. January 1999. Status Report Work to Date on the Development of the VARQ Flood Control Operation at Libby Dam and Hungry Horse Dam January 1999 Section 1 Appendix A VARQ Operating Procedures Appendix A A.1. INTRODUCTION.

More information

Yuba River Development Project FERC Project No. 2246

Yuba River Development Project FERC Project No. 2246 Draft Application for a New License Major Project Existing Dam Visual Resource Management Plan Security Level: Public Draft - December 2013 2013, Yuba County Water Agency All Rights Reserved Table of

More information

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed?

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed? Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed? John C. Tracy, Director Idaho Water Resources Research Institute

More information

Water. Power. HYDROMATRIX

Water. Power. HYDROMATRIX Water. Power. HYDROMATRIX HYDROMATRIX An innovative way to hydropower generation Conventional HYDROMATRIX Ø 6+ m Ø 1.3+ m An array ( Matrix ) of small turbines instead of conventional sized turbines Best

More information

Hydropower & Dams Services

Hydropower & Dams Services Hydropower & Dams Services We represent a world-class concentration of hydropower and dam expertise. Since 1920, we have designed hundreds of new hydropower and dams globally, producing clean reliable

More information

Review Plan U.S. Army Corps of Engineers Northwest Division Kansas City District. Kanopolis Dam Emergency Gate Replacement

Review Plan U.S. Army Corps of Engineers Northwest Division Kansas City District. Kanopolis Dam Emergency Gate Replacement Review Plan U.S. Army Corps of Engineers Northwest Division Kansas City District Kanopolis Dam Emergency Gate Replacement April 2015 1. PURPOSE AND REQUIREMENTS 1.1 PURPOSE This Review Plan is intended

More information

ALABAMA-COOSA-TALLAPOOSA RIVER BASIN WATER CONTROL MANUAL. Final Draft

ALABAMA-COOSA-TALLAPOOSA RIVER BASIN WATER CONTROL MANUAL. Final Draft Mobile District ALABAMA-COOSA-TALLAPOOSA RIVER BASIN WATER CONTROL MANUAL Final Draft APPENDIX G ROBERT F. HENRY LOCK AND DAM (R. E. BOB WOODRUFF LAKE) ALABAMA RIVER, ALABAMA U.S. ARMY CORPS OF ENGINEERS

More information

Revision Nalcor Doc. No. MFA-SN-CD-0000-GT-DC C1 Date Page SLI Doc. No EC Dec-2013 ii DESIGN CRITERIA - GEOTECHNICAL

Revision Nalcor Doc. No. MFA-SN-CD-0000-GT-DC C1 Date Page SLI Doc. No EC Dec-2013 ii DESIGN CRITERIA - GEOTECHNICAL SLI Doc. No. 505573-3000-40EC-0003 01 5-Dec-2013 ii TABLE OF CONTENTS Page No. 1 INTRODUCTION... 1 2 CREST ELEVATIONS... 2 2.1 Cofferdams... 2 2.2 North Spur... 3 3 STABILITY ANALYSIS LOADING CASES AND

More information

Hydroelectric Pumped Storage Potential and Renewable Energy Integration in the Northwest

Hydroelectric Pumped Storage Potential and Renewable Energy Integration in the Northwest Hydroelectric Pumped Storage Potential and Renewable Energy Integration in the Northwest Wind generation on Bonneville Power Administration s (BPA) system in the Northwest grew from almost nothing in 1998

More information

CHAPTER 28 WIND ENERGY CONVERSION SYSTEMS (WECS)

CHAPTER 28 WIND ENERGY CONVERSION SYSTEMS (WECS) CHAPTER 28 WIND ENERGY CONVERSION SYSTEMS (WECS) SECTION: 10-28-1: Purpose 10-28-2: Application 10-28-3: Declaration of Conditions 10-28-4: Site Plan Drawing 10-28-5: Compliance with State Building Code

More information

FAQ. Crown Hydro Frequently Asked Questions Page 1

FAQ. Crown Hydro Frequently Asked Questions Page 1 What are our current sources of electricity? In the Midwest, we get about 75% of our electricity from burning coal, 16% from nuclear fission, and the remainder from natural gas, oil, hydro, wind and solar.

More information

Assessment of Agricultural Flood Damages Along the James River in South Dakota

Assessment of Agricultural Flood Damages Along the James River in South Dakota Assessment of Agricultural Flood Damages Along the James River in South Dakota Ron S. Beyer Hydraulic Engineer Omaha District US Army Corps of Engineers 2007 Eastern South Dakota Water Conference October

More information

U.S. Army Corps of Engineers Los Angeles District. US Army Corps of Engineers BUILDING STRONG

U.S. Army Corps of Engineers Los Angeles District. US Army Corps of Engineers BUILDING STRONG U.S. Army Corps of Engineers Los Angeles District US Army Corps of Engineers BUILDING STRONG 1. Opening Comments; 2. Los Angeles County Drainage Area Project As-Built Condition, Current Condition, and

More information

PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017

PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017 PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017 Prepared by System Planning Department PJM 2017 Table of Contents Table of Contents

More information

OPTIMIZATION OF THE OPERATION OF WALLACE DAM AND SINCLAIR DAM AS A PUMPED STORAGE DEVELOPMENT. A THESIS. Presented to

OPTIMIZATION OF THE OPERATION OF WALLACE DAM AND SINCLAIR DAM AS A PUMPED STORAGE DEVELOPMENT. A THESIS. Presented to OPTIMIZATION OF THE OPERATION OF WALLACE DAM AND SINCLAIR DAM AS A PUMPED STORAGE DEVELOPMENT. A THESIS Presented to The Faculty of the Division of Graduate Studies and Research By James Owen Patrick In

More information

Freight Street Development Strategy

Freight Street Development Strategy Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed

More information

Hydropower retrofitted onto existing water infrastructure assets

Hydropower retrofitted onto existing water infrastructure assets Hydropower retrofitted onto existing water infrastructure assets Marco van Dijk Lecturer and Principal Researcher University of Pretoria / Water Research Commission South Africa Presentation Layout How

More information

EXPLORATORY VELOCITY MEASUREMENTS

EXPLORATORY VELOCITY MEASUREMENTS EXPLORATORY VELOCITY MEASUREMENTS IN IRON GATE RESERVOIR WITH AN ACOUSTIC DOPPLER CURRENT PROFILER PREPARED FOR PACIFICORP By Mike L. Deas Eric Miao 424 Second Street, Suite B Davis, California 95616 (530)

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH-Y Engineer Regulation 1110-8-2(FR) Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design INFLOW DESIGN FLOODS FOR DAMS AND RESERVOIRS ER 1110-8-2(FR)

More information

Environmental Protection (NJDEP) The Louis Berger Group, Inc.

Environmental Protection (NJDEP) The Louis Berger Group, Inc. Hydraulic Modeling for Preliminary Evaluation of Potential Flooding Impacts for Various Dredging, Capping and Armoring Scenarios of The Lower Passaic River Restoration Abdulai Fofanah, PE, D.WRE, CFM Murat

More information

CHAPTER 7 POWER PRODUCTION AND ENERGY CONSUMPTION

CHAPTER 7 POWER PRODUCTION AND ENERGY CONSUMPTION CHAPTER 7 POWER PRODUCTION AND ENERGY CONSUMPTION Hydroelectric facilities generate a significant portion of California s energy requirements. Private electric utilities and water agencies own and operate

More information

Nance County Zoning Regulations for Wind Energy Conversion Systems

Nance County Zoning Regulations for Wind Energy Conversion Systems Nance County Zoning Regulations for Wind Energy Conversion Systems ARTICLE 1: SMALL / NON-COMMERCIAL WIND ENERGY SYSTEMS Section 1. Purpose It is the purpose of this regulation to promote safe, effective

More information

Hydropower as Flexibility Provider: Modeling Approaches and Numerical Analysis

Hydropower as Flexibility Provider: Modeling Approaches and Numerical Analysis Hydropower as Flexibility Provider: Modeling Approaches and Numerical Analysis Andrew Hamann, Prof. Gabriela Hug Power Systems Laboratory, ETH Zürich February 8, 2017 Future Electric Power Systems and

More information

Some aspects of the sediment transit on the Mekong river in relation with hydropower development

Some aspects of the sediment transit on the Mekong river in relation with hydropower development Some aspects of the sediment transit on the Mekong river in relation with hydropower development Daniel Loudière Société Hydrotechnique de France A presentation in three parts - the situation when starting

More information

TRINITY RIVER CORRIDOR NORTH CENTRAL TEXAS

TRINITY RIVER CORRIDOR NORTH CENTRAL TEXAS TRINITY RIVER CORRIDOR NORTH CENTRAL TEXAS JOINTLY PREPARED BY: CITIES: ARLINGTON, CARROLLTON, COPPELL, DALLAS, FARMERS BRANCH, FORT WORTH, GRAND PRAIRIE, IRVING, LEWISVILLE COUNTIES: DALLAS, TARRANT SPECIAL

More information

Improved Operations of Mohawk River Movable Dams

Improved Operations of Mohawk River Movable Dams Improved Operations of Mohawk River Movable Dams Kenneth Avery 1, Emily Herbst 1, Michael Thiemann 2, Joe Savoie 3 1 Bergmann Associates; 2 Riverside Technology, inc; 3 New York State Canal Corporation

More information

CORPS OF ENGINEERS. Water Resource Activities in the ACF Basin May 18, 2007

CORPS OF ENGINEERS. Water Resource Activities in the ACF Basin May 18, 2007 CORPS OF ENGINEERS Water Resource Activities in the ACF Basin May 18, 2007 Mobile District River Basins Water Management Staff Supervisory Hydraulic Engineer 4 Hydraulic Engineers 1 Engineer/Co-op (Vacant)

More information

Federal Regulation. Copyright 2011 Gary A. Robbins. All rights reserved.

Federal Regulation. Copyright 2011 Gary A. Robbins. All rights reserved. Federal Regulation Copyright 2011 Gary A. Robbins. All rights reserved. Roles Different Federal agencies have different jurisdictions over water resources Main agencies Army Corp of Engineers (USACE) Bureau

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

Effect of Glen Canyon Dam on the Temperature Regime of Colorado River

Effect of Glen Canyon Dam on the Temperature Regime of Colorado River Effect of Glen Canyon Dam on the Temperature Regime of Colorado River Kaveh Zamani, PhD Student, (kzamani@ucdavis.edu) Department of Civil and Environmental Engineering, University of California at Davis

More information

Spring Forecast Based Operations, Folsom Dam, California

Spring Forecast Based Operations, Folsom Dam, California Spring Forecast Based Operations, Folsom Dam, California Paul E. Pugner, P.E. Chief, Water Management Section Sacramento District U.S. Army 1325 J Street, Room 1126 Sacramento, CA 95814-2922 Tel: (916)

More information

Dredge and Fill Standards on the Highland Lakes

Dredge and Fill Standards on the Highland Lakes www.lcra.org Dredge and Fill Standards on the Highland Lakes Lake Buchanan Inks Lake Lake LBJ Lake Marble Falls Lake Travis Introduction The Lower Colorado River Authority (LCRA) no longer requires that

More information

US ARMY CORPS OF ENGINEERS ACTIONS DURING 2016 TEXAS SPRING FLOOD

US ARMY CORPS OF ENGINEERS ACTIONS DURING 2016 TEXAS SPRING FLOOD 1 US ARMY CORPS OF ENGINEERS ACTIONS DURING 2016 TEXAS SPRING FLOOD 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

More information

Folsom Dam Water Control Manual Update

Folsom Dam Water Control Manual Update Folsom Dam Water Control Manual Update Stakeholder Discussion October 31, 2013 Location: Tsakopoulos Library Galleria, East Room, 828 I Street, Sacramento US Army Corps of Engineers WELCOME & INTRODUCTIONS

More information

Outlet Structure Modeling

Outlet Structure Modeling Watershed Modeling using HEC-RAS Outlet Structure Modeling Jeff Wickenkamp, P.E., CFM, D.WRE Patrick Lach, P.E. Hey and Associates, Inc. Water Resources, Wetlands and Ecology Outline of Presentation Why

More information

V. DRAINAGE IMPROVEMENTS

V. DRAINAGE IMPROVEMENTS V. DRAINAGE IMPROVEMENTS 5.1 Formulation of Drainage Improvements As indicated in Chapter 4, following the completion of the hydrologic analysis associated with future land use conditions, drainage improvements

More information

The Sustainability of Floods Pond

The Sustainability of Floods Pond The Sustainability of Floods Pond Bangor Water District s Public Water Supply Presented By: Rick Pershken Bangor Water District Overview Brief BWD History Watershed Characteristics Lake Characteristics

More information