Improved Operations of Mohawk River Movable Dams

Size: px
Start display at page:

Download "Improved Operations of Mohawk River Movable Dams"

Transcription

1 Improved Operations of Mohawk River Movable Dams Kenneth Avery 1, Emily Herbst 1, Michael Thiemann 2, Joe Savoie 3 1 Bergmann Associates; 2 Riverside Technology, inc; 3 New York State Canal Corporation

2 Advanced Forecasting for the New York State Canal System Series of Presentations 1. A Collaborative Approach 2. Collaborative Hydraulic Model Development and Onsite Testing 3. Improved Operations of Mohawk River Movable Dams 4. Inundation Mapping and Data Dissemination

3 Outline Description of movable dams Seasonal operations of movable dams Flood event operations of movable dams Flood Warning Operations System (FWOS) Testing of movable dam gate lifting procedures Historic flood event modeling to test gate lifting procedures Implications of modeling results on lifting procedures

4 New York State Erie Canal Overview 524 miles long Mohawk River 10 Movable Dams(1918) Canalized the river

5 Purpose of Movable Dams Allows the Canal Corp. to seasonally use the Mohawk River as a navigable channel for the Canal system 10 movable dams provide a total of 105 feet of lift Natural River Bed Profile Canalized River Bed Profile

6 Movable Dam

7 Movable Dam Operation Superstructure Mule Upright Upper Gate Upstream Pool Lower Gate Downstream Pool

8 Movable Dam Operation Winter to Navigation Season (1) LOWER UPRIGHTS (2) LOWER LOWER GATES (3) LOWER UPPER GATES

9 Movable Dam Operation Navigation Season Operations +/-2 ft Navigation Range RAISE UPPER GATE(S) LOWER GATES AND UPRIGHTS REMAIN IN PLACE THROUGHOUT THE NAVIGATION SEASON

10

11 When do Operations of the Movable Dams Occur? Seasonal Winter shutdown of the Canal (start of non-navigation season) Spring opening of the Canal (start of navigation season) Flood Events Currently when > 10 year recurrence interval flood is predicted to occur at one of three Northeast River Forecast Center (NERFC) gages in the basin. Future when out of bank flooding is projected to occur upstream of any of the movable dams.

12 Adverse Effects of Movable Dams During Flood Events Prior to the gate and hoist strengthening, completed in 2016, only the upper gates were raised Not raising the lower gates has the potential to cause: Debris Accumulation Flooding of municipalities Damage to: Highway infrastructure Canal infrastructure Public outcry

13 Movable Dam 5: Rotterdam Junction LOCK 9 MOVABLE DAM 5 Constructed 1914 Rehabilitated 1998,2006

14 Movable Dam 5: Rotterdam Junction LOCK 9 MOVABLE DAM 5 Constructed 1914 Rehabilitated 1998,2006

15 Tropical Storm Lee (50 YR Event): Sept 2011

16 Tropical Storm Lee (50 YR Event): Sept 2011

17 Flood Warning Operations System (FWOS) Ability to: Test Canal Corp. operation procedures Uses hindsight and foresight technology

18 Benefits to FWOS Can be used more accurately than current Northeast River Forecast Center (NERFC) predictions within 24 hours of a predicted storm event More precise operation timelines

19 How It s Done An unsteady simulation is run with historical and predicted data A continuously learning model FWOS uses four trigger criteria to determine whether the Movable Dams should be removed or not

20 How It s Done (cont.) Gate lifting times were observed during the 2015 winter shutdown operations Model tested against three large storm events: Hurricane Irene (2011) Tropical Storm Lee (2011) Tropical Storm Andrea (2013)

21 4 Triggers that Decide Whether to Remove MDs NYSCC Staff Safety Criteria Catwalk Upstream Pool Downstream Pool

22 4 Triggers that Decide Whether to Remove MDs Lower Gate Lifting Criteria HW TW Difference

23 4 Triggers that Decide Whether to Remove MDs HW TW Difference

24 4 Triggers that Decide Whether to Remove MDs Upright Lifting Criteria HW TW Difference

25 4 Triggers that Decide Whether to Remove MDs Upright Lifting Criteria HW TW Difference

26 4 Triggers that Decide Whether to Remove MDs Critical Infrastructure Criteria Upstream Pool Downstream Pool

27 4 Triggers that Decide Whether to Remove MDs Upstream Pool

28 Testing & Procedures 48 Hours Before Trigger NERFC Prediction Notice to Mariners 24 Hours Before Trigger FWOS Prediction Mobilization Safety Meeting Movable Dam Removal TRIGGER EXCEEDANCE

29 Conclusion The last 3 large storm events the Mohawk River has experienced have been tested using FWOS During all 3 simulations, flooding and damaged infrastructure could have been reduced if the Movable Dams were removed prior to the event

30 our people and our passion in every project Contact Information: Kenneth Avery, PE, CFM, D. WRE Emily Herbst, EIT

Environmental Protection (NJDEP) The Louis Berger Group, Inc.

Environmental Protection (NJDEP) The Louis Berger Group, Inc. Hydraulic Modeling for Preliminary Evaluation of Potential Flooding Impacts for Various Dredging, Capping and Armoring Scenarios of The Lower Passaic River Restoration Abdulai Fofanah, PE, D.WRE, CFM Murat

More information

Spring Forecast Based Operations, Folsom Dam, California

Spring Forecast Based Operations, Folsom Dam, California Spring Forecast Based Operations, Folsom Dam, California Paul E. Pugner, P.E. Chief, Water Management Section Sacramento District U.S. Army 1325 J Street, Room 1126 Sacramento, CA 95814-2922 Tel: (916)

More information

Presentation Overview

Presentation Overview Little Dry Creek Restoration Deep River Flood Risk Management Final Presentation to LCRBDC June 10, 2015 Presentation Overview Project Overview & Background Information Data Collection Model Development

More information

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 80 119 27 252 174.59 110 135 120 112 92 56 IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

More information

Hydrologic Calibration:

Hydrologic Calibration: Hydrologic Calibration: UPDATE OF EFFECTIVE HYDROLOGY FOR MARYS CREEK October 2010 Agenda Background Hydrologic model Calibrated rainfall Hydrologic calibration 100 year discharges, Existing Conditions

More information

Hydrology and Flooding

Hydrology and Flooding Hydrology and Flooding Background The 1996 flood Between February 4, 1996 and February 9, 1996 the Nehalem reporting station received 28.9 inches of rain. Approximately 14 inches fell in one 48 hour period.

More information

Sea Level Rise: Impacts, Adaptation and Information Gaps

Sea Level Rise: Impacts, Adaptation and Information Gaps University of New Orleans ScholarWorks@UNO Coastal Resilience Workshop Coastal Resilience Workshop 2015 Oct 28th, 10:00 AM - 12:00 PM Sea Level Rise: Impacts, Adaptation and Information Gaps Jeffrey R.

More information

FACT SHEET. 1/ The Recovery Act stipulates that Recovery Act funds for IWTF projects will not be cost shared.

FACT SHEET. 1/ The Recovery Act stipulates that Recovery Act funds for IWTF projects will not be cost shared. SUBJECT: Chickamauga Lock, Tennessee River, TN PROJECT DESCRIPTION: Chickamauga Lock is seven miles northeast of Chattanooga, TN, Hamilton County, Tennessee River mile 471. A new 110 x 600 lock will replace

More information

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp Geneva Dam Design of a Steep, Temporary, Riprap Ramp A Run-of of-river Dam Analysis for Geneva Dam Credit to: Yu-Chun Su, Ph.D., P.E., CFM David T. Williams. Ph.D., P.E, CFM Presentation Purpose History

More information

Stanley J. Woodcock, Michael Thiemann, and Larry E. Brazil Riverside Technology, inc., Fort Collins, Colorado

Stanley J. Woodcock, Michael Thiemann, and Larry E. Brazil Riverside Technology, inc., Fort Collins, Colorado 7.5 FRASER RIVER EXTENDED STREAMFLOW PREDICTION SYSTEM Stanley J. Woodcock, Michael Thiemann, and Larry E. Brazil Riverside Technology, inc., Fort Collins, Colorado Esther Vincent and Andy Pineda * Northern

More information

Fargo-Moorhead Metropolitan Area Flood Risk Management Project

Fargo-Moorhead Metropolitan Area Flood Risk Management Project Fargo-Moorhead Metropolitan Area Flood Risk Management Project 52ND ANNUAL IOWA ASCE ENVIRONMENTAL & WATER RESOURCES CONFERENCE 03 April 2014 Aaron W. Buesing Senior Hydraulic Engineer Corps of Engineers,

More information

Freight Street Development Strategy

Freight Street Development Strategy Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed

More information

Mark Twain Lake Water Control Manual Update

Mark Twain Lake Water Control Manual Update Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control US Army Corps of Engineers WATER CONTOL PLAN Overall Objectives Project Purposes Flood Control Hydroelectric Power

More information

OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT

OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 COLUMBIA RIVER BASIN 131 132 122 239 65 53 80 119 27 110 135 120 252 174.59

More information

Waterborne Transportation in Cold Regions Jon Zufelt, Ph.D., PE, CFM

Waterborne Transportation in Cold Regions Jon Zufelt, Ph.D., PE, CFM International Symposium on Systematic Approaches to Environmental Sustainability in Transportation August 2-5, 2015 Fairbanks, AK Waterborne Transportation in Cold Regions Jon Zufelt, Ph.D., PE, CFM 2015

More information

TECHNICAL MEMORANDUM Summerhill Rd Texarkana, Texas fax

TECHNICAL MEMORANDUM Summerhill Rd Texarkana, Texas fax TECHNICAL MEMORANDUM 5930 Summerhill Rd Texarkana, Texas 75503 903 838 8533 fax 903 832 4700 TO: Becky Griffith, Jon Jarvis FROM Spandana Tummuri SUBJECT: Technical Memorandum on IP Analysis PROJECT: Sulphur

More information

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E. \ Memorandum SSPEED Center at Rice University Department of Civil & Environmental Engineering 6100 Main MS-317 Houston, Texas 77005-1827 sspeed.rice.edu tel: 713-348-4977 To Andy Yung, P.E. CFM; Lane Lease,

More information

HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification

HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification OFMA 2017 Annual Conference September 19, 2017 Presented by: Jeff Doudrick, PE, ENV SP Project Manager HNTB Corporation Agenda Project

More information

LOWER BOISE RIVER INTERIM FEASIBILITY STUDY

LOWER BOISE RIVER INTERIM FEASIBILITY STUDY LOWER BOISE RIVER INTERIM FEASIBILITY STUDY Public Information Meetings June 29, 2010 June 30, 2010 July 1, 2010 US Army Corps of Engineers BUILDING STRONG Agenda Introductions / Meeting Objectives Greg

More information

Outlet Structure Modeling

Outlet Structure Modeling Watershed Modeling using HEC-RAS Outlet Structure Modeling Jeff Wickenkamp, P.E., CFM, D.WRE Patrick Lach, P.E. Hey and Associates, Inc. Water Resources, Wetlands and Ecology Outline of Presentation Why

More information

PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012

PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012 PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No. 1894 - SC SEPTEMBER 19, 2012 PARR AND FAIRFIELD LOCATIONS Lockhart Neal Shoals Monticello

More information

Herbert Hoover Dike (HHD), Florida Major Rehabilitation Project. The Challenges and Opportunities of Managing a Large Program NCER July 22, 2009

Herbert Hoover Dike (HHD), Florida Major Rehabilitation Project. The Challenges and Opportunities of Managing a Large Program NCER July 22, 2009 Herbert Hoover Dike (HHD), Florida Major Rehabilitation Project The Challenges and Opportunities of Managing a Large Program NCER July 22, 2009 Mike Rogalski, P.E. Chief, HHD Project Branch Presentation

More information

In Your House and in Your Yard, Watch for Water, Be on Guard

In Your House and in Your Yard, Watch for Water, Be on Guard In Your House and in Your Yard, Watch for Water, Be on Guard KEY TERMS Arroyo: A water-carved gully or a normally dry creek found in arid or desert regions. Dam: A barrier built across a river, stream

More information

Lower Ohio and Middle Mississippi Rivers Flood Management

Lower Ohio and Middle Mississippi Rivers Flood Management Lower Ohio and Middle Mississippi Rivers Flood Management Abstract The Great Lakes and Ohio River Division Water Management Team of the U.S. Army Corps of Engineers (USACE) is responsible for reducing

More information

Appendix B HYDROLOGIC AND HYDRAULIC MODELING

Appendix B HYDROLOGIC AND HYDRAULIC MODELING Appendix B HYDROLOGIC AND HYDRAULIC MODELING Memo To: George Hudson, PE and Jeff Robinson, PE, GEC, Inc. From: Stephen Sanborn, PE, Dynamic Solutions, LLC Date: 4/25/ /2014 CC: Chris Wallen, Vice President,

More information

PRINCESS ANNE DISTRICT STORMWATER PROJECTS

PRINCESS ANNE DISTRICT STORMWATER PROJECTS PRINCESS ANNE DISTRICT STORMWATER PROJECTS Topics o o o o o Sea Level Rise and the Southern Watersheds Ashville Park Sherwood Lakes Kingston Estates Drainage Operations & Maintenance in the Southern Watersheds

More information

ND Detention Project Development Update

ND Detention Project Development Update ND Detention Project Development Update Upper Red River Basin Halstad, MN = 8 Upstream Subwatersheds Fargo, ND = 3 Upstream Subwatersheds Halstad, MN Fargo, ND Wild Rice Otter Tail Bois de Sioux Upstream

More information

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR 1 INTRODUCTION 1.1 Project Description and Location Isabella Ocean Residences is a residential development to be constructed

More information

Chapter 4 "Hydrology"

Chapter 4 Hydrology Chapter 4 "Hydrology" Revised TxDOT Hydraulics Manual Jorge A. Millan, P.E., CFM TxDOT Design Division/Hydraulics 2012 Transportation Short Course October 17, 2012 Chapter 4 Sections 1 Hydrology s Role

More information

New York s Flood Response

New York s Flood Response Preparing for the next and ever-increasing 100-year storm event Post-storm Emergency Stream Response training opportunities August September 2011 August 28: Tropical Storm Irene September 7: Tropical Storm

More information

Synergy: Addressing Combined Sewer Overflows and Nitrogen

Synergy: Addressing Combined Sewer Overflows and Nitrogen District of Columbia Water and Sewer Authority Briefing on Synergy: Addressing Combined Sewer Overflows and Nitrogen to Anacostia Steering Committee August 27, 2009 1 Introduction Background Addressing

More information

Management of Water Control Systems

Management of Water Control Systems 10 October 2017 U.S. Army Corps of Engineers ENGINEERING AND DESIGN Management of Water Control Systems ENGINEER MANUAL THIS PAGE INTENTIONALLY LEFT BLANK DEPARTMENT OF THE ARMY *EM 1110-2-3600 U.S. Army

More information

DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety

DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety NAME OF DAM: Milltown Dam DEPDAMNO.: 15-146 LOCATION: Municipality: East Goshen Township

More information

SEDIMENT CHOREOGRAPHY

SEDIMENT CHOREOGRAPHY Global Reach. Local Benefit. SEDIMENT CHOREOGRAPHY 4/15/2016 Maritime and the Regional Economy The Port of Cleveland spurs job creation and helps our region compete globally by connecting local businesses

More information

Seepage Losses for the Rio Grande Project (Franklin Canal Case Study)

Seepage Losses for the Rio Grande Project (Franklin Canal Case Study) Seepage Losses for the Rio Grande Project (Franklin Canal Case Study) Zhuping Sheng, Ph.D., P.E. Yaqi Wanyan, M.S., EIT Luis S. Aristizabal Kadambari Reddy, M.S., EIT TAMU, Agricultural Research and Extension

More information

Note that the Server provides ArcGIS9 applications with Spatial Analyst and 3D Analyst extensions and ArcHydro tools.

Note that the Server provides ArcGIS9 applications with Spatial Analyst and 3D Analyst extensions and ArcHydro tools. Remote Software This document briefly presents the hydrological and hydraulic modeling software available on the University of Nice Server with Remote Desktop Connection. Note that the Server provides

More information

Appendix VI: Illustrative example

Appendix VI: Illustrative example Central Valley Hydrology Study (CVHS) Appendix VI: Illustrative example November 5, 2009 US Army Corps of Engineers, Sacramento District Prepared by: David Ford Consulting Engineers, Inc. Table of contents

More information

Flood Risk Management RD&T

Flood Risk Management RD&T 2014 RSM & EWN IPR and Working Meeting Flood Risk Management RD&T Bill Curtis Coastal and Hydraulics Laboratory July 22, 2014 US Army Corps of Engineers Get Involved in R&D! http://operations.usace.army.mil/flood.cfm

More information

PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013

PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013 PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No. 1894 - SC JANUARY 2013 PARR Relicensing Project PARR AND FAIRFIELD LOCATIONS FFPS PARR

More information

Bexar County Flood Warning System. Curtis Beitel, PE, CFM, Anthony Henry and Wayne Tschirhart, PE, PMP

Bexar County Flood Warning System. Curtis Beitel, PE, CFM, Anthony Henry and Wayne Tschirhart, PE, PMP Bexar County Flood Warning System Curtis Beitel, PE, CFM, Anthony Henry and Wayne Tschirhart, PE, PMP Software Overview 2 Processes Hydrometric DB Event Manager Automatic Low = Every 6 hours High = Every

More information

Great Lakes Update. Volume 189: 2013 January through June Summary

Great Lakes Update. Volume 189: 2013 January through June Summary Great Lakes Update Volume 189: 2013 January through June Summary The U.S. Army Corps of Engineers (USACE) tracks the water levels of each of the Great Lakes. This report highlights hydrologic conditions

More information

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 Phasing of Meetings April Meeting May Meeting October Review of Tax Day Storm Event and Immediate Actions Taken By City Review of Coordination

More information

POOL 11 ISLANDS SUNFISH LAKE AND MUD LAKE OPERATION AND MAINTENANCE MANUAL

POOL 11 ISLANDS SUNFISH LAKE AND MUD LAKE OPERATION AND MAINTENANCE MANUAL MISSISSIPPI RIVER POOL 11 ISLANDS SUNFISH LAKE AND MUD LAKE GRANT COUNTY, WISCONSIN AND DUBUQUE COUNTY, IOWA U.S. ARMY CORPS OF ENGINEERS ENVIRONMENTAL MANAGEMENT PROGRAM HABITAT REHABILITATION AND ENHANCEMENT

More information

Alternative Approaches to Water Resource System Simulation

Alternative Approaches to Water Resource System Simulation US Army Corps of Engineers Hydrologic Engineering Center Alternative Approaches to Water Resource System Simulation May 1972 Approved for Public Release. Distribution Unlimited. TP-32 REPORT DOCUMENTATION

More information

THE WATER IS RISING SCALABLE, RELIABLE, AND RELEVANT INFORMATION SUPPORTING FIRST RESPONDERS. May 3, 2017

THE WATER IS RISING SCALABLE, RELIABLE, AND RELEVANT INFORMATION SUPPORTING FIRST RESPONDERS. May 3, 2017 THE WATER IS RISING SCALABLE, RELIABLE, AND RELEVANT INFORMATION SUPPORTING FIRST RESPONDERS May 3, 2017 Association of State Floodplain Managers 2017 Conference Jim Keith, PE, CFM Walter P Moore Andy

More information

CLIMATE CHANGE ADAPTATION IN MASSACHUSETTS

CLIMATE CHANGE ADAPTATION IN MASSACHUSETTS CLIMATE CHANGE ADAPTATION IN MASSACHUSETTS Kathleen Baskin, Director of Water Policy June 3, 2013 MA Global Warming Solutions Act of 2008 Mitigation Reduce greenhouse gas emissions below 1990 levels by

More information

Suspended Sediment Discharges in Streams

Suspended Sediment Discharges in Streams US Army Corps of Engineers Hydrologic Engineering Center Suspended Sediment Discharges in Streams April 1969 Approved for Public Release. Distribution Unlimited. TP-19 REPORT DOCUMENTATION PAGE Form Approved

More information

Lake Houston Dam Comprehensive Evaluation of an Ambursen Dam

Lake Houston Dam Comprehensive Evaluation of an Ambursen Dam Lake Houston Dam Comprehensive Evaluation of an Ambursen Dam ASDSO September 10, 2008 John Rutledge - Freese & Nichols, Inc. Chuck Easton - Freese & Nichols, Inc. Janis Murphy - Freese & Nichols, Inc.

More information

Green River Diversion Rehabilitation

Green River Diversion Rehabilitation USDA Natural Resources Conservation Service-Utah Wallace F. Bennett Federal Building 125 S. State Street Room 4010 Salt Lake City, UT 84138-1100 Green River Diversion Rehabilitation National Environmental

More information

Hypothetical Flood Computation for a Stream System

Hypothetical Flood Computation for a Stream System US Army Corps of Engineers Hydrologic Engineering Center Hypothetical Flood Computation for a Stream System December 1968 Approved for Public Release. Distribution Unlimited. TP-12 REPORT DOCUMENTATION

More information

FY16 RSM IPR Portland District, Optimizing Fall Creek Reservoir Flush TMDL s, Stanford Gibson, Chris Nygaard, Jim Crain, Jarod Norton

FY16 RSM IPR Portland District, Optimizing Fall Creek Reservoir Flush TMDL s, Stanford Gibson, Chris Nygaard, Jim Crain, Jarod Norton Fall Creek Reservoir Fall Creek Dam is at river mile 7.2 on Fall Creek, a tributary of the Willamette River, about 20 miles southeast of Eugene, OR. Dam works in coordination with Lookout Point and Hills

More information

Mountain States Chapter International Erosion Control Association Conference

Mountain States Chapter International Erosion Control Association Conference Mountain States Chapter International Erosion Control Association Conference November 5, 2015 Ian Paton, P.E, CFM Wright Water Engineers, Inc. Eliot Wong P.E., CFM Contech Engineered Solutions Hayes Lenhart,

More information

Columbia River Basin Reservoir Operations

Columbia River Basin Reservoir Operations Columbia River Basin Reservoir Operations Future of Our Salmon Conference Portland, OR October 18, 2016 Pete Dickerson, P.E. USACE Northwestern Division US Army Corps of Engineers 2 Columbia River Basin!

More information

New Castle County, DE. Floodplain Regulations

New Castle County, DE. Floodplain Regulations New Castle County, DE Floodplain Regulations John J. Gysling, PE CFM Department of Land Use New Castle County, DE February 26, 2009 Today s Presentation Floodplain Protection and Uses Terms and Definitions

More information

OSAGE RIVER BASIN OPERATIONS WATER MANAGEMENT

OSAGE RIVER BASIN OPERATIONS WATER MANAGEMENT OSAGE RIVER BASIN OPERATIONS WATER MANAGEMENT An Overview of Basin Operations Water Management Section Hydrologic Engineering Branch Kansas City District Northwestern Division US Army Corps of Engineers

More information

Mike Jastremski, CFM Watershed Conservation Director

Mike Jastremski, CFM Watershed Conservation Director Planning for Flood Resilient and Fish Friendly Road-Stream Crossings in CT s Northwest Hills Mike Jastremski, CFM Watershed Conservation Director Presentation Outline Project area Climate threats Field

More information

Village of Winnetka Flood Risk Reduction Assessment. Christopher B. Burke Engineering, Ltd. (CBBEL) October 11, 2011

Village of Winnetka Flood Risk Reduction Assessment. Christopher B. Burke Engineering, Ltd. (CBBEL) October 11, 2011 Village of Winnetka Flood Risk Reduction Assessment October 11, 2011 Christopher B. Burke Engineering, Ltd. (CBBEL) Thomas T. Burke, Jr., PhD, PE David Buckley, PE, CFM Introduction The September 2008

More information

STONE OAK DAM: TO BREACH OR NOT TO BREACH, THAT IS THE QUESTION. TFMA Spring Conference 2013

STONE OAK DAM: TO BREACH OR NOT TO BREACH, THAT IS THE QUESTION. TFMA Spring Conference 2013 STONE OAK DAM: TO BREACH OR NOT TO BREACH, THAT IS THE QUESTION TFMA Spring Conference May 23, 2013T F M A Spring Conference 2013 INTRODUCTIONS ALYSHA GIRARD, P.E., CFM Storm Water Program Manager City

More information

Cokato Lake (86-263) Wright County. Hydrologic Investigation

Cokato Lake (86-263) Wright County. Hydrologic Investigation Cokato Lake (86-263) Wright County Hydrologic Investigation April 14, 2005 Cokato Lake (86-263) Wright County Hydrologic Investigation April 14, 2005 Problem Statement In recent years, heavy rainfall has

More information

America s Climate Choices Adaptation A Challenge to the Transportation Industry

America s Climate Choices Adaptation A Challenge to the Transportation Industry America s Climate Choices Adaptation A Challenge to the Transportation Industry November 3, 2010 TRB Webinar H. G. Schwartz, Jr. 1 Major Factors Affecting Climate 2 MITIGATION Measures to reduce Greenhouse

More information

Natural Hazards Mitigation Plan Kankakee County, Illinois Executive Summary

Natural Hazards Mitigation Plan Kankakee County, Illinois Executive Summary 1. Introduction Natural Hazards Mitigation Plan Kankakee County, Illinois Executive Summary Kankakee County s first Natural Hazards Mitigation Plan was adopted by the Kankakee County Board on October 11,

More information

United States Department of the Interior

United States Department of the Interior United States Department of the Interior FISH AND WILDLIFE SERVICE Red Bluff Fish & Wildlife Office 10950 Tyler Road, Red Bluff, California 96080 (530) 527-3043, FAX (530) 529-0292 July 20, 2015 To: Guy

More information

GEOMORPHIC EFECTIVENESS OF FLOODS ON LOWER TAPI RIVER BASIN USING 1-D HYDRODYNAMIC MODEL,HEC-RAS

GEOMORPHIC EFECTIVENESS OF FLOODS ON LOWER TAPI RIVER BASIN USING 1-D HYDRODYNAMIC MODEL,HEC-RAS GEOMORPHIC EFECTIVENESS OF FLOODS ON LOWER TAPI RIVER BASIN USING 1-D HYDRODYNAMIC MODEL,HEC-RAS Darshan Mehta 1, Raju Karkar 2, Lalji Ahir 3 Assistant Professor, CED, S.S.A.S.I.T, Surat, Gujarat, India

More information

1969 Western Judgment History and Application. January 7, 2011 Board of Public Utilities

1969 Western Judgment History and Application. January 7, 2011 Board of Public Utilities 1969 Western Judgment History and Application January 7, 2011 Board of Public Utilities Presentation Overview Overview of the Judgment Safe Yield Summary RPU Water Rights by Basin Judgment Overview Complaint

More information

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project IAFSM 2010 Annual Conference City of Rockford Keith Creek Greenway Flood Mitigation Project March 10, 2010 Introduction Problem Overview 1890 s Building of homes along Keith Creek 1920 s Home construction

More information

Creating a Flood Forecasting System for the San Diego River Watershed

Creating a Flood Forecasting System for the San Diego River Watershed Creating a Flood Forecasting System for the San Diego River Watershed Rand Allan County of San Diego Flood Control Martin J. Teal, P.E., P.H., D.WRE WEST Consultants inc. OUTLINE San Diego River Watershed

More information

SUMMARY OF HYDROLOGICAL SPECIALIST STUDY

SUMMARY OF HYDROLOGICAL SPECIALIST STUDY SUMMARY OF HYDROLOGICAL SPECIALIST STUDY The Government of the Republic of Mozambique (GOM) has received a grant from the Millennium Challenge Corporation (MCC), an innovative United States established

More information

Chehalis Basin Strategy Programmatic SEPA Draft EIS

Chehalis Basin Strategy Programmatic SEPA Draft EIS Chehalis Basin Strategy Programmatic SEPA Draft EIS History of Flooding I-5 closed in 1990, 1996, 2007, 2009 Five largest flood events occurred since 1986 2 History of Habitat Degradation Harvest has been

More information

OPERATION PLAN PERFORMANCE PLAN TEN MILE CREEK WATER PRESERVE AREA

OPERATION PLAN PERFORMANCE PLAN TEN MILE CREEK WATER PRESERVE AREA Revised 9 12 2011 to revise PE Certification page on Operation Plan and add PE Certification page to Performance Plan SOUTH FLORIDA WATER MANAGEMENT DISTRICT OPERATION PLAN PERFORMANCE PLAN TEN MILE CREEK

More information

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station City of St. Joseph, Missouri Hydraulic Analysis and Effluent Pump Station By Work Order No. 09-001 B&V Project 163509 May 20, 2010 Table of Contents 1.0 Executive Summary...1 2.0 Purpose of Study...2 3.0

More information

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY Draft Reformulation Public Information October 2016 US Army Corps of Engineers Presentation Outline Project Overview

More information

GIWW Brazos River Floodgates - Colorado River Locks System Feasibility Study

GIWW Brazos River Floodgates - Colorado River Locks System Feasibility Study GIWW Brazos River Floodgates - Colorado River Locks System Feasibility Study 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112

More information

Are You Ready for Risk and Uncertainty Analysis?

Are You Ready for Risk and Uncertainty Analysis? Are You Ready for Risk and Uncertainty Analysis? Presented to: Illinois Association for Floodplain And Stormwater Management Presented by: David T. Williams, Ph.D., P.E., P.H., CFM. D.WRE Senior Technical

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Flood management strategies for the Rivers Rhine and Meuse in The Netherlands

Flood management strategies for the Rivers Rhine and Meuse in The Netherlands Destructive Water: Water-Caused Natural Disasters, their Abatement and Control (Proceedings of the Conference held at Anaheim, California, June 1996). IAHS Publ. no. 239, 1997. 371 Flood management strategies

More information

Appendix J Hydrology and Hydraulics

Appendix J Hydrology and Hydraulics Appendix J Hydrology and Hydraulics Marsh Lake Dam Ecosystems Restoration Feasibility Study Hydraulics & Hydrology Appendix January 2011 Contents List of Figures iii List of Tables iii I. General 1 II.

More information

Measured Seepage of the Main Canal Brownsville Irrigation District

Measured Seepage of the Main Canal Brownsville Irrigation District COLLEGE OF AGRICULTURE AND LIFE SCIENCES TR-372 2011 Measured Seepage of the Main Canal Brownsville Irrigation District By: Eric Leigh, Extension Associate and Guy Fipps, P.E., Extension Agricultural Engineer

More information

Blanche Park Reservoir Decision Notice and Finding of No Significant Impact

Blanche Park Reservoir Decision Notice and Finding of No Significant Impact Blanche Park Reservoir Decision Notice and Finding of No Significant Impact U.S. Forest Service Grand Mesa, Uncompahgre, and Gunnison National Forests Delta County, Colorado INTRODUCTION The Grand Mesa

More information

CORPS OF ENGINEERS. Water Resource Activities in the ACF Basin May 18, 2007

CORPS OF ENGINEERS. Water Resource Activities in the ACF Basin May 18, 2007 CORPS OF ENGINEERS Water Resource Activities in the ACF Basin May 18, 2007 Mobile District River Basins Water Management Staff Supervisory Hydraulic Engineer 4 Hydraulic Engineers 1 Engineer/Co-op (Vacant)

More information

Introduction. General Description

Introduction. General Description Introduction General Description The 3-Gorges project is a vitally important and backbone project in the development and harnessing of the Yangtze River (Changjiang River). The dam site is situated at

More information

Chapter 11 Culverts and Bridges

Chapter 11 Culverts and Bridges Chapter 11 Culverts and Bridges Contents 1.0 Introduction... 1 2.0 General Design... 1 2.1 Design Criteria... 1 2.2 Design Flows... 1 2.3 Permitting and Regulations... 1 2.4 Aesthetics and Safety... 2

More information

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08 (b) Discuss in brief shaft spillway with neat sketches. Marks 04 OR Q (2) Explain in brief USBR stilling basin. Marks 08 Stilling Basins The basins are usually provided with special appurtenances including

More information

III. INVENTORY OF EXISTING FACILITIES

III. INVENTORY OF EXISTING FACILITIES III. INVENTORY OF EXISTING FACILITIES Within the Growth Management Boundary, the existing storm drainage facilities are largely associated with development that has historically occurred in the ten drainage

More information

SECTION 7.0 PROJECT FEASIBILITY, ENGINEER S RECOMMENDATION AND DESIGN ISSUES NEEDING RESOLUTION

SECTION 7.0 PROJECT FEASIBILITY, ENGINEER S RECOMMENDATION AND DESIGN ISSUES NEEDING RESOLUTION SECTION 7.0 PROJECT FEASIBILITY, ENGINEER S RECOMMENDATION AND DESIGN ISSUES NEEDING RESOLUTION 7.1 PROJECT FEASIBILITY The determination of project feasibility is based upon several criteria established

More information

CITY OF KIMBERLEY HYDROLOGICAL & HYDRAULIC ASSESSMENT

CITY OF KIMBERLEY HYDROLOGICAL & HYDRAULIC ASSESSMENT HYDROLOGICAL & HYDRAULIC ASSESSMENT ISSUED FOR USE January 31, 2012 FILE: 2011-015 LACAS CONSULTANTS INC. CONSULTING ENGINEERS & HYDROLOGICAL SPECIALISTS, SINCE 1991 Suite 200, 1311 Howe Street, Vancouver,

More information

LITTLE ROCK DISTRICT CORPS OF ENGINEERS WATER SUPPLY

LITTLE ROCK DISTRICT CORPS OF ENGINEERS WATER SUPPLY US Army Corps of Engineers LITTLE ROCK DISTRICT CORPS OF ENGINEERS WATER SUPPLY One Corps Serving The Army and the Nation Storage at Existing Lakes Basic Authority Water Supply Act of 1958 The Corps can

More information

Modeling Quarterly Review Meeting January 14, Bruce Michael Maryland Department of Natural Resources

Modeling Quarterly Review Meeting January 14, Bruce Michael Maryland Department of Natural Resources Ongoing Conowingo Dam / Lower Susquehanna River Studies Modeling Quarterly Review Meeting January 14, 2015 Bruce Michael Maryland Department of Natural Resources Draft Lower Susquehanna River Watershed

More information

Chehalis Basin Strategy Causes of Extreme Flooding. October 11, 2016 Policy Workshop

Chehalis Basin Strategy Causes of Extreme Flooding. October 11, 2016 Policy Workshop Chehalis Basin Strategy Causes of Extreme Flooding October 11, 2016 Policy Workshop Agenda Hydrology o Precipitation o Flow Climate Change Effects Land Use o Channel straightening and incision o Riparian

More information

Climate Change Impacts on Joint Riverine and Coastal Flooding on Calleguas Creek in Ventura County, CA

Climate Change Impacts on Joint Riverine and Coastal Flooding on Calleguas Creek in Ventura County, CA Climate Change Impacts on Joint Riverine and Coastal Flooding on Calleguas Creek in Ventura County, CA James Gregory, James Jackson (ESA) Lily Verdone (TNC) FMA, September 8, 2016 Project Overview Coastal

More information

PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS

PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS 1 255 255 255 237 237 237 217 217 217 200 200 200 Part 1: Summary of Floodplain Analysis for Los 0 Angeles 163 131 River239 110 112

More information

Some aspects of the sediment transit on the Mekong river in relation with hydropower development

Some aspects of the sediment transit on the Mekong river in relation with hydropower development Some aspects of the sediment transit on the Mekong river in relation with hydropower development Daniel Loudière Société Hydrotechnique de France A presentation in three parts - the situation when starting

More information

Missouri River Basin Water Management

Missouri River Basin Water Management Missouri River Basin Water Management Spring 2011 Public Meetings April 12 th 11:00 a.m. Nebraska City, NE April 12 th 7:00 p.m. Fort Peck, MT April 13 th 1:00 p.m. Bismarck, ND April 13 th 7:00 p.m. Pierre,

More information

Risk-Based Analysis for Corps Flood Project Studies A Status Report

Risk-Based Analysis for Corps Flood Project Studies A Status Report US Army Corps of Engineers Hydrologic Engineering Center Risk-Based Analysis for Corps Flood Project Studies A Status Report June 1996 Approved for Public Release. Distribution Unlimited. TP-153 REPORT

More information

ANNUAL PROGRESS REPORT FOR 2014 ROGUE RIVER SPRING CHINOOK SALMON CONSERVATION PLAN ROGUE WATERSHED DISTRICT OREGON DEPARTMENT OF FISH AND WILDLIFE

ANNUAL PROGRESS REPORT FOR 2014 ROGUE RIVER SPRING CHINOOK SALMON CONSERVATION PLAN ROGUE WATERSHED DISTRICT OREGON DEPARTMENT OF FISH AND WILDLIFE ANNUAL PROGRESS REPORT FOR 2014 ROGUE RIVER SPRING CHINOOK SALMON CONSERVATION PLAN ROGUE WATERSHED DISTRICT OREGON DEPARTMENT OF FISH AND WILDLIFE INTRODUCTION In September of 2007, the Oregon Fish and

More information

RAINFALL-RUNOFF STUDY FOR SINGAPORE RIVER CATCHMENT

RAINFALL-RUNOFF STUDY FOR SINGAPORE RIVER CATCHMENT 10 th International Conference on Hydroinformatics HIC 2012, Hamburg, GERMANY RAINFALL-RUNOFF STUDY FOR SINGAPORE RIVER CATCHMENT CHI DUNG DOAN (1)(3), JIANDONG LIU (1), SHIE-YUI LIONG (1), ADRI VERWEY

More information