1 WAVERLY FLOODPLAIN BACKGROUND INFORMATION Who designates the floodplains in Waverly? The Federal Emergency Management Agency (FEMA) is responsible for delineating floodplains. The floodplain FEMA uses for regulatory purposes is based on the 100-year flood event. This is the event that has a one in one hundred, or one percent, chance of occurring every year.. When was the last time the floodplain has been changed? In 2008 Waverly was notified that the floodplain would be remapped which would result in many neighborhoods that were not previously identified as being in the floodplain being designated in the new 100 year floodplain. Actual changes to the FIRM map were made in both 2011 and Why is it in Waverly s best interest to control flooding and reduce the 100 year floodplain? Floodwater will damage our homes and businesses, interrupt transportation and emergency services, damage roads, bridges & utilities, cause injuries and/or loss of life, temporarily close businesses, and in many cases require home and business owner to buy costly flood insurance. Property values and economic development potential can also be adversely impacted if homes and businesses are located in the regulatory floodplain. What areas in Waverly are most susceptible to flooding? The areas in Waverly susceptible to flooding are along Salt Creek both northwest and north of Waverly and along Ash Hollow on the west side of town. Street flooding can occur at about any location if intense heavy rain occurs, although those areas are not necessarily in the FEMA-designated 100 year floodplain. What can be done to reduce flooding and the area impacted by the 100 year flood? The City and NRD hired HWS/Benesch in 2009 to complete a watershed master plan for the City. The plan identified many projects that can reduce flooding. The plan recommended building a dam south of town on Ash Hollow to reduce the flooding and the 100 year floodplain.

2 Dam Frequently Asked Questions November 21, Why do we need a dam? The 2010 Watershed Master Plan identified a dry dam along Ash Hollow to be the best flood reduction alternative to reduce the peak flow rates along Ash Hollow. 2. How often does FEMA update the Waverly floodplain maps? There were almost 10 years between the last two publications of floodplain maps. The previous regulatory Flood Insurance Rate Map (FIRM) was published in September 2001 with the most recent updates being completed in February 2011 and April How many properties will the dam take out of the floodplain and floodway? Based on the best available information, there will be 94 structures that will be taken out of the floodplain. For most structures, the entire property will also be removed from the floodplain. For some structures, portions of the properties will remain in the floodplain. 4. Where would it be built? The proposed dry dam would be constructed along Ash Hollow Creek, south of Interstate 80, just upstream of McKelvie Road. 5. What is the timeline for it being built? The timeline will vary depending on funding partners, permitting, and land acquisition. Below is a tentative timeline, with the assumption that the process were to start in January 2015: Funding Requests, Final Design & Permitting Land Acquisition 2017 Construction 6 Month Duration 6. How much will the dam cost? The Engineers Opinion of Probable Development Costs identified the project costs around $2,785,000 in 2012 dollars. 7. How will the City pay for it? With revenue collected from the city sales tax.

3 8. How much does flood insurance cost? It varies depending on whether the property is residential or non-residential, or a preferred risk policy. The only way to get a correct rating for an individual property is to talk to a qualified insurance agent. 9. Will the City purchase the land or acquire easements? There will be approximately 30 acres of land for the dam embankment and spillway and another 111 acre flood pool area that easements will need to be acquired. 10. How many acres are needed for the dam? Approximately 30 acres for the dam embankment and spillway. 11. How many of the acres will be farmed? All of the 111 acres within the flood pool can be farmed. The 30 acres of the dam embankment and spillway would not be farmed. 12. Are there other options instead of the dam? There were two options identified in the 2010 Watershed Master Plan which included the reduction of peak flows with the construction of a dam or increasing the channel capacity. To increase channel capacity would require widening of the Ash Hollow channel along with various bridges throughout town. The overall cost opinion to increase channel capacity was approximately 2 to 3 times that of the flood reduction project. 13. How were these homes able to be built in the floodplain? The homes that are in the current floodplain were constructed prior to the floodplain remapping. So they were not in the regulatory floodplain at the time of construction. 14. Do the landowners want to sell the land and if not what happens? The City will work with the landowners 15. Who owns the land? The proposed dam site would be on four different parcels. The parcel numbers and property owners are: (Douglas W. Althouse), (Douglas W. Althouse), (Darlene Althouse), and (Clarence A. Althouse Jr. Trustee).

4 16. Could it ever be a wet dam and/or a permanent pool? Per the request of the current land owner, the structure will not be designed to easily accommodate a future wet dam. Why wouldn t you design and construct a wet dam? Per the request of the land owner, the dam will be designed as a dry dam only. 17. Who will maintain the dam and what are the expected costs? The dam will be maintained by the City or another entity through an inter-local agreement. Based on the Nebraska Resource Development Fund Guidelines, it was assumed that the Operation Maintenance and Rehabilitation costs would be 0.75% of Construction Costs or approximate $11,000 annually. 18. Will the land owner(s) be paid for crop loss after a flood? Crop loss due to flooding is taken into account as part of the appraisal process. Land owners would be compensated for any potential reduction in use of their land at the time of land acquisition. How many acres would be under water during the 100 yr. flood? The 100-year flood pool is approximately 117 acres (111 acre easement area as well as 6 acres along the dam embankment). 19. Were other locations for a dam considered? There were a total of four locations looked at for the centerline of the dam with the optimum location selected based on environmental impact, cost of structure, permanent depth of water within the channel banks, flood pool elevation in relation to county roads, and ability to meet flood reduction goals. 20. How long will land/crops be under water during the 100 yr. flood? For a 100-year 24 hour storm event, the dry dam facility would reach peak storage in approximately 24 hours and then draw down over approximately 67 hours. 21. Who will own the DAM? This hasn t been decided yet. It will be determined as part of the Responsibilities package that will be included in the Interlocal Agreement. 22. Was the TR-55 methodology used to determine peak flows, in accordance with FEMA standards and practices? In this case, TR-55 methodology was used in the modeling performed for the watershed for both existing and proposed conditions. It is important to note, TR-55 is only one of dozens of acceptable methodologies for hydrology submittals to FEMA. TR-55 is suitable for this analysis because conservation of volume is achieved with TR-55.

5 When you are routing flow hydrographs through reservoirs conservation of volume is important. 23. Is there a gauge on the watershed? As with the vast majority of watersheds we study, there is no gauge on the watershed. If a gauge was available, and the gauge records extended over a reasonable time period, say 20 years or so, we would prefer to use a gauge. Since we don t have gauge records, we use the TR-55 methodology to compute peak flows for the watershed. We can compare our results to similar watersheds in the region that do have a gauge. 24. Was the dam on watershed time of concentration taken into account? Yes. Detailed modeling was performed to determine the impact of the dam on watershed runoff, including an analysis of the changes in peak flows and timing of runoff. This information is provided in the Preliminary Design Summary Report. Detailed HEC-HMS models were developed to perform the analyses. 25. Was the Stevens Creek overflow accounted for when OA computed runoff for the Ash Hollow watershed? Using the FEMA maps and information, there is no evidence that Steven s Creek overflows would be a factor in determining Ash Hollow runoff. Steven s Creek flows into Salt Creek near 84 th and Cornhusker. The Steven s Creek overflow overtops Cornhusker highway just west of 98 th Street and flows north. There, Steven s Creek overflows either flow overland to the northwest, into Salt Creek, or flow overland to the northeast and overtop I-80 in the sag located west of the Waverly interchange (elevation ~1126 ft, where 104 th Street would intersect the Interstate if it extended that far north). In several locations, including the Novartis plant on the south side of Cornhusker between 98 th and 112 th, high ground prevents flows from continuing northeast towards the Ash Hollow watershed. The high point of Cornhusker Highway near Novartis is at elevation ~1134, which is ~6 ft higher than the road at the overflow crossing to the west. The flood elevation on the north side of Cornhusker and southwest of I-80 is 1126 ft. As you travel northeast from the interchange, the high point of Cornhusker, nearly the auction house is ~1129 ft. Steven s Creek overflows will rejoin the Salt Creek floodplain before reaching the Ash Hollow watershed. 26. What caused the flows to increase so much from 1981 to 2008? When FEMA restudied the watershed in 2008, they computed flows that were 2-3 times higher than the original study in This is not because of any changes to the watershed upstream of Waverly. This is entirely because the original flows FEMA computed were considerably lower than they should have been. The watershed has

6 now been restudied by the FEMA contractor in 2008, Benesch shortly after that, and now Olsson. I believe the results of the three analyses are consistent (though FEMA reported the wrong values in the FIS) and the flows used for the watershed today are accurate and reasonable. 27. Did the September 30 th and October 1 st rain approach a 2 year level of peak intensity (inches per hour of rain)? The rain gauge records for the region clearly indicate that the rainfall event of September 30 th and October 1 st did not even approach a 2-year level of peak intensity (inches per hour of rain). The peak intensity recorded for the Havelock gauge (nearest hourly gauge I ve found so far) is less than 1 inch per hour. The peak intensity in a 100- year design storm is 3.5 inches per hour. We received a lot of rain; but, it was spread out over many hours. We were very fortunate. A shorter, much more intense rainfall is possible and could cause significant flooding throughout the Ash Hollow watershed. The 100-year design storm is a 24-hour storm; but, it is not uniform over the 24-hours. The peak hour has 3.5 inches of rainfall. The peak two hour period has 4.4 inches and the peak three hour period has almost 5 inches. Approximately 70 percent of the total rainfall in a 100-year design event falls within three hours. The rainfall during the peak three hours for the recent storm was less than 2.5 inches, which is between a 2- and a 5-year event. I provided copies of the gauge information last night. 28. How do we know if FEMA will agree if the proposed dam will fix the problem and take all these structures out of the floodplain and if so, can we get it in writing? Several people noted that we should get it in writing from FEMA that this will fix the problem before we do any project. We did get it in writing. We have an approved CLOMR from FEMA (Case No R) that says in writing that the floodplain maps can be changed as we showed them on our proposed conditions map, if we build the dam according to the concept design plans. They also asked what would stop FEMA from coming in and changing the floodplain back again. We have all the detailed models and information necessary to prevent FEMA from doing this. Appealing any future map changes from FEMA is something we can and will do. The CLOMR we obtained from FEMA is based on a more conservative analysis than the original FEMA flood maps and future expansion of the floodplain due to restudy is highly unlikely. 29. If we build detention cells along Ash Hollow would we need a dam? Other locations along Ash Hollow were investigated as locations to place a small detention cell but due to the flat nature of the Ash Hollow watershed north of I-80, there is not enough area to construct a single detention cell or a series of detention cells that would provide a significant reduction in peak flows.

7 30. Does the change from a wet pool design to a dry dam reduce the anticipated construction costs and if so by how much? The cost should be decreased slightly by going from a permanent pool to a dry dam. The permanent pool area will not have to be graded and shaped now since there won t be a permanent pool area. The excavation/embankment would be reduced by approximately 3,000 cubic yards. Also, the principal spillway is now just a straight tube and it will no longer need a multi-stage riser structure on the inlet. Thus the 30 outlet pipe would be approximately 20 shorter. The projected cost savings is approximately $15,000. As for the change from a permanent pool to a dry dam, a new CLOMR would only be required if the change resulted in a significant difference in downstream flows for the 100 year or 500 year event. FEMA only cares about the peak flows and that the dam is designed to meet standards. The flows from the dam (permanent pool or not) are limited to what the 30 principal spillway pipe can discharge. The discharges do not change significantly going from a wet dam to a dry dam. The plans for the dam have changed, but it will not affect our future Letter of Map Revision (LOMR) application. 31. If the dam is constructed will all 94 structures be removed from the floodplain? If the dam is constructed, yes, based on the data we have, the 94 structures will be out of the floodplain (Salt Creek backwater and Ash Hollow floodplain). Based on the best data we have available, there are 94 structures that would be damaged if a 100 year event were to occur today. This project would eliminate those damages in the event of a 100 year storm. From what Olsson Associates has mapped, the Salt Creek backwater does not damage any structure. There are industrial properties without structures that benefit also. There is a large open area north of HWY 6 and west of Canongate that also benefits. There are so many ways to look at the data, but the bottom line is, based on the data available, none of the structures along Ash Hollow would be in a regulatory floodplain if the dam project were constructed. Properties and portions of the properties would be in the floodplain, just not structures. 32. What is a CLOMR? A Conditional Letter of Map Revision (CLOMR) is FEMA s comment on a proposed project that would, upon construction, affect the hydrologic or hydraulic characteristics of a flooding source and thus result in the modification of the existing regulatory floodway, the effective Base Flood Elevations (BFEs), or the Special Flood Hazard Area

8 (SFHA). The letter does not revise an effective NFIP map, it indicates whether the project, if built as proposed, would be recognized by FEMA.

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

FEMA/USACE Coordination Plan

FEMA/USACE Coordination Plan FEMA/USACE Coordination Plan Project: Fargo-Moorhead Metropolitan Feasibility Study ND Diversion Channel with upstream staging Federal Plan (Authorized WRRDA 2014) Project Design: Project Reach: U.S. Army

More information

Ash Hollow Dry Dam Table of Contents

Ash Hollow Dry Dam Table of Contents Ash Hollow Dry Dam Table of Contents Page No. Executive Summary... ES 1 SECTION 1 Project Background & Purpose... 1 1.1 Introduction... 1 1.2 Purpose... 1 Figure 1-1 FEMA Regulatory Floodplain... 2 Figure

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 HUFFAKER ROAD (PLANT HAMMOND) PRIVATE INDUSTRIAL LANDFILL (HUFFAKER ROAD LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Storm Water System Improvements

Storm Water System Improvements IV Storm Water System Improvements A. General The purpose of this Section is to establish standard principles and practices for the design and construction of storm drainage facilities within the City

More information

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements 4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for

More information

Project Drainage Report

Project Drainage Report Design Manual Chapter 2 - Stormwater 2A - General Information 2A-4 Project Drainage Report A. Purpose The purpose of the project drainage report is to identify and propose specific solutions to stormwater

More information

STORM DRAINAGE DESIGN MANUAL

STORM DRAINAGE DESIGN MANUAL Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated

More information

What to Expect When You re Expecting A LOMR. Mark Seidelmann, PE, GISP ASFPM 2015, Atlanta Georgia

What to Expect When You re Expecting A LOMR. Mark Seidelmann, PE, GISP ASFPM 2015, Atlanta Georgia What to Expect When You re Expecting A LOMR Mark Seidelmann, PE, GISP ASFPM 2015, Atlanta Georgia Thursday, June 4 th, 2015 Agenda 1 Why File a Letter Of Map Revision (LOMR)? 2 Basic Requirements and Common

More information

3.3 Acceptable Downstream Conditions

3.3 Acceptable Downstream Conditions iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and

More information

acquiring, managing, and disposing of federal lands and facilities;

acquiring, managing, and disposing of federal lands and facilities; 2.2.1 HYDROLOGY AND FLOODPLAIN This section discusses and analyzes the surface hydrology and water quality characteristics of the project. The information provided in this section is based on the Preliminary

More information

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine Bridge Replacement Project Preliminary Hydraulic Study Lincoln, California BRLS-5089 (021) BRIDGE 19C 0059 Mcbean Park Drive at Auburn Ravine Prepared By: Prepared By: Date 11/25/2014 Thomas S. Plummer

More information

2. DEFINITIONS. American Association of State Highway and Transportation Officials.

2. DEFINITIONS. American Association of State Highway and Transportation Officials. 2. DEFINITIONS 2.010 Definitions [See Amendment 2] In addition to words and terms that may be defined elsewhere in this manual, the following words and terms shall have the meanings defined below: AASHTO:

More information

4. Present Activities and Roles

4. Present Activities and Roles 4. Present Activities and Roles The present missions, authorities, activities and roles of the various agencies involved with flood protection, floodplain management and flood-damage reduction are identified

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Upper Lightning Lake Water Level Management Environmental Assessment Worksheet. Attachment D Design Report for Upper Lightning Lake

Upper Lightning Lake Water Level Management Environmental Assessment Worksheet. Attachment D Design Report for Upper Lightning Lake Upper Lightning Lake Water Level Management Environmental Assessment Worksheet Attachment D Design Report for Upper Lightning Lake DESIGN REPORT for Upper Lightning Lake Wetland Enhancement MN-332-2 I

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or

More information

DRAINAGE BASICS Common Terminology & Reference Tools Drainage Components Determine Existing Conditions Calculate Development Requirements

DRAINAGE BASICS Common Terminology & Reference Tools Drainage Components Determine Existing Conditions Calculate Development Requirements DRAINAGE BASICS 1 Common Terminology & Reference Tools Drainage Components Determine Existing Conditions Calculate Development Requirements 2 Common Terminology & Useful Tools CFS= Cubic Feet per Second-

More information

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 Phasing of Meetings April Meeting May Meeting October Review of Tax Day Storm Event and Immediate Actions Taken By City Review of Coordination

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part 257.82 PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part

More information

DRAINAGE STUDY CROWS LANDING INDUSTRIAL BUSINESS PARK. Stanislaus County. Prepared by:

DRAINAGE STUDY CROWS LANDING INDUSTRIAL BUSINESS PARK. Stanislaus County. Prepared by: DRAINAGE STUDY FOR CROWS LANDING INDUSTRIAL BUSINESS PARK Stanislaus County Prepared by: March, 2017 Revised November, 2017 Table of Contents EXECUTIVE SUMMARY... 1 1. INTRODUCTION... 2 2. HYDROLOGY...

More information

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

LAKE COUNTY HYDROLOGY DESIGN STANDARDS LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide

More information

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228 Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA 30534 (706) 344-3500 x 42228 DAWSON COUNTY STORM WATER REVIEW CHECKLIST Project Name: Property Address: Engineer: Fax #/Email: Date:

More information

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: 194 Muir Woods Ln Project ID Number: 216-2 Problem: At 194 Muir Woods Lane, nearly two acres of watershed flow through the

More information

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part

More information

Drainage Report. New Braunfels Municipal Airport. Master Plan Update 2005

Drainage Report. New Braunfels Municipal Airport. Master Plan Update 2005 Drainage Report Master Plan Update 2005 General The Texas Department of Transportation (TxDOT), Aviation Division, retained the consulting engineering team of Parkhill, Smith & Cooper, Inc. (PSC), to prepare

More information

Engineering Report Preliminary Floodplain Study. Executive Summary

Engineering Report Preliminary Floodplain Study. Executive Summary Executive Summary Engineering Report Preliminary Floodplain Study The Federal Emergency Management Agency (FEMA) has updated the Flood Insurance Rate Maps (FIRM) for Finney County, including the City of

More information

FINDINGS: Olsson used a three-step analysis strategy to develop a benefit cost ratio that would indicate the relative feasibility of this project.

FINDINGS: Olsson used a three-step analysis strategy to develop a benefit cost ratio that would indicate the relative feasibility of this project. EXECUTIVE SUMMARY FINDINGS: Based on the results of this feasibility study, the Platte Republican Diversion Project would be cost-effective. With minimal improvements to the channel, and the existing bridge

More information

Watersheds, Hydrology and Flooding

Watersheds, Hydrology and Flooding Watersheds, Hydrology and Flooding Greg Karlovits, P.E., CFM Hydrologist US Army Corps of Engineers Rock Island District US Army Corps of Engineers Outline of Topics Before lunch: Watersheds and basics

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

DICKINSON BAYOU WATERSHED STEERING COMMITTEE FINAL MEMBER CRITERIA COMPARISON

DICKINSON BAYOU WATERSHED STEERING COMMITTEE FINAL MEMBER CRITERIA COMPARISON DICKINSON BAYOU WATERSHED STEERING COMMITTEE FINAL MEMBER CRITERIA COMPARISON May 25, 2006 INTRODUCTION The Dickinson Bayou Watershed covers approximately 95.5 square miles and stretches from western Brazoria

More information

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Gregory J Daviero, PhD, PE, Principal Kevin Ruswick, PE, CFM, Associate May 2, 2014 Schnabel Engineering

More information

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project IAFSM 2010 Annual Conference City of Rockford Keith Creek Greenway Flood Mitigation Project March 10, 2010 Introduction Problem Overview 1890 s Building of homes along Keith Creek 1920 s Home construction

More information

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements 4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for

More information

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Hydrology Study Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Prepared for San Mateo Real Estate & Construction March 9, 21 Rev. 1 11-8-211 Rev.

More information

SECTION IV WATERSHED TECHNICAL ANALYSIS

SECTION IV WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling SECTION IV WATERSHED TECHNICAL ANALYSIS An initial step in the preparation of this stormwater management plan was the selection of a stormwater simulation model to be utilized. It

More information

The prioritization list along with the estimated probable construction cost and future cost index is shown in Table 1.

The prioritization list along with the estimated probable construction cost and future cost index is shown in Table 1. EXECUTIVE SUMMARY To address flooding concerns and assess costs of potential capital improvement projects associated with flooding in the downtown Town Center Area Plan (TCAP), the Town of Cary commissioned

More information

Traffic Impact Analysis (TIA) POLICY

Traffic Impact Analysis (TIA) POLICY Ascension Parish Planning Commission Traffic Impact Analysis (TIA) POLICY This policy establishes requirements for studies that provide information on traffic projected to be generated by all proposed

More information

Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South

Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Fork Dead Horse Slough in the, California Draft Location

More information

The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016

The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016 The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016 I. Purpose The purpose of this policy is to address home and property drainage issues relating to stormwater

More information

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows:

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows: UNION PACIFIC RAILROAD SCOPE OF HYDROLOGIC/HYDRAULIC DESIGN ENGINEERING AND PERMITTING SERVICES FOR SIZING WATERWAY OPENINGS AT NEW AND REPLACEMENT STRICTURES These flood passage criteria were developed

More information

WinTR-55 Small Watershed Hydrology

WinTR-55 Small Watershed Hydrology WinTR-55 Small Watershed Hydrology Intermediate WinTR-55 Training Modeling Watersheds with Structures SEE NOTES AT CLASS EXERCISE #4. 1 Course Outline Overview Review of Hydrology Terms Modeling Single

More information

MIDAS CREEK PROJECT. FINAL DESIGN REPORT SKR Hydrotech 4/11/2012

MIDAS CREEK PROJECT. FINAL DESIGN REPORT SKR Hydrotech 4/11/2012 2012 MIDAS CREEK PROJECT FINAL DESIGN REPORT SKR Hydrotech 4/11/2012 Executive Summary... 1 Section 1 Introduction... 1 Background Information... 1 Purpose of Study... 1 Scope of Work... 1 Section 2 Description

More information

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: Essex Point Subdivision/Sellenriek Retention Project ID Number: 2-A Problem: The watershed above the Essex Point Subdivision

More information

CHAPTER 3 FLOOD RELATED STUDIES

CHAPTER 3 FLOOD RELATED STUDIES CHAPTER 3 FLOOD RELATED STUDIES Although the area has experienced regular flooding there have been few formal flood studies until more recently. There are a number of water quality studies in the basins.

More information

5/25/2017. Overview. Project Background Information. Project Background Information Modeling Approach Model Development Results Next Steps

5/25/2017. Overview. Project Background Information. Project Background Information Modeling Approach Model Development Results Next Steps City of Corpus Christi Downtown 2D Mapping Effort Brandon Hilbrich, PE, CFM Jake Fisher, PE, CFM Curtis Beitel, PE, CFM 2016 HDR, Inc., all rights reserved. Overview Project Background Information Modeling

More information

INITIAL HAZARD POTENTIAL CLASSIFICATION ASSESSMENT REPORT

INITIAL HAZARD POTENTIAL CLASSIFICATION ASSESSMENT REPORT INITIAL HAZARD POTENTIAL CLASSIFICATION ASSESSMENT REPORT Lower AQC Impoundment Kansas City Power & Light Company La Cygne Generating Station File No. 27216294.00 Prepared by: SCS ENGINEERS 7311 West 130th

More information

APPENDIX A. Hydraulic Investigations: Cascade Mall at Burlington

APPENDIX A. Hydraulic Investigations: Cascade Mall at Burlington APPENDIX A m SUMMARY REPORT FOR E.I.S. Hydraulic Investigations: Cascade Mall at Burlington July 12, 1982 John E. Norman, P.E. 14779 Northeast 32nd, #A201 Bellevue, WA 98007 (206) 882-1767 92 General A

More information

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY Project #08223 CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY PREPARED FOR: City of Crystal Lake 100 West Woodstock Street Crystal Lake, Illinois 60014 FEBRUARY 11, 2009 26575 W. COMMERCE DRIVE, SUITE 601,

More information

Modernization of High Hazard Dams in Austin, Texas. TFMA Spring Conference May 23, 2007

Modernization of High Hazard Dams in Austin, Texas. TFMA Spring Conference May 23, 2007 Modernization of High Hazard Dams in Austin, Texas TFMA Spring Conference May 23, 2007 Modernization of High Hazard Dams in Austin, Texas City of Austin Glen Taffinder, P.E. Stormwater Pond Dam Safety

More information

Airport Master Plan. Floodplain Report. Prepared by: Prepared for: Illinois Department of Transportation

Airport Master Plan. Floodplain Report. Prepared by: Prepared for: Illinois Department of Transportation Airport Master Plan Floodplain Report Prepared by: Prepared for: Illinois Department of Transportation July 10, 2013 Table of Contents Topic Page Number Cover Sheet... Cover Sheet Table of Contents...

More information

LOCATION HYDRAULICS REPORT. SR 60 GRADE SEPARATION AT CSX RAILROAD PROJECT DEVELOPMENT AND ENVIRONMENT STUDY Polk County, Florida

LOCATION HYDRAULICS REPORT. SR 60 GRADE SEPARATION AT CSX RAILROAD PROJECT DEVELOPMENT AND ENVIRONMENT STUDY Polk County, Florida LOCATION HYDRAULICS REPORT SR 60 GRADE SEPARATION AT CSX RAILROAD PROJECT DEVELOPMENT AND ENVIRONMENT STUDY Polk County, Florida Financial Project ID: 436559-1-22-01 Prepared for: FLORIDA DEPARTMENT OF

More information

LIST OF TABLES... ii LIST OF FIGURES... iii LIST OF APPENDICES... iv. Section 1 - Introduction Purpose of Study... 1

LIST OF TABLES... ii LIST OF FIGURES... iii LIST OF APPENDICES... iv. Section 1 - Introduction Purpose of Study... 1 Preliminary Hydrologic Analysis for Alberhill Villages April 2015 TABLE OF CONTENTS Section Name Page Number LIST OF TABLES... ii LIST OF FIGURES... iii LIST OF APPENDICES... iv Section 1 - Introduction...

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Distributed Storage Alternative Screening Analysis February 17, 2015

Distributed Storage Alternative Screening Analysis February 17, 2015 Distributed Storage Alternative Screening Analysis February 17, 2015 Executive Summary The Distributed Storage Alternative (DSA) was conceptualized during the public comment and alternative screening process

More information

DRAINAGE REPORT. Project Name: PG&E Gas Operations Technical Training Center Winters, CA. Date: February 4, Prepared by: BKF Engineers

DRAINAGE REPORT. Project Name: PG&E Gas Operations Technical Training Center Winters, CA. Date: February 4, Prepared by: BKF Engineers DRAINAGE REPORT Project Name: PG&E Gas Operations Technical Training Center Winters, CA Date: February 4, 2015 Prepared by: BKF Engineers Client: Pacific Gas & Electric Company This report has been prepared

More information

Questions & Responses from April 26, 2017 Public Presentation

Questions & Responses from April 26, 2017 Public Presentation Questions & Responses from April 26, 2017 Public Presentation Questions and comments were gathered on index cards collected at the Public Presentation by the Maumee Watershed Conservancy District and Stantec

More information

TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST

TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST Instructions: This form must be included with an initial submittal of a Site Plan or Subdivision Application. Use the column to indicate if the SWPPP

More information

KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION

KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION Michael J. Van Mill, AICP Planning Director 189 East Court Street Kankakee, IL 60901

More information

Pajaro River Watershed Flood Prevention Authority. Phase 3 and 4a. Pajaro River Watershed Study

Pajaro River Watershed Flood Prevention Authority. Phase 3 and 4a. Pajaro River Watershed Study Pajaro River Watershed Flood Prevention Authority Phase 3 and 4a FEBRUARY 2005 Funding for this project has been provided in full or in part through a contract with the SWRCB pursuant to the Costa-Machado

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

Extended Detention Basin Design

Extended Detention Basin Design Extended Detention Basin Design 1 Extended Detention 2 Ohio Department of Transportation 1 Extended Detention Basin L&D Vol. 2 Section 1117.3 Provides quality and quantity treatment 3 Extended Detention

More information

PRELIMINARY DRAINAGE STUDY

PRELIMINARY DRAINAGE STUDY PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,

More information

Chapter 9 STORMWATER DESIGN. Table 9-1 Hydrology Design Methods

Chapter 9 STORMWATER DESIGN. Table 9-1 Hydrology Design Methods www.knoxvilletn.gov/engineering/ 9.1 Hydrology Methods Chapter 9 STORMWATER DESIGN Table 9-1 shows the various hydrologic computation methods that can be used to compute peak flows in the City of Knoxville.

More information

Contents. Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek

Contents. Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek Contents SITE LOCATION / DESCRIPTION... 3 WESTPOINTE STORMWATER MANAGEMENT PLAN... 3 THE ENCLAVE AT WESTPOINTE DETENTION POND... 3 Table

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT BOWEN PRIVATE INDUSTRY SOLID WASTE DISPOSAL FACILITY (ASH LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 2- Problem: Storm runoff from the park flows overland through a gap in a berm and then into the neighboring subdivision

More information

TABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models...

TABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models... TABLE OF CONTENTS 1.0 Background... 1 2.0 Watershed Description... 1 3.0 Hydrology - HEC-HMS Models... 2 3.1 Hydrologic Approach... 2 3.2 Drainage Areas... 2 3.3 Curve Numbers... 2 3.4 Lag Times... 3 3.5

More information

Project Alignment Appendix A

Project Alignment Appendix A Project Alignment Appendix A Fargo Moorhead Metropolitan Area Flood Risk Management Project EA Document This page is intentionally left blank Project Alignment Appendix A Table of Contents 1 BACKGROUND...

More information

MUD CREEK WATERSHED STUDY PUBLIC MEETING NOVEMBER 7, 2013

MUD CREEK WATERSHED STUDY PUBLIC MEETING NOVEMBER 7, 2013 MUD CREEK WATERSHED STUDY PUBLIC MEETING NOVEMBER 7, 2013 AGENDA Purpose of Study Hydrology Hydraulics Floodplain Mapping Floodplain Management Options PURPOSE OF STUDY Upstream Development Near I-80 Bondurant

More information

DRAINAGE SUBMITTAL CHECKLIST

DRAINAGE SUBMITTAL CHECKLIST Project Name: Firm Name: Map ID: Engineer: Address: City: State: Zip: Phone Number: Fax Number: Property Owner: Address: City: State: Zip: Reviewed By: Date Received: Date Accepted for Review: The following

More information

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1 City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June 2010... Chapter 1 i CITY OF AZLE iswm CRITERIA MANUAL FOR SITE DEVELOPMENT AND CONSTRUCTION Incorporating the Regional NCTCOG Integrated

More information

a. Title of Report Example: Final Hydrologic and Hydraulic Drainage Report For Tract #### (or Planning and Zoning Permit ##-###-###)

a. Title of Report Example: Final Hydrologic and Hydraulic Drainage Report For Tract #### (or Planning and Zoning Permit ##-###-###) CITY OF OXNARD ENGINEERING DIVISION REQUIRED FORMAT AND CONTENTS HYDROLOGIC AND HYDRAULIC DRAINAGE REPORTS This report will provide a basis for design of the drainage system for the subject project. The

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS 1500.01 GENERAL REQUIREMENTS 1500.02 NATURE OF STORM WATER FACILITIES 1500.03 DRAINAGE EASEMENTS 1500.04 STORM WATER MANAGEMENT

More information

US Army Corps of Engineers Kansas City District. A Dam Safety Study Involving Cascading Dam Failures

US Army Corps of Engineers Kansas City District. A Dam Safety Study Involving Cascading Dam Failures A Dam Safety Study Involving Cascading Dam Failures Policy / Technical Issues How to account for the failure of other dams in the drainage basin How to account for the behavior of all basin dams acting

More information

Title Advanced Hydraulic Modeling to Support Emergency Action Plans

Title Advanced Hydraulic Modeling to Support Emergency Action Plans Title Advanced Hydraulic Modeling to Support Emergency Action Plans Abstract Freese and Nichols, Inc. (FNI) developed an Emergency Action Plan (EAP) for a Levee Improvement District (LID) located in a

More information

Alternatives for Willow Creek Flood Mitigation Study

Alternatives for Willow Creek Flood Mitigation Study Alternatives for Willow Creek Flood Mitigation Study Presented by: Anil Tangirala, PE, CFM, ENV SP ms consultants, inc. June 22, 2016 Presentation Overview Introduction Project Background Willow Creek

More information

Are Flood Stages Rising? Our Fault or Mother Nature s?!

Are Flood Stages Rising? Our Fault or Mother Nature s?! Are Flood Stages Rising? Our Fault or Mother Nature s?! ASFPM National Conference June 4, 2014 Presented by: Siavash Beik, PE, CFM, D.WRE Peggy Shepherd, P.E., CFM Christopher B. Burke Engineering, LLC

More information

New Castle County, DE. Floodplain Regulations

New Castle County, DE. Floodplain Regulations New Castle County, DE Floodplain Regulations John J. Gysling, PE CFM Department of Land Use New Castle County, DE February 26, 2009 Today s Presentation Floodplain Protection and Uses Terms and Definitions

More information

M.D. of Foothills Proposal for a Highwood / Little Bow Flood Risk Mitigation Program

M.D. of Foothills Proposal for a Highwood / Little Bow Flood Risk Mitigation Program M.D. of Foothills Proposal for a Highwood / Little Bow Flood Risk Mitigation Program Submitted to the Government of Alberta by the MD of Foothills No. 31 October, 2016 Executive Summary In June of 2013,

More information

APPLICATION FOR HAZARD MITIGATION GRANT

APPLICATION FOR HAZARD MITIGATION GRANT Project Number South Dakota Office of Emergency Management 118 W. Capitol Ave Pierre, SD 57501 605-773-3231 APPLICATION FOR HAZARD MITIGATION GRANT This application is for a Hazard Mitigation Grant under

More information

The City of North Las Vegas (CNLV) does not allow valley gutters to be constructed across streets with right-of-way widths of 80 feet or greater.

The City of North Las Vegas (CNLV) does not allow valley gutters to be constructed across streets with right-of-way widths of 80 feet or greater. Background The City of rth Las Vegas strives to provide the development community with adequate information to ensure the successful completion of any project in the City. To aid in the submittal of a

More information

Section 6: Stormwater Improvements

Section 6: Stormwater Improvements Section 6: Stormwater Improvements A major objective of this study was to identify opportunities for improvements to address the widespread water quality impairments caused by stormwater runoff in the

More information

Submittal Requirements. Post Construction Verification Document Plan Requirements

Submittal Requirements. Post Construction Verification Document Plan Requirements Submittal Requirements Post Construction Verification Document survey plan in accordance with the items of this Checklist Supporting calculations in accordance with the items of this Checklist A copy of

More information

Who s in Charge!? 8/9/2018. Houston Geological Society Presents. Peak Floods Brays Bayou

Who s in Charge!? 8/9/2018. Houston Geological Society Presents. Peak Floods Brays Bayou Houston Geological Society Presents An Informational Workshop Flooding and Floodplains in the Houston Area: Past, Present, and Future: Part 1 Presented May 18, 2018 Dr. William R. Dupre Professor Emeritus

More information

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E. \ Memorandum SSPEED Center at Rice University Department of Civil & Environmental Engineering 6100 Main MS-317 Houston, Texas 77005-1827 sspeed.rice.edu tel: 713-348-4977 To Andy Yung, P.E. CFM; Lane Lease,

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

SECTION III: WATERSHED TECHNICAL ANALYSIS

SECTION III: WATERSHED TECHNICAL ANALYSIS Trout Creek Watershed Stormwater Management Plan SECTION III: WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling An initial step this study of the Trout Creek watershed was the selection of a stormwater

More information

Freight Street Development Strategy

Freight Street Development Strategy Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed

More information

The Beckett s Run Experience. Fort Wayne, Indiana

The Beckett s Run Experience. Fort Wayne, Indiana The Beckett s Run Experience Fort Wayne, Indiana Introductions Charlie Cochran City of Fort Wayne, Wet Weather Storm & Sewer Engineering Jason Durr, PE Christopher B. Burke Engineering, LLC 2 A Little

More information

APPLICATION FOR HAZARD MITIGATION GRANT

APPLICATION FOR HAZARD MITIGATION GRANT Project Number South Dakota Office of Emergency Management 118 W. Capitol Ave Pierre, SD 57501 605-773-3231 APPLICATION FOR HAZARD MITIGATION GRANT This application is for a Hazard Mitigation Grant under

More information