EXTRACT. MONITOR. CONTROL.

Size: px
Start display at page:

Download "EXTRACT. MONITOR. CONTROL."

Transcription

1 GUIDANCE OF ABSTRACTION AND DISCHARGE PERMITS FOR OPERATIONS When considering any potential dewatering requirement, it is necessary to consider the following questions: Are we allowed to abstract groundwater, and will the pumping impact third parties? Where can we dispose of the water, and what needs to be done to allow discharge? What can be done to minimise water disposal costs? Does the water need to be treated prior to discharge? EXTRACT. MONITOR. CONTROL.

2 Abstraction for Dewatering Abstraction for Dewatering Prior to the enactment of the Water Act (00), construction dewatering was exempt from requiring an abstraction licence. This is now not the case, but the type of licence and level of effort required to make an application is dependent upon the nature of the individual project and the perceived level of risk. For a small minority of short-term schemes which operate for less than 8-days, a Temporary Licence can be obtained. In the majority of cases, a Transfer Licence will be appropriate unless the water is used for an intervening use, such as Dust Suppression. If the For guidance, the Environment Agency considers a scoring system, based on aquifer characteristics, locality of water-dependent conservation sites, water-resource availability and dewatering abstraction flows: Tier (Basic) Effort Required Groundwater conceptual model developed using easily available data Suggested Design Tools Analytical equations, as set out in CIRIA C55 Weighted Score 0 to 0 discharged water is used for a secondary process and not returned back to the environment, a Full Licence will be required. An application for a licence will require a hydrogeological impact assessment (HIA), which is then summarised in an Environmental Statement to support the application. The amount of work required for the HIA is assessed using a tiered approach, and can also have an impact on the tools used to design a dewatering system, with groundwater modelling required in more complex cases. Tier (Intermediate) Conceptual model tested using more detailed data from limited field investigations Tier (Detailed) Conceptual model tested using numerical modelling techniques Simple D steadystate models D modelling, such as MODFLOW, with time dependent analysis to 0 to 0

3 Abstraction for Dewatering Abstraction for Dewatering Criteria and Classes Score Weight Aquifer Characteristics Karst Principal (Major) Aquifer Secondary (Minor) Aquifer Unproductive Strata Water-Dependent Conservation Sites Habitats Directive (Natura 000) Sites Sites of Special Scientific Interest Other Designations (Including National Parks and AONB) None Water Resource Availability Status Over-Abstracted Over-Licensed No Water Available Water Available Dewatering Quantity Very Large (> 5,000 m /d) Large (,500 to 5,000 m /d) Medium (,000 to,500 m /d) Low (<,000 m /d) Working through three common dewatering scenarios we might encounter, we would expect the following: Case (A Small Wellpoint Scheme): A contractor requires dewatering for a simple trench excavation to install 00m of drainage pipes and manholes up to.5m deep, in superficial silty sand deposits. There are no known conservation areas locally. The expected duration for the drainage works is weeks. A wellpoint system is proposed with flows of 5 l/sec (m /day). In this instance, a Temporary Licence should be sufficient as the dewatering works are less than 8 days duration. Should there be a concern over potential programme delays, and we used the proposed scoring system, a Tier study should be sufficient. Case (Cofferdam Depressurisation): A contractor plans to excavate a 0 x 0m sheet-pile cofferdam for the installation of an underground tank at a wastewater treatment works. The excavation is founded in clay, but below the clay is a layer of highly permeable sandy gravels (e.g. River Terrace Deposits, classed as a minor aquifer) with a sufficient pressure to cause a risk of basal uplift. The expected duration for the works is 0 weeks. In order to depressurise the underlying sandy gravels, a deepwell scheme is proposed with a total flowrate of 0 l/sec (50m /day). There is an adjacent wetland conservation area, but not in direct hydraulic continuity with the confined aquifer. Based on the scoring system, a Tier assessment is sufficient, despite the high expected flowrates involved.

4 Abstraction for Dewatering Abstraction for Dewatering Case (Deep Shaft Dewatering): A deep shaft is being constructed for a tunnel with an The process for the hydrogeological impact assessment should follow the flow chart below: invert level below the top of the confined chalk aquifer in an urban area with other nearby licenced abstractors. Working on a range of bulk permeability estimates for the Chalk, the overall flowrate for a proposed deep well system could range from 0 to 00 l/s (70 to 8600m /day). As the aquifer is confined, there is expected to be no direct impact on water-dependent conservation sites. The works involves a major aquifer with potentially high flows, so a Tier assessment is required. Detailed sensitivity analysis may be required to Step : Establish the regional water source status Step : Develop a conceptual model for the dewatering operation and surrounding area Step : Based on the conceptual model, identify all potential water features which are susceptible to flow impacts establish the range of impacts due to the uncertainty on the flowrates. Aqufier Characteristics Water-Dependent Conservation Sites Water Resource Availability Dewatering Quantity Case Case Case Score Weight Total Score Weight Total Score Weight Total 9 9 TOTAL 5 9 Step 6: Assess the significance of the net flow impacts Step 7: Define the search area for drawdown impacts Step 5: For the relevant water features, allow for the mitigating effects of any discharges associated with the abstraction to arrive at net flow impacts Step 8: Identify all features within the search area which could potentially be impacted by drawdown Step : Apportion the likely flow impacts to the water features, again based on the conceptual model Step 9: For all these features, predict the likely drawdown impacts

5 Abstraction for Dewatering Abstraction for Dewatering Step 0: For the relevant water features, allow for the effects of any measures being taken to mitigate the drawdown impacts Step : Assess the significance of the net drawdown impacts Step : Assess the water quality impacts As designers and specialist sub-contractors, the Project Dewatering Limited team have the capabilities to carry out the hydrogeological impact assessment associated with our designs. Importantly, any groundwater modelling work carried out is only as good as the input parameters and understanding of the aquifer conditions; inevitably, a high quality study would require information from pumping tests to calibrate the model, and further validation of the model, using monitoring data during the actual dewatering operations. Step : Develop a monitoring strategy, focussing on the features likely to experience flow or drawdown impacts Step : If necessary, redesign the mitigation measures to minimise the flow and drawdown impacts Top tip: Always engage with the Environment Agency as early on as possible to ensure the correct application is made and sufficient time is available to complete the process. Hydrogeological impacts assessments from dewatering should consider:. Detrimental impacts on surface water features sustained by groundwater. Derogation of existing abstractors. Contamination of groundwater and surface water

6 Discharge of Groundwater Discharge of Groundwater Disposal of clean, uncontaminated groundwater is usually carried out to either a surface water body, such as an adjacent river, or to sewer. Sewer discharge is often the least preferable option in terms of the expense accumulated through volumetric discharge charges, remembering that dewatering is a -hour, 7 day per week operation. Discharge rates can be as high as 0.70 per m for some areas of the country. Both the local sewer connections and wider network will have a limit on the flowrate that can be accepted; in many urban areas there is simply not sufficient capacity for the required dewatering discharge rate. An assessment will be made by the water company responsible for the network as part of the application process, and will take into account both the quality and quantity of water. In order to provide details on the expected quality, groundwater sample analysis results are essential. A discharge consent will place limits of the water quality parameters and contaminant concentrations that can be accepted, but are less stringent than for a discharge licence to surface water body. Top Tip: Where dewatering is expected, always include groundwater sampling as part of any pumping test or site investigation works to assist with discharge applications Discharge to rivers or estuaries can be a convenient and relatively cost effective way to dispose of water where the site is located nearby. Even where the discharge location isn t directly adjacent to the site boundary, specialist temporary pipe infrastructure can often be used, although there are planning issues to consider when running pipe work outside of the site boundary. The costs of installing pipework are still likely to be less than the costs of sewer discharge for longer duration projects with high flowrates. Discharge pipe arrangement in a busy city centre for large-scale dewatering. Project Dewatering Limited can design and install complex discharge pipelines to cross roads and structures.

7 Discharge of Groundwater Discharge of Groundwater A Regulatory Position Statement has recently been published by the Environment Agency on Recharge back to the ground via reinjection wells is an option that can be considered where February 06 entitled Dewatering Building Sites and Other Excavations: Environmental ground conditions are suitable. This is ideal where there is a physical cut-off wall between the Permits. This allows temporary discharge of clean dewatering water to a surface water body dewatered area and the location of the recharge wells, where there are water-bearing for up to months without a permit where the discharge does not: strata separated by a lower permeability layer, or a combination of both. Commonly, Pollute surface water or adversely affect aquatic life, or designated sites or species recharging of the water will lead to some increase in overall rate of abstraction required and Result in the spread of non-native invasive species, parasites or disease on larger schemes a groundwater modelling exercise is recommended to fully understand Cause flooding from surface water Cause erosion of the banks or bed of surface water the flow balances. In all cases, the Environment Agency should be consulted if a recharge scheme is considered. Enter the surface water feature less than 500m upstream of a designated conservation site (including SSSI, SAC, SPA, Ramsar, Nature reserves, wildlife sites) Where there is legacy contamination in the groundwater, treatment of the abstracted groundwater is likely to be required prior to disposal. In this event, a Mobile Plant Permit is For longer periods of discharge, or where there is known contamination, a bespoke required to allow operation of a temporary treatment plant, and a Deployment Notice needs environmental permit will always be required. to be submitted to the Environment Agency prior to commencement.

8 For more information about how we can design, implement and manage your dewatering project, please give us a call on or enquiries@project-dewatering.co.uk Published: March 06 Correct at the time of going to print References: Environment Agency (007), Hydrogeological impact appraisal for dewatering abstractions, Science Report SC0000/SR Preene et al. (000), CIRIA Report C55: Groundwater Control Design and Practice, Construction Industry Research and Information Association Published Feb 06

Assessment of Impacts from Groundwater Control Projects

Assessment of Impacts from Groundwater Control Projects Assessment of Impacts from Groundwater Control Projects Martin Preene Technical Development Director, Golder Associates Synopsis What is groundwater control? Potential impacts Case studies The future Conclusion

More information

COPYRIGHTED MATERIAL. Contents PART ONE: THEORY...1. Preface to the Third Edition xiii. About the Authors xv. Acknowledgements xvii

COPYRIGHTED MATERIAL. Contents PART ONE: THEORY...1. Preface to the Third Edition xiii. About the Authors xv. Acknowledgements xvii Preface to the Third Edition xiii About the Authors xv Acknowledgements xvii Contents PART ONE: THEORY...1 1. Groundwater in Construction...3 1.1 Groundwater in the Hydrologic Cycle 3 1.2 Origins of Dewatering

More information

Pumping tests for construction dewatering in chalk

Pumping tests for construction dewatering in chalk Lawrence, Preene, Lawrence and Buckley ISBN 978-0-7277-6407-2 https://doi.org/10.1680/eiccf.64072.631 ICE Publishing: All rights reserved Pumping s for construction dewatering in chalk M Preene *1, T O

More information

27 Land and groundwater contamination

27 Land and groundwater contamination 27 Land and groundwater contamination Overview This Chapter assesses the potential effects of the proposed Expressway on identified areas of contaminated land with the Project area. The contamination assessment

More information

Framework for Managing Dewatering and Accidental Artesian Aquifer Interception

Framework for Managing Dewatering and Accidental Artesian Aquifer Interception Northern Arterial Extension and Associated Stormwater Works - Resource Consents Application Appendix 12 Framework for Managing Dewatering and Accidental Artesian Aquifer Interception Beca // 13 August

More information

Case Study HST Shaft: Llanberis WwTW

Case Study HST Shaft: Llanberis WwTW Abstract An 9no. deep well dewatering system for a 12.5m Ø shaft at lanberis WwTW in Gwynedd. The shaft formed part of a new Humus Sedimentation Tank within the existing works and was constructed to 5.9m

More information

Oversized quarry sumps can be used to store run-off during

Oversized quarry sumps can be used to store run-off during Oversized quarry sumps can be used to store run-off during large events Paved quarry yard with channels routing run-off to attenuation 3 The Hydrogeology of Quarry Dewatering Extraction below the water

More information

Numerical Groundwater Flow Model Report. Caloosa Materials, LLC 3323 Gulf City Road Ruskin, Florida 33570

Numerical Groundwater Flow Model Report. Caloosa Materials, LLC 3323 Gulf City Road Ruskin, Florida 33570 Numerical Groundwater Flow Model Report Caloosa Materials, LLC 3323 Gulf City Road Ruskin, Florida 33570 GHD 2675 Winkler Ave Suite 180 Fort Myers, FL 33901 11138224 Report July 27, 2017 Table of Contents

More information

11 HYDROLOGY, HYDROGEOLOGY AND DRAINAGE

11 HYDROLOGY, HYDROGEOLOGY AND DRAINAGE 11 HYDROLOGY, HYDROGEOLOGY AND DRAINAGE 11.1 introduction 11.1.1 The objective of this section and the statements presented is to assess the existing hydrological and hydrogeological conditions to understand

More information

CONSTRUCTION SPECIFICATION FOR DEWATERING

CONSTRUCTION SPECIFICATION FOR DEWATERING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 517 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR DEWATERING TABLE OF CONTENTS 517.01 SCOPE 517.02 REFERENCES 517.03 DEFINITIONS 517.04 DESIGN

More information

South London Energy from Waste, Beddington Lane Initial Contaminated Land Assessment, July 2011

South London Energy from Waste, Beddington Lane Initial Contaminated Land Assessment, July 2011 South London Energy from Waste, Beddington Lane Initial Contaminated Land Assessment, July 2011 Infrastructure Planning SOUTH LONDON ENERGY FROM WASTE BEDDINGTON LANE SITE INITIAL CONTAMINATED LAND ASSESSMENT

More information

The influence of large scale inhomogeneities on a construction dewatering system in chalk Dr Toby Roberts. CTRL Thames Tunnel

The influence of large scale inhomogeneities on a construction dewatering system in chalk Dr Toby Roberts. CTRL Thames Tunnel The influence of large scale inhomogeneities on a construction dewatering system in chalk Dr Toby Roberts CTRL Thames Tunnel CTRL 320 Thames Tunnel ( 133M) Twin 2.5 km 7.15 m diameter bored tunnel beneath

More information

Hydropower Guidance Note: HGN 4 Designated Sites

Hydropower Guidance Note: HGN 4 Designated Sites Guidance Note Hydropower Guidance Note: HGN 4 Designated Sites This guidance note is not intended as a statement of law. It should be read in combination with, and in the context of, the relevant enactments

More information

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description.

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description. 7. WATER: HYDROGEOLOGY & HYDROLOGY 7.1 Introduction This chapter of the EIAR comprises of an assessment of the likely impact of the proposed development on the surrounding surface water and hydrogeological

More information

Supplemental Guide II-Delineations

Supplemental Guide II-Delineations Supplemental Guide II-Delineations Contents Source Water Protection Area Delineation... 1 Delineation Criteria for Systems Using Groundwater Sources... 2 Time of Travel... 4 Flow Boundaries... 4 Delineation

More information

8 Geology, Hydrology & Hydrogeology

8 Geology, Hydrology & Hydrogeology Inverneill Wind Farm Scoping Report Page 42 8 Geology, Hydrology & Hydrogeology 8.1 Introduction The EIA will consider the potential issues arising from the construction, operation and decommissioning

More information

Dewatering Fly Ash for Remediation: Two Approaches

Dewatering Fly Ash for Remediation: Two Approaches 2015 World of Coal Ash (WOCA) Conference in Nasvhille, TN - May 5-7, 2015 http://www.flyash.info/ Dewatering Fly Ash for Remediation: Two Approaches Gregory M. Landry, P.E. Moretrench American Corporation,

More information

Feasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park

Feasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park Feasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park Prepared for: City of Bellingham Public Works Department Environmental Resource Division 210 Lottie St.

More information

Developers Guide for Surface Water Management.

Developers Guide for Surface Water Management. Developers Guide for Surface Water Management www.southwark.gov.uk Contents 1. Introduction... 2 2. Requirements for Flood Risk Assessments and Drainage Strategies... 3 2.1 Planning Applications... 3 2.2

More information

Environment Agency Guidance on Requirements for Land Contamination Reports. July 2005

Environment Agency Guidance on Requirements for Land Contamination Reports. July 2005 Environment Agency Guidance on Requirements for Land Contamination Reports July 2005 ENVIRONMENT AGENCY GUIDANCE ON REQUIREMENTS FOR LAND CONTAMINATION REPORTS Context Who is this guidance aimed at? Developers,

More information

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E Ambassador Bridge Enhancement Project CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX E DRAFT EROSION AND SEDIMENT

More information

Edithvale and Bonbeach Level Crossing Removal Project

Edithvale and Bonbeach Level Crossing Removal Project Edithvale and Bonbeach Level Crossing Removal Project Passive subsurface horizontal drain Peer Review Kim Chan Work undertaken and general comments Scope of my review in relation to the Edithvale project:

More information

in brief corrs Policy What it means for developments in april 2012

in brief corrs Policy What it means for developments in   april 2012 corrs in brief april 2012 Delivery of the Strategic Regional Land Use Policy What it means for developments in regional areas The NSW Government has recently released a number of draft plans, policies

More information

Groundwater Control for Design & Construction

Groundwater Control for Design & Construction PDH Course C587 (2 PDH) Groundwater Control for Design & Construction Instructor: T. E. McLaughlin, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088

More information

E2. Water quantity, allocation and use

E2. Water quantity, allocation and use E2. Water quantity, allocation and use E2.1. Introduction E2 Water quantity, allocation and use Demand for water already equals or exceeds availability in some surface waterbodies and aquifers. Future

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

CHAPTER 2. Objectives of Groundwater Modelling

CHAPTER 2. Objectives of Groundwater Modelling CHAPTER 2 Objectives of Groundwater Modelling In the last two decades mathematical modelling techniques have increasingly proved their value in furthering the understanding of groundwater systems and,

More information

(No. of pages excluding this page = 10)

(No. of pages excluding this page = 10) SPECIALIST CONSULTANT STUDIES 3-65 BIG ISLAND MINING PTY LTD (No. of pages excluding this page = 10) Ltd BIG ISLAND MINING PTY LTD 3-66 SPECIALIST CONSULTANT STUDIES This page has intentionally been left

More information

Sustainability Statement

Sustainability Statement Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Sustainability Statement Doc Ref: 7.07 Appendix B.21 Greenwich Pumping Station

More information

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator Florida Department of Environmental Protection Bureau of Mining and Minerals Regulation Regulation of Mines Howard J. Hayes, Program Administrator April 2011 What is a mine? Nonphosphate mine: Subsections

More information

Appendix 14-I Description of Stream Crossing for Electrical Interconnect

Appendix 14-I Description of Stream Crossing for Electrical Interconnect Appendix 14-I Description of Stream Crossing for Electrical Interconnect 14.0 Ecology Appendix 14-I CPV Valley Energy Project Description of Stream Crossing for Electrical Interconnect The CPV Valley Energy

More information

Regulation of Mines In South Florida

Regulation of Mines In South Florida Florida Department of Environmental Protection Bureau of Mining and Minerals Regulation Regulation of Mines In South Florida Howard J. Hayes, Program Administrator February 8, 2011 What is a mine? Nonphosphate

More information

This chapter assesses the likely impact of the proposed power plant in relation to ground conditions and potential contamination.

This chapter assesses the likely impact of the proposed power plant in relation to ground conditions and potential contamination. 10 GROUND CONDITIONS AND CONTAMINATION 10.1 SUMMARY OF RESIDUAL IMPACTS Implementation of the mitigation measures identified in this Chapter will ensure that there will be no significant impacts of an

More information

Environment Protection (Water Quality) Policy 2015, stormwater pollution prevention & dewatering guidance

Environment Protection (Water Quality) Policy 2015, stormwater pollution prevention & dewatering guidance South Australia s Environment Protection Authority Environment Protection (Water Quality) Policy 2015, stormwater pollution prevention & dewatering guidance Clive Jenkins, Ruth Ward and Lara Settimio Outline

More information

E7. Taking, using, damming and diversion of water and drilling

E7. Taking, using, damming and diversion of water and drilling E7. Taking, using, damming and diversion of water and drilling E7.1. Introduction Taking, using, damming and diversion of surface water and groundwater provisions in this plan apply in accordance with

More information

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE GUIDELINES FOR HYDROGEOLOGIC ASSESSMENT AND REPORTING REQUIREMENTS NEW DEVELOPMENTS ON MUNICIPAL SERVICES REVISED

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

A tank filtration and settling system set up to dewater groundwater for excavation work near the Upper Truckee River.

A tank filtration and settling system set up to dewater groundwater for excavation work near the Upper Truckee River. 4.5.1.3 DEWATERING DESCRIPTION Dewatering techniques are methods of addressing extracted ground or surface water encountered during construction. This temporary BMP addresses the installation and maintenance

More information

Numerical Groundwater Model for the Kaweah Delta Water Conservation District

Numerical Groundwater Model for the Kaweah Delta Water Conservation District Numerical Groundwater Model for the Kaweah Delta Water Conservation District Nels Ruud and Peter Leffler Fugro West, Inc. Larry Dotson Kaweah Delta Water Conservation District Presentation Outline Background

More information

Crossrail Line 1 Assessment of Water Resource Impacts Technical Report

Crossrail Line 1 Assessment of Water Resource Impacts Technical Report Cross London Rail Links 1 Butler Place London SW1H 0PT United Kingdom Crossrail Line 1 Assessment of Water Resource Impacts Technical Report Volume 3 Demeter House Station Road Cambridge CB1 2RS United

More information

IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY WATER MANAGEMENT OF CONSTRUCTION SITE Patil V.A*, Gawade S.

IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY WATER MANAGEMENT OF CONSTRUCTION SITE Patil V.A*, Gawade S. IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY WATER MANAGEMENT OF CONSTRUCTION SITE Patil V.A*, Gawade S.L * Asst.prof. sant gajanan maharaj college of engineering, mahagon

More information

Abstract. Introduction

Abstract. Introduction Invited Paper The modelling of saline intrusion during the construction of submerged tunnels T. Roberts', J. White, Z. Mohammed' "WJ Engineering Resources Ltd. Civil Engineering, Queen Mary and Westfield

More information

ATTACHMENT 5 AQUIFER INTERFERENCE POLICY AND WATER LICENSING ADDENDUM

ATTACHMENT 5 AQUIFER INTERFERENCE POLICY AND WATER LICENSING ADDENDUM ATTACHMENT 5 AQUIFER INTERFERENCE POLICY AND WATER LICENSING ADDENDUM COWAL GOLD MINE EXTENSION MODIFICATION TABLE OF CONTENTS A5 AQUIFER INTERFERENCE POLICY CONSIDERATIONS AND WATER LICENSING ADDENDUM

More information

Selection of Proprietary Shoring Equipment

Selection of Proprietary Shoring Equipment CPA Safety Guidance Selection of Proprietary Shoring Equipment Introduction Every contractor involved with groundwork must ensure the safe support of trenches and excavations as part of their risk assessment.

More information

Form 1: Application for resource consent

Form 1: Application for resource consent Form 1: Application for resource consent All sections must be completed in full and accompanied by the initial fixed application fee (see section 11) and the relevant activity form (see section 7). Failure

More information

Remediation of the Former Gasworks, High Wycombe, UK

Remediation of the Former Gasworks, High Wycombe, UK Remediation of the Former Gasworks, High Wycombe, UK Apr-4-06 MGP Symposium, Reading UK, April 2006 Presented By Stuart Arch Apr-4-06 4/4/06 WPREpresentation1.ppt 1 Site Setting Contents of Presentation

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER 1993 Specifications CSJ 8015-24-003 SPECIAL SPECIFICATION TO ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER 1. DESCRIPTION. This item shall govern all work required to remove groundwater encountered

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION 6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts

More information

14.0 MONITORING AND CONTINGENCY 14.1 Effects Monitoring

14.0 MONITORING AND CONTINGENCY 14.1 Effects Monitoring 14.0 MONITORING AND CONTINGENCY 14.1 Effects Monitoring An effective monitoring program provides results to: indicate whether the facility is working as expected and that the assumptions used in the assessment

More information

OAR Table 240-1

OAR Table 240-1 OAR 690-240-0005 Table 240-1 WATER RESOURCES DEPARTMENT CHAPTER 690 DIVISION 240 CONSTRUCTION, MAINTENANCE, ALTERATION, CONVERSION AND ABANDONMENT OF MONITORING WELLS, GEOTECHNICAL HOLES AND OTHER HOLES

More information

Comparison of dewatering schemes for foundation pits under complex hydrogeological conditions

Comparison of dewatering schemes for foundation pits under complex hydrogeological conditions IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS Comparison of dewatering schemes for foundation pits under complex hydrogeological conditions To cite this article: H M Wu et al

More information

Irish Water VARTRY WATER SUPPLY UPGRADE PROJECT. EIS Screening Report

Irish Water VARTRY WATER SUPPLY UPGRADE PROJECT. EIS Screening Report Irish Water VARTRY WATER SUPPLY UPGRADE PROJECT IRISH WATER Vartry Water Supply Upgrade Project Environmental Impact Assessment Screening Report Nicholas O Dwyer Ltd Consulting Engineers Nutgrove Office

More information

E4. Other discharges of contaminants

E4. Other discharges of contaminants E4. Other discharges of contaminants E4.1. Background The following provisions are regional provisions and apply to discharges of contaminants onto or into land and/or into water that are not otherwise

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

Assessment and Restoration of the BP Llandarcy Refinery Landfill Martin Chapple, URS Corporation Ltd., Bristol, UK

Assessment and Restoration of the BP Llandarcy Refinery Landfill Martin Chapple, URS Corporation Ltd., Bristol, UK Assessment and Restoration of the BP Llandarcy Refinery Landfill Martin Chapple, URS Corporation Ltd., Bristol, UK 25th May 2004 History of the Llandarcy Refinery Commissioned in 1921 UK s oldest refinery

More information

Addendum Geotechnical Report Dewatering and Settlement Sanitary Sewer Improvements at Bush IAH, Project No. 699 HVJ Project No.

Addendum Geotechnical Report Dewatering and Settlement Sanitary Sewer Improvements at Bush IAH, Project No. 699 HVJ Project No. Memorandum Firm Registration No. F-646 Date: To: From: Subject: Broutin Sherrill, P.E. RS&H, Inc. Michael Hasen, P.E. Addendum Geotechnical Report Dewatering and Settlement HVJ Associates, Inc. was requested

More information

Hydropower Guidance Note: HGN 7 Competing Schemes

Hydropower Guidance Note: HGN 7 Competing Schemes Guidance Note Hydropower Guidance Note: HGN 7 Competing Schemes This guidance is not intended as a statement of law and should be read in combination with and in the context of the relevant enactments

More information

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Environmental Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Sustainable, Reliable, Affordable Stormwater Attenuation Systems Sustainable Drainage

More information

DEVELOPMENT OF AQUIFER TESTING PLANS. Brent Bauman, P.G. / Erin Lynam, Aquatic Biologist

DEVELOPMENT OF AQUIFER TESTING PLANS. Brent Bauman, P.G. / Erin Lynam, Aquatic Biologist DEVELOPMENT OF AQUIFER TESTING PLANS Brent Bauman, P.G. / Erin Lynam, Aquatic Biologist DEVELOPMENT OF AQUIFER TESTING PLANS Goals of Aquifer Testing What questions are we trying to answer Staff review

More information

Implementation Plan and FAQs for the Guide to Water Act Authorizations Required for Dugouts, Borrow Pits and other types of Pits/Excavations

Implementation Plan and FAQs for the Guide to Water Act Authorizations Required for Dugouts, Borrow Pits and other types of Pits/Excavations Title: Implementation Plan and FAQs for the Guide to Water Act Authorizations Number: Program Name: Approvals Effective Date: June 30, 2016 This document was updated on: ISBN No. 978-1-4601-3034-6 (PDF)

More information

Site Location AQUARION WATER COMPANY CANNONDALE WELL FIELD WILTON, CONNECTICUT

Site Location AQUARION WATER COMPANY CANNONDALE WELL FIELD WILTON, CONNECTICUT Site Location PW-1 O:\DWG\Aquarion\Wilton\2018\F1_SLM.dwg, Layout1, 2/9/2018 4:18:14 PM, AcroPlotTemp2644.pc3 SOURCE: USGS TOPOGRAPHIC QUADRANGLE NORWALK NORTH, CONNECTICUT (PHOTOINSPECTED 1975). CONNECTICUT

More information

BS8582, Code of Practice for Surface Water Management for Development Sites

BS8582, Code of Practice for Surface Water Management for Development Sites BSI Draft Review BS8582, Code of Practice for Surface Water Management for Development Sites Code of Practice for Surface Water Management Comment: The introduction of a specific British Standard which

More information

AM-PR-003 Construction Environmental Management Plan (C-EMP)

AM-PR-003 Construction Environmental Management Plan (C-EMP) OMS Procedure AM-PR-003 Construction Environmental Management Plan (C-EMP) Revision: 1 Prepared by: Shannon Holroyd Authorised by: Marcus Manning Authorisation Date: 18th May 2015 This document has been

More information

Comprehensive experimental study on prevention of land subsidence caused by dewatering in deep foundation pit with hanging waterproof curtain

Comprehensive experimental study on prevention of land subsidence caused by dewatering in deep foundation pit with hanging waterproof curtain Proc. IAHS, 372, 1 5, 2015 doi:10.5194/piahs-372-1-2015 Author(s) 2015. CC Attribution 3.0 License. Comprehensive experimental study on prevention of land subsidence caused by dewatering in deep foundation

More information

determine the effect of the Proposed Development together with the other planned changes within defined areas of influence;

determine the effect of the Proposed Development together with the other planned changes within defined areas of influence; 14 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 14.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts

More information

BERRY CREEK WASTEWATER INTERCEPTOR PROJECT. December 11, 2018

BERRY CREEK WASTEWATER INTERCEPTOR PROJECT. December 11, 2018 BERRY CREEK WASTEWATER INTERCEPTOR PROJECT December 11, 2018 Project Team City of Georgetown Owner Walker Partners Design Consultant SWCA Environmental and Hydrogeology Cambrian Geologic Assessment and

More information

LAKE LABELLE DEWATERING MODEL. AUTHOR Gail Murray Doyle, P.G. September Murray Consultants, Inc 769 Skyview Dr Hayesville, NC

LAKE LABELLE DEWATERING MODEL. AUTHOR Gail Murray Doyle, P.G. September Murray Consultants, Inc 769 Skyview Dr Hayesville, NC LAKE LABELLE DEWATERING MODEL AUTHOR Gail Murray Doyle, P.G. September 2013 Murray Consultants, Inc 769 Skyview Dr Hayesville, NC 28904 828-389-2476 LAKE LABELLE DEWATERING MODEL INTRODUCTION Purpose The

More information

Groundwater 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology

Groundwater 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology GG22A: GEOSPHERE & HYDROSPHERE Hydrology Definitions Groundwater Subsurface water in soil or rock that is fully saturated. Aquifer Contains enough saturated material to yield significant quantities of

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

Science Olympiad. Mentor Invitational Hydrogeology ANSWER KEY. Name(s): School Name: Point Totals

Science Olympiad. Mentor Invitational Hydrogeology ANSWER KEY. Name(s): School Name: Point Totals Science Olympiad Mentor Invitational Hydrogeology ANSWER KEY Team Number: Raw Score: Rank: Name(s): School Name: Point Totals Possible Part 1: Groundwater Concepts and Vocabulary 30 Part 2: The Hydrogeology

More information

CHAPTER 7 WATER RESOURCES AND DRAINAGE NORTHAMPTON GATEWAY

CHAPTER 7 WATER RESOURCES AND DRAINAGE NORTHAMPTON GATEWAY CHAPTER 7 WATER RESOURCES AND DRAINAGE NORTHAMPTON GATEWAY 7.0 7.1 WATER RESOURCES AND DRAINAGE INTRODUCTION 7.1.1 This chapter details the potential receptors and likely effects, including potential water

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

Drainage Strategy Report

Drainage Strategy Report CONSULTING ENGINEERS Report No: Date: C1014 Aug 2017 Project: Drainage Strategy Report Danygraig Works, Risca Client: P.D. Edenhall This report is provided for the benefit only of the party to whom it

More information

Trenchless Crossing of a Failure Prone Watermain in Poor Soil Conditions

Trenchless Crossing of a Failure Prone Watermain in Poor Soil Conditions Trenchless Crossing of a Failure Prone Watermain in Poor Soil Conditions Case Study Trevor Kealey, P.Eng. R.V. Anderson Associates Limited TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 Scotiabank Convention

More information

Surface Water Guidance for Developers

Surface Water Guidance for Developers Surface Water Guidance for Developers Contents Overview of Sustainable Drainage Systems (SuDS)... 2 Information Required in a Flood Risk Assessment or Drainage Strategy... 3 Outline Planning Applications...

More information

Draft Greater Sydney Region Plan

Draft Greater Sydney Region Plan Draft Greater Sydney Region Plan Submission_id: 31236 Date of Lodgment: 13 Dec 2017 Origin of Submission: Online Organisation name: HARC Organisation type: Industry First name: Russell Last name: Beatty

More information

FAX

FAX 21335 Signal Hill Plaza Suite 100 Sterling, Virginia 20164 www.geotransinc.com 703-444-7000 FAX 703-444-1685 Mr. William Kutash Florida Department of Environmental Protection Waste Management Division

More information

New Connections Services Charging Arrangements

New Connections Services Charging Arrangements New Connections Services Charging Arrangements 2018-19 January 2018 Contents Charging arrangements for new connection services... 3 Introduction to our charges... 3 Who pays for what?... 4 Who can deliver

More information

Glossary. September 11,

Glossary. September 11, Adequate public facilities: Facilities which have the capacity to serve development without decreasing levels of service below locally established minimums. (WAC 365- Adopt a comprehensive land use plan:

More information

WASTEWATER DRAINAGE BYLAW

WASTEWATER DRAINAGE BYLAW WASTEWATER DRAINAGE BYLAW 2018 Pursuant to Section 145 of the Local Government Act 2002 and every other enabling power and authority. To come into force: 1 July 2018 For the purpose of: a) Controlling

More information

GROUND WATER. Practice Note # water. sensitive. urban. design \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \

GROUND WATER. Practice Note # water. sensitive. urban. design \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 2013 water. sensitive. urban. design \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ Practice Note #8 GROUND Water Smart design is the effective planning, design and building of homes, subdivisions,

More information

8 Geology, Hydrology, Hydrogeology

8 Geology, Hydrology, Hydrogeology Camster II Wind Farm Scoping Report 50 8 Geology, Hydrology, Hydrogeology 8.1 Introduction The EIA will consider the potential issues arising from the construction, operation and decommissioning of the

More information

Pipe Jacking Association: Introduction Presentation. Lecture notes. Slide 1. Slide 2

Pipe Jacking Association: Introduction Presentation. Lecture notes. Slide 1. Slide 2 Slide 1 PIPE JACKING An introduction to pipe jacking prepared by the Pipe Jacking Association This introduction to pipe jacking has been prepared by the Pipe Jacking Association as an aid to engineers

More information

CLARIFICATIONS TO TECHNICAL SPECIFICATIONS SECTIONS

CLARIFICATIONS TO TECHNICAL SPECIFICATIONS SECTIONS C-44 Reservoir/STA System Discharge Project RFB: 6000000620 Addendum No. 1 March 2014 CLARIFICATIONS TO TECHNICAL SPECIFICATIONS SECTIONS HDR Engineering, Inc. SECTION 02401 DEWATERING, COFFERDAM AND BYPASS

More information

Waukesha Water Supply. Frequently Asked Questions

Waukesha Water Supply. Frequently Asked Questions Waukesha Water Supply Frequently Asked Questions 1. Why is long-term water supply planning important? Long-term water supply planning is important because an affordable water supply that is healthy, reliable

More information

REQUIRED SEPTIC DRAWINGS

REQUIRED SEPTIC DRAWINGS REQUIRED SEPTIC DRAWINGS The following list of drawings should be used as a guide when preparing drawings for submission for a septic permit, for a project designed under (Part Eight) of the Ontario Building

More information

10.1 Introduction This chapter describes the effects of the proposed Edinburgh Tram Line One on water resources along the route including:

10.1 Introduction This chapter describes the effects of the proposed Edinburgh Tram Line One on water resources along the route including: 10 Water Quality 10.1 Introduction This chapter describes the effects of the proposed Edinburgh Tram Line One on water resources along the route including: aquatic features; surface water quality; hydrogeology

More information

Mercia EnviRecover PROPOSED DEVELOPMENT OF A RENEWABLE ENERGY PLANT ON LAND AT HARTLEBURY TRADING ESTATE, HARTLEBURY, WORCESTERSHIRE

Mercia EnviRecover PROPOSED DEVELOPMENT OF A RENEWABLE ENERGY PLANT ON LAND AT HARTLEBURY TRADING ESTATE, HARTLEBURY, WORCESTERSHIRE Mercia EnviRecover PROPOSED DEVELOPMENT OF A RENEWABLE ENERGY PLANT ON LAND AT HARTLEBURY TRADING ESTATE, HARTLEBURY, WORCESTERSHIRE Environmental Statement Regulation 19 Submission (3a) Other Information

More information

BLOCKING AND FILLING SURFACE DRAINAGE DITCHES

BLOCKING AND FILLING SURFACE DRAINAGE DITCHES MINNESOTA WETLAND RESTORATION GUIDE BLOCKING AND FILLING SURFACE DRAINAGE DITCHES TECHNICAL GUIDANCE DOCUMENT Document No.: WRG 4A-1 Publication Date: 10/14/2015 Table of Contents Introduction Application

More information

The Mineral Industry Environmental Protection Regulations

The Mineral Industry Environmental Protection Regulations MINERAL INDUSTRY E-10.2 REG 5 The Mineral Industry Environmental Protection Regulations Repealed by Chapter 10.2 Reg 7 (effective March 6, 1996). Formerly Chapter E-10.2 Reg 5. NOTE: This consolidation

More information

Appendix 8: Best Practicable Environmental Option (BPEO) Assessment

Appendix 8: Best Practicable Environmental Option (BPEO) Assessment Appendix 8: Best Practicable Environmental Option (BPEO) Assessment ABERDEEN HARBOUR EXPANSION PROJECT BEST PRACTICABLE ENVIRONMENTAL OPTION (BPEO) ASSESSMENT October 2015 Updated April 2016 TABLE OF CONTENTS

More information

HOTEL KANATA 140 HEARST WAY KANATA, ONTARIO STORMWATER MANAGEMENT REPORT. Prepared for: David Johnston Architect. Prepared By:

HOTEL KANATA 140 HEARST WAY KANATA, ONTARIO STORMWATER MANAGEMENT REPORT. Prepared for: David Johnston Architect. Prepared By: HOTEL KANATA 140 HEARST WAY KANATA, ONTARIO STORMWATER MANAGEMENT REPORT Prepared for: David Johnston Architect Prepared By: BaseTech Consulting Inc. 309 Roywood Crescent Newmarket, Ontario L3Y 1A6 BCI

More information

Jan van Wonderen Mott MacDonald

Jan van Wonderen Mott MacDonald Groundwater Management in the UK The Importance of an Integrated Approach Jan van Wonderen Mott MacDonald Overview of Presentation Role of Groundwater in England Demands for Groundwater Regulation in England

More information

1.0 Introduction. 1.1 The Stream Depletion Issue. 1.2 Purpose of the Guidelines

1.0 Introduction. 1.1 The Stream Depletion Issue. 1.2 Purpose of the Guidelines Guidelines for the Assessment of Groundwater Abstraction Effects on 1.0 Introduction 1.1 The Stream Depletion Issue The management of water resources has often focussed on groundwater and surface water

More information

For inspection purposes only.

For inspection purposes only. 6 INDAVER IRELAND - Carranstown Duleek Statement of Evidence Eur.Geol Teri Hayes B.Sc M.Sc P.Geo, 1.O Experience 1.1 My name is Teri Hayes. I am a Senior Hydrogeologist and Director of White Young Green

More information

Water in Mining. A view from the West. Mike Harold Principal Advisor - Policy and Governance Inside Infrastructure

Water in Mining. A view from the West. Mike Harold Principal Advisor - Policy and Governance Inside Infrastructure Water in Mining A view from the West Mike Harold Principal Advisor - Policy and Governance Inside Infrastructure Overview Water in Mining: a view from the West 2 CONTEXT Overview of water use in mining

More information

Pollution Prevention. Getting your site right. September 2009

Pollution Prevention. Getting your site right. September 2009 Pollution Prevention Getting your site right September 2009 Purpose This session is designed to raise awareness on how to prevent and manage liquid spills It offers good practice measures and ideas for

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

16.3 An Agricultural Land Classification Report is included in ES Volume 2.

16.3 An Agricultural Land Classification Report is included in ES Volume 2. CHAPTER 16: GROUND CONDITIONS AND LAND CONTAMINATION Introduction 16.1 This section of the ES presents the results of an assessment of the impacts of the proposed development on matters associated with

More information