Meeting intraday modulation needs. Supply and demand match in intraday flexibility Outlook study for

Size: px
Start display at page:

Download "Meeting intraday modulation needs. Supply and demand match in intraday flexibility Outlook study for"

Transcription

1 Meeting intraday modulation needs Supply and demand match in intraday flexibility Outlook study for

2 Contents Preface by the Chief strategy & marketing officer Summary Background Outlook analysis Glossary

3 Preface by the Chief strategy & marketing officer The global energy sector is facing some overwhelming challenges: in particular constantly rising energy needs, environmental imperatives, and the management of risks and economic balances. Natural gas has numerous advantages in tackling these challenges. It has abundant reserves with worldwide geographical distribution. France, which lies at the crossroads of the main European gas routes, also benefits from a dynamic wholesale market with a growing number of suppliers. From an environmental perspective, gas is the fossil energy that produces the least CO2 emissions when burned. It contains no sulphur, produces no particles and releases limited quantities of nitrogen oxides. Apart from direct use, we are convinced at GRTgaz that natural gas will continue to develop as a fuel for electricity generation. With the prospect of a shift in the European energy mix, it is an ideal complement to renewable energy sources, in particular wind and photovoltaic plants, which are intermittent by nature. Combined-cycle gas turbine power plants make their full contribution to this trend since they are perfectly geared to respond to the fluctuations in electric power demand, with the additional advantage of being substantially more efficient than other power plants (coal, oil), and therefore require less primary energy to produce electricity. These gas-fired power stations need to be able to modulate their gas consumption widely over the day, in order to adjust to the fluctuating demand from electricity consumers. GRTgaz s natural gas network is capable of providing this essential operating flexibility in order to maintain the balance of the power grid in real time. Nearly non-existent until recently in France, though very common in Europe and around the world, the number of gas-fired power plants has multiplied over the past few years. At GRTgaz, we have responded positively to the influx of these new customers. We have adapted our organisation and products & services offering to follow these trends. But we want to go further. It is the purpose of this study to assess the match between our customers new needs and the availability of intraday flexibility resources over the period Its findings are much more satisfactory than in the previous study, published in The natural gas transmission network is now able to meet nearly all its users intraday modulation needs. After 2017, largely as a result of our investment efforts, our system will not only be able to respond to the growth in the need for intraday modulation, but even go further as the market develops. GRTgaz is anticipating, investing and innovating to provide France with infrastructures that are in keeping with the rapid development of energy systems. 3

4 4

5 Summary In the last few years, new consumers have arrived on GRTgaz s natural gas transmission system, bringing not only substantial consumption demand for which GRTgaz has built the necessary infrastructures, but also significant needs for variations in consumption over the day. These consumers are called highly modulated sites. The gas system, on which GRTgaz is responsible for coordinating intraday flexibility, is already responding satisfactorily to all the needs of these sites. Highly modulated sites thus have access to internal and external sources of intraday flexibility through the specific intraday flexibility service provided by GRTgaz. This service was introduced on April 1, 2011 after the publication of the Energy Regulatory Commission ruling on March 24, At the beginning of 2010, GRTgaz published a first analysis of the balance between the next-day intraday modulation needs of highly modulated sites and available intraday flexibility. Here, we publish an update of that study for the period GRTgaz has established a benchmark scenario that incorporates assumptions agreed with the gas infrastructure operators and shared with the market stakeholders under the Concertation Gaz consultation process. This scenario looks at the equivalent of 22 combined-cycle gas turbine power units installed in 2020 on GRTgaz s network, operating on the basis of hourly profiles supplied to GRTgaz by the electricity producers. The sources of intraday flexibility considered are an internal source usable linepack available on GRTgaz s network - and then external sources provided by other gas infrastructure operators. The results of this study show that across GRTgaz s whole network: n for the period , the gas infrastructures offer excellent capacity to meet the next-day intraday modulation needs of highly modulated sites; n in 2016, this capacity will increase and the need for external sources of intraday flexibility will become marginal, ceasing to be necessary from 2017 to cover the needs expressed by highly modulated sites; n recent decisions on the reinforcement of our main network will create sufficient potential usable linepack as an internal source of intraday flexibility. It is mostly because of these new transmission pipelines that the findings of this outlook analysis are much more optimistic than those of the previous study. In fact, GRTgaz is capable of covering greater future demand than predicted in the study s assumptions, in terms of the frequency or fluctuation amplitude of the modulation need. GRTgaz is also ready to provide intraday flexibility for highly modulated sites that may connect to its network up to

6 6

7 Background A growing need for intraday modulation Intraday modulation of consumption reflects the hourly variation in natural gas consumption over a gas day. Certain customers connected to GRTgaz s network experience both a high level of consumption and sharp variations in consumption over the day, and therefore a significant need for intraday modulation. When such customers require a daily modulated volume in excess of 0.8 GWh/d, they are described as highly modulated sites (HMS). At present, highly modulated sites are centralised gas-fired power generation plants. The first highly modulated sites were connected to the network only a few years ago. Today, their average annual aggregate modulation need is comparable to the need of the conventional market (1), and will undoubtedly become much greater in the near future. In fact, their total modulated volume (TMV) for the summer period 2012 is forecast to be 30 GWh/d, twice the level of the conventional market: Total modulated volume (TMV) in GWh January February March April May TMV HMS Conventional TMV June July August September October November December (1) The so-called conventional market corresponds to residential consumers and to industrial consumers directly connected to the transmission network, which do not meet the criteria characterising highly modulated sites. The need for intraday modulation over a day is characterised by: n the modulated daily volume, which represents a quantity of gas required over the gas day; n the amplitude of hourly operating flow, which represents the gap between the maximum and minimum hourly consumption. The diagram below illustrates this demand for intraday modulation, representing an example of the operating schedule of a highly modulated site on a given day Hourly consumption (MWh/h) Daily modulated volume Hourly consumption Average hourly consumption Operating amplitude Hours 7

8 Background Centralised power generation plants (On September, 1 st 2011) EDF Gennevillliers EDF Montereau TENDER Aire de Brest GDF SUEZ SPEM Montoir ALPIQ 3CB Bayet GDF SUEZ Combigolfe Fos-sur-Mer Transport Storage Interface Point EDF Martigues Montoir-de-Bretagne Elengy Gassco Dunkerque Belgium South Zone Taisnières North Zone Fluxys Obergailbach Oltingue Germany GRTgaz Deutschland Open Grid Europe Transitgas Switzerland Italy GDF SUEZ DK6 Dunkerque EON - LA SNET Hornaing POWEO PRODUCTION Pont-sur-Sambre DIRECT ENERGIE Hambrégie Hambach EON - LA SNET Saint-Avold EDF Blenod POWEO PRODUCTION Toul EON - LA SNET Lucy Storengy Entry and exit points Transport LNG Terminal Interface Point (PITTM) Spain TIGF Fos-sur-Mer Elengy Adjacent operators (transport, storage & LNG terminal) GDF SUEZ Cycofos Fos-sur-Mer Sites in project Sites in service We observe a steady growth in the centralised power generation from natural gas. 12 gas-fired power plants are connected to the transmission network, 8 of them in commercial operation, with installed capacity of 5,3 GWe. Other projects are currently under consideration for possible connection. Centralised power generation, and particularly combined-cycle gas turbine power plants, are on the rise because of their flexible operation and high efficiency. For these purposes, a high level of intraday modulation is required. 8

9 Background GRTgaz s response to these needs GRTgaz operates its network by transporting natural gas for its customers under optimum conditions of safety, reliability and cost. The system it operates is closely interconnected with the other European networks, and with French ground storage facilities and LNG terminals, thereby ensuring the system users access to various supply points and to marketplaces via the gas title transfer points (PEGs). GRTgaz maintains continuity of supply throughout the year to all customers connected to its network. This forms part of its public service mission, termed Legal Public Service Obligations. To provide this service, GRTgaz needs to develop a network of sufficient size to ensure that the required capacity is available and sufficient at any time. GRTgaz is also responsible for the intraday balancing of its network. It has to adjust pressure and flow rates on the network at all times to guarantee a match between gas entering the system and gas consumed by or leaving the system. GRTgaz has therefore adapted by offering an intraday flexibility service for highly modulated sites, establishing a position as the sole integrator and supplier of intraday flexibility. Sources of internal and external intraday flexibility To meet the needs for intraday modulation, GRTgaz draws on two kinds of intraday flexibility sources: n an internal source, owned by GRTgaz: usable linepack present in our gas pipelines; n external sources, i.e. sources made available by other gas infrastructures: natural gas ground storage facilities, LNG regasification terminals and natural gas transmission networks run by adjacent operators. GRTgaz s linepack is by definition well distributed over the transmission network, and is directly managed by GRTgaz s National Dispatching, which means that it can react rapidly to the intraday modulation needs of highly modulated sites. GRTgaz uses this source before external sources, which are subsequently called upon in order to optimise costs. The external sources are described in greater detail later in this study. The intraday flexibility offer for highly modulated sites The flexibility service was set up on April 1, 2011 after two years of consultation between electricity producers, gas suppliers, industrial customers, gas and electricity infrastructure operators, the French Energy Regulatory Commission (CRE), etc. It is covered by a specific contract, called the Intraday Flexibility Contract. Ongoing discussions are underway between the above-mentioned stakeholders within the framework of the Concertation Gaz consultation process, with a focus on improving the performance and operational management of the service and on providing greater transparency for power plant developers regarding GRTgaz s capacity to provide flexibility in the long term. So that GRTgaz can meet the demand for intraday modulation and has the time to adjust the network to bring in or remove gas, highly modulated sites provide day-ahead hourly consumption schedules on a daily basis. The operational conditions of the service both allow the highly modulated sites to carry through their consumption profiles and GRTgaz to maintain the safety and balance of the transmission network. 9

10 10

11 Outlook analysis with the benchmark scenario Introduction The purpose of this study, which follows on from an initial study published in 2010, is to give the market the necessary transparency regarding the capacity of the gas infrastructures to provide intraday flexibility to highly modulated sites over the period The purpose is also to help GRTgaz s existing and future customers to understand the issues. By its nature, this study is based on information provided by other stakeholders in the gas system. This study has an indicative character only. GRTgaz and the operators may under no circumstances be held liable for its contents, in particular with regard to the completion of potential projects. However, GRTgaz was keen for this study to provide as accurate a picture as possible of future developments, in particular with regard to the current context concerning highly modulated sites, known decisions on the completion of infrastructures, and the documents and information provided by third parties. The purpose of the analysis presented in this document is to determine the capacity of the French gas system to meet day-ahead known demand for intraday flexibility in the short-, medium- and long-term market, including existing, planned or potential future highly modulated sites. The handling of the withinday adjusted intraday flexibility needs of these sites does not fall within the scope of this study. The study s scope covers the whole of GRTgaz s H-gas network. As the study applies to dayahead needs, any transfers of flexibility between physical sub-zones on the network required to meet demand, are deemed to have been made at the beginning of the day in question. This means that the network behaves as a single entity in terms of dayahead intraday flexibility. The study sought to establish a statistical match between intraday modulation needs and available flexibility resources, on a monthly basis, over the years 2012 to 2016, and for the year It is based on a central scenario, termed the benchmark scenario, which embodies the hypotheses shared in consultation with the market players, hypotheses that are currently considered as the most probable. Two variants on this benchmark scenario, designed to encompass a full range of possibilities and presenting significant variations in terms of the hypotheses about needs and/or resources, are also considered. 11

12 Outlook analysis with the benchmark scenario The intraday modulation needs of highly modulated sites The assumptions made for the benchmark scenario on the intraday modulation needs of highly modulated sites are based both on hypotheses about the development of the existing fleet over the period , and on hypotheses about the operation of the sites. 1/ Hypotheses about the development of the fleet n Hypotheses retained by GRTgaz concerning the evolution of the number of Combined- Cycle Gas Turbine Power Plants (CCGT), expressed in number of units (1 CCGT unit being equivalent to approximately 440 MWe): Cumulative CCGT units This level of development is based on: the commercial forecasts available to GRTgaz, i.e. the number of existing power plants and of planned power plants that have signed either a connection contract or a design contract with GRTgaz, taking into account the dates when the plants are due to begin commercial operation on the gas network, as known in summer 2011; RTE s provisional report, published in July 2011 for the 2020 timeframe, reflecting the trend in the number of CCGTs and the 2 GWe power shortfall predicted for that date. n Hypotheses retained by GRTgaz concerning the evolution of the number of Gas Turbines (GT), expressed in numbers of units (1 unit being equivalent to approximately 180 MWe), including sites that have already been built and ongoing connection studies: Cumulative GT units n As regards cogeneration (Combined Heat and Power Plants - CHP plants) plants likely to move into market-based operation, i.e. to operate in a similar way to CCGTs, GRTgaz has assumed the equivalent of one CCGT unit from 2012, a rate that will remain stable until This hypothesis is based upon the existing fleet in France, RTE s provisional report published in July 2011, and uncertainties about the development of this fleet. Thus, for the 2020 timeframe, the assumptions defined above lead to a forecast of an equivalent of 22 CCGT units, where one unit corresponds to an electrical output of around 440 MWe, i.e. a daily delivery capacity need on GRTgaz s network of 20 GWh/d and an hourly delivery capacity of 1 GWh/h. 12

13 Outlook analysis with the benchmark scenario 2/ Hypotheses about the operation of the fleet The operation of a power plants is economically viable once the clean spark spread (i.e. the difference between the price of electricity on the one hand, and the cost of natural gas and the cost of the associated CO2 needed to produce that electricity, on the other hand) is positive. The clean spark spread depends on numerous highly volatile and hard-to-predict factors. This means that a site may have significant variations in its load over a single day. The operating assumptions for CCGTs and GTs were provided by existing or potential electricity producers. They simulated, for every day and every hour within the period from January 1, 2007 to December 31, 2010, on the basis of historical market prices for energy and CO2, the operation of their existing sites or of a standard unit. It is this hourly consumption profile, established over a four-year period, that they passed on to GRTgaz. For the CHP plants, it was assumed that those that moved into market-based operation would operate according to the standard average CCGT profile for the year under study. For each year considered, the total modulation need of the fleet was obtained by selecting the sites in operation in the year in question, and by applying to each one the standard operating profile provided by the producers. The aggregate hourly profile of all the sites was then used to determine the daily modulated volume to be covered. The average monthly modulated volume need (in GWh) of the fleet for a gas day over the period is summarised below: Modulated volume in GWh Average monthly modulated volumes of highly modulated sites (working days) January February March April May June July August September October November December An analysis of the data provided shows that: n the modulation need of the sites increases over the years, reaching its maximum in 2020 at an annual average of around 45 GWh; n it varies substantially from month to month, reaching a maximum in June (e.g. 60 GWh in 2020). Moreover, it is also apparent that the need differs markedly between working days and Sundays/public holidays within a single week: on working days, it is on average twice as large. The needs analysis will therefore focus on working days. 13

14 Outlook analysis with the benchmark scenario The sources of intraday flexibility Intraday flexibility on the gas system can be provided by pipelines (own networks or adjacent infrastructure networks), LNG terminals or ground storage facilities. The intraday flexibility resources identified in the benchmark scenario are: n GRTgaz s internal resources from the potential usable linepack available in its existing or future pipeline network; n the external resources currently contracted for, since April 1, 2011, with the operators Elengy (Fos Tonkin LNG terminal) and Storengy (ground storage facilities) in its benchmark scenario; n potential external resources for which capacity has been studied from a technical perspective (STMFC for the Fos Cavaou LNG terminal and the transmission system operator TIGF); discussions are currently underway on contracting for access to these sources. Other resources the Dunkerque LNG terminal, the Manosque ground storage site or resources from other foreign infrastructures are also possibilities but are not included in this study in the absence of concrete technical data. In addition, the work begun in June 2011 within the dedicated consultation working group on generating competition between intraday flexibility sources, provides an opportunity to explore the possibilities for additional resources, their technical feasibility, their likely availability date and their associated price. 1/ Intraday flexibility provided by GRTgaz s network or linepack The linepack available to meet customers modulation needs varies from one day to the next. It greatly depends on the level of gas consumption and total flow in the network, as well as the distribution of gas entry/exit flows. To assess potential linepack resources, simulations were carried out on GRTgaz s historical system (i.e. excluding new pipeline developments) covering a wide range of consumption levels; for each level of consumption, different assumptions were made about the distribution of gas entry/exit flows. For each of these scenarios, possible extremes of operating pressure were established (maximum operating pressure and minimum operating pressure, within pressure constraints of the system). The difference between these two pressure loads establishes the maximum available usable linepack (see inset). This linepack is first used by GRTgaz to maintain a reliable service to its customers and to cover the modulation needs of the conventional market. Once these two requirements have been met, the usable linepack available can be used to meet additional demand for intraday modulation. For 2011, this usable linepack generally stands at 110 GWh in summer, 65 GWh between seasons (spring, autumn); in winter, it is closer to zero, especially when daily consumption exceeds 2,000 GWh/d. The assumptions regarding flexibility resources are covered in detail below: linepack, ground storage facilities, LNG terminals, adjacent TSO. 14

15 Outlook analysis with the benchmark scenario Maximum available usable linepack The linepack that can be used in a transmission network pipeline depends on different factors: the dimensions of the pipeline, the maximum pressure at which the pipeline can operate (MOP in figures below), the minimum pressure constraints required to ensure continuity of supply (Pc) and the flow passing through the pipeline (Q). A certain quantity of the total gas present in a pipeline is required to ensure continuity of transmission (to maintain the minimum pressure required to meet pressure constraints), a further quantity to compensate for pressure losses associated with gas flow. It should be noted that the higher the flow is, the greater the pressure loss along the pipeline is and the smaller the potential usable linepack in the pipeline is. In practice, the maximum available usable linepack is the surplus gas between a minimum pressure level (P1) upstream of the pipeline, sufficient to maintain pressure constraints (Pc) downstream of the pipeline, and a maximum level starting from the Maximum Operating Pressure (MOP) and attaining a level P2. In the rest of this study, linepack is assessed in GWh for a given day. Usable linepack MOP P (bar) Q << Qmax P2 Linepack required for gas flow P1 Usable Linepack Linepack required for continuity of supply PC L (km) Usable linepack at high flow rate MOP P (bar) (Q<) Q < Qmax Linepack required for gas flow Usable P 1 Linepack P 2 Linepack required for continuity of supply PC L (km) 15

16 Outlook analysis with the benchmark scenario In addition, GRTgaz is investing to develop capacity on its network. These new infrastructures create further transmission capacity which, depending on consumption and the supply schemes chosen by shippers, can also generate usable linepack. GRTgaz s objective is to optimise the potential linepack on these new pipelines by installing appropriate control devices (such as regulator valves) in all its projects. In concrete terms, three major projects will contribute to increasing GRTgaz s flexibility resources to a significant extent: Hauts de France 2 (several staged phases between 2013 and 2016), Arc de Dierrey, in 2016 and Eridan in 2017 (see map below). These projects will create 150 GWh of potential additional internal flexibility by the year For the purposes of the study, a first step is to assess whether the modulation needs of highly modulated sites can be covered by usable linepack. If the total modulated volume (in GWh) corresponding to the schedules of Highly modulated sites is greater than GRTgaz s internal resources, then the capacity available from other infrastructure operators is assessed. The residual need is then converted into an amplitude, expressed in GWh/h, insofar as the flexibility provided by the other infrastructure operators results in a capacity to vary their output rate in the course of a day. Map of new GRTgaz pipelines Hauts de France II I: 2013 II: 2014 III: 2016 Dunkerque Pitgam Belgium Taisnières Germany Cuvilly Arc de Dierrey 2016 Obergailbach Dierrey Montoir Voisines Oltingue Switzerland Etrez Chazelles Eridan 2017 St-Avit Italy Spain 16

17 Outlook analysis with the benchmark scenario 2/ External intraday flexibility Intraday flexibility provided by Storengy The intraday flexibility provided by Storengy s storage facilities (1) entails varying the hourly quantities injected into (or withdrawn from) the storage sites in the course of a day, without affecting the daily schedule requested by storage customers. For a given day, this source of flexibility is interruptible: it is available after the capacity has been used by the storage customers. Storengy conducted a new, feedback-based study in the summer of 2011 to estimate the residual storage capacity likely to be made available to GRTgaz. The analysis was carried out on the period from April 2010 to March 2011, a period deemed to be most representative of storage site performance. In order to determine the available potential for upwards and downwards variation, Storengy calculated the difference between each storage site s recommended technical capacity and actual hourly schedules. Storengy provided GRTgaz with these results, aggregated for each storage type (aquifer, salt cavern). On average, for all aquifer and salt cavern storage facilities, the total amplitude is estimated at 15 GWh/h. Intraday flexibility provided by LNG terminals The flexibility available from the Fos Tonkin terminal is provided by Elengy under a contract in place since April 1, It is interruptible and the available technical capacity is known on a next-day basis. In fact, the possibilities of upward or downward variation in flow depend on the LNG terminal s output level and the number of pumps in operation. The period analysed for the terminal s output runs from November 1, 2010 to September 30, This period is considered the most representative because it includes the entry into service in nominal operating conditions of the Fos Cavaou LNG terminal, which directly impacts Fos Tonkin s output. This flexibility resource was assessed from 2012 to 2014 inclusive, but not beyond 2014, because of uncertainties about the future of the LNG terminal and the availability of this service beyond that date. On average, it is about 1.5 GWh/h. GRTgaz also questioned STMFC about the likely capacity of the Fos Cavaou LNG terminal to vary its output in the course of a day. The operator therefore conducted a number of tests over the summer of 2011, which confirmed that the terminal possesses a potential for flexibility, depending on its level of operation and the number of pumps in operation, and whether or not LNG tankers are currently unloading. A series of hypotheses could therefore be made, on the basis of data supplied by STMFC, and also based on the period from November 1, 2010 to September 30, Fos Cavaou s intraday flexibility service is deemed to be technically available from 2012 until On average, it stands around 3.5 GWh/h. (1) The Manosque storage facility, owned by the firm Géométhane, is not included within this scope. 17

18 Outlook analysis with the benchmark scenario Intraday flexibility provided by other networks At GRTgaz s request, during the first 2009 analysis, TIGF studied the flexibility that could be made available at Cruzy interconnection point. In that study, TIGF indicated that the intraday flexibility available on its network was provided by storage facilities and not by linepack. Indeed, the design of the network is such that the pipelines are operated at close to maximum operating pressure, which leaves very little possibility of varying the pressure to make usable linepack available. over the period , a period during which TIGF knows that no highly modulated sites will be commissioned on its network. This flexibility is about 1.5 GWh/h on average, subject to a minimum hourly flow rate being maintained at Cruzy in winter. For this study update, TIGF looked at the flexibility that could be made available to GRTgaz on the basis of capacity available in storage facilities, and of the possibility of transferring this storage flexibility to Cruzy. In practice, TIGF is capable of providing flexibility Future developments in intraday modulation needs and available flexibility sources Taking the year 2011 as the baseline, intraday modulation needs and the sources of intraday flexibility over the period evolve as follows: Development of needs/sources over the period of the study CCGT GT Modulation needs Flexibility sources Internal flexibility (Linepack) External flexibility CHP

19 Outlook analysis with the benchmark scenario Findings 1/ Summary of findings The table below shows, for each year, the level to which intraday modulation needs for highly modulated sites are covered on working days, and the number of days for which these needs are not fully covered. On days when intraday modulation needs are partially covered, highly modulated sites will have to operate on a modified schedule. The impact on the planned schedule consists in reducing the modulation amplitude for that day. Year Frequency of total coverage of modulation needs Frequency of partial coverage of modulation needs Potential impact on the modulation amplitude Comments % <1 day per year 14% Potential stress in June % <1 day per year 10% Potential stress in March and in June % <1 day per year 13% Potential stress in June % <1 day per year 16% End of contribution from TIGF and Fos Tonkin: potential stresses in winter and in June % - - Marginal use of external flexibility % - - Internal flexibility statistically covers all needs The results of the study show that the gas infrastructures have excellent capacity to meet the intraday modulation needs of highly modulated sites, with a level of coverage of needs statistically in excess of 99.7% in all the years considered. In real terms, GRTgaz may have to ask highly modulated sites to modify their schedules on less than 1 day per year over the period , and should be able to cover all needs from In 2015, slight stresses may also occur in winter, a time of high gas consumption when useable linepack becomes less available. Until 2015, external resources will be a major source of flexibility to cover the intraday modulation needs of highly modulated sites, especially in winter when they could be predominant. In contrast, the use of external sources of intraday flexibility becomes marginal in 2016, and ceases to be necessary from 2017 onwards. Low levels of stress could arise in the month of June in the years 2012 to 2015: this is explained by high demand for modulation by the highly modulated sites, and by engineering works on storage facilities and the transmission network, which will result in temporary reductions in the flexibility available from these infrastructures. 19

20 Outlook analysis with the benchmark scenario 2/ Close-up on the years 2012 and 2015 The more detailed findings are presented below for the year 2012, corresponding to the near future, and for 2015, when total coverage of needs is slightly lower and achieves a level of 99.7%. Coverage of modulation needs for the year benchmark scenario Frequency of full coverage modulation requirements of highly modulated sites Month Work. Day January % February % March 99.90% April % May 99.90% June 99.40% July % August 99.90% September % October 99.80% November % December % Total 99.90% In case of partial coverage (<1 day/year), average amplitude reduction of 14% January February Contribution from flexibility sources (in GWh/h) March April Contribution from internal flexibility May June July August September October November December Contribution from external flexibility The month-by-month analysis confirms that all needs are broadly covered. In 2012, linepack very largely contributes to meeting intraday modulation needs over the summer (in the region of 85%) and between seasons (in the region of 70%). This contribution is smaller in winter (some 20%), a time when flow rates are at the highest on the network and external flexibility sources are heavily drawn on. Coverage of modulation needs for the year benchmark scenario Frequency of full coverage modulation requirements of highly modulated sites Month Work. Day January 99.60% February 99.90% March 99.80% April % May % June 99.10% July % August 99.90% September % October 99.60% November 99.40% December 99.70% Total 99.70% In case of partial coverage (<1 day/year), average amplitude reduction of 16% January February Contribution from flexibility sources (in GWh/h) March April May June July August September October November December Contribution from internal flexibility Contribution from external flexibility 20

21 Outlook analysis with the benchmark scenario The frequency of coverage of highly modulated sites needs remains high, although two sources of external flexibility the Fos Tonkin LNG terminal and TIGF are no longer taken into account, and two additional highly modulated sites are present on the network. Coverage of needs remains excellent, since the risk of any impact on schedules is statistically limited to 1 day per year. In 2015, linepack makes a predominant contribution over the summer (some 95%) and between seasons (some 86%). Its contribution is lower (some 40%) in winter, because of high rates of flow on the network, in which case external flexibility sources will be used to meet the intraday modulation needs of highly modulated sites. The actual impact on the operation of highly modulated sites on that day when needs are not fully covered would be a requirement to operate a modified schedule: n either to operate with a slightly reduced hourly amplitude (some 16% on average) at equal consumption on the day in question, as shown in figure 1; n or to operate with a slightly reduced hourly amplitude (some 16% on average) by reducing consumption on the day in question, as shown in figure 2; n or to operate with constant hourly consumption over the day. Figure 1: Modification of hourly amplitude (at equal consumption) Figure 2: Modification of hourly amplitude (with reduced consumption) am 7 am 8 am 9 am 10 am 11 am 12 am 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pm 8 pm 9 pm 10 pm 11 pm Midnight 1 am 2 am 3 am 4 am Schedule Modified schedule Average 5 am 0 3 am 5 am 7 am 9 am 11 am 1 pm 3 pm 5 pm Schedule Modified schedule Average 7 pm 9 pm 11 pm 1 am 3 am 5 am 21

22 Outlook analysis with the benchmark scenario 3/ Findings for the post-2016 period From 2016 onwards, the modulation needs of highly modulated sites are fully covered. In addition, coverage is statistically provided almost entirely from usable linepack - GRTgaz s internal intraday flexibility resource - since the major pipeline infrastructures Hauts de France II (final stage) and Arc de Dierrey (2016) then Eridan (2017) come into service. The findings show that the infrastructures could provide intraday flexibility for even a greater number of sites, provided that there is sufficient transmission capacity available to support the significant rise in gas consumption. 4/ Comparison with the previous study The findings presented above show a very clear improvement in the coverage of the intraday modulation needs of highly modulated sites in comparison with the findings of the study published in The main conclusions of the previous study predicted a partial coverage of the needs of highly modulated sites in October and November 2012, over 10 to 15% of the sites operating days, and a gradually diminishing frequency of the total coverage of modulation needs. That study also concluded that, subject to the implementation of certain investments on the transmission network, modulation needs were likely to be fully covered for the years In fact, one of the factors explaining this clear improvement is the decision to build new pipelines Hauts de France 2 and Arc de Dierrey which were not included in the previous study. For its part, the construction of the Eridan pipeline had already been taken into account for the year Other hypotheses in the study have also changed significantly: n in terms of modulation needs, the producers modulation forecasts are on average less substantial; n with regard to intraday flexibility sources, the change in the operating conditions of storage facilities and a more refined (hour by hour) analysis of their operating performance, has resulted in a significantly higher assessment of their potential level of flexibility than in the study published in 2010; n the flexibility of the LNG terminals has also been revised: flexibility at Montoir is ruled out, but flexibility at Fos Cavaou has been included following trials to quantify what it is technically possible to do. Conclusion Over the period , the French gas infrastructures provide excellent capacity to meet the day-ahead intraday modulation needs of highly modulated sites, a capacity that increases substantially from 2016 onwards. In terms of the provision of day-ahead intraday flexibility, they are even able to accommodate a substantially greater number of sites than are considered in this study (i.e. the equivalent of 22 CCGT units by 2020). 22

23 Outlook analysis with the variant scenarios Outlook analysis with the variant scenarios Introduction Alongside the benchmark scenario, GRTgaz worked on the definition and exploration of additional scenarios in order to cover the full range of possibilities. A first, less constrained Low modulation demand scenario, in which combined-cycle gas turbine power plants develop more slowly than in the benchmark scenario, and in which the flexibility available from Storengy s storage facilities is greater than in the benchmark scenario. A second, constrained High modulation demand scenario, which explores a very high level of intraday flexibility need of the highly modulated sites, and in which the other assumptions are equivalent to those applied in the benchmark scenario. The main assumptions used in these scenarios are summarised in the table below: Scenario Modulation needs Flexibility source Modulation Number of CCGT units Storage facilities Benchmark Producer data GRTgaz benchmark - 19 in 2020 Average scenario Low modulation demand Producer data RTE benchmark - 14 in 2020 Optimistic scenario High modulation demand Max. amplitude, over 16 hours GRTgaz benchmark - 19 in 2020 Average scenario Low modulation demand scenario Hypotheses The development of CCGT plants is assumed to remain at 13 units beyond 2013, rising to 14 units in 2020, which corresponds to all the projects in place or under construction, with the addition of the Brest facility project. The operating assumptions are those provided by the producers, and therefore the same as in the benchmark scenario. In terms of external flexibility resources, high availability is assumed for the flexibility provided by Storengy (so-called optimistic assumptions, which reflect the maximum technical performance of each storage site). The other resources (TIGF, Fos Tonkin or Fos Cavaou LNG terminals) are the same as in the benchmark scenario. Findings Under this scenario, all the intraday modulation needs of highly modulated sites are covered for all the years simulated. In addition, from 2016, GRTgaz s internal flexibility is statistically capable of meeting all needs. 23

24 Outlook analysis with the variant scenarios High modulation demand scenario Hypotheses In the benchmark scenario, the modulation considered for the sites is based on hypotheses provided by the sites. In the high modulation demand scenario, GRTgaz has considered much constrained conditions, already explored in the study published in 2010, i.e. a socalled 16 hours forced modulation, with a maximum amplitude variation: in this case, all the highly modulated sites are envisaged as operating at full load for 16 hours, and being off operation for the remaining hours. This profile was applied every day of the year, on both working and nonworking days. This picture of the operation of the sites places the benchmark scenario under genuine stress, since it doubles the modulation needs vs. the producers forecasts, as shown hereafter. In terms of the development of the fleet, the assumptions in the benchmark scenario have been retained, i.e. 19 CCGT units by 2020, 5 GT units, and 1 equivalent unit for CHP plants by Modulated volume - «high modulation demand» scenario Modulated volumen in GWh Aggregated schedule - Assumption for producers Working Days Modulation at maximum amplitude over a 16-hour period Finally, the same data for flexibility sources are used as in the benchmark scenario. Findings 1/ Summary Year Frequency of total coverage of modulation needs Frequency of partial coverage of modulation needs Potential impact on modulation amplitude Comments % 2-3 days/year 12% Potential stress in March, June and August % 2-3 days/year 13% Potential stress in winter and in June % 3-4 days/year 11% Potential stress in winter and in June % 9-10 days/year 13% End of contribution from TIGF and Fos Tonkin: potential stresses all year long % - - Use of external flexibility in winter only % - - Internal flexibility statistically covers all needs 24

25 Outlook analysis with the variant scenarios 2/ Period The needs of the highly modulated sites continue to be covered to a very high level: in the region of 99% for the years 2012 to 2014, falling to 97% in 2015, which in practice represents a requirement on highly modulated sites to limit the amplitude of their modulation schedule for less than one day per month. 3/ Post-2016 period After 2016, coverage of the modulation needs of highly modulated sites is statistically total. In 2016, covering this demand still requires substantial use of external sources of flexibility, but from 2017 onwards it is met from GRTgaz s usable linepack. The increased stress in 2015 reflects the same factors as in the benchmark scenario: fewer external sources of flexibility and an even more significant rise in demand from highly modulated sites as a result of maximum modulation schedules being applied to the 2 additional units. The results for 2015 presented below show greater stress in the month of March, a period when linepack levels are fairly low and there is less available flexibility in storage facilities following the end of a withdrawal period. The contribution from linepack for 2015 remains high, in the region of 90% in summer and 75% between seasons. It falls substantially (to some 30%) in winter. Coverage of modulation needs for the year «high modulation demand» scenario Frequency of full coverage modulation requirements of high modulated sites 14 Contribution from flexibility sources (in GWh/h) Month January February March April May June July August September October November December Work. Day 94.90% 96.20% 91.60% 99.50% 99.10% 96.30% 99.60% 97.20% 99.90% 97.50% 96.30% 98.00% January February March April May June July August September October November December Total 97.10% In case of partial coverage (9-10 days/year), average amplitude reduction of 13% Contribution from internal flexibility Contribution from external flexibility Conclusion In the low modulation demand scenario, intraday modulation needs are fully covered. Even in the case of the high modulation demand scenario, which considers extremely high intraday modulation needs by the highly modulated sites, these needs are covered to a very high level. 25

26 Glossary Daily modulated volume The variation in the quantity delivered to a highly modulated site in the course of a day. This constitutes the sum, for a given day, of the differences in absolute value between the actual or forecast hourly consumption and the recorded or forecast daily consumption divided by 24, all divided by 2. Daily modulation of natural gas consumption Refers to a customer s need to be able to vary its daily consumption of natural gas in the course of a year. Highly modulated site (HMS) A site is said to be highly modulated when it shows a daily modulated volume in excess of 0.8 GWh/d per operating day. The daily modulated volume is the sum, for all hours in a gas day (from 6 a.m. on day D to 6 a.m. on day D+1), of the differences in absolute value between the recorded hourly consumption and the average daily consumption, divided by two. Flexibility sources Refer to the resources used by GRTgaz to meet intraday modulation needs. These resources may be internal (linepack) or external, where flexibility is obtained from other infrastructures (LNG terminals, storage facilities, other transmission networks). Intraday modulation of natural gas consumption Refers to a customer s need to be able to vary its hourly consumption of natural gas during a gas day. Operating amplitude Difference between maximum hourly consumption and minimum hourly consumption for a given day. Usable linepack A source of intraday flexibility intrinsic to the transmission network, corresponding to a proportion of the natural gas present in the pipelines. For a given day, the availability of this source depends on gas flows, pressure constraints and on which pipelines are in operation on the transmission network. 26

27 GRTgaz may not be held liable for damage of any kind whatsoever, whether direct or indirect, resulting from the use of the data and information contained in this document, and in particular for any operating, financial or commercial loss. This document is the property of GRTgaz. Any communication, reproduction, publication in whole or in part or use is prohibited without the written permission of GRTgaz.

28 Find us on your mobile Immeuble Bora 6, rue Raoul Nordling Bois-Colombes Cedex France December Media library reference: 2RTB GRTgaz s photograph credits: Azmoun Hamid, Crampes Gilles, Didier Marc, Dunouau Franck, Dupont Cyrille, Dureuil Philippe, Garault Eric, Grollier Philippe, Helsly Cédric - Illustration: Lucie Bertrand / lbcreations@orange.fr - Graphic design and production: - These documents are printed on 100% recyclable, chlorine-free bleached paper made from sustainably managed forests, in a European factory certified ISO 9001 (for its quality management), ISO (for its environmental management) and EMAS (for its environmental performance), by a printing firm with IMPRIM VERT, PEFC and FSC certifications.

Winter Outlook

Winter Outlook Winter Outlook 2016-2017 GRTgaz SA and TIGF SA may not be held liable for direct or indirect prejudice of any type that results from the use or processing of the information contained herein, in particular

More information

Winter Outlook

Winter Outlook Winter Outlook 2016-2017 GRTgaz SA and TIGF SA may not be held liable for direct or indirect prejudice of any type that should result from the use or processing of any of the information herein, in particular

More information

Development statement on GRTgaz s transmission system

Development statement on GRTgaz s transmission system Development statement on GRTgaz s transmission system 2010-2019 Contents Framework of the development statement and its evolution Changes in demand Highlights 2010 Capacity provision schedule Development

More information

Winter Outlook Released 24 October 2017

Winter Outlook Released 24 October 2017 Released 24 October 2017 GRTgaz SA and TIGF SA may not be held liable for direct or indirect prejudice of any type that should result from the use or processing of any of the information herein, in particular

More information

Feasability study of the merger of GRTgaz North and GRTgaz South zones

Feasability study of the merger of GRTgaz North and GRTgaz South zones Feasability study of the merger of GRTgaz North and GRTgaz South zones Pierre-Laurent Lucille 1 Market design changes in France 330 TWh 170 TWh? 500 TWh 460 TWh North merger completed in 2009 Investments

More information

CODE OPERATIONNEL DE RESEAU ACHEMINEMENT

CODE OPERATIONNEL DE RESEAU ACHEMINEMENT CODE OPERATIONNEL DE RESEAU ACHEMINEMENT PART B1.1 METHOD FOR DETERMINING UPSTREAM CAPACITY Disclaimer The present translation is not binding and proposed by GRTgaz exclusively for information purposes.

More information

Evolution of the ATM5 offer Proposals from Elengy and Fosmax LNG

Evolution of the ATM5 offer Proposals from Elengy and Fosmax LNG Evolution of the ATM5 offer Proposals from Elengy and Fosmax LNG Contents 1 Background... 2 2 Regasification services... 2 2.1 Core service... 2 2.2 Uniform option... 3 2.3 Spot service... 4 2.4 Management

More information

Shippers meeting. Maintenance schedule. 2011, February 11 th

Shippers meeting. Maintenance schedule. 2011, February 11 th Shippers meeting Maintenance schedule 2011, February 11 th 1 2 Welcome Agenda Le t s have a look back on 2010 Sophie Ménard Marketing & Sales 2011 maintenance schedule Marie Benoit Gas System Direction

More information

TRF & PEG news. Prices and liquidity of the. Price and liquidity focus p.2-3. Network flows and limits. 2 days of red alert*, i.e.

TRF & PEG news. Prices and liquidity of the. Price and liquidity focus p.2-3. Network flows and limits. 2 days of red alert*, i.e. TRF & PEG news + + SPRING ISSUE: WINTER REVIEW AND PROSPECTS FOR THE SUMMER The first winter of operation of the Trading Region France was particularly positive: the results in terms of price and liquidity

More information

Construisons le transport de demain

Construisons le transport de demain OVERVIEW le transport de demain COVERING 32,246 km IN FRANCE, THE GRTgaz NATURAL GAS TRANSMISSION NETWORK IS THE LONGEST IN EUROPE GRTgaz, an independent transmission operator, is owned by GDF SUEZ (75

More information

CODE OPERATIONNEL DE RESEAU TRANSMISSION

CODE OPERATIONNEL DE RESEAU TRANSMISSION CODE OPERATIONNEL DE RESEAU TRANSMISSION PART B3.1 CONDITIONS OF CAPACITY AVAILABILITY AT ENTRY/EXIT POINTS OF GRTGAZ TRANSMISSION SYSTEM EXCLUDING MAINTENANCE PERIODS Disclaimer The present translation

More information

Code Opérationnel de Réseau Transmission

Code Opérationnel de Réseau Transmission Code Opérationnel de Réseau Transmission Part B3.5 The distribution of capacity between the North-South link and PITS Nord Atlantique and Sud Atlantique For information Sommaire Physical network Physical

More information

PROPOSAL FOR THE UPGRADE OF THE BALANCING SYSTEM OF GRTGAZ S TRANSMISSION NETWORK

PROPOSAL FOR THE UPGRADE OF THE BALANCING SYSTEM OF GRTGAZ S TRANSMISSION NETWORK PROPOSAL FOR THE UPGRADE OF THE BALANCING SYSTEM OF GRTGAZ S TRANSMISSION NETWORK 5 JULY 2010 Courcellor 1 2, rue Curnonsky 75017 PARIS tel (+33) 01 47 54 30 00 fax (+33) 01 47 54 29 47 www.grtgaz.com

More information

CORE TRANSMISSION. The English Translation for information. Version of Disclaimer

CORE TRANSMISSION. The English Translation for information. Version of Disclaimer CORE TRANSMISSION PART B3.1 - CONDITIONS OF CAPACITY AVAILABILITY AT THE ENTRY/EXIT POINTS OF GRTGAZ'S TRANSMISSION SYSTEM OUTSIDE ENGINNERING WORK PERIODS - 214/215 The English Translation for information

More information

Main developments in the gas and electricity markets in France in Commission de Régulation de l Energie (CRE) 31 st July 2013

Main developments in the gas and electricity markets in France in Commission de Régulation de l Energie (CRE) 31 st July 2013 Main developments in the gas and electricity markets in France in 2012 Commission de Régulation de l Energie (CRE) 31 st July 2013 1. Major Developments for the regulator in 2012 The year 2012 was marked

More information

Shippers meeting Maintenance Schedule

Shippers meeting Maintenance Schedule Shippers meeting Maintenance Schedule February 9 th, 2012 1 Agenda Look back at 2011 LNG terminal maintenance 2012 maintenance schedule 2012 shippers survey Communication and publication Ongoing European

More information

TRANSMISSION CONTRACT ON THE NATURAL GAS TRANSMISSION SYSTEM

TRANSMISSION CONTRACT ON THE NATURAL GAS TRANSMISSION SYSTEM TRANSMISSION CONTRACT ON THE NATURAL GAS TRANSMISSION SYSTEM Appendix 1 GENERAL TERMS AND CONDITIONS Version of June 1, 2010 NON BINDING The English translation of the General Terms and Conditions of the

More information

Gassco. Dunkirk BELGIUM. Alveringem. Taisnières. Fluxys. Cuvilly. Obergailbach. Beynes. Dierrey- Saint-Julien. Étrez. Vindecy.

Gassco. Dunkirk BELGIUM. Alveringem. Taisnières. Fluxys. Cuvilly. Obergailbach. Beynes. Dierrey- Saint-Julien. Étrez. Vindecy. OVERVIEW UNITED KINGDOM Gassco Dunkirk LNG Dunkirk Pitgam Arleux-en- Gohelle Alveringem BELGIUM Taisnières Fluxys GERMANY Elengy Bréal Nozay Fontenay- Mauvoisin Cherré Auvers le-hamon Roussines Brizambourg

More information

CORE TRANSMISSION. The English Translation for information. Version of Disclaimer

CORE TRANSMISSION. The English Translation for information. Version of Disclaimer CORE TRANSMISSION PART B3.1 - CONDITIONS OF CAPACITY AVAILABILITY AT THE ENTRY/EXIT POINTS OF GRTGAZ'S TRANSMISSION SYSTEM OUTSIDE ENGINNERING WORK PERIODS - 212/213 The English Translation for information

More information

CRE consultation on the creation of a single gas market area

CRE consultation on the creation of a single gas market area CRE consultation on the creation of a single gas market area n EFET response 15 September 2017 The European Federation of Energy Traders (EFET) thanks CRE for the opportunity to react to its proposals

More information

Present: Philippe DE LADOUCETTE, Chairman, Olivier CHALLAN BELVAL, Catherine EDWIGE and Michel THIOLLIERE commissioners.

Present: Philippe DE LADOUCETTE, Chairman, Olivier CHALLAN BELVAL, Catherine EDWIGE and Michel THIOLLIERE commissioners. Deliberation Paris, 7 May 2014 Deliberation of the French Energy Regulatory Commission dated 7 May 2014 setting out guidelines for the creation of a single marketplace in France by 2018 Present: Philippe

More information

Decision. on 1 st April Decision of 30 October 2014 forming a ruling on the changes to the ATRT5 tariff concerning the interim measures

Decision. on 1 st April Decision of 30 October 2014 forming a ruling on the changes to the ATRT5 tariff concerning the interim measures Decision Deliberation of the French Regulatory Commission of Energy of 19 March 2015 deciding on the evolution of the tariffs for the use of natural gas transmission networks as of 1 April 2015 Present

More information

Deliberation. I - The Context. 1. The European regulatory framework: Directive 2003/55/CE

Deliberation. I - The Context. 1. The European regulatory framework: Directive 2003/55/CE Deliberation Deliberation of July 23 2009 regarding French Energy Regulatory Commission s opinion on the request filed by Dunkerque LNG Company for an exemption from regulated third party access to its

More information

Capacity reserves until 2025: declining, but sufficient

Capacity reserves until 2025: declining, but sufficient 1 Capacity reserves until 2025: declining, but sufficient Trends from ENTSO-E s Scenario Outlook & Adequacy Forecast 2015 Once a year, ENTSO-E 1 publishes a Scenario Outlook & Adequacy Forecast (SO&AF).

More information

GRTGAZ NETWORK TRANSMISSION CONTRACT

GRTGAZ NETWORK TRANSMISSION CONTRACT GRTGAZ NETWORK TRANSMISSION CONTRACT SECTION B UPSTREAM NETWORK VERSION APPLICABLE AS OF 1ST APRIL 2016 English translation for information. Disclaimer The present translation is not binding and is provided

More information

Deliberation by the French Energy Regulatory Commission of 22 March 2018 on the examination of the 10-year development plans of GRTgaz and TIGF

Deliberation by the French Energy Regulatory Commission of 22 March 2018 on the examination of the 10-year development plans of GRTgaz and TIGF DELIBERATION NO 2018-072 Deliberation by the French Energy Regulatory Commission of 22 March 2018 on the examination of the 10-year development plans of GRTgaz and TIGF Present: Jean-François CARENCO,

More information

Update on the Concertation Gaz Process. Benoît Pouzieux et Jean-Marc Brimont

Update on the Concertation Gaz Process. Benoît Pouzieux et Jean-Marc Brimont Update on the Concertation Gaz Process Benoît Pouzieux et Jean-Marc Brimont Update on the Concertation Gaz process Agenda An effective and mature process The need to connect with the European process 2010

More information

CRE consultation on the implementation of regulated access to underground gas storage in France

CRE consultation on the implementation of regulated access to underground gas storage in France CRE consultation on the implementation of regulated access to underground gas storage in France n EFET response 23 January 2018 The European Federation of Energy Traders (EFET) thanks CRE for the opportunity

More information

EUROPEAN ENERGY SECURITY GAS INFRASTRUCTURE CONTRIBUTION FRENCH ILLUSTRATION

EUROPEAN ENERGY SECURITY GAS INFRASTRUCTURE CONTRIBUTION FRENCH ILLUSTRATION EUROPEAN ENERGY SECURITY GAS INFRASTRUCTURE CONTRIBUTION FRENCH ILLUSTRATION Nathalie Zavidovique Infrastructure Strategy GDF SUEZ Paris, Nov. 30th 2012 Contents 1. GDF SUEZ profile 2. What does security

More information

TRF : Maintenance Schedule 2019

TRF : Maintenance Schedule 2019 TRF : Maintenance Schedule 2019 Agenda Main changes Maintenance Schedule 2019 How to read the Excel file Summary & schedule GRTgaz Maintenance Schedule 2019 2 Main changes GRTgaz Maintenance Schedule 2019

More information

Operator of LNG terminals since 1965 PIONEERING THE LNG INDUSTRY

Operator of LNG terminals since 1965 PIONEERING THE LNG INDUSTRY Operator of LNG terminals since 1965 PIONEERING THE LNG INDUSTRY THE WAY AHEAD FOR LNG 2 4 Registered office 1 3 Elengy, a GDF SUEZ subsidiary, is a committed player in the development and transformation

More information

Present: Jean-François CARENCO, President, Catherine EDWIGE, Hélène GASSIN, Jean-Laurent LASTELLE et Jean-Pierre SOTURA, commissioners.

Present: Jean-François CARENCO, President, Catherine EDWIGE, Hélène GASSIN, Jean-Laurent LASTELLE et Jean-Pierre SOTURA, commissioners. DECISION NO. 2018-022 Deliberation of the French Energy Regulatory Commission of 7 February 2018 deciding on the evolution of the tariff for the use of GRTgaz and TIGF natural gas transmission networks

More information

Smart grids. Socioeconomic value and optimal flexibility portfolios JUNE 2017 RTE SUMMARY

Smart grids. Socioeconomic value and optimal flexibility portfolios JUNE 2017 RTE SUMMARY Smart grids Socioeconomic value and optimal flexibility portfolios JUNE 2017 RTE SUMMARY BACKGROUND To succeed in the energy transition, i.e. increase the share of renewable energy sources in the generation

More information

RTE Réseau de transport d électricité shall not be liable for damages of any nature, direct or indirect, arising from the use, exploitation or

RTE Réseau de transport d électricité shall not be liable for damages of any nature, direct or indirect, arising from the use, exploitation or GENERATION ADEQUACY ACY REPORT on the electricity city supply-demand balance an in France 216 EDITION IO EXECUTIVE SUMMARY RTE Réseau de transport d électricité shall not be liable for damages of any nature,

More information

[R]enewables 24/7 EXECUTIVE SUMMARY

[R]enewables 24/7 EXECUTIVE SUMMARY [R]enewables 24/7 EXECUTIVE SUMMARY Infrastructure needed to save the climate Grids keep power systems working The electricity grid' is a collective name for all wires, transformers and infrastructure

More information

The French wholesale electricity, natural gas and CO 2 markets in

The French wholesale electricity, natural gas and CO 2 markets in The French wholesale electricity, natural gas and CO 2 markets in 21-211 October 211 Table of contents Table of contents 2 Introduction 5 Overview 7 Section I: The wholesale electricity markets 12 1. Development

More information

Lesson learned about the integration of large amount of volatile Renewable Energy Resources

Lesson learned about the integration of large amount of volatile Renewable Energy Resources Francesco Rizzo, Area Manager America & Iberia III BIREGIONAL FORUM WEC N.A. AND LAC- Cancun, Dec. 6-7, 2012 How to Satisfy the Energy Demand of the Americas in a World with Greater Environmental and Financial

More information

TRF : Maintenance Schedule GRTgaz and Teréga common superpoints

TRF : Maintenance Schedule GRTgaz and Teréga common superpoints TRF : Maintenance Schedule 2019 GRTgaz and Teréga Agenda 1st part: the consolidated Maintenance Schedule 2019 (1h) What s new Focus on the superpoints Trans@ctions and Smart Our new simulator 2 nd part:

More information

Operator of LNG terminals since 1965 PIONEERING THE LNG INDUSTRY

Operator of LNG terminals since 1965 PIONEERING THE LNG INDUSTRY Operator of LNG terminals since 1965 PIONEERING THE LNG INDUSTRY THE WAY AHEAD FOR LNG 2 4 Registered office 1 3 Elengy, an ENGIE subsidiary, is a committed player in the development and transformation

More information

STUDY SUMMARY (F) CDC-1319

STUDY SUMMARY (F) CDC-1319 Commission for Electricity and Gas Regulation Rue de l Industrie 26-28 1040 Brussels Tel.: 02/289.76.11 Fax: 02/289.76.09 COMMISSION FOR ELECTRICITY AND GAS REGULATION STUDY SUMMARY (F)140430-CDC-1319

More information

Energy. a source of progress

Energy. a source of progress Energy a source of progress Group Profile 198,200 employees throughout the world inc. 134,800 in energy and services and 63,400 in environment 74.3 billion euros in revenues in 2007 1,300 researchers and

More information

STUDY REGARDING THE ADEQUACY AND FLEXIBILITY NEEDS OF THE BELGIAN POWER SYSTEM. Period

STUDY REGARDING THE ADEQUACY AND FLEXIBILITY NEEDS OF THE BELGIAN POWER SYSTEM. Period STUDY REGARDING THE ADEQUACY AND FLEXIBILITY NEEDS OF THE BELGIAN POWER SYSTEM Period 2017-2027 APRIL 2016 1 EXECUTIVE SUMMARY About the adequacy of the electricity system 7 Adequacy assessment complemented

More information

Locational Spread. For network congestion management Winter 17/18

Locational Spread. For network congestion management Winter 17/18 Locational Spread For network congestion management Winter 17/18 Contents Congestions General process of congestion management Locational Spread Call for Tenders Supplier s obligations Penalties Contractual

More information

Dynamic reserve requirement in real time operation

Dynamic reserve requirement in real time operation Dynamic reserve requirement in real time operation Daniel Huertas Hernando SINTEF Energy Research SINTEF Energy Research 1 Wind power forecast uncertainty Uncertainty is higher for 1 wind farm than for

More information

NATURAL GAS STORAGE FAST. STRATEGIC. SAFE.

NATURAL GAS STORAGE FAST. STRATEGIC. SAFE. NATURAL GAS STORAGE FAST. STRATEGIC. SAFE. OUR CONCERN: YOUR NEEDS. TODAY AND TOMORROW. DELIVERING INNOVATIONS. Storengy is part of the international ENGIE Group and handles the company s global gas storage

More information

1. First of all, the CREG analysed the way in which the market operates. Its conclusions are as follows:

1. First of all, the CREG analysed the way in which the market operates. Its conclusions are as follows: Study on the measures to be taken in order to ensure an adequate volume of conventional production means to assure Belgium's electricity security of supply Following a request from the Minister of Energy,

More information

Locational Spread: a market mechanism

Locational Spread: a market mechanism Locational Spread: a market mechanism Context The locational spread arises from the works with shippers during the construction of the Single Marketplace, within the Concertation Gaz working group. This

More information

RELIABILITY AND SECURITY ISSUES OF MODERN ELECTRIC POWER SYSTEMS WITH HIGH PENETRATION OF RENEWABLE ENERGY SOURCES

RELIABILITY AND SECURITY ISSUES OF MODERN ELECTRIC POWER SYSTEMS WITH HIGH PENETRATION OF RENEWABLE ENERGY SOURCES RELIABILITY AND SECURITY ISSUES OF MODERN ELECTRIC POWER SYSTEMS WITH HIGH PENETRATION OF RENEWABLE ENERGY SOURCES Evangelos Dialynas Professor in the National Technical University of Athens Greece dialynas@power.ece.ntua.gr

More information

CODE OPERATIONNEL DE RESEAU TRANSMISSION

CODE OPERATIONNEL DE RESEAU TRANSMISSION CODE OPERATIONNEL DE RESEAU TRANSMISSION PART E1.3 SCHEDULING EXCEPT ON TITLE TRANSFERT POINTS Disclaimer The present translation is not binding and proposed by GRTgaz exclusively for information purposes.

More information

Study on the value of flexibility in the management and design basis of distribution networks in France

Study on the value of flexibility in the management and design basis of distribution networks in France Study on the value of flexibility in the management and design basis of distribution networks in France Summary - Version dated 7 December 2015 This document is a translation of E-CUBE Strategy Consultants

More information

POSITION ON GENERATION ADEQUACY, CAPACITY MECHANISMS AND THE INTERNAL MARKET IN ELECTRICITY

POSITION ON GENERATION ADEQUACY, CAPACITY MECHANISMS AND THE INTERNAL MARKET IN ELECTRICITY POSITION ON GENERATION ADEQUACY, CAPACITY MECHANISMS AND THE INTERNAL MARKET IN ELECTRICITY 6 March 2013 1 About UFE The Union Française de l Electricité (UFE) is the association of the French electricity

More information

RESEARCH, DEVELOPMENT AND INNOVATION (R&D&I) 2017 ANNUAL REPORT

RESEARCH, DEVELOPMENT AND INNOVATION (R&D&I) 2017 ANNUAL REPORT RESEARCH, DEVELOPMENT AND INNOVATION (R&D&I) 2017 ANNUAL REPORT CONTENTS FOREWORD O1 A benchmark in natural 2 gas transmission Research, 4 development and innovation with a purpose O2 Industrial safety

More information

Agenda Short and medium term impact of the German moratorium Longer term challanges: maintaining supply security during decarbonization

Agenda Short and medium term impact of the German moratorium Longer term challanges: maintaining supply security during decarbonization Challenges in electricity a focus on Europe Agenda Short and medium term impact of the German moratorium Longer term challanges: maintaining supply security during decarbonization Germany: Moderate, 10%

More information

TEN-YEAR NETWORK DEVELOPMENT PLAN

TEN-YEAR NETWORK DEVELOPMENT PLAN 10 th edition 2015-2024 TEN-YEAR NETWORK DEVELOPMENT PLAN contents Profile...1 Framework of the GRTgaz ten-year network development plan...2 Foreword by the managing director...4 Summary...5 1. evolution

More information

Executive Summary. Engineering Report of the: Adaptation of jetties and LNG transfer facilities for loading of bunker vessels in Fos Tonkin

Executive Summary. Engineering Report of the: Adaptation of jetties and LNG transfer facilities for loading of bunker vessels in Fos Tonkin Executive Summary Engineering Report of the: Adaptation of jetties and LNG transfer facilities for loading of bunker vessels in Fos Tonkin index 01 INTRODUCTION page 4 02 GENERAL DESCRIPTION OF THE PROJECT

More information

SEDC event EDF Vision of demand response and new opportunities for Power System

SEDC event EDF Vision of demand response and new opportunities for Power System SEDC event EDF Vision of demand response and new opportunities for Power System Bernard Delpech Deputy executive vice president EDF R&D 3 October 2011 Table of Contents Context and Challenges in France

More information

Smart grids. Socioeconomic value and optimal flexibility portfolios JUNE 2017 RTE SUMMARY

Smart grids. Socioeconomic value and optimal flexibility portfolios JUNE 2017 RTE SUMMARY Smart grids Socioeconomic value and optimal flexibility portfolios JUNE 2017 RTE SUMMARY BACKGROUND In order to make successfull the energy transition, i.e. increase the share of renewables energy sources

More information

Implementation of the Balancing Network Code: an overview of TSOs main challenges

Implementation of the Balancing Network Code: an overview of TSOs main challenges Implementation of Balancing Network Code 20 November 2013 Rev 1 Implementation of the Balancing Network Code: an overview of TSOs main challenges ENTSOG AISBL; Av. de Cortenbergh 100, 1000-Brussels; Tel:

More information

FRENCH REGULATED LNG TERMINALS

FRENCH REGULATED LNG TERMINALS FRENCH REGULATED LNG TERMINALS SCHEDULING FLEXIBILITY COMPETITIVE TARIFFS ACCESS TO BOTH MEDITERRANEAN AND ATLANTIC SHORES TARIFFS APPLICABLE AS OF 1 ST APRIL 2017 02/ MONTOIR-DE- BRETAGNE SPOT* /MWh $/MMBtu

More information

CAMG Gestion Opérationnelle des Contrats Tariff Operational rules

CAMG Gestion Opérationnelle des Contrats Tariff Operational rules 29 Tariff Operational rules A simplified transmission system and new services for shippers New point codes North-South link New Short-Term Use-It-or-Lose-It service (UIOLI 29) -2- A simplified transmission

More information

EWEA Response to the European Wind Integration Study (EWIS) Report Main Conclusions in a Nutshell

EWEA Response to the European Wind Integration Study (EWIS) Report Main Conclusions in a Nutshell EWEA Response to the European Wind Integration Study (EWIS) Report Main Conclusions in a Nutshell A consortium of Transmission System Operators (TSOs) carried out the European Wind Integration Study (EWIS)

More information

FUTURE ROLES AND RESPONSIBILITIES FOR THE DELIVERY OF ANCILLARY SERVICES

FUTURE ROLES AND RESPONSIBILITIES FOR THE DELIVERY OF ANCILLARY SERVICES FUTURE ROLES AND RESPONSIBILITIES FOR THE DELIVERY OF ANCILLARY SERVICES Market Development 11/12/2017 Version management Version Date Summary of changes 1 11/12/2017 Original version 11/12/2017 Future

More information

OUTLOOK. natural renewable gas 2017 GAS ADEQUACY REPORT

OUTLOOK. natural renewable gas 2017 GAS ADEQUACY REPORT OUTLOOK natural renewable gas 2017 GAS ADEQUACY REPORT INTRODUCTION P. 4 CONTEXT AND METHODOLOGIES P. 8 1. Context 2. Method RESIDENTIAL P.13 1. Hypotheses 2. Analysis and Prospects COMMERCIAL P.18 1.

More information

3 rd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes

3 rd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes 3 rd Technical Workshop: Gas Market Design and Natural Gas Transmission Grid Codes The EU Experience of Gas Storage Operation. Technology, Market, Regulation. Sergio Ascari VIS Consultants Vilnius, May

More information

Dispatching Variable Generation Resources

Dispatching Variable Generation Resources Dispatching Variable Generation Resources A Discussion Paper for Stakeholder Engagement 91 (Renewable Integration) Table of Contents Introduction... 3 IESO Dispatch Processes... 5 Registration... 5 Dispatch

More information

Gas transportation tariffs: comparing tariffs including and excluding free tolerance

Gas transportation tariffs: comparing tariffs including and excluding free tolerance Gas transportation tariffs: comparing tariffs including and excluding free tolerance A review of selected West European System Operators at 1 February 2008 Report to Gas Transport Services Publication

More information

CALL FOR MARKET INTEREST NOTICE

CALL FOR MARKET INTEREST NOTICE CALL FOR MARKET INTEREST NOTICE Dunkerque LNG SAS Terminal méthanier de Dunkerque 5100 Route de la Jetée du Clipon CS 20150 59792 Grande Synthe cedex SAS au capital de 1 263 374 000 euros 489 967 794 R.C.S.

More information

POWER-SYSTEM-WIDE ANALYSIS OF THE BENEFITS OF RESERVE PROVISION FROM SOLAR PHOTOVOLTAICS IN SOUTH AFRICA

POWER-SYSTEM-WIDE ANALYSIS OF THE BENEFITS OF RESERVE PROVISION FROM SOLAR PHOTOVOLTAICS IN SOUTH AFRICA POWER-SYSTEM-WIDE ANALYSIS OF THE BENEFITS OF RESERVE PROVISION FROM SOLAR PHOTOVOLTAICS IN SOUTH AFRICA Tobias Bischof-Niemz 1, Joanne Calitz 2, Jarrad G. Wright 3 1, 2, 3 Council for Scientific and Industrial

More information

COMPETITIVENESS OF NUCLEAR ENERGY AN INTERNATIONAL VIEWPOINT. Nuclear Power Plants for Poland, Warsaw 1-2 June 2006

COMPETITIVENESS OF NUCLEAR ENERGY AN INTERNATIONAL VIEWPOINT. Nuclear Power Plants for Poland, Warsaw 1-2 June 2006 COMPETITIVENESS OF NUCLEAR ENERGY AN INTERNATIONAL VIEWPOINT Power Plants for Poland, Warsaw 1-2 June 2006 Evelyne BERTEL OECD Energy Agency Bertel@nea.fr Introduction Economic competitiveness, which always

More information

Long-term Market Analysis Nordics and Europe Executive summary

Long-term Market Analysis Nordics and Europe Executive summary Long-term Market Analysis Nordics and Europe 2018 2040 Executive summary 1 December 2018 Europe is set to develop a low carbon power system with significant contribution from renewable energy sources.

More information

ADDENDUM TO THE ELIA STUDY REGARDING THE "ADEQUACY" AND FLEXIBILITY NEEDS OF THE BELGIAN POWER SYSTEM FOR THE PERIOD :

ADDENDUM TO THE ELIA STUDY REGARDING THE ADEQUACY AND FLEXIBILITY NEEDS OF THE BELGIAN POWER SYSTEM FOR THE PERIOD : ADDENDUM TO THE ELIA STUDY REGARDING THE "ADEQUACY" AND FLEXIBILITY NEEDS OF THE BELGIAN POWER SYSTEM FOR THE PERIOD 2017-2027: "Additional scenario" and clarifications SEPTEMBER 2016 SEPTEMBER 2016 CONTENT

More information

Sustainability KPIs 2016

Sustainability KPIs 2016 Sustainability KPIs Heading for 2020 A t Sappi Europe we have chosen to be eco-effective, integrating the way we do business with our approach to the environment, which is based on a holistic view of People,

More information

Winter Outlook 2013/14

Winter Outlook 2013/14 Natural Gas in Northern Ireland Winter Outlook 2013/14 Premier Transmission is a subsidiary of Mutual Energy Limited Winter Outlook 2013/14 Natural Gas in Northern Ireland... Introduction Welcome to the

More information

2016 Probabilistic Assessment. December 5, 2016 Southwest Power Pool

2016 Probabilistic Assessment. December 5, 2016 Southwest Power Pool 2016 Probabilistic Assessment December 5, 2016 Southwest Power Pool Table of Contents 1. Summary...2 a. SPP Planning Coordinator Footprint...2 b. Seasonal Capacity Totals... Error! Bookmark not defined.

More information

APPENDIX C Storage Operational Conditions

APPENDIX C Storage Operational Conditions Natural Gas Storage Contract APPENDIX C Storage Operational Conditions Version of 1 April 2017 CONTENTS ARTICLE 1. PURPOSE OF THE APPENDIX... 3 ARTICLE 2. EXCHANGES OF INFORMATION: TRANSPORT/STORAGE EQUIVALENCY...

More information

SOUTH AUSTRALIA VICTORIA (HEYWOOD) INTERCONNECTOR UPGRADE

SOUTH AUSTRALIA VICTORIA (HEYWOOD) INTERCONNECTOR UPGRADE 26 October 2012 Hugo Klingenberg Senior Manager Network Development Electranet Pty Ltd consultation@electranet.com.au Ashley Lloyd Senior Manager Victorian Planning Australian Energy Market Operator planning@aemo.com.au

More information

Monitoring report on the security of supply on the Belgian natural gas market. Year (based on article 5 of the directive 2009/73/EC)

Monitoring report on the security of supply on the Belgian natural gas market. Year (based on article 5 of the directive 2009/73/EC) Monitoring report on the security of supply on the Belgian natural gas market Year 2011 (based on article 5 of the directive 2009/73/EC) Member States are asked under the Directive 2009/73/EC of 13 July

More information

EDF and Integration of Distributed Energy Resources

EDF and Integration of Distributed Energy Resources IEEE Power Engineering Society Tuesday, June 20, 2006. Montreal EDF and Integration of Distributed Energy Resources Bruno Meyer (presenter) Director Power Systems Technology and Economics Yves Bamberger,

More information

SOLVAY GROUP Consistent implementation of our strategy for sustainable

SOLVAY GROUP Consistent implementation of our strategy for sustainable Sustainable Energy Management : Opportunities & Challenges SOLVAY GROUP Consistent implementation of our strategy for sustainable Philippe Warny, Manager of the Competence Center Energy, Utilities, Electrical

More information

Demand assessment report for incremental capacity between PEG Nord and ZTPL

Demand assessment report for incremental capacity between PEG Nord and ZTPL Demand assessment report for incremental capacity between PEG Nord and ZTPL 2017-07-27 This report is a joint assessment of the potential for incremental capacity projects conducted by GRTgaz SA 6 rue

More information

Power & Natural Gas Planning Taskforce Informational Brief

Power & Natural Gas Planning Taskforce Informational Brief Power & Natural Gas Planning Taskforce Informational Brief Gas Scheduling in the Northwest As the Northwest electric system becomes increasingly dependent on natural gas, it is important to understand

More information

I 5 Corridor Analysis Phase 1 Report

I 5 Corridor Analysis Phase 1 Report Power & Natural Gas Planning Task Force I 5 Corridor Analysis Phase 1 Report Table of Contents 1. Executive Summary... 2 2. Background and Need for Study... 4 3. NGA Outlook Approach... 5 4. Natural Gas

More information

Shippers' guide to maintenance-related capacity reductions

Shippers' guide to maintenance-related capacity reductions Shippers' guide to maintenance-related capacity reductions Table of contents 1. Introduction... 4 2. Chosen principles... 5 2.1 Summary of the principles... 5 2.2 Calculating the reduction rates due to

More information

Power to Gas in France

Power to Gas in France Power to Gas in France From perspectives to a demonstration project Laurent BEDEL (CEA) Sylvain LEMELLETIER (GRTgaz) The gas grid driving 1 the energy transition OUTLINE - Short introduction to GRTgaz

More information

ELEXON response to National Grid s consultation of its System Needs and Product Strategy 18 July 2017

ELEXON response to National Grid s consultation of its System Needs and Product Strategy 18 July 2017 ELEXON response to National Grid s consultation of its System Needs and Product Strategy 18 July 2017 ELEXON sent the following responses to National Grid in relation to its System Needs and Product Strategy

More information

Distributed Generation Concept and Case Study

Distributed Generation Concept and Case Study Distributed Generation Concept and Case Study 1 TABLE OF CONTENTS 01 Current European energy framework 02 Energy context: Spain 03 Distributed generation 04 New entrepreneurship ecosystem in the energy

More information

ALL ISLAND GRID STUDY STUDY OVERVIEW. January 2008

ALL ISLAND GRID STUDY STUDY OVERVIEW. January 2008 ALL ISLAND GRID STUDY STUDY OVERVIEW January 2008 1 Study Overview The All Island Grid Study is the first comprehensive assessment of the ability of the electrical power system and, as part of that, the

More information

CAISO Generator Deliverability Assessment Methodology. On-Peak Deliverability Assessment Methodology (for Resource Adequacy Purposes)

CAISO Generator Deliverability Assessment Methodology. On-Peak Deliverability Assessment Methodology (for Resource Adequacy Purposes) Background On-Peak Deliverability Assessment Methodology (for Resource Adequacy Purposes) The CAISO s deliverability study methodology for resource adequacy purposes was discussed extensively in the CPUC

More information

ECONOMIC TRENDS OF ITALIAN ELECTRICITY SECTOR SHORT TERMS STATISTICS

ECONOMIC TRENDS OF ITALIAN ELECTRICITY SECTOR SHORT TERMS STATISTICS NEWSLETTER January - March 2017 ECONOMIC TRENDS OF ITALIAN ELECTRICITY SECTOR SHORT TERMS STATISTICS In the first three months of 2017 data of national electricity sector has shown an increase in electricity

More information

TOWARDS ZERO CARBON. The University of Exeter Carbon Descent Plan for Utilities 2010 to 2050

TOWARDS ZERO CARBON. The University of Exeter Carbon Descent Plan for Utilities 2010 to 2050 TOWARDS ZERO CARBON The University of Exeter Carbon Descent Plan for Utilities 2010 to 2050 1) Introduction: The University already has an ambitious Carbon Management Plan in place to reduce carbon emissions

More information

Review of Bevoorradingszekerheidsstudie voor België: Nood aan strategische reserve voor de winter (November 2015)

Review of Bevoorradingszekerheidsstudie voor België: Nood aan strategische reserve voor de winter (November 2015) Review of Bevoorradingszekerheidsstudie voor België: Nood aan strategische reserve voor de winter 2016-2017 (November 2015) FINAL VERSION, DECEMBER 9 th, 2015 Johan Albrecht, Estelle Cantillon 1, Sam Hamels

More information

New Brunswick Electricity Business Rules. Chapter 3 Reliable Operations

New Brunswick Electricity Business Rules. Chapter 3 Reliable Operations New Brunswick Electricity Business Rules Chapter 3 Reliable Operations TABLE OF CONTENTS CHAPTER 3 RELIABLE OPERATIONS... 2 3.0 System Operator Roles and Responsibilities... 2 3.1 Reliability Assessments...

More information

Consultation on the draft consent decision of the Dutch Minister of Economic Affairs dated June 24, 2016 in respect of gas extraction at Groningen

Consultation on the draft consent decision of the Dutch Minister of Economic Affairs dated June 24, 2016 in respect of gas extraction at Groningen Consultation on the draft consent decision of the Dutch Minister of Economic Affairs dated June 24, 2016 in respect of gas extraction at Groningen ENGIE s response paper [ENGIE Energie Nederland NV / Gerda

More information

The Spanish Gas Industry 2014 WOC 4 IGU March 5 th Mr. Carlos Villalonga Vice-Secretary Spanish Gas Association (Sedigas)

The Spanish Gas Industry 2014 WOC 4 IGU March 5 th Mr. Carlos Villalonga Vice-Secretary Spanish Gas Association (Sedigas) The Spanish Gas Industry 2014 WOC 4 IGU March 5 th 2014 Mr. Carlos Villalonga Vice-Secretary Spanish Gas Association (Sedigas) Summary 1. Natural Gas in Spain. Figures 2013 2. Power Generation 3. Natural

More information

Groningen Production Cap and European gas (& electricity) markets

Groningen Production Cap and European gas (& electricity) markets Groningen Production Cap and European gas (& electricity) markets Kong Chyong, Research Associate & Director of Energy Policy Forum EPRG, Cambridge Judge Business School, University of Cambridge EPRG Winter

More information

In view of the upcoming EU Strategy for Heating and Cooling

In view of the upcoming EU Strategy for Heating and Cooling Position paper In view of the upcoming EU Strategy for Heating and Cooling About GIE Gas Infrastructure Europe (GIE) is an association representing the interests of European natural gas infrastructure

More information

Energy, Electricity and Nuclear Power Estimates for the Period up to 2050

Energy, Electricity and Nuclear Power Estimates for the Period up to 2050 REFERENCE DATA SERIES No. 1 2018 Edition Energy, Electricity and Nuclear Power Estimates for the Period up to 2050 @ ENERGY, ELECTRICITY AND NUCLEAR POWER ESTIMATES FOR THE PERIOD UP TO 2050 REFERENCE

More information

European Commission, Competition DG. Sector Inquiry under Art 17 Regulation 1/2003 on the gas and electricity markets. Preliminary Report

European Commission, Competition DG. Sector Inquiry under Art 17 Regulation 1/2003 on the gas and electricity markets. Preliminary Report European Commission, Competition DG Sector Inquiry under Art 17 Regulation 1/2003 on the gas and electricity markets Preliminary Report Under the aegis of the French Regulatory Authority (CRE), for almost

More information