INSTALLATION INSTRUCTIONS SORIC INTEGRATION CENTER

Size: px
Start display at page:

Download "INSTALLATION INSTRUCTIONS SORIC INTEGRATION CENTER"

Transcription

1 INSTLLTION INSTRUCTIONS SORIC INTEGRTION CENTER TEC-F-0018 REV2 3/11

2 SITE CONDITIONS Shipping Weight SORIC lbs. SORIC lbs. Rough Opening Recessed applications require a 74 W x 79 H x 30 D rough-in opening. Consideration and planning must be given by the general contractor to provide access panels above the unit for future service access and to provide stainless steel trim around the cabinet. Flooring Conditions The unit is equipped with leveling feet which will compensate for un-level floors. pplications requiring seismic anchorage require removal of leveling feet and use of shimming material to achieve a level state. Verify that the concrete slab to which unit is anchored is not cracked. Electrical Electrical services shall be provided by general contractor in accordance with facility requirements and national and local code ordinances by the general contractor. ll wall j-boxes rough-in must be completed prior to installation of the unit. Communication & Other Services Communications and other services shall be provided by general contractor in accordance with facility requirements. SORIC unit shall provide junction boxes to facilitate utility services. Cabinet provides an optional removable panel on the rear to facilitate utility routing. It is recommended to have the utilities be delivered from a junction box that is mounted behind one of the access panels in the upper compartment or in the lower compartments. Seismic nchorage Seismic applications require specific anchorage. Equipment anchorage provided by others. Calculation specification sheets available from SKYTRON. Structural Engineer of Record (SEOR) shall design the correct embedment and check the floor structure to support loading. nchors must be at an adequate distance from all slab openings or edges. Verify that anchors used to secure the unit are at an adequate distance from any new or existing anchors. Surface Preparations ll finished surfaces are coated with a protective layer of plastic sheeting. It will be necessary to remove portions of this sheeting during the installation process and once the installation is complete. To assist in the process of removal it is recommended to use a heat gun on a low setting to help soften the grip of the plastic to the stainless steel. Recommended tools - Heat Gun Cleaning Instructions The exterior and interior of the cabinet should be cleaned regularly using a mild soap and water solution or a cleaner formulated for stainless steel and a soft cloth. Do not use strong soaps, abrasives or steel wool. Tools required: Phillips screwdriver or drill with Phillips #2 bit Level Materials handling equipment Utility knife Slotted screwdriver set Wire strippers U.S. socket set U.S. open end wrench set Recommended: Heat Gun

3 SORIC INSTLLTION INSTRUCTIONS Page 1 ll versions of the SKYTRON SORIC units are shipped in two (2) crates. The top and bottom sections are shipped independently to facilitate shipping and handling procedures. Position the two crates near the installation area prior to removing the crating to avoid damage. Remove all crating material and remove the two sections from the respective bases. Refer to figure 1 on page 2. Caution should be observed as the optional Back Cover is shipped loose. Install optional back access cover using #10x5/8 SS TEK screws provided, place the completed assembly in final position and adjust leveling feet as required. NOTE Silicone, food grade caulking is recommended as a sealant in seams and joints along the desktop surfaces for added protection. Consult local and state codes for specific requirements. WRNING lways use caution when lifting and positioning. Follow OSH and state safety guidelines to avoid personal injury. Employ additional assistance if required. CUTION ll exposed surfaces are covered with a protective layer of plastic. This will need to be removed prior to final assembling of the unit. Place the upper section on the base unit, align the fastening holes and secure the two sections with the #10x5/8 SS TEK screws provided. lign the pins on the bottom of the side panels with the holes in the base unit, install the side panels and secure with the #10-32 screws provided. Side panels may be installed at a later date to facilitate utility routing and termination. Install all electrical and communications outlets with cabling as required. These are specific to each application and must be performed by a qualified electrician. During most applications, the electrical contractor should provide flexible conduit to facilitate sliding the unit in and out of placement. Install shelf clips (16) in upper compartments as desired and install shelves with the cable access holes to the rear. WRNING lways exercise caution when handling equipment to avoid personal injury. This equipment and all input leads provided by facility must be circuit protected and wired in accordance with all current applicable state, local and NEC codes. lways consult with the manufacturers of all Endoscopy, Video or other equipment to be used on the SORIC for all communications and services required within the unit or to external equipment. Due to the number of application variables, SKYTRON does not provide this information. ssembly Components (shipped inside the drawer) include: - #10-32 Phillips, pan head screws - Shelf brackets - Cabinet keys - #10x5/8 SS TEK pan head screws

4 Page 2 SHELF (4) BCK CCESS COVER (optional) UPPER SECTION #10x5/8 PNHED PHILLIPS (18) SHELF BRCKET (4 per shelf) OPTIONL SKYTRON SURGICL LIGHT PNEL PIN 4-GNG INSIDE PNEL (1) LEFT (1) RIGHT #10x5/8 PNHED PHILLIPS (20) (optional) #10-32 PNHED PHILLIPS FSTENING HOLES BSE KEYS (2) REMOVBLE INNER PNEL (1) LEFT (1) RIGHT 1/2" NUT LEVELING FEET (8) 3/8" THRED NOTE Refer to specific seismic calculations if applicable SORIC-72 SHOWN FRONT VIEW SORIC-72 Figure 1.

5 NOTE: SORIC-72 SHOWN, OTHER MODELS SIMILR Page 3 OPTIONL SLOPED TOP (lign with top of cabinet and secure with 1/4"-20 screws provided) 1/4"-20 SCREW REVERSE NGLE UPPER COMPRTMENT SINGLE GNG JUNCTION BOXES FOR ELECTRICL ND COMMUNICTIONS CONNECTORS (7 total) 2 GNG JUNCTION BOX 120VC, 4, 30W (work surface light connection) 2" x 6" THRU HOLE FOR CBLE ROUTING (3) REMOVBLE PNELS (from inside of upper compartments) SIDE PNEL RCEWY (1 each side) DESK UNIT RCEWY (1 each side) 4 GNG JUNCTION BOX (2 each side) (internally mounting inside left and right panels) 2 GNG JUNCTION BOX (internally mounting inside left and right panels) 2 GNG JUNCTION BOX (internally mounting inside left and right panels) 2.25" THRU HOLE FOR CBLE ROUTING (2) Figure 2.

6 Page 4 OPERTING ROOM INTEGRTION CENTER SORIC-72 3 LIFT & SLIDE POCKET DOORS (TEMPERED GLSS) 4 DJUSTBLE SHELVES 3 FLUORESCENT LIGHT FIXTURE COMPUTER COMPRTMENT PULL OUT WORK SURFCE DJUSTBLE LEVELING FEET (8) REMOVBLE VENTED INNER PNELS INTRODUCTION SKYTRON s SORIC-72 Operating Room Integration Center provides the perfect communications center for PCS and video integration, as well as networking of multiple services within the facility. The SORIC-72 provides a shared hub for information systems distribution within and outside the surgical suite. OPTIONS Standard Phone, Computer and Video Connectors can be provided. Specify type. Control of Lighting, udio, Video, Data and MIS Equipment System operations can be provided as custom applications. RCHITECTURL SPECIFICTIONS Operating Room Integration Center shall consist of a stainless steel cabinet designed to store video, audio and communications equipment. Junction boxes shall be provided for ease of routing electrical, communication and video cabling. Upper compartments have three lift and slide, tempered glass pocket doors, and four adjustable stainless steel shelves. Lower compartment shall include mounting location for SkyVision and a pull-out work surface. Heavy duty, adjustable leveling feet shall be included. Built-in chase shall allow space for up to four 20 mp circuits. Hospital Grade Electrical Receptacles are available for upper and lower compartments.

7 SORIC-72 OPTIONL REMOVBLE BCK PNEL (2) 4 GNG SWITCH BOXES 8"x 4"x 2-3/4" W/COVER Page 5 TOP VIEW GROMMETED CBLE PSS RIGHT ND LEFT INSIDE PNELS LEFT SHOWN 72" REMOVBLE CCESS COVER (3) OPTIONL SLOPED TOP 12" 3 EQUL SIZED COMPRTMENTS LL POCKET DOORS 44" (3) 6"x 2" 2"x 4"x 2-3/4" SWITCH BOX (7) W/COVER 3' FLUORESCENT LIGHT GROMMETED CBLE PSS 2"DI (2) 20" 76" 3" 19 24" 4"x 4"x 2-3/4" SWITCH BOX LOCK LOCK RER CUTOUTS REMOVBLE PNELS (2) TIE DOWNS NOTES: 1. Electrical, communications and other services shall be provided by general contractor in accordance with facility requirements. SORIC-72 unit shall provide junction boxes as indicated above to facilitate utility services. 2. Cabinet provides an optional removable panel on the rear to facilitate utility routing. It is recommended to have all utilities be delivered from a Junction Box that is mounted behind one of the access panels in the upper compartment or in the lower compartments. 3. Cabinet provides four 4 gang j-boxes to facilitate the main control panel area for user. 4. Shipped as two separate pieces. 5. Seismic applications require specific anchorage. Equipment anchorage provided by others. Calculation specification sheets available from SKYTRON. 24" FRONT VIEW 29" INSIDE CLR. 32" LEVELING FEET 7/8" MIN 2-1/2" MX 30" SIDE VIEW 9/16" 5085 Corp. Exchange Blvd. S.E., Grand Rapids, MI SKYTRON FX TEC-F-0017 REV0 8/10

8 Page 6 OPERTING ROOM INTEGRTION CENTER SORIC-48 2 LIFT & SLIDE POCKET DOORS (TEMPERED GLSS) 4 DJUSTBLE SHELVES 3 FLUORESCENT LIGHT FIXTURE COMPUTER COMPRTMENT COMPUTER COMPRTMENT DJUSTBLE LEVELING FEET (4) INTRODUCTION SKYTRON s SORIC-48 Operating Room Integration Center provides the perfect communications center for PCS and video integration, as well as networking of multiple services within the facility. The SORIC-48 provides a shared hub for information systems distribution within and outside the surgical suite. OPTIONS Standard Phone, Computer and Video Connectors can be provided. Specify type. Control of Lighting, udio, Video, Data and MIS Equipment System operations can be provided as custom applications. RCHITECTURL SPECIFICTIONS Operating Room Integration Center shall consist of a stainless steel cabinet designed to store video, audio and communications equipment. Junction boxes shall be provided for ease of routing electrical, communication and video cabling. Upper compartments have two lift and slide, tempered glass pocket doors, and four adjustable stainless steel shelves. Lower compartment shall include mounting location for SkyVision and a pull-out work surface. Heavy duty, adjustable leveling feet shall be included. Built-in chase shall allow space for up to three 20 mp circuits. Hospital Grade Electrical Receptacles are available for upper and lower compartments.

9 SORIC-48 OPTIONL REMOVBLE BCK PNEL (2) 4 GNG SWITCH BOXES 8"x 4"x 2-3/4" W/COVER Page 7 GROMMETED CBLE PSS RIGHT ND LEFT INSIDE PNELS LEFT SHOWN SIDE PNEL TOP VIEW 48 REMOVBLE CCESS COVER (2) OPTIONL SLOPED TOP 12 2 EQUL SIZED COMPRTMENTS LL POCKET DOORS (2) 6"x 2" CUT OUT 44 3' FLUORESCENT LIGHT "DI (2) GROMMETED CBLE PSS 2 3" 4"x 4"x 2-3/4" KNOCK-OUT CCESS FOR TIE DOWNS 28 INSIDE CLR. 34 TIE DOWN POINTS 9/16 RER CUTOUT TIE DOWNS LEVELING FEET 7/8" MIN 2-1/2" MX FRONT VIEW NOTES: 1. Electrical, communications and other services shall be provided by general contractor in accordance with facility requirements. SORIC-48 unit shall provide junction boxes as indicated above to facilitate utility services. 2. Cabinet provides an optional removable panel on the rear to facilitate utility routing. It is recommended to have all utilities be delivered from a Junction Box that is mounted behind one of the access panels in the upper compartment or in the lower compartments. 3. Cabinet provides four 4 gang j-boxes to facilitate the main control panel area for user. 4. Shipped as two separate pieces. 5. Seismic applications require specific anchorage. Equipment anchorage provided by others. Calculation specification sheets available from SKYTRON. 30" SIDE VIEW 5085 Corp. Exchange Blvd. S.E. Grand Rapids, MI SKYTRON FX TEC-F-0003 REV4 3/11 4

10 Page 8 SORIC-72 TIE-DOWN LOCTIONS Refer to specific seismic calculations if applicable. SKYTRON SORIC-72 TIE-DOWN LOCTIONS KNOCKOUT DETIL SECTION C-C SIDE 11Gx1"x 3" S.S. PLTE C B C B SECTION B-B SECTION - 5" 30" 16" 18-1/2" DENOTES TIE-DOWN LOCTIONS 16" 6-1/2" TOP 9" 72" FRONT C TIE-DOWNS 22-1/2" 25-1/2" C 22-1/2"

11 SORIC-48 TIE-DOWN LOCTIONS Page 9 Refer to specific seismic calculations if applicable. KNOCK-OUT CCESS FOR TIE DOWNS SKYTRON SORIC-48 TIE-DOWN LOCTIONS TIE DOWN POINTS SIDE 11Gx1"x 3" S.S. PLTE 9/16 4 SECTION B-B SECTION - B B B B DENOTES TIE-DOWN LOCTIONS 30" 16" TOP 9-1/8" 11/16" 46-5/8" 48" FRONT

12 5085 Corporate Exchange Blvd. S.E. Grand Rapids, MI FX

RECESSED SolidCare STORAGE CABINETS

RECESSED SolidCare STORAGE CABINETS TEC-NP-0002 REV0 9/09 RECESSED SolidCare STORAGE CABINETS Weight lbs. kg. Empty 323 (146.51) Loaded 723 (327.92) Crated 438 (198.67) Interior Dimensions 44 7/8"W x 17"D x 55"H 18" 45 3/4" NPRS4818 Recessed

More information

Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment.

Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment. RM140A-R3 RM140A-M-R3 RM145A-R3 RM145A-M-R3 Small Office/Home Office (SOHO) Cabinets Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment. Fit under most desktops in the

More information

SERVICE PEDESTAL FLOOR-MOUNTED SERVICE PEDESTAL. Installation Manual

SERVICE PEDESTAL FLOOR-MOUNTED SERVICE PEDESTAL. Installation Manual SERVICE PEDESTAL Installation Manual FLOOR-MOUNTED SERVICE PEDESTAL Figure 1. DEFINITION OF STATEMENTS Statements in this manual preceded by the following words are of special significance: WARNING: Means

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

Linear Drainage Z886. Perma-Trench. Installation Instructions. 100mm Clear Opening

Linear Drainage Z886. Perma-Trench. Installation Instructions. 100mm Clear Opening Linear Drainage Z886 100mm Clear Opening Perma-Trench Installation Instructions Z886 Tools Required Tape Measure Phillips Head Screwdriver Hammer Utility Knife Marker Cordless Drill Reciprocating Saw Ear

More information

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms REV. 9/08 Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms SKYTRON MOUNTING STRUCTURES for Ceiling Mounted Equipment Foreword Skytron s objective is to provide a program and guideline to assist

More information

Zurn Z886. 6" Perma-Trench. Installation Instructions

Zurn Z886. 6 Perma-Trench. Installation Instructions Zurn Z886 6" Perma-Trench Installation Instructions Z886 Accessories 6" [152mm] Wide Trench Drain System Below are the components of the Z886 trench drain typical to an installation. Check your order to

More information

SERIES SURGICAL LIGHTS

SERIES SURGICAL LIGHTS SERIES SURGICAL LIGHTS TEC-B-0012 REV1 Skytron's Aurora LED Surgical Lighting provides advanced bright, cool and color correct illumination to the surgical field and a selectable color temperature of 4,000K

More information

FORM FOOTWALL. FORM FOOTWALL (floating) (floating) Installation Manual

FORM FOOTWALL. FORM FOOTWALL (floating) (floating) Installation Manual FORM FOOTWALL (floating) Installation Manual FORM FOOTWALL (floating) OVERVIEW The Form is a UL-listed configurable footwall system. This system can include any combination of base cabinets, upper cabinets,

More information

LINEAR DRAINAGE. Z886 Perma-Trench. 6" Perma-Trench Installation Instructions

LINEAR DRAINAGE. Z886 Perma-Trench. 6 Perma-Trench Installation Instructions LINEAR DRAINAGE Z886 Perma-Trench 6" Perma-Trench Installation Instructions Z886 Accessories 6" [152MM] WIDE TRENCH DRAIN SYSTEM Below are the components of the Z886 trench drain typical to an installation.

More information

INSTALLATION MANUAL. FOOTWALL/SINKWALL (floor mount)

INSTALLATION MANUAL. FOOTWALL/SINKWALL (floor mount) INSTALLATION MANUAL FOOTWALL/SINKWALL (floor mount) OVERVIEW The Form is a UL-listed configurable footwall/sinkwall system. This system can include any combination of base cabinets, upper cabinets, wardrobes,

More information

SERIES SURGICAL LIGHTS

SERIES SURGICAL LIGHTS SERIES SURGICAL LIGHTS TEC-B-0012 REV1 Skytron's Aurora LED Surgical Lighting provides advanced bright, cool and color correct illumination to the surgical field and a selectable color temperature of 4,000K

More information

Axiom. SURFACE MOUNTED ARRAY Patient Headwall. Installation Guidelines. Installation Instructions.

Axiom. SURFACE MOUNTED ARRAY Patient Headwall. Installation Guidelines. Installation Instructions. Axiom www.hsiheadwalls.com SURFACE MOUNTED ARRAY Patient Headwall Installation Instructions Installation Guidelines Tel: 925.427.7800 Fax: 925.427.0800 support@hsiheadwalls.com Hospital Systems Inc. 750

More information

Installation Manual. Modular Bar Die. Krowne Metal Corporation 100 Haul Rd. Wayne, NJ Toll Free: (800) Fax: (973)

Installation Manual. Modular Bar Die. Krowne Metal Corporation 100 Haul Rd. Wayne, NJ Toll Free: (800) Fax: (973) Installation Manual Modular Bar ie Toll Free: (800) 631-0442 Fax: (973) 872-1129 sales@ Modular Bar ie Installation Specifications Bar die structure fabricated out of 16 gauge galvanized steel with stainless

More information

SlimLine Single Threshold Base & Q-Wall-5.1 BASE & BACKWALL INSTALLATION INSTRUCTIONS

SlimLine Single Threshold Base & Q-Wall-5.1 BASE & BACKWALL INSTALLATION INSTRUCTIONS SlimLine Single Threshold Base & Q-Wall-5.1 BASE & BACKWALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For

More information

Risk of fire and electrical shock. DISCONNECT POWER AT ELECTRICAL PANEL before installing or servicing this product.

Risk of fire and electrical shock. DISCONNECT POWER AT ELECTRICAL PANEL before installing or servicing this product. INSTALLATION INSTRUCTIONS RAIL 2 RM2D T-BAR LED NOTE: The following instructions provide general guidelines for product installation. For additional information consult the applicable electrical codes

More information

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1 16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

H50. DYNAMIC BARRIER Bench Fume Hood. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

H50. DYNAMIC BARRIER Bench Fume Hood. Fume Hoods. Installation Instructions. 48- 60- 72- 96 long Installation Instructions Supreme Air DYNAMIC BARRIER Bench Fume Hood H50 S T Y L E Fume Hoods 48"- 60"- 72"- 96" long Publication No. IIH50-SA 06/01 Part Number: IMAN-H50 Kewaunee Scientific Corporation

More information

INSTALLATION INSTRUCTIONS FOR McDONALDS LED CANOPY FASCIA. Table of Contents

INSTALLATION INSTRUCTIONS FOR McDONALDS LED CANOPY FASCIA. Table of Contents INSTLLTION INSTRUCTIONS FOR McDONLDS LED CNOPY FSCI Table of Contents Important Installer Notes ------------------------------------------------------------------- Page 2 Site specific documents ----------------------------------------------------------------------Page

More information

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets Seismic Frame Two-Post Rack Page 11-3 Seismic Protection Products - Racks Page 11-6 Seismic Protection Products - Runway Page 11-8 Seismic

More information

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual FORM HEADWALL (floor mount) Installation Manual FORM HEADWALL (floor mount) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated

More information

Prime Shower Enclosure, Base & Backwall

Prime Shower Enclosure, Base & Backwall Prime Shower Enclosure, Base & Backwall SHOWER ENCLOSURE, BASE & BACKWALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior

More information

SECTION NON-STRUCTURAL METAL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING SECTION 09 22 16 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

SINGLE BOWL SEMI-RECESSED VANITY

SINGLE BOWL SEMI-RECESSED VANITY BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing bathroom fixtures and plumbing. Signature Hardware accepts no liability for any damage to the floor, walls,

More information

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual FORM HEADWALL (floating) Installation Manual FORM HEADWALL (floating) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated

More information

TOLL FREE: (866) VANITY SPECIFICATIONS. VANITY COMPONENTS Model VG09008

TOLL FREE: (866) VANITY SPECIFICATIONS. VANITY COMPONENTS Model VG09008 VANITY SPECIFICATIONS VANITY COMPONENTS Model VG09008 MODEL VG09008 FEATURES Wall-mounted cabinet Soft closing sliding cabinet drawer hardware Cabinet ships assembled PACKING LIST Vanity Brackets - 2 Plastic

More information

Cornerview Shower Enclosure & Base

Cornerview Shower Enclosure & Base Cornerview Shower Enclosure & Base SHOWER ENCLOSURE AND BASE INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For

More information

DETAIL INSTRUCTION No. 1

DETAIL INSTRUCTION No. 1 BEFORE BEGINNING INSTALLATION, PLEASE READ THROUGH ALL INSTRUCTIONS. Uncrate shipment and check against packing list to insure all materials are included before beginning installation. If any discrepencies

More information

INSTALLATION MANUAL. All Types F Series Rev G

INSTALLATION MANUAL. All Types F Series Rev G INSTALLATION MANUAL All Types - 1570 F Series Page 1 of 16 TABLE OF CONTENTS DESCRIPTION PAGE GENERAL INFORMATION & ADVISORIES 2 PRODUCT INFORMATION 3 GET TO KNOW YOUR CBU 4 HARDWARE AND COMPONENTS 5 CONCRETE

More information

Impression Graphic panels

Impression Graphic panels Impression Graphic panels Installation Guidelines 6003.I Rev. 02 8/15 Please Read Disclaimers: PLEASE READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION!! These guidelines are provided in good faith to

More information

PRE-INSTALLATION GUIDE

PRE-INSTALLATION GUIDE TRUMPF MEDICAL SYSTEMS Inc. Charleston, SC PRE-INSTALLATION GUIDE FOR CEILING MOUNTED EQUIPMENT MANAGEMENT SYSTEMS, SURGICAL / EXAM LIGHTS, AND FLAT PANELS EMS and Light Pre-installation Guide File: 110720

More information

4 Double Hooks on a Board

4 Double Hooks on a Board 4 Double Hooks on a oard ssembly Instructions - Please keep for future reference 875/5292 875/5340 Dimensions Width - 45.7cm Depth - 7cm Height - 0.5cm Important Please read these instructions fully before

More information

Prime Shower Enclosure & Base Kit

Prime Shower Enclosure & Base Kit Prime Shower Enclosure & Base Kit SHOWER ENCLOSURE AND SHOWER BASE KIT INSTALLATION INSTRUCTIONS IMPORTANT DreamLine TM reserves the right to alter, modify or redesign products at any time without prior

More information

Prime Shower Enclosure & Base

Prime Shower Enclosure & Base Prime Shower Enclosure & Base SHOWER ENCLOSURE & BASE INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest

More information

BioPrism Solid Surface

BioPrism Solid Surface Please read all instructions before installing products. STORAGE & HANDLING: Check for damage that may have occurred during transit. Keep receptor flat on pallet, as it was shipped, until ready to install.

More information

Multi-Piece EasyStep Product Installation Instructions

Multi-Piece EasyStep Product Installation Instructions Tools/materials you might need for proper installation 6D galvanized screws 100% silicone caulking (See specific caulking recommendations) caulking gun shims tape measure 1/8 drill bit Phillips screw driver

More information

H07 H09. BENCH FUME HOOD with Combination Sash. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

H07 H09. BENCH FUME HOOD with Combination Sash. Fume Hoods. Installation Instructions. 48- 60- 72- 96 long Installation Instructions Supreme Air BENCH FUME HOOD with Combination Sash H07 H09 S T Y L E Fume Hoods 48"- 60"- 72"- 96" long Publication No. IIH07-SA 07/06 Part Number: IMAN-H07 FUME HOOD END PANEL

More information

Inigo Console Table INSTALLATION INSTRUCTIONS P74300, P A Page 1 of 5

Inigo Console Table INSTALLATION INSTRUCTIONS P74300, P A Page 1 of 5 P74300, P74301 Page 1 of 5 THANK YOU FOR CHOOSING KALLISTA We appreciate your commitment to Kallista quality products. Please take a moment to review this manual before you install your Kallista product.

More information

Multi-Piece EasyStep Product Installation Instructions

Multi-Piece EasyStep Product Installation Instructions Tools/materials you might need for proper installation 6D galvanized screws caulking gun shims tape measure 1/8 drill bit Phillips screw driver cardboard china marker (or grease pencil) furring strips

More information

This Installation Guide uses the following symbols to indicate important information. Always observe the instructions indicated by these symbols.

This Installation Guide uses the following symbols to indicate important information. Always observe the instructions indicated by these symbols. VIGO INDUSTRIES INSTALLATION GUIDE FOR STANDING SHOWER CABIN (MODEL VG06062) SAFETY PRECAUTIONS This Installation Guide uses the following symbols to indicate important information. Always observe the

More information

Section 7: Specifications

Section 7: Specifications Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required

More information

PC-PH SERIES BTUH

PC-PH SERIES BTUH C O M I T A L E N A T I O N A L I N C. PC-PH SERIES 7000 18000 BTUH Installation Instructions Comitale National Inc. 1683 B Winchester Road Bensalem, PA 19020 215-244-9650 Fax: 215-244-9679 email: sales@comitalenational.com

More information

Other HEMCO Products. HEMCOR Lab Planning Solutions. Installation, Operation, Maintenance Manual. HEMCO ModuLab

Other HEMCO Products. HEMCOR Lab Planning Solutions. Installation, Operation, Maintenance Manual. HEMCO ModuLab Other HEMCO Products Installation, Operation, Maintenance Manual HEMCO ModuLab Made In The U.S.A. UniFlow CE UniFlow SE AireStream High Performance Energy Efficient Laboratory Fume Hoods UniFlow LE SEFA

More information

1. Hangers and supports for electrical equipment and systems.

1. Hangers and supports for electrical equipment and systems. PART 1 - GENERAL... 1 1.1 RELATED DOCUMENTS... 1 1.2 SUMMARY... 1 1.3 DEFINITIONS... 1 1.4 PERFORMANCE REQUIREMENTS... 1 1.5 SUBMITTALS... 2 1.6 QUALITY ASSURANCE... 2 1.7 COORDINATION... 2 PART 2 - PRODUCTS...

More information

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions Tools and Supplies: C.R. LAURENCE CO., INC. Intelli-Track SPS Phase One - Installation Instructions Ratchet Wrench with 4" Extension 9/16" Open-End Wrench (two required for suspension mounting) 9/16" Hex

More information

WAKE UP DESCRIPTION ORDERING INFORMATION SAFETY: WARNINGS T01-E INSTALLATION INSTRUCTIONS MIRRORS K-13013T/K-13014T/K-13015T

WAKE UP DESCRIPTION ORDERING INFORMATION SAFETY: WARNINGS T01-E INSTALLATION INSTRUCTIONS MIRRORS K-13013T/K-13014T/K-13015T WAKE UP INSTALLATION INSTRUCTIONS MIRRORS K-303T/K-304T/K-305T BEFORE YOU BEGIN Warning! Risk of personal injury and product damage. Mirrored cabinets are very heavy and should not be lifted or installed

More information

SINGLE BOWL VESSEL VANITY

SINGLE BOWL VESSEL VANITY BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing bathroom fixtures and plumbing. Signature Hardware accepts no liability for any damage to the floor, walls,

More information

Double Tidy Rail. Assembly Instructions- Please keep for future reference. Important - Please read these instructions fully before starting assembly

Double Tidy Rail. Assembly Instructions- Please keep for future reference. Important - Please read these instructions fully before starting assembly Double Tidy Rail ssembly Instructions- Please keep for future reference 87198 Dimensions Width - 89cm Depth - 8cm Height - 101/17cm Important - Please read these instructions fully before starting assembly

More information

INSTALLATION MANUAL RECTANGULAR COLUMN

INSTALLATION MANUAL RECTANGULAR COLUMN INSTALLATION MANUAL RECTANGULAR COLUMN Model # 5502 OVERVIEW The Rectangular Column is a UL-listed, multi-sided, vertical hospital modular service assembly. This system uses vertical and/or horizontal

More information

Quick-release pins swing the rack open from left to right to simplify installing and maintaining your equipment.

Quick-release pins swing the rack open from left to right to simplify installing and maintaining your equipment. RM070A-R3 RM080A-R3 Wallmount Frame User s Manual Quick-release pins swing the rack open from left to right to simplify installing and maintaining your equipment. Customer Support Information Order toll-free

More information

SECTION METAL ATHLETIC LOCKERS

SECTION METAL ATHLETIC LOCKERS SECTION 10 51 13 - METAL ATHLETIC LOCKERS PART 1 GENERAL 1.1 SECTION INCLUDES A. DESCRIPTION: Furnish and install factory-assembled Heavy-Duty MIG-Welded Metal Lockers, complete, as shown and specified

More information

SECTION METAL ATHLETIC LOCKERS

SECTION METAL ATHLETIC LOCKERS SECTION 10 51 13 - METAL ATHLETIC LOCKERS PART 1 GENERAL 1.1 SECTION INCLUDES A. DESCRIPTION: Furnish and install factory-assembled Heavy-Duty MIG-Welded Metal Lockers, complete, as shown and specified

More information

ThermaSteel Corporation ASSEMBLY MANUAL

ThermaSteel Corporation ASSEMBLY MANUAL ThermaSteel Corporation ASSEMBLY MANUAL TABLE OF CONTENTS 1- INTRODUCTION 1.1 THERMASTEEL TM WALL PANELS 1.2 Drawing and Element Numbers 2- ASSEMBLY 2.1 Sequence of Assembly 2.2 Preparation of Foundation

More information

INSTALLATION INSTRUCTION (U.S.A) FOR LUMI-O DRY NICHE INGROUND LIGHT.

INSTALLATION INSTRUCTION (U.S.A) FOR LUMI-O DRY NICHE INGROUND LIGHT. www.lumi-o.com INSTALLATION INSTRUCTION (U.S.A) FOR LUMI-O DRY NICHE INGROUND LIGHT. STANDARD & L.E.D. Lumi-O Industries Inc. 370 Lajeunesse O. St-Jerome QC J7Y 4E5 tel (450)565-5544 * 1-866-99LUMI-O (450)565-5958

More information

Installation. Smart-UPS VT in Parallel kva 380/400/415 V 208/220 V 200/208 V

Installation. Smart-UPS VT in Parallel kva 380/400/415 V 208/220 V 200/208 V Installation Smart-UPS VT in Parallel 10-40 kva 380/400/415 V 208/220 V 200/208 V Contents Safety... 1 IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS.............................. 1 Prepare for

More information

SECTION PLASTIC-LAMINATE-CLAD COUNTERTOPS

SECTION PLASTIC-LAMINATE-CLAD COUNTERTOPS SECTION 12 3623.13 - PLASTIC-LAMINATE-CLAD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16 long / 1/2 thick or 16 oz. copper Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper Modular CABANA Kit 16 x 16 (6x6) Hipped Roof & Build-in Transoms Entry Key Lock Set (bright brass or dark bronze)

More information

Installation Manual. Retractable Ceiling Column Models 8301 & 8301PC

Installation Manual. Retractable Ceiling Column Models 8301 & 8301PC Retractable ceiling column Installation Manual Retractable Ceiling Column Models 8301 & 8301PC Overview The Retractable Ceiling Column is a convenient and cost-effective way of supplying medical gas and

More information

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International

More information

Guardian Wall Panel Installation Manual

Guardian Wall Panel Installation Manual Guardian 275 4 Wall Panel Installation Manual Guardian 275 4 Wall Panel Installation Manual This instructional manual provides General Installation Instruction. Installers should refer to the "as-built"

More information

Installation Guidelines for Sealing PTAC Sleeves

Installation Guidelines for Sealing PTAC Sleeves www.quakerwindows.com www.quakercommercialwindows.com PO Box 128 504 Highway 63 South Freeburg, MO 65035 800-347-0438 573-469-4151 (fax) Installation Guidelines for Sealing PTAC Sleeves Read these instructions

More information

Utility Cabinet System (UCS)

Utility Cabinet System (UCS) (UCS) The Ultimate in Stainless Steel Modular Walls UCS: Eliminates the need and the costs of constructing a traditional wall Provides easier access and faster installation of the utilities compared to

More information

Preference Slimline 5537 Utility Console I NSTALLATION GUIDE

Preference Slimline 5537 Utility Console I NSTALLATION GUIDE Preference Slimline 5537 Utility Console I NSTALLATION GUIDE WARNING Failure to install the 5537 as described in this installation guide may cause the unit to collapse, resulting in serious injury to personnel.

More information

Installation Guidelines for all Quaker products with nail fins New construction nail fin installation with a drainable weather resistant barrier.

Installation Guidelines for all Quaker products with nail fins New construction nail fin installation with a drainable weather resistant barrier. www.quakerwindows.com www.quakercommercialwindows.com PO Box 128 504 Highway 63 South Freeburg, MO 65035 800-347-0438 573-469-4151 (fax) Installation Guidelines for all Quaker products with nail fins New

More information

FIXED CEILING COLUMN. Installation Manual FIXED CEILING COLUMN

FIXED CEILING COLUMN. Installation Manual FIXED CEILING COLUMN FIXED CEILING COLUMN Installation Manual FIXED CEILING COLUMN INTRODUCTION Location, sequence of services and orientation of Surgical Ceiling Columns are specified on the building plans. Be certain installation

More information

INSTALLATION MANUAL KOCH

INSTALLATION MANUAL KOCH INSTALLATION MANUAL KOCH TECHNICAL SYSTEMS GROUP PRE-FAB ACOUSTICAL/THERMAL PANELS AND ENCLOSURES GEORGE KOCH SONS, LLC TECHNICAL SYSTEMS GROUP 10 South Eleventh Avenue Evansville, Indiana 47744 812-465-9600

More information

Aegis Heavy Capacity 20K Floor Scale. MODEL: 6200 Series. Installation Manual

Aegis Heavy Capacity 20K Floor Scale. MODEL: 6200 Series. Installation Manual Installation Manual Aegis Heavy Capacity 20K Floor Scale MODEL: 6200 Series Copyright 1997-2014 Fairbanks Scales, Inc. Revision 3 50637 All Rights Reserved 07/14 Aegis Heavy Capacity 20K Floor Scale Model:

More information

SECTION STEEL HEALTHCARE CASEWORK

SECTION STEEL HEALTHCARE CASEWORK SECTION 12 35 70.01 STEEL HEALTHCARE CASEWORK This guide specification has been prepared by InnerSpace Corporation to assist design professionals in the preparation of a specification section covering

More information

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS SECTION 16711-27 05 28.33 PART 1 - GENERAL 1.01 SUMMARY A. This section includes Labor, materials and equipment necessary to complete the installation required for the items specified under this Section,

More information

M-SERIES INSTALLATION

M-SERIES INSTALLATION M-SERIES INSTALLATION Connectivity with flexibility For more product information visit connectrac.com, call us at 877-480 - 5637 or email us at info@connectrac.com ADA COMPLIANT - U.L. TESTED AND LISTED

More information

SECTION OUTLET, PULL, AND JUNCTION BOXES

SECTION OUTLET, PULL, AND JUNCTION BOXES SECTION 16131 OUTLET, PULL, AND JUNCTION BOXES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16112 - Raceways and Conduits. 1.02 SYSTEM DESCRIPTION A. Performance Requirements:

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS TEC-B-0136 REV0 04/15/15 AUA SERIES SURGICAL LIGHTS (STANDARD RADIAL ARM MODELS ONLY) Read this manual before starting to work! This information is necessary for the safe and

More information

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware Tools/materials you might need for proper installation 6D galvanized screws 100% silicone caulking caulking gun acrylic latex caulk shims tape measure 1/8 drill bit Phillips screw driver cardboard china

More information

INSTRUCTIONS FOR ASSEMBLING NEBS FLOODED RACKS

INSTRUCTIONS FOR ASSEMBLING NEBS FLOODED RACKS INSTRUCTIONS FOR ASSEMBLING NEBS FLOODED RACKS Publication No. US-NEBS-IM-003 September 2013 INSTRUCTIONS for ASSEMBLING NEBS FLOODED RACKS Read all instructions carefully and observe all warnings before

More information

DIVISION 10 SPECIALTIES SECTION METAL LOCKERS

DIVISION 10 SPECIALTIES SECTION METAL LOCKERS DIVISION 10 SPECIALTIES SECTION 10 51 13 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

EXPRESS5800/1080Xd. Installation Procedures

EXPRESS5800/1080Xd. Installation Procedures EXPRESS5800/1080Xd () Installation Procedures Proprietary Notice and Liability Disclaimer The information disclosed in this document, including all designs and related materials, is the valuable property

More information

INSTALLATION MANUAL PROVIDER PLUS

INSTALLATION MANUAL PROVIDER PLUS INSTALLATION MANUAL PROVIDER PLUS OVERVIEW The Provider Plus is a UL-listed, surface-mounted, horizontal modular headwall assembly. This system uses one or more horizontal component tiers to locate services

More information

MODEL: ASCEND SIT/STAND COMMAND CENTER CONSOLES

MODEL: ASCEND SIT/STAND COMMAND CENTER CONSOLES 2015 WINSTED CORPORATION EMAIL: info@winsted.com WEB: winsted.com TEL: 800.447.2257 or 952.944.9050 FAX: 800.421.3839 or 952.944.1546 10901 Hampshire Ave. So. Minneapolis, Minnesota 55438-2385 U.S.A 1)

More information

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS PART 1 - GENERAL 01.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this Section.

More information

US Pool Lift Model #114 (Independence) Installation Guide

US Pool Lift Model #114 (Independence) Installation Guide US Pool Lift Model #114 (Independence) Installation Guide This manual has been provided to assist with lift installation. For further assistance please contact your authorized US Pool Lift dealer. Toll

More information

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

SCI-FAB Product Specifications. Casework Section 1. Part 1 General SCI-FAB Product Specifications Casework Section 1 Part 1 General 1.1 SCOPE OF WORK Includes all factory fabricated stainless steel casework as required by the project drawings. 1.2 TYPICAL INCLUSIONS A.

More information

SECTION MOTOR CONTROL CENTER

SECTION MOTOR CONTROL CENTER SECTION 16445 MOTOR CONTROL CENTER PART 1 GENERAL 1.01 DESCRIPTION A. This section covers the contract item Motor Control Center (MCC). The contract item includes demolition and removal of existing MCC;

More information

SYSTEM 600 BILL CHANGER INSTALLATION INSTRUCTIONS Congratulations...

SYSTEM 600 BILL CHANGER INSTALLATION INSTRUCTIONS Congratulations... www.standardchange.com 1-800-968-6955 Technical Phone Support is from 8:00AM to 7:30PM E.S.T., Monday-Friday Walk-in Service is from 8:00AM to 4:30PM E.S.T., Monday-Friday Parts Department is from 8:00AM

More information

LIFT FRONT CURVED GLASS HOT FOOD/DELI MERCHANDISERS Hot Temperature Service Display Cases

LIFT FRONT CURVED GLASS HOT FOOD/DELI MERCHANDISERS Hot Temperature Service Display Cases Installation & Service Manual LIFT FRONT CURVED GLASS HOT FOOD/DELI MERCHANDISERS Hot Temperature Service Display Cases Save the Instructions in this Manual for Future Reference!! This merchandiser conforms

More information

Installation Guide Single-Hung, Picture & Shapes Non-Impact & Impact Resistant Florida Flange Windows

Installation Guide Single-Hung, Picture & Shapes Non-Impact & Impact Resistant Florida Flange Windows Non-Impact & Impact Resistant Florida Flange Windows americancraftsmanwindows.com Project Requirements: Read guide before starting installation. Read all warnings and cautions during installation. Check

More information

SECTION (06415) - PLASTIC COUNTERTOPS

SECTION (06415) - PLASTIC COUNTERTOPS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: SECTION 12 36 23 (06415) - PLASTIC COUNTERTOPS 1. Plastic Laminate a. Countertops and Backsplashes b. Aprons B. Related Sections: 1.02 REFERENCES 1. Section

More information

Wall-Mount & Back to Wall Toilets

Wall-Mount & Back to Wall Toilets Wall-Mount & Back to Wall Toilets Installation Guide FLOOR LW600 back to wall LW600 wall-mount FLOOR 05-04 Attention Before Installation If you are installing this product in a new construction or remodel,

More information

Leveling Foot RB210. Leg Extender RLT66

Leveling Foot RB210. Leg Extender RLT66 Landing for Right & Left Turn R342 ITEMS # 0254049, 0254061, 0254072, 0254076, 0016567, 0254099, 0254110, 0054116, 0254117, 0254126, 0254140, 0254150, 0254156 CUSTOM ACCESS RAMP SYSTEM MODELS # R100, R242,

More information

INSTALLATION GUIDE PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

INSTALLATION GUIDE PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING! DURA - TRENCH INSTALLATION GUIDE This guide is intended to aide in the installation of Dura-Trench systems. There are many different applications and situations for the use of this product and the installation

More information

Weep Valves Stucco Wire Mesh Reinforcement Weather Resistive Barrier Sheathing Insulation Framing

Weep Valves Stucco Wire Mesh Reinforcement Weather Resistive Barrier Sheathing Insulation Framing INSTALLATION INSTRUCTION FOR SINGLE-HUNG AND FIXED WINDOW REPLACEMENT using FLUSH FLANGE Installation Instructions for replacing windows in a Typical Stucco Application. These instructions were developed

More information

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein.

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein. 16470 PANELBOARDS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 16 An optional keynote to

More information

Mounting Screw. Channel Filler. Light Angle Adjustable Screw. LED Board Vertical stud and blocking Locking Nose. Driver.

Mounting Screw. Channel Filler. Light Angle Adjustable Screw. LED Board Vertical stud and blocking Locking Nose. Driver. The Knife Edge Cove is a modular lighting system consisting of two parts: 1- An aluminum fixture housing extrusion 2- Drop-in lighting modules The fixture will provide a continuous knife edge architectural

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Installation Guide DROP-IN OR FREESTANDING CAST IRON BATH. English page T01-B

Installation Guide DROP-IN OR FREESTANDING CAST IRON BATH. English page T01-B Installation Guide DROP-IN OR FREESTANDING CAST IRON BATH 368 201419 English page 1-8 9-15 Before You Begin A. Introduction Please read these instructions carefully to familiarize yourself with the required

More information

PC-PH SERIES 2 TON. Installation Instructions

PC-PH SERIES 2 TON. Installation Instructions C O M I T A L E N A T I O N A L I N C. PC-PH SERIES 2 TON Installation Instructions Comitale National Inc. 1883 B Winchester Road Bensalem, PA 19020 2115-244-9650 Fax: 215-244-9679 email: sales@comitalenational.com

More information

EXIRA EXPOSED PIPE SHOWER INSTALLATION

EXIRA EXPOSED PIPE SHOWER INSTALLATION SKU(s): 923583 EXIRA EXPOSED PIPE SHOWER INSTALLATION BEFORE YOU BEGIN We recommend consulting a professional if you are unfamiliar with installing plumbing fixtures. Signature Hardware accepts no liability

More information

INSTALLATION MANUAL SURFACE-MOUNTED HEADWALL

INSTALLATION MANUAL SURFACE-MOUNTED HEADWALL INSTALLATION MANUAL SURFACE-MOUNTED HEADWALL Model # Series 7200-S Top Mounting Plate Electrical Junction Box Located Behind Removable Upper Panel Medical Gas Connections Lower Mounting Plate OVERVIEW

More information

5485HT 5650H 5660H 5660HTS 5665HTS Instruction Kit Same Deutz-Fahr Flow Sensor 5SW models Flow Sensor 6SW models

5485HT 5650H 5660H 5660HTS 5665HTS Instruction Kit Same Deutz-Fahr Flow Sensor 5SW models Flow Sensor 6SW models Note: Indented items indicate parts included in an assembly listed above Quantity by Model Part Name/Description Part Number 5485HT 5650H 5660H 5660HTS 5665HTS Instruction Kit Same Deutz-Fahr 4101102 1

More information

MODEL: SLAT-WALL COMMAND CENTER CONSOLES

MODEL: SLAT-WALL COMMAND CENTER CONSOLES 2015 WINSTED CORPORATION EMAIL: info@winsted.com WEB: winsted.com TEL: 800.447.2257 or 952.944.9050 FAX: 800.421.3839 or 952.944.1546 10901 Hampshire Ave. So. Minneapolis, Minnesota 55438-2385 U.S.A MODEL:

More information

Zurn Z874. Trench Drain System. Installation Instructions

Zurn Z874. Trench Drain System. Installation Instructions Zurn Z874 Trench Drain System Installation Instructions Z874 Accessories Trench Drain System Below are the components of the Z874-X trench drain typical to an installation. Check your order to verify you

More information