Options for Sustained Freight Rail Growth

Size: px
Start display at page:

Download "Options for Sustained Freight Rail Growth"

Transcription

1 Options for Sustained Freight Rail Growth

2 Existing freight rail infrastructure in San Diego is near capacity. With an expected growth rate for freight rail of 3% per year, the system will reach gridlock around the year Capacity is constrained on the main lines and the rail yards. The main lines operating north of San Diego used by BNSF are shared with AMTRAK and the COASTER. As the frequency of passenger trains increases, the operating windows for freight train operations decrease. The SDIV operates on a limited window from 0130 to 0400 six days a week on the Trolley Blue Line. This operating window already limits the amount of traffic that can be handled per day to about 40 carloads. If night service on the Trolley increases, the capacity could be further reduced. The freight yard receive incoming trains and sort the cars for delivery to customers. The empty cars are then collected and assembled for outbound trains at the same yards. Physical capacity of the yards is the number of freight cars than can occupy the yard. But some space and empty track is required to sort the cars in the yard, leaving the operating capacity of the yard at 60-75% of the physical capacity. Both BNSF and SDIV are operating near the limits of yard capacity. The arrival of extra manifest trains have already stressed the system, requiring additional trains, placing extra cars in sidings, and requiring difficult arrangements with the Trolley to operate trains outside the operating windows. These events result in increase costs per carload, and indicator of decreasing returns to scale and operations above the optimum car to capacity ratio on the system rail system. Growth in downtown San Diego has come into conflict with freight rail operations in the area. Downtown redevelopment has drastically changed the nature and population density of the area nears the downtown freight yards. The hotels, Convention Center, and PETCO Park have increased dramatically pedestrian and automotive traffic in the area. Yet rail and switching operation still occur along the Harbor Drive corridor that runs across major pedestrian and vehicle flows. This issue has been recognized and addressed at previous hearings. Ultimately, a solution is required which removes these operations from this corridor. A review of rail operations in San Diego by the freight rail operators identified some choke points that further impact the ability to increase freight tail traffic. They include Customs windows at San Ysidro for rail car interchange, and limited access for trucks to rail yards that conduct transload operations. And the recently introduced 286,000lb railcars require that the existing track be upgraded to handle these cars. Solutions to remedy these deficiencies are area available. Capital improvements are needed. But there are also operational changes that can be made which effectively increase the existing capacity. Some of these operational changes have already been implemented.

3 Operating Solutions As the operating window for freight services decreased, there were evenings where the SDIV was unable to complete switching operations. Efforts were initiated to investigate how better use could be made of the limited window. Joint discussions between the SDIV Superintendent of Operations and SDTI arrived at a scheme where the southbound freight could depart earlier from San Diego, and meet the last northbound trolley at the area of the Sweetwater River. An effective meet was also established for the later northbound train from San Ysidro to San Diego. This changed rule provides almost 45 minutes of additional time for freight operations on the line. The way in which cars are delivered to San Diego can speed switching and interchange. Pre-blocking a section of the manifest train for SDIV traffic would make pulling the cars for the SDIV easier and quicker. The freight rail operators have joined together to form the San Diego Freight Rail Advisory Council. It is anticipated that this group will develop further beneficial operating changes.

4 Capital Improvements

5 Yard Improvements The biggest yard bottleneck is located at the SDIV San Ysidro Yard. All customers in San Ysidro, Chula Vista, and National City have their cars sorted at San Ysidro. All Mexican interchange with CZRY is conducted at this facility. The Desert Line traffic for San Diego will be interchanged, and sorted for customers. And paper and plastic transload from railcar to truck is conducted there. The existing truck access is through a tight radius that further limits the ability to conduct these operations. The yard is subject to frequent flooding which can hamper or halt operations until the water recedes. To remedy these problems, a substantial upgrade to this yard is required. It would consist of moving the lead from to the yard from the trolley line farter north, expanding the physical capacity to 200 cars, making drainage improvements, and re-locating the truck access. A paved and lighted transload facility could also be constructed of sufficient size to attract sand and other bulk commodity transload traffic. The establishment of this site would have to address the increased truck traffic and access to the freeways in the area.

6 The downtown SDIV yard has become a victim of redevelopment encroachment and pedestrian/vehicular traffic growth. These operations can no longer expand with the increasing traffic. Additional capacity for this yard is required to support any growth in freight rail movements. Some of this capacity could be need to be shifted to a site to the south. One option is to move this yard to a site at National City located on Navy property north of 8 th St. along Harbor Dr. This location has the advantages of direct access for both BNSF and SDIV. It is located in an industrial area, and would not negatively impact the neighborhood. This site could be developed to provide a physical car capacity of 200 cars. A limited transload site could also be constructed. Movement of some SDIV switching operations to this site could eliminate the BNSF/SDIV interchange downtown that conflicts with vehicle and pedestrian traffic. If the yard is developed as a joint BNSF/SDIV facility, and BNSF provides a pre-blocked manifest train with SDIV traffic, this yard would provide a virtual capacity increase to BNSF of 150 cars. This capacity could handle the surge cause by additional manifest trains form Barstow. SDIV could serve the National City customers from this site without going through San Ysidro, further increasing capacity of that yard to handle the Desert Line growth.

7 Main Line Improvements Operating windows hampers the existing movement of freight traffic. Movement of traffic south of San Diego is severely limited by the short operating window on the SDTI Blue Line. By establishing a connection with BNSF farter south for interchange, and providing a freight track off the existing SDTI line would address these issues. To provide access to the proposed National City Yard and move SDIV/BNSF interchange out of out of San Diego. The proposed location for this crossover is just south of 32 nd St. in San Diego. A connection with BNSF at National City with the Coronado Line would enable the establishment of the separate freight main line to the south.

8 This line would continue south on the Coronado Line to F Street in Chula Vista where it would cross Interstate 5 south of F St. and then parallel the existing trolley main south to L St. Just north of L Street the track would cross the Trolley line and connect with the Palomar siding to the east of the Trolley line. This siding extends south of Main St. in Chula Vista. This alignment effectively takes SDIV through freight operations off the Trolley main north of Palomar with the exception of the crossing at L Street. With trackage rights, BNSF/SDIV could interchange well to the south. This dramatically opens up the operating window, and provides much more flexibility of SDTI in Trolley operations and maintenance.

9 Coastal Rail Corridor Improvements The BNSF operating window is still limited by the passenger operations on the LOSSAN corridor. But improvements have been programmed and budgeted that are providing second main lines and passing sidings. An extensive bridge rehabilitation program is also ongoing. Inputs ans support from the freight rail stakeholders are required to ensure that further improvements are adequate to handle the projected freight rail growth.

BAJA CALIFORNIA RAILROAD, INC.

BAJA CALIFORNIA RAILROAD, INC. BAJA CALIFORNIA RAILROAD, INC. BAJA CALIFORNIA RAILROAD The safest most efficient way to transport heavy loads over long distances Baja California Railroad INC. (BJRR) is the company that operates the

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION. New Jersey Statewide Strategic Freight Rail Plan

NEW JERSEY DEPARTMENT OF TRANSPORTATION. New Jersey Statewide Strategic Freight Rail Plan NEW JERSEY DEPARTMENT OF TRANSPORTATION New Jersey Statewide Strategic Freight Rail Plan OVER-ARCHING PROJECT PURPOSE In short, the plan is intended to: Identify Issues That Constrain Freight Rail Operations

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

Northeast Rail Operations Study (NEROps)

Northeast Rail Operations Study (NEROps) I-95 Corridor Coalition Northeast Rail Operations Study (NEROps) Phase I Final Report Executive Summary June 2007 Northeast Rail Operations Study (NEROps) Phase I Final Report Executive Summary Prepared

More information

NAFTA at 20 Infrastructure Overview. Tamara A. Nelsen Senior Director of Commodities Illinois Farm Bureau

NAFTA at 20 Infrastructure Overview. Tamara A. Nelsen Senior Director of Commodities Illinois Farm Bureau NAFTA at 20 Infrastructure Overview Tamara A. Nelsen Senior Director of Commodities Illinois Farm Bureau Overview U.S. infrastructure overview NAFTA s impact on trade and trade corridors NAFTA freight

More information

Rail Freight and Passenger

Rail Freight and Passenger Take Care of the System Critical Investments in the areas of: Rail Freight rehabilitate rail bridges o Rail Bridge Inventory Database... $0.5 - $1.0 million (one time) Rail Freight rail replacement and

More information

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR July 12, 2002 A Paper Submitted for the AREMA Annual Conference by: Paul B. Satterly, P.E. HNTB CORPORATION 111 Monument Circle, Suite 1200 Indianapolis,

More information

Operations Analysis using Simulation Modeling to Evaluate Capacity Requirements. for Direct Intermodal Rail Facilities at the Port of Long Beach

Operations Analysis using Simulation Modeling to Evaluate Capacity Requirements. for Direct Intermodal Rail Facilities at the Port of Long Beach Operations Analysis using Simulation Modeling to Evaluate Capacity Requirements for Direct Intermodal Rail Facilities at the Port of Long Beach Beth C. Kulick Sr. Professional, TranSystems Corporation

More information

Identifying Key Issues

Identifying Key Issues dmvwrr.com Identifying Key Issues Bismarck-Mandan MPO Regional Freight Study November 2, 2018 Identification of Key Issues Characteristics and Needs The Bismarck-Mandan MPO region is intersected by Interstate

More information

Section IMPLEMENTATION PLAN. 7. Implementation Plan

Section IMPLEMENTATION PLAN. 7. Implementation Plan Section 7 IMPLEMENTATION PLAN 7. Implementation Plan 7.0 Implementation Plan The Tier 1 Final EIS has presented several improvements along the Chicago to St. Louis corridor to meet the purpose and need

More information

The Des Moines Metropolitan Organization. Rail Market Analysis

The Des Moines Metropolitan Organization. Rail Market Analysis The Des Moines Metropolitan Organization Rail Market Analysis January 31, 2014 Table of Contents Project Overview... 1 Market Overview... 1 Overview of Des Moines and Iowa Market... 2 Current Infrastructure...

More information

Recommendations. Bismarck-Mandan MPO Regional Freight Study

Recommendations. Bismarck-Mandan MPO Regional Freight Study Recommendations Bismarck-Mandan MPO Regional Freight Study November 29, 2018 TABLE OF CONTENTS 1. Capital Improvements... 1 Roadway Improvements... 1 2040 MTP Freight Related Improvements... 1 US 83 Study

More information

HEARTLAND HUB WITH GLOBAL REACH

HEARTLAND HUB WITH GLOBAL REACH HEARTLAND HUB WITH GLOBAL REACH Patrick Robinson Vice President NorthPoint Development 816.888.7872 patrick@northpointkc.com Eric N. Goodman Regional Manager Economic Development BNSF Railway 913.551.4550

More information

PAJARO COMMUNITY PLAN PRINCIPAL FINDINGS Draft

PAJARO COMMUNITY PLAN PRINCIPAL FINDINGS Draft PAJARO COMMUNITY PLAN PRINCIPAL FINDINGS Draft 7-2-02 Community Vision Pajaro s future vision is a healthy balanced community in context with agricultural uses and the culturally diverse character of the

More information

Once known as warehousing and distribution, the process

Once known as warehousing and distribution, the process Map III-2.3 Proposed Agile Port Industrial Area AGILE PORT INDUSTRIAL AREA PLAN Once known as warehousing and distribution, the process of moving goods to market has evolved dramatically. No longer is

More information

Northeast Rail Operations Study (NEROps)

Northeast Rail Operations Study (NEROps) I-95 Corridor Coalition Northeast Rail Operations Study (NEROps) Phase I Final Report Executive Summary July 2007 Northeast Rail Operations Study (NEROps) Phase I Final Report Executive Summary Prepared

More information

Transportation Advisory Board May 21, 2014

Transportation Advisory Board May 21, 2014 Transportation Advisory Board May 21, 2014 1 2040 TPP Schedule April 2013 to May 2014: Policymaker Task Force, Partner Agency Work Group and other stakeholder discussions on preparation of draft 2040 TPP

More information

GREATER CHARLOTTE REGIONAL FREIGHT MOBILITY PLAN ADVISORY COMMITTEE MEETING

GREATER CHARLOTTE REGIONAL FREIGHT MOBILITY PLAN ADVISORY COMMITTEE MEETING GREATER CHARLOTTE REGIONAL FREIGHT MOBILITY PLAN ADVISORY COMMITTEE MEETING April 12, 2016 Welcome Safe, reliable, & efficient movement of goods is essential for continued economic success Every day, products

More information

RDEIR/SDEIS Traffic Forecasting Key Assumptions Update

RDEIR/SDEIS Traffic Forecasting Key Assumptions Update RDEIR/SDEIS Traffic Forecasting Key Assumptions Update presented to the Corridor Advisory Committee August 22, 2013 Traffic Forecasting Assumptions RDEIR/SDEIS Planning Horizon Year Socio-Economic Inputs

More information

Section IMPLEMENTATION PLAN. 7. Implementation Plan

Section IMPLEMENTATION PLAN. 7. Implementation Plan Section 7 IMPLEMENTATION PLAN 7. Implementation Plan 7.0 Implementation Plan The Tier 1 DEIS has presented several improvements along the Chicago to St. Louis corridor to meet the purpose and need of the

More information

Trends in the U.S. Rail Network. Mike McClellan Vice President Industrial Products Midwest Association of Rail Shippers July 15, 2014 Lake Geneva, WI

Trends in the U.S. Rail Network. Mike McClellan Vice President Industrial Products Midwest Association of Rail Shippers July 15, 2014 Lake Geneva, WI Trends in the U.S. Rail Network Mike McClellan Vice President Industrial Products Midwest Association of Rail Shippers July 15, 2014 Lake Geneva, WI 1 The Dynamics in US Rail Freight Traffic The (Growing)

More information

Joint Legislative Transportation Oversight Committee January 8, NCDOT Rail Division. Paul Worley, NCDOT Rail Division Director

Joint Legislative Transportation Oversight Committee January 8, NCDOT Rail Division. Paul Worley, NCDOT Rail Division Director Joint Legislative Oversight Committee January 8, 2015 NCDOT Rail Division Paul Worley, NCDOT Rail Division Director Rail Division Rail Division Director Administrative Business Office Planning & Development

More information

Appendix C Presentation Slides with Script

Appendix C Presentation Slides with Script Appendix C Presentation Slides with Script 32 Grand Crossing Rail Project 10 S. Riverside Plaza, Suite 400 Chicago, IL 60606 www.grandcrossingrail.com info@grandcrossingrail.com [title slide no narration]

More information

CHAPTER 5: TRANSPORTATION

CHAPTER 5: TRANSPORTATION CHAPTER 5: TRANSPORTATION GOAL 12: TRANSPORTATION BACKGROUND SUMMARY INTRODUCTION Albany s location and transportation facilities provide excellent advantages for commerce and economic development. Albany

More information

Policies and Procedures No. 12

Policies and Procedures No. 12 1255 Imperial Avenue, Suite 1000 San Diego, CA 92101-7490 619/231-1466 FAX 619/234-3407 Policies and Procedures No. 12 SUBJECT: Board Approval: 2/12/04 OWNERSHIP AND OPERATION OF THE SAN DIEGO AND ARIZONA

More information

Truck Management ` Strategies in Los Angeles

Truck Management ` Strategies in Los Angeles Truck Management ` Strategies in Los Angeles Susan Bok, AICP Senior Transportation Planner Los Angeles Department of Transportation NACTO Chicago Workshop May 11-12, 2009 Context Population Downtown LA

More information

CREATE: Benefits to U.S. Seaports. American Association of Port Authorities Maritime Economic Development Workshop

CREATE: Benefits to U.S. Seaports. American Association of Port Authorities Maritime Economic Development Workshop CREATE: Benefits to U.S. Seaports American Association of Port Authorities Maritime Economic Development Workshop June 27, 2013 CREATE Partners Chicago Terminal Operation and Railroad Daily Activity: 1,300

More information

Freight Work Group. May 1, :30 am 11:30 am

Freight Work Group. May 1, :30 am 11:30 am Freight Work Group May 1, 2017 9:30 am 11:30 am 1 AGENDA Welcome and Introductions Background & Connecting Cook County Plan Overview Stakeholder Involvement Existing Conditions & Context Discussion and

More information

Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey

Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey Maintain transportation system in state of good repair 1. Increase focus on maintenance of existing infrastructure in poor

More information

NATIONAL WESTERN CENTER

NATIONAL WESTERN CENTER NATIONAL WESTERN CENTER Rail Consolidation Study March 2015 1 List of Appendices and Exhibits Exhibits Exhibit A Exhibit B Exhibit C Exhibit D Exhibit E Regional Rail Map Study Area Rail Map Concept Plan

More information

Freight Handler to the Nation. Freight Planning in the Chicago Metropolitan Area

Freight Handler to the Nation. Freight Planning in the Chicago Metropolitan Area Freight Handler to the Nation Freight Planning in the Chicago Metropolitan Area American Planning Association, Chicago Randy Deshazo Chicago Metropolitan Agency for Planning rdeshazo@cmap.illinois.gov

More information

2004 FEASIBILITY STUDY UPDATE

2004 FEASIBILITY STUDY UPDATE Austin-San Antonio Intermunicipal Commuter Rail District 2004 FEASIBILITY STUDY UPDATE December 2004 EXECUTIVE SUMMARY INTRODUCTION Almost 3 million people in Central Texas, living and working between

More information

Web Page:

Web Page: KFR Rate Tariff 8001 designates specific charges for services described in the General Tariff 5000 series and is published with the corresponding Item number KFR Customer Service KFR Marketing Phone: 877.276.3777

More information

Rail - What Does the Future Bring?

Rail - What Does the Future Bring? Rail - What Does the Future Bring? Jeannie Beckett Sr. Dir., Inland Transportation Port of Tacoma Oct 18, 2007 The Rail Networks Railroads Media Blitz Print Ads TV Ads Radio Ads D:\aapa\ RailroadsPSA.wmv

More information

Transportation Problems and Issues Excerpts from WWW Links

Transportation Problems and Issues Excerpts from WWW Links Transportation Problems and Issues Excerpts from WWW Links Reference Bok, D. (2018). Transportation policy and planning. https://www.hks.harvard.edu/courses/transportation-policy-and-planning Transportation

More information

Federal Way Transit Center to Tacoma Dome Light Rail

Federal Way Transit Center to Tacoma Dome Light Rail Subarea South King/Pierce Primary Mode Light Rail Facility Type Corridor Length 9.7 miles Date Last Modified July 1, 2016 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT PROJECT DESCRIPTION This project

More information

RAIL COMMODITY FLOWS

RAIL COMMODITY FLOWS RAIL COMMODITY FLOWS. The major commodities handled by rail are bulk, with the exception of the automotive traffic. The following pages provide detailed information rail commodities in California, and

More information

EIGHT PLANNING FACTORS

EIGHT PLANNING FACTORS EIGHT PLANNING FACTORS Under the provisions of SAFETEA-LU, all Metropolitan Planning Organizations (MPOs) are required to consider eight (8) broad planning factors in the development of multi-modal transportation

More information

Chapter 8: Freight Investment Direction

Chapter 8: Freight Investment Direction 8.1 Chapter 8: Freight Investment Direction 2040 8.2 CONTENTS Chapter 8: Freight Investment Direction Overview 8.3 Challenges and Opportunities 8.5 Freight Capacity and Congestion 8.5 High Fuel Costs 8.5

More information

INDIANA S INTERMODAL MANAGEMENT SYSTEM Stephen C. Smith Planning Manager, Transportation Planning Division Indiana Department of Transportation

INDIANA S INTERMODAL MANAGEMENT SYSTEM Stephen C. Smith Planning Manager, Transportation Planning Division Indiana Department of Transportation 96 INDIANA S INTERMODAL MANAGEMENT SYSTEM Stephen C. Smith Planning Manager, Transportation Planning Division Indiana Department of Transportation Indiana is in the process of developing an Intermodal

More information

RDEIR/SDEIS Traffic Forecasting Key Assumptions Update

RDEIR/SDEIS Traffic Forecasting Key Assumptions Update RDEIR/SDEIS Traffic Forecasting Key Assumptions Update presented to the Technical Advisory Committee August 21, 2013 Traffic Forecasting Assumptions RDEIR/SDEIS Planning Horizon Year Socio-Economic Inputs

More information

Final Recommendations Identification of Improvements, Strategies, and Solutions

Final Recommendations Identification of Improvements, Strategies, and Solutions Identification of Improvements, Strategies, and Solutions Prepared by: December 2015 TABLE OF CONTENTS 1. Introduction... 1 1 2. Freight Policy Recommendations... 2 1 3. Freight Infrastructure Recommendations...

More information

Introduction... 1 Florida s Rail System... 1 Rail Freight... 3 Rail Passengers... 5 Conclusions... 9

Introduction... 1 Florida s Rail System... 1 Rail Freight... 3 Rail Passengers... 5 Conclusions... 9 January 2011 Table of Contents Introduction... 1 Florida s Rail System... 1 Rail Freight... 3 Rail Passengers... 5 Conclusions... 9 Table of Figures and Tables Figure 1 Florida Rail System Map... 2 Figure

More information

BRG RATE TARIFF 8001

BRG RATE TARIFF 8001 BRG RATE TARIFF 8001 designates specific charges for services described in the General Tariff 5000 series and is published with the corresponding item number. This tariff is also applicable on intrastate

More information

THE FUTURE OF FREIGHT RAILROADING. Joseph Schwieterman Professor, DePaul University

THE FUTURE OF FREIGHT RAILROADING. Joseph Schwieterman Professor, DePaul University THE FUTURE OF FREIGHT RAILROADING Joseph Schwieterman Professor, DePaul University WHO ARE THE RAILROADS? Dramatically reduced public understanding in just one generation Urban/Industrial Passengers Nostalgia

More information

WHILE LOCAL COMMUNITIES MAY NOT BE ABLE TO DIRECTLY INFLUENCE THE EQUIPMENT USED ON NEARBY RAIL CORRIDORS, LOCAL COMMUNITIES

WHILE LOCAL COMMUNITIES MAY NOT BE ABLE TO DIRECTLY INFLUENCE THE EQUIPMENT USED ON NEARBY RAIL CORRIDORS, LOCAL COMMUNITIES WHILE LOCAL COMMUNITIES MAY NOT BE ABLE TO DIRECTLY INFLUENCE THE EQUIPMENT USED ON NEARBY RAIL CORRIDORS, LOCAL COMMUNITIES CAN TAKE STEPS TO REDUCE THE EXPOSURE OF LOCAL RESIDENTS TO LOCOMOTIVE EXHAUST.

More information

The RIO System Creating Value Through Transportation

The RIO System Creating Value Through Transportation The RIO System Creating Value Through Transportation Christopher W. Keene President & CEO Rangeland Energy DUG Permian May 20, 2014 Rangeland Energy: Our Purpose Rangeland Energy is a midstream energy

More information

Going Forward The Plan to Maintain & Improve Mobility Frequently Asked Questions (FAQs)

Going Forward The Plan to Maintain & Improve Mobility Frequently Asked Questions (FAQs) Going Forward The Plan to Maintain & Improve Mobility Frequently Asked Questions (FAQs) What is Going Forward The Plan to Maintain & Improve Mobility (Plan) and why does the region need a Long Range Transportation

More information

HONDO RAILWAY, LLC (HRR)

HONDO RAILWAY, LLC (HRR) (HRR) (CANCELS ALL PRIOR FREIGHT TARIFFS) CONTAINING LOCAL SWITCHING AND ACCESSORIAL CHARGES AT LOCATIONS ON THE HONDO RAILWAY APPLICABLE ON INTERSTATE TRAFFIC AND INTRASTATE TRAFFIC IN THE STATE OF TEXAS

More information

Appendix D Presentation Slides with Script

Appendix D Presentation Slides with Script Appendix D Presentation Slides with Script 18 Grand Crossing Rail Project 10 S. Riverside Plaza, Suite 400 Chicago, IL 60606 www.grandcrossingrail.com info@grandcrossingrail.com [title slide no narration]

More information

Comprehensive Freight Gateway Study

Comprehensive Freight Gateway Study WORKING FINAL COPY San Diego Association of Governments (SANDAG) Comprehensive Freight Gateway Study Working Final Copy March 25, 2010 Prepared by: HDR Decision Economics IHS Global Insight Cambridge Systematics

More information

Fishermans Bend. Integrated Transport Plan Victorian Planning Panels. Cccc Eco City World Summit July Neal Giles, Fishermans Bend Taskforce

Fishermans Bend. Integrated Transport Plan Victorian Planning Panels. Cccc Eco City World Summit July Neal Giles, Fishermans Bend Taskforce Fishermans Bend Cccc Eco City World Summit July 2017 Integrated Transport Plan Victorian Planning Panels Neal Giles, Image: Lensaloft Aerial Photography Key Challenges The network needs to change The framework

More information

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 1 Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 2 During this public meeting, we will explain the 75 th Street Corridor Improvement

More information

Twin Cities Metro Freight Study Summary of Results

Twin Cities Metro Freight Study Summary of Results Twin Cities Metro Freight Study Summary of Results Transportation Committee July 22, 2013 Introduction Freight Study Overview Metro Freight System Freight and the Region s Economy Freight Study Reports

More information

HCRY (Cancels All Prior Versions)

HCRY (Cancels All Prior Versions) Charge Schedule Item 6000 Intra-Plant Switch $250 Item 6010 Intra-Terminal Switch $500 Item 6020 Inter-Terminal Switch $500 Item 6210 Diversion/Re-consignment $350 Item 6040 Error Moves $500 Item 6050

More information

KYLE Charge Schedule. Optional Services Catalog Customer Switching and Accessorial Services. Customer Switching.

KYLE Charge Schedule. Optional Services Catalog Customer Switching and Accessorial Services. Customer Switching. Charge Schedule Intra-Plant Switch $250 Item 6000 Intra-Terminal Switch $500 Item 6010 Inter-Terminal Switch $500 Item 6020 Diversion/Re-consignment $350 Item 6210 Error Moves $500 Item 6040 Car Released

More information

I-95 Corridor Study Phase II Highway Element

I-95 Corridor Study Phase II Highway Element I-95 Corridor Study Phase II Highway Element FAMPO Policy Committee February 26, 2018 1 Activity in January & February 1. Numerous discussion with VDOT to better understand the scope of recently funded

More information

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 1 Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 2 During this public meeting, we will explain the 75 th Street Corridor Improvement

More information

Richard Clarke Executive Director Program Management. Capital Program Management

Richard Clarke Executive Director Program Management. Capital Program Management Richard Clarke Executive Director Program Management Capital Program Management Department Overview > Transit, Highway Programs, and Regional Rail o Transit Deliver construction projects on-time and within

More information

Rail Division 2012 Annual Summary

Rail Division 2012 Annual Summary Rail Division 2012 Annual Summary Overview The Rail Division oversees rail planning and inspection, highway rail crossings, management of stateowned lines (such as the South Orient Rail line (SORR) and

More information

1.0 INTRODUCTION Federal Mandate for State Rail Plans Stakeholder Consultation Ongoing Planning Process...

1.0 INTRODUCTION Federal Mandate for State Rail Plans Stakeholder Consultation Ongoing Planning Process... TABLE OF CONTENTS 1.0 INTRODUCTION... 1-1 1.1 Federal Mandate for State Rail Plans......1-2 1.2 Stakeholder Consultation... 1-3 1.3 Ongoing Planning Process... 1-3 2.0 STATE RAIL ACTIVITY IN OHIO... 2-1

More information

Sorrento to Miramar 4(f) De Minimis Determination

Sorrento to Miramar 4(f) De Minimis Determination Sorrento to Miramar 4(f) De Minimis Determination LOSSAN Overview Bruce Smith PE SM2 Project Manager with SANDAG What is LOSSAN? A 351-mile coastal rail corridor Los Angeles San Diego San Luis Obispo Built

More information

Test bank Chapter 4. Multiple Choice

Test bank Chapter 4. Multiple Choice Test bank Chapter 4 Multiple Choice 1. During 1997, railroads carried what percentage of the total intercity freight traffic? a. 47 percent b. 39 percent c. 51 percent d. 25 percent 2. Which is considered

More information

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION AUGUST 2015 Table of Contents 1 Decision... 1 1.1 Project Description... 2 1.2 Basis for the FHWA Decision... 7 1.2.1

More information

FACT SHEETS LOS ANGELES COUNTY

FACT SHEETS LOS ANGELES COUNTY FACT SHEETS LOS ANGELES COUNTY WHAT IS THE REGIONAL TRANSPORTATION PLAN/ SUSTAINABLE COMMUNITIES STRATEGY (RTP/SCS) Every four years the Southern California Association of Governments (SCAG) prepares a

More information

Los Angeles County Congestion Reduction Demonstration Project

Los Angeles County Congestion Reduction Demonstration Project Los Angeles County Congestion Reduction Demonstration Project frequently asked questions update #1 /august 2008 Los Angeles County Metropolitan Transportation Authority (Metro), California Department of

More information

2.0 ALTERNATIVES. 2.1 Introduction. 2.2 No Build Alternative

2.0 ALTERNATIVES. 2.1 Introduction. 2.2 No Build Alternative 2.0 ALTERNATIVES 2.1 Introduction The alternatives selected for evaluation in this Environmental Assessment (EA) include the No Build Alternative and a Build Alternative that provides for increased HSR

More information

Regional Performance Measures Annual Progress Report TPO Board - 2/4/2016 Presentation by: Chris Wichman, Senior Planner

Regional Performance Measures Annual Progress Report TPO Board - 2/4/2016 Presentation by: Chris Wichman, Senior Planner 2015 TPO Board - 2/4/2016 Presentation by: Chris Wichman, Senior Planner Overview History and definition of performance-based planning & programming Review of 2015 TPO Board Action Requested 2 History

More information

The Fertilizer Institute. Current Transportation Dynamics November 6, 2006 By Tom Williamson, Transportation Consultants Co.

The Fertilizer Institute. Current Transportation Dynamics November 6, 2006 By Tom Williamson, Transportation Consultants Co. The Fertilizer Institute Current Transportation Dynamics November 6, 2006 By Tom Williamson, Transportation Consultants Co. Questions What will be the cost of fuel, insurance, taxes, and new transportation

More information

Riverview Corridor Pre-Project Development Study

Riverview Corridor Pre-Project Development Study Riverview Corridor Pre-Project Development Study American Society of Civil Engineers - Minnesota May 25, 2016 Work in Progress; Subject to Change 1 History 2000: Major Investment Study (MIS) offered several

More information

Strategic Transportation Plan FOCUS ON TRANSIT

Strategic Transportation Plan FOCUS ON TRANSIT Strategic Transportation Plan FOCUS ON TRANSIT Presented to: Gateway Cities Service Council Presented by: Jerry Wood, GCCOG Director of Transportation and Engineering COG2013\2013 - POWER POINTS for JRW

More information

Chapter 5 - Needs Assessment and Freight Forecast

Chapter 5 - Needs Assessment and Freight Forecast Chapter 5 - Needs Assessment and Freight Forecast KEY POINTS Missouri s central location in the United States was consistently identified as a top strength of the State s freight system and an asset for

More information

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA Introduction: North Jersey Transportation Planning Authority NJTPA Congestion Management Process Study Goals Analysis

More information

CO-OP REFINERY COMPLEX CASE STUDY INTEGRATED SERVICE SOLUTION STREAMLINES RAILCAR MOVEMENT AND IMPROVES EFFICIENCY AT THE CO-OP REFINERY COMPLEX

CO-OP REFINERY COMPLEX CASE STUDY INTEGRATED SERVICE SOLUTION STREAMLINES RAILCAR MOVEMENT AND IMPROVES EFFICIENCY AT THE CO-OP REFINERY COMPLEX CO-OP REFINERY COMPLEX CASE STUDY INTEGRATED SERVICE SOLUTION STREAMLINES RAILCAR MOVEMENT AND IMPROVES EFFICIENCY AT THE CO-OP REFINERY COMPLEX candorail.com THE CO-OP REFINERY COMPLEX (CRC) IN REGINA,

More information

American Short Line and Regional Railroad Association. North American Short Line and Regional Railroads Industry Report

American Short Line and Regional Railroad Association. North American Short Line and Regional Railroads Industry Report American Short Line and Regional Railroad Association North American Short Line and Regional Railroads Industry Report Recent Background of Railroads 1970 s Freight Railroads in NE Collapsing - 20% of

More information

TEXAS FREIGHT MOBILITY PLAN. Greater Houston Freight Committee Kick-Off Meeting

TEXAS FREIGHT MOBILITY PLAN. Greater Houston Freight Committee Kick-Off Meeting TEXAS FREIGHT MOBILITY PLAN Greater Houston Freight Committee Kick-Off Meeting July 11, 2016 Overview of Texas Freight Mobility Plan The Freight Plan is TxDOT's first multimodal transportation plan that

More information

New Approaches to Public Collaboration

New Approaches to Public Collaboration New Approaches to Public Collaboration Dean Wise Vice President, Network Strategy 2/25/2014 Rail Handles 40% of US Freight U.S. Freight By Mode 2009 Ton-Miles Truck 34% Rail 40% Water 12% Pipeline 14%

More information

SLR (Cancels All Prior Versions)

SLR (Cancels All Prior Versions) Charge Schedule Item 6000 Intra-Plant Switch $250 Item 6010 Intra-Terminal Switch $500 Item 6020 Inter-Terminal Switch $500 Item 6210 Diversion/Re-consignment $350 Item 6040 Error Moves $500 Item 6050

More information

Going/Greeley Interchange Enhancements for Truck Operations

Going/Greeley Interchange Enhancements for Truck Operations Going/Greeley Interchange Enhancements for Truck Operations City of Portland Table of Contents What Is The Problem?.1 What Is The Purpose Of The Study?...1 Review Of Alternatives.1 Table: Estimated Cost

More information

Transportation Modeling Tools. Rainer Dronzek November 3, 2006

Transportation Modeling Tools. Rainer Dronzek November 3, 2006 Transportation Modeling Tools Rainer Dronzek November 3, 2006 Presenter Info BSEE, Bradley University Institute of Industrial Engineers simulation Ask the Expert Simulation Solutions Conference chair and

More information

The Intermodal Connection to Rural America's Resources, Economic Development, and Sustainability

The Intermodal Connection to Rural America's Resources, Economic Development, and Sustainability The Intermodal Connection to Rural America's Resources, Economic Development, and Sustainability July 20, 2017 Libby Ogard Prime Focus LLC Freight Rail Overview Each American requires the movement of approximately

More information

SLR (Cancels All Prior Versions)

SLR (Cancels All Prior Versions) Charge Schedule Item 6000 Intra-Plant Switch $250 Item 6010 Intra-Terminal Switch $500 Item 6020 Inter-Terminal Switch $500 Item 6210 Diversion/Re-consignment $350 Item 6040 Error Moves $500 Item 6050

More information

Introduction to North American Rail Transportation

Introduction to North American Rail Transportation Introduction to North American Rail Transportation Christopher Barkan Professor & Executive Director Rail Transportation & Engineering Center University of Illinois at Urbana-Champaign Presentation Outline

More information

Massachusetts Rail Plan. September 16, 2010

Massachusetts Rail Plan. September 16, 2010 Massachusetts Rail Plan September 16, 2010 State Freight and Rail Plans State Rail Plan The plan describes state policy for freight and passenger rail transportation, including commuter rail Provides priorities

More information

Web Page:

Web Page: CRL Rate Tariff 8001 designates specific charges for services described in the General Tariff 5000 series and is published with the corresponding Item number CRL Customer Service CRL Marketing Phone: 877.276.3777

More information

Presented to : I 710 Project Committee June 30, 2011

Presented to : I 710 Project Committee June 30, 2011 Presented to : I 710 Project Committee June 30, 2011 Overview Metro s Public Private Partnership (PPP) program Traffic Effects of Tolling Trucks on I 710 Statutory Authority for Tolling Interstate Highways

More information

MAP 21 Interim Guidance. State Freight Advisory Committee & State Freight Plan

MAP 21 Interim Guidance. State Freight Advisory Committee & State Freight Plan MAP 21 Interim Guidance State Freight Advisory Committee & State Freight Plan Freight Advisory Committee Committee must consist of representative public and private sector stakeholders, including: the

More information

summary report West Texas Rail Feasibility Study Texas Department of Transportation Cambridge Systematics, Inc. HNTB August 2011

summary report West Texas Rail Feasibility Study Texas Department of Transportation Cambridge Systematics, Inc. HNTB August 2011 summary report prepared for Texas Department of Transportation prepared by Cambridge Systematics, Inc. with HNTB August 2011 www.camsys.com summary report West Texas Rail Feasibility Study prepared for

More information

Date: May 4, Clare M. Look-Jaeger, P.E. Kevin C. Jaeger Linscott, Law & Greenspan, Engineers Weingart Projects Construction Traffic Analysis

Date: May 4, Clare M. Look-Jaeger, P.E. Kevin C. Jaeger Linscott, Law & Greenspan, Engineers Weingart Projects Construction Traffic Analysis MEMORANDUM To: CAJA Environmental Services, LLC Date: From: Subject: Clare M. Look-Jaeger, P.E. Kevin C. Jaeger Linscott, Law & Greenspan, Engineers Weingart Projects Construction Traffic Analysis LLG

More information

Broward County Urban Freight/Intermodal Mobility Study Executive Summary

Broward County Urban Freight/Intermodal Mobility Study Executive Summary Broward County Urban Freight/Intermodal Mobility Study Executive Summary 2007/08 executive summary Urban Freight/Intermodal Mobility Study prepared for Broward MPO prepared by 110 East Broward Boulevard,

More information

Summary. Freight transportation in New England

Summary. Freight transportation in New England This memo is preliminary in nature and subject to revision and review. Any views expressed are not necessarily those of the Federal Reserve Bank of Boston or the Federal Reserve System. To: Carrie Conaway,

More information

A long-term, comprehensive solution

A long-term, comprehensive solution A long-term, comprehensive solution Nancy Boyd CRC Project Director for Washington Portland State University Transportation Seminar April 15 2011 Frank Green April 15, 2011 CRC Structural Engineering Manager

More information

CREATE Program Overview

CREATE Program Overview CREATE Program Overview April 2016 CREATE Partners 2 What is CREATE? A $4.4 billion Public-Private Partnership (PPP) designed to improve transportation flow through Chicago focusing on: Increased capacity,

More information

TEXAS TRANSPORTATION PLAN. Public Meeting Round 1

TEXAS TRANSPORTATION PLAN. Public Meeting Round 1 TEXAS TRANSPORTATION PLAN Public Meeting Round 1 The Texas Transportation System The Texas transportation system enables you to drive, ride, walk, bike, or fly to get where you need to go. It supports

More information

Web Page:

Web Page: KFR Rate Tariff 8001 designates specific charges for services described in the General Tariff 5000 series and is published with the corresponding Item number KFR Customer Service KFR eting Phone: 877.276.3777

More information

4/26/2013. I-435 and Front Street Diverging Diamond Interchange Missouri Department of Transportation. KCITE 2012 Excellence in Transportation Award

4/26/2013. I-435 and Front Street Diverging Diamond Interchange Missouri Department of Transportation. KCITE 2012 Excellence in Transportation Award 4/26/2013 I-435 and Front Street Diverging Diamond Interchange Missouri Department of Transportation KCITE 2012 Excellence in Transportation Award I-435 and Front Street Diverging Diamond Interchange Missouri

More information

SAN DIEGO FORWARD THE REGIONAL PLAN OUR REGION AT A CROSSROADS. A PLAN TO GUIDE OUR WAY. VISION. Healthy Environment & Communities

SAN DIEGO FORWARD THE REGIONAL PLAN OUR REGION AT A CROSSROADS. A PLAN TO GUIDE OUR WAY. VISION. Healthy Environment & Communities JUNE 2015 SAN DIEGO FORWARD THE REGIONAL PLAN OUR REGION AT A CROSSROADS. A PLAN TO GUIDE OUR WAY. We live in one of the most beautiful regions in the country. As we grow in the coming decades, we can

More information

Ohio Department of Transportation Ohio Statewide Freight Study/ Plan

Ohio Department of Transportation Ohio Statewide Freight Study/ Plan Ohio Statewide Freight Study/ Plan Ohio Planning Conference July, 2014 Statewide Freight Plan Purpose: To understand to the greatest detail possible, how Ohio s freight infrastructure is being utilized.

More information

kkrorkr-ntl One atew way PI= 213.gzz.z~

kkrorkr-ntl One atew way PI= 213.gzz.z~ --- kkrorkr-ntl One atew way PI= 213.gzz.z~ Los Angeles, CA 90012-2952 rnetro.net 9 PLANNING AND PROGRAMMING COMMITTEE JUNE 18,2010 SUBJECT: ACTION: FEASIBILITY AND COST OF EXTENDING THE METRO REDIPURPLE

More information

The NEW New York, Susquehanna and Western Railway. NEARS - Providence, RI - April 30,

The NEW New York, Susquehanna and Western Railway. NEARS - Providence, RI - April 30, The NEW New York, Susquehanna and Western Railway NEARS - Providence, RI - April 30, 2014 1 The NYS&W has been serving the Northeast since 1889 but is today, in many ways, a new railroad. We have taken

More information