Exhibit A Scope of Work and Deliverables

Size: px
Start display at page:

Download "Exhibit A Scope of Work and Deliverables"

Transcription

1 1 General Statement of Scope of Work 5 2 Background 6 3 Contract Completion Timeline 6 4 Project Management, Coordination, and Meetings Schedule Monthly Progress Meetings Project Instructions and Quality Assurance Subcontractor Management and Oversight Project Coordination with Stakeholders Mobilize and Utilize Strategic Advisory Group (SAG) Initial Project Coordination Meetings 7 5 Items provided by State 8 6 Conflict Scoping Process Municipal Consent Package FHWA Consent Letter or Equivalent CSP Deliverables Project Analysis Stakeholder Identification Conflict Identification Mapping Assessment Strategy Implementation and Management Outreach Meetings Noise Mitigation Meetings Staff Advisory Committee Meetings th, Portland and Nicollet Avenue Access Consolidation Design Workshops Elected Officials Meeting EA Public Open House Electronic Communications Business Meetings (assumes State will conduct these meetings) The Project Scope Video Project Management Resolution, Review, and Regeneration Post-Project Analysis 14 7 Environmental Documentation Early Notification Memo Purpose and Need Statement Draft Purpose and Need Statement Final Purpose and Need Statement Alternatives Evaluation Draft Project Alternatives Report Logical Termini Analysis and Report Alternatives Evaluation Impacts Not Covered in EAW Contamination Investigation, and Hazardous Materials and Regulated Waste Wetland Delineation and Impacts Report Benefit-Cost Analysis Flood Plain Assessment Section 4(f) Traffic 24 Page 1 of 66

2 7.4.7 Air Noise Social Impacts Considerations Relating to Pedestrians and Bicyclists Environmental Justice Economics Relocation Impacts Public and Agency Involvement Section 106 Review (Cultural Resources) EAW Questions EAW Items 1-6. Project Information EAW Item 7. Cover Type EAW Item 8. Permits and Approvals EAW Item 9. Land Use EAW Item 10. Geology, Soils and Topography/Land Forms EAW Item 11. Water Resources 29 Surface Water 29 Groundwater 29 Wastewater 30 Stormwater 30 Water appropriation 30 Wetlands 30 Other Surface Waters EAW Item 12. Contamination/Hazardous Materials/Wastes EAW Item 13. Fish, Wildlife, Plant Communities, and Sensitive Ecological Resources EAW Item 14. Historic Properties EAW Item 15. Visual EAW Item 16. Air EAW Item 17. Noise EAW Item 18. Transportation EAW Item 19. Cumulative Potential Effects: EAW Item 20. Other Potential Environmental Effects: Section 6(f) Additional Tasks beyond Issue Areas in the EA/EAW: Draft EA/EAW Document EA/EAW Public Hearing Draft Findings of Fact and Conclusion Responses to Comments and Final FOFC Water Quality Permits Army Corps of Engineers 34 8 Existing Traffic Conditions Report 35 9 Traffic Operations Analyses Alternative Evaluation Modeling Travel Demand Forecasts for Alternative Evaluation Travel Demand Forecasts Report for Alternative Evaluation Travel Demand Forecasts Meetings CORSIM Analysis for Alternative Evaluation CORSIM Analysis Report for Alternative Evaluation CORSIM Analysis Meetings Travel Demand Forecasts Travel Demand Modeling and Forecast Report 37 Page 2 of 66

3 9.2.2 Sensitivity Analysis on Travel Demand Modeling Microsimulation Modeling and Analysis Building of Base Model Base Model Calibration Report Year 2020 No-Build Alternative Traffic Analysis Year 2040 No-Build Alternative Traffic Analysis Year 2020 Preferred Alternative Traffic Analysis Year 2040 Preferred Alternative Traffic Analysis Sensitivity Analysis on CORSIM Modeling Traffic Management Plan Layout Alternatives TMP Staging Alternatives Analysis Report Final TMP Local Road TMP Analysis Error! Bookmark not defined Detour Analysis Travel Demand Modeling Enhanced NEPA Screening Analysis Coordination Transit Ridership Forecasts Travel Time Reliability Evaluation Benefit-Cost Analysis for NEPA Alternative Screening Model Calibration, Validation, and Analysis Interstate Access Request Geometric Layouts Draft Preliminary Geometric Layouts Drainage Spread Requirements and Analysis for Median Shoulders Final Preliminary Geometric Layouts Level 1 - Staff Approved Layout Drainage Overview Maps Drainage Overview Maps for Alternatives Drainage Overview Map for Staff Approved Layout Cost Estimates Cost Estimates for Draft Alternatives Cost Estimates for Final Alternatives % Quantities Based Cost Estimate Additional 30% Quantities Based Cost Estimate Work Bridge Evaluation Bridge Evaluation of Alternatives Bridge Evaluation of Staff Approved Layout Cross Sections and Construction Limits of Alternatives Cross Sections and Construction Limits for Staff Approved Layout State Scoping Report and Pavement Recommendations Initial State Scoping Report Initial State Pavement Recommendations Final State Scoping Report Final State Pavement Recommendations Value Engineering Value Engineering Participation 58 Page 3 of 66

4 17.2 Value Engineering Preferred Alternative Layout Revision Value Engineering Preferred Alternative LWD Cost Estimate Revision Preliminary Design Package Design Memorandum Right of Way Report Preliminary ITS, MNPASS, and Type A and OH Layout Visual Quality Manual Risk Management of Construction Risks Wetland Delineation General Statement of Scope of Work State will provide: Assumptions Deliverables WTL2000 Perform Level 1 Field Prep (Wetlands) WTL2010 Perform Level 1 Field Work (Wetlands) WTL2020 Perform Level 1 Post Field (Wetlands) WTL 2040 Early Coordination Meeting with Regulators (Wetlands) WTL2050 Perform Level 2 Field Work (Wetlands) WTL2060 Perform Level 2 Post Field (Wetlands) WTL2065 Final Coordination Meeting with Regulators (Wetlands) WTL2070 Write Report Documentation (Wetlands) Clean and video tape pipe sewer I-494 MnPASS Implementation Report Surveying Datums 66 THE REMAINDER OF THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK Page 4 of 66

5 1 General Statement of Scope of Work Contractor will conduct all tasks as described herein on Interstate (I)-494 from the Minnesota River by the Minneapolis/St. Paul International Airport to Highway 169 in the City of Bloomington, in both directions. These limits and this Project will be referred to as the I-494 Bloomington Strip Project. The project length is approximately ten miles. The Federal Highway Administration (FHWA) considers this to be a Project of Division Interest (PODI), which means that the FHWA will be doing full federal oversight of this project. The State has been working with the I-494 Corridor Coalition and the I-35W Solutions Alliance in the development of a multi-modal and increased capacity corridor. These coalitions are made up of the following Cities, County and agencies: Bloomington, Richfield, Edina, Minnetonka, Eden Prairie, Minneapolis, the Metropolitan Council, Metro Transit, and the Metropolitan Airport Commission. The State has previously commissioned numerous congestion relief studies along this stretch of highway. Recommendations that came out of these studies include the addition of MnPASS lanes and/or Auxiliary lanes in this corridor and the reconfiguration of the I-35W and I-494 Interchange. Furthermore, in the State Capital Highway Improvement Program (CHIP), infrastructure in this corridor has been identified as requiring preservation works be completed by the year The infrastructure needs are: Major Concrete Pavement Rehabilitation from the Mississippi River to 24 th St by year 2023; Bituminous Mill and Overlay from 24 th Street to France Avenue by year 2025 and Concrete Pavement Rehabilitation from France Avenue to I- 394 in year In addition the following bridges over I-494: 12 th Avenue, Portland Avenue have been identified in the Bridge Replacement and Improvement Management (BRIM) system to be replaced in , Nicollet Avenue is identified in BRIM for replacement in timeframe. Therefore, in the development of the environmental document for the proposed project following the National Environmental Policy Act (NEPA) guidelines and the Interstate Access Request (IAR), the Contractor is tasked to consider the interaction of the corridor vision i.e. MnPASS, Auxiliary Lanes, the implementation of the I-494/I- 35W Interchange Vision layout, Highway access consolidation as part of the potential 12th, Portland and Nicollet bridge replacements, the concurrent construction of Metro Transit s Knox Avenue bridges by I-494 (Metro Orange Line). The primary purpose of this contract is to propose a project that provides a long-term, sustainable option for all highway users (transit and non-transit) that: Addresses deficient bridge and pavement conditions Increases mobility, Improves travel time reliability, Maintains or improves transit advantages on I-494 between roughly Trunk Highway (TH) 5 and TH 169 in the cities of Bloomington, Richfield, Eden Prairie and the Minneapolis- St. Paul Airport State and regional transportation plan policies and strategies, including goals and objectives to better use existing and future infrastructure investments, will help guide project development. The Contractor will assist the State in the development of a preliminary design (30% plans) that incorporates the CHIP goals and corridor improvement targets mentioned previously. The proposed deliverables for this contract include Environmental Assessment (EA) with a preferred alternative, Staff Approved Layout, cost estimates, traffic modeling, traffic operational analysis, IAR, Traffic Management Plan (TMP), Preliminary Drainage Overview Map, Construction Limits, and right of way (R/W) acquisition report. The construction of this project has not been programmed, which means it does not have a letting date and does not have funding for construction. The FHWA policy on the NEPA and Fiscal Constraint prohibits the issuance of a determination until funding for a post-nepa project is programmed. This means that documents such as the EA and IAR may not actually be approved with the conclusion of this contract. However, the intent of this contract is to Page 5 of 66

6 have the FHWA review those documents and provide comments, so that State and the Contractor can address those comments and complete these draft documents such that it is reasonable to assume that they would be approved if a construction project were programmed. As a result, both State and the Contractor must be careful to manage the expectations of the public and other stakeholders. For example, even though our traffic operational analysis will use the year of construction as 2020 and the design year as 2040, we must be careful to explain that a construction project for the year 2020 has not been programmed or funded. Managed lane projects are difficult to fund based upon the current funding received by the department. The operational issues and the safety issues that have developed as a result of increased traffic on I-494 Bloomington strip are problematic and continue to degrade as traffic volumes increase, additional weaving occurs, and the congestion grows. 2 Background In 2014, the State commissioned a vision study for the I-494/I-35W interchange located in Bloomington, MN to enhance safety and improve upon the significant congestion that affects traffic operations at the interchange and segments of the I-494 and I-35W corridors. In the 2001 Final Environmental Impact Statement (FEIS) for the I-494 Reconstruction: I-394 to the Minnesota River major improvement strategies for the I-494 corridor were identified and some since implemented including projects involving interchange reconstruction, bridge replacements and roadway improvements. State and the Metropolitan Council in a joint effort published the Minnesota Highway System Investment Study (MHSIS) in September The purpose of this study was to develop a future transportation investment strategy that optimizes the investments already made in the region through the use of multimodal oriented managed lanes and comprehensive system management strategies. As noted in the MHSIS, The purpose of these strategies is not to fix congestion, but rather to provide residents, employees, and visitors with a consistently congestion free alternative throughout the regional highway system. The consideration of managed lane elements provides an opportunity for travelers to opt their way out of congestion, even if system congestion may persist. The study examined projects that could be implemented in the timeframe. Four categories of performance measures were used to examine the MHSIS alternatives: Increase the person moving capability of the metropolitan highway system Manage and optimize, to the greatest extent possible, the existing system Reduce future demand on the highway system Implement strategic and affordable investments The study findings rated 18 potential managed lane corridors, and I-494 Corridor described herein is one of those corridors. A composite performance rating of high, medium and low, was used to compare the managed lane corridors among each other. The rating indicated which improvements best corresponded with the objectives of the MHSIS for assumed potential implementation by Contract Completion Timeline State expects all deliverables in this scope of work to be completed within 18 months of Notice to Proceed. 4 Project Management, Coordination, and Meetings This task focuses on effective communication and coordination of the contract work to expedite the decisionmaking process and maintain the scheduled completion dates. The project manager s team will also be responsible to transferring/saving electronic files/deliverables to State s ProjectWise system prior to requesting State s review of said task/deliverable. 4.1 Schedule Create and actively maintain a detailed schedule, using the Primavera Project Manager (P6) program. The updated schedule will accompany the monthly invoicing and progress meetings and at other times deemed necessary to allow the Page 6 of 66

7 use of the schedule as an effective management tool. At a minimum the schedule will include durations and due dates for all deliverables listed in this scope of work. State will provide a sample schedule of this project, for reference only, at the following site: ftp://intradev.dot.state.mn.us/outbound/metrowatersedge/s.p bloomingtonstrip/ The Contractor will determine the final schedule by analyzing each Work Package s duration and networking to create a schedule that will accomplish the contract completion deadline. Deliverable: One electronic schedule to be updated monthly. Format: All files submitted electronically. Use P6 as the scheduling software. Monthly reports must be in Adobe Acrobat (pdf extension). Due: Within 14 business days of Notice To Proceed with monthly updates on progress. Standard: Critical Path Method (CPM) State Review: Five business days. Contractor Update: Five business days. 4.2 Monthly Progress Meetings Contractor s Project Manager will meet with State s Project Manager once per month to review the monthly progress and invoices. Contractor s Project Manager will solicit feedback from State s Project Manager to assess whether all services meet or exceed the requirements of the project. If needed, Contractor will direct changes to personnel and/or procedures to correct identified deficiencies and implement opportunities for improvements. Deliverable: An informal meeting to review invoices and progress. Format: All files submitted electronically. Meeting may be in person, teleconference, or web conference. Send to State s Project Manager at completion of meeting documenting that meeting occurred per work order requirements. Due: Monthly at the same time as the invoices. Standard: Meeting minutes are not required. State Review: During the meeting. Contractor Update: Update invoices within 5 business days. 4.3 Project Instructions and Quality Assurance Develop tools (Project Instructions, Work Plans, and a Quality Assurance Plan) to establish budgets, roles, and responsibilities for the project team members throughout the project. Provide project oversight, leadership to the project team, and facilitate team meetings. Contractor will perform Quality Assurance/Quality Control (QA/QC) functions throughout the project duration to ensure delivery of a quality product. Develop resource utilization tool to indicate "burn rate" to aid in budget management. 4.4 Subcontractor Management and Oversight Manage, coordinate, direct, and monitor subcontractor services. This includes review of progress reports, deliverables, schedule and invoices. 4.5 Project Coordination with Stakeholders Communicate and coordinate project goals, objectives, and general information with project stakeholders (those listed in Section 6). 4.6 Mobilize and Utilize Strategic Advisory Group (SAG) Meet with SAG to develop project strategy, review goals and objective, and receive executive input. 4.7 Initial Project Coordination Meetings Attend and facilitate meeting between Contractor and State to finalize traffic analysis criteria and goals. The results of this meeting will be presented to FHWA. Page 7 of 66

8 Attend and facilitate meeting between Contractor, State, and FHWA to present results of initial traffic analysis coordination meeting and gain FHWA concurrence on traffic analysis approach. Attend and facilitate meeting with Contractor, State and other State representatives for the 494/62 Congestion relief study, TH 77 Managed Lane Study with the purpose of gathering information and integrating study proposals into the 494 Bloomington strip project. Deliverable: Meeting minutes for Initial Project Coordination Meetings 5 Items provided by State Metropolitan Freeway System 2012 Congestion Report (or latest available Report), The I-494/I-35W Interchange Vision Layout report The I-494 Hydraulic reports. The 1991 & 2001 FEIS documents. Traffic Forecast from I-494/TH 62 Congestion Relief Study, Three-year crash summary for the I-494 Corridor from the Mississippi River to I-394. Report for the I-494/TH 62 Congestion Relief Study (report many not be finalized by the time of notice to proceed). Report for the TH 77 Managed Lane Study. Documentation regarding current and proposed transit service on I-494 and I-35W in Bloomington, Draft site plan showing previously developed project, MN Department of Natural Resources (DNR) Questionnaire response, and Natural Heritage database list for the project area, PONTIS Bird Nest report, R/W mapping, State Metro District s LWD cost estimate template and guidance for usage, Planimetric mapping, TIN model, right of way and utility information from previous work, and any other CADD base map information available, using the following datums: o Vertical datum is based on the North American Vertical Datum of 1988 (NAVD 88). o Horizontal datum is based on Hennepin County coordinate system, which is related to the Minnesota State Plane Coordinate System NAD 1983 (HARN 1996) adjustment south zone. CADD and Geopak files for previous alternatives, including layouts, profiles and cross sections, Comprehensive Intelligent Transporation System (ITS) as-builts showing existing ITS infrastructure, including, but not limited to, detection, cameras, dynamic message signs, cabinets, fiber optic cable, ramp metering, cabinets, source of power, etc. Comprehensive signing as-builts showing existing signing infrastructure, including but not limited to, Type A and Overhead (OH) guide signs. Cultural Resources Review for EA including Section 106 review and Determination of Effect Value Engineering Geotechnical Investigation including borings Materials Design Recommendation including borings Americans with Disabilities Act (ADA) Recommendations Section 7 of the Endangered Species Act-Determination of Effect Public Information Communications Plan: Contractor to insert this information into both CSP Strategy and TMP. United States Army Corps of Engineers (USACE) coordination meeting checklist 6 Conflict Scoping Process Assumptions: Project duration is 18 months. Page 8 of 66

9 Municipal Consent activities will follow State's Highway Project Development Process (HPDP) manual, Municipal Consent section. Municipal Consent documentation will be in the form of City Council resolutions. Assumes Municipal Consent is needed from all adjacent cities. Assumes City Council hearings will be required. Up to 18 Project Management Team (PMT) meetings over the duration of the project (one PMT meeting per month). PMT members to include State, FHWA and Metropolitan Council. Metropolitan Transit (or other agencies) to be invited to PMT meetings on an as needed basis. Up to 4 people from Contractor at each PMT meeting, 4 hours per meeting including travel. Up to 9 Technical Advisory Committee (TAC) meetings over the duration of the project (one TAC meeting every two months). TAC members to include project stakeholders identified below. Up to 4 people from Contractor at each TAC meeting, 4 hours per meeting including travel. Additional Contractor staff to attend TAC meetings on an as needed basis. Conflict Scoping Process Work Sessions will be held during PMT meetings on an as needed basis. Up to 10 conflict resolution meetings to discuss issues with project stakeholders, businesses, and property owners as needed. Up to 2 people from Contractor at each conflict resolution meeting, 3 hours per meeting including travel. Additional Contractor staff to attend conflict resolution meetings on an as needed basis. Three public information meetings as part of Conflict Scoping Process (open house format). Up to 5 people from Contractor at each public open house meeting, 6 hours per meeting including travel. Implement State s Conflict Scoping Process (CSP) and create the necessary documentation showing the progress and results of the process by following all guidance in State s CSP, which can be downloaded from the website: and selecting the link labeled Conflict Scoping Process. CSP consists of nine steps: 1) Project Analysis 2) Stakeholder Identification 3) Conflict Identification 4) Mapping 5) Assessment, 6) Strategy 7) Implementation and Management 8) Resolution, Review, and Regeneration 9) Post-Project Analysis Establish ongoing project coordination with all stakeholders including, but not limited to: State State s Project Manager State Functional Groups FHWA Metropolitan Transit Metro Transit The Metropolitan Airport Commission I-494 Corridor Coalition I-35W Solutions Alliance Dakota and Hennepin Counties Cities of Bloomington, Richfield, Edina, Minnetonka, Eden Prairie and Minneapolis The Mall of America Other Governmental Agencies Private and Public Utilities Other agencies as required Page 9 of 66

10 6.1 Municipal Consent Package This task consists of preparing the Municipal Consent Submittal Packages, submitting those packages, updating those packages as needed, and finally documenting that Municipal Consent has been acquired. The work required to resolve conflict for the goal of achieving Municipal Consent will be billed and shown under the CSP task itself and all of its CSP deliverables. Deliverable: Municipal Consent Packages, three hard copies extension). Complete package in Adobe Acrobat (pdf extension) and pdf should be created by using Adobe Acrobat to convert the source file to a pdf whenever possible with the use of scanned pages minimized if not eliminated with the exception of actual signature pages. Due: To follow the CSP process. Standard: State CSP Guidance, October 2013 State Review: To be determined by CSP process. Contractor Update: to be determined by CSP process. 6.2 FHWA Consent Letter or Equivalent Obtain approval from the FHWA to signify that this contract can conclude. This project is not programmed, which means it does not have funding for construction or a construction letting date. The FHWA will not actually approve an IAR, EA, or Finding of no Significant Impact (FONSI) until the project is programmed. Contractor will complete the IAR and EA, but Contractor may not be able to get a FONSI. The purpose of this task is to obtain documentation from FHWA that signifies that the IAR and NEPA process has been done correctly and that there should be no problem getting those documents approved once the project is programmed. The work required to resolve conflict for the goal of achieving FHWA consent will be billed and shown under the CSP task itself and all of its CSP deliverables. Deliverable: FHWA consent documentation. extension). Complete package in Adobe Acrobat (pdf extension) and pdf should be created by using Adobe Acrobat to covert the source file to a pdf whenever possible with the use of scanned pages minimized if not eliminate with the exception of actual signature pages. Due: To follow the CSP process. Standard: State CSP Guidance, October 2013 State Review: To be determined by CSP process. Contractor Update: to be determined by CSP process. 6.3 CSP Deliverables Project Analysis Thorough project research will be conducted and scaled to the size of the project or policy. The Project Goals Statement will be formalized. Deliverable: Document explaining all the project goals from major goals to minor goals. extension). Complete package in Adobe Acrobat (pdf extension) and pdf should be created by using Adobe Acrobat to convert the source file to a pdf whenever possible with the use of scanned pages minimized if not eliminate with the exception of actual signature pages. Due: To follow the CSP process. Standard: State CSP Guidance, October 2013 State Review: To be determined by CSP process. Contractor Update: to be determined by CSP process. Page 10 of 66

11 6.3.2 Stakeholder Identification Internal and external stakeholders will be identified, including agencies, elected and appointed officials, advocacy groups, businesses and adjacent property owners/tenants. Deliverable: Document identifying all stakeholders. extension). May use Microsoft Excel 2010 (xlsx extension). Complete package in Adobe Acrobat (pdf extension) and pdf should be created by using Adobe Acrobat to convert the source file to a pdf whenever possible with the use of scanned pages minimized if not eliminate with the exception of actual signature pages. Due: To follow the CSP process. Standard: State CSP Guidance, October 2013 State Review: To be determined by CSP process. Contractor Update: to be determined by CSP process Conflict Identification Existing and potential issues will be identified related to the stakeholders identified in step #2. Deliverable: Document identifying all conflicts. extension). May use Microsoft Excel 2010 (xlsx extension). Complete package in Adobe Acrobat (pdf extension) and pdf should be created by using Adobe Acrobat to convert the source file to a pdf whenever possible with the use of scanned pages minimized if not eliminate with the exception of actual signature pages. Due: To follow the CSP process. Standard: State CSP Guidance, October 2013 State Review: To be determined by CSP process. Contractor Update: to be determined by CSP process Mapping An influence/interest grid of stakeholders will be produced. Relationships between stakeholders will be mapped, including alliances, relationships with friction, broken relationships, relationships that don t exist and relationships that need to exist. Power imbalances and triggering events which may create issues will be indicated. Deliverable: Influence/interest grid document. extension). May use Microsoft Excel 2010 (xlsx extension). Complete package in Adobe Acrobat (pdf extension) and pdf should be created by using Adobe Acrobat to convert the source file to a pdf whenever possible with the use of scanned pages minimized if not eliminate with the exception of actual signature pages. Due: To follow the CSP process. Standard: State CSP Guidance, October 2013 State Review: To be determined by CSP process. Contractor Update: to be determined by CSP process Assessment Conflicts will be reviewed for likelihood of occurring, risk to the project for time, scope and budget, and risk to the agency s reputation. Deliverable: Assessment document that explains risk of each conflict. extension). May use Microsoft Excel 2010 (xlsx extension). Complete package in Adobe Acrobat (pdf extension) and pdf should be created by using Adobe Acrobat to convert the source file to a Page 11 of 66

12 pdf whenever possible with the use of scanned pages minimized if not eliminate with the exception of actual signature pages. Due: To follow the CSP process. Standard: State CSP Guidance, October 2013 State Review: To be determined by CSP process. Contractor Update: to be determined by CSP process Strategy Possible options for resolution will be generated by the team with a focus on identifying impacts, outcomes, strategies and planned responses. Deliverable: Strategy document. extension). May use Microsoft Excel 2010 (xlsx extension). Complete package in Adobe Acrobat (pdf extension) and pdf should be created by using Adobe Acrobat to convert the source file to a pdf whenever possible with the use of scanned pages minimized if not eliminate with the exception of actual signature pages. Due: To follow the CSP process. Standard: State CSP Guidance, October 2013 State Review: To be determined by CSP process. Contractor Update: to be determined by CSP process Implementation and Management CSP transitions to the implementation stage, where the team takes action toward resolutions, including communication with stakeholders and tracking progress. Conduct up to 18 Project Management Team (PMT) meetings during the project. The project PMT meetings will be attended by State's Project Manager, State functional groups (as necessary), FHWA, and Metro Transit (as necessary). This task includes agenda preparation, meeting facilitation, follow-up, and a summary of outcomes from each meeting. Conduct up to 9 TAC meetings during the project. The project TAC meetings will be attended by stakeholders, including but not limited to: State s Project Manager, State functional groups, FHWA, Metropolitan Council, Metro Transit, I-494 Coalition, I-35W Solutions Alliance, Counties (Dakota, Hennepin), Cities (Bloomington, Eden Prairie, Edina, Minnetonka, Richfield and Minneapolis), Metropolitan Airport Commission, Mall of America, other governmental agencies, private and public utilities, other agencies (as necessary). This task includes agenda preparation, meeting facilitation, followup, and a summary of outcomes from each meeting. Conduct up to 10 conflict resolution meetings during the project. This task includes agenda preparation, meeting attendance, follow-up, and a summary of outcomes from each meeting. Conduct three open house public information meetings. This work includes meeting attendance, preparation of meeting materials including sign-in sheets, handouts and displays, prepare open house summary, documenting materials presented, attendance and comments received. Coordinate with State s Public Affairs regarding public information meeting notifications. Deliverable: Document that explains how the strategies will be implemented and managed. PMT and TAC meeting agendas and summaries. Conflict resolution meeting summaries. Public information meeting summaries. extension). May use Microsoft Excel 2010 (xlsx extension). Complete package in Adobe Acrobat (pdf extension) and pdf should be created by using Adobe Acrobat to convert the source file to a Page 12 of 66

13 pdf whenever possible with the use of scanned pages minimized if not eliminate with the exception of actual signature pages. Due: To follow the CSP process. Standard: State CSP Guidance, October 2013 State Review: To be determined by CSP process. Contractor Update: to be determined by CSP process Outreach Meetings Coordinate meeting times and locations and best way to invite residents, apartment owners and businesses along the I-494 Bloomington strip. Develop material for meetings (assumes English and Spanish versions). Develop a plan for meetings to include: purpose, goals, and messages. Implement and attend outreach meetings Noise Mitigation Meetings Develop schedule including locations for two Noise Wall EA meetings. Develop invite list. Noise Wall presentation to be used at meetings. Develop Noise Wall invite EA look and language. Print and mail invites. Develop material/handouts for meeting. Implement and attend Noise Wall EA meetings (one Contractor staff member to attend meetings) Staff Advisory Committee Meetings Coordinate at least nine meeting times and locations and agendas. Implement and attend staff advisory meetings. AC meetings should be completed within six months from notice to proceed th, Portland and Nicollet Avenue Access Consolidation Design Workshops Coordinate meeting logistics, times, and locations. Determine invite list. Develop all materials to be used at the workshops (presentations, handouts, worksheets). Print and mail contact invitees. Implement and attend design workshops (assumes three workshops in total, first being the local agencies i.e. Cities and Counties only, the second being the initial public workshop, and the third being the follow up public workshop). Assumes an engineer and facilitator at each table (assumes at least five tables and that the Contractor will provide staff to accompany the tables). Prepare a Record of Meeting for each meeting Elected Officials Meeting Determine best way to inform elected officials (assumes State will perform all elected officials meetings and coordination). Assist in developing material/handouts for elected officials meetings. Attend event (assumes 2 meetings, one Contractor staff) EA Public Open House Determine alternative methods of outreach. Coordinate at least two meeting times and locations and agendas. Develop material for meetings. Implement and attend EA public meetings Electronic Communications Develop list and schedule of project documents that need to be posted to the project web site or distributed by other electronic means. Develop information for the web site - in plain language and ADA compliant. Develop an ongoing list of potential info that should be on the web site Business Meetings (assumes State will conduct these meetings) Develop list of business associations. Contact Chambers of Commerce for outreach alternatives (by State). Develop material for meetings The Project Scope Video Creative brief/scope. Determine timing of finished product. Video production. Page 13 of 66

14 Project Management Team Meetings (1 per month). Prepare for and attend public involvement scoping meetings. General Management and Coordination of development and implementation of public involvement activities. Quality control and Document Control. Assist with Preparation of Talking Points and Frequently Asked Questions Resolution, Review, and Regeneration Each identified conflict will be tracked until final resolution. Issues where potential conflict never materializes will be monitored until project completion. Conflicts will be reviewed; those that are resolved but could regenerate as other stakeholders and issues emerge then return to steps 2-7. Deliverable: Document that tracks status of each conflict until final resolution. extension). May use Microsoft Excel 2010 (xlsx extension). Complete package in Adobe Acrobat (pdf extension) and pdf should be created by using Adobe Acrobat to convert the source file to a pdf whenever possible with the use of scanned pages minimized if not eliminate with the exception of actual signature pages. Due: To follow the CSP process. Standard: State CSP Guidance, October 2013 State Review: To be determined by CSP process. Contractor Update: to be determined by CSP process Post-Project Analysis Best practices and lessons learned to benefit Project Managers (PMs) in similar situations and improve CSP will be established. Deliverable: Document explaining best practices and lessons learned from the CSP process on this project. extension). May use Microsoft Excel 2010 (xlsx extension). Complete package in Adobe Acrobat (pdf extension) and pdf should be created by using Adobe Acrobat to convert the source file to a pdf whenever possible with the use of scanned pages minimized if not eliminate with the exception of actual signature pages. Due: To follow the CSP process. Standard: State CSP Guidance, October 2013 State Review: To be determined by CSP process. Contractor Update: to be determined by CSP process. 7 Environmental Documentation Prepare a Federal EA/Minnesota Environmental Assessment Worksheet (EAW), and Findings of Fact and Conclusions (FOFC) that meets the project letting schedule. The deliverable for this item includes: Must use the latest version of the EAW located on the Environmental Quality Board s website at: Additional EA Federal issues not covered by the EAW form must be addressed in the document. The FHWA s guidebook or HPDP must be used as guidance to ensure that the NEPA laws have been fulfilled in the EA/EAW. Refer to the following web sites: Address and answer the EAW questions 1-20, additional EA federal issues, and State policy items with supporting data to sufficiently determine whether the project will cause an environmental effect. Additional Federal issues/state policy items that must be included, but may not be limited to, include the following: Purpose and Need Alternatives Analysis/Logical Termini Page 14 of 66

15 Cost Benefit Analysis: This requirement is State policy Impacts not covered in EAW, or may have a different federal standard: o Floodplain Assessment o Section 4(f) o Traffic o Noise o Air o Environmental Justice o Bicycle and Pedestrian Issues o Social Impacts o Economic Impacts o Relocation Impacts Public and Agency Involvement o Deliverable: EA, EAW, and FOFC. See task below for specific deliverables. o Format: All files submitted electronically. Report written in Microsoft Word 2013 document (docx extension). Complete package in Adobe Acrobat (pdf extension) and pdf should be created by using Adobe Acrobat to convert the source file to a pdf whenever possible with the use of scanned pages minimized if not eliminate with the exception of actual signature pages. o Due: To be determined upon completion of the schedule. o Standard: All requirements listed on the State s HPDP website: Must use the latest version of the EAW located on the Environmental Quality Board s website at: The FHWA s guidebook or State s HPDP must be used as guidance to ensure that the NEPA laws have been fulfilled in the EA/EAW. Refer to the following web sites: and Guidance for Preparing And Processing Environmental and Section 4(f) Documents, FHWA A. Key tasks that are required as part of the EA, EAW, and FOFC are described below. All subtasks must be represented in the separate detailed cost breakdown. 7.1 Early Notification Memo Assumptions: State s Metro District will circulate the completed Early Notification Memo to State functional groups, MnDNR, and FHWA. Prepare and process the Early Notification Memo following all requirements listed on the State s HPDP website. Deliverable: Early Notification Memo with hardcopies and electronic copies distributed according to the HPDP process. Format: Report written in Microsoft Word 2013 document (docx extension). Complete package in Adobe Acrobat (pdf extension) and pdf should be created by using Adobe Acrobat to convert the source file to a pdf whenever possible with the use of scanned pages minimized if not eliminate with the exception of actual signature pages. Due: Within two weeks of Notice to Proceed. Standard: Must use the latest version of the MN EAW located on the Environmental Quality Board s website at: The FHWA s guidebook or State s HPDP must be used as guidance to ensure that the NEPA laws have been fulfilled in the EA/EAW. Refer to the following web sites: and Guidance for Preparing And Processing Environmental and Section 4(f) Documents, FHWA A. State and FHWA Review: Arrange a meeting within two weeks of submitting to State with both State and FHWA staff in attendance. Contractor Update: The outcome of the meeting will determine the amount of work needed to complete the Final Purpose and Need Statement. Page 15 of 66

16 7.2 Purpose and Need Statement The purpose and need statement is a critical part of the EA and this contract. State and the FHWA will carefully scrutinize this language. Many of the tasks listed in this scope will be used to inform and develop the purpose and need statement. The discussion on purpose and need must have a starting point. State offers the following two examples as this starting point in the purpose and need discussion: 1) Need: The I-494 stretch in Bloomington is identified as one of the highly congested highways with a high crash rate in the state. The state has commissioned various reports to propose safety and congestion relief strategies on this corridor. In addition, the pavement on this corridor is identified in the state s preservation program is needed rehabilitation by Furth more, some of the bridges in the corridor have also been identified as needing to be reconstructed because they will reach their useful life by year 2037 i.e. The 12 th & Portland Avenue bridges need to be reconstructed between The Nicollet Avenue bridge needs to be reconstructed between timeframe. Purpose: The primary purpose of this project is to provide a long-term, sustainable option for all highway users (transit and non-transit) that: Addresses deficient bridge and pavement conditions Increases mobility, Improves travel time reliability, Maintains or improves transit advantages on I-494 between roughly TH 5 and TH 169 in the City of Bloomington, Richfield, Eden Prairie and the Minneapolis- St. Paul Airport. Use State and regional transportation plan policies and strategies, including goals and objectives to better use existing and future infrastructure investments, will help guide project development. 2) Need: The primary reason for initiating the proposed project is to implement a low cost/high benefit, or high return on investment, strategy for providing commuters with a more reliable congestion-free option during recurring weekday congestion, and increases transit use, car, vanpooling and people throughput on the highway during peak AM and PM periods. The State in conjunction with FHWA and local partners has commissioned planning studies on congestion relief in this corridor, the most recent being the I-494/TH 62 Congestion relief study. Recommendations from these studies have directed the implementation of MnPASS as the solution strategy. Therefore, as mentioned previously in the background section, this project will be getting the section of highway ready for MnPASS. The alternatives to be evaluated in the EA s more detailed quantitative analysis include: No Build Build Alternative Scope of work with an estimated budget of $150M - $200M that includes the necessary bridge preservation work of the 12 th /Portland/Nicollet Avenue bridges, access consolidation and the construction of phases of the I-494/I-35W Interchange Vision Layout. Pursuant to FHWA s Priced Managed Lane Guide (2012), MnPASS is a type of Priced Managed Lane known as a High Occupancy Toll Lane. The specific definition of which is: High-Occupancy Toll (HOT) lanes use price, occupancy and access restrictions to manage the number of vehicles traveling on them, thereby maintaining free-flow traffic conditions, even during peak travel periods. Typically, qualifying High-Occupancy Vehicles (HOVs) may use these limited access highway lanes for free or at a reduced cost. Motorists in vehicles that do not meet passenger occupancy requirements may choose between the general-purpose lanes or paying for premium conditions in the HOT lanes. Page 16 of 66

17 For more information on definitions see Chapter 1 of FHWA s Priced Managed Lane Guide entitled Purpose & Need for Managed Lanes, particularly pages 1.1 thru Draft Purpose and Need Statement The draft project Purpose and Need section will need to be reviewed by FHWA and State as part of the EA/EAW schedule. The outcome of this review will set the scope of work required to complete the Final Purpose and Need Statement. The completion of this task and the meeting between FHWA and State must occur early in the project to determine how much work will be needed to complete both the alternatives analysis and the final purpose and need statement. The Project Need statement will identify transportation problems along the project corridor. The Project Purpose statement will summarize the project objectives and goals for addressing some or all of the project needs, and will summarize regional transportation plans regarding the project corridor. At a minimum, but not limited to, the following items need to be incorporated into the Purpose and Need as necessary with particular attention to any additional issues noted by FHWA: Coordination with other separate projects occurring within this projects limits scheduled in relative close proximity to this project Analysis defining logical termini Traffic operations outlining current traffic problems Describe current geometric deficiencies Safety Analysis/Crash Analysis Pedestrian connectivity and surrounding land uses Project Need Statement will summarize and explain transportation needs based on: o Metropolitan Freeway System 2012 Congestion Report (or latest available Report) o The State MnSHIP and/or the Metro District 20 Year Plan. o The I-494/I-35W Interchange Vision Layout Report o The I-494/TH 62 Congestion Relief Study. o The TH 77 Managed Lane Study Project Purpose Statement will summarize regional transportation plans for this corridor, and explain the project objectives and goals. o Regional transportation plans are listed below: Metropolitan Council s 2030 Transportation Policy Plan, Chapter 4 1 State Metro District s Transportation System Plan 2 o The project objectives and goals are listed below: Addressing growing travel demand, to the extent possible, without taking private property Improving multi-modal options, including enhancing congestion free transit opportunities that provide reliable travel times Improve mobility Better utilize existing infrastructure investments Preserve or enhance advantages for transit Preserve or enhance corridor safety Stay within existing right of way Improve air quality Meet the needs of the 20-year travel demand forecast Transportation Policy Plan, Chapter 4, Metropolitan Council is available at: Transportation System Plan, MnDOT Metro District is available at: Page 17 of 66

18 Deliverable: One electronic Draft Purpose and Need Statement extension). Complete package in Adobe Acrobat (pdf extension) and pdf should be created by using Adobe Acrobat to convert the source file to a pdf whenever possible with the use of scanned pages minimized if not eliminate with the exception of actual signature pages. Due: Within 2 weeks of Notice to Proceed. Standard: Must use l version of the MN EAW located on the Environmental Quality Board s website at: The FHWA s guidebook or State s HPDP must be used as guidance to ensure that the NEPA laws have been fulfilled in the EA/EAW. Refer to the following web sites: and Guidance for Preparing And Processing Environmental and Section 4(f) Documents, FHWA A. State and FHWA Review: Arrange a meeting within 2 weeks of submitting to State with both State and FHWA staff in attendance. Contractor Update: The outcome of the meeting will determine the amount of work needed to complete the Final Purpose and Need Statement Final Purpose and Need Statement The Final Purpose and Need Statement will be completed at the conclusion of the Logical Termini and Alternatives Evaluation processes. The results of that process and the preferred alternative selected from it will be used to write a more precise and detailed final purpose and need statement. The Project Need statement will identify transportation problems along the project corridor. The Project Purpose statement will summarize the project objectives and goals for addressing some or all of the project needs. The Project Purpose will summarize regional transportation plans regarding the project corridor. The draft project Purpose and Need section will need to be reviewed and accepted by FHWA and State as part of the EA/EAW schedule. At a minimum, but not limited to, the following items need to be incorporated into the Purpose and Need as necessary with particular attention to any additional issues noted by FHWA: Coordination with other separate projects occurring within this projects limits scheduled in relative close proximity to this project Analysis defining logical termini Traffic operations outlining current traffic problems Describe current geometric deficiencies Safety Analysis/Crash Analysis Pedestrian connectivity and surrounding land uses Project Need Statement will summarize and explain transportation needs based on: o Metropolitan Freeway System 2012 Congestion Report (or latest available Report) o The I-494/I-35W Interchange Vision Layout Report o The I-494/TH 62 Congestion Relief Study. o TH 77 Managed Lane Study. o The State MnSHIP and/or the Metro District 20 Year Plan. Project Purpose Statement will summarize regional transportation plans for this corridor, and explain the project objectives and goals. o Regional transportation plans are listed below: Metropolitan Council s 2030 Transportation Policy Plan, Chapter Transportation Policy Plan, Chapter 4, Metropolitan Council is available at: Page 18 of 66

Exhibit A Scope of Work and Deliverables

Exhibit A Scope of Work and Deliverables Exhibit A Scope of Work and Deliverables General Statement of Scope of Work 4 General Information and Requirements 4 Background 4 Draft Schedule & Contract Completion Timeline 4 Source Type Codes and P6

More information

Exhibit A Scope of Work and Deliverables

Exhibit A Scope of Work and Deliverables xxxx General Statement of Scope of Work 4 General Information and Requirements 4 Background 4 Draft Schedule & Contract Completion Timeline 4 Source Type Codes and P6 Activity Codes 4 Standards 5 Items

More information

SCOPE 1.0 General Requirements

SCOPE 1.0 General Requirements SCOPE 1.0 General Requirements This section outlines a general list of the responsibilities and requirements for the GEC. It is anticipated that the GEC will be used to support and supplement MnDOT staff

More information

MnDOT Contract Exhibit A - Scope of Services

MnDOT Contract Exhibit A - Scope of Services Project Development for Pavement Rehabilitation and Pedestrian Access -Improvements on TH 22 in Glencoe, MN from US 212 to Cedar Ave. (R.P. 106+00.650 to 108+00.141) -Improvements on TH 71 in Olivia, MN

More information

TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP &

TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP & TH 25 Bituminous Mill, Full Depth Reclamation and Overlay SP 4910-29 & 0504-14 Contract No. 1002252 Project Overview is in need of professional and technical assistance to provide detail design for State

More information

DRAFT SCOPE 1.0 General Requirements

DRAFT SCOPE 1.0 General Requirements DRAFT SCOPE 1.0 General Requirements This section outlines a general list of the responsibilities and requirements for the GEC. It is anticipated that the GEC will be used to support and supplement MnDOT

More information

Alternatives Evaluation Report. Appendix C. Alternatives Evaluation Report

Alternatives Evaluation Report. Appendix C. Alternatives Evaluation Report s Evaluation Report Appendix C s Evaluation Report I-35W North Corridor Project EA Minnesota Department of Transportation Final Project s Report I-35W North Corridor Preliminary Design Project Report Version

More information

Exhibit A Mn/DOT Contract No

Exhibit A Mn/DOT Contract No Exhibit A Mn/DOT Contract No. 98142 SCOPE OF WORK AND DELIVERABLES Preliminary Design Red Wing US 63 Bridge and Approach Roadways State Project (SP) 2515-21 SCOPE OVERVIEW... 2 SCHEDULE... 2 PROJECT TASK

More information

Appendix. Sample EA/EIS Scope of Work

Appendix. Sample EA/EIS Scope of Work Appendix K Sample EA/EIS Scope of Work EA/EIS Sample Scope of Work The purpose of this Scope of Work (SOW) is to prepare an EA document pursuant to the National Environmental Policy Act (NEPA) to analyze

More information

Exhibit A - Scope of Work. Minnesota Trunk Highway (TH) 65 Access Planning and Environmental Corridor Study

Exhibit A - Scope of Work. Minnesota Trunk Highway (TH) 65 Access Planning and Environmental Corridor Study Minnesota Trunk Highway (TH) 65 Access Planning and Environmental Corridor Study PEL = Planning and Environmental Linkages Although not a Statutory PEL, this corridor planning study is intended to incorporate

More information

12 Evaluation of Alternatives

12 Evaluation of Alternatives 12 Evaluation of Alternatives This chapter evaluates the effectiveness of the No-Build Alternative and the proposed METRO Blue Line Light Rail Transit (BLRT) Extension project based on the information

More information

Minnesota Statewide Freight Bottlenecks

Minnesota Statewide Freight Bottlenecks Minnesota Statewide Freight Bottlenecks Transportation Performance Measures Reporting for MAP21 Compliance Oct. 1, 2018 2018 Minnesota Statewide Freight Bottlenecks Report Report Prepared by: Minnesota

More information

Exhibit A MnDOT Contract No

Exhibit A MnDOT Contract No SCOPE OF WORK AND DELIVERABLES Preliminary and Detail Design for US63 & I-90 Interchange Ramps and Approach Roadways State Project (SP) 5509-84 PROJECT OVERVIEW The STATE is in need of professional, technical

More information

Corridor Advisory Group and Task Force Meeting #19

Corridor Advisory Group and Task Force Meeting #19 Corridor Advisory Group and Task Force Meeting #19 September 24, 2014 1 AGENDA 9:00 CAG #18 Recap 9:10 Round 3 Evaluation - Continued 9:15 Environmental Impact Statement Overview 9:30 Existing Drainage

More information

The Caltrans Contract Manager will assign specific projects to the Consultant through the issuance of Task Orders.

The Caltrans Contract Manager will assign specific projects to the Consultant through the issuance of Task Orders. Scope of Work/Deliverables Environmental Services for Project Specific High Desert Corridor Area of Los Angeles and San Bernardino Counties (District 7 & 8) Attachment 1 Page 1 of 11 A. Project Description

More information

Northwest State Route 138 Corridor Improvement Project

Northwest State Route 138 Corridor Improvement Project Northwest State Route 138 Corridor Improvement Project Los Angeles County, CA DISTRICT 7- LA- 138 (PM 0.0/36.8); DISTRICT 7- LA- 05 (PM 79.5/83.1); DISTRICT 7- LA- 14 (PM 73.4/74.4) 265100/ 0700001816

More information

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work Background MnDOT, Metro Transit, Hennepin County, and the City of Minneapolis are in the process of developing a project for Interstate 35W between 43 rd Street in Minneapolis and 15 th Street in Minneapolis.

More information

Exhibit A Scope of Work. 0.0 Separation of work Types and Cost Estimate

Exhibit A Scope of Work. 0.0 Separation of work Types and Cost Estimate 0.0 Separation of work Types and Cost Estimate Exhibit A Scope of Work 0.1 Prepare scope of work and cost estimate for MnDOT efforts relating to all items numbered less than 20.0. 0.2 Prepare scope of

More information

Highway and Freight Current Investment Direction and Plan. TAC August 2, 2017

Highway and Freight Current Investment Direction and Plan. TAC August 2, 2017 Highway and Freight Current Investment Direction and Plan TAC August 2, 2017 Today s Topics Highway & Freight Where are we now? The Highway Story What are the issues? How is the system performing? Where

More information

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018 What is the Carolina Crossroads Project? The South Carolina Department of Transportation (SCDOT), in cooperation with the Federal Highway Administration (FHWA), is proposing to upgrade and redesign a key

More information

Comprehensive Transportation Study for Glencoe, MN

Comprehensive Transportation Study for Glencoe, MN Comprehensive Transportation Study for Glencoe, MN Introduction and Project Information Introduction There have been a number of planning and preliminary engineering studies completed in the Glencoe area

More information

Congestion Management Process (CMP)

Congestion Management Process (CMP) Congestion Management Process (CMP) Introduction The Congestion Management Process (CMP) is a systematic, data-driven, and regionally accepted approach that aims to improve the performance of the transportation

More information

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID 432430-1-32-13 TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS (TSM&O) GENERAL CONSULTANT SERVICES DISTRICT TWO November 27, 2017 Page 1 EXHIBIT A SCOPE

More information

Procedure for NEPA for County or City Projects

Procedure for NEPA for County or City Projects Procedure for NEPA for County or City Projects I. County or City Projects with any Federal Highway funding or action shall be submitted to Environmental Program Division (EPD) with a request to start studies

More information

SCOPE OF WORK AND DELIVERABLES

SCOPE OF WORK AND DELIVERABLES 1.0 PROJECT OVERVIEW The State of Minnesota (State) has identified the need for the replacement of Bridge 5308, a railroad bridge that carries the Canadian Pacific Railroad (CP Rail) over Trunk Highway

More information

Work Breakdown Structure Element Dictionary Preliminary Engineering

Work Breakdown Structure Element Dictionary Preliminary Engineering Element Name Initiation PE 3.1 Initiation includes the implementation of the project s funding and notification of the consultant or in-house design staff to commence work, the Kickoff Meeting with the

More information

Chapter 1: Overview. page 1. Figure 2-1: Road congestion is expected to continue to grow

Chapter 1: Overview. page 1. Figure 2-1: Road congestion is expected to continue to grow Chapter 1: Overview Figure 2-1: Road congestion is expected to continue to grow The region s mobility so fundamental to its economic vitality and quality of life is challenged by mounting congestion, rising

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: Traffic congestion in the Corpus Christi Metropolitan area is not as much a function of population growth as the function of the increase in single occupant trips. Using census data, the

More information

FINDINGS OF FACT and CONCLUSIONS

FINDINGS OF FACT and CONCLUSIONS FINDINGS OF FACT and CONCLUSIONS I-694/ I-494/ I-94 Interchange Improvements State Project No. 8286-81 Prepared by: Minnesota Department of Transportation July, 2018 CONTENTS STATEMENT OF ISSUE... 2 ADMINISTRATIVE

More information

Chapter 5: Highway Investment Direction and Plan

Chapter 5: Highway Investment Direction and Plan 5.1 Chapter 5: Highway Investment Direction and Plan 2040 2040 TRANSPORTATION POLIC PLAN version 1.0 5.2 Chapter 5: Highway Investment Direction and Plan Highway Investment Direction 3 Current Revenue

More information

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

SOUTHWEST LRT (METRO GREEN LINE EXTENSION) 8 Evaluation of Alternatives This chapter evaluates the effectiveness of the No Build Alternative and the Southwest Light Rail Transit (LRT) Project (the Project) based on the information contained in

More information

ATTACHMENT A. Detailed Study Scope. I-66 (Inside) Multi-modal Study Scope

ATTACHMENT A. Detailed Study Scope. I-66 (Inside) Multi-modal Study Scope ATTACHMENT A Detailed Study Scope I-66 (Inside) Multi-modal Study Scope EXECUTIVE SUMMARY The Virginia Department of Transportation (VDOT) seeks consultant assistance in identifying and evaluating a range

More information

CROWS LANDING CORRIDOR PLAN

CROWS LANDING CORRIDOR PLAN ATTACHMENT 1: SCOPE OF WORK CROWS LANDING CORRIDOR PLAN INTRODUCTION: StanCOG proposes the Crows Landing Corridor Plan (Plan), which is needed to determine the feasibility of inter-jurisdictional transportation

More information

EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD

EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD Scope of Services 12/08/2008 EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD TABLE OF CONTENTS Section Pace I. 0 PROJECT DESCRIPTION........................,............................................................

More information

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012 2030 Transportation Policy Plan SUMMARY PRESENTATION Land Use Advisory Committee November 15, 2012 Today s Topics Transportation Policy Plan (TPP) Requirements and Background Current TPP Policies, Issues

More information

Highway and Freight Current Investment Direction and Plan. TAB September 20, 2017

Highway and Freight Current Investment Direction and Plan. TAB September 20, 2017 Highway and Freight Current Investment Direction and Plan TAB September 20, 2017 Today s Topics Where are we now, what are the current issues? Where do we want to go? How will we get there? What are the

More information

Transportation Advisory Board May 21, 2014

Transportation Advisory Board May 21, 2014 Transportation Advisory Board May 21, 2014 1 2040 TPP Schedule April 2013 to May 2014: Policymaker Task Force, Partner Agency Work Group and other stakeholder discussions on preparation of draft 2040 TPP

More information

Purpose of the Public Hearing

Purpose of the Public Hearing www.virginiadot.org Public Hearings Interstate 66 - Outside the Beltway Tier 1 Draft Environmental Impact Statement From U.S. Route 15 To I-495 Prince William and Fairfax Counties Wednesday, March 13,

More information

PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT

PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT PROJECT DESCRIPTION McFarland-Johnson, Inc. (MJ) has prepared this proposal to perform

More information

Request for Proposals. Hillsdale Pedestrian/Bicyclist Bridge Design

Request for Proposals. Hillsdale Pedestrian/Bicyclist Bridge Design Request for Proposals Hillsdale Pedestrian/Bicyclist Bridge Design Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403 JUNE 13, 2013 The City of San Mateo (CITY) is accepting

More information

Locally Preferred Alternative. Work In Progress; Subject To Change Without Notice 1

Locally Preferred Alternative. Work In Progress; Subject To Change Without Notice 1 Locally Preferred Alternative 1 Riverview Corridor Study Area 12 mile study area between Saint Paul and Bloomington. Connects major destinations, neighborhoods and job concentrations. Serves growing and

More information

TRANSPORTATION IMPACT ANALYSISGUIDELINES

TRANSPORTATION IMPACT ANALYSISGUIDELINES TRANSPORTATION IMPACT ANALYSISGUIDELINES ADOPTED OCTOBER2014 SANTACLARAVALLEYTRANSPORTATION AUTHORITY CONGESTION MANAGEMENTPROGRAM CONGESTION MANAGEMENT PROGRAM TRANSPORTATION IMPACT ANALYSIS GUIDELINES

More information

8.0 Chapter 8 Alternatives Analysis

8.0 Chapter 8 Alternatives Analysis 8.0 Chapter 8 Alternatives Analysis The primary purpose for using CORSIM in the context of this manual is to guide the design process and program delivery. To this point in the manual, you have been given

More information

I-65/I-70 North Split Interchange Reconstruction Project Frequently Asked Questions

I-65/I-70 North Split Interchange Reconstruction Project Frequently Asked Questions I-65/I-70 North Split Interchange Reconstruction Project Frequently Asked Questions General Overview What is the I-65/I-70 North Split Reconstruction Project? The I-65/I-70 North Split Reconstruction Project

More information

Exhibit A Scope of Work and Deliverables

Exhibit A Scope of Work and Deliverables General Statement of Scope of Work Perform steps 1 through 9 of the State Utility Coordination Manual (UCM). Conduct all work necessary to meet the requirements for creating certified Subsurface Utility

More information

Transportation Committee

Transportation Committee Transportation Committee For the Metropolitan Council meeting of April 9, 2008 ADVISORY INFORMATION Date Prepared: March 27, 2008 Subject: Lowry Avenue Intermodal Freight Connector Committee Report Item:

More information

35 Moving Forward. O p t i m i z a t i o n P l a n E x e c u t i v e S u m m a r y. Project # KA Johnson and Wyandotte Counties

35 Moving Forward. O p t i m i z a t i o n P l a n E x e c u t i v e S u m m a r y. Project # KA Johnson and Wyandotte Counties Moving Forward Johnson and Wyandotte Counties Project # -106-KA-2597-01 O p t i m i z a t i o n P l a n E x e c u t i v e S u m m a r y June 2013 I- Corridor Optimization Plan Executive Summary Study Purpose

More information

Preparing a Reevaluation Using the Documented Reevaluation Checklist (DRC)

Preparing a Reevaluation Using the Documented Reevaluation Checklist (DRC) Guidance Preparing a Reevaluation Using the Documented This guidance outlines the TxDOT process for preparing a documented reevaluation as required by 43 TAC 2.85 and 23 CFR 771.129. TxDOT Environmental

More information

MnDOT Contract No

MnDOT Contract No Exhibit A Detailed Scope of Services and Deliverables Road Design Plans for Twin Ports Interchange (TPI) S.P. 6982-322 (TH. 35), 6980-60 (T.H. 535) and 6915-136 (T.H. 53) PROJECT OVERVIEW State has programmed

More information

20-Year State Highway Investment Plan. Appendix C ACRONYMS AND GLOSSARY APPENDIX C ACRONYMS AND GLOSSARY PAGE C-1

20-Year State Highway Investment Plan. Appendix C ACRONYMS AND GLOSSARY APPENDIX C ACRONYMS AND GLOSSARY PAGE C-1 20-Year State Highway Investment Plan Appendix C APPENDIX C PAGE C-1 This page intentionally left blank. PAGE C-2 MINNESOTA GO 20- YEAR HIGHWAY INVESTMENT PLAN 2018-2037 Acronyms ADA APS ATM ATP BRIM CAFE

More information

EXHIBIT "A" County Road 54 (Wesley Chapel Boulevard) (from North of Magnolia Boulevard to Oakley Boulevard) Work Order No. C-1640.

EXHIBIT A County Road 54 (Wesley Chapel Boulevard) (from North of Magnolia Boulevard to Oakley Boulevard) Work Order No. C-1640. EXHIBIT "A" County Road 54 (Wesley Chapel Boulevard) (from North of Magnolia Boulevard to Oakley Boulevard) Work Order No. C-1640.00 SECTION I PURPOSE This document describes the scope of work and the

More information

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION AUGUST 2015 Table of Contents 1 Decision... 1 1.1 Project Description... 2 1.2 Basis for the FHWA Decision... 7 1.2.1

More information

FINDINGS OF FACT And CONCLUSIONS

FINDINGS OF FACT And CONCLUSIONS FINDINGS OF FACT And CONCLUSIONS SOUTHWEST RECONNECTION PROJECT Highway 61/101 Flood Mitigation State Project No. 1009-24 and State Aid Project No. 010-661-002 Prepared for: Carver County September 2013

More information

Chapter 9 IMPLEMENTATION AND FUTURE DEVELOPMENTS CHAPTER 9 IMPLEMENTATION AND FUTURE DEVELOPMENTS PAGE 111

Chapter 9 IMPLEMENTATION AND FUTURE DEVELOPMENTS CHAPTER 9 IMPLEMENTATION AND FUTURE DEVELOPMENTS PAGE 111 Chapter 9 IMPLEMENTATION AND FUTURE DEVELOPMENTS CHAPTER 9 IMPLEMENTATION AND FUTURE DEVELOPMENTS PAGE 111 This page intentionally left blank. PAGE 112 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT

More information

Preliminary Design, Design Survey & Detailed Design for Highway Improvement Project on Highway 371 in Hackensack, MN

Preliminary Design, Design Survey & Detailed Design for Highway Improvement Project on Highway 371 in Hackensack, MN Preliminary Design, Design Survey & Detailed Design for Highway Improvement Project on Highway 371 in Hackensack, MN This represents work on State Project (SP) 1118-22, Trunk Highway (TH) 371. This project

More information

Midtown Corridor Alternatives Analysis. Technical Advisory Committee Meeting November 15, 2012

Midtown Corridor Alternatives Analysis. Technical Advisory Committee Meeting November 15, 2012 Midtown Corridor Alternatives Analysis Technical Advisory Committee Meeting November 15, 2012 Today s Agenda Introductions Roles and Responsibilities Alternatives Analysis Process Overview Outreach Overview

More information

Business Item Transportation Committee Item

Business Item Transportation Committee Item Business Item Transportation Committee Item 2008-88 Meeting date: March 24, 2008 Council meeting: April 9, 2008 ADVISORY INFORMATION Date: March 19, 2008 Subject: Lowry Avenue Intermodal Freight Connector

More information

Regional Transportation Studies Regional Council

Regional Transportation Studies Regional Council Pima Association of Governments 1 E. Broadway, Tucson, Arizona Santa Rita Conference Room Regional Transportation Studies Regional Council September 28, 2017 I-11 Tier 1 Environmental Impact Statement

More information

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies APPENDIX B Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies Revised December 7, 2010 via Resolution # 100991 Reformatted March 18, 2011 TABLE OF CONTENTS

More information

Research Initiatives at TxDOT Related to Utilities and Right of Way

Research Initiatives at TxDOT Related to Utilities and Right of Way Research Initiatives at TxDOT Related to Utilities and Right of Way Transportation Research Board Workshop on Transportation Law, New Orleans, LA July 17, 2012 Overview 2 TxDOT utility/right of way research

More information

Reconstruction Project Update

Reconstruction Project Update I-65/I-70 North Split Interchange Reconstruction Project Update September 18, 2017 Agenda Welcome/introductions Project overview Scope and limits Need Environmental Assessment Maintenance of traffic Financial

More information

NEPA and Design Public Hearings

NEPA and Design Public Hearings NEPA and Design Public Hearings Monday, December 5, 2016 Washington-Lee High School 1301 N. Stafford Street Arlington, VA 22201 Thursday, December 8, 2016 Mary Ellen Henderson Middle School 7130 Leesburg

More information

6.0 Indirect Effects and Cumulative Impacts

6.0 Indirect Effects and Cumulative Impacts 6.0 Effects and Impacts 6.1 Introduction This chapter of the Draft EIS addresses potential indirect and cumulative impacts of the Bottineau Transitway project. effects are those that are caused by the

More information

MnDOT Contract No

MnDOT Contract No Exhibit A Detailed Scope of Services and Deliverables Road Design Plans for Twin Ports Interchange (TPI) S.P. 6982-322 (TH. 35), 6980-60 (T.H. 535) and 6915-136 (T.H. 53) PROJECT OVERVIEW State has programmed

More information

Chapter 5 Highway Investment Direction and Plan

Chapter 5 Highway Investment Direction and Plan Chapter 5 Highway Investment Direction and Plan The Existing Regional Highway System Residents and businesses view a safe and efficient regional highway system as an essential part of a transportation

More information

Transportation Asset Management Plan. July 2014 Draft

Transportation Asset Management Plan. July 2014 Draft Transportation Asset Management Plan July 2014 Draft Executive Summary EXECUTIVE SUMMARY PAGE i This page intentionally left blank. PAGE ii MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN EXECUTIVE

More information

TH 169/TH 494 DESIGN BUILD PROJECT

TH 169/TH 494 DESIGN BUILD PROJECT TH 169/TH 494 DESIGN BUILD PROJECT PROJECT OVERVIEW Eliminates traffic signals at Highwood/Townline, South Ramp termini, and North Ramp termini. Adds WB 494 to SB 169 flyover ramp. Adds direct NB 169 to

More information

Scope of Services Traffic Signal Retiming Contract FM NO Florida Department of Transportation District Four

Scope of Services Traffic Signal Retiming Contract FM NO Florida Department of Transportation District Four Scope of Services Traffic Signal Retiming Contract FM NO. 230017-8-32-01 Florida Department of Transportation District Four A-1 Contents 1. Background... 3 2. Summary of Services... 3 3. Consultant Requirements...

More information

I-25 South Gap Project

I-25 South Gap Project I-25 South Gap Project Monument to Castle Rock I-25 Gap Coalition Meeting April 26, 2018 EA Schedule/Key Dates EA Release April 27, 2018 EA Comment Period = 30 days, ends May 28, 2018 Media Briefing April

More information

Appendix B. Benefit-Cost Technical Memorandum

Appendix B. Benefit-Cost Technical Memorandum Appendix B Benefit-Cost Technical Memorandum This Page Left Blank Intentionally MEMORANDUM TO: FROM: Michael Kalnbach MnDOT District 1 Project Manager Graham Johnson, PE DATE: September 2, 2014 RE: TH

More information

Request for Letters of Intent. Connected Traffic Control System (CTCS): Research Planning and Concept Development. October 18, 2017.

Request for Letters of Intent. Connected Traffic Control System (CTCS): Research Planning and Concept Development. October 18, 2017. Request for Letters of Intent Connected Traffic Control System (CTCS): Research Planning and Concept Development October 18, 2017 Issued by University of Virginia Center for Transportation Studies Charlottesville,

More information

Regional Performance Measures Annual Progress Report TPO Board - 2/4/2016 Presentation by: Chris Wichman, Senior Planner

Regional Performance Measures Annual Progress Report TPO Board - 2/4/2016 Presentation by: Chris Wichman, Senior Planner 2015 TPO Board - 2/4/2016 Presentation by: Chris Wichman, Senior Planner Overview History and definition of performance-based planning & programming Review of 2015 TPO Board Action Requested 2 History

More information

CHAPTER 2. VISION, GOALS AND MTP FRAMEWORK

CHAPTER 2. VISION, GOALS AND MTP FRAMEWORK CHAPTER 2. VISION, GOALS AND MTP FRAMEWORK MTP VISION In order to create a framework for the 2040 Metropolitan Transportation Plan (MTP), a vision statement was drafted by the Vision/Goals Committee and

More information

I-90 / I-495 Interchange Improvements Project Hopkinton-Westborough- Southborough

I-90 / I-495 Interchange Improvements Project Hopkinton-Westborough- Southborough I-90 / I-495 Interchange Improvements Project Hopkinton-Westborough- Southborough December, 2014 Introduction / Welcome Paul Matthews, Executive Director, 495 MetroWest Partnership Renata Welch, MassDOT

More information

Project Delivery Process. Bruce Johnson, P.E. State Bridge Engineer Oregon Department of Transportation

Project Delivery Process. Bruce Johnson, P.E. State Bridge Engineer Oregon Department of Transportation Project Delivery Process Bruce Johnson, P.E. State Bridge Engineer Oregon Department of Transportation February 1, 2010 Outline Introduction 1. Planning 2. Design (through DAP) Break 3. Design (DAP through

More information

EXHIBIT A SCOPE OF SERVICES FOR. FINANCIAL PROJECT ID(S). Various Projects DISTRICT 2 VARIOUS COUNTIES

EXHIBIT A SCOPE OF SERVICES FOR. FINANCIAL PROJECT ID(S). Various Projects DISTRICT 2 VARIOUS COUNTIES EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID(S). Various Projects DISTRICT 2 VARIOUS COUNTIES 1 PURPOSE... 3 2 PROJECT DESCRIPTION... 5 3 PROJECT COMMON AND PROJECT GENERAL TASKS... 6 4 ROADWAY

More information

FINDINGS OF FACT AND CONCLUSIONS

FINDINGS OF FACT AND CONCLUSIONS FINDINGS OF FACT AND CONCLUSIONS T.H. 100 RECONSTRUCTION PROJECT State Project: 2734-33 Minnesota Project: Not assigned at this time Prepared by Minnesota Department of Transportation May 2013 ii CONTENTS

More information

SCS Scenario Planning

SCS Scenario Planning E SCS Scenario Planning Introduction As part of the 2035 MTP/SCS process, AMBAG developed a series of land use and transportation alternative scenarios for evaluation and testing to demonstrate how the

More information

EXHIBIT A SCOPE OF WORK

EXHIBIT A SCOPE OF WORK EXHIBIT A SCOPE OF WORK This contract is for Planning, Preliminary Engineering, Final Design Engineering, Environmental Coordination and preparation of 2 complete plan sets for roadway improvements on

More information

Scope of Work. Project Approach and Understanding. Task 1: Study Initiation and Administration

Scope of Work. Project Approach and Understanding. Task 1: Study Initiation and Administration Scope of Work Route 116/Hinesburg Growth Center Corridor Study Town of Hinesburg and CCRPC Project Approach and Understanding Route 116 through Hinesburg had seen substantial changes in the past 15 years,

More information

EXHIBIT 2 SCOPE OF SERVICES FOR THE GAINESVILLE URBANIZED AREA YEAR 2040 LONG RANGE TRANSPORTATION PLAN UPDATE. Prepared by:

EXHIBIT 2 SCOPE OF SERVICES FOR THE GAINESVILLE URBANIZED AREA YEAR 2040 LONG RANGE TRANSPORTATION PLAN UPDATE. Prepared by: CA.5 EXHIBIT 2 SCOPE OF SERVICES FOR THE GAINESVILLE URBANIZED AREA YEAR 2040 LONG RANGE TRANSPORTATION PLAN UPDATE Prepared by: Metropolitan Transportation Planning Organization for the Gainesville Urbanized

More information

CLA /10.54, PID Project Description:

CLA /10.54, PID Project Description: Project Description: The proposed project will consist of widening IR 70 to three lanes from Enon Road (SLM 06.75) to the US 68 interchange ramps (SLM 10.55). IR 70 is a component of the Strategic Highway

More information

Alternatives Identification and Evaluation

Alternatives Identification and Evaluation I-290 Environmental Impact Statement West of Mannheim Road to East of Cicero Avenue Alternatives Identification and Evaluation May 2012 Draft Interim Report: Initial Alternatives Identification and Round

More information

I. PROJECT INITIATION

I. PROJECT INITIATION REPLACE BELLE CHASSE TUNNEL AND BRIDGE STAGE 1 - ENVIRONMENTAL ASSESSMENT PLAQUEMINES PARISH, LOUISIANA (State Project No. 700-38-0108) / H.004791 Background This is a scope of services for the preparation

More information

REQUEST FOR PROPOSAL KIPDA REGIONAL FREIGHT PLAN MARCH 30, 2018

REQUEST FOR PROPOSAL KIPDA REGIONAL FREIGHT PLAN MARCH 30, 2018 REQUEST FOR PROPOSAL KIPDA REGIONAL FREIGHT PLAN MARCH 30, 2018 1 REQUEST FOR PROPOSAL KIPDA REGIONAL FREIGHT PLAN The Kentuckiana Regional Planning and Development Agency (KIPDA), the designated Metropolitan

More information

Progress reports and invoices will be submitted on a monthly basis. The CONTRACTOR will submit invoices in a timely manner.

Progress reports and invoices will be submitted on a monthly basis. The CONTRACTOR will submit invoices in a timely manner. PROJECT OVERVIEW Exhibit A MnDOT Contract No. 1031452 SCOPE OF WORK AND DELIVERABLES Reconstruction of US65 in City of Albert Lea from Newton Avenue to I-35 State Project (SP) 2405-32 The State is in need

More information

I. Project Overview and Limits. Project Goal

I. Project Overview and Limits. Project Goal Scope of Work and Deliverables for Subsurface Utility Engineering (SUE) for both Underground and Overhead Utilities on T.H. 10, and its Connecting Roads under S.P. 8001-40 I. Project Overview and Limits

More information

CMNAA. Central Manatee Network Alternatives Analysis Alternatives Public Meeting CMNAA STUDY PROCESS. STUDY AREA 17th St. W

CMNAA. Central Manatee Network Alternatives Analysis Alternatives Public Meeting CMNAA STUDY PROCESS. STUDY AREA 17th St. W District One CMNAA Central Manatee Network Alternatives Analysis December 12, 2017 5:00 pm - 7:00 pm First Baptist Church 1306 Manatee Ave. W, Bradenton, FL 34205 Central Manatee Network Alternatives Analysis

More information

Oklahoma Department of Transportation Environmental Programs Division Office Fax

Oklahoma Department of Transportation Environmental Programs Division Office Fax Oklahoma Department of Transportation Environmental Programs Division Office 521-3050 Fax 522-5193 Documented Categorical Exclusion (DCE) for I-40: Pavement Reconstruction and Added Lanes from the Douglas

More information

Major Highway Projects and Trunk Highway Fund Expenditures

Major Highway Projects and Trunk Highway Fund Expenditures Report on Major Highway Projects and Trunk Highway Fund Expenditures December 2014 Prepared by The Minnesota Department of Transportation 395 John Ireland Boulevard St. Paul, Minnesota 55155-1899 Phone:

More information

Congestion Management Safety Plan Phase 4

Congestion Management Safety Plan Phase 4 AUGUST 2018 Congestion Management Safety Plan Phase 4 Executive Summary Report for MnDOT Metro District Prepared by: SRF Consulting Group, Inc. and Sambatek, Inc. BACKGROUND The Congestion Management Safety

More information

Willmar Wye Public Open House #4 and Public Hearing

Willmar Wye Public Open House #4 and Public Hearing Willmar Wye Public Open House #4 and Public Hearing February 23, 2017 www.dot.state.mn.us/d8/willmarwye Agenda Time Topic 5:00 pm Open House Opportunity for the public to ask questions of project staff

More information

I-74 Final Design Request For Proposal

I-74 Final Design Request For Proposal Dear Consultants: Introduction I-74 Final Design Request For Proposal Iowa Department of Transportation (In cooperation with Illinois Department of Transportation) October 5, 2007 The Iowa Department of

More information

Outer Loop/Rail Bypass Study

Outer Loop/Rail Bypass Study Outer Loop/Rail Bypass Study Outer Loop Stakeholder Roundtable Southwest Segment Joshua City Hall April 16, 2008 North Central Texas Council of Governments Transportation Department Stakeholder Roundtable

More information

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014 2040 Transportation Policy Plan Conversion to Performance Based Planning Basis 25 th Annual CTS Transportation Research Conference May 21, 2014 1 About the plan Long-range transportation plan for the Twin

More information

NC General Statutes - Chapter 136 Article 3A 1

NC General Statutes - Chapter 136 Article 3A 1 Article 3A. Transportation Systems in and around Municipalities. 136-66.1. Responsibility for streets inside municipalities. Responsibility for streets and highways inside the corporate limits of municipalities

More information

Between existing Interstate 70 in St. Louis, MO to west of the IL 203 Interchange on existing I-55/70 in Madison, IL

Between existing Interstate 70 in St. Louis, MO to west of the IL 203 Interchange on existing I-55/70 in Madison, IL American Association of State Highway and Transportation Officials An Application from the State Highway or Transportation Department of Illinois for: Elimination of a U.S. (Interstate) Route Establishment

More information

Chapter 6: Highways. Existing System. Roadways

Chapter 6: Highways. Existing System. Roadways Chapter 6: Highways The region s roadways provide connections that are essential to the metro area s economic vitality and quality of life. But the demand for travel is enormous and growing posing difficult

More information

PROGRAMMATIC AGREEMENT

PROGRAMMATIC AGREEMENT PROGRAMMATIC AGREEMENT CATEGORICAL EXCLUSION APPROVALS NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION & FEDERAL HIGHWAY ADMINISTRATION FEBRUARY 2000 PREAMBLE This Agreement establishes the procedures of the

More information

Highest Priority Performance Measures for the TPP

Highest Priority Performance Measures for the TPP Highest Priority Performance Measures for the TPP The following list of measures are the highest priority performance measures as identified by modal working groups. These groups consist of staff from

More information