1 TEXAS-OKLAHOMA PASSENGER RAIL STUDY TPP Planning Conference 2014
2 Funding for the Project Study is funded through a Federal Railroad Administration (FRA) Grant. Original grant application for the corridor running from Oklahoma City, OK to South Texas and was $14,000,000. FRA approved $7,000,000 for the corridor between Oklahoma City and Dallas/Fort Worth. We convinced the FRA that we needed to study the entire corridor and they agreed if we had a way to pay for the additional work. Agreements were signed with the Oklahoma Department of Transportation and the North Central Texas Council of Governments for in kind services for constraints mapping, ridership information and public out reach assistance along with other TxDOT contracts for infrastructure evaluation to allow us to complete the necessary work. 2
3 Public Outreach Public Outreach Goals Get the word out to as many people as possible Project Website Social Media Extensive stakeholder list Project News Letter Public Meetings Avoid Confusion with other studies and plans Identify groups that might oppose the project and reach out early Texas Farm Bureau South Texas Property Rights Assoc. Environmental Groups Class 1 Railroads Avoid confusion other studies and plans 3
4 Why study rail between Oklahoma and South Texas? IH-35 is congested and will continue to get more congested as Texas population and economy grow. Passenger rail service could fit the needs of many travelers and reduce demand on the state s roadways. Study will provide a blueprint for feasible rail improvements. 4
5 A big question about our process These questions will be answered through the study: Is improved passenger rail a good idea? What kind of passenger rail service is feasible? What are the costs, impacts, and benefits of passenger rail service? What cities would be served by passenger rail? These questions will not be answered through the study: Where would new rail be constructed? What would the impacts be to specific properties? When would new service be available? Exactly where would stations be located?
6 Different kinds of service Conventional rail (mostly uses existing tracks) Higher speed rail (some dedicated tracks) High speed rail (fully dedicated tracks) Speed (miles per hour) Maximum: mph Average: mph Maximum: mph Average: mph Maximum: mph Average: mph Stops/ frequency Stops 15 to 60 miles apart 3-6 trains/day each direction (no more than 12) Stops 30 to 90 miles apart 4-8 trains/day each direction (as many as 12) Stops 50 to 100+ miles apart trains/day each direction Common Attributes: Single or double deck trains, stations with parking, operation on existing or dedicated tracks 6
7 How we got here Step 1: screening Wide range of ideas Feasibility screen: physical constraints Step 2: alternatives analysis Range of feasible ideas Step #2: evaluation criteria Range of alternatives to study in EIS 7
8 How we compared alternatives Green: Strength or benefit Yellow: Some benefit Red: Weakness or drawback 8
9 Public Meeting Display Boards 9
10 Screening criteria: operations Revenue/operating cost ratio Tells us if a route would require a subsidy to operate Minimum thresholds must be met for alternatives to move forward Travel times Comparison of rail travel time to auto travel time between cities Mode share on rail % of people who would choose rail as opposed to other modes for their trip 10
11 Screening criteria: infrastructure Capital cost Per passenger mile Right-of-way/real estate impacts A representation of possible impacts to private property based on whether or not a route uses existing transportation rights-of-way 11
12 Screening criteria: environment Natural resources Wetlands Critical habitat Cultural/recreational resources National and state historic places Potential archeological sites Parks and open space Social resources Prime farmland Sensitive receptors (homes, schools, hospitals) potentially affected by noise or vibration Environmental Justice populations 12
13 ALTERNATIVES Northern Section 13
14 Northern Section 14
15 Northern Section 15
16 Northern Section 16
17 ALTERNATIVES Central Section 17
18 Central Section 18
19 Central Section 19
20 Central Section 20
21 What could Metroplex train service look like?
22 ALTERNATIVES Southern Section 22
23 Southern Section 23
24 Southern Section 24
25 Southern Section 25
26 Southern Section 26
27 ALTERNATIVES Recommended for further evaluation 27
28 Proposed Alternatives 28
29 Study Products Service Level Environmental Document and ROD Tier 1 environmental planning level study Document corridor level environmental impacts of the service 30,000 foot look at the corridor impacts to specific locations are not part of the document Service Development Plan Detail the type appropriate type of service in the corridor Develop train schedules and frequencies Detail operation and maintenance cost for the service types Order of magnitude infrastructure costs 29
30 Questions? Questions? 30
TEXAS-OKLAHOMA PASSENGER RAIL STUDY
TEXAS-OKLAHOMA PASSENGER RAIL STUDY Jennifer Moczygemba, P.E. Rail Division Texas-Oklahoma Passenger Rail Study (TOPRS) Study of the feasibility of various passenger rail options that will result in a
More informationTexas-Oklahoma Passenger Rail Study. Welcome to the scoping open house!
Texas-Oklahoma Passenger Rail Study Welcome to the scoping open house! INTRODUCTION Welcome! At this scoping open house you can provide input to help shape the Texas- Oklahoma Passenger Rail Study (TOPRS).
More informationDRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HOUSTON DALLAS HIGH SPEED RAIL (TEXAS CENTRAL)
DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HOUSTON DALLAS HIGH SPEED RAIL (TEXAS CENTRAL) Background On June 25, 2014, the Federal Railroad Administration (FRA) issued a Notice of Intent to Prepare an Environmental
More informationEnvironmental Impact Statement; Lone Star Regional Rail Project Williamson, Travis, Bastrop, Hays, Caldwell, Comal, Guadalupe, and Bexar Counties, TX
This document is scheduled to be published in the Federal Register on 10/06/2014 and available online at http://federalregister.gov/a/2014-23711, and on FDsys.gov [4910-22] DEPARTMENT OF TRANSPORTATION
More informationAgency Scoping Meeting
Agency Scoping Meeting Dallas Fort Worth Core Express Service Drop-in Public Information Open House Tuesday, June 30, 2015 1 WELCOME AND THANK YOU FOR COMING TODAY 2 Meeting Format Open House 3 Purpose
More informationUpdate on the Texas Rail Plan. Jennifer Moczygemba Texas Department of Transportation Rail Division Rail System Section Director
Update on the Texas Rail Plan Jennifer Moczygemba Texas Department of Transportation Rail Division Rail System Section Director Where We Were 1970 s - Freight Railroads struggling due to restrictive regulation
More informationRail Division. Riding the Rails
Rail Division Riding the Rails Amtrak Ridership within Texas Remains Strong The annual ridership within Texas on all three services (Heartland Flyer, Texas Eagle and Sunset Limited) continues to soar.
More information1. Evaluation of route and service alternatives; 2. Tier 1 Environmental Impact Analysis; and 3. Service Development Plan.
Rail Rail plays a significant role in transportation planning, especially when considering economic development, safety, freight, and intermodal connectivity. Jackson has two rail lines serving the area,
More informationRail Division 2012 Annual Summary
Rail Division 2012 Annual Summary Overview The Rail Division oversees rail planning and inspection, highway rail crossings, management of stateowned lines (such as the South Orient Rail line (SORR) and
More informationTier 1 EIS Round 2 Local Officials Briefing Fall 2011
1 Tier 1 EIS Round 2 Local Officials Briefing Fall 2011 Agenda AGENDA 2» Corridor Level Environmental Review (TIER 1 Environmental Impact Statement)» Next Steps» Public Involvement» Questions 3 Corridor
More informationCumulative and Secondary Impacts
Chapter 14: Cumulative and Secondary Impacts A. INTRODUCTION SEQRA regulations require the consideration of the Proposed Project s potential to result in cumulative impacts (6 NYCRR 617.9(b)(5)(a)) and
More informationSTUDY OVERVIEW. Federal Railroad Administration Southeast Regional Rail Planning Study. Stakeholder Group Workshop 1 Columbia, South Carolina
Federal Railroad Administration Southeast Regional Rail Planning Study Stakeholder Group Workshop 1 Columbia, South Carolina STUDY OVERVIEW SEPTEMBER 20, 2016 1 CONNECT What is CONNECT? Features of CONNECT
More informationITEM #11: PHASE 2B SUPPLEMENT HAMPTON ROADS PASSENGER RAIL STUDY: SCOPE OF WORK
ITEM #11: PHASE 2B SUPPLEMENT HAMPTON ROADS PASSENGER RAIL STUDY: SCOPE OF WORK During FY 2011, in the interest of improving the region s potential for passenger rail service, the HRTPO retained the services
More informationHAMPTON ROADS PASSENGER RAIL STUDY DATA COLLECTION PHASE 2A NORFOLK-RICHMOND CORRIDOR
Presentation To: Agenda Item #11 Hampton Roads Transportation Planning Organization Board HAMPTON ROADS PASSENGER RAIL STUDY DATA COLLECTION PHASE 2A NORFOLK-RICHMOND CORRIDOR Presentation By: March 21,
More informationDeveloping New Revenue Streams For Transit
Developing New Revenue Streams For Transit Jennifer Mitchell Agency Director Rail~Volution October 23, 2018 DRPT Role in Transportation DRPT focuses on moving people and goods: Rail Public transportation
More information12 Evaluation of Alternatives
12 Evaluation of Alternatives This chapter evaluates the effectiveness of the No-Build Alternative and the proposed METRO Blue Line Light Rail Transit (BLRT) Extension project based on the information
More informationMinnesota Comprehensive Statewide Freight and Passenger Rail Plan
Minnesota Comprehensive Statewide Freight and Passenger Rail Plan Passenger Technical Advisory Committee August 13, 2009 presented by Cambridge Systematics, Inc. Kimley-Horn and Associates, Inc. TKDA,
More informationEnvironmental Impact Statement for the California High-Speed Rail System Burbank to Los Angeles Section, CA
This document is scheduled to be published in the Federal Register on 07/24/2014 and available online at http://federalregister.gov/a/2014-17384, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION
More informationKammy Horne, AICP. Austin, Texas
Environmental Review of Transit and Rail Projects by FHWA and State Departments of Transportation Kammy Horne, AICP Manager, NEPA and Regulatory Planning AECOM, Americas Transportation Austin, Texas Key
More informationE2 D0 U 1 C 3 A E T D IUOCNA A T IL O S N E A R L I E S S E R I E S HUB/DBE/SBE R A I L
2E 0D1U3CEAT D UI O CN ATAI LO NSAELR ISEESR I E S R AIL HUB/DBE/SBE RAIL IN TEXAS OVERVIEW Since its inception, the Texas Department of Transportation (TxDOT) has focused on meeting the transportation
More informationTexas A&M Transportation Short Course
Texas A&M Transportation Short Course Joseph Black Rail Director October 16, 2013 What are the Challenges? Public Safety Issues with trains of up to 2 miles in length running through the urban cores of
More informationSouth Bay Metro Green Line Extension
Meeting Agenda Project overview and update Recap of the Scoping Meetings Progress on the project alternative and proposed station locations Meeting Schedule 6:00 Open House 6:30 Presentation 7:15 Public
More informationDallas City Council Transportation & Environment Committee. May 13, 2013
Dallas City Council Transportation & Environment Committee May 13, 2013 Presentation Outline Technology Definitions Current RTC Policy Families of Alignment/Station Options RTC/NCTCOG Role in Statewide
More informationMulti-State Planning Proposal
High Speed Intercity Passenger Rail (HSIPR) Program Multi-State Planning Proposal Groups of states seeking FRA-led corridor planning must submit this Proposal Form and other documents as outlined in Section
More informationColumbia Pike Transit Initiative
The purpose of this project is to implement higher-quality and higher-capacity transit service in the corridor in order to: Provide more capacity; Enhance access within the corridor and provide connections
More informationLubbock Outer Route Feasibility Study Report Executive Summary
Lubbock Outer Route Feasibility Study Report Executive Summary Prepared for: Texas Department of Transportation Lubbock District Prepared by: MACTEC Engineering and Consulting, Inc. 6701 Aberdeen, Suite
More informationAGENDA ITEM #8: HAMPTON ROADS PASSENGER RAIL STUDY HIGH SPEED RAIL SERVICE ALTERNATIVES ANALYSIS: PHASE 2B DRAFT SCOPE OF WORK
AGENDA ITEM #8: HAMPTON ROADS PASSENGER RAIL STUDY HIGH SPEED RAIL SERVICE ALTERNATIVES ANALYSIS: PHASE 2B SCOPE OF WORK SUBJECT: The draft scope of work for the next phase of the Hampton Roads Passenger
More informationFOR IMMEDIATE RELEASE June 7, ATK Contact: Media Relations
FOR IMMEDIATE RELEASE June 7, 2010 ATK-10-080 Contact: Media Relations 202 906.3860 NATIONAL RAIL PLAN NEEDS TO RECOGNIZE THE VALUE OF AMTRAK S INTERCITY PASSENGER RAIL NETWORK Serves as foundation to
More informationNotice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report
Notice of Preparation For Link Union Station (Link US) Project Joint Environmental Impact Statement and Environmental Impact Report Date: May 27, 2016 To: Subject: Project Title: From: All Interested Agencies,
More informationRTAC Meeting OCTOBER 10, 2018
RTAC Meeting OCTOBER 10, 2018 Presentation Agenda 1. Welcome 2. Evaluation Framework 3. Tier 1 Service Concepts (Presentation & Discussion) 4. Introduction to the Tier 1 Models 5. Public Comment 2 Evaluation
More informationTexas State Highway 130 Proposed Routes
Texas State Highway 130 Proposed Routes Submitted by: Mary Magnuson Tom Myatt April 12, 2000 Executive Decision Making Dr. Ernest Forman Table of Contents Executive Summary... 1 Background. 2 Alternatives.
More informationRail & Transit Alternatives Analysis. NH Capitol Corridor. Public Scoping Meeting. March 5, 2014
NH Capitol Corridor Rail & Transit Alternatives Analysis Public Scoping Meeting March 5, 2014 Agenda Study overview National Environmental Policy Act Preliminary alternatives: rail, bus, stations, layover
More informationStatewide Model Application Using the Texas SAM
Statewide Model Application Using the Texas SAM Presented by: William Smithson Wilbur Smith Associates September 2008 Texas Statewide Analysis Model Application Presentation Outline Brief Model Description
More informationTexas Transportation Forum The Fast Track: Passenger Rail In Texas. Federal Railroad Administration Karen Rae, Deputy Administrator
US Department of Transportation Federal Railroad Administration Texas Transportation Forum The Fast Track: Passenger Rail In Texas Federal Railroad Administration Karen Rae, Deputy Administrator January
More informationTier 1: Chicago to St. Louis High-Speed Rail Corridor Program
U.S. Department of Transportation Federal Railroad Administration Record of Decision Tier 1: Chicago to St. Louis High-Speed Rail Corridor Program Chicago, Illinois to St. Louis, Missouri December 2012
More informationRTC Position on Pavement Condition Targets
RTC Position on Pavement Condition Targets NCTCOG Supports TxDOT Statewide 2022 Good Pavement Condition Targets for National Highway System Facilities NCTCOG Supports TxDOT Statewide 2022 Poor Pavement
More information2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan. Minnesota Department of Transportation
2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan Minnesota Department of Transportation ! First Statewide Comprehensive Rail Plan for MN! Commissioned by 2008 Legislature! Compliant
More informationNEW JERSEY STATE RAIL PLAN NJ TRANSIT New Jersey Department of Transportation
NJ TRANSIT New Jersey Department of Transportation NJ TRANSIT AND NJDOT TEAM Developing State Rail Plan NJ TRANSIT contract Over the next six months Most planning information already exists Data must be
More informationTier 1 Environmental Impact Statement for the Chicago, Illinois, to Detroit-Pontiac,
This document is scheduled to be published in the Federal Register on 08/31/2012 and available online at http://federalregister.gov/a/2012-21587, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION
More informationPreapplication for HSIPR Program OMB No
U.S. Department of Transportation Preapplication for HSIPR Program OMB No. 2130 0583 Preapplication instructions: For each question, enter the appropriate information in the designated gray box; keep text
More informationvi Figures viii Summary S.1
Contents Contents iii Tables vi Figures viii Summary S.1 Chapter 1: Purpose and Need Project History A.1 Project Description A.2 Project Purpose A.5 Transportation Need A.6 Highway Capacity and Congestion
More informationMARTINSVILLE SOUTHERN CONNECTOR STUDY CITIZEN INFORMATION MEETING Magna Vista High School 701 Magna Vista School Road Ridgeway, Virginia May 8,
MARTINSVILLE SOUTHERN CONNECTOR STUDY CITIZEN INFORMATION MEETING Magna Vista High School 701 Magna Vista School Road Ridgeway, Virginia 24148 May 8, 2018 MEETING OVERVIEW AND OBJECTIVES Introduce study
More informationCost / Benefit Analysis Table 1: Input variables used in Cost / Benefit Analysis Parameters Units Values General External Costs -Vehicles
Cost / Benefit Analysis Input values used in this analysis are taken from the U.S. Department of Transportation (USDOT) guidance on the preparation of Cost Benefit Analyses, including the recently published
More informationGULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL
GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL OCTOBER 2014 Cover photographs courtesy of Top left - Mike Bates TABLE OF CONTENTS MISSION... 1 INTRODUCTION... 1 VISION STATEMENT... 1 BACKGROUND... 2
More informationPhase II Options Feasibility Study. Draft Evaluation Methodology and Options Evaluation Matrix
Phase II Options Feasibility Study Draft Evaluation Methodology and Options Evaluation Matrix August 2, 2006 TABLE OF CONTENTS.0 Overview... 2.0 Development of Performance Measures....0 Application of
More informationVDOT and DRPT MPO and PDC Winter Meeting Amy Inman Planning & Mobility Programs Administrator Virginia Department of Rail and Public Transportation
VDOT and DRPT MPO and PDC Winter Meeting Amy Inman Planning & Mobility Programs Administrator Virginia Department of Rail and Public Transportation www.drpt.virginia.gov 1 DRPT Customers 54 Transit Systems
More information3.0 COMMENTS AND RESPONSES
General Plan 3.0-374 October 2003 3.0-375 General Plan Final Environmental Impact Report General Plan 3.0-376 October 2003 3.0-377 General Plan Final Environmental Impact Report General Plan 3.0-378 October
More informationTable 2.3 Alternatives Considered by the ACT Interstate 73 EIS: I-95 to the Myrtle Beach Region
Alternative Table 2.3 Alternatives Considered by the ACT 73 EIS: I- to the Region Recommendation 1 Recommended for further study 2 Recommended for further study 3 Eliminated due to having high relocations
More informationPreparation of an Environmental Impact Statement for High Capacity Transit
This document is scheduled to be published in the Federal Register on 11/19/2013 and available online at http://federalregister.gov/a/2013-27583, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal Transit
More informationInitial Alternative One: No Build
Initial Alternatives The first steps in the ultimate selection of a Most Feasible Alternative the transportation improvements along the SH 288 corridor that make best meet the study goals - is the conceptual
More informationProject Overview. A Collaborative Effort
Project Overview A Collaborative Effort DRPT and FRA are working closely with CSX, which owns and operates the corridor, as well as with passenger operators Amtrak and Virginia Railway Express (VRE), the
More informationLONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17
LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17 1 PROJECT TEAM & COLLABORATORS 2 OPEN HOUSE SERIES Tuesday, May 16, 2017 6-8:00 pm La Verne City Council Chambers 3660 D Street La
More informationHill Country Alliance Presentation
Hill Country Alliance Presentation September 24, 2015 Lone Star Regional Rail Strategic Considerations Lone Star Rail District Connectivity/Mobility Issues 1 Lone Star Regional Rail Strategic Considerations
More informationSTATEWIDE ANALYSIS MODEL (SAM-V3) June 5, 2014 Janie Temple
STATEWIDE ANALYSIS MODEL (SAM-V3) June 5, 2014 Janie Temple Introduction Brief SAM History Intro to SAM-V3 functionality Past and Current SAM projects Future additions to SAM Suggestions from model users
More informationCHAPTER 3 THE BUILDING BLOCKS POLICIES AND SUPPORTIVE STRATEGIES REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY
CHAPTER 3 THE BUILDING BLOCKS POLICIES AND SUPPORTIVE STRATEGIES REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY CHAPTER 3 THE BUILDING BLOCKS POLICIES AND SUPPORTIVE STRATEGIES INTRODUCTION
More information2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan
2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan Public Open House Meetings January 2010 presented by: Minnesota Department of Transportation Agenda Introductions State Rail Plan
More informationPUBLIC HEARING April 24, 2017
PUBLIC HEARING April 24, 2017 1 Agenda SDEIS Public Review Environmental Process Overview Project Highlights Comments to Stenographer 2 3 SDEIS Public Review Public Hearing Schedule Monday, April 24, 2017
More informationMassachusetts Rail Plan. September 16, 2010
Massachusetts Rail Plan September 16, 2010 State Freight and Rail Plans State Rail Plan The plan describes state policy for freight and passenger rail transportation, including commuter rail Provides priorities
More informationTIER 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT. 7. Affected Environment, Environmental Consequences, and Mitigation Strategies
TIER 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT 7. Affected Environment, Environmental Consequences, and Mitigation Strategies Table of Contents Chapter 7 7 Affected Environment, Environmental Consequences,
More information2004 FEASIBILITY STUDY UPDATE
Austin-San Antonio Intermunicipal Commuter Rail District 2004 FEASIBILITY STUDY UPDATE December 2004 EXECUTIVE SUMMARY INTRODUCTION Almost 3 million people in Central Texas, living and working between
More informationSUPPLEMENTAL NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT. ACEforward Notice of Additional Project Element Niles Junction Connections
SUPPLEMENTAL NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT DATE: May 9, 2016 FROM: TO: SUBJECT: San Joaquin Regional Rail Commission Agencies, Organizations, and Interested Parties ACEforward
More informationParking and Multi-Modal Station Access. Jennifer Niece Metrolinx, Sr. Advisor, Sustainability Toronto, Ontario
Parking and Multi-Modal Station Access Jennifer Niece Metrolinx, Sr. Advisor, Sustainability Toronto, Ontario The Big Move Regional Transportation Plan Vision: an integrated multi-modal transportation
More informationINTERSTATE CORRIDOR PLANNING
INTERSTATE CORRIDOR PLANNING Prioritization of Corridor Studies July 29, 2015 Importance of the Interstate System Texas is an integral part of the national interstate system. The interstate system provides
More informationOuter Loop/Rail Bypass Study
Outer Loop/Rail Bypass Study Outer Loop Stakeholder Roundtable Southwest Segment Joshua City Hall April 16, 2008 North Central Texas Council of Governments Transportation Department Stakeholder Roundtable
More informationLong Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need
Environmental Impact Statement (EIS) Revised Purpose and Need November 9, 2017 1.0 What is the Proposed Action? The consists of potential improvements to the Long Bridge and related railroad infrastructure
More informationTwin Cities-Milwaukee-Chicago Intercity Passenger Rail Phase I Study Twin Cities- Milwaukee High Speed Rail to Chicago Corridor Study
Twin Cities-Milwaukee-Chicago Intercity Passenger Rail Phase I Study Twin Cities- Milwaukee High Speed Rail to Chicago Corridor Study Rail Modeling Update May 4, 2017 www.dot.state.mn.us/passengerrail/tc-mil-chi/
More informationTable of Contents. Green Line Extension Project. Draft Environmental Impact Report/Environmental Assessment and Draft Section 4(f) Evaluation
Table of Contents Acronyms and Abbreviations Secretary s Certificate on the EENF Executive Summary 1 Introduction and Background... 1-1 1.1 Introduction... 1-1 1.2 Project Summary... 1-2 1.3 Permits and
More informationPeninsula Corridor Electrification Project. Draft Environmental Impact Report
Peninsula Corridor Electrification Project Draft Environmental Impact Report Public Meeting Purpose of Tonight s Meeting Provide an overview of Draft Environmental Impact Report (Draft EIR) Receive comments,
More informationWelcome and thank you for your interest in the proposed Baltimore-Washington Superconducting Maglev Project.
Transcript for Baltimore-Washington Superconducting Maglev Environmental Study Project Process & Information Video October 2017 Slide 1 Welcome and thank you for your interest in the proposed Baltimore-Washington
More informationTier 2 Environmental Impact Statement for the High-Speed Rail Project from Granite
This document is scheduled to be published in the Federal Register on 02/18/2014 and available online at http://federalregister.gov/a/2014-03324, and on FDsys.gov 4910-06-P DEPARTMENT OF TRANSPORTATION
More informationCharlottesville Albemarle MPO:
Charlottesville Albemarle MPO: Applying The Eco-Logical Approach To Small MPOs September 21, 2015 Charlottesville Albemarle Metropolitan Planning Organization (CAMPO) and The Thomas Jefferson Planning
More informationTechnical Briefing Report
Technical Briefing Report March 2007 CONGESTION MANAGEMENT PROCESS (CMP) The Congestion Management Process (CMP) seeks a management solution to a growing traffic problem by targeting resources to operational
More informationLocally Preferred Alternative. Work In Progress; Subject To Change Without Notice 1
Locally Preferred Alternative 1 Riverview Corridor Study Area 12 mile study area between Saint Paul and Bloomington. Connects major destinations, neighborhoods and job concentrations. Serves growing and
More informationChicago Transit Authority Orange Line Alternatives Analysis Study
Chicago Transit Authority July 10, 2009 Written questions and comments regarding the were submitted by a variety of individuals and groups from throughout the Chicago region at the study s Screen 2 Public
More informationTECHNICAL MEMORANDUM #1. The Vision, Goals and Objectives for Rail Transportation in Missouri
TECHNICAL MEMORANDUM #1 The Vision, Goals and Objectives for Rail Transportation in Missouri April 2012 1 The Vision, Goals and Objectives for Rail Transportation in Missouri Role of Railroads in Missouri
More informationPURPOSE AND NEED FOR ACTION
Section 2 PURPOSE AND NEED FOR ACTION 2. Purpose and Need for Action 2.0 Purpose and Need for Action This chapter describes the purpose and need for improved high speed passenger rail on the Chicago to
More informationFOCUS40 MassDOT Board Presentation March 13, 2017
FOCUS40 MassDOT Board Presentation March 13, 2017 What is Focus40? A 25-year strategic plan for how the MBTA can meet the needs of the region in 2040. Focus40 is: Highlighting long-term performance, reliability,
More informationCHAPTER 3.0 CIRCULATION ELEMENT
CHAPTER 3.0 CIRCULATION ELEMENT The Circulation Element identifies the general location and extent of existing and proposed major transportation facilities for vehicle, rail, air, water, and bicycle transportation
More informationTri-County Regional Planning Commission 2045 Regional Metropolitan Transportation Plan Goals and Objectives Adopted March 22, 2017
Tri-County Regional Planning Commission 2045 Regional Metropolitan Transportation Plan Goals and Objectives Adopted March 22, 2017 One of the initial steps in the development of the TCRPC 2045 Metropolitan
More informationAppendix C Scoping Meeting Materials
Appendix C Scoping Meeting Materials Appendix C - Contents Sign-in Sheet for Agency Scoping Meeting Sign-in Sheet for Public Scoping Meeting Scoping Information Booklet Scoping Presentation Scoping Brochure/Comment
More informationTABLE OF CONTENTS. Rochester Twin Cities Passenger Rail Corridor Investment Plan and Tier 1 EIS Final Scoping Decision Document
TABLE OF CONTENTS INTRODUCTION...1 COORDINATION WITH THE FEDERAL ENVIRONMENTAL PROCESS...1 RESPONSIBLE GOVERNMENTAL UNIT AND PROJECT MANAGER...3 PROJECT DESCRIPTION...3 PURPOSE AND NEED...6 ALTERNATIVES
More information6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS
6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS 6.1 MODEL RUN SUMMARY NOTEBOOK The Model Run Summary Notebook (under separate cover) provides documentation of the multiple
More informationEnvironmental Assessment of Rail Infrastructure in Illinois
Environmental Assessment of Rail Infrastructure in Illinois Presentation at the 16 th Railroad Environmental Conference, October 28, 2014. Ning Ai, Marcella Bondie, Anthony Grande, Shuo Ma & Shi Yin Outline
More informationRegional Transit Framework Study
MARICOPA ASSOCIATION OF GOVERNMENTS Regional Transit Framework Study Regional Stakeholders Group Meeting #1 February 29, 2008 Copyright 2008 AGENDA Welcome and Introductions Project Process Regional Transit
More informationChicago to St. Louis Tier 1 Environmental Impact Statement
Chicago to St. Louis Tier 1 Environmental Impact Statement Scoping Document April 2012 Illinois Department of Transportation Federal Railroad Administration Table of Contents 1.0 PROJECT DEFINITION...
More information2017 Educational Series RAIL
2017 Educational Series RAIL RAIL OVERVIEW The state of Texas has the most rail lines of any state with a total of 10,469 miles of track, and the most public highway-rail grade crossings with a total of
More informationTransit Investment Direction and Plan Introduction. Transportation Advisory Board TPP Workshop August 16, 2017
Transit Investment Direction and Plan Introduction Transportation Advisory Board TPP Workshop August 16, 2017 Today s Topics - Transit Where are we now, what are the current issues? Where do we want to
More informationRegional Transit System Plan
Policy, Program Development & Intergovernmental Relations Committee Item III-A October 14, 2010 Regional Transit System Plan Washington Metropolitan Area Transit Authority Board Action/Information Summary
More information6.0 Indirect Effects and Cumulative Impacts
6.0 Effects and Impacts 6.1 Introduction This chapter of the Draft EIS addresses potential indirect and cumulative impacts of the Bottineau Transitway project. effects are those that are caused by the
More informationChapter IX Regional Performance
Chapter IX Regional Performance In recent years, performance-based planning and project programming have increasingly been employed by the North Central Texas Council of Governments (NCTCOG) in the development
More informationPreapplication for HSIPR Program OMB No
U.S. Department of Transportation Federal Railroad Administration Preapplication for HSIPR Program OMB No. 2130 0583 Preapplication instructions: For each question, enter the appropriate information in
More informationSection IMPLEMENTATION PLAN. 7. Implementation Plan
Section 7 IMPLEMENTATION PLAN 7. Implementation Plan 7.0 Implementation Plan The Tier 1 Final EIS has presented several improvements along the Chicago to St. Louis corridor to meet the purpose and need
More informationContents. S. Executive Summary... ES Overview of Purpose & Need
Contents S. Executive Summary... ES-1 S.1 Introduction... ES-1 S.2 Purpose of this Study... ES-3 S.3 Background... ES-6 S.4 Purpose and Need for Transit Investment... ES-10 S.5 Community Input Process...
More informationThe Metropolitan Transportation Plan. Public Meetings January 2016
The Metropolitan Transportation Plan for North Central Texas Public Meetings January 2016 Presentation Agenda Mobility 2040 Draft Recommendations 2016 Transportation Conformity RTC Policy Bundle Concept
More informationBenefit Cost Analysis Narrative
Chicago Region Environmental and Transportation Efficiency Program (CREATE) Grade Separations of: GS21a - Union Pacific and 95 th Street GS11 - Belt Railway Company of Chicago and Columbus Ave. GS 9 -
More informationCapitol Corridor Vision Implementation Plan Vision for the Megaregion. CCJPA November 2017
Capitol Corridor Vision Implementation Plan Vision for the Megaregion CCJPA November 2017 1990 s: Prop 116/108 SR3T Ph 1 2006 Electrified, very frequent passenger rail service plateau Europe Asia 3 CCJPA
More informationAPPENDIX TRAVEL DEMAND MODELING OVERVIEW MAJOR FEATURES OF THE MODEL
APPENDIX A TRAVEL DEMAND MODELING OVERVIEW The model set that the Central Transportation Planning Staff (CTPS), the Boston Region Metropolitan Planning Organization s (MPO) technical staff, uses for forecasting
More informationHighest Priority Performance Measures for the TPP
Highest Priority Performance Measures for the TPP The following list of measures are the highest priority performance measures as identified by modal working groups. These groups consist of staff from
More informationSUMMARY S.1 PROJECT DESCRIPTION AND LOCATION S.2 PURPOSE AND NEED
S SUMMARY S.1 PROJECT DESCRIPTION AND LOCATION The Virginia Department of Transportation (VDOT), in cooperation with the Federal Highway Administration (FHWA), is studying alternatives to meet transportation
More informationChapter PURPOSE AND NEED
2.1 PURPOSE AND NEED 2 PURPOSE AND NEED This section identifies the transportation constraints and need for improved transit services to accommodate growing travel demand between Central Orange County,
More information