London Air Mail Unit Heathrow Airport. 63,000 sq ft (5,853 sq m) Cargo transit warehouse facility Pre-let to Royal Mail

Size: px
Start display at page:

Download "London Air Mail Unit Heathrow Airport. 63,000 sq ft (5,853 sq m) Cargo transit warehouse facility Pre-let to Royal Mail"

Transcription

1 London Air Mail Unit Heathrow Airport 63,000 sq ft (5,853 sq m) Cargo transit warehouse facility Pre-let to Royal Mail

2 The construction of this new facility for Royal Mail confirms the proven ability of BAA Lynton to deliver bespoke buildings to meet the requirements of its airport customers. The project required detailed attention to the specific business and operational requirements of Royal Mail and, in particular, attention to security issues, bearing in mind the proximity of the airside boundary. This all worked together and the project was finished on time and within budget. Another successful development by BAA Lynton! Stuart Rogers, Senior Development Surveyor, BAA Lynton The facility is world class and provides the greatest level of flexibility and understanding of the business priority, together with a maximum interaction with the airline operators and handlers. Mike Edmondson, Project Manager, Royal Mail

3 London Air Mail Unit is located at the gateway to Heathrow s Cargo Centre and facilitates Royal Mail s only UK airport operation. The development was particularly technically challenging due to the on-site presence of airport fuel pipes, fibre optic cables, BT infrastructure and a high voltage network. The resulting building is both architecturally challenging and aesthetically pleasing. 22,000 tonnes of redundant concrete was crushed and re-used, negating the need for landfill, use of virgin resources and saving over 2,200 lorry movements providing an environmentally friendly solution. A 1.2km cycle lane was constructed, which also improves the environment and conditions for sustainable transport. Working closely with Royal Mail, the shell and core construction took only 24 weeks and the operation was seamlessly transferred from the existing Royal Mail facility. The fit out included installing a 2.6m automated freight handling system (ETV) and stringent security measures which are unparalleled in the cargo community, including full lock-down capability. The development also involved 2.6m of investment in local infrastructure and improving the capacity of the DfT airside control post adjacent to the site. This is the first phase of the site with a pre-let for Phase Two to Servisair Cargo having just been concluded. Programme June Detailed planning permission obtained July Enabling Works commenced, incorporating movement of services, a road closure and reconfiguration of Stirling Road adjacent to the site. November Agreement for Lease signed January Start on site May Completion of shell and core works and handover for office, warehouse works and fit out. November Completion of office and warehouse works February Royal Mail operational date

4 Project The project consisted of five main elements; a cargo transit warehouse, infrastructure works, upgrade of Stirling Road, reconstruction of the DfT airside security post and construction of a 1.2km cycle path. It was essential that all elements worked together, to ensure a seamless handover from the existing Royal Mail building to the new facility. The cargo transit warehouse was specifically designed to optimise the efficiency of the Royal Mail operation. Through understanding Royal Mail s requirements, the team were able to reduce the size of building required, when compared to their existing facility. The warehouse benefits from airside access by way of a shared airside yard which has an area of 3,465m 2. There are 12 loading doors to both the airside and landside elevations incorporating dock levellers, ETV docks and level access doors. The twin span portal frame structure is semi rigid which allows flexibility for door positioning in the future, but still provides the benefit of very few interruptions to the warehouse floor which in turn maximises the efficiency of the space. The cargo transit warehouse was developed as a landmark building at the gateway to the Heathrow Airport cargo community. A significant amount of time was taken to develop an office/ warehouse solution that is of premium quality and aesthetically very pleasing. The cladding finish to the warehouse is of a high standard and, in particular, the front elevation of the office was designed to minimise the affect of the mass of the building, whilst still ensuring that the impact of the quality of the elevation was maximised. Design of the office, warehouse and fit out works was undertaken with the tenant, Royal Mail and involved reverse integration within the design process to ensure that the end product and process influenced the base design of the building. The team also focused on developing a robust environmental and sustainable project. The project crushed and re-used 22,000 tonnes of existing foundations on the site which provided the basis for the new building. This reduced the requirement for landfill, the use of virgin resources and saved 2,200 lorry movements on the roads around Heathrow, dramatically reducing the impact of the construction on both the environment and the local community. The project also worked in conjunction with Heathrow Airport Limited and their Sustainability Team to further develop a coordinated response to the issue of sustainability around the Airport. By doing so the project was able to construct an important piece of sustainable infrastructure, a 1.2km cycle way which benefits not only the project and the Airport but also the wider community around Heathrow.

5 BAA Lynton - Development & Project Management Norwest Holst - Main contractor and Delivery Team leader REID - Architect Buro Happold - Structural and Civil Engineer WS Atkins - Planning Supervisor Davis Langdon - Cost Consultants and Assistant Project Manager DSSR - Mechanical and Electrical Engineers Yorkshire Sheeting - Envelope design and installation Rowans Structures - Structural design and installation Drake & Skull - Services contractor Technical Specification Site 14,164 m 2 Infrastructure Work Diversion of 1.2m twin diameter storm water pipes New pit and duct system for BT infrastructure Stirling Road Road reconfigured, incorporating a 24m roundabout Capacity of Stirling Road increased by 65% Building Plan Area 5,853 m 2 The Team The project was developed and managed by BAA Lynton, the commercial property division of BAA plc. BAA Lynton appointed REID, DSSR, Davis Langdon, Buro Happold, WS Atkins and Norwest Holst as the project team for the shell and core work. This is the seventh successful project that this virtual company, known as Shed Co, has completed. The office and warehouse fit out works were completed by Galliford Try. The team has successfully completed projects in the past for BAA Lynton, Heathrow Airport Limited and Stansted Airport Limited. As a result, the team are highly effective and have a proven track record in delivering bespoke air related buildings. This new facility was built on time and within budget whilst at the same time meeting specific and demanding customer needs and requirements. Another successful development. Warehouse First development to meet the new Part L & DDA standards, including pressure testing of warehouse 4,794 m 2 of warehouse floor area 2,636 tonnes of concrete with a power floated AR1 floor finish, poured in four pours 12m to underside of haunch Floor loading 55KN/m m 2 additional area under external canopies Dedicated 400KVA transformer Steel Frame 430 tonnes of steel plus 606 tonnes of pre-cast concrete in the warehouse erected in 5 weeks Elevated Transfer Vehicles 2.6m installation for processing ingoing and outgoing prepared Universal Loading Devices (ULD s) Dual cab flexible operation with 104 ULD storage facility ETV capacity more than doubled from the previous facility Offices 405 m 2 ground floor 327 m 2 first floor 327 m 2 second floor Raised access flooring, suspended ceilings Full air conditioning Plant level 251 m 2 (additional area to warehouse and offices) Security Post To DfT standard with full lock down capability Set benchmark for new security posts within BAA Cycle path 3m wide cycle path constructed offsite over a 1.2km length to Highways Agency standards 3 dedicated crossover points

6 For further information: BAA Lynton BAA Lynton was appointed by Heathrow Airport Limited (HAL). The customer, Royal Mail required a world class air mail unit, to meet the challenges of a competitive business environment and which would provide more efficient space than their existing airport location. BAA Lynton, in its role as both Developer and Project Manager were able to assess the operational and business requirements of Royal Mail, and provide a bespoke facility to meet those needs. The result is the construction of a high quality cargo transit warehouse, an investment in local infrastructure and a robust environmental and sustainable project. BAA Lynton is a trading division of BAA plc. This brochure does not constitute any part of a contract. All information is given as a guide, and no liability can be accepted for any errors arising therefrom. No responsibility is taken for any other error, omission or mis-statement in this brochure. Any party representing the owner, or the owner himself do not make or give, whether in these particulars, during negotiations or otherwise any representation or warranty whatsoever in relation to this property. Maps not to scale, diagrams and impressions for illustrative purposes only. August 2005.

WAREHOUSE INDUSTRIAL UNITS TO LET

WAREHOUSE INDUSTRIAL UNITS TO LET WAREHOUSE INDUSTRIAL UNITS TO LET BEDFONT ROAD HEATHROW TW14 8EE UNITS TO LET FROM 34,517 109,893 SQ FT (3,207 10,209 SQ M) OPPORTUNITIES NOW LANDED AT HE THROW LOGISTICS P RK FIRST CLASS BENEFITS Four

More information

TO LET: UNIT 2 NEW WAREHOUSE / INDUSTRIAL UNIT 75,274 SQ FT (6,993 SQ M) AVAILABLE NOW. SEGRO.com/skyline

TO LET: UNIT 2 NEW WAREHOUSE / INDUSTRIAL UNIT 75,274 SQ FT (6,993 SQ M) AVAILABLE NOW. SEGRO.com/skyline TO LET: NEW WAREHOUSE / INDUSTRIAL UNIT SEGRO.com/skyline WELCOME TO WORLDWID Adjacent to the international hub Heathrow Airport and the immediate transport network, SEGRO Park Skyline Heathrow is an exceptional

More information

CONSENTED PRIME CONNECTED

CONSENTED PRIME CONNECTED CONSENTED PRIME CONNECTED A NEW 27,350 SQ FT INDUSTRIAL/LOGISTICS Development. JUNCTION 6,, WA5 0AF. AVAILABLE FOR OCCUPATION Q 206. A56 A55 PRESTON LIVERPOOL SUPERPORT CHESTER 2 AIRPORT LEEDS SHEFFIELD

More information

concrete Precast car park The Avenue MSCP, Bracknell Sustainability by the sea Colwyn Bay seafront Clean water Treating hydro-demolition waste

concrete Precast car park The Avenue MSCP, Bracknell Sustainability by the sea Colwyn Bay seafront Clean water Treating hydro-demolition waste concrete THE MAGAZINE OF THE CONCRETE SOCIETY Volume 51 November 2017 Issue09 Visit: www.concrete.org.uk Precast car park The Avenue MSCP, Bracknell Clean water Treating hydro-demolition waste Sustainability

More information

Global Logistics, Personal Approach

Global Logistics, Personal Approach Global Logistics, Personal Approach Our approach ensures a premier, bespoke service and has contributed to the establishment of long term global working partnerships ABOUT BURHILL LOGISTICS Burhill Logistics

More information

J13 M1 15M UNDER DC4 NEW 275,000 SQ FT INDUSTRIAL/DISTRIBUTION OPPORTUNITY TO LET CONSTRUCTION CLEAR HEIGHT PROLOGIS PARK AVAILABLE JUNE 2017

J13 M1 15M UNDER DC4 NEW 275,000 SQ FT INDUSTRIAL/DISTRIBUTION OPPORTUNITY TO LET CONSTRUCTION CLEAR HEIGHT PROLOGIS PARK AVAILABLE JUNE 2017 PROLOGIS PARK UNITED KINGDOM J13 DIRECT ACCESS TO MOTORWAY NETWORK 15M UNDER CONSTRUCTION CLEAR HEIGHT AVAILABLE JUNE 2017 NEW 275,000 SQ FT INDUSTRIAL/DISTRIBUTION OPPORTUNITY TO LET A PROLOGISMARSTONGATE.CO.UK

More information

Day Night Day Night Day Night Residential site and amphitheatre Green Non residential site boundary Red

Day Night Day Night Day Night Residential site and amphitheatre Green Non residential site boundary Red Plant Areas External plant must meet the following noise suppression requirement as adopted by the Landlord: 1. Air handling units 45db measured at 3metres from source. 2. Heat rejection plant 45db measured

More information

Dock and Yard Management e.g. for Air Cargo Terminals. Siemens AG 2012

Dock and Yard Management e.g. for Air Cargo Terminals. Siemens AG 2012 Dock and Yard Management e.g. for Air Cargo Terminals 1 Introduction/Table of Contents Dock & Yard Management (DYM) a software solution for systematic planning and controlling of transport processes within

More information

cornish concrete products Structural precast

cornish concrete products Structural precast cornish concrete products Structural precast / Ground and edge beams / Retaining Walls / crosswall construction / concrete frames / Staircases and Floors / seating and terracing / Loading Bays / Lift shafts

More information

A PLEASANT FLIGHT BEGINS AND ENDS AT THE AIRPORT. KONE solutions for airports

A PLEASANT FLIGHT BEGINS AND ENDS AT THE AIRPORT. KONE solutions for airports A PLEASANT FLIGHT BEGINS AND ENDS AT THE AIRPORT KONE solutions for airports 1 MANAGING THE FLOW OF PEOPLE AND GOODS THROUGH AIRPORTS SMOOTHLY AND EFFICIENTLY 5 7 3 8 11 KONE SOLUTIONS FOR AIRPORTS 1.

More information

INCHWOOD PARK. Inchwood Park is an exciting development of 20 new industrial/business units totalling 4,666 sq m (50,225 sq ft)

INCHWOOD PARK. Inchwood Park is an exciting development of 20 new industrial/business units totalling 4,666 sq m (50,225 sq ft) PHASE 1 NOW COMPLETE INCHWOOD PARK Inchwood Park is an exciting development of 20 new industrial/business units totalling 4,666 sq m (50,225 sq ft) Phase 1 comprises units from 223 sq m (2,400 sq ft) to

More information

EVERY SQ.FOOT MATTERS

EVERY SQ.FOOT MATTERS EVERY SQ.FOOT MATTERS 44.77 ACRES WITH PLANNING CONSENT FOR DESIGN & BUILD INDUSTRIAL / DISTRIBUTION FACILITIES RANGING FROM 111,405-687,987 SQ FT At the heart of the UK s motorway network, close to a

More information

Crossrail and our international tunnelling expertise

Crossrail and our international tunnelling expertise Crossrail and our international tunnelling expertise Analyst briefing Thursday 1 October 2015 Neil Thomas Managing director Water, Ground and Environment Crossrail Crossrail Crossrail has one purpose to

More information

CHAPTER 3: Modern Methods of Construction (MMC)

CHAPTER 3: Modern Methods of Construction (MMC) CONTENTS 3.1.1 INTRODUCTION 3.1.2 SUITABILITY OF SYSTEMS AND COMPONENTS 3.1.3 TYPES OF MODERN METHODS OF CONSTRUCTION (MMC) 3.1.4 SUITABILITY OF SYSTEMS TO MEET WARRANTY REQUIREMENTS 3.1.5 INSULATED CONCRETE

More information

106 TALL BUILDINGS: A STRATEGIC DESIGN GUIDE

106 TALL BUILDINGS: A STRATEGIC DESIGN GUIDE 106 TALL BUILDINGS: A STRATEGIC DESIGN GUIDE KEY TECHNICAL COMPONENTS 107 cost: The cost and scarcity of developable land, the permitted footprint, building bulk, quality of specification, and the time

More information

Solutions for Airport Logistics. Terminal Equipment TECHNOLOGY IN MOTION

Solutions for Airport Logistics. Terminal Equipment TECHNOLOGY IN MOTION Solutions for Airport Logistics Terminal Equipment TECHNOLOGY IN MOTION Headline1 Headline2 Air Sea Road Intralogistics Lödige Industries - Technology in Motion The core competence of the Lödige Industries

More information

Becon Projects. Air Cargo Consultancy Company Presentation BECON-PROJECTS GmbH D Idstein Germany

Becon Projects. Air Cargo Consultancy Company Presentation BECON-PROJECTS GmbH D Idstein Germany + Becon Projects Air Cargo Consultancy Company Presentation 2016 BECON-PROJECTS GmbH D-65510 Idstein Germany + About us BeCon Projects GmbH founded August 2009 Group CEO: Uwe Beck BeCon Projects Headquarter

More information

COST AND CONSTRUCTION TIME FOR A 3-STOREY POST- TENSIONED TIMBER BUILDING COMPARED WITH CONCRETE AND STEEL BUILDINGS

COST AND CONSTRUCTION TIME FOR A 3-STOREY POST- TENSIONED TIMBER BUILDING COMPARED WITH CONCRETE AND STEEL BUILDINGS COST AND CONSTRUCTION TIME FOR A 3-STOREY POST- TENSIONED TIMBER BUILDING COMPARED WITH CONCRETE AND STEEL BUILDINGS Stephen John 1 and Andrew H Buchanan 2 ABSTRACT: This paper presents the initial cost,

More information

Commercial Remodel Permit

Commercial Remodel Permit Commercial Remodel Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts, each

More information

Golden prospects+ Goodman Grossbeeren III Logistics Centre. Your premium property south of Berlin. Can be divided into two units of 5,888 sqm each

Golden prospects+ Goodman Grossbeeren III Logistics Centre. Your premium property south of Berlin. Can be divided into two units of 5,888 sqm each Golden prospects+ Your premium property south of Berlin Up to 13,500 sqm of modern logistics space in a desirable location, available at short notice. Can be divided into two units of 5,888 sqm each Close

More information

Network Access Chamber Systems

Network Access Chamber Systems Network Access Chamber Systems STAKKAbox ULTIMA Connect The Next Generation in Chamber Access Systems A modular scalable solution built on-site with easily connectable components. Contents Introduction

More information

FOR SALE STATE-OF-THE-ART MANUFACTURING/WAREHOUSE STATE-OF-THE-ART MANUFACTURING/WAREHOUSE. 950 South Service Rd. Stoney Creek, ON

FOR SALE STATE-OF-THE-ART MANUFACTURING/WAREHOUSE STATE-OF-THE-ART MANUFACTURING/WAREHOUSE. 950 South Service Rd. Stoney Creek, ON STATE-OF-THE-ART MANUFACTURING/WAREHOUSE STATE-OF-THE-ART MANUFACTURING/WAREHOUSE FOR SALE 950 South Service Rd. Stoney Creek, ON For further details contact: Nick Holzinger Senior Vice President Sales

More information

DP WORLD LONDON GATEWAY LOGISTICS PARK

DP WORLD LONDON GATEWAY LOGISTICS PARK THE NEXT PROLOGIS A NEW 6,96 SQ FT INDUSTRIAL / DISTRIBUTION UNIT BREEAM E XCELLENT EPC A RATED prologislondongateway.co.uk PROLOGIS A GREAT OPPORTUNITY AWAITS... AVAILABLE NOW READY FOR IMMEDIATE OCCUPATION

More information

Bonner Bridge Replacement Update:

Bonner Bridge Replacement Update: Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner

More information

Distribution Center 1 + 2

Distribution Center 1 + 2 BELGIUM Distribution Center 1 + 2 www.prologis.com Prologis Park Boom consists of a modern logistics facility located in Industrial Park Krekelenberg I and a new logistics development of approximately

More information

SEPTEMBER Bespoke Fabrication Systems

SEPTEMBER Bespoke Fabrication Systems FB-V1 SEPTEMBER 2008 Bespoke Fabrication Systems Polypipe Civils unique solutions in fabrication The UK Market Leader Polypipe Civils is the UK s leading manufacturer of cable protection, drainage, sewerage

More information

Chartered Membership Examination

Chartered Membership Examination Chartered Membership Examination 1 Chartered Membership Examination Friday 8 January 2016 Structural Engineering Design and Practice 09.30 13.00 and 13.30 17.00 (Discussion between individuals is not permitted

More information

LoadSafe Platforms. September 2014

LoadSafe Platforms.  September 2014 www.catnic.com LoadSafe Platforms September 2014 Care has been taken to ensure that the contents of this publication are accurate, but Tata Steel Europe Limited and its subsidiaries, which includes Tata

More information

THE MODULAR HOUSE - PLOT 15 - SCOTLAND S HOUSING EXPO

THE MODULAR HOUSE - PLOT 15 - SCOTLAND S HOUSING EXPO THE MODULAR HOUSE - PLOT 15 - SCOTLAND S HOUSING EXPO by David Keith Bracewell Stirling Consulting A state-of-the-art, carbon neutral living space as natural as the environment, which considers carbon

More information

Introduction. Disclaimer. Table of contents

Introduction. Disclaimer. Table of contents Updated July 18, 2012 Introduction The Cambridge Elevating Limited-Use / Limited-Application Elevator is designed to service schools, libraries, low rise, low occupancy commercial buildings, churches and

More information

BT for Global Logistics

BT for Global Logistics BT for Global Logistics Connecting logistics for better delivery Insert name Date Event / client Major trends affecting global trade... An unbalanced economy Uneven global growth European recession US

More information

Greener Systems=Greater Profits

Greener Systems=Greater Profits Greener Systems=Greater Profits Sheila M. Thomas Managing Director March 27, 2008 2008 ACI-NA Air Cargo Conference - Los Angeles Greener Systems=Greater Profits I II III IV Paradoxes of Green Logistics

More information

Drive-In Rack A Low Cost, Versatile Solution for High Density Pallet Storage

Drive-In Rack A Low Cost, Versatile Solution for High Density Pallet Storage Drive-In Rack A Low Cost, Versatile Solution for High Density Pallet Storage Contents About Colby Why use Drive-In Rack? Drive-In Rack Advantages The Colby DI Rack System Application Examples 2 About Colby

More information

MANCHESTER AIRPORT MAJOR LED UPGRADE HELPS MANCHESTER AIRPORT REACH SUSTAINABILITY GOALS.

MANCHESTER AIRPORT MAJOR LED UPGRADE HELPS MANCHESTER AIRPORT REACH SUSTAINABILITY GOALS. MANCHESTER AIRPORT MAJOR LED UPGRADE HELPS MANCHESTER AIRPORT REACH SUSTAINABILITY GOALS. ABOUT THE CLIENT In 2015, Manchester Airport was once again crowned Best UK Airport at the prestigious Globe Travel

More information

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE - 268-5161 Residential Accessory Structures This information has been compiled for the benefit of any person

More information

Capability Statement. January Airports

Capability Statement. January Airports Capability Statement January 2018 Airports Contents About Us... III Palmerola Airport, Honduras... VIII Our Services.. IV Heathrow Airport, United Kingdom... IX Our Strategy... V Gatwick Airport, United

More information

Building with cardboard: the reality

Building with cardboard: the reality Building with cardboard: the reality Andrew Cripps PhD 1 1 Buro Happold Consulting Engineers, 17 Newman St, London, W1T 1PD, UK. Phone: +44 20 7927 9700. Fax: +44 20 7927 9701. E-mail: andrew.cripps@burohappold.com,

More information

ROYAL ARSENAL Buildings 10, 11 and Royal Carriage Square Foul Sewage & Utilities Report

ROYAL ARSENAL Buildings 10, 11 and Royal Carriage Square Foul Sewage & Utilities Report ROYAL ARSENAL Buildings 10, 11 and Royal Carriage Square Foul Sewage & Utilities Report Submitted to Berkeley Homes (East Thames) Limited Submitted by AECOM Scott House Alençon Link Basingstoke Hampshire

More information

Hebel - Better for building in bushfire zones

Hebel - Better for building in bushfire zones Hebel - Better for building in bushfire zones BUILDING WITH HEBEL IN BUSHFIRE ZONES Bushfires are a fact of Australian life. When building in a bushfire zone, the most important consideration is the choice

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

We re Looking for Re-sellers in the UAE

We re Looking for Re-sellers in the UAE CONTACT The Quality Leader In Forklift Truck Attachments We re Looking for Re-sellers in the UAE Contact us today to see how we can help you! Call Us On + (0) 686 6 00 www.cflaglobal.com About Us Introduction

More information

What is NUFORM HOUSE KIT?

What is NUFORM HOUSE KIT? Introduction Nuform Building Technologies Inc. (NUFORM ) is creating a better way to deliver affordable housing the NUFORM HOUSE KIT is a solution for creating neighborhoods where people live with pride

More information

Last Updated March 15, 2016

Last Updated March 15, 2016 CASS COUNTY, MISSOURI BUILDING CODES, ENVIRONMENTAL HEALTH AND ZONING DEPARTMENT 30508 S. West Outer Road, Harrisonville, MO 64701 P- (816) 380-8134 F- (816) 380-8130 Last Updated March 15, 2016 Information

More information

Capital Rail Constructors a Clark & Kiewit Joint Venture Jim Ansari Senior Vice President & General Manager

Capital Rail Constructors a Clark & Kiewit Joint Venture Jim Ansari Senior Vice President & General Manager Program Panelist Capital Rail Constructors a Clark & Kiewit Joint Venture Jim Ansari Senior Vice President & General Manager Moderator Kevin Pavuk, Structural Technologies Presentation 5:30 to 7:00 p.m.

More information

Minimising construction waste through project design

Minimising construction waste through project design Case Study: New South Glasgow Hospitals Minimising construction waste through project design Key facts Applying WRAP s Designing out Waste principles to the project design identified 21 areas of potential

More information

5 simple rules for innovation in megaprojects

5 simple rules for innovation in megaprojects 5 simple rules for innovation in megaprojects Centre for Systems Engineering and Innovation Imperial College 28 th June 2017 Mark Dodgson Professor of Innovation Studies, University of Queensland Visiting

More information

Design Guidelines. pegasus-town.co.nz

Design Guidelines. pegasus-town.co.nz Design Guidelines pegasus-town.co.nz Welcome to Pegasus Town These guidelines have been developed to help make your home-building process as easy as possible. The contents provide you, or your designer

More information

white design Anns Grove Primary School, Heeley, Sheffield Education to Support Regeneration

white design Anns Grove Primary School, Heeley, Sheffield Education to Support Regeneration Anns Grove Primary School, Heeley, Sheffield Education to Support Regeneration In Autumn 2005, the Heeley area of Sheffield will have an inspiring new primary school. The new school has set itself a challenging

More information

Salt lake city Public Safety Building. Case Study CS 2. Grounded in strength.

Salt lake city Public Safety Building. Case Study CS 2. Grounded in strength. Salt lake city Public Safety Building CS 2 Case Study Grounded in strength. Forterra Structural & Specialty Products High-Efficiency Design, Precast Envelope System Put Dramatic Public Safety Building

More information

CENTERPOINT V ±224,147 SF AVAILABLE FOR LEASE

CENTERPOINT V ±224,147 SF AVAILABLE FOR LEASE CENTERPOINT V ±224,147 SF AVAILABLE FOR LEASE CenterPoint Intermodal Center 20 Sonny Perdue Drive,, GA 31405 CROSSDOCK WAREHOUSE Ready for Occupancy! DANNY CHASE, SIOR Colliers International 912 662 8012

More information

WE DESIGN! ENGINEERS. CONTRACTORS.. PROJECT MANAGEMENT CONSULTANTS WE ENGINEER!! WE BUILD!!!

WE DESIGN! ENGINEERS. CONTRACTORS.. PROJECT MANAGEMENT CONSULTANTS WE ENGINEER!! WE BUILD!!! Orion WE DESIGN! ENGINEERS. CONTRACTORS.. PROJECT MANAGEMENT CONSULTANTS WE ENGINEER!! WE BUILD!!! TABLE OF CONTENTS 1. COMPANY PROFILE 2. SERVICES OFFERED 3. SUCCESSFULLY COMPLETED WORKS 4. ONGOING AND

More information

Tunnel waterproofing seamless waterproofing to create watertight tunnels

Tunnel waterproofing seamless waterproofing to create watertight tunnels www.tunnelwaterproofing.com Tunnel waterproofing seamless waterproofing to create watertight tunnels Passion that has preserved for over 40 years For over a quarter of a century, the development of new

More information

Welcome: What is U-Drain? Drain Materials. Flow

Welcome: What is U-Drain? Drain Materials. Flow Welcome: Thank you for looking into the U-Drain floor drain system. This paper will explore the functional features of the U-Drain and why it is superior to other grated systems in the marketplace. We

More information

MUCKLOW PARK. New CGI to follow. MANUFACTURING & LOGISTICS UNITS from 50,000 to 110,000 sq ft.

MUCKLOW PARK. New CGI to follow. MANUFACTURING & LOGISTICS UNITS from 50,000 to 110,000 sq ft. REAL ESTATE INVESTORS AND DEVELOPERS MUCKLOW PARK MANUFACTURING & LOGISTICS UNITS from 50,000 to 110,000 sq ft www.mucklowparktyseley.com 19 acres within 3 miles of central Birmingham Ideally placed for

More information

Underfloor Heating System

Underfloor Heating System More than just an Underfloor Heating System including More than just an Underfloor Heating System underfloor heating + acoustic flooring + integrated control technology Performance Technology Integrated

More information

CROSSRAIL INFORMATION PAPER D8 TUNNEL CONSTRUCTON METHODOLOGY

CROSSRAIL INFORMATION PAPER D8 TUNNEL CONSTRUCTON METHODOLOGY CROSSRAIL INFORMATION PAPER TUNNEL CONSTRUCTON METHODOLOGY This paper sets out the proposed Crossrail tunnel construction strategy and methodology. It will be of particular relevance to those in the vicinity

More information

Response to a Bridge Strike. at a Bridge carrying the Railway. over a Road

Response to a Bridge Strike. at a Bridge carrying the Railway. over a Road Response to a Bridge Strike at a Bridge carrying the Railway over a Road A Protocol for Highway and Road Managers, Emergency Services and Bridge Owners NR/GPG/CIV/008 3 rd March 2009 Note This protocol

More information

Moor Row Farm, Merry Lane, East Huntspill, nr. Highbridge, Somerset TA9 3PS

Moor Row Farm, Merry Lane, East Huntspill, nr. Highbridge, Somerset TA9 3PS Moor Row Farm, Merry Lane, East Huntspill, nr. Highbridge, Somerset TA9 3PS For Sale by Private Treaty An excellent opportunity to acquire a 4-bed Period Farmhouse set in 11.29 acres, with a substantial

More information

LOCATION CONNECTIVITY MASTERPLAN BUILDING THREE WAREHOUSE OFFICE SPECIFICATIONS FLEXIBILITY EFFICIENCY LEASE DETAILS

LOCATION CONNECTIVITY MASTERPLAN BUILDING THREE WAREHOUSE OFFICE SPECIFICATIONS FLEXIBILITY EFFICIENCY LEASE DETAILS NORTH CONNEX (under construction) Located in Sydney s premier Eastern Creek Industrial precinct at the junction of the M4 and M7 motorways, Calibre delivers unbeatable connections. M7 BLACKTOWN M4 M2 PARRAMATTA

More information

Elizabeth River Tunnels Project. ASHE October Technical Meeting ERT Project Overview October 8, 2015

Elizabeth River Tunnels Project. ASHE October Technical Meeting ERT Project Overview October 8, 2015 Elizabeth River Tunnels Project ASHE October Technical Meeting ERT Project Overview October 8, 2015 Project Location: Hampton Roads, VA ERT Project Scope New, two-lane, WB tunnel Rehab and lifesafety improvements

More information

11.1 INTRODUCTION Objectives Key References Interpretation GENERAL CONDITIONS DESIGN...

11.1 INTRODUCTION Objectives Key References Interpretation GENERAL CONDITIONS DESIGN... CONTENTS SECTION 11 TELECOMMUNICATIONS UTILITIES 11.1 INTRODUCTION... 1 11.1.1 Objectives... 1 11.1.2 Key References... 1 11.1.3 Interpretation... 2 11.2 GENERAL CONDITIONS... 2 11.3 DESIGN... 3 11.4 DESIGN

More information

garages, sheds & carports

garages, sheds & carports garages, sheds & carports thank you for enquiring about Rainbow Building Solutions exceptional range of products. Please take a moment to look through this brochure. If you have any questions please don

More information

You dream it. We build it. ELEVATORS

You dream it. We build it. ELEVATORS You dream it. We build it. ELEVATORS RAM can help you tailor your Crystal Elevator to be a focal point in your home with stunning architectural features or it can be tucked away for seamless and simple

More information

TradePort III. TradePort Court, Pickaway County (Columbus), Ohio FOR LEASE :: INDUSTRIAL SPACE. Building Amenities

TradePort III. TradePort Court, Pickaway County (Columbus), Ohio FOR LEASE :: INDUSTRIAL SPACE. Building Amenities FOR LEASE :: INDUSTRIAL SPACE TradePort III Building Amenities 350,000 Total square feet Office space BTS 48 Dock doors (9 x10 ) 4 Drive-in doors (12 x 14 ) 220 Car parking spaces 52 Trailer parking spaces

More information

The designer shall also submit additional information required by the University as described and underlined below.

The designer shall also submit additional information required by the University as described and underlined below. I. Structural Engineering Submissions The designer shall submit all information required by the State Construction Office (SCO) as described in the State Construction Manual Chapter 300 - Project Design

More information

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application DATE: / / PERMIT # REQUEST FOR: NEW BUILDING ADDITION REMODEL PLUMBING ONLY ELECTRIC ONLY

More information

TradePort II. TradePort Court, Pickaway County (Columbus), Ohio FOR LEASE :: INDUSTRIAL SPACE. Building Amenities

TradePort II. TradePort Court, Pickaway County (Columbus), Ohio FOR LEASE :: INDUSTRIAL SPACE. Building Amenities FOR LEASE :: INDUSTRIAL SPACE TradePort II Building Amenities 500,000 Total square feet Office space BTS 64 Dock doors (9 x10 ) 4 Drive-in doors (12 x 14 ) 240 Car parking spaces 73 Trailer parking spaces

More information

TradePort III. Ashville Pike, Pickaway County (Columbus), Ohio FOR LEASE :: INDUSTRIAL SPACE. Building Amenities

TradePort III. Ashville Pike, Pickaway County (Columbus), Ohio FOR LEASE :: INDUSTRIAL SPACE. Building Amenities FOR LEASE :: INDUSTRIAL SPACE TradePort III Building Amenities 350,000 Total square feet Office space BTS 4-12 x 14 Drive-in doors 220 Car parking spaces 52 Trailer parking spaces 36 Clear ceiling height

More information

HADDOCKSTONES FARM. Price Guide: 895,000 WATERGATE ROAD, MARKINGTON HG3 3LA.

HADDOCKSTONES FARM. Price Guide: 895,000 WATERGATE ROAD, MARKINGTON HG3 3LA. HADDOCKSTONES FARM WATERGATE ROAD, MARKINGTON HG3 3LA A SUPERB DEVELOPMENT OPPORTUNITY. THIS IS AN EXCELLENT AND INCREASINGLY RARE OPPORTUNITY TO ACQUIRE A RANGE OF FORMER AGRICULTURAL BUILDINGS AND STONE

More information

Scotland Hill Farm, Llandygwydd, Cardigan. For Sale by Public Auction

Scotland Hill Farm, Llandygwydd, Cardigan. For Sale by Public Auction Scotland Hill Farm, Llandygwydd, Cardigan For Sale by Public Auction Scotland Hill Farm, Llandygwydd, Cardigan, Ceredigion SA43 2RN For sale by public auction on Saturday 28th September 2013 at 2pm at

More information

Technology s role in shaping warehouse design

Technology s role in shaping warehouse design Technology s role in shaping warehouse design Definition of warehouse What is a warehouse? Warehousing is the storage of goods for profit. A warehouse is a physical storage facility that receives goods

More information

Recommended Qualification Structure for Specialist Installation Occupations (Construction) Level 2

Recommended Qualification Structure for Specialist Installation Occupations (Construction) Level 2 Recommended Qualification Structure for Specialist Installation Occupations (Construction) Level 2 This structure has been recommended by employers and stakeholders from the above occupational area for

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Date Description of Change Pages / Sections Modified ID 6/15/16 Updated format, division title, and removed references to other sections. - mgl44 A. Summary This section contains design criteria for the

More information

Complete Façades. Solutions

Complete Façades. Solutions Complete Façades Solutions 1 Omnis, a leading provider of premium, architecturally inspired exterior solutions. Comprising four divisions Roofing & Cladding, Rainscreen Panels, Rainscreen Framing and Complete

More information

ACERO, SHEFFIELD AT A GLANCE

ACERO, SHEFFIELD AT A GLANCE ACERO, SHEFFIELD AT A GLANCE NEW GRADE A SPACE Air conditioning and extensive glazing for natural light. AVAILABLE NOW Acero reached practical completion in July 2017 and is available for occupation now.

More information

TradePort I TradePort Court, Pickaway County (Columbus), Ohio FOR LEASE :: INDUSTRIAL SPACE 1 MSF DISTRIBUTION CENTER - 4Q 2017 COMPLETION

TradePort I TradePort Court, Pickaway County (Columbus), Ohio FOR LEASE :: INDUSTRIAL SPACE 1 MSF DISTRIBUTION CENTER - 4Q 2017 COMPLETION FOR LEASE :: INDUSTRIAL SPACE 3780 TradePort Court, Pickaway County (Columbus), Ohio 1 MSF DISTRIBUTION CENTER - 4Q 2017 COMPLETION Building Amenities 1,020,255 Total square feet; expandable up to 1,229,443

More information

PROLOGIS PARK RYTON COVENTRY A45 / M45 M6 J2 / M69 M1 J17 BUILD TO SUIT BUILDINGS FROM 100,000 FT 2 UP TO 350,000 FT 2

PROLOGIS PARK RYTON COVENTRY A45 / M45 M6 J2 / M69 M1 J17 BUILD TO SUIT BUILDINGS FROM 100,000 FT 2 UP TO 350,000 FT 2 PROLOGIS PARK RYTON UNITED KINGDOM / M45 M6 J2 / M69 M1 J17 BUILD TO SUIT BUILDINGS FROM 100,000 FT 2 UP TO 350,000 FT 2 UNDER CONSTRUCTION 225,000 FT 2 FULLY AVAILABLE APRIL 2014 DC6 FUTURE PHASE AVAILABLE

More information

Kelley HULK Dock Lifts and Ergonomic Lift Tables

Kelley HULK Dock Lifts and Ergonomic Lift Tables Kelley HULK Dock Lifts and Ergonomic Lift Tables Kelley HULK Lift Products help increase productivity and employee safety with innovative, cost effective solutions to the unique challenges associated with

More information

REINSTATEMENT VALUATION

REINSTATEMENT VALUATION REINSTATEMENT VALUATION Marylebone, London W1U FOR Mr K Prepared by: INDEPENDENT CHARTERED SURVEYORS Marketing by: CONTENTS INTRODUCTION AND INSTRUCTION SYNOPSIS CONSTRUCTION SUMMARY EXECUTIVE SUMMARY

More information

BUILDING PERMIT APPLICATION

BUILDING PERMIT APPLICATION TOWN OF LEICESTER 132 Main Street Post Office Box 197 Leicester, New York 14481 Phone: (585) 382-3231 FAX: (585) 382-9766 BUILDING PERMIT APPLICATION All Town of Leicester property owners are required

More information

AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW.

AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW. AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW www.stromatech.com AIR BARRIER DESIGN PRINCIPLES Building Regulations Approved Document Parts L1A & L2A currently requires that new buildings have to achieve a

More information

Aluminium & PVC Windows Doors Curtain Walling

Aluminium & PVC Windows Doors Curtain Walling Aluminium & PVC Windows Doors Curtain Walling Aluminium & PVC Windows, Doors & Curtain Walling T urkington Windows has been successfully completing commercial window and door contracts for over 35 years

More information

Overview. Introduction to Housing Solutions 2-3. Why Modular Housing 4-5. Standarised Designs Apartments Warranties.

Overview. Introduction to Housing Solutions 2-3. Why Modular Housing 4-5. Standarised Designs Apartments Warranties. Housing Overview Introduction to Housing Solutions Why Modular Housing Standarised Designs Apartments Warranties Flexible Design 2-3 4-5 6-13 14-17 18 19 Click here for more information on Buy Case Studies

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

POST TENSIONED SLABS. Imagineering the possibilities

POST TENSIONED SLABS. Imagineering the possibilities POST TENSIONED SLABS Imagineering the possibilities imagineering... CCL post - tensioned slab solutions represent continuous development through involvement in building structures worldwide. CCL systems

More information

Communications Page 1 of 9

Communications Page 1 of 9 Page 1 of 9 Last Update: April 23 rd, 2014 Introduction Design In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a

More information

Refurbishment of No.36 Fenian Street, Dublin for Trinity College Dublin

Refurbishment of No.36 Fenian Street, Dublin for Trinity College Dublin IRISH CONSTRUCTION INDUSTRY AWARDS 2016 Conservation Project of the Year Refurbishment of No.36 Fenian Street, Dublin for Trinity College Dublin The design, co-ordination and management of the internal

More information

Country House Department. Home House I Cherry Tree Lane I Hemel Hempstead

Country House Department. Home House I Cherry Tree Lane I Hemel Hempstead Country House Department Home House I Cherry Tree Lane I Hemel Hempstead Home House Cherry Tree Lane Hemel Hempstead Hertfordshire, HP2 7HS A spectacular contemporary architect designed family home set

More information

TABLE OF CONTENT. Equipment kit Description of the technology Installation of equipment Start of construction...

TABLE OF CONTENT. Equipment kit Description of the technology Installation of equipment Start of construction... TABLE OF CONTENT Equipment kit.... 6 Description of the technology.... 8 Installation of equipment.... 10 Start of construction.... 14 Erection of walls and partitions.... 17 Second floor printing....

More information

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS 1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014

More information

The right solutions. However, it is inevitable that with the introduction of any new construction system the question arises How does it compare?

The right solutions. However, it is inevitable that with the introduction of any new construction system the question arises How does it compare? Value assessment. The right solutions. We Believe We believe that Porotherm offers both short and long term value to all involved in the building process - from bricklayer to client and everyone in between.

More information

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings Building Safety Department 400-2 nd Street South St. Cloud, MN 56301 (320) 255-7239 A building permit is required for any accessory

More information

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire Additional Instructions and Clarifications 1. Please review ARC 4496 before beginning the project identification

More information

HAMBRO COMPOSITE FLOOR SYSTEM

HAMBRO COMPOSITE FLOOR SYSTEM HAMBRO COMPOSITE FLOOR SYSTEM OUR EXPERTISE AT YOUR SERVICE Canam has been offering owners, real estate developers, architects, engineers and contractors an array of construction solutions since 1970.

More information

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements General Information Site Card. Before starting construction, post the site card (issued by the City) in a front window visible from the street. Miss Dig. Before you dig, call Miss Dig at 800.482.7171 This

More information

RAINHAM SEGRO.COM/PARKRAINHAM NEW INDUSTRIAL / WAREHOUSE DEVELOPMENT AVAILABLE NOW

RAINHAM SEGRO.COM/PARKRAINHAM NEW INDUSTRIAL / WAREHOUSE DEVELOPMENT AVAILABLE NOW NEW INDUSTRIAL / WAREHOUSE DEVELOPMENT AVAILABLE NOW SEGRO.COM/PARK TO LET: NEW UNITS AVAILABLE FROM 17,316 TO 70,8 SQ FT PRE-LETS AVAILABLE ON PHASE UP TO 100,63 SQ FT INTRODUCING SEGRO PARK A HIGH QUALITY

More information

Design Guidelines. 1. INTRODUCTION 2. SECTION SPECIFICATIONS 3. HOUSE DESIGN RULES

Design Guidelines. 1. INTRODUCTION 2. SECTION SPECIFICATIONS 3. HOUSE DESIGN RULES Design Guidelines. 1. INTRODUCTION Waimakariri District Council (WDC) and Ravenswood Developments Ltd (Ravenswood) have in place a number of rules and covenants that effect the development of sections

More information

3600 Army Post Road Des Moines, IA 50321

3600 Army Post Road Des Moines, IA 50321 3600 Army Post Road Des Moines, IA 50321 Located within the Airport Business Park, 3600 Army Post Road offers approximately 80,000 +/- SF of top quality call center office space, 288,677 +/- SF of warehouse

More information