1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE China Wuhan Second Urban Transport Report No.: AB5009 Region EAST ASIA AND PACIFIC Sector General transportation sector (60%); Roads and highways (20%); Sub-national government administration (10%); Other social services (10%) Project ID P Borrower(s) PEOPLE S REPUBLIC OF CHINA Ministry of Finance San Li He Street, Xicheng District China Tel: Fax: Implementing Agency Municipality of Wuhan No. 188, Yan Jiang Avenue Hankou, Wuhan Hubei Province China Tel: (86-27) Fax: (86-27) whcjwzxmb@163.com Environment Category [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Date PID Prepared November 2, Date of Appraisal September 15-18, Authorization Date of Board Approval April 22, 2010 (estimated) 1. Country and Sector Background Wuhan, the capital of Hubei Province, is the eighth largest city in China (with a population of more than 8 million) and a major economic and transportation hub in central China. At the confluence of the middle reaches of the Yangtze and Han rivers, the city consists of the conglomeration of three urban boroughs Wuchang, Hanyang, and Hankou that have grown simultaneously to an urban core population of more than 5 million people. Wuhan, historically known as the thoroughfare of nine provinces, enjoys a key geographic advantage that has attracted manufacturing and service industries, and has given the city its recognition as a political, financial, educational, and transportation center. In 2007, its GDP per capita reached about US$4,500 and is expected to grow at 7 to 9 percent annually in the near future. On December 2007, the City was designated by the State Council as a National Experimental Zone for the implementation of the Comprehensive Supplementary Reform on the Construction

2 of a Resource-Saving/Environmentally Friendly Oriented Society ( Two-Type Society ). In this context, Wuhan seeks to improve mobility in the city s central area and relieve congestion, particularly along corridors crossing the Yangtze River. The City has put forth a strong public transport improvement plan as demonstrated by its investments in bus priority and metro system, of which Line 1 is operational, as well as by its ancillary investments in areas such as traffic management. Urban transport. At present, the City s public transport (PT) system comprises mainly buses (with a fleet of more than 6,500), trolley buses, ferries, and one 10 km elevated rail line 1 which is not yet integrated with other modes but is being extended to better link potential trip origins and destinations. Transport by car has been increasing steadily with the rising personal incomes and so has the number of trips by motorcycle. Trips by bicycle and other NMT have decreased but walking remains popular. There are indications that the growth in car ownership is spurring a continued increase in the number of trips undertaken by car or motorcycles at the expense of other modes. 2 The following table shows the modal split with the estimates for 2008 based on the growth in the number of vehicles. Mode Walking 37% 41% 38% Bicycle 29% 20% 20% Public transport (bus, ferry, metro) 22% 23% 24% Passenger car and motorcycle 12% 16% 18% Source: Wuhan Municipality, Pre-Feasibility Study Report, and World Bank Wuhan Urban Transport Project PAD, Municipal Transport Strategy and Key Sector Issues. Urban transport is largely the responsibility of the municipal government, which is entrusted with planning, financing, and implementing urban transport infrastructure. In 2003, Wuhan Municipality commissioned a study on a Wuhan Transport Strategy, with the objective of establishing a comprehensive transport system characterized by rapid, safe, and convenient movement of people and goods in such a way as to minimize travel and pollution, and to advance coordinated development across the urban region. The strategy was fed into a revision of the Urban Master Plan in 2006 for the period up to The transport strategy identified four key issues that framed the proposed Bank-intervention: (i) congestion on river crossings; (ii) missing links in the primary road network; (iii) congestion in the city center due to limitations in the performance of the road network; (iv) the need to improve performance and mode share of public transport services. 2. Objectives The Project Development Objective (PDO) is to enhance mobility for passenger trips within and to the central area of Wuhan in an environmentally sustainable, integrated, and safe manner. The 1 See Annex 1 on the metro network in Wuhan. 2 Urbanization and motorization would continue to grow but rates of growth might decrease in the context of the current worldwide financial crisis.

3 project will involve (i) priority interventions in public transport (including traffic management), (ii) road safety improvements, (iii) enhanced management of the tunnel and bridges connecting Wuhan s three boroughs, (iv) road improvements, and (v) institutional development. These interventions would be carried out in a coordinated fashion and concentrated along a few key municipal transport corridors in order to increase their impact and serve as demonstration initiatives that can later be implemented in other critical corridors of the city. 3. Rationale for Bank Involvement The World Bank-financed Urban Transport Project in Wuhan, currently in its last year of implementation, was conceived to address a number of the issues listed in the previous section as identified at the time of its appraisal in 2003, with particular attention to: (a) shortcomings in the public transport system with limited network coverage; weak operational on-street management; and shortage of depots and facilities; (b) traffic congestion in an ill-defined hierarchy of roads, which were not well maintained; and (c) declining mobility for pedestrian and cyclists due to encroachments of cars and high rates of accidents with fatalities. The Wuhan Municipal Government have assessed very positively the World Bank s involvement in the ongoing Urban Transport Project and considers that the project has contributed substantially to overall improvement of municipal capacity in urban transport matters and to enhance the general mobility across the network. Although the project is not yet completed, most performance indicators show good progress towards the achievement of project targets, with several targets already met. Building upon the strategies, interventions, and achievement of the ongoing World Bankfinanced (first) Wuhan Urban Transport Project, the Chinese Government and the Wuhan Municipality City have asked the World Bank to continue the support to the financing of a new urban transport project with a focus on further improving traffic conditions in the core urban center (within the 2 nd Ring Road), complemented with sustained assistance in strengthening the institutional capacity in urban transport matters. The proposed new project then would build upon the interventions being carried out under the ongoing project to continue the support to the implementation of the urban development and transport strategies envisioned by the Wuhan Municipality, and would take into account the lessons learned during the implementation of the ongoing project. In this endeavor, the World Bank is ideally placed to continued its assistance to the Wuhan Municipality given its experience in other cities in China and elsewhere in urban transport matters and, particularly, in devising and supervising the implementation of interventions that attempt to shift trips from private to public and non-motorized modes of transport. 4. Description The project is composed of five components. A detailed description can be found in Annex 4 of the PAD. Component 1: Public Transport (PT) Component: PT Priority Corridor Improvements $49.27 million ($21.23 million Bank Financing). The PT Component comprises a range of

4 investments to strengthen PT route rationalization and operations and to give priority to buses on four key corridors, roughly within the 2 nd Ring Road as follows: (i) Jiefang Dadao (in Hankou); (ii) Xinhua Lu/Youyi Lu (in Hankou); (iii) Heping Dadao (in Wuchang); and (iv) Hanyang Dadao/Yingwu Dadao (in Hanyang). In two of the corridors, Jiefang Dadao and Heping Dadao, the public transport improvements are being integrated with road safety improvements (see below). In addition, it is proposed to construct four public transport transfer terminals/interchanges at San Jin Tan, Gangdu Garden, Tian Shun Yuan, and Jinyin Tan to facilitate mode transfer from private to public modes, and Park and Ride (P+R) for NMVs and cars. Component 2: Road Safety (RS) Component $16.05 million ($11.41 million Bank financing). The RS Component consists of (i) an integrated package of good practice road safety interventions in the fields of enforcement, education, and engineering carried out along five key high-risk corridors identified during project preparation through a fatality map; and (ii) major investment in traffic management in the project area (the area within the 2nd Ring Road). Two of the identified corridors are also priority public transport corridors and offer opportunities to integrate public transport improvements with treatments to improve traffic safety. The corridors and area are: (i) Jiefang Dadao (included in the PT Component); (ii) Heping Dadao (included in the PT Component); (iii) Longyang Dadao; (iv) Xudong Dajie/No. 2 Yangtze Bridge; (v) Yanhe Dadao/Yanjiang Dadao; and (vi) specific activities to support overall improvement in safety and mobility in the area within the 2nd Ring Road. The costs of all road safety activities on Jiefang Dadao and Heping Dadao are recorded under the public transport component. Component 3: Road Improvement (RI) Component $ million ($58.27 million Bank financing). This component includes the rehabilitation, upgrading, and construction of three key links of the urban road network of Wuhan, including: (i) Rehabilitation of 6.7 km of an existing section of Jiefang Dadao; (ii) Ground roads along the Shuidong Section of the 2nd Ring Road and the concurrent ground road section under the approach bridge of the Erqi Yangtze River Bridge in Wuchang; and (iii) New construction of the elevated Shuidong Section of the 2 nd Ring Road from Heping Dadao to Zhongbei Lu Extension to close the 3.63 km missing link (under construction) from the Er Qi Yangtze Bridge (under construction) and the east section of the 2nd Ring Road in Wuchang. This last subcomponent is being mostly financed by Wuhan Municipal Government; only 2 3 out of 8 contracts will be partially financed by the Bank. However, the Bank has conducted a review of the technical designs for this component and all Bank social and environmental safeguard policies apply. Component 4. Travel Demand Management (TDM) Component. $5.41 million ($4.35 million Bank financing) This aims to lay the foundations for possible future travel demand management measures in Wuhan by financing equipment for the Wuhan Urban Road and Bridge Monitoring Center (URBMC) and support for their training and capacity building. The component comprises monitoring equipment for the URBMC to support better management of the river crossings and is complemented by institutional development activities (costed under the institutional development component including (i) a technical assistance study on the feasibility 3 (i) Shuidong Section I and along-the route PT stop works ($18.56 m) and (ii) Shuidong Section V-ground and along-the route PT stop works, subsidiary works and surface pavement ($12.47 m).

5 of alternative congestion charging schemes for Wuhan; and (ii) training and capacity building for URBMC. This component lays the groundwork for a future Electronic Tolling Systems (ETC) and possible congestion charging scheme for Wuhan. Component 5: Institutional Development (ID) and Capacity Building Component $4.94 million ($4.49 million Bank Financing). This component includes key selected studies and a comprehensive capacity building plan that would support Wuhan to use the Bank-financed project as a platform for dialog and international experience on comprehensive urban transportrelated issues relevant to the city. It was agreed that based on current priorities, particular foci of this program would include: public transport integration; travel demand management and strategic environmental assessment. 5. Financing Source: ($m.) Borrower International Bank for Reconstruction and Development Total Implementation The project will be implemented by the Wuhan Municipal Government (WMG). Following arrangements similar to those established for the implementation of the ongoing Wuhan Urban Transport Project, the Project Owner, Wuhan Municipal Government Urban Construction Fund Management Office (WUCFM) will retain the current Wuhan Urban Construction Utilization of Foreign Investment Project Management Office or Wuhan Urban Transport Project Office (WUTPO) in short with responsibilities for managing and coordinating the implementation of the project. WUCFM is an entity of the WMG, established in 2008, responsible for raising, managing, and repaying funds for investment projects. This arrangement has precedence with other urban transport projects financed by the World Bank in China and reflects the prevailing legal framework established in many municipalities that attempts to delineate the revenue-raising authority within the legal mandate and responsibility of the municipal governments in the implementation of investment projects. WUTPO will be entrusted with the overall project management and, through its units, with coordinating the implementation of the procurement, contract management, resettlement, social and environmental safeguards, loan disbursement requests, fiduciary compliance, and evaluation, results monitoring, and reporting. As it is under the ongoing Wuhan Urban Transport Project, WUTPO will be the primary coordinating body responsible for communicating with the World Bank, ensuring that implementation is consistent with all relevant World Bank policies and procedures, and ensuring good coordination between the different implementing entities. In order to provide overall leadership, policy guidance, and institutional coordination for project implementation, a Project Leading Group (PLG) Wuhan Urban Construction Utilization of Foreign Investment Project Multi-Agencies Meeting has been established by WMG in The PLG is headed by the Vice-Mayor responsible for urban construction and is composed of

6 leaders and directors of about 24 government line agencies. 4 The PLG will be maintained throughout project implementation with functions and membership satisfactory to the Bank, and will meet on a regular basis (twice a year) and upon request of WUTPO when important issues arise. WUTPO would provide the PLG with the relevant information and support for the PLG to carry out its functions in policy guidance and strategic coordination of the project. Taking into account the characteristics of the components of the project, three sub-project management offices (Sub PMOs) have been established to assist WUTPO in managing the implementation of the public transport, road safety, and road investment components, respectively, as follows: Public Transport Sub-PMO. This Sub-PMO is established under the Wuhan Public Transport Group Company (WPTGC), an entity under the Wuhan Transport Commission, in charge of operating public bus transport in Wuhan. The Public Transport Sub-PMO is the designated sub-implementing agency for all elements of the public transport component except those elements involving urban road development and modification, (such as civil works on bus priority lanes junction channelization, bus bays, and PT interchanges) which will be implemented by WUTPO, and traffic management measures (signs, lines, barriers, traffic signals and E-police enforcement equipment) which will be implemented by the Wuhan Public Security Bureau Traffic Police Detachment (WPSB). Upon completion, the traffic facilities associated with bus priority lanes will be turned over to the WPSB other facilities for improving bus transport such as bus bays and bus stations will be turned over to the WPTGC; and urban roads will be turned over to the Wuhan Urban Management Bureau (WUMB). Road Improvement Sub-PMO. WUTPO itself will be responsible for implementing the road improvement component. Upon its completion, the WUMB will take over the maintenance of the assets. Road Safety & Traffic Management Sub-PMO. The Wuhan Public Security Bureau Traffic Police Detachment (WPSB), has been designated as the Sub PMO to lead the implementation of the road safety component and the road safety and traffic management activities envisaged under the PT component. Upon completion, the WPSB will remain responsible for maintaining all facilities and equipment established under the project. Institutional Arrangements for the Capacity Building and Institutional Strengthening Component. WUTPO will continue to pay a critical role in terms of execution of studies, training efforts and study tours. However, this component will also have strong links with technical content-oriented government agencies and top WMG leadership. WUTPO will serve as the executive agency, responsible for implementing all TA studies. To ensure that the TA 4 Municipal Development and Reform Commission; Municipal Finance Bureau; Municipal Construction Committee; Municipal Transport Commission; Municipal Land Resources and Housing Bureau; Municipal Auditing Bureau; Municipal Planning Bureau; Municipal Environmental Protection Bureau; Municipal Administration Bureau; Municipal Price Bureau; Municipal Water Works Bureau; Municipal Public Security Bureau; Municipal Traffic Police Bureau; People s Government of Jiangan, Jianghan, Qiaokou, Hanyang, Wuchang, Qingshan, Hongshan, Huangpi, Dongxihu, and Caidian Districts; and Wuhan Urban Construction Investment and Development Group Company Ltd.

7 products remain relevant to government priorities and inform government decision-making, the range of relevant government agencies has been identified for involvement. Appropriate specific persons from each participant agency have also been identified. In particular, the lead agency eventually responsible for acting on the results of each TA study has been identified and will be integrated into the study efforts. All relevant agencies, particularly the lead agency will be sought at regular intervals including the finalization of terms-of-reference, inception report, mid-term report and draft-final report for each study. Wuhan Municipality shall enter into an agreement with the (WUCFM) (where the WUTPO is located) for the purposes of managing and coordinating the overall implementation of the project. During project implementation, the line agencies that were responsible for leading the preparation of the project sub-components and have ownership of the design will assist the WUTPO under the WUCFM in preparing the technical parts of the bidding documents (including design drawings), participating in the Bid Evaluation Committees, and signing off on the technical parts of the contracts and the completed works. Definition and supervision of environmental and social safeguards will be carried out by specialized units of the WUTPO. 7. Sustainability Past experience suggests that the Road Investment Component is likely to be constructed to highquality standards and completed on schedule. Long-term sustainability of the road assets will, however, depend on effective and timely maintenance. Maintenance and asset management has been a focus of the Bank engagement under the ongoing Wuhan Urban Transport Project (2 major TAs) under which Wuhan has put in place a Comprehensive Road Maintenance Management System (RMMS) that provides municipal decision makers with a tool for the analysis, planning, programming, and budgeting of maintenance requirements. Competitive bidding for maintenance works contracts has been introduced and Wuhan has acquired advanced road maintenance equipment to improve the efficiency and effectiveness of in-house emergency maintenance works. In all the experience suggests that in the foreseeable future, maintenance is not a significant concern, particularly for major roads such as those being financed by this Project. The corridor approach adopted in this project will offer demonstrations of elements of a sustainable urban transport system through better public transport operations and enhanced safety. Given past Chinese practice vis-à-vis adoption and mainstreaming of successful pilots, there is good reason to expect that successes of the project will be mainstreamed across Wuhan to create a safer and more public transport oriented transport network. In a city like Wuhan, which is in the midst of constructing a significant urban rail system, the key to successful and sustainable public transport in the medium term will be the quality and level of integration operational, institutional, fare, and physical across public transport modes. Currently, though all bus and rail related agencies are ultimately accountable to one entity, the Municipal Government, much remains to be done to achieve successful integration. As such, public transport integration is possibly the key transport challenge the city will need to address in the coming years. The investment components of the proposed project support some of the building blocks of the integration agenda: (i) the current LRT system is being extended along the Bank-financed Jiefang Dadao and the adopted design reflects considerable effort to integrate

8 the two projects during the Bank-financed project preparation period; and (ii) the public transport corridors finance a series of intermodal terminals. Public transport integration is also the centerpiece of the project s capacity building component. The project will support technical assistance studies, as well as study tours focusing on different elements of this agenda. Furthermore, the project will support a series of workshops and seminars to bring together Chinese and international good practice related to public transport integration in the context of Wuhan s actual needs. 8. Lessons Learned from Past Operations in the Country/Sector Though it is premature to draw final conclusions on the results and impacts of the ongoing Wuhan Urban Transport Project, there are several lessons that appear relevant at this stage based on the implementation performance of that project and the experience of other similar type of projects in China. These lessons are listed below and have been appropriately considered in the design of the Wuhan Second Urban Transport Project. Balanced package of investments. Proposals made by municipalities for World Bank urban transport projects have tended to allocate the majority of investments to road construction given the pressing needs in this respect and the view that enhancing road space can reduce traffic congestion. This view however does not take fully into account the need to focus on the movement of people rather than cars. The need for sizeable investments in public transport and in road safety must be stressed. The balance reached between road capacity and other investments in this project reflects that balance. Importance of Management and Operations: Under the ongoing Wuhan Urban Transport Project, the city has successfully managed the construction of key urban infrastructure elements and has progressively started to realize the importance of management and operations, especially for public transport. The proposed second project will help nurture and support a transition for the city towards placing greater emphasis on management and operations issues by supporting: (i) training programs including (but not limited to): (a) public transport integration, (b) public transport service planning, (c) public transport operations management, (d) traffic management, and (e) road safety; and (ii) studies including (but not limited to): (a) optimization of public transport networks and integration across modes; (b) urban transport investment and asset operation; and (c) institutional and management framework for urban-rural integration. Enhancing Bus Priority Schemes. The PT pilot bus priority scheme under the ongoing Wuhan Urban Transport Project, due to its rather limited design, does not appear to be achieving the full benefits of bus priority schemes. For bus priority to be fully effective, there has to be the foundation of good route rationalization and efficient operational practices, seamless integration of corridors and good physical design with attention to detail which should focus on the physical separation of the lanes from general traffic, signal priority at intersections and good bus stop location and design. Under the proposed project, it was decided to focus PT improvements along a selected set of key municipal transport corridors and integrate them closely with the interventions carried out under the Road Safety Component to maximize the benefits.

9 Giving more Visibility to Road Safety: During project preparation, at the concept stage, in line with what is being implemented under several World Bank urban transport projects, it was recommended to create a stand-alone Road Safety Component to ensure that proper attention was given to this major health issue in China. Experience under previous World Bank Projects has shown the importance of focusing such a component along major municipal corridors with a high number of fatalities and designing an integrated package of good practice demonstration initiatives in the fields of enforcement, education, and engineering that could be replicated by the city on other corridors. Focused Institutional Development and Capacity Building Component. The Institutional Development and Capacity Building Component of the ongoing Wuhan Urban Transport Project appears to have encountered delays due to the large number of initiatives. The second project focuses on a smaller number of key items and attempt to achieve greater depth in their elaboration and follow-up. The benefits of participatory planning processes. Chinese and international experience has shown that inclusion of the views of the public in the selection, planning and design of investments improves the quality of the completed infrastructure. Building on successful pilots in recent World Bank projects in Liaoning and Taiyuan, a public consultation process has been carried out in Wuhan and has provided significant guidance on the detailed planning for the project components. 9. Safeguard Policies (including public consultation) Safeguard Policies Triggered by the Project Yes No Environmental Assessment (OP/BP 4.01) [x] [ ] Natural Habitats (OP/BP 4.04) [ ] [ ] Pest Management (OP 4.09) [ ] [x] Physical Cultural Resources (OP/BP 4.11) [ ] [x] Involuntary Resettlement (OP/BP 4.12) [x] [ ] Indigenous Peoples (OP/BP 4.10) [ ] [x] Forests (OP/BP 4.36) [ ] [x] Safety of Dams (OP/BP 4.37) [ ] [x] Projects in Disputed Areas (OP/BP 7.60) * [ ] [x] Projects on International Waterways (OP/BP 7.50) [ ] [x] * By supporting the proposed project, the Bank does not intend to prejudice the final determination of the parties' claims on the disputed areas

10 10. List of Factual Technical Documents No. Name Author Date Chin./ Eng. 1 Map Existing bus routes and bus Wuhan City October Chinese passenger flow volumes at Comprehensive 2008 selected segments Transportation Planning 2 Wuhan City Transport Development Strategy Study 3 Wuhan Urban Transport Project Phase II General Design Scheme & Design Institute Wuhan City Comprehensive Transportation Planning & Design Institute Wuhan Municipal Engineering Design and Research Institute Co Ltd February, March 4, 4 Capacity Building Component WUTPO March 5, 5 Road Network Improvement Planning and Design March 5, Component Design Institution of Wuhan 6 Jiefang Ave. Downward Extension Report 7 Summary Report of Public Participation 8 Wuhan City Transport Model Report 9 Map of 2015 projected traffic volume on road network Municipality Planning and Design Institution of Wuhan Municipality March 5, Wuhan University March 5, Wuhan City March, Comprehensive Transportation Planning & Design Institute Wuhan City Comprehensive Transportation Planning & Design Institute March, Chinese English Both Chin/Eng English English English Chinese Chinese / 10 Feasibility study of the project WMEDRI May English 11 Feasibility Study for Road Safety Component WPSB May English / 12 Spreadsheet data on speeds, traffic flows, bus stops & schools for the RS Corridors China Management Science Research Institute May Chinese 13 Feasibility Study for Public Transport Component Wuhan Transport Science Research Institute 14 Economic Analysis Report Wuhan City Comprehensive Transportation Planning & Design Institute 15 Environment Impact Assessment (EIA) Report China Railway Siyuan Survey & Design Group May English May English / July Both Chin/Eng /

11 No. Name Author Date Chin./ Eng. 16 EMP Road Component China Railway Siyuan June Both Survey & Design Group Chin/Eng 17 EMP Public Transport China Railway Siyuan April Both Component Survey & Design Group Chin/Eng / / / 11. Contact point Contact: Shomik Raj Mehndiratta Title: Senior Transport Specialist Tel: / Fax: smehndiratta@worldbank.org Location: Beijing, China (IBRD) 12. For more information contact: The InfoShop The World Bank 1818 H Street, NW Washington, D.C Telephone: (202) Fax: (202) pic@worldbank.org Web:

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Lahendong II Geothermal

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Peru Second Rural Electrification

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Peru Second Rural Electrification Project Name Region Sector Project ID GEF Focal Area Global Supplemental ID Borrower(s) Implementing Agency PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Peru Second Rural Electrification Latin America

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.:51272 Project Name CBF Sidi

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982. Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982. Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982 Project Name Electric

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6220 Operation Name. P GOVERNMENT OF MOROCCO Kingdom of Morocco Morocco

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6220 Operation Name. P GOVERNMENT OF MOROCCO Kingdom of Morocco Morocco Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6220 Operation Name

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name. Parent Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: September 13, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Mali Project Name: Second Transport Sector Project Estimated

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN])

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN]) Railway Rolling Stock Project (RRP BAN 49094) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN]) Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Bangladesh s transport

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA14823 Project Name

More information

URBAN TRANSPORT FOR DEVELOPMENT

URBAN TRANSPORT FOR DEVELOPMENT URBAN TRANSPORT FOR DEVELOPMENT World Bank s Strategic Framework for Urban Transport Slobodan Mitric at CODATU XII July 2006 The key documents Cities on the Move A World Bank Urban Transport Strategy Review,

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Parent Project

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

Integrated Safeguards Data Sheet (Initial)

Integrated Safeguards Data Sheet (Initial) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Initial) Report No: AC124 Section I - Basic Information

More information

InfoShop. Integrated Safeguards Data Sheet (Initial) Date ISDS Prepared/Updated: 10/21/2002. Section I - Basic Information

InfoShop. Integrated Safeguards Data Sheet (Initial) Date ISDS Prepared/Updated: 10/21/2002. Section I - Basic Information Public Disclosure Authorized THE WORLD BANK GROUP InfoShop Integrated Safeguards Data Sheet (Initial) 25030 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date Prepared/Updated:

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. GZ-Gaza II Emergency Water Project MIDDLE EAST AND NORTH AFRICA PLO FOR THE BENEFIT OF THE PA

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. GZ-Gaza II Emergency Water Project MIDDLE EAST AND NORTH AFRICA PLO FOR THE BENEFIT OF THE PA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE GZ-Gaza II Emergency

More information

VIETNAM GOVERNMENT State Bank of Vietnam

VIETNAM GOVERNMENT State Bank of Vietnam Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5969 VIETNAM:

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 05-Mar-2014

More information

Workshop on enabling Inclusive Cities ADB 29 October PAKISTAN: Karachi Mass-Transit Project (KMTP)

Workshop on enabling Inclusive Cities ADB 29 October PAKISTAN: Karachi Mass-Transit Project (KMTP) Workshop on enabling Inclusive Cities ADB 29 October 2013 PAKISTAN: Karachi Mass-Transit Project (KMTP) Agenda 1. Karachi - Context 2. Rapid Project Description 3. Urban Transport and Inclusiveness: Different

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name EGAT

More information

TCATS October 12-Michigan Works 5:30-7pm. NATS October 19-Niles District Library 6-7:30pm

TCATS October 12-Michigan Works 5:30-7pm. NATS October 19-Niles District Library 6-7:30pm Goal Development Workshop TCATS October 12- Works 5:30-7pm NATS October 19-Niles District Library 6-7:30pm SAFETEA-LU Goals 2035 TwinCATS Goals 2030 TwinCATS Goals 1. Support the economic vitality of the

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5136 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5136 Project Name PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5136 Project Name Luhri Hydro Electric Project Region SOUTH ASIA Sector Power (50%); Renewable energy (50%) Project ID P102843 Borrower(s)

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name CBF Sidi Daoud Wind Farm

More information

Policy on Travel Management in Beijing City

Policy on Travel Management in Beijing City Policy on Travel Management in Beijing City Qi Xiong Senior Engineer Research Institute of Highway Ministry of Transportation, China 1 Urban Sector Review 1.1 Basic General Data Beijing is a political

More information

URBAN TRANSPORT AUDITS. Jorge M. Rebelo

URBAN TRANSPORT AUDITS. Jorge M. Rebelo file:///o /PUBLIC/twu_xweb/transpor/publicat/td-ut2.htm TRANSPORTATION, URBAN AND WATER DEVELOPMENT DEPARTMENT THE WORLD BANK July 1992 Transport No. UT-2 URBAN TRANSPORT AUDITS Jorge M. Rebelo A questionnaire

More information

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014 2040 Transportation Policy Plan Conversion to Performance Based Planning Basis 25 th Annual CTS Transportation Research Conference May 21, 2014 1 About the plan Long-range transportation plan for the Twin

More information

ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5416 Project Name

ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5416 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL

More information

Project Consultancy 4 (PC 4) 1. Background:

Project Consultancy 4 (PC 4) 1. Background: Terms of Reference (ToR) for Selection of Project Consultant for Development of a Manual for the Planning, Design and Implementation of Bus Depots for City Bus Operations 1. Background: Project Consultancy

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: June 10, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Brazil Project Name: Brasilia Environmentally Sustainable Pro

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE CO National Urban Transport

More information

Seminar on Importance of Transport Infrastructure for National Development Chamber of Construction Industry 26th August 2008

Seminar on Importance of Transport Infrastructure for National Development Chamber of Construction Industry 26th August 2008 Amal S. Kumarage kumarage@sltnet.lk Seminar on Importance of Transport Infrastructure for National Development Chamber of Construction Industry 26th August 2008 Constraints for Development Infrastructure

More information

CHINA BUILDING INSTITUTIONS FOR SUSTAINABLE URBAN TRANSPORT

CHINA BUILDING INSTITUTIONS FOR SUSTAINABLE URBAN TRANSPORT CHINA BUILDING INSTITUTIONS FOR SUSTAINABLE URBAN TRANSPORT A World Bank Analytical Advisory Activity Collaboration between World Bank China Academy of Urban Planning and Design Institute of Comprehensive

More information

3. STATION SPACING AND SITING GUIDELINES

3. STATION SPACING AND SITING GUIDELINES 3. STATION SPACING AND SITING GUIDELINES The station spacing and siting guidelines are summarized in Table 3-1. Table 3-1 also includes benchmark information for local transit service and express bus as

More information

DEMOCRACTIC REPUBLIC OF CONGO Implementing Agency Democratic Republic of Congo Congo, Democratic Republic of

DEMOCRACTIC REPUBLIC OF CONGO Implementing Agency Democratic Republic of Congo Congo, Democratic Republic of Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2795 Regional

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) te to Task Teams: The following sections are system generated and can only be edited online in the Portal. Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated:

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of Indonesia Project: Engineering Services (E/S) for Construction of Jakarta Mass Rapid Transit East-West

More information

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Himachal Pradesh Environmentally Sustainable Development DPL Region

Himachal Pradesh Environmentally Sustainable Development DPL Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE May 30, 2011 Report No.: AB6585 (The

More information

GUIDING PRINCIPLES MEMORANDUM

GUIDING PRINCIPLES MEMORANDUM M E T R O P O L I TAN TRA NS P O RTATI O N PLAN GUIDING PRINCIPLES MEMORANDUM El Paso Metropolitan Planning Organization INTRODUCTION The guiding principles for development of the El Paso MPO s Destino

More information

THE REGION S PLAN POLICY FRAMEWORK. August 2015

THE REGION S PLAN POLICY FRAMEWORK. August 2015 THE REGION S PLAN POLICY FRAMEWORK August 2015 2 What is The Policy Framework? Cover photo credit: Sinan Sinharoy for Atlanta BeltLine, Inc. Atlanta is one of the world s most dynamic metropolitan areas,

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

More information

Global Mandates and Regional Overview of Sustainable Urban Transport Policies, Practices & Systems

Global Mandates and Regional Overview of Sustainable Urban Transport Policies, Practices & Systems Expert Group Meeting on Planning and Development of Sustainable Urban Transportation Systems 22-23 Sept. 2016, Kathmandu, Nepal Global Mandates and Regional Overview of Sustainable Urban Transport Policies,

More information

I Fifth Power System Development Project SOUTH ASIA Power (100%) P POWERGRID CORPORATION OF INDIA LIMITED

I Fifth Power System Development Project SOUTH ASIA Power (100%) P POWERGRID CORPORATION OF INDIA LIMITED I Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Date PID Prepared Date of Appraisal Authorization Date of Board Approval PROJECT INFORMATION DOCUMENT (PID)

More information

The Development of a Master Plan for Public Transport: The Riyadh Example

The Development of a Master Plan for Public Transport: The Riyadh Example UITP Workshop Public Transport Organization Authorities Riyadh, Kingdom of Saudi Arabia 28 th 29 th November 2010 The Development of a Master Plan for Public Transport: The Riyadh Example Ulrich Luedtke

More information

International Bank for Reconstruction and Development International Development Association

International Bank for Reconstruction and Development International Development Association International Bank for Reconstruction and Development International Development Association PROGRESS REPORT TO THE BOARD OF EXECUTIVE DIRECTORS ON THE IMPLEMENTATION OF THE MANAGEMENT ACTION PLAN IN RESPONSE

More information

IPSWICH NORTHERN ROUTES STUDY. Stage 1 Progress

IPSWICH NORTHERN ROUTES STUDY. Stage 1 Progress IPSWICH NORTHERN ROUTES STUDY Stage 1 Progress 17 th January 2017 STUDY CONTEXT 2 The study is being funded in partnership with the Suffolk district and borough councils. Work forms part of the Suffolk

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Lending Instrument Project ID Borrower(s) Implementing Agency

More information

MONITORING IMPLEMENTATION AND PERFORMANCE

MONITORING IMPLEMENTATION AND PERFORMANCE 12 MONITORING IMPLEMENTATION AND PERFORMANCE The FAST Act continues the legislation authorized under MAP-21, which created a data-driven, performance-based multimodal program to address the many challenges

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Project Name. 1. Key development issues and rationale for Bank involvement

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: Project Name. 1. Key development issues and rationale for Bank involvement Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: 58946 Project Name Jamaica

More information

Regional Overview of Sustainable Urban Transport Systems in Asia

Regional Overview of Sustainable Urban Transport Systems in Asia Capacity Building Workshop on Sustainable Urban Transport Index 30-31 October 2017, Colombo Regional Overview of Sustainable Urban Transport Systems in Asia Madan B. Regmi, DEng Transport Division UNESCAP,

More information

Project Name Region Sector. Project ID Borrower(s) Implementing Agency. Environment Category Date PID Prepared April 7, 2009 Date of Appraisal

Project Name Region Sector. Project ID Borrower(s) Implementing Agency. Environment Category Date PID Prepared April 7, 2009 Date of Appraisal Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4110 GZ-SOUTHERN WEST BANK SOLID WASTE MANAGEMENT (SWMP) MIDDLE EAST

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3692 Project Name. CM PRG for Kribi Gas to Power Project (FY09) Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3692 Project Name. CM PRG for Kribi Gas to Power Project (FY09) Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3692 Project Name CM PRG for Kribi Gas to Power Project (FY09) Region AFRICA Sector Power (100%) Project ID P110177 Borrower(s) REPUBLIC OF

More information

Improving Public Transport in Chinese Cities: Elements of an Action Plan

Improving Public Transport in Chinese Cities: Elements of an Action Plan CHAPTER 11 Improving Public Transport in Chinese Cities: Elements of an Action Plan Shomik Mehndiratta and Andrew Salzberg Overview Urban public transport can provide more energy efficient transportation

More information

September Public Meetings. Developing a Blueprint for the Corridor

September Public Meetings. Developing a Blueprint for the Corridor September Public Meetings Developing a Blueprint for the Corridor Study Background Study initiated by the Commonwealth Transportation Board (CTB) and administered by VDOT in association with VDRPT. Addresses

More information

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name Balochistan Small Scale Irrigation Project Region SOUTH ASIA

More information

To provide an update on the progress of the Peel Goods Movement Task Force and the Peel Goods Movement Strategic Plan.

To provide an update on the progress of the Peel Goods Movement Task Force and the Peel Goods Movement Strategic Plan. 9.2-1 REPORT Meeting Date: 2015-11-26 Regional Council For Information DATE: November 10, 2015 REPORT TITLE: REGION OF PEEL GOODS MOVEMENT STRATEGIC PLAN - 2015 STATUS UPDATE FROM: Dan Labrecque, Commissioner

More information

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES 3.20.2017 PREPARED FOR: CITY OF JACKSONVILLE 55 Railroad Row White River Junction, VT 05001 802.295.4999

More information

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives. 4 Goals & Objectives INTRODUCTION The 2015-2040 MTP preserves and promotes the quality of life and economic prosperity of the MAB by providing a transportation system consistent with the regional goals.

More information

Terms of Reference for International Consultant

Terms of Reference for International Consultant Ref: BTN/IC/2015-01 Terms of Reference for International Consultant Intelligent Transport Systems (ITS) feasibility study and preparation of a comprehensive ITS Action Plan for Thimphu City I. BACKGROUND

More information

REVIEW OF TEN YEAR PROGRAMME OF WORK ON SUSTAINABLE CONSUMPTION AND PRODUCTION PATTERNS

REVIEW OF TEN YEAR PROGRAMME OF WORK ON SUSTAINABLE CONSUMPTION AND PRODUCTION PATTERNS REVIEW OF TEN YEAR PROGRAMME OF WORK ON SUSTAINABLE CONSUMPTION AND PRODUCTION PATTERNS The Government Ministries and Agencies responsible for Management and Improvement of the Transport System include:

More information

Prague Integrated Transport (PID) Contract Management

Prague Integrated Transport (PID) Contract Management Prague Integrated Transport (PID) Contract Management Characteristics of the metropolitan area (PID area of interest) Prague - area 496 km 2 population 1.25 mil. Prague transport region includes a part

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/24/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

Effective Transportation Demand Management (TDM) in Congested Corridors US 422 TDM Best Practices Policy Brief and Recommendations

Effective Transportation Demand Management (TDM) in Congested Corridors US 422 TDM Best Practices Policy Brief and Recommendations Effective Transportation Demand Management (TDM) in Congested Corridors US 422 TDM Best Practices Policy Brief and Recommendations Pennsylvania Chapter of the American Planning Association Annual Conference

More information

China, PR: Metro in Guangzhou. OECD sector Railway sector / BMZ project ID

China, PR: Metro in Guangzhou. OECD sector Railway sector / BMZ project ID China, PR: Metro in Guangzhou Ex-post evaluation OECD sector Railway sector / 21030 BMZ project ID 1993 65 883 Project-executing agency Consultant Guangzhou Metro Corporation (GMC) Hamburg Consult (HC)

More information

1 RICHMOND HILL CENTRE / LANGSTAFF URBAN GROWTH CENTRE - TRANSPORTATION STUDY

1 RICHMOND HILL CENTRE / LANGSTAFF URBAN GROWTH CENTRE - TRANSPORTATION STUDY Report No. 4 of the Transportation Services Committee Regional Council Meeting of April 22, 2010 1 RICHMOND HILL CENTRE / LANGSTAFF URBAN GROWTH CENTRE - TRANSPORTATION STUDY The Transportation Services

More information

Strategic Vision for Transportation Planning In Egypt & GNSS Application Needs Assessment

Strategic Vision for Transportation Planning In Egypt & GNSS Application Needs Assessment Strategic Vision for Transportation Planning In Egypt & GNSS Application Needs Assessment Dr. Ahmed Mosa Ministry of Transportation Advisor for Transportation Planning Associate Professor of Transportation

More information

Transit Service Guidelines

Transit Service Guidelines G R E AT E R VA N CO U V E R T R A N S P O RTAT I O N A U T H O R I T Y Transit Service Guidelines PUBLIC SUMMARY REPORT JUNE 2004 Greater Vancouver Transportation Authority TRANSIT SERVICE GUIDELINES

More information

Ottawa Transportation Master Plan 2013

Ottawa Transportation Master Plan 2013 Introduction Ottawa s 2013 Transportation Master Plan (TMP) update sets a new standard for sustainable transportation planning in Canada. The plan, unanimously approved by Ottawa City Council, sets forward

More information

TRANSPORT Policies and progress on transport access

TRANSPORT Policies and progress on transport access TRANSPORT Policies and progress on transport access Accession to the European Union and further enlargement of the EU had a significant effect on the Hungarian transport development. Investment resources

More information

TRANSPORT SYSTEM IN URBAN INDIA

TRANSPORT SYSTEM IN URBAN INDIA MULTI MODAL TRANSPORT SYSTEM IN URBAN INDIA Pawan Kumar, Asstt TCP, Town & Country Planning Organization,, MoUD, New Delhi 1 Urban India(2001) Total Urban Population = 286.11 million = 27.78 % of total

More information

Indonesia-Lombok Poverty Alleviation and... Environmental Infrastructure Project

Indonesia-Lombok Poverty Alleviation and... Environmental Infrastructure Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency Regional Dev. &

More information

Project Evaluation Criteria

Project Evaluation Criteria Project Evaluation Criteria Goals and Objectives were developed to guide Envision 35 Long Range Transportation Plan (LRTP) Update. These guiding principles were based on the requirements included in the

More information

Sustainability. Sustainability Principles. 1. Framework. Spokane Transit s definition of Sustainability is:

Sustainability. Sustainability Principles. 1. Framework. Spokane Transit s definition of Sustainability is: Sustainability Spokane Transit s definition of Sustainability is: Sustainability at Spokane Transit is about providing services in ways that optimize our ability to meet the needs of present and future

More information

MULTIMODAL INTEGRATION: CASE EXAMPLE SEOUL

MULTIMODAL INTEGRATION: CASE EXAMPLE SEOUL MULTIMODAL INTEGRATION: CASE EXAMPLE SEOUL (Mike) Gyeng Chul KIM Ph.D., P.E., Prof. Gachon Univ. S Korea (Ex-President, Korea Transport Institute) gckim1004@gmail.com (Take Transit, Enjoy more time of

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB784 Additional Financing for Colombia Integrated Mass Transit Systems.

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB784 Additional Financing for Colombia Integrated Mass Transit Systems. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB784 Additional

More information

I Managing Unit: EASRE

I Managing Unit: EASRE Date ISDS PreparedNpdated: 08/06/07 I. BASIC INFORMATION INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE A. Basic Project Data I Country: Indonesia I Project ID: PI04022 Project Name: Makassar Landfill

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291 Project Name

More information

VICE MINISTER FOR TRANSPORTATION REPUBLIC OF INDONESIA

VICE MINISTER FOR TRANSPORTATION REPUBLIC OF INDONESIA VICE MINISTER FOR TRANSPORTATION REPUBLIC OF INDONESIA Opening Remarks ASEAN IN 2050: THE TRANSPORT SYSTEM AND ITS IMPLICATIONS ON ENERGY, ENVIRONMENT, AND CLIMATE CHANGE BALI, 23 FEBRUARY 2012 Assalamu

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. West Africa Agricultural Productivity Program APL (WAAPP-1B) Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. West Africa Agricultural Productivity Program APL (WAAPP-1B) Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE West Africa Agricultural

More information

Report on National Activities and Projects Regarding ITS Priority Areas

Report on National Activities and Projects Regarding ITS Priority Areas Republic of Cyprus Report on National Activities and Projects Regarding ITS Priority Areas Implementing Co-ordinating Agency: Public Works Department, Ministry of Communications and Works, 165 Strovolos

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 15 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Adopting the 2017 Transportation Sector Climate Action Strategy,

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA22659

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA22659 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Lending Instrument Project ID Borrower(s) Implementing Agency

More information

CDM in Urban Railway Sector and JICA s Cooperation

CDM in Urban Railway Sector and JICA s Cooperation CDM in Urban Railway Sector and JICA s Cooperation February 25, 29 The 4th Regional EST Forum in Asia Seoul, Republic of Korea Tomonori SUDO, Ph.D., Office for Climate Change Japan International Cooperation

More information

Overview on transport data and MRV potential in Asia

Overview on transport data and MRV potential in Asia Overview on transport data and MRV potential in Asia Bert Fabian Clean Air Initiative for Asian Cities Center (CAI-Asia Center) Transport Sector and NAMAs: Assessing Data Readiness for MRV Pasig, Philippines

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name. Indonesia Power Transmission Development Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name. Indonesia Power Transmission Development Project Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name Indonesia Power Transmission Development Project Region EAST ASIA AND PACIFIC Sector Power (100%) Project ID P117323 Borrower(s)

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Lending Instrument Project ID Borrower(s) Implementing Agency

More information

Region of Waterloo Stage 1 Light Rail Transit Project. Definitions, Acronyms, Cited References Article 1 Definitions.

Region of Waterloo Stage 1 Light Rail Transit Project. Definitions, Acronyms, Cited References Article 1 Definitions. Region of Waterloo Stage 1 Light Rail Transit Project Definitions, Acronyms, Cited References Article 1 Definitions Table of Contents 1.0 Definitions... 1-1 ARTICLE 1 DEFINITIONS 1.0. Definitions. In the

More information

Progress Report on National Activities and Projects Regarding ITS Priority Areas

Progress Report on National Activities and Projects Regarding ITS Priority Areas Republic of Cyprus Progress Report on National Activities and Projects Regarding ITS Priority Areas Implementing Co-ordinating Agency: Public Works Department, Ministry of Transport Communications and

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No.: 38582 Date ISDS Prepared/Updated: 16 January 2007 I. BASIC INFORMATION A.

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6559 Project Name. Arab World Initiative for Financing Food Security Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6559 Project Name. Arab World Initiative for Financing Food Security Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6559 Project Name Arab World Initiative for Financing Food Security Region MIDDLE EAST AND NORTH AFRICA Sector General agriculture, fishing

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared/ Updated

More information

FUTURE BUS RAPID TRANSIT PLANS

FUTURE BUS RAPID TRANSIT PLANS ATTACHMENT 1 Preferred Configuration Saskatoon Bus Rapid Transit - Preferred Configuration FUTURE BUS RAPID TRANSIT PLANS Plan For Growth Transportation Plan BRT Plan October 2017 saskatoon.ca/engage 1

More information

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance 3. Project Objectives 4. Project Description

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance 3. Project Objectives 4. Project Description Ex-ante Evaluation 1. Name of the Project Country: India Project: Delhi Mass Rapid Transport System Project Phase 2 (III) (Loan Agreement: March 10, 2008; Loan Amount: 72,100 million yen; Borrower: The

More information

To provide an update on the progress of the Peel Goods Movement Task Force and Peel Goods Movement Strategic Plan.

To provide an update on the progress of the Peel Goods Movement Task Force and Peel Goods Movement Strategic Plan. 8.4-1 REPORT Meeting Date: 2014-06-26 Regional Council For Information DATE: June 17, 2014 REPORT TITLE: PEEL GOODS MOVEMENT STRATEGIC PLAN UPDATE 2014 FROM: Dan Labrecque, Commissioner of Public Works

More information

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012 2030 Transportation Policy Plan SUMMARY PRESENTATION Land Use Advisory Committee November 15, 2012 Today s Topics Transportation Policy Plan (TPP) Requirements and Background Current TPP Policies, Issues

More information

EAST COAST ROAD, TAMIL NADU, INDIA. Case Study (Transportation) Project Summary:

EAST COAST ROAD, TAMIL NADU, INDIA. Case Study (Transportation) Project Summary: EAST COAST ROAD, TAMIL NADU, INDIA Case Study (Transportation) Project Summary: The southern India state of Tamil Nadu has been a leader in the area of urban sector reforms and has established an efficient

More information

Amman Transportation Strategy

Amman Transportation Strategy Amman Transportation Strategy from Planning to Implementation Ayman Smadi Regional Conference on Sustainable Urban Transport Damascus (Syria), April 11-13, 2010 Outline Background and introduction Current

More information