1 Fiber Reinfrced Plymer Upgrades fr Large Pipelines Anna Pridmre, PhD Vice President- Pipeline Slutins Structural Technlgies

2 Agenda Inspectin Methds evlutin Repair Optins analysis Carbn Fiber technical verview Prject verview: 144-inch PCCP Prject verview: 36 & 42-inch steel pipeline Advancements in surface preparatin Overcming peratinal challenges Cnclusins

3 State f the Art Prducts Engineering Supprt Services Specialty Cntracting Slutins that integrate prducts, engineering, and cnstructin

4 Prducts & Systems Strengthening Frce Prtectin Pipe Repair & Upgrade Crrsin Cntrl Misture Cntrl Cncrete Restratin Equipment Fundatins Pst Tensining Engineering Supprt Investigative Cnditin Assessment Engineering Prduct Custmizatin Design Assist Specialty Full Design State f the Art Prducts Engineered Slutins

5 Pre-Stressed Cncrete Cylinder Pipe (PCCP) verview Key pints: Certain types f pre-stressing wires susceptible t failure Installed in ft sectins, ften referred t as spls, which lends well t segmental r targeted repairs Current inspectin technlgy and wner behavir, typically repairing suspect segments

6 Other Pipe types failure mdes verview Other cncrete cracking due t surge pressure damage, crrded reinfrcement steel, age r sil settlement factrs Metallic crrsin f pipeline due t sil chemistry, age r ther factrs causing sectin lss (wall thinning) and can lead t leaks Plymer based cracking due t surge pressure damage, age r sil settlement issues

7 Pipeline Inspectin Methds Electrmagnetics 1. Visual & sunding Determines severely deterirated pipe areas 2. In-line acustics Determines leaks in the pipe 3. Electrmagnetics Determines prestressing wire breaks in PCCP 4. Impact ech Determines cncrete integrity r metallic wall thickness 5. Magnetic flux leakage Determines metallic pipe wall lss Impact Ech 6. Crrelatrs - Determines leaks in the pipe and average pipe wall thickness

8 Repair Optins Analysis What are the alternatives? 1. Dig & replace new pipe 2. Steel slip-lining 3. Prtective catings 4. Structural lining CFRP 5. External pst-tensining

9 Carbn Fiber Technical Overview FRP = Fiber Reinfrced Plymer Carbn Fiber prvides structural strength. Epxy resin prvides durability.

10 Carbn Fiber Technical Overview 36-inches and abve diameter fr buried pipe, n size limitatins fr expsed piping Fluid type - water and waste water Internal pressures - up t 400psi External lads n limit Hst pipe materials - mst any material including PCCP, reinfrced cncrete, steel, cast irn, ductile irn, and plymer based piping systems Temperature limit 130F Schedule need minimum 4 day cnstructin windw

11 Carbn Fiber Technical Overview Durability ICC cmpliance Testing requirements Full-scale testing Resin system Wet lay-up methd Lng-term lab testing Minimum field applicatins

12 Carbn Fiber Technical Overview ICC AC-125 Durability Matrix ENVIRONMENTAL DURABILITY TEST RELEVANT SPECIFICATIONS TEST CONDITIONS TEST DURATION MINIMUM PERCENT RETENTION Hurs 1,000 3,000 Water resistance ASTM D 2247 ASTM E percent, 100 ± 2 F Full-scale testing 1,000, 3,000 and 10,000 hurs Saltwater resistance ASTM D 1141 ASTM C 581 Alkali resistance ASTM C 581 Immersin at 73 ± 2 F Immersin in Ca (CO3) at ph = 9.5 & 73 ± 3 F 1,000, 3,000 and 10,000 hurs 1,000 and 3,000 hurs Dry heat resistance ASTM D ± 5 F 1,000 and 3,000 hurs

13 Carbn Fiber Technical Overview Design Cnsideratins Overview Internal wrking pressure Internal wrking-plus-transient pressure Weight f pipe and fluid Earth lad abve the pipe Live lads at the grund surface Full-scale testing External pressure due t grundwater abve the pipe Negative pressure inside the pipe What is the desired service life?

14 Carbn Fiber Technical Overview End cnnectin detailing Full-scale testing

15 Prject Overview: 36 & 42-inch steel pipeline Nuclear Facility in United States Circulating Water System cnsists f 36 & 42-inch carbn steel pipelines Thinning wall sectins and limited thru-wall leaks were detected during inspectin

16 Prject Overview: 36 & 42-inch steel pipeline Prject Scpe: Carbn fiber reinfrced plymer (CFRP) cmpsite lining f 255 cntinuus lineal feet f 36 & 42-inch carbn steel pipe during 2013 utage Unique Prject Challenges: Extremely pr cnditin f substrate Sequencing peratins activity in small diameter pipeline Crdinatin f weld repairs during peratins Changes in elevatin and slpe cnditins within scpe area

17 Prject Overview: 36 & 42-inch steel pipeline

18 Advances in Surface Preparatin Befre After 36 & 42-inch steel pipeline prject

19 Prject Challenges: 36 & 42-inch steel pipeline Pipe Primer Interir cat Clse-up installatin Prject sequencing during installatin due t limited access within 36-inch pipe Carbn Fiber Installatin Glass Fiber installatin Spnge-Jet Set-up Final CFRP layer & tpcat

20 Backgrund- Quality Cntrl Prgram Multiple QA/QC Persnnel 3 rd Party inspectr Full time Quality Assurance Manager Multiple Owner Representatives Dcumentatin fr each stage f implementatin Material verificatin Surface preparatin Mixing and saturatin CFRP liner installatin End details and special detailing Tp cat Final cure

21 FRP Cmpsite Systems Next Generatin Installatin Overview Reinfrcing Steel

22 FRP Cmpsite Systems Next Generatin StrngPIPE Hybrid FRP System Descriptin StrngPIPE System Legend 1. 1 st Glass FRP Layer (lngitudinal) 2. High Str. Steel Wire 3. Plymer Matrix Existing Pipe nd Glass FRP Layer (lngitudinal) 1 5. Flexible Tpcat

23 Thank yu! Questins? Anna Pridmre, PhD VP- Pipeline Slutins Structural Technlgies, LLC

TECHNIQUES, MATERIALS AND DESIGN CONSIDERATIONS: REHABILITATION & STRENGTHENING OF WATER AND WASTEWATER PIPELINES. Solutions & Case Studies

TECHNIQUES, MATERIALS AND DESIGN CONSIDERATIONS: REHABILITATION & STRENGTHENING OF WATER AND WASTEWATER PIPELINES. Solutions & Case Studies TECHNIQUES, MATERIALS AND DESIGN CONSIDERATIONS: REHABILITATION & STRENGTHENING OF WATER AND WASTEWATER PIPELINES Solutions & Case Studies Mike Larsen Senior Manager Pipeline Solutions 972-210-9511 mlarsen@structuraltec.com

More information

LRFD Bridge Design Manual. Bridge Office MINNESOTA DEPARTMENT OF TRANSPORTATION MANUAL

LRFD Bridge Design Manual. Bridge Office MINNESOTA DEPARTMENT OF TRANSPORTATION MANUAL MANUAL 5-392 MINNESOTA DEPARTMENT OF TRANSPORTATION Bridge Office LRFD Bridge Design Manual MnDOT BRIDGE OFFICE LRFD Bridge Design Manual Minnesta Department f Transprtatin 3485 Hadley Avenue Nrth Mail

More information

CM-10/PT SP1 Screw Pile Specification

CM-10/PT SP1 Screw Pile Specification Piletech Supplementary Prcedure CM-10/PT SP1 CM-10/PT SP1 Screw Pile Specificatin Screw Pile Specificatin 1.0 INTRODUCTION 1.1 PURPOSE/SCOPE This specificatin cvers the prcurement, design, installatin

More information

SOURCE INSPECTION QUALITY MANAGEMENT PLAN

SOURCE INSPECTION QUALITY MANAGEMENT PLAN SOURCE INSPECTION QUALITY MANAGEMENT PLAN Campus Parkway / State Rute 140 Prject BAR REINFORCEMENT APPENDIX I Table f Cntents 1 GENERAL... 3 1.1 Certificatins... 3 1.1.1 Black Bar Reinfrcement... 3 1.1.2

More information

Premium-6 Hexagonal Wire Netting for roofing applications

Premium-6 Hexagonal Wire Netting for roofing applications CONTENTS SUMMARY OF FEATURES... 2 TECHNICAL INFORMATION... 2 Prduct Descriptin... 2 Applicatins... 2 Prduct Infrmatin... 2 Handling & Strage... 4 Technical Data... 4 Installatin infrmatin... 4 Size Range

More information

TECHNICAL DATA INDUSTRIAL WATER CHILLERS AIR COOLED. 1-4 kw Cooling Capacity MADE IN AUSTRALIA HAVCR ENGINEERING SOLUTIONS MAINTAINENCE SERVCIES

TECHNICAL DATA INDUSTRIAL WATER CHILLERS AIR COOLED. 1-4 kw Cooling Capacity MADE IN AUSTRALIA HAVCR ENGINEERING SOLUTIONS MAINTAINENCE SERVCIES TECHNICAL DATA INDUSTRIAL WATER CHILLERS AIR COOLED 1-4 kw Cling Capacity The MIKRO series chillers are a lw capacity unit designed t be installed indrs r utdrs. All THERMEX MIKRO chillers have as standard

More information

Strengthening methods for reinforced concrete sections with Fiber reinforced polymers

Strengthening methods for reinforced concrete sections with Fiber reinforced polymers IOSR Jurnal f Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684,p-ISSN: 2320-334X, Vlume 14, Issue 6 Ver. I (Nv. - Dec. 2017), PP 17-22 www.isrjurnals.rg Strengthening methds fr reinfrced

More information

DECK PERMIT INFORMATION

DECK PERMIT INFORMATION DECK PERMIT INFORMATION REQUIRED INFORMATION: 1) A Plt Plan shwing the prpsed deck with the distances t the side rear and frnt f prperty lines. Als, shw lcatins f existing structures and septic system

More information

MONOPOUR PREFAB SYSTEM

MONOPOUR PREFAB SYSTEM Enter Prject Name Enter Prject Number (Nte t Specifier: This dcument has been prepared fr Fab-Frm Industries Ltd. (Fastft prduct) in accrdance with the Cnstructin Specificatins Institute (CSI) Sectin Frmat.

More information

[Note to Engineer: Choose one below. Confirm with your geotech if you need further compaction.]

[Note to Engineer: Choose one below. Confirm with your geotech if you need further compaction.] 2-06 SUBGRADE PREPARATION (******) 2-06.3 Cnstructin Requirements 2-6.3(1) Subgrade fr Surfacing This sectin is supplemented with the fllwing: The subgrade must be suitable, as determined by the Engineer,

More information

Building Permit Application Accessory Buildings/ Detached Garages

Building Permit Application Accessory Buildings/ Detached Garages Parkland Cunty 53109A Hwy 779 Parkland Cunty, Alberta T7Z 1R1 Phne: (780) 968-8888 Fax: (780) 968-3225 Tll Free: 1-888-880-0858 Email: safetycdest@parklandcunty.cm Building Permit Applicatin Accessry Buildings/

More information

Cleves Pump Station Stabilization, Project ID Date Issued: August 6, 2012

Cleves Pump Station Stabilization, Project ID Date Issued: August 6, 2012 Cleves Pump Statin Stabilizatin, Prject ID 10210020 Date Issued: August 6, 2012 ADDENDUM NO. 2 This addendum will nly be distributed via e-mail, but will remain available fr viewing n the MSDGC website

More information

Examination programs Level 2 Application sector «Land»

Examination programs Level 2 Application sector «Land» Examinatin prgrams Theme 2 Crrsin and materials - Specific envirnments: sils, natural waters, sea water - Crrsivity f grunds, relatins with the resistivity and humidity, general knwledge f standard NF

More information

TECHNICAL DATA SHEET

TECHNICAL DATA SHEET Prduct Cde: HH0106000010 Page 1 f 5 Certificates ETA 16/0600 Certificatin Optin 1 fr anchring f threaded bars in nn-cracked and cracked cncrete, f reinfrcing bars in nn-cracked cncrete ETA 16/0599 Certificatin

More information

KCL-Line Air Cooled Condensers

KCL-Line Air Cooled Condensers PRODUCT DATA & INSTALLATION Bulletin K50-KCL-PDI-1 1089596 Latest prduct updates and further infrmatin at w w w. k e e p r i t e r e f r i g e r a t i n. c m KCL-Line Air Cled Cndensers One t Furteen Fan

More information

PSI Cementitious Patching Guide

PSI Cementitious Patching Guide PSI Cementitius Patching Guide Material Use TuffPatch VOH fr Vertical and Overhead Repairs and TuffPatch DOT fr any Hrizntal r frm and pur applicatins. Use neat materials fr applicatins up t 2 inches thick.

More information

Technical Welding. Course Design EASTERN ARIZONA COLLEGE Industrial Technology Education. Technical Welding

Technical Welding. Course Design EASTERN ARIZONA COLLEGE Industrial Technology Education. Technical Welding Curse Infrmatin Organizatin Divisin Curse Number MSP 210 Title Credits 2 Develped by Lecture/Lab Rati Transfer Status Activity Curse Technical Welding Curse Design 2005-2006 EASTERN ARIZONA COLLEGE Industrial

More information

Version 4.0 LineDesign Engineering 11/1/04

Version 4.0 LineDesign Engineering 11/1/04 Ple Lading Prgram (Transverse, Vertical, Guying & Buckling) User's Guide Versin 4.0 LineDesign Engineering 11/1/04 Cntents Intrductin 3 Descriptin f Tabs 4-7 Ple Data 7 Wire Data 8-9 Inputs, Drives & Flders.....

More information

DESIGN STEPS USING ADAPT FLOOR-PRO 1

DESIGN STEPS USING ADAPT FLOOR-PRO 1 Technical Nte Structural Cncrete Sftware System TN230_PT_design_prcedure_FP_12 053007 DESIGN STEPS USING ADAPT FLOOR-PRO 1 Bijan O Aalami 2 This Technical Nte utlines the steps that yu have t fllw in designing

More information

BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING?

BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING? BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING? Overview Building cnstructin has becme increasingly cmplex during the last tw decades. Buildings are larger and use new materials and cnstructin

More information

Silicon Valley Mid-Summer Emergency: Santa Clara Addresses Peak-Demand Repair of 96-inch Pipeline Mike Larsen Anna Pridmore, PhD, PE

Silicon Valley Mid-Summer Emergency: Santa Clara Addresses Peak-Demand Repair of 96-inch Pipeline Mike Larsen Anna Pridmore, PhD, PE Silicon Valley Mid-Summer Emergency: Santa Clara Addresses Peak-Demand Repair of 96-inch Pipeline Mike Larsen Anna Pridmore, PhD, PE BACKGROUND Santa Clara Valley Water District: Primary Water Source for

More information

The PennEast Pipeline Project. Delaware Township, New Jersey September 29, 2014

The PennEast Pipeline Project. Delaware Township, New Jersey September 29, 2014 The Prject Delaware Twnship, New Jersey September 29, 2014 Abut the Prject AGL Resurces; NJR Pipeline Cmpany; PSEG Pwer; Suth Jersey Industries; and UGI Energy Services (UGIES) cmprise Cmpany, LLC. Apprximately

More information

CERTIFICATE OF APPROVAL No CF 255 ROYDE & TUCKER LIMITED

CERTIFICATE OF APPROVAL No CF 255 ROYDE & TUCKER LIMITED CERTIFICATE OF APPROVAL N CF 255 1 This is t certify that, in accrdance with TS00 General Requirements fr Certificatin f Fire Prtectin Prducts The undermentined prducts f Biltn Rad, Cadwell Lane, Hitchin,

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Strmwater Pllutin Preventin Plan NUMBER: SPECIFIC SUBJECT: APPROVAL: Strmwater

More information

Structural Evaluation of Slab Rehabilitation by Method of Hydrodemolition (HD) and Latex Modified Concrete (LMC) Overlay

Structural Evaluation of Slab Rehabilitation by Method of Hydrodemolition (HD) and Latex Modified Concrete (LMC) Overlay Structural Evaluatin f Sla Rehailitatin y Methd f Hydrdemlitin (HD) and Latex Mdified Cncrete (LMC) Overlay Kent A. Harries, PhD, FACI, P.Eng University f Pittsurgh Matthew McCae Beaudette Cnsulting Engineers,

More information

STRENGTHENING OF REINFORCED CONCRETE BEAMS UNDER TORSION USING CFRP SHEETS

STRENGTHENING OF REINFORCED CONCRETE BEAMS UNDER TORSION USING CFRP SHEETS STRENGTHENING OF REINFORCED CONCRETE BEAMS UNDER TORSION USING CFRP SHEETS El Mstafa Higazy*, Ain Shams University, Egypt Mahmud El-Kateb, Ain Shams University, Egypt 36th Cnference n OUR WORLD IN CONCRETE

More information

STIFPIPE : INTRODUCING A NEW HONEYCOMB-FRP PIPE

STIFPIPE : INTRODUCING A NEW HONEYCOMB-FRP PIPE STIFPIPE : INTRODUCING A NEW HONEYCOMB-FRP PIPE Mo Ehsani, PhD, PE, SE, F.ASCE President, PipeMedic, LLC and Professor Emeritus of Civil Engineering, University of Arizona, 2055 E. 17 th St.,Tucson, AZ

More information

INDUSTRIAL PROCESS WATER CHILLERS R Series I 2 t 9kW AUSTRALIAN DESIGN, DEVELOPMENT AND MANUFACTURE Aqua Cler Pty Ltd 161 Orchard Rd Chester Hill, NSW, 2162 Australia P +612 9721 9305 F +612 9721 9344

More information

EXTENSION OF DESIGN SERVICE LIFE OF KOZLODUY NPP UNITS 5 AND 6

EXTENSION OF DESIGN SERVICE LIFE OF KOZLODUY NPP UNITS 5 AND 6 EXTENSION OF DESIGN SERVICE LIFE OF KOZLODUY NPP UNITS 5 AND 6 September 15, 2014 Grunds fr Design Service Life Extensin Main Pririties in the Energy Strategy f the Republic f Bulgaria by 2020: Prvisin

More information

QuakeWrap, Inc. Pipe Repair October 2012

QuakeWrap, Inc. Pipe Repair October 2012 History Innovative Applications of Carbon FRP in Pipelines Mo Ehsani, Ph.D., P.E., S.E. President, PipeMedic, LLC and Professor Emeritus of Civil Engineering, Univ. of Arizona QuakeWrap, Inc. was founded

More information

Micro-grids and Smart Grid Applications

Micro-grids and Smart Grid Applications Micr-grids and Smart Grid Applicatins Wrking and Future Micrgrid Applicatin MCAGCC 29 Palms Gary Mrrissett UMCS Utilities Energy Management Supervisr gary.mrrissett@usmc.mil 760-830-5128 August 15 2017

More information

Strengthening of Deteriorating Decks of Highway Bridges in Indiana Using FRPC

Strengthening of Deteriorating Decks of Highway Bridges in Indiana Using FRPC Final Reprt FHWA/IN/JTRP-2001/15 Strengthening f Deterirating Decks f Highway Bridges in Indiana Using FRPC by Elisa D. Stelin Assciate Prfessr Schl f Civil Engineering Purdue University Ming-Hung Teng

More information

FACT SHEET Assessing the Feasibility of a Geoexchange System for your Agricultural or Agri-Food Operation

FACT SHEET Assessing the Feasibility of a Geoexchange System for your Agricultural or Agri-Food Operation FACT SHEET Assessing the Feasibility f a Geexchange System fr yur Agricultural r Agri-Fd Operatin Geexchange systems are an increasingly cmmn technlgy used t prvide efficient, renewable heating and cling

More information

The i3c research chair Past, Present and Future. Guy Doré Jean-Pascal Bilodeau

The i3c research chair Past, Present and Future. Guy Doré Jean-Pascal Bilodeau The i3c research chair Past, Present and Future Guy Dré Jean-Pascal Bildeau The NSERC i3c industrial research chair Phase 1-2008-2013 Phase 2-2015-2020 Research activities started in 2008 Cntext - Paramunt

More information

CCAC Municipal Solid Waste Initiative African Regional Municipal Solid Waste Workshop Nice, France November 5-7, 2014 Nice, France

CCAC Municipal Solid Waste Initiative African Regional Municipal Solid Waste Workshop Nice, France November 5-7, 2014 Nice, France ISWA Main Spnsrs: CCAC Municipal Slid Waste Initiative African Reginal Municipal Slid Waste Wrkshp Nice, France Nvember 5-7, 2014 Nice, France Sanitary landfill design and peratins Derek Greedy Where d

More information

STAFF REPORT. Peter Zielsdorf

STAFF REPORT. Peter Zielsdorf STAFF REPORT Applicatin: Cnstruct a new septic drainfield t replace the existing drainfield apprximately 64 feet frm Mink Lake (min. 75 ft required). Applicant: Agenda Item: 4(a) Peter Zielsdrf Backgrund

More information

ENGINEERING EVALUATION

ENGINEERING EVALUATION PRIEST & ASSOCIATES CONSULTING, LLC ENGINEERING EVALUATION Fire Resistance Evaluatin f Nichiha Fiber Cement Cladding in Fire Rated Exterir Wall Assemblies Prject N. 10500 Prepared fr: David Hhenstern NICHIHA

More information

Sovereign Industrial Capability Assessment Framework Update

Sovereign Industrial Capability Assessment Framework Update Svereign Industrial Capability Assessment Framewrk Update Matt Ramage, Assistant Secretary Defence Industry 10 Octber 2017 Svereign Industrial Capability Assessment Framewrk Guidance Defence will evlve

More information

Office for Capital Facilities

Office for Capital Facilities Office fr Capital Facilities Guidance Dcument February 20, 2015 Phtvltaic Slar Prjects A resurce cntaining infrmatin related t the acquisitin f phtvltaic slar panels by state-perated campuses. Phtvltaic

More information

SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION

SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION Incmplete applicatins will nt be prcessed. Accepted applicatins must include the fllwing cmpleted frms: Prvincial Frms: Applicatin t Cnstruct

More information

Oracle Project Portfolio Management Integration Pack for Primavera P6 and Oracle E-Business Suite Release Notes

Oracle Project Portfolio Management Integration Pack for Primavera P6 and Oracle E-Business Suite Release Notes Oracle Prject Prtfli Management Integratin Pack fr Primavera P6 and Oracle E-Business Suite 3.1 - Release Ntes Release 3.1 Part N. E20583-03 January 2012 Oracle Prject Prtfli Management Integratin Pack

More information

GUIDE TO TREND MAPPING

GUIDE TO TREND MAPPING GUIDE TO TREND MAPPING Example Trend Map 1 TREND MAPPING OVERVIEW What is a trend map? A trend map is a visual depictin f relevant trends influencing the system arund a given tpic. It is develped using

More information

DINÉ COLLEGE Request for Proposals (RFP)

DINÉ COLLEGE Request for Proposals (RFP) DINÉ COLLEGE Request fr Prpsals (RFP) PROJECT NAME: Tsaile Security Department Mdular Stucc Prject PROJECT NUMBER: TS1819SDM1 RFP Submitted By: Hereinafter referred t as Cnstructin Cntractr : crpratin,

More information

MLGCA Requirements for the Microsoft Dynamics SL Upgrade. Summary: Vendor Minimum Qualifications: Scope of Work: General:

MLGCA Requirements for the Microsoft Dynamics SL Upgrade. Summary: Vendor Minimum Qualifications: Scope of Work: General: Summary: The Maryland Lttery and Gaming Cntrl Agency (MLGCA) will prcure a vendr t upgrade the Agency s current Micrsft Dynamics SL (Slmn) applicatin t the mst recent versin (SL 2015), as well as implement

More information

INNEGRA TECHNOLOGIES. Corporate Presentation. 2014: Ver. 4

INNEGRA TECHNOLOGIES. Corporate Presentation. 2014: Ver. 4 INNEGRA TECHNOLOGIES Crprate Presentatin 2014: Ver. 4 Our Cmpany Innegra Fiber was develped in Greenville SC 2004-2008 Cmmercial prductin began 2009 Extensive dmestic & internatinal patent prtfli INNEGRA

More information

REMI - Outline performance and technical specifications

REMI - Outline performance and technical specifications REfurbishment as Manufacturing Industry REMI Prject 24 May 2016 REMI - Outline perfrmance and technical specificatins WP2.2 - WP3.1 Deliverable Intrductin The cncept f deep retrfit is nt new. The main

More information

How to mitigate the risk of CUI? ProRox PS 960/970 mandrel wound pipe sections with. WR-Tech

How to mitigate the risk of CUI? ProRox PS 960/970 mandrel wound pipe sections with. WR-Tech Hw t mitigate the risk f CUI? PrRx PS 960/970 mandrel wund pipe sectins with WR-Tech Cntents 1 What is CUI and why is it a prblem? 2 3 4 5 6 Crrsin statistics and imprtance f insulatin Cmmn preventative

More information

TALCEM. Issue Date July 2014

TALCEM. Issue Date July 2014 DESCRIPTION TALCEM is a specially frmulated rapid-setting Grey Cement, requiring the additin f sand and mixing with clean water, fr the preparatin f rapid-setting shrinkage-cmpensated mrtars t be used

More information

The Core Team Process: Making Risk-Informed Decisions for On-site Monitoring at the SRS

The Core Team Process: Making Risk-Informed Decisions for On-site Monitoring at the SRS The Cre Team Prcess: Making Risk-Infrmed Decisins fr On-site Mnitring at the SRS Mary A. Flra Directr, Envirnmental Cmpliance & Area Cmpletin Prjects Savannah River Nuclear Slutins, LLC January 10, 2014

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directrate B Grwth and Innvatin Circular Ecnmy and Industrial Leadership Seville, 6 th April 2018 Level(s) testing phase Guidance and rules

More information

Good Secure Enterprise Suite Quickstart Program Description ( Quickstart Program Description )

Good Secure Enterprise Suite Quickstart Program Description ( Quickstart Program Description ) Gd Secure Enterprise Suite Quickstart Prgram Descriptin ( Quickstart Prgram Descriptin ) This dcument includes all attached Annexes, is prvided fr infrmatinal purpses nly, and des nt in itself cnstitute

More information

Communications White Paper

Communications White Paper Intrductin The quality and effectiveness f the cmmunicatin between the prject and the stakehlder grups is a significant cntributing factr t prject success r failure. Cmmunicatin is abut sending and receiving

More information

Cisco Quickstart Service for DC Network Foundation: Nexus 2k-7k (ASF-C1-DC-NX-F)

Cisco Quickstart Service for DC Network Foundation: Nexus 2k-7k (ASF-C1-DC-NX-F) Page 1 f 1 Service Descriptin: Advanced Services Fixed Price Cisc Quickstart Service fr DC Netwrk Fundatin: Nexus 2k-7k (ASF-C1-DC-NX-F) This dcument describes Advanced Services Fixed Price: Cisc Quickstart

More information

Centennial Management System

Centennial Management System Shrt descriptin The Centennial HSEQ Management and Respnsibility sectin gverns the requirements fr rganizatinal supprt and implementatin f the HSEQ management system and describes the prcess fr auditing

More information

Best Practice Checklist for EPC

Best Practice Checklist for EPC Best Practice Checklist fr EPC / A Definitins, interpretatin Technical aspect & what t lk fr in the EPC cntract 1. Is there a set f definitins f imprtant terms prvided and are thse clear and understd by

More information

Panel Project Solicitation

Panel Project Solicitation Panel Prject Slicitatin April 4, 2016 BUSINESS PROCESSES ELECTRICAL TECHNOLOGIES ENVIRONMENTAL INFORMATION TECHNOLOGIES PLANNING, PRODUCTION PROCESSES & FACILITIES RISK MANAGEMENT SHIP DESIGN & MATERIAL

More information

Centennial Management System

Centennial Management System Identificatin number: 0206500_CP_11_02_en_2.0 Centennial Management System Shrt descriptin The Centennial HSEQ Management and Respnsibility sectin gverns the requirements fr rganizatinal supprt and implementatin

More information

ida Certification Services IEC Functional Safety Assessment Project: Series 20/30 Butterfly Valves Customer: Bray International, Inc.

ida Certification Services IEC Functional Safety Assessment Project: Series 20/30 Butterfly Valves Customer: Bray International, Inc. e ida Certificatin Services IEC 61508 Functinal Safety Assessment Prject: Series 20/30 Butterfly Valves Custmer: Bray Internatinal, Inc. Hustn, Texas USA Cntract Number: Q07/12-19 Reprt N.: BRA 07-12-19

More information

Guidelines for Designing Backflow Prevention Assembly Installations

Guidelines for Designing Backflow Prevention Assembly Installations Guidelines fr Designing Backflw Preventin Assembly Installatins Supplement t the 1981 Crss Cnnectin Cntrl Manual - January 1992 Purpse The purpse f these guidelines is t augment and/r clarify thse guidelines

More information

Permit Application Guide For a Garage, Gazebo, Sauna, Pump House or Shed

Permit Application Guide For a Garage, Gazebo, Sauna, Pump House or Shed Permit Applicatin Guide Fr a Garage, Gazeb, Sauna, Pump Huse r Shed The fllwing pages cntain the permit applicatin, as well as ther frms that may be required fr yur permit applicatin. Apprvals required:

More information

NB SEMIPLATE SN 150 Pure tin plating process

NB SEMIPLATE SN 150 Pure tin plating process NB SEMIPLATE SN 150 Pure tin plating prcess INTRODUCTION NB SEMIPLATE SN 150 is a high-purity electrplating prcess which prduces fine-grained, matte, pure tin depsits. It is especially frmulated fr use

More information

EASTERN ARIZONA COLLEGE Advanced Arc Welding

EASTERN ARIZONA COLLEGE Advanced Arc Welding EASTERN ARIZONA COLLEGE Advanced Arc Welding Curse Design 2010-2011 Curse Infrmatin Divisin Industrial Technlgy Educatin Curse Number WLD 114 Title Advanced Arc Welding Credits 3 Develped by Wendell Cats

More information

Memo. Background. South Rochford Road Type recipient(s) here HDR, Inc. Roadway Options for Protection of Iron Fen Wetlands. Rochford Cemetery Fen

Memo. Background. South Rochford Road Type recipient(s) here HDR, Inc. Roadway Options for Protection of Iron Fen Wetlands. Rochford Cemetery Fen Mem Date: Mnday, January 05, 2015 Prject: T: Frm: Subject: Suth Rchfrd Rad Type recipient(s) here HDR, Inc. Radway Optins fr Prtectin f Irn Fen Wetlands Backgrund Sphagnum angustiflium a U.S. Frest Service

More information

O c t o b e r 1 0 th,

O c t o b e r 1 0 th, Oil and Gas Study Octber 10 th, 2011 Agenda 1. Intrductins 2. Shale gas extractin and resurces in NC 3. Prcess f the DENR il and gas study 4. Public input pprtunities 5. Prpsed utline fr the il and gas

More information

Delivering World Class Support Services

Delivering World Class Support Services The Cmpass Service Framewrk Delivering Wrld Class Supprt Services Our Standard Operating Platfrm The Cmpass Service Framewrk (CSF) is ur Standard Operating platfrm develped t deliver high quality and efficient

More information

Flood Water Barriers Inflow Protection. Flood Protection Barriers Flood Protection Walls. Blobel Environmental Engineering 3

Flood Water Barriers Inflow Protection. Flood Protection Barriers Flood Protection Walls. Blobel Environmental Engineering 3 Fld Water Barriers Inflw Prtectin Fld Prtectin Barriers Fld Prtectin Walls Blbel Envirnmental Engineering 3 Blbel Envirnmental Engineering Blbel Envirnmental Engineering State f the Art Fld Prtectin Systems

More information

Southern Alberta Section IAS-PES Chapter. Introduction to Transmission Line Design Workshop Carl Orde, P.Eng Utilitech Consulting Inc.

Southern Alberta Section IAS-PES Chapter. Introduction to Transmission Line Design Workshop Carl Orde, P.Eng Utilitech Consulting Inc. Suthern Alberta Sectin IAS-PES Chapter Intrductin t Transmissin Line Design Wrkshp Carl Orde, P.Eng Utilitech Cnsulting Inc. The IEEE Suthern Alberta PES/IAS Chapter is pleased t annunce a tw-day, hands-n

More information

PERMIT REQUIREMENTS. City of West Park Permit Application (signed and notarized by the owner and contractor)

PERMIT REQUIREMENTS. City of West Park Permit Application (signed and notarized by the owner and contractor) CITY OF WEST PARK ROOF AND REROOF PERMIT PACKAGE PERMIT REQUIREMENTS City f West Park Permit Applicatin (signed and ntarized by the wner and cntractr) Cntract signed between wner and cntractr *All cntracts

More information

Building Permit Inspections Inspection Stages

Building Permit Inspections Inspection Stages Building Permit Inspectins Inspectin Stages District f Lake Cuntry 10150 Bttm Wd Lake Rad Lake Cuntry, BC V4V 2M1 t: 250-766-6675 f: 250-766-0200 Inspectin Request Line 250-766-6676 lakecuntry.bc.ca Purpse

More information

Chapter 11: Water. A. The Water Cycle Water is a resource because it is circulated in the water cycle.

Chapter 11: Water. A. The Water Cycle Water is a resource because it is circulated in the water cycle. Chapter 11: Water Sectin 1: Water Resurces Objectives 1. Describe the distributin f Earth s water resurces. 2. Explain why fresh water is ne f Earth s limited resurces. 3. Describe the distributin f Earth

More information

City of Vancouver Planning By-law Administration Bulletins

City of Vancouver Planning By-law Administration Bulletins City f Vancuver Planning By-law Administratin Bulletins Planning, Urban Design and Sustainability Department 453 West 12th Avenue, Vancuver, BC V5Y 1V4 tel: 3-1-1, utside Vancuver 604.873.7000 fax: 604.873.7100

More information

AN INNOVATIVE APPROACH TO IMPROVED PIPELINE INTEGRITY MANAGEMENT

AN INNOVATIVE APPROACH TO IMPROVED PIPELINE INTEGRITY MANAGEMENT AN INNOVATIVE APPROACH TO IMPROVED PIPELINE INTEGRITY MANAGEMENT PRESENTERS Presenter Michael Glven, PE Senir Vice President G2 Integrated Slutins Mderatr Christian Carlsn, Marketing Manager G2 Integrated

More information

Resilient and Renewable Microgrids

Resilient and Renewable Microgrids Sessin: Planning Large and Small Scale Micrgrids and Smart Grids Resilient and Renewable Micrgrids Sam Bth Natinal Renewable Energy Labratry August 10th, 2016 Rhde Island Cnventin Center Prvidence, Rhde

More information

Tube Bundle General Configuration

Tube Bundle General Configuration Tube Bundle General Cnfiguratin Length B Inlet Tube Supprt Tubes Outlet Head Rib Gasket Tube Sheet Tank lange Ring Gasket Tank Tank Lining Please Cmplete The llwing Infrmatin: 1 Tube Sheet Data Outside

More information

Project Management Professional

Project Management Professional Prject Management Prfessinal 2 Prgram Overview This 4-day training & hmewrk is structured t prepare and facilitate the participants in line with appearing fr and achieving the PMP Certificatin. It helps

More information

Water Body and Riparian Area Boundary Delineation Course

Water Body and Riparian Area Boundary Delineation Course Water Bdy and Riparian Area Bundary Delineatin Curse This training prvides an eclgical perspective n the delineatin f water bdies, with a specific fcus n riparian habitat adjacent t streams, rivers, lakes,

More information

CONTRACT OPPORTUNITY ANNOUNCEMENT Professional Service Contract Construction Contract Service Contract Material Requirement Other

CONTRACT OPPORTUNITY ANNOUNCEMENT Professional Service Contract Construction Contract Service Contract Material Requirement Other Purchasing Plicy N. 3 Exhibit 1, Page 1 f 2 X CONTRACT OPPORTUNITY ANNOUNCEMENT Prfessinal Service Cntract Cnstructin Cntract Service Cntract Material Requirement Other Cntract Opprtunity Title: Overall

More information

Generation and Transmission Interconnection Facility Construction

Generation and Transmission Interconnection Facility Construction PJM Manual 14C Generatin and Transmissin Intercnnectin Facility Cnstructin Revisin: 05 Effective Date: 04/01/2008 Prepared by Pwer System Crdinatin Department Reliability Integratin Divisin PJM 2008 Revisin

More information

LAB1604 Laboratory Quality Management System (ISO 17025:2005): SOP, Accreditation, Documentation and Auditing

LAB1604 Laboratory Quality Management System (ISO 17025:2005): SOP, Accreditation, Documentation and Auditing LAB1604 Labratry Quality Management System (ISO 17025:2005): SOP, Accreditatin, Dcumentatin and Auditing H.H. Sheikh Sultan Twer (0) Flr Crniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Curse Intrductin:

More information

ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL

ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL PROFESSIONAL SERVICE CONTRACT PIER B SOUTH REHABILITATION RFQ Number: ASPA-TS-2018-02 MARCH 2018 REQUEST FOR QUALIFICATIONS (RFQ) FOR ENGINEER DESIGN &

More information

Unlocking the value of BIM for asset management

Unlocking the value of BIM for asset management Unlcking the value f BIM fr asset management In New Zealand the benefits f using Building Infrmatin Mdelling (BIM) during the design and cnstructin phases f a building s life cycle are increasingly understd.

More information

Facilities Study Report

Facilities Study Report Wellhead Pwer Cltn, LLC Facilities Study Reprt Revised May 15, 2014 Prepared by: Edgar Ramirez Rger Salas, P.E. Distributin Field Engineering Apprved by: Rger Salas Distributin Field Engineering Manager

More information

NB SEMIPLATE CU 100 Copper electroplating process

NB SEMIPLATE CU 100 Copper electroplating process NB SEMIPLATE CU 100 Cpper electrplating prcess INTRODUCTION The NB SEMIPLATE CU 100 prcess is an acid cpper plating frmulatin engineered fr wafer plating applicatins including cpper bump plating, intercnnects

More information

Table of Contents. High Resolution Melt Software [HRM] v3.0.1 Release Notes

Table of Contents. High Resolution Melt Software [HRM] v3.0.1 Release Notes v3.0.1 Release Ntes Table f Cntents 1. OVERVIEW 2. FEATURES in HRM v3.0.1 3. SUSTAINED FEATURES 4. SYSTEM REQUIREMENTS 5. INSTALLATION OF THE THE SOFTWARE HRM V3.0.1 6. SUSTAINED KNOWN ISSUES 7. LEGAL

More information

STRUCTURAL PROBLEMS IN THE DESIGN OF LARGE MASONRY HALLS

STRUCTURAL PROBLEMS IN THE DESIGN OF LARGE MASONRY HALLS 1488 STRUCTURAL PROBLEMS IN THE DESIGN OF LARGE MASONRY HALLS PROF. K.-J. SCHNEIDER Fachhchschule Bielefeld I Abteilung Minden ArtilleriestraBe 9, D-4950 Minden, Germany ABSTRACT lhe paper deals with sme

More information

The moisture susceptibility of a mixture is determined based on the combined effect of material properties as well as mixture properties.

The moisture susceptibility of a mixture is determined based on the combined effect of material properties as well as mixture properties. Asphalt Research Cnsrtium Misture Damage Hypthesis The misture susceptibility f a mixture is determined based n the cmbined effect f material prperties as well as mixture prperties. Material prperties

More information

Building Project Design & Construction Using the ECI Approach. Simon Xiberras Design Manager Strongbuild

Building Project Design & Construction Using the ECI Approach. Simon Xiberras Design Manager Strongbuild Building Prject Design & Cnstructin Using the ECI Apprach Simn Xiberras Design Manager Strngbuild What We Build Hme Building Streamlined Hmes Hme Building Custm Hmes What We Build Cmmunity & Cmmercial

More information

INTEC-High Pressure Steam Generator for closed circuits Series inook

INTEC-High Pressure Steam Generator for closed circuits Series inook INTEC-High Pressure Steam Generatr fr clsed circuits Series inook 1. Functinality The ink is a High Pressure Steam generatr f vertical design especially develped fr clsed circuits. He is installed directly

More information

Summary AB 1739 (Dickinson), SB 1168 (Pavley) and SB 1319 (Pavley)

Summary AB 1739 (Dickinson), SB 1168 (Pavley) and SB 1319 (Pavley) Summary AB 1739 (Dickinsn), SB 1168 (Pavley) and SB 1319 (Pavley) The Sustainable Grundwater Management Act empwers lcal agencies t manage grundwater basins in a sustainable manner ver a lng-term hrizn.

More information

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap Digital Advisry Services Prfessinal Service Descriptin Sftware Defined Netwrking Strategy and Radmap 1. Descriptin f Services. 1.1 Sftware Defined Netwrking Strategy and Radmap. Verizn will prvide Sftware

More information

DOT CONSTRUCTION AUDITS

DOT CONSTRUCTION AUDITS DOT CONSTRUCTION AUDITS Lessns Learned Nvember 2017 RECENT REGULATIONS SUMMARY 49 CFR 192.620(c)(6) AMAOP Cnstructin Requirements Octber 17, 2008 192.801(b) Cnstructin Operatr Qualificatin Prgram 192.328(a)

More information

DESIGN OF THE ADVANCED HIGH KINETIC ENERGY LAUNCH SYSTEM. W. V. Hill Black & Veatch Kansas City, Missouri

DESIGN OF THE ADVANCED HIGH KINETIC ENERGY LAUNCH SYSTEM. W. V. Hill Black & Veatch Kansas City, Missouri DESIGN F THE ADVANCED HIGH KINETIC ENERGY LAUNCH SYSTEM W. V. Hill Black & Veatch Kansas City, Missuri 0> 4/ ABSTRACT This reprt describes the design f a facility t prvide fr de- structive testing f U.S.

More information

Consultant Engineer, Interactive Design Services Pty Ltd

Consultant Engineer, Interactive Design Services Pty Ltd Name: JENKINS Duglas A Date f Birth: 5 April 1951 Citizenship: Australian Qualificatins: B.Sc.(Eng) Hns. University f Lndn, 1972 M.Eng.Sci. University f New Suth Wales, 1989 Affiliatins: Present Psitin:

More information

New Product Approval Process

New Product Approval Process New Prduct Apprval Prcess 1. Scpe T prvide an assessment f the suitability f a new prduct fr prcurement and use by Manitba Infrastructure (MI). Manitba Infrastructure may require updates, resubmissin f

More information

Energy Efficiency and Conservation Working Group Meeting #4. May 24, 2016; 1:00 pm 3:00 pm. Meeting Summary

Energy Efficiency and Conservation Working Group Meeting #4. May 24, 2016; 1:00 pm 3:00 pm. Meeting Summary Energy Efficiency and Cnservatin Wrking Grup Meeting #4 May 24, 2016; 1:00 pm 3:00 pm Meeting Summary I. Meeting Objectives T develp draft bjectives fr recmmendatin t the energy plan leadership team. T

More information

Residential Builder s Guide Revised August 31, 2005

Residential Builder s Guide Revised August 31, 2005 Residential Builder s Guide Revised August 31, 2005 PO Bx 12157, Austin, TX 1-800-803-9202 1-512-463-7353 Email address: industrialized.buildings@license.state.tx.us Web Address: www.license.state.tx.us

More information

Stormwater NPDES Compliance Rule 5. February 23, 2017

Stormwater NPDES Compliance Rule 5. February 23, 2017 Strmwater NPDES Cmpliance Rule 5 February 23, 2017 Presenter Kathy Allen Strmwater Prgram Department f Public Wrks City f Indianaplis Kathy.Allen@indy.gv Agenda Overview EPA Audit New INDOT Requirements

More information

Design Standard Structural Design Guidelines

Design Standard Structural Design Guidelines Versin 1.2015.0921 Design Standard Structural Design Guidelines Purpse The fllwing Structural Design Guidelines establish basic design parameters fr the East Side Unin High Schl District with the gal f

More information

Wave Energy at its best

Wave Energy at its best 2006 Mk1 Full scale pilt unit Wave Energy at its best Sept 2011 Summary Currently at TRL 7 and ready fr pilt scale deplyment at very cmpetitive csts cmpared t all renewable energies 28 patents (granted

More information

SOIL CONSULTANTS, ENGINEERS & GEOLOGISTS. Since P.O. Drawer 698 Charleston, South Carolina / Fax

SOIL CONSULTANTS, ENGINEERS & GEOLOGISTS. Since P.O. Drawer 698 Charleston, South Carolina / Fax SOL COSULTATS, C. EGEERS & GEOLOGSTS Cnstructin Malerlals n Destructive Getechnical Envirnmental Since 95 P.O. Drawer 698 Charlestn, Suth Carlina 29402 843/723-4539 Fax 843723-3648 Palmett Gunite Cnstructin

More information