CITY OF MIAMI ENVIRONMENTAL RESOURCES Tree Permit Process and Checklist

Size: px
Start display at page:

Download "CITY OF MIAMI ENVIRONMENTAL RESOURCES Tree Permit Process and Checklist"

Transcription

1 Page 1 f 6 CITY OF MIAMI ENVIRONMENTAL RESOURCES Tree Permit Prcess and Checklist Submittals: Tree Permit Prcess 1. Cmpleted tree permit applicatins, alng with the required supprting dcumentatin, must be submitted t the City f Miami s Building Department. Depending n the scpe f wrk, sme prjects can be reviewed the same day while thers may need t be drpped ff fr review. Review: Tree Permit Applicatins can be btained in persn at 444 S.W. 2 nd Avenue, 4 th Flr, Miami, FL r n line at a. Checklists (n the fllwing pages) have been designed t list the supprting dcumentatin needed fr cmpliance. The Checklists are t be used fr the fllwing prjects: New cnstructin with the remval, relcatin r rt pruning f trees (A) New cnstructin with n tree remvals, relcatins r rt pruning (B) Stand Alne Tree Permit fr trees being remved, relcated r pruned that s unrelated t cnstructin (C) Tree planting in the City Right-f-Ways (Stand Alne) (D) *A cmbinatin f checklists may be applicable depending n the scpe f wrk *Master Building Plans must include the Tree Permit plans as it will be prcessed as a sub permit. 2. Tree Permit Applicatins are reviewed by the Envirnmental Resurces Divisin either thrugh walkthrugh r drp-ff. 3. Applicatins requiring additinal infrmatin and/r crrectins will be returned t the applicant t crrect and resubmit fr further review. Status f applicatins can be viewed using the City s ibuild system at 4. Once the applicatin is apprved, the Department will issue a ntice f Intended Decisin. This ntice is psted nt the subject prperty r adjacent t fr ten (10) calendar days which prvides all interested parties the pprtunity t review and appeal the Intended Decisin. Issuance f Permit: 5. If n appeals are received within the appeal perid, the applicant is ntified t pick up the applicatin and pay fr the permit. 6. Once payment is made, the permit is issued accrdingly.

2 Page 2 f 6 Final Inspectin: 7. The final inspectin shall be cmpleted n mre than six (6) mnths frm the apprval date f the tree permit. This inspectin shall be apprved prir t requesting a Temprary Certificate f Occupancy (TCO) r Certificate f Occupancy (CO) frm the Building Department. 8. T request the final inspectin, the applicant shall call the number indicated n the permit card r the Envirnmental Resurces Divisin at The inspectin is cnducted within hurs f the requested date. 10. Upn apprval f the final inspectin, the permit is apprved and finalized.

3 Page 3 f 6 Checklist (A) NEW CONSTRUCTION Tw (2) Signed and Sealed sets f the fllwing plans inserted in the Master Building set: Tree/Bundary survey drawn t scale, identifying the tree species, lcatin, and listing the height, spread and diameter f all existing trees including all trees within the right-f-way. This survey shall be prepared by a prfessinal Land Surveyr, licensed in the state and dated n mre than 12 mnths. The Base Building Line, establishing the prperty bundaries, shall be marked n said Bundary Survey by the Building r Public Wrks Department. Dispsitin Plan / Site Plan- drawn t scale, identifying and listing all existing trees and specifying the cnditin f each tree and whether said trees are t remain, t be remved, r t be relcated. The tree dispsitin plan shall superimpse all prpsed new cnstructin. Plan shall include lt dimensins, Center Line, Mnument Line and adjacent street names. Tree Replacement/Landscaping Plan - drawn t scale, illustrating all prpsed new cnstructin, new lcatins f relcated and newly installed trees. Said plan shall include lt dimensins, Center Line, Mnument Line and depict adequate tree spacing between trees, hardscapes and utility lines. If the minimum tree requirements are nt prvided n-site, applicant must meet alternative requirements via ff-site replacement r Tree Trust Fund. Tree Prtectin / Planting / Maintenance Plan identifying all trees t remain n site with the apprved tree prtectin plan and prtectin barrier detail. Said plan shall als include the details n newly installed planting materials and a ne (1) year maintenance guarantee. *All plans shall be prepared by and bear the seal f a registered Landscape Architect currently licensed in the state r by persns authrized by F.S. ch. 481 t prepare landscape plans r drawings. Tree Assessment Reprt (when applicable) - prviding an assessment n all existing trees with the trees specificatins (cnditin, species, size, rt ball etc.) and includes clr phtgraphs in supprt f the assessment. Fr trees and/r palms prpsed fr relcatin, the reprt shall include relcatin specificatins, in accrdance t ANSI A300 Standards. Additinal infrmatin such as the Tree Prtectin Zne (TPZ), Critical Rt Zne (CRZ), tree prtectin and/r pruning recmmendatins, may be required fr trees t remain and/r t be relcated. Said reprt shall be dated n mre than three (3) mnths.

4 Page 4 f 6 CHECKLIST (B) NEW CONSTRUCTION WITH NO TREE IMPACTS (All trees n site will remain and be prtected) New Cnstructin Plans (including Demlitin): Tree/Bundary survey drawn t scale, identifying the tree species, lcatin, and listing the height, spread and diameter f all existing trees including all trees within the right-f-way. This survey shall be prepared by a prfessinal Land Surveyr, licensed in the state and dated n mre than 12 mnths. Dispsitin Plan / Site Plan- drawn t scale, identifying and listing all existing trees and specifying the cnditin f each tree and whether said trees are t remain, t be remved, r t be relcated. The tree dispsitin plan shall superimpse all prpsed new cnstructin. Plan shall include lt dimensins, Center Line, Mnument Line and adjacent street names. Tree Prtectin Plan plan shall identify all trees t remain n site with the apprved tree prtectin plan and prtectin barrier detail.. Tree Assessment Reprt (when applicable) - prviding an assessment n all existing trees with the trees specificatins (cnditin, species, size, rt ball etc.) and includes clr phtgraphs in supprt f the assessment. Fr trees and/r palms prpsed fr relcatin, the reprt shall include relcatin specificatins, in accrdance t ANSI A300 Standards. Additinal infrmatin such as the Tree Prtectin Zne (TPZ), Critical Rt Zne (CRZ), tree prtectin and/r pruning recmmendatins, may be required fr trees t remain and/r t be relcated. Said reprt shall be dated n mre than three (3) mnths.

5 Page 5 f 6 Checklist (C) STAND ALONE (unrelated t cnstructin) Permit Applicatin cmpleted, signed and ntarized by prperty wner r authrized representative. Written Statement - frm prperty wner r authrized representative indicating the reasn(s) fr the wrk Dispsitin Plan Use an existing bundary/prperty survey r Site Plan, drawn t scale t depict: The lcatin f all existing structures, prperty bundaries, adjacent rads and any verhead and/r undergrund utilities. Bundary Surveys must have the Base Building Line marking. The lcatin, species, height and DBH f all existing trees n site. This includes trees within the adjacent rightf-way and which trees are t be relcated, remved r t remain The prpsed lcatin, species, height and DBH f all relcatin and required replacement trees t be planted. A Cvenant will be issued fr trees being remved, relcated, pruned and/r planted in the right-f-way Tree Assessment Reprt (when applicable) - prviding an assessment n all existing trees with the trees specificatins (cnditin, species, size, rt ball etc.) and includes clr phtgraphs in supprt f the assessment. Fr trees and/r palms prpsed fr relcatin, the reprt shall include relcatin specificatins, in accrdance t ANSI A300 Standards. Additinal infrmatin such as the Tree Prtectin Zne (TPZ), Critical Rt Zne (CRZ), tree prtectin and/r pruning recmmendatins, may be required fr trees t remain and/r t be relcated. Said reprt shall be dated n mre than three (3) mnths. Measuring Tree Diameter 1. Measure the circumference (like measuring yur waist) f the tree at 4 ½ feet abve the grund level. 2. Use a calculatr t divide the circumference by This will give yu the diameter at breast height (DBH). DBH = Circumference Fr example, a Live Oak with a 45 in. circumference wuld have a diameter f 14.3 in.

6 Page 6 f 6 Checklist (D) RIGHT-OF-WAY PLANTING (Stand Alne) N Cnstructin Permit Applicatin cmpleted, signed and ntarized by prperty wner r authrized representative. Written Statement - frm prperty wner r authrized representative indicating the reasn(s) fr the wrk Prf f Ownership a cpy f the Warranty Deed; Miami-Dade Tax infrmatin r Crprate Reslutin. Bundary/Prperty Survey identifying the tree species, lcatin, and listing the height, spread and diameter f all existing and prpsed trees within the right-f-way. Plan shall illustrate the lcatin f all existing structures and any verhead and/r undergrund utilities.

IESBA Meeting (March 2013) Agenda Item

IESBA Meeting (March 2013) Agenda Item Agenda Item 7-A Backgrund Lng Assciatin f Senir Persnnel (Including Partner Rtatin) with an Audit Client Matters fr Cnsideratin 1. Paragraph 290.150 f the IESBA Cde f Ethics fr Prfessinal Accuntants (the

More information

TG 19 SOUTH AUSTRALIAN WATER CORPORATION

TG 19 SOUTH AUSTRALIAN WATER CORPORATION TG 19 SOUTH AUSTRALIAN WATER CORPORATION TECHNICAL GUIDELINE Checklist: Water Netwrk Requirements fr Land Develpment Applicatins Issued by: Principal Engineer Water & Wastewater Netwrks Issue Date: SA

More information

*************************************************************************************************************

************************************************************************************************************* * THIS PRINTED VERSION OF THE FORM IS FOR INFORMATION PURPOSES ONLY. * * YOU MUST COMPLETE AND SUBMIT THE FORM ONLINE AT * * GO.NCSU.EDU/SURVEY.REGISTRATION.FORM * NC State Survey Registratin Frm Intrductin

More information

The PennEast Pipeline Project. Delaware Township, New Jersey September 29, 2014

The PennEast Pipeline Project. Delaware Township, New Jersey September 29, 2014 The Prject Delaware Twnship, New Jersey September 29, 2014 Abut the Prject AGL Resurces; NJR Pipeline Cmpany; PSEG Pwer; Suth Jersey Industries; and UGI Energy Services (UGIES) cmprise Cmpany, LLC. Apprximately

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directrate B Grwth and Innvatin Circular Ecnmy and Industrial Leadership Seville, 6 th April 2018 Level(s) testing phase Guidance and rules

More information

B Asset Evaluation

B Asset Evaluation B-25.7.1.2 Asset Evaluatin Prcess Owner Team, Lead: Shawn Hynes (NAVFAC HQ) Nte, this PDF is fr training purpses nly. Nne f the links within this dcument functin. Prcess Step Assciated Prcedure Resurces

More information

Family Support Service Provider Quick Reference Guide to CYBER

Family Support Service Provider Quick Reference Guide to CYBER Welcme Page: Family Supprt Service Prvider Quick Reference Guide t CYBER Links t Mnitr Regularly: Authrizatin Current: Will list all currently pen authrizatins; shuld include nly thse yuth currently receiving

More information

MEVION SOURCING STRATEGY SUPPLIER CODE OF CONDUCT

MEVION SOURCING STRATEGY SUPPLIER CODE OF CONDUCT MEVION SOURCING STRATEGY The MEVION S250, while being the mst cmpact prtn therapy system in the wrld, is still a relatively large and cmplex prduct. As such, ur supply chain utilizes a high-mix, lw vlume

More information

Disciplinary Procedure

Disciplinary Procedure Disciplinary Prcedure Applicatin Overview Definitins Prcedure Crss references Further assistance APPLICATION This prcedure nly applies t academic, prfessinal, security, grunds and dcument services staff

More information

DEPARTMENT OF WATERSHED MANAGEMENT SITE DEVELOPMENT PLAN REVIEW

DEPARTMENT OF WATERSHED MANAGEMENT SITE DEVELOPMENT PLAN REVIEW DEPARTMENT OF WATERSHED MANAGEMENT SITE DEVELOPMENT PLAN REVIEW SUBMITTAL REQUIREMENTS ONE & TWO FAMILY RESIDENTIAL I. General 1. Cmplete plans- All plans submitted fr permit review must be cmplete and

More information

BUTLERiCONNECT Co-Marketing Program for Butler Builders Funds Use & Program Guidelines

BUTLERiCONNECT Co-Marketing Program for Butler Builders Funds Use & Program Guidelines BUTLERiCONNECT C-Marketing Prgram fr Butler Builders Funds Use & Prgram Guidelines Cngratulatins! As a Butler Builder, yu are eligible t participate in the BUTLERiCONNECT Marketing Prgram ( Prgram ). The

More information

GM In-Dealership Digital Network (IDDN)

GM In-Dealership Digital Network (IDDN) GM In-Dealership Digital Netwrk (IDDN) Dealer Pre-installatin & Installatin Day Requirements and Checklist Cntents Installatin Overview... 1-3 Crdinatin... 1 Day f Installatin... 2 Equipment, Safety, and

More information

CHAPTER ELEVEN LIQUID AND EMULSIFIED ASPHALT ITEMS

CHAPTER ELEVEN LIQUID AND EMULSIFIED ASPHALT ITEMS CHAPTER ELEVEN LIQUID AND EMULSIFIED ASPHALT ITEMS 11 LIQUID AND EMULSIFIED ASPHALT ITEMS 1 1 OVERV IEW All Liquid and emulsified asphalt items have a unit f measure (UOM) f tns r square yards. All liquid

More information

Procurement Gateway & I Want Doc User Guide https://gateway.procurement.cornell.edu/

Procurement Gateway & I Want Doc User Guide https://gateway.procurement.cornell.edu/ Prcurement Gateway & I Want Dc User Guide https://gateway.prcurement.crnell.edu/ Prcurement Gateway Once yu lg int the Prcurement Gateway, the system will identify wh yu are and yur primary FTC/BSC yu

More information

Certificate in Construction Project Management

Certificate in Construction Project Management Certificate in Cnstructin Prject Management Duratin: 6 Mnths Distance Learning Prgramme Language: English RICS Member: 895.00 + VAT Nn RICS Member 1075.00 + VAT Curse Summary This prgramme explres the

More information

[Note to Engineer: Choose one below. Confirm with your geotech if you need further compaction.]

[Note to Engineer: Choose one below. Confirm with your geotech if you need further compaction.] 2-06 SUBGRADE PREPARATION (******) 2-06.3 Cnstructin Requirements 2-6.3(1) Subgrade fr Surfacing This sectin is supplemented with the fllwing: The subgrade must be suitable, as determined by the Engineer,

More information

TAG Training Provider Program

TAG Training Provider Program Thank yu fr yur interest in becming a TAG Training Prvider. The prcess t becme part f this prgram is the fllwing: 1. Cmplete and submit this applicatin t Amanda Shk ashk@tagnline.rg 2. Upn invice r receipt

More information

SA Happy Island Water World

SA Happy Island Water World SA Happy Island Water Wrld Rad K6 Cnstructin Backgrund Infrmatin Dcument INTEGRATED ENVIRONMENTAL AUTHORISATION FOR THE PROPOSED DEVELOPMENT OF A WATERPARK, RIETFONTEIN, MOGALE CITY Purpse f Dcument The

More information

BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING?

BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING? BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING? Overview Building cnstructin has becme increasingly cmplex during the last tw decades. Buildings are larger and use new materials and cnstructin

More information

Epicor Commerce Connect (ECC) Services Specification

Epicor Commerce Connect (ECC) Services Specification Epicr Cmmerce Cnnect (ECC) Services Specificatin This Epicr Cmmerce Cnnect Services Specificatin ( Specificatin ) utlines the services and services levels assciated with Epicr s delivery f its Epicr Cmmerce

More information

STAFF REPORT. Application: Applicant: Agenda Item: 4(a) Background Information:

STAFF REPORT. Application: Applicant: Agenda Item: 4(a) Background Information: STAFF REPORT Applicatin: Applicant: Agenda Item: 4(a) Backgrund Infrmatin: Interim Use Permit request t cntinue peratin f an existing cabinet shp business in the Urban Residential district. Jeremy and

More information

MONOPOUR PREFAB SYSTEM

MONOPOUR PREFAB SYSTEM Enter Prject Name Enter Prject Number (Nte t Specifier: This dcument has been prepared fr Fab-Frm Industries Ltd. (Fastft prduct) in accrdance with the Cnstructin Specificatins Institute (CSI) Sectin Frmat.

More information

CDM Plan Submission and Review Criteria Rules

CDM Plan Submission and Review Criteria Rules Cnservatin First Framewrk LDC Tl Kit Final v4.0 January 17, 2018 CDM Plan Submissin and Review Rules 1) Purpse and definitins 1.1 These Rules set ut: a) the rles, respnsibilities and timing fr CDM Plan

More information

Regulations Amending the Food and Drug Regulations (1475 Good Manufacturing Practices)

Regulations Amending the Food and Drug Regulations (1475 Good Manufacturing Practices) Canada Gazette: Vl. 147, N. 10 May 8, 2013 Registratin SOR/2013-74 April 26, 2013 FOOD AND DRUGS ACT Regulatins Amending the Fd and Drug Regulatins (1475 Gd Manufacturing Practices) P.C. 2013-420 April

More information

NJDEP PROPOSES TO CHANGE FLOOD HAZARD AREA CONTROL ACT RULES

NJDEP PROPOSES TO CHANGE FLOOD HAZARD AREA CONTROL ACT RULES NJDEP PROPOSES TO CHANGE FLOOD HAZARD AREA CONTROL ACT RULES NJDEP has prpsed far-reaching regulatins which culd effect stream encrachment wetlands and buffers alng streams and tidal areas. Key highlights

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Strmwater Pllutin Preventin Plan NUMBER: SPECIFIC SUBJECT: APPROVAL: Strmwater

More information

A method of securing cellular services information is being implemented under the

A method of securing cellular services information is being implemented under the Cellular Telephne Service Descriptin The Cellular Telephne service plan prvides cellular telephne service and equipment frm a number f cellular telephne service prviders. The plan is intended t cver the

More information

Service Description: Advanced Services Fixed Price: Cisco UCCE Branch and Mobile Advise and Implement Services (ASF-CX-G-REBMPB-CE)

Service Description: Advanced Services Fixed Price: Cisco UCCE Branch and Mobile Advise and Implement Services (ASF-CX-G-REBMPB-CE) Page 1 f 1 Service Descriptin: Advanced Services Fixed Price: Cisc UCCE Branch and Mbile Advise and Implement Services (ASF-CX-G-REBMPB-CE) This dcument describes Advanced Services Fixed Price: Cisc UCCE

More information

New Balance Stores New Balance Development Fund *(NBDF) Program & Policy. *(NBDF replaced Coop in 2011)

New Balance Stores New Balance Development Fund *(NBDF) Program & Policy. *(NBDF replaced Coop in 2011) New Balance Stres 2012 New Balance Develpment Fund *(NBDF) Prgram & Plicy *(NBDF replaced Cp in 2011) NBDF Objectives The NBDF is designed fr New Balance Sales Representatives t cllabratively plan and

More information

ELIGIBILITY ENTRY REQUIREMENTS AWARD CATEGORIES

ELIGIBILITY ENTRY REQUIREMENTS AWARD CATEGORIES presents Please review requirements and instructins befre submitting. Multiple prjects may be entered hwever every prject requires a separate entry. Entry fees are nnrefundable and apply t each individual

More information

Safety and Security Checks for Tank Container HSE CoP 613. Safety and Security Checks for Tank Container. HSE Code of Practice 613

Safety and Security Checks for Tank Container HSE CoP 613. Safety and Security Checks for Tank Container. HSE Code of Practice 613 Safety and Security Checks fr Tank Cntainer HSE Cde f Practice 613 Table f Cntents 1. Purpse... 3 2. Definitins... 3 3. Scpe... 3 4. Mandatry principles r standards... 3 4.1 Legal... 4 4.2 Prcess requirements...

More information

The E-Recruitment Process - Guide for Line Managers

The E-Recruitment Process - Guide for Line Managers The E-Recruitment Prcess - Guide fr Line Managers This dcument is fr Line Managers. The use f the term Line Manager is purely a descriptive term fr the level f access t the E-Recruitment system and it

More information

Send My Ad Publications User s Guide

Send My Ad Publications User s Guide Send My Ad Publicatins User s Guide Welcme t the ASHRAE Magazine Print Ad Prtal ASHRAE s print magazine Advertising Prtal allws clients t submit ad materials quickly and easily. Yu can uplad yur advertising

More information

Executive Summary European Union s General Data Protection Regulation (EU GDPR) January 2018

Executive Summary European Union s General Data Protection Regulation (EU GDPR) January 2018 Executive Summary Eurpean Unin s General Data Prtectin Regulatin (EU GDPR) January 2018 Legal Disclaimer The infrmatin in this presentatin is cnfidential and prprietary t SAP and may nt be disclsed withut

More information

Project Status Report

Project Status Report Prject Status Reprt Fr perid: March 2007 Defining and Delivering a Service Level Agreement Submitted by: Ann Berry-Kline Distributin: ITSMG Status Item Current Status Prir Status Status Ntes: Overall Prject

More information

OWNER S MANUAL. MODEL FE (ALL) Serial number

OWNER S MANUAL. MODEL FE (ALL) Serial number VESTIL MANUFACTURING CORP. 2999 N. Wayne St., Angla, IN 46703 Ph: 260-665-7586 Fax: 260-665-1339 E-mail: sales@vestil.cm www.vestil.cm Rutine Maintenance & Safety Checks 2 Operatin Instructins... 2 10/05

More information

Proposed EASR Regulation Standard Systems and Equipment. AWMA Breakfast Sessions Fall 2013

Proposed EASR Regulation Standard Systems and Equipment. AWMA Breakfast Sessions Fall 2013 Prpsed EASR Regulatin Standard Systems and Equipment AWMA Breakfast Sessins Fall 2013 What This Presentatin Will Cver New prpsed activities t be added t the EASR Prpsed exemptins t be added t O. Reg. 524/98

More information

City of Vancouver Land Use and Development Policies and Guidelines

City of Vancouver Land Use and Development Policies and Guidelines City f Vancuver Land Use and Develpment Plicies and Guidelines Planning, Urban Design and Sustainability Department 453 West 12th Avenue, Vancuver, BC V5Y 1V4 tel: 3-1-1, utside Vancuver 604.873.7000 fax:

More information

Re: PSC Storm Hardening Report for the City of Tallahassee Electric Utility pursuant to Rule , F.A.C for Calendar Year 2015

Re: PSC Storm Hardening Report for the City of Tallahassee Electric Utility pursuant to Rule , F.A.C for Calendar Year 2015 March 1, 2016 Ms. Penelpe Buys Flrida Public Service Cmmissin Re: PSC Strm Hardening Reprt fr the City f Tallahassee Electric Utility pursuant t Rule 25-6.0343, F.A.C fr Calendar Year 2015 Dear Ms. Buys:

More information

Report on Inspection of Grant Thornton LLP (Headquartered in Chicago, Illinois) Public Company Accounting Oversight Board

Report on Inspection of Grant Thornton LLP (Headquartered in Chicago, Illinois) Public Company Accounting Oversight Board 1666 K Street, N.W. Washingtn, DC 20006 Telephne: (202) 207-9100 Facsimile: (202) 862-8433 www.pcabus.rg Reprt n 2013 (Headquartered in Chicag, Illinis) Issued by the Public Cmpany Accunting Oversight

More information

DIRECTV POLICY Corrective Action Home Services Workforce Management

DIRECTV POLICY Corrective Action Home Services Workforce Management DIRECTV POLICY Wrkfrce Management DIRECTV Cmpany Plicy July 2015 Scpe... 3 Definitins... 3 Respnsibilities... 4 Emplyees... 4 Supervisrs... 4 Human Resurces... 4 Crrective Actin Categries... 4 Crrective

More information

REQUEST FOR PROPOSALS LAUNDRY VENDOR

REQUEST FOR PROPOSALS LAUNDRY VENDOR REQUEST FOR PROPOSALS LAUNDRY VENDOR 1 TABLE OF CONTENTS TABLE OF CONTENTS.2 REQUEST FOR PROPOSAL LAUNDRY SERVICE PROVIDER.....3 INTRODUCTION.3 A. OVERVIEW...3 B. TIME OF COMPLETION. 3 C. TERM OF CONTRACT.4

More information

Request for Quotes PennDOT Leadership Academy for Managers (PLAM) Solicitation Number:

Request for Quotes PennDOT Leadership Academy for Managers (PLAM) Solicitation Number: www.dt.state.pa.us Request fr Qutes PennDOT Leadership Academy fr Managers (PLAM) Slicitatin Number: 6100041372 Curse Title: Curse Date(s) & Lcatins: PennDOT Leadership Academy fr Managers (PLAM) This

More information

Managing Exceptions in Time & Labor A Guide for Approvers and Department Processors

Managing Exceptions in Time & Labor A Guide for Approvers and Department Processors Instructin Guide Managing Exceptins in Time & Labr A Guide fr Apprvers and Department Prcessrs Exceptins are prblems which prevent time and labr frm prcessing crrectly. It is imprtant that yu view exceptins

More information

Kupu Sustainability Initiatives Hawai i Energy Fellow Position Description

Kupu Sustainability Initiatives Hawai i Energy Fellow Position Description Kupu Sustainability Initiatives Hawai i Energy Fellw Psitin Descriptin Kupu, in cllabratin with Hawai i Energy, is seeking t hire ne (1) Sustainability Initiatives Fellw wh is a current higher educatin

More information

Single Family Residential Development Guide City of McCall and McCall Impact Area

Single Family Residential Development Guide City of McCall and McCall Impact Area Single Family Residential Develpment Guide City f McCall and McCall Impact Area TABLE OF CONTENTS Intrductin... 2 What is the zning f my prperty?... 2 Des my prject need planning apprval?... 2 What are

More information

Sage 300 ERP Payroll Sage HRMS Link Integration Guide. April 2014

Sage 300 ERP Payroll Sage HRMS Link Integration Guide. April 2014 Sage 300 ERP Payrll Sage HRMS Link Integratin Guide April 2014 This is a publicatin f Sage Sftware, Inc. Dcument versin: April 16, 2014 Cpyright 2014. Sage Sftware, Inc. All rights reserved. Sage, the

More information

Re: Correction of Road Permit located at Seg. 1 from d-7-b, 93-M-12 to b-7-b, 93- M-12 Seg. 2 from b-17-b, 93-M-12 to c-7-b, 93-M-12

Re: Correction of Road Permit located at Seg. 1 from d-7-b, 93-M-12 to b-7-b, 93- M-12 Seg. 2 from b-17-b, 93-M-12 to c-7-b, 93-M-12 Cmmissin File: 9641880 February 26, 2016 Prince Rupert Gas Transmissin Ltd. 450-1 st Street SW Calgary, Alberta T2P 5H1 Attentin: Prince Rupert Gas Transmissin Ltd. Re: Crrectin f Rad Permit lcated at

More information

Nanogate Jay Systems

Nanogate Jay Systems Nangate Jay Systems Revisin: H Page 1 1.0 Purpse The purpse f this prcedure is t prvide fr a system and instructins t give each supplier the necessary tls t prvide prduct and services that meet the expectatins

More information

Web Financial Office How to Setup a New HR User and Security Specialized Data Systems, Inc Revised Last:

Web Financial Office How to Setup a New HR User and Security Specialized Data Systems, Inc Revised Last: Specialized Data Systems, Inc. Web Financial Office Specialized Data Systems, Inc. 2017 Revised Last: 2.22.2017 Table f Cntents... 3 Adding & Setting Up a New Emplyee...3 Input New Emplyee Basic Demgraphics...

More information

BROKER SELECTION AND ASSESSMENT POLICY

BROKER SELECTION AND ASSESSMENT POLICY BROKER SELECTION AND ASSESSMENT POLICY Date created: 1 Nvember 2007 Last updated: 19 Nvember 2012 Departments affected: Management departments, senir management, CICD Subject: Definitin f brker selectin

More information

Chapter 7 Construction BMPs

Chapter 7 Construction BMPs Cnstructin BMPs Cntents 1.0 Intrductin... 1 2.0 Fundamental Ersin and Sediment Cntrl Principles... 2 2.1 Ersin... 2 2.2 Sedimentatin... 3 2.3 Effective Ersin and Sediment Cntrl... 3 3.0 Lcal and State

More information

Isetan Personal Data Protection Policy (PDPP)

Isetan Personal Data Protection Policy (PDPP) Isetan Persnal Data Prtectin Plicy (PDPP) ISETAN OF JAPAN SDN BHD (IOJ) and ICJ DEPARTMENT STORE (M) SDN BHD (ICJ) are cmmitted t ensure that Custmer s privacy is prtected in accrdance t the Persnal Data

More information

JOB TITLE: Business and Systems Analyst

JOB TITLE: Business and Systems Analyst JOB TITLE: Business and Systems Analyst 1. PURPOSE OF POSITION This psitin has a strng service delivery fcus and is respnsible fr functinal supprt and nging imprvement f the applicatins and systems envirnment.

More information

Lighting. Itemized Invoice for electrical/lighting equipment

Lighting. Itemized Invoice for electrical/lighting equipment NEW CONSTRUCTION OR MAJOR RENOVATION LIGHTING REQUIREMENTS General Requirements T qualify fr new cnstructin lighting rebates, prjects must have an installed Lighting Pwer Density (LPD) that is at least

More information

STANDARDS AND POLICIES MANUAL VOLUME I (LAND DEVELOPMENT)

STANDARDS AND POLICIES MANUAL VOLUME I (LAND DEVELOPMENT) STANDARDS AND POLICIES MANUAL VOLUME I (LAND DEVELOPMENT) Prepared By Land Develpment Engineering & Surveying Divisin Dean P. Larsn, Manager/Cunty Surveyr Fr ENVIRONMENTAL MANAGEMENT/ GENERAL SERVICES

More information

Water Body and Riparian Area Boundary Delineation Course

Water Body and Riparian Area Boundary Delineation Course Water Bdy and Riparian Area Bundary Delineatin Curse This training prvides an eclgical perspective n the delineatin f water bdies, with a specific fcus n riparian habitat adjacent t streams, rivers, lakes,

More information

Yale Shared Services. Benefits of Creating a Purchase Order: Procure to Pay Tool Kit

Yale Shared Services. Benefits of Creating a Purchase Order: Procure to Pay Tool Kit Prcure t Pay Tl Kit Benefits f Creating a Purchase Order: Priritized cntract pricing Upfrnt charging validatin Cmmitment is made Details f gds and services prvided Terms and Cnditins are met Wrkflw f payment

More information

To download the documentation mentioned above, log into your Ariba SN account and navigate to Help link from the top of the page.

To download the documentation mentioned above, log into your Ariba SN account and navigate to Help link from the top of the page. Intrductin This dcument cntains Cummins specificatins and requirements fr supplier invice file transactins. The infrmatin in this dcument is specific t Cummins internal requirements, nt necessarily the

More information

Purpose. Contaminated Materials. Contaminated Materials Management Team (CMMT) Contacts

Purpose. Contaminated Materials. Contaminated Materials Management Team (CMMT) Contacts Cntaminated Materials Cntaminated Materials Management Team (CMMT) Cntacts Michelle Waters Districts 2, 4, Metr West (651) 366-3627 michelle.waters@state.mn.us Carlyn Bben - Districts 1, 3, Metr Nrth &

More information

SECTION I: RBC ROYAL BANK ONLINE APPLICATION TERMS AND CONDITIONS

SECTION I: RBC ROYAL BANK ONLINE APPLICATION TERMS AND CONDITIONS SECTION I: RBC ROYAL BANK ONLINE APPLICATION TERMS AND CONDITIONS Please review the fllwing RBC Ryal Bank Online Applicatin Terms and Cnditins (the "Terms and Cnditins"). Yu must read them, check the tick

More information

Guidelines for the Use of Residential Leased Properties at HYCO LAKE

Guidelines for the Use of Residential Leased Properties at HYCO LAKE PERSON-CASWELL LAKE AUTHORITY Guidelines fr the Use f Residential Leased Prperties at HYCO LAKE INCORPORATED AS ATrr ACHMENT NUMBER ONE PERSON-CASWELL LAKE AUTHORITY LEASE OF THE CONTROL STRIP TO PROPERTY

More information

Heat Pump KEYMARK. Date Description of modification Revision number Initial version 1

Heat Pump KEYMARK. Date Description of modification Revision number Initial version 1 Page: 1 f 26 Date Descriptin f mdificatin Revisin number 14-12-2015 Initial versin 1 10/03/2017 Additin f air/air Editrial changes Annex E included in reference t pren12102-2 suppressed Reference t EN

More information

Application Process: Customer Service

Application Process: Customer Service Applicatin Prcess: Custmer Service STEP ONE: ORGANIZATIONAL PROFILE The rganizatinal prfile is a snapsht f yur rganizatin used t quickly understand yur business and what yu cnsider imprtant. 1) In tw pages

More information

Foot Protection Standard

Foot Protection Standard Ft Prtectin Standard Safety and Envirnment Systems Management System Dcumentatin Ft Prtectin Standard 1.0 PURPOSE This standard specifies the selectin, use, inspectin and care f ft prtectin at SaskPwer.

More information

ITC APPROVED CATERERS RULES AND REGULATIONS

ITC APPROVED CATERERS RULES AND REGULATIONS ITC APPROVED CATERERS RULES AND REGULATIONS Please review prir t each event. Cmmunicate and/r distribute t catering staff t ensure they are aware f the ITC s rules and regulatins. Prir t event Review catering

More information

ROYAL BANK OF CANADA ONLINE APPLICATION TERMS AND CONDITIONS

ROYAL BANK OF CANADA ONLINE APPLICATION TERMS AND CONDITIONS ` ROYAL BANK OF CANADA ONLINE APPLICATION TERMS AND CONDITIONS Please review the fllwing Ryal Bank f Canada Online Applicatin Terms and Cnditins (the "Terms"). Yu must read them alng with yur Accunt Disclsures

More information

Payroll Handbook

Payroll Handbook 2017-2018 Payrll Handbk 1 DAILY PAY RATES Classificatin Full Day Half Day Substitute Teachers/Testers/Nurses/Librarians $90.00 $45.00 Certified/HQ Teacher $90.00 $45.00 Certified/Nn-HQ Teacher $90.00 $45.00

More information

etime Sheet Setup and Processing

etime Sheet Setup and Processing etime Sheet Setup and Prcessing Updated: 10/3/16 PC and CY Belw are instructins n hw t setup and prcess etime Sheets. 1. Setup the Optins needed in the SDS Web Office Settings fr etime Sheet Prcessing

More information

MS4 REQUIREMENTS TABLE INSTRUCTIONS

MS4 REQUIREMENTS TABLE INSTRUCTIONS COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER MS4 REQUIREMENTS TABLE INSTRUCTIONS Revised, July 29, 2016 Intrductin The Pennsylvania Department f Envirnmental

More information

Making the move from Sage Abra Suite (FoxPro) to Sage HRMS (SQL)

Making the move from Sage Abra Suite (FoxPro) to Sage HRMS (SQL) Making the mve frm Sage Abra Suite (FxPr) t Sage HRMS (SQL) 5272 S. LEWIS, SUITE 100 TULSA, OK 74105 918.496.1600 TOLL FREE: 877.496.1600 Making the mve frm Sage Abra Suite (FxPr) t Sage HRMS (SQL) As

More information

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID(S) & DISTRICT 6 MIAMI-DADE & MONROE COUNTIES

EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID(S) & DISTRICT 6 MIAMI-DADE & MONROE COUNTIES April 17, 2018 EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID(S). 250605-3-32-01 & 250605-3-32-02 DISTRICT 6 MIAMI-DADE & MONROE COUNTIES 1 PURPOSE 4 2 PROJECT DESCRIPTION 6 3 PROJECT COMMON AND

More information

NBN Co. Pit Lid Descriptor

NBN Co. Pit Lid Descriptor Technical Infrmatin Bulletin (TIB) Dcument Number: TIB-017 Dcument Type TIB Status: Final Issue Date: 16 May 2013 Versin Number: 1.0 Classificatin Public Disclaimer This dcument is prvided fr infrmatin

More information

CASE / PERMIT # GREENVILLE COUNTY, SC STORMWATER MANAGEMENT/SEDIMENT CONTROL CHECKLIST DISTURBING 1 ACRE

CASE / PERMIT # GREENVILLE COUNTY, SC STORMWATER MANAGEMENT/SEDIMENT CONTROL CHECKLIST DISTURBING 1 ACRE _ GREENVILLE COUNTY, SC STORMWATER MANAGEMENT/SEDIMENT CONTROL CHECKLIST DISTURBING 1 ACRE r MORE AND/OR INCREASING FLOWS BY 1 CFS r MORE Please nte that if we d nt have r receive the crrect infrmatin

More information

Microsoft Windows 7 Migration

Microsoft Windows 7 Migration Micrsft Windws 7 Migratin Hw utilizing SaaS slutins frm Dell can ease the prcess Dell IT Management Sftware as a Service 1 Applicatins Business Prcess Cnsulting Infrastructure Supprt Windws 7 is here t

More information

STATE OF VERMONT AGENCY OF AGRICULTURE, FOOD & MARKETS

STATE OF VERMONT AGENCY OF AGRICULTURE, FOOD & MARKETS STATE OF VERMONT AGENCY OF AGRICULTURE, FOOD & MARKETS RE: GREEN MOUNTAIN CENTER ) DISTRICT ENVIRONMENTAL RANDOLPH, VT ) COMMISSION # 3 ) ) APPLICATION #3R1089 ) ) September 11, 2015 COMMENTS This revised

More information

PECO Innovation Challenge

PECO Innovation Challenge 2017-2018 PECO Innvatin Challenge Prgram Guidelines and Applicatin Apply NOW! Applicatins will be accepted and apprved n a rlling basis. All applicatins must be submitted by February 1. Fr mre details

More information

Notice No Closing Date: December 18, 2015

Notice No Closing Date: December 18, 2015 Public Ntice U.S. Army Crps f Engineers Pittsburgh District In Reply Refer t Ntice N. belw US Army Crps f Engineers, Pittsburgh District 1000 Liberty Avenue Pittsburgh, PA 15222-4186 Applicatin N. LRP-2005-1230

More information

Request for Proposal. Southern Maryland Electric Coop (SMECO) Residential Appliance Recycling Program. October 17, 2017

Request for Proposal. Southern Maryland Electric Coop (SMECO) Residential Appliance Recycling Program. October 17, 2017 Request fr Prpsal Residential Appliance Recycling Prgram Suthern Maryland Electric Cp (SMECO) Octber 17, 2017 Table f Cntents SECTION 1 RFP Infrmatin & Instructins SECTION 2 Backgrund Infrmatin SECTION

More information

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap Digital Advisry Services Prfessinal Service Descriptin Sftware Defined Netwrking Strategy and Radmap 1. Descriptin f Services. 1.1 Sftware Defined Netwrking Strategy and Radmap. Verizn will prvide Sftware

More information

Rocky Mountain PBS. REQUEST FOR PROPOSAL Creative Editor Edit 2 hours of content for the upcoming I-News Special, "Standing in the Gap" May 8, 2015

Rocky Mountain PBS. REQUEST FOR PROPOSAL Creative Editor Edit 2 hours of content for the upcoming I-News Special, Standing in the Gap May 8, 2015 Rcky Muntain PBS REQUEST FOR PROPOSAL Creative Editr Edit 2 hurs f cntent fr the upcming I-News Special, "Standing in the Gap" May 8, 2015 Rcky Muntain PBS 1089 Bannck Street Denver, Clrad 80204 PH: 303-620-5728

More information

Report on Inspection of PricewaterhouseCoopers LLP (Headquartered in New York, New York) Public Company Accounting Oversight Board

Report on Inspection of PricewaterhouseCoopers LLP (Headquartered in New York, New York) Public Company Accounting Oversight Board 1666 K Street, N.W. Washingtn, DC 20006 Telephne: (202) 207-9100 Facsimile: (202) 862-8433 www.pcabus.rg Reprt n 2014 (Headquartered in New Yrk, New Yrk) Issued by the Public Cmpany Accunting Oversight

More information

P&H Mining Equipment. P&H Response to Surface Mining Association for Research & Technology (SMART) Scope of Vision

P&H Mining Equipment. P&H Response to Surface Mining Association for Research & Technology (SMART) Scope of Vision P&H Mining Equipment P&H Respnse t Surface Mining Assciatin fr Research & Technlgy (SMART) Scpe f Visin SMART Summit Meeting Vancuver, BC, Canada May 8, 2010 SMART Scpe f Visin The Surface Mining Assciatin

More information

In this fact sheet we answer the four most common questions new clients ask:

In this fact sheet we answer the four most common questions new clients ask: Wrking With Federal Prpsals Intrductin In this fact sheet we answer the fur mst cmmn questins new clients ask: What tasks d yu perfrm and what d yu need frm us? Hw d we use the Virtual War Rms? Hw much

More information

Redeployment Due to Ill Health

Redeployment Due to Ill Health Redeplyment Due t Ill Health Guide fr managers This guide utlines steps t fllw when managing an emplyee thrugh the redeplyment prcess due t ill health Main tpic areas Overview General principles The prcess

More information

2014 Phillips 66 Branded Aviation Cooperative Fund Program Qualifying Items for Reimbursement

2014 Phillips 66 Branded Aviation Cooperative Fund Program Qualifying Items for Reimbursement 2014 Phillips 66 Branded Aviatin Cperative Fund Prgram Qualifying Items fr Reimbursement 2013 Phillips 66 Marketing Cnference and Trade Shw Registratin fee and airfare fr cnference travel fr the 2013 Marketing

More information

CODE OF BUSINESS CONDUCT AND ETHICS

CODE OF BUSINESS CONDUCT AND ETHICS Intelitek Inc. CODE OF BUSINESS CONDUCT AND ETHICS The value f uncmprmising integrity, strict cmpliance with applicable laws and full, fair, accurate and timely disclsure are the fundatins f Intelitek

More information

2018 FREQUENTLY ASKED QUESTIONS

2018 FREQUENTLY ASKED QUESTIONS 2018 FREQUENTLY ASKED QUESTIONS PINNACLE PROGRAM QUESTIONS 1. Q: Hw d I knw if I have cmpleted all requirements t receive PINNACLE rewards? A: View yur PINNACLE Mnthly Eligibility dashbard n the Fundatins

More information

Determination 2015/050

Determination 2015/050 Determinatin 2015/050 Regarding the refusal t issue a cde cmpliance certificate fr a 19-year-ld huse with a 14-yearld additin at 19A Jhn Rymer Place, Khimarama, Auckland Summary This determinatin cnsiders

More information

Tippecanoe County Public Library Collection Management Policy

Tippecanoe County Public Library Collection Management Policy Tippecane Cunty Public Library Cllectin Management Plicy Purpse f Cllectin Management Plicy This plicy is established by the Library Bard t guide the library staff in the management f the cllectin and

More information

EDS - Land Status Check Manual

EDS - Land Status Check Manual EDS - EDS - Revisin Histry Versin Date Authr/Organizatin Descriptin V1.00 2011-06-09 Mnarch Delumen First Draft 2012 Gvernment f Alberta Page 2 f 13 EDS - Disclaimer In this disclaimer prvisin: Crwn means

More information

UDI Compliance Service

UDI Compliance Service UDI Cmpliance Service What is UDI? The US Fd and Drug Administratin (FDA) has issued a ruling that medical devices must cnfrm t a Unique Device Identificatin (UDI) standard. The UK Department f Health

More information

Records Management Policy

Records Management Policy Recrds Management Plicy Main Authr: Cnsultatin Rute: Apprved By: Date f Issue: Applicable: Organisatinal wide Versin: 1.0 Review Date: February 2011 Versin 1.0: February 2010 Change Cntrl Versin Change

More information

Apprenticeship ERR Workbook

Apprenticeship ERR Workbook Apprenticeship ERR Wrkbk Emplyee Rights and Respnsibilities Welcme and Intrductin Dear apprentice, Bth emplyers and emplyees have a range f statutry rights and respnsibilities under Emplyment Law. It is

More information

Attn: Dealer Principal/General Manager/ Parts & Service Managers Parts & Service Advertising Support Programs (DAS & RMF)

Attn: Dealer Principal/General Manager/ Parts & Service Managers Parts & Service Advertising Support Programs (DAS & RMF) January 27, 2011 KIA MOTORS AMERICA, INC. Crprate Headquarters 111 Peters Canyn Rd. Irvine, CA 92606 TEL: (949) 468-4800 FAX: (949) 468-4905 T: All Kia Dealers Attn: Dealer Principal/General Manager/ Parts

More information

Michigan Local Public Health Accreditation Program Tool 2016 MPR Indicator Guide Section VI: Onsite Wastewater Treatment Management

Michigan Local Public Health Accreditation Program Tool 2016 MPR Indicator Guide Section VI: Onsite Wastewater Treatment Management MPR 1 The lcal health department shall have a wastewater treatment regulatin capable f prtecting the public health legally adpted under enabling state legislatin. The regulatin shall authrize an enfrcement

More information

Limited Scope Project Delivery Guideline August, 2017

Limited Scope Project Delivery Guideline August, 2017 Limited Scpe Prject Delivery Guideline August, 2017 Check the Capital Prject Delivery website t ensure this is the current versin. Table f Cntents Table f Cntents... 2 Limited Scpe Prject Delivery Apprach...

More information

PJM Manual 14C: Generation and Transmission Interconnection Facility Construction Revision: 12 Effective Date: June 22, 2017

PJM Manual 14C: Generation and Transmission Interconnection Facility Construction Revision: 12 Effective Date: June 22, 2017 PJM Manual 14C: Generatin and Transmissin Intercnnectin Facility Cnstructin Revisin: 12 Effective Date: June 22, 2017 Prepared by System Planning Divisin PJM 2017 PJM Manual 14C: Generatin and Transmissin

More information

Moving Out. Moving In

Moving Out. Moving In HISD Guide t Mving Out and Mving In HISD GUIDE TO MOVING ut AND MOVING in Dear HISD Principal, Yur schl sn will be mving int a new facility, and we share yur excitement as planning and preparatins fr that

More information

CORPORATE. Freedom to Speak Up Standard Operating Procedure. Document Control Summary Status:

CORPORATE. Freedom to Speak Up Standard Operating Procedure. Document Control Summary Status: CORPORATE Freedm t Speak Up Standard Operating Prcedure Dcument Cntrl Summary Status: Replacement. This plicy supersedes the Public Interest Disclsure Plicy 28.01.15 (v3.1) Versin: V1.1 Date 01.10.16 Authr/Owner:

More information