PROJECT MANUAL & SPECIFICATIONS FOR GRACE LUTHERAN CURCH Newlin Gulch Boulevard Parker, Colorado, 80134

Size: px
Start display at page:

Download "PROJECT MANUAL & SPECIFICATIONS FOR GRACE LUTHERAN CURCH Newlin Gulch Boulevard Parker, Colorado, 80134"

Transcription

1 PROJECT MANUAL & SPECIFICATIONS FOR GRACE LUTHERAN CURCH Newlin Gulch Boulevard Parker, Colorado, Date BUILDING OWNER Name GRACE LUTHERAN CHURCH Newlin Gulch Boulevard Parker, Colorado, ARCHITECT 101 Architecture, LLC 8231 E. Prentice Avenue Greenwood Village, CO CIVIL ENGINEER Highline Engineering & Surveying Co., Inc Caley Avenue, Suite 201 Centennial, CO STRUCTURAL ENGINEER Aegis Engineering, Inc S. Parker Road, Suite 199 Parker, CO MEP ENGINEER E.W.A.S. Consulting Elm Street Denver, CO 80260

2 SECTION TABLE OF CONTENTS Division 00 Introductory Information Project Title Page Table of Contents Geotechnical Data Agreement Forms General Conditions Division 01 General Requirements General Requirements Alternates Contract Modification Procedures Payment Procedures Project Management and Coordination Submittal Procedures Temporary Facilities and Project Sign Product Requirements Execution Cutting and Patching Closeout Procedures Project Record Documents Division 03 Concrete Cast-in-Place Concrete Division 04 Masonry Unit Masonry and Stone Manufactured Masonry Division 05 Metals Structural Steel Framing Metal Fabrications Metal Ladders Division 06 Wood, Plastics, and Composites Rough Carpentry Shop-Fabricated Wood Trusses Interior Finish Carpentry Division 07 Thermal and Moisture Protection Thermal Insulation Weather Barrier Fiber Reinforced Asphalt Shingles Fiber Cement Siding Flashing and Sheet Metal Joint Sealants Division 08 Openings Metal Doors and Frames Wood Doors Floor Access Door Access Doors and Frames Aluminum Framed Entrances Storefront Doors & Windows Hardware Glass and Glazing Grace Lutheran Church, Parker, CO Issue Date TABLE OF CONTENTS

3 Division 09 Finishes Gypsum Board Ceramic & Porcelain Tiling Acoustical Ceilings Resilient Flooring Carpet Painting Division 10 Specialties Signage Metal Toilet Partitions Toilet Accessories Fire Protection Specialties See additional Structural, Mechanical, Electrical and Plumbing Specification incorporated within the respective discipline s drawings. END OF SECTION Grace Lutheran Church, Parker, CO Issue Date TABLE OF CONTENTS

4 SECTION GEOTECHNICAL DATA PART 1 GENERAL 1.1 RELATED DOCUMENTS: A. The following Geotechnical Data report (Soil Report) is hereby incorporated by reference and is made part of these Construction Documents: 1. Geotechnical Investigation Grace Lutheran Church CTL Thompson Incorporated Project No. DNA46, Dated May 10th, 2013 B. The Soil Report has been issued in the RFP to all invited bidders as an existing condition. If it is not attached to this set of Specifications, a copy is available at the following locations: 1. Civil Engineer (303) Soils Engineer (303) Architect (303) PART 2 - PRODUCTS A. Not applicable PART 3 - EXECUTION A. All recommendations and procedures outlined or detailed in the Soil Report shall be followed by the Contractor. Conditional recommendations shall be implemented with approval of the Structural and Soils Engineer. B. The services of a Soil Engineer shall be retained by the Owner for the duration of the construction of this Project. Soil and Testing services shall include, but not be limited to, the following tasks: 1. Field consulting of topsoil stripping 2. Field consulting of soil compaction 3. Field consulting of proof rolling operations 4. Field testing of structural fill material 5. Field testing of soil bearing capacity 6. Field recommendations for dewatering operations END OF SECTION Grace Lutheran Church, Parker, CO Issue Date GEOTECHNICAL DATA

5 SECTION AGREEMENT FORMS PART 1 - GENERAL A. The form of agreement between the Owner and the Contractor shall be the AIA Document A Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum. PART 2 - PRODUCTS - Not Applicable To This Section PART 3 - EXECUTION - Not Applicable To This Section END OF DOCUMENT Grace Lutheran Church, Parker, CO Issue Date AGREEMENT FORMS

6 SECTION GENERAL CONDITIONS PART 1 GENERAL A. The General Conditions are the terms and conditions for this construction contract. All materials and labor supplied therein are detailed in AIA Document A General Conditions of the Contract for Construction. All contractors, suppliers, vendors and subcontractors and others contractually obligated to provide materials or labor on this Project are hereby advised that their work shall conform with the requirements of this Document, whether or not included in this Project Manual, B. The General Conditions contained in AIA Document A General Conditions of the Contract for Construction shall be considered the minimum acceptable standard used by the Architect to judge the responsibilities of the parties and their performance, compliance, quality and acceptability of all Work provided therein. C. The Architect is the sole judge of all Work related to this Project D. These specifications and the accompanying drawings shall be subject of all requirements stated in these General Conditions and shall form the body of documents, consisting of drawings, specifications, and forms of agreements, to be known collectively as the Contract Documents. PART 2 - PRODUCTS - Not Applicable To This Section PART 3 - EXECUTION - Not Applicable To This Section END OF DOCUMENT Grace Lutheran Church, Parker, CO Issue Date GENERAL CONDITIONS

7 SECTION GENERAL REQUIREMENTS PART 1 - GENERAL 1.01 COMPLIANCE A. All construction shall comply with applicable local, state and federal codes, rules, and regulations, and other entities having jurisdiction. Any discrepancy between local, state or federal building codes, rules and regulations and work built, or work delineated in these Contract Documents shall be corrected to full compliance with such rules, regulations, or codes. B. All clearances, door sizes, hardware locations handle types, restroom equipment, mounting heights, and all other dimensions, heights, locations, and clearances shall comply with Title III of the Americans With Disabilities Act of 1991 (ADA); and ICC/ANSI A Accessible & Usable Buildings And Facilities; and all local or state adopted handicapped accessibility codes. C. Utility connections and services shall be coordinated with the utility companies having jurisdiction, and shall comply with the rules, regulations, and codes of the utility companies or the prevailing authority having jurisdiction. D. Other than the Building Permit, which shall be paid or by the Owner, the Contractor is responsible for obtaining and paying for all other permits and related trade permits, fees, and approvals required by state, or local building authorities; utilities; or other regulatory agencies. E. Contractors, Suppliers, and Subcontractors shall build the work described in these Contract Documents exactly as shown herein. If any inconsistency, error, or omission in the Contract Documents is discovered, such information shall be documented and submitted to the Architect as a notification in writing within 10 days of its discovery. The Architect's reply in writing to this notification of inconsistency, error, or omission is a prerequisite to any action concerning the claimed inconsistency, error or omission and any subsequent action taken to deviate from the work shown in the Contract Documents. F. If Changes are required in the work that differ from the conditions shown in these Contract Documents, such changes shall be submitted as a written Proposal to the Architect and Owner for written approval in the form of a Change Order. Any Changes made without the specific written consent of the Architect shall be considered as unauthorized changes, not in compliance with the Contract Documents, and excluded from any responsibility of the Architect either during construction or after occupancy. G. Changes in the Work, not approved in writing by the Architect, shall be removed and replaced with correct Work at the sole expense of the Contractor, Subcontractor, and Supplier, but in no case shall the full cost, any portion of the cost, or any consequential cost, of removal and replacement of such non-conforming work be at the expense of the Architect or Owner. PART 2 - PRODUCTS - Not Applicable To This Section PART 3 - EXECUTION - Not Applicable To This Section END OF SECTION Grace Lutheran Church, Parker, CO Issue Date GENERAL REQUIREMENTS

8 SECTION ALTERNATES PART 1 - GENERAL 1.01 SUMMARY A. List price for each alternate identified below. Include cost of modifications to other work to accommodate alternate, including both credits and adds. Include related costs such as overhead and profit. B. Owner will determine which alternates are selected for inclusion in the Contract. C. Alternates are described briefly in this section. The Contract Documents define the requirements for all Alternates. D. Coordinate alternates with related work to ensure that work affected by each selected alternate is properly accomplished. PART 2 - PRODUCTS - Not Applicable To This Section PART 3 - EXECUTION 3.01 SCHEDULE A. List of Alternates: 1. ADD ALTERNATE NO. 1 CROSS TOWER STRUCTURE. NOTE: INCLUDE CROSS TOWER FOUNDATION IN BASE BID. 2. ADD ALTERNATE NO. 2 ALTAR PLATFORM, ALTAR RAILING, ALTAR RAMP AND ASSOCIATED FINISHES. 3. ADD ALTERNATE NO. 3 ALTAR THEATRICAL AND A/V LIGHTING. NOTE: INCLUDE WIRING AND CONDUITS FOR THEATRICAL & A/V LIGHTING IN BASE BID. 4. ADD ALTERNATE NO. 4 4'-0" ROLL-UP SERVING WINDOW AND COUNTER BETWEEN KITCHEN AND NARTHEX. NOTE: INCLUDE WINDOW FRAMING AND ELECTRICAL WIRING IN BASE BID. 5. ADD ALTERNATE NO. 5 IN-SLAB ELECTRICAL SNOW MELT SYSTEM AT FRONT ENTRY PEDESTRIAN PLAZA, FROM BUILDING ENTRANCE TO EDGE OF SIDEWALK. INCLUDE ELECTRICAL CONDUIT, WIRING AND ELECTRICAL PANEL BREAKER. END OF SECTION Grace Lutheran Church, Parker, CO Issue Date ALTERNATES

9 SECTION CONTRACT MODIFICATION PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. This Section specifies administrative and procedural requirements for handling and processing Contract modifications. B. See Division 01 Section "Allowances" for procedural requirements for handling and processing allowances. C. See Division 01 Section "Unit Prices" for administrative requirements for using unit prices. 1.2 MINOR CHANGES IN THE WORK 1.3 PROPOSAL REQUESTS A. Owner-Initiated Proposal Requests: Architect will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications. 1. Proposal Requests issued by Architect are for information only. Do not consider them instructions either to stop work in progress or to execute the proposed change. 2. Within 10 days after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change. a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. b. Indicate applicable delivery charges, equipment rental, and amounts of trade discounts. c. Include costs of labor directly attributable to the change. d. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time. B. Contractor-Initiated Proposals: If latent or unforeseen conditions require modifications to the Contract, Contractor may propose changes by submitting a request for a change to Architect. 1. Include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time. 2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. 3. Indicate applicable delivery charges, equipment rental, and amounts of trade discounts. 4. Include costs of labor directly attributable to the change Grace Lutheran Church, Parker, CO Issue Date CONTRACT MODIFICATION PROCEDURES

10 5. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time. 6. Comply with requirements in Division 01 Section "Product Requirements" if the proposed change requires substitution of one product or system for product or system specified. C. Proposal Request Form: Use AIA Document G709 for Proposal Requests. 1.4 ALLOWANCES A. Allowance Adjustment: To adjust allowance amounts, base each Change Order proposal on the difference between purchase amount and the allowance, multiplied by final measurement of workin-place. If applicable, include reasonable allowances for cutting losses, tolerances, mixing wastes, normal product imperfections, and similar margins. 1. Include installation costs in purchase amount only where indicated as part of the allowance. 2. If requested, prepare explanation and documentation to substantiate distribution of overhead costs and other margins claimed. 3. Submit substantiation of a change in scope of work, if any, claimed in Change Orders related to unit-cost allowances. 4. Owner reserves the right to establish the quantity of work-in-place by independent quantity survey, measure, or count. B. Submit claims for increased costs because of a change in scope or nature of the allowance described in the Contract Documents, whether for the Purchase Order amount or Contractor's handling, labor, installation, overhead, and profit. Submit claims within 10 days of receipt of the Change Order or Construction Change Directive authorizing work to proceed. Owner will reject claims submitted later than 15 days after such authorization. 1. Do not include Contractor's or subcontractor's indirect expense in the Change Order cost amount unless it is clearly shown that the nature or extent of work has changed from what could have been foreseen from information in the Contract Documents. 2. No change to Contractor's indirect expense is permitted for selection of higher- or lowerpriced materials or systems of the same scope and nature as originally indicated. 1.5 CHANGE ORDER PROCEDURES A. On Owner's approval of a Proposal Request, Architect will issue a Change Order for signatures of Owner and Contractor on AIA Document G CONSTRUCTION CHANGE DIRECTIVE A. Construction Change Directive: Architect may issue a Construction Change Directive on AIA Document G714. Construction Change Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order. 1. Construction Change Directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Sum or the Contract Time Grace Lutheran Church, Parker, CO Issue Date CONTRACT MODIFICATION PROCEDURES

11 B. Documentation: Maintain detailed records on a time and material basis of work required by the Construction Change Directive. 1. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION Grace Lutheran Church, Parker, CO Issue Date CONTRACT MODIFICATION PROCEDURES

12 SECTION PAYMENT PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. This Section specifies administrative and procedural requirements necessary to prepare and process Applications for Payment. 1.2 SCHEDULE OF VALUES A. Coordination: Coordinate preparation of the Schedule of Values with preparation of Contractor's Construction Schedule. 1. Correlate line items in the Schedule of Values with other required administrative forms and schedules, including Application for Payment forms with Continuation Sheets, Submittals Schedule and Contractor's Construction Schedule. 2. Submit the Schedule of Values to Architect at earliest possible date but no later than ten days before the date scheduled for submittal of initial Applications for Payment. 3. Subschedules: Where the Work is separated into phases requiring separately phased payments, provide subschedules showing values correlated with each phase of payment. B. Format and Content: Use the Project Manual table of contents as a guide to establish line items for the Schedule of Values. Provide at least one line item for each Specification Section. 1. Identification: Include the following Project identification on the Schedule of Values: a. Project name and location. b. Name of Architect. c. Architect's project number. d. Contractor's name and address. e. Date of submittal. 2. Submit draft of AIA Document G703 Continuation Sheets. 3. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with the Project Manual table of contents. Provide several line items for principal subcontract amounts, where appropriate. 4. Round amounts to nearest whole dollar; total shall equal the Contract Sum. 5. Provide a separate line item in the Schedule of Values for each part of the Work where Applications for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed. 6. Provide separate line items in the Schedule of Values for initial cost of materials, for each subsequent stage of completion, and for total installed value of that part of the Work. 7. Allowances: Provide a separate line item in the Schedule of Values for each allowance. Show line-item value of unit-cost allowances, as a product of the unit cost, multiplied by measured quantity. Use information indicated in the Contract Documents to determine quantities. 8. Each item in the Schedule of Values and Applications for Payment shall be complete. Include total cost and proportionate share of general overhead and profit for each item Grace Lutheran Church, Parker, CO Issue Date PAYMENT PROCEDURES

13 a. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the Schedule of Values or distributed as general overhead expense, at Contractor's option. 9. Schedule Updating: Update and resubmit the Schedule of Values before the next Applications for Payment when Change Orders or Construction Change Directives result in a change in the Contract Sum. 1.3 APPLICATIONS FOR PAYMENT A. Each Application for Payment shall be consistent with previous applications and payments as certified by Architect and paid for by Owner. 1. Initial Application for Payment, Application for Payment at time of Substantial Completion, and final Application for Payment involve additional requirements. B. Payment Application Times: The date for each progress payment is indicated in the Agreement between Owner and Contractor. The period of construction Work covered by each Application for Payment is the period indicated in the Agreement. C. Payment Application Times: Progress payments shall be submitted to Architect by the last day of the month. The period covered by each Application for Payment is one month, ending on the last day of the month. D. Payment Application Forms: Use AIA Document G702 and AIA Document G703 Continuation Sheets as form for Applications for Payment. E. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. Architect will return incomplete applications without action. 1. Entries shall match data on the Schedule of Values and Contractor's Construction Schedule. Use updated schedules if revisions were made. 2. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application. F. Transmittal: Submit 1 signed and notarized original copies of each Application for Payment to Architect by a method ensuring receipt within 24 hours. One copy shall include waivers of lien and similar attachments. 1. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application. G. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's lien from every entity who is lawfully entitled to file a mechanic's lien arising out of the Contract and related to the Work covered by the payment. 1. Submit partial waivers on each item for amount requested in previous application, after deduction for retainage, on each item. 2. When an application shows completion of an item, submit final or full waivers. 3. Owner reserves the right to designate which entities involved in the Work must submit waivers Grace Lutheran Church, Parker, CO Issue Date PAYMENT PROCEDURES

14 4. Waiver Forms: Submit waivers of lien on forms, executed in a manner acceptable to Owner. H. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following: 1. List of subcontractors. 2. Schedule of Values. 3. Contractor's Construction Schedule (preliminary if not final). 4. Schedule of unit prices. 5. Submittals Schedule (preliminary if not final). 6. List of Contractor's staff assignments. 7. List of Contractor's principal consultants. 8. Copies of building permits. 9. Copies of authorizations and licenses from authorities having jurisdiction for performance of the Work. 10. Initial progress report. 11. Report of preconstruction conference. 12. Certificates of insurance and insurance policies. I. Application for Payment at Substantial Completion: After issuing the Certificate of Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete. 1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum. 2. This application shall reflect Certificates of Partial Substantial Completion issued previously for Owner occupancy of designated portions of the Work. J. Final Payment Application: Submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following: 1. Evidence of completion of Project closeout requirements. 2. Insurance certificates for products and completed operations where required and proof that taxes, fees, and similar obligations were paid. 3. Updated final statement, accounting for final changes to the Contract Sum. 4. AIA Document G706, "Contractor's Affidavit of Payment of Debts and Claims." 5. AIA Document G706A, "Contractor's Affidavit of Release of Liens." 6. AIA Document G707, "Consent of Surety to Final Payment." 7. Evidence that claims have been settled. 8. Final meter readings for utilities, a measured record of stored fuel, and similar data as of date of Substantial Completion or when Owner took possession of and assumed responsibility for corresponding elements of the Work. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION Grace Lutheran Church, Parker, CO Issue Date PAYMENT PROCEDURES

15 SECTION PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Administrative and supervisory personnel. 2. Submittals. 3. Subcontractor quality control. 4. Coordination. 5. Project coordination. 6. Preconstruction meeting. 7. Progress meetings. 8. Progress reports. 9. Pre-installation meetings. 10. Architect s inspections 1.02 ADMINISTRATIVE AND SUPERVISORY PERSONNEL FOR EACH TRADE A. Project Coordination Administrator: Subcontractor Representative experienced in administration, supervision, and quality control of building construction, similar to Work of this Project, including mechanical and electrical work. B. Project Field Superintendent: 1 Subcontractor Representative experienced in general field supervision of building construction, similar to Work of this Project, including mechanical and electrical work, to supervise, direct, inspect and coordinate Work of Subcontractor, suppliers and installers, and expedite Work to assure compliance with Construction Schedules SUBMITTALS A. Submit list of Subcontractor principal staff assignments, including Project Coordination Administrator, Project Field Superintendent, Quality Control Representative, and other personnel in attendance at site; identify their duties and responsibilities. B. Submit shop drawings, product data, and other required submittals, in accordance with Section Submittal Procedures, for review and compliance with Contract Documents, for field dimensions and clearances, for relation to available space, and for relation to Work by Others. C. Submit Requests for Information and interpretation of Contract Documents in a timely manner and obtain replies from Architect in accordance with the Contract SUBCONTRACTOR QUALITY CONTROL FOR EACH TRADE A. Perform project quality control in accordance with requirements in the Contract. B. Coordinate schedule for testing to be performed by Subcontractor and under separate contract Grace Lutheran Church, Parker, CO Issue Date PROJECT MANAGEMENT AND COORDINATION

16 1.05 COORDINATION DRAWINGS FOR EACH TRADE A. Prepare and distribute coordination drawings where close coordination is required for installation of Products and materials fabricated off-site by separate entities, and where limited space availability requires maximum utilization of space for efficient installation of different components. Show interrelationship of components shown on separate shop drawings. Indicate required installation sequences PROJECT COORDINATION FOR EACH TRADE A. Coordinate construction activities and work of other trades under various Sections of these Specifications and Work of Contract to facilitate orderly installation of each part of Work. Coordinate construction operations included under different Sections of Specifications and Contract that are dependent upon each other for proper installation, connection, and operation. B. Where installation of one part of Work is dependent on installation of other components, either before or after that part of Work, schedule construction activities in sequence required to obtain uninterrupted installation. C. Obtain drawings, manufacturer's product data, instructions, and other data to provide a complete and proper installation. 1. Check field dimensions prior to installing products. Verify necessary clearances and means of access from equipment storage to final position. 2. Make data and information available to trades involved. D. Ensure that utility requirements of operating equipment are compatible with building utilities. Coordinate Work of various specification Sections for installation and final connection of equipment. 1. Assure that mechanical, plumbing, and electrical rough-ins have been properly located. E. Coordinate space requirements and installation of mechanical, plumbing, and electrical Work which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, conduits, and wiring, as closely as possible; make runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs. F. Where availability of space is limited, coordinate installation of different components to ensure maximum accessibility for required maintenance, service, and repair. G. Provide for installation of items scheduled for future installation. H. Where necessary, prepare memoranda for distribution to each party involved outlining special procedures required for coordination. Prepare memoranda for Architect and separate Subcontractors where coordination of their work is required. I. In finished areas, conceal pipes, ducts, conduits, and wiring in the construction. Coordinate locations of fixtures and outlets with finish elements Grace Lutheran Church, Parker, CO Issue Date PROJECT MANAGEMENT AND COORDINATION

17 J. Coordinate completion and clean up of Work of separate Sections in preparation for completion of work per the Contract. Each Subcontractor shall leave work area in clean condition and ready for next Subcontractor trade. K. After occupancy of Project, coordinate access to site for correction of defective Work and Work not in accordance with Contract Documents, to minimize disruption of occupant activities PRECONSTRUCTION MEETING A. Architect and Construction Manager will schedule a meeting after issuance of Notice To Proceed. B. Attendance: Architect, Owner, Construction Manager, Each Subcontractor, and Project Superintendents. C. Agenda: 1. Designation of personnel representing the parties in Contract. 2. Procedures and processing of Requests for Information, field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and contract closeout procedures. 3. Scheduling of Work 4 Submittal of Critical Path Schedule or other graphic work progress Schedule 5. Construction facilities and temporary controls. 6. Environmental procedures. D. Record minutes and distribute copies to participants, and those affected by decisions made CONSTRUCTION SCHEDULE A. Prior to start of construction, CM shall submit a construction progress schedule for the entire construction process from start to final occupancy. Schedule can be in any standard format such as Gantt chart, bar-chart, CPM flow charts, or other acceptable format. Contractor shall review and update this schedule weekly. The project schedule should be forwarded to the Architect upon revision PROGRESS MEETINGS A. Schedule and administer meetings throughout progress of Work at intervals as determined by Construction Manager. B. Construction Manager will make arrangements for meetings, prepare agenda with copies for participants and preside at meetings. C. Attendance: Job Superintendent, Construction Manager Subcontractors, Suppliers, and Architect as appropriate to agenda topics for each meeting. D. Agenda: 1. Review minutes of previous meetings. 2. Review of Work progress. 3. Field observations, problems, and decisions. 4. Identification of problems which impede planned progress. 5. Review of submittals schedule and status of submittals Grace Lutheran Church, Parker, CO Issue Date PROJECT MANAGEMENT AND COORDINATION

18 6. Review of off-site fabrication and delivery schedules. 7. Maintenance of progress schedule. 8. Corrective measures to regain projected schedules. 9. Planned progress during succeeding work period. 10. Coordination of projected progress. 11. Other business relating to Work PRE-INSTALLATION MEETING A. When required in individual specification sections or as determined necessary by Architect, convene a pre-installation meeting at work site prior to commencing work of the section. B. Require attendance of parties directly affecting, or affected by, work of the specific section. C. Notify Architect or authorized representative seven days in advance of meeting date. D. Prepare agenda and preside at meeting: 1. Review conditions of installation, preparation and installation procedures. 2. Review coordination with related work. 3. Agenda items listed in individual specification Sections. 4. Installation schedule. 5. Review environmental procedures ARCHITECT S OBSERVATIONS A. The Architect will have access to the Project at all times for purposes of observing the Work in progress, and reporting on the adequacy, quality, compliance, and completeness of the work. B. The Architect will prepare a written field report, summarizing each observation and noting Site Conditions; Work in Progress; Information or Action Required; Non- Compliance Items; and other communication relative to the Work. C. The Architect will observe the work at the following minimum milestone points. The Contractor is responsible for contacting the Architect to advise of the dates for arriving at the following milestones in the Work. 1. Foundation: Foundation walls and footings ready for concrete placement. 2. Structural: Structural steel in place and ready for precast plank placement. 3. Pre-Drywall: Rough framing complete and MP&E rough-in complete 4. Finish: Finish work in progress; MP&E final, fixtures 5. Occupancy: Final inspection; punch-list; Certificate of Occupancy PART 2 PRODUCTS Not Used. PART 3 EXECUTION Not Used Grace Lutheran Church, Parker, CO Issue Date PROJECT MANAGEMENT AND COORDINATION

19 END OF SECTION Grace Lutheran Church, Parker, CO Issue Date PROJECT MANAGEMENT AND COORDINATION

20 SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.01 SUMMARY A. Comply with project format for submittals. B. Provide Architect with types of submittals listed in individual sections and number of copies required. Architect will retain one (1) of each for records. 1. Shop drawings, prior review by Contractor - one pdf copy. 2. Product data one pdf copy. 3. Samples 2 each, plus extra samples as required to indicate range of color, finish, and texture to be expected. One sample will be retained by Architect. 4. Mock-ups - when required in the individual sections. 5. Inspection and test reports one pdf copy. 6. Warranties - minimum 3 copies. 7. Survey data - minimum 3 copies. 8. Closeout submittals - minimum 3 copies. C. Provide warranties as specified; warranties shall not limit length of time for remedy of damages Owner may have by legal statute. Warranties shall be signed by contractor, supplier or installer responsible for performance of warranty. A preliminary or sample warranty shall be included with all items requiring warranty submittals for review under this Section. Warranty documents shall be submitted for review for the following minimum items: 1. Asphalt Shingles 2. Windows 3. Doors 4. Water Heater, Mixing Valves, Recirculation Pumps 5. Heating and Cooling Equipment 6. Fans and Ventilation Equipment PART 2 - PRODUCTS - Not Applicable To This Section PART 3 EXECUTION Schedule of Submittals : Within 30 days after receiving a notice to proceed, the contractor must complete the Schedule of Submittals, included in Paragraph 1.01 in this Section, in duplicate, listing all items that must be furnished for review and approval by the Architect. The schedule must indicate the type of items (such as sample, shop drawings, catalog cut, etc.) and include the scheduled dates of submittal. In preparing the schedule, adequate time must be allowed for Architect's review and approval and possible resubmittal. Also, the schedule must be coordinated with the approved construction progress chart. The contractor must revise and/or update the schedule as directed. Such revised schedules must be made available to the Architect, and Owner for monitoring Shop Drawings and Related Data : Submittal of shop drawings and related data must conform to the requirements specified in this Section. If approved by the Architect, the shop drawing will be identified as having received approval by being so stamped and dated. The contractor must make any corrections required by the Architect. If the contractor considers any correction indicated on the submittal drawings to constitute a change to the contract drawings or specifications, notice must be given to the Architect in writing. Unless otherwise noted or discussed and agreed, the minimum number of prints (see above) of all approved shop drawings must be given to the Architect. The Grace Lutheran Church, Parker, CO Issue Date SUBMITTAL PROCEDURES

21 approval of the submittals and shop drawings by the Architect shall not be construed as a complete checking of the fit, finish, and integration of the product, but instead indicates only that the general method of construction, design concepts, and detailing are satisfactory. Approval of the shop drawings does not relieve the contractor of responsibility for any error that may exist because the contractor is responsible for the dimensions and design of adequate connections and details and for satisfactory construction of all work. The submission by the contractor must be accompanied by a transmittal letter or other specific letter indicate the contents of the submittal, and the name, address and phone number of the supplier or subcontractor Mechanical Area Layout Requirements: The contractor must prepare and submit Mechanical area layout drawings for areas where equipment proposed for use could present interface or space difficulties. Such layout drawings must be submitted not less than 30 days in advance of actual installation of such equipment, and must conform to the specified requirements for shop drawings. Submittals describing the various mechanical and electrical equipment items that are to be installed in the areas represented by the layout drawings must be assembled and submitted concurrently and must be accompanied by the room or area layout drawings. All mechanical and electrical equipment and accessories must be shown to scale in the plan and also in elevation or section in their installation positions. Ductwork and piping must be shown 3.04 Material, Equipment, and Fixture Lists: Lists of equipment, and fixtures must be submitted by the contractor in accordance with the requirements specified for shop drawings. The lists must be supported by sufficient descriptive material, such as catalogs, cuts, diagrams, and other data published by the manufacturer, as well as by evidence of compliance with safety and performance standards, to demonstrate conformance to the specification requirements. Catalog numbers alone are not acceptable. The data must include the name and address of the nearest service and maintenance organization that regularly stocks repair parts Certificates of Compliance: Any certificates required for demonstrating proof of compliance of materials with specification requirements, including mail certificates, statements of application, and extended guarantees, must be signed and submitted to the Architect at least 10 days before delivery. The contractor must review all certificates before submissions are made to the Architect, to ensure compliance with the specification requirements and to ensure that the affidavit is properly signed. Each certificate must be signed by an official authorized to certify on behalf of the manufacturing company and must contain the name and address of the contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates must contain the name and address of the testing laboratory and the dates of tests to which the report applies. Certification must not be construed as relieving the contractor from furnishing satisfactory material if, after tests are performed on selected samples, the material is found not to meet the specific requirements 3.06 Architect's Review of Submittal A. When submittals are reviewed by the Architect each submittal shall be returned to the contractor stamped or otherwise indicated by the Architect in one of the following ways: 1. APPROVED: The contractor is advised that fabrication, manufacture, or construction of the submitted work may proceed, provided the work complies with the contract documents. 2. APPROVED AS NOTED: The contractor is advised that fabrication, manufacture, or construction may proceed, provided the work complies with Grace Lutheran Church, Parker, CO Issue Date SUBMITTAL PROCEDURES

22 the Architect's notations on the submittal and that the work complies with the contract documents.. 3. REVISE & RESUBMIT: The contractor is advised that no work may be fabricated, manufactured, or constructed and that the contractor must make a new submittal to the Architect. Any submission marked "REVISE & RESUBMIT" is not permitted on the site 4. NOT APPROVED: The contractor is advised that the submittal does not meet the requirements of the specification, the drawings, or other requirements of the Contract Documents and will not be reviewed or commented upon further. B. The Architect will return marked-up reproducibles if included in the submittal. The contractor is responsible for obtaining prints and for distributing such marked-up drawings to the field and to subcontractors C. In the case of shop drawings in the form of manufacturers' descriptive literature, catalog cuts, and brochures the Architect shall return APPROVED or APPROVED AS NOTED copies to the contractor, who is responsible for distributing them to the field and to the subcontractors. If the shop drawings are stamped REVISE & RESUBMIT the Architect will return stamped copies to the contractor, who shall submit new shop drawings to the Architect D. In the case of samples stamped APPROVED or APPROVED AS NOTED the Architect shall return one of the samples to the contractor. In the case of samples stamped REVISE & RESUBMIT the Architect shall return all of the submitted samples 3.07 Not Used Grace Lutheran Church, Parker, CO Issue Date SUBMITTAL PROCEDURES

23 3.08 Sample of Architect s Shop Drawing Stamp Shop Dwg File No. Shop Dwg Submittal No. APPROVED APPROVED AS NOTED If checked above, fabrication MAY be undertaken. Approval does not authorize changes to Contract Sum of Scope of Work unless stated in separate letter or Change Order. REVISE & RESUBMIT NOT APPROVED Checking is only for general conformance with the design concept of the Project and general compliance with the information given in the Contract Documents. The Contractor is solely responsible for: dimensions which shall be confirmed and correlated at the job site; fabrication, processes and techniques of the construction; coordination of his work with that of other trades; and the satisfactory performance of his work. Contractor is responsible for all corrections noted hereupon. ARCHITECT Address City, State ZIP By Date 3.09 Sample Schedule For Submittals Project Contract No. Project Description Submittal Type: C Certificate S Sample SD Shop Drawing CD Catalog Data PL Spare Parts List MM Maintenance Manual Spec. Section Spec. Description Paragraph Number Submittal Type Date Submittal Returned Action Taken Assigned Number END OF SECTION Grace Lutheran Church, Parker, CO Issue Date SUBMITTAL PROCEDURES

24 PART 1 - GENERAL 1.01 SUMMARY SECTION TEMPORARY FACILITIES & PROJECT SIGN A. Provide temporary services and utilities, including utility costs: 1. Water (potable and non-potable). 2. Lighting and power & metering. 3. Telephone. 4. Toilet facilities. 5. Materials storage. 6. Dumpster and approved debris removal. B. Provide temporary site management items for the following areas : 1. Silt and sediment control and cleanup 2. Material Storage Enclosures 3. Daily mud, silt, and dirt cleanup of public streets, sidewalks, and offsite grounds 4. Work area cleanup and placement of debris in authorized dumpster, or carry-off site for legal disposal 5. Dewatering 6. Temporary roofing for weather protection of building interior. C. Provide for Project security and protection: 1. Fire extinguishers. 2. Site enclosure fence, barricades, warning signs, and lights. 3. Building enclosure and lock-up. 4. Environmental protection. 5. Pest control. 6. Snow and ice removal. D. Provide personnel support facilities: 1. Field office for Contractor s and Architect s use. 2. Sanitary facilities. 3. Drinking water. 4. Cleaning and trash removal. E. Project Identification Sign: The Contractor shall provide, install and maintain the Project Identification Sign. Locate sign where directed by the Architect or the Owner s Representative, or as otherwise required for maximum exposure to vehicular traffic for each direction. 1. The sign design is to approval by local ordinances and permits for temporary signage. 2. The Project Identification Sign shall be erected within 15 days after receiving notice to proceed. 3. No other signs are permitted on the project site. PART 2 - PRODUCTS - Not Applicable To This Section PART 3 - EXECUTION - Not Applicable To This Section END OF SECTION Grace Lutheran Church, Parker, CO Issue Date TEMPORARY FACILITIES & PROJECT SIGN

25 SECTION EXECUTION PART 1 - GENERAL 1.1 SUMMARY A. This Section includes general procedural requirements governing execution of the Work including, but not limited to, the following: 1. Construction layout. 2. Field engineering and surveying. 3. General installation of products. 4. Progress cleaning. 5. Starting and adjusting. 6. Protection of installed construction. 7. Correction of the Work. B. See Division 01 Section "Closeout Procedures" for submitting final property survey with Project Record Documents, recording of Owner-accepted deviations from indicated lines and levels, and final cleaning. 1.2 SUBMITTALS A. Certificates: Submit certificate signed by land surveyor certifying that location and elevation of improvements comply with requirements. B. Landfill Receipts: Submit copy of receipts issued by a landfill facility, licensed to accept hazardous materials, for hazardous waste disposal. C. Certified Surveys: Submit two copies signed by land surveyor. D. Final Property Survey: Submit 10 copies showing the Work performed and record survey data. 1.3 QUALITY ASSURANCE A. Land Surveyor Qualifications: A professional land surveyor who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing land-surveying services of the kind indicated Grace Lutheran Church, Parker, CO Issue Date EXECUTION

26 PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION 3.1 EXAMINATION A. Existing Conditions: The existence and location of site improvements, utilities, and other construction indicated as existing are not guaranteed. Before beginning work, investigate and verify the existence and location of mechanical and electrical systems and other construction affecting the Work. 1. Before construction, verify the location and points of connection of utility services. B. Existing Utilities: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities and other construction affecting the Work. 1. Before construction, verify the location and invert elevation at points of connection of sanitary sewer, storm sewer, and water-service piping; and underground electrical services. 2. Furnish location data for work related to Project that must be performed by public utilities serving Project site. C. Acceptance of Conditions: Examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations. 1. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers. 2. Examine roughing-in for mechanical and electrical systems to verify actual locations of connections before equipment and fixture installation. 3. Examine walls, floors, and roofs for suitable conditions where products and systems are to be installed. 4. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions. 3.2 PREPARATION A. Existing Utility Information: Furnish information to local utility that is necessary to adjust, move, or relocate existing utility structures, utility poles, lines, services, or other utility appurtenances located in or affected by construction. Coordinate with authorities having jurisdiction. B. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work. C. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings Grace Lutheran Church, Parker, CO Issue Date EXECUTION

27 D. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to Architect. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents. 3.3 CONSTRUCTION LAYOUT A. Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks. If discrepancies are discovered, notify Architect promptly. B. General: Engage a land surveyor to lay out the Work using accepted surveying practices. 1. Establish benchmarks and control points to set lines and levels at each story of construction and elsewhere as needed to locate each element of Project. 2. Establish dimensions within tolerances indicated. Do not scale Drawings to obtain required dimensions. 3. Inform installers of lines and levels to which they must comply. 4. Check the location, level and plumb, of every major element as the Work progresses. 5. Notify Architect when deviations from required lines and levels exceed allowable tolerances. 6. Close site surveys with an error of closure equal to or less than the standard established by authorities having jurisdiction. C. Site Improvements: Locate and lay out site improvements, including pavements, grading, fill and topsoil placement, utility slopes, and invert elevations. D. Building Lines and Levels: Locate and lay out control lines and levels for structures, building foundations, column grids, and floor levels, including those required for mechanical and electrical work. Transfer survey markings and elevations for use with control lines and levels. Level foundations and piers from two or more locations. E. Record Log: Maintain a log of layout control work. Record deviations from required lines and levels. Include beginning and ending dates and times of surveys, weather conditions, name and duty of each survey party member, and types of instruments and tapes used. Make the log available for reference by Architect. 3.4 FIELD ENGINEERING A. Reference Points: Locate existing permanent benchmarks, control points, and similar reference points before beginning the Work. Preserve and protect permanent benchmarks and control points during construction operations. B. Benchmarks: Establish and maintain a minimum of two permanent benchmarks on Project site, referenced to data established by survey control points. Comply with authorities having jurisdiction for type and size of benchmark. 1. Record benchmark locations, with horizontal and vertical data, on Project Record Documents Grace Lutheran Church, Parker, CO Issue Date EXECUTION

SECTION PAYMENT PROCEDURES

SECTION PAYMENT PROCEDURES SECTION 012900 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract including General and Supplementary Conditions and other Division 01 Specifications Sections apply

More information

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.

More information

DeKalb County Library Dunwoody Library Staff Area Renovation

DeKalb County Library Dunwoody Library Staff Area Renovation PROJECT MANUAL DeKalb County Library Dunwoody Library Staff Area Renovation OWNER: DeKalb County Library Email: kimbroj@dekalblibrary.org Contact: Jackee Kimbro 404-508-719-, ext. 2236 ARCHITECT: MEP ENGINEER:

More information

TOWNES + architects, P.A.

TOWNES + architects, P.A. TOWNES + architects, P.A. 2421 North 12th Avenue, Pensacola, Florida 32503 Telephone: (850) 433-0203 Florida Registration AA-26001051 PROJECT MANUAL City of Pensacola Fleet Maintenace Garage Re ovation

More information

RANDOLPH COMMUNITY CENTER GYMNASIUM FLOOR REPLACEMENT

RANDOLPH COMMUNITY CENTER GYMNASIUM FLOOR REPLACEMENT PROJECT MANUAL RANDOLPH COMMUNITY CENTER GYMNASIUM FLOOR REPLACEMENT CITY OF RICHMOND Richmond, Virginia Architect s Project No. 563107 ARCHITECT/ENGINEER RICHMOND, VIRGINIA A/E s Project No. 563107 set

More information

1ARCHITECTURE TABLE OF CONTENTS

1ARCHITECTURE TABLE OF CONTENTS TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 0102 COVER 00 0107 SEALS PAGE 00 0111 TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 1000 01 2000 01 2100 01 2300 01

More information

RWA, Inc. TECHNICAL SPECIFICATIONS NORTH COLLIER BOULEVARD PAVING AND DRAINAGE IMPROVEMENTS Willow Park Drive Suite 200 Naples, FL 34109

RWA, Inc. TECHNICAL SPECIFICATIONS NORTH COLLIER BOULEVARD PAVING AND DRAINAGE IMPROVEMENTS Willow Park Drive Suite 200 Naples, FL 34109 RWA, Inc. TECHNICAL SPECIFICATIONS NORTH COLLIER BOULEVARD PAVING AND DRAINAGE IMPROVEMENTS 6610 Willow Park Drive Suite 200 Naples, FL 34109 MAY 23, 2012 NORTH COLLIER BOULEVARD PAVING AND DRAINAGE IMPROVEMENTS

More information

TRUMAN STATE UNIVERSITY SITE IMPROVEMENTS, KIRK BLDG, MISSOURI HALL & STUDENT REC CENTER LTD RENOVATIONS

TRUMAN STATE UNIVERSITY SITE IMPROVEMENTS, KIRK BLDG, MISSOURI HALL & STUDENT REC CENTER LTD RENOVATIONS SECTION 011000 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

Ogden Regional Medical Center Courtyard Remodel. Construction Documents. MountainStar Healthcare PROJECT MANUAL FOR

Ogden Regional Medical Center Courtyard Remodel. Construction Documents. MountainStar Healthcare PROJECT MANUAL FOR PROJECT MANUAL FOR Ogden Regional Medical Center 5475 South 500 East Ogden, UT 84405 for MountainStar Healthcare Construction Documents NJRA Architects, Inc. 5272 South College Dr. Murray, Utah 84123 Telephone:

More information

DIVISION 10 - SPECIALTIES Toilet, Bath, and Laundry Accessories Fire Extinguishers

DIVISION 10 - SPECIALTIES Toilet, Bath, and Laundry Accessories Fire Extinguishers DIVISION 01 GENERAL REQUIREMENTS 012500 Substitution Procedures 012600 Contract Modification Procedures 013100 Project Management and Coordination 013150 Requests for Information 013200 Construction Progress

More information

New Mexico State University Herritage Farm Interpretive Trail

New Mexico State University Herritage Farm Interpretive Trail PROJECT MANUAL PROJECT MANAGER: SHELLEY ZIVKOVICH 575-646-1991 shelleyz@nmsu.edu New Mexico State University Herritage Farm Interpretive Trail APRIL 28, 2017 PROJECT #206-88 WDG ARCHITECTS 1014 South Main

More information

Project Manual OVERLAND PARK BRANCH & ESIS RELOCATION. for

Project Manual OVERLAND PARK BRANCH & ESIS RELOCATION. for Project Manual OVERLAND PARK BRANCH & ESIS RELOCATION for Chubb Floor 4 34 Corporate Woods 10950 Grandview Drive Overland Park KS 66210 Issued for Bid & Permit July 18, 2016 SECTION 000110 TABLE OF CONTENTS

More information

CITY OF RICHMOND EDI BUILDING WINDOW REPLACEMENT PROJECT MANUAL. Commonwealth Architects

CITY OF RICHMOND EDI BUILDING WINDOW REPLACEMENT PROJECT MANUAL. Commonwealth Architects CITY OF RICHMOND EDI BUILDING WINDOW REPLACEMENT 701 North 25th Street Richmond, Virginia 23223 PROJECT MANUAL PERMIT SET FEBRUARY 27, 2017 Commonwealth Architects 101 Shockoe Slip Richmond, VA 23219 CITY

More information

PROJECT MANUAL POINT BLANK RANGE & GUN SHOP. 600 Corporate way Knoxville, TN. Bid/Permit Set

PROJECT MANUAL POINT BLANK RANGE & GUN SHOP. 600 Corporate way Knoxville, TN. Bid/Permit Set PROJECT MANUAL POINT BLANK RANGE & GUN SHOP 600 Corporate way Knoxville, TN Bid/Permit Set Division Section Title SPECIFICATIONS GROUP DIVISION 01 - GENERAL REQUIREMENTS 011000 SUMMARY 012600 CONTRACT

More information

VAE VIEW ELEMENTARY WINDOW REPLACEMENT West 1600 North Layton, UT Specifications. Construction Documents

VAE VIEW ELEMENTARY WINDOW REPLACEMENT West 1600 North Layton, UT Specifications. Construction Documents VAE VIEW ELEMENTARY WINDOW REPLACEMENT 1750 West 1600 North Layton, UT 84041 Specifications 19 March 2018 TABLE OF CONTENTS DIVISION 00 PREREQUIREMENT AND CONTRACTING REQUIREMENTS A101 A201 A310 A312 G701

More information

CITY OF RICHMOND EDI BUILDING WINDOW REPLACEMENT 701 North 25th Street Richmond, Virginia PROJECT MANUAL BID SET April 4, 2018

CITY OF RICHMOND EDI BUILDING WINDOW REPLACEMENT 701 North 25th Street Richmond, Virginia PROJECT MANUAL BID SET April 4, 2018 CITY OF RICHMOND EDI BUILDING WINDOW REPLACEMENT 701 North 25th Street Richmond, Virginia 23223 PROJECT MANUAL BID SET April 4, 2018 Commonwealth Architects 101 Shockoe Slip, Fl 3 Richmond, VA 23219 CITY

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

SPECIFICATIONS. September 27, 2016 Bid Set

SPECIFICATIONS. September 27, 2016 Bid Set SPECIFICATIONS September 27, 2016 Bid Set CITY HALL SUITE 100 & 102 RENOVATIONS TABLE OF CONTENTS (Refer to Project Book under separate cover for additional requirements) SPECIFICATIONS DIVISION 1 - GENERAL

More information

INVITATION FOR BIDS FOR

INVITATION FOR BIDS FOR ********************************************************************************************** IFB NO. Y18-749-RM ISSUED: March 16, 2018 INVITATION FOR BIDS FOR EAST ORANGE HEAD START MODULAR RELOCATION

More information

A. Remove Table of Contents and insert new attached Table of Contents.

A. Remove Table of Contents and insert new attached Table of Contents. ADDENDUM NO. 01 PROJECT Colby Glass E.S. Window Upgrades and ADA Work PROJECT NO. 16043 DATE February 07, 2018 TO: All Prime Contract Bidders and all others to whom Drawings and Specifications have been

More information

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows: ADDENDUM NO. 1 TO THE DRAWINGS AND SPECIFICATIONS FOR THE New Dishman-McGinnis Elementary School Bowling Green Independent Schools Bowling Green, Kentucky BG 12-256 RTA 1209 March 11, 2013 To All Plan

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6 PROJECT MANUAL for: FRANKLIN VILLAGE APARTMENTS Building I Morristown, NJ 07960 Block: 3901 Lots: 4,5,6 Owner: Atlantic Health Investment Corp. 200 American Road Morris Plains, NJ 07950 Architect NETTA

More information

Document B252TM 2007

Document B252TM 2007 Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation

More information

Project Manual Index of Specifications Shenandoah Schools Concession Building

Project Manual Index of Specifications Shenandoah Schools Concession Building INDEX OF SPECIFICATIONS Division 0..BIDDING AND CONTRACT REQUIREMENTS 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 41 00 Bid Forms 00 43 13 Bid Security Form 00 72 00 General Conditions

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION Section 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Invitation

More information

TABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages

TABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages TABLE OF CONTENTS VOLUME 1 DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages SCHEDULE OF DRAWINGS...... 1 PROJECT PERSONNEL & DIRECTORY......

More information

TRUMAN STATE UNIVERSITY BALDWIN HALL, PERSHING BLDG AND VIOLETTE HALL ROOFING & EXT. RENOV.

TRUMAN STATE UNIVERSITY BALDWIN HALL, PERSHING BLDG AND VIOLETTE HALL ROOFING & EXT. RENOV. SECTION 011000 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

Willow Oak Veterinary Hospital

Willow Oak Veterinary Hospital Project Manual For Willow Oak Veterinary Hospital Durham, North Carolina Linton Architects Project #1219 September 11, 2013 Linton Architects 331 West Main Street, Suite 608 Durham, North Carolina 27701

More information

Project Manual. Unitarian Universalist Congregation of Princeton 50 Cherry Hill Road Princeton, New Jersey Lot: 11 Block: 5201

Project Manual. Unitarian Universalist Congregation of Princeton 50 Cherry Hill Road Princeton, New Jersey Lot: 11 Block: 5201 Project Manual for Alterations & Building Addition to: Unitarian Universalist Congregation of Princeton 50 Cherry Hill Road Princeton, New Jersey Lot: 11 Block: 5201 SCHEMATIC DESIGN ISSUE NOT FOR CONSTRUCTION

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE DIVISION 1 GENERAL REQUIREMENTS SECTION 01 32 16 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. All drawings and technical specifications, Notice to Bidders, Instructions and Information to Bidders, Bid Proposal

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

DALLAS-FORT WORTH INTERNATIONAL AIRPORT

DALLAS-FORT WORTH INTERNATIONAL AIRPORT DALLAS-FORT WORTH INTERNATIONAL AIRPORT ADDENDUM NO. 2 TO THE REQUEST FOR BIDS Contract No. 9500445 Restroom Rehabilitation at Terminal B (Phase 3 & 4) December 20, 2010 THE REQUEST FOR BIDS (RFB) FOR

More information

Baseball Performance Development Center A Prevailing Wage Project

Baseball Performance Development Center A Prevailing Wage Project June 30, 2016 Baseball Performance Development Center A Prevailing Wage Project PROJECT MANUAL Owner CENTRAL MICHIGAN UNIVERISTY 206 Combined Services Building Mount Pleasant, Michigan PROJECT NUMBER 15-231

More information

Façade Access Upgrade Project

Façade Access Upgrade Project University of California Hastings College of Law Façade Access Upgrade Project 200 McAllister Street, San Francisco, CA 94102 Project Number 12042.04 ITB #56-0160 (Revised) August 20, 2015 PROJECT MANUAL

More information

Division 00 Procurement and Contracting Requirements

Division 00 Procurement and Contracting Requirements SECTION 00 01 10 TABLE OF CONTENTS Division SECTION NO. VOLUME ONE Title SECTION TITLE Division 00 Procurement and Contracting Requirements 00 11 00 Invitation to Bidders 00 21 00 Instructions to Bidders

More information

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following: SECTION 01700 - CONTRACT CLOSEOUT PART 1 - GENERAL 1.01 RELATED DOCUMENTS 1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

County of Elko, Nevada Requirements, Specifications and Contract Documents. Mechanical System Upgrade, Project Manuel. Jackpot, Elko County, Nevada

County of Elko, Nevada Requirements, Specifications and Contract Documents. Mechanical System Upgrade, Project Manuel. Jackpot, Elko County, Nevada 1 County of Elko, Nevada Requirements, Specifications and Contract Documents for Jackpot Recreation Center Mechanical System Upgrade 2016 Project in Jackpot, Elko County, Nevada Department of Community

More information

PARKING LOTS 4 AND 5 (DEMOLITION)

PARKING LOTS 4 AND 5 (DEMOLITION) TECHNICAL SPECIFICATIONS PARKING LOTS 4 AND 5 (DEMOLITION) AT 9200 Valley View Street Cypress, CA 90630 1830 Romneya Drive Anaheim, CA 92801-1819 Tel. (714) 808-4747 WW Project No. 17030.00 October 25,

More information

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

ADDENDUM NO. 2 Consisting of 3 pages and Attachments 10404-125 Street, Edmonton, AB. T5N 1T2 Tel: 780.455.5975 Fax: 780.454.2397 info@cdyarchitect.com ADDENDUM NO. 2 Consisting of 3 pages and Attachments PROJECT: Maina Centre Ville Phase II, Beaumont, Alberta

More information

SSM Project: Centennial School District Issued for Bid AC Unit Replacements 05/16/2014 Klinger and Log College Middle Schools

SSM Project: Centennial School District Issued for Bid AC Unit Replacements 05/16/2014 Klinger and Log College Middle Schools Division Section Title SPECIFICATIONS GROUP General Requirements Subgroup DIVISION 01 GENERAL REQUIREMENTS 011000 SUMMARY 012500 SUBSTITUTION PROCEDURES 012600 CONTRACT MODIFICATION PROCEDURES 012900 PAYMENT

More information

University Apartments on Brooklyn PROJECT MANUAL

University Apartments on Brooklyn PROJECT MANUAL Section 011000 - Summary PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Project information. 2. Work covered by Contract Documents. 3. Phased construction. 4. Work under separate contracts. 5. Access

More information

A62 UT PRE-CONSTRUCTION MEETING AGENDA

A62 UT PRE-CONSTRUCTION MEETING AGENDA Provided below are the agenda items typically required by the Owner for the Pre-Construction Meeting. Guidance provided in agenda items does not revise the requirements of the Agreement. Instructions:

More information

NMSU Carlsbad Campus Main Building and Computer Building DDC Control Upgrade. Project Manual Technical Specifications Review Submittal May 12, 2017

NMSU Carlsbad Campus Main Building and Computer Building DDC Control Upgrade. Project Manual Technical Specifications Review Submittal May 12, 2017 NMSU Carlsbad Campus Main Building and Computer Building DDC Control Upgrade NMSU Facilities and Services Department P.O. Box 30001 Las Cruces, NM 88003-8001 Project Manual Technical Specifications Review

More information

OSNI PONCA OFFICE REMODEL

OSNI PONCA OFFICE REMODEL OSNI PONCA OFFICE REMODEL PROJECT MANUAL OCTOBER 2016 SCHEMMER PROJECT NO. 06571.002 OSNI PONCA OFFICE REMODEL TABLE OF CONTENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 000115 LIST OF DRAWING

More information

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders

More information

SPECIFICATIONS May 25, Ellicott Station Redevelopment Brewery Building - 40 Ellicott Street Ellicott Street Batavia, New York United States

SPECIFICATIONS May 25, Ellicott Station Redevelopment Brewery Building - 40 Ellicott Street Ellicott Street Batavia, New York United States SPECIFICATIONS May 25, 2018 Ellicott Station Redevelopment Brewery Building - 40 Ellicott Street Ellicott Street Batavia, New York United States Ellicott Station Development, LLC 500 Seneca Street Suite

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

SECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL)

SECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL) SECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL) PART 1 - PROJECT TITLE PAGE February 8, 2018 Project No. PROJECT NAME PART 2 - PROJECT GUIDELINES 2.1 BIDDERS/CONTRACTORS SHOULD CHECK

More information

SECTION CONSTRUCTION PROGRESS DOCUMENTATION

SECTION CONSTRUCTION PROGRESS DOCUMENTATION SECTION 01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

SPECIFICATIONS. Permit Set RICHMOND CITY HALL: SUITE 110 RENOVATIONS. City of Richmond, Virginia Architect s Project No

SPECIFICATIONS. Permit Set RICHMOND CITY HALL: SUITE 110 RENOVATIONS. City of Richmond, Virginia Architect s Project No SPECIFICATIONS Permit Set RICHMOND CITY HALL: SUITE 110 RENOVATIONS ARCHITECT RICHMOND, VIRGINIA MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL ENGINEERS GLEN ALLEN, VIRGINIA A/E s Project No. 563109

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 4000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Pre-Construction Conference Discussion Guide

Pre-Construction Conference Discussion Guide Pre-Construction Conference Discussion Guide This guide is a summary of the topics normally required at the Pre-Construction Conference based upon the Tennessee Board of Regents Designers Manual standard

More information

EXECUTION REQUIREMENTS

EXECUTION REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: Execution requirements. B. Related Requirements: 1. Specification Sections 2 through 49. PART 2 - PRODUCTS (Not Used). PART 3 - EXECUTION 3.1 SAFETY 01

More information

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS AIA General Conditions... GC-1 to GC-44 Amendments to General Conditions... AM-1 to AM-2 Supplements to General Conditions... SU-1 to SU-7 00200 Instructions To Bidders... 1 3 00201 Contractor s Bidding

More information

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS GENERAL The commercial bidding process is a well-defined path of positioning oneself to be the successful bidder amongst a group purporting to offer the same quality materials and labor. There are certain

More information

BOWIE STATE UNIVERSITY CAR PARKING LOT

BOWIE STATE UNIVERSITY CAR PARKING LOT BOWIE STATE UNIVERSITY CAR PARKING LOT TECHNICAL SPECIFICATIONS 100% CD SUBMISSION NOVEMBER 2, 2018 Prepared by WHITNEY, BAILEY COX & MAGNANI, LLC 300 East Joppa Road, Suite 200 Baltimore, Maryland 21286

More information

WAYNE COMMUNITY COLLEGE SECTION

WAYNE COMMUNITY COLLEGE SECTION WAYNE COMMUNITY COLLEGE SECTION 00-01-15 LIST OF DRAWING SHEETS SECTION 00-01-15 LIST OF DRAWING SHEETS 1.1 LIST OF DRAWINGS A. Drawings: Drawings consist of the Contract Drawings and other drawings listed

More information

A62 PRE-CONSTRUCTION MEETING AGENDA

A62 PRE-CONSTRUCTION MEETING AGENDA Provided below are the agenda items typically required by the Owner for the Pre-Construction Meeting. Guidance provided in agenda items does not revise the requirements of the Agreement. Instructions:

More information

G , Request for Proposal Land Survey

G , Request for Proposal Land Survey G601 1994, Request for Proposal Land Survey AIA Document G601 1994 allows owners to request proposals from a number of surveyors based on information deemed necessary by the owner and architect. G601 1994

More information

1) Unified School District No. 489 reserves the right to reject any or all bids and to waive any informalities in the bid procedure.

1) Unified School District No. 489 reserves the right to reject any or all bids and to waive any informalities in the bid procedure. Prospective bidders: The Board of Education, Unified School District No. 489, will receive bids for the fabrication and construction of two pre-manufactured metal building in the designated area at the

More information

707 Minnesota Ave., Suite 506 Kansas City, Kansas Tel Fax

707 Minnesota Ave., Suite 506 Kansas City, Kansas Tel Fax ADDENDUM 707 Minnesota Ave., Suite 506 Kansas City, Kansas 66101 Tel. 913.287.1900 Fax. 816.300.4102 www.wskfarch.com A r c h i t e c t u r e I n t e r i o r D e s i g n I l l u s t r a t I o n P l a n

More information

SECTION GENERAL REQUIREMENTS

SECTION GENERAL REQUIREMENTS SECTION 01005 GENERAL REQUIREMENTS PART 1 GENERAL 1.01 WORK COVERED BY CONTRACT DOCUMENTS A. Work of this Contract comprises the chiller and cooling tower replacement at Five Oaks Middle School which includes

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

George Washington Middle School - HVAC Replacement 100% Construction Documents May 7, 2018 TABLE OF CONTENTS

George Washington Middle School - HVAC Replacement 100% Construction Documents May 7, 2018 TABLE OF CONTENTS TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS 011000 SUMMARY 012500 SUBSTITUTION PROCEDURES 012900 PAYMENT PROCEDURES 013100 PROJECT MANAGEMENT AND COORDINATION 013200 CONSTRUCTION PROGRESS DOCUMENTATION

More information

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower DOCUMENT 001153 - REQUEST FOR QUALIFICATIONS 1.1 PURPOSE, LAWS, AND REGULATIONS A. The purpose of the Prequalification Procedure described in this Document is to provide Owner with a mechanism to evaluate

More information

1. Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

1. Section Temporary Facilities and Controls for limitations and procedures governing temporary use of Owner's facilities. CSB 7th Floor Orthopaedic Surgery Office Renovation Phase 2 SECTION 011000 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

THE FORUM ROME, GEORGIA FOR FLOYD COUNTY PROJECT MANUAL (BALLROOM AND CONCESSIONS) Construction Documents

THE FORUM ROME, GEORGIA FOR FLOYD COUNTY PROJECT MANUAL (BALLROOM AND CONCESSIONS) Construction Documents THE FORUM ROME, GEORGIA FOR FLOYD COUNTY PROJECT MANUAL (BALLROOM AND CONCESSIONS) Construction Documents Architect s Project Number: 420.01.01 Issued: November 11, 2016 PEACOCK a r c h i t e c t s 5525

More information

ANTELOPE VALLEY COLLEGE PALMDALE AIRPORT TERMINAL REMODEL

ANTELOPE VALLEY COLLEGE PALMDALE AIRPORT TERMINAL REMODEL PALMDALE AIRPORT TERMINAL REMODEL 21000 20 TH STREET EAST, PALMDALE, CA 93550 for ANTELOPE VALLEY COMMUNITY COLLEGE DISTRICT 3041 WEST AVENUE K LANCASTER, CALIFORNIA 93536-5436 PROJECT MANUAL AUGUST 15,

More information

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...

More information

1.07 SUPPLEMENTS PRODUCTS (NOT USED) EXECUTION (NOT USED) END OF SECTION

1.07 SUPPLEMENTS PRODUCTS (NOT USED) EXECUTION (NOT USED) END OF SECTION 1.07 SUPPLEMENTS d. Complete using typewriter or electronic printing. 3. Include detailed lubrication instructions and diagrams showing points to be greased or oiled; recommend type, grade, and temperature

More information

A. Section includes general administrative and procedural requirements governing execution of the Work including, but not limited to, the following:

A. Section includes general administrative and procedural requirements governing execution of the Work including, but not limited to, the following: SECTION 01 73 00 - EXECUTION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

RIVERSIDE CHURCH OF CHRIST. Lafayette, LA

RIVERSIDE CHURCH OF CHRIST. Lafayette, LA SECTION 000010 INVITATION FOR BIDS Bids for will be received in the office of Church Development Construction Services, 708 S. Rosemont Road, Suite #101,, until 12:00 noon Local Prevailing Time on Friday,

More information

Commercial Remodel Permit

Commercial Remodel Permit Commercial Remodel Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts, each

More information

East Central College

East Central College SECTION 013200 - CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013200 - CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Southwest Middle School 6030 Ogeechee Road, Savannah Georgia

Southwest Middle School 6030 Ogeechee Road, Savannah Georgia Southwest Middle School 6030 Ogeechee Road, Savannah Georgia Savannah Chatham County Public School System Savannah, GA Bid C18-01 May 2017 Barnard Architects 220 East Hall Street, Savannah GA 31410 Southwest

More information

ATTACHMENT W.2 GENERAL SPECIFICATIONS

ATTACHMENT W.2 GENERAL SPECIFICATIONS ATTACHMENT W.2 GENERAL SPECIFICATIONS IFB No. 016-002 Virginia Railway Express Page 1 of 39 General Specifications Table of Contents SECTION TITLE PAGE Title Page 1 00 01 10 Table of Contents 2 Division

More information

PROJECT MANUAL. Phi Delta Theta Phase NW 13 th Street Corvallis, OR Varitone Architecture LLC

PROJECT MANUAL. Phi Delta Theta Phase NW 13 th Street Corvallis, OR Varitone Architecture LLC PROJECT MANUAL Phi Delta Theta Phase 2 120 NW 13 th Street Corvallis, OR 97330 Varitone Architecture LLC 231 SW 2nd Ave. PO Box 3420 Albany, Oregon 97321 Project Contacts Owner Phi Delta Theta Chapter

More information

New Outdoor Firing Range Facility Project Manual

New Outdoor Firing Range Facility Project Manual Pinellas County Sheriff s Office New Outdoor Firing Range Facility Project Manual April 5, 2010 Project Address: 3410 118 th Avenue North Pinellas Park, Florida 337625 Owner: Pinellas County Sheriff s

More information

Chapter 6, Construction

Chapter 6, Construction Chapter 6, Construction CHAPTER CONTENTS 6.1 OWNER-CONTRACTOR AGREEMENT A. Preparation B. Owner Signature C. Award 6.2 PRE-CONSTRUCTION CONFERENCE A. Administration B. Attendees C. Pre-Construction Conference

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

UMC El Paso Far East Clinic and Neighborhood Healthcare Center West Issue for Construction Page Project No and April 13, 2015

UMC El Paso Far East Clinic and Neighborhood Healthcare Center West Issue for Construction Page Project No and April 13, 2015 Page Project No. 414018 and 414019 April 13, 2015 Table of Contents Division Section Title Pages PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 003100

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

PIKES PEAK PARKING RESTORATION TABLE OF CONTENTS

PIKES PEAK PARKING RESTORATION TABLE OF CONTENTS 23 HEATING, VENTILATING AND AIR CONDITIONING TABLE OF CONTENTS TABLE OF CONTENTS DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING - Basic HVAC Requirements 238239.19 - Wall and Ceiling Unit Heaters

More information

City Of Mendota Construction Procedures

City Of Mendota Construction Procedures City Of Mendota Construction Procedures Building Permit Application: A permit shall be obtained prior to commencing work of any type. Failure to do so may result in doubling the permit fees. At the time

More information

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility RFP Components CLIENT: TradePort International Corporation, Operators of John C. Munro

More information

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS Watercrest - Sand Hill - Columbia, SC 00 0110-1 TABLE OF CONTENTS DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS INTRODUCTORY INFORMATION Document 00 0101 Document 00 0110 Project Title Page CONTRACTING

More information

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of: 02070 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General Requirements"

More information

Project Manual. Beaverton School District Beaverton High School Gymnasium Improvement Beaverton, Oregon. Issue date: December 21st 2017

Project Manual. Beaverton School District Beaverton High School Gymnasium Improvement Beaverton, Oregon. Issue date: December 21st 2017 Project Manual Beaverton School District Beaverton High School Gymnasium Improvement Beaverton, Oregon Issue date: December 21st 2017 18241 Beaverton High School Gymnasium Improvement TABLE OF CONTENTS

More information

SECTION QUALITY REQUIREMENTS

SECTION QUALITY REQUIREMENTS SECTION 014000 - PART 1 - GENERAL 1.1 SUMMARY A. Defines SRP requirements for Contractor Quality Control and Owner Quality Assurance. As an Electric and Water Utility, SRP has many critical facilities.

More information

PROJECT SPECIFICATIONS PENSACOLA INTERNATIONAL AIRPORT PARKING GARAGE REHABILITATION

PROJECT SPECIFICATIONS PENSACOLA INTERNATIONAL AIRPORT PARKING GARAGE REHABILITATION PROJECT SPECIFICATIONS PENSACOLA INTERNATIONAL AIRPORT PARKING GARAGE REHABILITATION CITY OF PENSACOLA November 2018 SECTION 011000- SUMMARY OF WORK PART 1 - GENERAL 1.1 DOCUMENTS A. Drawings and general

More information

ruby ridge terrace apartments

ruby ridge terrace apartments p r o j e c t m a n u a l for: ruby ridge terrace apartments 550 South, 12th Street 89801 Re-Bid Package 01 May 14, 2014 TABLE OF CONTENTS 1. Title page 2. Table of Contents 3. Invitation to Bid 4. Bid

More information

AWT 9TH FLOOR IMPROVEMENTS CITY OF ANAHEIM, CALL CENTER CREDIT & BILLING DEPARTMENTS, ANAHEIM, CA TECHNICAL SPECIFICATIONS AUGUST 2, 2018

AWT 9TH FLOOR IMPROVEMENTS CITY OF ANAHEIM, CALL CENTER CREDIT & BILLING DEPARTMENTS, ANAHEIM, CA TECHNICAL SPECIFICATIONS AUGUST 2, 2018 CITY OF ANAHEIM, CALL CENTER CREDIT & BILLING DEPARTMENTS, ANAHEIM, CA TECHNICAL SPECIFICATIONS AUGUST 2, 2018 ROBERT BORDERS & ASSOCIATES. General Conditions AIA A201 by reference. TABLE OF CONTENTS DIVISION

More information

QUALITY REQUIREMENTS

QUALITY REQUIREMENTS SECTION 014000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

1.4 USE OF EXISTING ELEVATORS FOR CONSTRUCTION PURPOSES (NO ELEVATOR CONTRACTOR IS CONTRACTED FOR THE PROJECT)

1.4 USE OF EXISTING ELEVATORS FOR CONSTRUCTION PURPOSES (NO ELEVATOR CONTRACTOR IS CONTRACTED FOR THE PROJECT) 1.4 USE OF EXISTING ELEVATORS FOR CONSTRUCTION PURPOSES (NO ELEVATOR CONTRACTOR IS CONTRACTED FOR THE PROJECT) The use of an existing elevator during construction shall be strictly prohibited. Any deviation

More information

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,

More information

SECTION SUMMARY OF WORK

SECTION SUMMARY OF WORK SECTION 01010 - SUMMARY OF WORK PART 1 - GENERAL 1.01 SUMMARY OF WORK A. Work covers construction of the new Southeast Kentucky Regional Business Park Speculative Building #3, with associated site work.

More information

ATTACHMENT A. Bid # 6793

ATTACHMENT A. Bid # 6793 ATTACHMENT A SCOPE OF WORK TECHNICAL SPECIFICATIONS AND CONTRACT DRAWINGS STORAGE SHED INSTALLATION AT THE SAN JOAQUIN COUNTY HOUSEHOLD HAZARDOUS WASTE FACILITY Bid # 6793 Department of Public Works Solid

More information