T.O. COPING T.O. COPING SECOND FLOOR FIRST FLOOR ELEV.= 0'-0" 6 T.O. COPING FIRST FLOOR ELEV.= 0'-0"
|
|
- Annabella Gaines
- 5 years ago
- Views:
Transcription
1 ELEV.= ±8'-0" ELEV.= ±'-" SECOND FLOOR ELEV.= ±'-0" ELEV.= ±5'-8" SECOND FLOOR ELEV.= ±'-0" E ELEV.= ±'-0" CHEVROLET EXISTING EAST ELEVATION /8" = '-0" PADDOCK Goodwrench Service Plus SERVICE SERVICE QUICK LUBE QUICK LUBE EXISTING SOUTH ELEVATION /8" = '-0" 9 8 EXISTING WEST ELEVATION /8" = '-0" ELEV.= ±8'-0" SECOND FLOOR ELEV.= ±'-0" ELEV.= ±8'-0" SECOND FLOOR ELEV.= ±'-0" 9 ELEV.= ±'-0". REMOVE ALL EXISTING SIGNAGE IN AREA OF WORK, TURN OVER TO OWNER.. REMOVE EXISTING ACCENT LIGHTING, REMOVE WIRING BACK TO SOURCE.. REMOVE EXISTING EIFS SYSTEM AS SHOWN, PREPARE AREA TO RECEIVE NEW FINISHES.. REMOVE PORTION OF EXISTING GLAZING AS NEW CONSTRUCTION, PREPARE AREA TO RECEIVE NEW CONSTRUCTION. 5. REMOVE EXISTING PYLON SIGN, COORDINATE POSSIBLE REUSE OF EXISTING PYLON SIGN FOUNDATION WITH SIGNAGE CONTRACTOR.. EXISTING EIFS, PATCH AND REPAIR AS INSTALLATION OF NEW FINISHES.. EXISTING GLAZING. 8. EXISTING DOOR. 9. EXISTING OVERHEAD DOOR.. EXISTING ALUMINUM COPING.. EXISTING CHAIN-LINK GARBAGE ENCLOSURE.. EXISTING GAS METER. X DEMOLITION NOTES. EXISTING PAINTED CMU, PATCH AND REPAIR AS INSTALLATION OF NEW FINISHES. AD-0 AD-0 ELEV.= ±'-0" ELEV.= ±'-0" ELEV.= ±8'-0" ELEV.= ±'-" SECOND FLOOR ELEV.= ±'-0" A AD-0 Delaware Ave. Kenmore, NY DEMOLITION A EXISTING NORTH ELEVATION /8" = '-0" KEY PLAN Scale: NTS E- AD AD-0
2 A AS- Delaware Ave. Kenmore, NY OVERALL SITE PLAN OVERALL SITE PLAN A SCALE: : AS-
3 SOMERTON AVENUE NEW ACM PANELS ABOVE DEALER SIGN ABOVE PER (" HIGH) EXISTING BUILDING LINE.08' TO PROPERTY LINE SALES ENTRY ELEMENT PER (0' WIDE x ' HIGH) '-0" 0'-0" 8'-0" '-8" EXISTING SIDEWALK NEW GMDI ENTRY ELEMENT TO EDGE OF CANOPY '-0" '-0" NEW ACM PANELS ABOVE EXISTING PADDOCK CHEVROLET PYLON SIGN PER DELAWARE AVENUE EXISTING PARKING LOT SERVICE SERVICE SIGN ABOVE PER (" HIGH) NEW ACM PANELS ABOVE NORTH END AVENUE Delaware Ave. Kenmore, NY ARCHITECTURAL SITE PLAN A ARCHITECTURAL SITE PLAN SCALE: /" = '-0" AS-
4 PLAN SCALE: /8" = '-0" A A- A A-50 A5 A- REMOVE EXISTING PARTITION WALL. PATCH ADJACENT SURFACES DAMAGED BY REMOVALS TO ALLOW FOR NEW CONSTRUCTION. NEW GLASS WALL TO MATCH EXISTING, PROVIDE BREAK METAL TO CAP END OF EXISTING WALL, REMOVE EXISTING DOOR, DOOR FRAME AND ASSOCIATED HARDWARE. NEW GLASS DOOR TO MATCH EXISTING, HEIGHT TO MATCH EXISTING FIELD VERIFY B5 CLEAR ANODIZED ALUM. CHANNEL AT HEAD TO MATCH EXISTING, SECTION AT PARTITION / GLASS SCALE: -/" = '-0" ALUM. CONNECTOR TO MATCH EXISTING, B PROVIDE BREAK METAL TO CAP END OF EXISTING WALL, B5 EXISTING PARTITION CLEAR ANODIZED ALUM. END CAP " TEMPERED GLASS EXISTING PARTITION - DRYWALL B SCALE: -/" = '-0" BASE SECTION AT BASE AT PARTITION METAL TRIM TO MATCH EXISTING, ALUM. END CAP - CLEAR ANODIZED " TEMPERED GLASS ALUM. BASE NEW /" TEMPERED GLASS WALL TO MATCH EXISTING, DOOR HARDWARE TO MATCH EXISTING, METAL KICK PLATE TO MATCH EXISTING, Delaware Ave. Kenmore, NY PLAN A ENLARGED PLAN SCALE: /" = '-0" LOCK, A5 INTERIOR ELEVATION SCALE: /8" = '-0" NEW GLASS DOOR TO MATCH EXISTING, FIELD VERIFY NEW GLASS DOOR TO MATCH EXISTING, PROVIDE TOP AND BOTTOM TO MATCH EXISTING ALL ALUM. TO BE CLEAR ANODIZED TO MATCH EXISTING A-
5 '-0" '-0" DEALER SIGN PER (" HIGH) PAINT (EP) EXISTING GLAZING () E ACM FASCIA (ACM) EAST ELEVATION /8" = '-0" SOUTH ELEVATION /8" = '-0" WEST ELEVATION /8" = '-0" ACM ACCENT BAND (ACM) ACM ENTRY (ACM) '-0" PAINT (EP) PAINT (EP) ENTRY ELEMENT PER (0' WIDE x ' HIGH) C5 A-0 GLAZING (GL) ACM FASCIA (ACM) ENTRY ELEMENT PER (0' WIDE x ' HIGH) 0'-0" PAINT (EP) ACM CANOPY (ACM) ACM FRAME (ACM) ACM ACCENT BAND (ACM) '-0" ALIGN FINISH SURFACE () ACM FRAME (ACM) A-50 PAINT (EP) PAINT (EP) PAINT (EP) ACM FASCIA (ACM) EXISTING GLAZING () PAINT (EP) EXISTING GLAZING () PAINT (EP) ACM ACCENT BAND (ACM) PAINT (EP) PAINT (EP) PAINT (EP) PAINT (EP) ALIGN FINISH SURFACE () ACM ACCENT BAND (ACM) ACM FASCIA (ACM) EXISTING GLAZING () ENTRY ELEMENT PER (0' WIDE x ' HIGH) C5 A-0 PAINT (EP) PAINT (EP) PAINT (EP) PAINT (EP) PAINT (EP) EXISTING GLAZING () SERVICE SIGN PER (" HIGH) ACM FASCIA (ACM) FINISH SCHEDULE NO. LOCATION COLOR & MATERIAL SPECIFICATIONS DESCRIPTIONS MANUFACTURER/ SUPPLIER ACM ACM ACM EP EP AT MAIN SHOWROOM STRUCTURE ENTRY ELEMENT ENTRY ELEMENT SERVICE BUILDING STRUCTURE AND ANY OTHER BUILDING EXCEPT MAIN SHOWROOM S AT MAIN SHOWROOM STRUCTURE PAINT TO MATCH ACM- ALPOLIC, TBX, BRIGHT ALUMINUM METALLIC ALPOLIC, CVB BLUE, COLOR TO MATCH PMS 00 CHEVROLET BLUE ALPOLIC, DM HLZ ALUMINUM, BRUSHED HAIRLINE ALUMINUM BENJAMIN MOORE, OC-, WHITE DIAMOND BENJAMIN MOORE, -0, SILVER HALF DOLLAR PAINT (EP) A-0 C A-0 ALUMINUM COMPOSITE MATERIAL ALUMINUM COMPOSITE MATERIAL ALUMINUM COMPOSITE MATERIAL GRADE PAINT GRADE PAINT A-0 ALPOLIC OR EQUAL, DAVE KEARNEY 5-8-5, ALT. SOURCE: ALUCOBOND, ALCOA ALPOLIC OR EQUAL, DAVE KEARNEY 5-8-5, ALT. SOURCE: ALUCOBOND, ALCOA ALPOLIC OR EQUAL, DAVE KEARNEY 5-8-5, ALT. SOURCE: ALUCOBOND, ALCOA LOCAL BENJAMIN MOORE PAINT SUPPLY STORE LOCAL BENJAMIN MOORE PAINT SUPPLY STORE A-0 A A-0 Delaware Ave. Kenmore, NY PAINT (EP) EXISTING GLAZING () PAINT (EP) PAINT (EP) PAINT (EP) A NORTH ELEVATION /8" = '-0" KEY PLAN Scale: NTS E- A A-0
6 F.R.T. BLOCKING REMOVE EXISTING METAL COPING, PREPARE SURFACE TO RECEIVE NEW FINISHES () TOP OF PARAPET ±'-" ABOVE MAIN F.F. " REVEAL () PANEL - ACM () () " REVEAL () SHEATHING () REMOVE EXISTING EIFS SYSTEM, PREPARE SURFACE TO RECEIVE NEW FINISHES () " REVEAL () PANEL - ACM () () " REVEAL () PANEL - ACM () DRIP EDGE () MAIN FINISH FLOOR +0'-0" EXIST. FOUNDATION WALL SECTION SCALE: /" = '-0" D A-50 PROVIDE NEW EPDM MEMBRANE ROOF SYSTEM PER MANUF. SPECS. (CONTINUE UP AND OVER PARAPET) AS REQUIRED BY NEW CONSTRUCTION EXIST. ROOF CONSTRUCTION INSTALLATION () EXIST. CMU WALL INSTALLATION () E A-50 F.R.T. BLOCKING REMOVE EXISTING METAL COPING, PREPARE SURFACE TO RECEIVE NEW FINISHES () TOP OF PARAPET ±'-" ABOVE MAIN F.F. " REVEAL () PANEL - ACM () () EXIST. CMU WALL " REVEAL () SHEATHING () REMOVE EXISTING EIFS SYSTEM, PREPARE SURFACE TO RECEIVE NEW FINISHES () PROVIDE BLOCKING FOR SIGNAGE AS REQUIRED () EXIST. MASONRY OPENING ±'-0" ABOVE MAIN F.F. PANEL, ADHERE TO EXISTING OPENING - ACM () EXISTING OVERHEAD DOOR C MAIN FINISH FLOOR +0'-0" EXIST. FOUNDATION WALL SECTION SCALE: /" = '-0" D A-50 PROVIDE NEW EPDM MEMBRANE ROOF SYSTEM PER MANUF. SPECS. (CONTINUE UP AND OVER PARAPET) AS REQUIRED BY NEW CONSTRUCTION EXIST. ROOF CONSTRUCTION INSTALLATION () F.R.T. BLOCKING REMOVE EXISTING METAL COPING, PREPARE SURFACE TO RECEIVE NEW FINISHES () TOP OF PARAPET ±8'-0" ABOVE MAIN F.F. () REMOVE EXISTING EIFS SYSTEM, PREPARE SURFACE TO RECEIVE NEW FINISHES () EXIST. CMU WALL PANEL - ACM () PANEL - ACM () EXIST. MASONRY OPENING ±'-0" ABOVE MAIN F.F. PANEL, ADHERE TO REQUIRED - ACM () () EXISTING GLAZING () MAIN FINISH FLOOR +0'-0" C5 WALL SECTION SCALE: /" = '-0" D A-50 PROVIDE NEW EPDM MEMBRANE ROOF SYSTEM PER MANUF. SPECS. (CONTINUE UP AND OVER PARAPET) AS REQUIRED BY NEW CONSTRUCTION EXIST. ROOF CONSTRUCTION SHEATHING () INSTALLATION () Delaware Ave. Kenmore, NY WALL SECTIONS A-0
7 8 5 5 ABOVE X FLOOR PLAN NOTES: FLOOR PLAN NOTES. CLEAN AND PREPARE EXISTING FLOORING TO RECEIVE NEW FINISHES. PREPARATION SHALL BE COMPLIANT WITH MANUFACTURE OF NEW FINISH.. CLEAN AND PREPARE EXISTING CONCRETE FLOORING TO RECEIVE ASHFORD FORMULA SEALER. PREPARE PER MANUFACTURES SPECIFICATIONS. APPROVE WITH OWNER BEFORE APPLICATION OF PRODUCTS.. CLEAN AND PREPARE MILLWORK, COUNTER TOPS AND SHROUDS TO RECEIVE NEW FINISHES.. REMOVE ALL FLOOR AND WALL TILE. PATCH AND REPAIR WALLS AND PREPARE FOR NEW FINISHES. 5. RE LAMINATE ALL PLASTIC LAMINATE ON MILLWORK. FRONT FACE, CABINET, SIDES, SUPPORT AND ALL OTHER VERTICAL APPLICATIONS TO RECEIVE PL. TOE KICK/BASE TO RECEIVE PL-. COUNTER TOP/EDGE AND ALL HORIZONTAL SURFACES TO RECEIVE PL-.. REFINISH BATHROOM COUNTER TOP AND SHROUD WITH NEW COMPLIANT FINISHES. COUNTER TOP/EDGE TO RECEIVE GR-. SHROUD/SUPPORT TO RECEIVE PL-.. REFINISH COUNTER TOP AND ALL PLASTIC LAMINATE AT MILLWORK. FRONT FACE, SIDES, CABINET,SUPPORT, AND ALL OTHER VERTICAL APPLICATIONS TO RECEIVE PL-. TOE KICK/BASE TO RECEIVE PL-. COUNTER TOP/EDGE TO RECEIVE GR- 8. DOOR WINDOWS TO BE COVERED WITH BLACK VINYL FILM. 9. REMOVE EXISTING DOOR AND WALL AS SHOWN, PREPARE AREA TO RECEIVE NEW GLASS WALL AND DOOR, MATCH EXISTING SALES OFFICES.. REMOVE EXISTING GLAZING AS NEW CONSTRUCTION, PREPARE AREA TO RECEIVE NEW FINISHES.. NEW WALL : 5 8" METAL " O.C., " BATT INSULATION, 5 8" GYP. BD., FINISHES PER FINISH SCHEDULE.. PROVIDE NEW GLAZING AS REQUIRED BY NEW CONSTRUCTION, MATCH EXISTING GLAZING. GENERAL NOTES: GENERAL NOTES FURNITURE, SYSTEMS FURNISHINGS & SHELVING ARE N.I.C. FINAL EQUIPMENT LOCATIONS TO BE COORDINATED WITH OWNER PRIOR TO INSTALLATION OF ELECTRICAL, BLOCKING, ETC. PATCH AND REPAIR S AS REQUIRED BY NEW CONSTRUCTION. SEE ROOM FINISH SCHEDULE FOR ALL FINISH INFORMATION. AREA SHOWN ABOVE Delaware Ave. Kenmore, NY ENLARGED PLANS A A A ENLARGED PARTIAL FLOOR PLAN SC ALE: /" = '-0" KEY PLAN Scale: NTS A-0
8 5 ENLARGED PARTIAL FLOOR PLAN SC ALE: /" = '-0" X FLOOR PLAN NOTES: FLOOR PLAN NOTES. CLEAN AND PREPARE EXISTING FLOORING TO RECEIVE NEW FINISHES. PREPARATION SHALL BE COMPLIANT WITH MANUFACTURE OF NEW FINISH.. CLEAN AND PREPARE EXISTING CONCRETE FLOORING TO RECEIVE ASHFORD FORMULA SEALER. PREPARE PER MANUFACTURES SPECIFICATIONS. APPROVE WITH OWNER BEFORE APPLICATION OF PRODUCTS.. CLEAN AND PREPARE MILLWORK, COUNTER TOPS AND SHROUDS TO RECEIVE NEW FINISHES.. REMOVE ALL FLOOR AND WALL TILE. PATCH AND REPAIR WALLS AND PREPARE FOR NEW FINISHES. 5. RE LAMINATE ALL PLASTIC LAMINATE ON MILLWORK. FRONT FACE, CABINET, SIDES, SUPPORT AND ALL OTHER VERTICAL APPLICATIONS TO RECEIVE PL. TOE KICK/BASE TO RECEIVE PL-. COUNTER TOP/EDGE AND ALL HORIZONTAL SURFACES TO RECEIVE PL-.. REFINISH BATHROOM COUNTER TOP AND SHROUD WITH NEW COMPLIANT FINISHES. COUNTER TOP/EDGE TO RECEIVE GR-. SHROUD/SUPPORT TO RECEIVE PL-.. REFINISH COUNTER TOP AND ALL PLASTIC LAMINATE AT MILLWORK. FRONT FACE, SIDES, CABINET,SUPPORT, AND ALL OTHER VERTICAL APPLICATIONS TO RECEIVE PL-. TOE KICK/BASE TO RECEIVE PL-. COUNTER TOP/EDGE TO RECEIVE GR- GENERAL NOTES: GENERAL NOTES FURNITURE, SYSTEMS FURNISHINGS & SHELVING ARE N.I.C. FINAL EQUIPMENT LOCATIONS TO BE COORDINATED WITH OWNER PRIOR TO INSTALLATION OF ELECTRICAL, BLOCKING, ETC. PATCH AND REPAIR S AS REQUIRED BY NEW CONSTRUCTION. SEE ROOM FINISH SCHEDULE FOR ALL FINISH INFORMATION. AREA SHOWN ABOVE Delaware Ave. Kenmore, NY ENLARGED PLANS 8. DOOR WINDOWS TO BE COVERED WITH BLACK VINYL FILM. 9. REMOVE EXISTING DOOR AND WALL AS SHOWN, PREPARE AREA TO RECEIVE NEW GLASS WALL AND DOOR, MATCH EXISTING SALES OFFICES.. REMOVE EXISTING GLAZING AS NEW CONSTRUCTION, PREPARE AREA TO RECEIVE NEW FINISHES.. NEW WALL : 5 8" METAL " O.C., " BATT INSULATION, 5 8" GYP. BD., FINISHES PER FINISH SCHEDULE.. PROVIDE NEW GLAZING AS REQUIRED BY NEW CONSTRUCTION, MATCH EXISTING GLAZING. KEY PLAN Scale: NTS A-0
9 ACM PANEL, FINISH PER INSTALLATION () 8" F.R.T. TREATED SHEATHING () A A-50 '-0".08' TO PROPERTY LINE E D PNL REF. " PNL REF. " VERTICAL PANEL JOINT DETAIL SCALE: " = '-0" INSTALLATION () " PNL. REF. " ALIGN SURFACE WITH EXISTING EIFS SYSTEM () SHEATHING () INSTALLATION () PNL. REF. PANEL OUTSIDE PANEL DETAIL SCALE: " = '-0" '-0" '-0" TO EDGE OF CANOPY '-" '-" '-0" " " '-8" A A-50 ENTRY ELEMENT FRONT ELEVATION SCALE: /" = '-0" '-0" 5'-0" 8" '-" '-" 0'-0" " 8'-0" EQ.PANELS '-0" SHEATHING () " C5 A-50 " PNL. REF. PNL. REF. ACM PANEL, FINISH PER PROVIDE () GRADE RECESSED DOWNLIGHTS, CONNECT TO EXISTING LIGHTING CIRCUITS AS REQUIRED. '-8" '-8" EDGE OF CANOPY ABOVE PNL REF. PNL REF. " " ACM PANEL, FINISH PER INSTALLATION () SHEATHING () '-8" '-8" '-8" 0'-0" PROPERTY LINE E '-0" ALIGN SURFACE WITH EXISTING EIFS SYSTEM () SHEATHING () INSTALLATION () HORIZONTAL PANEL JOINT DETAIL SCALE: " = '-0" '-0" '-" '-" 8" D " " PNL. REF. PANEL PARAPET DETAIL SCALE: " = '-0" 5'-0" A A-50 '-0" '-8" " '-0" " " '-" '-" SLOPE '-8" ALIGN SURFACE WITH EXISTING EIFS SYSTEM () WEEP HOLE FIELD DRILL () PER PANEL () DRIP EDGE () SHEATHING () PROPERTY LINE " '-0" " " D A-50 E '-0" CANOPY " INSTALLATION () PANEL BASE CONDITION DETAIL SCALE: " = '-0" MECHANICAL FASTEN ACM PANEL TO CONSTRUCTION () PROVIDE NEW EPDM MEMBRANE ROOF SYSTEM PER MANUF. SPECS. (CONTINUE UP AND OVER PARAPET) AS REQUIRED BY NEW CONSTRUCTION () '-0" '- " '- " 8'-" '-0" METAL CANOPY CONSTRUCTION W/ 5 8" F.R.T. TREATED SHEATHING () TREATED WOOD REQUIRED () ACM PANEL, FINISH PER STEEL PER CANOPY SECTION D E () () PROVIDE NEW EPDM MEMBRANE ROOF SYSTEM PER MANUF. SPECS. (CONTINUE UP AND OVER PARAPET) AS REQUIRED BY NEW CONSTRUCTION () 5 8" METAL " O.C. () PROVIDE NEW EPDM MEMBRANE ROOF SYSTEM PER MANUF. SPECS. AS REQUIRED BY NEW CONSTRUCTION () 5 8" METAL " O.C. () " METAL " O.C. '-0" " " CAN VARY. PANEL SOFFIT DETAIL SCALE: " = '-0" CANOPY SECTION SCALE: " = '-0" NOTE: ALL WOOD BLOCKING AND PLYWOOD/ SHEATHING SHALL BE TREATED. 5 8" METAL STUDS " O.C. () '-8" " " SHEATHING. () " PANEL REFERENCE '-0" " " SLOPE SLOPE SHEATHING () '- " '-" ACM PANEL, FINISH PER ACM PANEL (ACM) '-0" CANOPY PROPERTY LINE ACM PANEL (ACM) SLOPE ACM PANEL (ACM) ACM PANEL BEYOND (ACM) TREATED WOOD PLUMB AND SQUARE INSTALLATION () ALIGN SURFACE WITH EXISTING EIFS SYSTEM () 5 8" METAL " O.C. () " ACM PANEL SYSTEM (ACM) " SHEATHING () LAYER 5 8" F.R.T. TREATED SHEATHING W/ " REQUIRED, 8" TOTAL THICKNESS. SHEATHING () " ACM PANEL SYSTEM (ACM) '-0" ±'- 8 " '-5 8 " 8" 8'-" C5 '-0" E5 () ACM PANEL (ACM) " METAL " O.C. () ACM PANEL (ACM) '-8" LAYER 5 8" F.R.T. TREATED SHEATHING W/ /" REQUIRED, 8" TOTAL THICKNESS. () " PANEL ABUTMENT DETAIL SCALE: " = '-0" NEW 5 8" METAL STUD WALL, 5 8" GYP. BD., " BATT INSULATION, FINISH TO MATCH NEW FINISHES. EXISTING GLAZING '-0" ENTRY ELEMENT SECTION SCALE: " = '-0" HSS xx0.5 W/ " BASE & CAP, () " Ø A.B. () "Ø ANCHOR " O.C. () EXISTING SLAB, SAWCUT AS NEW CONSTRUCTION () " ACM PANEL SYSTEM (ACM) SHEATHING () NEW GLAZING, VERIFY ACTUAL WIDTH IN FIELD, MATCH EXISTING GLAZING " METAL " O.C. () SHEATHING () B5 C8x.5 C8x.5 ENTRY ELEMENT CONSTRUCTION W/ 5 8" F.R.T. TREATED SHEATHING () " HSS xx0.5 W/ " BASE & CAP, () " Ø A.B. () LAYER 5 8" F.R.T. TREATED SHEATHING W/ " REQUIRED, 8" TOTAL THICKNESS. " ACM PANEL SYSTEM (ACM) " '-0" 8" C8x.5 '-" C8x.5 C8x.5 " '-" " REMOVE EXISTING GLAZING AS NEW CONSTRUCTION () W8x8 '-0" '-" '-" '-0" CANOPY FRAMING PLAN SCALE: /8" = '-0" 8" B E PANEL INSIDE CORNER DETAIL SCALE: " = '-0" W8x8 NEW GLAZING, VERIFY ACTUAL WIDTH IN FIELD, MATCH EXISTING GLAZING C8x.5 W8x8 C8x.5 "Ø ANCHOR " O.C. () EXISTING SLAB, SAWCUT AS NEW CONSTRUCTION () '-0" CANOPY FRAMING SECTION PLAN SCALE: /8" = '-0" 5 8" METAL " O.C. () SHEATHING () " ACM PANEL SYSTEM (ACM) " METAL " O.C. SHEATHING. HSS xx0.5 W/ " BASE & CAP, () " Ø A.B. () C8x.5 BEYOND SHEATHING () 9 8 " " '- 8 " " 8" C8x.5 HSS xx0.5 W/ " BASE & CAP, () " Ø A.B. () 8" '-" '-8" PLUMB AND SQUARE INSTALLATION () HSS xx0.5 W/ " BASE & CAP, () " Ø A.B. () HSS xx0.5 W/ " BASE & CAP, () " Ø A.B. () MOMENT CONNECTION () Delaware Ave. Kenmore, NY DETAILS & NOTES A ENTRY ELEMENT SECTION SCALE: /" = '-0" A-50 A SCALE: /" = '-0".08' PROPERTY LINE ENTRY ELEMENT SIDE ELEVATION A ENTRY ELEMENT SECTION SCALE: /" = '-0".08' PROPERTY LINE 8" WALL () # " O.C. () () # BAR CONT. TOP & BOTTOM () A () #5 BAR () '-0" '-0" '-0" MIN. FOUNDATION COLUMNS SCALE: /8" = '-0" 8" WALL () # " O.C. () () # BAR CONT. TOP & BOTTOM () A () #5 BAR () SCALE: /8" = '-0" '-" FOUNDATION SECTION '-0" '-0" MIN A-50
10 ROOM NUMBER ROOM NAME FLOOR BASE ROOM FINISH SCHEDULE WALLS CEILING MILLWORK NORTH SOUTH EAST WEST MAT'L HEIGHT FACE OF CAB./SHRO UD SHOWROOM PT-, C- PT- P- P- P- P- EXIST EXIST FINANCE WAITING AREA PT- PT- -- P EXIST EXIST COUNTER TOP REMARKS MILLWORK TO RECEIVE NEW FINISHES. PL- FOR FACE AND SIDES AND ALL VERTICAL SURFACES OF MILLWORK. PL- FOR COUNTER TOPS/EDGE AND ALL HORIZONTAL SURFACES. PL- FOR TOE KICKS. KEY TRACK NON CUSTOMER TOUCH POINT RECEPTION PT- PT- P- P- -- P- EXIST EXIST SALES MANAGER'S OFFICE C- VB- P- P- P- P- EXIST EXIST SALES MANAGER'S OFFICE C- VB- P- P- P- P- EXIST EXIST SALES MANAGER'S OFFICE C- VB- P- P- P- P- EXIST EXIST SALES MANAGER'S OFFICE C- VB- P- P- P- P- EXIST EXIST SALES MANAGER'S OFFICE C- VB- P- P- P- P- EXIST EXIST FINANCE OFFICE C- VB- P- P- P- P- EXIST EXIST FINANCE OFFICE C- VB- P- P- P- P- EXIST EXIST FINANCE OFFICE C- VB- P- P- P- P- EXIST EXIST FINANCE OFFICE C- VB- P- P- P- P- EXIST EXIST HALLWAY PT- PT- P- P- P- P- EXIST EXIST HALLWAY PT- PT- P- P- P- P- EXIST EXIST RECEPTION DESK AND BACK COUNTER TO RECEIVE NEW FINISHES. PL- FOR FACE AND SIDES OF DESK/SUPPORT. PL- FOR COUNTER TOP/EDGE. PL- FOR TOE KICKS. COFFEE AREA TO RECEIVE NEW FINISHES. PL- FOR FACE AND SIDE OF CABINET/SUPPORT. GR- FOR COUNTER TOP/EDGE. PL- FOR TOE KICK AT CABINETS CLOSET NON CUSTOMER TOUCH POINT MEN'S ROOM PT- PT- P- P- P- PT- EXIST EXIST PL- GR- 8 WOMEN'S ROOM PT- PT- P- P- PT- P- EXIST EXIST PL- GR- BATHROOM COUNTER/SHROUD TO RECEIVE NEW FINISHES. GR- FOR COUNTER TOP/EDGE. PL- FOR SHROUD/ALL SUPPORT BATHROOM COUNTER/SHROUD TO RECEIVE NEW FINISHES. GR- FOR COUNTER TOP/EDGE. PL- FOR SHROUD/ALL SUPPORT 9 RETAIL PARTS COUNTER GF- VB- P- -- P- P- EXIST EXIST STAINLESS COUNTER 0 RETAIL PARTS DISPLAY GF- VB- P- -- P- P- EXIST EXIST PL- GR- TECH PARTS COUNTER GF- -- P- P- -- P- EXIST EXIST PL- GR- PARTS GF- -- P- P- P- P- EXIST EXIST CLOSET GF- -- P- P- P- P- EXIST EXIST HALLWAY GF- -- P- P- P- P- EXIST EXIST PARTS RECEIVING GF- -- P- P- P- P- EXIST EXIST PARTS STORAGE GF- -- P- P- P- P- EXIST EXIST MEN'S ROOM PT- PT- P- PT- P- P- EXIST EXIST COUNTER TO RECEIVE NEW FINISHES. ALL HORIZONTAL SURFACES/EDGES TO RECEIVE PL-. ALL SUPPORT TO RECEIVE PL- COUNTER TO RECEIVE NEW FINISHES. ALL HORIZONTAL SURFACES/EDGES TO RECEIVE PL-. ALL SUPPORT TO RECEIVE PL- 8 CLOSET NON CUSTOMER TOUCH POINT 9 WOMEN'S ROOM PT- PT- PT- P- P- P- EXIST EXIST REFRESMENTS/ HOSPITALITY PT- PT- -- P- -- P- EXIST EXIST PL- PL- CASHIER PT- PT- -- P- P- P- EXIST EXIST PL- PL- CHILDREN'S PLAY AREA RF- VB- P- P- P- P- EXIST EXIST CUSTOMER LOUNGE PT- PT- P- P- P- P- EXIST EXIST PL- GR- LOBBY PT- PT- P- P- P- P- EXIST EXIST SERVICE MANAGERS OFFICE VCT- VB- P- P- P- P- EXIST EXIST SERVICE GF- -- P- P- P- P- EXIST EXIST STORAGE GF- -- P- P- P- P- EXIST EXIST MILLWORK TO RECEIVE NEW FINISHES. PL- FOR FACE AND SIDE OF DESK/CABINET/SUPPORT. PL- FOR COUNTER TOP/EDGE. PL- FOR TOE KICK MILLWORK TO RECEIVE NEW FINISHES. PL- FOR FACE AND SIDE OF DESK/CABINET/SUPPORT. PL- FOR COUNTER TOP/EDGE. PL- FOR TOE KICK CUSTOMER BUSINESS CENTER MILLWORK TO RECEIVE NEW FINISHES. PL- FOR FACE, BACK AND SIDES OF MILLWORK WALL AND COUNTER SUPPORT. GR- FOR COUNTER TOP/EDGE. PL- FOR TOE KICK/ BASE COLOR 8 SERVICE STALLS GF- -- P-, P-, P- P-, P-, P- P-, P-, P- P-, P-, P- EXIST EXIST SEE ELEVATION C- AI- FOR PAINT LOCATION AND SIZES () 9 TECHNICIAN LOCKER ROOM GF- -- P- P- P- P- EXIST EXIST MECHANICAL GF- -- P- P- P- P- EXIST EXIST SERVICE GF- -- P- P- P- P- EXIST EXIST MACHINE ROOM GF- -- P- P- P- P- EXIST EXIST TOOL ROOM GF- -- P- P- P- P- EXIST EXIST STORAGE GF- -- P- P- P- P- EXIST EXIST E5 ENLARGEMENT FOR FLOOR MATERIAL AT SHOWROOM PT C RF CF P SCALE: /" = '-0" FINISH SELECTIONS PORCELAIN TILE: (PT-) MFG: CROSSVILLE STYLE: CROSS-COLORS MINGLES COLOR: A85 MERCURY SIZE: " X " CUSTOM SIZE GROUT: FLEXTILE: SILVER GREY CARPET: (CPT-) MFG: INTERFACE COLLECTION: CONCRETE MIX STYLE: 80050H GROOVED COLOR: 0088 LIMESTONE SIZE: 50CM X 50CM RESILIENT FLOORING: (RF-) LINOLEUM MFG: ARMSTRONG STYLE: MARMORETTE COLOR: LP050 SILVER GREY SIZE: '-" ROLLED GOODS,.5MM THICK CONCRETE FLOORING: (CF-) CHEMICALLY PROCESSED CONCRETE SEALER MFG: ARMSTRONG STYLE: MARMORETTE COLOR: LP050 SILVER GREY SIZE: '-" ROLLED GOODS,.5MM THICK PAINT: (P-) MFG: BENJAMIN MOORE COLOR: SILVER HALF DOLLAR -0 FINISH: EGGSHELL (P-) (P-) (P-) MFG: BENJAMIN MOORE COLOR: SILVER SPRING 0-50 FINISH: EGGSHELL NOT USED PORCELAIN TILE CARPET RESILIENT FLOORING CONCRETE FLOORING PAINT VB BASE PL GR ROOM FINISH LEGEND PLASTIC LAMINATE GRANITE COMPOSITE MFG: BENJAMIN MOORE COLOR: SILVER SPRING 0-50 FINISH: EGGSHELL IN MAIN AREAS, SEMI GLOSS IN RESTROOMS GENERAL NOTES NO CHANGES OR SUBSTITUTIONS WILL BE MADE TO THE FOLLOWING FINISHES UNLESS DIRECTED BY THE OWNER OR ARCHITECT. ALL MATERIALS AND FINISHES ARE TO BE PREPARED AND INSTALLED PER MANUFACTURES SPECIFICATIONS MANY FINISH MATERIALS REQUIRE A SUBSTANTIAL LEAD TIME. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ORDER ALL MATERIALS AT THE APPROPRIATE TIME. ANY FEE'S INCURRED AS A RESULT OF FINISHES NOT BEING ORDERED ON TIME WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. ANY AND ALL FINISH SELECTIONS/ COLORS MUST BE SUBMITTED TO ARCHITECT FOR APPROVAL ACCOUNTING FOR PROPER LEAD TIME. ANY FINISH THAT IS INSTALLED WITHOUT ARCHITECTS APPROVAL MAY BE REQUIRED TO BE REMOVED AND REPLACED BY THE GENERAL CONTRACTOR. ALL HARDWARE SHALL BE SATIN CHROME AS A STANDARD INCLUDING CABINETRY PULLS AND DOOR HARDWARE. ALL CABINETRY (DOORS AND DRAWERS) TO RECEIVE STANDARD WIRE PULL UNLESS OTHERWISE NOTED. CEILINGS: GYPSUM BOARD CEILINGS ARE TO BE PAINTED CEILING WHITE UNLESS OTHERWISE NOTED. C- PT- P- ELEVATION AT SERVICE STALL WALL () C-5 SCALE: /8"='-0" VINYL BASE: (VB-) MANUF: ARMSTRONG COLOR: - MILK PLASTIC LAMINATE: (PL-) HIGH PRESSURE WOOD GRAIN LAMINATE MFG: WILSONART STYLE: -0 KENSINGTON MAPLE (PL-) HIGH PRESSURE LAMINATE MFG: WILSONART STYLE: D8-0 FASHION GREY (PL-) NOT USED (PL-) HIGH PRESSURE LAMINATE MFG: WILSONART STYLE: D9-0 SLATE GREY GRANITE COMPOSITE: (GR-) MFG: SILESTONE COLOR: GREY EXPO SIZE: " THICK EDGE: SQUARE GENERAL NOTES ALL MECHANICAL DUCT COVERS SHALL BE PAINTED TO MATCH THE SURROUNDING WALL/ CEILING COLOR. PRIME AS NECESSARY. WALLS: PROVIDE () COAT WALL PRIMER FOLLOWED BY () COATS WALL PAINT ON ALL INTERIOR WALL SURFACES. FLOORS: PROVIDE APPROPRIATE SCHLUTER SYSTEMS, INC. NICKLE FINISH: SATIN TRANSITION STRIPS WHERE TILE AND OTHER FLOOR FINISHES MEET. PROVIDE THE ARCHITECT WITH COLOR SAMPLES. FINAL COLOR TO BE SELECTED BY ARCHITECT. BASE: PROVIDE A STRAIGHT BASE WHERE CARPET IS LOCATED UNLESS OTHERWISE NOTED ON THE DRAWINGS. WINDOWS: 5'-0" '-0" LOCATION AND DIMENSIONS OF CARPET TO BE COORDINATED WITH EXACT SIZE AND LOCATION OF CUBICAL FURNITURE. CARPET IS TO SPAN UNDERNEATH THE CUBICAL FURNITURE, REST OF SHOWROOM TO BE PT- FINISH SELECTIONS REFINISH ALL PLASTIC LAMINATE WINDOW SILLS TO THE FOLLOWING: PL-: HIGH PRESSURE WOOD GRAIN LAMINATE MANUF: WILSONART COLOR: KENSINGTON MAPLE -0 SUBMIT SAMPLE TO ARCHITECT FOR APPROVAL. '-0" '-0" TO CEILING REST OF WALL TO CEILING P- '-0" BAND OF P- FIRST '-0" TO RECIEVE P- Delaware Ave. Kenmore, NY FINISH PLAN AND SCHEDULE AI-
11 A SPACE ALLOCATION PLAN SCALE: /8" = '-0" NOTE: FURNITURE SHOWN AS REFERENCE ONLY NOT IN CONTRACT ROOM NUMBER ROOM NAME FLOOR BASE ROOM FINISH SCHEDULE WALLS CEILING MILLWORK NORTH SOUTH EAST WEST MAT'L HEIGHT FACE OF CAB./SHRO UD SHOWROOM PT-, C- PT- P- P- P- P- EXIST EXIST FINANCE WAITING AREA PT- PT- -- P EXIST EXIST COUNTER TOP REMARKS MILLWORK TO RECEIVE NEW FINISHES. PL- FOR FACE AND SIDES AND ALL VERTICAL SURFACES OF MILLWORK. PL- FOR COUNTER TOPS/EDGE AND ALL HORIZONTAL SURFACES. PL- FOR TOE KICKS. KEY TRACK NON CUSTOMER TOUCH POINT RECEPTION PT- PT- P- P- -- P- EXIST EXIST SALES MANAGER'S OFFICE C- VB- P- P- P- P- EXIST EXIST SALES MANAGER'S OFFICE C- VB- P- P- P- P- EXIST EXIST SALES MANAGER'S OFFICE C- VB- P- P- P- P- EXIST EXIST SALES MANAGER'S OFFICE C- VB- P- P- P- P- EXIST EXIST SALES MANAGER'S OFFICE C- VB- P- P- P- P- EXIST EXIST FINANCE OFFICE C- VB- P- P- P- P- EXIST EXIST FINANCE OFFICE C- VB- P- P- P- P- EXIST EXIST FINANCE OFFICE C- VB- P- P- P- P- EXIST EXIST FINANCE OFFICE C- VB- P- P- P- P- EXIST EXIST HALLWAY PT- PT- P- P- P- P- EXIST EXIST HALLWAY PT- PT- P- P- P- P- EXIST EXIST RECEPTION DESK AND BACK COUNTER TO RECEIVE NEW FINISHES. PL- FOR FACE AND SIDES OF DESK/SUPPORT. PL- FOR COUNTER TOP/EDGE. PL- FOR TOE KICKS. COFFEE AREA TO RECEIVE NEW FINISHES. PL- FOR FACE AND SIDE OF CABINET/SUPPORT. GR- FOR COUNTER TOP/EDGE. PL- FOR TOE KICK AT CABINETS CLOSET NON CUSTOMER TOUCH POINT MEN'S ROOM PT- PT- P- P- P- PT- EXIST EXIST PL- GR- 8 WOMEN'S ROOM PT- PT- P- P- PT- P- EXIST EXIST PL- GR- BATHROOM COUNTER/SHROUD TO RECEIVE NEW FINISHES. GR- FOR COUNTER TOP/EDGE. PL- FOR SHROUD/ALL SUPPORT BATHROOM COUNTER/SHROUD TO RECEIVE NEW FINISHES. GR- FOR COUNTER TOP/EDGE. PL- FOR SHROUD/ALL SUPPORT 9 RETAIL PARTS COUNTER GF- VB- P- -- P- P- EXIST EXIST STAINLESS COUNTER 0 RETAIL PARTS DISPLAY GF- VB- P- -- P- P- EXIST EXIST PL- GR- TECH PARTS COUNTER GF- -- P- P- -- P- EXIST EXIST PL- GR- PARTS GF- -- P- P- P- P- EXIST EXIST CLOSET GF- -- P- P- P- P- EXIST EXIST HALLWAY GF- -- P- P- P- P- EXIST EXIST PARTS RECEIVING GF- -- P- P- P- P- EXIST EXIST PARTS STORAGE GF- -- P- P- P- P- EXIST EXIST MEN'S ROOM PT- PT- P- PT- P- P- EXIST EXIST COUNTER TO RECEIVE NEW FINISHES. ALL HORIZONTAL SURFACES/EDGES TO RECEIVE PL-. ALL SUPPORT TO RECEIVE PL- COUNTER TO RECEIVE NEW FINISHES. ALL HORIZONTAL SURFACES/EDGES TO RECEIVE PL-. ALL SUPPORT TO RECEIVE PL- 8 CLOSET NON CUSTOMER TOUCH POINT 9 WOMEN'S ROOM PT- PT- PT- P- P- P- EXIST EXIST REFRESMENTS/ HOSPITALITY PT- PT- -- P- -- P- EXIST EXIST PL- PL- CASHIER PT- PT- -- P- P- P- EXIST EXIST PL- PL- MILLWORK TO RECEIVE NEW FINISHES. PL- FOR FACE AND SIDE OF DESK/CABINET/SUPPORT. PL- FOR COUNTER TOP/EDGE. PL- FOR TOE KICK MILLWORK TO RECEIVE NEW FINISHES. PL- FOR FACE AND SIDE OF Delaware Ave. Kenmore, NY 09 SPACE ALLOCATION PLAN 0-0- AI-
MECHANICAL M-1 LEGEND AND DETAILS M-2 FLOOR PLAN - DUCTWORK M-3 FLOOR PLAN - PIPING
SHEET TITLE ARCHITECTURAL A-0 COVER SHEET A-1 DEMOLITION NOTES A-2 DEMOLITION PLAN A-3 FLOOR PLAN NOTES A-4 FLOOR PLAN A-5 INTERIOR ELEVATIONS A-6 DOOR SCHEDULE A-7 DETAILS MECHANICAL M-1 LEGEND AND DETAILS
More information6'-0" G-4 ADJUSTABLE SHELVING 2'-0" 4'-5" MOP SINK STORAGE '-0" 2'-0" 26'-6" G-4 6' X 4' OPENING WITH SHUTTER BASE CABINETS 34" FOR ADA 20'-0"
2 G1 3'4" 4'0" ROOM FINISH SCHEDULE 4'0" F.F. WINDOW DETAILS GROUT CORES SOLID GROUT CORES SOLID 3 G1 #5 BARS HOLLOW METAL FRAME INSULATED GLASS 1" CLEAR INSULATED (U=0.45) CAULKING & BACKER ROD PREFORMED
More informationSECTION GYPSUM BOARD ASSEMBLIES
SECTION 09260 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SUMMARY A. Provide gypsum board assemblies. 1.2 SUBMITTALS A. Product Data: Submit manufacturer's product data and installation instructions for
More informationDivision 09 FINISHES TABLE OF CONTENTS
Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING
More informationALL DIMENSIONS FROM FINISHED FACE OF PARTITION TO FINISHED FACE OF PARTITION UNLESS OTHERWISE NOTED.
ALL DIMENSIONS FROM FINISHED FACE OF PARTITION TO FINISHED FACE OF PARTITION UNLESS OTHERWISE NOTED. PARTITION CONSTRUCTION TO BE 3 5/8 METAL STUDS 24 ON CENTER WITH 5/8 TYPE X GYPSUM BOARDS BOTH SIDES.
More informationBudget Estimate Basic Tenant Improvement
Building work rules, conditions and insurance: 1. Review the work rules. If they are not available no budget should be provided. 2. Hours available for construction 3. Insurance requirements 4. Entities
More informationNEW ILLUMINATED LED SIGNAGE PAINTED STOREFRONT W/ VINYL GRAPHIC AND NEW LED SIGNAGE PAINT FINISHES (PROVIDE (2) COATS FOR ALL PAINTING) PT-1
MTA RR APPARATUS NEW ILLUMINATED LED SIGNAGE LIGHTWEIGHT REMOVABLE ALUMINUM PANEL FENCE 88 NORTH AVE CDR JOB NO. 60 NORTH AVE NORTH AVE CURRENT VIEW OF 88 NORTH AVENUE PROPOSED FACADE AT 88 NORTH AVENUE
More informationA1.01 SITE PLAN 394 W OLENTANGY ST POWELL, OH BUILDING TO BE RENOVATED SITE PLAN. P F www. archa ll.
N O R T H F I F T H S T R E E T C O L U M B U S O H I O P.. 00 F.. 000 www. archa ll. com W OLENTANGY ST POWELL, OH 0 DRAWING SET 0 0 0 preliminary check bid permit construction REVISIONS BUILDING TO BE
More informationMULTILINE FACILITY DESIGN REQUIREMENTS 6/29/2018
MULTILINE FACILITY DESIGN REQUIREMENTS 6/29/2018 SUMMARY OF MULTILINE DESIGN REQUIREMENTS ELEMENT Cadillac Vehicle Runway Floor Tile Furniture Color and Trim Wood Wall Carpet DESCRIPTION Vehicle(s) are
More informationADDENDUM No. 1 Issue Date: September 27, 2016
ENDUM No. 1 Issue Date: September 27, 26 TO CONTRACT DOCUMENTS ENTITLED: Outpatient Pharmacy Relocation for Columbia, Missouri BHC Project No. #16C0831100 SOA Project No. 164 Consultants: Simon Oswald
More informationATTACHMENT 2 DRC Page 1 of 13
Page 1 of 13 CLEAR GLASS 7' - 6" SPANDREL GLASS CLEAR GLASS SOLID PHENOLIC PANEL MEAT PREP 206 EMPLOYEE LOCKERS 181 VARIES 8' - 1" 2' - 9" 3' - 1" 2' - 8" 2' - 5" 0'-0" 19' - 6" SECTION @ SOUTH WALL Scale:
More informationDemolition Plan A1 A3. Scale: 3/32" = 1'-0" Arch. Men N.I.C. Elev. Lobby. Stairs N.I.C. N.I.C. Women N.I.C. Issued for Tender.
inc. 400-7 avenue edmonton, alberta, canada tr y t: (780) 48 47 f: (780) 48 00 e: lesnider@shaw.ca 4 door to North Common Corridor doors to door to F. H. C. Men Women ELEC/TEL UP Stairs DN F. H. C. DN
More informationSchedule C STANDARD Specifications
Schedule C STANDARD Specifications RTM Finished Home Specifications Name: Job #: Address: Phone: Standard Specifications FRAMING 2x6 exterior wall construction 3/8 OSB sheeting 2x4 interior wall construction
More informationWhitley Shower Locker Toilet Facilities
Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.com Building Type Building Code Whitley Shower Locker Toilet Facilities
More informationFOR LEASE th & LOUISE AVENUE RETAIL LOCATION SIZE PRICE DESCRIPTION $20.00 / SF NNN 3,154 SF RAQUEL BLOUNT, SIOR 605
3511 W 57th Street Sioux Falls, SD 57108 FOR LEASE $20.00 / SF NNN 3,154 SF SIZE DESCRIPTION PRICE $20.00 / SF NNN Estimated NNN: $5.25 / SF LOCATION Co-tenant with Great Western Bank, Healing Touch, Honeybaked
More informationADDENDUM NO. 1. Kapuskasing District High School Interior Upgrades. ADDENDUM NO. 1 November 9, 2018
Kapuskasing District High School Kapuskasing District High School JLR No.: 27729-032 Owner No.: 7587 Page 1 of 4 This Addendum forms part of the Contract Documents and amends the original drawings and
More informationPROCUREMENT AND CONTRACTING DOCUMENTS GROUP
PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders
More informationALUMNI CENTER RENOVATIONS - UNIVERSITY COMMUNICATIONS
ALUMNI CENTER RENOVATIONS UNIVERSITY COMMUNICATIONS 07 DANA AVENUE 7 0 7 7 7 7 7 RONALD REAGAN HIGHWAY 7 7 7 7 7 7 7 0 7 0 7 CINCINNATI 7 7 NORWOOD LATERAL 7 7 7 7 CINCINNATI, OH RONALD REAGAN HIGHWAY
More informationPulaski County, Virginia
Pulaski County, Virginia Typical Carport Enclosure Details Based on the 2009 International Residential Code CONTENTS General Requirements... 2 Emergency Escape and Rescue... 2 Foundation and Floor... 3
More informationSECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection
SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION
More informationSECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM
Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING
More informationSECTION HOLLOW METALWORK. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 081113 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationBIDDER REQUEST FOR INFORMATION #001 CONSOLIDATED
BIDDER REQUEST FOR INFORMATION #001 CONSOLIDATED Project: Los Chingones and HashTAG Location: 10155 E. 29 th Drive Denver, CO 80238 Date: 12/5/16 1. There are existing PVC roof drains in the space and
More informationF.C.L. INTERIOR FINISHES CHECK LIST 2010 PRODUCT SELECTION - FLOORING GENERAL ITEMS PRODUCT SELECTION GENERAL ITEMS
INTERIOR FINISHES CHECK LIST 2010 Project: Project Number: Wil-Spec # This should not take long to go through, most questions below are listed as options, all you have to do is check off those answers
More informationWalgreens Store #10787 Grosenbacher and Potranco RFI s
1207 West Blanco Rd. San Antonio TX 78232 210.492.7775 Fax 210.492.8490 www.dbc-tx.com Grosenbacher and Potranco RFI s RFI #1-Reference Sheet G-010 shows A-520 as one of the included sheets. There is no
More informationProposal Request (attachment to AIA Form G709)
Proposal Request (attachment to AIA Form G09) PR No: PR-0 Date: January, 06 Project: Great Work Montessori School Owner: Great Work Inc. Architect: Cuningham Group Copy To: File DESCRIPTION OF WORK The
More informationTHE SPENCER RESIDENCE J&S ARCHITECT
THE SPENCER RESIDENCE J&S ARCHITECT 75 POURED CONCRETE FOUNDATION WALL (0MPa) 97.94 50Ø WEEPER TILE C/W SOCK W/MIN. 50 GRANULAR COVER F.D. E.P.B. F.D. 00 POURED CONCRETE FOUNDATION WALL (0MPa) 475 X 00
More informationCONSULTING PROJECT LOCATION
LOCATION Drawing Index: GENERAL NOTES: COVER SHEET Drawing Cover Sheet INDE D Drawing Index O.B.C. Matrix ARCHITECTURAL DRAWINGS A0 First Floor Plan, Basement Plan, Washrooms A0 Second Floor Plan, Washrooms
More informationHIGHLANDVIEW CEMETERY CHAPEL
HIGHLANDVIEW CEMETERY CHAPEL CONTACT: Ferris State University Small Town Studio Christopher Cosper, AIA, LEED, AP, Assistant Professor cosperc@ferris.edu 23.59.33 Sheet List Sheet Name Sheet # COVER A00
More informationTP: 89'-0" BP: 86'-6 1/4" 2'-0" Typ TP: 89'-0" BP: 86'-6 1/4" 2'-0" Typ S201 TW: 89'-0" TF: 86'-0" S201 TW: 87'-11 1/4" S201 TF: 86'-10 1/4" S201
Resource reginc.com 0.. '-" P: '-" 0'-0" " P: '- /" 0'-" '-" '-0" '-0" 0'-0" '-0" '-" '- /" TF: '-0" TW: '-0" TF: '-0" TW: '-0" TF: '-0" TW: '- /" TF: '-" " Typ Sim. P: '-" " TF: '-0" C '- /" '-" Varies
More informationMarch 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen:
March 6, 2018 Subject: Addendum No. 2 Toyota Park Transit Center Phase II Ladies and Gentlemen: This Addendum No. 2 is being issued to provide responses to questions submitted by potential bidders and
More informationG703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project
Billing Requirements G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Sitework / Paving Excavation and Grading Labor
More informationTEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up
TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM Form 15 Work Write-Up Owner-Builder Applicant Owner-Builder Co-Applicant Physical Address: City,
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS
USACE / NAVFAC / AFCEC / NASA UFGS-09 06 00 (May 2009) Change 1-11/13 ----------------------------- Preparing Activity: USACE Superseding UFGS-09 06 90 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationSchedule D. RTM Finished Home Specifications
Schedule D RTM Finished Home Specifications RTM Finished Home Specifications Name: Job #: Address: Phone: Executive Specifications Executive Spec-Line Features upgraded finishes not offered in the Standard
More informationWork Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free
/ / Paperport 2000 official estimating report Work Write Up / Specification of Repairs Toll Free 1-877-932-7177 Clients Name. GREAT CLIENT Property Address. NUMBER ONE GOOD ROAD METRO, VA 20000 Primary
More information1 BASE HOME CONSTRUCTION SPECIFICATIONS: TOWNHOMES 5-13-2015 Note: Specifications noted below may change based on selected options. Verify upgrades from the base specifications with the option sheets and
More informationSECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS
Page 1 of 6 SECTION 08 32 20 CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS [OR WOOD] PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,
More informationSECTION WALL AND DOOR PROTECTION
PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 10 26 00 WALL AND DOOR PROTECTION SPEC WRITER NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable to
More information109 S. MARKET CURTIS ARCHITECTURE & DESIGN PC SITE MAP EXISTING PHOTOGRAPH PROPOSED RENDERING
HISTORIC PHOTOGRAPH EXISTING PERSPECTIVE PROPOSED PERSPECTIVE TUCKPOINT ENTIRE BUILDING FACADE WITH MORTAR MATCHING ORIGINAL, REMOVE ALL FASTENERS, BRACKETS & MISC. METAL. REPAIR STAINED GLASS ABOVE EACH
More informationProject Manual Index of Specifications Shenandoah Schools Concession Building
INDEX OF SPECIFICATIONS Division 0..BIDDING AND CONTRACT REQUIREMENTS 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 41 00 Bid Forms 00 43 13 Bid Security Form 00 72 00 General Conditions
More informationWhat this Family Room Specification Package can be used for:
Family Room Conversion Specification Package. 1) These plans are for conceptual and bidding purposes only. 2) These plans cannot be used to apply for a building permit. 3) All design information must be
More informationOFFICE Space STANDARD SPECS Page 1
OFFICE Space STANDARD SPECS Page 1 Standard features listed are based on manufacturer availability- Substitutions may occur and interchanged with items of similar standard likeness at the discretion of
More informationDivision 11 - Equipment Section 11401
PART 1 - GENERAL 1.1 GENERAL A. Division 1 General Requirements applies and becomes a part of this Section of the Specification as fully as if repeated herein. B. Items of equipment which are included
More informationOAK TREE LIQUOR STORE
DRAWING LIST ARCHITECTURAL A000 - COVER SHEET D0 - DEMOLITION PLANS & ELEVATIONS A0 - PLANS, ELEVATIONS & DETAILS A40 - BUILDING S A40 - BUILDING S ARCHITECT: Engineering (00) Inc. 6 Great George Street,
More informationWATER 107 TOILET 106 EXISTING TYP. EXISTING CLG. TYP. (E) RETURN REGISTER SUPPLIES 105 NEW RETURN REGISTER
GFI (E) ROOM NOW WORK REQUIRED 60x66 30x60 ISTING TYP. ISTING CLG. TYP. AURORA, LLC 1155 S. Havana St. Space 53 Aurora, CO 80012 Code Information: 2009 International Building Code Address: 1155 S. Havana
More informationTABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS
AIA General Conditions... GC-1 to GC-44 Amendments to General Conditions... AM-1 to AM-2 Supplements to General Conditions... SU-1 to SU-7 00200 Instructions To Bidders... 1 3 00201 Contractor s Bidding
More informationELEVATION GENERAL NOTES: 1. ALL PAINT / FINISH SYMBOL DEFINITIONS FOUND ON A8.1. 2. ALL NEW GLAZING WITHIN 18" OF GROUND OR ADJACENT TO DOOR(S) TO BE TEMPERED. 3. REMOVE ALL EXISTING METLA COPING CAPS
More informationTENDER ADDENDUM NO. TWO (2)
TENDER ADDENDUM NO. TWO () : PROJECT: PROJECT NO.: CONTRACTOR: PREPARED BY: Oct 04, 08 Pickering 7th Floor IT Meeting Rooms Interior Alterations RFQ-0049-08 TBD Anitha Rasuratnam We are informing you of
More informationA2.0 TRIPLE M DEVELOPMENT EXTERIOR ELEVATIONS. Rochester, MN Hwy 52 North. Apr 07, phone fax
NORTH ELEVATION 1 1/8" = 1'-0" WEST ELEVATION 2 1/8" = 1'-0" SOUTH ELEVATION 3 1/8" = 1'-0" EXTERIOR ELEVATIONS A2.0 EAST ELEVATION 4 1/8" = 1'-0" EXTERIOR FRAME TYPES 1 1/4" = 1'-0" 2 INTERIOR FRAME TYPES
More informationBuilding Excellence IV Capital Levy Projects Under Construction
Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary
More informationOAK HILL 6901 OLD BEE CAVE RD. AUSTIN, TX ISSUE FOR: DESIGN DEVELOPMENT GENERAL NOTES
OAK HILL 90 OLD BEE CAVE RD. AUSTIN, TX ISSUE FOR: DF- # GENERAL LIGHTING NOTES A. ALL LIGHTING SHOWN ON ID.0 ARE DECORATIVE FIXTURES ONLY. CONTRACTOR TO REFERENCE MEP SHEETS FOR ALL GENERAL LIGHTING LOCATIONS
More informationCustom 22' x 40' - 16' Tall Garage Plan #g227 By SDS-CAD Specialized Design Systems
P O Box 34 Mendon, Utah Custom 22' x 40' - 16' Tall Garage Plan #g22 By Page 1 Title Page Page 2 Main Floor Plan Page 3 Foundation Plan Page 4 Elevation Views Page 5 Framing and Details Page 6 Typical
More informationWAYNE COUNTY COMMUNITY COLLEGE DISTRICT DAVENPORT UNIVERSITY SUITE RENOVATION
WAYNE COUNTY COMMUNITY COLLEGE DISTRICT DAVENPORT UNIVERSITY DESIGN DIVISION SOUTHFIELD ROAD SOUTHFIELD, MI 80 o (8) -00 I f (8) - SUITE RENOVATION GENERAL RUIREMENTS The General Provisions of the Contract
More informationSECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS
Page 1 of 6 SECTION 08 32 20 EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,
More informationCustom 30 x 48-14' Tall Garage Plan #g226 By SDS-CAD Specialized Design Systems
P O Box 34 Mendon, Utah Custom 30 x 48-14' Tall Garage Plan #g226 By Page 1 Title Page Page 2 Main Floor Plan Page 3 Foundation Plan Page 4 Elevation Views Page 5 Framing and Details Page 6 Typical Section
More informationSECTION GYPSUM BOARD & SHEATHING SYSTEMS
PART 1!GENERAL! 1.01! SECTION INCLUDES SECTION 09260 GYPSUM BOARD & SHEATHING SYSTEMS! Metal stud wall framing. Metal channel ceiling framing.! Gypsum board.! Sheathing.! Taped and sanded joint treatment.!
More informationA. All tackboards shall be mechanically fastened to walls; gluing shall not be allowed.
10 1101 VISUAL DISPLAY BOARDS A. All white boards, chalkboards, glass boards, and smart boards shall be mechanically fastened to walls; gluing shall not be allowed. Paint-on and vinyl display boards are
More informationMAIN FLOOR PLAN. #G x 14 x 8 Shed - Chicken Coop By SDS-CAD Specialized Design Systems 10'-0" 3'-0" 1'-0" 14'-0" 14'-0" 1'-0" 6'-0" 3'-0"
10'-0" BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS. BARN TO BE BUILT AS PER LOCAL CODE REQUIREMENTS 14'-0" BWP BWP BWP ABWP 101
More informationPLANNING FOUNDATION FRAMING
TRITON MODEL 3208 Chiquita Blvd. S. #208 Cape Coral, FL 33914 (239) 549-5554 CBC 1259879 What s Included in a Poseidon Home PLANNING Provide all permits necessary to comply with local codes Provide all
More informationBIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D
HOSKINS ARCHITECTURE, LLC 1827 1 ST AVENUE NORTH, SUITE 104 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 3 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS
More informationAddendum #4 July 13, 2015
Five Counties Children s Centre Addition 872 The Dutton Firehouse Road Complex Addendum #4 Peterborough, 721 Monaghan ON Road, K9H Peterborough, 7G1 ON K9J 5J8 Page 1 Addendum #4 July 13, 2015 The following
More informationNorth Village Condominiums
North Village Condominiums An ambient community in Douglas, Massachusetts encompassing the luxury of Blackstone Valley s serene country surroundings FOUNDATION Builders General Specifications (As of 1/1/2017)
More informationCRM Homes BUILDER Mangan Drafting Jim Mangan
BACK ELEVATION 1/8" = 1' LEFT SIDE 1/8" = 1' RIGHT SIDE 1/8" = 1' ROOF LINE NTS FRONT VIEW 1/4" = 1' A-1 Springfield MO 65610 Fremont Hills Lot 57 12/12 12/12 14/12 14/12 12/12 12/12 12/12 MAIN ROOF PITCH
More informationMAYMONT FOUNDATION ARCHITECT 1840 WEST BROAD ST SUITE 400 RICHMOND, VA
80 West Broad Street Suite 00 Richmond, Virginia 2220 80.788.77 phone 80.788.0986 fax 000 WESTOVER ROAD RICHMOND, VA 2220 BH ARCHITECTS /9/20 BH VAN YARHES STUDIO VANASSE HANGEN BRUSTLIN, INC DUNBAR MILBY
More informationDallas County Community College District Purchasing Department 4343 IH-30 Mesquite, Texas 75150
Dallas County Community College District Purchasing Department 4343 IH-30 Mesquite, Texas 75150 August 11, 2017 ADDENDUM NO. 1 Bid No. 12404 Interior Space Renovation Mountain View College Opening Date:
More informationZ & C Construction, Inc. Subdivision:
: Buyer(s): Address: Lot: Block: Model: Subdivision: A. Foundations Unfinished basement or crawlspace included per buyer selection (extra fees may apply) Engineered concrete foundation Perimeter drainage
More informationSECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.
SECTION 06110 WOOD FRAMING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But Not Supplied
More informationMETROPOLITAN PIER AND EXPOSITION AUTHORITY INVITATION FOR BIDS (IFB) # M OFFICE BUILD OUT, 5 TH FLOOR OF ABC BUILDING ADDENDUM NO.
METROPOLITAN PIER AND EXPOSITION AUTHORITY INVITATION FOR BIDS (IFB) #2017-20-M OFFICE BUILD OUT, 5 TH FLOOR OF ABC BUILDING ADDENDUM NO. (1) September 28, 2017 This Addendum No. 1 consists of seven (7)
More informationPHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No C
PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No. 20140101C CONSTRUCTION ESTIMATE AND PROJECT BUDGET Dated June 7. 2014 Estimated Cost HARD COSTS $ 1,560,284 Core Renovations (Toilet Rooms, Ceilings
More informationCOLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100
COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 Part 1 General 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified,
More informationNortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1
16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories
More informationSECTION ORNAMENTAL ALUMINUM RAILING
SECTION 05730 ORNAMENTAL ALUMINUM RAILING PART 1 GENERAL 1.1 SECTION INCLUDES A. Aluminum Pipe Railing 1.2 RELATED SECTIONS A. Section 03300 Cast-In-Place Concrete: Placement of sleeves cast in concrete.
More informationA. WCMA A Safety of Corded Window Covering Products; Window Covering Manufacturers Association; (ANSI/WCMA A101.1)
SECTION 12 21 14 VERTICAL LOUVER BLINDS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Vertical slat louver blinds and operating hardware. 1.2 REFERENCE STANDARDS A. WCMA A100.1 - Safety of Corded Window Covering
More informationUniversity Apartments on Brooklyn PROJECT MANUAL
Section 122100 Horizontal Louver Blinds University Apartments on Brooklyn PART 1 - GENERAL 1.1 SECTION INCLUDES A. Horizontal slat louver blinds. B. Operating hardware. 1.2 RELATED SECTIONS A. Section
More informationSECTION NON-STRUCTURAL METAL FRAMING
SECTION 09 22 16 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories
More informationADDENDUM NUMBER 3. Date: December 6, Towneplace Suites by Marriott Springfield, MO. General Contractors Baron Design & Associates, L.L.C.
ADDENDUM NUMBER 3 Date: December 6, 2012 Project: Towneplace Suites by Marriott Springfield, MO To: From: General Contractors Baron Design & Associates, L.L.C. Documents for the referenced project are
More informationMichael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School
A D D E N D U M # 1 DATE: TO: FROM: PROJECT: All Bidders Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School CBI JOB NO.: 11063 The following items shall modify
More informationThe Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage
The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco
More informationDelta Gamma Sorority Renovation Budget Scope 3/7/2018
Delta Gamma Sorority Renovation Budget Scope 3/7/2018 PROJECT: Barbara Cerni Delta Gamma Sorority Tallahassee, Fla. This scope is based on the 50% Construction Documents drawn by BKJ Architecture dated
More informationSECTION STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 08110 - STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division 1 Specification
More informationAIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7
AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 www.airwayscrossing.ca Excellent access to Barlow Trail/McKnight Blvd. Bays starting at 4,000 sq. ft. Surface loading T5 lighting
More informationGARAGE MAIN FLOOR PLAN
12'-0" 4'-6" 3'-0" 4'-6" 3040 14'-0" LADDER LT LINE BUNK CABIN 11'-4" x 13'-4" 14'-0" BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS.
More information6 Bears and a Goat Brewery - Phase I
Abbreviations 417 William Street Project Address 1140 International Parkway, Virginia 22406 Agency with Jurisdiction Stafford County, VA Tenant Area 9,975 SF- gross Vicinity Map Code Data Applicable Code
More informationPulaski County, Virginia Typical Carport Enclosure Details Based on the 2012 International Residential Code
Pulaski County, Virginia Typical Carport Enclosure Details Based on the 2012 International Residential Code Carports enclosed into one-story garages or living spaces must be constructed in conformance
More informationSTATE OF NEW HAMPSHIRE DEPARTMENT OF NATURAL AND CULTURAL RESOURCES DIVISION OF PARKS AND RECREATION SKI PATROL HUT PROJECT #: CAP 1804
STATE OF NEW HAMPSHIRE DEPARTMENT OF NATURAL AND CULTURAL RESOURCES DIVISION OF PARKS AND RECREATION PROJECT #: CAP 1804 FRANCONIA NOTCH STATE PARK FRANCONIA, NEW HAMPSHIRE BID SET 8/4/2017 DRAWING LIST:
More informationSECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS
SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,
More informationThorp Associates, P.C. Architects and Planners Bank of Choice Arvada Lending Office ADDENDUM #1 August 23, 2010 SPECIFICATIONS
Thorp Associates, P.C. Architects and Planners Bank of Choice Arvada Lending Office ADDENDUM # August 23, 200 SPECIICATIONS. Section 00 6 INVITATION TO BID and Section 00 4 3 BID ORM OR GENERAL CONTRACT:
More informationADDENDUM A CONSTRUCTION SPECIFICATIONS
ADDENDUM A Description of Improvements: CONSTRUCTION SPECIFICATIONS The Improvements shall consist of constructing an approximate square foot single-family residence including car garage on the real property
More information2. In moist areas, portland cement plaster should be used if a more permanent material is not within budget limits.
UDIVISION 9 FINISHES 09 00 00 FINISHES 09 20 00 PLASTER AND GYPSUM BOARD PLASTER 1. Major partitions are to extend to underside of structure as required by code. Allow for structural deflection. Provide
More informationPASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017
SECTION 10505 - METAL STUDENT LOCKERS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationCLASSROOM MODIFICATIONS AT MURRAY LASAINE ELEMENTARY
MODIFICATIONS AT PROGRAM MANAGER ARCHITECT CIVIL ENGINEER MEP ENGINEER 399 BRIDGEVIEW DRIVE NORTH CHARLESTON, SC 29405 8435294989 CONT: RONALD KRAMPS CUMMING CONSTRUCTION CORPORATION 3896 LEEDS AVENUE
More informationPage 1 of 5 STATE BANK OF INDIA COMMERCIAL BRANCH - ERNAKULAM (NEW PREMISES) Name of Work
Page 1 of 5 STATE BANK OF INDIA COMMERCIAL BRANCH - ERNAKULAM (NEW PREMISES) Name of Work Sealed bid format for the interior furnishing work of SBI, Commercial Branch, Ernakulam(2ND FLOOR) Name and Address
More informationWARRANTY PROVIDER ACCEPTED A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS
WARRANTY PROVIDER ACCEPTED A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS Per: 2006 B.C.B.C. Part 9 DISCLAIMER: THE INFORMATION CONTAINED IN THIS DOCUMENT REPRESENTS CURRENT WOOD FRAME
More information10155 Toilet Compartments
10155 Toilet Compartments This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or
More informationWeatherSmart Air Barrier Installation Guide
WeatherSmart Air Barrier Installation Guide 1 The intent of this document is to provide a guide for the installation of WeatherSmart as both a Weather Resistive Barrier (W.R.B.) and an Air Barrier Material
More informationSCI-FAB Product Specifications. Casework Section 1. Part 1 General
SCI-FAB Product Specifications Casework Section 1 Part 1 General 1.1 SCOPE OF WORK Includes all factory fabricated stainless steel casework as required by the project drawings. 1.2 TYPICAL INCLUSIONS A.
More informationGLASSWALL SPECIFICATIONS
GLASSWALL SPECIFICATIONS Series GL1 Individual, Glass Panels PRODUCT OVERVIEW: Top Supported Side Stack Individual, Omni-Directional Panels Manually Operated Maximum Opening Height: 10' 5 [.m] Maximum
More informationSHEET INDEX Name. Published COVER SHEET
ID A-001 A-101 A-102 A-201 A-401 A-501 E-101 E-102 E-103 S-101 SHEET INDEX Name COVER SHEET FOUNDATION PLAN AIN LEVEL PLAN ELEVATIONS SECTIONS/DETAILS DETAILS SCHEDULES EXISTING FOUNDATION PLAN EXISTING
More informationBuilding Envelope
9.36.2. Building Envelope Module 2 BCBC 9.36. 2014 1 Richard Kadulski Architect 9.36.2. Building Envelope Focus is on total building performance, not just thermal insulation Heat transfer and air leakage
More information