1 B. CIVIL WORKS 205 A Cement Board Providing and Fixing 8mm thick for external and internal wall without infill,erected with C channel and required material as directed by A/E(Everest Cement Board,Shera board or Equivalent ) 98 B Floor carpeting Supplying, fixing of heavy guage medium class, tufted carpet with foam backing in executive areas specified as per drawing and instruction, all complete. (colour and sample to be approved by the Consultant) Heritage,yeti or Equivalent FULL HEIGHT Collapsable partition WITH ALUMINIUM C FRAME WORK Providing, Fabricating and fixing full height board partitions of overall thickness of 75mm consisting of the following: Framework: Partition frame work to be formed out of 50 X 25mm aluminum frame work placed vertically and horizontally at required centre to centre and cross braced with floor and ceiling channels supported by hinges, using galvanized metal screws and wooden / PVC rawl plugs. D E F Cladding: Partition framework to be cladded with 2.5mm thick tapered edge gypsum board on both sides of the partition in line and level fixed with drywall 300mm c/c with staggered joints to avoid through joints and finished with proprietary supplied jointing tape and compound as per manufacturers specification. Wall Putting Wall putty over cement plaster surface perfect in line and level on wall. The surface shall be smoothened by rubbing sand paper, all complete as per specification and instruction of consultant. Make Birla white putty or equal. Wall Emulsion painting Painting on wall and ceiling with two coats Washable distemper of First quality (Must be ISO 900 : 2000 certified company) of approved color and shade over one coat of primer to give uniform coloring and quality floss finish after properly sanding the surface, all complete as per specification and instruction of the consultant.make Asian Paint,Berger or Equivalent Vertical louvre Supplying and installing vertical blinds at windows, with vane width 00mm, made of sufficiently high quality material, specialy woven fabric from polyster viscousyarn died in first colours, "Dust Guard Treated" and with quality not to fray or curl in normal use, with bottom pocket in the same material as the vane, secured with stainless steel vane carrier in the top of each fabric vane mounted in headrail manufactured from extruded aluninium powder coated in approvied colour, tilting to be controlled by an endless ball chain which revolves a splined shaft (made of extruded corrosion resistant alunimium to be supported at both ends in plastic end- cap) acutuing awom gear mechanism Sq FT Sq FT Sq FT OF CIVIL WORKS

2 E.ELECTRICAL & ALLIED WORKS 205 specification all complete. selected contractor shall prepare the complete shop drawings for approval and As built drawing after completion of project) A Light and Power Point wiring All Points wiring shall be done with surface laying PVC Rigid conduit (confirm to BS-EN-50086, Wall thickness 2 mm minimum, fire retardant FRLS grade schedule 40) with necessary spring bend, mounting saddle at an interval of 800mm, clamp, Circular, GI connection boxes, Polymer Cable Glands, PVC bushing etc. - no junction boxes shall be used in the middle of span UON by consultant. Supplying,providing and installing way Light points led light 8 wt ceiling panel Fiam,Torsel or equivalent by means of 2x.5 sq. mm; Copper single core multistrand PVC wire with 20 mm PVC rigid conduit all complete 3 6A power points by means of (2x4+x2.5) sq. mm; Copper single core multistrand PVC wire with 20 mm conduit; no more than 4 sockets can be wired in a circuit - Normal supply Sub - A point point B Switches & socket outlets (modular type) switches, sockets, outlets with their GI boxes, faceplates, modules etc. all complete gang way switch Northwest,Norisys or eqvt. etc all complete. set 2 2 gang way switch Northwest,Norisys or eqvt. etc all complete. set gang way switch Northwest,Norisys or eqvt. etc all complete. set 3 6 gang way switch Northwest,Norisys or eqvt. etc all complete. set 6 4 6/6 Amps combined S/socket flush type Northwest,Norisys or eqvt. etc all complete. set 26 5 Telephone socket single F set 5 Sub - B OF ELECTRICAL WORKS

3 C. FALSE CEILING WORKS 205 C FALSE CEILING WORKS.00 Providing and fixing Gypsum M/F suspended false celing of Boral/Elephant/CKM brand consisting of IGL intermediate channel, perimeter channel, ceiling section & ceiling angle using metal dash fastners for suspension. The 2.5mm thk. Gypsum board is screw fixed to the bottom of the suspended frame. The joints between the boards are finished with jointing compound & fibre tape to get a smooth flush finish.the finishes shall be to the satisfaction of the Engineer/architect Providing and fixing the joints between the gypsum boards of false ceiling with jointing compound & fibre tape to get a smooth flush finish. Ceiling to be finished with full putty of Birla/Asian/JK/Burger brand, coat of primer and 2 coats of plastic emulsion paint of Asian/Burger brand. Final coat will be with roller finish. The finishes shall be to the satisfaction of the Engineer/architect. Special Provisions: Contractor to make cutouts for all electrical, networking boxes as shown in the drawing. Sq FT LS OF FALSE CEILING WORKS

4 E. HVAC WORKS 205 Supply and delivery of heat pump Ceiling Cassette type single split Air Conditioning system with fully charged refrigerant inclusive of interconneting power and control cables, individual wired remote controllers and supports made of MS angle/ rods as per specifications and drawing of following capacity. A(i) 4-Way Ceiling Cassette type indoor s Nominal cooling capacity: 0.55 kw Nominal heating capacity:.7 kw Refrigerant: R40A Sound pressure level: H/Mi/Low 54/50/47 db (A) Air Flow at high speed: 700 CMH Electrical Power Source: 3Ph, 380V~ 45 V, 50Hz Liquid Pipeline diameter: 2.7 mm Gas Pipeline diameter: 9.05 mm Cabinet Size: 830 mm x 830 mm x 290 mm nos 3 A(ii) 4-Way Ceiling Cassette type indoor s Nominal cooling capacity: 5.5 kw Nominal heating capacity: 5.6 kw Refrigerant: R40A Sound pressure level: H/Mi/Low 44/4/38 db (A) nos Air Flow at high speed: 00 CMH Electrical Power Source: Ph, 220V, 50Hz Liquid Pipeline diameter: 6.35 mm Gas Pipeline diameter: 2.7 mm Cabinet Size: 830 mm x 830 mm x 230 mm nos 4 2 Refrigerant Quality Copper Pipe with 9mm thick insulation,wires a feet Installation of Ceiling Cassette split Air Conditioner sets 7 4 MS-Angle Frame specially designed as per site condition sets 7 OF HVAC WORKS

5 BILL OF QUANTITY A. PARTATION WORKS 205 A PARTITION WORKS.00 FULL HEIGHT PARTITION WITH ALUMINIUM FRAME WORK Providing, Fabricating and fixing full height board partitions of overall thickness of 75mm consisting of the following: Framework: Partition frame work to be formed out of 50 X 25mm aluminum frame work placed vertically and horizontally at required centre to centre and cross braced with floor and ceiling channels. The cross bracing channels shall be provided also at above and below the glass in partition framework and to be secured to floor at bottom and to any nearest structural member using galvanized metal screws and wooden / PVC rawl plugs. Cladding: Partition framework to be cladded with 2.5mm thick tapered edge board on both sides of the partition in line and level fixed with drywall 300mm c/c with staggered joints to avoid through joints and finished with proprietary supplied jointing tape and compound as per manufacturers specification. Sq FT PARTLY PARTITION WITH ALUMINIUM FRAME WORK Same as above in item.00 Sq FT ALUMINIUM FRAME WORK DOORS Fabricate supply and fix in position the following anodized aluminum doors, complete with 6mm thick clear glass all necessary frames, sub frames, fixing, fittings, accessories weather stripping and hardware as per specifications * Shop drawings & samples to be approved by the Engineer. Sq FT OF PARTATION WORKS

6 F. SANITARY WORKS 205 A. CIVIL WORKS.0 DISMANTELLING WORKS Dismantelling of following items, including removal of debris from the site. Including cleaning, chipping of the surface or area for the new construction to be done. all complete as per drawing, and instruction of the consultant. i Brick internal duct wall sft PATCHUP WORKS Patch up of dismatelled brick work with fresh brick work and plastering,putting and painting all complete as per drawing, and instruction of the consultant. 2.0 TILE WORKS i Floor Tiles: Providing & laying 24" x 24" non-skid ceramic floor tiles of approved quality and colour over previously done cement punning with required adhesive with joint grouting,all complete as per design and drawings and approval of the Consultant. i Providing and fixing 2" X 8" wall Tile wall in executive floor of approved make colour, shade and size with : cement sand mortar over plaster surface and joined with white cement slurry mixed with pigment to match the shade of the tile including 3mm chipping of the surface all complete as per drawing, specification and instruction of the consultant. sft 5 sft 24 sft 30 B. SANITARY INSTALLATION 2.0 WASH BASIN 2. Providing and fixing in position Wash Basin of size 500x 450x 65 with 32mm dia. waste coupling with nos. 32mm dia. bottle trap, nos. of Angular Stop Cock with CP cap, nos. of Pressmatic Piller Cock with nos. 450mm long connecting pipe, connection to waste line and water lines to nearest duct all complete as per drawing, specification, direction of direction of theand ready Consultan for operation.make Mogen/Jaguar or equivalent. Nos..00 C. WATER SUPPLY.0 COLD WATER LINES. Providing and fixing in position Chlorinated Poly Vinyl Chloride (CPVC) with necessary CPVC fittings such as elbow, tee, union, nipple, brass elbow and brass tee etc making joint with applying solvent yellow, including nailing, clamping. Pipe line should lay disregarding groove cutting and hole cutting all complete as per drawing specification, direction of the Consultant and ready for operation. Note: at the outlet fittings should be of brass elbow or brass tee and check valve as required. a) 25mm dia. SDR CPVC pipe with fittings Rft Providing and fixing in position CPVC valve as per drawing specification, direction of the Consultant and ready for operation. a) CPVC CTS 25mm dia. Ball Valve Nos..00 OF SANITARY WORKS

7 SUMMARY SHEET Project: Client: 205 No. Description (NRs.) A Partition Works B Civil Works C False Ceiling Works D Electrical and allied Work E HVAC Work F Sanitary Work 3% VAT WORKS

PND Training Hall Conex Building, Kabul ABSTRACT OF COST

PND Training Hall Conex Building, Kabul ABSTRACT OF COST PND Training Hall Conex Building, Kabul ABSTRACT OF COST A Civil Works All work items shall be carried as per drawing, specification and instruction of the Engineer. 1 Sub-structure Works Earthwork in

More information

(1) Name of Work: Renovation and upgradation of Medical council room/meeting room at ground floor, HIMSR Building. Bill of Quantities of Civil Work

(1) Name of Work: Renovation and upgradation of Medical council room/meeting room at ground floor, HIMSR Building. Bill of Quantities of Civil Work () Name of Work: Renovation and upgradation of Medical council room/meeting room at ground floor, HIMSR Building. Bill of Quantities of Civil Work Part- S No Description UOM Qty Rate Amount (A) Schedule

More information

Page 1 of 5 STATE BANK OF INDIA COMMERCIAL BRANCH - ERNAKULAM (NEW PREMISES) Name of Work

Page 1 of 5 STATE BANK OF INDIA COMMERCIAL BRANCH - ERNAKULAM (NEW PREMISES) Name of Work Page 1 of 5 STATE BANK OF INDIA COMMERCIAL BRANCH - ERNAKULAM (NEW PREMISES) Name of Work Sealed bid format for the interior furnishing work of SBI, Commercial Branch, Ernakulam(2ND FLOOR) Name and Address

More information

PRICE BID: LAST DATE AND TIME FOR SUBMISSION 2:00PM ON BOQ FOR INTERIOR WORKS HR SECTION, ZONAL OFFICE-1

PRICE BID: LAST DATE AND TIME FOR SUBMISSION 2:00PM ON BOQ FOR INTERIOR WORKS HR SECTION, ZONAL OFFICE-1 Item No. Description Qty. Unit Rate (in Rs.) 1 Doors in partitions: The door frame made of approved quality 2 Sq.M Beach/Safeli wood. The Shutter to be 35mm thk BWR Block Board with both side finished

More information

SCHEDULE OF QUANTITIES INTERIOR WORKS FOR RACC,GADAG Description Qty. Unit Rate Amount

SCHEDULE OF QUANTITIES INTERIOR WORKS FOR RACC,GADAG Description Qty. Unit Rate Amount Item No. 1 PARTITION 1.1 DOUBLE SKIN WOODEN PARTITION SCHEDULE OF QUANTITIES INTERIOR WORKS FOR RACC,GADAG Description Qty. Unit Rate Amount Providing and fixing 71 mm thick solid fully or partly glazed

More information

NEPAL RASTRA BANk. Sn. Detail of Work Unit Quantity Rate in figure Rate in words Total Cost Remarks Civil Works: 1 Aluminium Partation Work:

NEPAL RASTRA BANk. Sn. Detail of Work Unit Quantity Rate in figure Rate in words Total Cost Remarks Civil Works: 1 Aluminium Partation Work: Civil Works: 1 Aluminium Partation Work: 1.1 providing and fixing Aluminium half and full partation with 5 mm thick glass and 9 mm thick laminated board of section (101 X 45X1.1) as per drawing, specification

More information

TENDER DOCUMENT PART-II

TENDER DOCUMENT PART-II NATIONAL BANK FOR AGRICULTURE AND RURAL DEVELOPMENT TAMILNADU REGIONAL OFFICE TENDER DOCUMENT PART-II (PRICE BID) RENOVATION OF SENIOR OFFICERS CABIN AT NABARD REGIONAL OFFICE NUNGAMBAKKAM CHENNAI-34 ISSUED

More information

Sl No. Sqm Sqm Sqm Cum Cum 0.73

Sl No. Sqm Sqm Sqm Cum Cum 0.73 BOQ Name of Work: Repairing & repainting works at the adjunct room between Old block and New Extension Building in Second floor of Chemistry Department. Sl No 1 2 3 4 Desription of Item Unit Qnty Rate

More information

BILL OF QUANTITIES (BOQ) ADMIN OFFICE - FIRST FLOOR - KALABURAGI

BILL OF QUANTITIES (BOQ) ADMIN OFFICE - FIRST FLOOR - KALABURAGI Item No. Civil Works:- BILL OF QUANTITIES (BOQ) ADMIN OFFICE - FIRST FLOOR - KALABURAGI Description Qty. Unit Rate Amount 1 Granite Cladding near entrance. Providing and fixing to the 110 wall after preparing

More information

BOQ FOR INTERIOR FURNISHING WORKS OF BASEMENT AT H-6, INDIRA PALACE, CONNAUGHT CIRCUS, NEW DELHI FOR SHIFTING SME CITY CENTER BRANCH

BOQ FOR INTERIOR FURNISHING WORKS OF BASEMENT AT H-6, INDIRA PALACE, CONNAUGHT CIRCUS, NEW DELHI FOR SHIFTING SME CITY CENTER BRANCH BOQ FOR INTERIOR FURNISHING WORKS OF BASEMENT AT H-6, INDIRA PALACE, CONNAUGHT CIRCUS, NEW DELHI FOR SHIFTING SME CITY CENTER BRANCH D E T A I L E D E S T I M A T E 1: Flooring 1.1 Providing & laying of

More information

Corrigendum I dated 02/06/2017

Corrigendum I dated 02/06/2017 Corrigendum I dated 0/0/07 TO NOTICE NIT NO. MMTC/Estate/8/VII/7-8 DATED 9 TH MAY 07 for E-NIT FOR REPAIR / RENOVATION OF OF DUPLEX TYPE FLAT IN L-/ (MIDDLE FLAT), HAUZ KHAS ENCLAVE, NEW DELHI-00 A fresh

More information

BOQ. Name of Work: Renovation of Research Lab AR 6 (A & B), AR 3, Lab III -Wing 2 (Old building) and Computer Lab of Chemical Engineering Department.

BOQ. Name of Work: Renovation of Research Lab AR 6 (A & B), AR 3, Lab III -Wing 2 (Old building) and Computer Lab of Chemical Engineering Department. Name of Work: Renovation of Research Lab AR 6 (A & B), AR 3, Lab III -Wing 2 (Old building) and Computer Lab of Chemical Engineering Department. NIT NO: IITG/MAIN/NIT/FY18-19/01 Dated 03.05.2018 Sl No

More information

SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR

SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR FINANCIAL BID Item DSR Item Description Qty Units No No. Total 1.1.1 Excavating trenches of

More information

BILL OF QUANTITY PART-III CIVIL WORKS ITEM NO. DESCRIPTION UNIT QTY RATE AMOUNT

BILL OF QUANTITY PART-III CIVIL WORKS ITEM NO. DESCRIPTION UNIT QTY RATE AMOUNT Page 1 BILL OF QUANTITY PART-III CIVIL WORKS ITEM NO. DESCRIPTION UNIT QTY RATE AMOUNT 1 Providing and fixing door Closer/Bottle type Each 10 2 Providing and fixing door Stopper Each 10 Providing and placing

More information

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M. Bill of Quantities Nature of work : Construction of Health Center with 8 rooms (Clinics, Pharmacy, Labs, Fence & Latrines) Location: Shakreen- El Fasher Town- North Darfur State No. Description Qty Unit

More information

STATE BANK OF INDIA-NUAGAON ADB SCHEDULE OF RATES FOR THE FACE LIFTING OF THE BRANCH BUILDING

STATE BANK OF INDIA-NUAGAON ADB SCHEDULE OF RATES FOR THE FACE LIFTING OF THE BRANCH BUILDING STATE BANK OF INDIA-NUAGAON ADB SCHEDULE OF RATES FOR THE FACE LIFTING OF THE BRANCH BUILDING Sl. No. Description of the Works Unit Quantity Rate Amount 1 DISMANTLING WORKS Surface cleaning of roof by

More information

Saraswathi. Floor Plans

Saraswathi. Floor Plans 1 / 15 Saraswathi Saraswathi is situated in a posh yet serene locality in Besant Nagar, a stone s throw away from Elliots Beach. The property covers 3 grounds and houses 8 apartments in a spacious 3 BHK

More information

ONLINE SEALED BID FORMAT FOR INTERIOR WORKS AT THODUPUZHA TOWN BRANCH (EXISTING PREMISES) FOR ACCOMMODATING RACC

ONLINE SEALED BID FORMAT FOR INTERIOR WORKS AT THODUPUZHA TOWN BRANCH (EXISTING PREMISES) FOR ACCOMMODATING RACC Page 1 of 6 ONLINE SEALED BID FORMAT FOR INTERIOR WORKS AT THODUPUZHA TOWN BRANCH (EXISTING PREMISES) FOR ACCOMMODATING RACC 2 Sl No. Description of work Unit Quantity Rate Amount 1 Officers Table No.

More information

CIVIL/INTERIOR RENOVATION WORKS OF BASEMENT-2 AT ADMINISTRATIVE OFFICE, SHIMLA

CIVIL/INTERIOR RENOVATION WORKS OF BASEMENT-2 AT ADMINISTRATIVE OFFICE, SHIMLA CIVIL/INTERIOR RENOVATION WORKS OF BASEMENT-2 AT ADMINISTRATIVE OFFICE, SHIMLA FINANCIAL BID/PRICE BID/SHEDULE OF QUANTITIES Sl.No. Description of Item Quantity Rate (Rs) Unit Amount (Rs) 1 Providing and

More information

CONSTRUCTION WORK AT THE AU MEDICAL CENTER

CONSTRUCTION WORK AT THE AU MEDICAL CENTER CONSTRUCTION WORK AT THE AU MEDICAL CENTER No Description of works Unit Quantity RENDER THE FOLLOWING TO THE AUC, Medical Center.01. Laboratory 1.0 Dismantling Works; 1.1 Remove carefully the existing

More information

BILL OF QUANTITY. Estimated: - Rs. 1, 83, 650/- Time of Completion:- Class of Contractor:- D & above

BILL OF QUANTITY. Estimated: - Rs. 1, 83, 650/- Time of Completion:- Class of Contractor:- D & above BILL OF QUANTITY Name of Work:- Estimate for renovation of S.D.O, No.I Office, Old Control Room of accommodation of E.E, BNED, Bhadrak for Latrine & Bathroom. PART-A Estimated: - Rs. 1, 83, 650/- Time

More information

UNDP / PAPP OFFICE BUILDING RAMALLAH HVAC WORKS

UNDP / PAPP OFFICE BUILDING RAMALLAH HVAC WORKS UNDP / PAPP OFFICE BUILDING RAMALLAH WORKS Bill of Quantities July 2008 ENGINEERING UNIT Project: system The contractor shall, when pricing the rates of this bill take into consideration including and

More information

TENDER FOR CIVIL INTERIOR WORK OF BABAI BRANCH

TENDER FOR CIVIL INTERIOR WORK OF BABAI BRANCH TENDER FOR CIVIL INTERIOR WORK OF BABAI BRANCH S.N DESCRIPTION UNIT QTY RATE AMOUNT (Rs.) C. CIVIL RENOVATION 1 VITRIFIED TILE FLOORING Sqm. 170 Providing and fixing Premium quality double charge Vitrified

More information

Soundmaster & Modernfold TECHNICAL DATA

Soundmaster & Modernfold TECHNICAL DATA This specification along with product information and model details can be downloaded from www.modernfold.com SPECIFICATION - SECTION 08 35 13 ACCORDION FOLDING DOORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS

More information

The International Committee of the Red Cross

The International Committee of the Red Cross The International Committee of the Red Cross WATER & HABITAT DEPARTMENT Rozhawa / Hospital / Rehabiliation Phase II Rozhawa Hospital / Erbil City / Erbil 25 - February - 217 Rozhawa / Hospital / Rehabiliation

More information

SQMT SQMT Tender No. SBIIMS/BHU/BAM/INT/ / Dated:06/10/ SCHEDULE OF QUANTITIES

SQMT SQMT Tender No. SBIIMS/BHU/BAM/INT/ / Dated:06/10/ SCHEDULE OF QUANTITIES SCHEDULE OF QUANTITIES FOR INTERIOR & FURNISHING WORKS FOR SBI-GALLERY BRANCH, RBO-VI, BERHAMPUR-II Sr.No. Description of Items Units Quantity Rate Amount SUB-HEAD:-I: FALSE CEILING WORKS:- 1.01 Gypsum

More information

Name of Work: Interior and Furnishing Works for Second Floor of Bank of India Headquarters at H-2, Connaught Circus

Name of Work: Interior and Furnishing Works for Second Floor of Bank of India Headquarters at H-2, Connaught Circus Name of Work: Interior and Furnishing Works for Second Floor of Bank of India Headquarters at H-2, Connaught Circus S. No. Description Unit Qty. Rate Amount I. PARTITIONS AND PANELLING:- 1. Full Height

More information

SECTION WALL AND DOOR PROTECTION

SECTION WALL AND DOOR PROTECTION PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 10 26 00 WALL AND DOOR PROTECTION SPEC WRITER NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable to

More information

भ रत य प रब धन स स थ न न गप र

भ रत य प रब धन स स थ न न गप र भ रत य प रब धन स स थ न न गप र INDIAN INSTITUTE OF MANAGEMENT NAGPUR Tender No : IIMN/CAO/12/2018-19 dated 30-08-2018 Name of Work :Provision of toilet, extension of washing shade and Stainless steel railing

More information

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC).

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC). SECTION 16111 CONDUITS PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide conduits, complete, as shown, specified or required per Contract Documents. Principal items include: 1. Rigid aluminum conduit.

More information

BoQ for Flat No.B 39/4, Bank's Nerul complex, Nerul, Navi Mumbai S.no Description Qnty. Rate Unit Amount

BoQ for Flat No.B 39/4, Bank's Nerul complex, Nerul, Navi Mumbai S.no Description Qnty. Rate Unit Amount BoQ for Flat No.B 39/4, Bank's Nerul complex, Nerul, Navi Mumbai S.no Description Qnty. Rate Unit Amount 1 2 3 4 5 Providing & laying double charge vitrified flooring tiles make Kajaria, Johnson, or equivalent

More information

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS PART 1 - GENERAL 01.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this Section.

More information

SCHEDULE OF RATES FOR INTERIOR & FURNITURE AND ALLIED CIVIL WORKS FOR SBI-PHASI BRANCH, RBO-VI, BERHAMPUR-II

SCHEDULE OF RATES FOR INTERIOR & FURNITURE AND ALLIED CIVIL WORKS FOR SBI-PHASI BRANCH, RBO-VI, BERHAMPUR-II SUB-HEAD:-I: FALSE CEILING WORKS:- 1.01 Gypsum board false ceiling Providing and fixing in position Gypsum Board False Ceiling as per manufacturer's specifications SQMT 76.00 and instructions with 12.5

More information

SBI INFRA MANAGEMENT SOLUTIONS PVT.LTD. (A Whole Owned Subsidiary of State Bank of India), Circle Office, Patna

SBI INFRA MANAGEMENT SOLUTIONS PVT.LTD. (A Whole Owned Subsidiary of State Bank of India), Circle Office, Patna SBI INFRA MANAGEMENT SOLUTIONS PVT.LTD. (A Whole Owned Subsidiary of State Bank of India), Circle Office, Patna BRANCH:-PATNA SECRETARIATE, PATNA DETAILED ESTIMATE OF FURNITURE / INTERIOR DECORATION ALLIED

More information

SCHDULE OF WORKS N/w :providing Aluminium partititon and vitrified floor tiles for Chemical Engineering Department

SCHDULE OF WORKS N/w :providing Aluminium partititon and vitrified floor tiles for Chemical Engineering Department NAIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPALLI - 620015 DEPARTMENT OF ESTATE MAINTRNANCE SCHDULE OF WORKS N/w :providing Aluminium partititon and vitrified floor tiles for Chemical Engineering Department

More information

BRIEF SPECIFICATION OF SCHOOL BUILDING. 1.1 Foundation Isolated and combined foundation as per structure design for G+1 story.

BRIEF SPECIFICATION OF SCHOOL BUILDING. 1.1 Foundation Isolated and combined foundation as per structure design for G+1 story. BRIEF SPECIFICATION OF SCHOOL BUILDING S.No. ITEM Specification 1 Foundation 1.1 Foundation Isolated and combined foundation as per structure design for G+1 story. 2 Superstructure 2.1 Superstructure RCC

More information

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1 16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

National Bank of Agriculture and Rural Development, Head Office, Mumbai Department of Premises, Security and Procurement

National Bank of Agriculture and Rural Development, Head Office, Mumbai Department of Premises, Security and Procurement National Bank of Agriculture and Rural Development, Head Office, Mumbai Department of Premises, Security and Procurement Lift door frame granite cladding and other miscellaneous works at NABARD Residential

More information

SECTION NON-STRUCTURAL METAL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING SECTION 09 22 16 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

PONNANI BRANCH (EXSTING BRANCH PREMISES)

PONNANI BRANCH (EXSTING BRANCH PREMISES) PONNANI BRANCH (EXSTING BRANCH PREMISES) SCHEDULE OF WORKS Sl No Description of work Qty Unit Rate Amount 1 SINGLE WINDOW SYSTEM: Providing and fixing of Single window system without partitions as shown

More information

Sl. no Description of Work Unit Quantity Unit rate (BDT) Total cost (BDT) 3. Supplying, fitting and fixing country made Sqm 50

Sl. no Description of Work Unit Quantity Unit rate (BDT) Total cost (BDT) 3. Supplying, fitting and fixing country made Sqm 50 Specification for Renovation of Civil and Electrical works, supplying of furniture in Career Guidance & Employment Support Cell of Panchagarh Technical School and College (PTSC). A) Civil works. Sl. no

More information

Name of the Vendor Sl. No. Rate in Figures Description of Items Unit Quantity

Name of the Vendor Sl. No. Rate in Figures Description of Items Unit Quantity Sl. No. 1 2 National Institute of science education and research, JATNI Notice Inviting E-Tender No.- NISER/ IWD-Civil/Academic/2017-18/17, Dated: 12.02.2018. Bill of Quantities Provision of False Ceiling,

More information

Annex 1 Bill of Quantity. Lot 1 Salyan and Kaplivastu District Court (Western Region)

Annex 1 Bill of Quantity. Lot 1 Salyan and Kaplivastu District Court (Western Region) Annex 1 Bill of Quantity Lot 1 Salyan and Kaplivastu District Court (Western Region) BILL OF QUANTITES 1 of 6 Project:ROLHR Job: Construction of Information centre Location: District court, Salyan SN Particulars

More information

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 05 28 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

T. SUNDUPALLI BRANCH (04427)

T. SUNDUPALLI BRANCH (04427) STATE BANK OF INDIA T. SUNDUPALLI BRANCH (04427) REGION 2, KADAPA RURAL TIRUPATI (A.O) ELECTRICAL WORK BILL OF QUANTITIES SL. NO. DESCRIPTION QTY. UNIT RATE AMOUNT Rs. Rs. 1 Supply, installation, testing

More information

Name of work: Renovation of toilets in main building near molecular biology lab. Sl Rate Amount Description Quantity Unit No Rs Ps Rs Ps Schedule A

Name of work: Renovation of toilets in main building near molecular biology lab. Sl Rate Amount Description Quantity Unit No Rs Ps Rs Ps Schedule A SPECIFICATIONS AND SCHEDULE OF QUANTITIES Name of work: Renovation of toilets in main building near molecular biology lab Sl Rate Amount Schedule A 1 Demolishing concrete in cement mortar including disposal

More information

Name of Work: Setting Up of Laboratory Facility For Dr. Dimple Lab in Ground Floor of Eastern Laboratory. Schedule of Quantity. Description Unit Qty

Name of Work: Setting Up of Laboratory Facility For Dr. Dimple Lab in Ground Floor of Eastern Laboratory. Schedule of Quantity. Description Unit Qty Name of Work: Setting Up of Laboratory Facility For Dr. Dimple Lab in Ground Floor of Eastern Laboratory Schedule of Quantity Sl. 1 Dismantling the existing Aluminium partitions,glass, boards in doors,

More information

Series 3000 Pocket Doors

Series 3000 Pocket Doors Series 3000 Pocket Doors Introduction: The following three (3) part specification offers the Standard and Optional features for the Series 3000 Pocket Doors. The yellow highlighted areas in the specification

More information

SINDH BANK LIMITED. Design Booklet. (For Sindh Bank s Upcoming Branches)

SINDH BANK LIMITED. Design Booklet. (For Sindh Bank s Upcoming Branches) SINDH BANK LIMITED Design Booklet (For Sindh Bank s Upcoming Branches) 2016 S No Description Image A Civil & Interior works A1 Porcelain Tiles on Floor and Skirting Full body Porcelain of approved design,

More information

NOTICE INVITING QUOTATION

NOTICE INVITING QUOTATION INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & MAINTENANCE DIVISION MAIDAN GARHI NEW DELHI-110068. IG/CMD/NIQ-civil/2016/ Dated: 13.4.2016 NOTICE INVITING QUOTATION Name of work : Modification of

More information

SECTION ACCORDION FOLDING PARTITIONS

SECTION ACCORDION FOLDING PARTITIONS PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 10 22 26.13 ACCORDION FOLDING PARTITIONS SPEC WRITER NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES SECTION 09 21 16 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SECTION INCLUDES A. Metal stud wall and ceiling framing, 20 gauge. B. Metal channel suspended ceiling framing. C. Gypsum board. D. Gypsum sheathing.

More information

Islamic Republic of Afghanistan Ministry of Interior Affairs Central Prison Directorate

Islamic Republic of Afghanistan Ministry of Interior Affairs Central Prison Directorate Islamic Republic of Afghanistan Ministry of Interior Affairs Central Prison Directorate Appendix II: Bill of Quantity for the construction of Boundary wall,guard towers, Check point,guard house, Access

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES SECTION 09260 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SUMMARY A. Provide gypsum board assemblies. 1.2 SUBMITTALS A. Product Data: Submit manufacturer's product data and installation instructions for

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 102239 - FOLDING PANEL PARTITIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

PRODUCTS AND SYSTEMS FOR ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES

PRODUCTS AND SYSTEMS FOR ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES 04 05 PRODUCTS AND SYSTEMS FOR ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES Over floor trunking 0 300 9 0 300 93 0 38 00 Conform to standard EN 50085-- For creating a link between trunking, column,

More information

RENOVATE BUILDING 18-C FTFA SECTION GYPSUM BOARD 05/11

RENOVATE BUILDING 18-C FTFA SECTION GYPSUM BOARD 05/11 SECTION 09 29 00 GYPSUM BOARD 05/11 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text

More information

ALL INDIA INSTITUTE OF LOCAL SELF GOVERNMENT, VISAKHAPATNAM. IMPORTANT INFORMATION: Start Date for Submission of BID :

ALL INDIA INSTITUTE OF LOCAL SELF GOVERNMENT, VISAKHAPATNAM. IMPORTANT INFORMATION: Start Date for Submission of BID : ALL INDIA INSTITUTE OF LOCAL SELF GOVERNMENT, VISAKHAPATNAM. IMPORTANT INFORMATION: Start Date for Submission of BID : 01.01.2018 Last Date for SUBMISSION OF BID : 06.01.2018 Contact for Queries and Site

More information

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer

More information

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16 long / 1/2 thick or 16 oz. copper Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper Modular CABANA Kit 16 x 16 (6x6) Hipped Roof & Build-in Transoms Entry Key Lock Set (bright brass or dark bronze)

More information

Waterfront. Floor Plans

Waterfront. Floor Plans Waterfront Spread over 4.33 acres and joined by an additional 4 acres of green belt, Waterfront is an exquisite upscale residential complex overlooking the lake at Kazhipattur Village with 115 high end

More information

C. Samples: For each door face material, at least 3 by 5 inches (75 by 125 mm) in size, in specified finish.

C. Samples: For each door face material, at least 3 by 5 inches (75 by 125 mm) in size, in specified finish. SECTION 083113 - ACCESS DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SUPPLY ERECTION TOTAL RATE AMOUNT RATE AMOUNT AMOUNT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)

SUPPLY ERECTION TOTAL RATE AMOUNT RATE AMOUNT AMOUNT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) SBI-AO2 Project Residency Rd Br-elect/RBO-4 SCHEDULE OF QUANTITIES FOR ELECTRICAL WORKS. DATE : 24/4/2018 Sl. No. DESCRIPTION OF WORK UNIT QTY 1 READYMADE FINAL DISTRIBUTION BOARDS Supply, Instillation,

More information

SCHEDULE OF ITEMS & QUANTITIES FOR CIVIL WORKS OF PROPOSED GIRLS/ BOYS TOILET BLOCK

SCHEDULE OF ITEMS & QUANTITIES FOR CIVIL WORKS OF PROPOSED GIRLS/ BOYS TOILET BLOCK Schedule-I: Civil Works EARTH WORK Section-A : DSR Items 1 2.8 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in

More information

DETAILED ESTIMATE FOR S & P OF PROPOSED 2 No. LABORATORY AT S. N. BOSE NATIONAL CENTRE FOR BASIC SCIENCES AT SALTLAKE, KOLKATA.

DETAILED ESTIMATE FOR S & P OF PROPOSED 2 No. LABORATORY AT S. N. BOSE NATIONAL CENTRE FOR BASIC SCIENCES AT SALTLAKE, KOLKATA. DETAILED ESTIMATE FOR S & P OF PROPOSED 2 No. LABORATORY AT S. N. BOSE NATIONAL CENTRE FOR BASIC SCIENCES AT SALTLAKE, KOLKATA. 1 Supplying fitting and fixing G.I. pipes TATA make with all necessary accessories,

More information

ALUMINIUM SAND TRAP LOUVER : CONSTRUCTION

ALUMINIUM SAND TRAP LOUVER : CONSTRUCTION ALUMINIUM SAND TRAP LOUVER : CONSTRUCTION RUSKIN sand trap louvers are specially designed to separated the sand and dust from the air. It is effective and necessary to apply for ventilations and inlet

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

SECTION SECTIONAL OVERHEAD DOORS

SECTION SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS PART 1 GENERAL 1.1 SECTION INCLUDES A. Aluminum Doors B. Track and Framing 1.2 RELATED SECTIONS A. Section 04810 - Unit Masonry Assemblies: Prepared opening in masonry.

More information

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS [OR WOOD] PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

Appendix 4. Bills of Quantities

Appendix 4. Bills of Quantities Appendix 4. Bills of Quantities 201 A4.1 Deep trench latrines Partitions of local materials 1m apart Timber foot rests and floor plates Lightweight timber frame Excavated soil (used for back-fill) Plastic

More information

INDICATIVE PRICE BID SBI WEALTH, KANNUR (EXISTING BRANCH PREMISES NO OFFICE FUNCTIONING CURRENTLY)

INDICATIVE PRICE BID SBI WEALTH, KANNUR (EXISTING BRANCH PREMISES NO OFFICE FUNCTIONING CURRENTLY) INDICATIVE PRICE BID SBI WEALTH, KANNUR (EXISTING BRANCH PREMISES NO OFFICE FUNCTIONING CURRENTLY) Name of work INTERIOR FURNISHING WORK (RENOVATION) AT SBI SCHEDULE OF WORKS Sl No Description of work

More information

ALL DIMENSIONS FROM FINISHED FACE OF PARTITION TO FINISHED FACE OF PARTITION UNLESS OTHERWISE NOTED.

ALL DIMENSIONS FROM FINISHED FACE OF PARTITION TO FINISHED FACE OF PARTITION UNLESS OTHERWISE NOTED. ALL DIMENSIONS FROM FINISHED FACE OF PARTITION TO FINISHED FACE OF PARTITION UNLESS OTHERWISE NOTED. PARTITION CONSTRUCTION TO BE 3 5/8 METAL STUDS 24 ON CENTER WITH 5/8 TYPE X GYPSUM BOARDS BOTH SIDES.

More information

INTERIOR ESTIMATE-UDAYAGIRI

INTERIOR ESTIMATE-UDAYAGIRI BOQ FOR INTERIOR WORKS UDAYAGIRI BRANCH, KADAPA DIST. A.P. Banks Uniform Layout Policy Color Scheme to be followed. All contractors are requested to understand the uniform layout policy color scheme and

More information

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems.

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems. PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe and equipment support systems. B. Inserts. 1.02 RELATED SECTIONS A. Section 15890 - Ductwork Supports. 1.03 DEFINITIONS A. Supports: Attachments, hangers,

More information

NATIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPLLI ESTATE MAINTENANCE DEPARTMANT NAME OF THE CONTRACTOR / FIRM :

NATIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPLLI ESTATE MAINTENANCE DEPARTMANT NAME OF THE CONTRACTOR / FIRM : NATIONAL INSTITUTE OF TECHNOLOGY, TIRUCHIRAPPLLI- 620015 ESTATE MAINTENANCE DEPARTMANT SCHDULE OF WORK Name of Work :Renovation of Geotechnical Lab and Environmental lab in Civil Engineering Departemnt

More information

INVITATION FOR QUOTATION. Repairing & Renovation of Staff Ladies Toilet at Botany Department at Presidency University, Kolkata

INVITATION FOR QUOTATION. Repairing & Renovation of Staff Ladies Toilet at Botany Department at Presidency University, Kolkata INVITATION FOR QUOTATION NO:-10/AR/PU/DM/15-16 Date: 25 th June 2015. Competitive quotations from enlisted or reputed vendors are invited for the following goods/works with item wise detailed specifications

More information

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING 2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending

More information

RESIDENTIAL COMMERCIAL INDUSTRIAL. Distributed by L.P. Murphy THE ECONOMICAL ALTERNATIVE

RESIDENTIAL COMMERCIAL INDUSTRIAL. Distributed by L.P. Murphy THE ECONOMICAL ALTERNATIVE RESIDENTIAL COMMERCIAL INDUSTRIAL Distributed by L.P. Murphy THE ECONOMICAL ALTERNATIVE WHAT IS ECO-SLAB? BENEFITS OF ECO-SLAB ECO-SLAB is a new building material that is formed by two surface boards with

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

SECTION SECTIONAL OVERHEAD DOORS

SECTION SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS PART 1 GENERAL 1.1 SECTION INCLUDES A. Aluminum Doors B. Track and Framing 1.2 RELATED SECTIONS A. Section 04810 - Unit Masonry Assemblies: Prepared opening in masonry.

More information

Type D. Ver. Ver. 6'-11"x 4'-8" Maid. 7'-5"x 4'-0" 6'-6"x 4'-7" Toilet. Kitchen. 5'-0"x 8'-1" 9'-1" X 8'-1" Living 11'-11"x 16'-8" 10'-9"x 12'-6"

Type D. Ver. Ver. 6'-11x 4'-8 Maid. 7'-5x 4'-0 6'-6x 4'-7 Toilet. Kitchen. 5'-0x 8'-1 9'-1 X 8'-1 Living 11'-11x 16'-8 10'-9x 12'-6 R O A D O : 10 A S T y p i c a l F l o o r P l a n ( 2nd to 5th floor) Bed-2 14'-8"x 12'-0" 11'-3"x 12'-6" 9'-0"x 10'-4" 6'-11"x 5'-0" Bed-4 12'-6"x 9'-0" 12'-7"x 10'-1" 4'-6"x 11'-3" 12'-11" X 10'-9"

More information

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights 1 Exam Prep Application and Finishing of Gypsum Board GA-216-2013 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2013 Application and Finishing of Gypsum Panel Products. Each

More information

SECTION HYDRONIC PIPING

SECTION HYDRONIC PIPING PART 1 GENERAL 1.1 REFERENCES SECTION 23 21 13 HYDRONIC PIPING A. ANSI/ASME SEC 9: Welding and Brazing Qualifications B. ANSI/ASME B16.3: Malleable Iron Threaded Fittings Class 150 and 300 C. ANSI/ASME

More information

BOQ. Name of Work: Renovation of AR 10 lab of Chemical Engineering Department at Academic Complex.

BOQ. Name of Work: Renovation of AR 10 lab of Chemical Engineering Department at Academic Complex. Sl No BOQ Name of Work: Renovation of AR 10 lab of Chemical Engineering Department at Academic Complex. NIT NO: IITG/MAIN/NIT/17-18/39 Dated 19.03.2018 Desription of Item Unit Qnty Rate Rate in Words Amount

More information

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights 1 Exam Prep Application and Finishing of Gypsum Board GA-216-2016 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2016 Application and Finishing of Gypsum Panel Products. Each

More information

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 Part 1 General 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified,

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation

More information

PRICE BID: LAST DATE AND TIME FOR SUBMISSION 2:00 PM ON BOQ FOR INTERIOR WORKS SBI ANKOLA BRANCH,RBO-4,AO-I,BBSR

PRICE BID: LAST DATE AND TIME FOR SUBMISSION 2:00 PM ON BOQ FOR INTERIOR WORKS SBI ANKOLA BRANCH,RBO-4,AO-I,BBSR Item Description Qty. Unit Rate Amount No. 1 Single Window Counters: 1.52mX 0.915mX 0.762m or 5'- 2 Each 0 (5'-0 to5'-6 )X3'-0 X2'-6, Side table 0.915mX 0.405m or 3'-0 X1'-4 ): Providing, making & placing

More information

General Technical Specification

General Technical Specification GENERAL For calculating the requirements of cement in various items of work the following standards will be adopted. Over the above theoretical quantity of cement, additional allowance upto plus or minus

More information

E. Fume hood to have set baffling system. No adjustable baffles allowed.

E. Fume hood to have set baffling system. No adjustable baffles allowed. 1.01 SUMMARY A. Section Includes: 1. Laboratory fume hoods. B. Related Sections: 1. Section 6500 Laboratory casework 2. Section 15 Mechanical: Furnishing and installation of plumbing utilities and final

More information

SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD. (A wholly owned Subsidery of SBI)

SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD. (A wholly owned Subsidery of SBI) SBI INFRA MANAGEMENT SOLUTIONS PVT. LTD. (A wholly owned Subsidery of SBI) TENDERS ARE INVITED FOR PROPOSED FURNISHING WORKS FOR WEALTH MANAGEMENT HUB AT MAIN BRANCH, RAJKOT FROM THE SBI APPROVED EMPANELLED

More information

SECTION ALUMINUM HANDRAIL SYSTEMS

SECTION ALUMINUM HANDRAIL SYSTEMS SECTION 05520 ALUMINUM HANDRAIL SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes aluminum handrails and railings. B. Related Work: 1. Section 03300 - Cast-in-Place Concrete C. References: 1. American

More information

Technical Description For MK-CTX Office Cabins

Technical Description For MK-CTX Office Cabins Technical Description For MK-CTX Office Cabins Inside Length 5860 mm Width 2240 mm Height 2340 mm Outside Length 6055 mm Width 2435 mm Height 2591 mm Weight 1924 kg In General: The following description

More information

Parabond 600 Elastic adhesive sealant with high initial bonding strength.

Parabond 600 Elastic adhesive sealant with high initial bonding strength. Parabond 600 Elastic adhesive sealant with high initial bonding strength. Product: Parabond 600 is an MS-polymer based, durable and fast curing elastic adhesive. Applications: Parabond 600 has a very high

More information

PRICE BID: LAST DATE AND TIME FOR SUBMISSION 2:00 PM ON BOQ FOR INTERIOR WORKS SBI CHANDICHHAK BRANCH,RBO-II,AO-I,BBSR

PRICE BID: LAST DATE AND TIME FOR SUBMISSION 2:00 PM ON BOQ FOR INTERIOR WORKS SBI CHANDICHHAK BRANCH,RBO-II,AO-I,BBSR 1 Single Window Counters: 1.52mX 0.915mX 0.762m or 4 Each 5'-0 (5'-0 to5'-6 )X3'-0 X2'-6, Side table 0.915mX 0.405m or 3'-0 X1'-4 ): Providing, making & placing in position SW counter table and side table

More information

Parabond 600 Elastic adhesive sealant with high initial bonding strength.

Parabond 600 Elastic adhesive sealant with high initial bonding strength. Parabond 600 Elastic adhesive sealant with high initial bonding strength. Product: Parabond 600 is an MS-polymer based, durable and fast curing elastic adhesive. Applications: Parabond 600 has a very high

More information

Item No Description Unit Quantity Rate Amount

Item No Description Unit Quantity Rate Amount Bill No 1 Gypsum Boards and False Ceiling Works: Preamble. The contractor shall, when pricing the rates of this bill, take into consideration including and allow for the costs or expenses of all requirements

More information

A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent.

A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent. SECTION 092900 - GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

The fire resistance required for doors in this building is 1 (one) hour resistance in compliance with the below general specifications:

The fire resistance required for doors in this building is 1 (one) hour resistance in compliance with the below general specifications: Query No.1 ; we need more specs. about fire resistant doors Answer to Query No. 1: The fire resistance required for doors in this building is 1 (one) hour resistance in compliance with the below general

More information

BOQ for Plumbing, Sanitary Works

BOQ for Plumbing, Sanitary Works BOQ for Plumbing, Sanitary Works Page of 6 Sr.No Item Description Quantity Unit Rate Amount (Rs.) SANITARY FIXTURES a Providing & Fixing star white colour vitreous china wall mounted wc with heavy duty

More information