SLURRY WALLS FOR SEEPAGE CUTOFF IN LEVEE APPLICATIONS RECENT EXPERIENCE AND CONSTRUCTION CHALLENGES IN THE NORTHERN CENTRAL VALLEY OF CALIFORNIA

Size: px
Start display at page:

Download "SLURRY WALLS FOR SEEPAGE CUTOFF IN LEVEE APPLICATIONS RECENT EXPERIENCE AND CONSTRUCTION CHALLENGES IN THE NORTHERN CENTRAL VALLEY OF CALIFORNIA"

Transcription

1 SLURRY WALLS FOR SEEPAGE CUTOFF IN LEVEE APPLICATIONS RECENT EXPERIENCE AND CONSTRUCTION CHALLENGES IN THE NORTHERN CENTRAL VALLEY OF CALIFORNIA Deep Foundation Institute Slurry Wall Committee July 22, TRLIA Cutoff Walls Designed by GEI 2 1

2 Bear River Setback Levee Feather River Setback Levee Feather River Levee Segments 1 and 3 Soil Bentonite CutoffWall Length (LF) 9,390 25,800 2,600 37,790 Max Depth (FT) Area (SF) 439,000 1,668, ,000 2,283,000 Soil Cement Bentonite Cutoff Wall Length (LF) 11,100 11,100 Max Depth (FT) Area (SF) 620, ,000 Total Summary of TRLIA Cutoff Walls Designed by GEI 3 SOIL-BENTONITE CUTOFF WALL 4 2

3 TYPICAL SOIL-BENTONITE CUTOFF WALL SPECIFICATION: WALL WIDTH: 3 FT BACKFILL PERMEABILITY: LESS THAN 5 X 10-7 CM/SEC CONTENT OF DRY BENTONITE IN THE BACKFILL: NOT LESS THAN 1.5% BY WEIGHT DEPTH OF KEY INTO PREVIOUSLY EXPLORED FINE-GRAINED STRATUM: NOT LESS THAN 3 FT BACKFILL FINES CONTENT: NOT MORE THAN 50% 5 Soil-Bentonite Cutoff Wall Under Setback Levee 6 3

4 Soil-Bentonite Cutoff Wall Under Setback Levee 7 Heading Overlaps POTHOLE TO CONFIRM LOCATION OF EXISTING WALL MONITOR TRENCH EXCAVATION CUTTINGS TO CONFIRM EXCAVATION INTO EXISTING WALL 4(H):1(V) SLOPE OF CUT INTO EXISTING WALL MINIMUM 10-FOOT OVERLAP AT THE BOTTOM 8 4

5 CUTOFF WALL ADJACENT TO CULTURAL SITE 9 Wall Construction Adjacent to Sensitive Cultural Site 10 5

6 Wall Construction Adjacent to Sensitive Cultural Site 11 PREVENTIVE MEASURES TO AVOID TRENCH CAVE-IN RAISED SLURRY LEVEL INCREASED WORK HOURS ALLOWED TOE OF BACKFILL CLOSER TO EXCAVATION FACE ATTEMPTED TO INCREASE SLURRY UNIT WEIGHT ATTEMPTED TO STIFFEN BACKFILL TO STEEPEN THE BACKFILL SLOPE WITHIN TRENCH 12 6

7 Wall Construction Adjacent to Sensitive Cultural Site 13 CUTOFF WALL AT TOE OF EXISTING LEVEE 14 7

8 Soil-Bentonite Cutoff Wall at Toe of Levee 15 Soil-Bentonite Cutoff Wall at Toe of Levee 16 8

9 Longitudinal Crack Along Landside Levee Slope 17 Inclinometer Plot Levee with Longitudinal Crack 18 9

10 Foundation Shear Strength Characterization 19 Field Vane Shear Strength of Cutoff Wall Backfill (6 months after construction of cutoff wall) 20 10

11 Repair Section Levee with Longitudinal Crack 21 SOIL-CEMENT-BENTONITE CUTOFF WALL 22 11

12 Soil-Cement-Bentonite Cutoff Wall Through Levee 23 TYPICAL SOIL-CEMENT-BENTONITE CUTOFF WALL SPECIFICATION: WALL WIDTH: 2.5 FT BACKFILL PERMEABILITY: LESS THAN 5 X 10-7 CM/SEC BACKFILL UNCONFINED COMPRESSIVE STRENGTH: 30 TO 300 PSI DEPTH OF KEY INTO PREVIOUSLY EXPLORED FINE-GRAINED STRATUM: INCREASED TO NOT LESS THAN 8 FT AFTER CONCERNS RAISED AS PART OF SAFCA WORK ABOUT CONTINUITY OF BACKFILL AT THE BOTTOM OF THE WALL 24 12

13 Soil-Cement-Bentonite Cutoff Wall Through Levee 25 Exposed Recently Constructed Cutoff Wall 26 13

14 CONSTRUCTION ISSUES WE ENCOUNTERED TRENCH CAVE-IN LARGE OBSTRUCTION BACKFILL WITH HIGHER-THAN-SPECIFIED PERMEABILITY 27 CUTOFF WALL TRENCH CAVE-IN 28 14

15 Cutoff Wall Trench Cave-in Levee Profile 29 Cutoff Wall Trench Cave-in - Plan 30 15

16 Cutoff Wall Trench Cave-in Cross Section 31 Cutoff Wall Trench Cave-in Temporary Berm 32 16

17 Cutoff Wall Trench Cave-in Final Repair Plan and Profile 33 Cutoff Wall Trench Cave-in Final Repair Seepage Berm 34 17

18 CUTOFF WALL TRENCH OBSTRUCTION 35 Obstruction in Levee Foundation Abandoned Pump Station Sump 36 18

19 Obstruction in Levee Foundation Backfilled Excavation 37 CUTOFF WALL REACH WITH HIGHER- THAN-SPECIFIED PERMEABILITY 38 19

20 Cutoff Wall with Higher Permeability Permeability Data 39 CUTOFF WALL REACH WITH HIGHER-THAN-SPECIFIED PERMEABILITY Permeability Data: Average of 44 QC Tests: 9.1x10-7 cm/sec Maximum Value of QC Permeability Tests: 2.2x10-6 cm/sec Average of 4 QA Tests: 5.8x10-7 cm/sec Maximum Value of QA Permeability Tests: 7.1x10-6 cm/sec 40 20

21 Cutoff Wall with Higher Permeability Unconfined Strength Data 41 Cutoff Wall with Higher Permeability Piezometers 42 21

22 QUESTIONS? Deep Foundation Institute Slurry Wall Committee July 22,

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM SOIL SAMPLING, TESTING AND LOGGING ULOP GEOTECHNICAL EVALUATION STAR BEND SETBACK LEVEE Sutter County, California Prepared by: BLACKBURN CONSULTING 2491 Boatman Avenue West Sacramento,

More information

LEVEE DISTRICT NO. 1 OF SUTTER COUNTY

LEVEE DISTRICT NO. 1 OF SUTTER COUNTY LEVEE DISTRICT NO. 1 OF SUTTER COUNTY STAR BEND SETBACK LEVEE AND HABITAT ENHANCEMENT PROJECT BASIS OF DESIGN FEBRUARY 2009 Prepared By: TABLE OF CONTENTS QUALITY CONTROL CERTIFICATION... iv 1.0 INTRODUCTION...

More information

Levee Cutoff Wall Construction Considerations Natomas Levee Improvement Program July 28, 2009

Levee Cutoff Wall Construction Considerations Natomas Levee Improvement Program July 28, 2009 Levee Cutoff Wall Construction Considerations Natomas Levee Improvement Program Background The Natomas Levee Improvement Program (NLIP), sponsored by the Sacramento Area Flood Control Agency (SAFCA) with

More information

Paul Brunner, Larry Dacus, Doug Handen. Repairs to Concrete-Lined V-Ditch Alternatives Evaluation

Paul Brunner, Larry Dacus, Doug Handen. Repairs to Concrete-Lined V-Ditch Alternatives Evaluation Memo To: Paul Brunner, Larry Dacus, Doug Handen From: Alberto Pujol /Dan Wanket Date: 09/10/2010 Re: Feather River Levee Site 7 Extension Repairs to Concrete-Lined V-Ditch Alternatives Evaluation This

More information

MAMMAL BURROW CHARACTERIZATION AND EFFECTIVENESS OF BURROW GROUTING

MAMMAL BURROW CHARACTERIZATION AND EFFECTIVENESS OF BURROW GROUTING MAMMAL BURROW CHARACTERIZATION AND EFFECTIVENESS OF BURROW GROUTING Diego Cobos, Michelle Shriro, Nicholas Sitar, Jonathan Bray University of California, Berkeley 1 INTRODUCTION Mammal burrowing activity

More information

THREE RIVERS LEVEE IMPROVEMENT AUTHORITY 1114 Yuba Street, Suite 218 Marysville, CA Office (530) Fax (530)

THREE RIVERS LEVEE IMPROVEMENT AUTHORITY 1114 Yuba Street, Suite 218 Marysville, CA Office (530) Fax (530) THREE RIVERS LEVEE IMPROVEMENT AUTHORITY 1114 Yuba Street, Suite 218 Marysville, CA 95901 Office (530) 749-7841 Fax (530) 749-6990 November 20, 2013 Mr. Eric Simmons Regional Engineer, FEMA Region IX 1111

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION Date: June 12, 2014 To: From: Subject: Governor s Office of Planning and Research/State Clearinghouse Unit, Responsible Agencies, Trustee Agencies, and Interested Parties Announcement

More information

TG03 - Buttress, Shoring, Excavation - Issued for Bid

TG03 - Buttress, Shoring, Excavation - Issued for Bid TG03 - Buttress, Shoring, Excavation - Issued for Bid Questions are numbered in the order received. Question numbers missing in the sequence either have been answered or are still under review and will

More information

CASE STUDY: FEATHER RIVER WEST LEVEE PROGRAM CUTOFF WALLS

CASE STUDY: FEATHER RIVER WEST LEVEE PROGRAM CUTOFF WALLS CASE STUDY: FEATHER RIVER WEST LEVEE PROGRAM CUTOFF WALLS Jared P. Williams, GLEI, Rocklin, CA USA 916-462-6400 jaredwilliams@gleis.com Kyle R. Lackner, GLEI, Rocklin, CA USA 916-462-6400 kylelackner@gleis.com

More information

CONSTRUCTION COST ESTIMATE FOR SOUTHWESTERN ILLINOIS LEVEE CERTIFICATION DESIGN IMPROVEMENTS

CONSTRUCTION COST ESTIMATE FOR SOUTHWESTERN ILLINOIS LEVEE CERTIFICATION DESIGN IMPROVEMENTS CONSTRUCTION COST ESTIMATE FOR SOUTHWESTERN ILLINOIS LEVEE CERTIFICATION DESIGN IMPROVEMENTS PREPARED FOR SOUTHWESTERN ILLINOIS FLOOD PREVENTION DISTRICT COUNCIL PREPARED BY AMEC EARTH & ENVIRONMENTAL,

More information

Chapter 3 - Excavation

Chapter 3 - Excavation Chapter 3 - Excavation South Dakota Department of Transportation Structures Construction Manual Excavation - Chapter 3 The What and Where of Excavation What is Excavation The removal of Earth material

More information

APPLICATION FOR A BUILDING PERMIT (Retaining Wall/Garden Wall Construction Details)

APPLICATION FOR A BUILDING PERMIT (Retaining Wall/Garden Wall Construction Details) APPLICATION FOR A BUILDING PERMIT (Retaining Wall/Garden Wall Construction Details) City of San Jacinto 595 S. San Jacinto Ave San Jacinto CA 92583 951.487.7330 fax 951.654.9896 Must print legibly, submit

More information

Pump Station Excavation

Pump Station Excavation Pump Station Excavation SPONSORED BY THE KIEWIT CORPORATION A capstone project for the The Department of Civil & Environmental Engineering in The Ira A. Fulton College of Engineering and Technology Brigham

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

AGUA FRIA RIVER 5 LEVEE SYSTEM MARICOPA COUNTY, ARIZONA NLD SYSTEM ID #

AGUA FRIA RIVER 5 LEVEE SYSTEM MARICOPA COUNTY, ARIZONA NLD SYSTEM ID # AGUA FRIA RIVER 5 LEVEE SYSTEM MARICOPA COUNTY, ARIZONA NLD SYSTEM ID # 3805020001 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING

More information

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM

Lower San Joaquin River Feasibility Study PLAN FORMULATION ADDENDUM PLAN FORMULATION ADDENDUM Non-Structural Measure Descriptions Elevate Critical Infrastructure This measure would raise at-risk critical structures above the design inundation level. Elevation would be

More information

SAN GABRIEL RIVER/SAN JOSE CREEK 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

SAN GABRIEL RIVER/SAN JOSE CREEK 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # SAN GABRIEL RIVER/SAN JOSE CREEK 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010052 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE

More information

GUIDE TECHNICAL SPECIFICATIONS SOIL-CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

GUIDE TECHNICAL SPECIFICATIONS SOIL-CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL GUIDE TECHNICAL SPECIFICATIONS SOIL-CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL Version 2006 {This technical specification is to be used to guide the writer in the contract requirements for Soil- Cement-Bentonite

More information

Misan University - College of Engineering Civil Engineering Department

Misan University - College of Engineering Civil Engineering Department CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s

More information

FINAL DRAFT. The Use of Filter Press Tests in Soil-Bentonite Slurry Trench Construction

FINAL DRAFT. The Use of Filter Press Tests in Soil-Bentonite Slurry Trench Construction Reference: Ruffing, D.G., Evans, J.C., Spillane, V.A., and Malusis, M.A., (2016). The Use of Filter Press Tests in Soil-Bentonite Slurry Trench Construction, ASCE GeoChicago Sustainability, Energy, and

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18) Page 1 of 8 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

Evaluation of Cutoff Walls Impact on Groundwater Recharge (Kleinfelder)

Evaluation of Cutoff Walls Impact on Groundwater Recharge (Kleinfelder) C3 Evaluation of Cutoff Walls Impact on Groundwater Recharge (Kleinfelder) December 19, 2007 Revised April 21, 2009 File No.: 72834 Mr. Timothy Washburn SAFCA 1007 7th Street, 7th Floor Sacramento, CA

More information

Central Region GeoHazard Assessment Site C8 SH597:02 East of Blackfalds May 2007 Site Assessment and Instrumentation Monitoring Report

Central Region GeoHazard Assessment Site C8 SH597:02 East of Blackfalds May 2007 Site Assessment and Instrumentation Monitoring Report Alberta Infrastructure & Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 May 18, 2007 Mr. Alain Momedi, P.Eng. Project Engineer Dear Mr. Momedi: Central Region GeoHazard Assessment

More information

10.0 References. California Department of Water Resources Feasibility Report, American Basin Conjunctive Use Project. Sacramento, CA.

10.0 References. California Department of Water Resources Feasibility Report, American Basin Conjunctive Use Project. Sacramento, CA. 10.0 References American States Water Company, Wood Rodgers, Inc., Stratecon, Inc., and Hatch & Parent. 2006. Integrated Water Resources Management Plan. Prepared for Natomas Central Mutual Water Company.

More information

Regulation 18 August 2009 NO Operations and Maintenance LEVEE ENCROACHMENT STANDARDS AND PROCEDURES

Regulation 18 August 2009 NO Operations and Maintenance LEVEE ENCROACHMENT STANDARDS AND PROCEDURES CENWP-EC DEPARTMENT OF THE ARMY PDR 30-2-5 Portland District, Corps of Engineers (Draft) P.O. Box 2946 Portland, Oregon 97208 Regulation 8 August 2009 NO. 30-2-5 Operations and Maintenance LEVEE ENCROACHMENT

More information

Station 1 Project Location

Station 1 Project Location Station 1 Project Location SUTTER BYPASS FEATHER RIVER Fremont Weir NATOMAS CROSS CANAL PLEASANT GROVE CREEK CANAL PLEASANT GROVE CREEK SUTTER CO PLACER CO YOLO BYPASS SACR AMENTO RIVER (STEELHEAD CREEK)

More information

In-situ Stabilization at MGP Sites A Cost-Effective and Practical Remedial Alternative. Paul R. Lear, Ph.D.

In-situ Stabilization at MGP Sites A Cost-Effective and Practical Remedial Alternative. Paul R. Lear, Ph.D. In-situ Stabilization at MGP Sites A Cost-Effective and Practical Remedial Alternative Paul R. Lear, Ph.D. Manufactured Gas Plants Starting in late 1900s, gas was manufactured by heating coal in specialized

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

GUIDE SPECIFICATION FOR CONSTRUCTION

GUIDE SPECIFICATION FOR CONSTRUCTION USACE / NAVFAC / AFCEC / NASA UFGS-02 35 27 (May 2010) ------------------------ Preparing Activity: USACE Superseding UFGS-02 35 27 (April 2006) GUIDE SPECIFICATION FOR CONSTRUCTION References are in agreement

More information

APPENDIX A. Project Scoping

APPENDIX A. Project Scoping APPENDIX A Project Scoping Notice of Preparation To: From: Agencies and Interested Parties Paul Brunner, Executive Director, Three Rivers Levee Improvement Authority Date: June 13, 2006 Subject: Notice

More information

Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000

Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000 The Institution of Engineers of Ireland Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000 MODULE 4 RETAINING STRUCTURES DEEP EXCAVATIONS

More information

Preliminary Concepts for Soil-Bentonite Cutoff Wall Topock Compressor Station, Needles, California

Preliminary Concepts for Soil-Bentonite Cutoff Wall Topock Compressor Station, Needles, California TECHNICAL MEMORANDUM Preliminary Concepts for Soil-Bentonite Cutoff Wall Topock Compressor Station, Needles, California DATE: April 14, 2004 Pacific Gas and Electric Company (PG&E) is undertaking an expedited

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

Brooks/Cole Thomson LearningiM. Fundamentals of Geotechnical Engineering. Braja M. Das. California State University, Sacramento

Brooks/Cole Thomson LearningiM. Fundamentals of Geotechnical Engineering. Braja M. Das. California State University, Sacramento Fundamentals of Geotechnical Engineering Braja M. Das California State University, Sacramento Brooks/Cole Thomson LearningiM Australia Canada Mexico Singapore Spain United Kingdom United States CHAPTER

More information

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe. MTS Jack and Bore Design Criteria Note: For the purposes of this Design Criteria and subsequent Construction Notes, the term Jack and Bore is used generically to refer to a number of trenchless construction

More information

Civil Engineer USACE, Omaha District. 28 February 2017 FLOOD FIGHTING AND SURVEILLANCE

Civil Engineer USACE, Omaha District. 28 February 2017 FLOOD FIGHTING AND SURVEILLANCE 217 FLOOD FIGHTING AND SURVEILLANCE 237 200 237 217 200 Don Moses, 237 P.E. 217 200 Civil Engineer USACE, Omaha District 255 0 163 131 255 0 163 132 255 0 163 122 28 February 2017 239 65 53 80 119 27 110

More information

4.0 Water Budgets for Existing and Future Groundwater Conditions in the Natomas Basin

4.0 Water Budgets for Existing and Future Groundwater Conditions in the Natomas Basin 4.0 Water Budgets for Existing and Future Groundwater Conditions in the Natomas Basin 4.1 IGSM Models In order to evaluate the cumulative effects of SAFCA s proposed construction activities on groundwater

More information

Chapter A-10 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (NATIONAL STARCH AREA)

Chapter A-10 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (NATIONAL STARCH AREA) Kansas Citys, Missouri and Kansas Flood Damage Reduction Feasibility Study (Section 216 Review of Completed Civil Works Projects) Engineering Appendix to the Interim Feasibility Report Chapter A-10 GEOTECHNICAL

More information

CCU Engineering Specifications. Section PIPE REMOVAL, DISPOSAL, ALTERATION, MODIFICATION OR PIPE ABANDONMENT

CCU Engineering Specifications. Section PIPE REMOVAL, DISPOSAL, ALTERATION, MODIFICATION OR PIPE ABANDONMENT CCU Engineering Specifications Section 002310 PIPE REMOVAL, DISPOSAL, ALTERATION, MODIFICATION OR PIPE ABANDONMENT Effective Date: Nov. 1st, 2011 Page 1 of 5 PART 1 - GENERAL The following specification

More information

2 ALTERNATIVES 2.1 INTRODUCTION NEPA/CEQA REQUIREMENTS FOR EVALUATION OF ALTERNATIVES NEPA REQUIREMENTS

2 ALTERNATIVES 2.1 INTRODUCTION NEPA/CEQA REQUIREMENTS FOR EVALUATION OF ALTERNATIVES NEPA REQUIREMENTS 2 ALTERNATIVES 2.1 INTRODUCTION As noted in Chapter 1, Introduction and Statement of Purpose and Need, this EIS/EIR has been prepared to evaluate the potential environmental impacts of the Phase 4b Project,

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

CHAPTER 8 SEEPAGE CONTROL IN EMBANKMENTS

CHAPTER 8 SEEPAGE CONTROL IN EMBANKMENTS CHAPTER 8 SEEPAGE CONTROL IN EMBANKMENTS 8-1. General. All earth and rock-fill dams are subject to seepage through the embankment, foundation, and abutments. Seepage control is necessary to prevent excessive

More information

COYOTE CREEK 3 LEVEE SYSTEM LOS ANGELES COUNTY AND ORANGE COUNTY, CALIFORNIA NLD ID #

COYOTE CREEK 3 LEVEE SYSTEM LOS ANGELES COUNTY AND ORANGE COUNTY, CALIFORNIA NLD ID # LOS ANGELES COUNTY AND ORANGE COUNTY, CALIFORNIA NLD ID # 3805010025 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY SEPTEMBER 2012 FINAL RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: 19

More information

Jet Grouting Experience at Posey Webster Street Tubes Seismic Retrofit Project

Jet Grouting Experience at Posey Webster Street Tubes Seismic Retrofit Project Jet Grouting Experience at Posey Webster Street Tubes Seismic Retrofit Project Umakant Dash 1, Ph.D., P.E., Thomas S. Lee 2, P.E., G. E., and Randy Anderson 3, P.E. Abstract This paper summarizes the construction

More information

CCR Impoundment Closure: Reshaping your Ash! 2017 MWCC Technical Conference

CCR Impoundment Closure: Reshaping your Ash! 2017 MWCC Technical Conference CCR Impoundment Closure: Reshaping your Ash! 2017 MWCC Technical Conference Setting the Stage Who? SCS Engineers Consulting/Design Engineer Pat Goeke, P.E. Radmacher Brothers Earthwork Contractor Ben Cummings,

More information

Design, Construction, & Verification of a Partial- Depth Seepage Barrier through Glacial Outwash

Design, Construction, & Verification of a Partial- Depth Seepage Barrier through Glacial Outwash Design, Construction, & Verification of a Partial- Depth Seepage Barrier through Glacial Outwash Kenneth Darko, PhD., P.E., P.G. Geotech/Water Resources, LRH Seth Lyle, P.E., P.G. USACE DSMMCX/LRD DSPC

More information

CONSTRUCTION OF TWO MICROTUNNEL ACCESS SHAFTS USING THE CUTTER SOIL MIX (CSM) METHOD IN THE SAN JOAQUIN DELTA, CALIFORNIA

CONSTRUCTION OF TWO MICROTUNNEL ACCESS SHAFTS USING THE CUTTER SOIL MIX (CSM) METHOD IN THE SAN JOAQUIN DELTA, CALIFORNIA CONSTRUCTION OF TWO MICROTUNNEL ACCESS SHAFTS USING THE CUTTER SOIL MIX (CSM) METHOD IN THE SAN JOAQUIN DELTA, CALIFORNIA Eric S. Lindquist, Berti-Lindquist Consulting Engineers, Moraga, CA, USA John Morgan,

More information

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010047 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE

More information

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment rotary drill hydro-mill backhoe Clamshell + Kelly bar VERTICAL BARRIERS SLURRY

More information

ACEFormer Installation Manual

ACEFormer Installation Manual ACEFormer Installation Manual Disclaimer: This document is provided solely for general information, and shall not be construed as engineering advice or part of the contract with any customer notwithstanding

More information

Time-Dependent Strength Behavior of Soil-Bentonite Slurry Wall Backfill

Time-Dependent Strength Behavior of Soil-Bentonite Slurry Wall Backfill Time-Dependent Strength Behavior of Soil-Bentonite Slurry Wall Backfill Jeffrey Evans 1, and Christopher Ryan 2 1 Bucknell University, Department of Civil and Environmental Engineering, Lewisburg, PA 17837

More information

SECTION () SOIL-BENTONITE SLURRY TRENCH CUTOFF WALL

SECTION () SOIL-BENTONITE SLURRY TRENCH CUTOFF WALL SECTION () SOIL-BENTONITE SLURRY TRENCH CUTOFF WALL I. Scope of Work This section of the specifications includes requirements for the Soil Bentonite Slurry Trench Cutoff Wall and related work as indicated

More information

Flood Fighting and Surveillance

Flood Fighting and Surveillance Flood Fighting and Surveillance Don Moses Civil Engineer February 2016 US Army Corps of Engineers 1 Agenda Levee Design Common Failure Modes Surveillance/Inspection Flood Fighting 2 Levee Design Issues

More information

USACE LEVEE RISK ASSESSMENT PROCESS LESSONS LEARNED

USACE LEVEE RISK ASSESSMENT PROCESS LESSONS LEARNED USACE LEVEE RISK ASSESSMENT PROCESS LESSONS LEARNED 1 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56

More information

Proceedings of the 10 th Australia New Zealand Conference on Geo-Mechanics, Common Ground Brisbane Australia, October 2007

Proceedings of the 10 th Australia New Zealand Conference on Geo-Mechanics, Common Ground Brisbane Australia, October 2007 Page 1 of 6 Proceedings of the 10 th Australia New Zealand Conference on Geo-Mechanics, Common Ground Brisbane Australia, October 2007 Vertical groundwater barriers for contaminated site reclamation Christopher

More information

Chapter A-9 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (HARLEM AREA)

Chapter A-9 GEOTECHNICAL ANALYSIS NORTH KANSAS CITY - LOWER (HARLEM AREA) Kansas Citys, Missouri and Kansas Flood Damage Reduction Feasibility Study (Section 216 Review of Completed Civil Works Projects) Engineering Appendix to the Interim Feasibility Report Chapter A-9 GEOTECHNICAL

More information

CUTTER SOIL MIXED WALL SHORING AND SEEPAGE CUT OFF OFFICE BUILDING NEAR WATERFRONT

CUTTER SOIL MIXED WALL SHORING AND SEEPAGE CUT OFF OFFICE BUILDING NEAR WATERFRONT CUTTER SOIL MIXED WALL SHORING AND SEEPAGE CUT OFF OFFICE BUILDING NEAR WATERFRONT By John Kvinsland Malcolm Drilling Company, Kent, Washington Bob Plum ASCE, P.E., Principal Kleinfelder Consultants, Seattle

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010047 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE

More information

July 2011 BUREAU OF INDIAN STANDARDS. Draft Indian Standard

July 2011 BUREAU OF INDIAN STANDARDS. Draft Indian Standard FOR COMMENTS ONLY DOC: WRD 8 (551)C July 2011 BUREAU OF INDIAN STANDARDS Draft Indian Standard GUIDELINES FOR DESIGN OF UNDER-SEEPAGE CONTROL MEASURES FOR EARTH AND ROCKFILL DAMS (FIRST REVISION OF IS

More information

Details of the Proposed Action

Details of the Proposed Action Details of the Proposed Action Proposed Action This alternative is based on the proposed Plan of Operations submitted to the Forest Service on June 4, 2010 by Shoshone Silver/Gold Mining Company for the

More information

Table 1: Minimum Perimeter Control Performance Requirements. Physical Property* Test Method Required Value

Table 1: Minimum Perimeter Control Performance Requirements. Physical Property* Test Method Required Value Supplemental Technical Specification for PERIMETER CONTROL SCDOT Designation: SC-M-815-17 (08/13) 1.0 Perimeter Control This Supplemental Technical Specification maybe used as an alternative to Sections

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EG Engineer Regulation 1110-2-1942 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design INSPECTION, MONITORING AND MAINTENANCE OF RELIEF WELLS 25 September

More information

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS PSH. w/ CUSTOM LENGTH PANELS 13 AND 7. TABULATED DATA Effective December 10, 2013 YELLOW

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS PSH. w/ CUSTOM LENGTH PANELS 13 AND 7. TABULATED DATA Effective December 10, 2013 YELLOW 1 w/ CUSTOM LENGTH PANELS 13 AND 7 Effective December 10, 2013 ALUMINUM PSH 265 Roberts Avenue Santa Rosa, Ca. 95407 (707) 575-9014 Construction Engineering Resource 1837 Wright Street Santa Rosa, Ca.

More information

FOUNDATION ENGINEERING HANDBOOK

FOUNDATION ENGINEERING HANDBOOK FOUNDATION ENGINEERING HANDBOOK Design and Construction with the 2009 International Building Code Robert W. Day Principal Engineer American Geotechnical San Diego, California Second Edition Mc Graw Hill

More information

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS PSH. TABULATED DATA Effective December 10, 2013 RED

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS PSH. TABULATED DATA Effective December 10, 2013 RED 1 Effective December 10, 2013 PSH Construction Engineering Resource 265 Roberts Avenue Santa Rosa, Ca. 95407 (707) 575-9014 1837 Wright Street Santa Rosa, Ca. 95404 jmtengr2@aol.com (707) 484-4704 2 Contents

More information

Land Ownership in the Phase 3 Project Footprint

Land Ownership in the Phase 3 Project Footprint Source: Base Map: SACOG 2007, Adapted by EDAW in 2008 based on data from Mead & Hunt and HDR Land Ownership in the Phase 3 Project Footprint USACE and SAFCA Plate H-1d H-11 Construction Details Construction

More information

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS. TABULATED DATA Effective March 22, 2017 RED

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS. TABULATED DATA Effective March 22, 2017 RED 1 Effective March 22, 2017 PSH 265 Roberts Avenue Santa Rosa, Ca. 95407 (707) 575-9014 Construction Engineering Resource 1837 Wright Street Santa Rosa, Ca. 95404 jmtengr2@aol.com (707) 484-4704 2 Contents

More information

Southeast Louisiana Flood Protection Authority - East Levee Safety Permit Policy. Revised November 17, 2017

Southeast Louisiana Flood Protection Authority - East Levee Safety Permit Policy. Revised November 17, 2017 Southeast Louisiana Flood Protection Authority - East Levee Safety Permit Policy Revised November 17, 2017 A. Background. Levee districts and Flood Authorities, as sponsors of most federally authorized

More information

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by Construction Technology B (CON4313) Self Assessment Questions: Chapter 1 Prestressed Concrete 1. How does the prestressing of steel tendons in prestressed concrete offer a higher loading capacity than

More information

Use of Calcium-Based Products to Stabilize Ponded Coal Ash Techniques and Results. Chemical Lime Company, 3700 Hulen Street, Ft. Worth, Texas 76107

Use of Calcium-Based Products to Stabilize Ponded Coal Ash Techniques and Results. Chemical Lime Company, 3700 Hulen Street, Ft. Worth, Texas 76107 2009 World of Coal Ash (WOCA) Conference - May 4-7, 2009 in Lexington, KY, USA http://www.flyash.info/ Use of Calcium-Based Products to Stabilize Ponded Coal Ash Techniques and Results Eric Berger, P.E.

More information

Construction Dewatering. Lecture 11. Construction Dewatering

Construction Dewatering. Lecture 11. Construction Dewatering Construction Dewatering Lecture 11 Construction Dewatering The purpose of construction dewatering is to control the surface and subsurface hydrologic environment in such a way as to permit the structure

More information

DEEP MIXING GROWS UP. Over the last decade, deep mixing. The Evolution of Deep-Mixing Technology in the U.S. Market over the Last Decade

DEEP MIXING GROWS UP. Over the last decade, deep mixing. The Evolution of Deep-Mixing Technology in the U.S. Market over the Last Decade What s New in Geo? DEEP MIXING GROWS UP The Evolution of Deep-Mixing Technology in the U.S. Market over the Last Decade By George M. Filz, PhD, PE, F.ASCE, and Donald A. Bruce, PhD, D.GE, M.ASCE GEORGE

More information

Contents. Glossary 9. Foreword 10

Contents. Glossary 9. Foreword 10 Glossary 9 Foreword 10 1 Design considerations 11 1.1 Introduction 11 1.2 Client's general requirements 11 1.3 The ground 11 1.3.1 The concept of effective stress 11 1.3.2 Ground profile 13 1.3.3 Groundwater

More information

Temporary Structures. Excavations and Excavation Supports

Temporary Structures. Excavations and Excavation Supports UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Temporary Structures Excavations and Excavation Supports CM 420

More information

Underpinning. Underpinning

Underpinning. Underpinning is the installation of temporary or permanent support to an existing foundation to provide either additional depth or an increase in bearing capacity. There are several existing conditions which may lead

More information

SRW SPECIFICATIONS SRW HISTORY ARTICLE SERIES NCMA SPECIFICATIONS

SRW SPECIFICATIONS SRW HISTORY ARTICLE SERIES NCMA SPECIFICATIONS SRW HISTORY ARTICLE SERIES SRW SPECIFICATIONS This is the fifth article in a series of ten articles on the history of segmental retaining walls developed under a grant from the NCMA Education and Research

More information

EVALUATION OF SOIL-BENTONITE BACKFILL CONSOLIDATION PROPERTIES

EVALUATION OF SOIL-BENTONITE BACKFILL CONSOLIDATION PROPERTIES EVALUATION OF SOIL-BENTONITE BACKFILL CONSOLIDATION PROPERTIES Jeffrey C. Evans, Bucknell University, Lewisburg, PA USA 570-577-1371 evans@bucknell.edu Hejintao Huang, Bucknell University, Lewisburg, PA

More information

Bringing mass stabilisation technology to China. Kai XU (Harry), NHRI URL:

Bringing mass stabilisation technology to China. Kai XU (Harry), NHRI URL: Bringing mass stabilisation technology to China Kai XU (Harry), NHRI URL: www.nhri.cn Email: kxu@nhri.cn 1 Contents 1. Background 2. Pilot test preparation 3. Major Construction Procedure 4. Results of

More information

Chapter 1. Introduction to Engineering Ground Modification. The Need for Engineered Ground Improvement

Chapter 1. Introduction to Engineering Ground Modification. The Need for Engineered Ground Improvement Chapter 1 Introduction to Engineering Ground Modification The Need for Engineered Ground Improvement As more and more land becomes subject to urban or industrial development, good construction sites and

More information

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION CHAPTER 23.105 GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION Sections 23.105.101 General... 1 23.105.102 Definitions... 1 23.105.103 Permits required... 3 23.105.104 Hazards.... 4 23.105.105 Permit

More information

Central Region GeoHazard Assessment H597:02, km Slide May 2011 Site Inspection and Instrumentation Monitoring Report

Central Region GeoHazard Assessment H597:02, km Slide May 2011 Site Inspection and Instrumentation Monitoring Report Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 July 14, 2011 Mr. Dennis Grace, P.Eng. Construction Engineer Dear Mr. Grace: Central Region GeoHazard Assessment H597:02,

More information

Case Study: Cement-Bentonite Pre-Trenching and Cutter Soil Mixing (CSM) for Temporary Shoring and Groundwater Cutoff

Case Study: Cement-Bentonite Pre-Trenching and Cutter Soil Mixing (CSM) for Temporary Shoring and Groundwater Cutoff Case Study: Cement-Bentonite Pre-Trenching and Cutter Soil Mixing (CSM) for Temporary Shoring and Groundwater Cutoff Dominic M. Parmantier 1, M. ASCE, P.E; Rowland F P Stow 2, P.Eng.; R. John Byrne 3,

More information

BASEMENT CONSTRUCTION PREPARED BY PN NOOR AISYAH ASYIKIN

BASEMENT CONSTRUCTION PREPARED BY PN NOOR AISYAH ASYIKIN BASEMENT CONSTRUCTION PREPARED BY PN NOOR AISYAH ASYIKIN BASEMENT CONSTRUCTION 01 content 1.DEFINITION 2. CONSTRUCTION CONSIDERATION 3. DESIGN REQUIREMENT 4.METHOD OF CONSTRUCTION a. Open Cut Construction

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to

More information

SPECIAL SPECIFICATION 3153 Geosynthetic Clay Liner

SPECIAL SPECIFICATION 3153 Geosynthetic Clay Liner 2004 Specifications CSJ 0215-02-029, etc. SPECIAL SPECIFICATION 3153 Geosynthetic Clay Liner 1. Description. Install a Geosynthetic Clay Liner (GCL) in accordance with this specification and as shown on

More information

Ground Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging

Ground Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging Ground Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging James J. Serpico (&) Geotechnical Services, Maser Consulting P.A.,

More information

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com

More information

Land Ownership in the Phase 3 Project Footprint

Land Ownership in the Phase 3 Project Footprint Source: Base Map: SACOG 2007, Adapted by EDAW in 2008 based on data from Mead & Hunt and HDR Land Ownership in the Phase 3 Project Footprint USACE Plate H-1d H-11 Construction Details the adjacent levee,

More information

Section 401. PIPE CULVERTS

Section 401. PIPE CULVERTS 401.02 Section 401. PIPE CULVERTS 401.01. Description. This work consists of constructing pipe culverts of the size and class required, including excavation and backfill. 401.02. Materials. Provide materials

More information

OAR Table 240-1

OAR Table 240-1 OAR 690-240-0005 Table 240-1 WATER RESOURCES DEPARTMENT CHAPTER 690 DIVISION 240 CONSTRUCTION, MAINTENANCE, ALTERATION, CONVERSION AND ABANDONMENT OF MONITORING WELLS, GEOTECHNICAL HOLES AND OTHER HOLES

More information

Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1

Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Updated: November 2010 Directive 74 Appendix C Requirement Approval: 8512D Submitted to SHELL CANADA ENERGY MRM DDA PLAN-UPDATE NOV

More information

Chapter A-13 STRUCTURAL ANALYSIS ARGENTINE RAISE

Chapter A-13 STRUCTURAL ANALYSIS ARGENTINE RAISE Kansas Citys, Missouri and Kansas Flood Damage Reduction Feasibility Study (Section 216 Review of Completed Civil Works Projects) Engineering Appendix to the Interim Feasibility Report Chapter A-13 STRUCTURAL

More information

Problems in Improvement Evaluation, QA and QC

Problems in Improvement Evaluation, QA and QC Problems in Improvement Evaluation, QA and QC Specifying test types, locations, and frequency Representativeness of samples Variability in treatment and uncertainty about acceptable amount of variability

More information

An Introduction to Seepage, Slope and Settlement of Levees

An Introduction to Seepage, Slope and Settlement of Levees An Introduction to Seepage, Slope and Settlement of Levees Course No: G02-011 Credit: 2 PDH J. Paul Guyer, P.E., R.A., Fellow ASCE, Fellow AEI Continuing Education and Development, Inc. 9 Greyridge Farm

More information

UNIT V RETAINING WALLS RETAINING WALL 2.5. Retaining walls are structures used to retain earth or water or other materials such as coal, ore, etc; where conditions do not permit the mass to assume its

More information

SECTION TRENCH SAFETY PART 1 - GENERAL

SECTION TRENCH SAFETY PART 1 - GENERAL SECTION 31 41 33 - TRENCH SAFETY PART 1 - GENERAL A. This Section is intended to provide specifications for the minimum requirements for trench safety. The Contractor shall endeavor to insure the safety

More information

GeoEng2000 An International Conference on Geotechnical & Geological Engineering

GeoEng2000 An International Conference on Geotechnical & Geological Engineering GeoEng2000 An International Conference on Geotechnical & Geological Engineering 19-24 November 2000 Melbourne Exhibition and Convention Centre Melbourne, Australia Barrettes : A versatile foundation for

More information

5/25/2017. Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon. Lumpkin Basin. Lumpkin Road Overall Description

5/25/2017. Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon. Lumpkin Basin. Lumpkin Road Overall Description Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon TEXAS FLOODPLAIN MANAGEMENT ASSOCIATION April 27, 2017 PROJECT LOCATION PROJECT VICINITY MAP Lumpkin Road Overall Description

More information