1 Bill No. 1 : PRELIMINARIES 1.01 CONTRACT: Allow for complying with obligations and liabilities in, or implied by the contract documents and for all necessary temporary and ancillary works. Mobilisation and demobilisation of all necessary plant. Provide all necessary insurance as required by the conditions of contract. Provide for the co-ordination and execution of the total works for the work of sub-contractors appointed by Contractor. Provision of competent supervision during the duration of the works SPECIFICATIONS: Allow for all necessary instruments, materials and testing, contained or implied by the specifications Allow for the supply of samples and materials for testing. Retain approved samples in good, clean condition on site for comparison with product used in the Works. Before starting work, allow for examining all available information, allow for carrying out all surveys, setting out of works, agreeing levels including the provision and erecting permanent setting out marks of the quantity and quality as required by the Architect. Submit a survey report and method statements to the Architect covering all relevant matters listed below The form, condition and demolition methods of the structure(s). The form, location and removal methods of any toxic or hazardous materials. The type and location of adjoining or surrounding premises which may be adversely affected by noise, vibration, dust or removal of structure. The identification and location of services above and below ground HEALTH & SAFETY: Allow for protecting at all times the whole of the works, including providing screens, fans, planked footways, guardrails, warning lights and similar items as required and as deemed necessary at all times by the Architect Ensure that means of escape from the property in the event of fire are maintained for the duration of the Works. Take adequate precautions to protect site operatives and the general public from health hazards associated with dangerous fumes and dust arising during the course of the Works. Allow for complying with Health & Safety regulations. Allow for services rendered by Consultant Health & Safety Officer SECURITY: Adequately safeguard the site, the Works, materials arising, products, plant, and any existing buildings affected by the Works from damage and theft. Take all reasonable precautions to prevent unauthorised access to the site, the Works and adjoining property MAINTENANCE: Allow for continuously keeping the site clean and in a workmanlike condition free from debris, surplus materials and any other type of loose matter, which will disturb the proper conditions of any roads or adjoining structures. Reduce dust by periodically spraying demolition works with water. Page 1 of 15
2 Adequately maintain roads and footpaths within and adjacent to the site and keep clear of mud, debris and obstructions. Any damage to roads and footpaths caused by site traffic or otherwise consequent upon the Works must be made good to the satisfaction of the Local Authority or other owner. Bear any costs arising. C/F - Bill No. 1 : Preliminaries Cont'd B/F - Allow for sweeping and cleaning / washing of all access roads pertaining to the Site of works at times deemed appropriate to keep the roads clean and dust free at all time FIRE: Take all necessary precautions to prevent personal injury, death, and damage to the Works or other property from fire EXISTING SERVICES: Notify all service authorities and/or adjacent owners of the proposed works not less than one week before commencing site operations. Observe service authority's recommendations for work adjacent to existing services. Adequately protect and prevent damage to all services. Do not interfere with their operation without consent of the service authorities or other owners. Replace any marker tapes or protective covers disturbed during site operations to the service authority's recommendations. Allow for providing, maintaining and removing all necessary temporary services, including fresh water, compressed air, electrical supplies, telephone, etc. Disconnection and removal of existing mechanical and electrical systems and cart-away off-site, including water-tanks, pipes, airconditioning units, etc. Allow for the supply and consumption of water and electricity required for the works GENERAL: Allow sum to carry-out modifications to site as necessary to allow plant and equipment access into the site and making-good to original state on completion. Allow for the provision of site office accommodation. Allow for site-storage as required by the works. Allow for providing site lighting Allow for police and local council permits as required by works. Page 2 of 15
3 Total Carried to Cost mary - Bill No.2 : MASONRY WORKS mm tk softstone wall, quarry faced both sides in foundations. m² Composite wall - 460mm tk softstone, quarry faced both sides; comprising two skins 230mm tk with no cavity in foundations. m² / 180mm tk softstone wall, fair faced & flush pointed both sides. m² mm tk softstone wall, fair faced & flush pointed both sides. m² Composite wall - 460mm tk softstone, fair faced & flush pointed both sides; comprising two skins 230mm tk and 150mm tk with 80mm cavity. m² Composite wall - 460mm tk softstone, fair faced & flush pointed both sides; comprising two skins 230mm tk with no cavity. m² Supply and install 230mm tk softstone lintols not exceeding 1.00m. Nr Supply and install 230mm tk softstone lintols not exceeding 1.50m. Nr Supply and install 230mm tk softstone lintols not exceeding 2.00m. Nr mm tk HCB wall, facework & flush pointed both sides. m² mm tk HCB wall, facework & flush pointed both sides. m² mm tk HCB wall single density type, facework & flush pointed both sides. m² 1, mm tk HCB wall double density type, facework & flush pointed both sides. m² Composite wall - 460mm tk HCB, facework & flush pointed both sides; comprising two skins 230mm tk single density with no cavity. m² Composite wall - 460mm tk HCB, facework & flush pointed both sides; comprising two skins 230mm tk double density with no cavity. m² Extra over for concrete Grade C20 infill to 150mm tk HCB single density. m² Extra over for concrete Grade C20 infill to 230mm tk HCB single density. m² 1, Extra over for concrete Grade C30 infill to 230mm tk HCB single density. m² Extra over for formation of angles, skewed corners (each skin measured separately, any thickness, HCB & softstone). m Extra over for toothing new soft stone walls to existing walls. Nr Extra over for formation of chase (ingall) to accommodate suspended slab. m Extra over for formation of soft stone horizontal /vertical moulded m Extra over for formation of 'membri' (vertical & horizontal, any thickness, HCB & softstone). m Extra over for formation of softstone dressing (tlibissa) to balconies. m 1.00 Page 3 of 15
4 2.25 Extra over per face single skin walls curved on-plan. m² Extra over for formation of softstone recess (imbrol). m 1.00 C/F Bill No.2 : Masonry Works Cont'd B/F 2.27 Extra over for formation of softstone strips, bands (faxex lixxi). m Extra over for pointed type (fuq il-fil) masonry finish. m² Extra over for formation of splayed edges. m Extra over for formation of voisours (samrotti). Nr 1.00 Page 4 of 15
5 Total Carried to Cost mary - Bill No.3 : CONCRETE WORKS 3.01 Grade C15, tk not exceeding 150mm, unreinforced, poured on or against earth or unbinded hardcore. m³ Grade C15, tk not exceeding 150mm, unreinforced, laid to falls on or against earth or unbinded hardcore. m³ Grade C15, mass, unreinforced, between HCB and rock face. m³ Grade C20, reinforced, unreinforced, cavity filling (reinforcement measured separately). m³ Grade C25, reinforced, in strip footings inclusive of all necessary formwork (reinforcement measured separately). m³ mm x 75mm sand cement fillet. m Grade C25, reinforced, in isolated foundations inclusive of all necessary formwork (reinforcement measured separately). m³ Grade C25, reinforced, in beds inclusive of all necessary formwork (reinforcement measured separately). m³ Grade C25, reinforced, in ground beams inclusive of all necessary formwork (reinforcement measured separately). m³ Grade C20, tk not exceeding 250mm, reinforced, in ground slab inclusive of all necessary formwork (reinforcement measured separately). m³ Grade C20, unreinforced, tk not exceeding 100mm, to 230mm tk walls, in made-up piece over ground slab to receive wall inclusive of all necessary formwork. m³ Grade C30, reinforced, in rectangular columns inclusive of all necessary formwork (reinforcement measured separately). m³ Extra over, ditto for circular columns. m³ Grade C20, reinforced in concrete walls inclusive of all necessary formwork (reinforcement measured separately). m³ Grade C20, part course to 230mm tk walls, in pad stones or spreader beams (suletta) inclusive of all necessary formwork (reinforcement measured separately). m³ Grade C30, reinforced, in lintols inclusive of all necessary formwork (reinforcement measured separately). m³ Grade C30, reinforced, in upstand/ down stand beams inclusive of all necessary formwork (reinforcement measured separately). m³ Grade C30, tk not exceeding 150mm, in suspended slab inclusive of all necessary formwork (reinforcement measured separately). m² Extra over for addition 25mm Grade C30, tk in suspended slab. m² 1, Extra over, ditto for cantilevering slabs (balconies). m² Grade C30, reinforced, in straight stairs and landings inclusive of all necessary formworks (reinforcement measured separately). m Page 5 of 15
6 3.22 Extra over, ditto for circular stairs. m 1.00 C/F - Bill No.3 : Concrete Works Cont'd B/F Grade C30, removable fibre reinforced flagstones complete as shown in detail 2 section 4 in LS5-(20)-Z-(-)-085 (reinforcement measured separately). Rate includes for all necessary preparatory work and sealing prior to backfilling (by other). m² Grade C35, tk not exceeding 125mm, reinforced, in topping inclusive of all necessary formwork (reinforcement measured m³ Grade C25, concrete grouting to precast concrete slabs. m Grade C20, 100mm tk to 230mm tk walls, unreinforced, in coping inclusive of all necessary formwork, splayed top edge. m Extra over for using Concrete: C35 instead of C30. m³ C30 instead of C25. m³ C25 instead of C20. m³ C20 instead of C15. m³ Extra over for application of approved surface hardener. m² Extra over for power float surface finish to slabs. m² Extra over for broom surface finish to slabs. m² Extra over for trowelling of concrete surface, to take self-adhesive membrane. m² Extra over for fair faced formwork finish for in-situ concrete. m² Extra over for dust inhibiter to slabs. m² Extra over for formwork left in place rate. m² Extra over for formation of ramps / slopes. m² Extra over for erection of scaffolding exceed 3.00m for construction of concrete elements. m³ Extra over for formation of recess (drip moulds) in concrete m Extra over for formation of chamfered edges to concrete elements. m Formation of saw cut expansion joints (filling with approved material measured separately). m Supply, cut and installation of polystyrene 50mm thick sheeting placed between beams and walls (maximum width 230mm). m² Construction of concrete C25 jambs to hollow concrete walls. m³ Extra over for Sika 1 (or approved equivalent) m³ Extra over for Plastocrete N. Grade C20 Concrete m³ 1.00 Grade C25 Concrete m³ 1.00 Grade C30 Concrete m³ 1.00 Page 6 of 15
7 Total Carried to Cost mary - Bill No.4 : STEEL REINFORCEMENT 4.01 Supply, cut, bend and fix steel bar reinforcement: a 10mm diameter Kg b 12mm diameter Kg 1, c 16mm diameter Kg 7, d 20mm diameter Kg e 25mm diameter Kg f 32mm diameter Kg g Extra over for stirrups Kg Supply, cut, bend and fix steel mesh fabric reinforcement: a A 98; weighing 1.54kg/m2; lapped a minimum of 150mm m² 1.00 b A252; weighing 3.95kg/m2; lapped a minimum of 150mm m² c A393; weighing 6.16kg/m2; lapped a minimum of 150mm m² d A503; weighing 7.90kg/m2; lapped a minimum of 150mm m² 1.00 e B503; weighing 5.93kg/m2; lapped a minimum of 150mm m² f C503; weighing 4.34kg/m2; lapped a minimum of 150mm m² Page 7 of 15
8 Total Carried to Cost mary - Bill No.5 : ROOFING WORKS 5.01 Supply and installation of 50mm tk polystyrene insulation layer. m² - Rate Only 5.02 Supply, spread and level 80mm average tk torba laid to falls (3/8" and sand). m² mm tk unreinforced concrete grade C25 in roof screed laid to falls. m² Formation of 50 x 50mm cement sand triangular fillet at junction between roofer and parapet walls. m Chase soft stone parapet walls to accommodate water proofing membrane. m Supply and installation hot weld 4.0mm proof membrane including 2 coats of liquid bitumen to roof screed, over-laps and turn-ups. m² Ditto, where membrane is embedded in HCB courses along the perimeter of the roof, formation of joint in wall filled with epoxy nonshrink grout. m Page 8 of 15
9 Total Carried to Cost mary - Bill No.6 : WATERPROOFING WORKS 6.01 Supply and installation of 4mm thick damp proof membrane in foundations including over-laps and turn-ups: a Horizontally m² b Vertically m² Supply, lay, bond and tie geotextile Horizontally/ vertically m² 1.00 To French drains m² Supply and lay gauge 1000 polythene sheeting m² Supply and lay damp proof course a Plastic type m 1.00 b Lead type m Supply and installation of 2 coats of liquid bitumen to structure to receive water proof membrane. m² 1.00 Page 9 of 15
10 Total Carried to Cost mary - Bill No.7 - DAYWORKS STAFF & LABOUR 7.01 Clerk of Works Hr Foreman Hr Mason Hr Concerters Hr Carpenter Hr Steel Fixer Hr Plumber Hr Electrician Hr Drain layer Hr Land Surveyor Hr Skilled Labourer Hr Unskilled Labourer Hr 1.00 PLANT & EQUIPMENT Rates for equipment are to be inclusive of the respective operator and all ancillary items required to setup the equipment on site. Rates will only be paid for the actual hours of operation Compressor Hr Hydraulic Excavator Hr Mini Excavator Hr Mobile Crane : 7-15 tonnes Hr Mobile Crane : 40 tonnes Hr Lorry Tipper : up to 12m3 Hr Lorry Tipper : up to 20m3 Hr Fixed Body Lorry : up to 12m3 Hr Fixed Body Lorry : up to 20m3 Hr Dumper (1.00cm capacity) Hr Skip hire Nr Self-priming pump Hr Chaser, small tools etc. Hr Hydraulic Excavator Hr Mechanical Shovel Hr 1.00 Page 10 of 15
11 7.28 Mechanical Trencher - 300mm wide Hr Mechanical Trencher - 600mm wide Hr 1.00 C/F - Bill No.8 : Dayworks Works Cont'd B/F Mechanical Trencher - Rotary Drum Cutter Hr Hand held tools - Chaser Hr Hand held tools - Jigger Hr Tower crane (up to 25 tonnes), including operator and bankman day Tower crane (up to 50 tonnes), including operator and bankman day Tower crane (up to 25 tonnes), including operator and bankman day Tower crane (up to 50 tonnes), including operator and bankman day Proprietary scaffolding including assembly and disassembly 7.38 Height up to 4.50m (per m2 of floor area per week) week Height above 4.50m (per m2 of floor area per week) week 1.00 Hollow concrete blocks, delivered site mm thickness each mm thickness each mm thickness, single density each mm thickness, double density each 1.00 Masonry limestone fair faced both sides, delivered to site per batch (vjegg) mm thickness vjegg mm thickness vjegg mm thickness vjegg 1.00 Plain Concrete 7.47 Grade C10 m³ Grade C15 m³ Grade C20 m³ Grade C25 m³ Grade C30 m³ Grade C35 m³ Grade C40 m³ 1.00 Payment for materials will be the prime cost including cost of delivery to site. Tenderers are to enter below their percentage to be added for expenses and overheads, profit and obligations whatsoever Overhead Percentage to be added % Page 11 of 15
12 7.55 Profit Percentage (cost over and above overhead cost above) % Total Carried to Cost mary Bill No.8 - MISCELLANEOUS WORKS 8.01 Supply, hoist, spread and level selected imported fill (Type 1 Aggregate) in foundations. m³ Supply, hoist, spread and level imported fill (zrar tal- franka) to the required levels. m³ Supply, hoist, spread and level imported fill (zrar tal- qawwi) to the required levels. m³ Manufacture, supply and installation of precast concrete roofing slabs: a 150mm tk. m² 1.00 b 175mm tk. m² 1.00 c 200mm tk. m² 1.00 d 230mm tk. m² 1.00 e 250mm tk. m² 1.00 f 300mm tk. m² 1.00 g 350mm tk. m² 1.00 h 410mm tk. m² 1.00 i 460mm tk. m² 1.00 j 350mm tk. (heavy) m² 1.00 k 460mm tk. (heavy) m² Manufacture, supply and installation of precast inverted T-Beams and bricks to roofing slabs, inclusive of 75mm concrete grade C25 topping. a Single T-Beam and bricks 5" tk. m² 1.00 b Single T-Beam and bricks 7" tk. m² 1.00 c Single T-Beam and bricks 9" tk. m² 1.00 d Double T-Beam and bricks 7" tk. m² 1.00 e Double T-Beam and bricks 9" tk. m² Complete rainwater drainage system as shown in detail 4 in drawing LS5-(20)-Z-(-)-086. Rate is to include for all necessary preparatory works, fixtures and fittings, and coordination as required Supply and install 75mm Ø PVC pipe under ground slab as shown in Detail B on drawing LS5-(20)-Z-(-)-082 require by Enemalta for earthing purpose. Rate is to include for sealing, with liquid membrane, areas where pipe penetration occurs. (Provisional depending on Enemalta requirements) 8.08 Allow for coordination and sequencing of the works with the enabling works contractor for the interface between service culvert and substation ensuring that joints are properly aligned and sealed. Page 12 of 15
13 Total Carried to Cost mary - Bill No.9 : PLASTERING & PAINTING WORKS All work is to be cleaned, rubbed down and prepared before plastering and painting. Plaster is to be of a minimum thickness of 6mm using galvanised steel beads at all external corners, sills, etc. And galvanised steel plastered stops at all points where plaster ends. Surfaces are to be smooth finished (using fine sand paper), crack free and level and worked in accordance with good practice. all corner angles are to be truly vertical and plumb Preparation of surface for the application of the plastering works ensuring proper removal of loose material, dust, oils and similar foreign materials. m² Hacking of walls m² Forming all angles using plumb, level, straight and clean beading m 1.00 Internal Plastering 9.04 Supply and installation of 2 base coats (1 coarse + 1 fine) of cement based render to ceilings. m² Pointing to existing HCB / softstone walls to receive water based m² Supply and installation of 2 coats of water based paint in one colour to walls and soffits m² Extra over for 2 colours, one to walls and one to soffits m² Extra over for changes in colour m² 1.00 External Plastering 9.09 Supply and installation of 2 base coats of cementations polymermodified plaster to receive an acrylic based decorative finish m² Supply and installation of suitable primer to receive the specified finish m² Supply and installation of single coat of acrylic based, composite, decorative finish in silicate m² Supply and installation of single coat of acrylic based, composite, decorative finish in graffiato m² Extra over for coloured plaster (depends on colour) m² Supply and installation of single coat of sand and cement mixture (frakas) to receive paint m² Supply and installation of 2 coats of exterior paint m² 1.00 Page 13 of 15
14 Total Carried to Cost mary - Bill No.10 - NON - STRUCTURAL METAL WORKS All galvanized items are to be hot dipped, unless otherwise indicated in the technical specifications or drawings. The rates for galvanized steel metal doors, louvers, meshes, chequered plates and ventilators are to include : a) manufacturing, delivering to site and fixing in position of all apertures, etc. as described in these bills of quantities as specified. b) the necessary primer and paint finish to match Enemata standards (RAL colour to be specified by Architect). For Items to refer to Details 1 to 7 on Drawing No. LS5-(41)-Z-(-) Supply and install 2650mm x 2670mm x 50mm galvanized sheet metal door for sub station (ED 501) Nr Supply and install 1500mm x 2670mm x 50mm galvanized sheet metal door for switch gear room (ED 502) Nr Supply and install 1150mm x 2575mm x 50mm galvanized sheet metal door for service culvert (ED 503) Nr Supply and install 3000mm x 3500mm x 50mm galvanized louvred metal door for generator room (ED 514) Nr Supply and install 460mm x 530mm x 50mm galvanized metal frame and louvers fixed internally to jambs (EW 501, 502, 503, 504) Nr Supply and install 460mm x 530mm x 50mm galvanized metal frame and mesh (EW 501, 502, 503, 504) Nr Supply and install 800mm x 530mm x 50mm galvanized metal frame and louvers fixed internally to jambs (EW 505, 506, 507, 508) Nr Supply and install 800mm x 530mm x 50mm galvanized metal frame and mesh (EW 505, 506, 507, 508) Nr Supply and install 1600mm x 530mm x 50mm galvanized metal frame and louvers fixed internally to jambs (EW 509) Nr Supply and install 1600mm x 530mm x 50mm galvanized metal frame and mesh (EW 509) Nr For Items to refer to Details 2 and 2A on Drawing No. LS5-(16)-Z-(-) Supply and install 6mm tk galvanized chequered steel plate cover; width not exceeding 750mm; to trenches in switch gear room. m Supply and install 6mm tk galvanized chequered steel plate cover; width not exceeding 750mm; to trenches in substation. m Supply and install 6mm tk galvanized chequered steel plate cover including 50mm x 75mm T-sections spaced at 1m centres for reinforcement, width not exceeding 1500mm; to trenches in switch gear room. m Page 14 of 15
15 10.16 Supply and install complete galvanized trench cover angles including flat bar, steel plate, grouted angles and support cast in concrete. m Total Carried to Cost mary - Page 15 of 15
WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00
Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type
More informationPROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount
EXTERNAL WORKS DEMOLITION AND ALTERATIONS EXTERNALLY Pulling down to ground level; removing debris from Site a 200 mm thick masonry wall finished both sides with plaster and paint; net total area 158 square
More informationDrainage, Road Drainage and Collection Pit A - EXCAVATION:
57 Drainage, Road Drainage and Collection Pit SCHEDULE OF QUANTITY Sl.N o. 1 Particulars Qty Unit Rate Amount A - EXCAVATION: Earth work in EXCAVATION IN FOUNDATION TRENCHES IN ALL KIND OF SOIL including
More informationBILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil
United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES
More informationPROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI
GROUND FLOOR COMPLETION OF WORKS TO GROUND FLOOR SITE WORKS DEMOLITIONS AND ALTERATIONS Ground floor Removing a polythene damp proof membranes, complete with mesh fabric reference A 252, hacking edges
More informationDescription Unit Quantity Rate Kshs. Amount Kshs.
BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove
More informationCONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND
BILL Nr1 - PRELIMINARIES 1.0 PRELIMINARY PARTICULARS 1.1 Funding The funding shall be provided by the Guyana Power & light Inc., of 40 Main street, North Cummingsburg, Georgetown. 1.2 Engineer The Engineer
More informationBRICKWORK 3.5 BRICKWORK 1 GENERAL
BRICKWORK 1 GENERAL 1.1 INSPECTION Notice Give sufficient notice so that inspection may be made of the following: - Set out of brickwork to lintels, arches and other architectural features. - Damp-proof
More information0331 Brick and block construction
0331 BRICK AND BLOCK CONSTRUCTION 1 GENERAL 1.1 STANDARDS Materials and construction: To AS 4773.1 and AS 4773.2. 2 PRODUCTS 2.1 DURABILITY Exposure environment: [complete/delete] Exposure locations: To
More informationCOUNTY GOVERNMENT OF SIAYA: PROPOSED ECD BLOCK
PROPOSED ECD BLOCK ELEMENT NO. 1 SUBSTRUCTURES (ALL PROVISIONAL) A B C D Site clearance Clear the site off grass, shrubs and all vegetation; cart away as directed Excavate vegetable soil average 200mm
More informationUnit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.
Bill of Quantities Nature of work : Construction of Health Center with 8 rooms (Clinics, Pharmacy, Labs, Fence & Latrines) Location: Shakreen- El Fasher Town- North Darfur State No. Description Qty Unit
More information1 BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION.
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT 1 BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION. Clearing of site, site office/work shed, Toilet, etc. A provisional cost to be allocated in South African
More informationSECTION UNIT MASONRY
SECTION 04200 UNIT MASONRY PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, and equipment and perform functions required in the installation and maintenance of the work covered by this Section.
More informationEstimate FOR THE SEPTIC TANK
Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks
More informationPRICED BILL OF QUANTITIES
Engineering Projects (dia) Limited (A Govt of dia Enterprise) Words 1 EARTH WORK 1.1 Earth work in excavation by mechanical means (Hydraulic Excavator) / Manual means over areas (exceeding 30 cm in depth,
More informationPART A: JOB PROCDRE FOR PLASTERING
PART A: JOB PROCDRE FOR PLASTERING 1. SCOPE: The scope of this procedure shall apply to all cement plaster finishes to column, ceilings, walls and similar surfaces on backgrounds met with such as brick,
More informationroofing ROOFING Design of the base ROOFING DETAILS
DETAILS The general arrangement details and the principles to be followed at skirtings, upstands, abutments, verges, gutters and expansion joints are as details illustrated. SELECTION PARAMETERS It is
More informationBILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"
"Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO
More informationBILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil
United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES
More informationOPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total
BILL OF QUANTITY Proposed Market Shed OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) ELEMENT NO. 1: - SUBSTRUCTURE (ALL PROVISIONAL): - Excavations and Earthworks: - A Clear site of all bush and grass and
More informationPROPOSED ERECTION AND COMPLETION OF CEREAL STORE.
PROPOSED ERECTION AND COMPLETION OF. AB/1 STORE ELEMENT NO. 1 A B SUBSTRUCTURES (ALL PROVISIONAL) Excavations Clear site of small bushes and grub roots of small trees and cart away Excavate average 150mm
More informationCONCRETE BLOCK MASONRY
CONCRETE BLOCK MASONRY CONTENT Introduction Types Manufacturing process Properties Advantages Introduction These are the concrete blocks either hollow or solid. A hollow unit is that unit which has core
More information11/09/2018 LBP licence classes
LBP licence classes Occupational Licensing aims to ensure that people in the building industry are competent and accountable so that homes and buildings are designed and built right first time. Summary
More informationB Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1
PRELIMINARIES 1 All rates to be inclusive of all taxes including V.A.T General Matters A Water for the works item 1 B Insurance against injury to persons, property and works item 1 C Performance Bond 5%
More informationSECTION BRICKWORK PART I GENERAL
SECTION 04210 BRICKWORK PART I GENERAL 101 Scope General: supply and build the brickwork shown on the drawings or needed to complete the brickwork, including but not limited to the following: Provide all
More informationParagraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4
City of Columbia Engineering Regulations PART 25: SPECIFICATIONS FOR ALTITUDE VALVE VAULT Table of Contents Paragraph Description Page No. 25.1 General 25-1 25.2 Materials 25-1 25.3 Concrete Masonry Work
More information2002 Advanced Building Products, Inc., P.O. Box 98, Springvale, Maine TEL: ; FAX: ; WEBSITE:
SECTION 07651 FLEXIBLE COPPER SHEET FLASHINGS Advanced Building Products, Inc. manufacturer many types of flexible copper sheet flashings. Due to their ductility, high tensile strength, and resistance
More informationSPECIFICATION FOR REINFORCED SOIL WALL
SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details
More informationConcrete Slab-on-Ground
Concrete Slab-on-Ground This training package provides information on concrete slab-on-ground construction, including reinforcement, formwork, mix, placement and curing, for village infrastructure and
More informationSECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:
PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral
More information50948-RHN Putney. 06 January This document includes: F30. Accessories/ sundry items for brick/ block/ stone walling. Code Section Revision Dated
50948-RHN Putney 06 January 2018 This document includes: Code Section Revision Dated F30 Accessories/ sundry items for brick/ block/ stone walling 1 Table of Contents Title F30 Accessories/ sundry items
More informationDIVISION 04 MASONRY. Section Title Number MASONRY Maintenance of Masonry Masonry Mortaring Masonry Accessories
04 00 00 MASONRY 04 01 00 Maintenance of Masonry 04 01 20 Maintenance of Masonry 04 05 13 Masonry Mortaring 04 05 23 Masonry Accessories 04 20 00 UNIT MASONRY 04 21 00 Clay Unit and Brick Veneer 04 22
More informationTILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:
PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral
More informationREINFORCED CONCRETE MASONRY SECTION
SECTION 04 22 02 - REINFORCED CONCRETE MASONRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification
More informationNZQA Expiring unit standard version 2 Page 1 of 5. Prepare a schedule of quantities, cost estimate and tender documentation for landscape work
Page 1 of 5 Title Prepare a schedule of quantities, cost estimate and tender documentation for landscape work Level 5 Credits 15 Purpose This unit standard is for people working, or intending to work,
More informationBELMURO WALL SYSTEM INSTALLATION GUIDE
BELMURO WALL SYSTEM INSTALLATION GUIDE TABLE OF CONTENTS TABLE OF CONTENTS... 1 SYSTEM DESCRIPTION... 2 DRY STACK SYSTEM: INSTALLATION GUIDE... 5 GEOGRID WALL SYSTEM: INSTALLATION GUIDE... 9 MASONRY WALL
More informationEXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS
BILLS OF QUANTITIES - Name of Project CONSULTANT: Name of Office DATE:APR. 2008 External Works EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS page 1 BILLS OF QUANTITIES - Name of Project CONSULTANT:
More informationBill No.1: Preliminaries
Bill No.1: Preliminaries Item No. Description of Works Qty. 1 Mobilization 1.1 This item should include site office for the use of the Engineer's and Employer's staffs with the necessary facilities, furniture,
More informationTILING SPECIFICATIONS
TILING SPECIFICATIONS SPECIFICATION NUMBER: NR204-16 PREPARED BY: Mike Cubley PREPARED FOR: Porcelain Plus ATTENTION: Kirk Pollock INSTALLATION: 712 Turner Floor and Wall Tiling Specification. M40 STONE/
More informationBILLS OF QUANTITIES FOR CONSTRUCTION OF MODEL DISPENSARY BLOCK AT MGUNGANI / SALAITA
BILLS OF QUANTITIES FOR CONSTRUCTION OF MODEL DISPENSARY BLOCK AT MGUNGANI / SALAITA CONSTRUCTION OF MODEL DISPENSARY BLOCK Item DESCRIPTION QTY UNIT RATE TOTAL(KS ELEMENT : SUBSTRUCTURE (ALL PROVISIONAL):
More informationPARTICULAR SPECIFICATIONS MASONRY WORK BRICK WORK
PARTICULAR SPECIFICATIONS MASONRY WORK BRICK WORK (For Building & Area Development Work) 1.0 INDIAN STANDARDS: Work shall be carried out to Indian Standards and Code of practices. In absence International
More informationCHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES
CONTENTS 10.1 PLASTERWORK 10.2 2 ND AND 3 RD FIX FINISHES FUNCTIONAL REQUIREMENT 10.1 Plasterwork Workmanship Design Technical Manual TS-011-09-010412 i. All workmanship must be within defined tolerances
More informationPROPOSED COMPLETION OF ROAD INFRASTRUCTURE AND MAINTENANCE WORKS AT EXPORT PROCESSING ZONES AUTHORITY - ATHI RIVER. ITEM NO.
BILL 1 : GENERAL & PRELIMINARIES A B C Allow for preliminaries of mobilization and set up, storage facilities etc,minor preparatory works and compliance with conditions of contract. 1.00 Allow a Prime
More informationBILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION.
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION. Clearing of site, site office/work shed, Toilet, etc. A provisional cost to be allocated in South African Rands.
More informationCATCHMENT STRUCTURE 13M X 15M
BILL OF QUANTITIES AND SPECIFICATIONS CONSTRUCTION OF 100M3 DJABIA ITEM No. DESCRIPTION UNIT QUANTITY RATE AMOUNT KSHS CATCHMENT STRUCTURE 13M X 15M 1.1 Clear catchment site of all bushes, scrubs, undergrowth,
More informationTITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY
D DEMOLITION & SITE CLEARANCE D1 GENERAL CLEARANCE 6-D152 Open bush and thicket in and around ha 0.02 the ponds. Locally disposed. D2 REMOVAL OF TREES AND STUMPS 6-D212 Trees of girth: 150 mm - 500 mm
More informationSECTION BRICKWORK
SECTION 04210 BRICKWORK THERE ARE NOTES AND CLAUSES IN THE SUSTAINABILITY GUIDE ON THIS TRADE. THIS TRADE SECTION DEPENDS ON COORDINATION BETWEEN THIS SPECIFICATION AND THE FINISHES SCHEDULE AS WELL AS
More informationConcrete. Copyright: Quasar Management Services Pty Ltd
Concrete This training package provides information on basic concrete, including materials, reinforcement, formwork, concrete mix, placement and curing for village infrastructure and houses common in South-
More informationWCU ALUMNI TOWER MASONRY & ENVELOPE REPAIRS
SCO #: 8-8-0 TABLE OF CONTE COV DESCRIPTION COVER SHEET ALUMNI TOWER ELEVATIONS & PLAN VIEWS REPAIR DETAILS - M TO REPAIR DETAILS - TO M0 & C TO REPAIR DETAILS - A & F TO F VICINITY MAP ALUMNI TOWER ALUMNI
More informationRequirements for Measuring and Pricing of Structural Concrete
Requirements for Measuring and Pricing of Structural Concrete October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing
More informationCHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10
CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES 283 Chapter 10 FUNCTIONAL REQUIREMENTS FUNCTIONAL REQUIREMENTS 10.1 PLASTERWORK Workmanship i. All workmanship must be within the tolerances
More informationINDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2
INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...
More informationCONCRETE SCREEDS, INTERIOR FLOORING AND WALL COVERINGS. BME Lepel, Adrienn PhD
CONCRETE SCREEDS, INTERIOR FLOORING AND WALL COVERINGS BME Lepel, Adrienn PhD Claddings Place in the sequence of activities 13Constructing roof LB structure (carpentry) 14Roof tiling (waterproofing, battens,
More informationGravity Wall. A force to be reckoned with... Gravity (SRW) segmental retaining wall systems are structures
A force to be reckoned with... Gravity (SRW) segmental retaining wall systems are structures lower in height that use the FrogStone unit weight combined with gravel core infill to resist earth pressures
More informationSPECIFICATION FOR PIPE CULVERT CONSTRUCTION
SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.
More informationEmployment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2
Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2 PARTICULAR SPECIFICATIONS FOR THE CONSTRUCITON OF STORM WATER DRAINAGE NETWORK March 2018 BUREAU TECHNIQUE POUR LE DEVELOPPEMENT P.O.B
More informationBILL OF QUANTITIES FOR KIPUNGANI SEA WALL
BILL NO 17 CONCRETE WORK (All Provisional) 17/1 Clear site of all obstacles and dispose as directed by the Engineer on site. SM 500 200 100,000.00 17/2 Set out works over land and water ITEM 1 50000 50,000.00
More informationTENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA
TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA AT PLOT NO. IIA/35, ACTION AREA IIA, NEW TOWN, KOLKATA, WEST BENGAL 700 157 Pages (1 5)
More informationSITE VISIT REPORT DATE: JOB: NO. OF VISIT: PAGE OF : PURPOSE OF VISIT: CONTRACTOR: Items to be checked Observations Actions SETTING OUT
SETTING OUT Correct to boundaries Correct to building lines? Diagonals accurate? Levels correct? EXCAVATIONS Adjoining structures OK? Centres of foundations line with walls? Bottoms of trenches uniform,
More informationBill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No.
Bill 1: Site Preparatory Works Page No. 1/7 Bill 1 Page 1/1 1.1 Construction of access roads to quarry sites LS 1 including their maintenance throughout the working period 1.2 Construction of deviations
More informationJabfloor is also available in higher grades up to Jabfloor 250 which may be required in certain specialist industrial and commercial applications.
JABLITE JABFLOOR Screed Finish Vapour Control Layer Concrete Slab Jabfloor Classic Damp-proof Membrane Jabfloor insulation can be used in all floor constructions for both domestic and commercial buildings.
More informationPart 5 Substructure and ground floors. Chapter 5.2. Suspended ground floors
Part 5 Substructure and ground floors Chapter CONTENTS SCOPE Clause Page DESIGN - General Design standards D1 1 Statutory and other requirements D2 1 Resistance to ground contaminants D3-D4 1 This Chapter
More informationAN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR
AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: EPI/WRO/CON/757/0119 FOR Construction of Boundary Wall and allied works for DHH & MCH Hospital at Kendrapara at Odisha state VOLUME III PRICE BID
More informationTechnical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION
Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION This Technical Notes contains the guide specifications in CSI format for Part III
More informationReCote Finish System over Concrete
Part 1 General 1.01 GENERAL A. The Master Wall ReCote Finish System for smooth precast and cast in place concrete consists of an acrylic primer and ReCote acrylic finish. When needed an acrylic modified
More informationUnion County Vocational - Technical Schools Scotch Plains, New Jersey
SECTION 092216 - NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationScanned by CamScanner
JODHPUR MUNICIPAL CORPORATION G-SCHDULE NIT No. Date Sr No. Last Date of Sale :- Earnest Money : Rs... Date of Receipt :- CR No. Dated.. Copy issued to M/s STORM WATER DRAINAGE MASTER PLAN FOR THE CITY
More informationCarried to collection
ELEMENT NO. 1 SUBSTRUCTURES (ALL PROVISIONAL) A B C D Site clearance Clear the site off grass, shrubs and all vegetation; cart away as directed 40 sm Excavate vegetable soil average 200mm deep and cart
More informationSLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu
INSTALLATION INSTRUCTIONS Note: The following installation instructions are based off of ASTM E 1643 (Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS
CITY OF TORONTO STANDARD CONSTRUCTION SPECIFICATIONS FOR ROADS TS 3.80 November 2010 CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS INDEX TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS 3.80.03
More informationBuilding Construction 14. Dr Nabil El-Sawalhi Associate professor Engineering Projects Management
Building Construction 14 Dr Nabil El-Sawalhi Associate professor Engineering Projects Management Plaster Plaster is a wet mixed material applied to internal walls as a finish to fill in any irregularities
More informationSECTION TILT-UP PRECAST CONCRETE. A. Work includes, but is not limited to, the following:
SECTION 03470 TILT-UP PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Work includes, but is not limited to, the following: 1. Precast wall panels. 2. Forms and casting beds. 3. Concrete. 4. Reinforcing
More informationSECTION CAST-IN-PLACE CONCRETE
McClellan Blakemore Architects New Warehouse Facility for SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete formwork. B. Floors and slabs on grade. C. Concrete floor
More informationWHATEVER THE CHALLENGE, PHILLIPS HAS YOU COVERED.
WHATEVER THE CHALLENGE, PHILLIPS HAS YOU COVERED. Build walls and ceilings with a strong base, sturdy reinforcements and much more with Phillips extensive line of high quality products. As a single source
More informationC. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:
02070 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General Requirements"
More informationPENTABLOCK Technical Information 190mm Series
PENTABLOCK Technical Information 190mm Series The PENTABLOCK Walling System was developed in consultation with masonry construction stakeholders with an aim of reducing labor time and material costs required
More informationConstruction of Shopping Complex at MNIT campus.
Name of work:- Construction of Shopping Complex at MNIT campus. G-Schedule S.No Qty Items Unit Rate Amount 1 253 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation
More informationDesign No. HI/BP PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table 1
FIRESTOP JOINT SPRAY CFS-SP WB SILICONE JOINT SPRAY CFS-SP SIL F-RATING 2-HR. 2-HR. T-RATING -HR. -HR. APPLICATION THICKNESS PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table /8" WET FILM (/6"
More informationSPECIFICATION FOR PRECAST/ COMPOSITE CONCRETE FLOORS/ ROOF DECKS SECTION E60
SPECIFICATION FOR SECTION E60 A 2007-09-26 S.W. Revision Date Issue Authorised By Approved for Issue SW Date 24.09.07 clarkebond Page 1 of 6 To be read with Preliminaries/ General Conditions. GENERAL 10
More informationNATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD
NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD TENDER FOR Construction of Stone Masonry Compound Wall for NIAB Campus at Survey No.37, Serlingampally, Hyderabad VOLUME V January 2013 HSCC
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS
Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...
More informationConstruction Specification for Concrete Unit Pavers
Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS
More information84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 protecting Membranes 90 System Components.
84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 protecting Membranes 90 System Components installation/ SYSTEM COMPONENTS INSTALLATION ADVICE LAPPING and JOINTING
More informationINSTALLATION METHOD STATEMENT
INSTALLATION METHOD STATEMENT 1.0 Introduction - Liquid screed is a flowing screed flooring system comprising a calcium sulphate binder, fine aggregate and water. - It is for internal use only, in general
More information84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components.
84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes 90 System Components installation/ SYSTEM COMPONENTS INSTALLATION ADVICE LAPPING and JOINTING
More informationSECTION MORTAR
PART l - SCOPE SECTION 04100 - MORTAR A. This Section includes all labor, materials, equipment, and related items required for the work of mortar as shown on the Drawings and specified herein. The work
More informationBISON PRECAST FLOORING SPECIFICATION
BISON PRECAST FLOORING SPECIFICATION 1.0 SCOPE OF THE SPECIFICATION 1.01 Relates to: This specification covers the design, manufacture and associated site work of the following types of floors:- Hollowcore
More informationSOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE
SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE S.NO Description Unit Total Qty EARTH WORK EXCAVATION : Earthwork in excavation at all depths for foundation, pile cap,drain, ramp,pits, etc.,
More informationResidential Wall Panel Installation
Residential Wall Panel Installation Planning & System Parameters 1. Health & Safety Act 1992 The principle objects of the Health & Safety Employment Act 1992 (HSE Act) are to prevent harm to employees
More informationCONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS
More informationLIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS. Diagram 1: Standard Membrane Continuation 150 mm Overlap
LIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS Diagram 1: Standard Membrane Continuation 150 mm Overlap Ensure Membrane to Membrane Contact Diagram 2: Membrane Continuation
More informationRFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) OF THR 8th PRIMARY SCHOOL TOILETS IN MYTILENE. Annex A - BILL OF QUANTITIES 1/9
RFP/GRC/LSV/2017-005: RENOVATION (CIVIL WORKS) OF THR 8th PRIMARY SCHOOL TOILETS IN MYTILENE Annex A - BILL OF QUANTITIES 1/9 The Contractor shall consider in his price all costs or expenses of all requirements
More informationfreestone eco Prestige & quality DIY vertical wall Large blocks - 10/m 2 Smooth surface finish No concrete footings
freestone eco Retaining Wall SystemTM The Freestone ECO Retaining Wall System TM is a more sustainable DIY, vertical retaining wall which is manufactured with up to 40% recycled glass aggregate to provide
More informationF10. BRICK/BLOCK WALLING To be read with Preliminaries/General conditions. TYPES(S) OF WALLING 110 CLAY FACING BRICKWORK SHALL BE:
F10 BRICK/BLOCK WALLING To be read with Preliminaries/General conditions. TYPES(S) OF WALLING 110 CLAY FACING BRICKWORK SHALL BE: Product Name: Pre War Common Size: 215x102x65mm Manufacturer and reference:
More informationThe fire resistance required for doors in this building is 1 (one) hour resistance in compliance with the below general specifications:
Query No.1 ; we need more specs. about fire resistant doors Answer to Query No. 1: The fire resistance required for doors in this building is 1 (one) hour resistance in compliance with the below general
More informationNATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT
NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI 620 015 ESTATE MAINTENANCE DEPARTMENT NOTICE INVITING TENDERS NO: NITT/EMD//Civil works / 2015 TENDER NOTIFICATION Ref: NITT/EMD/ CoW/Civil Works /15-16
More informationAnnex II- Lot 2. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 6 Admin Units in localities of Sinar State
Annex II- Lot 2 Bills of Quantities for Civil Works of septic tanks and soak-away wells in 6 Admin Units in localities of Sinar State Lot: 2 Site 2-1: Allakandie All Prices of items shall include Supplying,
More informationCONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS
More informationCONCRETE TILE PAVERS
Section 32 14 13 CONCRETE TILE PAVERS (1995 MasterFormat Section 02780) Note: This guide specification for the U.S. is for the installation of concrete tile paving units whose thickness are less than the
More informationF10. BRICK/BLOCK WALLING To be read with Preliminaries/General conditions. TYPES(S) OF WALLING 110 CLAY FACING BRICKWORK SHALL BE:
F10 BRICK/BLOCK WALLING To be read with Preliminaries/General conditions. TYPES(S) OF WALLING 110 CLAY FACING BRICKWORK SHALL BE: Product Name: Olde English Grey Size: 215x102x65mm Manufacturer and reference:
More information