1 Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director 2/5/2015 Project Addendum No. 6 PID No FRA IR Major Reconstruction Letting: February 10, 2015 Notice to all Bidders and Suppliers to please be advised of the attached Proposal Addendum. For internet access to information referenced in this addendum, please see the ODOT web site at -> ftp://ftp.dot.state.oh.us/pub/contracts/attach/fra-88310/ The Department utilizes Bid Express ( as the official medium for electronic bid submittal. All bidders must prepare bids and submit them online via Bid Express. Addenda amendments must be acknowledged in the miscellaneous section of the Expedite (EBS) file and all amendments loaded in order for your bid to be considered for award of this project. Bid express will not accept bids that do not have amendments incorporated. Failure to incorporate changed quantities or items in your Expedite (EBS) submissions will result in the rejection of your bid. ODOT is an Equal Opportunity Employer and Provider of Services

2 Proposal Addendum For FRA ; PID Project Completion Date Change: No Bid Item Changes, Additions or Deletions: Yes Funding Splits Required: Yes Revised Bid Items: Ref. No. Item No. Total Quantity Unit Description Section E SY SEALING OF CONCRETE SURFACES (NON- EPOXY), AS PER PLAN E EACH IMPACT ATTENUATOR, TYPE 2 (UNIDIRECTIONAL) E FT CONCRETE BARRIER, SINGLE SLOPE, TYPE B E FT CONCRETE BARRIER, SINGLE SLOPE, TYPE B E FT CONCRETE BARRIER, SINGLE SLOPE, TYPE C E FT CONCRETE BARRIER, SINGLE SLOPE, TYPE C, AS PER PLAN E FT CONCRETE BARRIER, SINGLE SLOPE, TYPE C E FT CONCRETE BARRIER SINGLE SLOPE, TYPE D E EACH CONCRETE BARRIER, END ANCHORAGE, REINFORCED E EACH CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE D E EACH BARRIER REFLECTOR E SF CURB RAMP E FT COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN E FT CONDUIT, 4, MULTICELL, , EPC-40 FOR TRAFFIC SURVEILLANCE E SF STRUCTURE DRAINAGE, MISC.: MIRADRAIN 5000 DRAINAGE SYSTEM OR EQUIVALENT E LB EPOXY COATED REINFORCING STEEL E SF MECHANICALLY STABILIZED EARTH WALL E SF MECHANICALLY STABILIZED EARTH WALL E CY UNCLASSIFIED EXCAVATION E LB EPOXY COATED REINFORCING STEEL E CY CLASS QC1 CONCRETE, HEADWALL E SY SEALING OF CONCRETE SURFACES (EPOXY- URETHANE) 0037

3 E SY TYPE 2 WATERPROOFING, AS PER PLAN E SF 1 PREFORMED EXPANSION JOINT FILLER E CY POROUS BACKFILL WITH FILER FABRIC E LB EPOXY COATED REINFORCING STEEL E CY CONCRETE MASONRY, AS PER PLAN E FT 12 CONDUIT, TYPE B, AS PER PLAN E FT 15 CONDUIT, TYPE B, AS PER PLAN E FT 18 CONDUIT, TYPE B, AS PER PLAN E FT 24 CONDUIT, TYPE A, AS PER PLAN E FT 24 CONDUIT, TYPE B, AS PER PLAN E FT INCREASED BARRIER DELINEATION E EACH WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) E EACH OBJECT MARKER, ONE WAY E FT PORTABLE BARRIER, E FT PORTABLE BARRIER, 32, BRIDGE MOUNTED 0015 Deleted Bid Items: Ref. No. Item No. Total Quantity Unit Description Section E FT GUARDRAIL, TYPE MGS, 25 LONG-SPAN 0001 Added Bid Items: Ref. No. Item No. Total Quantity Unit Description Section E FT GUARDRAIL, THRIE BEAM RAIL AND TRANSITION SECTION E EACH THRIE BEAM BULLNOSE E EACH CONCRETE BARRIER END SECTION, TYPE B E CY EMBANKMENT E CY GRANULAR MATERIAL, TYPE B E LS COFFERDAMS AND EXCAVATION BRACING E LS PILE DRIVING EQUIPMENT MOBILIZATION E FT STEEL PILES HP 12X53, FURNISHED E FT STEEL PILES HP 12X53, DRIVEN E CY CLASS QC1 CONCRETE WITH QC/QA, FOOTING E CY CLASS QCI CONCRETE WITH QC/QA E SY SEALING OF CONCRETE SURFACES (NON- EPOXY), AS PER PLAN E FT 6 PERFORATED CORRUGATED PLASTIC PIPE E FT 6 NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDING SPECIALS 0037

4 E EACH DYNAMIC LOAD TESTING E FT DRILLED SHAFTS, 24 DIAMETER, AS PER PLAN E EACH PRECAST REINFORCED CONCRETE OUTLET E EACH CATCH BASIN, NO. 2-2B, AS PER PLAN E EACH OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 10, AS PER PLAN 0015 Please be advised of the following: EBS Amendment.005, which was created by Addendum #5, did not incorporate all the item changes made by that addendum. EBS Amendment.006, created with this addendum, includes all the item changes made in both Addendum #5 and this addendum. Structural steel shop drawings (34 sheets) for Structure File No are being added to the bid documents by this addendum. Bidders may review the two structural steel purchasing contract documents and requests for information ( and ), as posted by ODOT on their website. The Waterway Permit date is expected to be April 15, Revised Special Provisions for Soil Nails and Aesthetics will be posted separately. Add the following Note: No Replace/Add Plan sheets: Yes Replace the following with revised sheets: 2, 41, 59, 61, 63, 66, 70-72, 74-79, 82A, 225, 231, 242, 248, 273, 296, 297, 302, 304, 307B, 307C, 307D, 307E, 307H, 307J, 307K, , 361, 369, 379, 434, 529, 573, 743, 746, 756, 757, 767, 799, 846, 847, 1065, 1083, 1086, 1087, 1090, 1229, 1238, , , 1370A, 1370B, 1370C, 1371, 1511, 1566, 1567, 1572, 1575, 1592, 1593, 1596A, 1627 Answers to Prebid Questions: Yes Q1: Submitted January 29, 2:03 PM. The plan quantities for the various concrete barrier items have not deducted linear feet to be paid with the end anchors (15 ft/ea), light foundations (8 ft/ea), ITS junction boxes (4 ft/ea), lighting junction boxes (4 ft/ea) and median overhead sign foundations (10 ft/ea). Please revise the quantities for the various concrete barrier items accordingly. A1: Barrier quantities will be updated accordingly. Q2: Submitted January 30, 1:36 PM. 1. Will the removals of the temporary drainage items be paid for with the rest of the removals or is the cost to be included in the temporary drainage items? 2. Bid item 101 is for 6" reinforced concrete pipe. That size of concrete pipe is not made. Please revise the material spec. A2: 1. The removal of temporary drainage items will be included in the bid item for the temporary drainage items. The note on Sheet 63 will be clarified. 2. The material specification will be revised.

5 Q3: Submitted January 30, 2:38 PM. We see end anchor requirements change from project to project. On this project, how many end anchors are required per barrier median inlet? How many end anchors are required per barrier light pole? Are there any other locations at which end anchors are to be installed? A3: Reinforced end anchorages will be required at the location specified in Standard Drawings RM-4.3 through RM-4.5. Reinforced end anchorages will be required at median barrier inlets where there are expansion joints. Q4: Submitted February 2, 2:00 PM. The subsummary on page 1,331 of the landscaping plans lists 1,060 sy of item nonreinforced concrete pavement, app & 118 cy of item 304 aggregate base. There are no bid items set up for either of these items. Please provide bid items. A4: Item 452 and Item 304 are not required. These items will be removed from sheet The Item concrete walks are detailed on sheet 1326, and the quantity is specified on sheet 1328 (and on the Landscape Sub-summary on sheet 1321). Q5: Submitted February 2, 2:05 PM. Under the current standards the curb ramps are paid by the square foot and include the cost of the walk through the ramp areas. It appears that this project is setup per the old standards where the ramps were paid by the each and the walk was paid through the curb ramps. Please clarify how the Curb ramps and the walk will be paid for. A5: The curb ramp pay item will be updated to be paid for in SF. Q6: Submitted February 2, 3:03 PM. Reference the prebid question answer to the prebid question asked on 1/28/15 at 2:44:01 PM. Since the contract for the structural steel for these bridges is between the fabricator and ODOT it would probably be in ODOT'S best interest to provide the storage fees ( $/unit of time) for the structural steel for bridges 271L & 257 L&R to the contractors so that every bidder can incorporate the appropriate costs if they deem necessary. A6: Plan sheets will be updated to include storage costs. Q7: Submitted February 2, 3:12 PM. Will a Concrete Barrier End Section, Type B1, be required on US 33 at the west end of the project (50+80)? If so, please add a biditem for this. A7: A Type B1 concrete barrier end section will be required. The plans will be updated accordingly. Q8: Submitted February 2, 3:21 PM. Sheet 87 describes that impact attenuator installation, repair, and removal associated with construction access points should be paid for under lump sum Item 614 Maintaining Traffic. However, MOT sub-summary sheets show all impact attenuators associated with construction access points are to be paid for under the typical bid item 454 Work Zone Impact Attenuator, 60 EA. Please clarify where impact attenuators associated with construction access points are to be paid for.

6 A8: The work zone impact attenuators shown at construction access points will be removed from the quantities. The installation, removals and relocations of work zone impact attenuators required to complete construction and change access points are included in Item 614 Maintaining Traffic per the plan insert sheet. Q9: Submitted February 2, 3:23 PM. The quantities for bid Items 605 & 623 Mechanically Stabilized Earth Walls are understated. It appears the 3 embedment was not accounted for. A9: The quantities for Mechanically Stabilized Earth Walls (Bid Items 605 & 623) have been revised. Q10: Submitted February 2, 3:25 PM. Will Glass Fiber Reinforced Polymer (GFRP) stiffening reinforcement be required for RW5 moment slab parapet joints? A10: No, GFRP will not be required for the moment slab parapet joints. Q11: Submitted February 2, 3:27 PM. Bid Item 598 Epoxy Coated Reinforcing Steel qty of 40,849 LB does not match the reinforcing list on sheet 1087/1763. Please revise. A11: Quantity has been revised. Q12: Submitted February 2, 3:58 PM. It appears that the quantity for bid item 582 is substantially understated. A12: The quantity for Item 518 Structure Drainage, Misc.: Miradrain 5000 drainage system or equivalent has been revised. Q13: Submitted February 2, 4:14 PM. Sheet 6 of the Specifications and Special Provisions for Aesthetic Treatments references approved shop drawings for the form liners. There is no other mention of shop drawings for the form liners in this specification or the plans. Are shop drawings required to be submitted for the form liners on this project? If so, please provide all information that is to be included in these drawings. Additionally, please provide the applicable Department review times for approval of these drawings. A13: Shop drawings shall be provided for verification for all Project form liner types. The information shall include, but not be limited to, fully dimensioned drawings, sections, manufacturing conventions, special fabrication instructions, contract document references, manufacturing material specifications, catalog cut sheets, and information pertaining to affixing the form liner to the form. Review times for these shop drawings will be 10 working days. Q14: Submitted February 2, 4:14 PM. In speaking with potential form liner suppliers, it is evident that the City has had several previous discussions with only one supplier. This supplier has had the opportunity to get a head-start on this project. Due to the intricacy of the form liners and the quantity required to build the job, the remaining suppliers are requesting more time to bid this project. If additional time is not granted, these suppliers are suggesting that their prices will be significantly inflated and/or that they might not be able to bid the project. As a means of leveling the playing field for all bidders, and thus ensuring the most economical form liner price to the Department, please consider delaying the sale date of this project. A14: The sale date remains unchanged.

7 Q15: Submitted February 2, 4:16 PM. Sheet 2 of the Special Provisions for Permanent Soil Nails states that the Department will pay for each abandoned soil nail at 50 percent of the production soil nail unit price. Plan sheet 1003 states that the Department will pay for each abandoned soil nail at 25 percent of the soil nail unit price. Please clarify which note is correct in the next addendum. A15: The Department will pay for each abandoned soil nail at 25 percent of the soil nail unit price. Q16: Submitted February 2, 4:18 PM. In an answer to a previous question regarding form liners needed for the project ODOT stated that, The City of Dublin contacted a possible fabricator and verified that the time frames are feasible so long as the contractor is timely with permission to proceed with fabrication. The FRA L/R bridges will be constructed in 2015 per the sequence of construction. We have reached out to several suppliers and none of them have been able to meet our schedule needs so that the FRA L/R bridges can be built in 2015 per the sequence of construction. Will the Department please provide the contact information for the fabricator the City spoke with? A16: The City of Dublin is aware of the following potential fabricators. This is not an all-inclusive list, nor is it intended to imply prequalification: Creative Formliners: (Maryland) Scott System: (Colorado) Spec Formliners: (California) Q17: Submitted February 2, 4:26 PM. The Special Provisions for Aesthetic Treatments states that the work shall be in accordance with American Concrete Institute ACI 303R-91, Guide to Cast-In-Place Architectural Concrete and other appropriate ACI guidelines. This publication was updated in 2012 and is now ACI 303R- 12. Sheet 1 of this ACI standard states that reference to the standard shall not be made in contract documents. Please clarify this discrepancy. A17: This reference has been removed from the Special Provisions for Aesthetic Treatments. Q18: Submitted February 2, 4:27 PM. In an answer to a previous question, ODOT stated that, One complete set of form liners for each wall type shall be furnished to the City at project close-out. To remove all ambiguity and to ensure that bidders are interpreting this response the same, please identify the number of each type of panels required to be furnished to the City for each wall type. A18: The Contractor is responsible for turning over 55 unique form liners at the end of the project. They are as follows: CIP Walls and Abutments: 31 unique form liners MSE Walls: 17 unique form liners Parapets and Piers: 7 unique form liners More detail about the form liners can be found on Exhibit A of the Special Provisions for Aesthetic Treatments.

8 Q19: Submitted February 2, 4:31 PM. Per the sequence of construction requirements, the FRA L/R bridges shall be constructed during the 133 day maximum window duration for Phases 2A and 2B. To meet the 133 day window, the abutments of these bridges will need to be built simultaneously. This will not allow for the re-use of form liner panels between abutments. As such, the Contractor will be required to purchase 100% of the liner for each of these abutments. At the very least, this equates to purchasing 260 form liner panels. The purchase of 260 form liner panels will result in a significant cost to the project. Please consider increasing the maximum duration for the Phase 2A and 2B window to allow for the re-use of form liner panels between the abutments of the FRA L/R bridges. A19: See updated Special Provisions for form liners. The contractor will have to purchase as many as they require to meet the schedule. The time frames will not be modified. Q20: Submitted February 2, 4:32 PM. The Special Provisions for Aesthetic Treatments states, Original bas-relief patterns of the proposed river scene for the highway walls, Celtic design and Martel Font text for the parapet fascia, piers, and bullnose shall be designed and fabricated by the form liner supplier, from clay, to assist in making the molds for the urethane rubber form liners Under no circumstance can these patterns be created on the computer and enlarged by a CNC machine. We have spoken to several potential suppliers who cannot bid this project due to these requirements. Additionally, and to this point, we have only received confirmation from a single supplier who can comply with these requirements. While this single supplier can comply with the requirements of the special provisions, they cannot meet the schedule required to ensure construction of the FRA L/R bridges per the sequence of construction. Please revise the Special Provisions for Aesthetic Treatments to remove the requirements that original patterns be designed and fabricated from clay. A20: The schedule and specification requiring clay molds will not be adjusted. Q21: Submitted February 2, 5:06 PM. The MOT note requires a switch in to 2A no sooner than 6/8/15, and the steel delivery for 271L is scheduled on 6/15/15 per note on the bridge plans. There can be no preconstruction of the substructure of 271, as it is under where traffic is maintained. There will be considerable extra cost due to the error in delivery date in the plans. We need to know what storage costs you negotiated so we can analyze if it will be cheaper to mobilize a crane in to double handle the beams and set up contracts with delivery trucks to move from a temporary storage facility to the bridge placement and all associated costs, or if it will be cheaper to pay the storage costs as indicated on the bridge plans. The same will apply to the 257L and R structures as the same error exists in those dates as well. There is also a high probability the steel for 1763 will need additional storage fees analyzed as well. Please provide those costs for analysis as well. If ODOT would reveal the storage fees, and make it available for all, it will even the playing field and ensure the lowest taxpayer cost. A21: Plan sheets will be updated to include storage costs.

9 Q22: Submitted February 2, 5:35 PM. This question is regarding the field office note on plan page 59. First, the City of Dublin will not allow construction office trailers in their city unless it is located ON the construction project. The level of landscaping and the difficulty getting utilities eliminate the possible use of the project ramp infields as field office location. The 25 x 25 conference room requirement practically eliminates the option of trailers. The City of Dublin also does not allow the installation of fence without a permit which could take up to a year to get. It is also not likely that commercial real estate owners will allow such installation of chain link fencing if the contractor were to provide leased commercial office space. Securing 25 parking spaces also eliminates the ability to limit the rented square footage because generally the parking space ratio is generally 3.5 to 1000sf. This makes the 25 parking spaces and the chain link fence difficult to provide in the city of Dublin. When we look at the next interchange west of the project (Post Road) the availability of commercial real estate is extremely limited. Weighing in all these factors makes the current note unpractical. Has the department coordinated these requirements with the City of Dublin? Will the department consider changing the note to eliminate either the conference room requirement or the fencing requirement? If not, how far from the project will the department accept for a field office location? A22: The City is open to a field office site (a) within the project limits, (b) on City-owned property, or (c) on private property adjacent to the project limits. The 6-foot temporary chain link fence will be allowed. A temporary sign, 32 square feet maximaum size, can be coordinated through Dublin s Code Enforcement. The note on sheet 59 will be replaced by the following: TEM 619 FIELD OFFICE, TYPE C, AS PER PLAN IN ADDITION TO THE REQUIREMENTS OF THE CMS, PROVIDE AN ADDITIONAL UNOBSTRUCTED 625 SQ FT (MINIMUM) AREA OF FLOOR SPACE TO BE USED AS A CONFERENCE ROOM FOR PROJECT RELATED MEETINGS, INCLUDING SIX 30 X72 WORK TABLES AND 36 PADDED, FOLDABLE OR STACKABLE CHAIRS. INCREASE THE BROADBAND INTERNET CONNECTION SPEED TO A MINIMUM OF 30 MBPS. INCREASE THE NUMBER OF ALL-WEATHER PARKING SPACES TO 25 SPACES TOTAL. Q23: Submitted February 2, 5:41 PM. Temp Ramp WN2 typical section on sheet 247 shows bid item 482 Portable Concrete Barrier, 32 (unanchored) on the outside of the temporary ramp. This is next to a 5 to 20 vertical temporary MSE wall. Should this be bid item 484 Portable Concrete Barrier, 32, Bridge Mounted (anchored)? Will anchoring to flexible (if chosen) 615 Temp Pavement be sufficient? A23: The plans will be clarified to specify Item 615 Pavement for Maintaining Traffic, Class A, shall be rigid within the limits of the temporary wall. The portable barrier shall be specified as Item 622 Portable Barrier, 32, Bridge Mounted.

10 Q24: Submitted February 3, 3:02 AM. On plan sheet 225 the Exit 15 Tuttle Crossing Blvd 1 Mile Sign near the bottom of the page appears as though it is intended to be mounted a little to the left of the center of what would have to be a truss of over 100 feet. There is a permanent aluminum sign truss of 50 ft. going in at this location that will support the other two signs detailed on this page, however this location would require the truss to be at least 100' that would likely require the larger truss and foundation. Is this really the intent of the Department, or are we misinterpreting the need to mount this sign on a large overhead truss in this phase of MOT? On page 231 and 242 of the plans at Station there is a proposed sign detailed that does not match the permanent sign that is not detailed on plan sheet What will be required at this location? Ref. Nos. 262 thru 265 are tabulated on plan sheet 1129B. The new trusses that are being painted have 3 pay items per sign Overhead Sign Support Truss. Since the box truss is aluminum those have not been painted in the past. If that is the case then there should only be 2 sections on all of the sign structures listed. The quantity should be reduced for all four painting bid items should be reduced accordingly. A24: The large overhead truss is not required for MOT. The Tuttle Crossing Blvd 1 Mile sign will be located at its permanent location along I-270 SB. The plan sheet will be updated to clarify. The sign at the exit ramp will be temporary. The plans will be updated to clarify. The box truss is to be painted. The quantity of 3 sections per sign structure is correct. Q25: Submitted February 3, 5:00 PM. We request the Department to re-evaluate the 10/19/15 late completion date and 133 calendar day maximum duration to complete Bridges #0257L, #0257R, #0271L and #0271R in Phases 2A and 2B. Did the Department include the following work items when contemplating this work duration: 1. Temporary shoring walls T-02 and T-03 which include 78 each drilled-in soldier piles and 136 each tiebacks. 2. Approximately 50,000 cy of roadway and structure excavation and associating lagging for the temporary shoring walls. 3. The challenging requirements to create clay molds and manufacture substantial formliner quantities to build both abutments at both the #0271L and #0271R bridges concurrently, with the formliner delivery occurring no later than mid-june Including weather days required per CMS C. 5. The abutment widening on the #0257L and #0257R bridges cannot begin until after the closure of US The architectural relief on the parapets on all four bridges requires the parapets to be formed and poured instead of slipformed. 7. Structure water cure requirements per CMS Table A25: The schedule will not be changed. Q26: Submitted February 4, 8:36 AM. There are two items for Work Zone Raised Pavement Markers, bid items 462 and 463. Is it the department s intent for all 614 RPMs to fall under bid item 462 Work Zone Raised Pavement

11 Marker and for all RPM conforming to CMS 621 to be paid for under bid item 463 Work Zone Raised Pavement Marker, APP? A26: Yes, it was the intent to identify the different WZRPM based upon the MOT phasing. Q27: Submitted February 4, 9:56 AM. We have contacted a number of form liner suppliers regarding the liner for this project. There are several suppliers who cannot quote this job due to the strict requirements set forth in the Special Provisions for Aesthetic Treatments. Of the few suppliers who have the capability to follow these requirements, none are able to meet our schedule needs for the construction of the FRA L/R bridges within in the 133 calendar day window. As stated previously, the four abutments at these bridges must be built simultaneously to meet this window duration. Because of this, all form liner will need to be on-site at the beginning of June. The uncertainty of shop drawing requirements (see previously submitted question) and the City s approval process further compound this issue. Please revise the contract documents and make revisions to the requirements so that construction of the FRA L/R bridges is achievable. A27: The schedule will not be changed. Q28: Submitted February 4, 9:58 AM. According to sheet 1332 it shows Everlow Yews and Buffalo Junipers. It only has everlow yews on the subsummary list and only buffalo junipers on the bid sheet. Please clarify. A28: The Buffalo Juniper (Juniperus Sabina Buffalo ) should be bid and installed as Everlow Yew (Taxus x media Everlow ). Any reference to Buffalo Juniper in sections A-A and B-B on sheet 1332 shall be replaced with Everlow Yew. Q29: Submitted February 4, 10:00 AM. On the landscape sheets it states that we can use 8-10' trees. On the bid form, it only states 10' that can be used. Please clarify. A29: Evergreen Trees, both Taxodium distichum and Picea glauca shall have a minimum height of 10 at the time of acceptance as indicated in the general summary. The landscape sheets will be clarified. Q30: Submitted January 21, 11:02 AM. On page 1057, Plan Note #2 reads that the soldier piles shall be pre-fabricated with shear studs attached prior to installation into the drilled shaft. To keep the shear studs undamaged during excavation and lagging, would it be acceptiable to attach the studs as the walls are excavated down? A30: ODOT will allow field welding of the shear studs. A revised sheet will be issued. Q31: Submitted January 23, 10:18 AM. The text on 67/1763 says the 257 L and R substructure is critical to 1B completion. The bridge plans show substructure removal and piling beneath where 1B has traffic maintained. We also could not locate the shoring design to accommodate this abutment work. If the work on abutment substructure cannot begin until Phase 2A, and 2A cannot begin until 6/8/15 then the beams will not be ready 6/15/15 as noted in the bridge plans. This very likely will push off beam delivery at 257 R and the completion of 2B as well. What should these new dates be? A31: The following note will be clarified on Sht. 67, Phase 1B: US33 over Substructure (FRA L&R), as noted on sheets 1566/1763 and 1596/1763. The shading on sheets 143 and

12 153 will be clarified to reflect the direction per sheets 1566/1763 and 1596/1763. Shoring design shall be performed by the contractor. The steel girders will be available to the contractor on 6/15/15; the contractor can erect girders once necessary work is completed. Q32: Submitted January 28, 2:44 PM. The MOT note requires a switch in to 2A no sooner than 6/8/15, and the steel delivery for 271L is scheduled on 6/15/15 per note on the bridge plans. There can be no preconstruction of the substructure of 271, as it is under where traffic is maintained. There will be considerable extra cost due to the error in delivery date in the plans. We need to know what storage costs you negotiated so we can analyze if it will be cheaper to mobilize a crane in to double handle the beams and set up contracts with delivery trucks to move from a temporary storage facility to the bridge placement and all associated costs, or if it will be cheaper to pay the storage costs as indicated on the bridge plans. The same will apply to the 257L and R structures as the same error exists in those dates as well. There is also a high probability the steel for 1763 will need additional storage fees analyzed as well. Please provide those costs for analysis as well. If ODOT would reveal the storage fees, and make it available for all, it will even the playing field and ensure the lowest taxpayer cost. A32: The intent of having the structural steel available at the dates provided in the plans is to try and ensure that the steel fabricator will not be responsible for any delays to the contractor. The steel fabrication bids do include a unit price for additional storage cost per day. If the contractor needs additional storage beyond the stated delivery date, then the additional storage costs which are owed to the steel fabricator will be the responsibility of the contractor. ODOT will collect these costs from the contractor by decreasing the Lump Sum payment for pay item: STRUCTURAL STEEL MISC: ERECTION OF STATE SUPPLIED STEEL. The General Note for this pay item will be updated to detail the potential decrease in Lump Sum payment. Q33: Submitted February 4, 4:03 PM. The intermediate crossframe detail for Br on Sht 1462/1763 shows a field weld at the intersection of the diagonals while all of the other welds on the crossframe are shown as shop welds. Please clarify if it is truly the department's intent to have this weld performed in the field rather than in the shop by the fabricator. A33: A shop weld is acceptable for the weld at the intersection of the crossframe diagonals. Q34: Submitted January 22, 5:08 PM. Will the Department allow the use of Stay-in-Place metal deck forms on this project? A34: No, stay-in-place forms cannot be used. Q35: Submitted January 22, 5:08 PM. Sheets 202 and 203 show proposed Ramp EN open in Phase 2B. This will require the completion of Soil Nail Wall RW-2A, Cast-in-Place Walls RW-2B and RW-2D, SPL Wall RW-2C and Bridge BR#1763 along with the associated roadway work on Ramp EN and I- 270NB. Phase 2B occurs during the 133 day maximum shutdown of US33 through traffic during the summer of With the focus of the project in the summer of 2015 being the completion of four US-33 mainline bridges and approach roadway during the 133 day shutdown, it will be incredibly difficult to also complete all the elements associated with Ramp EN and open proposed Ramp EN in Phase 2B. We request the Department to modify the MOT

13 plan and maintain the 33WB to 270NB traffic on the existing ramp EN and allow proposed Ramp EN construction to continue into the second construction season. A35: The contractor is permitted to modify the MOT scheme as noted on sheet 60: If the contractor so elects, he may submit alternate methods for the maintenance of traffic, provided the intent and provision herein are followed, and no additional inconvenience to the traveling public results therefrom. No alternate plan shall be placed into effect until approval has been granted in writing by the engineer. At the end of the first construction season, the number of lanes and movements as indicated in the MOT plans will be open to traffic. At the end of the second construction season, all proposed lanes shall be open to traffic in their final alignment. The contractor shall set the steel girders for FRA (Ramp EN over South Fork Indian Run) in the first construction season as required by the notes in the bridge plans.

Ohio Department of Transportation

Ohio Department of Transportation Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 Ted Strickland, Governor Jolene M. Molitoris, Director THE DEPARTMENT UTILIZES BID EXPRESS (http://www.bidx.com)

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 10/16/2014 Project 140522 Addendum No. 1 PID No. 76282 FRA USR 40

More information

ODOT Design & Construction Requirements for MSE Walls

ODOT Design & Construction Requirements for MSE Walls ODOT Design & Construction Requirements for MSE Walls Peter Narsavage, P.E. Foundation Engineering Coordinator Ohio Department of Transportation Office of Structural Engineering 2006 Ohio Transportation

More information

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA PURPOSE AND SCOPE These criteria modify and supplement the applicable sections of the AREMA Manual of Recommended Practice in connection

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014

More information

All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford

All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford Seymour Road Replacement Bridge Addendum #1 April 27, 2015 To: From: Cc: All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford RE: Construction Bid Information

More information

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 9, 2018

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 9, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING March 9, 2018 This pamphlet is issued solely for the purpose of circulating advance information

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work Background MnDOT, Metro Transit, Hennepin County, and the City of Minneapolis are in the process of developing a project for Interstate 35W between 43 rd Street in Minneapolis and 15 th Street in Minneapolis.

More information

ENGINEERING DIRECTIVE

ENGINEERING DIRECTIVE Number: E-95-001 Date: 2/2/95 ENGINEERING DIRECTIVE Ross B. Dindio (Signature on Original) CHIEF ENGINEER The purpose of this engineering directive is to formally notify ALL Department engineering personnel

More information

JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106.

JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106. JOB BB0113 SHELL LAKE STR. & APPRS. (S) MARCH 10, 2015 LETTING QUESTIONS PREVIOUSLY ASKED UNDER JOB BB0106. There are notes in the plans regarding driving the test pile without the use of a follower. The

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2013 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

MOA Project # Golden View Drive Intersection & Safety Upgrades

MOA Project # Golden View Drive Intersection & Safety Upgrades Appropriate transitions can include extending the insulation beyond the roadway improvements, reducing the insulation thickness, or angling the insulation downward. Use of a frost tolerant section, an

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS Delete this Section in its entirety and replace with the following: SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS 905-1 DESCRIPTION: This

More information

Bridge Manual - Part I - June CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE

Bridge Manual - Part I - June CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE Bridge Manual - Part I - June 2007 5-1 CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE 5.1 GENERAL This chapter is intended to instruct the Designer in the preparation and submission of Special Provisions and

More information

Table of Contents for Guide Specifications

Table of Contents for Guide Specifications Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan

More information

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS PAGE : 133-1 CONTRACT TIME : 12/20/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-080-5(094) ROUTE 80 BRIDGE OVER ROUTE 287 NORTHBOUND AND SMITH ROAD GRADING, PAVING & STRUCTURRS CONTRACT

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT MAINE TURNPIKE AUTHORITY ADDENDUM NO. CONTRACT 08.09 BRIDGE REPAIRS RUNNING HILL ROAD UNDERPASS (MILE 5.) BLACKSTRAP ROAD UNDERPASS (MILE 58.3) WEYMOUTH ROAD UNDERPASS (MILE 66.) SUPERSTRUCTURE REPLACEMENT

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

ANNE ARUNDEL COUNTY Department of Public Works DATE: 01/25/2017 FROM: Rich Osborn, P.E., Prof.L.S., Project Manager, Bureau of Engineering SUBJECT: Minutes for Pre-Bid Meeting January 19, 2017 South Shore

More information

Bonner Bridge Replacement Update:

Bonner Bridge Replacement Update: Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner

More information

I-94/I-69 Interchange Bridge Construction

I-94/I-69 Interchange Bridge Construction I-94/I-69 Interchange Bridge Construction General Project Information Let in August 2013 Cost of $76 million Prime Contractor Walter Toebe Construction Company Reconstruction of I-94 from Griswold to Lapeer

More information

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the

More information

Addendum No. 1 Page 1 of 2

Addendum No. 1 Page 1 of 2 Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 2 SPECIAL BENCHING AND SIDEHILL EMBANKMENT FILLS Geotechnical Bulletin GB2

More information

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects The Chief Estimator Software Item Cost Summary Bridge & Overpass Projects Elevated Transit Guideways Precast Girder Elevated Guideway 10 Abutment Excavation & Backfill 1,500.00 m3 222 10,368 8,634 1,309

More information

DALLAS/FORT WORTH INTERNATIONAL AIRPORT DESIGN, CODE AND CONSTRUCTION DEPARTMENT ADDENDUM NO. 2 FOR

DALLAS/FORT WORTH INTERNATIONAL AIRPORT DESIGN, CODE AND CONSTRUCTION DEPARTMENT ADDENDUM NO. 2 FOR DALLAS/FORT WORTH INTERNATIONAL AIRPORT DESIGN, CODE AND CONSTRUCTION DEPARTMENT ADDENDUM NO. 2 FOR TAXIWAY Y BRIDGE REINFORCEMENT FOR GROUP VI AIRCRAFT CONTRACT NO. 9500498 November 30, 2017 The Request

More information

CIVIL BREADTH Exam Specifications

CIVIL BREADTH Exam Specifications NCEES Principles and Practice of Engineering Examination CIVIL BREADTH and STRUCTURAL DEPTH Exam Specifications Effective Beginning with the April 2015 Examinations The civil exam is a breadth and depth

More information

2013 VIRGINIA CONCRETE CONFERENCE LESSONS LEARNED / CHALLENGES NOVA MEGAPROJECTS PROGRAM STRUCTURE AND BRIDGE FIELD PERSPECTIVE. Fawaz K. Saraf, P.E.

2013 VIRGINIA CONCRETE CONFERENCE LESSONS LEARNED / CHALLENGES NOVA MEGAPROJECTS PROGRAM STRUCTURE AND BRIDGE FIELD PERSPECTIVE. Fawaz K. Saraf, P.E. 2013 VIRGINIA CONCRETE CONFERENCE LESSONS LEARNED / CHALLENGES NOVA MEGAPROJECTS PROGRAM STRUCTURE AND BRIDGE FIELD PERSPECTIVE Fawaz K. Saraf, P.E. CHALLANGES Poor Detailing a challenge on some bridge

More information

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 ADDENDUM No. 6 ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 Due: June 9, 2016 at 2:00 p.m. (local time) The following changes, additions, and/or deletions

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION MANUAL OF THE STRUCTURE AND BRIDGE DIVISION DESIGN AIDS AND TYPICAL DETAILS VIRGINIA DEPARTMENT OF TRANSPORTATION VDOT GOVERNANCE DOCUMENT VDOT Manual of the Structure and Bridge Division: Part 02: Design

More information

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan

More information

SECTION PLATE CONNECTED WOOD TRUSSES

SECTION PLATE CONNECTED WOOD TRUSSES SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:

More information

The State of Ohio Bridges

The State of Ohio Bridges Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director ABCD NEOH Chapter The State of Ohio Bridges Tim Keller, P.E. Administrator ODOT Office of Structural Engineering Agenda 1.

More information

Temporary Shoring. Specifications, Applications, & Best Practices. Stephen M. (Matt) Revell, P.E. Assistant Geotechnical Engineer

Temporary Shoring. Specifications, Applications, & Best Practices. Stephen M. (Matt) Revell, P.E. Assistant Geotechnical Engineer Temporary Shoring Specifications, Applications, & Best Practices Stephen M. (Matt) Revell, P.E. Assistant Geotechnical Engineer Temporary Shoring Specifications, Applications, & Best Practices Temporary

More information

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges. STANDARD BRIDGE & CULVERT COMPONENTS Alberta Bridge Inventory In Alberta there are about 13,300 bridges. Types of bridges in Alberta: Standard bridges 3521 (26%) Bridge size culverts 8348 (63%) Major bridges

More information

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,

More information

Hamilton Rapid Transit Preliminary Design and Feasibility Study

Hamilton Rapid Transit Preliminary Design and Feasibility Study Hamilton Rapid Transit Preliminary Design and Feasibility Study B-LINE STRUCTURAL ASSESSMENT DESIGN BRIEF Version:1.0 Hamilton Rapid Transit Preliminary Design and Feasibility Study B-LINE STRUCTURAL ASSESSMENT

More information

Addendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16

Addendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16 Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 1 Perdue Stadium Seating Bowl Improvements

More information

Alternative No. 1 Total Cost DRAFT

Alternative No. 1 Total Cost DRAFT OPINION OF PROBABLE PROJECT COSTS SUMMARY OF ALL THREE ALTERNATIVE ALIGNMENTS Item Description Alternative No. 1 Total Cost Alternative No. 2 Total Cost Alternative No. 3 Total Cost Design Phase 1. Preliminary

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM. Charles A. Babish, PE State Materials Engineer Approved:

VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM. Charles A. Babish, PE State Materials Engineer Approved: VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Revisions to Chapter VII of Manual of Instructions Materials Acceptance and Materials Notebook Program NUMBER: MD 407-17

More information

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific

More information

LANDSCAPE RETAINING WALLS

LANDSCAPE RETAINING WALLS SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9070 - Landscape Retaining Walls LANDSCAPE RETAINING WALLS PART - GENERAL.0 SECTION INCLUDES A. Modular Block Retaining Walls

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

Annual CSAH Needs Update for 2017

Annual CSAH Needs Update for 2017 Annual CSAH Needs Update for 2017 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segments and project data using the SANeeds system.

More information

Lump Sum L.S. (15") EA

Lump Sum L.S. (15) EA Page of 6 ROADWAY ITEMS 000 000000000-N 800 MOBILIZATION Lump Sum L.S. 000 000000000-N 80 CONSTRUCTION SURVEYING 0003 009000000-N SP REINFORCED BRIDGE APPROACH FILL, STATION ************ (5+6.0) 000 0050000000-E

More information

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT SAMPLE GUIDE FOR RESIDENTIAL DECKS revised 7 16 Call before you dig! 1 800 272 1000 New Jersey One Call. Utility Mark Out. THIS GENERIC GUIDE IS NOT ALL INCLUSIVE

More information

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT 1 East Franklin Street Phone: 301-790-4163 Third Floor Hagerstown, MD 21740 Fax: 301-791-2650 BUILDING PERMIT APPLICATION FOR RESIDENTIAL ACCESSORY

More information

BID FORM - LUMP SUM BID

BID FORM - LUMP SUM BID BID FORM - LUMP SUM BID PROJECT: Livingston Northside Park and Soccer Fields Phase 1 Construction LOCATION: Livingston, Montana Ladies & Gentlemen: Pursuant to and in compliance with the Advertisement

More information

I-405 Sepulveda Pass Widening Project. Community Advisory Committee Meeting June 24, 2010

I-405 Sepulveda Pass Widening Project. Community Advisory Committee Meeting June 24, 2010 I-405 Sepulveda Pass Widening Project Community Advisory Committee Meeting June 24, 2010 1 MWD LA-29 Project Drilling to install beams for shoring to support excavation at Sunset Bl and Church Ln 2 MWD

More information

DESIGN AND INSTALLATION OF THE SHORING AND DECKING FOR TTC YONGE STATION

DESIGN AND INSTALLATION OF THE SHORING AND DECKING FOR TTC YONGE STATION DESIGN AND INSTALLATION OF THE SHORING AND DECKING FOR TTC YONGE STATION INTRODUCTION By Dawn Tattle, P. Eng. Anchor Shoring & Caissons Ltd. TTC Yonge Station is the largest and most complicated of the

More information

Inlets & Catch Basins

Inlets & Catch Basins A Delivering Reliability Inlets & Catch Basins Water-Conveyance & Drainage A Environmentally Responsible Oldcastle Precast to the Rescue All of our products are produced in a controlled environment helping

More information

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment & Convention Authority

More information

STATE AID GUIDE FOR: Updated: December 16, 2005

STATE AID GUIDE FOR: Updated: December 16, 2005 STATE AID GUIDE FOR: Updated: December 16, 2005 1. AFTER THE FACT RIGHT OF WAY DEPARTMENT OF MINNESOTA TRANSPORTATION 2. MISCELLANEOUS AFTER THE FACT Traffic Signals, Lighting, Retaining Walls, Sidewalk,

More information

American Legion Park City Pool Glasgow Ky. REPAIR SPECIFICATIONS SECTION I

American Legion Park City Pool Glasgow Ky. REPAIR SPECIFICATIONS SECTION I American Legion Park City Pool Glasgow Ky. REPAIR SPECIFICATIONS SECTION I A. DESCRIPTION OF WORK INCLUDED PIPING UPDATE INCLUDED ITEMS: Shop fabricate custom perimeter cover plates. Shop fabricate inlet

More information

10:00 AM, Wednesday, April 8, 2015

10:00 AM, Wednesday, April 8, 2015 NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, April 8, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference

More information

Construction Contract Basics

Construction Contract Basics PDHonline Course P120 (2 PDH) Construction Contract Basics Instructor: Kevin D. Waddell, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options

Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options A local utility company issued a Request for Proposal to our university s capstone design class for structural improvements

More information

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Washington State s Skagit River Bridge Emergency Slide Bijan Khaleghi

More information

Existing Project Conditions. General Conditions Estimate. Michael Vergari Construction Management Advisor: Dr. Riley

Existing Project Conditions. General Conditions Estimate. Michael Vergari Construction Management Advisor: Dr. Riley Existing Project Conditions General Conditions Estimate The Center for Health Research and Rural Advocacy is constructed under the supervision of the Geisinger Facilities Division. The project team develops

More information

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK DIVISION 03 CONCRETE SPECIFICATION 031000: FORMS AND FORMWORK PART 1.0 GENERAL 1.1 DESCRIPTION The work of this specification includes furnishing of all labor, materials, equipment and incidentals to install,

More information

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE - 268-5161 Residential Accessory Structures This information has been compiled for the benefit of any person

More information

TRANSVERSE SECTION TABLE OF CONTENTS CHAPTER 9

TRANSVERSE SECTION TABLE OF CONTENTS CHAPTER 9 TABLE OF ONTENTS HAPTER FILE TITLE DATE TABLE OF ONTENTS AND INTRODUTION 0.TO- Table of ontents - hapter... 2Sep20 0.00- Introduction - hapter... 0Jul202 PLAN 0.0- General Information... 2Sep20 SAMPLE

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT

Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT CHAPTER Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT Sixth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering 19 By Dr. Ibrahim

More information

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS April 1, 2009 CITY OF PORTSMOUTH Public Works Department Bid #54-09 2009 Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS This Addendum forms part of the original document marked Bid #54-09 2009

More information

LRFD BRIDGE MANUAL PART II: STANDARD DETAILS CONVENTIONAL CONSTRUCTION DRAWING NUMBER, DESCRIPTION, DATE OF ISSUE

LRFD BRIDGE MANUAL PART II: STANDARD DETAILS CONVENTIONAL CONSTRUCTION DRAWING NUMBER, DESCRIPTION, DATE OF ISSUE LRFD Bridge Manual - Part II i LRFD BRIDGE MANUAL PART II: STANDARD DETAILS CONVENTIONAL CONSTRUCTION DRAWING NUMBER, DESCRIPTION, DATE OF ISSUE CHAPTER 1: PREPARATION OF PLANS 1.1 CONSTRUCTION DRAWINGS

More information

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK The professional services to be provided by the Consultant under this Agreement shall be as necessary to complete the required analyses, layouts,

More information

Grade-Separated Trail Crossings How Do We Get Over There?

Grade-Separated Trail Crossings How Do We Get Over There? Grade-Separated Trail Crossings How Do We Get Over There? 2008 National Trails Symposium Rory Renfro, Alta Planning + Design Scott Belonger, Loris and Associates Peter Loris, Loris and Associates PRESENTATION

More information

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit 7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit 7.1 E-Permit and U-Permit Permit Description and Purpose The Excavation Permit (E-Permit) and the Utility Permit (U-Permit) are issued to allow construction,

More information

SECTION PREFABRICATED PIPE BRIDGE(s)

SECTION PREFABRICATED PIPE BRIDGE(s) SECTION 13135 - PREFABRICATED PIPE BRIDGE(s) PART 1 - GENERAL 1.01 Scope A. The Contractor is responsible for all engineering design, detailing, fabricating, installation including foundations for the

More information

JULY 2016 LRFD BRIDGE DESIGN 11-1

JULY 2016 LRFD BRIDGE DESIGN 11-1 JULY 016 LRFD BRIDGE DESIGN 11-1 11. ABUTMENTS, PIERS, AND WALLS This section contains guidance for the design and detailing of abutments, piers, retaining walls, and noise walls. Abutments and piers are

More information

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 22, 2018

PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING. March 22, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION COLUMBUS, OHIO PROPOSED HIGHWAY IMPROVEMENTS FOR CONTRACT LETTING March 22, 2018 This pamphlet is issued solely for the purpose of circulating advance information

More information

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO. 2017-26R Stone Group Architects Project No. 1731 ADDENDUM DATE: September 14, 2017 BID DATE: September 18, 2017 2:00 P.M. C.S.T. SCOPE OF THIS ADDENDUM:

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES January 18, 2013 811.01 Conduit Description 811.02 Conduit Materials 811.03 Conduit Definitions

More information

Aluminum Component Pipe Railings

Aluminum Component Pipe Railings 1 SECTION 05 7360 ALUMINUM COMPONENT PIPE RAILINGS PART 1 GENERAL 1.01 SECTION INCLUDES A. Aluminum component pipe handrails and railings. 1.02 RELATED REQUIREMENTS A. Section 02 9000: Landscaping: Installation

More information

Short Span Steel Bridges

Short Span Steel Bridges Short Span Steel Bridges MINK 2015 Michael Barker, PE University of Wyoming & SSSBA Bridge Technology Center Outline of Today s Presentation SSSBA & espan140 Design Competitiveness of Steel Bridges Economics

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES

More information

Administrative Changes

Administrative Changes Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $984,032.05 Gordon Contracting - Sangerville, ME $985,607.00 CPM Constructors - Freeport, ME $1,177,689.54 Page 1 of 7 Wyman & Simpson

More information

Folsom Lake Crossing by Hans Strandgaard, Alex Harrison, Jeff Aldrich, and Jeff Thomure, CH2M HILL

Folsom Lake Crossing by Hans Strandgaard, Alex Harrison, Jeff Aldrich, and Jeff Thomure, CH2M HILL Design and Construction Folsom Lake Crossing by Hans Strandgaard, Alex Harrison, Jeff Aldrich, and Jeff Thomure, CH2M HILL View of the Folsom Dam and the canyon just upstream of construction. The area

More information

BUILDING PERMIT APPLICATION PACKAGE

BUILDING PERMIT APPLICATION PACKAGE BUILDING PERMIT APPLICATION PACKAGE NOTICE TO BUILDING PERMIT APPLICANTS In addition to completed applications forms, the following documentation is required to accompany all building permit applications

More information

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.

More information

Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC)

Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC) Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC) Plan Check Submittal Date: Plan Check / PCIS App #: Job Address: Applicant: P.C. Engineer: (Print first / last name) Phone:

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

September 13, Enclosed is Addendum No. 6 to SEPTA's Sealed Bid No AMJP Frazer Shop & Yard Expansion Contract 2.

September 13, Enclosed is Addendum No. 6 to SEPTA's Sealed Bid No AMJP Frazer Shop & Yard Expansion Contract 2. September 13, 2016 Dear Sir/Madam Enclosed is Addendum No. 6 to SEPTA's Sealed Bid No. 16-00138-AMJP Frazer Shop & Yard Expansion Contract 2. The bid opening date and time scheduled for Monday, September

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 3: Roofs 1 & 3 DATE: December 29, 2017 1235 Mission

More information

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES. Engineering Manual Preamble

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES. Engineering Manual Preamble MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES Engineering Manual Preamble This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that

More information