WATER-COOLED HELICAL ROTARY CHILLER

Size: px
Start display at page:

Download "WATER-COOLED HELICAL ROTARY CHILLER"

Transcription

1 WATER-COOLED HELICAL ROTARY CHILLER 1.0 GENERAL REQUIREMENTS 1.1 Application. This technical specification applies to equipment and materials furnished and installation work performed by the Contractor. 1.2 Jobsite: The State of Florida, Dept. of Children and Families (Owner) is procuring one replacement chiller for the following state-owned building: Emmett S. Roberts Building 5920 Arlington Expressway, Jacksonville, FL Site Contact: Chuck Johnson, Tel. (904) Alternate Site Contact: Larry Lemelin, Tel. (904) Scope of Work. Work included under this specification includes: A. Furnishing one new water-cooled helical rotary water chiller as specified herein. B. Removal and disposal of existing Chiller #2 and starter/control cabinet. C. Installation of the new chiller, including chilled water and condenser water piping connections inside the mechanical room; re-routing and insulating chilled water piping inside the mechanical room; installation of water flow switches; and, verification of proper water treatment for the new chiller. D. Providing electrical power and control wiring connections (including water flow interlocks), and building automation system (BAS) programming to interface with the new chiller. 1.4 System Description. The chiller to be replaced (Chiller #2) fits into the HVAC systems as follows: A. Chiller evaporators are piped in series ( T=5 F each per original design). CHW flows sequentially through chillers at 600 gpm, leaving Chiller #2 at 44 F supply setpoint. B. Each chiller has its own cooling tower and condenser water pump. Condenser water flow is 450 gpm, designed for 85 F supply water under full-load conditions. C. Each chiller reports its operational parameters to an existing Trane Tracer Summit building automation system (BAS). The BAS operator, in turn, is capable of starting and stopping each chiller (manually or by daily schedule), and can remotely adjust the chilled water supply temperature for each chiller. 1.5 Documentation. The Contractor shall submit the following: Technical Specification -- Page 1

2 A. Chiller shop drawings shall be submitted and approved by the Owner before equipment is ordered. Shop drawings shall indicate components and their assembly; control features; weights and dimensions; and, operational and performance data. 1. Operational data shall include: rated capacities, refrigerant type, electrical requirements, performance specifications, control system operation, and other such information. 2. Performance data (energy input versus cooling load output) based on ANSI/AHRI Standard 550/590 conditions, shall be plotted from 10 percent to 100 percent of full load. B. Shop drawings for installation materials shall be submitted before ordering. Submittals shall include diagrams showing intended routing of new conduit above the floor, and new chilled water piping routing to accommodate 2-pass evaporator configuration. C. Performance test results shall accompany or precede chiller delivery to the jobsite. (Performance test shall be conducted by the chiller manufacturer in accordance with ANSI/AHRI Standard 550/590.) D. Three copies of operating and maintenance instructions shall be provided to the Owner upon completion of the job. E. Copies of both the Manufacturer's warranty and the Contractor's warranty shall be delivered to the Owner at completion of the job. 1.6 Coordination. All on-site activity shall be coordinated with the Site Contact or his designee. 1.7 Installation work shall be conducted such that system downtime is minimized. 1.8 Acceptance. Work not conforming to specified requirements, or any work for which approval has not been obtained, shall be rejected. 1.9 Warranty. Provide a one-year Contractor s Warranty on all installation workmanship and materials. 2.0 ACCEPTABLE PRODUCTS 2.1 The Contractor shall furnish one Trane Model RTHD water-cooled helical rotary water chiller with Adaptive Frequency Drive, B2-B2-B2 configuration (Product Version #167), conforming to Owner s Basis of Design. 2.2 Basis of Design. Specified unit shall be certified in accordance with ANSI/AHRI Standard 550/590 at the following conditions: Technical Specification -- Page 2

3 Trane Model RTHD w/ Adaptive Frequency Drive Compressor/Evaporator/Condenser B2-B2-B2 Configuration Evaporator Leaving water temp 44 F Evaporator Entering water temp 51.7 F Evaporator Flow (gpm) 600 gpm Evaporator passes 2 Evaporator pressure drop 7.00 ft. Condenser Entering water temp 85 F Condenser Leaving water temp 97.4 F Condenser Flow (gpm) 450 gpm Condenser passes 2 Cond pressure drop (max) 8.30 ft. Full Load Capacity Tons Full Load Efficiency kw/ton NPLV kw/ton IPLV kw/ton Electrical 480v / 3ph / 60Hz Minimum Ckt. Ampacity (MCA) amperes Max. Overcurrent Protection (MOCP) 400 amperes Factory Refrigerant Included R-134A Dimensions 125.4"L x 64.9"W x 74.4"T 2.3 Factory-supplied Accessories. The chiller manufacturer shall provide each of the following features, without exception: Factory Adaptive Frequency Drive Factory mounted circuit breaker Factory insulation (all cold surfaces) 7" Color touch screen control panel LonMark control interface Factory charge of R-134A refrigerant Shrink wrap packing for shipment Two (2) flow switches (shipped loose for contractor installation) Factory start-up 5 year factory warranty - Whole unit - including parts, labor & refrigerant 2.4 Performance requirements. The Manufacturer will be required to conduct a factory performance acceptance test to verify performance figures submitted with the shop drawings. Chiller performance shall be tested in accordance with ANSI/AHRI Standard 550/590. Certified performance shall be equal to performance claimed by the Manufacturer. 2.5 Condition of Equipment Furnished. The furnished equipment shall be shipped, delivered, and set in place, free of internal and external physical damage. The owner shall have the right to refuse any equipment set in place with obvious physical damage. Technical Specification -- Page 3

4 2.6 Internal control features. The new chiller shall be furnished with an integral programmable control system with display panel front. Panel shall feature a display readout for pressures, temperatures, setpoints, etc., plus keypad(s) for programming setpoints and calling up data for display. Control system shall provide the following key features, as a minimum: A. Programmable setpoints: leaving chilled water temperature, electrical demand limit. B. Selectable display of operating parameters: Chilled water temperatures, condenser water temperatures, refrigerant pressures, percent motor current draw, oil pressure, operating hours. C. Display of safety/cycling shutdown messages providing the day and time of shutdown, cause of shutdown, and type of restart required. D. A time delay to prevent compressor restart within fifteen minutes of shutdown. E. Anti- single phase and phase reversal protection. F. High condenser refrigerant pressure cutout. G. Low evaporator refrigerant temperature cutout. H. Low oil pressure and high oil temperature trips. I. Waterflow interlocks (to prove chilled water and condenser water flow via external flow switches) as a condition for chiller operation). 3.0 EXECUTION 3.1 Release for Manufacture. Contractor shall obtain Owner approval of shop drawing submittal before ordering any equipment. (Release for Manufacture is contingent upon release of appropriated funds by the Office of the Governor.) 3.2 Demolition. The Contractor shall remove existing Chiller #2 and dispose offsite. The Contractor shall also remove the chiller starter/control cabinet (mounted on a separate concrete pad behind the chiller), preserving the underfloor conduit stub coming up through the pad for pulling new power conductors. 3.3 Chiller delivery to Jobsite. The Contractor shall provide offloading, crane and rigging as needed to unload the delivery truck, and shall assure protected storage if the chiller is not immediately set in place on the mounting pad. (The Owner, with advance notice, will make storage space inside the loading dock available for temporary storage of the new chiller on the date of delivery to the jobsite.) Provide the Owner with documentation of certified performance test results. Technical Specification -- Page 4

5 3.4 Installation of new equipment. The new chiller shall be set on the equipment pad vacated by the old machine. The Contractor shall provide loading, lifting, disassembly/reassembly, and rigging as needed to install the new chiller on the equipment pad. Follow Manufacturer s procedures for mechanical installation (Trane Document #RTHD-SVX01D-EN). The Contractor is responsible for restoring & reconnecting building fixtures requiring temporary relocation to clear a travel path for chiller equipment. 3.5 Pipe Fabrication and Installation: A. Modify existing piping & valves as necessary to reconnect to new chiller. Connections shall be in accordance with approved shop drawings. B. Per the original design, Chiller #2 had a 1-pass evaporator with left-hand inlet and right-hand outlet. Shop drawings should describe a rerouting of chilled water piping to accommodate 2-pass evaporator connections. Recommended: Left-hand inlet & outlet connections, with CHW outlet piping routed through space vacated where existing starter/control cabinet was removed (see Paragraph 3.2 above). Coordinate with new power conduit routing (see Paragraph 3.7B below). C. Make piping layout and installation in the most advantageous manner possible with respect to headroom, valve access, opening and equipment clearance for other work. Give particular attention to piping in the vicinity of equipment. Preserve the maximum access to various equipment parts for maintenance. D. Chilled water and condenser water piping shall be Schedule 40 black steel per ASTM A120 Gr. A or ASTM A53 Gr. A or B. Fittings shall be Schedule 40 black steel seamless butt-welded per ASTM A234 and ANSI B16.9 to match pipe wall thickness. Flanges shall be ANSI 16.5, 150-lb. rated, black steel, flat-faced, welding neck to match pipe wall thickness. E. Fabricate sections having butt-welded joints offsite, to the greatest extent possible, to minimize welding activity inside the building. F. Install pipe neatly, free from unnecessary traps and pockets. Work into place without springing or forcing. Align piping to eliminate strain on evaporator and condenser heads. Use fittings to make all changes in direction (i.e., field bending and mitering are prohibited). Make reducing connections with reducing fittings only. Make all connections to equipment using flanged joints or unions. Arrange piping to permit removal of evaporator and condenser heads with minimal disassembly of piping. G. Flush dirt, scale and other foreign matter from inside piping before tying in sections, fittings, valves or equipment. H. Whenever practical, install piping close to walls, ceilings and columns, so as to minimize space requirements. Provide proper clearances for pipe insulation, for offsets, and for operation and maintenance of fittings. Technical Specification -- Page 5

6 I. Support pipe adequately to maintain line and grade, with due provision for expansion and contraction. Support piping so that no piping weight is supported by equipment. J. Provide anchors as required. Use pipe anchors consisting of heavy steel collars with lugs and bolts for clamping to pipe and attaching anchor braces. Install anchor braces in the most effective manner to secure the desired results. Do not install supports, anchors or similar devices where they will damage construction during installation or because of the weight or the expansion of the pipe. If necessary, insulate anchors sufficiently to prevent moisture condensation problems. K. Install 3/4" drain valves at all low points of water piping systems so that these systems can be drained completely. L. Install Factory-provided flow switches in the chilled water and the condenser water piping per Manufacturer s instructions. M. Clean or flush piping systems thoroughly. Purge pipe of construction debris and contamination before placing the systems in service. Remove temporary piping and jumpers when cleaning and flushing is complete. Use temporary strainers on initial start-up, to protect the new shell-andtube exchangers on the new chiller. Remove temporary strainers before completion of job. N. Furnish suitable water treatment for the chilled water loop. 3.6 Pipe Insulation. Provide cellular glass piping insulation on all new chilled water piping. A. Cellular glass insulation shall be preformed, water retardant, closed cell composition, complying with ASTM C 552, Specification for Cellular Glass Thermal Insulation. Thermal conductivity k rating shall be less than 0.30 Btu-in/hr ft² F at 75 F. Flame-spread/smoke-developed ratings shall be 0/0. Equal to Pittsburgh-Corning Foamglas. B. Pipe jacketing and fitting covers shall be aluminum, minimum inch thick, with laminated or baked moisture retardant. C. Insulate with bore-coated prefabricated cellular glass pipe insulation. Apply thickness of insulation equal to the existing insulation to which it is joined. Coat joints with joint sealant and secure each new section with not less than two 16-gauge stainless steel wires. Finish with jacketing secured with straps. Finish elbows and fittings with mastic reinforced with fabric, or finish with fitting covers. D. Apply insulation and finish materials in strict accordance with all manufacturers recommendations. 3.7 Electrical Hookup. The Contractor shall provide a complete electrical installation, as follows: Technical Specification -- Page 6

7 A. All wiring shall be copper, sized per NEC. B. Provide properly-supported rigid conduit to the chiller for power wiring. Extend new conduit to the chiller from the conduit stub left penetrating through pad where existing starter/control cabinet was removed. (See Paragraph 3.2 above.) Verify grounded continuity of entire conduit run, or alternatively, provide an equipment grounding conductor sized per NEC Article 250 (Table ) within the conduit. C. New power conductors shall be minimum 250 kcmil, Type THW, rated 75 C. Pull new power conductors through new conduit in a continuous run from existing fused switch. Verify existing or provide new 400-amp fuses in existing fused disconnect. D. The chilled water and condenser water flow switches shall be wired to internal controls per Manufacturer's instructions. Flow switches shall be checked to confirm that they are installed and wired correctly, and that they are functioning properly to prove condenser- and chilled-water flow. E. Contact Trane Factory Service to reconnect disconnected BAS wiring. 3.8 Start-Up and test. Contact Trane Factory Service for factory startup. 3.9 Final acceptance. The completed installation shall be inspected by the Owner s designee. Final payment shall not be authorized until: A. All building fixtures temporarily relocated to clear a path for equipment are fully restored & reconnected. B. All noted deficiencies are corrected. C. All required documentation has been delivered to the Owner. D. Necessary water treatment systems are in place and functioning. E. Full BAS control of chiller operation and chilled water setpoint is tested and confirmed. Technical Specification -- Page 7

SECTION COOLING TOWER

SECTION COOLING TOWER PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

B. System Design and Performance Requirements

B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

(Condensed from National Electric Code)

(Condensed from National Electric Code) WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,

More information

SECTION PIPING INSULATION

SECTION PIPING INSULATION SECTION 23 07 19 PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Piping insulation for refrigerant piping within building envelope. 2. Furnishing and installation of insulation.

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS SECTION 02620 PART 1 GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required to install High Density Polyethylene (HDPE) pressure pipe, fittings, and appurtenances

More information

1. Division 23 Section "Hangers and Supports for HVAC Piping and Equipment" for pipe insulation shields and protection saddles.

1. Division 23 Section Hangers and Supports for HVAC Piping and Equipment for pipe insulation shields and protection saddles. SECTION 23 07 19 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION SECTION 230713 DUCT INSULATION PART 1 GENERAL 1.1 SUMMARY A. Related Sections: 1. 233113 Ductwork and Accessories 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. E84-96a Test Method

More information

SECTION ROTARY SCREW WATER CHILLERS

SECTION ROTARY SCREW WATER CHILLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms REV. 9/08 Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms SKYTRON MOUNTING STRUCTURES for Ceiling Mounted Equipment Foreword Skytron s objective is to provide a program and guideline to assist

More information

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

1. Vertical reciprocating conveyor, Hydraulic straddle VRC. PART 1: GENERAL 1.01 Section Includes: 1. Vertical reciprocating conveyor, Hydraulic straddle VRC. a. Machine, controller, platform, structural steel hoist frame. b. Wire mesh enclosure and gates. Related

More information

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL). 16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the

More information

TGG, TBG, TEG, TUG, 3.9 TBS, Gene-Link series

TGG, TBG, TEG, TUG, 3.9 TBS, Gene-Link series Absorption Chillers TGG, TBG, TEG, TUG, 3.9 TBS, Gene-Link series Stable Chilled Water Outlet Temperature PID control is applied to maintain constant chilled water outlet temperature. When the cooling

More information

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists SECTION 412213- BRIDGE CRANES Part 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

ADDENDUM. Project: BYU-I Smith Building Chiller Replacement Project No.: Addendum No.: 1

ADDENDUM. Project: BYU-I Smith Building Chiller Replacement Project No.: Addendum No.: 1 ADDENDUM Project: BYU-I Smith Building Chiller Replacement Project No.: 11162 Addendum No.: 1 Project Address: BYU-Idaho Operations Building Rm. #213, Rexburg, Idaho 83460 Date: 2/18/16 Owner: BYU-Idaho

More information

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how?

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how? SECTION 08360 SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Glazed Aluminum

More information

PIP PCEPA003 Process Analyzer System Field Installation Guidelines

PIP PCEPA003 Process Analyzer System Field Installation Guidelines January 2016 Process Control PIP PCEPA003 Process Analyzer System Field Installation Guidelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification

More information

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING 7160 Krick Rd., Walton Hills, OH 44146 800-321-3827 - Tel 440-439-8650 - Fax 440-439-6889 SECTION 12 48 16 ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING PART 1. GENERAL 1.01 SUMMARY: This section includes

More information

ST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

ST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 10530 PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS SECTION 13096 MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS Prepared by: NELCO 125 Chenoweth Lane, Ste. 206 Louisville, KY 40207 (502) 899-3726 13096-1 MODULAR GALVANIZED RF SHIELDING SYSTEM PART

More information

SECTION HVAC INSULATION

SECTION HVAC INSULATION PART 1 GENERAL 1.1 SUMMARY SECTION 23 07 00 HVAC INSULATION A. Section Includes: 1. Ductwork insulation. 2. Duct liner. 3. Insulation jackets. 4. Equipment insulation 5. Piping system insulation. 6. Insulation

More information

University of Delaware

University of Delaware University Contact: Energy & Engineering Group (302) 831-1744 SECTION 23 07 00_ HVAC INSULATION PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Piping system insulation. 2. Equipment insulation. 3.

More information

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS PART 1 GENERAL 1.01 DESCRIPTION A. General 1. Furnish SST-II Hydraulic Bi-Fold System complete from one manufacturer. Provide all labor, materials, tools and equipment to furnish the SST-II Bi-Fold System

More information

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International

More information

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466 BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein

More information

GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM

GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM 1 GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM 1.01 WORK INCLUDED PART 1: GENERAL A. Provide for all labor, equipment, materials and services to furnish and install SECURITY

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral

More information

SECTION BASIC ELECTRICAL REQUIREMENTS

SECTION BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies

More information

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 10505 - METAL STUDENT LOCKERS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION RESILIENT SHEET FLOORING

SECTION RESILIENT SHEET FLOORING SECTION 09 65 16 RESILIENT SHEET FLOORING SPEC WRITER NOTE: Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1.

More information

HVAC Piping Insulation- FIBERGLAS Insulation

HVAC Piping Insulation- FIBERGLAS Insulation PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.

More information

SECTION PLUMBING PIPING SYSTEMS

SECTION PLUMBING PIPING SYSTEMS SECTION 15300 PLUMBING PIPING SYSTEMS PART 1 - GENERAL 1.01 SPECIAL NOTICE A. Each contractor shall read all relevant documents, become familiar with the job, the scope of work, type of general construction,

More information

Fiberglass Cooling Towers

Fiberglass Cooling Towers Fiberglass Cooling Towers Available in sizes from 100 to 240 tons. FC Series 700 Fiberglass Cooling Tower Available in sizes from 170 to 240 tons. No other fiberglass cooling tower comes with as many high-quality

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin

This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin PART 1: GENERAL 1.01 Purpose: This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin 1.02 Scope: A. Extent of mechanical insulation

More information

Cryogenic Pipe Support Systems

Cryogenic Pipe Support Systems Cryogenic Pipe Support Systems Overview Rilco cryogenic pipe supports are developed to support cold piping in various applications ranging from chilled water to liquefied natural gas. The qualified service

More information

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual FORM HEADWALL (floating) Installation Manual FORM HEADWALL (floating) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated

More information

Diffused Aeration Piping Equipment

Diffused Aeration Piping Equipment 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections

More information

Legacy Environmental Process, LLC 1445 Ashville Road, Suite 103 Leeds, Alabama In USA Fax:

Legacy Environmental Process, LLC 1445 Ashville Road, Suite 103 Leeds, Alabama In USA Fax: Legacy Environmental Process, LLC 1445 Ashville Road, Suite 103 Leeds, Alabama 35094 In USA 1-205-640-1035 Fax: 1-205-640-1039 www.legacyenvpro.com Pre-Plant Delivery And Installation Manual For Project

More information

CFFWA-20-1-U Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 60,000 BTUH

CFFWA-20-1-U Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 60,000 BTUH CFFWA-20-1-U Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 60,000 BTUH Rev. 1.3 HVAC Guide Specifications Chilled and Hot Water Universal Mount Fan Coil 2-Pipe Nominal Size: 60,000

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 6/15/16 Updated division section from 16124 to 2605 - mgl44 13, removed references to other section 10/17/14

More information

SECTION VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220550 - VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. It is the intent of this specification to provide vibration isolation supports for Plumbing

More information

SECTION SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM

SECTION SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM SECTION 13 1100 SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM This section includes editing notes to assist the user in editing the section to suit project requirements. These notes are included as

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

Section BUILDINGS, SHELTERS, ENCLOSURES

Section BUILDINGS, SHELTERS, ENCLOSURES Section 13121 BUILDINGS, SHELTERS, ENCLOSURES Part 1 GENERAL 1.1 SECTION INCLUDES 1.2 A. Pre-engineered buildings. B. Pre-engineered shelters. C. Pre-engineered enclosures. D. Electrical wiring and devices

More information

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March

More information

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS SECTION 270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Communications equipment coordination and installation. 2. Sleeves for pathways and cables. 3. Raceway

More information

PRODUCT SPECIFICATIONS

PRODUCT SPECIFICATIONS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: High density cast resin architectural products, including columns, panels, caps, bases, trim elements and balustrade systems. Specifier Note: Article below

More information

American Legion Park City Pool Glasgow Ky. REPAIR SPECIFICATIONS SECTION I

American Legion Park City Pool Glasgow Ky. REPAIR SPECIFICATIONS SECTION I American Legion Park City Pool Glasgow Ky. REPAIR SPECIFICATIONS SECTION I A. DESCRIPTION OF WORK INCLUDED PIPING UPDATE INCLUDED ITEMS: Shop fabricate custom perimeter cover plates. Shop fabricate inlet

More information

SECTION INSULATED WIRE AND CABLE

SECTION INSULATED WIRE AND CABLE SECTION 16120 INSULATED WIRE AND CABLE PART 1 GENERAL 1.01 DESCRIPTION A. This section covers the contract item Insulated Wire and Cable, which includes the following items with accessories, and appurtenances:

More information

CSI GUIDE Countertops

CSI GUIDE Countertops CSI GUIDE Countertops Part 1 General 1.0 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including general and supplementary conditions and Division 1 Specification Sections, apply

More information

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT SECTION 11322 MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT PART 1 GENERAL 1.01 SCOPE There shall be furnished ( ) Grit Separator Mechanism(s) suitable for installation in (a) concrete tank(s) -ft.

More information

SECTION FIBERGLASS REINFORCED POLYMER (FRP) PANELS

SECTION FIBERGLASS REINFORCED POLYMER (FRP) PANELS SECTION 07 44 50 FIBERGLASS REINFORCED POLYMER (FRP) PANELS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Design, Engineering, manufacturing and erection of fiberglass reinforced panels. Delegated Design of

More information

A. Submit the following in addition to the standard requirements.

A. Submit the following in addition to the standard requirements. SECTION [13120] OMNIFLEX 300 MODULAR WALL SYSTEM SECTION 1 GENERAL 1.01 SECTION INCLUDES A. This Section specifies all requirements necessary to furnish and install a complete modular wall system including,

More information

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 [08 33 13] COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Metal Counter

More information

SECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following:

SECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following: SECTION 10501 PERSONNEL DUTY LOCKERS PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 specifications

More information

A. Pipe Supports: ANSI B 31.1, Power Piping. B. Automatic Sprinkler Pipe Supports: Refer to Section

A. Pipe Supports: ANSI B 31.1, Power Piping. B. Automatic Sprinkler Pipe Supports: Refer to Section SECTION 15140 SUPPORTS, ANCHORS, AND SEALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract including General and Supplementary Conditions, Division 1 Specification

More information

DIVISION 13 - SPECIAL CONSTRUCTION SECTION ACOUSTICAL PANEL ENCLOSURE

DIVISION 13 - SPECIAL CONSTRUCTION SECTION ACOUSTICAL PANEL ENCLOSURE DIVISION 13 - SPECIAL CONSTRUCTION SECTION 13080 - ACOUSTICAL PANEL ENCLOSURE 1 GENERAL 1.01 SUMMARY A. ACOUSTIC ENCLOSURE CONSISTING OF WALLS, CEILING, STRUCTURAL FRAMING, CONNECTING MEMBERS, DOORS, WINDOWS,

More information

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification. SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,

More information

Large University Central Chiller Plant Design Considerations

Large University Central Chiller Plant Design Considerations Carrier Engineering Newsletter Volume 5, Issue 3 Large University Central Chiller Plant Design Considerations Large campus chilled water plants have unique constraints and need careful evaluation for successful

More information

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

B. Provide liquid-filled secondary substation transformers as indicated on drawings. SECTION 26 12 13 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 26 05 00. B. Provide liquid-filled secondary substation transformers as indicated on drawings. 1.02 RELATED

More information

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER Dyplast Products Copyright 2012 1 Rev 0112 DYPLAST PRODUCTS

More information

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction 1.00 DESCRIPTION 1.01 WORK INCLUDED: This work shall include the furnishing of all labor, equipment and materials necessary

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

HYDRAULIC DOCK LEVELER OWNERS MANUAL

HYDRAULIC DOCK LEVELER OWNERS MANUAL HYDRAULIC DOCK LEVELER OWNERS MANUAL 1 HYDRAULIC DOCK LEVELER OWNERS MANUAL 2 TABLE OF CONTENTS Table Of Contents.. Page 2 Koke Hydraulic Leveler Model Information... Page 3 Hydraulic Dock Leveler Installation

More information

DIVISION 1100 TRAFFIC

DIVISION 1100 TRAFFIC SECTION 1102 STREET LIGHTING GENERAL INFORMATION The Idaho State Electrical Board has determined that all street lights are to be provided with an external fuse disconnect, in a junction box between the

More information

2000 POCKET DOOR TECHNICAL DATA

2000 POCKET DOOR TECHNICAL DATA 2000 POCKET DOOR TECHNICAL DATA KWIK-WALL... One Source for Wall Systems. KWIK-WALL s s for the 2000 Series - Steel Panel operable wall systems answer the challenge for space division needs posed by multi-purpose

More information

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific

More information

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein. SECTION 10530 - EXTRUDED ALUMINUM WALKWAY COVERS PART I - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division

More information

INSTALLATION INSTRUCTIONS CMP SERIES

INSTALLATION INSTRUCTIONS CMP SERIES INSTALLATION INSTRUCTIONS CMP 25677 SERIES 1. PRODUCT OVERVIEW Thank you for choosing our 25677 Series Brilliant Wonders LED Waterfall. This lighted waterfall will add a unique ambiance to your pool or

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

15 kv EPR Insulated, Jacketed, URD Cable

15 kv EPR Insulated, Jacketed, URD Cable 15 kv EPR Insulated, Jacketed, URD Cable 1000 kcm Copper Conductor with Tape Shield Page 1 of 11 Table Of Contents 1 GENERAL... 3 2 STANDARDS... 3 3 APPROVED CABLE MANUFACTURERS... 3 4 REEL SPECIFICATIONS...

More information

SECTION ALUMINUM WINDOWS

SECTION ALUMINUM WINDOWS SECTION 08520 ALUMINUM WINDOWS PART 1 - GENERAL 1.01 SUMMARY A. Section includes: 1. Storefront systems and aluminum framed glass doors. 2. Hardware, fasteners, accessories, filler pieces, etc., required

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and

More information

Signature Series 5 Lap SECTION ALUMINUM WINDOWS

Signature Series 5 Lap SECTION ALUMINUM WINDOWS Signature Series 5 Lap SECTION 08 51 13 ALUMINUM WINDOWS PART 1 GENERAL 1.01 SUMMARY A. Related Documents: Conditions of the Contract, Division 1 - General Requirements, and Drawings apply to Work of this

More information

Pioneer Forced Draft Cooling Tower Specifications

Pioneer Forced Draft Cooling Tower Specifications Delta Cooling Towers, Inc. 41 Pine Street P.O. Box 315 Rockaway, New Jersey 07866-0315 Telephone 973.586.2201 Fax 973.586.2243 www.deltacooling.com sales@deltacooling.com Pioneer Forced Draft Cooling Tower

More information

Effective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O.

Effective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O. Siemens, Model # SUAS877-PG (or Landis & Gyr # UAS877-PG) Eaton-Durham Model # UTRS223ACH Milbank Midwest Model # U980-O UTRS223AMEP These are some examples of the single meter sockets we require for underground

More information

WALL MOUNTED ARTICULATING JIB CRANE

WALL MOUNTED ARTICULATING JIB CRANE SECTION 14656 WALL MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and

More information

Standard of Practice - Campus Electrical Distribution System

Standard of Practice - Campus Electrical Distribution System A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all

More information

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM ARCHITECTURAL SPECIFICATIONS MANUFACTURER: InterBlock LLC PO Box 1123, Sheboygan, WI 53082 Phone Number 920-207-7234 SECTION 03100 STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM PART 1 GENERAL 1.01 Summary

More information

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract including general and supplementary conditions and specifications section apply to this section. B. Related Sections:

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS SECTION 11000 MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. This section contains general information required to install mechanical equipment as shown on the plans and

More information

DBI-SALA Uni 8 Overhead Horizontal Lifeline Cable System SECTION HORIZONTAL FALL PROTECTION - OVERHEAD CABLE

DBI-SALA Uni 8 Overhead Horizontal Lifeline Cable System SECTION HORIZONTAL FALL PROTECTION - OVERHEAD CABLE SECTION 112429.18 - HORIZONTAL FALL PROTECTION - OVERHEAD CABLE PART 1 - GENERAL 1.1 SECTION INCLUDES A. Provide overhead horizontal cable fall protection system, including end anchors, energy absorbers,

More information

medixx Series Installation Guidelines medixx 50 medixx 60 medixx 70 Suitable for the following Siemens MRI Systems, or similar models:

medixx Series Installation Guidelines medixx 50 medixx 60 medixx 70 Suitable for the following Siemens MRI Systems, or similar models: medixx Series Installation Guidelines Suitable for the following Siemens MRI Systems, or similar models: medixx 50: Symphony / Harmony Quantum and Aera (XJ gradient) medixx 60: Avanto, Espree, TaTs, Vero,

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES... DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements

More information

ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT

ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT Specification for Acoustical Insulation (Lagging) for Piping and Equipment 1 of 5 TABLE OF CONTENTS 1.0SCOPE..... 3 2.0REFERENCED PUBLICATIONS...

More information

HVAC INSULATION. A. General Requirements for Flexible Elastomeric Insulation: 3. Use pre-molded roll on pipe sizes 3.5" and below.

HVAC INSULATION. A. General Requirements for Flexible Elastomeric Insulation: 3. Use pre-molded roll on pipe sizes 3.5 and below. 230700 HVAC INSULATION PART 1: GENERAL 1.01 RELATED SECTIONS A. Section 232300 Refrigeration B. Section 233100 Air Distribution 1.02 INSULATION A. General Requirements for Flexible Insulation: 1. Use is

More information

SECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS

SECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED BI-FOLD GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

300828TWP INSTALLATION INSTRUCTIONS MODEL SUBMERSIBLE SUMP PUMP

300828TWP INSTALLATION INSTRUCTIONS MODEL SUBMERSIBLE SUMP PUMP www.burcam.com 2190 Dagenais Blvd. West TEL : 514.337.4415 LAVAL (QUEBEC) FAX : 514.337.4029 CANADA H7L 5X9 info@burcam.com Your pump has been carefully packaged at the factory to prevent damage during

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE Magnetic Shielding

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE Magnetic Shielding SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE Magnetic Shielding Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 MAGNETIC SHIELDING PART 1 GENERAL 1.1 GENERAL

More information

SECTION ALUMINUM GATES

SECTION ALUMINUM GATES P.O. Box 1058 370 South Athol Rd. Athol, Massachusetts 01331 Phone: (978) 249-7924 Fax: (978) 249-3072 SECTION ALUMINUM GATES PART 1 GENERAL 1.01 SCOPE OF WORK A. The CONTRACTOR shall furnish all labor,

More information