1 ITB-CD-CME Bridge Rehabilitation ADDENDUM NO. 2 ISSUE DATE: September27, 2016 DUE DATE: October 27, 2:00pm SUBJECT: Questions & Answers INTENT: This addendum is issued prior to the date bids are due in order to incorporate the following clarifications, additions, omissions, deletions, or changes into the Contract Documents. Except as hereinafter specified, the work shall be in accordance with the drawings and specifications. Bidders are to use the changed quantities of the items listed in this addendum in their proposals, and it shall become a part of the Contract Documents when construction is executed. Bidders are reminded that this addendum must be noted on the Official City Acknowledgment Form when they submit their proposal. A signed copy of the addendum must also be included with the bid submittal. 1. Please Note: Attached is the allowance sheet, additional work sheet, inspection sheet, and the engineers estimate sheet. Acknowledgment: Signature and Date Printed Name and Title Company Name END OF ADDENDUM NO. 2 *Sixty-seven pages to follow. City of Palm Coast Project Manager ITB-CD-CME Bridge Rehabilitation

2 ALLOWANCES The following Allowances shall be included in the Lump Sum Base Bid. 1.1 ALLOWANCES A. Allowances: Include in the Contract, a stipulated sum/price of the following amounts indicated for use upon the City s instruction. 1. ALLOWANCE #1 Additional Landscaping (if needed, above and beyond the expected restoration of the disturbed construction areas): $5, ALLOWANCE #2 Bridge Repairs (see exhibits 1 through 3): $30, B. Contractor's costs for products, delivery, installation, labor, insurance, payroll, taxes, equipment rental, overhead and profit will be included in Change Orders authorizing expenditure of funds from this allowance. The cost of the bond for the amount of Allowance shall be included as part of the lump sum base bid. C. Funds will be drawn from an Allowance only by Change Order. Contractor can proceed with Change Order Work against Allowance with direction from the Contract Administrator. The Contractor shall not proceed with any work that will exceed the amount of Allowance remaining. Submit proposals for purchase of products or systems included in allowances, in the form specified for Change Orders. D. Submit invoices or delivery slips to show the actual quantities of materials delivered to the Site for use in the fulfillment of each allowance. E. Credits can only be added to an Allowance by Change Order. The Contractor may not use a credit until a Change Order is fully executed. F. Notwithstanding the Contractor s objection, the City may at any time reduce the funds remaining in the Allowance by Change Order. G. At Final Payment of the Contract, funds remaining in the Allowance will be credited to the City. *NOTE: THE LUMP SUM BASE BID SHALL INCLUDE ALLOWANCES BID FORM /16/16 ITB-CD-CME REHABILITATION

3 FLORIDA DEPATMENT OF TRANSPORTATION Bridge No: Inspection Date: 12/21/2015 BRIDGE LOCATION MAP West Elevation Palm Harbor Prkwy over Clubhouse WW 0.1 Mile North of Clubhouse Dr. PAGE 2 OF 14

4 FLORIDA DEPATMENT OF TRANSPORTATION Bridge No: Inspection Date: 12/21/2015 SKETCHES AND PHOTOS B-1 Photo 1: Element 301: Deteriorated joint over Bent 3 at left shoulder B-2 Photo 2: Element 301: Typical unsealed abutment joint PAGE 4 OF 14 EXHIBIT 1

5 FLORIDA DEPATMENT OF TRANSPORTATION Bridge No: Inspection Date: 12/21/2015 SKETCHES AND PHOTOS Photo 3: Element 109: Spall with exposed steel at diaphragm in Bay 1-1 at Bent 2 Photo 4: Element 109: Shallow spalls with exposed steel of Beam 1-4 at Abutment 1 cap PAGE 5 OF 14

6 FLORIDA DEPATMENT OF TRANSPORTATION Bridge No: Inspection Date: 12/21/2015 SKETCHES AND PHOTOS Photo 5: Element 580: East swing light conduit has broken clamps and corroded hardware Photo 6: Element 215: Spall at Bay 3-4 on top of Abutment 4 Cap PAGE 6 OF 14

7 FLORIDA DEPATMENT OF TRANSPORTATION Bridge No: Inspection Date: 12/21/2015 SKETCHES AND PHOTOS Photo 7: Element 234: Delamination under Bay 1-4 south face of the Abutment 1 cap Photo 8: Element 394: Undermining of southwest slope protection PAGE 7 OF 14

8 FLORIDA DEPATMENT OF TRANSPORTATION Bridge No: Inspection Date: 12/21/2015 SKETCHES AND PHOTOS F-2 Photo 9: Element 394: Deteriorated joint sealant in northeast slope protection F-3 Photo 10: Element 394: Abutment 1 slope pavement/bulkhead joint packed with dirt and debris PAGE 8 OF 14 EXHIBIT 1

9 FLORIDA DEPATMENT OF TRANSPORTATION Bridge No: Inspection Date: 12/21/2015 SKETCHES AND PHOTOS Photo 11: Element 321: Spalling in the northeast approach sidewalk Photo 12: Inspection Notes: Typical graffiti under Abutment 4 PAGE 9 OF 14

10 FLORIDA DEPATMENT OF TRANSPORTATION Bridge No: Inspection Date: 12/21/2015 SKETCHES AND PHOTOS Photo 13: Inspection Notes: No pedestrian rail at the northwest approach guardrail Photo 14: Inspection Notes: Cracked pipe coupling at northwest corner of bridge PAGE 10 OF 14

11 FLORIDA DEPATMENT OF TRANSPORTATION Bridge No: Inspection Date: 12/21/ P/S Conc Open Girder Repair spall in lower south edge Diaphragm 1-2 at Bent 2. Repair spalls in bottom face of Beam 1-4 at abutment Pourable Joint Seal Install pourable sealant in both abutment expansion joints. Repair sealant in left shoulder over Bent 3. RECOMMENDED CORRECTIVE ACTION 580 Navigational Lights Remove corrosion on the brackets and anchor bolts for both swing navigational lights and apply a protective coating. Replace broken conduit clamps on east swing light conduit. 215 R/Conc Abutment Repair spalling delaminations with exposed steel up to 20in. x 20in. x 1in. at Abutment 1 Bays 1-3 and 1-4 and Abutment 4 in Bay R/Conc Cap Repair delamination in south face of Bent 2 cap under Bay R/Conc Abut Slope Pr Repair undermining at slope pavement/bulkhead cap transition southwest, northwest and northeast slope. Repair undermining top of southwest slope. Repair crack in northeast slope. Clean and seal slope joints at slope pavement/bulkhead cap transition. 321 R/Conc Approach Slab Remove unsound concrete in the southeast and northeast approach sidewalks along the construction joint beneath the aluminum rails and install a flexible sealant. Non-Structural Item: Graffiti Remove graffiti from Beams 3-2, 3-3, 3-4, Abutment 4 cap and backwall. Guardrail Install pedestrian rail at northwest approach guardrail. Utilities Repair broken conduit coupling at northwest corner. PAGE 11 OF 14

12 Bridge No: Inspection Date: 01/28/2016 BRIDGE LOCATION MAP North Elevation Palm Harbor Pkwy over College Waterway 0.1 mile East of FL Park Dr PAGE 2 OF 12

13 Bridge No: Inspection Date: 01/28/2016 SKETCHES AND PHOTOS Photo 1: Element 204: Pile 3-2 typical crack with corrosion bleedout. Photo 2: Element 204: Pile 2-6 typical delamination with corrosion bleedout. PAGE 5 OF 12

14 Bridge No: Inspection Date: 01/28/2016 SKETCHES AND PHOTOS Photo 3: Element 204: Spall / delamination with exposed steel at Bent 3 strut north end. Photo 4: Element 215: Palm tree growing at the north end of Abutment 1. PAGE 6 OF 12

15 Bridge No: Inspection Date: 01/28/2016 SKETCHES AND PHOTOS Photo 5: Element 215: Delamination at Abutment 4 cap between Beams 3-2 and 3-3. Photo 6: Element 394: Undermining south end of Abutment 1 slope protection. PAGE 7 OF 12

16 Bridge No: Inspection Date: 01/28/2016 SKETCHES AND PHOTOS Photo 7: Inspection Notes: Graffiti on Abutment 1. Photo 8: Inspection Notes: Depression at the southwest approach guardrail second post from the end. PAGE 8 OF 12

17 Bridge No: Inspection Date: 01/28/2016 RECOMMENDED CORRECTIVE ACTION Element 204 P/S Conc Column Repair spalls and delamination s on the following Piles 2-1, 2-2, 2-4, 2-5, 2-6, 2-7, 3-2, 3-3, 3-4, 3-5, 3-6 and 3-7. Remove unsound concrete and repair any spalls and delaminations at the strut undersides in Bents 2 and 3. Element 215 R/Conc Abutment Remove the palm tree growing at the north end of Abutment 1 cap. Repair the delamination at Abutment 4 cap between Beams 4-2 and 4-3. Element 394 Blhd Sewl Any Mater Repair the undermining on south end of Abutment 1 slope protection, adjacent to the bulkhead cap. Non-Structural Items: Approach Slopes/Shoulders Repair the depressions in the southwest and southeast approach guardrail mowing strips. Graffiti Remove / paint over graffiti at Abutment 1 and 4 slope paving, cap and beams. PAGE 9 OF 12

18 Bridge No: Inspection Date: 01/28/2016 ADDITIONAL ELEMENT INSPECTION NOTES PIL LOCATION DEFICIENCY SIZE PHOTO E 2-1 SE Corner Delamination with corrosion 30in. x 8in. bleedout South and East Delamination with corrosion in. x 22in. Faces bleedout Delamination with corrosion 2-2 SW Corner 24in. 3in. NEW. bleedout 2-4 East Face and East Half of North Face 2-5 SW Corner at Strut 2-6 SE Corner at Strut SE and NE Corner at Strut SE Corner 6in. below Strut NW Corner 12in below Strut SW Corner 6in. below Strut NW Corner below Strut SE Corner 6in. below Strut SW Corner 6in. below Strut All faces 10in. below Strut SE Corner 13in. below Strut Delamination with corrosion bleedout Delamination with corrosion bleedout Delamination with corrosion bleedout Delamination with corrosion bleedout Delamination with corrosion bleedout Delamination with corrosion bleedout Delamination with corrosion bleedout Delamination with corrosion bleedout Delamination with corrosion bleedout Delamination with corrosion bleedout 31in. x 20in. 30in. x 8in. REPAI R YES YES YES YES YES 38in. x 12in. YES YES 22in. x 6in. YES 20in. x 7in. YES YES 26in. x 7in. 20in. x 8in. 30in. x 8in. 22in. x 9in. 22in. x 9in. YES YES YES YES YES Vertical Crack 16in. x.03in. wide YES Delamination with corrosion bleedout 20in. x 6in. 3-7 North Face Corrosion bleedout NOT FOUND YES PAGE 3 OF 12

19 Bridge No: Inspection Date: 01/28/2016 BRIDGE LOCATION MAP South Elevation Colechester Lane over College Waterway 0.4 mile E of Palm Hbr Pkwy PAGE 2 OF 8

20 Bridge No: Inspection Date: 01/28/2016 SKETCHES AND PHOTOS Photo 1: Element 99: Slab Unit 5-2 spall with exposed rebar. PAGE 4 OF 8

21 Bridge No: Inspection Date: 01/28/2016 RECOMMENDED CORRECTIVE ACTION Element 99 P/S Conc Slab Repair spalls with exposed rebar on the undersides of Slab Units 1-1, 2-8 and 5-2. PAGE 5 OF 8

22 Inspection/CID Report BRIDGE ID: DISTRICT: 05 Deland PAGE: 1 OF 27 INSPECTION DATE: 1/28/2016 SIVG BY: Ayres Associates STRUCTURE NAME: Colorado Dr / College Waterway OWNER: 4 City/Municipal Hwy Agy YEAR BUILT: 1974 MAINTAINED BY: 4 City/Municipal Hwy Agy SECTION NO.: STRUCTURE TYPE: 5 Prestressed Concrete - 01 Slab MP: 0.01 LOCATION: 0.2 Mi E of Palm Hrbr Pky ROUTE: SERVICE TYPE ON: SERV TYPE UND: 5 Highway-pedestrian 5 Waterway FACILITY CARRIED: FEATURE INTERSECTED: Colorado Drive College Waterway FUNCTIONALLY OBSOLETE STRUCTURALLY DEFICIENT TYPE OF INSPECTION: Regular NBI DATE FIELD INSPECTION WAS PERFORMED: ABOVE WATER: 01/28/2016 UNDERWATER: 1/29/2016 SUFFICIENCY RATING: 95.0 HEALTH INDEX: This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied. REPORT ID: INSP005 (condensed) PRINTED: 03/18/2016

23

24 Inspection/CID Report BRIDGE ID: DISTRICT: 05 Deland All Elements PAGE: 3 OF 27 INSPECTION DATE: 1/28/2016 SIVG UNIT: 0 DECKS ELEMENT/ENV: 99/4 PS Conc Slab 6223 sf. ELEM CATEGORY: Decks/Slabs CONDITION STATE (5) DESCRIPTION QUANTITY 2 Repaired areas and/or potholes or impending potholes 6223 sf. and/or raveling or rutting exist. Their combined area is more than 2% but less than 10% of the total deck area. ELEMENT INSPECTION NOTES: Note: There are utilities on both sidewalks along both sides of the bridge. CS2 = The asphalt overlay has several deck width x up to 1/32in. wide cracks over the expansion joints, there are longitudinal cracks up to 1/64in. wide over the slab unit joints in the eastbound lane. Both sidewalks have transverse cracks up to 1/8in. wide along the intermediate bent expansion joints outlining delaminations up to 8in. x sidewalk width. Refer to Photo 1. REPAIR Refer to Table 1 in the addendum for a list of deck underside deficiencies and Photo 2. REPAIR Noted This Inspection: CS2 = There is a 28in. x 10in. x 1 1/2in. spall with exposed steel on the underside of the closure pour in Span 2. Refer to Photo 3. REPAIR The right sidewalk along Bent 4 expansion joint has a spall 15in. x 4in. x 2 1/2in. with no exposed steel. At the base of right rail Post 3-5 there is a spall 22in x 6in. x 1in. with exposed steel. ELEMENT/ENV: 301/4 Pourable Joint Seal 169 lf. ELEM CATEGORY: Joints CONDITION STATE (3) DESCRIPTION QUANTITY 2 Minor adhesion and/or cohesion failures may be present. 143 lf. Signs of seepage along the joint may be present. Joint may be slightly impacted with debris. Minor spalls in the deck and/or headers may be present adjacent to the joint. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied. REPORT ID: INSP005 (condensed) PRINTED: 03/18/2016

25 Inspection/CID Report BRIDGE ID: DISTRICT: 05 Deland All Elements PAGE: 4 OF 27 INSPECTION DATE: 1/28/2016 SIVG UNIT: 0 DECKS ELEMENT/ENV: 301/4 Pourable Joint Seal 169 lf. ELEM CATEGORY: Joints CONDITION STATE (3) DESCRIPTION QUANTITY 3 Major adhesion and/or cohesion failures may be present. 26 lf. Signs or observance of leakage along the joint may be present. Joint may be heavily impacted with debris and/or stones. Major spalls may be present in the deck and/or header adjacent to the joint. ELEMENT INSPECTION NOTES: Note: The expansion joints are not visible due to an overlay of asphalt. CS3 = The joints are not sealed in the sidewalks. Refer to Photo 4. REPAIR CS2 = Water staining on the intermediate bent caps indicate that the expansion joints are leaking. ELEMENT/ENV: 330/4 Metal Rail Uncoated 322 lf. ELEM CATEGORY: Railing CONDITION STATE (4) DESCRIPTION QUANTITY 1 There is no evidence of active corrosion of the uncoated 314 lf. metal. 2 Surface corrosion has formed or is forming on the 8lf. uncoated metal. ELEMENT INSPECTION NOTES: CS1 = Right rail Posts 1-1 and 1-2 have vertical splits up to 1/8in. wide x 8-1/2in. long near the base plates. Refer to Photo 5. REPAIR Noted This Inspection: CS2 = Left rail Posts 1-6, 2-1, 4-1, 4-4, 5-1 and right rail Posts 3-1, 3-2 and 4-4 have moderate surface corrosion at the bases. CS1 = Several rail posts are missing hardware at the connection plate. (However the rails are secure). This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied. REPORT ID: INSP005 (condensed) PRINTED: 03/18/2016

26 Inspection/CID Report BRIDGE ID: DISTRICT: 05 Deland All Elements PAGE: 5 OF 27 INSPECTION DATE: 1/28/2016 SIVG UNIT: 0 DECKS ELEMENT/ENV: 331/4 Conc Bridge Railing 322 lf. ELEM CATEGORY: Railing CONDITION STATE (4) DESCRIPTION QUANTITY 1 The element shows little or no deterioration. There may 280 lf. be discoloration, efflorescence, and/or superficial cracking but without effect on strength and/or serviceability. 2 Minor cracks, surface scaling or spalls may be present but 30 lf. there is no exposed reinforcing or surface evidence of rebar corrosion. 3 Some delaminations and/or spalls may be present and 12 lf. some reinforcing may be exposed. Corrosion of rebar may be present but loss of section is incidental and does not significantly affect the strength and/or serviceability of either the element or the bridge. ELEMENT INSPECTION NOTES: CS2 and CS3 = The parapets have surface spalls up to 9in. x 4in. x 1/2in., some with exposed corroded rebar. Refer to Photo 6. REPAIR CS1 = The parapets have full width and full height, up to 1/32in. wide transverse and vertical cracks and full width and full height, up to 1/8in. wide vertical cracks at the joint over the bents. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied. REPORT ID: INSP005 (condensed) PRINTED: 03/18/2016

27 Inspection/CID Report BRIDGE ID: DISTRICT: 05 Deland All Elements PAGE: 6 OF 27 INSPECTION DATE: 1/28/2016 SIVG UNIT: 0 SUBSTRUCTURE ELEMENT/ENV: 204/4 P/S Conc Column 20 ea. ELEM CATEGORY: Substructure CONDITION STATE (4) DESCRIPTION QUANTITY 1 The element shows little or no deterioration. There may 12 ea. be discoloration, efflorescence, and/or superficial cracking but without affect on strength and/or serviceability. 2 Minor cracks, spalls and scaling may be present and there 7 ea. may be exposed reinforcing with no evidence of corrosion. There is no exposure of the prestress system. 3 Moderate cracks, spalls, scaling and some delaminations 1 ea. may be present. There may be minor exposure but no deterioration of the prestress system. Corrosion of non-prestressed reinforcement may be present but loss of section is incidental and does not significantly affect the strength and/or serviceability of either the element or the bridge. ELEMENT INSPECTION NOTES: CS3 = The underwater inspectors noted the following: Pile 3-2, southeast corner at the top of the marine growth, delamination 4ft. H x 7in. W. CS2 = The piles have small construction related surface spalls. CS1 = At several piles, the ends of the cut and patched pickup points are visible. The northeast corner of Pile 2-1 has a 12in. long x 1/64in. wide vertical crack with efflorescence, adjacent to west bulkhead. ELEMENT/ENV: 215/4 R/Conc Abutment 84 lf. ELEM CATEGORY: Substructure CONDITION STATE (4) DESCRIPTION QUANTITY 1 The element shows little or no deterioration. There may 82 lf. be discoloration, efflorescence, and/or superficial cracking but without affect on strength and/or serviceability. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied. REPORT ID: INSP005 (condensed) PRINTED: 03/18/2016

28 Inspection/CID Report BRIDGE ID: DISTRICT: 05 Deland All Elements PAGE: 7 OF 27 INSPECTION DATE: 1/28/2016 SIVG UNIT: 0 SUBSTRUCTURE ELEMENT/ENV: 215/4 R/Conc Abutment 84 lf. ELEM CATEGORY: Substructure CONDITION STATE (4) DESCRIPTION QUANTITY 3 Some delaminations, moderate cracks, spalls and/or 2lf. scaling may be present and some reinforcing may be exposed. Corrosion of rebar may be present but loss of section is incidental and does not significantly affect the strength and/or serviceability of either the element or the bridge. ELEMENT INSPECTION NOTES: CS3 = At the south end of Abutment 1 cap, there are several delaminated patches up to 4in. diameter x 1in. deep with exposed corroded rebar ends. Refer to Photo 7. REPAIR Abutment 6 cap has a 4in. diameter x 1/2in. deep spall (popout) exposing a rebar end at the south end. REPAIR CS1 = The inboard faces of the abutment caps typically have water and mildew staining. At the south end of Abutment 1, there is a 12in. section of protruding rebar which is a tripping concern. Refer to Photo 8. REPAIR ELEMENT/ENV: 234/4 R/Conc Cap 162 lf. ELEM CATEGORY: Substructure CONDITION STATE (4) DESCRIPTION QUANTITY 1 The element shows little or no deterioration. There may 157 lf. be discoloration, efflorescence, and/or superficial cracking but without affect on strength and/or serviceability. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied. REPORT ID: INSP005 (condensed) PRINTED: 03/18/2016

29 Inspection/CID Report BRIDGE ID: DISTRICT: 05 Deland All Elements PAGE: 8 OF 27 INSPECTION DATE: 1/28/2016 SIVG UNIT: 0 SUBSTRUCTURE ELEMENT/ENV: 234/4 R/Conc Cap 162 lf. ELEM CATEGORY: Substructure CONDITION STATE (4) DESCRIPTION QUANTITY 3 Some delaminations, moderate cracks, spalls and/or 5lf. scaling may be present and some reinforcing may be exposed. Corrosion of rebar may be present but loss of section is incidental and does not significantly affect the strength and/or serviceability of either the element or the bridge. ELEMENT INSPECTION NOTES: CS3 = Refer to Table 2 in the addendum for a list of cap deficiencies and Photo 9. REPAIR CS1 = The vertical faces of the intermediate bent caps have efflorescence, water and mildew staining. The underside of the bent caps have exposed rebar ends adjacent to several piles, due to insufficient concrete cover. ELEMENT/ENV: 390/4 Other Fender/Dolphin 110 lf. ELEM CATEGORY: Substructure CONDITION STATE (4) DESCRIPTION QUANTITY 1 There is little or no deterioration. Surface defects only are 90 lf. in evidence. Random open joints may exist. 2 There may be minor deterioration, random open joints, 20 lf. cracking and weathering. Mortar in joints may show minor deterioration. ELEMENT INSPECTION NOTES: Note: This element represents the plastic type pile fender system. CS2 = The coating on the top two wales of the east fender is beginning to split along the center of the wales. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied. REPORT ID: INSP005 (condensed) PRINTED: 03/18/2016

30 Inspection/CID Report BRIDGE ID: DISTRICT: 05 Deland All Elements PAGE: 9 OF 27 INSPECTION DATE: 1/28/2016 SIVG UNIT: 0 SUBSTRUCTURE ELEMENT/ENV: 393/4 Blkhd Sewl Any Mater 240 ft ELEM CATEGORY: Substructure CONDITION STATE (4) DESCRIPTION QUANTITY 2 There may be minor deterioration, random open joints, 205 ft cracking and weathering. Mortar in joints may show minor deterioration. 3 Moderate to major deterioration and cracking. Major 35 ft deterioration of joints. Minor settlement may be present. ELEMENT INSPECTION NOTES: Note: This element represents the bulkheads constructed of concrete sheet piles and composite sheet piles with concrete caps. CS3 = The west bulkhead has a broken composite panel at the south side of Pile 2-5, the cap above the hole has an 11in. x 4in. x 2in. spall with no exposed steel. Refer to Photo 10. REPAIR There are composite panels (4 ea) at the north side of Pile 5-1 and south side of Pile 5-5. These panels have holes up to 11in. diameter and heavy backfill loss. Refer to Photo 11. REPAIR The cap for the east bulkhead, 8ft. south of Pile 5-5, has a 20ft. long area of delamination and spalling with exposed corroded steel, similar at northeast area north of Pile 5-1. Refer to Photo 12. REPAIR CS2 = The joints between the sheet pile bulkheads are open, up to 1-1/2in. wide, allowing minor fill migration. The bulkhead caps typically have full height x full width, 1/64in. to 1/16in. wide vertical and horizontal cracks. ELEMENT/ENV: 394/4 R/Conc Abut Slope Pr 4600 sf. ELEM CATEGORY: Substructure CONDITION STATE (4) DESCRIPTION QUANTITY 3 Some delaminations and/or spalls and/or minor settlement 3000 sf. may be present and some reinforcing may be exposed. Corrosion of rebar may be present but loss of section is incidental and does not significantly affect the strength and/or serviceability of either the element or the bridge. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied. REPORT ID: INSP005 (condensed) PRINTED: 03/18/2016

31 Inspection/CID Report BRIDGE ID: DISTRICT: 05 Deland All Elements PAGE: 10 OF 27 INSPECTION DATE: 1/28/2016 SIVG UNIT: 0 SUBSTRUCTURE ELEMENT/ENV: 394/4 R/Conc Abut Slope Pr 4600 sf. ELEM CATEGORY: Substructure CONDITION STATE (4) DESCRIPTION QUANTITY 4 Advanced deterioration. Corrosion of reinforcement and/or 1600 sf. loss of concrete section and/or settlement is sufficient to warrant review to ascertain the impact on the strength and/or serviceability of either the element or the bridge. ELEMENT INSPECTION NOTES: CS4 = One slope panel near the top of the east slope beneath the south edge of the bridge is heavily undermined and settled up to 24in. This appears due to loss of fill through the seawall panels. Refer to Photo 13. REPAIR. The loss of fill is also due to storm water infiltration beneath the slope pavement along the heel of the slope paving and at the abutment cap interface. Refer to Photo 14. REPAIR The flat slope paving sections behind the seawall along the south end of Bent 5 has widespread undermining and two collapsed panels. Refer to Photo 15. REPAIR CS3 = Many of the slope panels have signs of settlement and failure of the panel joint sealants, vegetation is growing from some of these joints. Refer to Photo 16. REPAIR This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied. REPORT ID: INSP005 (condensed) PRINTED: 03/18/2016

32 Inspection/CID Report BRIDGE ID: DISTRICT: 05 Deland All Elements PAGE: 11 OF 27 INSPECTION DATE: 1/28/2016 SIVG UNIT: 0 CHANNEL ELEMENT/ENV: 290/4 Channel 1 ea. ELEM CATEGORY: Channel CONDITION STATE (4) DESCRIPTION QUANTITY 3 Bank protection may be being eroded, bank protection 1 ea. may be undermined, river control devices may have severe damage or trees, brush or debris may be restricting the channel. ELEMENT INSPECTION NOTES: CS3 = The west and east slope protection and bulkheads have washouts and undermining due to holes in the seawall panels. Refer to Elements 393 Bulkheads and 394 Slope Protection for comments, photos, and repair recommendations. Structure Notes BRIDGE OWNER: CITY OF PALM COAST Bridge inventoried from west to east. TRAFFIC RESTRICTIONS: Based on the current load rating analysis dated 02/15/13, the structure does not require posting. The structure is not posted. This structure is on a 12 month inspection frequency due to SIA Item 61 Channel being rated 4. Asphalt thickness = 3in. As stated in section 3.4 of the Bridge and Other Structures Inspection and Reporting as of 11/24/2009 superstructure unit numbering (Section ) and substructure unit numbering (Section 3.4.3) are designated NOT BY ORDER IN WHICH THE ELEMENTS WERE CONSTRUCTED AND PUT INTO SERVICE. Plans sheet or drawing in Topic G, Bridge Description and Drawings section of the bridge folder can confirm all references to these elements prior to this date. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied. REPORT ID: INSP005 (condensed) PRINTED: 03/18/2016

33 Inspection/CID Report BRIDGE ID: DISTRICT: 05 Deland PAGE: 12 OF 27 INSPECTION DATE: 1/28/2016 SIVG INSPECTION NOTES: SIVG 1/28/2016 Sufficiency Rating Calculation Accepted by KNAAAJI-P at :01:34 LOAD RATING EVALUATION: This inspection noted no changes in the structure condition that would warrant a new load rating. The load rating dated 02/15/13 appears to still apply. The lead underwater inspector for the current routine inspection is Jonathan Ivey (CBI #00540). The following underwater element were inspected: 204 P/S Concrete Piling / Columns- Bents 2 through 5 each with 5 18in. concrete piling. 290 Channel 390 Fender System - Composite 393 Bulkhead INSPECTION NOTES: Non-Structural Items: Approach Parapets: The southwest approach parapet is fractured at Abutment 1. Refer to Photo 17. REPAIR Approach Shoulders: The earthen approach shoulders at the SE and SW corners of the structure are 4in. to 6in. lower than the sidewalks. There are no approach sidewalks. Guardrails: The NW and SE guardrails have panels that are lapped incorrectly. REPAIR There is a palm tree overgrowing the SW guardrail approximately 12ft. from bridge. The NE guardrail end terminal has minor impact damage The SW and NE guardrail transitions are lapped incorrectly. Refer to Photo 18. REPAIR Approach guardrail posts and cushion blocks typically have moderate weathering. Noted This Inspection: The northeast guardrail is attached with one bolt. Refer to Photo 18. REPAIR The reflective coating on the northwest guardrail end treatment is missing. Reflectors: No object markers are provided at all four corners of the bridge; however, reflectors are provided on the guardrail end terminals. Utilities: The bolts for the left utility cover have moderate to heavy corrosion. Several bolts have 100% section loss. Refer to Photo 19. REPAIR Several nuts are missing from the utility cover along the right and left sides of the structure. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied. REPORT ID: INSP005 (condensed) PRINTED: 03/18/2016

34 Inspection/CID Report REPORT ID: INVT001A COMPREHENSIVE Page 13 of 27 Structure ID: DATE PRINTED: 03/18/2016 Description Structure Unit Identification Bridge/Unit Key: Structure Name: Description: Type: Colorado Dr / College Waterway MAIN SPAN 1 M Main Roadway Identification: NBI Structure No (8) Position/Prefix (5) Route On Structure Kind Hwy (Rte Prefix) 5 City Street Design Level of Service 1 Mainline Route Number/Suffix 00000/ 0 N/A (NBI) Feature Intersect (6) College Waterway Critical Facility Not Defense-crit Facility Carried (7) Colorado Drive Mile Point (11) 0.01 Latitude (16) 029d35'36.8" Roadway Traffic and Accidents Lanes (28) 2 Medians 0 Speed 30 mph ADT Class ADT Class 2 Recent ADT (29) 441 Year (30) 2015 Future ADT (114) 560 Year (115) 2035 Truck % ADT (109) 2 Detour Length (19) 2.0 mi Detour Speed 30 mph Accident Count -1 Rate -1 Long (17) 081d13'05.1" Roadway Classification Nat. Hwy Sys (104) 0 Not on NHS National base Net (12) Not on Base Network LRS Inventory Rte (13a) Functional Class (26) 19 Urban Local On Federal Aid System N Defense Hwy (100) 0 Not a STRAHNET hwy Direction of Traffic (102) 2 2-way traffic Emergency Sub Rte (13b) 00 Roadway Clearances Vertical (10) ft Appr. Road (32) 28.6 ft Horiz. (47) 28 ft Roadway (51) 28 ft Truck Network (110) 0 Not part of natl netwo Toll Facility (20) 3 On free road Fed. Lands Hwy (105) 0 N/A (NBI) School Bus Route Transit Route This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied.

35 Inspection/CID Report REPORT ID: INVT001A COMPREHENSIVE Page 14 of 27 Structure ID: DATE PRINTED: 03/18/2016 Structure Identification Admin Area Not located in area District (2) D5 - Deland County (3) (73)Flagler Place Code (4) Palm Coast Location (9) 0.2 Mi E of Palm Hrbr Pky Border Br St/Reg (98) Not Applicable (P) Share 0 % Border Struct No (99) FIPS State/Region (1) 12 Florida NBIS Bridge Len (112) Meets NBI Length Parallel Structure (101) No bridge exists Temp. Structure (103) Not Applicable (P) Appraisal Maint. Resp. (21) 4 City/Municipal Hwy Agy Owner (22) 4 City/Municipal Hwy Agy Historic Signif. (37) 5 Not eligible for NRHP Curb/Sidewalk (50): Bridge Median (33): Main Span Material (43A): Appr Span Material (44A): Main Span Design (43B): Appr Span Design (44B): Left Structure Appraisal Open/Posted/Closed (41) A Open, no restriction Region 4-Atlanta Geometrics Spans in Main Unit (45) 5 Approach Spans (46) 0 Structure Type and Material Deck Type and Material 0 No median 5 Prestressed Concrete Not Applicable 01 Slab Not Applicable Navigation Control (38) Permit Required Deck Geometry (68) 5 Above Tolerable Nav Vertical Clr (39) Underclearances (69) N Not applicable (NBI) Approach Alignment (72) 7-No Accel/Reduce Curve Min Vert Lift Clr (116) Bridge Railings (36a) 0 Substandard Transitions (36b) 0 Substandard Approach Guardrail (36c) 0 Substandard Approach Guardrail ends (36d) 0 Substandard Minimum Vertical Clearance Schedule Over Structure (53) 2.7 ft Right 2.7 ft Scour Critical (113) U Unknown Foundation ft Under (reference) (54a) N Feature not hwy or RR Current Inspection Inspection Date: 01/28/2016 Inspector: KNAAAJI-P - Jonathan Ivey Bridge Group: C9J75 Primary Type: Regular NBI Review Required: Deck Width (52): 38.7 ft Skew (34): Deck Type (107): Surface (108): Membrane: Deck Protection: Navigation Data 16.7 ft Nav Horizontal Clr (40) ft 0 ft 0 deg 2 Concrete Precast Panel 6 Bituminous 0 None None Pier Protection (111) 2 In-Place, Functioning Structural Eval (67) 7 Above Min Criteria Reference (55a) N Feature not hwy or RR Right Side (55b) 0 ft Under (54b) 0 ft Left Side (56) 0 ft Load Rating Design Load (31) 0 Unknown Rating Date 2/15/2013 Initials RLH Posting (70) 5 At/Above Legal Loads Length of Max Span (48) 40.1 ft Structure Length (49) ft Age and Service NBI Condition Rating Sufficiency Rating Health Index Operating Type (63) 3 LRFR Load & Res. Fact Operating rating (64) 43.6 tons Alternate -1 Inventory Type (65) 3 LRFR Load & Res. Fact Next Inspection Date Total Length ft Deck Area 6223 sqft Structure Flared (35) 0 No flare Year Built (27) 1974 Year Reconstructed (106) 0 Type of Service On (42a) 5 Highway-pedestrian Under (42b) 5 Waterway Fracture Critical Details Not Applicable Deficiency Not Deficient Minimum Lateral Underclearance Inventory Rating (66) 33.5 tons Alternate -1 Scheduled NBI: 1/28/2018 Element: 01/28/2017 Fracture Critical: Underwater: 01/29/2018 Other/Special: 01/28/2017 Alt Meth -1 This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied.

36 Inspection/CID Report REPORT ID: INVT001A COMPREHENSIVE Page 15 of 27 Structure ID: DATE PRINTED: 03/18/2016 Schedule Cont. Inspection Types Performed Fracture Critical mos Crew Hours 2 Underwater 24 mos 01/29/2016 Flagger Hours 0 Other Special 12 mos 01/28/2016 Helper Hours 0 Custom General Bridge Information Parallel Bridge Seq Channel Depth 8.1 ft Radio Frequency -1 Phone Number (000) Exception Date Exception Type Unknown Accepted By Construction 01/01/1974 Warranty Expiration 00/00/0000 NBI Element Fracture Critical Underwater Other Special Inspection Intervals Required (92) Frequency (92) Last Date (93) Inspection Resources NBI 24 mos (91) 01/28/2016 (90) Snooper Hours 0 Special Crew Hours 3 Bridge Load Rating Information Bridge Scour and Storm Information Condition NBI Rating Special Equip Hours 0 Bridge Rail 1 Other Bridge Rail 2 Other Electrical Devices No electric service Culvert Type Not applicable Maintenance Yard Not FDOT Maintained FIHS ON / OFF No Routes on FIHS Previous Structure 2nd Previous Structure Replacement Structure HS20 Govr. Span Length 28.9 ft Single Unit Truck 2 Axles 43.9 tons L-Rating Origination Field Measurements Single Unit Truck 3 Axles 46.5 tons Load Rating Date 02/15/2013 Single Unit Truck 4 Axles 45.5 tons Method Calculation AASHTO formula Combination Unit Truck 3 Axles 65.8 tons Load Dist. Factor Combination Unit Truck 4 Axles 59 tons Impact Factor 33 Combination Unit Truck 5 Axles 64.8 tons Design Method Unknown Truck Trailer 5 Axles 70.8 tons Design Measure English Posting Weight 34 tons Recommend SU Posting 99 tons Actual SU Posting 99 tons Recommend C Posting 99 tons Actual C Posting 99 tons Recommend ST Posting 99 tons Actual ST Posting 99 tons Gov FB Span 0 ft FL 120 Long Gov Span 51.6 tons Gov FB Spacing 0 ft FL 120 Trans -1 tons FB HS20 Rating 0 tons Single Axle Trans -1 tons FB SU4 Rating 0 tons Tandem Axle Trans -1 tons FB Present N Wing Span -1 ft FB INV Rating Factor 0 Web to Web Span -1 ft FB OPR Rating Factor 0 HS20 OPR Rating Max Span -1 tons FB FL tons FL120 Long Max Span 63.6 tons Pile Driving Record No pile driving records Scour Recommended I Not Applicable Foundation Type No foundation details Scour Recommended II Not Applicable Mode of Flow Tidal Scour Recommended III Not Applicable Rating Scour Eval Minimal Risk Scour Elevation 999 ft Highest Scour Eval Low Risk POA Completed Action Elevation 999 ft Storm Frequency 999 Channel (61) 4 Protection Undermined Culvert (62)N N/A (NBI) Deck (58) 7 Good Waterway (71) 8 Equal Desirable Superstructure (59) 7 Good Unrepaired Spalls -1 sq.ft. Substructure (60) 7 Good Review Required This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied.

37 Inspection/CID Report REPORT ID: INVT001A COMPREHENSIVE Page 16 of 27 Structure ID: DATE PRINTED: 03/18/2016 Elements Inspection Date: 1/28/2016SIVG Span Id Elem/Env Description Qty1 %1 Qty2 %2 Qty3 %3 Qty4 %4 Qty5 %5 T Qty 0 99/4 PS Conc Slab sf. Notes Note: There are utilities on both sidewalks along both sides of the bridge. CS2 = The asphalt overlay has several deck width x up to 1/32in. wide cracks over the expansion joints, there are longitudinal cracks up to 1/64in. wide over the slab unit joints in the eastbound lane. Both sidewalks have transverse cracks up to 1/8in. wide along the intermediate bent expansion joints outlining delaminations up to 8in. x sidewalk width. Refer to Photo 1. REPAIR Refer to Table 1 in the addendum for a list of deck underside deficiencies and Photo 2. REPAIR Noted This Inspection: CS2 = There is a 28in. x 10in. x 1 1/2in. spall with exposed steel on the underside of the closure pour in Span 2. Refer to Photo 3. REPAIR The right sidewalk along Bent 4 expansion joint has a spall 15in. x 4in. x 2 1/2in. with no exposed steel. At the base of right rail Post 3-5 there is a spall 22in x 6in. x 1in. with exposed steel /4 Pourable Joint Seal lf. Notes Note: The expansion joints are not visible due to an overlay of asphalt. CS3 = The joints are not sealed in the sidewalks. Refer to Photo 4. REPAIR CS2 = Water staining on the intermediate bent caps indicate that the expansion joints are leaking /4 Metal Rail Uncoated lf. Notes CS1 = Right rail Posts 1-1 and 1-2 have vertical splits up to 1/8in. wide x 8-1/2in. long near the base plates. Refer to Photo 5. REPAIR Noted This Inspection: CS2 = Left rail Posts 1-6, 2-1, 4-1, 4-4, 5-1 and right rail Posts 3-1, 3-2 and 4-4 have moderate surface corrosion at the bases. CS1 = Several rail posts are missing hardware at the connection plate. (However the rails are secure) /4 Conc Bridge Railing lf. Notes CS2 and CS3 = The parapets have surface spalls up to 9in. x 4in. x 1/2in., some with exposed corroded rebar. Refer to Photo 6. REPAIR CS1 = The parapets have full width and full height, up to 1/32in. wide transverse and vertical cracks and full width and full height, up to 1/8in. wide vertical cracks at the joint over the bents /4 P/S Conc Column ea. Notes CS3 = The underwater inspectors noted the following: Pile 3-2, southeast corner at the top of the marine growth, delamination 4ft. H x 7in. W. CS2 = The piles have small construction related surface spalls. CS1 = At several piles, the ends of the cut and patched pickup points are visible. The northeast corner of Pile 2-1 has a 12in. long x 1/64in. wide vertical crack with efflorescence, adjacent to west bulkhead. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied.

38 Inspection/CID Report REPORT ID: INVT001A COMPREHENSIVE Page 17 of 27 Structure ID: DATE PRINTED: 03/18/2016 Elements Inspection Date: 1/28/2016SIVG Span Id Elem/Env Description Qty1 %1 Qty2 %2 Qty3 %3 Qty4 %4 Qty5 %5 T Qty 0 215/4 R/Conc Abutment lf. Notes CS3 = At the south end of Abutment 1 cap, there are several delaminated patches up to 4in. diameter x 1in. deep with exposed corroded rebar ends. Refer to Photo 7. REPAIR Abutment 6 cap has a 4in. diameter x 1/2in. deep spall (popout) exposing a rebar end at the south end. REPAIR CS1 = The inboard faces of the abutment caps typically have water and mildew staining. At the south end of Abutment 1, there is a 12in. section of protruding rebar which is a tripping concern. Refer to Photo 8. REPAIR 0 234/4 R/Conc Cap lf. Notes CS3 = Refer to Table 2 in the addendum for a list of cap deficiencies and Photo 9. REPAIR CS1 = The vertical faces of the intermediate bent caps have efflorescence, water and mildew staining. The underside of the bent caps have exposed rebar ends adjacent to several piles, due to insufficient concrete cover /4 Other Fender/Dolphin lf. Notes Note: This element represents the plastic type pile fender system. CS2 = The coating on the top two wales of the east fender is beginning to split along the center of the wales /4 Blkhd Sewl Any Mater ft Notes Note: This element represents the bulkheads constructed of concrete sheet piles and composite sheet piles with concrete caps. CS3 = The west bulkhead has a broken composite panel at the south side of Pile 2-5, the cap above the hole has an 11in. x 4in. x 2in. spall with no exposed steel. Refer to Photo 10. REPAIR There are composite panels (4 ea) at the north side of Pile 5-1 and south side of Pile 5-5. These panels have holes up to 11in. diameter and heavy backfill loss. Refer to Photo 11. REPAIR The cap for the east bulkhead, 8ft. south of Pile 5-5, has a 20ft. long area of delamination and spalling with exposed corroded steel, similar at northeast area north of Pile 5-1. Refer to Photo 12. REPAIR CS2 = The joints between the sheet pile bulkheads are open, up to 1-1/2in. wide, allowing minor fill migration. The bulkhead caps typically have full height x full width, 1/64in. to 1/16in. wide vertical and horizontal cracks. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied.

39 Inspection/CID Report REPORT ID: INVT001A COMPREHENSIVE Page 18 of 27 Structure ID: DATE PRINTED: 03/18/2016 Elements Inspection Date: 1/28/2016SIVG Span Id Elem/Env Description Qty1 %1 Qty2 %2 Qty3 %3 Qty4 %4 Qty5 %5 T Qty 0 394/4 R/Conc Abut Slope Pr sf. Notes CS4 = One slope panel near the top of the east slope beneath the south edge of the bridge is heavily undermined and settled up to 24in. This appears due to loss of fill through the seawall panels. Refer to Photo 13. REPAIR. The loss of fill is also due to storm water infiltration beneath the slope pavement along the heel of the slope paving and at the abutment cap interface. Refer to Photo 14. REPAIR The flat slope paving sections behind the seawall along the south end of Bent 5 has widespread undermining and two collapsed panels. Refer to Photo 15. REPAIR CS3 = Many of the slope panels have signs of settlement and failure of the panel joint sealants, vegetation is growing from some of these joints. Refer to Photo 16. REPAIR 0 290/4 Channel ea. Notes CS3 = The west and east slope protection and bulkheads have washouts and undermining due to holes in the seawall panels. Refer to Elements 393 Bulkheads and 394 Slope Protection for comments, photos, and repair recommendations. Total Number of Elements: 11 This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied.

40 Inspection/CID Report REPORT ID: INVT001A COMPREHENSIVE Page 19 of 27 Structure ID: DATE PRINTED: 03/18/2016 Inspection Information Inspection Date: Type: Regular NBI Inspector: KNAAAJI-P - Jonathan Ivey Inspection Notes: Sufficiency Rating Calculation Accepted by KNAAAJI-P at :01:34 LOAD RATING EVALUATION: This inspection noted no changes in the structure condition that would warrant a new load rating. The load rating dated 02/15/13 appears to still apply. The lead underwater inspector for the current routine inspection is Jonathan Ivey (CBI #00540). The following underwater element were inspected: 204 P/S Concrete Piling / Columns- Bents 2 through 5 each with 5 18in. concrete piling. 290 Channel 390 Fender System - Composite 393 Bulkhead INSPECTION NOTES: Non-Structural Items: Approach Parapets: The southwest approach parapet is fractured at Abutment 1. Refer to Photo 17. REPAIR Approach Shoulders: The earthen approach shoulders at the SE and SW corners of the structure are 4in. to 6in. lower than the sidewalks. There are no approach sidewalks. Guardrails: The NW and SE guardrails have panels that are lapped incorrectly. REPAIR There is a palm tree overgrowing the SW guardrail approximately 12ft. from bridge. The NE guardrail end terminal has minor impact damage The SW and NE guardrail transitions are lapped incorrectly. Refer to Photo 18. REPAIR Approach guardrail posts and cushion blocks typically have moderate weathering. Noted This Inspection: The northeast guardrail is attached with one bolt. Refer to Photo 18. REPAIR The reflective coating on the northwest guardrail end treatment is missing. Reflectors: No object markers are provided at all four corners of the bridge; however, reflectors are provided on the guardrail end terminals. Utilities: The bolts for the left utility cover have moderate to heavy corrosion. Several bolts have 100% section loss. Refer to Photo 19. REPAIR Several nuts are missing from the utility cover along the right and left sides of the structure. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied.

41 Inspection/CID Report REPORT ID: INVT001A COMPREHENSIVE Page 20 of 27 Structure ID: DATE PRINTED: 03/18/2016 Inspection Information Inspection Date: Type: Interim Inspector: KNVOLSE-P - Steve Eorgan Inspection Notes: Sufficiency Rating Calculation Accepted by KNVOLCW-P at :57:15 LOAD RATING EVALUATION: This inspection noted no changes in the structure condition that would warrant a new load rating. The load rating dated 02/15/13 appears to still apply. This is an interim inspection report due to SIA Item 61, Channel, being rated 4. Only elements 393, Blkhd Sewl Any Mater, 394, R/Conc Abut Slope Pr, and 290 Channel are included. Refer to the routine inspection report dated 1/15/14 for all other elements. INSPECTION NOTES: Non-Structural Items: Approach Parapets: The southwest approach parapet is fractured at Abutment 1. Refer to Photo 8. REPAIR Approach Shoulders: The earthen approach shoulders at the SE and SW corners of the structure are 4in. to 6in. lower than the sidewalks. There are no approach sidewalks. Guardrails: The NW and SE guardrails have panels that are lapped incorrectly. There is a palm tree overgrowing the SW guardrail approximately 12ft. from bridge. The NE guardrail end terminal has minor impact damage The SW and NE guardrail transitions are lapped incorrectly. Refer to Photo 9. REPAIR Approach guardrail posts and cushion blocks typically have moderate weathering. Reflectors: No object markers are provided at all four corners of the bridge; however, reflectors are provided on the guardrail end terminals. Utilities: The bolts for the left utility cover have moderate to heavy corrosion. Several bolts have 100% section loss. Refer to Photo 10. REPAIR Several nuts are missing from the utility cover along the right side of the structure. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied.

42 Inspection/CID Report REPORT ID: INVT001A COMPREHENSIVE Page 21 of 27 Structure ID: DATE PRINTED: 03/18/2016 Inspection Information Inspection Date: Type: Regular NBI Inspector: KNVOLSH-P - Scott Hughes Inspection Notes: Sufficiency Rating Calculation Accepted by KNVOLCW-P at :25:56 LOAD RATING EVALUATION: This inspection noted no changes in the structure condition that would warrant a new load rating. The load rating dated 02/15/13 appears to still apply. The lead underwater inspector for the current routine inspection is Keith Hoogland (CBI #00341). The following underwater elements were inspected: 204 P/S Concrete Piling/Columns Bents 2 through 5 each with five 18in. concrete piling 290 Channel 390 Fender System Composite 393 Bulkhead INSPECTION NOTES: Non-Structural Items: Approach Parapets: The southwest approach parapet is fractured at Abutment 1. Refer to Photo 17. REPAIR Approach Shoulders: The earthen approach shoulders at the SE and SW corners of the structure are 4in. to 6in. lower than the sidewalks. There are no approach sidewalks. Guardrails: The NW and SE guardrails have panels that are lapped incorrectly. There is a palm tree overgrowing the SW guardrail approximately 12ft. from bridge. The NE guardrail end terminal has minor impact damage The SW and NE guardrail transitions are lapped incorrectly. Refer to Photo 18. REPAIR Approach guardrail posts and cushion blocks typically have moderate weathering. Reflectors: No object markers are provided at all four corners of the bridge; however, reflectors are provided on the guardrail end terminals. Utilities: The bolts for the left utility cover have moderate to heavy corrosion. Several bolts have 100% section loss. Refer to Photo 19. REPAIR Several nuts are missing from the utility cover along the right side of the structure. CORRECTIVE ACTION: The posting signs have been removed. The structure no longer requires posting. The void at the northwest approach sidewalk has filled in naturally. Inspection Date: Type: Special-Posted Bridge Inspector: KNVOLSH-P - Scott Hughes Inspection Notes: Sufficiency Rating Calculation Accepted by KNVOLCW-P at :48:10 LOAD RATING EVALUATION: This inspection noted no changes in the structure condition that would warrant a new load rating. The load rating dated 02/15/13 appears to still apply. This is a Special-Posted and Interim inspection, only Elements 99 P/S Conc Slab, 393 Blkhd Sewl Any Mater, 394 R/Conc Abut Slope Pr, and 290 Channel are included in this report. No dive was required during this inspection due to elements required for inspection were in less than 3ft. of water. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied.

43 Inspection/CID Report REPORT ID: INVT001A COMPREHENSIVE Page 22 of 27 Structure ID: DATE PRINTED: 03/18/2016 Inspection Information Inspection Date: Type: Regular NBI Inspector: KNVOLRO-P - Rick O'Connor Inspection Notes: Sufficiency Rating Calculation Accepted by KNVOLCW-P at :13:29 LOAD RATING EVALUATION: This inspection noted nothing that warrants a new load rating. The current load rating dated 12/22/83 appears to still apply. The lead underwater inspector for the current routine inspection is Stephen Hays (CBI #00438). The following underwater elements were inspected: 204 P/S Concrete Piling/Columns Bents 2 through 5 each with five 18in. concrete piling 290 Channel 390 Fender System Composite 393 Bulkhead The channel NBI rating has been lowered from 5 to 4 due to widespread backfill loss through deteriorated seawall panels. Non-Structural Items: Due to a large amount of text and Pontis limitations, refer to the addendum for inspection notes. Inspection Date: Type: Special-Posted Bridge Inspector: KNKCABA-P - Michael Betz Inspection Notes: Sufficiency Rating Calculation Accepted by KNKCARL-P at :25:33 Note: This Special-Posted Bridge inspection is being conducted based on SIA Item 70, Bridge Posting, being coded a 4. Structural deficiencies affecting the load carrying capacity of Element 99 PS Conc Slab were inspected and evaluated and will be included in this report. For a comprehensive list of all other deficiencies, refer to the previous routine report dated Non-Pontis Items: Signs: The structure is posted at both approaches for the SU type vehicles as follows: SU-34 tons. The signing does not meet current FDOT Standard Index No guidelines due to the lack of advanced warning signs. Refer to photos 1 and 2. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied.

44 Inspection/CID Report REPORT ID: INVT001A COMPREHENSIVE Page 23 of 27 Structure ID: DATE PRINTED: 03/18/2016 Inspection Information Inspection Date: Type: Regular NBI Inspector: INACTIVE - Paul Elborne Inspection Notes: Sufficiency Rating Calculation Accepted by KNKCABT-P at :53:43 Non-Pontis Items: Approach Roadways: Noted This Inspection: CORRECTIVE ACTION TAKEN: A new asphalt approach roadway and deck overlay has been installed. Approach Shoulders: The earthen approach shoulders at the SE and SW corners of the structure are 4in. to 6in. lower than the sidewalks. There are no approach sidewalks. The SW approach asphalt curb is crumbling 3ft. x 7in. x 6in. approximately 12ft. from the bridge. This is due to a palm tree growing adjacent to this area. A repair recommendation will not be made at this time due to the insignificance of the deficiency. Guardrails: The NW and SE (previously NW only) guardrails have panels that are lapped incorrectly. Refer to photo 19. There is a palm tree overgrowing the SW guardrail approximately 12ft. from bridge. Noted This Inspection: The NE guardrail end terminal has minor impact damage The SW and NE guardrail transitions are lapped incorrectly. Approach guardrail posts and cushion blocks typically have full height x up to 1/4in. wide checks. Reflectors: No object markers are provided at all four corners of the bridge. Signs: The structure is posted at both approaches 34 tons. The signing does not meet current FDOT Standard Index guidelines due to improper sign configuration and the lack of advanced warning signs. Refer to photos 1 and 2. Noted This Inspection: CORRECTIVE ACTION TAKEN: The east weight limit sign has been reset and is no longer leaning. Utilities: The bolts for the left utility cover have moderate to heavy corrosion with 10% to 75% section loss. Several bolts have 100% section loss. Refer to photo 20. Random nuts are missing from the utility cover along the right side of the structure. Refer to photo 21. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied.

45 Inspection/CID Report REPORT ID: INVT001A COMPREHENSIVE Page 24 of 27 Structure ID: DATE PRINTED: 03/18/2016 Inspection Information Inspection Date: Type: Special-Posted Bridge Inspector: KNKCAMB-P - Brice McMinn Inspection Notes: Sufficiency Rating Calculation Accepted by knkcapo-p at :28:38 Note: This interim inspection is being conducted based on SIA Item #70 Bridge Posting being rated 4 or less. Structural deficiencies affecting the load carrying capacity of Element 99 PS Conc Slab were inspected, evaluated and will be included in this report. For a comprehensive list of all other deficiencies, refer to the previous routine report dated 1/9/08. Non-Pontis Items: Signs: Corrective Action Taken: New posting signs have been installed at the west and east bridge approaches. The signing does not meet FDOT Standard Index No guidelines, since there are no advance posting signs. Refer to photos 1 and 2. Inspection Date: Type: Regular NBI Inspector: KNKCAST-P - Timothy Sweeney Inspection Notes: Sufficiency Rating Calculation Accepted by knkcast-p at :04:38 Non-Pontis Items: Approach Roadways: Both approach roadway asphalt overlays, exhibit 1/16in. to 1/8in. wide longitudinal and transverse cracks at various locations. Approach Shoulders: The earthen approach shoulders at the southeast and southwest corners of the structure are 4in. to 6in. lower than the sidewalks. There are no approach sidewalks. The southwest approach asphalt curb is crumbling 3ft. x 7in. x 6in.; approximately 12ft. from the bridge. This is due to a palm tree growing adjacent to this area. Refer to photo 19. Guardrails: The northwest guardrail panels are lapped incorrectly. Refer to photo 20. There is a palm tree overgrowing the southwest guardrail approximately 12ft. from bridge. Reflectors: No object markers are provided at the four corners of the bridge. Signs: The structure is posted at both approaches for 34 tons. The east sign is leaning. The signing does not meet FDOT Standard Index No guidelines due to improper sign configuration and the lack of advance warning signs. Refer to photos 1 and 2. Utilities: The bolts for the left utility cover have moderate to heavy corrosion with 10% to 75% section loss. Several bolts have 100% section loss. Refer to photo 21. Random nuts are missing from the utility cover along the right side of the structure. Refer to photo 22. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied.

46 Inspection/CID Report REPORT ID: INVT001A COMPREHENSIVE Page 25 of 27 Structure ID: DATE PRINTED: 03/18/2016 Inspection Information Inspection Date: Type: Special-Posted Bridge Inspector: 1034 Inspection Notes: Sufficiency Rating Calculation Accepted by knkcacd-p at :46:22 Note: This interim inspection is being conducted based on SIA Item #70 Bridge Posting being rated 4 or less. Structural deficiencies affecting the load carrying capacity of Element 99 PS Conc Slab were reviewed and will be included in this report. For a comprehensive list of all other deficiencies, refer to the previous routine report dated 2/15/06. Non-Pontis Items: Signs: The structure is posted at both approaches for 34 tons. The east sign is leaning. The signing does not meet FDOT Standard Index No guidelines due to improper sign configuration and the lack of advance warning signs. Refer to photos 1 and 2. Inspection Date: Type: Regular NBI Inspector: KNAAAOJ-P - John O'Grady Inspection Notes: Sufficiency Rating Calculation Accepted by kn538oj-p at :13:00 Non-Pontis Items: Approach Roadways: The approach roadway asphalt overlays exhibit 1/16in. to 1/8in. wide longitudinal and transverse cracks at various locations. Noted This Inspection: Minor settlement is present along each approach roadway/bridge deck transition. Approach Shoulders: The earthen approach shoulders at the southeast and southwest corners of the structure are 4in. to 6in. lower than the sidewalks. There are no approach sidewalks. The southwest approach asphalt curb is crumbling 3ft. x 7in. x 6in. approximately 12ft. from the bridge. This is due to a palm tree growing adjacent to this area. Refer to Photo 25. Guardrails: The guardrail panels are lapped incorrectly. Refer to Photo 26. There is a palm tree overgrowing the southwest guardrail approximately 12ft. from the bridge. Reflectors: No hazard markers are provided at all four corners of the bridge. Signs: Noted This Inspection: The structure is posted at both approaches for 34 tons. The east sign is leaning. The signing does not meet current FDOT Standard Index No guidelines due to improper sign configuration and the lack of advanced warning signs. Refer to Photos 1 and 2. CORRECTIVE ACTION TAKEN: New signs have been installed at each end of the structure since the previous routine inspection. Utilities: The bolts for the left utility cover have moderate to heavy corrosion with 10% to 75% section loss. Several bolts have 100% section loss. Refer to Photo 27. Noted This Inspection: Random nuts are missing from the utility cover along the right side of the structure. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied.

47 Inspection/CID Report REPORT ID: INVT001A COMPREHENSIVE Page 26 of 27 Structure ID: DATE PRINTED: 03/18/2016 Inspection Information Inspection Date: Type: Regular NBI Inspector: KN238JK-P - James Kelley Inspection Notes: Sufficiency Rating Calculation Accepted by kn538pl-p at :08:53 KN238JK-P inspection comments - Structure Date Element 99 PS Conc Slab (continued): Noted This Inspection: Deck Top: The longitudinal cracking adjacent to the barriers is up to 1/2in. wide and the asphalt is beginning to upheave. Refer to Photo 4. Deck Underside: Slab Unit 1-3 has a 3in. x 1in. x 1/2in. spall with exposed rebar near mid-span. Refer to Photo 2. Sidewalks: The right sidewalk has a 14in. x 5in. delaminated area in the exterior edge over Bent 4. Refer to Photo 5. Non-Pontis Items: Approach Roadway: The approach roadway asphalt overlays exhibit 1/16in. to 1/8in. wide transverse and vertical cracks in various locations. Approach Shoulders: The earthen approach shoulders at the southeast and southwest corners of the structure are 4in. to 6in. lower than the sidewalks. There are no approach sidewalks. Noted This Inspection: The southwest approach asphalt curb is crumbling 3ft. x 7in. x 6in. approximately 12ft. from the bridge. This is due to a palm tree growing adjacent to this area. Refer to Photo 20. Guardrails: The northwest and southeast guardrail panels are lapped incorrectly. Refer to Photo 21. Noted This Inspection: The southwest and northeast guardrails are lapped incorrectly at the bridgerail attachment shoes. There is a palm tree overgrowing the southwest guardrail approximately 12ft. from the bridge. Refer to Photo 20. Non-Pontis Items continued in the addendum. Inspection Date: Type: Regular NBI Inspector: 256 Inspection Notes: Sufficiency Rating Calculation Accepted by kn538sf at 6/4/02 10:35:11 KN853NP inspection comments - Structure Date 2/14/02 - This structure was inventoried from west to east. Non-Pontis Items: Guardrails - > The northwest and southeast guardrail panels are lapped in the wrong direction. Roadway Condition - > The approach roadway asphalt overlays exhibit 1/16" to 1/8" wide transverse and vertical cracks in various locations. Approach Shoulders - > The earthen approach shoulders at the southeast and southwest corners of the structure are 4" to 6" lower than the sidewalks, creating a potential tripping hazardous for pedestrians. There are no approach sidewalks. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied.

48 Inspection/CID Report REPORT ID: INVT001A COMPREHENSIVE Page 27 of 27 Structure ID: DATE PRINTED: 03/18/2016 Inspection Information Inspection Date: Type: Regular NBI Inspector: 299 Inspection Notes: Sufficiency Rating Calculation Accepted by kn538rr at 4/3/00 14:42:49 Sufficiency Rating Calculation Accepted by kn538rr at 4/3/00 13:31:54 KN538RR inspection comments - Structure Date 1/22/00 - This structure was inventoried from west to east. Approach Slopes/Shoulders The erosion at the west end of the right sidewalk and the undermining of the slope protection at the southwest corner of the structure have been filled with sod and concrete. Guardrails The northwest and southeast guardrail systems panels are lapped in the wrong direction. Roadway Condition The approach roadway asphalt overlays exhibit 1/16" to 1/8" wide transverse and vertical cracks in various locations. Previous comments > (none) Structure Notes BRIDGE OWNER: CITY OF PALM COAST Bridge inventoried from west to east. TRAFFIC RESTRICTIONS: Based on the current load rating analysis dated 02/15/13, the structure does not require posting. The structure is not posted. This structure is on a 12 month inspection frequency due to SIA Item 61 Channel being rated 4. Asphalt thickness = 3in. As stated in section 3.4 of the Bridge and Other Structures Inspection and Reporting as of 11/24/2009 superstructure unit numbering (Section ) and substructure unit numbering (Section 3.4.3) are designated NOT BY ORDER IN WHICH THE ELEMENTS WERE CONSTRUCTED AND PUT INTO SERVICE. Plans sheet or drawing in Topic G, Bridge Description and Drawings section of the bridge folder can confirm all references to these elements prior to this date. This report contains information relating to the physical security of a structure and depictions of the structure. This information is confidential and exempt from public inspection pursuant to sections (3)(a) and (3)(b), Florida Statutes. Only the cover page of this report may be inspected and copied.

49 ADDENDUM CONTENTS OF ADDENDUM Bridge Location Map Additional Element Inspection Notes Sketches and Photos Recommended Corrective Action Load Rating Analysis Summary Scour Evaluation * Posting Photos * Fracture Critical Inspections * This section is not included in this report. PREPARED FOR: FDOT BRIDGE OWNER: CITY OF PALM COAST PREPARED BY: AYRES ASSOCIATES REPORT IDENTIFICATION Bridge Number: Regular NBI Inspection Date: 01/28/2016 Bridge Name: Colorado Dr over College Waterway Facility Carried: Colorado Dr Featured Intersected: College Waterway East Approach PAGE 1 OF 18

50 Bridge No: Inspection Date: 01/28/2016 BRIDGE LOCATION MAP South Elevation Colorado Dr over College Waterway 0.2 mile east of Palm Hrbr Pky PAGE 2 OF 18

51 Bridge No: Inspection Date: 01/28/2016 ADDITIONAL ELEMENT INSPECTION NOTES TABLE 1 99/4 PS Conc Slab Slab Location Deficiency Size Repair Unit 1-3 Left edge near midspan Spall with exposed steel 1ft. x 1ft. x 1in. Yes 2-4 Right edge, 6ft. from Bent 3 Spall with no exposed steel 17in. x 12in. x 1-1/2in. No 3-1 Left edge, 6ft. from Bent 3 Spall with no exposed steel 6in. x 4in. x 1/2in. No 3-1 Left edge, 8ft. from Bent 3 Spall with no exposed steel 19in. x 6in. x 1/2in. No 3-5 Right edge near midspan Delaminated Patch 23in. x 5in. Yes 4-1 North end at midspan Length of exposed rebar 6in. No 4-7 Right edge, 6ft. from Bent 4 Spall with no exposed steel 10in. x 5in. x 1/2in. No TABLE 2 234/4 R/Conc Cap Bent Location Deficiency Size Repair 2 East face under Slab Unit 2-2 Popout with exposed steel 4in. Dia x 3/4in. deep No Spall with exposed corroded 3 South end, west face steel 20in. x 20in. x 2in. Yes Spall with exposed corroded 5 East face under Slab Unit 5-5 steel 10in. x 10in. x 1in. Yes Spall with exposed corroded 5 East face of north haunch steel (lack of cover) 4in. x 10in. x 1/2in. Yes PAGE 3 OF 18

52 Bridge No: Inspection Date: 01/28/2016 LOAD RATING ANALYSIS SUMMARY PAGE 4 OF 18

53 Bridge No: Inspection Date: 01/28/2016 SKETCHES AND PHOTOS Photo 1: Element 99: Transverse crack outlining delamination s on the right sidewalk. Photo 2: Element 99: Slab unit 1-3 left edge spall with exposed rebar. PAGE 5 OF 18

54 Bridge No: Inspection Date: 01/28/2016 SKETCHES AND PHOTOS Photo 3: Element 99: Closure pour in Span 2 spall with exposed steel. Photo 4: Element 301: Unsealed joint on the left sidewalk. PAGE 6 OF 18

55 Bridge No: Inspection Date: 01/28/2016 SKETCHES AND PHOTOS Photo 5: Element 330: Vertical split in right rail Post 1-1. Photo 6: Element 331: Spalls with exposed rebar on the north face of the right parapet. PAGE 7 OF 18

56 Bridge No: Inspection Date: 01/28/2016 SKETCHES AND PHOTOS Photo 7: Element 215: Delaminated patch with rebar on the south end of Abutment 1. Photo 8: Element 215: Protruding rebar at the south end of Abutment 1. PAGE 8 OF 18

57 Bridge No: Inspection Date: 01/28/2016 SKETCHES AND PHOTOS Photo 9: Element 234: Spall with exposed steel west face of Bent 3 cap south end. Photo 10: Element 393: West bulkhead hole in composite material. PAGE 9 OF 18

58 Bridge No: Inspection Date: 01/28/2016 SKETCHES AND PHOTOS Photo 11: Element 393: Typical hole in composite bulkhead panel. Photo 12: Element 393: Spalled / delaminated cap south end of east bulkhead. PAGE 10 OF 18

59 Bridge No: Inspection Date: 01/28/2016 SKETCHES AND PHOTOS Photo 13: Element 394: Undermining and collapse of slope pavement panel south end of Abutment 6. Photo 14: Element 394: Pathway for storm water infiltration at the north end of Abutment 6. PAGE 11 OF 18

60 Bridge No: Inspection Date: 01/28/2016 SKETCHES AND PHOTOS Photo 15: Element 394: Undermining and collapse of slope pavement panel south end of Bent 5. Photo 16: Element 394: Failed joint sealant and vegetation growth. PAGE 12 OF 18

61 Bridge No: Inspection Date: 01/28/2016 SKETCHES AND PHOTOS Photo 17: Inspection Notes: Fractured southwest approach parapet at Abutment 1. Photo 18: Inspection Notes: Northeast guardrail panels improperly lapped and attachment bolt missing. PAGE 13 OF 18

62 Bridge No: Inspection Date: 01/28/2016 SKETCHES AND PHOTOS Photo 19: Inspection Notes: Heavy corrosion on the attaching bolts for the utility cover. PAGE 14 OF 18

63 Bridge No: Inspection Date: 01/28/2016 RECOMMENDED CORRECTIVE ACTION Element 99 P/S Conc Slab Repair sidewalk delamination s over bents in both sidewalks. Repair all the spalls with exposed steel on the slab underside and closure pour. Element 301 Pourable Joint Seal Seal the sidewalk joints over the Abutments. Element 330 Metal Rail Uncoated Repair vertical splits in right rail Posts 1-1 and 1-2 near the base plates. Element 331 Conc Bridge Railing Repair spalls with exposed steel in the traffic faces of both parapets. Element 215 R/Conc Abutment Repair the pop outs with exposed steel at the south ends of Abutment 1 and 6 caps. Remove the rebar protruding from the south end of Abutment 1. Element 234 R/ Conc Cap Repair spalls with exposed steel in Bent caps 2, 3 and 5. Element 393 Blkd Sewl Any Mater Replace the bulkhead with composite sheet piles at both Abutments and replace lost backfill in the conjunction with slope pavement repairs. Replace 24ft. of deteriorated cap at the south end of the east bulkhead. Element 394 R/Conc Abut Slope Pro Repair widespread loss of fill beneath the east slop pavement. Repair the collapsed and settled panels in conjunction with the bulkhead repairs. Eliminate pathways for storm water infiltration beneath the slope paving along the upper edges and Abutment caps. Repair the failed joint sealant in the slope pavement. Non-Structural Items: Approach Parapets: Repair the fractured southwest approach parapet. Guardrails: Properly lap the guardrail transitions at the southwest, southeast, northwest and northeast approaches. Utilities: Remove corrosion and apply coating to the left utility cover fasteners. PAGE 15 OF 18

64 Bridge No: Inspection Date: 01/28/2016 SCOUR EVALUATION LEFT SIDE 12/02/83 01/15/14 01/28/16 Change Abutment Bent Bent C/L of Channel Bent Bent Abutment Waterline at C/L of Channel RIGHT SIDE 12/02/83 01/15/14 01/28/16 Change Abutment Bent Bent C/L of Channel Bent Bent Abutment Waterline at C/L of Channel NOTE: - = An increase in degradation. Blank box = No previous measurement available. Relative Channel Plots Are Not To Scale. Any Vertical Curvature Of Datum Point Is Not Reflective In Plot. The waterline and mudline measurements, in reference to the top of the sidewalks, are provided for future comparison. All measurements are in feet. PAGE 16 OF 18

65 Bridge No: Inspection Date: 01/28/2016 SCOUR EVALUATION LEFT SIDE SOUNDINGS 12/02/83 01/15/14 01/28/16 Top of Left Sidewalk 0.0 Abutment 1 Bent 2 Bent 3 C/L of Channel Bent 4 Bent 5 Abutment Vertical Distance (ft) RIGHT SIDE SOUNDINGS 12/02/83 01/15/14 01/28/16 Top of Right Sidewalk 0.0 Abutment 1 Bent 2 Bent 3 C/L of Channel Bent 4 Bent 5 Abutment Vertical Distance (ft) Relative Channel Plots Are Not To Scale. Any Vertical Curvature Of Datum Point Is Not Reflective In Plot. PAGE 17 OF 18

66 Bridge No: Inspection Date: 01/28/2016 SCOUR EVALUATION Channel Looking North Channel Looking South PAGE 18 OF 18

67 PALM COAST BRIDGE # REHAB: OPIONION OF PROBABLE COST 8/19/2016 FOOT PAY ITEM No. 1 CIVIL CONSTRUCTION MOBTIrTZATTON LS 1 $ S MATKTKNANCE OF TRAFFIC (DFTOnRl. LS 1 $ s lo.sno 00 UNIT SUBTOTAL CONSTRUCTION S v.'^.fion on CONTIGENCY (10%) s 7.3sn on 1 DEMOLITION / REMOVAL / ADJUSTMENTS CLEARING S GRUBBING AC 0.25 $ 4, S 1,0? ,0 4 REMOVAL OF FXTSTTNG CONCRFTF PAVEMENT SY 78 $ S 1, REGULAR EXCAVATTON (ROADWAY REMOVAL) CY 56 S 3.82 $?l. 9? MILLING EXIST ASPH PAVT, 1 1/2" AVG DEPTH.SY 410 $ 3.16 S 1.? GUARDRAIL REMOVAL LF 208 $ 1.79 S REMOVAL OF EXISTING ASPHALT CURB 1 INC. ASPH. FLUMES) LE 298 S 3.68 S 1. n9(=i. 64 REMOVAL OF EXISTING DECORATIVE, CONCRETE CURB (INC. STONE) LF 24 $ 3.68 S REMOVAL OF EXISTING 4" D.I.P. FORCE MAIN (INC. ADDTTTONAL 4" CONDUIT.S) LE 1 63 $ 2.63 S BEMOyAL.QF, EXISTING 8" D.I.P. WATER MAIN (INC. ADDITIONAL 4" CONDUITS) LF 1 63 $ 2.63 S REMOVAL OF EXISTING PEDESTRIAN RATLING LF 344 S 1.89 S 6,so. ^ f> REMOVAL OF EXISTING 12" CMP LF 47 S 5.25 S REMOVAL OF PALM TREES. 3 TOTAT, (GRIND.STUMP 6" BELOW GRADE) LS 1 S S S. 0 0 REMOVAL OF EXISTING CONCRETE CAP (SHEET PILE WALL).SY 1 05 S 24.3? S 7, RELOCATION OF EXISING MAILBOX..EA. 1 S $ 13?. 7 5 TOTAL SUBTOTAL DEMOLITION / REMOVAL s 11. r^-^? 10 CONTIGENCY (10%) S 1.1 ^ ^?1 TOTAL 12" CORREGATED METAL PIPE (CMPl " MITERED END SECTION SILT FENCE STAKED (TYPE I I I ) rloflting TVRBIDITY BARRIEP LF INLET PROTECIIOW SYSTEM Eh SEDIMENT BARRIER (SYNTHETIC BALES) 12" STABILIZED.SUB-GRADE ^ INLETS. DT BOT. TYPE C. <10' ^ GHARDRAIL - BRIDGE ANCHORAGE ASSEM Ff;I , GUARDRAIL END ANCHORAGE ASSEMBLY- PARATiLEI, EA 3, l?,44q,po CONCRETE DRIVEWAY. 5" THICK, REINFORCED , ?7Qg LIMEROCK BASE, 10" 1, flsfh STRVi:iUm CTDRSE SF-g.5 (1,3") (ROADWAY) COKCRETE CffRB i PIfTTRR - STflPPflPP _ke_ 21A , SUBTOTAL ROADWAY 70,624.8^ CONTIGENCY (10%) 7, BAHIA,.SOD SY S S 3, SUBTOTAL LANDSCAPE ;=! r^.i.rr in CONTIGENCY (10%) 3 H =^ R1 TOTAL SIGNING AND PAVEMENT MARKINGS THERMOPLASTIC. STANDARD,YELLOW, SOLID. 6" LF 662 S S BRIDGE BARRIER REFLECTORS (25' SPACING)....EA 14 S 6.30 S SUBTOTAL SIGNING AND PAVEMENT MAiOCINGS S T CONTIGENCY (10%) S 10<J 44 TOTAL

68 PALM COAST BRIDGE # REHAB: OPIONION OF PROBABLE COST 8/19/ UTILITIES FORCE MAIN 6" HDPE FORCE MAIN (DTRECTTONAL DRTI.I.l LE 443 S S 23, " X 4" M.J. REDUCER EA $ S AIR RET.EA.3E VALVE AND VAULT EA 2 S S " M.J. PLlIfi WITH ROX AND COVER EA $ S CONNECT TO EXTSTTNC, 4" PVC EA?- $ GROUT FILL EXISTING 4" PVC LF 280 $ WATF.R MAIN 10" HDPE WATER MAIN (DIRECTIONAL DRILL! LE 538 $ , " X 8" M.J. TAPPING SLEEVE EA 2 S , " M.J. GATE VALVE WITH BOX AND COVER EA 2 S $ " X 8" M.J. REDUCER EA $ , SAMPLE POINT EA 2 S " SADDLE WET TAP EA 1 $ S " POLY WATER SERVICE EA 1 $ " SCH. 40 PVC CASING LF 4 5 S WATER METER wi th ROX S COVER EA 1 $ REMOVE VALVE ROX AND COVER AND ABANDON IN PLAGE EA 2 S " M.J. BLIND FLANGE EA 9. $ , " 90 DEGREE BEND EA 1 S " M.J. 90 DEGREE BEND EA S , GROUT FILL EXISTING 8" PVC LE 235 S SUBTOTAL UTILITIES.S 94.f!49.fi.'i CONTIGENCY (10%) S TOTAL S (^.-^4. fig STRUCTURAL BRIDGE REPAIR ITEMS REMOVAL OF EXISTING STRUCTURE I INC. 20'. CONT1 N'GE.XrY 1 LS 1 S , EMBANKMENT (INC. 25>. CONTINGENCY) CY 767 S , CLEANING S COATING CONCRETE SURFACE. CLASS 5 'INC..15) CONTINGENCY:. SF $ , RESTORE SPALLED AREA. PORTTAND CEMENT GROUT (ihc. 251 COSTINGEMCY! CF 22 $ 2, S 56, EPOXY MATERIAL FOR CRACK INJECTION-STRUCTURE REHAB (INC. 25' CONTINGENCY! GA 2 S , CRACK INJECT S SEAL-STRUCTURES REHAB (TNT:.?5- CONTINGENCY! T,F 19 $ , METHACRYLATE MONOMOR (INC. 25» CONTINGENCYl GA 11 S CLEANING t SEALING CONCRETE SURFACES. PENETRANT SEALER OR SF 1, 553 $ METHACRYLATES (INC.?5'- C.'JNI'INGEK'CY! 0 i! 31.";.. i.sf?.00 CONTIGENCY INCLUDED IN PRICES TOTAL S RRinCE TTEMK CLASS IT CONCRETE - SUPERSTRUCTURE CY 11.0 $ 1, REINFORCING STEEL -.SUPERSTRUCTURE LB 2, 534 S , STANDARD INTEGRAL PIIF, JACKET. NON-STRUCTURAL, LF 6 S , TO 30" (INC. 25' CONTINGENCY! PEDESTRIAN/BICYCLE RAILING. ALUMINUM ONLY. 42" TYPE 1 LE 344 S , GOMCRFTF SLOPE PAVEMENT. 4". REINFORCED SY 575 S SUBTOTAL BRIDGE ITEMS.S CONTIGENCY (10%) S TOTAL S 124..'il RnT.KHRAn SHEET PILING, COMPOSITE, PERMANENT SE 5, 481 $ SHEET PILING, COMPOSITE, PERMANENT (UNDER BRIDGE! SF 1,092 S RETURN WAIJ.S LS 1 $ 2, , CONCRETE CAP LE $ , SOIL ANCHORS EA 65 S S SOIL ANCHORS (TINDER BRIDGE! EA , SUBTOTAL BULKHEAD ITEMS.S ^S.'i.."il 0.00 CONTIGENCY (10%).S.3?..'; TOTAL S TOTAL <i 1 ^ mv Qil at

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION NBI INSPECTION DWCJ Inspector Name Agency / Company Name Insp. Freq. Insp. Date Evan Currie Great Lakes Engineering Group 12 07/31/2017 GENERAL NOTES Posting Signs in Place DECK 1. Surface (SIA-58A) 2.

More information

Element Condition Values

Element Condition Values Element Condition Values Bridge Number I 837 Bridge Location I 15 Over SR589 SAHARA AV Inspection Date Elem/Env Element Description Quantity UOM Qty1 Qty2 Qty3 Qty4 012- / 2 Reinforced Concrete Deck/Slab

More information

I 939. RMP I 515N-I 15S Over I 15 & US 95 01/26/2015. Report Contents. Signs and Utilities Inspection Report Maintenance Recommendation Report

I 939. RMP I 515N-I 15S Over I 15 & US 95 01/26/2015. Report Contents. Signs and Utilities Inspection Report Maintenance Recommendation Report Bridge Number Bridge Location Inspection Date I 939 RMP I 515N-I 15S Over I 15 & US 95 This report identifies deficiencies requiring urgent corrective action This bridge is scour critical This bridge contains

More information

BRIDGE INSPECTION REPORT

BRIDGE INSPECTION REPORT Bridge No. 054-77-161.66(2388) BARS No. ROCKPORT I/C N (CSWB) over I 77 NORTH I-77 NBL 8.37 MILES S OF WV 14 Wood County District 3 IS on the NHS ADT - 007000-2011 Type of Inspections Performed: BRIDGE

More information

BRIDGE INSPECTION REPORT

BRIDGE INSPECTION REPORT Bridge No. 054-77-161.66(2388) BARS No. ROCKPORT I/C N (CSWB) over I 77 NORTH I-77 NBL 8.37 MILES S OF WV 14 Wood County District 3 IS on the NHS ADT - 007000-2011 Type of Inspections Performed: BRIDGE

More information

HistoricBridges.org - National Bridge Inventory Data Sheet

HistoricBridges.org - National Bridge Inventory Data Sheet HistoricBridges.org - National Bridge Inventory Data Sheet 3 Inventory The National Bridge Inventory contains data submitted by state transportion departments to the Federal Highway Administration in coded

More information

Ontario Structure Inspection Manual Inspection Form Structure Number: 12

Ontario Structure Inspection Manual Inspection Form Structure Number: 12 Inventory Data: Structure Name Gailbraith Road Bridge 1 Main Hwy/Road # On Under Crossing Navig. Water Non-Navig. Water Rail Type: Road Ped. Other Hwy/Road Name Structure Location Latitude Owner(s) Galbraith

More information

US 278 East Bound and West Bound. MacKay Creek and Skull Creek. Cursory Above Water and Underwater Investigation Of. Over

US 278 East Bound and West Bound. MacKay Creek and Skull Creek. Cursory Above Water and Underwater Investigation Of. Over Cursory Above Water and Underwater Investigation Of US 278 East Bound and West Bound Over MacKay Creek and Skull Creek In Hilton Head, South Carolina Bridges over MacKay Creek Bridges over Skull Creek

More information

Alberta Transportation Bridge Inspection & Maintenance System (Web 2005) N-1 Bridge. Bridge Inspection Form Type Lot No. 2

Alberta Transportation Bridge Inspection & Maintenance System (Web 2005) N-1 Bridge. Bridge Inspection Form Type Lot No. 2 Bridge File Number Year Built/Year Supstr 75340 N-1 Bridge 1962/1962 Bridge or Town Name LACOMBE Located Over 12:10 L1 0.000;12:10 R1 0.000 Located On 2:26 R1 17.464 Water Body Cl./Year Navigabil. Cl./Year

More information

Bridge Replacement Study (Phase 1)

Bridge Replacement Study (Phase 1) Bridge Replacement Study (Phase 1) San Martin Boulevard over Riviera Bay Bridge Project Number 154371 Prepared For: Engineering & Technical Support Division Department of Environment & Infrastructure,

More information

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan

More information

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure. Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE

More information

LRFD Bridge Design Manual Changes

LRFD Bridge Design Manual Changes LRFD Bridge Design Manual Changes Dave Dahlberg Bridge Design Manual & Policy Engineer May 17, 2017 Bridge Office mndot.gov/bridge Overview 1) Concrete mix designations 2) Reinforcing bar development and

More information

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION MANUAL OF THE STRUCTURE AND BRIDGE DIVISION DESIGN AIDS AND TYPICAL DETAILS VIRGINIA DEPARTMENT OF TRANSPORTATION VDOT GOVERNANCE DOCUMENT VDOT Manual of the Structure and Bridge Division: Part 02: Design

More information

Chapter 4 Bridge Program Drawings

Chapter 4 Bridge Program Drawings Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles

More information

!"#$ % 1( =4+0(1*0)4 A)*.(.)44)4 8(: 4 0, 2(3*05. Page 1A of 10 11

!#$ % 1( =4+0(1*0)4 A)*.(.)44)4 8(: 4 0, 2(3*05. Page 1A of 10 11 !"#$ % 9 8 8 8784 867 *-+(+ +,- 40. -8/5 '()* +,-. *()/ 0,, 0, (*0 )4 *, /)(*0)4 06&5 &60 455678 ()() 90( (:8; +,- (7)4 4 0 4(+0()*0/ 0()*5 ', 0@A' +,- -* =B9C+ ()( 0 0, +0(0 8(:5 ', =40(*0( +,- (?)/ 4

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 11/21/2014 Project 140560 Addendum No. 2 PID No. 82972 HAM IR 275

More information

Bridges. Chapter 6: chapter contents

Bridges. Chapter 6: chapter contents Chapter 6: Bridges chapter contents Characteristics of Well-Maintained Bridges 95 Optimum Timing/Conditions for Maintenance 95 Bridge Maintenance Activities 96 Bridge Washing 96 Debris Removal 96 Guardrail

More information

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS BRIDGE PREVENTIVE MAINTENANCE STRATEGY Approved January 3, 2007 BLANK Purpose To maximize the non-deficient service life of local bridges in the Erie-Niagara region, members of the Greater Buffalo-Niagara

More information

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation Design and Construction of Concrete Overlays By: James K. Cable, P.E. Cable Concrete Consultation PCC OVERLAY AGENDA Current design & construction features What is needed in a PCC overlay set of plans?

More information

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B401: DELETED B402: DELETED B403: DELETED B404: STRUCTURE/CULVERT IDENTIFICATION SIGNS B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B406: ITEM 514 - FIELD PAINTING, MISC.; REPAIR PAINTING

More information

CHAPTER 12 MICHIGAN DESIGN MANUAL BRIDGE DESIGN REHABILITATION PROJECTS REHABILITATION PROJECTS SCOPE OF REHABILITATION PROJECTS

CHAPTER 12 MICHIGAN DESIGN MANUAL BRIDGE DESIGN REHABILITATION PROJECTS REHABILITATION PROJECTS SCOPE OF REHABILITATION PROJECTS CHAPTER 12 REHABILITATION PROJECTS 12.00 REHABILITATION PROJECTS 12.01 SCOPE OF REHABILITATION PROJECTS 12.01.01 Structures Carrying Pedestrian Traffic 12.01.02 Historic Bridges 12.02 GEOMETRIC CRITERIA

More information

FRACTURE CRITICAL BRIDGE INSPECTION

FRACTURE CRITICAL BRIDGE INSPECTION FRACTURE CRITICAL BRIDGE INSPECTION In-Depth Report BRIDGE # 9340 (SQUIRT BRIDGE) I-35W over the Mississippi River at Minneapolis, MN JUNE 2006 Prepared For Minnesota Department of Transportation Office

More information

BRIDGE RATING. Prepared for MASSACHUSETTS DEPARTMENT OF TRANSPORTATION HIGHWAY DIVISION BOSTON. ST Monsignor William Casey Highway.

BRIDGE RATING. Prepared for MASSACHUSETTS DEPARTMENT OF TRANSPORTATION HIGHWAY DIVISION BOSTON. ST Monsignor William Casey Highway. BRIDGE RATING Prepared for MASSACHUSETTS DEPARTMENT OF TRANSPORTATION HIGHWAY DIVISION BOSTON ST 203 - Monsignor William Casey Highway over Washington Street & Amtrak/MBTA Rail Road BRIDGE NO. B-16-367

More information

Bridge Manual - Part I - June CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE

Bridge Manual - Part I - June CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE Bridge Manual - Part I - June 2007 5-1 CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE 5.1 GENERAL This chapter is intended to instruct the Designer in the preparation and submission of Special Provisions and

More information

Panama City Marina City of Panama City, Florida

Panama City Marina City of Panama City, Florida Panama City Marina City of Panama City, Florida MARINA BULKHEAD ASSESSMENT October 3, 2011 Prepared For: Prepared By: 543 Harbor Boulevard, Suite 204 Destin, Florida 32541 DRAFT - 12/19/2011 Panama City

More information

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges. STANDARD BRIDGE & CULVERT COMPONENTS Alberta Bridge Inventory In Alberta there are about 13,300 bridges. Types of bridges in Alberta: Standard bridges 3521 (26%) Bridge size culverts 8348 (63%) Major bridges

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes

More information

BRIDGE INSPECTION REPORTS 101. Protecting Your Bridge Inventory for the Future Jason Kelly, PE

BRIDGE INSPECTION REPORTS 101. Protecting Your Bridge Inventory for the Future Jason Kelly, PE BRIDGE INSPECTION REPORTS 101 Protecting Your Bridge Inventory for the Future Jason Kelly, PE >> Presentation Overview Program History Data Collection Reporting Sufficiency Rating 5/26/2016 Bridge Inspection

More information

Procedure No: (SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION PROCEDURE

Procedure No: (SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION PROCEDURE Approved : Procedure No: 210-003(SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting Julie Ray, Deputy Director Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION

More information

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK The professional services to be provided by the Consultant under this Agreement shall be as necessary to complete the required analyses, layouts,

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

Guidelines for Checking Final Design Bridge Plans

Guidelines for Checking Final Design Bridge Plans MNDOT BRIDGE OFFICE Guidelines for Checking Final Design Bridge Plans Edited by the MnDOT Bridge Office ES ESS Committee February 2018 Disclaimer: This document is meant to be used as a checklist for the

More information

Designing Bridges for Inspectability

Designing Bridges for Inspectability Designing Bridges for Inspectability Sreenivas Alampalli 1 and Arthur P. Yannotti 2 1 New York State Department of Transportation 50 Wolf Road, Albany, NY 12232 (518) 457-5498; salampalli@dot.state.ny.us

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 55J11 TWP 197 (70 TH AVE NW) OVER A STREAM DISTRICT 6 OLMSTED COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 55J11 TWP 197 (70 TH AVE NW) OVER A STREAM DISTRICT 6 OLMSTED COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 55J11 TWP 197 (70 TH AVE NW) OVER A STREAM DISTRICT 6 OLMSTED COUNTY OCTOBER 2, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS

More information

ENGINEERING DIRECTIVE

ENGINEERING DIRECTIVE Number: E-95-001 Date: 2/2/95 ENGINEERING DIRECTIVE Ross B. Dindio (Signature on Original) CHIEF ENGINEER The purpose of this engineering directive is to formally notify ALL Department engineering personnel

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

JULY 2016 LRFD BRIDGE DESIGN 11-1

JULY 2016 LRFD BRIDGE DESIGN 11-1 JULY 016 LRFD BRIDGE DESIGN 11-1 11. ABUTMENTS, PIERS, AND WALLS This section contains guidance for the design and detailing of abutments, piers, retaining walls, and noise walls. Abutments and piers are

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , & TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS Financial Project ID 429140-1-52-01, 429140-2-52-01 & 428267-1-52-01 The official record of this Technical Special Provision is the electronic file signed

More information

CONTRACTOR S PROPOSAL FISCAL YEAR STREET IMPROVEMENT PROJECT AND MAIN STREET BRIDGE REHABILITATION

CONTRACTOR S PROPOSAL FISCAL YEAR STREET IMPROVEMENT PROJECT AND MAIN STREET BRIDGE REHABILITATION CONTRACTOR S PROPOSAL COMPANY ADDRESS CITY, STATE, ZIP ( ) TELEPHONE NUMBER City of Hesperia 9700 Seventh Avenue Hesperia, CA 92345 Ladies and Gentlemen: STATE LICENSE NUMBER Pursuant to the Public Notice

More information

Table of Contents. July

Table of Contents. July Table of Contents 36.1 General... 3 36.1.1 Bridge or Culvert... 3 36.1.2 Box Culvert Size Restrictions... 4 36.1.3 Stage Construction for Box Culverts... 4 36.2 Dead Loads and Earth Pressure... 5 36.3

More information

Annual CSAH Needs Update for 2017

Annual CSAH Needs Update for 2017 Annual CSAH Needs Update for 2017 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segments and project data using the SANeeds system.

More information

Alligator Cracking. Light. Medium. High

Alligator Cracking. Light. Medium. High Alligator Cracking Description: A series of interconnecting cracks caused by fatigue failure on the asphalt concrete surface under repeated traffic loading. Causes: Loads in excess of the current pavement

More information

Structural - Engineering Review Checklist

Structural - Engineering Review Checklist Structural - Engineering Review Checklist Project: List Corridor Criteria ID Review Priority (H,M,L) TOPICS S-_-## Structural Design Codes, Manuals and Specifications 6.1.0 REFERENCES DESIRED Criteria

More information

Critical Structures Construction Issues

Critical Structures Construction Issues Critical Structures Construction Issues FLORIDA DEPARTMENT OF TRANSPORTATION STATE CONSTRUCTION OFFICE Specification 1-3: Definitions Contractor s Engineer of Record Specialty Engineer CLASS OF CONTRACTOR

More information

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY Detailing of ABC Bridges for Simplicity and Durability Michael P. Culmo, P.E. CME Associates, Inc. East Hartford, CT DETAILS This presentation contains many preferred details My favorite details will be

More information

ODOT Design & Construction Requirements for MSE Walls

ODOT Design & Construction Requirements for MSE Walls ODOT Design & Construction Requirements for MSE Walls Peter Narsavage, P.E. Foundation Engineering Coordinator Ohio Department of Transportation Office of Structural Engineering 2006 Ohio Transportation

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Bridge Project/Plan Authorization and Approval Authority SPECIFIC SUBJECT:

More information

RETROFIT AND REPLACEMENT OF DUMBARTON RAILROAD BRIDGES

RETROFIT AND REPLACEMENT OF DUMBARTON RAILROAD BRIDGES RETROFIT AND REPLACEMENT OF DUMBARTON RAILROAD BRIDGES Kuan S. Go, P.E., Semyon Treyger, S.E., Michael Jones, S.E., HNTB Corporation Stephen J. Hill, Bernard Susanto, Wenlin Yang, San Mateo County Transit

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2017.02 Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 The following changes are made to the Proposal, Specifications and Plans: SPECIFICATIONS:

More information

Bonner Bridge Replacement Update:

Bonner Bridge Replacement Update: Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner

More information

In Service Replacement of Box Girder Bottom Slab

In Service Replacement of Box Girder Bottom Slab In Service Replacement of Box Girder Bottom Slab WSDOT Bridge No. 5/537S - Span 11 Craig R. Boone, P.E., S.E. Lynn Peterson Secretary of Transportation 2015 Western Bridge Engineers Seminar Reno, Nevada

More information

CHAPTER 11 PAVEMENT TYPE DETERMINATION

CHAPTER 11 PAVEMENT TYPE DETERMINATION CHAPTER 11 PAVEMENT TYPE DETERMINATION 11.1 PAVEMENT TYPE SELECTION FACTORS A highway system designation shall not determine the choice of pavement type. The following factors should be considered when

More information

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.

More information

Addendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16

Addendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16 Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 1 Perdue Stadium Seating Bowl Improvements

More information

National Bridge Inspection Program Risk-based, Data-driven FHWA Oversight

National Bridge Inspection Program Risk-based, Data-driven FHWA Oversight National Bridge Inspection Program Risk-based, Data-driven FHWA Oversight March 21, 2012 National Bridge Inspection Standards (NBIS) Metrics Metric #1: 23 CFR 650.307 Bridge inspection organization Metric

More information

December 19, 2012 ADDENDUM NO. 11. To Prospective Bidders and Others on:

December 19, 2012 ADDENDUM NO. 11. To Prospective Bidders and Others on: 601096-12 December 19, 2012 ADDENDUM NO. 11 To Prospective Bidders and Others on: Technical/Price Proposals Postponed To: Thursday, January 17, 2013 @ 2:00 PM Transmitting the following Documents and Clarifications:

More information

SCOPE OF SERVICES TRAFFIC SIGNAL MAST ARMS & HIGH MAST LIGHT POLE INSPECTIONS IN MIAMI DADE COUNTY

SCOPE OF SERVICES TRAFFIC SIGNAL MAST ARMS & HIGH MAST LIGHT POLE INSPECTIONS IN MIAMI DADE COUNTY TRAFFIC SIGNAL MAST ARMS & HIGH MAST LIGHT POLES INSPECTONS IN MIAMI DADE COUNTY FM #410568-4-72-02 SCOPE OF SERVICE Table of Contents 1.0 GENERAL DESCRIPTION 2~3 2.0 PERSONNEL REQUIREMENTS.3~4 3.0 FIELD

More information

Maintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013

Maintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013 Maintenance, Construction & Secondary Roads Terry Gibson, PE Chief Engineer February 20, 2013 State versus local responsibility Division structure Allocations Flexibility in funding Implications of not

More information

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

Section 13. Guidelines for the Design of Ground Mounted Sign Supports Section 13 BDC11MR-04 13.1 Introduction Highway signs fall into two main categories, which are subdivided as follows: 1. Overhead Signs a. Sign Bridge Structures (GO) b. Sign Cantilever Structures (GO)

More information

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013 ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME

More information

Alder Drive / Blair Road Bridge Replacement Projects

Alder Drive / Blair Road Bridge Replacement Projects Alder Drive / Blair Road Bridge Replacement Projects Presented By: County of El Dorado Community Development Agency Transportation Division Matthew Smeltzer, P.E. Deputy Director of Engineering Paul Hom,

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Washington State s Skagit River Bridge Emergency Slide Bijan Khaleghi

More information

Bijan Khaleghi, Ph, D. P.E., S.E.

Bijan Khaleghi, Ph, D. P.E., S.E. 0 Submission date: July, 0 Word count: 0 Author Name: Bijan Khaleghi Affiliations: Washington State D.O.T. Address: Linderson Way SW, Tumwater WA 0 INTEGRAL BENT CAP FOR CONTINUOUS PRECAST PRESTRESSED

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

Designer Supplement: AS-2-15 Approach Slab Installation January 16, 2015

Designer Supplement: AS-2-15 Approach Slab Installation January 16, 2015 1 Overview: The purpose of Standard Bridge Drawing, AS-2-15, is to address details of approach slabs not previously addressed in the AS-1-81 Standard Bridge Drawing. Specifically, the drawing was initiated

More information

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION Vireak Hinh, P.Eng. R.V. Anderson Associates Ltd., Toronto, Canada Jennifer Trimble Region of Halton, Oakville, Canada

More information

PRESERVING LOUISIANA S INFRASTRUCTURE: US190 MISSISSIPPI RIVER BRIDGE

PRESERVING LOUISIANA S INFRASTRUCTURE: US190 MISSISSIPPI RIVER BRIDGE PRESERVING LOUISIANA S INFRASTRUCTURE: US190 MISSISSIPPI RIVER BRIDGE Overview 1. Project Objectives 2. Bridge Data 3. Timeline 4. Existing Condition 5. Sequence of Coating and Repair Operations 6. Major

More information

SECTION PAVEMENT STRUCTURE ANALYSIS

SECTION PAVEMENT STRUCTURE ANALYSIS MATERIALS PAVEMENT DESIGN 540.02.01 540.01 General SECTION 540.00 PAVEMENT STRUCTURE ANALYSIS 540.01.01 An engineering report covering life cycle cost analysis of the pavement structure shall be made for

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

Minnesota Department of Transportation (MnDOT) Local Historic Bridge Report

Minnesota Department of Transportation (MnDOT) Local Historic Bridge Report Executive Summary Bridge 27547 carries two-way traffic on Chicago Avenue South over Minnehaha Creek. It is owned by the City of Minneapolis. The bridge was designed by R. Fredrickson for the City of Minneapolis

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Bridge Safety Inspections SPECIFIC SUBJECT: Inventory and Inspection Requirements

More information

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA PURPOSE AND SCOPE These criteria modify and supplement the applicable sections of the AREMA Manual of Recommended Practice in connection

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

REQUEST FOR PROPOSAL Asphalt & Concrete Repair

REQUEST FOR PROPOSAL Asphalt & Concrete Repair REQUEST FOR PROPOSAL 2017 Asphalt & Concrete Repair English Landing Elementary School Union Chapel Elementary School Lakeview Middle School Park Hill High School Prairie Point Elementary School Congress

More information

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) SPECIAL PROVISION August 31, 2009 PROJECT # S-R399(42) PROJECT # S-R399(59) PIN # 6697/7236 SECTION 03253S BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) Add Section 03253S: PART

More information

ADDENDUM NO. 1. Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road

ADDENDUM NO. 1. Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road Financial Services Purchasing Division 215 N. Mason St. 2 nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

DECEMBER 2017 LRFD BRIDGE DESIGN 2-1

DECEMBER 2017 LRFD BRIDGE DESIGN 2-1 DECEMBER 2017 LRFD BRIDGE DESIGN 2-1 2. GENERAL DESIGN AND LOCATION FEATURES The design of a bridge typically takes place in two major phases of work: preliminary design and final design. During preliminary

More information

FINAL REPORT EVALUATION OF HYDRAULIC CEMENT CONCRETE OVERLAYS PLACED ON THREE PAVEMENTS IN VIRGINIA. Michael M. Sprinkel, P.E.

FINAL REPORT EVALUATION OF HYDRAULIC CEMENT CONCRETE OVERLAYS PLACED ON THREE PAVEMENTS IN VIRGINIA. Michael M. Sprinkel, P.E. FINAL REPORT EVALUATION OF HYDRAULIC CEMENT CONCRETE OVERLAYS PLACED ON THREE PAVEMENTS IN VIRGINIA Michael M. Sprinkel, P.E. Research Manager Celik Ozyildirim, Ph.D. Principal Research Scientist (The

More information

Bridge Inspection Manual. Revised July 2002 by Texas Department of Transportation (512) all rights reserved

Bridge Inspection Manual. Revised July 2002 by Texas Department of Transportation (512) all rights reserved Bridge Inspection Manual Revised July 2002 by Texas Department of Transportation (512) 416-2055 all rights reserved Bridge Inspection Manual July 2002 Manual Notices Manual Notice 2002-1 To: From: Manual:

More information

Bridge Preventative Maintenance.Act now before this happens to you! Keith Cooper, P.E. Local Bridge Program Manager

Bridge Preventative Maintenance.Act now before this happens to you! Keith Cooper, P.E. Local Bridge Program Manager Bridge Preventative Maintenance.Act now before this happens to you! Keith Cooper, P.E. Local Bridge Program Manager 1 Local Bridge Program Asset Management for Local Bridges 2008 started approving Rehabilitation

More information

Executive Summary. Champlain Bridge Approach Spans Edge Girder Condition Assessment and Rehabilitation Requirements.

Executive Summary. Champlain Bridge Approach Spans Edge Girder Condition Assessment and Rehabilitation Requirements. Executive Summary "Les Ponts Jacques Cartier et Champlain Incorporée" (PJCCI) requested that Buckland & Taylor (B&T) study the overall condition of the approach span edge girders of the Champlain Bridge

More information

Design and Rating of Steel Bridges

Design and Rating of Steel Bridges 2014 Bentley Systems, Incorporated Parametric and Integrated Bridge Design LEAP Bridge Steel Steve Willoughby Design and Rating of Steel Bridges 2 WWW.BENTLEY.COM 2014 Bentley Systems, Incorporated 1 Discussion

More information

ODOT Manual of Bridge Inspection 2014 v8. Element Level (Condition States) Field Manual (Chapters 7 & 9)

ODOT Manual of Bridge Inspection 2014 v8. Element Level (Condition States) Field Manual (Chapters 7 & 9) ODOT Manual of Bridge Inspection 2014 v8 Element Level (Condition States) Field Manual (Chapters 7 & 9) Chapter 7: Field Evaluation The importance of keeping public vehicular traffic safe and the inspector

More information

SUNSHINE SKYWAY BRIDGE

SUNSHINE SKYWAY BRIDGE SUNSHINE SKYWAY BRIDGE Retrofit of the Post-Tensioned Precast Transition Pier Columns on the Sunshine Skyway Bridge Presented by: Antonio Ledesma, P.E. May 7, 2012 SUNSHINE SKYWAY BRIDGE, FLORIDA Presentation

More information

Scott Neubauer. Bridge Maintenance and Inspection Engineer Office of Bridges and Structures Iowa DOT

Scott Neubauer. Bridge Maintenance and Inspection Engineer Office of Bridges and Structures Iowa DOT Scott Neubauer Bridge Maintenance and Inspection Engineer Office of Bridges and Structures Iowa DOT 515-239-1165 scott.neubauer@dot.iowa.gov Manual Development IOWA HIGHWAY RESEARCH BOARD PRO JECT N O.

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT MAINE TURNPIKE AUTHORITY ADDENDUM NO. CONTRACT 08.09 BRIDGE REPAIRS RUNNING HILL ROAD UNDERPASS (MILE 5.) BLACKSTRAP ROAD UNDERPASS (MILE 58.3) WEYMOUTH ROAD UNDERPASS (MILE 66.) SUPERSTRUCTURE REPLACEMENT

More information

2008 Bridge Load Rating Class 101

2008 Bridge Load Rating Class 101 2008 Bridge Load Rating Class 101 Workshop Agenda VIII. Load Rating Example #2 IX. Simple Span Nail Laminated Timber Deck (without distress) Class Exercise Simple Span Nail Laminated Timber Deck (with

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

VENETIAN CAUSEWAY. (Venetian Way) Project Development & Environment (PD&E) Study FROM NORTH BAYSHORE DRIVE TO PURDY AVENUE. FM No.

VENETIAN CAUSEWAY. (Venetian Way) Project Development & Environment (PD&E) Study FROM NORTH BAYSHORE DRIVE TO PURDY AVENUE. FM No. VENETIAN CAUSEWAY (Venetian Way) Project Development & Environment (PD&E) Study FROM NORTH BAYSHORE DRIVE TO PURDY AVENUE FM No. 422713-2-22-01 Efficient Transportation Decision Making (ETDM): 12756 Project

More information

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable

More information

Carter Bridge to Brooks Street Design Build RFI Questions and Answers

Carter Bridge to Brooks Street Design Build RFI Questions and Answers 1. Project Limits -- Nick Wyatt of Kokosing Construction Co., Inc The project criteria defines the project limits by listing 19 bridges. However, portions of these structures were very recently overlayed