INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

Size: px
Start display at page:

Download "INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION"

Transcription

1 Updated April 13, 2018 ALLEGHENY COUNTY SR 376(A65) # PROPOSAL:$15.96 PLANS 8.5x11:$2.04 The description and location of the project is as follows: For the milling, resurfacing, pavement marking, and other miscellaneous construction, all within a length of 39,082 linear feet (7.40 miles) as indicated on the approved drawings included in the bid package for I 376 LONGITUDINAL JOINT REPAIR in ALLEGHENY COUNTY, CITY OF PITTSBURGH, EDGEWOOD, BRADDOCK HILLS, WILKINSBURG, CHURCHILL, and MONROEVILLE BOROUGHS, WILKINS and PENN HILLS TOWNSHIPS, Commonwealth of Pennsylvania. The project being situated as follows: SR 0376, Section A65 (Penn Lincoln Parkway) From a point approximately 500 feet east of the South Braddock Avenue Interchange at Segment 0764/0765 EB/WB Offset 0639/0602 EB/WB (Station 0+00) to a point approximately 170 feet west of SR 0022 (Penn Lincoln Highway) and SR 2048 (William Penn Highway) at Segment 0844 Offset 0628 EB (Station ) and to SR 0022 (Penn Lincoln Highway) and SR 2048 (William Penn Highway) at Segment 0845 Offset 0334 WB (Station ). Various State Routes and Facilities throughout Allegheny County for unforeseen repair and/or resurfacing, as directed. CLINTON COUNTY SR 120(P22) #4601 PROPOSAL:$29.04 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$85.80 The description and location of the project is as follows: For the improvement to bridges in CLINTON COUNTY, GRUGAN and CASTANEA TOWNSHIPS, CITY of LOCK HAVEN, Commonwealth of Pennsylvania, SR 0120-P22. For the rehabilitation and preservation of two bridges involving Type 3 deck repair, rebar installation, concrete repairs, neoprene strip seal dam replacement, and epoxy surface treatments for bridge decks. Work includes design and construction of Precast Reinforced Concrete Prefabricated T-Wall Retaining Wall System. Work is near an airport and FAA additional conditions apply. Work also includes Superpave Asphalt Mixture Designs for the base and wearing courses, guide rail, pavement markings and miscellaneous construction for a total construction length of approximately 1161 feet (0.22 miles) as indicated on the approved drawings included in the bid package. LAWRENCE COUNTY SR 3010(L04) # Moved to 4/26/18 from 4/12/18 PROPOSAL:$28.68 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ The description and location of the project is as follows: For the bridge rehabilitation, approach, drainage, guide rail, pavement markings, and other miscellaneous construction, all within a length of feet (0.08 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 3010, SECTION L04 (West Washington Street) in LAWRENCE COUNTY, CITY OF NEW CASTLE, Commonwealth of Pennsylvania. The project being situated as follows: From a point approximately 495 linear feet east of North Front Street (Station 6+90) to a point approximately 188 linear feet west of North Beaver Street (Station 12+00). INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated April 4, 2018 SCHUYLKILL COUNTY SR 125(SHR) # PROPOSAL:$16.44 PLANS:$ X18:$ X36:$35.10 This project is to construct a 90 section of SR 0125 (E. Center Street) as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0125, SECTION SHR, in SCHUYLKILL COUNTY, PORTER TOWNSHIP. The work includes installation of micropiles for the purpose of creating a bulkhead in an abandoned mine air hole. From approximately 0.5 MI. W of SR 0081 at segment 0220 offset 1898 to approximately 0.6 MI. W of SR 0081 at segment 0220 offset

2 BEAVER COUNTY SR 18(B53) # PROPOSAL:$50.64 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ Ex St:$ x18:$ x36:$35.10 The description and location of the project is as follows: This is a partial Design Build roadway project. Design activities are limited to: Concrete curb ramps, utility coordination For the milling and resurfacing, concrete pavement rehabilitation, drainage, guide rail, signing and pavement marking, signals, bridge preservation, and other miscellaneous construction, all within a length of 28, linear feet (5.355 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 0018 SECTION B53 (Brodhead Road, Pennsylvania Avenue, 9th Street) and STATE ROUTE 3002 SECTION B01 (Old Brodhead Road), in BEAVER COUNTY, MONACA BOROUGH, CENTER TOWNSHIP, Commonwealth of Pennsylvania. This project being situated as follows: From a point approximately 930 feet west of Beaver Valley Mall Boulevard (T-627) at Segment 0390/0391 Offset 3628/3633 (Station ) to a point approximately 175 feet north of Atlantic Avenue at Segment 0490 Offset 0100 (Station ). BEAVER COUNTY SR 6018(B08) # PROPOSAL:$27.84 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ Ex St:$ x18:$ x36:$ The description and location of the project is as follows: This is a partial Design Build roadway project. Design activities are limited to: Concrete curb ramps For the bituminous milling and resurfacing, concrete pavement patching, drainage, curb and sidewalk, signing and pavement marking, signals, bridge rehabilitation, bridge preservation, and other miscellaneous construction, all within a length of 33, linear feet (6.36 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 6018, SECTION B08 (Rhode Island Avenue, Brighton Avenue, West Madison Street, Delaware Avenue) and STATE ROUTE 0018, SECTION B54 (Junction Stretch Road, Third Avenue, Fifth Street), in BEAVER COUNTY, ROCHESTER TOWNSHIP, ROCHESTER AND NEW BRIGHTON BOROUGHS, Commonwealth of Pennsylvania. This project being situated as follows: From a point approximately 135 feet west of the 5th Street and 5th Avenue intersection at Segment 0216 Offset 0147 (Station ) to a point approximately 350 feet east of the Rochester-Monaca Bridge overpass at Segment 0221 Offset 1030 (Station ). INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated April 2, 2018 VENANGO COUNTY SR 2013(582) # PROPOSAL:$16.80 PLANS:$4.32 For the construction or improvement of a certain section of STATE HIGHWAYS in VENANGO COUNTY, CITY OF OIL CITY, CRANBERRY AND ROCKLAND TOWNSHIPS, Commonwealth of Pennsylvania, STATE ROUTE 2013 SECTION 582. This project being situated as follows, SR From the intersection with Rockland Station Rd.(T-480) & McDowels Rd. (T-522) at Segment 0010 Offset 0000 then north to approximately 401 feet north of the Rockland/Cranberry Township line at Segment 0100 Offset SR From approximately 205 feet west of the intersection with Carroll Ave. at Segment 0040 Offset 2100 then east and north to approximately 100 feet east of the intersection with Lynch Blvd. at Segment 0060 Offset For the bituminous milling and overlay with Warm Mix Superpave Asphalt Mixture Designs 20' to 46' in width, also for drainage, ADA curb ramps, guide rail, and pavement markings all within a project length of 5.77 miles as indicated on the approved drawings. 2

3 WARREN COUNTY SR 1021(681) # PROPOSAL:$16.68 PLANS 8.5x11:$4.20 For the construction or improvement of a certain section of STATE HIGHWAYS in WARREN COUNTY, CITY OF WARREN AND CONEWANGO AND GLADE TOWNSHIPS, Commonwealth of Pennsylvania, STATE ROUTE 1021 SECTION 681. This project being situated as follows, SR From the intersection with SR & SR at Segment 0010 Offset 0000 then west to approximately 279 feet west of the intersection with Evening Star Lane (T-491) at Segment 0010 Offset SR From the intersection with SR (Conewango Ave.) at Segment 0010 Offset 0000 then east and north to the intersection with SR (Fifth St.). at Segment 0070 Offset SR From the intersection with SR & SR at Segment 0010 Offset 0000 then east and north to the intersection with SR at Segment 0040 Offset For the bituminous milling and overlay with Warm Mix Superpave Asphalt Mixture Designs 19' to 58' in width, also for drainage, ADA curb ramps, paved shoulders, guide rail, loop sensors, and pavement markings all within a project length of 5.14 miles as indicated on the approved drawings. DELAWARE COUNTY SR 3(GED) # PROPOSAL:$25.08 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$78.00 The description and location of the project is as follows: Project is located at the I-476 and West Chester Pike (SR 0003) interchange on the northwest and southwest quadrants. Roadway widening from a 4 lane section to 6 lane section along SR 0003, from New Ardmore Avenue to Ramp S-WC Spur. Replacement of an existing overhead sign structure on SR Reconfiguration of the I-476 southbound off ramp (Ramp S-WC Spur) from a 3 lane section to 4 lane section including minor widening, and the installation of BMP Basin and Rain Gardens. Roadway widening along Langford Run Road (Future Township Road) Improvements approaching SR Traffic signal improvements along SR 0003 including new traffic signal at the intersection of SR 0003 and Langford Run Road and implementation of a Traffic Adaptive system along SR 0003 from New Ardmore Avenue to Old West Chester Pike and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0003, SECTION GED, in MARPLE TOWNSHIP, DELAWARE COUNTY from approximately New Ardmore Road at Segment 0120/0121 Offset 2056/2072 to east of SR 0476 Southbound off ramp Segment 0120/0121 to Offset 3501/3517. WESTMORELAND COUNTY SR 30(HFS) # PROPOSAL:$13.08 PLANS:$ X18:$ X36:$39.00 The description and location of the project is as follows. Various municipalities in Fayette, Greene, Washington and Westmoreland Counties all as indicated on the approved drawings for the 2018 HSIP HFS Contract. The improvements will consist of a combination of the following mitigation measures - high friction surface treatment, raised pavement markers and pavement markings. CENTRE COUNTY SR 64(P30) # PROPOSAL:$29.52 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: For the improvement/repairs to bridges in CENTRE COUNTY, PATTON and WALKER TOWNSHIPS, MILESBURG BOROUGH, Commonwealth of Pennsylvania, SR 0064-P30. For the rehabilitation of two bridges involving bridge deck replacement, Type 3 deck repair, rebar installation, concrete repairs, neoprene strip seal dam replacement, and epoxy surface treatments for bridge decks, also miscellaneous repairs to a third structure. Work also includes Superpave Asphalt Mixture Designs for the base and wearing courses, guide rail, pavement markings and miscellaneous construction for a total construction length of approximately 4317 feet (0.82 miles) as indicated on the approved drawings included in the bid package. 3

4 ALLEGHENY COUNTY SR 7403(LOC) #93370 PROPOSAL:$37.92 PLANS:$ X18:$5.6 24X36:$81.90 The description and location of the project is as follows: For the bridge preservation, approach roadway, pavement marking, painting structural steel, and other miscellaneous construction, all within a length of linear feet (0.055 miles), as indicated on the approved drawings included in the bid package for BROWNSVILLE ROAD BRIDGE NO. 1 (Brownsville Road), in ALLEGHENY COUNTY, BALDWIN and WHITEHALL BOROUGHS, Commonwealth of Pennsylvania. This project being situated as follows: From a point approximately 100 feet north of Linhart Lane at Station to a point approximately 995 feet south of Snyder Drive at Station ALLEGHENY COUNTY SR 7110(LOC) #78212 PROPOSAL:$45.12 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$50.70 Ex St:$ x18:$ x36:$ The description and location of the project is as follows: For the bridge preservation, approach roadway, drainage, highway lighting, signing and pavement marking, painting structural steel, and other miscellaneous construction, all within a length of 1,550.0 linear feet (0.294 miles), as indicated on the approved drawings included in the bid package for FLEMING PARK BRIDGE (Neville Road), in ALLEGHENY COUNTY, NEVILLE and STOWE TOWNSHIPS, Commonwealth of Pennsylvania. This project being situated as follows: From Island Avenue / Robinson Boulevard (SR 0051) at Station 2+10 to a point approximately 3240 feet south of Grand Avenue at Station Updated May 28, 2018 LACKAWANNA COUNTY SR 3022(FP2) # PROPOSAL:$18.96 PLANS:$2.64 This project is for the resurfacing of approximate total of 3.42 miles of existing bituminous roadway on the following STATE ROUTES: (S.R. 3022: Segment 0010 Offset 0000 to Segment 0010 Offset 3882 (.74 MI), S.R. 3022: Segment 0011 Offset 0000 to Segment 0011 Offset 3985 (.75 MI). S.R. 8005: Segment Offset 0010 to Segment 0010 Offset 1402 (Ramp A-.27 MI). S.R. 8005: Segment 0250 Offset 0000 to Segment 0250 Offset 1846 (Ramp C MI). S.R: 8005 Segment 0260 Offset 0000 to Segment 0260 Offset 1421 (Ramp B-.27 MI) and S.R. 8005: Segment 0270 Offset 0000 to Segment 0270 Offset 0410 (Ramp F-.77 MI), S.R. 8005: Segment 0500 Offset 0000 to Segment 0500 Offset 0598 (Ramp D-.12 MI), S.R. 8025: Segment 0500 Offset 0000 to Segment 0500 Offset 0626 (Ramp B-.07 MI), ), S.R. 8025: Segment 0510 Offset 0000 to Segment 0510 Offset 0532 (Ramp C.10 MI), S.R. 8025: Segment 0250 Offset 0000 to Segment 0250 Offset 1442 (Ramp D-.10 MI) 8025: Segment 0750 Offset 0000 to Segment 0750 Offset 1890 (Ramp E-.35 MI), IN Lackawanna COUNTY IN VARIOUS MUNICIPALITIES in the COMMONWEALTH OF PENNSYLVANIA with Warm Mix Design Asphalt Wearing and Scratch Courses, Milling, Safety Improvement up grades (Glare Screen with Fluorescent Reflector Panels attached to Median Barrier), Line Painting and Pavement Markings BERKS COUNTY SR 7214(01B) # PROPOSAL:$21.96 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$35.10 Ex St:$ x18:$ x36:$23.40 Superstructure replacement of 3-lane, single span Harvey Avenue (T-543) over Antietam Creek bridge and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 7214, SECTION 01B, in Berks COUNTY, Exeter TOWNSHIP between Station Butter Lane (T-449) and Station Bingaman Street (T-543) (no segments/offsets). 4

5 BLAIR COUNTY SR 0000(12P) # PROPOSAL:$20.88 PLANS:$ X18:$ X36:$ The proposed project will replace the existing stairs and landings with precast units. The ornamental railings will be rehabilitated and the structural steel will be sand blasted and painted. Expansion dams will be repaired or replaced. The brick casing on the piers will be repointed. All pedestrian lighting will be replaced. All cracked/spalled areas will be patched and a penetrating sealer will be applied to all exposed concrete surfaces as indicated on the approved drawings included in the bid package for STATE ROUTE 0000, SECTION 12P, in BLAIR COUNTY, CITY OF ALTOONA. BEDFORD COUNTY SR 0000(---) # PROPOSAL:$9.96 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: This project is for the application of painted pavement markings at various locations on STATE HIGHWAYS in BEDFORD, BLAIR, CAMBRIA, FULTON, HUNTINGDON and SOMERSET COUNTIES, VARIOUS TOWNSHIPS AND MUNICIPALITIES, Commonwealth of Pennsylvania, all as indicated on the approved drawings included in the bid package. PHILADELPHIA COUNTY SR 95(AF1) #79911 PROPOSAL:$ PLANS:$ X18:$ X36:$1, X-SEC:$ X18:$ X36:$ The description and location of the project is as follows: reconstruction of S.R. 2001, reconstruction of four traffic signal installations, reconstruction of SEPTA trolley tracks, catenary, and the Westmoreland Loop trolley/bus station, utility relocations, and other miscellaneous construction, all as indicated on approved drawings for State Route 0095, Section AF1, in Philadelphia County, City of Philadelphia from approximately Cambia Street at Segment 0160 Offset 0737 to approximately Westmoreland Street at Segment 0170 Offset Updated May 20, 2018 FAYETTE COUNTY SR 166(06R) #98411 PROPOSAL:$21.00 PLANS:$ X18:$ X36:$ Ex St:$ x18:$ x36:$23.40 The description and location of the project is as follows, base repair, milling, resurfacing, slide repair, bridge spall repair, signal replacement, drainage, guide rail, tree trimming, delineation and signing and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0166, SECTION 06R, in FAYETTE COUNTY, GERMAN, LUZERNE & REDSTONE TWPS from approximately the intersection of SR 0166 and SR 4004 at segment 0330 offset 1110 to the intersection of SR 0166 and SR 0040 at segment 0470 offset 075 NB, segment 0471 offset 0680 SB. LACKAWANNA COUNTY SR 307(253) #8239 PROPOSAL:$26.88 PLANS:$ X18:$ X36:$ Ex St:$ x18:$ x36:$ For the rehabilitation and improvement of certain sections of STATE HIGHWAY in LACKAWANNA COUNTY, City of Scranton, Commonwealth of Pennsylvania, STATE ROUTE 0307, SECTION 253 and STATE ROUTE 3020, SECTION EBR. The Project being situated as follows: From Segment 0200/Offset 2327 (Station ) to Segment 210/Offset 0771(Station ) of SR Also from Segment 0010/Offset 2000 (Station 20+00) to Segment 0014/Offset 0278 (Station 24+00) of SR The proposed project consists of bridge rehabilitation on State Route 307 (Moosic Street) over Interstate 81 North Bound, in City of Scranton, Lackawanna County. Project includes type 2 and 3 deck repairs, Latex Modified Concrete Wearing Surface overlay, Class A concrete repairs to the abutments, prestressed beam end repairs, concrete sidewalk replacement, install temporary jacking towers to replace bearings at near and far abutments and approach roadway milling and paving. The proposed project also consists of Bridge repairs on State Route 3020 (Linden Street), over Lackawanna County Rail Authority, in City of Scranton, Lackawanna County. Repairs include installing a temporary support tower and jacking the superstructure to perform concrete repairs to the near abutment. Additional work includes replacing the existing bearings, and resealing the pavement/median curb joint at the near abutment. MPT for the installation of the pavement/median curb joint seals will be under a daytime flagging operation. 5

6 WAYNE COUNTY SR 652(GRM) # PROPOSAL:$11.88 PLANS 8.5x11:$0.12 The description and location of the project is as follows: Wayne County Guide Rail Maintenance Group 4-18-GRM5 - The project includes the repair, replacement and maintenance of guiderail, end treatments, bridge railing, right-of-way fence, and traffic impact attenuator systems on VARIOUS STATE ROUTES throughout WAYNE COUNTY, in the COMMONWEALTH OF PENNSYLVANIA COLUMBIA COUNTY SR 42(65M) #87884 PROPOSAL:$51.36 PLANS:$ X18:$ X36:$ Ex St:$ x18:$ x36:$93.60 Milling and resurfacing of existing roadway, including flexible base replacement, Superpave Asphalt Mixture scratch and wearing courses, pavement markings, guide rail, bridge rehabilitation, design and construction of ADA curb ramps, and other miscellaneous construction as indicated on approved drawings for STATE ROUTE 42, SECTION 65M from approximately 1.61 miles north of the intersection with State Route 4021 at Segment 0700 Offset 0775 to the intersection with State Route 442 at Segment 0080 Offset 0556 in MILLVILLE BOROUGH and GREENWOOD TOWNSHIP, COLUMBIA COUNTY and STATE ROUTE 42, SECTION 108 from approximately 0.24 mile north of the intersection with State Route 3012 at Segment 0350 Offset 1265 to approximately 0.25 mile southeast of the intersection with State Route 2016 at Segment 0350 Offset 1581 in CATAWISSA BOROUGH, COLUMBIA COUNTY and STATE ROUTE 487, SECTION 108 from approximately 0.20 mile north of the intersection with State Route 254 at Segment 0630 Offset 1271 to approximately 25 feet south of the intersection with State Route 239 at Segment 0650 Offset 2000 in BENTON BOROUGH and BENTON TOWNSHIP, COLUMBIA COUNTY and STATE ROUTE 487, SECTION 109 from approximately 0.13 mile north of the intersection with State Route 1007 at Segment 0420 Offset 1647 to approximately 0.99 mile south of the intersection with State Route 1022 at Segment 0520 Offset 0810 in ORANGE and FISHING CREEK TOWNSHIPS, COLUMBIA COUNTY. MONTGOMERY COUNTY SR 0000(GRA) # PROPOSAL:$18.48 The description and location of the project is as follows: The maintenance and repair of impact attenuators/concrete barrier on various state highways in Bucks, Chester, Delaware, Montgomery and Philadelphia Counties. Work is primarily on-demand responding to notifications of damaged units. No work is guaranteed. WYOMING COUNTY SR 292(GRM) # PROPOSAL:$11.52 PLANS 8.5x11:$0.12 The description and location of the project is as follows: Wyoming County Guide Rail Maintenance Group 4-18-GRM6 - The project includes the repair, replacement and maintenance of guiderail, end treatments, delineators, right-of-way fence, and traffic impact attenuator systems on VARIOUS STATE ROUTES throughout WYOMING COUNTY, in the COMMONWEALTH OF PENNSYLVANIA INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION 6

7 Updated May 20, 2018 CLINTON COUNTY SR 64(A02) #89985 PROPOSAL:$21.00 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$4.60 The description and location of the project is as follows: For the improvement of a certain section of STATE HIGHWAY in CLINTON COUNTY, PORTER TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0064, SECTION A02. The project being situated as follows: On State Route 0064 from Segment 0030/Offset 0478 to Segment 0030/Offset 1353, approximately 0.2 mile North of the Village of Lamar. For the removal of the existing Two Span Concrete Adjacent Box Beam with Rolled Steel I-Beams structure and construction of its replacement Two Span Pre-Stressed Concrete Bulb Tee Beam Bridge, approach work consisting of superpave asphalt mixture designs for the base, binder and wearing course, guide rail, pavement markings, and miscellaneous construction for a construction length of approximately 720 feet (0.136 miles) as indicated on the approved drawings. INDIANA COUNTY SR 22(403) # PROPOSAL:$12.84 PLANS 8.5x11:$6.36 The description and location of the project is as follows: For Ultra-thin Bonded Wearing Course, concrete patching, joint cleaning and sealing, sawing and sealing of bituminous overlays and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 22, SECTION 403 in Indiana COUNTY, East Wheatfield TOWNSHIP from approximately 600 feet east of the SR 22/SR 403 intersection at segment 0330 offset 0598 EB and segment 0331 offset 0607 WB to the INDIANA/CAMBRIA County line at segment 0422 offset 0695 EB and segment 0423 offset 0705 WB and STATE ROUTE 22 in Cambria County, Jackson Township from the Indiana/Cambria County line at segment 0012 offset 0000 EB and segment 0013 offset 0000 WB to approximately the SR22/Longspur Road intersection at segment0012 offset 2760 EB and segment 0013 offset 2760 WB. NORTHAMPTON COUNTY SR 248(M89) # PROPOSAL:$16.68 PLANS 8.5x11:$1.20 The project involves milling, base repair, scratch course, wearing course, ultra-thin bonded wearing course, accelerated concrete pavement patching, joint cleaning & sealing, pavement markings, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 248 SECTION M89, in NORTHAMPTON COUNTY LEHIGH TOWNSHIP from segment 20 offset 0000 to segment 60 offset 2404 and segment 21 offset 0000 to segment 21 offset LANCASTER COUNTY SR 4020(020) # PROPOSAL:$15.60 PLANS:$ X18:$ X36:$78.00 This is a pavement preservation project with work that will consist of base replacement, milling, bituminous overlay, guide rail updates, drainage improvements, sign updates, pavement markings, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 4020, SECTION 020, in LANCASTER COUNTY, EAST HEMPFIELD TOWNSHIP, from Old State Road at Segment 0100 Offset 0143 to SR 0741 (McGovernville Road) at Segment 0130 Offset 0090, for an overall project length of 7, linear feet (1.49 miles). VENANGO COUNTY SR 427(B04) #97403 PROPOSAL:$19.32 PLANS:$ X18:$ X36:$89.70 Ex St:$ x18:$ x36:$15.60 The description and location of the project is as follows: For the Bridge Preservation of structure over Sugar Creek, Also for construction of new roadway approaches using Superpave Asphalt Mixture Designs, guiderail, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0427, SECTION B04, in VENANGO COUNTY, SUGARCREEK BOROUGH from segment 0030 offset 0262 to segment 0030 offset

8 LYCOMING COUNTY SR 180(120) #97671 PROPOSAL:$54.60 PLANS:$ X18:$ X36:$ Ex St:$ x18:$ x36:$2, The description and location of the project are as follows: For Resurfacing and Bridge Preservation including excavation, selected borrow excavation rock, subbase, superpave asphalt mixture design WMA scratch, and wearing courses, stone matrix asphalt mixture WMA wearing course, milling, sawing and sealing of bituminous overlays, guide rail, fence, paved shoulders, rumble strips, coarse aggregate, selective tree removal, pavement markings, highway lighting, signs, raised pavement markers, steel wire fabric, class AAAP cement concrete, reinforcement bars, removal of portion of existing bridge, protective coating for reinforced concrete surfaces, neoprene strip seal dam, concrete deck repair, repair deteriorated concrete, epoxy based surface treatment for bridge decks, adhesive anchors, and other related work within an overall length of 144,495 linear feet (27.37 miles) all as indicated on the approved drawings included in the bid package for STATE ROUTE 180, SECTION 120 from approximately 0.40 miles east of the intersection with State Route 2060 at Segment 0344 Offset 1946 (Eastbound)/ Segment 0331 Offset 2336 (Westbound) and approximately 0.33 miles southwest of the intersection with State Route 2014 at Segment 0494 Offset 0210 (Eastbound)/ Segment 0495 Offset 0210 (Westbound) in CITY OF WILLIAMSPORT, LOYALSOCK TOWNSHIP, MONTOURSVILLE BOROUGH, FAIRFIELD TOWNSHIP, MUNCY TOWNSHIP and MUNCY CREEK TOWNSHIP, LYCOMING COUNTY. LYCOMING COUNTY SR 118(14M) # PROPOSAL:$30.72 PLANS:$ X18:$ X36:$78.00 Milling and resurfacing of existing roadway, including flexible base replacement, scratch and wearing courses, guide rail, pavement markings, and other miscellaneous construction within a length of 27,314 linear feet (5.17 miles) as indicated on approved drawings for STATE ROUTE 118, SECTION 14M, also STATE ROUTE 42 from approximately 0.5 mile northeast of the intersection with State Route 2015 at Segment 0170 Offset 0253 to approximately 0.1 mile west of the intersection with State Route 42 at Segment 0300 Offset 00562, also for STATE ROUTE 42 in FRANKLIN and JORDAN TOWNSHIPS, LYCOMING COUNTY. CAMBRIA COUNTY SR 3013(001) # PROPOSAL:$14.40 PLANS:$ X18:$ X36:$39.00 This project is for the resurfacing of approximately miles of bituminous roadway and includes milling, drainage, guiderail & signing upgrades and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 3013, SECTION 001, in CAMBRIA COUNTY, RICHLAND TOWNSHIP at the approximate location: SR 3013, Segment 0010, Offset 0000 to Segment 0030, Offset

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated May 4, 2018 FULTON COUNTY SR 0000(FMC) #109343 PROPOSAL:$21.36 PLANS:$9.02 12X18:$11.07 24X36:$159.90 X-SEC:$7.48 12X18:$9.18 24X36:$132.60 This project involves

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 Updated June 30, 2014 LUZERNE COUNTY SR 309(W02) #102354 PROPOSAL:$25.20 PLANS:$6.24 The description and location

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION APRIL 6, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION APRIL 6, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated March 20, 2017 ALLEGHENY COUNTY SR 3088(05) #106380 PROPOSAL:$23.40 PLANS:$11.88 12X18:$14.58 24X36:$210.60 EXSTRUCT:$3.08 12X18:$3.78 24X36:$54.60 The description and location of the project is

More information

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10 ASSOCIATED PENNSYLVANIA CONSTRUCTORS Update January 3, 2018 GREENE COUNTY - SR 221(J10) #105392 PROPOSAL:$11.76 PLANS:$4.18 12X18:$5.13 24X36:$47.10 The description and location of the project is as follows:

More information

$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000

$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000 $600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000 $- Other Programs Highway Program $800,000,000 $700,000,000 $600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000

More information

Straight Line Diagram. Cameron 12. January 2018

Straight Line Diagram. Cameron 12. January 2018 Straight Line Diagram Cameron 12 January 2018 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is not

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could

More information

AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PUB 336 (4-17)

AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PUB 336 (4-17) AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PREPARED BY: BUREAU OF MAINTENANCE AND OPERATIONS ASSET MANAGEMENT DIVISION P.O. Box 3437 HARRISBURG, PENNSYLVANIA 17105-3437

More information

Bridge Asset Management City of Battle Creek Planning and Projects

Bridge Asset Management City of Battle Creek Planning and Projects Bridge Asset Management City of Battle Creek Planning and Projects Michigan Bridge Conference, March 20, 2013 Gregory B. Rickmar P.E., Public Works Department, City of Battle Creek Alan Halbeisen, P.E.

More information

Blueprint for One of the Nation s Largest SCM Maintenance Programs

Blueprint for One of the Nation s Largest SCM Maintenance Programs Blueprint for One of the Nation s Largest SCM Maintenance Programs PA Department of Transportation Hydrologic & Hydraulic Studies Waterway Permitting Stormwater Design & Permitting Technical Course Development

More information

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 3, Route 46, Valley Road and Notch/Rifle Camp Road Interchange, Contract B DBNUM: 059B / UPC: 123020 From Notch/Rifle Camp Road to just east of the Valley Road Intersection, Route 46 will be widened

More information

Act 101 Section 902 Grants Round 53 Summary

Act 101 Section 902 Grants Round 53 Summary APPLICANT PROJECT REQUESTED AWARDED Comments SOUTHEAST REGION 1 Bristol Township Curbside Recycling $90,585 $90,585 Bucks County Prorgam 2 Chester County Office Building & Community $46,490 $43,439 Item

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Oil and Gas Management

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Oil and Gas Management DOCUMENT NUMBER: ***-****-*** EFFECTIVE DATE: Month DD, YYYY DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Oil and Gas Management TITLE: Addressing Spills and Releases from Oil & Gas Wells and Related

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure. Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:

More information

3.6 Construction Methods

3.6 Construction Methods Exhibit 144: Birchmount Stop Layout West Don River Bridge - Girders are adequate to accommodate LRT right-of-way and required deck widening. Supplementary support or deck strengthening may be required

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 11/21/2014 Project 140560 Addendum No. 2 PID No. 82972 HAM IR 275

More information

CHAPTER 11 PAVEMENT TYPE DETERMINATION

CHAPTER 11 PAVEMENT TYPE DETERMINATION CHAPTER 11 PAVEMENT TYPE DETERMINATION 11.1 PAVEMENT TYPE SELECTION FACTORS A highway system designation shall not determine the choice of pavement type. The following factors should be considered when

More information

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016 Rt. 29 Solutions Project Delivery Advisory Panel February 18, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Feb

More information

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017 2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017 2017 CBD Improvements Agenda Meeting Agenda Introduction Scope of Improvements Time frames for improvements May vary

More information

General Permit WMGR116. Beneficial Use of Alternative Fuels for Circulating and Bubbling Fluidized Bed Boilers and Pulverized Coal-fired Boilers

General Permit WMGR116. Beneficial Use of Alternative Fuels for Circulating and Bubbling Fluidized Bed Boilers and Pulverized Coal-fired Boilers General Permit WMGR116 Beneficial Use of Alternative Fuels for Circulating and Bubbling Fluidized Bed Boilers and Pulverized Coal-fired Boilers Department of Environmental Protection Bureau of Waste Management

More information

REHABILITATION PACKAGE 4-a

REHABILITATION PACKAGE 4-a 4-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 4-a Rehab option 4-a is a rehabilitation package whereby all spans of the existing steel truss structure would be rehabilitated and strengthened.

More information

NJDOT STATE REPORT NORTHEAST PAVEMENT PRESERVATION PARTNERSHIP ANNUAL MEETING APRIL 29 MAY 1, 2015 NEWARK, DELAWARE

NJDOT STATE REPORT NORTHEAST PAVEMENT PRESERVATION PARTNERSHIP ANNUAL MEETING APRIL 29 MAY 1, 2015 NEWARK, DELAWARE NJDOT STATE REPORT NORTHEAST PAVEMENT PRESERVATION PARTNERSHIP ANNUAL MEETING APRIL 29 MAY 1, 2015 NEWARK, DELAWARE OVERVIEW Pavement Specification Changes Status of NJDOT Highway System NJDOT Pavement

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

STANDARD CONDITIONS GENERAL PERMIT WMGM042

STANDARD CONDITIONS GENERAL PERMIT WMGM042 STANDARD CONDITIONS GENERAL PERMIT WMGM042 A. Authorization: This general permit authorizes the processing (mixing or blending) of (i) animal manure, (ii) grease trap waste (collected from restaurants,

More information

Annual CSAH Needs Update for 2017

Annual CSAH Needs Update for 2017 Annual CSAH Needs Update for 2017 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segments and project data using the SANeeds system.

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

STATE AID GUIDE FOR: Updated: December 16, 2005

STATE AID GUIDE FOR: Updated: December 16, 2005 STATE AID GUIDE FOR: Updated: December 16, 2005 1. AFTER THE FACT RIGHT OF WAY DEPARTMENT OF MINNESOTA TRANSPORTATION 2. MISCELLANEOUS AFTER THE FACT Traffic Signals, Lighting, Retaining Walls, Sidewalk,

More information

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS BRIDGE PREVENTIVE MAINTENANCE STRATEGY Approved January 3, 2007 BLANK Purpose To maximize the non-deficient service life of local bridges in the Erie-Niagara region, members of the Greater Buffalo-Niagara

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, Bridge over Branch Lopatcong Creek DBNUM: 16345 / UPC: 163450 Problem Statement submitted by BMS for Tier 1 Screening. It is recommended for

More information

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION PURPOSE, INTENT AND INTERPRETATION OF SPECIFICATIONS The purpose of these Specifications is to establish, where applicable, minimum acceptable standards

More information

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs G2-0 LIST OF ACTIVE MTODs DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200- GRADING 219.101 Light Duty Straw

More information

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs G2-0 LIST OF ACTIVE MTODs DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200- GRADING 219.101 Light Duty Straw

More information

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s) G2-0 List of Active Ministry of Transportation of Ontario Drawings ( s) DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings 01/04/1994 04/01/1994 TOS/TO For use with Pavement Marking items.

More information

SHRP2 SOLUTONS. Innovative Bridge Designs for Rapid Renewal. Peer-to-Peer Exchange Workshop Atlanta, GA November 2015

SHRP2 SOLUTONS. Innovative Bridge Designs for Rapid Renewal. Peer-to-Peer Exchange Workshop Atlanta, GA November 2015 SHRP2 SOLUTONS Innovative Bridge Designs for Rapid Renewal Peer-to-Peer Exchange Workshop Atlanta, GA November 2015 VIJAYKUMAR THAKER, PE HARDEV DAVÉ INTRODUCTION VIJAYKUMAR THAKER, PE EXECUTIVE MANAGER

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids 1 COUNTY'S ESTIMATE Skanska USA Civil West CA Dist. Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066100 DUST CONTROL LS 1 3,000.00

More information

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS STANDARD SPECIFICATIONS SECTION 02950 PAVEMENT REQUIREMENTS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for removing, replacing and providing new paving for roads, driveways, parking

More information

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs G2-0 LIST OF ACTIVE MTODs DIVISION 100 ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200 GRADING 219.101 Light Duty Straw

More information

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1,

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1, General Info Number: 316-00-17-47-2 Description: Lake Village Drainage Improvements - N. Pearl Mill & Overlay Deadline: 2017-7-9 2:00 PM CST Bids Business Bid Total McDonald Construction Inc of Slidell

More information

Maryland Transportation Authority (MDTA)

Maryland Transportation Authority (MDTA) Maryland Transportation Authority (MDTA) I-95 Major Deck and Superstructure Rehabilitation South of the Fort McHenry Tunnel Northeast Bridge Preservation Partnership Conference September 20, 2016 David

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

Biosolids Quality. Enhancement Plan. For more information, visit keyword: Biosolids.

Biosolids Quality. Enhancement Plan. For more information, visit  keyword: Biosolids. Biosolids Quality Enhancement Plan For more information, visit www.dep.state.pa.us, keyword: Biosolids. Biosolids Quality Enhancement Plan INTRODUCTION The beneficial use of biosolids has become a growing

More information

Procedure No: (SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION PROCEDURE

Procedure No: (SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION PROCEDURE Approved : Procedure No: 210-003(SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting Julie Ray, Deputy Director Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION

More information

SITE ASSESSMENT SAMPLING REQUIREMENTS AT REGULATED STORAGE TANK SYSTEM CLOSURES

SITE ASSESSMENT SAMPLING REQUIREMENTS AT REGULATED STORAGE TANK SYSTEM CLOSURES SITE ASSESSMENT SAMPLING REQUIREMENTS AT REGULATED STORAGE TANK SYSTEM CLOSURES Bureau of Environmental Cleanup and Brownfields Division of Storage Tanks November 1, 2016 2630-BK-DEP4699 11/2016 An Equal

More information

Chapter 4 Bridge Program Drawings

Chapter 4 Bridge Program Drawings Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT MAINE TURNPIKE AUTHORITY ADDENDUM NO. CONTRACT 08.09 BRIDGE REPAIRS RUNNING HILL ROAD UNDERPASS (MILE 5.) BLACKSTRAP ROAD UNDERPASS (MILE 58.3) WEYMOUTH ROAD UNDERPASS (MILE 66.) SUPERSTRUCTURE REPLACEMENT

More information

Pattullo Bridge Replacement Project. Cost Report

Pattullo Bridge Replacement Project. Cost Report Pattullo Bridge Replacement Project Cost Report January 2018 Cost Report Page i TABLE OF CONTENTS 1 PURPOSE... 1 2 BASIS FOR THE ESTIMATE... 2 2.1 Scope of the Works... 2 2.2 Scope of Capital Costs...

More information

Transportation Subcommittee Meeting July 18, 2014

Transportation Subcommittee Meeting July 18, 2014 Transportation Subcommittee Meeting July 18, 2014 Action Requested Recommend for Planning and Programming Committee approval in August 2014 and placement on the Board of Directors agenda for October 2014.

More information

Implementing a Pavement Management System PASER Based City of Omaha, NE

Implementing a Pavement Management System PASER Based City of Omaha, NE Implementing a Pavement Management System PASER Based City of Omaha, NE Introductions JESS HASTINGS, PE Project Manager 10 Years of Experience TIM O BRYAN, PE Senior Project Manager 30 Years of Experience

More information

Life Cycle Cost Analysis July 2011 Materials Division Page 1 TABLE OF CONTENTS V. ASPHALT PAVEMENT CONSTRUCTION/RECONSTRUCTION...

Life Cycle Cost Analysis July 2011 Materials Division Page 1 TABLE OF CONTENTS V. ASPHALT PAVEMENT CONSTRUCTION/RECONSTRUCTION... Materials Division Page 1 TABLE OF CONTENTS EXECUTIVE SUMMARY...2 I. INTRODUCTION...4 II. Purpose...4 What is LCCA?...4 History of LCCA in VDOT...4 ECONOMIC ANALYSIS COMPONENTS...6 Analysis Period...6

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

550 Surface Treatments

550 Surface Treatments Table of Contents 550 Surface Treatments... 550-1 550.1 Introduction... 550-1 551 Crack Sealing... 550-1 551.1 Project Selection... 550-1 551.2 Design Considerations... 550-1 552 Chip Sealing... 550-2

More information

APPLICANT PROJECT REQUESTED RECOMMENDED COMMENTS

APPLICANT PROJECT REQUESTED RECOMMENDED COMMENTS Act 101, Section 902 Recycling Development and Implementation Grant Applications SOUTHEAST REGION 1 Bristol Township Curbside Recycling & $199,109 $116,957 ineligible item requested Educational s 2 Lower

More information

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation Design and Construction of Concrete Overlays By: James K. Cable, P.E. Cable Concrete Consultation PCC OVERLAY AGENDA Current design & construction features What is needed in a PCC overlay set of plans?

More information

For Public Input Period

For Public Input Period 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,

More information

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 10/21/10 PAGE : TABULATION OF BIDS PAGE : 133-1 CONTRACT TIME : 12/20/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-080-5(094) ROUTE 80 BRIDGE OVER ROUTE 287 NORTHBOUND AND SMITH ROAD GRADING, PAVING & STRUCTURRS CONTRACT

More information

2017 Highway Safety Improvement Program Call

2017 Highway Safety Improvement Program Call 2017 Highway Safety Improvement Program Call The Highway Safety Improvement Program (HSIP) is for highway safety projects that eliminate or reduce the number of fatalities and serious injuries on all public

More information

Re: PW Appendix 3 - Part 8

Re: PW Appendix 3 - Part 8 Demolish S/W DVP ramp, FGE WBL (including Logan Ramp), Don River bridge WB, and existing LSB WBL Construct new S/W DVP ramp, FGE WBL ramp, Don River bridge WB, and remaining portion of LSB WB roadwork.

More information

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( )

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( ) Total preliminary Value for Project shown in initial year is for project duration. Projects have been listed in each year there are major Preliminary 4.8 Beech Ridge Road Underpass Repairs York $410,000

More information

CHAPTER 10: PAVING. Refer to page 548 of the 2016 Spec book or page 573 of the 2018 Spec book for material specifications under G.

CHAPTER 10: PAVING. Refer to page 548 of the 2016 Spec book or page 573 of the 2018 Spec book for material specifications under G. CHAPTER 10: PAVING AGGREGATE Aggregate has become more specific on how it is paid for. Therefore, make sure the plan specifies they type of aggregate to use. Spec 2118 Aggregate Surfacing - Aggregate placed

More information

PARKING LOT AND ROADWAY MAINTENANCE

PARKING LOT AND ROADWAY MAINTENANCE Village of Vernon Hills Community Development Engineering Division Phone 847-367-3704 Fax 847-367-2541 PERMIT APPLICATION PROCESS PARKING LOT AND ROADWAY MAINTENANCE Removal and replacement, concrete and

More information

General Permit WMGR025 Residual and Municipal Waste Composting

General Permit WMGR025 Residual and Municipal Waste Composting Department of Environmental Protection Bureau of Waste Management Division of Municipal and Residual Waste February, 9 2008 A. Description: This general permit authorizes the composting and beneficial

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 9 September 13, 2017 Agenda Welcome and Presenter Introductions Update on Construction and Demolition

More information

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,

More information

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND RAIL-HWY PROJECT DEVELOPMENT GUIDE AND New procedures for Railroad Right-of-Entry Agreements & Bid Documents (SP Item 007) Bridge Division Webinar - July 18, 2013 GUIDE TO RAILROAD PROJECT DEVELOPMENT

More information

COUNTY ROAD ASSOCIATION OF MICHIGAN

COUNTY ROAD ASSOCIATION OF MICHIGAN COUNTY ROAD ASSOCIATION OF MICHIGAN 417 SEYMOUR SUITE ONE - LANSING, MI 48933 TELEPHONE 517.482.1189 - FAX 517.482.1253 Talking Points- HB 5305 Mandatory Competitive Bidding Summary: House Bill 5305, introduced

More information

2 State Profile. Pennsylvania 2018 State Hazard Mitigation Plan 7

2 State Profile. Pennsylvania 2018 State Hazard Mitigation Plan 7 Pennsylvania 2018 State Hazard Mitigation Plan 7 2. State Profile Geography and Environment The Commonwealth of Pennsylvania consists of approximately 46,058 square miles, 44,820 square miles of which

More information

An Assessment of the Economic Impacts of the Pennsylvania Dairy Industry 1

An Assessment of the Economic Impacts of the Pennsylvania Dairy Industry 1 An Assessment of the Economic Impacts of the Pennsylvania Dairy Industry 1 Executive Summary Steven Deller, Mark Stephenson and Chuck Nicholson 2 To assess the contribution of dairy to the Pennsylvania

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) South Inlet Transportation Improvement Project DBNUM: 09361 / UPC: 093610 The Casino Redevelopment Authority (CRDA) has identified certain road improvements to be performed in Atlantic City on certain

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2017.02 Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 The following changes are made to the Proposal, Specifications and Plans: SPECIFICATIONS:

More information

Asphalt Paving

Asphalt Paving University of New Hampshire University of New Hampshire Scholars' Repository Division 32 Exterior Improvements Chapter 5 Technical Construction and Renovation Standards 1-25-2013 321216 - Asphalt Paving

More information

B313-1 HOT MIX ASPHALT OPSS.PROV 313

B313-1 HOT MIX ASPHALT OPSS.PROV 313 B313-1 OPSS.PROV 313 313-1.1 GENERAL Hot mix asphalt consists of several mix types, which are grouped into two categories: Stone Mastic Asphalt and Superpave as detailed below. The type of hot mix asphalt

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List February 2017 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

February Page 1

February Page 1 February 2017 - Page 1 CHAPTER 1 LOCATED ON. This section is revised as shown in the highlight below The description of the project location should reflect the beginning and ending location of the project.

More information

PENNSYLVANIA TURNPIKE COMMISSION

PENNSYLVANIA TURNPIKE COMMISSION PENNSYLVANIA TURNPIKE COMMISSION RETENTION OF AN ENGINEERING OR CONSTRUCTION MANAGEMENT FIRM Construction Management Services for Roadway and Bridge Reconstruction Northeast Extension, I-476, MP A-031.73

More information

Washington State Department of Transportation Case Study. Guidelines for the Preservation of High-Traffic-Volume Roadways (R26)

Washington State Department of Transportation Case Study. Guidelines for the Preservation of High-Traffic-Volume Roadways (R26) Washington State Department of Transportation Case Study Guidelines for the Preservation of High-Traffic-Volume Roadways (R26) Background Stretching the time between major rehabilitation projects can save

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

Final Recommendations Identification of Improvements, Strategies, and Solutions

Final Recommendations Identification of Improvements, Strategies, and Solutions Identification of Improvements, Strategies, and Solutions Prepared by: December 2015 TABLE OF CONTENTS 1. Introduction... 1 1 2. Freight Policy Recommendations... 2 1 3. Freight Infrastructure Recommendations...

More information

Curtis Bouteillier, Proform Management Inc. Wayne Gustafson, The City of Red Deer

Curtis Bouteillier, Proform Management Inc. Wayne Gustafson, The City of Red Deer Life Cycle Cost Analysis Considerations in Pavement Type Selection in Red Deer and Construction Challenges Bozena Czarnecki, Ph.D., P.Eng., Principal Specialist, Engineering Practice, Tetra Tech Canada

More information

Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax

Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax Engineering Sales Tax Projects Bridges $ 43.4 m (27) Roads (Resurfacing) $ 77.6 m (121) Roads (Restriping) $

More information

CUY-IR MNT FY2018 Tree Removal PRUNING/OR TREE/BRUSH REMOVAL

CUY-IR MNT FY2018 Tree Removal PRUNING/OR TREE/BRUSH REMOVAL Notices 181004 Late CUY-IR MNT FY2018 Tree Removal PRUNING/OR TREE/BRUSH REMOVAL FOR IMPROVING VARIOUS SECTIONS IN CUYAHOGA COUNTY, OF OHIO, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS BY REMOVING TREES

More information

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013 ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant

PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant Quick Facts PortMiami is located in Miami-Dade County, one of the most diverse, multilingual populations in the U.S. making

More information

Submission Date: November 14, ,114 words (not including Title Page) plus words each = 4,114

Submission Date: November 14, ,114 words (not including Title Page) plus words each = 4,114 Joint-less Continuous Curved Steel Girder Structure Harold Fink, PE New York City Region New York State Department of Transportation 47-40 21 st Street Long Island City, NY 11101 T) 718-482-4725 F) 718-482-6319

More information

CHAPTER 12 MICHIGAN DESIGN MANUAL BRIDGE DESIGN REHABILITATION PROJECTS REHABILITATION PROJECTS SCOPE OF REHABILITATION PROJECTS

CHAPTER 12 MICHIGAN DESIGN MANUAL BRIDGE DESIGN REHABILITATION PROJECTS REHABILITATION PROJECTS SCOPE OF REHABILITATION PROJECTS CHAPTER 12 REHABILITATION PROJECTS 12.00 REHABILITATION PROJECTS 12.01 SCOPE OF REHABILITATION PROJECTS 12.01.01 Structures Carrying Pedestrian Traffic 12.01.02 Historic Bridges 12.02 GEOMETRIC CRITERIA

More information

12/11/ th Annual Illinois Bituminous Paving Conference December 11, 2013

12/11/ th Annual Illinois Bituminous Paving Conference December 11, 2013 PCC Pavement Rehabilitation with Hot Mix Asphalt 54th Annual Illinois Bituminous Paving Conference December 11, 2013 Kevin Burke III, P.E. Illinois Asphalt Pavement Association burkeiii.kevin@comcast.net

More information

REQUEST FOR PROPOSAL Asphalt & Concrete Repair

REQUEST FOR PROPOSAL Asphalt & Concrete Repair REQUEST FOR PROPOSAL 2017 Asphalt & Concrete Repair English Landing Elementary School Union Chapel Elementary School Lakeview Middle School Park Hill High School Prairie Point Elementary School Congress

More information

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four DISTRICT FOUR PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In fiscal years 2014 and 2015, current Turnpike projects total over $127

More information

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Americans with Disabilities Act Requirements of Maintenance and Operational

More information