1 Updated March 20, 2017 ALLEGHENY COUNTY SR 3088(05) # PROPOSAL:$23.40 PLANS:$ X18:$ X36:$ EXSTRUCT:$ X18:$ X36:$54.60 The description and location of the project is as follows - For the rehabilitation of an existing bridge with deck replacement, jacking of superstructure, repair of deteriorated concrete, expansion dams and bearing pad replacement including approach roadway reconstruction and other miscellaneous construction all within a length of 586 Linear Feet (0.112 Miles) as indicated on the approved drawings included in the Bid Package for STATE ROUTE 3088, SECTION A05, in FINDLAY TOWNSHIP, ALLEGHENY COUNTY, Commonwealth of Pennsylvania, from a point approximately 1,800 feet west of the intersection of Hookstown Grade Road and Flaugherty Run Road at Segment 50 Offset 0 to a point approximately 1,500 feet west of the same intersection at Segment 50 Offset 274. Anticipated Notice to Proceed , Required Completion BEAVER COUNTY SR 168(B16) #70797 PROPOSAL:$41.52 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$39.00 The description and location of the project is as follows: For the replacement of an existing bridge, minor roadway approach work and other miscellaneous construction, all within a length of 550 Linear feet (0.104 Miles), as indicated on the approved drawings included in the Bid Package for STATE ROUTE 168, SECTION B16, in BEAVER COUNTY, SOUTH BEAVER TOWNSHIP, Commonwealth of Pennsylvania from a point approximately 450 feet west of the intersection with Brush Run Drive at Segment 460 Offset 842 to a point approximately 200 feet east of the same intersection at Segment 460 Offset DBE 5%, Anticipated Notice to Proceed , Required Completion ALLEGHENY COUNTY SR 50(A30) # PROPOSAL:$18.36 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: For the installation of traffic signals, video detection, controllers, adaptive signal systems, and other miscellaneous construction, as indicated on the Approved Drawings Included In The Bid Package For State Route 0286 Section A12, In Plum Borough, State Route 0065 Section A55 In Sewickley Borough, Sr 0050 Sections A30 And Sr 3003 Section A09 In South Fayette Township, Sr 2048 Section A12, Sr 0022 Section A35, Sr 0048 Section A37 And Sr 0130 A29 All In The Municipality Of Monroeville, Sr 0030 Section A33 In North Versailles Township And Sr 0019 Section Gl1 In Cranberry Township, Allegheny And Butler Counties. Anticipated Notice to Proceed , Required Completion

2 Updated March 13, 2017 COLUMBIA COUNTY SR 11(136) # PROPOSAL:$21.48 PLANS:$5.52 The description and location of the project is as follows: Microsurfacing and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 11, SECTION 136, from approximately 1.3 miles west of the intersection of SR 11 and SR 4004, Quarry Rd at Segment 0060 Offset 0000 to the intersection of SR 11 and SR 487 at Segment 0150 Offset 0000 and STATE ROUTE 11 SECTION 135 from approximately 3.1 miles west of the intersection of SR 11 and SR 4004, Quarry Rd., to the intersection of SR 11 and SR 487 at Segment 0150 Offset 0000 and STATE ROUTE 42 SECTION 091from approximately 0.4 miles north of the intersection of SR 42 and SR 2010 at Segment 0200 Offset 0000 to approximately 0.3 miles south of the intersection of SR 42 and SR 2016 at Segment 0350 Offset 1265 and STATE ROUTE42 SECTION 099 from approximately 2.5 miles northwest of the intersection of SR 42 and SR 3006 at Segment 0100 Offset 0000 to approximately 0.1 miles southeast of the intersection of SR 42 and SR 2008 at Segment 0140 Offset 2685 and STATE ROUTE 42 SECTION 100 from approximately 0.9 miles northwest of the intersection of SR 42 and Mystic mtn. Rd. at Segment 0140 Offset 2685 to approximately 0.4 miles southeast of the intersection of SR 42 and SR 3010 and STATE ROUTE 487 SECTION 102 from approximately 0.7 miles north of the intersection of SR 487 and Quarry Rd., T-440, at Segment 0150 Offset 000 to approximately 0.6 miles southeast of the intersection of SR 487 and SR 11 in COLUMBIA COUNTY, in VARIOUS TOWNSHIP. DBE 0%, Anticipated Notice to Proceed , Required Completion DELAWARE COUNTY SR 1(LCS) # PROPOSAL:$57.72 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: The project consists of changing a 4-lane section of SR 0001 (Township Line Road) to a 5-lane section that includes a center turn lane. Milling and overlay will be provided on SR 0001 from State Road and Harding Drive. The remaining section of SR 0001 east of Harding Drive will have refreshing of pavement marking and signing. Four radar display speed signs will be added to help reduce speeds on the corridor. The northbound right lane of SR 0001 between State Road and Arrowhead Lane will be treated with High Friction Surface (HSF) treatment to improve safety and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0001, SECTION LCS, in DELAWARE COUNTY, UPPER DARBY & HAVERFORD TOWNSHIPS from approximately south of STATE ROAD at segment 0330 offset 0138 to approximately COBBS CREEK/PHILADELPHIA COUNTY LINE at segment 0410 offset DBE 6%, Anticipated Notice to Proceed , Required Completion INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated March 10, 2017 LANCASTER COUNTY SR 743(033) #96210 PROPOSAL:41.16 PLANS:$ X18:$ X36:$202.80$ This project consists of resurfacing the existing roadway using Superpave wearing, leveling, and scratch courses, milling; base replacement; minor drainage improvements; roadside development items; pavement markings; ADA ramp improvements; and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0743, SECTION 033, in LANCASTER COUNTY, EAST DONEGAL & WEST DONEGAL TOWNSHIPS and ELIZABETHTOWN BOROUGH, from SR 0441 (River Road) at Segment 0010 Offset 0000 to SR 0230 (Market Street) at Segment 0130 Offset 1204, for an overall project length of 34, linear feet (6.49 miles). Anticipated Notice to Proceed , Required Completion BUCKS COUNTY SR 0000(CS2) #

3 PROPOSAL:$20.52 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$35.10 The description and location of the project is as follows: new sidewalks/curbs, curb ramps and pedestrian crossings, pavement markings, street lighting for pedestrian safety, traffic signs, guiderail, catch basins and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0013, SECTION CS2, in BUCKS COUNTY Village of Croydon in BRISTOL TOWNSHIP from the Neshaminy Creek Bridge at segment 0120 offset 0561 to the Walnut Road/Cedar Road (SR 2011) intersection at segment 0120 offset DBE 7%, Anticipated Notice to Proceed , Required Completion HUNTINGDON COUNTY SR 2017(01M) #96583 PROPOSAL:$20.16 PLANS:$ X18:$ X36:$58.50 The description and location of the project is as follows: This project is for the resurfacing of approximately miles of bituminous roadway on SR 2017 and includes milling, drainage & signing and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 2017, SECTION 01M, in HUNTINGDON COUNTY, SHIRLEY TOWNSHIP at the approximate location: Station to Station Segment 0180, Offset 2169 to Segment 0250, Offset Anticipated Notice to Proceed , Required Completion INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated March 7, 2017 BEAVER COUNTY SR 376(B09) #81976 PROPOSAL:$47.52 PLANS:$ X18:$ X36:$ EXSTRUCT:$ X18:$ X36:$ The description and location of the project is as follows: This is a partial Design Build roadway project. Design activities are limited to: Highway lighting For the milling and resurfacing, concrete pavement restoration, guide rail, signing and pavement marking, bridge preservation, and other miscellaneous construction, all within a length of 33, (6.40 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 0376, SECTION B09 (Beaver Valley Expressway), in BEAVER COUNTY, VANPORT, POTTER, CENTER, HOPEWELL, and BRIGHTON TOWNSHIPS, Commonwealth of Pennsylvania. This project being situated as follows: From a point approximately 3500 feet west of the Beaver-Midland Interchange at Segment 0370/0371 Offset 1954/1952 (Station ) to a point approximately 5280 feet east of the Hopewell Interchange at Segment 0490/0491 Offset 0736/0615 (Station 0+85). DBE 6%, Anticipated Notice to Proceed , Required Completion ALLEGHENY COUNTY SR 48(A35) #

4 PROPOSAL:$26.28 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: [ For the milling, resurfacing, base repair, drainage, shoulder repair, pavement marking, and other miscellaneous construction, all within a length of 56,898 linear feet ( miles) as indicated on the approved drawings included in the Bid Package for Group in ALLEGHENY COUNTY, NORTH VERSAILLES and SOUTH FAYETTE TOWNSHIPS, WHITE OAK, NORTH BRADDOCK, EAST PITTSBURGH, and CHALFANT BOROUGHS, and MUNICIPALITY OF MONROEVILLE, Commonwealth of Pennsylvania. This project being situated as follows: SR 0048, Section A35 (Mosside Boulevard) From a point approximately 900 feet south of MacBeth Road at Segment 0360 Offset 1645 (Station ) to SR 2048 (William Penn Highway) at Segment 0400 Offset 2733 and Segment 0401 Offset 2769 (Station ). SR 0048, Section A36 (Jacks Run Road) From SR 2031 (Lincoln Way) at Segment 0210 Offset 2060 and Segment 0211 Offset 2051 (Station 0+00) to SR 30 (Lincoln Highway) at Segment 0280 Offset 0000 (Station ). SR 978, Section A12 (Battle Ridge Road) From a point 2,400 feet south of Robinson Run Road at Segment 0090 Offset 0617 (Station 0+00) to SR 3024 (Battle Ridge Road) at Segment 0100 Offset 2210 (Station 46+07). SR 2054, Section A05 (Northern Pike) From Monroeville Road and Pitcairn Road at Segment 0010 Offset 0000 (Station 1+00) to SR 0022 (William Penn Highway) at Segment 0050 Offset 1250 (Station ). SR 2057, Section A04 (Haymaker Road) From SR 2048 (William Penn Highway) at Segment 0010 Offset 0000 and Segment 0011 Offset 0000 (Station ) to Beatty Road at Segment 0024 Offset 1271 (Station ). SR 2112, Section A06 (Electric Avenue) - From a point approximately 2,500 feet east of Rockwood Avenue at Segment 0010 Offset 0000 and Segment 0011 Offset 0000 (Station 1+00) to SR 2037 (Tri-Boro Avenue) at Segment 0030 Offset 0100 (Station 41+29). SR 3024, Section A03 (Battle Ridge Road) - From SR 0978 (Battle Ridge Road) at Segment 0060 Offset 0000 (Station 46+07) to Thoms Run Road at Segment 0090 Offset 2014 (Station ). Various State Routes and Facilities throughout Allegheny County for unforeseen repair and/or resurfacing, as directed. Anticipated Notice to Proceed , Required Completion LANCASTER COUNTY SR 72(053) #91195 PROPOSAL:$16.56 PLANS:$ X18:$ X36:$ This is a Pavement Preservation which includes: 3 overlay, partial and full width milling within curb to curb areas and where directed on 2 lanes plus 3rd turning lanes, base repair, guide rail updates and guide rail back-up, ADA Ramps, line painting, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0072, SECTION 053, in LANCASTER COUNTY, EAST PETERSBURG BOROUGH and EAST HEMPFIELD & PENN TOWNSHIPS, from Edgemont Drive at Segment 0170 Offset 2441 to Chiques Creek at Segment 0290 Offset 0643, for an overall project length of 26, linear feet (5.097 miles). Anticipated Notice to Proceed , Required Completion SCHUYLKILL COUNTY SR 443(M89) # PROPOSAL:$11.52 PLANS:$2.40 The description and location of the project is as follows: This project is for the improvement of sections of SR 443 located in Schuylkill County as follows: SR 443 PINE GROVE TOWNSHIP, SEG 0010/0000 TO SEG 0130/0000. The project involves a bituminous overlay, bituminous base repair, bituminous surface repair, guide rail update, inlet adjustments, pavement markings, and other miscellaneous items. The total construction distance is 5.77 miles (30,487 LF). All work is within the existing right-of-way and is 100% state funded. Anticipated Notice to Proceed , Required Completion CHESTER COUNTY SR 0000(KSW) # PROPOSAL:$64.56 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: The construction of new sidewalks and ADA-accessible ramps, including clearing and grading, installation of an infiltration bed, modifying guide rail, soil amendments, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0000, SECTION KSW, in CHESTER COUNTY KENNETT AND NEW GARDEN TOWNSHIPS from approximately Scarlet Road at segment 0070 offset 3129 to approximately Mill Road at segment 0091 offset DBE 10%, Anticipated Notice to Proceed , Required Completion

5 YORK COUNTY SR 7230(BRG) #91472 PROPOSAL:$32.52 PLANS:$ X18:$ X18:$ X-SEC:$ X18:$ X36:$21.30 This project is the construction of a two-span composite pre-stressed concrete spread box beam bridge over the Bermudian Creek with approach work and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for Bermudian Church Road (T-809), in YORK COUNTY, WASHINGTON TOWNSHIP, from Sta to Sta , a length of linear feet (0.066 mile). The project also includes Detters Mill Road (T-803) and Blue Hill School Road (T-808) from Sta to Sta , a length of linear feet (0.047 mile). Overall project length is linear feet (0.113 mile). DBE 4%, Anticipated Notice to Proceed , Required Completion BEDFORD COUNTY SR 0000 # PROPOSAL:$19.68 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: This project is for the installation of wrong way signs in five counties in District 9-0 and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0000, SECTION WW2, in BEDFORD, BLAIR, CAMBRIA, FULTON & SOMERSET COUNTIES, VARIOUS TOWNSHIPS AND BOROUGHS. DBE 5%, Anticipated Notice to Proceed , Required Completion SOMERSET COUNTY - SR 281(22B) # PROPOSAL:$24.60 PLANS:$ X18:$ X36:$ EXSTRUCT:$ X18:$ X36:$93.60 The description and location of the project is as follows: This project is for the rehabilitation of the structure that carries SR 0281 over Casselman River in Somerset County. Bridge work includes new strip seals, epoxy overlay, minor roadway approach work, ADA ramps, strip seal gland replacement on 6 structures along SR 0219 and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0281, SECTION 22B, in SOMERSET COUNTY, CONFLUENCE BOROUGH, VARIOUS TOWNSHIPS. Anticipated Notice to Proceed , Required Completion Updated March 6, 2017 BUTLER COUNTY SR 19(201) # PROPOSAL:$14.52 PLANS:$ X18:$ X36:$42.90 The description and location of the project is as follows: For the repair of center line and edge line joints and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 19, SECTION 201, in Butler COUNTY Cranberry and Jackson TOWNSHIPS and Zelienople Borough from approximately the Butler/Allegheny County line at Northbound/Southbound segment 0010/0011 offset 0000/0000 to approximately 1.4 miles south of Harmony Borough at Northbound/Southbound segment 0190/0181 offset 0250/1995. Anticipated Notice to Proceed , Required Completion CHESTER COUNTY SR 3033(MSB) #98096 PROPOSAL:$35.04 PLANS :$ X18:$ X36:$ X-SEC:$ X18:$ X36:$70.20 The description and location of the project is as follows: This project is for construction of adding a left turn lane and removing the right turn lanes in both directions on SR 3033, full depth pavement, curb and guiderail replacement, and associated drainage and storm water management features and other miscellaneous construction as indicated on the approved drawings included in the bid package STATE ROUTE 3033, SECTION 5

6 MSB. The project limits on SR 3033 Section MSB are approximately 950 feet north and south of the SR 3033/SR 0041 Intersection, and on SR 0041 are approximately 600 feet east and west of the SR 3033/SR 0041 Intersection located entirely within New Garden Township, PA from segment 0020 offset 2100 to segment 0030 offset DBE 8%, Anticipated Notice to Proceed , Required Completion BRADFORD COUNTY SR 6(140) # PROPOSAL:$40.20 PLANS:$ X18:$ X36:$89.70 EXSTRUCT:$ X18:$ X36:$31.20 The description and location of the project are as follows: This work is the milling and resurfacing of the existing roadway, including flexible base replacement, Superpave Asphalt Mixture scratch, binder, and wearing courses, rumble strips, guide rail, pavement markings, design and construction of ADA curb ramps, and other miscellaneous construction as indicated on the approved drawings included in the bid package for STATE ROUTE 6, SECTION 140 from approximately 0.4 mile southeast of the intersection with State Route 1074 at Segment 0990 Offset 0510 to approximately 6.9 miles northwest of the intersection with State Route 367 at Segment 1010 Offset 0550 in WYALUSING TOWNSHIP, BRADFORD COUNTY and for STATE ROUTE 2010, SECTION 018 from approximately 3.0 miles northeast of the intersection with State Route 2011 at Segment 0230 Offset 1432 to approximately 0.1 mile south of the intersection with State Route 6 at Segment 0250 Offset 1850 in TERRY and WYALUSING TOWNSHIPS, BRADFORD COUNTY and for STATE ROUTE 4014, SECTION 024 from approximately 1.7 miles east of the intersection with State Route 4013 at Segment 0200 Offset 1307 to approximately 1.5 miles southwest of the intersection with State Route 4021 at Segment 0220 Offset 0016 in SMITHFIELD TOWNSHIP, BRADFORD COUNTY and for STATE ROUTE 4022, SECTION 015 from the intersection with State Route 4020 at Segment 0120 Offset 0000 to the intersection with State Route 1069 at Segment 0120 Offset 3207 in ATHENS TOWNSHIP, BRADFORD COUNTY and for STATE ROUTE 4020 from approximately 6.7 miles northeast of the intersection with State Route 4018 at Segment 0140 Offset 2900 to the intersection with State Route 4022 at Segment 0140 Offset 3490 in ATHENS TOWNSHIP, BRADFORD COUNTY. Anticipated Notice to Proceed , Required Completion WARREN COUNTY SR 666(B01) #90149 PROPOSAL:$22.56 PLANS:$ X18:$ X36:$81.90 X-SEC:$ X18:$ X36:$19.50 For the construction of a certain sections of STATE HIGHWAY in WARREN COUNTY, SHEFFIELD TOWNSHIP, Commonwealth of Pennsylvania; STATE ROUTE 0666, SECTION B01. This project situated as follows, From approximately 0.13 mile north of the intersection with T-323 at Segment 0120 Offset 0754 (Station ) then north to approximately 1.23 mile south of the intersection with T-325 at Segment 0120 Offset 1310 (Station ). For the construction of a Precast Reinforced Concrete Culvert over Dodge Run having an overall span length of 13'-0', Also for construction of new roadway approaches using Superpave Asphalt Mixture Designs, guiderail, and other miscellaneous work all within a project length of feet (0.048 mile) as indicated on the approved drawings. Anticipated Notice to Proceed , Required Completion ERIE COUNTY SR 3020(01M) #98999 PROPOSAL:$26.88 PLANS:$ X18:$ X36:$ EXSTRUCT:$ X18:$ X36:$39.00 For the construction or improvement of a certain section of STATE HIGHWAY in ERIE COUNTY, MCKEAN BOROUGH AND MCKEAN TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 3020, SECTION 01M. This project is situated as follows, From the intersection with SR at Segment 0010 Offset 0000 (Station ) then east to the intersection with SR at Segment 0070 Offset 3187 (Station ). For the milling of the existing bituminous pavement and resurfacing with Superpave Asphalt 6

7 Mixture Designs 22' in width, also for cold in place recycled bituminous, paved shoulders, bridge structure work, sidewalk, concrete curb ramps, drainage, guiderail, signing, and pavement markings updates, all within a project length of 16, linear feet (3.22 miles) as indicated on the approved drawings. DBE 6%, Anticipated Notice to Proceed , Required Completion BUCKS COUNTY SR 0000(221) #96221 PROPOSAL:$56.52 PLANS:$ X18:$ X36:$ The description and location of the project is as follows: Construction of approximately 1000 of shared use path, sidewalks, ADA ramps, traffic signal improvements, landscaping and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 2089,SECTION 221 in BUCKS COUNTY New Britain BOROUGH from approximately Butler Avenue at segment 0160 offset 1295 to approximately New Britain SEPTA Station at segment 0160 offset DBE 8%, Anticipated Notice to Proceed , Required Completion SUSQUEHANNA COUNTY SR 171(M17) # PROPOSAL:$31.80 PLANS:$3.12 This project is for the resurfacing of approximately miles of existing bituminous roadway in Susquehanna County (8.35 Miles) and in Wyoming County (8.45 Miles) on the following STATE ROUTES : S.R Segment 0360 Offset 1167 to Segment 0500 Offset 3040, S.R Segment 0010 Offset 0000 to Segment 0040 Offset 2706 in SUSQUEHANNA COUNTY; S.R Segment 0080 Offset 0000 to Segment 0120 Offset 1908, S.R Segment 0230 Offset 0173 to Segment 0280 Offset 3891, and S.R Segment 0010 Offset 0000 to Segment 0050 Offset 3263 in WYOMING COUNTY; VARIOUS MUNICIPALITIES in the COMMONWEALTH OF PENNSYLVANIA, with Warm Mix Asphalt Scratch and Wearing Courses, Milling, Roadway Patching, Line Painting and Pavement Markings as shown on the drawings contained in this bid proposal. Anticipated Notice to Proceed , Required Completion PIKE COUNTY SR 2001(M17) # PROPOSAL:$ PLANS:$3.84 This project is for the resurfacing of approximately miles of existing bituminous roadway in WAYNE COUNTY (8.38 miles) and in PIKE COUNTY (19.18 miles) on the following STATE ROUTES: S.R.3018 from Segment 0010 Offset 0000 to Segment 0170 Offset 3300 in WAYNE COUNTY; and S.R from Segment 0340 Offset 1116 to Segment 0420 Offset 1451, S.R from Segment 0340 Offset 1116 to Segment 0420 Offset 1451, S.R from Segment 0010 Offset 0000 to Segment 0220 Offset 3040, S.R from Segment 0010 Offset 0000 to Segment 0030 Offset 3296, S.R from Segment 0010 Offset 0000 to Segment 0040 Offset 1817 in PIKE COUNTY; VARIOUS MUNICIPALITIES, in the COMMONWEALTH OF PENNSYLVANIA with Warm Mix Asphalt Wearing, Scratch and Binder Leveling Courses, Surface Treatment, Milling, Roadway Patching, Line Painting and Pavement Markings as shown on the drawings contained within this bid proposal. Anticipated Notice to Proceed , Required Completion PIKE COUNTY SR 6(FP1) # PROPOSAL:$24.48 PLANS:$2.28 This project is for the resurfacing of approximately 4.01 miles of existing bituminous roadway on the following sections of STATE ROUTE 0006 in PIKE COUNTY: Segment 0430 Offset 0000 to Segment 0430 Offset 2066; Segment 0431 Offset 0000 to Segment 0431 Offset 2037; Segment 0440 Offset 0000 to Segment 0470 Offset 0300; Segment 0580 Offset 1700 to Segment 0590 Offset 3547; Segment 0581 Offset 1700 to Segment 0591 Offset 3499; Segment 0600 Offset 0000 to Segment 0600 Offset 1000; VARIOUS MUNICIPALITIES in the COMMONWEALTH OF PENNSYLVANIA with Warm Mix Asphalt Wearing and Scratch Courses, Milling, Line Painting and Pavement Markings as shown on the drawings contained within this bid proposal. DBE 4%, Anticipated Notice to Proceed , Required Completion

8 CUMBERLAND COUNTY SR 1025(004) #18477 PROPOSAL:$52.44 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$ ESTRUCT:$ X18:$ X36:$15.60 The project is a design-build bridge rehabilitation project (superstructure replacement). The existing structure carries SR 1025 (Erford Road) over SR 1014 (Harvey Taylor Bridge Bypass). The three-span, continuous steel I-beam structure is 218 long and has a 36 deck width. The structure was built in 1952 and has an approximate 14 4 vertical under clearance (posted for 14 ). The bridge is on a 75-degree skew to the road below. Residential and commercial properties surround the structure on all four quadrants. The Harvey Taylor Bridge Bypass is a limited-access highway with an entrance and exit just west of the structure. Currently two lanes exist and three lanes are proposed (1 additional continuous turning lane). Three spans are to remain. In addition to the structure work, this project includes other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 1025, SECTION 004, in CUMBERLAND COUNTY, EAST PENNSBORO TOWNSHIP, from the NB SR 0015 On/Off ramps at Segment 0010 Offset 0505 to the SB SR 0015 On/Off ramps at Segment 0030 Offset 0302, for an overall project length of linear feet (0.334 mile). DBE 3%, Anticipated Notice to Proceed , Required Completion Updated March 3, 2017 WASHINGTON COUNTY SR 88(SIP) # PROPOSAL:$29.16 PLANS:$ X18:$ X36:$74.10 EXSTRUCT:$ X18:$ X36:$31.20 The description and location of the project is as follows: Surface improvement contract of certain sections of various State Routes in Washington County. Construction consists of milling, superpave asphalt courses, base repair, pavement markings and other miscellaneous construction on all or portions of the selected State Routes, all as indicated on the approved drawings for various State Routes in Washington County. Anticipated Notice to Proceed , Required Completion SUSQUEHANNA COUNTY SR 374(GRM) # PROPOSAL:$17.52 PLANS:$0.12 The description and location of the project is as follows: Susquehanna County Guide Rail Maintenance Group 4-17-GRM4 - The project includes the repair, replacement and maintenance of guiderail, end treatments, bridge railing, right-of-way fence, median barrier and traffic impact attenuator systems on VARIOUS STATE ROUTES throughout SUSQUEHANNA COUNTY, in the COMMONWEALTH OF PENNSYLVANIA. Anticipated Notice to Proceed , Required Completion WYOMING COUNTY SR 187(GRM) # PROPOSAL:$ $17.52 PLANS:$0.12 The description and location of the project is as follows: Wyoming County Guide Rail Maintenance Group 4-17-GRM6 - The project includes the repair, replacement and maintenance of guiderail, end treatments, delineators, right-of-way fence, and traffic impact attenuator systems on VARIOUS STATE ROUTES throughout WYOMING COUNTY, in the COMMONWEALTH OF PENNSYLVANIA. Anticipated Notice to Proceed , Required Completion WAYNE COUNTY SR 371(GRM) # PROPOSAL:$ $17.52 PLANS:$0.12 The description and location of the project is as follows: Wayne County Guide Rail Maintenance Group 4-17-GRM5 - The project includes the repair, replacement and maintenance of 8

9 guiderail, end treatments, bridge railing, right-of-way fence, and traffic impact attenuator systems on VARIOUS STATE ROUTES throughout WAYNE COUNTY, in the COMMONWEALTH OF PENNSYLVANIA. Anticipated Notice to Proceed , Required Completion LUZERNE COUNTY SR 339(GRM) # PROPOSAL:$18.72 PLANS:$0.12 The description and location of the project is as follows: Luzerne County Guide Rail Maintenance Group 4-17-GRM2 includes the repair, replacement and maintenance of guiderail, end treatments, bridge railing, right-of-way fence, median barrier, glare screen and traffic impact attenuator systems on VARIOUS STATE ROUTES throughout LUZERNE COUNTY, in the COMMONWEALTH OF PENNSYLVANIA. Anticipated Notice to Proceed , Required Completion COLUMBIA COUNTY SR 3014(006) #93578 PROPOSAL:$16.92 PLANS:$ X18:$ X36:$78.00 The description and location of the project are as follows: The work is the furnishing and installation of a 7-6 x 8-0 precast reinforced concrete box culvert over a tributary to the Susquehanna River at a Department-prepared site with an overall length of linear feet (0.116 mile) as indicated on the approved drawings included in the bid package for STATE ROUTE 3014, SECTION 006 from approximately 0.07 mile east of the intersection with State Route 3012 at Segment 0010 Offset 0070 to approximately 1.4 mile west of the end of State Route 3014 at Segment 0010 Offset 0685 in FRANKLIN TOWNSHIP, COLUMBIA COUNTY. Anticipated Notice to Proceed , Required Completion Updated February 28, 2017 CLARION COUNTY SR 28(301) # PROPOSAL:$17.04 PLANS:$5.64 The description and location of the project is as follows: For pavement patching, drainage work, Superpave overlay and other miscellaneous construction all as indicated on the drawings approved for Clarion County ; various routes, stockpiles and various municipalities. Anticipated Notice to Proceed , Required Completion Updated February 27, 2017 CLARION COUNTY SR 28(301) # PROPOSAL:$17.04 PLANS:$5.64 The description and location of the project is as follows: For pavement patching, drainage work, Superpave overlay and other miscellaneous construction all as indicated on the drawings approved for Clarion County ; various routes, stockpiles and various municipalities. Anticipated Notice to Proceed , Required Completion

10 Updated February 24, 2017 WASHINGTON COUNTY SR 18(21R) #98368 PROPOSAL:$21.72 PLANS:$ X18:$ X36:$62.40 The description and location of the project is as follows: resurfacing the existing pavement, guiderail updates and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 18, SECTION 21R, in WASHINGTON COUNTY from approximately Sparta Road at segment 0070 offset 1048 to approximately PA 221 at segment 0110 offset 1603 and from approximately SR 2001 at segment 0350 offset 0530 to approximately Railroad Street at segment 0350 offset DBE 5%, Anticipated Notice to Proceed , Required Completion ECMS ADVANCED INFORMATION APRIL 6, 2017 MONTOUR COUNTY SR 21006(021) # PROPOSAL:$29.88 PLANS:$ X18:$ X36:$58.50 The description and location of the project are as follows: This work is the milling and resurfacing of the existing roadway, including flexible base replacement, Superpave Asphalt Mixture scratch and wearing courses, pavement markings, and other miscellaneous construction all within a length of 7,908 linear feet (1.50 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 2006, SECTION 021 from approximately 0.4 mile east of the intersection with State Route 2054 at Segment 0012 Offset 0150 to approximately 2.7 miles northwest of the intersection with State Route 2013 at Segment 0030 Offset 1030 in MAHONING TOWNSHIP, MONTOUR COUNTY and for STATE ROUTE 2006, SECTION 020 from the intersection with State Route 2054 at Segment 0011 Offset 0000 to approximately 3.6 miles west of the intersection with State Route 2013 at Segment 0012 Offset 0150 in DANVILLE BOROUGH, MONTOUR COUNTY. Anticipated Notice to Proceed , Required Completion

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated May 4, 2018 FULTON COUNTY SR 0000(FMC) #109343 PROPOSAL:$21.36 PLANS:$9.02 12X18:$11.07 24X36:$159.90 X-SEC:$7.48 12X18:$9.18 24X36:$132.60 This project involves

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) As of February14, 2018 SNYDER COUNTY SR 2007(012) #93607 PROPOSAL:$16.56 PLANS:$4.40 12X18:$5.40 24X36:$78.00 The description and location of the project are as follows: The work is the furnishing and

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 Updated June 30, 2014 LUZERNE COUNTY SR 309(W02) #102354 PROPOSAL:$25.20 PLANS:$6.24 The description and location

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 22, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 22, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 22, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated December 5, 2016 SCHUYLKILL COUNTY SR 4027(M89) #99482 PROPOSAL:$21.60 PLANS:$1.68

More information

BEAVER COUNTY SR 68(B38) # PROPOSAL:$26.64 PLANS:$ X18:$ X36:$222.30

BEAVER COUNTY SR 68(B38) # PROPOSAL:$26.64 PLANS:$ X18:$ X36:$222.30 ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 29, 2018 Update March 13, 2018 CHESTER COUNTY SR 23(ELV) #107680 PROPOSAL:$22.80 PLANS:$32.56 12X18:$39.96 24X36:$577.20

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JUNE 5, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JUNE 5, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated on May 19, 2014 VENANGO COUNTY SR 308(DOI) #96906 PROPOSAL:$13.44 PLANS:$3.96 For the bituminous milling and resurfacing of various state routes throughout VENANGO COUNTY, Commonwealth of Pennsylvania,

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 1, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 1, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated November 15, 2016 BEAVER COUNTY SR 588(B18) #91922 PROPOSAL:$22.80 PLANS:$18.04 12X18:$22.14 24X36:$319.80 X-SEC:$3.52 12X18:$4.32 24X36:$62.40 The description and location of the project is as

More information

11, 2019 MONTOUR COUNTY SR 2006(026) # PROPOSAL:$16.56 PLANS:$ X18:$ X36:$19.50

11, 2019 MONTOUR COUNTY SR 2006(026) # PROPOSAL:$16.56 PLANS:$ X18:$ X36:$19.50 Updated February 11, 2019 MONTOUR COUNTY SR 2006(026) #112211 PROPOSAL:$16.56 PLANS:$1.10 12X18:$1.35 24X36:$19.50 The description and location of the project are as follows: Emergency repairs due to flood

More information

CENTRE COUNTY SR 26(ST1) # PROPOSAL:$21.00 PLANS:$ X18:$ X36:$70.20

CENTRE COUNTY SR 26(ST1) # PROPOSAL:$21.00 PLANS:$ X18:$ X36:$70.20 Updated January 25, 2016 CENTRE COUNTY SR 26(ST1) #104647 PROPOSAL:$21.00 PLANS:$3.96 12X18:$4.86 24X36:$70.20 The description and location of the project is as follows: For the improvement of certain

More information

SCHUYLKILL COUNTY SR 125(JFR) # PROPOSAL:$20.76 PLANS 8.5X11:$1.20

SCHUYLKILL COUNTY SR 125(JFR) # PROPOSAL:$20.76 PLANS 8.5X11:$1.20 SCHUYLKILL COUNTY SR 125(JFR) #111844 PROPOSAL:$20.76 PLANS 8.5X11:$1.20 The emergency project consists of rock protection and underpinning of the piers to prevent future scouring and other miscellaneous

More information

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated November 17, 2008 PHILADELPHIA COUNTY SR 30(ADA) PROPOSAL:$14.40 The description and location of the project is as follows: For the design and construction of ADA compliant concrete curb ramps

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION AUGUST 10, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION AUGUST 10, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated July 21, 2017 ALLEGHENY COUNTY SR 0000 #109397 PROPOSAL:$28.56 The description and location of the project is as follows: This work is the 3-year term maintenance if intelligent transportation

More information

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated April 13, 2018 ALLEGHENY COUNTY SR 376(A65) #110880 PROPOSAL:$15.96 PLANS 8.5x11:$2.04 The description and location of the project is as follows: For the milling, resurfacing, pavement marking,

More information

3, 2018 LACKAWANNA COUNTY SR 8031(WWR)

3, 2018 LACKAWANNA COUNTY SR 8031(WWR) SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING AUGUST 9, 2018 Updated August 3, 2018 LACKAWANNA COUNTY SR 8031(WWR) #109012 Moved to 8/9/18 from 7/26/18, orig 7/12/18 PROPOSAL:$14.40 PLANS 8.5x11:$4.80

More information

14, 2019 MERCER COUNTY SR 173(491) # PROPOSAL:$11.40 PLANS:$5.40 X-SEC:$ X18:$ X36:$39.00

14, 2019 MERCER COUNTY SR 173(491) # PROPOSAL:$11.40 PLANS:$5.40 X-SEC:$ X18:$ X36:$39.00 Updated January 14, 2019 MERCER COUNTY SR 173(491) #100019 PROPOSAL:$11.40 PLANS:$5.40 X-SEC:$2.20 12X18:$2.70 24X36:$39.00 For the construction or Improvement of a certain section of STATE HIGHWAY in

More information

DELAWARE COUNTY - SR 13(DD9) # PROPOSAL:$28.80

DELAWARE COUNTY - SR 13(DD9) # PROPOSAL:$28.80 ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING DECEMBER 21, 2017 Updated December 8, 2017 DELAWARE COUNTY - SR 13(DD9) #109039 PROPOSAL:$28.80 The description and location

More information

BEAVER COUNTY SR 2012(EMP) #97889 PROPOSAL:$17.04 PLANS:$ X18:$ X36:$179.40

BEAVER COUNTY SR 2012(EMP) #97889 PROPOSAL:$17.04 PLANS:$ X18:$ X36:$179.40 Updated on April 28, 2014 BEAVER COUNTY SR 2012(EMP) #97889 PROPOSAL:$17.04 PLANS:$10.12 12X18:$12.42 24X36:$179.40 The description and location of the project is as follows: For milling, resurfacing,

More information

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10 ASSOCIATED PENNSYLVANIA CONSTRUCTORS Update January 3, 2018 GREENE COUNTY - SR 221(J10) #105392 PROPOSAL:$11.76 PLANS:$4.18 12X18:$5.13 24X36:$47.10 The description and location of the project is as follows:

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION SEPTEMBER 11, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION SEPTEMBER 11, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated August 27, 2014 LEHIGH COUNTY SR 78(GSR) #91957 PROPOSAL:$22.56 PLANS:$24.20 12X18:$29.70 24X36:$429.00 The description and location of the project is as follows: This project is the replacement

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 12, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 12, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated July 9, 2018 BUCKS COUNTY SR 1017(SC1) #15341 PROPOSAL:$22.80 This project is for the applying of seal coat to existing bituminous roadway on various state routes (32.33 segment miles) in Bucks

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION MAY 24, 2012 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION MAY 24, 2012 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Update May 8, 2012 ALLEGHENY COUNTY SR 3048(A16) #74333 PROPOSAL:$44.88 PLANS:$7.26 12X18:$8.91 24X6:$128.70 X-SEC:$0.66 12X18:$0.81 24X36:$11.70 The description and location of the project is as follows:

More information

4, 2011 VENANGO COUNTY SR 428(SLD) #92815 PROPOSAL:$17.40 PLANS;$ X18:$ X36:$31.20 X-SEC:$ X18:$ X36:$50.

4, 2011 VENANGO COUNTY SR 428(SLD) #92815 PROPOSAL:$17.40 PLANS;$ X18:$ X36:$31.20 X-SEC:$ X18:$ X36:$50. ASSOCIATED PENNSYLVANIA CONSTRUCTORS Updated May 4, 2011 VENANGO COUNTY SR 428(SLD) #92815 PROPOSAL:$17.40 PLANS;$1.76 12X18:$2.16 24X36:$31.20 X-SEC:$2.86 12X18:$3.51 24X36:$50.70 For the construction

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 26, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 26, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated July 23, 2018 LACKAWANNA COUNTY SR 8031(WWR) #109012 Moved to 7/26/18 from 7/12/18 PROPOSAL:$14.40 PLANS 8.5x11:$4.80 For the rehabilitation and improvement of certain sections of Varies STATE

More information

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated January 30, 2018 ALLEGHENY COUNTY SR 1037(A03) #107983 PROPOSAL:$23.28 PLANS:$4.84 12X18:$5.94 24X36:$85.80 X-SEC:$4.40 12X18:$5.40 24X36:$78.00 24x36:$81.90 The description and location of the

More information

21, 2010 ALLEGHENY COUNTY SR 910(A24) #82614 PROPOSAL:$14.88 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$62.

21, 2010 ALLEGHENY COUNTY SR 910(A24) #82614 PROPOSAL:$14.88 PLANS:$ X18:$ X36:$ X-SEC:$ X18:$ X36:$62. Updated May 21, 2010 ALLEGHENY COUNTY SR 910(A24) #82614 PROPOSAL:$14.88 PLANS:$6.82 12X18:$8.37 24X36:$120.90 X-SEC:$3.52 12X18:$4.32 24X36:$62.40 The description and location of the project is as follows:

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JUNE 22, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JUNE 22, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 6, 2017 LEHIGH COUNTY SR 1025(POC) #109335 PROPOSAL:$16.80 PLANS:$0.96 Project includes bituminous overlay, pavement markings, and other miscellaneous construction, as indicated on the approved

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 7, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 7, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated November 21, 2017 BEDFORD COUNTY - SR 000071 #106779 PROPOSAL:$13.92 PLANS:$6.82 12X18:$8.37 24X36:$120.90 The description and location of the project is as follows: This project is for the construction

More information

PennDOT District 11. Constructors Association of Western Pennsylvania March 5, Cheryl L. Moon-Sirianni, P.E. District Executive

PennDOT District 11. Constructors Association of Western Pennsylvania March 5, Cheryl L. Moon-Sirianni, P.E. District Executive PennDOT District 11 Constructors Association of Western Pennsylvania March 5, 2018 Cheryl L. Moon-Sirianni, P.E. District Executive Anticipated 2018 Lettings 118 Projects anticipated to be let in 2018

More information

Straight Line Diagram. Montour 47. January 2019

Straight Line Diagram. Montour 47. January 2019 Straight Line Diagram Montour 47 January 2019 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is not

More information

Straight Line Diagram. Cameron 12. January 2018

Straight Line Diagram. Cameron 12. January 2018 Straight Line Diagram Cameron 12 January 2018 This document was produced by the Pennsylvania Department of Transportation (PENNDOT) as an internal management tool for State maintained highways and is not

More information

$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000

$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000 $600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000 $- Other Programs Highway Program $800,000,000 $700,000,000 $600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000

More information

GENERAL PERMIT NUMBER WMGR114

GENERAL PERMIT NUMBER WMGR114 Description: The approval herein granted is limited to: 1. the processing of spent polyethylene glycol slurry containing silicon and silicon carbide or diamond ( waste ) for beneficial use in fresh slurry

More information

Blueprint for One of the Nation s Largest SCM Maintenance Programs

Blueprint for One of the Nation s Largest SCM Maintenance Programs Blueprint for One of the Nation s Largest SCM Maintenance Programs PA Department of Transportation Hydrologic & Hydraulic Studies Waterway Permitting Stormwater Design & Permitting Technical Course Development

More information

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities PCL Definitions for the Local Program Projects that are administered by the Central Bureau of Local Roads. Engineering, utilities and land acquisition are coded with the PCL for the type of construction

More information

NJTPA Transportation Improvement Program Fiscal Years

NJTPA Transportation Improvement Program Fiscal Years Routes Name: CR 571 Mileposts: 4.85 DBNUM: N1127 County Route 571/County Route 527, Reconstruction, Toms River Township This project is for intersection improvements at CR 571 and CR 527 in Tom s River

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could

More information

AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PUB 336 (4-17)

AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PUB 336 (4-17) AUTOMATED PAVEMENT CONDITION SURVEY FIELD MANUAL PUBLICATION 336 APRIL 2017 PREPARED BY: BUREAU OF MAINTENANCE AND OPERATIONS ASSET MANAGEMENT DIVISION P.O. Box 3437 HARRISBURG, PENNSYLVANIA 17105-3437

More information

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s) G2-0 List of Active Ministry of Transportation of Ontario Drawings ( s) DIVISION 100 - ABBREVIATIONS 101.070 Legend - Markings 01/04/1994 04/01/1994 TOS/TO For use with Marking items. DIVISION 200 GRADING

More information

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s) G2-0 List of Active Ministry of Transportation of Ontario Drawings ( s) DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings 01/04/1994 04/01/1994 TOS/TO For use with Pavement Marking items.

More information

PROCEDURES FOR REVISIONS TO NATIONAL HIGHWAY SYSTEM CONNECTIONS TO MAJOR INTERMODAL FACILITIES

PROCEDURES FOR REVISIONS TO NATIONAL HIGHWAY SYSTEM CONNECTIONS TO MAJOR INTERMODAL FACILITIES PROCEDURES FOR REVISIONS TO NATIONAL HIGHWAY SYSTEM CONNECTIONS TO MAJOR INTERMODAL FACILITIES Pennsylvania Department of Transportation Transportation Planning Division April 2014 (Revised March 2018)

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Oil and Gas Management

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Oil and Gas Management DOCUMENT NUMBER: ***-****-*** EFFECTIVE DATE: Month DD, YYYY DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Oil and Gas Management TITLE: Addressing Spills and Releases from Oil & Gas Wells and Related

More information

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA 2008/09 $52.0 M 85% SELF-PERFORMED Widen 12 miles of Interstate 10 to six lanes including the reconstruction

More information

LEVEL 1 ASSESSMENT FORM

LEVEL 1 ASSESSMENT FORM COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF SAFE DRINKING WATER LEVEL 1 ASSESSMENT FORM I. General Information PWS Name: PWSID #: Contact Name: Phone #: PWS Address: E-mail:

More information

Lehigh Valley Transportation Study

Lehigh Valley Transportation Study ITEM: IV-A Lehigh Valley Transportation Study SUBJECT: PA 33 Preservation SR 22-Belfast COUNTY... Northampton FED.-AID SYSTEM... On-NHS S.R./SEC.... 33/07M DECADE OF INVESTMENT... No A.D.T.... 25,463 CAPITAL

More information

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees CR 9 (Bradt Hollow Road) Over Fox Creek Bridge Replacement Project Replacement of a 156 ft. long x 32ft. wide, 3 span pre stressed concrete box beam bridge over Fox Creek in the Town of Berne. The bridge

More information

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs G2-0 LIST OF ACTIVE MTODs DIVISION 100 ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200 GRADING 219.101 Light Duty Straw

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) Route 3, Route 46, Valley Road and Notch/Rifle Camp Road Interchange, Contract B DBNUM: 059B / UPC: 123020 From Notch/Rifle Camp Road to just east of the Valley Road Intersection, Route 46 will be widened

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006

More information

Bridge Asset Management City of Battle Creek Planning and Projects

Bridge Asset Management City of Battle Creek Planning and Projects Bridge Asset Management City of Battle Creek Planning and Projects Michigan Bridge Conference, March 20, 2013 Gregory B. Rickmar P.E., Public Works Department, City of Battle Creek Alan Halbeisen, P.E.

More information

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs G2-0 LIST OF ACTIVE MTODs DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200- GRADING 219.101 Light Duty Straw

More information

THE GOVERNOR GOVERNOR S OFFICE. Amendment to Proclamation

THE GOVERNOR GOVERNOR S OFFICE. Amendment to Proclamation 5346 THE GOVERNOR GOVERNOR S OFFICE September 18, 2004 in Allegheny, Armstrong, Butler and Washington Counties due to widespread and unusually severe storms, heavy rain, high winds and general population

More information

Annual CSAH Needs Update for 2018

Annual CSAH Needs Update for 2018 Annual CSAH Needs Update for 2018 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segment and project data using the SANeeds system.

More information

There has been much speculation

There has been much speculation Marcellus Education Fact Sheet Pennsylvania Dairy Farms and Marcellus Shale, 2007 2010 There has been much speculation about the implications of Marcellus shale development for Pennsylvania farms and farmers.

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List October 2018 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Comment Form Date: To: From:

More information

GENERAL PERMIT WMGM020 RECOVERY AND BENEFICIAL USE OF FERROUS AND NONFERROUS METALS; AND REMOVAL OF UNBURNED

GENERAL PERMIT WMGM020 RECOVERY AND BENEFICIAL USE OF FERROUS AND NONFERROUS METALS; AND REMOVAL OF UNBURNED GENERAL PERMIT WMGM020 RECOVERY AND BENEFICIAL USE OF FERROUS AND NONFERROUS METALS; AND REMOVAL OF UNBURNED MATERIAL FROM MUNICIPAL WASTE INCINERATION FACILITIES DEPARTMENT OF ENVIRONMENTAL PROTECTION

More information

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida November 7, 2014 SUBMITTED BY: Dewberry Bowyer-Singleton 520 South

More information

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs G2-0 LIST OF ACTIVE MTODs DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200- GRADING 219.101 Light Duty Straw

More information

BID ITEM WORKBOOK COSTARS-8 Maintenance, Repair, & Operation Equipment & Supplies ("MRO") BIDDER/CONTRACTOR DATA

BID ITEM WORKBOOK COSTARS-8 Maintenance, Repair, & Operation Equipment & Supplies (MRO) BIDDER/CONTRACTOR DATA COSTARS-8 Maintenance, Repair, & Operation Equipment & Supplies ("MRO") BIDDER/CONTRACTOR DATA BIDDER/CONTRACTOR'S LEGAL NAME: D/B/A NAME, IF APPLICABLE: BIDDER ADDRESS: COUNTY LOCATED IN: PA Legislative

More information

Annual CSAH Needs Update for 2017

Annual CSAH Needs Update for 2017 Annual CSAH Needs Update for 2017 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segments and project data using the SANeeds system.

More information

BUREAU OF WASTE MANAGEMENT. DIVISION OF MUNICIPAL and RESIDUAL WASTE GENERAL PERMIT WMGR028

BUREAU OF WASTE MANAGEMENT. DIVISION OF MUNICIPAL and RESIDUAL WASTE GENERAL PERMIT WMGR028 BUREAU OF WASTE MANAGEMENT DIVISION OF MUNICIPAL and RESIDUAL WASTE GENERAL PERMIT WMGR028 BENEFICIAL USE OF BAGHOUSE FINES OR SCRUBBER POND PRECIPITATES FROM HOT-MIX ASPHALT PLANTS Issued: August 1, 2017

More information

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) 10/16/2014 Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) July 2002 Prepared by Construction Cost Estimating Unit Program Support Services 10/16/2014 Table of Contents

More information

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016 Cleveland Opportunity Corridor Project Section 3 Subcontractor Informational Meeting August 12, 2016 Agenda Welcome and Opening Remarks Project Overview Prequalifications & Work Types Procurement Overview

More information

3.6 Construction Methods

3.6 Construction Methods Exhibit 144: Birchmount Stop Layout West Don River Bridge - Girders are adequate to accommodate LRT right-of-way and required deck widening. Supplementary support or deck strengthening may be required

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 1 DBNUM: 15417 / UPC: 154170 This contract will bring projects into compliance with current ADA design requirements that could

More information

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN 2016 STRUCTURE INSPECTION APPRAISAL REPORT Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN by K. SMART ASSOCIATES LIMITED 8 McIntyre Drive Kitchener ON N2R 1H6 August 2016

More information

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

TABLE OF DRAWINGS. Pierce County Public Works & Utilities Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 05/10/2018 PC.A1.2 Arterial with Cement

More information

LAND APPLICATION OF RESIDUAL WASTE ANNUAL OPERATION REPORT. Instructions

LAND APPLICATION OF RESIDUAL WASTE ANNUAL OPERATION REPORT. Instructions 2520>FM>LWM0408 ev. 8/97 25 PA Code 291.222 DEPATMENT OF ENVIONMENTAL POTECTION BUEAU OF LAND ECYCLING AND WASTE MANAGEMENT LAND APPLICATION OF ESIDUAL WASTE ANNUAL OPEATION EPOT Instructions 1. This report

More information

BID ITEM WORKBOOK COSTARS-6 Packaged Software BIDDER/CONTRACTOR DATA

BID ITEM WORKBOOK COSTARS-6 Packaged Software BIDDER/CONTRACTOR DATA BIDDER/CONTRACTOR DATA BIDDER/CONTRACTOR'S LEGAL NAME: D/B/A NAME, IF APPLICABLE: BIDDER ADDRESS: COUNTY LOCATED IN: 1102 15th Street SW, Suite 102 Auburn, WA 98001 King PA Legislative House District Number

More information

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

TABLE OF DRAWINGS. Pierce County Public Works & Utilities Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 04/01/2019 PC.A1.2 Arterial with Cement

More information

Berkshire Region TIP Project Data Form

Berkshire Region TIP Project Data Form BASIC INFORMATION: 1. TIP ID #: 2. MUNICIPALITY: 3. ROUTE# AND/OR NAME: Berkshire Region TIP Project Data Form 4. PROJECT TYPE (CHECK BEST DEFINITION OF PROJECT): Intersection Improvement Road Resurfacing

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

Commonwealth of Pennsylvania

Commonwealth of Pennsylvania Commonwealth of Pennsylvania Date: April 1, 2016 Subject: Children's Health Insurance Program Outreach Solicitation Number: RFQ 6100037762 Opening Date/Time: April 4, 2016 5:00 PM Addendum Number: 1 To

More information

IMPROVING I 81 IN MARYLAND

IMPROVING I 81 IN MARYLAND IMPROVING I 81 IN MARYLAND April 25, 2017 Stephen A. Bucy, P.E. Improving I 81 in Maryland Overview: Facts SHA s Comprehensive I 81 Strategy Current Phase 1 Widening Project Update Closing Improving I

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Foreword This manual contains

More information

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810

STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS. 3 East Pulteney Square Bath, New York 14810 STEUBEN COUNTY DEPARTMENT OF PUBLIC WORKS 3 East Pulteney Square Bath, New York 14810 County Route 22 over Canisteo River Bridge Replacement Project BIN 3333290 D035511 PIN 6755.06 ADDENDUM #1 October

More information

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 29, Resurfacing of Aldrich Road West Contract # 11-06

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 29, Resurfacing of Aldrich Road West Contract # 11-06 TOWNSHIP OF HOWELL DEPARTMENT OF COMMUNITY DEVELOPMENT & LAND USE 4567 Route 9 North, 2 nd Floor Phone: (732) 938-4500 x2300 Post Office Box 580 Fax: (732) 414-3243 Howell, NJ 07731-0580 Web: www.twp.howell.nj.us

More information

Act 101 Section 902 Grants Round 53 Summary

Act 101 Section 902 Grants Round 53 Summary APPLICANT PROJECT REQUESTED AWARDED Comments SOUTHEAST REGION 1 Bristol Township Curbside Recycling $90,585 $90,585 Bucks County Prorgam 2 Chester County Office Building & Community $46,490 $43,439 Item

More information

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure. Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE

More information

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle

More information

Mn/DOT BRIDGE INSPECTION REPORT

Mn/DOT BRIDGE INSPECTION REPORT 08/13/2007 Page 1 of 5 County: City: Township: WINONA DRESBACH Section: 33 Township: 105N Range: 04W Span Type: NBI Deck: 5 Super: 6 Sub: 6 Chan: 8 Culv: N Location: Route: Control Section: AT MINN/WISC

More information

Maine Turnpike Authority

Maine Turnpike Authority PAVEMENT REHABILITATION & CLEAR ZONE IMPROVEMENTS MM 80.7 TO MM 88.6 202.121 Removing Existing Concrete (6CY) 1.00 LS 202.127 Removing of Existing Bituminous Pavement (470 SY) 1.00 LS 202.202 Removing

More information

BID ITEM WORKBOOK COSTARS-3 IT Hardware BIDDER/CONTRACTOR DATA

BID ITEM WORKBOOK COSTARS-3 IT Hardware BIDDER/CONTRACTOR DATA BIDDER/CONTRACTOR DATA BIDDER/CONTRACTOR'S LEGAL NAME: D/B/A NAME, IF APPLICABLE: BIDDER ADDRESS: COUNTY LOCATED IN: VENDOR NUMBER: PA Legislative House District Number DGS Self-Certified Small Business

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

Information for File # RJH

Information for File # RJH Information for File #2011-01629-RJH Applicant: Matthew Ternes Corps Contact: Ryan Huber, U. S. Army Corps of Engineers, 211 North Broadway, Suite 221, Green Bay, Wisconsin 54303; ryan.j.huber@usace.army.mil;

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:

More information

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS SECTION PAGE NO. SECTION TITLE NO. EXECUTIVE SUMMARY -------------------------------------------------------------------- ES-1 1.0 INTRODUCTION

More information

BID ITEM WORKBOOK COSTARS-13 Emergency Responder Vehicles BIDDER/CONTRACTOR DATA

BID ITEM WORKBOOK COSTARS-13 Emergency Responder Vehicles BIDDER/CONTRACTOR DATA BIDDER/CONTRACTOR DATA BIDDER/CONTRACTOR'S LEGAL NAME: D/B/A NAME, IF APPLICABLE: BIDDER ADDRESS: COUNTY LOCATED IN: VENDOR NUMBER: Primary POC regarding IFB/Contract: Secondary POC regarding IFB/Contract:

More information

MICRO-SURFACING - OPSS 336

MICRO-SURFACING - OPSS 336 - OPSS 336 336.1 GENERAL 336.1.1 Definitions Micro-surfacing is recommended by the Regional Geotechnical Section on a work project specific basis. It is generally used as a preventive maintenance treatment

More information

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway. Last Revision by CO Special Provisions: 09/14/18 Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2018-143 ((2360) PLANT MIXED ASPHALT PAVEMENT (MSCR)) when using this writeup.

More information

LEVEL 2 ASSESSMENT FORM

LEVEL 2 ASSESSMENT FORM COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF SAFE DRINKING WATER LEVEL 2 ASSESSMENT FORM I. General Information PWS Name: PWSID #: Contact Name: Phone #: PWS Address: E-mail:

More information

Northeast Bridge Preservation Partnership Meeting

Northeast Bridge Preservation Partnership Meeting Northeast Bridge Preservation Partnership Meeting Superstructure Preservation Strategies Aetna Viaduct Superstructure Repairs Route I-84 City of Hartford, CT State Project No. 63-648 David A. Cutler, P.E.

More information

BID ITEM WORKBOOK COSTARS-25 Municipal Work Vehicles BIDDER/CONTRACTOR DATA

BID ITEM WORKBOOK COSTARS-25 Municipal Work Vehicles BIDDER/CONTRACTOR DATA BIDDER/CONTRACTOR DATA BIDDER/CONTRACTOR'S LEGAL NAME: D/B/A NAME, IF APPLICABLE: BIDDER ADDRESS: COUNTY LOCATED IN: VENDOR NUMBER: PA Legislative House District Number 4162 LIBRARY RD PITTSBURGH, PA 15234

More information

SPECIAL CONDITIONS GENERAL PERMIT WMGM025

SPECIAL CONDITIONS GENERAL PERMIT WMGM025 A. Authorization: This general permit authorizes the grinding, shredding, crushing, screening and/or beneficial use of construction waste materials as follows: 1. Activity authorized at the permanent facility:

More information

APPLICANT PROJECT REQUESTED RECOMMENDED COMMENTS

APPLICANT PROJECT REQUESTED RECOMMENDED COMMENTS Act 101, Section 902 Recycling Development and Implementation Grant Applications SOUTHEAST REGION 1 Bristol Township Curbside Recycling & $199,109 $116,957 ineligible item requested Educational s 2 Lower

More information

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement

B510-5 REMOVAL-PAVEMENT WORK OPSS 510. CDED B Removal CDED B Reclaim Asphalt Pavement B510-5 OPSS 510 510-5.1 GENERAL This section is for Pavement Work removal tender items. The work covered by these tender items includes the removal and disposal of materials. 510-5.2 REFERENCES CDED B510-0

More information

STANDARD CONDITIONS GENERAL PERMIT WMGM042

STANDARD CONDITIONS GENERAL PERMIT WMGM042 STANDARD CONDITIONS GENERAL PERMIT WMGM042 A. Authorization: This general permit authorizes the processing (mixing or blending) of (i) animal manure, (ii) grease trap waste (collected from restaurants,

More information