OAKVILLE POWER BOAT CLUB
|
|
- Beverly Cross
- 5 years ago
- Views:
Transcription
1
2 XISTING PIL SUPPORTD TIMBR DOCK AND DCKS TO B RMOVD BURLOAK CANO CLUB XISTING DOCKS TO B RMOVD (TYP) PROPRTY BOUNDARY XISTING STORM WATR OUTLT.. All dimensions in millimeters. All elevations in meters, GSC. 3. Topographic survey completed May 3, 6 by J. H. Gelbloom data collected by Shore ngineering Apr, Construction access and staging. nclose all work areas with as per OPSD-9.6 and See Sheet for general 7. The Contractor shall read detailed 8. No in-water work shall be carried out between Sept. st and June 3th, unless otherwise permitted 9. All equipment shall be refueled at least 3 meters from the lake.. Any operation that creates dust,. All trees within work area to be standard. See Sheet TP to TP3 for Tree. Design dredge elevation adjacent to basin walls is.m and shoreline is.m. Design live pier is KPa and 4.8KPa along 3. All loose riprap and debris from PARKING LOT XISTING ROCK SLOP MARINA BASIN PROPRTY BOUNDARY 7//4 Issued for Construction, Phase Only OAKVILL POWR BOAT CLUB XISTING TIMBR RTAINING WALL TO B RMOVD AFTR INSTALLATION OF NW WALL, S NOT 3 XISTING DOCKS TO B RMOVD (TYP) XISTING FLOATING DOCKS TO B RLOCATD AS DIRCTD BY TOWN 4 7//4 Issued for Construction 3 7//3 CH & MNRF Comments 7/7/ Issued for Approval Only 7/7/7 RMOV XISTING GABION BASKT AND ROCK FILL, S NOT 3 Drawing Location: S:\Shore Project Files\Files 3-399\6-38 Oakville Power Boat Club Seawall Rehabilitation\Drawings\6-38 r.dwg :4 PHAS XISTING TRS TO B RMOVD. S NOT S I X T N M I L C R K XISTING PIL SUPPORTD DOCKS AND DCKS TO B RMOVD XZ Z88 XISTING TIMBR DCK, NOT TO B DISTURBD GAS DOCK BUILDING XISTING GAS DOCK TO B RMOVD GAS PUMP,NOT TO B DISTURBD PARKING LOT XISTING PIL SUPPORTD DOCKS TO B RMOVD PHAS XISTING SHORLIN (MAY 3 6) APPROXIMAT LOCATION OF XISTING BRIDG ABUTMNT XISTING SSP WALL XISTING TIMBR RTAINING WALL AND GABION BASKTS TO B RMOVD AFTR INSTALLATION OF NW WALL, S NOT 3 SIT PLAN OAKVILL POWR BOAT CLUB SAWALL RHABILITATION XISTING SIT PLAN AND RMOVALS of Issue Project 6-38 Sheet of 7
3 .. 3. ROSION AND SDIMNT CONTROL NOTS 4.. rosion control measures will be installed, maintained while construction activities occur. Measures may only be removed after final stabilization of the site has occurred.. Sediment tracked onto offsite streets will be removed weekly or as needed. 3.. engineer. 4. All catch basins within the work area are to be protected with sediment sock.. 6. events or as identified during site inspections. 6. Modifications to the SC Plan must be approved by engineer. 7. These s are subject to change with all changes agreed up by the engineer and the appropriate agency MUD MAT S DTAIL D7 L 9. S. S. S AC TRU C C SS TIO N K BURID ANCHOR WALL (TYP.). TI RODS (TYP.) CO N S9 S S STL SHT PIL WALL 3. C. XISTING STORM WATR OUTLT. RLOCAT XISTING PIP THROUGH RVTMNT All dimensions in millimeters All elevations in meters, GSC. Topographic survey completed May 3, 6 by J. H. Gelbloom data collected by Shore ngineering Apr, 7. Construction access and staging nclose all work areas with as per OPSD-9.6 and 9.6. See Sheet for general The Contractor shall read detailed No in-water work shall be carried out between Sept. st and June 3th, unless otherwise permitted All equipment shall be refueled at least 3 meters from the lake. Any operation that creates dust, All trees within work area to be standard. See Sheet TP to TP3 for Tree Design dredge elevation adjacent to basin walls is.m and shoreline is.m. Design live pier is KPa and 4.8KPa along All loose riprap and debris from RAMP STAGING ARA. BOULDR BRM J FAST FNC OR APPROVD QUAL S8 B SILT BARRIR AS PR OPSS 9. TO B INSTALLD UPON COMPLTION AND RMOVD WHN VGTATION HAS R-STABLISHD PROPRTY LIN xisting levations Proposed levations BACK OF RDI-ROCK WALL (ALONG PROPRTY LIN) D CRST OF RVTMNT TO OF RVTMNT PHAS. 3.m RDI-ROCK WALL STL SHT PIL WALL. Control Point S S S3 S4 S S6 S7 S8 S9 S S Northing (m) asting (m) Issued for Construction, Phase Only 4 7//4 Issued for Construction 3 7//3 CH & MNRF Comments 7/7/ Issued for Approval Only 7/7/7 S3 S4 BURID ANCHOR WALL F TURBIDITY CURTAIN S NOT XISTING SSP WALL S6. SI 4.6m 7.9m XT S7 7.6m S G N OAKVILL POWR BOAT CLUB SAWALL RHABILITATION H M IL XZ Z 88 C R K SIT PLAN SHOR WALL LAYOUT of Issue PHAS :4 A I Drawing Location: S:\Shore Project Files\Files 3-399\6-38 Oakville Power Boat Club Seawall Rehabilitation\Drawings\6-38 r.dwg TURBIDITY CURTAIN S NOT PH AS 7//4 G BURID ANCHOR WALL TIMBR DCK PROPOSD m CONTOUR SIT PLAN Project Sheet 6-38 of 7
4 8 8 8 PROPRTY LIN GRANULAR "A" COMPACTD TO 98% S.P.D. 9mm CLAR STON BDDING RDI ROCK WALL WITH CAP S DTAIL D 8 PROPOSD DOCK RMOV XISTING STON FILLD TIMBR CRIB AND GABION BASKTS AS RQUIRD AFTR INSTALLATION OF SSP WALL RMOV XISTING STON FILLD TIMBR CRIB AND GABION BASKTS AS RQUIRD AFTR INSTALLATION OF SSP WALL mm GRANULAR "A" COMPACTD TO 98% S.P.D. COMPACTD TO 98% S.P.D. Z88 STL SHT PIL WALL, S DTAILD SCTION D.8m.. 3. PROPOSD DOCK PROPOSD FLOATING DOCK. 7. % MIN (A.W.L.) 7. (A.W.L.) % MIN (A.W.L.) m. DRDG LIN S NOT GOTXTIL TRRAFIX 6R OR APPROVD QUAL. m A : 6.. DRDG LIN (S NOT ) GOTXTIL, TRRAFIX R OR APPROVD QUAL. DRDG LIN (S NOT ) 9 mm CLAR STON MIN. 3mm AROUND ANCHOR RODS GOTXTIL, TRRAFIX 6R OR APPROVD QUAL 7. Z88 STL SHT PIL WALL, S DTAILD SCTION D : XISTING GRAD PROPRTY LIN mm GRANULAR "A" COMPACTD TO 98% S.P.D. COMPACTD TO 98% S.P.D. 8 Z88 STL SHT PIL WALL 9.. XISTING GRAD RDI-ROCK WALL WITH CAP S DTAIL D GRANULAR "A" COMPACTD TO 98% S.P.D. 7..m MIN. PROPOSD FLOATING DOCK. 9mm CLAR STON BDDING % MIN (A.W.L.) 7 APPROXIMAT OUTLIN OF XISTING PIR TO B RMOVD (A.W.L.) RMOV XISTING STON FILLD GABION BASKTS AND STON FILL AS RQUIRD AFTR STL SHT PIL WALL IS CONSTRUCTD. m B : 9mm CLAR STON MIN. 3mm AROUND ANCHOR RODS.. DRDG LIN (S NOT ) GOTXTIL TRRAFIX R OR APPROVD QUAL ANCHOR WALL (TYP.) S DTAILS 3. F : 8. ANCHOR ROD. DRDG LIN (S NOT ) All dimensions in millimeters All elevations in meters, GSC. Topographic survey completed May 3, 6 by J. H. Gelbloom data collected by Shore ngineering Apr, 7. Construction access and staging nclose all work areas with as per OPSD-9.6 and 9.6. See Sheet for general The Contractor shall read detailed No in-water work shall be carried out between Sept. st and June 3th, unless otherwise permitted All equipment shall be refueled at least 3 meters from the lake. Any operation that creates dust, All trees within work area to be standard. See Sheet TP to TP3 for Tree Design dredge elevation adjacent to basin walls is.m and shoreline is.m. Design live pier is KPa and 4.8KPa along All loose riprap and debris from 8 mm GRANULAR "A" COMPACTD TO 98% S.P.D. XISTING GRAD COMPACTD TO 98% S.P.D. 9mm CLAR STON MIN. 3mm AROUND ROD mm TOP SOIL AND SD. COMPACTD TO 98% S.P.D. 8 8 PROPOSD DOCK XISTING DOCK WALL XISTING GRAD 7. (A.W.L.) 7.7 % MIN. 7. 7//4 Issued for Construction, Phase Only 4 7//4 Issued for Construction 3 7//3 CH & MNRF Comments 7/7/ Issued for Approval Only 7/7/7 7. (A.W.L.) DRDG LIN (S NOT ) COMPACTD TO 98% S.P.D. XISTING DOCK WALL TO B RMOVD. m GOTXTIL TRRAFIX R OR APPROVD QUAL Z88 STL SHT PIL WALL, S DTAILD SCTION D3.m MIN. mm GRANULAR "A" COMPACTD TO 98% S.P.D GOTXTIL, TRRAFIX 6R OR APPROVD QUAL 64.. DRDG LIN (S NOT ) C : ANCHOR WALL (TYP.) S DTAILS 9mm CLAR STON MIN. 3mm AROUND ANCHOR RODS Drawing Location: S:\Shore Project Files\Files 3-399\6-38 Oakville Power Boat Club Seawall Rehabilitation\Drawings\6-38 r.dwg 8 8 mm GRANULAR "A" COMPACTD TO 98% S.P.D. COMPACTD TO 98% S.P.D. : G XISTING GRAD 9mm CLAR STON MIN. 3mm AROUND ROD % MIN. COMPACTD TO 98% S.P.D (A.W.L.). RMOV XISTING STON FILLD TIMBR WALL AS RQUIRD AFTR SSP WALL IS CONSTRUCTD, NSUR ALL DBRIS IS RMOVD FROM CRK XCAVATD ARA m : SCTIONS - PHAS. DRDG LIN (S NOT ) GOTXTIL TRRAFIX R OR APPROVD QUAL 63. OAKVILL POWR BOAT CLUB SAWALL RHABILITATION Z88 STL SHT PIL WALL ANCHOR WALL (TYP.) S DTAILS 7. mm TOP SOIL AND SD 7 GOTXTIL, TRRAFIX 6R OR APPROVD QUAL D of Issue Project Sheet of 7
5 7 7 : 8 8 GOTXTIL 9mm Ø CLAR STON WAL 4.m GOTXTIL. XISTING GRAD (VARIS) XISTING GRAD RDI-ROCK WALL. TIMBR DCK S DTAILS D-D GRANULAR "A" COMPACTD TO 98% S.P.D. mm TOP SOIL AND SD. FUTUR DRDG LIN S NOT TIMBR DCK S DTAILS D-D4 GRANULAR "A" COMPACTD TO 98% S.P.D. TI RODS 9mm Ø CLAR STON MIN. 3mm AROUND RODS Z88 STL SHT PIL WALL XZ STL SHT PIL WALL S DTAILD SCTION D4 FLOATING DOCK TIMBR FISH HABITAT, S DTAIL D7 7. (A.W.L.) H : 9mm Ø CLAR STON MIN. 3mm AROUND RODS TI ROD WAL mm TOP SOIL AND SD XISTING GRAD RDI-ROCK WALL TIMBR DCK S DTAILS D-D4. XZ STL SHT PIL WALL 7. TIMBR FISH HABITAT, S DTAIL D7 GRANULAR 'A' COMPACTD TO 98% SPD. FUTUR DRDG LIN S NOT GOTXTIL 9mm Ø CLAR STON WAL 64. XISTING STAIRS TIMBR DCK S DTAILS D-D4 GRANULAR "A" COMPACTD TO 98% SPD. XZ STL SHT PIL WALL (A.W.L.). FUTUR DRDG LIN S NOT 7. (A.W.L.) K 7 7. All dimensions in millimeters. All elevations in meters, GSC. 3. Topographic survey completed May 3, 6 by J. H. Gelbloom data collected by Shore ngineering Apr, Construction access and staging. nclose all work areas with as per OPSD-9.6 and See Sheet for general 7. The Contractor shall read detailed 8. No in-water work shall be carried out between Sept. st and June 3th, unless otherwise permitted 9. All equipment shall be refueled at least 3 meters from the lake.. Any operation that creates dust,. All trees within work area to be standard. See Sheet TP to TP3 for Tree. Design dredge elevation adjacent to basin walls is.m and shoreline is.m. Design live pier is KPa and 4.8KPa along 3. All loose riprap and debris from : 64. MIN. I : L 7//4 Issued for Construction, Phase Only 4 7//4 Issued for Construction 3 7//3 CH & MNRF Comments 7/7/ Issued for Approval Only 7/7/7 STL SHT PIL WALL 7. m M CLIP WLDD TO SSP WALL.7mm CHAIN Drawing Location: S:\Shore Project Files\Files 3-399\6-38 Oakville Power Boat Club Seawall Rehabilitation\Drawings\6-38 r.dwg 7 : GOTXTIL 9mm Ø CLAR STON. XISTING GRAD mm TOP SOIL AND SD GRANULAR "A" COMPACTD TO 98% SPD RDI-ROCK WALL S DTAIL TIMBR DCK S DTAILS D-D4 XZ STL SHT PIL WALL 7. TIMBR FISH HABITAT, S DTAIL D7. FUTUR DRDG LIN S NOT (A.W.L.) J 7 M CLIP WLDD TO CHANNL Cx3 89 X 89 mm TIMBR (UNTRATD DOUGLAS FIR). m D7 8 TYP..m TIMBR FISH HABITAT FATUR :.7m TYP. M CLIP (TYP.) 8 TYP. 3m 89 X 89 TIMBR CX3 M4 BOLT WITH DOUBL NUT AND WASHR SSP.m.3m.97m.3m CX3 TIMBR.36m M4 BOLT WITH DOUBL NUT AND WASHR OAKVILL POWR BOAT CLUB SAWALL RHABILITATION SCTIONS - PHAS of Issue Project 6-38 Sheet 4 of 7
6 3.m PIL DRIVING LIN mm GRANULAR "A" COMPATD TO 98% S.P.D. ± 7x7xmm MIN. THICKNSS BVLD PLAT #4 DYWIDAG GRAD 7 TI AND ROD 9mm CLAR STON.m 3 MIN. COMPACTD TO 98% S.P.D. 7.± 3 MIN. COMPACTD TO 98% S.P.D..7. m MIN. % MIN. MIN. 7.. mm TOP SOIL AND SD XISTING GRAD.m APPROXIMAT LOCATION OF SANITARY SWR LIN.m 7.m - Cx3 WAL PIL DRIVING LIN #4 DYWIDAG, GRAD 7 TI ROD AND NUT CMRM Z88 SSP OR APPROVD QUAL GOTXTIL, TRRAFIX R OR APPROVD QUAL 7x7xmm MIN. THICKNSS BVLD PLAT DRAIN HOL AT VRY IN-PAN BTWN TI RODS, S DTAIL D8 GOTXTIL, TRRAFIX R OR APPROVD QUAL 7.m (A.W.L.) D 9.6m± DTAILD SCTION C : GRANULAR PAVMNT TIMBR DCKING S DTAIL D3 ± - Cx3 WAL 9mm CLAR STON DRAIN VRY SCOND INPAN, S DTAIL D8 CMRM XZ SSP OR APPROVD QUAL; SHT TO B DRIVN WITH A BATTR TOWARDS SHOR OF. DGRS mm GRANULAR "A" COMPACTD TO 98% S.P.D COMPACTD TO 98% S.P.D 3 MIN. 3 MIN..m m 7x7xmm MIN. THICKNSS PLAT #4 DYWIDAG, GRAD 7 TI ROD AND NUT - Cx3 WAL CMRM Z88 SSP OR OTHR APPROVD QUAL 9mm CLAR STON MIN 3mm AROUND TI ROD DRAIN HOL AT VRY IN-PAN BTWN ANCHORS, S DTAIL XX SHT D8. DRDG LIN.m PIL DRIVING LIN STANDARD CMRM "JZ" SRIS PIL CAP.m GRANULAR "A" COMPACTD TO 98% SPD GOTXTIL, TRRAFIX R OR APPROVD QUAL TIMBR FISH HABITAT S DTAIL D7 SPCIFICATIONS: SURFAC TRATMNT BY OTHRS mm GRANULAR "A" COMPACTD TO 98% S.P.D STANDARD CMRM "Z" SRIS PIL CAP 7x7xmm THICK PLAT #4 DYWIDAG GRAD 7 TI AND ROD 7.m 7.m (A.W.L.) 9mm CLAR STON MIN. 3mm AROUND TI ROD GOTXTIL, TRRAFIX R OR APPROVD QUAL.m % MIN. COMPACTD TO 98% S.P.D. D % MIN. DTAILD SCTION :.m.m 7.m #4 DYWIDAG, GRAD 7 TI ROD AND NUT - Cx3 WAL STANDARD CMRM "Z" SRIS PIL CAP GOTXTIL, TRRAFIX R OR APPROVD QUAL 7.m (A.W.L.) 7x7xmm THICK PLAT CMRM Z88 SSP OR OTHR APPROVD QUAL DRAIN HOL AT VRY IN-PAN BTWN TI RODS, S DTAIL D8. Work includes preparation of the access to the site, demolition and/or removal of items indicated on the contract drawing or required to complete the specified work, tree and brush removal required to complete the work, removal of existing timber structures, gabion baskets, gabion stone and miscellaneous other site preparation tasks required to complete the specified works, disposal of the derived or excess material in a legal manner, and the restoration of the sites and access routes to existing or better nsure stone fill and debris is removed from creek bottom. rect any silt curtains or fences as required by conditions of approvals and comply with any and all conditions outlined on permits. Turbidity curtain as per OPSD 9.6 and Granular A as per OPSS. 9mm Clear Stone as per OPSS 4, Type. General fill material shall be clean native or imported soil material suitable for compaction. All fill material shall be compacted to minimum 9% S.P.D. All fill material to be rough graded and matched to existing grades to the satisfaction of the owner. Maintain positive drainage towards the seawall. 3. The filter fabric material (geotextile) shall be non-woven pervious, inert and durable. The material shall be Terrafix R or approved equal. Individual filter fabric sheets shall reach from the top of the revetment to the toe. Provide a minimum of mm overlap width in the across the slope direction when placing a new section of filter fabric adjacent to a previously placed section. Repair any damaged filter fabric by placing second layer, overlaying the damaged area by not less then mm in all directions beyond the damaged area. 4. Boulder shall be hard, dense, round stone, free from seams, cracks or other structural defects with relative density.7, +/-.. Boulder material shall be rock, ranging in size from 3 to 6 mm. Minimum % of the total volume shall contain stone of individual size greater than 4 mm and not more than % of volume shall contain stone less than 3 mm in size. Specified dimensions represent the smallest dimension of individual rock pieces. In case of a dispute regarding the size of material the contractor shall provide scientific proof of size at his expense. Place riprap to lines and grades indicated on the contract drawings.. All dimensions in millimeters. All elevations in meters, GSC. 3. Topographic survey completed May 3, 6 by J. H. Gelbloom data collected by Shore ngineering Apr, Construction access and staging. nclose all work areas with as per OPSD-9.6 and See Sheet for general 7. The Contractor shall read detailed 8. No in-water work shall be carried out between Sept. st and June 3th, unless otherwise permitted 9. All equipment shall be refueled at least 3 meters from the lake.. Any operation that creates dust,. All trees within work area to be standard. See Sheet TP to TP3 for Tree. Design dredge elevation adjacent to basin walls is.m and shoreline is.m. Design live pier is KPa and 4.8KPa along 3. All loose riprap and debris from 7//4 Issued for Construction, Phase Only 4 7//4 Issued for Construction 3 7//3 CH & MNRF Comments 7/7/ Issued for Approval Only 7/7/7 GOTXTIL, TRRAFIX R OR APPROVD QUAL CMRM Z88 SSP OR APPROVD QUAL. All steel bars, plates and shapes shall be new, free from rust and meet the requirements of CSA G4./G4. M3 W. unless otherwise specified. All bolts, nuts and washers shall meet the requirements of ASTM A3. All welds, welding equipment, procedures etc. shall conform to CSA W9-3. Welding shall only be undertaken by a company approved by the Canadian Welding Bureau to the requirements of CSA W47., Division or, Certification for companies for Fusion Welding of Steel Structures. Use electrode W4XX. Welding of steel reinforcement bar shall conform to CSA W86-M99 (R). Steel sheet pile wall sections shall be as shown on sections and details, or approved equal. Type of steel shall be CSA G4./G4. (Grade 7). All Hot Dipped Galvanized (HDG) steel to be treated in accordance with CSA G64. D3 DTAILD SCTION G : 6. RediRock 8" and 4" wall systems to be installed according to manufacturer's specifications. 7. All timber to be treated with MCA PT SYP (Micro Copper Azole Pressure Treated Southern Yellow Pine). Timber to be treated appropriately for full ground exposure, unless otherwise noted. Timber for fish habitat to be untreated Douglas fur. Drawing Location: S:\Shore Project Files\Files 3-399\6-38 Oakville Power Boat Club Seawall Rehabilitation\Drawings\6-38 r.dwg D4 64. DTAILD SCTION I - CANTILVR WALL : 8. Seed mix to be approved by Conservation Halton and shall include the following: % Wild Blue Flag (Iris versicolor), % Purple Stemmed Aster (Aster puniceus), % Spotten Joe-Pye-Weed (upatorium maculatum) or Boneset (upatorium perfoliatum), % Green Headed Coneflower (Rudbeckia lacinata), % Tall Meadow Rue (Thalictrum pubescens), % Swamp Milkweed (Asclepias incarnata), 6% Virginia Wild Rye (lymus virginicus), % Blue Vervain (Verbena hastata). Minimum mm of top soil shall be applied to restored area. Any ting and seeding work will be monitored for health and germination for the duration of the warranty ( years). Contractor will be responsible to replace any t material as required by the warranty. 9. nvironmental Protections: rosion and Sediment Control and wildlife exclusion fencing should be installed and in good condition prior to works commencing. If large mobile animals enter the work area, stop work and allow the animal to leave the area on its own free of harassment. In the event that a smaller less mobile species enters the work area, a qualified individual (e.g. environmental monitor) should remove the animal. Should a listed Species at Risk be encountered, the MNRF should be consulted before proceeding. As a good general practice, handling protocols for all species should follow those outlined in the MNRF's Ontario Species at Risk Handling Manual: For ndangered Species Act Authorization Holders.. Installation of steel sheet pile wall in Phase to be done from marine t. All other work to be completed from shore. OAKVILL POWR BOAT CLUB SAWALL RHABILITATION DTAILD SCTIONS of Issue Project 6-38 Sheet of 7
7 7 Z88 STL SHT PIL -mm Ø DRAIN 4 O.C. 7 x mm O.C. x PLAT MIN. mm THICK BVLLD AS RQUIRD (S SCTIONS) 7.m TYP. 3 TYP. 4 TYP. 3 TYP. mm PLAT TOP AND BOTTOM 6-M6 BOLTS ACH SID CX3 WAL TYP. M4 BOLT NUT & PLAT D STL SHT PIL, SCTION VARIS, S DTAILS GOTXTIL, TRRAFIX R OR APPROVD QUAL xxmm LONG SPACR BAR, TOP & BOTTOM xxmm STL PLAT mmø DRILLD HOL #4 DYWIDAG, GRAD 7, TI ROD AND NUT, S SIT PLANS FOR ANCHOR LAYOUT NOT: CORNR PLATS TO B INSTALLD AT VRY CORNR. TYPICAL CORNR PLAT DTAIL : M6 STL BOLTS AND NUTS PR SID #4 DYWIDAG, GRAD 7, TI ROD AND NUT 63 mm PLAT D9 VARIS S SIT - mm Ø DRAIN 4mm O.C. 4 3 TYPICAL WAL SPLIC SCAL : D6 NOT: TOP AND BOTTOM WAL SPLIC TO B STAGGRD.8m AND LOCATD 63mm FROM TI RODS. RDI-ROCK WALL GOTXTIL 6 6 TYPICAL STL SHT PIL WALL LAYOUT : STL SHT PIL CMRM Z88 OR APPROVD QUAL -Cx3 (TOP AND BOTTOM) mm THICK mm O.C. 4 MAX. 4-M6 BOLTS ON ACH SID OF M4 BOLT mm FROM M4 BOLT xx PLAT M4 BOLT AT VRY IN-PAN BTWN ANCHORS D Z88 STL SHT PIL TYP. M4 BOLT AND NUT xx PLAT TYP. TYPICAL WAL ATTACHMNT : 7.m WAL -Cx3 STL SHT PIL WALL S SCTIONS FOR TYP D7 D TYPICAL TMPORARY GRAVL CONSTRUCTION NTRAC (MUD MAT) Not to VARIS 4mm ( 8 ") STBACK. m TYPICAL RDI-ROCK WALL LAYOUT WITH CAP : 4-SIDD 6" CAP BLOCK GARDN CORNR BLOCK 4" MIDDL BLOCK 4" BAS BLOCK CRUSHD STON LVLING PAD.m. All dimensions in millimeters. All elevations in meters, GSC. 3. Topographic survey completed May 3, 6 by J. H. Gelbloom data collected by Shore ngineering Apr, Construction access and staging. nclose all work areas with as per OPSD-9.6 and See Sheet for general 7. The Contractor shall read detailed 8. No in-water work shall be carried out between Sept. st and June 3th, unless otherwise permitted 9. All equipment shall be refueled at least 3 meters from the lake.. Any operation that creates dust,. All trees within work area to be standard. See Sheet TP to TP3 for Tree. Design dredge elevation adjacent to basin walls is.m and shoreline is.m. Design live pier is KPa and 4.8KPa along 3. All loose riprap and debris from D8 XTND GOTXTIL OVR DRAIN HOL TYPICAL SSP DRAIN HOL : 38 X 4 P.T. TIMBR DCKING 3mm O.C. 4x4 P.T. TIMBR SUPPORT -X3 WAL #4 DYWIDAG, GRAD 7, ANCHOR ROD AND NUT (TYP.) GRANULAR "A" COMPACTD TO 98% S.P.D. (MIN. ) 3.m MIN. D TIMBR DCK SCTION SID VIW : 7//4 Issued for Construction, Phase Only RDI-ROCK WALL 7.7m± 3.m± 4 7//4 Issued for Construction 3 7//3 CH & MNRF Comments 7/7/ Issued for Approval Only -X3 WAL 7/7/7 ANCHOR WALL, CMRM Z88 OR APPROVD QUAL #4 DYWIDAG ROD 38X84 P.T. O.C.C JOIST Z88 STL SHT PIL DCKING NOT SHOWN FOR CLARITY 4 6 min D PIR ANCHOR ROD LAYOUT : CORNR PLAT, S DTAIL D, SHT 4 STL SHT PIL CMRM Z88 OR APPROVD QUAL Drawing Location: S:\Shore Project Files\Files 3-399\6-38 Oakville Power Boat Club Seawall Rehabilitation\Drawings\6-38 r.dwg D3 TIMBR DCK PLAN VIW : 3mm O.C., US ' (6.m) LONG STOCK, JOISTS TO B LAID OUT IN STAGGRD PATTRN, S LAYOUT FOR DTAIL, MIN. OVRLAP OF TWO JOISTS IN LIN TO B 6 4X4 SUPPORT GRANULAR BD COMPACTD TO 98% 34 S.P.D. 4 6 SSP CAP JOIST OVRLAP (MIN. 6) TYP. 38 X 4 P.T. TIMBR DCKING 3 3 4X4 SUPPORT GRANULAR BD COMPACTD TO 98% 34 S.P.D. 4 D4 TIMBR DCK SCTION FRONT VIW : 4X4 SUPPORT GRANULAR BD COMPACTD TO 98% 34 S.P.D. 4 4X4 SUPPORT GRANULAR BD COMPACTD TO 98% 34 S.P.D. 4 STANDARD CMRM "Z" SRIS PIL CAP M4 WAL BOLT AND xx mm THICK BAS PLAT (TYP.) #4 DYWIDAG, GRAD 7, TI ROD AND NUT WAL -X3 D6 LVATION VIW : STL SHT PIL WALL, CMRM Z88 OR APPROVD QUAL #4 DYWIDAG, GRAD 7, TI ROD AND NUT (TYP.) LOWR WAL -X3 PIR ND WALL, S DTAILD SCTION D.7m.m 7.m m.m DATUM OAKVILL POWR BOAT CLUB SAWALL RHABILITATION DTAILS of Issue Project 6-38 Sheet 6 of 7
8 L TRAFA KRR ST. D. GAR R TOWN OF MIL N SIT ARA SIX T CRK RBCCA ST. LAKSHOR RD. W. S WO TOR BU OD Y ILD FR ING AM NO. 6 TANNRY PARK WATR STRT GRA VL PAT H CONSTRUCTION ACCSS, PR SHORPLAN NG. DWG STL TANK OUTLIN OF DOCKS TO B RMOVD TI ROADS, PR SHORPLAN NG. DWG TURBIDITY CURTAIN, PR SHORPLAN NG. DWG STL SHT PIL WALL XISTING SHORLIN (MAY 3 6) S LO TOR Y CL G UB HO US WOOD FRAM SHD BURID ANCHOR WALL, PR SHORPLAN NG. DWG STL SHT PIL WALL. FAST FNC, RFR TO SHORPLAN DWG LAKSID PARK FAST FNC, RFR TO SHORPLAN DWG OAKVILL RBCCA STRT (BRIDG OVRHAD) MUD MAT, PR SHORPLAN NG. DWG RANDALL ST. PA TIO OUTLIN OF DOCKS TO B RMOVD.. AS (X PHA IST LT P ING AR KI ) XISTING SHORLIN (MAY 3 6) NG. LO SILT BARRIR, PR SHORPLAN NG. DWG TO OF RVTMNT, PR SHORPLAN NG. DWG FAST FNC, RFR TO SHORPLAN DWG T TURBIDITY CURTAIN, PR SHORPLAN NG. DWG SI XT N BURID ANCHOR WALL, PR SHORPLAN NG. DWG K 3 Centurian Drive, Suite, Markham, Ontario L3R 8B8 Telephone Fax info@cgla.ca RDI-ROCK WALL. TIMBR DCK STL SHT PIL WALL TURBIDITY CURTAIN.. FUL DOCK. CR IL OUTLIN OF XISTING DOCKS TO B RMOVD M FU S L BU RVIC ILD ING TP
9 3 Centurian Drive, Suite, Markham, Ontario L3R 8B8 Telephone Fax TP
10 3 Centurian Drive, Suite, Markham, Ontario L3R 8B8 Telephone Fax TP3
Design. Spaces. People
RGISTRD ARCHITCT T X INFILL WINDOW OPNING (NORTH AND SOUTH) SIDWALLS WITH BLOCKING AND DRYWALL LAVING A MINIMUM OF 3" DPTH JAMB THN INSTALL QUADRATIC RSIDU DIFFUSR QUAL TO KINTICS MIDTON WOOD DIFFUSR WITH
More informationCONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 541 NOVEMBER 2005 CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE TABLE OF CONTENTS 541.01 SCOPE 541.02 REFERENCES 541.03 DEFINITIONS 541.04 SUBMISSION
More informationRETAINING WALL REPLACEMENT REGNART ROAD CUPERTINO, CALIFORNIA
RTAINING WALL RPLACMNT CPRTINO, CALIFORNIA N PROJCT NO. 207-2 SHT INDX SHT NO. TITL DRAWING TS0 TITL SHT N 2 IP0 RTAINING WALL PLAN AND PROFIL 3 NT0 CONSTRCTION NOTS AND DTAILS 4 S0 RTAINING WALL DTAILS
More informationSTRUCTURAL DAMAGE: INSPECTION: TIMBER DOCK NOTES: CONSTRUCTION SEQUENCE: 1. INSTALL EROSION CONTROL DEVICES.
GENERAL NOTES. ASSESSMENT OF THE CONDITION/STRUCTURAL ADEQUACY/STABILITY OF THE EXISTING 2" DIA. TIMBER PILES WAS OUTSIDE OF THE PROJECT SCOPE. ALL INFORMATION PRESENTED IN THESE PLANS ASSUMES THE 2" DIA.
More informationBRG ABUT 2 STA PG EL WING C END STRUCTURE STA
03 BRG ABUT 43'-0" BRG ABUT / BRG ABUT 2 STA +06.00 PG L 03.23 00 ROBINSON FORK 00 BRG ABUT 2 STA +49.00 PG L 03.0 6'- OUT/OUT (PRFABRICATD STL STRUCTUR) '-0" OUT/OUT DCK 4'-0" CLAR ROADWAY 7'-0" 7'-0"
More informationArea 1 see S2.0. New top of catwalk " Existing top of catwalk "±
General Notes: 1. Design Specifications: International Building Code (2015 Edition). Design Loads: Catwalks for maintenance access: 40PSF Dead load: Actural 2. The construction falsework/shoring/design
More informationSpecial Provision No. 541S01 October OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced with the following:
CHAIN LINK FENCE - Item No. GATES - Item No. Special Provision No. 541S01 October 1998 AMENDMENT TO OPSS 541, DECEMBER 1990 OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced
More informationCONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 772 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE TABLE OF CONTENTS 772.01 SCOPE 772.02 REFERENCES 772.03 DEFINITIONS 772.04 DESIGN
More informationHISTORIC HOLLY BEND HOLLY BEND HOUSE AND RESTROOM / WARMING PANTRY
HISTORIC HOLLY BND HOLLY BND HOUS AND RSTROOM / WARMING PANTRY CONSTRUCTION DOCUMNTS MARCH 13, 2017 HUNTRSVILL MP# 380685 CHARLOTT/MCKLNBURG MP# 374755 3701 NCK ROAD HUNTRSVILL, NORTH CAROLINA Vicinity
More informationMinistry of Forests, Lands and Natural Resource Operations
Ministry of Forests, Lands and Natural Resource Operations Southern Engineering Group N2-38 FINDLAY CREEK FINDLAY-LAVINGTON FSR 12.6km SITE INFORMATION N SITE No. N2-38 STRUCTURE No. N2-38A FSR NAME &
More informationEROSION & SEDIMENT CONTROL STANDARDS MANUAL
ROSION & SDIMNT CONTROL STANDARDS MANUAL Compliance with this manual is RQUIRD for: one & two family residential construction & sites disturbing between 5,000 ft 2 & 1 acre Table of Contents Introduction...
More informationSpecial Provision No. 405F03 March 2005
PIPE SUBDRAINS - Item No. VIDEO CAMERA INSPECTION Item No. Special Provision No. 405F03 March 2005 OPSS 405, February 1990, Construction Specification for Pipe Subdrains is deleted in its entirety and
More informationBRICK WALL WITH WOODEN FENCE TYPE 2 CONCRETE PAVING TREE PIT MIN 6' WIDE AND 12' LONG WITH GROUND COVERS AND SHRUBS TREE GUARD (TYP.
LGND: LGND: STRTSCAP LIGHT POL BIK RACKS TRASH CAN BNCH CONCRT PAVING UNIT PAVRS : UTILITIS S D T VRGRN TRS (TOTAL 6) FOR RPLACMNT OF TR #6. APPROVAL NDD FROM NIGHBORING PROPRTY BRICK ALL ITH OODN FNC
More informationTYPE "A" CATCH BASIN
27" 1.67' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3250-BV OR APPROVED EQUAL. "INFI SHIELD" SEAL OR APPROVED EQUAL RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR). PLASTER OUTSIDE,
More informationHYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST
HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST CONSTRUCTION PLAN BID SET PREPARED FOR: LOCATION MAP CARRABELLE US ROUTE 319/98 EASTPOINT Prepared By Plan Design Enable CORPORATE
More informationPUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR
EASEMENT NOTES:. EASEMENT LIMIT SHOWN AS PROVIDED BY. TESC NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY EROSION AND SEDIMENT CONTROL PLAN AND PROVIDE ONSITE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL)
More informationSECTION TIMBER FLOATS
SECTION 06210 PART 1 - GENERAL 1.01 SUMMARY A. This section covers furnishing and installing the timber float framing for the pile guide area, and all other components not specifically mentioned, necessary
More informationCATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE
3.33' 3.0' 2.0' 4.33' 4.0' 3.0' 1.00' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3067-V OR AS NOTED ON PLANS. "INFA-SHIELD" SEAL OR EQUAL. RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR).
More informationFOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 REVISION 7 ITEM 516 INSTALLATION OF FLEX BEAM GUARDRAIL
AFTER NOVEMBER 1, 2008 ITEM 516 INSTALLATION OF FLEX BEAM GUARDRAIL 516.1 Description. This item shall govern for furnishing and placing 10 or 12 gauge galvanized flex beam guardrail, complete with timber
More informationCONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 507 JULY 1991 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES 507.01 SCOPE 507.02 REFERENCES 507.03 Not Used 507.04 Not Used
More informationGENERAL PLAN OF SERVICING
No. REVISIONS By 400 333 Preston Street GENERAL PLAN OF SERVICING 38158 100 T UTILITY LEGEND TRANSFORMER SERVICING LEGEND SANITARY MANHOLE C/W IDENTIFICATION TRANSFORMER C/W CONCRETE WINGS SANITARY SEWER
More informationCONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 541 DECEMBER 1990 CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE 541.01 SCOPE 541.02 REFERENCES 541.03 DEFINITIONS 541.05 MATERIALS TABLE OF CONTENTS
More informationEXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.
CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related
More informationCONSTRUCTION SPECIFICATION FOR GUIDE RAIL ENERGY ABSORBING TERMINALS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 554 NOVEMBER 1989 CONSTRUCTION SPECIFICATION FOR GUIDE RAIL ENERGY ABSORBING TERMINALS 554.01 SCOPE 554.02 REFERENCES 554.05 MATERIALS 554.05.01 Concrete.02
More informationCONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS
More informationGENERAL NOTES ENGINEERS OVERSIGHT 1. ALL ELEVATIONS, DIMENSIONS, ALIGNMENTS AND ORIENTATION OF ALL ELEMENTS SHOWN IN THE PLANS MUST BE APPROVED BY THE ENGINEER OR ENGINEER'S REPRESENTATIVE ( REP ENGINEER
More informationApplicant Information
Applicant Information Project Address: 1615 Roanoke Way Mercer Island, WA. 98040 Parcel Numbers: 7355700060 Agent: Ted Burns, Seaborn Pile Driving Company, 9311 SE 36 th Street, Mercer Island, Wa. 98040
More informationCONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 616 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03
More informationSECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.
PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Fusion welded and rackable ornamental steel picket fence system. B. Related sections: 1. Section 03310 Concrete Work for post support. 2. Section 09960
More informationSchedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw
Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture
More informationCITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS
TEXAS STANDARD CONSTRUCTION NOTES DRWN. BY: DSGN. BY: KJW 1 of 2 *Place geotextile fabric as a permeable seperator to prevent mixing of coarse aggregate and underlying soil. (as needed). 1. GEOTEXTILE
More informationCONSTRUCTION SPECIFICATION FOR GROUNDING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 609 NOVEMBER 2001 CONSTRUCTION SPECIFICATION FOR GROUNDING TABLE OF CONTENTS 609.01 SCOPE 609.02 REFERENCES 609.03 DEFINITIONS - Not Used 609.04 DESIGN
More informationCONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 772 NOVEMBER 2017 (Formerly OPSS 772, November 2012) Note: The PROV published in November 2017 replaces OPSS 772 COMMON, November 2012 with no technical
More informationCONSTRUCTION SPECIFICATION FOR MODULAR BRIDGE STRUCTURES FOR TEMPORARY INSTALLATIONS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 918 APRIL 2017 (formerly OPSS 918 Common, March 1998) Note: The MUNI implemented in April 2017 replaces OPSS 918 COMMON, March 1998 with no technical
More informationFoundation Specifications for 3.6-/3.7-Meter Earth Station Antennas
Installation Instructions Foundation Specifications for 3.6-/3.7-Meter Earth Station Antennas Bulletin 37835A Revision E Introduction This document specifies typical foundation characteristics, designs,
More informationMETAL FABRICATION..1 General Conditions and Division 1 shall govern Work of this section.
CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 05500-1 PART 1 GENERAL 1.1 Description of Work.1 General Conditions and Division 1 shall govern Work of this section. 1.2 Quality Assurance.1 Personnel:.1
More informationCONSTRUCTION SPECIFICATION FOR NOISE BARRIER SYSTEMS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 760 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR NOISE BARRIER SYSTEMS TABLE OF CONTENTS 760.01 SCOPE 760.02 REFERENCES 760.03 DEFINITIONS 760.04 DESIGN
More informationCity of Doral 8401 NW 53 rd Ter. Doral, FL 33166
City of Doral 8401 NW 53 rd Ter. Doral, FL 33166 Project Address: (305) 593-6700 Permit Number: National Pollution Discharge Elimination System (NPDES) Construction Site Erosion and Sedimentation Control
More informationMATERIAL SPECIFICATION FOR FRAMES, GRATES, COVERS, AND GRATINGS
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 1850 APRIL 2018 (Formerly OPSS 1850, April 2013) Note: The PROV published in April 2018 replaces OPSS 1850 COMMON, April 2013 with no technical content
More informationSECTION A-A NTS. Figure 4.1 Alternative Flow Dispersal Trench NOTES:
Figure 4.1 Alternative Flow Dispersal Trench NOTES: galvanized bolts 2" x 12" pressure treated grade board 2" x 2" notches 18" O.C. *20% max 12" min. 36" max 1' - 6" min *20% max 4" x 4" support post clean
More informationSITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013
WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown
More informationONTARIO PROVINCIAL STANDARD SPECIFICATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1850 NOVEMBER 2003 MATERIAL SPECIFICATION FOR FRAMES, GRATES, COVERS, AND GRATINGS TABLE OF CONTENTS 1850.01 SCOPE 1850.02 REFERENCES 1850.03 DEFINITIONS
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 553 FEBRUARY 1991 CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS 553.01 SCOPE 553.02 REFERENCES 553.03 DEFINITIONS TABLE OF CONTENTS 553.04 SUBMISSION
More informationA.2.a Random Riprap... Table
3601 RIPRAP MATERIAL 3601.1 SCOPE Provide stone and filter layer material for use in random or hand-placed riprap, gabion, and revet mattress construction. 3601.2 REQUIREMENTS A Stones A.1 Quality Provide
More informationPROJECT: 4/30/14 DATE: REVISIONS: 6/10/14 7/28/14 11/3/14 11/12/14 11/14/14 OF 6
4/30/14 C 7/31/2014 4'-6" RAMP TO EXISTING GRADE DRAWN: JW 11/12/2014 AS REQ'D 7'-10 1/2" 7'-10 1/2" 7'-10 1/2" 7'-10 1/2" 2'-0 1/2" 4'-10 1/2" 6" 3'-10" 3'-8" L2X2X1/8 @ 16" OC (TYP) L2X2X1/8 @ 16"
More informationSection 208. SOIL EROSION AND SEDIMENTATION CONTROL
208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01. Description. This work consists of installing and maintaining erosion and sedimentation controls to minimize soil erosion and control
More informationTable of Contents for Guide Specifications
Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan
More informationMacoupin Mechanical Boats
Macoupin Mechanical Boats Hank Sutton, President Lake Rip Rap, Inc. (217) 899-9706 hank@lakeriprap.com www.lakeriprap.com Setting the stage for a natural shoreline healing 2010 Illinois Lake Management
More informationMODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications
MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall
More informationSECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...
SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...
More informationSECTION 10 - TRENCHING AND BACKFILLING
SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements
More informationMaine s Land Use Regulations and Erosion Control Techniques
Maine s Land Use Regulations and Erosion Control Techniques Protecting Maine s Air, Land and Water Colin Clark 441-7419 colin.a.clark@maine.gov Tom Gilbert 441-8031 thomas.gilbert@maine.gov Jim Rodrigue
More information2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1
2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment
More informationSTANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018
STANDARD CONSTRUCTION DETAILS REVISED - JANUARY 2018 TABLE OF CONTENTS STORM WATER POLLUTION PLAN NOTES - - - - - - - - - - - - - - - - - - - - - - - - - SD-EC01 SILT FENCE NOTES - - - - - - - - - - -
More information1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.
SECTION 05500- METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER OPR:CT 1 of 5 APPR:JAR:DBP:09-07-11 FHWA:APPR:09-07-11 a. Description. This work consists of furnishing and installing
More informationSTANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS
TABLE OF CONTENTS 11.01 SCOPE OF WORK... 1 11.02 REFERENCES... 1 11.03 MATERIALS... 2 11.04 GRANULAR & NATIVE BACKFILL... 2 11.05 CONSTRUCTION... 2 11.06 MEASUREMENT FOR PAYMENT... 5 11.07 BASIS OF PAYMENT...
More informationSECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationSECTION EROSION AND SEDIMENTATION CONTROLS
SECTION 312500 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL REQUIREMENTS which are hereby made
More informationIN T R A / M IN T R A M
SPRING MESA SUBDIVISION CONSTRUCTION PLANS A PART OF SECTION 35, TOWNSHIP 2 SOUTH, RANGELINE 70 WEST, 6th. PRINCIPAL MERIDIAN. CITY OF ARVADA, COUNTY OF JEFFERSON, STATE OF COLORADO COVER SHEET MARTIN
More informationCONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 405 NOVEMBER 2017 (Formerly OPSS 405, November 2008) Note: The MUNI implemented in November 2017 replaces OPSS 405 COMMON, November 2008 with no technical
More informationSpecial Provision No. 999S28 June 2010 CONSTRUCTION SPECIFICATION FOR PRECAST PANELS FOR USE AS STAY-IN-PLACE DECK FORMS
PRECAST PANEL STAY-IN-PLACE DECK FORMS FABRICATION Item No. PRECAST PANEL STAY-IN-PLACE DECK FORMS DELIVERY Item No. PRECAST PANEL STAY-IN-PLACE DECK PANELS ERECTION Item No. Special Provision No. 999S28
More informationENVIRONMENTAL RESOURCE PERMIT APPLICATION
ENVIRONMENTAL RESOURCE PERMIT APPLICATION SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT 2379 BROAD STREET, BROOKSVILLE, FL 34604-6899 (352) 796-7211 OR FLORIDA WATS 1 (800) 423-1476 SECTION E INFORMATION
More informationThe Manitoba Water Services Board SECTION Standard Construction Specifications CONSTRUCTION OF WATERWAYS September 2013 Page 1 of 9
September 2013 Page 1 of 9 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work shall consist of the excavation of all materials from within the limits of drains, canals, ditches and floodways, hereinafter
More informationSpecial Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS
... m NOISE BARRIER - Item No.... m NOISE BARRIER INCLUDING PRECAST NOISE/TRAFFIC BARRIER - Item No.... m NOISE BARRIER ON STRUCTURES - Item No.... m SALVAGEABLE NOISE BARRIER - Item No.... m SALVAGEABLE
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationCONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 405 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS TABLE OF CONTENTS 405.01 SCOPE 405.02 REFERENCES 405.03 DEFINITIONS 405.04 DESIGN AND
More informationSECTION 2831 ITEM F-162 CHAIN-LINK FENCES
SECTION 2831 ITEM F-162 CHAIN-LINK FENCES PART 1 - GENERAL 1.1 DESCRIPTION. This item shall consist of furnishing and erecting a chain-link fence in accordance with these specifications and the details
More informationCONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 492 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES TABLE OF
More informationSunshine Coast Regional District Section Port Facility Reparation Page 1
Sunshine Coast Regional District Section 06 15 00 TIMBER Port Facility Reparation Page 1 PART 1 GENERAL 1.1 SCOPE.1 This section relates to the following:.1 Pickup of Owner supplied timber materials from
More informationSILT FENCE HAND PLACED MACHINE SLICED SILT FENCE POST 5' LONG MIN. SPACED 6' MAX. APART COMPACTED BACKFILL 6" DEEP FILTER FABRIC 24" MIN ABOVE GROUND
POST 5' LOG MI. SPACD 6' MAX. APART COMPACTD BACKFILL 6" DP GROUD SURFAC FLOW 6" MI. FILTR FABRIC 24" MI ABOV GROUD P:\AutoCAD Libraries\AutoCAD Blocks\Standard Plates\SP69.02dwg.dwg APL AC C DAT: FILTR
More informationCONSTRUCTION SPECIFICATION FOR STANDARD HIGHWAY FENCE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 540 APRIL 2007 CONSTRUCTION SPECIFICATION FOR STANDARD HIGHWAY FENCE TABLE OF CONTENTS 540.01 SCOPE 540.02 REFERENCES 540.03 DEFINITIONS 540.04 SUBMISSION
More informationEXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013
GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary
More informationCONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER
CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER Tavares, Florida Jones Edmunds & Associates, Inc. Project No. 06806-012-01 CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR
More informationSECTION TRENCHING
SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.
More informationTypical Deck Details Based on the 2009 International Residential Code (Designed and Printed August 2010)
1307 West Lehigh Street Bethlehem, PA 18018 610-866-9663 Office info@keycodes.net www.keycodes.net Typical Deck Details Based on the 2009 International Residential Code (Designed and Printed August 2010)
More informationThe Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 5
September 2013 Page 1 of 5 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of a water intake including: The supply and installation of pipe and appurtenances
More informationSTANDARD DESIGN NOTES 1 / 2
ISIONS STANDARD DESIGN NOTES / 2 N/A ISIONS STANDARD DESIGN NOTES 2 / 2 N/A 2 FENCE AS REQUIRED BY OWNER. SEE DETAIL 8 / DWG. 9 CAP BLOCK LEVEL WEDGE FOR CAP AS REQUIRED FINAL SITE GRADING MATERIAL BY
More informationCONSTRUCTION SPECIFICATION FOR TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 577 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES TABLE OF CONTENTS 577.01 SCOPE 577.02 REFERENCES 577.03
More informationFlotation Docking Systems, Inc.
GENERAL SPECIFICATIONS The following data outlines the design calculations and specifications around which Flotation Docking Systems, Inc. products are constructed. The use of such information for contract
More informationWharf, Dock and Buoy Policy
DEV-250 Wharf, Dock and Buoy Policy Effective Date: June 12, 2018 Authorized By: Council Regular Meeting Replaces: August 28, 2012 April 12, 2011 1.1 Policy Statement The District of Peachland has entered
More informationCCSD#1 Stormwater Standards
SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless
More informationMATERIAL SPECIFICATION FOR FRAMES, GRATES, COVERS, AND GRATINGS
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 1850 NOVEMBER 2018 MATERIAL SPECIFICATION FOR FRAMES, GRATES, COVERS, AND GRATINGS TABLE OF CONTENTS 1850.01 SCOPE 1850.02 REFERENCES 1850.03 DEFINITIONS
More informationMATERIAL SPECIFICATION FOR FRAMES, GRATES, COVERS, AND GRATINGS
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS 1850 APRIL 2018 (Formerly OPSS 1850, April 2013) Note: The MUNI implemented in April 2018 replaces OPSS 1850 COMMON, April 2013 with no technical content
More informationCivil and Structural Engineering CONSTRUCTION OF BRIDGE STRUCTURES SHALL BE IN ACCORDANCE WITH THE FOLLOWING SPECIFICATIONS, LISTED IN ORDER OF PRECEDENCE: 1. CDOT STANDARD SPECIFICATIONS FOR ROAD AND
More informationCONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 220 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02
More informationMATERIAL SPECIFICATION FOR FRAMES, GRATES, COVERS, AND GRATINGS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1850 APRIL 2013 MATERIAL SPECIFICATION FOR FRAMES, GRATES, COVERS, AND GRATINGS TABLE OF CONTENTS 1850.01 SCOPE 1850.02 REFERENCES 1850.03 DEFINITIONS
More informationUNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2015 REVISIONS
, NEVADA YEAR 2015 REVISIONS SECTION TITLE AND REVISIONS SUMMARY EFFECTIVE DATE 217.S2 "Residential Curb and Gutter, R-Type" - New drawing to accommodate ADA requirements. 223 "Residential Driveway" -
More informationSECTION EROSION CONTROLS
SECTION 31 25 13 EROSION CONTROLS PART 1 GENERAL 1.1 SUMMARY A. Section Includes installing, maintaining and removing: 1. Silt Fence. 2. Temporary Construction Entrances. 3. Diversion Channels. 4. Sediment
More informationCONSTRUCTION SPECIFICATION FOR STEEL BEAM GUIDE RAIL AND CABLE GUIDE RAIL
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 552 NOVEMBER 2002 CONSTRUCTION SPECIFICATION FOR STEEL BEAM GUIDE RAIL AND CABLE GUIDE RAIL TABLE OF CONTENTS 552.01 SCOPE 552.02 REFERENCES 552.03
More informationEROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.
EROSION CONTROL GENERAL NOTES EC - 000 EROSION CONTROL GENERAL NOTES EC - 001 INSTALL TEMPORARY DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT EXISTING PAVEMENT OR APPROVED ACCESS POINT OR AS PRACTICABLE
More informationFoundation Specifications
Installation Instructions Foundation Specifications for 3.6-/3.7-Meter Earth Station Antennas ulletin 37835A Revision L Introduction This document specifies typical foundation characteristics, designs,
More informationNo. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads
No. 6 December, 1995 Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads Steve Holaday, Wisconsin Dept. of Natural Resources, and Jeff Martin, Dept. of Forestry, UW-Madison BMPs
More informationSECTION TRENCHING, BACKFILL AND COMPACTION
SECTION 312333 TRENCHING, BACKFILL AND COMPACTION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes 1. Native Backfill Material 2. Crushed Stone Bedding 3. Select Backfill Material 4. Shoring and Bracing
More informationSECTION TRENCHING & BACKFILLING
SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications
More informationSpecial Provision No. 540S01 March OPSS 540, Construction Specification for Highway Fence, is deleted and replaced with the following:
HIGHWAY FENCE - Item No. BRACE PANELS - Item No. GATES - Item No. Special Provision No. 540S01 March 2006 AMENDMENT TO OPSS 540, MAY 1988 OPSS 540, Construction Specification for Highway Fence, is deleted
More informationCONSTRUCTION SPECIFICATION FOR STANDARD HIGHWAY FENCE
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 771 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR STANDARD HIGHWAY FENCE TABLE OF CONTENTS 771.01 SCOPE 771.02 REFERENCES 771.03 DEFINITIONS 771.04 DESIGN
More informationConstruction Specification for General Excavation
Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03
More informationCONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 220 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04
More information