1 FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT District South Marion Avenue Lake City, FL INTERSTATE 10 (SR 8) / SR 200 (US 301) INTERCHANGE FM No Section No and Duval County, Florida August 2012 DRAFT

2 PROFESSIONAL ENGINEER CERTIFICATE I hereby certify that I am a registered professional engineer in the State of Florida practicing with The Corradino Group, a Florida Corporation authorized to operate as an engineering business, P.E. #7665, by the State of Florida Department of Professional Regulation, Board of Engineers, and that I have prepared or approved the evaluation, findings, opinions, conclusions or technical advice hereby reported for: FM No.: Project: County: Interstate 10 (SR 8) / SR 200 (US 301) Interchange Duval FDOT Project Manager: Brandi Vittur, P.E. I acknowledge that the procedures and references used to develop the results contained in this report are standard to the professional practice of transportation engineering as applied through professional judgment and experience. SIGNATURE: NAME Ryan Solís-Ríos, PE, PTOE P.E. No.: FIRM: The Corradino Group DATE: August 16, 2012 i

3 I-10 / US 301 INTERCHANGE INTERCHANGE MODIFICATION REPORT TABLE OF CONTENTS SECTION DESCRIPTION PAGE EXECUTIVE SUMMARY... 1 Assessment of FHWA s Policy on Access to Interstate System... 3 I. INTRODUCTION Application Information Background Purpose Project Location... 8 II. METHODOLOGY Overview Analysis Years Travel Demand Forecasting Adjustment Procedures Traffic Factors Traffic Operational Analysis III. EXISTING CONDITIONS Existing Land Use Existing Roadway Network Functional Classification Typical Section Alternative Travel Modes Interchanges IV. EXISTING OPERATIONAL PERFORMANCE Existing Traffic Data Level of Service Basic Freeway Segment Analysis Ramp Merge/Diverge/Weaving Analysis Arterial and Intersection Analysis Existing Accident Data Existing Environmental Constraints Cultural Resources Community Services Natural and Biological Features Physical Environment ii

4 V. NEED Project Corridor Needs Interchange Design and Deficiencies Structural Safety Area Needs System Linkage and Area Connectivity Access to Freight Activity Transportation Demand Social Demands and Economic Development Federal, State and Local Government Authority VI. ALTERNATIVES No-Build Alternative Alternative Travel Modes Build Alternative Definition of Alternative Preferred Alternative (2020 Opening Year) Preferred Alternative (2040 Design Year) VII. FUTURE YEAR TRAFFIC Opening and 2040 Design Year Traffic VIII. ALTERNATIVES ANALYSIS Conformance with Transportation Plan Compliance with Policies and Engineering Standards Roadway Design Criteria Design Exceptions and Variations Operational Analysis Environmental Impacts Cultural Resources Community Services Natural and Biological Features Physical Environment Safety Right-of-Way Alternatives Comparison Conceptual Signing Master Plan IX. FUNDING PLAN X. RECOMMENDATIONS iii

5 LIST OF FIGURES SECTION DESCRIPTION PAGE 1.1 Study Location Map Area of Influence Map Existing Land Use Map I-10 Existing Four-Lane Divided Rural Typical Section (West of US 301) I-10 Existing Four-Lane Divided Rural Typical Section (East of US 301) US 301 Existing Four-Lane Divided Rural Typical Section Baldwin Commuter Shuttle Route Interchange Deficiencies Northbound US 301 South of I-10 (Photo) Existing Lane Geometry and Configurations AADT Traffic Volumes AM/PM Peak Hour Volumes AM/PM Balanced Truck Percentages by Movement AM Level of Service Existing Conditions PM Level of Service Existing Conditions High Crash Areas Historic Resources, Archaeological Sites and Known Contaminated Sites Community Facilities Adjacent to Study Area Wetlands Map Federal Emergency Management Agency Flood Insurance Rate Map US 301 Northbound Left-Turn Lane Queue (Photo) Preferred Alternative Lane Geometry and Configurations Concept #1 Lane Geometry and Configurations Concept #2 Lane Geometry and Configurations and 2040 AADT Traffic Volumes AM/PM Peak Hour Volumes (DDHV) AM/PM Peak Hour Volumes (DDHV) AM Level of Service No-Build Alternative PM Level of Service No-Build Alternative AM Level of Service No-Build Alternative PM Level of Service No-Build Alternative AM Level of Service Preferred Alternative PM Level of Service Preferred Alternative AM Level of Service Concept # PM Level of Service Concept # AM Level of Service Concept # PM Level of Service Concept # Wetland Impacts iv

6 LIST OF TABLES SECTION DESCRIPTION PAGE 2.1 I-10 Traffic Trends Growth Rates Facility Traffic Factors Basic Freeway Segment Analysis (Interstate 10) 2007 Existing Conditions Ramp Merge/Diverge Analysis (Interstate 10/US 301) 2007 Existing Conditions Ramp Weaving Analysis (US 301) 2007 Existing Conditions Intersection Analysis (Signalized Intersections) 2007 Existing Conditions Intersection Analysis (Unsignalized Intersections) 2007 Existing Conditions Arterial Analysis (US 301) 2007 Existing Conditions I-10 and US 301 Crash Data Summary I-10 Crash Statistics Summary US 301 Crash Statistics Summary I-10 Crash Data by Severity US 301 Crash Data by Severity Basic Freeway Segment Analysis (Interstate 10) IMR Alternatives Ramp Merge/Diverge Analysis (Interstate 10/US 301) IMR Alternatives Ramp Weaving Analysis (US 301) IMR Alternatives Intersection Analysis (Signalized Intersections) IMR Alternatives Intersection Analysis (Unsignalized Intersections) IMR Alternatives Arterial Analysis (US 301) IMR Alternatives Evaluation Matrix Project Funding Plan LIST OF APPENDICES APPENDIX DESCRIPTION A.. Methodology Letter of Understanding (Original and Revised) B Highway Capacity Software and Synchro Output Files C.. I-10 Eastbound Ramps/US 301 Intersection Existing Timing and Phasing Plans D.. Safety Analysis Evaluation: Crash Data Analysis E.. Interchange Concepts Considered F Preferred Alternative Concept Plans G Preferred Alternative Concept Plans (Concept #1 and Concept #2) H and 2040 Highway Capacity Software and Synchro Output Files I.. Conceptual Signing Master Plan v

7 EXECUTIVE SUMMARY The Florida Department of Transportation (FDOT) District Two is conducting an Interchange Modification Report (IMR) to evaluate roadway and safety improvement alternatives to the Baldwin Interchange located on Interstate 10 (I-10) in Duval County. The interchange is located at the I-10 exit to SR 200 (US 301) within the Town of Baldwin and is commonly referred to as the Baldwin Interchange (see Figure 1.1). US 301 is a four-lane roadway classified as an urban principal arterial and provides access to areas north and south of I-10. I-10 is a four-lane roadway classified as a rural principal arterial west of US 301 and as an urban principal arterial east of US 301. A CSX railroad maintenance yard is located along the east side of US 301. In April 2006, FDOT completed a master planning study for the I-10 corridor. Geographic limits of the study were the Jefferson/Madison County Line on the west to I-295 in Jacksonville on the east. An I-10/US 301 Interchange Project Development and Environment (PD&E) Study was one of the recommendations outlined in the master plan with the main objectives of improving the capacity of the I-10 transportation corridor and the traffic operations of the US 301 Interchange. As part of the PD&E Study, FDOT recently completed a Bridge Feasibility Study of the bridge structures within the interchange study limits. The results of this study determined that the I-10 bridge structures over US 301 and the CSX railroad maintenance yard will need to be replaced within the next ten (10) years. As part of the PD&E study and IMR efforts, a Build Alternative was developed by reconfiguring the interchange access to US 301 in order to be able to propose a maintenance of traffic (MOT) plan that will allow the replacement of the bridge structures and the reconstruction of the I-10 mainline profile without closing the existing I-10 through lanes and without future construction throwaway. A phased approach was identified for construction that provides immediate congestion relief and safety benefits and is the alternative for which approval is being sought as the Build Alternative. Since this Build Alternative requires modification to the interstate system access, an IMR was funded by FDOT. The purpose of this IMR is to provide the required technical documentation for obtaining Federal Highway Administration (FHWA) approval to modify the I-10/US 301 Interchange. Current traffic demands have modified the role of the interchange with a high number of commercial vehicles using the two truck stops immediately south of the interchange as a major servicing point just outside the Jacksonville urban area. The heavy demand for the northbound US 301 to eastbound I-10 on-ramp creates difficult operational conditions and results in a sustained northbound queue for the signalized intersection left-turn (see Figures 3.7 and 5.1). The large portion of trucks in this long queue creates an operational and safety problem for all traffic in the area as the large vehicles obstruct sight distance, move slowly, block driveways, interfere with the median openings and prompt drivers to perform unsafe and unpredictable movements. I-10 and US 301 have an average of twenty-three (23) and twenty-four (24) crashes per year respectively for a total of forty-seven (47) crashes. The average year safety ratios for I-10 and US 301, within the study limits, were found to be 1.46 and 2.28 respectively. Many of the traffic safety concerns relate to turning movements and existing physical conditions that can be addressed by modifying the interstate access and improving the ramp terminals. The objective of the IMR is to evaluate improvements to the existing interchange by developing solutions to current deficiencies and substandard conditions. The analysis years 1

8 proposed for this IMR are 2007 existing year, 2020 opening year and 2040 design year. The IMR analyzed the 2020 opening year in order to be consistent with the bridge replacement construction schedule. After the Department s review and concurrency of the final evaluation of the interchange concepts, an IMR preferred interchange alternative was identified to move forward in the study. This preferred Build Alternative will increase capacity, improve safety, improve traffic operations and will accommodate the necessary MOT plan to replace the bridge structures and reconstruct the I-10 mainline profile. The Preferred Alternative (see Figure 6.1 and Appendix F) was developed based on the evaluation and analysis of several key evaluation parameters including: environmental considerations, traffic level of service (LOS), safety, MOT, construction cost and right-of-way cost. The proposed interchange modification, for which approval to a change in access is being sought, includes: 1. The construction of a new US 301 northbound to I-10 eastbound on-ramp in the southeast quadrant of the interchange This new ramp will improve the operations on US 301 by removing the major left-turn movement from the I-10/US 301 eastbound ramp terminal allowing the intersection to operate more efficiently. This new ramp will also allow the heavy truck volume movement to use a directional ramp and merge with the I-10 traffic at a speed commensurate with the I-10 mainline speed eliminating the eastbound speed differentials. This ramp will merge with the ramp coming from the southwest quadrant of the interchange to maintain a single I-10 eastbound merge point location. 2. The reconstruction of the loop ramp in the southwest quadrant of the interchange This ramp will be reconstructed by removing the existing merge point with I-10 and extending the ramp eastbound separate and parallel to the I-10 mainline until merging with the new ramp in the southeast quadrant of the interchange. 3. The construction of a new two-lane I-10 westbound to US 301 off-ramp in the northeast quadrant of the interchange The new westbound off-ramp will provide the appropriate length and number of lanes to decelerate before reaching the low design speed loop ramp to access US 301 eliminating the I-10 westbound mainline speed differentials. This design will improve LOS by providing separate ramp connections to access US 301 northbound and southbound. Two additional projects will be constructed and in place by the design year 2040 within the interchange area (see Figures 6.2 and 6.3). I-10 Six-Lane Widening Project The project limits of the widening of I-10 from four lanes to six lanes are from the Baker/Nassau County Line to SR 23. Baldwin Bypass Project A new four-lane roadway (Baldwin Bypass) will be constructed from south of US 90 to north of the Town of Baldwin. This project currently proposes two distinct concepts to connect with the existing US 301 corridor north of the interchange. 1. T-Intersection just north of New Brandy Branch Road 2. Four-Leg Intersection just north of the Interchange 2

9 The interchange 2040 Preferred Alternative will be the same as in the opening year 2020 except for minor modifications to accommodate the two projects described above. The interchange 2020 Preferred Alternative is the proposed interchange modification for which approval to a change in access is being sought in this IMR document as part of the IMR interchange proposal process. The IMR traffic operational analysis results show that all the freeway segments, system merge/diverge ramps and intersections analyzed as part of the IMR Preferred Alternative will operate at LOS D or better by the years 2020 and By the year 2040, the two proposed intersection concepts along US 301 will preserve an arterial acceptable LOS when comparing to the 2020 Preferred Alternative. In terms of traffic operations, Concept #2 will be a more suitable and practical design when compared to Concept #1. The IMR Preferred Alternative interchange modifications will add the necessary improvements to enhance traffic operations, safety and interstate access. The IMR Preferred Alternative is the most prudent when compared with the No-Build Alternative for the following reasons: Meets future growth in travel demand. Meets existing and future high truck traffic demand. Significantly improves LOS, traffic flow and interstate access. Anticipated to reduce crashes related to left-turn maneuvers, sight distance, traffic signal timing, weaving maneuvers, speed differentials and poor intersection geometry. Improves interchange geometric design and access management helping the corridors to be more effective during emergency evacuation events. Helps service the social demands and economic developments of the area. There are no significant environmental impacts. In addition, the IMR Preferred Alternative will provide the necessary interchange footprint to accommodate an MOT plan to replace the US 301 and CSX bridges without closing the interchange, while maintaining all travel lanes and ramps at all times during construction. The needs addressed through the IMR Preferred Alternative cannot be addressed through modifications to other interchanges, TSM strategies, or other multimodal improvements. The implementation of this interchange design was found feasible and presents a balance in providing the needed improvements for this area. The Florida Department of Transportation District 2 recommends the Preferred Alternative be approved, as proposed, for a change in interstate access. Assessment of FHWA s Policy on Access to Interstate System The proposed interchange modifications are consistent with the requirements of the FHWA policy on Access to the Interstate System (Volume 74, Number 165 of the Federal Register), dated August 27, 2009 and the FDOT Interchange Justification Procedure, Topic Number h, dated September 5, The FHWA policy requires the following eight (8) points to be addressed: 1. The need being addressed by the request cannot be adequately satisfied by existing interchanges to the Interstate, and/or local roads and streets in the corridor can neither 3

10 provide the desired access, nor can they be reasonably improved (such as access control along surface streets, improving traffic control, modifying ramp terminals and intersections, adding turn bays or lengthening storage) to satisfactorily accommodate the design-year traffic demands (23 CFR 625.2(a)). The proposed interchange modifications (Preferred Alternative) are a result of the I-10/US 301 Interchange PD&E Study, currently underway. The PD&E study and IMR efforts clearly demonstrate that the Preferred Alternative will add the necessary improvements to enhance traffic operations, safety and interstate access. In addition, the Preferred Alternative will provide the necessary interchange footprint to accommodate an MOT plan to replace the US 301 and CSX bridges without closing the interchange and maintaining all travel lanes and ramps at all times during construction. The adjacent interchanges west and east are approximately 7.6 and 6.5 miles, respectively, away from US 301. Improvements to these other facilities will not meet the operational and safety needs for this project. The No-Build Alternative fails to fulfill the needs of this project for the area. 2. The need being addressed by the request cannot be adequately satisfied by reasonable transportation system management (such as ramp metering, mass transit, and HOV facilities), geometric design, and alternative improvements to the Interstate without the proposed change(s) in access (23 CFR 625.2(a)). As part of the PD&E study, FDOT recently completed a Bridge Feasibility Study of the bridge structures within the interchange study limits. The results of this study determined that the I-10 bridge structures over US 301 and the CSX railroad maintenance yard will need to be replaced within the next ten (10) years. As part of the PD&E study and IMR efforts, the Preferred Alternative was developed by reconfiguring the interchange access to US 301 in order to be able to propose an MOT plan that will allow the replacement of the bridge structures and the reconstruction of the I-10 mainline profile without future construction throwaway. The Preferred Alternative will provide the necessary interchange footprint to accommodate an MOT plan to replace the US 301 and CSX bridges without closing the interchange and maintaining all travel lanes and ramps at all times during construction. A phased approach was identified for construction that provides immediate congestion and safety benefits. Therefore, a TSM Alternative was not considered in this IMR because it fails to fulfill the needs of this project. 3. An operational and safety analysis has concluded that the proposed change in access does not have a significant adverse impact on the safety and operation of the Interstate facility (which includes mainline lanes, existing, new, or modified ramps, ramp intersections with crossroad) or on the local street network based on both the current and the planned future traffic projections. The analysis shall, particularly in urbanized areas, include at least the first adjacent existing or proposed interchange on either side of the proposed change in access (23 CFR 625.2(a), (d) and (f)). The crossroads and the local street network, to at least the first major intersection on either side of the 4

11 proposed change in access, shall be included in this analysis to the extent necessary to fully evaluate the safety and operational impacts that the proposed change in access and other transportation improvements may have on the local street network (23 CFR 625.2(a) and (d)). Requests for a proposed change in access must include a description and assessment of the impacts and ability of the proposed changes to safely and efficiently collect, distribute and accommodate traffic on the Interstate facility, ramps, intersection of ramps with crossroad, and local street network (23 CFR 625.2(a) and (d)). Each request must also include a conceptual plan of the type and location of the signs proposed to support each design alternative (23 U.S.C. 109(d) and 23 CFR (d)). The operational analysis conducted in this IMR confirmed that the proposed interchange modifications do not adversely impact safety and operation on the interstate facility. When compared with the No-Build Alternative, the Preferred Alternative improves the operations at the merge and diverge areas as well as the cross street ramp terminal intersections. The freeway, ramps and intersections will all operate at an acceptable LOS. The proposed improvements at the I-10/US 301 Interchange will not impact the traffic operations of the adjacent interchanges due to the lengthy distance from the subject interchange. As part of this interchange proposal and agreed upon in the MLOU, a full interchange analysis was not performed at the adjacent interchanges. The Preferred Alternative proposes minor signing improvements. Additional signing will be needed to accommodate the new eastbound on-ramp. Signing along I-10 westbound will be modified to direct traffic to the new exit ramp location. 4. The proposed access connects to a public road only and will provide for all traffic movements. Less than ``full interchanges'' may be considered on a case-by-case basis for applications requiring special access for managed lanes (e.g., transit, HOVs, HOT lanes) or park and ride lots. The proposed access will be designed to meet or exceed current standards (23 CFR 625.2(a), 625.4(a)(2), and (d)). The study limits involve I-10 and US 301 only, both public facilities. A full interchange is provided and the proposed interchange improvements are designated to meet or exceed current standards at the interchange location. 5. The proposal considers and is consistent with local and regional land use and transportation plans. Prior to receiving final approval, all requests for new or revised access must be included in an adopted Metropolitan Transportation Plan, in the adopted Statewide or Metropolitan Transportation Improvement Program (STIP or TIP), and the Congestion Management Process within transportation management areas, as appropriate, and as specified in 23 CFR part 450, and the transportation conformity requirements of 40 CFR parts 51 and 93. The project is consistent with and supports regional land use and transportation plans. The proposed improvements contained in this IMR have resulted from a long-range transportation planning process that included the development of a master plan for the I-10 corridor and the 5

12 preparation of the on-going I-10/US 301 Interchange PD&E Study. The proposed interchange improvements are consistent with the development plans for the corridor that have been adopted by the local Metropolitan Planning Organization and is contained in the 2035 LRTP. 6. In corridors where the potential exists for future multiple interchange additions, a comprehensive corridor or network study must accompany all requests for new or revised access with recommendations that address all of the proposed and desired access changes within the context of a longer-range system or network plan (23 U.S.C. 109(d), 23 CFR 625.2(a), (d), and ). The IMR addresses the existing and future interchange needs for the area. The proposed interchange modifications contained herein were developed based upon a comprehensive interstate network study and are consistent with the I-10 Master Plan Study and the long-term vision for the corridor. 7. When a new or revised access point is due to a new, expanded, or substantial change in current or planned future development or land use, requests must demonstrate appropriate coordination has occurred between the development and any proposed transportation system improvements (23 CFR 625.2(a) and (d)). The request must describe the commitments agreed upon to assure adequate collection and dispersion of the traffic resulting from the development with the adjoining local street network and Interstate access point (23 CFR 625.2(a) and (d)). The proposed interchange improvements are required to accommodate the anticipated growth in the region and associated increase in transportation demand. The need for the interstate access modification was identified as part of the regional transportation planning process. The forecasted transportation demand was developed in accordance with this process and was based on approved land use plans and planned transportation system improvements for the region. 8. The proposal can be expected to be included as an alternative in the required environmental evaluation, review and processing. The proposal should include supporting information and current status of the environmental processing (23 CFR ). The IMR was developed in consensus with the on-going I-10/US 301 Interchange PD&E Study. A Categorical Exclusion Type II is anticipated as the appropriate class of action for this study. The PD&E study will include a comprehensive environmental evaluation of the potential impacts of the proposed interchange improvements. The PD&E study is not anticipating any fatal flaws from a planning and environmental perspective. Environmental impacts are expected to be relatively minor and those that do occur can be addressed through reasonable mitigation measures. 6

13 I. INTRODUCTION The Florida Department of Transportation (FDOT) District Two is conducting an Interchange Modification Report to evaluate roadway and safety improvement alternatives to the Baldwin Interchange located on Interstate 10 (I-10) in Duval County. The interchange is located at the I-10 exit to SR 200 (US 301) within the Town of Baldwin and is commonly referred to as the Baldwin interchange. US 301 is a four-lane roadway classified as an urban principal arterial and provides access to areas north and south of I-10. I-10 is a four-lane roadway classified as a rural principal arterial west of US 301 and as an urban principal arterial east of US 301. A CSX railroad maintenance yard is located along the east side of US Application Information The applicant for this (IMR) is: FDOT District Two 1109 South Marion Avenue Mail Station 2007 Lake City, Florida Background In April 2006, FDOT completed a master planning study for the I-10 corridor. Geographic limits of the study were the Jefferson/Madison County Line on the west to I-295 in Jacksonville on the east. The total project length was approximately 120 miles. The study corridor was subdivided into three (3) segments for specific analysis: Segment 1: Jefferson/Madison County Line to I-75 (Columbia County) Segment 2: I-75 (Columbia County) to CR 125 (Baker County) Segment 3: CR 125 (Baker County) to I-295 (Duval County) An I-10/US 301 Interchange Project Development and Environment (PD&E) Study was one of the recommendations outlined in the master plan with the main objectives of improving the capacity of the I-10 transportation corridor and the traffic operations of the US 301 interchange within the specified limits by identifying and implementing viable and appropriate transportation alternatives. In 2007, FDOT began a PD&E study and IMR to evaluate roadway and safety improvement alternatives to the Baldwin Interchange. The PD&E/IMR Study was initiated as part of the planning process to evaluate interchange concepts that could be implemented as short and long term improvements to alleviate the current and future traffic conditions. A Methodology Letter of Understanding (MLOU) was approved by the Federal Highway Administration (FHWA) in 2007 and later revised and approved in As part of this study, FDOT completed a Bridge Feasibility Study to widen, through repair or replacement, the existing bridges over the CSX railroad maintenance yard. Various bridge alternatives were evaluated to bring the bridges up to current design standards and widen the typical section. The recommended alternative from the Bridge Feasibility Study was to replace the CSX bridges. 7

14 Due to the proximity of the CSX bridges to the US 301 bridges, it was determined that the US 301 bridges will also need to be replaced in order to bring all four bridges to meet vertical clearance criteria and to reconstruct the I-10 mainline within the interchange limits. In order to be able to replace the bridges and maintain the existing number of interstate through lanes at all times during construction, improvements to the interchange access will be needed and must be in place before the replacement of the bridges. A phased approach was identified for construction that provides immediate congestion and safety benefits and is the alternative for which approval is being sought as the Build Alternative. Since this Build Alternative requires modification to the interstate system access, an IMR was funded by FDOT District Two. North of the interchange, FDOT is conducting a PD&E study to construct a new four-lane roadway (Baldwin Bypass) to provide a US 301 bypass route from south of US 90 to north of the Town of Baldwin. The PD&E study began in 2005 and is anticipated to have a Location Design Concept Acceptance (LDCA) by Summer of The project is scheduled to be constructed by the year Purpose I-10 is the primary interstate facility that links all major cities through the Florida Panhandle and is also one of the most important Florida transportation systems. Master planning of major transportation facilities such as I-10 has been essential to ensure the availability of capacity within the transportation network and to support the region s high growth. US 301 is considered one of the most important arterials within the State of Florida. US 301 is a popular shortcut between Northeastern Florida and the Gulf Coast region. A high number of commercial vehicles use US 301 as an alternate route from I-75 to I-10 and from I-95 to I-10. The purpose of this IMR is to provide the required technical documentation for obtaining FHWA approval to modify the I-10/US 301 Interchange. Current traffic demands have modified the role of the interchange with a high number of commercial vehicles using the two truck stops immediately south of the interchange as a major servicing point just outside the Jacksonville urban area. The heavy demand for the northbound US 301 to eastbound I-10 on-ramp creates difficult operational conditions and results in a sustained northbound queue for the signalized intersection left-turn. The large portion of trucks in this long queue creates an operational and safety problem for all traffic in the area as the large vehicles obstruct sight distance, move slowly, block driveways, interfere with the median openings and prompt drivers to perform unsafe and unpredictable movements. The high demand of left-turn vehicles together with the high number of commercial vehicles are contributing to creating interchange congestion and interrupted interchange access. The objective of the IMR is to evaluate improvements to the existing interchange by developing short and long term solutions to current deficiencies and substandard conditions. 1.4 Project Location The study area for the I-10/US 301 Interchange IMR is the I-10 corridor from just east of the Nassau/Duval County Line to east of CR 217 (Yellow Water Road) and from 0.6 miles south of I-10 to New Brandy Branch Road along the US 301 corridor in Duval County, Florida (see Figure 1.1). The I-10/US 301 Interchange is located at Mile Post

15 STUDY LOCATION Figure 1.1 Study Location Map The Area of Influence for the IMR is described below. I-10 Corridor (Section Number ) from just east of SR 228 (South 5 th Street) to west of SR 23 (Cecil Commerce Parkway). US 301 Corridor (Section Number ) from Mile Post 7.46 to Mile Post (New Brandy Branch Road). Figure 1.2 depicts the Area of Influence boundaries and the interchange spacing to the adjacent interchanges. The proposed improvements at the I-10/US 301 Interchange will not impact the traffic operations of the adjacent interchanges. 9

16

17 The interchanges are listed below: I-10/SR 228 Interchange This interchange is in Baker County and is approximately 7.6 miles west of the I-10/US 301 Interchange. I-10/SR 23 Interchange This interchange is in Duval County and is approximately 6.5 miles east of the I-10/US 301 Interchange. The interchanges listed above will have insignificant changes in the travel demand due to the lengthy distance from the subject interchange. As part of this interchange proposal, a full interchange analysis was not performed at the adjacent interchanges. The Area of Influence will include the following intersections along US 301: I-10/US 301 Eastbound Ramp Terminal I-10/US 301 Westbound Ramp Terminal US 301/New Brandy Branch Road 11

18 II. METHODOLOGY 2.1 Overview The methodology applied in this IMR is documented in the MLOU dated October 2007 and later revised in February The MLOU, a companion document to this IMR Study, was approved by FDOT District Two, FDOT Central Office Systems Planning and FHWA. The final MLOU was executed on February 23, The MLOU was revised in 2012 due to changes in the FDOT Work Program and the results from the Bridge Feasibility Study. The MLOU outlines the criteria, assumptions, processes, analyses and documentation requirements for the project. A copy of the two approved MLOUs is attached to this report as Appendix A. The following sections summarize some of the more prominent issues covered under the MLOU. The traffic projections and volumes used for the interchange traffic analysis were gathered from the I-10 and US 301 Design Traffic Report, companion document to the PD&E study, dated March 2010 and later revised in April This report documents and discusses the following items: Traffic Data Collection Peak Hour Volumes Traffic Factors Forecasting Methodology Existing and Projected Annual Average Daily Traffic (AADT) Existing and Projected Directional Design Hour Volumes (DDHV) The report was later revised in April 2012 in order to include the traffic projections and volumes from the Baldwin Bypass PD&E Study. The Baldwin Bypass project is scheduled to be constructed by the year Therefore, the only volumes revised in the report were for the design year Analysis Years The analysis years proposed for this IMR are as follows: Existing Year: 2007 Opening Year: 2020 Design Year: 2040 The IMR will analyze the opening year in order to be consistent with the bridge replacement construction schedule. 2.3 Travel Demand Forecasting Future traffic forecast was based on the Northeast Regional Planning Model (NERPM) Version 4, I-10 Master Plan Study, dated April 2006 and area historical growth rates. The NERPM is the approved and validated model for the metropolitan area. The model base and design years of this version are 2005 and The NERPM4 model covers beyond the western urban boundary including Baker 12

19 County. US 301 is the urban/rural boundary along the I-10 corridor. The 2035 total traffic volumes for the I-10 corridor within the study area were analyzed using this version of the model. Based on the 2007 balanced volumes from the I-10 and US 301 Design Traffic Report an average annual growth rate was calculated. The average annual growth rate was found to be 2.23 percent. The forecast was compared to historic traffic counts. A comparison of this approach and the model projections was performed to provide consistent and logical traffic forecasts. Table 2.1 shows the growth rates and traffic volumes. Site ID Table I-10 Traffic Trends Growth Rates Description 2007 Balanced AADT NERPM Total Volume Annual Growth Rate feet west of SR ,000 69, % feet east of SR ,600 78, % At CR 217 overpass, east of US ,800 89, % mile east of Chaffee Road 51, , % Average 2.23% In order to preserve the I-10 Master Plan Study volume projections, it was determined that the master plan forecasts would be considered in the forecasting effort for this IMR study. The master plan included traffic forecasts for 2020 and The 2007 traffic counts formed the base year traffic for both forecast methods. The opening year 2020 and design year 2040 traffic volumes were generated as follows: Grew all 2007 volumes by 2.2%. Held all ramps east of US 301 to the I-10 Master Plan Study volume numbers. In 2040, an independent model run was performed in order to determine how much additional traffic the Baldwin Bypass would attract within the area of influence. The Baldwin Bypass was found to attract approximately 5,000 additional trips. These additional 5,000 trips were added to the already grown 2040 volumes to develop the 2040 forecast. 2.4 Adjustment Procedures AADT estimates were developed for the entire study area by following the process below: 1) 2007 Average Daily Traffic (ADT) volumes were computed by calculating the arithmetic mean of the 72-hour traffic counts. 2) The computed ADT volumes were converted to AADT by applying the applicable FDOT seasonal adjustment factors and axle correction factors from the 2006 Florida Traffic Information DVD. 3) 2007 AADT assignments for the study were generated by rounding and balancing the estimates that were developed from the steps above. 13

20 4) The generated 2007 and forecasted 2020 and 2040 AADT volumes were checked against historical data and the I-10 Master Plan Study forecasts for reasonableness. DDHV volumes were developed for the entire study area by following the approved processes and techniques consistent with the FDOT s Project Traffic Forecasting Handbook. Some of the key steps are listed below: 1) The DDHV volumes were computed by multiplying the K 30 and D 30 traffic factors times the AADT volumes. 2) Traffic data collected for the study area was examined to identify the common AM and PM peak hours. 3) The DDHV volumes were first established for the mainlines and ramps by balancing the calculated volumes. The volumes developed at the intersection approaches from this procedure were used as control values in the subsequent development of the intersection turning movement volumes. 4) The turning movement volumes were then refined by adjusting and balancing the volumes along the arterial segments. The turning movement percentages from the traffic counts were applied to the DDHV volumes to develop the intersection turning movement volumes. This is the FDOT approved procedure from the Project Traffic Forecasting Handbook, Section 2.6, which emphasizes the development of volumes using the K 30 and D 30 traffic factors. 5) The peak hour volumes developed for the study area were checked for reasonableness. Checks involved comparing directional volumes generated for the peak hours with local knowledge of travel patterns within the study area and observations made during field reviews. 2.5 Traffic Factors The traffic factors for this study, shown in Table 2.2, were developed by using the following sources and documented in the MLOU: 2007 FDOT Planning Traffic Counts 2008 Florida Traffic Information DVD Recommendations from the I-10 and US 301 Design Traffic Report Facility Interstate 10 (SR 8) US 301 (SR 200) K 30 (%) Table 2.2 Facility Traffic Factors D 30 T 24 K 30 D 30 T 24 K 30 D 30 (%) (%) (%) (%) (%) (%) (%) T 24 (%)

21 2.6 Traffic Operational Analysis The Highway Capacity Manual (HCM), 2000 Edition, as well as the Highway Capacity Software (HCS) Version 5.5 and Synchro Version 7.0 were used for the operational analysis in this study. Operational analyses were performed on mainline segments, ramp merge/diverge, weaving sections and ramp terminals. The operational analysis also included cross street links and intersection analysis along US 301. The HCS was used for the interstate mainline segments and ramp merge/diverge and weaving sections. Synchro was used for the arterial and intersection analysis including the ramp terminals. This software uses the methodology of the HCM to determine intersection capacity and LOS. This analysis was performed for the existing conditions and the selected Build Alternative. In addition, a preliminary simulation was performed using the SimTraffic software to provide a detailed look at the simulated traffic flow. Due to the rural nature of this project, the need for more complex micro-simulation software modeling like CORSIM was not performed. III. EXISTING CONDITIONS 3.1 Existing Land Use The existing land use within the Area of Influence is a mix of agricultural, industrial and residential with isolated commercial uses. The I-10/US 301 Interchange is immediately surrounded by commercial and heavy industrial land uses. The Area of Influence includes undeveloped lands and businesses serving the trucking industry such as truck stops, motels and auto parts stores located directly adjacent to the I-10/US 301 Interchange. Heavy industrial land uses associated with the CSX railroad maintenance yard are located east of the interchange. The existing land use is mostly industrial to the south of I-10 and low density residential to the north of I-10. As the I-10 corridor has become more densely developed, commercial/industrial land uses have displaced residential development, especially near the interchanges. Figure 3.1 shows the existing land uses within the vicinity of the project area. Developments of Regional Impacts (DRI) have historically been proposed in the City of Jacksonville along the I-10 corridor in western Duval County. Based on the Northeast Florida Regional Council project list, there are no DRIs within the vicinity of the study area. 15

22 Figure 3.1 Existing Land Use Map 16

23 3.2 Existing Roadway Network Functional Classification FDOT s Straight Line Diagrams for Duval County indicate that the section of I-10, just west of US 301, is classified as a four-lane rural principal arterial and east of US 301, including the interchange, is classified as a four-lane urban principal arterial. US 301 is classified as a four-lane urban principal arterial and provides access to areas north and south of I-10. In general, arterial roadways provide direct service between cities and larger towns, which generate and attract a large proportion of the relatively longer trips. The existing speed limit along I-10 is posted at 70 MPH and 45 MPH along US 301 within the study limits. The access management classification within the study limits along I-10 is Class 1 Freeway and along US 301 is Class 3 Restrictive where medians physically prevent vehicle crossing between intersections. I-10 and US 301 are both part of the Strategic Intermodal System (SIS), Florida Intrastate Highway System (FIHS) and National Highway System (NHS). I-10 is a major highway in the State of Florida and is the main provider of east-west travel in north Florida Typical Section The existing roadway typical section along I-10 varies slightly, consisting primarily of four twelvefoot (12 ) wide travel lanes with a sixty four-foot (64 ) wide depressed grass median, two eight-foot (8 ) inside shoulders (four-foot paved and four-foot unpaved), two twelve-foot (12 ) outside shoulders (ten-foot paved and two-foot unpaved) and roadside swales (see Figure 3.2). The existing right-of-way width is 300 feet wide throughout the study limits. The right-of-way is standard throughout the corridor except at the interchanges, where it varies to accommodate entrance and exit ramps. An extended acceleration lane (3,970 ) is located along I-10 in the eastbound direction just east of US 301 to help trucks accelerate before merging with the I-10 traffic (see Figure 3.3). The existing roadway typical section along US 301 varies slightly, consisting primarily of four twelve-foot (12 ) wide travel lanes with a fifty six-foot (56 ) wide depressed grass median, two eight-foot (8 ) inside unpaved shoulders, two eleven-foot (11 ) outside shoulders (four-foot paved and seven-foot unpaved) and roadside swales (see Figure 3.4). The existing right-of-way width varies from 164 to 205 feet wide throughout the study limits. Deceleration and acceleration lanes exist along the median in order to accommodate vehicles turning left across the US 301 corridor to the adjacent business driveways. 17

24 EXISTING CONDITIONS 4-LANE DIVIDED ROADWAY TYPICAL SECTION (West of US 301) Figure 3.2 I-10 Existing Four-Lane Divided Rural Roadway Typical Section (West of US 301) 18

25 EXISTING CONDITIONS 4-LANE DIVIDED ROADWAY TYPICAL SECTION (East of US 301) Figure 3.3 I-10 Existing Four-Lane Divided Rural Typical Section (East of US 301) 19

26 EXISTING CONDITIONS 4-LANE DIVIDED ROADWAY TYPICAL SECTION Figure 3.4 US 301 Existing Four-Lane Divided Rural Typical Section 20

27 3.3 Alternative Travel Modes No multimodal facilities such as existing bicycle facilities or transit routes exist within the study area. The closest transit route to the study area is located approximately one mile north along US 90 (Beaver Street). The bus route service is called the Baldwin Commuter Shuttle, managed and operated by the Jacksonville Transportation Authority. The Baldwin Commuter Shuttle is an innovative service that combines the benefits of express bus service with the convenience of a doorto-door on-demand service. During the peak morning and afternoon hours, the shuttle will express commuters to and from Baldwin and Macclenny to destinations in downtown Jacksonville, along US 90 (Beaver Street). Figure 3.5 illustrates the bus route, schedule and stops. Multimodal alternatives such as bus transit, high occupancy vehicle lanes and pedestrians or bicycle improvements will not meet the needs for this project because of the rural conditions and travel patterns within the interchange. Multimodal alternatives will not improve the current and future traffic conditions within the interchange area. 21

28

29 3.4 Interchanges The existing interchange design is a partial cloverleaf AB type with straight and loop ramps serving all movements located along the west side of the interchange. This configuration was chosen at the time of construction for its relatively small footprint and to avoid conflict with the CSX railroad maintenance yard. The railroad maintenance yard is located along the east side of US 301. The current interchange does not conform to the current FDOT roadway geometric standards. Some of these deficiencies include (see Figure 3.6): Substandard loop ramp and turning radii design (low design speed). The geometric design of the loop ramps does not meet current design speed standards. Loop ramps need to be designed with a radius that accommodates a design speed of 50 percent of the mainline design speed, or in this case a 35 MPH design. The existing loop ramps have a minimum radius of 230 feet which correspond with design speeds of 25 MPH based on current standards. Speed differentials within the interchange limits. The change in design speed between the mainline and ramps (entering and exiting) causes a significant difference in the travel speeds of vehicles that decelerate in the I-10 mainline for the exit ramp or are accelerating for the entrance ramp. The merging traffic (especially trucks) from US 301 to eastbound I-10 must climb to achieve the grade at the merge point with I-10, and when on I-10, continue to climb to clear the CSX railroad maintenance yard crossing just east of the existing ramp gore. This upgrade flow contributes to the speed differential between the mainline and ramp traffic. This speed differential increases the density of vehicles in the outside travel lanes within the ramp area of influence. Insufficient I-10 westbound exit ramp deceleration length. The current posted speed of the ramp is 25 MPH with a deceleration length of 880 feet. The change in the design speed causes a significant difference in the travel speeds of vehicles that decelerate in the I-10 mainline for the westbound exit ramp. Insufficient queue storage bay length along US 301. The current storage bays cannot accommodate the heavy demand for the northbound US 301 to eastbound I-10 on-ramp and the median access to the truck stops (see Figure 3.7). Short weaving distance between the loop ramps along US 301 southbound. The current distance between the two loop ramps is approximately 400 feet. Limited access right-of-way along US 301 does not meet current standards. Private driveways are currently located within the two ramp terminals creating poor operational conditions at the ramp terminals and increasing the probability of crashes. Substandard access management along US 301 south of I-10. A total of eleven (11) businesses surround the interchange with only one (1) span wire traffic signal and multiple median crossings that do not meet current spacing criteria. Substandard sight distance along I-10 within the interchange limits. The current I-10 profile within the interchange limits corresponds to a design speed of 55 MPH based on current standards. The posted speed for I-10 is 70 MPH. Substandard vertical bridge clearance under the I-10 bridge structures over US 301. Substandard vertical bridge clearance under the I-10 bridge structures over the CSX railroad yard. Substandard surface deck on the I-10 bridge structures over the CSX railroad yard. 23

30 N W E S Weaving Distance Deceleration Length Speed Differentials Loop Ramp Radius Merge Point Turning Radius CSX Rail Yard Travel Center Truck Stop Queue Length Figure 3.6 Interchange Deficiencies Figure 3.7 Northbound US 301 South of I-10 24

31 The recommended alternative from the Bridge Feasibility Study was to replace the bridges over the CSX railroad maintenance yard in the next ten (10) years (by 2020). The bridges will need to be replaced due to the following deficiencies: Substandard vertical bridge clearance Substandard horizontal bridge clearance Substandard surface deck Substructure concrete spallings Substandard vertical curve Raising the vertical elevation of these bridges to meet current FDOT standards will require the I-10 mainline vertical profile (profile grade line) to be raised east and west of the interchange. Due to the close proximity of the I-10 bridges over US 301 to the bridges over CSX, the change in profile will also require the replacement of the US 301 bridges. In order to be able to replace the bridges and maintain the existing number of interstate through lanes at all times during construction, improvements to the interchange access will be needed and must be in place before the replacement of the bridges. This IMR documents and addresses the improvements needed to replace the bridges. IV. EXISTING OPERATIONAL PERFORMANCE 4.1 Existing Traffic Data The traffic data collection was coordinated with FDOT in order to determine the type and location of the counts for the study. The traffic data collection efforts are documented in the I-10 and US 301 Design Traffic Report, companion document to the PD&E study, dated March 2010 and later revised in April The data collection for the traffic analysis consisted of taking a field inventory of the number of lanes, lane transitions and traffic counts. Figure 4.1 depicts the existing interchange lane configuration including the number of lanes and intersections. Signal timing data was retrieved from the City of Jacksonville Traffic Operations Division and compared with field operations. Traffic counts and turning movement counts were conducted for the I-10 ramps, intersections and arterial links along US 301 during the middle of an average week (Tuesday, Wednesday and Thursday from September 25 through September 27, 2007) while no special events were occurring. The raw hose and turning movement count data were analyzed using a peak hour frequency analysis to determine which peak hours represented the AM and PM peaks. The AM peak hour was from 6:30-7:30 AM and the PM peak hour was from 4:45-5:45 PM. As described in Section 2.4, 2007 AADT and DDHV volumes were developed for the entire study area by following the approved processes and techniques consistent with the FDOT s Project Traffic Forecasting Handbook. The 2007 existing AADT and DDHV volumes are shown on Figures 4.2 and 4.3. The existing traffic data is five years old at the time of this report. In order to decide if new traffic counts were needed for the study, the last five years ( ) of traffic data was obtained from the 2011 Florida Transportation Information (FTI) DVD. The data shows that the 2011 AADT volumes were the same or lower when compared to the 2007 AADT volumes reported in the 2011 FTI. Therefore, new counts were not needed. Figure 4.2 also shows the historic AADT volumes. 25

32

33

34

35 4.2 Level of Service This section presents the analysis results for the existing lane configuration under existing traffic conditions. An existing traffic operational analysis was conducted for the 2007 base condition for the mainlines, ramps, intersections and ramp terminals within the I-10/US 301 Interchange. The first part of the analysis consisted of a basic freeway segment analysis used to determine the current conditions under which the I-10 mainline is operating. Level of Service (LOS) and densities for each analyzed segment were determined as a baseline to compare with proposed modifications to this facility. The second part of the analysis consisted of a ramp merge, diverge and weaving analysis used to determine the current operating conditions of the ramps entering and exiting I-10 and US 301. LOS and densities were also used as measures of effectiveness for this analysis. The third part of the analysis consisted of determining the LOS and delay at each ramp terminal and intersection along US 301. The 2000 HCM classifies roadway capacity based on LOS A through F, where LOS A represents a roadway operating below capacity (free-flow conditions with little or no delays) and LOS F suggests a roadway is operating above design capacity (congested traffic with forced flow conditions at very low operating speeds). The analysis was conducted using the latest versions of the HCS and Synchro. The FDOT s Statewide Minimum LOS Standards for the State Highway System were adopted by Administrative Rule in 1992 (Rule Chapter No ) and are described in the 2009 Quality/Level of Service Handbook. The LOS standard (based on area and facility type) that will be used for the I- 10 and US 301 corridors and interchange is LOS D (urban) Basic Freeway Segment Analysis The I-10 mainline, within the study area, was divided into four (4) different segments for the purpose of evaluating each segment independently for the existing conditions. The LOS for each segment was determined using the freeway module of the HCS. A summary of the input variables as well as the output obtained from the application are provided as part of Appendix B. Table 4.1 summarizes the most determinant factors that were used as well as the LOS obtained for each one of the segments for the existing condition. 29

36 Table Basic Freeway Segment Analysis Interstate 10 (Existing Conditions) Segment Year Segment Distance (mi) # of Lanes Truck % DDHV (veh/h) Density Range (pc/mi/ln) LOS Eastbound I-10 (SR 228 to US 301) ,290 (1,870) 19.1 (15.6) C (B) Eastbound I-10 (US 301 to SR 23*) ,850 (2,330) 23.6 (19.1) C (C) Westbound I-10 (SR 23 to US 301) ,330 (2,850) 19.1 (23.6) C (C) Westbound I-10 (US 301 to SR 228) ,870 (2,290) 15.6 (19.1) B (C) Note: Density and LOS values are Peak Period Scenarios AM (PM). LOS is interpreted from HCM 2000 for Basic Freeway Segments (Page 23-3). Peak Hour Factor = 0.92 for Truck % = T24/2 * SR 23 = Cecil Commerce Parkway The capacity analysis shows that I-10 currently is operating at an acceptable LOS C or better Ramp Merge/Diverge/Weaving Analysis For this analysis, four (4) ramps were analyzed within the I-10/US 301 Interchange. Two (2) ramps were identified along I-10 in the eastbound direction and two (2) in the westbound direction. Also a weaving analysis was performed between the two (2) loop ramp terminals along US 301 in the southbound direction. The LOS for each ramp was determined using the ramp and weaving modules of the HCS. Various assumptions and variables are necessary to run HCS successfully, and these variables must accurately reflect the features of the roadway that affect operations. One of the critical variables required, related specifically to trucks and other large vehicles, is known as passenger car equivalents (PCE). The HCM defines PCE as The number of passenger cars that are displaced by a single heavy vehicle of a particular type under prevailing roadway, traffic and control conditions. Reasons PCE s are critical in this analysis include the fact that trucks are larger and have different operating characteristics compared to cars. The current HCS has a limitation of a maximum of 25% trucks per movement. Based on the traffic data collection and field reviews it was found that some of the ramps and turning movement volumes exceed the 25% HCS limitation. In order to maintain the usage of the software, manual calculation (using HCM 2000 equations) of the heavy vehicle adjustment factors and flow rates (see equations below) were performed and then entered to the HCS ramp and weaving modules for the traffic streams with a truck percentage greater than 25%. 30

37 Heavy Vehicle Adjustment Factor = f HV = P T (E T 1) Peak 15-minute Flow Rate = V i = V PHF x f HV x f p Where: P T = Percentage of trucks in the traffic stream E T = Passenger car equivalents for trucks in the traffic stream PHF = Peak hour factor f p = driver population factor After the flow rates were calculated manually, they were entered directly into the software with the following modifications to the module: Input volume (DDHV) = Peak 15-minute Flow Rate (calculated above) PHF = 1.0 Truck percentage = 0% The modifications listed above will preserve the input volumes, preventing the software module from calculating the peak 15-minute flow rate for a second time. A summary of the input variables as well as the output obtained from the application are provided as part of Appendix B. In order to understand the high truck movements and truck patterns within the area, a truck percentage by movement was collected during the traffic data collection efforts (see Figure 4.4). Tables 4.2 and 4.3 summarize the most determinant factors that were used as well as the LOS obtained for each ramp for the existing condition. 31

38

39 Ramp Junction Year Table Ramp Merge/Diverge Analysis I-10/US 301 Interchange (Existing Conditions) I-10 # Acceleration Ramp Ramp # Truck of Deceleration Type of Lanes % Lanes Distance (ft) DDHV (veh/h) Density Range (pc/mi/ln) LOS Eastbound I-10 (I-10 to US 301) 2007 Off-Ramp (Diverge) (32) 150 (120) 22.8 (18.5) C (B) Eastbound I-10 (US 301 to I-10) 2007 On-Ramp (Merge) 1 2 3, (15) 710 (580) 21.4 (16.8) C (B) Westbound I-10 (I-10 to US 301) 2007 Off-Ramp (Diverge) (17) 580 (710) 19.3 (24.4) B (C) Westbound I-10 (US 301 to I-10) On-Ramp (10) 120 (150) 19.9 (23.7) (Merge) B (C) Note: Density and LOS values are Peak Period Scenarios AM (PM). LOS is interpreted from HCM 2000 for Merge and Diverge Areas (Exhibit 25-4). Peak Hour Factor = 0.92 for All system merge and diverge ramps analyzed are currently operating at an acceptable LOS C. Segment Table Ramp Weaving Analysis Type A I-10/US 301 Interchange (Existing Conditions) Year Weaving # of Lanes Segment Distance (ft) Volume Ratio Density Range (pc/mi/ln) LOS Southbound US 301 (Between I-10 WB Loop Ramp and I-10 EB Loop Ramp ) (0.74) (11.20) B (B) Note: Density and LOS values are Peak Period Scenarios AM (PM). LOS is interpreted from HCM 2000 for Weaving Segments (Exhibit 24-2). Peak Hour Factor = 0.92 for The 2007 weaving analysis along US 301 (under I-10) shows that it is currently operating at LOS B. However, according to HCS, three-lane Type A segments do not operate well at volume ratios greater than Poor operations and some local queuing are expected in such cases. Arterial weaving is most problematic on street segments associated with large turning volumes. Such volumes are often found near interchanges just like this one where a high number of cars and trucks have been observed entering and exiting I-10 and performing u-turns at the intersections between the southbound weaving area. For example, u-turns were observed north of I-10 by drivers bypassing the northbound left- turn lane lengthy queue south of I-10. Also intensive truck weaving activity was observed on the segment between the interchange offramp terminal and the adjacent signalized intersection due to these u-turns. 33

40 4.2.3 Arterial and Intersection Analysis The Synchro traffic software was used to compute the roadway LOS, based on the HCM methodology. The desired LOS for this study area is LOS D or better. The US 301 overall LOS depends on the intersection and arterial LOS. Intersection LOS corresponds to the average delay experienced by a vehicle passing through a given intersection. Arterial LOS, in this case a four-lane signalized roadway, is a function of the average travel speed through the project segment. The US 301 LOS analysis included three (3) intersections within the study limits. Figure 4.1 graphically shows the existing intersections and lane configurations. I-10 Eastbound Ramps Signalized Intersection I-10 Westbound Ramps Unsignalized Intersection New Brandy Branch Road Unsignalized Intersection Tables summarize the operational analysis results for the signalized and unsignalized intersections. Table 4.6 summarizes the arterial analysis. The 2007 LOS calculations were based on the existing timing and phasing configurations along US 301. The existing timing data information was provided by the City of Jacksonville Traffic Operations Division (see Appendix C). A preliminary simulation was performed using the SimTraffic software to provide a detailed look at the micro-simulation. The SimTraffic simulation model was also developed to verify the operational function of the Synchro model and perform edits and changes to correct input mistakes and accommodate unique features. This effort involved establishing reasonable saturation rates, balanced truck percentages, turning speeds, adjusting the mandatory lanes distances, adjusting lane geometry as well as usage assignment to replicate observed operational behaviors. This process does not imply that the model is completely calibrated. The process to calibrate the Synchro model requires significant time and effort. However, collected field data such as queue lengths and knowledge of vehicular traffic operations was compared to the running of the SimTraffic model. The Synchro model was adjusted as close as possible to match the observed field conditions. Table Intersection Analysis - Signalized Intersections US 301 (Existing Conditions) Delay Intersection Year Maximum v/c LOS (sec) NB to EB Left-Turn Lane Queue (ft) I-10 Eastbound Ramps (1.00) 42.3 (42.7) D (D) 552 (549) Note: v/c, Delay and LOS values are Peak Period Scenarios AM (PM). LOS is interpreted from HCM 2000 for Signalized Intersections (Exhibit 16-2). Peak Hour Factors from 2007 Traffic Data Collection. 95 th percentile volume exceeds capacity, queue is anticipated to be longer after two cycles. 34

41 Table 4.4 summarizes the LOS of the US 301 signalized intersection with the I-10 eastbound ramps. This intersection experiences significant queuing in the northbound direction. The critical movement at this intersection is the northbound left-turn movement. This long queue was observed to extend past the current available storage bay blocking access to and from Boxcar Drive and the adjacent driveways causing traffic operational conflicts within the median openings and with the northbound mainline flow. Issues were also observed in the southbound direction where semi-trailer trucks and other vehicles coming from the two major truck stops along the westside of US 301 block the southbound mainline traffic flow while trying to squeeze in into the few to none traffic gaps to merge with the northbound traffic flow. Table Intersection Analysis - Unsignalized Intersections US 301 (Existing Conditions) Approach Intersection Year LOS Control Delay (sec) I-10 Westbound Ramps EBLT, NBLT EBLT, NBLT (25.0), 8.5 (8.7) C (C), A (A) New Brandy Branch Road EB, NBLT Note: v/c, Delay and LOS values are Peak Period Scenarios AM (PM). LOS is interpreted from HCM 2000 for Unsignalized Intersections (Exhibit 17-2). Peak Hour Factors from 2007 Traffic Data Collection. EBLT, NBLT, EB = Eastbound Left Turn, Northbound Left Turn, Eastbound. EB, NBLT (11.3), 8.3 (8.1) B (B), A (A) Table 4.5 shows that the unsignalized intersections within the interchange area are currently operating at LOS C or better during the peak hour periods. US 301, within the interchange limits, will experience severe intersection congestion and delays with an anticipated LOS F by the year 2020 if improvements are not considered. The amount of truck traffic is expected to increase due to the closure of the I-10 rest areas just east of US 301 and the current and projected growth of the Jacksonville Port Authority. The rest areas were closed and removed from the corridor to accommodate the new Cecil Commerce Parkway. The expansion of the port and new seaport container facilities are making Jacksonville one of the largest container ports on the east coast. It is estimated that 70% of the containers that come through the port will be handled by trucks. The only intersection not affected within the study area is New Brandy Branch Road. This is a local rural low volume residential roadway that provides access to a small community. 35

42 Table Arterial Analysis US 301 (Existing Conditions) Average Travel Speed Roadway Year Direction LOS (mph) US Northbound 37.3 (36.6) A (A) 2007 Southbound 25.1 (24.3) C (C) Note: Speed and LOS values are Peak Period Scenarios AM (PM). LOS is interpreted from HCM 2000 for Suburban Class II Roadway (Exhibit 15-2). Table 4.6 shows that US 301 is currently experiencing LOS C or better. The arterial LOS in the southbound direction is dictated by the delay at the I-10 eastbound ramps signal. The signal at this ramp intersection is a three-phase operation with the maximum green time assigned to the northbound left-turn movement. The southbound mainline approach is the opposite movement to the critical movement having to wait longer for the green time phase. Figures 4.5 and 4.6 show a summary of the LOS results for the 2007 existing conditions. 36

43

44

45 4.3 Existing Accident Data Traffic crash data along the I-10 and US 301 corridors was obtained from the FDOT Crash Analysis Reporting System database from the years 2006 through 2010 for a total of five (5) years of information. The crash data included information on: Number of crashes Type of crash Severity (injury, fatality) Tables summarize the crash data for the years 2006 through A detailed graphical crash data analysis is shown in Appendix D. Year Table 4.7 Crash Data Summary Interstate 10 (SR 8) SR 200 (US 301) Number of Crashes Safety Ratio Number of Crashes Safety Ratio Average / Year The safety ratio is used to determine if a roadway segment may potentially be considered a high crash segment location. If the safety ratio is greater than 1.0 and has at least eight (8) crashes per year, then it is considered a high crash segment location. The safety ratio on Table 4.7 shows the overall safety ratio along the study limits. The safety ratio was calculated by assessing the corridor as a whole. The two (2) major factors in the safety ratio calculation are traffic volumes and number of crashes. The average year safety ratio of 1.46 and 2.28 means there are sections within the study limits that already reach the high crash segment location thresholds. Tables 4.8 and 4.9 shows the crash statistics summary along I-10 and US 301 within the study limits. 39

46 CHARACTERISTICS CRASH TYPE Table 4.8 I-10 Crash Statistics Summary MP 2.4 to MP 4.31 TYPE OF CRASH NUMBER OF CRASHES 5-YEAR MEAN PERCENT OF YEAR TOTAL CRASHES TOTAL CRASHES PER YEAR Rear End % 4 Head On % 1 Angle % 1 Left Turn % 0 Right Turn % 0 Sideswipe % 4 Backed Into % 0 Collision with Parked Car % 0 Collision with Pedestrian % 0 Collisions with Bicycle % 0 Fixed Object % 6 Ran Off Road % 1 Overturned % 1 Other % 5 TOTAL CRASHES % 23 Clear % 10 WEATHER CONDITIONS SURFACE CONDITIONS Cloudy % 4 Rain % 8 Fog % 0 Other % 0 Dry % 13 Wet % 9 Other % 0.6 January % 2 February % 2 March % 2 April % 1 May % 2 MONTH OF YEAR J une % 3 July % 2 August % 1 September % 1 October % 1 November % 2 December % 2 Sunday % 3 Monday % 3 DAY OF WEEK Tuesday % 3 Wednesday % 4 Thursday % 3 Friday % 4 Saturday % 3 00:00-06: % 3 06:00-09: % 3 HOUR OF DAY 09:00-11: % 2 11:00-13: % 1 13:00-15: % 2 15:00-18: % 6 18:00-24: % 5 40

47 Table 4.9 US 301 Crash Statistics Summary MP 6.9 to MP CHARACTERISTICS TYPE OF CRASH NUMBER OF CRASHES YEAR YEAR TOTAL CRASHES PERCENT OF TOTAL MEAN CRASHES PER YEAR Rear End % 5 Head On % 0 Angle % 5 Left Turn % 4 Right Turn % 0 Sideswipe % 4 CRASH TYPE Backed Into % 1 Collision with Parked Car % 0 Collision with Pedestrian % 1 Collisions with Bicycle % 0 Fixed Object % 0 Ran Off Road % 1 Overturned % 0 Other % 2 TOTAL CRASHES % 23 Clear % 14 WEATHER CONDITIONS SURFACE CONDITIONS Cloudy % 7 Rain % 2 Fog % 0 Other % 0 Dry % 20 Wet % 3 Other % 0 January % 2 February % 1 March % 3 April % 3 May % 3 MONTH OF YEAR June % 2 July % 3 August % 1 September % 2 October % 1 November % 2 December % 2 Sunday % 3 M onday % 4 DAY OF WEEK T ues day % 3 Wednesday % 2 Thursday % 5 Friday % 5 Saturday % 2 00:00-06: % 1 06:00-09: % 3 HOUR OF DAY 09:00-11: % 2 11:00-13: % 4 13:00-15: % 5 15:00-18: % 3 18:00-24: % 5 41

48 In summary, Tables 4.8 and 4.9 show that fixed object collisions are the most common crashes and account for an average of 28% of the crashes along I-10. Rear-end collisions are the second most common with an average of 19% of the crashes and sideswipe collisions are the third most common with an average of 16.81% of the crashes along I-10. The high percentage of rear-end and sideswipe collisions along a freeway are typical of roadways experiencing heavy traffic congestion and weaving movements similar to the I-10/US 301 Interchange; whereas fixed object collisions are typical of roadways having poor geometry, restricted sight distance, inadequate delineation, inadequate shoulders and/or excessive speed. Along US 301, rear-end collisions are the most common crashes and account for an average of 22.22% of the crashes. Angle collisions are the second most common with an average of 21.37% of the crashes and sideswipe collisions are the third most common with an average of 17.09% of the crashes along US 301. The high percentage of angle and rear end collisions along arterials are typical of roadways experiencing heavy traffic congestion and inadequate signal timing; whereas sideswipe collisions are typical of roadways experiencing heavy traffic congestion and weaving movements. Figure 4.7 depicts the high crash areas within the interchange limits. 42

49 Travel Center Truck Stop Pilot Truck Stop N Legend CSX Railroad W S E High Crash Spots High Crash Segments Gerdau Ameristeel Figure 4.7 High Crash Areas 43

50 Tables 4.10 and 4.11 summarize the information on the severity of the crashes in terms of injuries and fatalities. Year Number of Crashes Table 4.10 I-10 Crash Data by Severity Number of Injury Crashes Number of Injuries Number of Fatal Crashes Number of Fatalities Total Average/ Year Table 4.10 shows the number of injuries on I-10 had remained relatively constant between the years 2007 and 2009, with a significant increase in the years 2006 and 2008, and a significant decrease in the year The same can be said with regards to the number of injury crashes. The average number of accidents per year over the 5-year period is twenty-three (23) crashes with eighteen (18) injuries. Year Number of Crashes Table 4.11 US 301 Crash Data by Severity Number of Injury Crashes Number of Injuries Number of Fatal Crashes Number of Fatalities Total Average/ Year Table 4.11 shows the number of injuries on US 301 has been decreasing between the years The number of injury crashes has remained relatively constant between the years The same can be said with regards to the number of fatal crashes in years 2006, 2008, and The average number of accidents per year over the 5-year period is twenty-four (24) crashes with eleven (11) injuries and one (1) fatality. 44

51 4.4 Existing Environmental Constraints This section presents a desktop screening and summary of pertinent existing conditions environmental information within the study area. Information of these environmental elements will be expanded and analyzed further in more detail during the PD&E study Cultural Resources There are no historic resources or archaeological sites located within the project study limits. Figure 4.8 shows those facilities located closest to the study area Community Services There are no community service facilities located within the project study limits. Figure 4.9 shows those facilities located closest to the study area. The facilities serve residents within the study area, but are all located outside the project study limits. Consequently, none of these facilities are expected to pose a Section 4(f) involvement from the proposed project. Emergency Evacuation The Florida Division of Emergency Management has designated I-10 as a primary emergency evacuation route. I-10 has been modified to be able to convert all the lanes to travel in the westbound direction under hurricane evacuation conditions. 45

52

53 Figure 4.9 Community Facilities Adjacent to Study Area 47

54 4.4.3 Natural and Biological Features Wetlands Wetlands within the study area were identified through the interpretation of current color aerial photographs (Aerials Express, 2010), St. Johns River Water Management District (SJRWMD) Land Use and Land Cover, United States Fish and Wildlife Service (USFWS) National Wetlands Inventory Map, Natural Resources Conservation Service (NRCS) Soils Survey of Jacksonville, Duval County, Florida and from wetland data previously collected for other studies in the area. A handful of isolated wetland areas have been identified along the north side of the interchange and along the I-10 and US 301 corridors. Initial comments received from various agencies through the Environmental Screening Tool (EST) of the Efficient Transportation Decision Making (ETDM) process calls attention to these wetlands. These wetlands include forested and vegetated non-forested communities. Based on interpretive mapping, these wetlands primarily appear to be hydrologically isolated depressions not associated with named wetland systems. A wetlands map is included in Figure Water Quality The project is contained entirely in the St. Johns River Water Management District (SJRWMD) Planning Unit 2A. Unit 2A is the upper St. Mary s River Unit of the St. Mary s River Basin and outfalls into Deep Creek, a tributary of the St. Mary s River. All waters in the St. Mary s Basin are considered Class III. Water quality criteria for Class III waters should support the designated uses of recreation and the propagation and maintenance of a healthy, well-balanced population of fish and wildlife. Deep Creek is not listed as an impaired water body, therefore does not have established total maximum daily loads (TMDL). A TMDL is the maximum amount of a given pollutant that a waterbody can assimilate and remain healthy, such that all of its designated uses are met. However, FDOT requires that all stormwater management systems be designed to keep post development nitrogen and phosphorous discharge amounts below existing conditions. Floodplains The proposed project limits fall within Flood Zone X as shown in the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) community panel number E (see Figure 4.11). Flood Zone X corresponds to areas outside the 500-year flood and as such, no floodplain compensation will be required. 48

55

56 Figure Federal Emergency Management Agency Flood Insurance Rate Map 50

57 Threatened and Endangered Species The I-10/US 301 Interchange study area was evaluated for the potential presence of threatened and endangered species. Inquiries were made with the USFWS, Florida Fish and Wildlife Conservation Commission (FWC) and Florida Natural Areas Inventory (FNAI). In addition, database searches were conducted specifically for bald eagle nest and bird rookery locations. 1. U.S. Fish and Wildlife Service. Information on federally listed species for Duval County was obtained from the internet website of the USFWS Endangered Species Field Office in Jacksonville, FL ( A request was also submitted to Mr. Dave Hankla of USFWS to provide listed species information for the project area. This was followed with correspondence with Ms. Candace Martino and Todd Mecklenborg of USFWS. 2. Florida Fish and Wildlife Conservation Commission. A request was submitted in 2007 to Mr. Mike Abbott of FWC in regard to the occurrence of listed species in the project area. Ms. Jan Stearns of FWC responded with the requested information. Strategic Habitat Conservation Areas (SHCA) hotspots were reviewed. FWC Geographic Information System (GIS) data was also reviewed to determine the location of nearby wood stork rookeries and their Critical Foraging Area (CFA). 3. Florida Natural Areas Inventory (FNAI). In 2008, FNAI was contacted to request a standard Data Report for the project. FNAI responded, listing element occurrence records from their database. Based on responses from the regulatory agencies and review of available data, no federally listed wildlife species are documented within the study area. There are no critical habitats, Core Foraging Areas (CFA), or Strategic Habitat Conservation Areas, as defined by USFWS, within the project corridor Physical Environment Air The project is located in Duval County which is in attainment of the National Ambient Air Quality Standards (NAAQS). Noise The majority of land uses within the study limits are commercial, agricultural or heavy industrial. None of these land uses are considered to be noise sensitive. The low-density residential area along Brandy Branch Road and the Baldwin Inn located south of I-10 and west of US 301 are potential noise sensitive sites. However, only those homes south of Brandy Branch lie within the project study limits. 51

58 Contamination A desktop screening assessment of the area located four (4) known suspected contaminated sites within the project study limits (see Figure 4.8): CSX railroad maintenance yard facility north of I-10 CSX railroad maintenance yard facility south of I-10, east of US 301 Travel Center and Pilot truck stops located south of I-10, west of US 301 Eight (8) private commercial parcels located south of I-10, east of US 301 V. NEED 5.1 Project Corridor Needs The I-10/US 301 Interchange is deficient in terms of design criteria, capacity, ability to serve as an effective evacuation route and ability to accommodate future growth within the study area. Improvements are needed to address these deficiencies Interchange Design and Deficiencies The existing interchange design is a partial cloverleaf AB type with straight and loop ramps serving all movements located on the west side of the interchange. This configuration was chosen at the time of construction for its relatively small footprint and to avoid conflict with the CSX railroad maintenance yard. The railroad maintenance yard is located along the east side of US 301. Two (2) major truck stops have been developed along US 301 in the southwest quadrant of the interchange. Traffic congestion has significantly increased in recent years with police and fire rescue representatives reporting numerous conflicts and crash incidents within the study area. Current traffic demands have modified the role of the interchange with a high number of commercial vehicles using the two (2) truck stops immediately south of the interchange as a major servicing point just outside the Jacksonville urban area. The heavy demand for the northbound US 301 to eastbound I-10 on-ramp creates difficult operational conditions that result in a sustained northbound queue for the signalized intersection left-turn (see Figure 5.1). The large portion of trucks in this queue create a highly dangerous situation for all traffic in the area as the large vehicles obstruct sight distance, move very slowly, block driveways, interfere with the median openings and prompt drivers to perform unsafe and unpredictable movements. As documented in Section 3.4 of this report, the I-10/US 301 Interchange has several design deficiencies based on the current FDOT standards. These are summarized below: Substandard loop ramp and turning radii design (low design speed). Speed differentials within the interchange limits. Insufficient I-10 westbound exit ramp deceleration length. Insufficient queue storage bay lengths along US 301. Short weaving distance between the loop ramps along US 301 southbound. Limited access right-of-way along US 301 does not meet current standards. 52

59 Substandard access management along US 301 south of I-10. Substandard sight distance along I-10 within the interchange limits. Substandard vertical bridge clearance under the I-10 bridge structures over US 301. Substandard vertical bridge clearance under the I-10 bridge structures over CSX railroad yard. Substandard surface deck on the I-10 bridge structures over the CSX railroad yard. Figure US 301 Northbound Left-Turn Lane Queue (Looking South) Structural FDOT completed a Bridge Feasibility Study to widen, through repair or replacement, the existing bridges over the CSX railroad maintenance yard. Various bridge alternatives were evaluated to bring the bridges up to current design standards and widen the typical section. The recommended alternative from the Bridge Feasibility Study was to replace the CSX bridges. Due to the closely spaced CSX bridges to the US 301 bridges, it was determined that the US 301 bridges will also need to be replaced in order to bring all four (4) bridges to meet vertical clearance criteria and to reconstruct the I-10 mainline within the interchange limits. A preliminary maintenance of traffic evaluation determined that the current roadway footprint could not accommodate an acceptable maintenance of traffic plan that will maintain all lanes open during construction. In order to be able to replace the bridges and maintain the existing number of interstate through lanes at all times during construction, improvements to the interchange access will be needed and must be in place prior to the replacement of the bridges. 53

60 5.1.3 Safety I-10 and US 301 have an average of twenty-three (23) and twenty-four (24) crashes per year respectively for a total of forty-seven (47) crashes. Along I-10, fixed object, rear-end and sideswipe collisions are the most common crashes. The high percentages of rear-end and sideswipe collisions along a freeway are typical of roadways experiencing heavy traffic congestion and weaving movements similar to the I-10/US 301 Interchange; whereas fixed object collisions are typical of roadways having poor geometry, restricted sight distance, inadequate delineation, inadequate shoulders and/or excessive speed. Along US 301, rear-end, angle and sideswipe collisions are the most common crashes. The high percentages of angle and rear-end collisions along an arterial are typical of roadways experiencing heavy traffic congestion and inadequate signal timing; whereas sideswipe collisions are typical of roadways experiencing heavy traffic congestion and weaving movements. The average year safety ratios for I-10 and US 301, within the study limits, were 1.46 and 2.28 respectively. A safety ratio greater than 1.0 and at least eight (8) crashes per year are indicators that these particular segments and locations of roadways had experienced crash rates comparable to statewide averages for similar roadways. Many of the traffic safety concerns relate to turning movements and existing physical conditions that can be addressed by modifying the interstate access and improving the ramp terminals. A detailed review of the crash data is presented in Section Area Needs System Linkage and Area Connectivity I-10 and US 301 are both part of the Strategic Intermodal System (SIS), Florida Intrastate Highway System (FIHS) and National Highway System (NHS). I-10 is a major highway in the State of Florida and is the main provider of east-west travel in north Florida. East of the project limits, I-10 also provides regional connectivity with Cecil Commerce Parkway, Interstate 295 and Interstate 95 which are used by many drivers accessing or passing through the northeast Florida region. The existing I-10/US 301 Interchange provides interstate access to local and regional traffic. Some of the regional traffic includes vehicles and commercial trucks traveling from as far as Gainesville, Waldo, Hawthorne, Lawtey and Starke. A high number of commercial vehicles use US 301 as an alternate route from I-75 to I-10 and from I-95 to I-10. The Florida Division of Emergency Management has designated I-10 as a primary emergency evacuation route. I-10 has been modified to be able to convert all the lanes to travel in the westbound direction under hurricane evacuation conditions. 54

61 5.2.2 Access to Freight Activity The I-10 corridor is part of the Florida s SIS, and provides direct/indirect connections to: Two public airports; Cecil Field and Jacksonville International Airport Two rail lines operated by CSX Transportation One deep-water port, the Port of Jacksonville (JAXPORT) Other SIS corridors; I-75, I-95, I-295, US 301 and the First Coast Outer Beltway As of 2007, the daily truck volumes are currently as high as 28% and 35% along the I-10 and US 301 corridors respectively. The amount of truck traffic is expected to increase due to the recent closure of the I-10 rest areas just east of US 301 and the current and projected growth of the Jacksonville Port Authority. The expansion of the port and new seaport container facilities are making Jacksonville one of the largest container ports on the east coast. It is estimated that 70% of the containers that come through the port will be handled by trucks Transportation Demand Long-range transportation planning forecasts developed by the North Florida Transportation Planning Organization (NFTPO) indicate that growth in travel demand will continue. In 2007, this section of I-10 west of US 301 had 38,800 vehicles per day AADT with a LOS B and 49,000 vehicles per day east of US 301 with a LOS C. These traffic volumes are expected to grow, exceeding 85,200 vehicles per day with a LOS D by 2040 west of US 301 and 100,400 east of US 301 with a LOS F under the existing number of lanes. The eastbound on-and off-ramps currently exceed their capacity carrying a range of 15-38% truck traffic during peak hours. These two ramps are the critical movements of this interchange with existing and projected poor LOS by movement. Other segments along the I-10 corridor east of US 301 will increase at an even faster rate Social Demands and Economic Development The study area and its surroundings currently have nine (9) major traffic generators that utilize this interchange daily. Winn-Dixie Distribution Center Publix Distribution Center Michaels Distribution Center Jacksonville Electric Authority Generating Station Wal-Mart Distribution Center Wal-Mart Super Center Gerdau Ameristeel Pilot Truck Stop Travel Center Truck Stop 55

62 Along with these major generators, commercial land uses are located just south of the interchange. Approximately five (5) miles east of the interchange is the former Cecil Field Naval Air Station (NAS), currently being redeveloped into the Cecil Commerce Center (CCC). The CCC will include a variety of mixed-use developments and is anticipated to trigger considerable residential and commercial development in Western Duval County Federal, State and Local Government Authority This IMR is consistent with the approved I-10 Master Plan Study and is consistent with the current adopted 2035 NFTPO LRTP in Duval County and Local Government Comprehensive Plans (LGCP). Planned and Programmed Development in the Project Area The following area projects are included in the 2035 Long Range Transportation Plan: I-10/SR 23 (Cecil Commerce Parkway) Interchange The interchange construction is complete and open to traffic. The only component still under construction is the widening of I-10 within the interchange limits. The construction is scheduled to be completed by SR 23 (Cecil Commerce Parkway) The widening of SR 23 from two lanes to four lanes from NW 103 rd Street to New World Avenue is scheduled to be constructed by New World Avenue is one of the main roadways that provide access to the Cecil Commerce Center. I-10 The widening of I-10 from four lanes to six lanes from US 301 to SR 23 is scheduled to be constructed by The widening of I-10 from four lanes to six lanes from the Baker/Nassau County Line to US 301 is scheduled to be constructed by US 301 A new four-lane roadway (Baldwin Bypass) is planned to be constructed from south of US 90 to north of the Town of Baldwin. The proposed project will provide a bypass route on US 301 that will avoid traffic congestion and delays caused by the existing co-location of US 301 with US 90 and the two existing at-grade CSX railroad crossings within the Town of Baldwin in Duval County. The project is scheduled to be constructed by The widening of US 301 from two lanes to four lanes from north of the Town of Baldwin to the Duval/Nassau County Line is scheduled to be constructed by

63 VI. ALTERNATIVES 6.1 No-Build Alternative The No-Build Alternative proposes to keep the existing roadways and interchange configuration into the future without improvements. No traffic capacity, operation, or safety improvements would be implemented throughout the corridors. The effect associated with this alternative includes the acceptance of existing congested traffic conditions. Also, travel demand and truck traffic will increase in future years, given the continued growth and new roadway projects in the area. This alternative is considered to be viable during the public hearing and final selection phase to serve as a comparison to the study proposed alternative. The No-Build Alternative has a number of positive aspects, since it would not require expenditure of public funds for design, right-of-way acquisition, construction or utility relocation. Traffic would not be disrupted due to construction, therefore, avoiding inconveniences to local residents and businesses. Also, there would be no direct or indirect impacts to the environment, the socio-economic characteristics, community cohesion, or system linkage of the area. However, the No-Build Alternative fails to fulfill the needs of this project for the area. If no improvements are made, the I-10/US 301 Interchange and surrounding area will experience heavy congestion during the peak hours and will operate at undesirable levels of service. The congestion within the area will cause additional impacts to these roadways. Such impacts may include excessive delays in travel time, poor interstate access, large reduction of average travel speeds, excess fuel consumption from idling vehicles, increased air pollutants (particularly hydrocarbons and carbon monoxide) and a potential increase in rear-end, left-turn and sideswipe collisions. 6.2 Alternative Travel Modes No multimodal facilities such as existing bicycle facilities or transit routes exist within the study area. Multimodal alternatives such as bus transit, high occupancy vehicle lanes and pedestrians or bicycle improvements will not meet the needs for this project because of the rural land use conditions and travel patterns within the interchange. Multimodal alternatives will not improve the current and future traffic conditions within the interchange area. Therefore, alternative travel modes were not considered in this IMR because it fails to fulfill the needs of this project. 6.3 Build Alternative Definition of Alternative The No-Build and Transportation Systems Management (TSM) Alternatives will not provide adequate traffic capacity or operational improvements to the interchange. TSM alternatives are comprised of minor improvement options that are typically developed to alleviate specific traffic 57

64 congestion/safety problems, or to get the maximum utilization out of the existing facility by improving operational efficiency. TSM alternatives may include improvements to the mainlines and interchange such as adding auxiliary lanes, lanes to access ramps, turn-lanes at the ramp terminals, signal optimization and increasing turn-lane storage on the cross streets. As discussed in previous sections, the I-10 bridge structures over US 301 and CSX railroad maintenance yard will need to be replaced within the next ten (10) years. As part of the PD&E study and IMR efforts, a Build Alternative was developed by reconfiguring the interchange access to US 301 in order to be able to propose a maintenance of traffic (MOT) plan that will allow the replacement of the bridge structures and the reconstruction of the I-10 mainline profile without future construction throwaway. Therefore, a TSM Alternative was not considered in this IMR because it fails to fulfill the needs of this project. Various interchange concepts were considered during the early stages of the PD&E study. The interchange concepts evaluation mainly focused on addressing long-term improvements under 2040 design year conditions. The concepts were evaluated in a general manner and analyzed in order to select a preferred alternative. The concepts were categorized based on the interchange needs for the area, type of interstate access and number of lanes. The selection of the appropriate criteria and standards was influenced by safety features, traffic volumes and composition, levels of service, environmental impacts and interstate design. Some of the interchange improvements considered included: Flyover ramps Reduction of interstate access points Removal of loop ramps Increase of loop ramp radiuses design Additional ramps Ramp merging Relocation of ramp gores away from the mainline interchange vertical curves Additional interchange capacity Redistribution of traffic entering and exiting the interstate Intersection urbanization Appendix E depicts the interchange concepts considered as part of the PD&E study. After the Department s review and concurrency of the final evaluation of the interchange concepts, an IMR preferred interchange alternative was identified to move forward in the study. The preferred Build Alternative will increase capacity, improve safety, improve traffic operations and will accommodate the necessary MOT plan to replace the bridge structures and reconstruct the I-10 mainline profile. 58

65 6.3.2 Preferred Alternative (2020 Opening Year) The interchange Preferred Alternative (see Figure 6.1) will consist of the following elements and improvements: Eastbound Ramps o Reconstruct the loop ramp in the southwest quadrant to improve the ramp geometrics and maintain a single I-10 eastbound merge point location. This ramp will service the traffic traveling from US 301 southbound to I-10 eastbound. Once the loop ramp reaches the I-10 profile, it will continue eastbound separate and parallel to the I-10 mainline. The ramp will cross over US 301 on a separate bridge structure. The ramp will continue eastbound and will cross over the CSX railroad maintenance yard on a separate bridge structure. After crossing CSX, the ramp will merge with the new southeast quadrant eastbound on-ramp as a two-lane ramp. After merging, the ramp will continue eastbound as a two-lane ramp. The two-lane ramp will become a onelane ramp before merging with I-10 just west of the CR 217 overpass. o o Construct a new two-lane on-ramp in the southeast quadrant. This ramp will service the traffic traveling from US 301 northbound to I-10 eastbound. This new ramp will improve the ramp terminal traffic operations by relocating the existing US 301 northbound to I-10 eastbound movement from a left-turn lane controlled by a signal to a free-flow through-right turn lane. Realign the eastbound off-ramp to accommodate the new loop ramp design in the southwest quadrant and improve the eastbound off-ramp terminal from a singlelane left-turn lane to a dual left-turn lane. This ramp will service the traffic traveling from I-10 eastbound to US 301 northbound and southbound. Westbound Ramps o Construct a new two-lane off-ramp in the northeast quadrant. This ramp will service the traffic traveling from I-10 westbound to US 301 northbound and southbound. After the two-lane off-ramp diverges from I-10, a downstream onelane ramp peels off to the north to provide access to US 301 northbound. The two-lane off-ramp will continue westbound and cross over CSX and US 301 on separate bridge structures. After crossing over US 301, the two-lane ramp turns into a loop ramp intersecting with US 301 southbound. This two-lane ramp will be controlled by a traffic signal eliminating the southbound weaving section between the two southbound ramp terminals along US 301. This new ramp design will improve the ramp terminal traffic operations by relocating the existing I-10 westbound to US 301 northbound movement from a left-turn lane controlled by a stop sign or traffic signal to a right turn lane controlled by a yield sign. This design will also improve traffic operations by eliminating the I-10 westbound 59

66 mainline speed differentials and providing additional queuing areas during the peak periods. o o Urbanize the US 301 southbound to I-10 westbound right-turn lane. This improvement will replace the existing rural high speed entrance ramp with an exclusive right-turn lane controlled by a traffic signal at the ramp terminal intersection. Realign the westbound on-ramp near the ramp terminal to accommodate the new loop ramp design in the northwest quadrant and the urbanization of the US 301 southbound right-turn lane. This ramp will service the traffic traveling from US 301 northbound and southbound to I-10 westbound. US 301 Improvements o Close the full median opening at Boxcar Drive. o Close the full median opening at the Baldwin Inn Hotel. o Extend the storage of all the left-turn lanes within the study area. Appendix F contains the interchange 2020 Preferred Alternative conceptual plans. The 2020 Preferred Alternative will provide the necessary interchange footprint to accommodate a future MOT plan to replace the US 301 and CSX bridges without closing the interchange and maintaining all travel lanes and ramps at all times during construction. The new bridges will be constructed to meet the required vertical and horizontal clearances per FDOT standards. As Figure 6.1 shows, replacing the bridges will require a change in profile along I-10. The 2020 Preferred Alternative interchange concept was designed with the idea of relocating and constructing the eastbound merge and westbound diverge gores outside of the new limits of the I-10 profile (profile grade line) to minimize construction throwaway and simplify the MOT phases. By relocating the gores away from the interchange, the future I-10 MOT plan will be able to use the existing shoulders, eastbound acceleration and westbound deceleration lane areas left behind from the existing conditions, within the interchange limits, to accommodate the necessary lane shifts and MOT phases to demolish the existing bridges and construct the new bridges. The interchange 2020 Preferred Alternative is the proposed interchange modification for which approval to a change in access is being sought in this IMR document as part of the IMR interchange proposal process. 60

67

68 6.3.3 Preferred Alternative (2040 Design Year) Two additional projects will be constructed and in place by the design year 2040 within the interchange area (see Figures 6.2 and 6.3). I-10 Six-Lane Widening Project The widening of I-10 from four lanes to six lanes from US 301 to SR 23 is scheduled to be constructed by the year The widening of I-10 from four lanes to six lanes from the Baker/Nassau County Line to US 301 is scheduled to be constructed by the year Baldwin Bypass Project A new four-lane roadway (Baldwin Bypass) will be constructed from south of US 90 to north of the Town of Baldwin. The project is scheduled to be constructed by the year This project currently proposes two distinct concepts to connect with the existing US 301 corridor north of the interchange. 1. T-Intersection just north of New Brandy Branch Road This new intersection is the southern begin/end of the Baldwin Bypass Corridor intersecting with the existing US 301 corridor as a signalized intersection. Traffic wanting to access the Baldwin Bypass from I-10 will exit at the I-10/US 301 Interchange continue north and turn left at the T-intersection. 2. Four-Leg Intersection just north of the Interchange In this concept, the Baldwin Bypass Corridor will be constructed to have a seamless connection with the US 301 corridor to and from the south and the I-10/US 301 Interchange. US 301 to and from the north will be realigned north of the interchange to end at the Baldwin Bypass near the New Brandy Branch Road area as a four-leg signalized intersection. The new intersection will provide access to US 301, New Brandy Branch Road and the Baldwin Bypass. Traffic wanting to access the Baldwin Bypass from I-10 will exit at the I-10/US 301 Interchange and continue north through the new intersection. Traffic from I-10 with the Town of Baldwin as their destination will exit at the I-10/US 301 Interchange continue north and turn right at the new four-leg intersection. The interchange 2040 Preferred Alternative will be the same as in the opening year 2020 except for the following interchange modifications to accommodate the two projects described above. The new southeast quadrant eastbound on-ramp will be extended and widened to two lanes before merging with I-10. The two-lane ramp will merge with I-10 just west of the CR 217 overpass. The CR 217 overpass will be replaced by the I-10 six-lane project in order to accommodate the six-lane typical section and the two-lane on-ramp acceleration lanes. The acceleration lanes will end east of the CR 217 overpass providing ample distance for trucks and vehicles to merge with the I-10 eastbound traffic. In Concept #2, the I-10 westbound to US 301 northbound ramp terminal will be widened to two lanes and will be controlled by a traffic signal. This improvement is needed due to the close proximity and proposed intersection spacing between the ramp terminal and the new Baldwin Bypass intersection to the north. Appendix G contains the interchange 2040 Preferred Alternative conceptual plans. 62

69

70

71 VII. FUTURE YEAR TRAFFIC Opening and 2040 Design Year Traffic As previously discussed in Section 2.3, the future traffic forecast was based on the Northeast Regional Planning Model (NERPM) Version 4, I-10 Master Plan Study, (dated April 2006) and area historical growth rates. Based on the 2007 balanced volumes from the I-10 and US 301 Design Traffic Report, an average annual growth rate was calculated. The average annual growth rate was found to be 2.23 percent. The forecast was compared to historic traffic counts. A comparison of this approach and the model projections was performed to provide consistent and logical traffic forecasts. In order to preserve the I-10 Master Plan Study volume projections, it was determined that the master plan forecasts would be considered in the forecasting effort for this IMR study. The master plan included traffic forecasts for 2020 and The 2007 traffic counts formed the base year traffic for both forecast methods. The opening year 2020 and design year 2040 traffic volumes were generated as follows: Grew all 2007 volumes by 2.2%. Held all ramps east of US 301 to the I-10 Master Plan Study volume numbers. In 2040, an independent model run was performed in order to determine how much additional traffic the Baldwin Bypass would attract within the area of influence. The Baldwin Bypass was found to attract approximately 5,000 additional trips. These additional 5,000 trips were added to the already grown 2040 volumes to develop the 2040 forecast. As previously discussed in Section 2.4, 2020 and 2040 AADT estimates were developed for the entire study area. DDHV volumes were also developed for the entire study area by following the approved processes and techniques consistent with the FDOT s Project Traffic Forecasting Handbook. The traffic factors utilized for obtaining the future traffic peak hour volumes are listed in Table 2.2. The 2020 and 2040 projected AADT and DDHV volumes are shown on Figures 7.1 through

72

73

74

INTERCHANGE MODIFICATION REPORT

INTERCHANGE MODIFICATION REPORT INTERSTATE 75 AND STATE ROAD 884 (COLONIAL BOULEVARD) INTERCHANGE LEE COUNTY, FLORIDA INTERCHANGE MODIFICATION REPORT Prepared for: Florida Department of Transportation District One May 2017 Interchange

More information

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 INTERCHANGE MODIFICATION REPORT FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 PREPARED BY: VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT DECEMBER 13, 2006

More information

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS SECTION PAGE NO. SECTION TITLE NO. EXECUTIVE SUMMARY -------------------------------------------------------------------- ES-1 1.0 INTRODUCTION

More information

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies APPENDIX B Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies Revised December 7, 2010 via Resolution # 100991 Reformatted March 18, 2011 TABLE OF CONTENTS

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Interstate, NHS Non-Interstate and Non-NHS (IJR / IMR Guidance) SPECIFIC SUBJECT:

More information

PROCEDURES FOR NEW OR REVISED FREEWAY ACCESS IN ARKANSAS

PROCEDURES FOR NEW OR REVISED FREEWAY ACCESS IN ARKANSAS PROCEDURES FOR NEW OR REVISED FREEWAY ACCESS IN ARKANSAS June 2011 PROCEDURES FOR NEW OR REVISED FREEWAY ACCESS IN ARKANSAS June 2011 Prepared by: Arkansas State Highway and Transportation Department

More information

The TIS is to be signed and sealed by a Florida Registered Professional Engineer.

The TIS is to be signed and sealed by a Florida Registered Professional Engineer. CHAPTER 900. SECTION 901. DEVELOPMENT STANDARDS INFRASTRUCTURE STANDARDS 901.5. Transportation Impact Study A. Intent and Purpose The intent and purpose of the Traffic Impact Study (TIS) is to identify

More information

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0 SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605/SR-60 EA# 3101U0 October 9, 2017 Contents 1 Purpose of ICE Memo... 1 2 Background... 1 3 Existing Interchange Deficiencies... 1 4 Context Sensitive

More information

Exit 73 I-29 Interchange Modification Justification Study

Exit 73 I-29 Interchange Modification Justification Study xit 73 I-29 Interchange Modification Justification tudy Introduction Figure 1 shows the location of xit 73. This interchange is proposed to be the connecting point of the ast and West Corridors to I-29.

More information

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002 TRANSPORTATION INTERSTATE 87 INTERCHANGE 11A TOWN OF MALTA SARATOGA COUNTY, NY DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002 PROJECT REPORT NEW YORK STATE DEPARTMENT OF TRANSPORTATION JOSEPH

More information

EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD

EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD Scope of Services 12/08/2008 EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD TABLE OF CONTENTS Section Pace I. 0 PROJECT DESCRIPTION........................,............................................................

More information

AIR QUALITY TECHNICAL MEMORANDUM

AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM GOLDEN GLADES INTERCHANGE PD&E STUDY Miami-Dade County, Florida Financial Management Number: 428358-1-22-01 Efficient Transportation Decision

More information

Traffic Impact Study Requirements

Traffic Impact Study Requirements [TYPE THE COMPANY NAME] Traffic Impact Study Requirements County of San Mateo Department of Public Works Roadway Services 9/1/2013 I. Introduction The County of San Mateo (County), Department of Public

More information

South Dakota Department of Transportation. Interchange Modification Justification Report. Interstate 90 Exit 44 (Bethlehem Road - Piedmont)

South Dakota Department of Transportation. Interchange Modification Justification Report. Interstate 90 Exit 44 (Bethlehem Road - Piedmont) South Dakota Department of Transportation Interchange Modification Justification Report Interstate 90 Exit 44 (Bethlehem Road - Piedmont) February 28, 2014 Prepared By: SDDOT Office of Project Development

More information

I-35/80 Operations Study: Douglas Avenue to NW 86 th Street FOR

I-35/80 Operations Study: Douglas Avenue to NW 86 th Street FOR : Douglas Avenue to NW 86 th Street FOR Iowa Department of Transportation City of Urbandale City of Grimes February 7, 2013 FINAL Prepared by: HR Green, Inc. HR Green Project Number: 40110031 TABLE OF

More information

FLORIDA DEPARTMENT OF TRANSPORTATION PROCEDURE DEVELOPMENT OF THE

FLORIDA DEPARTMENT OF TRANSPORTATION PROCEDURE DEVELOPMENT OF THE FLORIDA DEPARTMENT OF TRANSPORTATION PROCEDURE DEVELOPMENT OF THE FLORIDA INTRASTATE HIGHWAY SYSTEM Topic No.: 525-030-250-f Office: Systems Planning Effective Date: May 16, 2002 DEVELOPMENT OF THE FLORIDA

More information

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project 06/2014 PROJECT STUDY REPORT (Cal Poly Pomona Senior Project) For Conceptual Approval of an Interchange Improvement And Cooperative Agreement with The City of Lake Elsinore for completion of Project Approval

More information

Route 7 Connector Ramp MODIF IE D I N T ER C H A N G E M OD IFICATIO N R E PO RT TRA N S F O R M I : I N S ID E THE BE LTWAY

Route 7 Connector Ramp MODIF IE D I N T ER C H A N G E M OD IFICATIO N R E PO RT TRA N S F O R M I : I N S ID E THE BE LTWAY STATE PROJECT NUMBER: 0066-96A-493,P101, C501, B686; UPC: 110629 FEDERAL PROJECT NUMBER: NHPP-066-1(356) FAIRFAX COUNTY, VIRGINIA TRA N S F O R M I - 6 6 : I N S ID E THE BE LTWAY Route 7 Connector Ramp

More information

LOCATION HYDRAULIC REPORT

LOCATION HYDRAULIC REPORT Draft LOCATION HYDRAULIC REPORT Florida Department of Transportation District One US 41 at Fruitville Road (CR 780) Intersection Improvements - PD&E STUDY Sarasota County, Florida Financial Project ID

More information

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement 2 Purpose and Need 2.1 Study Area Interstate 81 (I-81) is relied upon for local and regional travel and interstate travel in the eastern United States. It extends 855 miles from Tennessee to New York at

More information

DRAFT AIR QUALITY TECHNICAL MEMORANDUM

DRAFT AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM PROJECT DEVELOPMENT AND ENVIRONMENT STUDY STATE ROAD 60 GRADE SEPARATION OVER CSX RAILROAD Polk County, Florida Financial Project ID: 436559-1-22-01 Prepared for: Florida

More information

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares

More information

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80)

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) FINAL DRAFT - NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) La Center, Washington February 2015 FINAL DRAFT - NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) La Center,

More information

500 Interchange Design

500 Interchange Design 500 Interchange Design Table of Contents 501 Interchange Design... 5-1 July 2015 501.1 General... 5-1 501.2 Interchange Type... 5-1 501.2.1 General... 5-1 502 Interchange Design Considerations... 5-2 502.1

More information

BCEO TRAFFIC IMPACT STUDY GUIDELINES

BCEO TRAFFIC IMPACT STUDY GUIDELINES BCEO TRAFFIC IMPACT STUDY GUIDELINES February 2006 TABLE OF CONTENTS INTRODUCTION..... i TRAFFIC IMPACT STUDY STRUCTURE... 1 WHEN IS A TRAFFIC IMPACT STUDY NEEDED?..... 1 STUDY AREA, SITE PLAN & HORIZON

More information

Final Air Quality Report

Final Air Quality Report Florida Department of Transportation - District VII County Line Road (C.R. 578) Project Development and Environment Study From U.S. 19 (S.R. 55) to U.S. 41 (S.R. 45) Work Program Item Segment Number: 257298

More information

SR 60 Grade Separation over CSX Railroad Traffic Technical Memorandum

SR 60 Grade Separation over CSX Railroad Traffic Technical Memorandum To: Marlon Bizerra, PE From: Thirulokesh Krishnan Email: thirulokesh.krishnan@atkinsglobal.com Phone: 210.321.2019 Date: Nov 25, 2014 Ref: cc: Kim Warren, Doug Reed, PE Subject: SR 60 Grade Separation

More information

GUIDE FOR THE PREPARATION OF TRAFFIC IMPACT STUDIES

GUIDE FOR THE PREPARATION OF TRAFFIC IMPACT STUDIES GUIDE FOR THE PREPARATION OF TRAFFIC IMPACT STUDIES Adopted by Town Council on November 25, 2008 Prepared By: HNTB Engineering Department Planning Department TABLE OF CONTENTS I. INTRODUCTION... 1 II.

More information

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS 6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS 6.1 MODEL RUN SUMMARY NOTEBOOK The Model Run Summary Notebook (under separate cover) provides documentation of the multiple

More information

Military Highway Interchange

Military Highway Interchange III. Military Highway Interchange Deficiencies Design Challenges Proposed Alternatives III.1.2 Volumes & Operations Figure III.2: Existing Volumes displays the existing volumes for the Military Highway

More information

Beltline Interchange Range of Alternatives Screening Summary Memo

Beltline Interchange Range of Alternatives Screening Summary Memo Range of Alternatives Screening Summary Memo (Concurrence Point #2 from the Agency Coordination Plan) (I-39/90 and US 12/18 Interchange) Dane County, Wisconsin WisDOT Project ID 1007-10-02 Table of Contents

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report APPENDIX B Excerpts from the October 2002 Interstate 83 and PA Route 921 The objective for the SR 921 interchange site was to study alternatives for construction of a new interchange. There are no short-term

More information

500 Interchange Design

500 Interchange Design 500 Interchange Design Table of Contents 501 Interchange Design... 1 501.1 General... 1 501.2 Interchange Type... 1 501.2.1 General... 1 502 Interchange Design Considerations... 2 502.1 Determination of

More information

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT February 2016 INTERSTATE 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION PROJECT Commonwealth of Virginia Virginia

More information

DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS

DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS CITY OF ALBANY DEPARTMENT OF PUBLIC WORKS DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS Prepared By PUBLIC WORKS DEPARTMENT ALBANY, OREGON 97321 Telephone: (541) 917-7676 TABLE OF CONTENTS

More information

FINAL PROJECT PRIORITIZATION PLAN FOR THE NM 599 CORRIDOR

FINAL PROJECT PRIORITIZATION PLAN FOR THE NM 599 CORRIDOR FINAL PROJECT PRIORITIZATION PLAN FOR THE NM 599 CORRIDOR PROJECT NO. WIP-599-1(102) CONTROL NO. D5SF2 APRIL 2010 Prepared for: New Mexico Department of Transportation Northern Design Bureau P.O. Box 1149

More information

Environmental Consequences and Mitigation

Environmental Consequences and Mitigation Chapter 4 Environmental Consequences and Mitigation 4.1 Introduction This chapter provides a detailed description of the impacts (and indirect impacts where applicable) associated with the alternatives

More information

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018 What is the Carolina Crossroads Project? The South Carolina Department of Transportation (SCDOT), in cooperation with the Federal Highway Administration (FHWA), is proposing to upgrade and redesign a key

More information

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES 4.0 INTRODUCTION The ability to accommodate high volumes of intersecting traffic safely and efficiently through the arrangement of one or more interconnecting

More information

9.0 I-26 & I-526 Interchange Improvements

9.0 I-26 & I-526 Interchange Improvements 9.0 I-26 & I-526 Interchange Improvements The I-26 & I-526 System-to-System interchange currently consists of a combination of directional and loop ramps providing for all movements from one Interstate

More information

CHAPTER 2: MODELING METHODOLOGY

CHAPTER 2: MODELING METHODOLOGY CHAPTER 2: MODELING METHODOLOGY 2.1 PROCESS OVERVIEW The methodology used to forecast future conditions consisted of traditional traffic engineering practices and tools with enhancements to more accurately

More information

Chapter 2 Transportation Element Goals, Objectives and Policies

Chapter 2 Transportation Element Goals, Objectives and Policies Chapter 2 Transportation Element Goals, Objectives and Policies City of Belleview Comprehensive Plan Adopted by Ord 2016-10 on July 5, 2016 GOALS, OBJECTIVES AND POLICIES Goal 2 Transportation...1 Objective

More information

Traffic Impact Analysis Guidelines. Town of Queen Creek

Traffic Impact Analysis Guidelines. Town of Queen Creek Traffic Impact Analysis Guidelines Town of Queen Creek January 2016 1. INTRODUCTION The purpose of this document is to outline the procedures and requirements for preparing a Transportation Impact Analysis

More information

M D 355 [FR E D E R IC K R O A D] OVER

M D 355 [FR E D E R IC K R O A D] OVER M D 355 [FR E D E R IC K R O A D] OVER LITTLE BENNETT CREEK MAINTENANCE OF TRAFFIC ALTERNATIVE ANA LYSIS Prepared by: INTRODUCTION The purpose of this report is to present the results of traffic analyses

More information

Traffic Impact Study Guidelines. City of Guelph

Traffic Impact Study Guidelines. City of Guelph Traffic Impact Study Guidelines City of Guelph April 2016 Engineering and Capital Infrastructure Services Infrastructure, Development & Enterprise 1 Carden Street Guelph, Ontario Canada N1H 3A1 Page 1

More information

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1 TRANSPORTATION IMPACT STUDY (TIS) GUIDELINES FOR DEVELOPMENT APPLICATIONS Transportation and Works Department The Regional Municipality of York 17250 Yonge Street Newmarket, Ontario L3Y 6Z1 August, 2007

More information

GRE PID 80468

GRE PID 80468 Assessment of Feasible Alternatives Prepared for Ohio Department of Transportation 505 South SR 741 Lebanon, OH 45036-9518 December 2011 One Dayton Centre, Suite 1100 One South Main Street Dayton, OH 45402

More information

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS HPTER 5 PRLLEL PRKWY ORRIDOR IMPROVEMENTS nother key area within the Village West study area is the Parallel Parkway corridor. This chapter focuses on the segment of Parallel Parkway between 106 th Street

More information

NORTH I-75 MASTER PLAN Summary Report

NORTH I-75 MASTER PLAN Summary Report NORTH I-75 MASTER PLAN Summary Report Interstate 75 (SR 93) From the Florida s Turnpike Interchange to the I-10 Interchange Alachua, Bradford, Clay, Citrus, Columbia, Duval, Levy, Marion, and Sumter Counties,

More information

Woodburn Interchange Project Transportation Technical Report

Woodburn Interchange Project Transportation Technical Report Final Report Woodburn Interchange Project Transportation Technical Report Prepared for Oregon Department of Transportation April 212 Prepared by DKS Associates Contents Methodologies... 4 Volume Development...

More information

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI)

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI) 2013 ITE Western District Annual Meeting COCEPT DEVELOPMET, AALYSIS, AD DESIG OF A EW PARKWAY AT GRADE ITERSECTIO (PAGI) Lead Author: James M. Witkowski, PhD Supporting Author: Darrell Truitt, PE The Pima

More information

Community Advisory Committee Meeting No. 2. June 22, 2006

Community Advisory Committee Meeting No. 2. June 22, 2006 Community Advisory Committee Meeting No. 2 June 22, 2006 Introductions The Study Team KDOT Wichita Partners Consultants CAC members Overview Today s Agenda Opinion Survey Study Status Starting Concept

More information

Draft Environmental Impact Statement. Appendix A Purpose and Need Report

Draft Environmental Impact Statement. Appendix A Purpose and Need Report Draft Environmental Impact Statement Appendix A Purpose and Need Report Appendix A Purpose and Need Report Purpose and Need Report Carolina Crossroads I-20/26/126 Corridor Improvement Project Lexington

More information

Final Air Quality Report

Final Air Quality Report Florida Department of TRANSPORTATION Final Air Quality Report PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida Financial Project ID: 430136-1-22-01 ETDM Project Number: 13026

More information

WOO-SR Feasibility Study (PID 90541) Feasibility Study Report April 22, 2011

WOO-SR Feasibility Study (PID 90541) Feasibility Study Report April 22, 2011 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 CHAPTER 1: INTRODUCTION... 5 1.1 Study Purpose and background... 5 1.2 Study Approach... 6 1.3 Study Area... 6 CHAPTER 2: DESCRIPTIONS OF ALTERNATIVES... 7 2.1

More information

8.0 Chapter 8 Alternatives Analysis

8.0 Chapter 8 Alternatives Analysis 8.0 Chapter 8 Alternatives Analysis The primary purpose for using CORSIM in the context of this manual is to guide the design process and program delivery. To this point in the manual, you have been given

More information

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting.

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting. On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting. Located in the heart of South Carolina, the I-20/26/126 Corridor is the crossroads of the state

More information

Alternatives Evaluation Methodology

Alternatives Evaluation Methodology Alternatives Evaluation Methodology www.vision54 56.com B 1 Phase 2 Alternatives Evaluation Methodology PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 8731 Citizens Drive New Port Richey, FL 34654 Ph

More information

CITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES

CITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES The City Engineer, under the authority of the Public Works Director and recommendations from the Traffic Engineer, will make the final decision on the need for a traffic study. The purpose of the traffic

More information

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS FINAL REPORT SEPTEMBER 2010 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 EXISTING TRAFFIC CONDITIONS 2 3.0 FUTURE TRAFFIC CONDITIONS 3 4.0 POTENTIAL IMPACTS

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design Exceptions / Waivers SPECIFIC SUBJECT: Design Exception Request Form

More information

Future Build Alternative Traffic Forecasts and Level of Service Analysis

Future Build Alternative Traffic Forecasts and Level of Service Analysis 4.2.10 Future Build Alternative Traffic Forecasts and Level of Service Analysis For the five Build Alternatives, study intersections within one mile of potential station locations were analyzed, as it

More information

Draft Preliminary Engineering Report

Draft Preliminary Engineering Report Draft Preliminary Engineering Report May, 2016 Draft Preliminary Engineering Report I 95 from north of Northlake Boulevard (MP 36.575) to south of Donald Ross Road (MP 38.775), PGA Boulevard from west

More information

Interstate 10 (SR 8)/ SR 200 (US 301) Interchange Interchange Modification Report. APPENDIX E Interchange Concepts Considered

Interstate 10 (SR 8)/ SR 200 (US 301) Interchange Interchange Modification Report. APPENDIX E Interchange Concepts Considered Interstate 10 (SR 8)/ SR 200 (US 301) Interchange Interchange Modification Report APPENDIX E Interchange Concepts Considered 112 Screening of Interchange Concepts Nine (9) interchange concepts were considered

More information

EXHIBIT A. SCOPE OF SERVICES District-Wide Traffic Operations/Safety Studies (Work Group 6.1)

EXHIBIT A. SCOPE OF SERVICES District-Wide Traffic Operations/Safety Studies (Work Group 6.1) EXHIBIT A SCOPE OF SERVICES District-Wide Traffic Operations/Safety Studies (Work Group 6.1) TABLE OF CONTENTS OBJECTIVE... 1 SERVICES... 1 PROJECT MANAGEMENT... 1 SCHEDULE/STATUS REPORTS... 2 MEETINGS...

More information

TRAFFIC STUDY GUIDELINES

TRAFFIC STUDY GUIDELINES TRAFFIC STUDY GUIDELINES December 2013 The scope of the traffic impact analysis (TIA) should follow these guidelines and the requirements of VMC 11.80.130 and VMC 11.70, transportation concurrency (attached

More information

CHAPTER 8 TRANSPORTATION ELEMENT

CHAPTER 8 TRANSPORTATION ELEMENT CHAPTER 8 TRANSPORTATION ELEMENT Section 8.01 Purpose: The purpose of this Chapter (element) is to establish the desired and projected transportation system within Niceville and to plan for future motorized

More information

1.1 Purpose of the Project

1.1 Purpose of the Project Chapter 1 Purpose and Need for East Link Project 1.1 Purpose of the Project The purpose of the East Link Project is to expand the Sound Transit Link light rail system from Seattle to Mercer Island, Bellevue

More information

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN Prepared for: City of Colorado Springs Prepared by: Felsburg Holt & Ullevig 508 South Tejon Street Colorado Springs, CO 80903

More information

I-4 Beyond the Ultimate Project Development & Environment (PD&E) Reevaluation Study FROM WEST OF SR 528 (BEACHLINE EXPRESSWAY)

I-4 Beyond the Ultimate Project Development & Environment (PD&E) Reevaluation Study FROM WEST OF SR 528 (BEACHLINE EXPRESSWAY) I-4 Beyond the Ultimate Project Development & Environment (PD&E) Reevaluation Study FROM WEST OF SR 528 (BEACHLINE EXPRESSWAY) TO WEST OF SR 435 (KIRKMAN ROAD) ORANGE COUNTY, FLORIDA Financial Project

More information

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance APPENDICES Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance D.1 Functional classification identifies the role a highway or street plays in the transportation

More information

Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance Functional classification identifies the role a highway or street plays in the transportation system. Some highways

More information

Access Operations Study: Analysis of Traffic Signal Spacing on Four Lane Arterials

Access Operations Study: Analysis of Traffic Signal Spacing on Four Lane Arterials Mn/DOT Access Management Guidelines Background Technical Report Access Operations Study: Analysis of Traffic Signal Spacing on Four Lane Arterials November 2002 Minnesota Department of Transportation Office

More information

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison T E C H N I C A L M E M O R A N D U M US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison PREPARED FOR: Mn/DOT District 7 PREPARED BY: CH2M HILL DATE: March 27, 2007 This technical

More information

This IJR demonstrates that modified access to Blaine meets the FHWA policy points, specifically:

This IJR demonstrates that modified access to Blaine meets the FHWA policy points, specifically: Executive Summary Introduction This Interchange Justification Report (IJR) documents responses to the Federal Highway Administration s (FHWA) eight policies on interchange justification to support the

More information

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES

MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES 1 st Edition City of San Luis Obispo 2035 Circulation Element 1 Table of Contents Introduction... 2 Process... 2 When Impact Studies Are Required... 3

More information

I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H FEDERAL AID PROJECT NUMBER H004100

I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H FEDERAL AID PROJECT NUMBER H004100 JULY 2016 I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H.004100 FEDERAL AID PROJECT NUMBER H004100 EAST BATON ROUGE AND WEST BATON ROUGE PARISHES, LOUISIANA Section TABLE OF

More information

MEMORANDUM: INITIAL CONCEPTS SUMMARY

MEMORANDUM: INITIAL CONCEPTS SUMMARY MEMORANDUM: INITIAL CONCEPTS SUMMARY INTRODUCTION This memo presents a summary of initial concepts that have been identified as development of the project study has progressed, along with a recommendations

More information

TOWN OF MOORESVILLE TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL TOWN OF MOORESVILLE, NORTH CAROLINA

TOWN OF MOORESVILLE TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL TOWN OF MOORESVILLE, NORTH CAROLINA TOWN OF MOORESVILLE TRANSPORTATION IMPACT ANALYSIS PROCEDURES MANUAL TOWN OF MOORESVILLE, NORTH CAROLINA Effective August 1, 2007 Amended March 4, 2013, December 1, 2014, May 1, 2017 TOWN OF MOORESVILLE,

More information

Alternatives Evaluation Report. Appendix C. Alternatives Evaluation Report

Alternatives Evaluation Report. Appendix C. Alternatives Evaluation Report s Evaluation Report Appendix C s Evaluation Report I-35W North Corridor Project EA Minnesota Department of Transportation Final Project s Report I-35W North Corridor Preliminary Design Project Report Version

More information

CITY OF MARIANNA MUNICIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL (850)

CITY OF MARIANNA MUNICIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL (850) CITY OF MARIANNA MUNICIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL 32447 (850) 482-2786 TRANSPORTATION CONCURRENCY ANALYSIS CITY OF MARIANNA CONCURRENCY MANAGEMENT SYSTEM (CMS) This form

More information

CITY OF CLOVIS Traffic Impact Study Guidelines

CITY OF CLOVIS Traffic Impact Study Guidelines CITY OF CLOVIS Traffic Impact Study Guidelines CLOVIS, A WAY OF LIFE Approved August 25, 2014 City Council Resolution 2014-79 Prepared by City of Clovis Engineering Division Steve White, City Engineer

More information

CLA /10.54, PID Project Description:

CLA /10.54, PID Project Description: Project Description: The proposed project will consist of widening IR 70 to three lanes from Enon Road (SLM 06.75) to the US 68 interchange ramps (SLM 10.55). IR 70 is a component of the Strategic Highway

More information

City of Berkeley. Guidelines for Development of Traffic Impact Reports

City of Berkeley. Guidelines for Development of Traffic Impact Reports Office of Transportation (OOT) City of Berkeley Guidelines for Development of Traffic Impact Reports Office of Transportation, City of Berkeley 1 1. Overview These guidelines provide a framework to help

More information

Vicinity Map. Interstate 605 (I-605) and State Route 91 (SR-91) in Los Angeles County

Vicinity Map. Interstate 605 (I-605) and State Route 91 (SR-91) in Los Angeles County 07 - LA - 605 - PM 2.87/PM 6.36 07 - LA - 91 - PM 14.10/PM 19.81 Vicinity Map N On Routes Interstate 605 (I-605) and State Route 91 (SR-91) in Los Angeles County I-605 between Excelsior Dr UC (PM 6.36)

More information

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines Public Works Department Traffic Impact Analysis Guidelines Revised: August 2015 TABLE OF CONTENTS INTRODUCTION... 3 PURPOSE... 3 EXEMPTIONS... 3 SCOPING... 4 METHODOLOGY... 5 STUDY AREA... 6 STUDY SCENARIOS...

More information

HIGHWAY 71 CORRIDOR IMPROVEMENT STUDY BELLA VISTA BYPASS MISSOURI STATE LINE BENTON COUNTY

HIGHWAY 71 CORRIDOR IMPROVEMENT STUDY BELLA VISTA BYPASS MISSOURI STATE LINE BENTON COUNTY HIGHWAY 71 CORRIDOR IMPROVEMENT STUDY BELLA VISTA BYPASS MISSOURI STATE LINE BENTON COUNTY DRAFT December 2017 Highway 71 Corridor Improvement Study Bella Vista Bypass to Missouri State Line BENTON COUNTY

More information

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida November 7, 2014 SUBMITTED BY: Dewberry Bowyer-Singleton 520 South

More information

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018 Project Prioritization for Urban and Rural Projects 2018 TEAM CONFERENCE March 7, 2018 Challenge Limited funding for transportation improvements requires strategic selection of projects to ensure resource

More information

Transportation Connectivity, Accessibility and Economic Opportunity Study

Transportation Connectivity, Accessibility and Economic Opportunity Study COMMERCE CORRIDOR Transportation Connectivity, Accessibility and Economic Opportunity Study Richmond Regional Transportation Planning Organization Citizens Transportation Advisory Committee 9/15/2016 Photo:

More information

Appendix B Highway 407 Interchange Review - Cochrane Street Area

Appendix B Highway 407 Interchange Review - Cochrane Street Area Appendix B Highway 407 Interchange Review - Cochrane Street Area AECOM 300 ater Street hitby, ON, Canada L1N 9J2 www.aecom.com Memorandum To Michael May, P.Eng., Town of hitby Page 1 CC Subject Greg Hardy,

More information

DDI s Can Move More Than Cars. Alex Ariniello. Presentation for the ITE Western District Annual Meeting. July, 2016 in Albuquerque, New Mexico

DDI s Can Move More Than Cars. Alex Ariniello. Presentation for the ITE Western District Annual Meeting. July, 2016 in Albuquerque, New Mexico DDI s Can Move More Than Cars Alex Ariniello Presentation for the ITE Western District Annual Meeting July, 2016 in Albuquerque, New Mexico In January, 2016, a Diverging Diamond Interchange (DDI) opened

More information

Conclusions & Lessons Learned

Conclusions & Lessons Learned What is a DDI Recommended Practices Traffic Operations Analysis Geometric Design FHWA Review Conclusions & Lessons Learned It s not about you, it s about the public Developed by Access Utah County

More information

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence. THE PROJECT A freeway segment ranked 6th worst in the Nation, with levels of congestion, pollution and accidents that are simply unacceptable and which have Statewide and National implications. Executive

More information

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.1 INTRODUCTION A preliminary environmental review was performed on the proposed freeway improvements that form Concept C, which encompasses the three freeway corridors

More information

VIII. LAND USE ISSUES

VIII. LAND USE ISSUES VIII. LAND USE ISSUES The & Route 57 Land Use and Circulation Study (Land Use Study, Figure 6) was completed for the Town of Clay in November 1999 (Clough, Harbour & Associates). This study investigated

More information

A three-stage process was implemented in order to develop and evaluate the project concepts and provide recommendations for the project.

A three-stage process was implemented in order to develop and evaluate the project concepts and provide recommendations for the project. MEMORANDUM TO: FROM: Highway 36/Rice Street PMT Mark Benson DATE: March 23, 2009 RE: Selection of a Preferred Alternative SEH No. 105803 The purpose of this memorandum is to document the process for selecting

More information

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... Amendment No. 2 to Reclamation Plan 2006-01 Traffic Impact Analysis TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX

More information

Proposed Comprehensive Update to the State of Rhode Island s Congestion Management Process

Proposed Comprehensive Update to the State of Rhode Island s Congestion Management Process Proposed Comprehensive Update to the State of Rhode Island s Statewide Planning Program January 2018 Summary Outline of of Action Steps 1. Develop Objectives for Congestion Management What is the desired

More information