1 poga Pat O Gorman & Associates CONSULTING ENGINEERS STRUCTURAL & CIVIL Engineering Planning Report Residential Scheme Earls Court Kill Co Kildare Ref: 1715-EPS(P)-R1 Date of Original Issue: July 2017 Date of Current Issue: December 2017 Revision: R1 Unit C2 Dublin 14 T

2 poga CONSULTING ENGINEERS TABLE OF CONTENTS: PAGE: 1.0 INTRODUCTION EXISTING SERVICES SURFACE WATER ATTENUATION SURFACE WATER PIPE DESIGN FOUL WATER WATER SUPPLY WATER CONSERVATION AND MANAGEMENT PLAN ROADS APPENDICES APPENDIX A FLOOD RISK MAPPING 7.2 APPENDIX B - PRECONNECTION ENQUIREY RESPONSE 7.3 APPENDIX C - RAINFALL DATA 7.4 APPENDIX D QBAR CALCULATION 7.5 APPENDIX E - ATTENUATION DESIGN 7.6 APPENDIX F SURFACE WATER PIPE DESIGN 7.7 APPENDIX G FOUL WATER PIPE DESIGN 7.8 APPENDIX G PAVED AREA FACTORS 1 P a g e

3 poga CONSULTING ENGINEERS 1.0 INTRODUCTION The subject site is located off the N7 close to the M50 and is approximately 6.32 Ha in size. It is situated to the East of the village of Kill and represents an extension of the existing Earls Court residential estate. The site is currently zoned residential. A total of 130 residential units are proposed for the site in the form of apartments, detached, semi-detached, and terraced dwellings. This report should be read in conjunction with Pat O Gorman & Associates drawings and all other Consultants reports and drawings. The engineering drainage design philosophy is outlined below and detailed calculations are contained in the Appendixes of this report. 2.0 EXISTING SERVICES Flooding Appendix A contains the predicted 1:100 year flood risk draft maps produced as part of the CFRAM program. The potential source of flooding predicted in the vicinity of the site is fluvial flooding from the adjacent Painstown and Kill Rivers which pass close to the site to the East and West respectively. The Kill river passes approximately 300m from the site but the elevation of the site, which rises towards Kill Hill, is far greater. The 100 year flood waters therefore, do not approach the site as shown on the mapping. The Painstown River is further away, approximately 1km. Once again the 100 year flooding contour is a considerable distance from the site. The steep topography may lead to a rainfall generated overland flow in the direction of the proposed development from Kill Hill. To offset the risk of associated pluvial flooding it is proposed to provide an interceptor drain running along the Eastern side of the development downhill from the elevated ground. The interceptor drain will convey pluvial rainwater to the surface water drainage system. It is anticipated that infiltration and retention time on the natural surface will be significantly greater than the impermeable surfaces within the site. The time of entry of any runoff into the surface water drainage system will be large; meaning the impact on the capacity of the sewer system will be negligible. The residual risk of flooding on the subject site therefore is considered low. Surface Water There is an existing surface water sewer running along the Western boundary of the site. This sewer was constructed as part of the original Earls Court development. The surface water drainage network in the Earls Court site discharges to a surface water sewer on the main street. It is likely that the surface water sewer ultimately outfalls at the Kill River. 2 P a g e

4 Foul Water Sewer poga CONSULTING ENGINEERS There is an existing foul water sewer running along the Western boundary of the site. This sewer was constructed as part of the original Earls Court development. Irish Water have reported that an the proposed development can be facilitated subject to upgrade works of the Irish Water Network in the area (Upper Liffey Valley Contract 2B) as set out in the pre-connection enquiry response attached in Appendix B. Following further consultation it was agreed that a phased connection of the properties may be acceptable as confirmed by Irish Water in response letter contained in Appendix B. The phasing strategy will be devised in conjunction with Irish Water in parallel with the progress of the proposed upgrade works in the area. Water There is an existing 100/ 150mm ø watermain running along the Western boundary of the site. This sewer was constructed as part of the original Earls Court development. Irish Water has reported that a water connection can be facilitated as set out in the preconnection enquiry response attached in Appendix B 3.0 SURFACE WATER The topography of the site slopes steeply, with a 1 in 15 fall from West to East. In all, there is a fall of approximately 11m across the site towards the existing housing previously developed in Earls Court. It is proposed therefore to drain the (attenuated) surface water network by gravity into the existing surface water sewer network in the Earls Court estate. Three number connections are proposed as per drawings and Attenuation In accordance with the SuDS philosophy, a Surface Water Treatment Train approach has been applied to the design of the surface water drainage on this site. The techniques that apply here suit this sites topography, ground conditions and receiving environment. The treatment train approach assures that both runoff quantity and quality are addressed, through the overall techniques of: Pollution prevention: spill prevention, recycling, public awareness and participation; Source control: conveyance and infiltration of runoff; Site control: reduction in volume and rate of surface runoff, with some treatment provided; Regional control: interception of runoff downstream from all source and site controls, to provide follow-up flow management and water quality treatment. Pollution Prevention Pollution prevention is essentially good housekeeping, since minimising or preventing pollution in the first place is more practical and cost effective than having to treat it afterwards. Thus, the best approach to urban runoff pollution is to 3 P a g e

5 poga CONSULTING ENGINEERS prevent chemical and other pollutants from coming into contact with rainfall runoff through appropriate storage and management, and through education. In this respect, it is proposed that the developer will provide information to the operator on appropriate usage of the proposed drainage systems. Source Control The second element of the treatment train is to detain or infiltrate runoff as close as possible to the point of origin. The use of such source control devices reduces the peak runoff rate and attenuates flows, thus reducing stress on downstream facilities, allowing them to be smaller in capacity. Infiltration of flows would ensure that unavoidable pollutants are treated where practicable. It is proposed to use permeable paving on the parking bays to collect the surface water, we have allowed for 5% of the run off from these areas into the pipe network, i.e. 95% infiltration. The stone under the permeable paving will help treat the water before it recharges the ground water. It is also proposed to provide a 225l rain water harvesting butt to each of the terraced & semi-detached houses to reuse the rainwater for garden use. No outside tap therefore will be required. Please refer to drawings and for drainage details. Site Control Site control comprises runoff and treatment installations to serve individual developments (or combinations of developments on adjacent sites), using elements such as attenuation tanks detention basins, permeable paving, or cellular systems. On this development it is proposed to use buried attenuation tanks for the 1:100 year event plus 20% for climate change. The system is also check for a 30 year storm event. The rainfall profile for the Naas Met-Éireann rainfall station as attached in Appendix C has been utilised. The GDSDS allows for development sites to discharge surface water at either the Greenfield or brownfield run-off rate. We are proposing to use the GDSDS recommended Qbar formula as described IN the Institute of Hydrology Report No.124 and then apply an interpolated rate for sites less than 50Ha. Using a 50ha site area, this gives an allowable outfall of 106.5l/s. The calculation of Qbar is attached in Appendix D. Two number attenuation areas are provided on the site. Attenuation area 1, for example, attenuates a site area of 3.48 Ha. By linear interpolation therefore, this gives a Qbar for the drained area of ((106.5/50) x 3.48 = 7.4 l/s. The following runs off rates factors have been applied to the scheme to calculate the Percentage Runoff or PIMP: 1. 95% from Roofs 2. 85% from Roads and Footpaths 3. 5% from Grassed s 4. 5% from Parking Bays 4 P a g e

6 poga CONSULTING ENGINEERS Storage volumes in the attenuation tank have been calculated using the 1:100 year storm events, with no surface flooding taking place in the 100 year storm event. The design storage volume is also checked against a 30 year storm. On this site it is proposed to provide a flow-control device in the form of a Hydrobrake to limit the surface water outfall rate on each of the attenuation tanks. Refer to Appendix E for attenuation design. Regional Control Regional control comprises of treatment facilities to reduce pollutants from contaminated runoff, with the potential to provide biological treatment on a catchment scale. They are often end-of-pipe facilities. 3.2 SURFACE WATER PIPE DESIGN All surface water pipes sizes and gradients are designed in accordance with the Department of Environment Recommendation for Site Development Works and Building Regulations. The pipes have been designed for a 2 year return period storm, See Appendix F for pipe design calculations. 4.0 FOUL WATER The foul water from the subject site flows to manholes within the existing Earls Court site. In total there are three number connections as set out in drawings and Irish water to advice on scheduling/ conditions in relation to these connections and the proposed upgrade works. All foul water pipes sizes and gradients are designed in accordance with the Department of Environment Recommendation for Site Development Works and Building Regulations. See Appendix G for pipe design calculations. 5.0 WATER SUPPLY It is proposed the water connection will be made at two locations to the 150mm diameter watermain in the existing Earls court housing development. The subject site will be serviced with a mixture of 100mm ø and 150mm ø HDPE watermain looping around the development. Bulk flow water meters to Irish Water s Specification will be fitted at the main connection locations to the site. Refer to drawings and for the watermain layout. 5 P a g e

7 poga CONSULTING ENGINEERS 5.1 Water Conservation and Management Plan A Bulk Water Meter shown on drawings will be installed and commissioned at this time of the connection to the existing main on the site. The specification is to be agreed with Kildare County Council prior to construction. To conserve water the following is proposed; 1. All bathrooms to be fitted with low flow fittings such as taps, shower head, etc. 2. All electrical appliances will be A energy rated. 3. All bathrooms will be fitted with dual flush toilet cisterns. 4. The building will reuse roof water for toilet flushing, gardening and laundry from the rainwater harvesting. 5. All fittings will be installed by qualified personnel and the pumping arrangement for each unit type agreed with Irish Water prior to construction. 6.0 ROADS The site is bounded to the North by Kill Road. Refer to the NRB traffic impact assessment and POGA Traffic and Transportation Statement completed as part of this submittal. Long sections, levels and sight lines of the local estate roads are also included also in this submission. Refer to drawings and and for the road details. Report prepared by; Eamonn Mahon BEng (Hons), MSc, CEng, MIEI, MIStructE Date of issue: 13th Dec P a g e

8 ENGINEERING PLANNING REPORT EARL S COURT KILL PAT O GORMAN & ASSOCIATES 1715 CONSULTING ENGINEERS DEC 2017 APPENDICES 7.1 APPENDIX A Flood Risk Mapping

9 Location Plan : Legend: Flood Extents Important User Note: The flood extents shown on these maps are based on broadscale simple analysis and may not be accurate for a specific location. Information on the purpose, development and limitations of these maps is available in the relevant reports (see Users should seek professional advice if they intend to rely on the maps in any way. If you believe that the maps are inaccurate in some way please forward full details by contacting the OPW (refer to PFRA Information leaflets or Have Your Say on Project : PRELIMINARY FLOOD RISK ASSESMENT (PFRA) Map : PFRA Indicative extents and outcomes - Draft for Consultation Figure By : : Figure No. : PJW MA 2019 / MAP / Fluvial - Indicative 1% AEP (100-yr) Event Fluvial - Extreme Event Coastal - Indicative 0.5% AEP (200-yr) Event Coastal - Extreme Event Pluvial - Indicative 1% AEP (100-yr) Event Pluvial - Extreme Event Groundwater Flood Extents Lakes / Turloughs PFRA Outcomes kj kj Probable for Further Assesment Possible for Further Assesment Office of Public Works Jonathon Swift Street Trim Co Meath Ireland Drawing Scale : 1:50, / A Date : July2011 Date : July 2011 Revision 0 Plot Scale : A3 Government of Ireland Osi permit number EN kj SALLINS kj KILL No Fluvial Data Available For No Fluvial Data Available For kj JOHNSTOWN (NE NAAS) kj NAAS No Fluvial Data Available For No Fluvial Data Available For kj BLESSINGTON No Fluvial Data Available For Kilometers

10 ENGINEERING PLANNING REPORT EARL S COURT KILL PAT O GORMAN & ASSOCIATES 1715 CONSULTING ENGINEERS DEC APPENDIX B Pre-connection Enquiry Response

11 Mr. Eamonn Mahon, Pat O Gorman & Associates Consulting Engineers., Unit C2,,, D14 CR20 15 th December 2017, Re: CUST17327 Earls Court, Kill, Co. Kildare no. dwellings Dear Mr. Mahon, Irish Water hereby confirms that it has been further consulted by Pat O Gorman & Associates regarding the proposed development consisting of 130 no. dwellings at Earls Court, Kill, Co. Kildare. The outcome of a Pre-connection enquiry process (CUST17327) concluded that a wastewater connection for this full development is feasible following completion of the Upper Liffey Valley Sewerage Scheme Contract 2B. Note that this project contains two pump stations that have already received planning permission from Kildare County Council. The current programme for construction commencement is It is anticipated that ongoing engagement regarding phasing of this development will result in the execution of Connection Services Agreement with Irish Water. Yours sincerely,. Maria O Dwyer Connections and Developer Services Manager

12 Letter Ref: CUST17327 Pat O Gorman & Associates, Unit C2,,, Dublin 14, D14CR20. 7th July 2017 Dear Sir/Madam, Re: CUST17327 pre-connection enquiry Subject to contract Contract denied Connection for 126 unit development at Earls Court, Kill Irish Water has reviewed your pre-connection enquiry in relation to water and wastewater connections at Earls Court, Kill, Co. Kildare (the Premises). Based upon the details you have provided and on the capacity currently available as assessed by Irish Water, we wish to advise you that, subject to a valid connection agreement being put in place, your proposed connection to the Irish Water network can be facilitated. In order to accomodate the proposed wastewater connection at the Premises, upgrade works are required to increase the capacity of the Irish Water network. Irish Water currently has a project (Upper Liffey Valley Contract 2B) on our current investment plan which will provide the necessary upgrade and capacity. This upgrade project is scheduled to be completed by 2021 (this may be subject to change) and the proposed connection could be completed as soon as possibly practicable after this date. Before completing the design of water services infrastructure at the Premises, and prior to submitting any planning application, you are advised to contact Irish Water. You are advised that this correspondence does not constitute an offer in whole or in part to provide a connection to any Irish Water infrastructure and is provided subject to a connection agreement being signed at a later date. A connection agreement can be applied for by completing the connection application form available at Irish Water s current charges for water and wastewater connections are set out in the Water Charges Plan as approved by the Commission for Energy Regulation. If you have any further questions, please contact Fionán Ginty from the design team on or fginty@water.ie. For further information, visit Yours sincerely, Maria O Dwyer Connections and Developer Services

13 ENGINEERING PLANNING REPORT EARL S COURT KILL PAT O GORMAN & ASSOCIATES 1715 CONSULTING ENGINEERS DEC APPENDIX C Rainfall Data

14 Extreme Rainfall Return Periods Location: Naas, Co. Kildare Average Annual Rainfall: 800 rainfall of indicated duration expected in the indicated return period. Return Period (years) Duration 1/ min min min min min min min hour hour hour hour hour hour hour Notes: Larger margins of error for 1, 2,5 and 10 minute values and for 100 year return periods M560: 16.9 M52d: 56 M560/m52d: 0.30

15 ENGINEERING PLANNING REPORT EARL S COURT KILL PAT O GORMAN & ASSOCIATES 1715 CONSULTING ENGINEERS DEC APPENDIX D QBar Calculation

16 Pat O'Gorman & Associates Page 1 Dublin 14 Date 05 December :04 Designed By Paul File Source Control W.10.4 IH 124 Mean Annual Flood Input Return Period (years) 1 Soil (Ha) Urban SAAR Region Number 15 (Greater Dublin) Results l/s QBAR Rural QBAR Urban Q 1 year 90.6 Q 1 year 90.6 Q 2 years 98.0 Q 5 years Q 10 years Q 20 years Q 25 years Q 30 years Q 50 years Q 100 years Q 200 years Q 250 years n/a Q 1000 years n/a WARNING: Irish growth curves are not defined above 200 years.

17 ENGINEERING PLANNING REPORT EARL S COURT KILL PAT O GORMAN & ASSOCIATES 1715 CONSULTING ENGINEERS DEC APPENDIX E Attenuation Design

18 Pat O'Gorman & Associates Page 1 Earls Court Kill Dublin 14 Att 1 1:100 Date Designed By EM File sw1 attenuation R1.SRC Source Control W.10.4 Summary of Results for 100 year Return Period (+20%) Critical storm not identified, please run longer storm durations. Storm Duration Control Outflow Water Level (m OD) Volume (m³) Status 15 Summer O K 30 Summer O K 60 Summer O K 120 Summer O K 180 Summer O K 240 Summer O K 360 Summer O K 15 Winter O K 30 Winter O K 60 Winter O K 120 Winter O K 180 Winter O K 240 Winter O K 360 Winter FLOOD RISK Storm Duration Rain (mm/hr) Time-Peak 15 Summer Summer Summer Summer Summer Summer Summer Winter Winter Winter Winter Winter Winter Winter

19 Pat O'Gorman & Associates Page 2 Earls Court Kill Dublin 14 Att 1 1:100 Date Designed By EM File sw1 attenuation R1.SRC Source Control W.10.4 Rainfall Details Region SCOT+NI Shortest Storm 15 Return Period (years) 100 Longest Storm 360 M Summer Storms Yes Ratio-R Winter Storms Yes Cv (Summer) Climate Change % +20 Cv (Winter) Pipe Network Volume in Pipe Network (m³) 60 Dia of Outfall Pipe Slope of Outfall Pipe (1:x) Roughness of Outfall Pipe Time / Diagram Total = Time from: to: Time from: to: Time from: to:

20 Pat O'Gorman & Associates Page 3 Earls Court Kill Dublin 14 Att 1 1:100 Date Designed By EM File sw1 attenuation R1.SRC Source Control W.10.4 Tank/Pond Details Invert Level Ground Level (m²) (m²) (m²) (m²) (m²) Hydro-Brake Outflow Control Design Head Hydro-Brake Type MD4 Invert Level Design 7.4 Diameter

21 Pat O'Gorman & Associates Page 1 Earls Court Kill Dublin 14 Att 1 1:30 Date Designed By EM File sw1 attenuation 30.SRC Source Control W.10.4 Summary of Results for 30 year Return Period (+20%) Storm Duration Control Outflow Water Level (m OD) Volume (m³) Status 15 Summer O K 30 Summer O K 60 Summer O K 120 Summer O K 180 Summer O K 240 Summer O K 360 Summer O K 480 Summer O K 600 Summer O K 720 Summer O K 960 Summer O K 1440 Summer O K 2160 Summer O K 2880 Summer O K 4320 Summer O K 5760 Summer O K 7200 Summer O K 8640 Summer O K Summer O K 15 Winter O K 30 Winter O K 60 Winter O K Storm Duration Rain (mm/hr) Time-Peak 15 Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Winter Winter Winter

22 Pat O'Gorman & Associates Page 2 Earls Court Kill Dublin 14 Att 1 1:30 Date Designed By EM File sw1 attenuation 30.SRC Source Control W.10.4 Summary of Results for 30 year Return Period (+20%) Storm Duration Control Outflow Water Level (m OD) Volume (m³) Status 120 Winter O K 180 Winter O K 240 Winter O K 360 Winter O K 480 Winter O K 600 Winter O K 720 Winter O K 960 Winter O K 1440 Winter O K 2160 Winter O K 2880 Winter O K 4320 Winter O K 5760 Winter O K 7200 Winter O K 8640 Winter O K Winter O K Storm Duration Rain (mm/hr) Time-Peak 120 Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter

23 Pat O'Gorman & Associates Page 3 Earls Court Kill Dublin 14 Att 1 1:30 Date Designed By EM File sw1 attenuation 30.SRC Source Control W.10.4 Rainfall Details Region SCOT+NI Shortest Storm 15 Return Period (years) 30 Longest Storm M Summer Storms Yes Ratio-R Winter Storms Yes Cv (Summer) Climate Change % +20 Cv (Winter) Pipe Network Volume in Pipe Network (m³) 60 Dia of Outfall Pipe Slope of Outfall Pipe (1:x) Roughness of Outfall Pipe Time / Diagram Total = Time from: to: Time from: to: Time from: to:

24 Pat O'Gorman & Associates Page 4 Earls Court Kill Dublin 14 Att 1 1:30 Date Designed By EM File sw1 attenuation 30.SRC Source Control W.10.4 Tank/Pond Details Invert Level Ground Level (m²) (m²) (m²) (m²) (m²) Hydro-Brake Outflow Control Design Head Hydro-Brake Type MD4 Invert Level Design 7.4 Diameter

25 Pat O'Gorman & Associates Page 1 Earls Court Kill Dublin 14 Att2 1:100 Date Designed By EM File sw2 attenuation R1.SRC Source Control W.10.4 Summary of Results for 100 year Return Period (+20%) Critical storm not identified, please run longer storm durations. Storm Duration Control Outflow Water Level (m OD) Volume (m³) Status 15 Summer O K 30 Summer O K 60 Summer O K 120 Summer O K 180 Summer O K 240 Summer O K 360 Summer FLOOD RISK 15 Winter O K 30 Winter O K 60 Winter O K 120 Winter O K 180 Winter FLOOD RISK 240 Winter FLOOD RISK 360 Winter FLOOD RISK Storm Duration Rain (mm/hr) Time-Peak 15 Summer Summer Summer Summer Summer Summer Summer Winter Winter Winter Winter Winter Winter Winter

26 Pat O'Gorman & Associates Page 2 Earls Court Kill Dublin 14 Att2 1:100 Date Designed By EM File sw2 attenuation R1.SRC Source Control W.10.4 Rainfall Details Region SCOT+NI Shortest Storm 15 Return Period (years) 100 Longest Storm 360 M Summer Storms Yes Ratio-R Winter Storms Yes Cv (Summer) Climate Change % +20 Cv (Winter) Pipe Network Volume in Pipe Network (m³) 23 Dia of Outfall Pipe Slope of Outfall Pipe (1:x) Roughness of Outfall Pipe Time / Diagram Total = Time from: to: Time from: to: Time from: to:

27 Pat O'Gorman & Associates Page 3 Earls Court Kill Dublin 14 Att2 1:100 Date Designed By EM File sw2 attenuation R1.SRC Source Control W.10.4 Tank/Pond Details Invert Level Ground Level (m²) (m²) (m²) (m²) (m²) Hydro-Brake Outflow Control Design Head Hydro-Brake Type MD4 Invert Level Design 4.7 Diameter

28 Pat O'Gorman & Associates Page 1 Earls Court Kill Dublin 14 Att2 1:30 Date Designed By EM File sw2 attenuation 30.SRC Source Control W.10.4 Summary of Results for 30 year Return Period (+20%) Storm Duration Control Outflow Water Level (m OD) Volume (m³) Status 15 Summer O K 30 Summer O K 60 Summer O K 120 Summer O K 180 Summer O K 240 Summer O K 360 Summer O K 480 Summer O K 600 Summer O K 720 Summer O K 960 Summer O K 1440 Summer O K 2160 Summer O K 2880 Summer O K 4320 Summer O K 5760 Summer O K 7200 Summer O K 8640 Summer O K Summer O K 15 Winter O K 30 Winter O K 60 Winter O K Storm Duration Rain (mm/hr) Time-Peak 15 Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Winter Winter Winter

29 Pat O'Gorman & Associates Page 2 Earls Court Kill Dublin 14 Att2 1:30 Date Designed By EM File sw2 attenuation 30.SRC Source Control W.10.4 Summary of Results for 30 year Return Period (+20%) Storm Duration Control Outflow Water Level (m OD) Volume (m³) Status 120 Winter O K 180 Winter O K 240 Winter O K 360 Winter O K 480 Winter O K 600 Winter FLOOD RISK 720 Winter FLOOD RISK 960 Winter FLOOD RISK 1440 Winter FLOOD RISK 2160 Winter FLOOD RISK 2880 Winter FLOOD RISK 4320 Winter O K 5760 Winter O K 7200 Winter O K 8640 Winter O K Winter O K Storm Duration Rain (mm/hr) Time-Peak 120 Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter

30 Pat O'Gorman & Associates Page 3 Earls Court Kill Dublin 14 Att2 1:30 Date Designed By EM File sw2 attenuation 30.SRC Source Control W.10.4 Rainfall Details Region SCOT+NI Shortest Storm 15 Return Period (years) 30 Longest Storm M Summer Storms Yes Ratio-R Winter Storms Yes Cv (Summer) Climate Change % +20 Cv (Winter) Pipe Network Volume in Pipe Network (m³) 23 Dia of Outfall Pipe Slope of Outfall Pipe (1:x) Roughness of Outfall Pipe Time / Diagram Total = Time from: to: Time from: to: Time from: to:

31 Pat O'Gorman & Associates Page 4 Earls Court Kill Dublin 14 Att2 1:30 Date Designed By EM File sw2 attenuation 30.SRC Source Control W.10.4 Tank/Pond Details Invert Level Ground Level (m²) (m²) (m²) (m²) (m²) Hydro-Brake Outflow Control Design Head Hydro-Brake Type MD4 Invert Level Design 4.7 Diameter

32 ENGINEERING PLANNING REPORT EARL S COURT KILL PAT O GORMAN & ASSOCIATES 1715 CONSULTING ENGINEERS DEC APPENDIX F Surface Water Pipe Design

33 Pat O'Gorman & Associates Page 1 Earls Court Kill Dublin 14 Date Designed By EM File SW1.sws System1 W.10.4 STORM SEWER DESIGN by the Modified Rational Method Global Variables ipe Size File anhole Size File S:\01 PROJECTS\2017\1715 Earls Court Kill\01 DRAWINGS\06 Design\01 Drainage\Min225.PIP C:\WinDes\STANDARD.MHS Location - Scotland & Ireland Return Period (years) 2 from Soffit to G.L M Min Vel. (m/s - Auto Design Only) 0.75 Ratio R Min Slope (1:X - Optimisation) 200 Rainfall (mm/hr) 50 Minimum Outfall Invert Foul Sewage (l/s/ha) 0.00 Ground Level at Outfall O'flow Setting (*Foul only) 0 Outfall Manhole Name Volumetric Runoff Coeff Outfall Manhole Dia/Length 0 Infiltration % 0 Outfall Manhole Width 0 Minimum Backdrop Height Designed with Level Soffits Network Design Table PN Length Fall Slope (1:X) T.E. DWF k HYD SECT DIA o o o o o o 225 Network Results Table PN Rain (mm/hr) T.C. US/IL E. E.DWF Foul Infil. Vel (m/s) CAP

34 Pat O'Gorman & Associates Page 2 Earls Court Kill Dublin 14 Date Designed By EM File SW1.sws System1 W.10.4 Network Design Table PN Length Fall Slope (1:X) T.E. DWF k HYD SECT DIA o o o o o o o o o o o o o o 225 Network Results Table PN Rain (mm/hr) T.C. US/IL E. E.DWF Foul Infil. Vel (m/s) CAP

35 Pat O'Gorman & Associates Page 3 Earls Court Kill Dublin 14 Date Designed By EM File SW1.sws System1 W.10.4 Network Design Table PN Length Fall Slope (1:X) T.E. DWF k HYD SECT DIA o o o o o 450 Network Results Table PN Rain (mm/hr) T.C. US/IL E. E.DWF Foul Infil. Vel (m/s) CAP

36 Pat O'Gorman & Associates Page 4 Earls Court Kill Dublin 14 Date Designed By EM File SW1.sws System1 W.10.4 Time Diagram Time From Time To Total Contributing = Total Pipe Volume (m³) =

37 Pat O'Gorman & Associates Page 1 Dublin 14 Date 14 December :55 Designed By Paul File SW2.sws System1 W.10.4 STORM SEWER DESIGN by the Modified Rational Method Global Variables ipe Size File anhole Size File S:\01 PROJECTS\2017\1715 Earls Court Kill\01 DRAWINGS\06 Design\01 Drainage\Min225.PIP C:\WinDes\STANDARD.MHS Location - Scotland & Ireland Return Period (years) 2 from Soffit to G.L M Min Vel. (m/s - Auto Design Only) 0.75 Ratio R Min Slope (1:X - Optimisation) 200 Rainfall (mm/hr) 50 Minimum Outfall Invert Foul Sewage (l/s/ha) 0.00 Ground Level at Outfall O'flow Setting (*Foul only) 0 Outfall Manhole Name Volumetric Runoff Coeff Outfall Manhole Dia/Length 0 Infiltration % 0 Outfall Manhole Width 0 Minimum Backdrop Height Designed with Level Soffits Network Design Table PN Length Fall Slope (1:X) T.E. DWF k HYD SECT DIA o o o o o o o 225 Network Results Table PN Rain (mm/hr) T.C. US/IL E. E.DWF Foul Infil. Vel (m/s) CAP

38 Pat O'Gorman & Associates Page 2 Dublin 14 Date 14 December :55 Designed By Paul File SW2.sws System1 W.10.4 Network Design Table PN Length Fall Slope (1:X) T.E. DWF k HYD SECT DIA o o o o o 300 Network Results Table PN Rain (mm/hr) T.C. US/IL E. E.DWF Foul Infil. Vel (m/s) CAP

39 Pat O'Gorman & Associates Page 3 Dublin 14 Date 14 December :55 Designed By Paul File SW2.sws System1 W.10.4 Time Diagram Time From Time To Total Contributing = Total Pipe Volume (m³) =

40 Pat O'Gorman & Associates Page 1 Dublin 14 Date 14 December :56 Designed By Paul File SW3.SWS System1 W.10.4 STORM SEWER DESIGN by the Modified Rational Method Global Variables ipe Size File anhole Size File S:\01 PROJECTS\2017\1715 Earls Court Kill\01 DRAWINGS\06 Design\01 Drainage\Min225.PIP C:\WinDes\STANDARD.MHS Location - Scotland & Ireland Return Period (years) 2 from Soffit to G.L M Min Vel. (m/s - Auto Design Only) 0.75 Ratio R Min Slope (1:X - Optimisation) 200 Rainfall (mm/hr) 50 Minimum Outfall Invert Foul Sewage (l/s/ha) 0.00 Ground Level at Outfall O'flow Setting (*Foul only) 0 Outfall Manhole Name Volumetric Runoff Coeff Outfall Manhole Dia/Length 0 Infiltration % 0 Outfall Manhole Width 0 Minimum Backdrop Height Designed with Level Soffits Network Design Table PN Length Fall Slope (1:X) T.E. DWF k HYD SECT DIA o o 225 Network Results Table PN Rain (mm/hr) T.C. US/IL E. E.DWF Foul Infil. Vel (m/s) CAP

41 Pat O'Gorman & Associates Page 2 Dublin 14 Date 14 December :56 Designed By Paul File SW3.SWS System1 W.10.4 Time Diagram Time From Time To Total Contributing = Total Pipe Volume (m³) = 3.532

42 ENGINEERING PLANNING REPORT EARL S COURT KILL PAT O GORMAN & ASSOCIATES 1715 CONSULTING ENGINEERS DEC APPENDIX G Foul Water Pipe Design

43 Pat O'Gorman & Associates Page 1 Dublin 14 Date 14 December :57 Designed By Paul File FW1.fws System1 W.10.4 FOUL SEWERAGE DESIGN Global Variables ipe Size File anhole Size File S:\01 PROJECTS\2017\1715 Earls Court Kill\01 DRAWINGS\06 Design\01 Drainage\Min225.PIP C:\WinDes\STANDARD.MHS Industrial (l/s/ha) 0.00 from Soffit to G.L Industrial Peak Factor 0.00 Min Vel. (m/s - Auto Design Only) 0.75 Per Person (l/per/day) Min Slope (1:X - Optimisation) 200 Persons per House 3.50 Minimum Outfall Invert Domestic (l/s/ha) 0.00 Ground Level at Outfall Domestic Peak Factor 6.00 Outfall Manhole Name O'flow Setting (*Foul only) 0 Outfall Manhole Dia/Length 0 Infiltration % 0 Outfall Manhole Width 0 Minimum Backdrop Height Designed with Level Soffits Network Design Table PN Length Fall Slope (1:X) Hse DWF k HYD SECT DIA o o o o o o o o 225 Network Results Table PN US/IL E. E.DWF E.Hse Infil. P.Dep P.Vel (m/s) Vel (m/s) CAP

44 Pat O'Gorman & Associates Page 2 Dublin 14 Date 14 December :57 Designed By Paul File FW1.fws System1 W.10.4 Network Design Table PN Length Fall Slope (1:X) Hse DWF k HYD SECT DIA o o o o o o o o o o o o 225 Network Results Table PN US/IL E. E.DWF E.Hse Infil. P.Dep P.Vel (m/s) Vel (m/s) CAP

45 Pat O'Gorman & Associates Page 1 Dublin 14 Date 14 December :57 Designed By Paul File FW2.fws System1 W.10.4 FOUL SEWERAGE DESIGN Global Variables ipe Size File anhole Size File S:\01 PROJECTS\2017\1715 Earls Court Kill\01 DRAWINGS\06 Design\01 Drainage\Min225.PIP C:\WinDes\STANDARD.MHS Industrial (l/s/ha) 0.00 from Soffit to G.L Industrial Peak Factor 0.00 Min Vel. (m/s - Auto Design Only) 0.75 Per Person (l/per/day) Min Slope (1:X - Optimisation) 180 Persons per House 3.50 Minimum Outfall Invert Domestic (l/s/ha) 0.00 Ground Level at Outfall Domestic Peak Factor 6.00 Outfall Manhole Name O'flow Setting (*Foul only) 0 Outfall Manhole Dia/Length 0 Infiltration % 0 Outfall Manhole Width 0 Minimum Backdrop Height Designed with Level Soffits Network Design Table PN Length Fall Slope (1:X) Hse DWF k HYD SECT DIA o o o o o o o o 225 Network Results Table PN US/IL E. E.DWF E.Hse Infil. P.Dep P.Vel (m/s) Vel (m/s) CAP

46 Pat O'Gorman & Associates Page 2 Dublin 14 Date 14 December :57 Designed By Paul File FW2.fws System1 W.10.4 Network Design Table PN Length Fall Slope (1:X) Hse DWF k HYD SECT DIA o o o o 225 Network Results Table PN US/IL E. E.DWF E.Hse Infil. P.Dep P.Vel (m/s) Vel (m/s) CAP

47 Pat O'Gorman & Associates Page 1 Dublin 14 Date 14 December :58 Designed By Paul File FW3.fws System1 W.10.4 FOUL SEWERAGE DESIGN Global Variables ipe Size File anhole Size File S:\01 PROJECTS\2017\1715 Earls Court Kill\01 DRAWINGS\06 Design\01 Drainage\Min225.PIP C:\WinDes\STANDARD.MHS Industrial (l/s/ha) 0.00 from Soffit to G.L Industrial Peak Factor 0.00 Min Vel. (m/s - Auto Design Only) 0.75 Per Person (l/per/day) Min Slope (1:X - Optimisation) 180 Persons per House 3.50 Minimum Outfall Invert Domestic (l/s/ha) 0.00 Ground Level at Outfall Domestic Peak Factor 6.00 Outfall Manhole Name O'flow Setting (*Foul only) 0 Outfall Manhole Dia/Length 0 Infiltration % 0 Outfall Manhole Width 0 Minimum Backdrop Height Designed with Level Soffits Network Design Table PN Length Fall Slope (1:X) Hse DWF k HYD SECT DIA o 225 Network Results Table PN US/IL E. E.DWF E.Hse Infil. P.Dep P.Vel (m/s) Vel (m/s) CAP

48 ENGINEERING PLANNING REPORT EARL S COURT KILL PAT O GORMAN & ASSOCIATES 1715 CONSULTING ENGINEERS DEC APPENDIX H Paved Factors

49 PAT O'GORMAN & ASSOCIATES Unit C2,,, Dublin 14. Tel , Fax , Consulting Structural & Civil Engineers Earls' Court Kill Calc'd Date EM 29/11/17 Subject Paved Factors 1 Site s Out Total Site = m² Roofs = 8964 m² Roads/Hardstanding = m² Green = m² Parking/Loading Bays = 3475 m² Paved Factors (PIMP Factors) Roofs = 0.90 Roads/Hardstanding = 0.85 Green = 0.05 Parking Bays = 0.05 (Permeable Paving ) PIMP = or 42.6 % 5

National Paediatric Hospital Project. Planning Application Satellite Centre, Tallaght Hospital - Engineering Report

National Paediatric Hospital Project. Planning Application Satellite Centre, Tallaght Hospital - Engineering Report National Paediatric Hospital Project Planning Application Satellite Centre, Tallaght Hospital - Engineering Report Roughan & O'Donovan Consulting Engineers Tallaght satellite centre, Dublin 24 Tallaght

More information

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives

More information

Attachment 12 Stage 1 Flood Risk Assessment (IE RP-0001)

Attachment 12 Stage 1 Flood Risk Assessment (IE RP-0001) IE0311133-22-RP-0001, Issue A 17/10/2013 Attachment 12 Stage 1 Flood Risk Assessment (IE0311133-30-RP-0001) IE0311133-22-RP-0001_A_02.DOC Flood Risk Assessment Celebrating 40 Years in Business Jazz Pharmaceuticals

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Learning objectives. Upon successful completion of this lecture, the participants will be able to: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design

More information

SuDS design criteria for catchment flood protection Are current criteria appropriate?

SuDS design criteria for catchment flood protection Are current criteria appropriate? SuDS design criteria for catchment flood protection Are current criteria appropriate? Richard Kellagher SuDS Drainage design for catchment flood protection All countries of UK (roughly) in alignment, BUT

More information

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Environmental Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Sustainable, Reliable, Affordable Stormwater Attenuation Systems Sustainable Drainage

More information

Water and Sewer connections application form. Section 1. 1a. Applicant details

Water and Sewer connections application form. Section 1. 1a. Applicant details Water and Sewer connections application form Application for new connections to the existing water and/or sewer network. Please use this application to apply for a new water connection(s) and/or sewer

More information

ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE DR-0021)

ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE DR-0021) ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE0310818-30-DR-0021) SITE SERVICES LAYOUT SHEET 2 OF 2 (IE0310818-30-DR-0022) LOCATION OF EMISSION TO SURFACE WATER (IE0310818-22-DR-

More information

Surface Water Drainage Pro-forma for major developments

Surface Water Drainage Pro-forma for major developments Surface Water Drainage Pro-forma for major developments We advise that developers complete this form and submit it to the Local Planning Authority with their planning application, referencing from where

More information

Rainwater Harvesting for Domestic Water Supply and Stormwater Mitigation

Rainwater Harvesting for Domestic Water Supply and Stormwater Mitigation Rainwater Harvesting for Domestic Water Supply and Stormwater Mitigation C Liaw 1, W Huang 2, Y Tsai 3, and, J Chen 4 1 President, Taiwan Rainwater Catchment Systems Association, Chliaw@ms41.hinet.net

More information

DESIGN OF SEWER SYSTEMS

DESIGN OF SEWER SYSTEMS Wastewater Engineering (MSc program) DESIGN OF SEWER SYSTEMS Prepared by Dr.Khaled Zaher Assistant Professor, Public Works Engineering Department, Faculty of Engineering, Cairo University 1. Sewer Materials

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

Module 2 : System of Sanitation. Lecture 2 : System of Sanitation

Module 2 : System of Sanitation. Lecture 2 : System of Sanitation 1 P age Module 2 : System of Sanitation Lecture 2 : System of Sanitation 2 P age 2.1 BACKGROUND For safe disposal of the sewage generated from a locality efficient collection, conveyance, adequate treatment

More information

Water supply components

Water supply components Water supply components Water sources structures (Dams, wells, reservoirs) Surface water Groundewater Pipelines from source Water treatment plant components Pumping stations Storage (elevated tanks) Distribution

More information

ENGINEERING INFRASTRUCTURE REPORT 32 & 34 TENNYSON AVE, TAKAPUNA ISSUED FOR RESOURCE CONSENT

ENGINEERING INFRASTRUCTURE REPORT 32 & 34 TENNYSON AVE, TAKAPUNA ISSUED FOR RESOURCE CONSENT ENGINEERING INFRASTRUCTURE ENGINEERING INFRASTRUCTURE REPORT 32 & 34 TENNYSON AVE, TAKAPUNA ISSUED FOR RESOURCE CONSENT Job No 37240R#C Date May 17 Level 1, 12 14 Como Street, PO Box 33 426, Takapuna,

More information

Attachment 1. Updated Infrastructure Assessment Report

Attachment 1. Updated Infrastructure Assessment Report Attachment 1 Updated Infrastructure Assessment Report Infrastructure Assessment Report Prepared for Bloom St Georges Limited 21 Swanson Road, Henderson,, Auckland Prepared by Terra Group NZ Ltd. June 2016

More information

Design of Sewerage System for Jaffarpur area in Southwest New Delhi

Design of Sewerage System for Jaffarpur area in Southwest New Delhi International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 1 (2014), pp. 29-34 Research India Publications http://www.ripublication.com/ijcer.htm Design of Sewerage System for

More information

Building over or close to a public sewer

Building over or close to a public sewer Building over or close to a public sewer Place holder image thameswater.co.uk/developerservices Building over or close to a public sewer Did you know Thames Water is legally responsible for more than 100,000

More information

La Riereta Catchment Sant Boi de Llobregat

La Riereta Catchment Sant Boi de Llobregat La Riereta Catchment Sant Boi de Llobregat Final Report Team 2 Enrique Amaya (COL) Lilian Yamamoto (BRA) Martín Pez (ARG) Sergio Esquivel (MEX) Instructor: José Macor Summary Contents 1. Introduction...

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Initial Construction Costs For Various Pavement and Drainage Options

Initial Construction Costs For Various Pavement and Drainage Options Interpave Initial Construction Costs For Various Pavement and Drainage Options Final Prepared For Interpave Scott Wilson Ltd Interpave Pavement Design CONTENTS 1. Overview 2. Summary of Pavement Types

More information

Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE

Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE 10th International Drainage Workshop of ICID 06.-11. July 2008 Flood risk management and land use planning in changing climate conditions Mikko Huokuna Finnish Environment Institute, SYKE Background hydrological

More information

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1)

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1) 525 Golden Gate Avenue, 11th Floor San Francisco, CA 94102 EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1) The following example Stormwater Management Plans (SMPs) are provided

More information

Drainage, Sewerage System, Groundwater and Surface Water drainage

Drainage, Sewerage System, Groundwater and Surface Water drainage Drainage, Sewerage System, Groundwater and Surface Water drainage Summary There are significant impacts to the community from high levels of groundwater on a regular basis. In extreme cases, these can

More information

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report Prepared for: Cameron McCarthy Landscape Architects LLP

More information

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL INTRODUCTION The District developed a hydraulic model of the sanitary sewer system as part the 2000 Wastewater Comprehensive Plan. The output from this model

More information

S.O.P. No. HMD

S.O.P. No. HMD Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT

More information

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Storm Sewer Design Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Major floods are dramatic and water flow routes must be recognized when minor drainage systems fail. These types

More information

SEPARATORS A RANGE OF FUEL/OIL SEPARATORS FOR PEACE OF MIND

SEPARATORS A RANGE OF FUEL/OIL SEPARATORS FOR PEACE OF MIND SEPARATORS A RANGE OF FUEL/OIL SEPARATORS FOR PEACE OF MIND Separators A RANGE OF FUEL/OIL SEPARATORS FOR PEACE OF MIND Surface water drains normally discharge to a watercourse or indirectly into underground

More information

North West Cambridge Potable Water Supply Strategy

North West Cambridge Potable Water Supply Strategy North West Cambridge Potable Water Supply Strategy NWC1-URS-SW-SWD-XX- RPT-CE-0003 P03 For Information Prepared for: University of Cambridge UNITED KINGDOM & IRELAND ISSUE SCHEDULE Issue Date Details Prepared

More information

The role of domestic rainwater harvesting systems in storm water runoff mitigation

The role of domestic rainwater harvesting systems in storm water runoff mitigation European Water 58: 497-53, 217. 217 E.W. Publications The role of domestic rainwater harvesting systems in storm water runoff mitigation I. Gnecco *, A. Palla and P. La Barbera Department of Civil, Chemical

More information

CTCN assistance in Thailand

CTCN assistance in Thailand CTCN assistance in Thailand Strengthening Bangkok s Early Warning System to respond to climate induced flooding Deliverable 2 (Activity 1.2.1) Mapping and understanding of the existing BMA data management

More information

ROYAL ARSENAL Buildings 10, 11 and Royal Carriage Square Foul Sewage & Utilities Report

ROYAL ARSENAL Buildings 10, 11 and Royal Carriage Square Foul Sewage & Utilities Report ROYAL ARSENAL Buildings 10, 11 and Royal Carriage Square Foul Sewage & Utilities Report Submitted to Berkeley Homes (East Thames) Limited Submitted by AECOM Scott House Alençon Link Basingstoke Hampshire

More information

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7: Hydraulic Design of Sewers and Storm Water Drains

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7: Hydraulic Design of Sewers and Storm Water Drains Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7: Hydraulic Design of Sewers and Storm Water Drains 7.0 HYDRAULIC DESIGN OF SEWERS AND STORM WATER DRAINS 7.1 General Consideration

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS

SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS Page 4-1 INTRODUCTION 4-3 4-1.01 Applicability of VMCs 14.24, 14.25, 14.26 4-4 4-1.02 Minimum Requirements - Projects Below Threshold

More information

Issue paper: Aquifer Water Balance

Issue paper: Aquifer Water Balance Issue paper: Aquifer Water Balance 1. Introduction And Background 1.1. Purpose and Scope The population in Kitsap County has grown rapidly in recent years and is expected to increase substantially in the

More information

Taking the pain out of the treatment train: continuous simulation modelling for integrated water management

Taking the pain out of the treatment train: continuous simulation modelling for integrated water management Engineers & Consultants Taking the pain out of the treatment train: continuous simulation modelling for integrated water management Stu Farrant & Reuben Ferguson, Morphum Environmental Limited Abstract

More information

Flood Consequence Assessment. Proposed Commercial Development, Tank Farm Way, Sully

Flood Consequence Assessment. Proposed Commercial Development, Tank Farm Way, Sully Flood Consequence Assessment Proposed Commercial Development, Tank Farm Way, Sully Client O Reilly Concrete Group Larchfield Kingscourt County Cavan Ireland By RVW Consulting 6 Neptune Court Vanguard Way

More information

Design criteria, Flooding of sewer systems in flat areas.

Design criteria, Flooding of sewer systems in flat areas. Design criteria, Flooding of sewer systems in flat areas. Ir Harry. Van Luijtelaar Tauw bv, P.O. box 830, 7400 AV Deventer, The Netherlands, Telephone +31570699304, Fax +31570699666, E-mail hlj@tauw.nl.

More information

6.1 Introduction to Wastewater Issues

6.1 Introduction to Wastewater Issues Section 6: Water Pollution This Section will help you: Understand if you generate industrial wastewater; Understand where your wastewater goes; Make sure you meet requirements for floor drains; Properly

More information

ROOF TOP RAIN WATER HARVESTING. Manohar Patil

ROOF TOP RAIN WATER HARVESTING. Manohar Patil ROOF TOP RAIN WATER HARVESTING Manohar Patil Why harvest rainwater To arrest ground water To beneficiate water quality in aquifers To conserve surface water runoff To reduce soil erosion What is Rainwater

More information

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines Pennsylvania Stormwater Best Management Practices Manual Chapter 3 Stormwater Management Principles and Recommended Control Guidelines 363-0300-002 / December 30, 2006 Chapter 3 Stormwater Management Principles

More information

LAYING IBSTOCK CLAY PAVERS FOR PERMEABLE PAVEMENTS

LAYING IBSTOCK CLAY PAVERS FOR PERMEABLE PAVEMENTS PERMEABLE PAVEMENTS (SUDS) This leaflet highlights the basic requirements for laying Ibstock clay pavers to form a permeable pavement. Ibstock clay pavers are intended for domestic use only i.e. patios

More information

APPENDIX G HYDRAULIC GRADE LINE

APPENDIX G HYDRAULIC GRADE LINE Storm Drainage 13-G-1 APPENDIX G HYDRAULIC GRADE LINE 1.0 Introduction The hydraulic grade line is used to aid the designer in determining the acceptability of a proposed or evaluation of an existing storm

More information

Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity

Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity 9th International Conference on Urban Drainage Modelling, Belgrade 2012 C4. Climate change impacts, pp.287-288 Modelling Climate Change and Urbanization Impacts on Urban Stormwater and Adaptation Capacity

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF Mutchmor Public School Addition 185 Fifth Avenue Ottawa, Ontario Report No. 12073-SB February 15, 2013 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage

More information

Developer Services. Building over or near a sewer. DEV 005G Guidance notes and procedure. What is a public sewer?

Developer Services. Building over or near a sewer. DEV 005G Guidance notes and procedure. What is a public sewer? Developer Services DEV 005G Guidance notes and procedure Building over or near a sewer If you are thinking of building a structure (for example, a new building, extension, conservatory, garage etc.) you

More information

Appendix B. Storm Drain System Data

Appendix B. Storm Drain System Data MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendix Appendix B. Storm Drain System Data June 2017 MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO

More information

PERMEABLE PAVEMENTS FREQUENTLY ASKED QUESTIONS

PERMEABLE PAVEMENTS FREQUENTLY ASKED QUESTIONS Question: Why should I consider using a permeable pavement? Answer: Planning for climate change is today a major driver for construction and the built environment. Environment Agency research following

More information

Flood Risk Assessment

Flood Risk Assessment Temporary Shale Gas Exploration Roseacre Wood, Lancashire PNR_PL_ June 2014 Contents 1 Introduction 1 2 Development Description and Location 2 Page 2.1 Location 2 2.2 Existing Site Characteristics 3 2.3

More information

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E. \ Memorandum SSPEED Center at Rice University Department of Civil & Environmental Engineering 6100 Main MS-317 Houston, Texas 77005-1827 sspeed.rice.edu tel: 713-348-4977 To Andy Yung, P.E. CFM; Lane Lease,

More information

New connection to a public sewer

New connection to a public sewer New connection to a public sewer Application form You can go to our website thameswater.co.uk/buildover and apply online or complete this form and return to Thames Water, Developer Services, Clearwater

More information

City of Saint John. Storm Drainage Design Criteria Manual

City of Saint John. Storm Drainage Design Criteria Manual Storm Drainage Design Criteria Manual March 7, 2016 LIST OF 2016 REVISIONS PAGES SECTION TITLE iii, iv, v, vi All Table of Contents 31-35 3 SUBMISSION REQUIREMENTS March 7, 2016 Page i DISCLAIMER The material

More information

Urban Rainwater Harvesting Systems: Promises and Challenges

Urban Rainwater Harvesting Systems: Promises and Challenges TheWaterChannel Webinar #5 Urban Rainwater Harvesting Systems: Promises and Challenges By Vishwanath S Zenrainman@gmail.com www.ircsa.org www.rainwaterclub.org Thanks for coming. The webinar will begin

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

SEWER SYSTEM DESIGN GUIDELINES

SEWER SYSTEM DESIGN GUIDELINES SEWER SYSTEM DESIGN GUIDELINES PART 1 GENERAL 1.1 GENERAL GUIDELINES A. The following sewer system design guidelines are based on Federal, State and Local health requirements, and the Berkeley County Water

More information

WESTMEATH COUNTY COUNCIL

WESTMEATH COUNTY COUNCIL WESTMEATH COUNTY COUNCIL AL RIVER IMPROVEMENTS PRELIMINARY REPORT Document Title : Report Document Ref(s). : 685/01/1b/Report Date Edition/Rev Status Originator Checked Approved July 2001 First Draft Pat

More information

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan TES Industrial Development Lacombe County Outline Plan 112849297 June 2012 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc i Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE... 1

More information

Greater Dublin Drainage Alternative Sites Assessment and Route Selection Report (Phase 4) Greater Dublin Drainage

Greater Dublin Drainage Alternative Sites Assessment and Route Selection Report (Phase 4) Greater Dublin Drainage Greater Dublin Drainage June 2013 Document control sheet P 04 F8 Client: Fingal County Council Project: Greater Dublin Drainage Job No: 32102900 Document Title: ASA Stage 4: Sites Assessment and Route

More information

1956 Altona Road, City of Pickering Functional Servicing and Stormwater Management Report. Marshall Homes. Project # E15031

1956 Altona Road, City of Pickering Functional Servicing and Stormwater Management Report. Marshall Homes. Project # E15031 1956 Altona Road, City of Pickering Functional Servicing and Stormwater Management Report Marshall Homes Project # E15031 August 2016 Table of Contents 1.0 Introduction and Background... 1 2.0 Existing

More information

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) Hydromodification design criteria for the North Orange County permit area are based on the 2- yr, 24-hr

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... 4.17-1 4.17.0 Introduction... 4.17-1 4.17.1 Methodology... 4.17-2 4.17.2 Existing Conditions... 4.17-2 4.17.3 Impacts... 4.17-4 4.17.4 Applicant-Proposed

More information

Flood hazard assessment in the Raval District of Barcelona using a 1D/2D coupled model

Flood hazard assessment in the Raval District of Barcelona using a 1D/2D coupled model 9 th International Conference on Urban Drainage Modelling Belgrade 2012 Flood hazard assessment in the Raval District of Barcelona using a 1D/2D coupled model Beniamino Russo, David Suñer, Marc Velasco,

More information

MODELING AND RELIABILITY OF RAINWATER HARVESTING SYSTEM AT EDUCATIONAL INSTITUTION

MODELING AND RELIABILITY OF RAINWATER HARVESTING SYSTEM AT EDUCATIONAL INSTITUTION MODELING AND RELIABILITY OF RAINWATER HARVESTING SYSTEM AT EDUCATIONAL INSTITUTION Abstract Thamer Ahmad Mohammad, Abdul Halim Ghazali, Megat Johari Megat Mohd. Noor Department of Civil Engineering Faculty

More information

5.3 Flood Protection Plan

5.3 Flood Protection Plan 5.3 Flood Protection Plan 5.3.1 Existing Conditions (1) Land Elevation The majority of land in the study area is characterized as undeveloped land such as agricultural, unused land and forests which have

More information

Regulations and applications of SUDS technology in Scotland

Regulations and applications of SUDS technology in Scotland Namur workshop, November 2014 Regulations and applications of SUDS technology in Scotland Dr BJ D Arcy Independent environmental consultant Research Fellow Abertay University Chair Scottish Green Infrastructure

More information

Wairaka Precinct (Unitec) Wastewater Servicing

Wairaka Precinct (Unitec) Wastewater Servicing mps limited 29 Chamberlain Street Grey Lynn, Auckland 1021 Ph: 021 899 221 30 October 2015 Unitec Institute of Technology Private Bag 92025 Victoria Street West Auckland 1142 Attention: Will Smith Dear

More information

Tucson Water s Rainwater Harvesting Incentive Workshop Provided as a community service by

Tucson Water s Rainwater Harvesting Incentive Workshop Provided as a community service by Tucson Water s Rainwater Harvesting Incentive Workshop Provided as a community service by A 501(c)3 Non-profit organization Rainwater Harvesting Systems Capturing rainwater for beneficial use 1. Harvest

More information

APPENDIX D STORMWATER QUALITY CONTROL INFORMATION AND INFILTRATION SIZING

APPENDIX D STORMWATER QUALITY CONTROL INFORMATION AND INFILTRATION SIZING APPENDIX D STORMWATER QUALITY CONTROL INFORMATION AND INFILTRATION SIZING Source: TRCA/CVC LID Plannign and Design Guide (Version 1.0) Figure 4.10.5 Schematic of perforated pipe system integrated with

More information

RAINWATER HARVESTING SYSTEMS FOR DOMESTIC APPLICATIONS

RAINWATER HARVESTING SYSTEMS FOR DOMESTIC APPLICATIONS RAINWATER HARVESTING SYSTEMS FOR DOMESTIC APPLICATIONS Rainwater Harvesting The Kingspan Klargester portfolio of Rainwater Harvesting products offer economical solutions for water conservation in the home

More information

FUN NCTIONAL SER RVICING AN ND STO R MA ORMWATER ANAGEMENT PREPARED FOR: CITY O 333 AN REET EAST ND 351 KING STR OF TORONTO VICTORIA PA

FUN NCTIONAL SER RVICING AN ND STO R MA ORMWATER ANAGEMENT PREPARED FOR: CITY O 333 AN REET EAST ND 351 KING STR OF TORONTO VICTORIA PA FUN NCTIONAL SER RVICING AN ND STO ORMWATER R MA ANAGEMENT T RE PORT 333 AN ND 351 KING STR REET EAST P PREPARED FOR: CITY O OF TORONTO F IRST GULF COR PORATION 3 751 VICTORIA PA ARK AVENUE T TORONTO,

More information

Lecture 9A: Drainage Basins

Lecture 9A: Drainage Basins GEOG415 Lecture 9A: Drainage Basins 9-1 Drainage basin (watershed, catchment) -Drains surfacewater to a common outlet Drainage divide - how is it defined? Scale effects? - Represents a hydrologic cycle

More information

Modelling Stormwater Contaminant Loads in Older Urban Catchments: Developing Targeted Management Options to Improve Water Quality

Modelling Stormwater Contaminant Loads in Older Urban Catchments: Developing Targeted Management Options to Improve Water Quality Modelling Stormwater Contaminant Loads in Older Urban Catchments: Developing Targeted Management Options to Improve Water Quality Frances J. CHARTERS 1, Thomas A. COCHRANE 1, Aisling D. O SULLIVAN 1 1

More information

COLDRA WOODS HOTEL BY CELTIC MANOR AND STARBUCKS DRIVE- THRU RESTAURANT Flood Consequences Assessment

COLDRA WOODS HOTEL BY CELTIC MANOR AND STARBUCKS DRIVE- THRU RESTAURANT Flood Consequences Assessment COLDRA WOODS HOTEL BY CELTIC MANOR AND STARBUCKS DRIVE- THRU RESTAURANT Flood Consequences Assessment APRIL 2017 CONTACTS JOSHUA MOORE Graduate Hydrologist dd ++44 (0) 117 372 1238 joshua.moore@arcadis.com

More information

Review & Design of the Apia Pressure Sewer System. Presented by Jammie Saena - Samoa Water Authority & Paul Edwards Urban Water Solutions

Review & Design of the Apia Pressure Sewer System. Presented by Jammie Saena - Samoa Water Authority & Paul Edwards Urban Water Solutions Review & Design of the Apia Pressure Sewer System Presented by Jammie Saena - Samoa Water Authority & Paul Edwards Urban Water Solutions 1 Contents Project Background Project Team Data Collection Physical

More information

Prepared by Irwin Juckes, PhD (Microbiology), MBA

Prepared by Irwin Juckes, PhD (Microbiology), MBA COMMENT ON DRAFT ENVIRONMENTAL IMPACT ASSESSMENT FOR LINKSFIELD MIXED USE INCLUSIONARY DEVELOPMENT (REFERENCE GAUT: 002/13-14/EO153) Prepared by Irwin Juckes, PhD (Microbiology), MBA Table of Contents

More information

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar Hydrology and Water Management Dr. Mujahid Khan, UET Peshawar Course Outline Hydrologic Cycle and its Processes Water Balance Approach Estimation and Analysis of Precipitation Data Infiltration and Runoff

More information

DIVISION 5 STORM DRAINAGE CRITERIA

DIVISION 5 STORM DRAINAGE CRITERIA DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the

More information

Stormwater Management System Project Review

Stormwater Management System Project Review TRANSIT NEW ZEALAND SH1 AVALON DRIVE BYPASS Project Review TRANSIT NEW ZEALAND TRANSIT NEW ZEALAND SH1 AVALON DRIVE BYPASS Project Review Prepared By Emma Innocente Environmental Engineer Cedric Malaval

More information

Estimation of Parameters and Flow Characteristics for the Design of Sanitary Sewers in Malaysia

Estimation of Parameters and Flow Characteristics for the Design of Sanitary Sewers in Malaysia Estimation of Parameters and Flow Characteristics for the Design of Sanitary Sewers in Malaysia KAMRAN ANSARI*, ZAHEER AHMED ALMANI*, AND NAEEM AZIZ MEMON* RECEIVED ON 25.02.2012 ACCEPTED ON 18.09.2012

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

HYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY

HYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY HYDRAULIC HYDRODYNAMIC MODELING AS AN EFFECTIVE MANAGEMENT TOOL FOR LARGE COLLECTION SYSTEMS - THE L.A. STORY Fernando Gonzalez, Adel Hagekhalil, Bryan Trussell, City of Los Angeles Bureau of Sanitation

More information

Chapter 8 Addressing I/I Issues and High Flows

Chapter 8 Addressing I/I Issues and High Flows Chapter Outline Chapter 8 Addressing I/I Issues and High Flows This chapter is organized into the following sections: Introduction Background Estimation of Infiltration Volume Conveyance Costs Effect of

More information

SANITARY SEWER FEASIBILITY STUDY AND REPORT NORTH SEBASTIAN AREA

SANITARY SEWER FEASIBILITY STUDY AND REPORT NORTH SEBASTIAN AREA SANITARY SEWER FEASIBILITY STUDY AND REPORT FOR THE NORTH SEBASTIAN AREA INDIAN RIVER COUNTY, FLORIDA November 2013 Prepared for: Indian River County Utilities Prepared by: MASTELLER & MOLER, INC. ~ CONSULTING

More information

Review of State and Federal Stormwater Regulations November 2007

Review of State and Federal Stormwater Regulations November 2007 Review of State and Federal Stormwater Regulations November 2007 By: James T. Spaulding, PE, CPESC Joseph M. Ducharme, Jr., PE TTG ENVIRONMENTAL CONSULTANTS, LLC 27 LOCKE ROAD, CONCORD, NH 03301-5301 TELEPHONE:

More information

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX H H.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

124 MODERN SEWER DESIGN

124 MODERN SEWER DESIGN 14 MODERN SEWER DESIGN Fabricated fittings are hydraulically superior. 5. HYDRAULIC DESIGN OF STORM SEWERS CHAPTER 5 Hydraulic Design of Storm Sewers 15 The hydraulic design of a sewer system may have

More information

Water too much and too little. HWU, School of the Built Environment. EDINBURGH and DUBAI.

Water too much and too little. HWU, School of the Built Environment. EDINBURGH and DUBAI. Water too much and too little. Water too much and too little. Welcome to the Dubai Campus of Heriot Watt University and to the School of the Built Environment. Edinburgh and Dubai Water too much and too

More information

Julia Bahen, Urban Strategies Inc.

Julia Bahen, Urban Strategies Inc. THE MUNICIPAL INFRASTRUCTURE GROUP LTD. 8800 Dufferin Street, Suite 200 Vaughan, Ontario L4K 0C5 T 905.738.5700 F 905.738.0065 www.tmig.ca TECHNICAL MEMORANDUM DATE June 13, 2017 TO CC SUBJECT FROM PROJECT

More information

Phil Mashoko(Pr Eng) Director: W & S City of Cape Town South Africa

Phil Mashoko(Pr Eng) Director: W & S City of Cape Town South Africa Phil Mashoko(Pr Eng) Director: W & S City of Cape Town South Africa SECURITY OF WATER SUPPLY It is the ability to continuously produce and supply safe drinking water to the enduser ASSURANCE RISK LEVEL

More information

Understanding flood risk

Understanding flood risk Guides for Community Emergency Volunteers Understanding flood risk The Guides for Community Emergency Volunteers series has been developed in collaboration with: 2 The series has been funded through grants

More information

Quantity of sewage. Dry weather flow: Domestic and industrial wastewater (Base flow) including inflow, infiltration and exfiltration

Quantity of sewage. Dry weather flow: Domestic and industrial wastewater (Base flow) including inflow, infiltration and exfiltration Quantity of sewage Quantity of sewage depends on Dry weather flow and storm water Dry weather flow: Domestic and industrial wastewater (Base flow) including inflow, infiltration and exfiltration Infiltration

More information

Boise City Public Works General Drainage Plan Review Requirements Checklist

Boise City Public Works General Drainage Plan Review Requirements Checklist Boise City Public Works General Drainage Plan Review Requirements Checklist Development Name Bldg. Permit # Drainage Reviewer Site Address Initial Review Date ODI Number Designer Company Name Treated Acres

More information

development impact assessment (DIA)

development impact assessment (DIA) application for a development impact assessment (DIA) Form E Important Please te there may have been significant changes to the requirements/process since you last used this form. We only accept electronic

More information

PALMERSTON NORTH CITY PALMERSTON NORTH STORMWATER DRAINAGE BYLAW. Administration Manual

PALMERSTON NORTH CITY PALMERSTON NORTH STORMWATER DRAINAGE BYLAW. Administration Manual PALMERSTON NORTH CITY PALMERSTON NORTH STORMWATER DRAINAGE BYLAW 2015 Administration Manual 1 Contents Part One Introduction... 4 Part Two Standard Conditions For Stormwater Connections... 5 Appendix 1

More information