Wendy Landry, AIA, LEED AP Richard Rodriguez, LEED AP
|
|
- Joshua Bryan
- 6 years ago
- Views:
Transcription
1 Wendy Landry, AIA, LEED AP Richard Rodriguez, LEED AP Wendy Landry, Associate Principal, Green Building Services 112 Lake Ave., Orlando, FL 32801, , Richard Rodriguez, Project Director, WELBRO Building Corporation 2301 Maitland Center Parkway, #250, Maitland, FL 32751, ,
2 How is Cost Defined? Design Approach Design/Construction Process Key Steps to Success Cost Breakdown Benefits Conclusion: How is the Question Answered? Q&A
3 At the end of this course you will: Recognize the impacts of design and construction decisions on: The Project Budget LEED Certification Potential Be aware of approaches to cost modeling Understand the difference between Conventional and Integrated Design Understand the benefits of LEED certification
4
5 Perception 19% Perception 17% Reality 40% Reality 0 5% Source: World Business Council for Sustainable Development Energy Efficiency in Buildings: Business realities and opportunities, Summary Report
6 Hard Cost Renovation Costs Project Cost Soft Cost Employee Health & Benefits Operating Expense
7
8 Design to meet code minimum standards Design to meet optimized environmental standards Component Driven Integrated Seeks Compliance Seeks Optimization
9 timeless and durable carbon-neutral market differentiation daylight and views for occupants increase productivity 40% better than ASHRAE building as educational tool healthy interiors minimum 10% ROI
10 Planning, Site Selection, Programming Design Development Construction Administration Schematic Design Construction Documents Occupancy and Ongoing Operations
11 Start SD CD Construction Occupancy Program DD Bid Eco-Charrette Calculations & Analysis Prebid Conference Specifications Construction Administration Preconstruction Conference Submittal Review Submit Documentation Preliminary Review Energy Modeling Commissioning Program SD DD CD Bid Construction
12 High Skeptical participant Company is highly motivated by CSR Leader Willing to drive/lead adoption but individual is not convinced Needs clear argument for why Convince Why Believes in the economics, the climate impact and the regulatory incentives Personal Know-how Educate how Educate how Low Unengaged Very low knowledge levels Pessimistic about doability Unengaged on environmental issues Convince Why Uninformed enthusiast Pessimistic about the economics, the climate impact and the incentives Doesn t know how to get involved Passionate about the environment Low Personal commitment High Source: World Business Council for Sustainable Development
13 Can-do attitude Open communication Willing to invest time Leader Willing to drive/lead adoption Believes in the economics, the climate impact and the regulatory incentives
14
15 80,192 sq ft, 3-stories Programs: Dental Hygiene CVT-Cardiovascular Technology Radiology Respiratory Therapy General Sciences Biology & Micro-Biology General, Organic, & Inorganic Chemistry
16 17,333 sq ft, one story Program areas: Assembly spaces State of the Art Meeting Spaces Architectural Design Studio Culinary Arts kitchen Front porch design with specific building orientation to capture sunlight year round Modern interpretation of Florida Vernacular Mauricio Maso, HuntonBrady Architects
17
18 The Creation, Exploration, and Presentation of Ideas The program is identified
19 The Total Sum of Money set aside or needed for a purpose The Budget is established The budget is established
20 Design a Facility that: Meets the Needs of the Desired Program Is in Alignment with the Facility Standards Environmental Goals Energy Conservation Goals Does Not Exceed the Master Budget
21 Understand Client Expectations Establish Building Imagery/Architecture Program Verification Sustainability Requirements Occupancy / Fiscal Projections Prepare initial project budgets
22 Establish Global Design Parameters Department Team Meetings Understand Client Operational Needs Confirm sustainability requirements Provide alternative design solutions Prepare schematic construction budget
23 Design and Engineering Detail building systems MEP selected and sized Initiate project pre-plan process Constructability reviews
24 All details come together Finalize equipment selection Selection of finishes look & feel Complete constructability and quality control reviews Prepare GMP
25
26 Cross check phases Open communication Follow-through Monitor goals & objectives
27
28 Description Total General Requirements (Division 1) 692,653 Division ,097,040 TOTAL ALL DIVISIONS 16,089,653 G/Cs & Contingencies 1,559,203 TOTAL COST OF WORK 17,648,856 Fees & Insurance 1,120,192 TOTAL PROPOSED GMP $19,469,048
29 Description Total General Requirements (Division 1) 346,836 Division ,215,294 TOTAL ALL DIVISIONS 4,562,130 G/Cs & Contingencies 369,149 TOTAL COST OF WORK 4,931,279 Fees & Insurance 318,721 TOTAL PROPOSED GMP $5,250,000
30 Description Schematic Design Design Development GMP General Requirements (Division 1) 750,000 Division ,227,844 TOTAL ALL DIVISIONS 15,977,844 G/Cs & Contingencies 1,057,433 TOTAL COST OF WORK 17,035,277 Fees & Insurance 1,715,459 TOTAL PROPOSED GMP $18,750, ,000 16,019,853 16,769,853 1,074,845 17,844,698 1,715,459 $19,560, ,653 16,097,040 16,089,653 1,559,203 17,648,856 1,120,192 $19,469,048 LEED Category Schematic Design April 2007 Yes Maybe No Design Development March 2008 Yes Maybe No GMP July 2009 Yes Maybe No SUSTAINABLE SITES WATER EFFICIENCY ENERGY & ATMOSPHERE MATERIALS & RESOURCES INDOOR ENVIRONMENTAL QUALITY INNOVATION & DESIGN TOTALS
31 Description Schematic Design Design Development GMP General Requirements (Division 1) 250,000 Division ,437,357 TOTAL ALL DIVISIONS 4,687,357 G/Cs & Contingencies 411,260 TOTAL COST OF WORK 5,098,617 Fees & Insurance 402,396 TOTAL PROPOSED GMP $5,501, ,000 4,338,505 4,588, ,260 4,999, ,396 $5,402, ,836 4,215,294 4,562, ,149 4,931, ,721 $5,250,000 LEED Category Schematic Design December 2006 Yes Maybe No Design Development December 2007 Yes Maybe No GMP January 2009 Yes Maybe No SUSTAINABLE SITES WATER EFFICIENCY ENERGY & ATMOSPHERE MATERIALS & RESOURCES INDOOR ENVIRONMENTAL QUALITY INNOVATION & DESIGN TOTALS
32
33 By Lisa Fay Matthiessen and Peter Morris
34 Examines 221 buildings 83 at some level of LEED Certified 138 no goal of LEED Certification Building on a previous study Costing Green: A Comprehensive Cost Database and Budget Methodology Released in 2004 Basically the same findings
35 Library Buildings Community Centers Ambulatory Care Facilities Academic Buildings Laboratory Buildings
36 Source: Cost of Green Revisited
37 Source: Cost of Green Revisited
38 Source: Cost of Green Revisited
39 VCC Special Events Center $302/SF Source: Cost of Green Revisited
40 VCC Allied Health & Sciences $243/SF Source: Cost of Green Revisited
41 Findings Many projects are achieving LEED within their budgets, and in the same cost range as non-leed projects Construction costs have risen dramatically, but projects are still achieving LEED The idea that green is an added feature continues to be a problem
42 Conclusion There is a very large variation in costs of buildings, even within the same building program category Cost differences between buildings are due primarily to program type There are low cost and high cost green buildings There are low cost and high cost non-green buildings
43
44 Habitat Ecosystem services Fresh air Clean water Food Waste Absorption Beauty & awe Reduce resource depletion Reduce pollution impacts Environment Reduce total environmental footprint Society Economy Community Health Transportation Cultural resources Educational opportunities Demonstrate environmental leadership Operational saving Utility saving Increase productivity Financial incentives Demonstrate fiscal responsibility
45 Operational savings Less water use Less energy use Ability to closely monitor energy consumption User experience Pleasant day lit spaces Healthy indoor environments
46 Campus Initiatives Green housekeeping policy Recycling policy Site lighting and stormwater plans Landscape approach Student/staff education Indirect Educational Benefits
47
48 Wendy Landry, AIA, LEED AP Associate Principal, Green Building Services Richard Rodriguez, LEED AP Project Director, WELBRO Building Corporation
Working with SPiRiT as a LEED Adaptation
Working with SPiRiT as a LEED Adaptation USGBC Fourth Annual Member Summit Tucson AZ - August 20, 2001 Dagmar Epsten, AIA, CCS LEED Accredited Professional President,, Atlanta, Georgia Working with SPiRiT
More information1.0 ABOUT THE NU GUIDELINES
Construction Policies & Procedures Northeastern University Guidelines for Capital Project Design & Implementation.0 ABOUT THE NU GUIDELINES This document is intended to describe in a comprehensive manner
More informationLEED LEED. Leadership in Energy and Environmental Design. A voluntary, consensus-based. high-performance, sustainable buildings and neighborhoods
LEED An Introduction to LEED V3 2009 LEED Leadership in Energy and Environmental Design A voluntary, consensus-based national standard for developing high-performance, sustainable buildings and neighborhoods
More informationLEED Project Delivery Process Manual Appendices
LEED Project Delivery Process Manual Appendices November 2016 Second Edition Appendices Page Appendix 1: Other Alberta Requirements and Green Building Standards 3 Appendix 2: Integrated Design Process
More informationALBUQUERQUE S GREEN PATH
INTEGRATING GREEN BUILDING STRATEGIES INTO YOUR PROJECTS Expedited Permitting and Other Incentives: Albuquerque's Green Path Program John Wm. Bucholz ALBUQUERQUE S GREEN PATH The purpose of the Green Path
More informationConstruction Specifications Canada Conference May 23, BOMA BESt
Construction Specifications Canada Conference May 23, 2013 BOMA BESt Creating a sustainable environment one building at a time. BOMA Calgary BOMA Canada BOMA Calgary BOMA BESt local administrator BOMA
More informationSOUTHBROOK WINERY. LEED Canada Gold
SOUTHBROOK WINERY CLIENT: Southbrook Farms Limited CONSULTANT: Diamond & Schmitt Architects Incorporated TYPE OF PROJECT: Construction Management LOCATION: Niagara-On-The-Lake, Ontario VALUE: $ 7 million
More informationBUSINESS NEW CONSTRUCTION Energy Design Assistance Energy Efficient Buildings
BUSINESS NEW CONSTRUCTION Energy Design Assistance Energy Efficient Buildings Add energy efficiency to your new construction plans Business New Construction is a FREE, comprehensive approach to energy
More informationMidwest Healthcare Engineering Conference. ASHRAE Standard : Sustainability Defined for Healthcare
Midwest Healthcare Engineering Conference ASHRAE Standard 189.3-2017: Sustainability Defined for Healthcare November 30, 2017 Speakers Alan Holley, Director of Facilities, IU Health Doug Fick, Director
More informationGreen Building. Certificate. Green building design, construction, materials, and economics to design a LEED Certified building.
Grade: 9-12 Version 4 Nov. 2017 Certificate building design, construction, materials, and economics to design a LEED Certified building www.seiinc.org Sustainability Certification: Welcome to the Sustainability
More informationPresidents Climate Commitment Climate Action Plan
Presidents Climate Commitment Climate Action Plan January 2012 Contents Executive Summary 1. Introduction and background 2. Campus Emissions 3. Mitigation Strategies 4. Educational, Research, Community
More informationResidence Hall Phase XVI Code Item 308 Code Item 312 Advanced Planning
The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704/687-0558 PROJECT: UNC Charlotte Residence Hall Phase
More informationM $336M .73 S/L/A/M CONSTRUCTION SERVICES BY THE NUMBERS A BETTER WAY TO BUILD. YEARS OF CONSTRUCTION SERVICES DESIGN-BUILD PROJECTS
A BETTER WAY TO BUILD. S/L/A/M CONSTRUCTION SERVICES BY THE NUMBERS Our team of construction professionals has more than 30 years of building experience in New England. We pride ourselves on the personal
More informationMinnesota State Colleges and Universities. South Central College. Request for Proposals for Commissioning Agent. STEM and Healthcare Renovation
Minnesota State Colleges and Universities South Central College Request for Proposals for Commissioning Agent STEM and Healthcare Renovation Date: 12/18/2017 ADDENDUM #1 1. The Sign-In sheet for the voluntary
More informationPlanning for LEED. Leadership in Energy and Environmental Design
Planning for LEED Leadership in Energy and Environmental Design LEED and related logo is a trademark owned by the U.S. Green Building Council and is used by permission Planning for LEED LEED Building Types
More informationRequest for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents
Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Bishop Woods Landscape Restoration Response
More informationgren skül (Green and Sustainable Schools)
gren skül (Green and Sustainable Schools) Southwest Education Alliance September 10, 2008 Presented by: Donald S. Hughes, AIA Director of Facilities, Planning and Construction Union County Public Schools
More information1/4/2014. Alternative Project Delivery Methods 1. Agenda
Steven. C. Thweatt Assistant Vice Chancellor Facilities Management University of Colorado @ Boulder Steven.thweatt@colorado.edu Introduction Fun in the air More Fun in Chattanooga Licensed Architect Georgia
More informationLight Control and LEED
Light Control and LEED How light control helps achieve LEED certification in new construction and major renovations of commercial buildings AIA Program Number LCAL10 1.0 Learning Unit HSW/SD Approved by
More informationLiving Building Challenge The Metaphor of a Flower
Living Building Challenge The Metaphor of a Flower Harvest all its own energy and water Adapted to climate and site Promotes health and well-being Operates pollution free Comprised of Integrated Systems
More informationRFQ for Architectural Services - Attachment 5 North Campus Student Housing Phase IV(b) Haggett Hall Replacement and Oak Hall Project No.
SPECIAL CONDITIONS Article I, Section A delete this paragraph in its entirety and replace it with the following language: Owner s representative to act on its behalf with respect to this Agreement shall
More informationResearch Analysis: Building Envelope and LEED Credits Introduction
: Building Envelope and LEED Credits Introduction Green buildings are no longer a new idea and are quickly becoming the trend in the slowly changing industry of building construction. Even though the essence
More informationMcCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007
Project Highlights McCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007 > 42.7% reduction in potable water usage achieved with high-efficiency low-flow fixtures > 94.6% of the construction
More informationLEED 2009 for Commercial Interiors. Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP
LEED 2009 for Commercial Interiors Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP Homes Commercial Interiors Core & Shell New Construction Schools Healthcare Existing Building Operations
More informationPROJECT DESIGN EVALUATION AND APPROVAL PROCESS DESIGN AND CONSTRUCTION STANDARD
PART 1: GENERAL 1.01 General Requirements A. These guidelines are intended to provide a framework to evaluate building projects for the University of Texas at Austin to: 1. Verify the feasibility of options
More informationUSGBC National Capital Region MasterClass Series: The Ins and Outs of Existing Building Commissioning Analysis Credit
USGBC National Capital Region MasterClass Series: The Ins and Outs of Existing Building Commissioning Analysis Credit Jeffrey Salay, PE, CEM, LEED AP Senior Principal 13 December 2017 GHT Limited is a
More informationAnalysis 1. LEED Analysis of Laboratory Buildings. Penn State School of Forest Resources University Park, PA
Analysis 1 LEED Analysis of Laboratory Buildings Background The LEED program (Leadership in Energy and Environmental Design) established by the U.S. Green Building Council is becoming the standard by which
More informationOne That is Already Built.
Montgomery County Planning Board 2009 Growing Smarter Speaker Series Thursday, February 12 th, 2009 Green Building: Today s Practices Tomorrow s Challenges Carl Elefante, FAIA, LEED AP Principal Director
More informationLEED Application Guide for Multiple Buildings and On-Campus Building Projects
LEED Application Guide for Multiple Buildings and On-Campus Building Projects For Use with 2009 LEED Rating Systems for Design and Construction and Operations and Maintenance Released October 31, 2011
More informationDesign Build - Project Delivery Model Trends
Drag picture to placeholder or click icon to add Drag picture to placeholder or click icon to add Drag picture to placeholder or click icon to add Design Build - Project Delivery Model Trends Sean M. Collins,
More informationEnergy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort
Please add relevant logo here Energy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort Presented by: Peter J. Arsenault, FAIA, NCARB, LEED-AP Disclaimer: This presentation was developed by
More informationPROFESSIONAL SERVICES ORIENTATION
PROFESSIONAL SERVICES ORIENTATION 03.07.2018 1.0 introductions 2.0 fp&c 3.0 projects 3.1 minor 3.2 major workflow 5.0 additional information 6.0 evaluations 7.0 inquiries index 0.0 Architects MEPF Landscape
More informationAbove Code Building Programs
Above Code Building Programs Commercial Programs Commercial Programs Reduce Carbon Emissions through Community Energy Conservation Building Energy Conservation Waste Reduction 1 Commercial Standards Program
More informationSustainable Building Operations & Upgrades
Sustainable Building Operations & Upgrades LEED for Existing Buildings 2010 Energy / Facilities Connections Conference Brightworks & Glumac Eric Baxter and Todd McGuire 12 May, 2010 The Value Proposition
More informationLEED v4 for Homes, Residential Project Summary and Checklist One and Two Family New Construction
LEED v4 for Homes, Residential Project Summary and Checklist One and Two Family New Construction Summary Date of Application Path Project Project Address Owner Architect Third Party Third Party Provider
More informationAddendum #02 New County Office Building Responses to RFP Questions
Sam Lin Manager Project Development Unit 1402 Maple Street Redwood City, CA 94063 650-369-4766 September 22, 2017 slin@smcgov.org Addendum #02 New County Office Building Responses to RFP Questions To All
More informationGREEN BUILDINGS Risks and Rewards
GREEN BUILDINGS Risks and Rewards Mark Lucuik, P.Eng., LEED AP, Morrison Hershfield October 14, 2010 Agenda Green Buildings LEED Intro Risks 2 What is a Green Building? Radical Design? Natural Materials?
More informationElEmEntal ExcEllEncE brings monumental results.
elements Elemental excellence brings monumental results. Global Presence Ragno USA plays a key role within the strong global presence of Marazzi Group by decisively meeting the tile needs of the North
More informationGreen Building Rating System
An Introduction to the U.S. Green Building Council and the LEED TM Green Building Rating System March 2004 U.S. Green Building Council The nation's foremost coalition of leaders from across the building
More informationBuilding Careers in Sustainable Facilities Design and Management
Building Careers in Sustainable Facilities Design and Management November 29, 2017 11:15 am 12:15 pm Presented By Robert T. Mejia, Executive Director, Economic, Resource, and Community Development, San
More informationFresh Air Ideas SUPPORTING GREEN INITIATIVES WITH INNOVATION
Fresh Air Ideas SUPPORTING GREEN INITIATIVES WITH INNOVATION SUPPORTING GREEN INITIATIVES WITH INNOVATION As one of the first manufacturers of air movement and control equipment to join the U.S. Green
More informationLEED Application Guide for Multiple Buildings and On Campus Building Projects
LEED Application Guide for Multiple Buildings and On Campus Building Projects For Use with 2009 LEED Rating Systems for Design and Construction and Operations and Maintenance Released October 31, 2011
More informationCarolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery
Carolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery Carolinas HealthCare System Case Study Behavioral Health Davidson, NC Project Team Carolinas
More informationUSGBC & LEED. A Summary of the LEED Development as a primer for LEED ND
USGBC & LEED A Summary of the LEED Development as a primer for LEED ND US Green Building Council USGBC Basic USGBC information LEED (Leadership in Energy and Environmental Design GBCI (Green Building Certification
More informationScience Gazing: Sustainable Solutions for High Performance Laboratories. David Gibney Western Regional Director HDR Sustainable Design Solutions
Science Gazing: Sustainable Solutions for High Performance Laboratories David Gibney Western Regional Director HDR Sustainable Design Solutions About HDR Founded in 1917 7,500+ employees Employee owned
More informationHow to Make Money with LEED for Homes
How to Make Money with LEED for Homes Presenters Kelly Parker Jay Hall Donney Dorton 1 What is LEED? Leadership in Energy & Environmental Design RESNET Materials and information can be found at - www.usgbc.org
More informationCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT Construction Management is not a new idea. The function of the Construction Manager is to work on behalf of the owner to complete a project within the plans and specifications provided.
More informationBroward County Professional Architectural and Engineering Services RFP # R P1
1. Ability of Professional Personnel: 1A. Describe the qualifications, and relevant experience of the Project Manager, all key staff and all subconsultants key staff that are most likely to be assigned
More information600 - Phase C Intermediate Review Checklist for the Architect- Engineer
600 Phase C Intermediate Review Checklist for the Architect Engineer This checklist is to be used by the ArchitectEngineer during Phase C of the Project and shall be included in the Intermediate Review
More informationbuilding new horizons
building new horizons www.tektondevelopment.com UNIQUE INSIGHT SMARTER CONSTRUCTION Tekton Development has been a leader in delivering quality construction projects throughout New Jersey and Eastern Pennsylvania.
More informationBeyond LEED, Sustainable Laboratory Design
Beyond LEED, Sustainable Laboratory Design Beyond LEED, Sustainable Laboratory Design The U.S. Green Building Council s LEED (Leadership in Energy and Environmental Design ) Green Building Rating System
More informationElemental Excellence Brings Monumental Results. sustainable elements
Elemental Excellence Brings Monumental Results sustainable elements OurMission Ragno recognizes that the continued success of our company relies on the well-being of our employees, our communities and
More informationPresented by: C.A.S.H. 36 th Annual Conference on School Facilities PRESENTING SPEAKERS. LISA
Presented by: C.A.S.H. 36 th Annual Conference on School Facilities PRESENTING SPEAKERS CHRIS MEEHLEISchris@meehleis.com RANDY ROWLESrowles@bcsd.com ROBERT THORNTONrobert.thornton@teterae.com LISA SHARPElisa@growthpointglobal.com
More informationScience Technology Engineering and Mathematics (STEM) Initiative
DEPARTMENT of FACILITIES DESIGN December 17, 2013 and CONSTRUCTION REQUEST for PROPOSAL Science Technology Engineering and Mathematics (STEM) Initiative PRE-CONSTRUCTION SERVICES Facilities Design and
More informationCivil Engineer PE. Summary. Title: Civil Engineer PE ID: N Department: Civil Engineering Job Location: Raleigh, NC.
Civil Engineer PE Summary Title: Civil Engineer PE ID: N2017-012 Department: Civil Engineering Job Location: Raleigh, NC Description Position Open: February 1, 2017 Position Close: Until filled Clark Nexsen
More informationFACILITIES CONFERENCE
FACILITIES CONFERENCE April 24-26, 2013 Construction Manager at Risk Lessons Learned Minnesota State Colleges and Universities The Minnesota State Colleges and Universities system is an Equal Opportunity
More information- DATA REQUIREMENTS BIM
UHS BIM Protocol S E C T I O N 1 - DATA REQUIREMENTS BIM authoring software: The design team is required to use parametric BIM authoring software for creation of models that include all geometry, physical
More informationUSGBC's Vision. Buildings and communities will regenerate and sustain the health and vitality of all life within a generation.
USGBC's Mission To transform the way buildings and communities are designed, built and operated, enabling an environmentally and socially responsible, healthy, and prosperous environment that improves
More informationDesign-Build Done Right. Sandra Beck AIA, LEED AP University of California, Berkeley
Design-Build Done Right Sandra Beck AIA, LEED AP University of California, Berkeley Why Design-Build? TEAM One Integrated Project Team Team Continuity through Project Single source Contract, Contact &
More informationSUSTAINABLE BUILDINGS 2030 PROCESS
Welcome Welcome to the Sustainable Building 2030 (SB 2030) process. In 2008 the State of Minnesota implemented a program similar to the national Architecture 2030 1 program called Sustainable Building
More informationGreen Certification Moderator: Michael Jerabek, AIA Worn Jerabek Architects, P.C.
Green Certification Moderator: Michael Jerabek, AIA Worn Jerabek Architects, P.C. mikej@wjaworks.com David Epley Jason La Fleur Bill Styczynski Enterprise Community Partners, Inc. depley@enterprisecommunity.
More informationGBCI EPP Course Approval
Level 100 Courses Climate Change and LEED (R) GBCI CE Units 1.5 AIA/CES 1 Course ID: 90003979 This course is intended to allow participants to first understand the reasons behind climate change and why
More informationGreen Ordinance Implementation City of Dallas, TX
Green Ordinance Implementation City of Dallas, TX City of Dallas BUILDING INSPECTION DEPARTMENT Phase 1 Effective Date October 1, 2009 Applications for building permits Structure One ordinance amending
More informationREQUEST FOR PROPOSAL. Construction Management Services Not at Risk
REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk
More informationENERGY AND WATER CONSERVATION AND DEMAND MANAGEMENT PLAN
ENERGY AND WATER CONSERVATION AND DEMAND MANAGEMENT PLAN 2014 2019 CONTENTS EXECUTIVE SUMMARY... 3 1. CENTENNIAL COLLEGE - DISTRIBUTION OF ENERGY CONSUMPTION IN 2012... 4 1.1. Overview of Centennial College
More informationTHE ROLE OF THE GENERAL CONTRACTOR IN SUSTAINABLE GREEN BUILDINGS: The Case Study of Two Buildings in The Leed Certification in Italy
Int. Journal for Housing Science, Vol.36, No.3 pp. 138-148, 2012 Published in the United States THE ROLE OF THE GENERAL CONTRACTOR IN SUSTAINABLE GREEN BUILDINGS: The Case Study of Two Buildings in The
More informationWe make buildings greener. W ith Advanced Architectural Glass. Updated for LEED Version 3
E A R N L E E D P O I N T S W H E N Y O U B U I L D W I T H L I G H T T H E S U N G U A R D G U I D E T O L E E D We make buildings greener. W ith Advanced Architectural Glass. Updated for LEED Version
More informationFMD Project File Management Procedures
Issued: November 10, 2014 Revised: April 9, 2015 GUIDELINE: Applies to: All Planning, Project Management and Business Office Employees of the Facilities Management Department (FMD) PURPOSE: To establish
More informationBenefits of Green Buildings. Government Finance Officers Association of Texas April 2014
Benefits of Green Buildings Government Finance Officers Association of Texas April 2014 Overview LEED History and information General Purpose & Examples LEED Scoring & Benefits City of Irving Projects
More informationFor The Design Architect for Phase 1 of a Visual and Performing Arts Center and Site Micro-Master Plan
STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL SERVICES July 2, 2013 For The University of Colorado Colorado Springs For The Design
More informationRequest for Proposal Complete Interior Design for 2- Story Historic Building into Collaborative Innovation Space Proposals are due: December 6, 2014
The Bakery, LLC 910 N. Main Avenue Sioux Falls SD 57104-5910 605-310- 4259 Request for Proposal Complete Interior Design for 2- Story Historic Building into Collaborative Innovation Space Proposals are
More informationUse of Commissioning for LEED Projects. H. Jay Enck President Commissioning & Green Building Solutions, Inc.
Use of Commissioning for LEED Projects H. Jay Enck President Commissioning & Green Building Solutions, Inc. AIA Quality Assurance Learning Objectives 1. Use of the commissioning process for more efficient
More informationDemand for Green Buildings: Office Tenants Willingness to Pay for Green Features
2 nd Levin College Annual Research Conference Demand for Green Buildings: Office Tenants Willingness to Pay for Green Features Robert Simons and Eunkyu Lee (CSU) Spenser Robinson and Andrew Kern (CMU)
More informationCommissioning Cx High Performance Facilities Green Projects-LEED
Background High Performance Facilities Green Projects-LEED 15-or-so-Best Practices Thoughts & Ideas Glin W. Jay, CFM, CFMJ, PMP, IFMA Fellow Characteristics of FM O&M Models Deferred Industry Standard
More informationDenver Medical Micro Project
Denver Medical Micro Project 6 Unit Development Opportunity across from Denver Health Project Overview 224 W. 6 th Ave. Denver, CO 80204 Prepared by Ray Design Development 09.13.17 Project Summary Project
More informationctbuh.org/papers Cost of Green Revisited: Reexamining the Feasability and Cost Impact of Sustainable Design in the Light of Increased Market Adoption
ctbuh.org/papers Title: Authors: Subjects: Keywords: Cost of Green Revisited: Reexamining the Feasability and Cost Impact of Sustainable Design in the Light of Increased Market Adoption Peter Morris, Davis
More informationLease-Leaseback Project Delivery Method
Lease-Leaseback Project Delivery Method ASBA Technical Meeting & Tradeshow Winter 2013 Presented by: Mark Baginski Principal Verde Design, Inc. James Moore V.P. of Pre-Construction Services Robert A. Bothman,
More informationSUSTAINABILITY & WELLNESS Trends in Design
SUSTAINABILITY & WELLNESS Trends in Design FIRM AT A GLANCE / FOUNDED IN 1935 TOTAL STAFF 2200+ PRACTICE AREAS 8 Corporate + Commercial Science + Technology Healthcare Higher Education K-12 Education Transportation
More informationDesign Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright
Design Process 101 Michael Barnard, AIA, NCARB animalsheltering.org/expo #AnimalCareExpo Copyright 1 Design and Construction Process Needs Assessment Conceptual Design Schematic Design Design Development
More informationUsers Guide to Green Performance Contracting. A White Paper by Leonardo Academy Inc.
Users Guide to Green Performance Contracting A White Paper by Leonardo Academy Inc. Working Draft Updated: This is a Leonardo Academy Inc. White Paper This White Paper was prepared with funding generously
More informationBaldwin High School. Jeremy Jewart Senior Thesis Presentation. Pittsburgh Pennsylvania. Construction Management Option
Baldwin High School Pittsburgh Pennsylvania Option 2007 Senior Thesis Presentation Presentation Outline Research Costs and Benefits of Providing Green Schools Analysis 1 Analysis 2 Alternative Window Building
More informationTHERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS
SUSTAINABLE DESIGN FORM 010.901 REV 1211 THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS SUSTAINABLE DESIGN GUIDE StopWaste.Org LEED-NC Platinum Energy Foundation LEED-CI Platinum Adobe East Tower LEED-EB
More informationInformation Influx: Distilling the Right Information to Make Good Business Decisions. Laurie A. Gilmer, P.E., CFM, SFP, LEED AP, CxA
Information Influx: Distilling the Right Information to Make Good Business Decisions Laurie A. Gilmer, P.E., CFM, SFP, LEED AP, CxA MANAGING CEUs AND CFM MAINTENANCE POINTS You are eligible to receive
More informationRFQ WEB Advertisement
165 Capitol Avenue, Hartford, CT 06106 Selection Type: Request for Qualifications (RFQ) Web Advertisement Construction Manager at Risk Adv. No.: Web Advertisement Date: July 18, 2008 General Statement:
More informationCase Study: Element PROJECT DESCRIPTION
Case Study: Element PROJECT DESCRIPTION Project type: Project gross SF: Number of keys: Location: Hotel (Hospitality), extended-stay prototype Varies, prototypical SF: 79,035 SF gross Varies, prototypical:
More informationLEED Basics. Presented by. Jeremy Knoll PGAV Architects
LEED Basics Presented by Jeremy Knoll PGAV Architects 1. Green Building? Why? 2. The Basics of LEED 3. The Future of LEED Lecture Summary BETTER USE OF RESOURCES HEALTHIER SPACES LEED BASICS The Triple
More informationCMGT 380 Green Building Principles and LEED Certification Department of Construction Management California State University, Chico
CMGT 380 Green Building Principles and LEED Certification Department of Construction Management California State University, Chico Discussion #7 Introduction to Green Buildings and Communities GA01 LEED
More informationJASPER SHARED SCHOOL FACILITY
JASPER SHARED SCHOOL FACILITY A BRIDGING PERSPECTIVE Robert Rabinovitch M.Arch., Architect, AAA, SAA, MRAIC History Jasper Junior / Senior High School Originally constructed in 1952 with additions in 1958,
More informationLEED -Existing Buildings. Crescent Ridge Corporate Center I
LEED -Existing Buildings Crescent Ridge Corporate Center I LEED Leadership in Energy and Environmental Design The U.S. Green Building Council is a coalition of leaders in the building industry promoting
More informationDLR Group is ranked #1 by ARCHITECT, the official publication of the American Institute of Architects, in its 2012 ARCHITECT 50 ranking of U.S.
DLR Group is ranked #1 by ARCHITECT, the official publication of the American Institute of Architects, in its 2012 ARCHITECT 50 ranking of U.S. firms. This ranking is based on design excellence (reflected
More informationLEED for Existing Buildings:
LEED for Existing Buildings: Operations and Maintenance 101 0 Agenda 1. Overview of changes to LEED-EBOM 2009 3. Assessing Building Opportunities Building Exterior and Site Water Efficiency Energy & Atmosphere
More informationLEED. Leadership in Energy and Environmental Design
LEED Leadership in Energy and Environmental Design GREEN BUILDING In years past, the theory of high performance green buildings was hard to define and the practice even more obscure. All of that is rapidly
More informationNAVY LEED COMMISSIONING NAVFAC Symposium 1 December 2010 David Bylund AIA LEED-AP Architects Hawaii
NAVY LEED COMMISSIONING 2010 NAVFAC Symposium 1 December 2010 David Bylund AIA LEED-AP Architects Hawaii INTRODUCTION LEED v3 Navy & Sustainability Commissioning Lessons Learned LEED v3 LEED v3 LEED v3
More informationThe University of Texas System. 1. Title. Sustainability Practices. 2. Policy
1. Title 2. Policy Sustainability Practices Sec. 1 Sec. 2 Sec. 3 Sec. 4 Sec. 5 Purpose. The initiatives described in this policy are intended to provide the scope, direction, and expectations underlying
More informationAIA/COTE 2014 Top Ten Green Projects
AIA/COTE 2014 Top Ten Green Projects PROJECT REQUIREMENTS NOTE: This PDF form is for information and planning purposes only. It is not a substitute for the online submittal. The following information is
More informationConference For Catholic Facility Management. Track 8 Making Cents of Financing and Building in this Economy
Track 8 Making Cents of Financing and Building in this Economy Course Description In October 2010, the AIA/CES system was updated with the new CES Discovery system, in that time we have transferred more
More informationCommissioning at NYP. Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015
1 Commissioning at NYP Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015 Presentation Agenda 2 What is Commissioning Why Commission? Developing NYP s Commissioning Program
More informationUniversity of Illinois Business Instructional Facility LEED Gold Design. University of Illinois. University of Illinois
Keys to success: Sustainable design strategies included early. Clear and early benchmarking choice. Integrated design process. Consensus building. Keys to success: Sustainable design strategies considered
More information