1 SPP Emergency Operations: 2016 Summer Preparedness Workshop

2 AGENDA 9:00 9:15 Welcome.. CJ Brown 9:20 9:30 EOP Update Process... Kim Gorter 1. Review 2. Posting Red-line Version 3. Stakeholder Interaction 4. Transition to In-Use Version 9:35 9:55 Short Tem Reliability Unit Commitment (STRUC). Yasser Bahbaz 10:00 10:15 Wind Penetration in SPP.. Casey Cathey 10:20 10:45 Overview of EOP, Summer-Related Topics.. CJ Brown 1. Severe Weather Alerts 2. Conservative Operations 3. Energy Emergency Alerts 4. Notifications 10:50 11:45 EEA Scenarios Table Top Exercise CJ Brown 11:45 Noon General Q/A All

3 Session Objectives Understand updating and posting of the Emergency Operating Plan (EOP) Examine Wind Penetration in SPP s Footprint Outline Short Term Reliability Unit Commitment Process (STRUC) Relate segments of the EOP to Summer Preparedness Review the EEA levels through a table-top exercise Polling questions will be asked throughout the presentation so let s get started with one now!

4 Is everyone excited to participate today and make this our best workshop ever?

5 Emergency Operations Plan (EOP) Update Process --Kim Gorter

6 EOP Update Process BAOC receives redline version for review (14-days) Incorporate any changes and forward to Stakeholders (MWG, GECTF, RCWG, ORWG, and BAOC) for 14 day review Stakeholder changes are made and reviewed by BAOC with 2/3 majority required for final redline version Final redline version is posted with a Publish Date and adjacent BAs and RCs are notified. On Publish Date, IN USE version is created from the redline version.

7 EOP Update Process Latest password-protected version posted to: %20operating%20plan_v%204%205.pdf SPP.org/Documents/Operations/SPP Emergency Operations Plan Two versions posted: In Use Redline Contact your Customer Relations contact for the password.

8 Does the EOP update process allow enough time for review and input?

9 Short-Term Reliability Unit Commitment (STRUC) --Yasser Bahbaz

10 Short Term RUC - STRUC Runs every 15 minutes for 180 minutes window. 150 minute commitment period Committable window 30 minute near window (RTBM window) Not committable The intent of the study is to give intra hour granularity and more frequent evaluation of the system in terms of generation needed to commit.

11 STRUC Will, in the future, provide an enhancement to the Quick Start resources and how they are dispatched in real time. STRUC will be the study to indicate to RTBM whether a Quick Start qualified and registered resource should be dispatched by RTBM For now, Quick Start either opt-in or out of STRUC. Resources Opting-in will be committable by the study Resources Opting-out will not be committable by the study

12 Network Topology RTBM window State estimator topology Commit window Apply Outages on top of SE topology Restore the Outages which end in the intervals. Restore all Market Units not isolated by other equipment outages so that they are available for commitment by ST-RUC.

13 Unit Commitment Resources are committed based on, Ability to start within the study window Start Cost and No load Needed products qualification Existing commitments in COP are respected by STRUC Ability to recuperate cost in the desired commitment window minutes Headroom STRUC Headroom = Hourly base headroom converted to quarters Example: 900MW Hourly requirement = 225MW STRUC Requirement from one 15-minute interval to the next

14 Product Clearing Energy: 15-minute ramp is used to dispatch resources within the study Regulation 5 minute ramp to clear Regulation Up and Down STRUC uses existing Regulation Selection and, May select additional qualified resources if not DESELECTED Spin/Supp 10-minute ramp is used to dispatch resources within the study

15 Constraint Management Previous RTBM Previous RUC Constraint Type STRUC Exists Doesn't Exist - Internal M2M - External M2M - Non-M2M RTBM for the Constraint Carry Forward Window. Nothing for other intervals. Doesn't Exist Exists - Internal M2M - External M2M - Non-M2M RUC Source Case for all matching intervals Exists Exists - Internal M2M MF in Previous RTBM but M2M in Previous RUC RTBM for all intervals Exists Exists - Internal M2M not MF External - External M2M - Non-M2M RTBM for the Constraint Carry Forward Window and RUC out of the Constraint Carry Forward Window

16 Resource Management State Non-committable Window Committable Window Not in COP for entire study and observed SCADA Not in COP for first few intervals and observed SCADA Echo SCADA MW if the resource is not in startup and shutdown window. Echo SCADA MW if the resource is not in startup and shutdown window. Fix at 0MW if the resource is not in startup/shutdown window. The resource is not committable by STRUC. Scenario 1: If the resource is not eligible for ST-RUC commitment (i.e. not flexible), then echo SCADA MW until the interval in which startup profile is applied for the future planned commitment. Scenario 2: If the resource is eligible for ST- RUC commitment (i.e. flexible) in intervals in which there is no planned COP, then ST-RUC can commit (or advance the future commitment) the resource. If STRUC decides not to change the commitment (due to economic reasons), then the resource is dispatched at 0MW till the interval in which the future planned commitment. There is no startup profile built in this case. In COP for the entire study but SCADA is 0 Fix at 0MW Fix at 0MW. The resource is not committable by STRUC. In COP for the first few intervals and SCADA is 0 and resource is committed again in STRUC window. Fix to 0MW Fix at 0MW in the intervals until next start. After that, follow COP and the resource is committable and dispatchable. In COP and submitted CMODE=3 Echo SCADA MW Follow COP and the resource is committable and dispatchable.

17 Commitment Expectations Intra hour blocks for short term ramp needs for Energy and Operating Reserves Control flowgates more reflective of near real time conditions Extending or early starting resources with commitments for congestion management or meet needed demand for market products Allow SPP operators to hold off commitments longer for resources that are flexible, based on start up times, until closer to real time to further ensure the need for the commitment.

18 Wind Penetration in SPP s Footprint --Casey Cathey

19 Annual Average Wind Speed 19

20 Wind Integration Study Overview Analyzed the SPP transmission area to determine what is required to reliably operate at higher penetration levels The study performed the following scenarios: 1. Steady-state thermal analysis 2. Steady-state voltage analysis 3. Voltage stability analysis 4. Re-dispatch analysis 5. Ramping analysis 20

21 Wind Generation in each Study Scenario 30 Generation by Fuel Type 25 GW Hydro Combined Cycle Other ST Gas ST Coal Nuclear Wind 0 30% Fall 45% Fall 60% Fall 30% Spring 45% Spring 60% Spring 21

22 Current MWs By Fuel Type Wind Totals MWs NDVER 6430 MWs DVER 6550 MWs Solar 190 MWs Nuclear 2635 MWs Natural Gas MWs Coal MWs Generic Coal MWs Lignite Coal 3006 MWs Subbituminous 4885 MWs Hydro 3427 MWs MW's By Fuel Type Other Fuel Types (Oil, Agricultural Byproducts, Municipal Solid Waste) 1719 MWs

23 Wind Capacity Installed by Year Wind Installed Wind Capacity Forecast of Remaining Wind to be Installed Year End Installed Wind Forecast Wind Forecasted Capacity 23

24 Wind Penetration vs Obligation: Summer 2015

25 Wind Integration Study 60% Wind Penetration Wind Output and Siting. 25

26 Wind Integration Study results The Steady-state thermal and voltage analysis confirms the need for approved ITP projects Additional transmission needs beyond what was approved in the ITP process was discovered Some approved ITP projects should be expedited and placed in-service sooner than the projects scheduled in-service date The Voltage stability analysis shows that renewable penetration levels are approaching current limits All N-1 constraints were resolved, albeit with substantial curtailments Ramping analysis indicates that in general, SPP has enough ramping capability to sustain 60% penetration 26

27 WIS - Voltage Stability Analysis The Spring operations model (Outages) 27

28 Wind Integration Study Redispatch Analysis Redispatched Wind Final Wind Curtailed Wind 60% Spring B 11,591 2,744 60% Spring 9,329 5,006 60% Fall B 11,526 2,912 60% Fall 9,780 4,659 45% Spring B 9,351 1,406 45% Spring 7,909 2,847 45% Fall B 9,440 1,389 45% Fall 7,785 3,043 30% Spring B 30% Spring 30% Fall B 30% Fall 6,850 7,023 7,052 7,

29 Monthly Wind Penetration vs Load

30 2015 Final Destination of SPP Wind 100% Actual (delivered) Wind OOME (NDVER) Curtailments RTBM DVER Curtailments OOME (DVER) Curtailments 100% % of Potential Wind 99% 99% 98% 98% Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

31 Monthly Lost Wind vs Load

32 Wind Integration Study Phase II

33 2016 Variable-generation Integration Study ORWG and MOPC approved Scope is an expansion of Phase I reliability-based study elements with updated models and assumptions Additional scenarios in Phase II Transient Stability Analysis for the Spring MDWG 2017 outlook for the 30%, 45%, and 60% wind cases. Seasonal Voltage Stability Analysis 2017 and 2021 year outlook. Comparison between thermal and voltage to determine if Voltage Stability or thermal limitations are the most limiting. Operations and Planning sensitivity. Frequency Response Analysis for the spring MDWG 2017 outlook for the 30%, 45% and 60% wind cases. Targeted 5-minute analysis future ramping 5-year outlook. Expect results published prior to January MOPC

34 NDVER Turbine Capability

35 35

36 NDVER Turbine Types Turbine Types 1 and 2 have no control functionality Turbine Types 3 and 4 do have control functionality Physically capable of providing voltage control, dispatch, real output, etc. More information on wind turbine types can be found at this link: es2009_3.pdf

37 Plan For Summer Assessment Similar to 2015/2016 Winter Assessment Thermal and voltage analysis June 1 st through September 30 th 2 models per week with outages Sunday & Wednesday Additional sensitivities as time permits Single Seasonal Model Includes all outages lasting longer than designated time threshold Used by other ISO/RTO Transfer Limit Analysis Major corridors PV Screening/Analysis Test only a few incremental transfer points Worst violation limits studied in more detail Loss of major gas pipeline Additional contingencies in N-1 analysis

38 Operations Season Assessment Task Force Updating our process going forward How often? What sensitives? Initial input by members? Feedback/result mitigation by members?

39 What are the primary reliability concerns we must prepare for with more non-synchronous generation and less conventional generation?

40 Emergency Operating Plan (EOP) Overview

41 Types of Alerts In order of severity: Severe Weather Alert Conservative Operations Notification Energy Emergency Alert (EEA) (EEA1, EEA2, EEA 3) Image: web.distran.com

42 Goal of Alert System SPP s Alert System Provides SPP timely info: For evaluation Not readily available via other methods Provides stakeholders ways to heighten awareness and provide direction

43 Which season tends to affect your operations the most?

44 Severe Weather Alerts Section 9.2

45 Severe (Hot) Weather Pattern Weather forecasts identify increased likelihood of extreme heat in the SPP BA Studies indicate normal operations should not lead to insufficient BA capacity for affected period

46 46

47 Do you have a plan for updating your resource offers based upon anticipated fuel supply issues for the upcoming season?

48 Conservative Operations Section 9.1

49 Condition Indications Potential for: Stranded capacity due to transmission outages Unexpected resource outages Forward-looking studies indicate normal operations could likely lead to increased risk of sufficient BA capacity for affected period Image: mrtremblaycambridge.weebly.com

50 Conservative Operations Assess situation Determine need to enter into Conservative Operations Issue notification to MPs

51 SPP Actions SPP will identify: Period in which situation is expected to last Expected MP actions

52 Conservative Operations Conditions are such, or expected to be such, that some extraordinary measures may be necessary to maintain RELIABLE operations KEEP GOING UPDATE! EARLY committal of Resources BRIDGING of Resources Delay/Postpone Outages (if possible) Additional UPDATES (as needed)

53 Conservative Operations Environment in which SPP is operating to/with: A. Conservative transfer limits values B. Selected double-contingencies C. Greater unit commitment notification timeframes D. Increased Operating Reserve requirements E. Increased reliability Margin F. Timely coordination calls

54 MP Actions Resource Offers cannot reflect some conditions SPP needs to know

55 What fuel types are most vulnerable to supply issues in your area?

56 Conservative Operations Alert Who gets Alerts? MP list Generation Operator (GOP) RC list TOP RC list Neighboring BAs and RCs

57 Conservative Operations Alert Mechanisms for Alerts s Markets UI posting OASIS posting RCIS posting

58 Have you updated your internal procedures to reflect any potential Conservative Operations conditions communicated by SPP?

59 Resource Load Energy Emergency Alerts (EEAs) Section 6.3

60 Energy Emergency Alerts (EEA) FORESEE not being able to maintain reserves Cannot MAINTAIN reserves Cannot MEET customer Load obligations

61 Stakeholder Communication Methods Section CALL appropriate SPP Operations Desk shiftsupervisor Update CROW with outages /de-rates Notification via ICCP Update Markets User Interface (UI) / API Participate in Monthly Reliability Call(on request; TOPs only)

62 Other Notifications Reliability Coordinator Information System (RCIS) for RC notices Subscribe to follow notifications

63 SPP Contact Information: All Desks Option 1: Reliability Option 2: Balancing Option 3: Tariff/Interchange Option 4: Real Time Markets (RTBM/GDO) Option 5: Reliability Unit Commitment (RUC) Option 6: Day Ahead Market Option 7: Shift Engineer Option 8: Shift Supervisor

64 Are you confident SPP has your correct contact information for each notification/alert?

65 EEA Scenarios Table Top Exercise

66 Energy Emergency Alert 1 If declared, SPP BA will: Identify and curtail non-firm sales Commit all available Resources Identify outages that can be postponed/delayed

67 Energy Emergency Alert 2 In EEA 2, SPP BA will: Notify MPs of imposition of emergency ratings on Resources Utilize Other Extreme Conditions (OEC) to get Reserve Sharing Group (RSG) assistance Put all available generation on-line

68 Energy Emergency Alert 2 Prepare for potential load shedding Curtail non-firm sales Implement plan for curtailable/interruptible loads

69 Emergency Energy Alert 3 In EEA 3, SPP BA could: Direct Transmission Operators (TOPs) to implement load shedding plans

70 Load Shed Steps Determine need to Shed Load Calculate MW Load Shed values SPP BA SPP BA Send s Initiate Blast Call Initiate Individual Load Shed Directives Perform final Blast Call when Load Shed complete Report back to BA amount shed TOPs

71 Would you like to coordinate your capacity and Energy Emergency training with SPP Operations training staff in the future?

72 Questions Anyone?

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation.

Section 3 Characteristics of Credits Types of units. Economic Noneconomic Generation. Section 3 Operating Reserve Operating Reserve Day-ahead and real-time operating reserve credits are paid to market participants under specified conditions in order to ensure that resources are not required

More information

Outage Coordination Training MISO Training

Outage Coordination Training MISO Training MISO Last material update: 05/19/2015 Course Content and Disclaimer 2 1 2 3 4 Course Description This course will review MISO's outage study processes and the coordination opportunities with TOs and MPs.

More information

Pre-Scheduling Operations

Pre-Scheduling Operations Style Definition: PJM_Normal Style Definition: PJM_Bulleted_Para_1 PJM Manual 10: Pre-Scheduling Operations Revision: 365 Effective Date: January 1, 2017 Prepared by Operations Support Division Generation

More information

PJM Manual 10: Pre-Scheduling Operations Revision: 36 Effective Date: December 22, Prepared by Operations Planning Division

PJM Manual 10: Pre-Scheduling Operations Revision: 36 Effective Date: December 22, Prepared by Operations Planning Division PJM Manual 10: Pre-Scheduling Operations Revision: 36 Effective Date: December 22, 2017 Prepared by Operations Planning Division PJM 2017 Table of Contents Table of Contents Table of Exhibits...4 Approval...5

More information

Functional Entity Roles and Responsibilities

Functional Entity Roles and Responsibilities Functional Entity Roles and Responsibilities NWPP MC Phase 3 Operations Integration Work Group 9/28/2014 Page 1 of 13 Table of Contents 1. Purpose... 3 2. Roles and Responsibilities of Functional Entities...

More information

ANNUAL REPORT ON MARKET ISSUES & PERFORMANCE

ANNUAL REPORT ON MARKET ISSUES & PERFORMANCE ANNUAL REPORT ON MARKET ISSUES & PERFORMANCE Department of Market Monitoring ACKNOWLEDGEMENT The following members of the Department of Market Monitoring contributed to this report Eric Hildebrandt Keith

More information

Fundamentals of Transmission Operations

Fundamentals of Transmission Operations Fundamentals of Transmission Operations Equipment Outages PJM State & Member Training Dept. Objectives At the end of this presentation the Learner will be able to: Identify how weather may influence outage

More information

Northwest Power Pool Processes

Northwest Power Pool Processes Northwest Power Pool Processes Background The Northwest Power Pool membership (NWPP) was founded in 1941 to promote efficient production of electrical energy. The NWPP is the geographic area encompassed

More information

Wind Workshop. Technical Characterization: Dependable Capacity & Firm Energy 10:00-10:30am

Wind Workshop. Technical Characterization: Dependable Capacity & Firm Energy 10:00-10:30am Wind Workshop Technical Characterization: Dependable Capacity & Firm Energy 10:00-10:30am Objective of this session: Understand BC Hydro s definitions and calculation methodology of dependable capacity

More information

August 22, 2014 FIRE ISLAND WIND

August 22, 2014 FIRE ISLAND WIND August 22, 2014 FIRE ISLAND WIND Phase 1 Summary: Performance Project Performance: Benefits realized: 93,500 MWh LTD >875,000 MCF of NG burn avoided ~$6.5 MM in NG purchases avoided 55,000 tons of CO2

More information

IMM Quarterly Report: Fall 2017

IMM Quarterly Report: Fall 2017 IMM Quarterly Report: Fall 2017 MISO Independent Market Monitor David Patton, Ph.D. Potomac Economics December 5, 2017 Highlights and Findings: Fall 2017 The MISO markets performed competitively this fall,

More information

DEMAND PEAK FORECAST SUPPLY RENEWABLES IMPORTS OPERATING RESERVE SUMMER LOADS AND RESOURCES ASSESSMENT. March 15, 2012

DEMAND PEAK FORECAST SUPPLY RENEWABLES IMPORTS OPERATING RESERVE SUMMER LOADS AND RESOURCES ASSESSMENT. March 15, 2012 SUPPLY 2012 SUMMER LOADS AND RESOURCES ASSESSMENT March 15, 2012 IMPORTS DEMAND FORECAST PEAK RENEWABLES OPERATING RESERVE Prepared by: Market & Infrastructure Development Grid Assets Department Version:

More information

Reserve Market. PJM State & Member Training Dept. PJM /06/2016

Reserve Market. PJM State & Member Training Dept. PJM /06/2016 Reserve Market PJM State & Member Training Dept. PJM 2016 Objectives Define Reserve products Explain the Reserve requirements Calculate Reserve offers PJM 2016 2 Reserves Reserves are additional generation

More information

Renewable Energy in The Netherlands

Renewable Energy in The Netherlands Renewable Energy in The Netherlands Dr. Martien Visser Professor Energy Transition & Network Integration Hanze University of Applied Sciences Groningen Partner of the Energy Academy Europe E-mail: b.m.visser@pl.hanze.nl

More information

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh) For the first quarter of 2015, Ontario experienced overall demand that was typical for the province in winter, and strong generator output. Demand for Ontario electricity increased as a result of cold

More information

2014 State of the Market

2014 State of the Market 2014 State of the Market 24 August 2015 SPP Market Monitoring Unit Disclaimer The data and analysis in this report are provided for informational purposes only and shall not be considered or relied upon

More information

Day Ahead Market Enhancements: Issue Paper/Straw Proposal

Day Ahead Market Enhancements: Issue Paper/Straw Proposal Day Ahead Market Enhancements: Issue Paper/Straw Proposal Don Tretheway Senior Advisor, Market Design Policy Megan Poage Senior Market Design & Regulatory Policy Developer March 7, 2018 Agenda Time Topic

More information

Dispatching Variable Generation Resources

Dispatching Variable Generation Resources Dispatching Variable Generation Resources A Discussion Paper for Stakeholder Engagement 91 (Renewable Integration) Table of Contents Introduction... 3 IESO Dispatch Processes... 5 Registration... 5 Dispatch

More information

Market Trial Working Group I-SEM Project

Market Trial Working Group I-SEM Project Market Trial Working Group I-SEM Project Dublin, 31 August 2017 1 Overview of the Session Meeting Details Meeting Purpose Chair Secretariat I-SEM Market Trial Working Group Mark Needham Louise Dalton Amy

More information

INTEGRATED TRANSMISSION PLANNING MANUAL

INTEGRATED TRANSMISSION PLANNING MANUAL INTEGRATED TRANSMISSION PLANNING MANUAL Published on July 20, 2017 Pending FERC approval of Tariff language By SPP staff REVISION HISTORY DATE OR VERSION NUMBER AUTHOR CHANGE DESCRIPTION COMMENTS 10/13/2010

More information

Midwest ISO. Prepared by: Midwest ISO Independent Market Monitor. David B. Patton, Ph.D. Potomac Economics. June Executive Summary: Introduction

Midwest ISO. Prepared by: Midwest ISO Independent Market Monitor. David B. Patton, Ph.D. Potomac Economics. June Executive Summary: Introduction 2009 State of the Market Report Midwest ISO Prepared by: Midwest ISO Independent Market Monitor David B. Patton, Ph.D. Potomac Economics June 2010 Executive Summary: Introduction This State of the Market

More information

Summary of 2016 MISO State of the Market Report

Summary of 2016 MISO State of the Market Report Summary of 2016 MISO State of the Market Report Presented to: MISO Board Markets Committee David B. Patton, Ph.D. MISO Independent Market Monitor July 20, 2017 Introduction As the Independent Market Monitor

More information

Capacity Performance Training. March 16, 2015

Capacity Performance Training. March 16, 2015 Capacity Performance Training March 16, 2015 Training Objectives Provide Capacity Market Sellers with information necessary to participate in the Reliability Pricing Model (RPM) under a Capacity Performance

More information

PJM Roadmap for edart

PJM Roadmap for edart PJM Roadmap for edart As of March 15, 2017 Background edart (electronic Dispatcher Application and Reporting Tool) is suite of electronic applications used to facilitate dispatcher-todispatcher communications,

More information

Managing Flexibility in MISO Markets

Managing Flexibility in MISO Markets Managing Flexibility in MISO Markets Clean Energy Regulatory Forum November 9, 2012 Outline Impacts of Variable Generation on Ancillary Services Dispatchable Intermittent Resources Introduction to Proposed

More information

The Confluence Model. Presentation to Modeling and Forecasting Working Group January 21, 2015

The Confluence Model. Presentation to Modeling and Forecasting Working Group January 21, 2015 The Confluence Model Presentation to Modeling and Forecasting Working Group January 21, 2015 Introductions Presenter: Gary Fiske Working Group Water Department staff Objective: Penetrate the Black Box

More information

Pumped hydro Storage Plants

Pumped hydro Storage Plants Pumped hydro Storage Plants Olivier Teller, Product Director PSP 15 Nov 2012 PSP >130 GW (99% world electricity storage) Market: 6 GW/year Europe: ~1.5GW/year 100 years / illimited cycle numbers ~1000

More information

Outlook for Natural Gas Demand for Winter

Outlook for Natural Gas Demand for Winter Outlook for Natural Gas Demand for 2010-2011 Winter Energy Ventures Analysis, Inc. (EVA) Overview Natural gas demand this winter is projected to be about 295 BCF, or 2.5 percent, above demand levels recorded

More information

Internal NYISO HVDC Controllable Line Scheduling. Concept of Operation. LECG Staff

Internal NYISO HVDC Controllable Line Scheduling. Concept of Operation. LECG Staff ConOp Internal NYISO HVDC Controllable Line Scheduling Concept of Operation Author: Scott Harvey, LECG Reviewers: ISO Staff LECG Staff Project Sponsor: Point of Contact: C. King B. Kranz Document Locator:

More information

Two Settlement PJM /06/2016

Two Settlement PJM /06/2016 Two Settlement PJM 2016 Objectives Describe Two-Settlement process Day-Ahead Market Balancing Market Explain Virtual Transactions and their settlement Inc Offers Dec Bids Up-to Congestion Transactions

More information

Final Flexible Capacity Needs Assessment for 2018

Final Flexible Capacity Needs Assessment for 2018 Final Flexible Capacity Needs Assessment for 2018 April 28, 2017 1 Table of Contents 1. Introduction... 3 2. Summary... 3 3. Defining the ISO System-Wide Flexible Capacity Need... 5 4. Forecasting Minute-by-Minute

More information

APRIL 23, Capacity Value of Wind Assumptions and Planning Reserve Margin

APRIL 23, Capacity Value of Wind Assumptions and Planning Reserve Margin APRIL 23, 2014 Capacity Value of Wind Assumptions and Planning Reserve Margin Executive Summary Effective Load Carrying Capacity (ELCC), or capacity value, of variable generation and required planning

More information

EXHIBIT I Final Report Prepared For: Southwest Power Pool 415 North McKinley, #140 Plaza West Little Rock, AR 72205 SPP WITF Wind Integration Study Prepared By: 200 Clarendon Street T-33 Boston, Massachusetts

More information

ConOp. Internal NYISO Controllable Lines. Concept of Operation. Scott Harvey, LECG. Document Locator:

ConOp. Internal NYISO Controllable Lines. Concept of Operation. Scott Harvey, LECG. Document Locator: ConOp Internal NYISO Controllable Lines Concept of Operation Author: Reviewers: Scott Harvey, LECG Project Sponsor: Point of Contact: Document Locator: Revision History Date Additions, deletions, modifications

More information

Transmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008

Transmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008 Transmission Planning at the Midwest ISO Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008 Midwest ISO: What We Do Monitor flow of power over the high voltage

More information

A. Introduction Balancing Authority Reliability Coordinator Transmission Operator. 5. Effective Date:

A. Introduction Balancing Authority Reliability Coordinator Transmission Operator. 5. Effective Date: A. Introduction 1. Title: Emergency Operations 2. Number: EOP-011-1 3. Purpose: To address the effects of operating Emergencies by ensuring each Transmission Operator and Balancing Authority has developed

More information

ERCOT ISO: Current Market and Trends in Future Market Design

ERCOT ISO: Current Market and Trends in Future Market Design ERCOT ISO: Current Market and Trends in Future Market Design Reza Alaghehband, P.E. Control Engineering, Austin Energy, Austin, TX EMS Users Group Meeting September 12-13, 2005 Providence, RI Outline:

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents California Independent System Operator Corporation 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination Of Ancillary Service Standards...

More information

MISO Hourly Scheduling Rules. PJM Interconnection - Generator Offer Flexibility Senior Task Force June 19, 2015

MISO Hourly Scheduling Rules. PJM Interconnection - Generator Offer Flexibility Senior Task Force June 19, 2015 MISO Hourly Scheduling Rules PJM Interconnection - Generator Offer Flexibility Senior Task Force June 19, 2015 Purpose Overview Discuss MISO hourly Generation Offer structure/capability Reference: Energy

More information

Data Viewer, Member Voting, Account Manager, DR Hub, Power Meter, and Data Miner Roadmaps

Data Viewer, Member Voting, Account Manager, DR Hub, Power Meter, and Data Miner Roadmaps Data Viewer, Member Voting, Account Manager, DR Hub, Power Meter, and Data Miner Roadmaps As of March 20, 2018 www.pjm.com 2018 Roadmap Data Viewer, Voting, Account Manager, DR Hub and Power Meter, Data

More information

Energy Efficiency in Kuwait: Past, Current & Future

Energy Efficiency in Kuwait: Past, Current & Future Regional Workshop on: Developing a Regional Energy Efficiency Investment Pipeline UN ESCWA 19-20 June 2014 El-Gouna, Hourghada, Egypt Energy Efficiency in Kuwait: Past, Current & Future Ali Ebraheem Hajiah,

More information

System Impact Study and Facilities Study Process Manual For Cleco Power LLC

System Impact Study and Facilities Study Process Manual For Cleco Power LLC System Impact Study and Facilities Study Process Manual For Cleco Power LLC Version 3 March 2010 System Impact Study and Facilities Study Manual for Cleco Power LLC 1.0 Introduction.3 1.1 Purpose.3 1.2

More information

Eugene Water & Electric Board. The Future of Utilities in the Pacific Northwest

Eugene Water & Electric Board. The Future of Utilities in the Pacific Northwest Eugene Water & Electric Board The Future of Utilities in the Pacific Northwest 1 Eugene Water & Electric Board The Future of Utilities in the Pacific Northwest Erin Erben Manager, Power & Strategic Planning

More information

Schedule 2 TECHNICAL INFORMATION

Schedule 2 TECHNICAL INFORMATION Schedule 2 TECHNICAL INFORMATION This document is intended to provide context to the Haida Gwaii Request for Expressions of Interest (RFEOI) for the potential electricity supply opportunity for clean electricity

More information

6.1.9 IFM Initial Conditions

6.1.9 IFM Initial Conditions 6.1.9 IFM Initial Conditions A Generating Unit that was committed in the previous day s Day-Ahead Market (IFM or RUC) run (TD-2 for TD-1) but was de-committed before HE24 would normally be considered initially

More information

3. Overview of Market Instruments

3. Overview of Market Instruments 3. Overview of Market Instruments 3.2 Ancillary Services Bids Four types of Ancillary Services are used by CAISO in its markets Regulation Up, Regulation Down, Spinning Reserve, and Non-Spinning Reserve.

More information

Final 2014 Flexible Capacity Needs Assessment

Final 2014 Flexible Capacity Needs Assessment Final 2014 Flexible Capacity Needs Assessment May 1, 2014 Table of Contents 1. Introduction... 2 2. Summary... 2 3. Defining the ISO System-Wide Flexible Capacity Need... 3 4. Forecasting Minute-by-Minute

More information

MISO SPP Interregional Stakeholder Advisory Committee. April 8 th, 2014 Carmel, IN

MISO SPP Interregional Stakeholder Advisory Committee. April 8 th, 2014 Carmel, IN MISO SPP Interregional Stakeholder Advisory Committee April 8 th, 2014 Carmel, IN 1 Agenda Introductions Discussion on Draft Coordinated System Plan (CSP) Study Scope Lunch Continue Discussion on Draft

More information

Winter Readiness Workshop. November 6, 2017

Winter Readiness Workshop. November 6, 2017 2017-18 Winter Readiness Workshop November 6, 2017 1 2 Emergency Preparedness - Planning Reminders FERC Order 831 - Energy Offer Cap Reference Levels CROW Outage Cause Codes Replaces the current hard energy

More information

VTWAC Project: Demand Forecasting

VTWAC Project: Demand Forecasting : Demand Forecasting IEEE PES Green Mountain Chapter Rutland, Vermont, 23 June 2016 Mathieu Sinn, IBM Research Ireland 1 Outline Smarter Energy Research in IBM Background & demo Data sources Analytics

More information

Portland General Electric 2016 Integrated Resource Plan. OPUC Public Meeting December 20, 2016

Portland General Electric 2016 Integrated Resource Plan. OPUC Public Meeting December 20, 2016 Portland General Electric 2016 Integrated Resource Plan OPUC Public Meeting December 20, 2016 Agenda Process and Compliance Approach and Summary Analysis Action Plan Next steps 2 2013 IRP Order Resource

More information

ESCI-61 Introduction to Photovoltaic Technology

ESCI-61 Introduction to Photovoltaic Technology April 7, 2010 1 ESCI-61 Introduction to Photovoltaic Technology Lecture #1 Ridha Hamidi, Ph.D. April 7, 2010 2 Today s Agenda 3:30-4:00 - Green sheet review and introductions 4:00-4:45 - Group Research

More information

2016 ANNUAL VRL ANALYSIS

2016 ANNUAL VRL ANALYSIS 2016 ANNUAL VRL ANALYSIS Published on 08/01/2016 By Ops Market Support/Forensics Chris Davis Ricky Finkbeiner REVISION HISTORY DATE OR VERSION NUMBER AUTHOR CHANGE DESCRIPTION COMMENTS 7/11/2016 Ricky

More information

California ISO. Q Report on Market Issues and Performance. July 10, Prepared by: Department of Market Monitoring

California ISO. Q Report on Market Issues and Performance. July 10, Prepared by: Department of Market Monitoring California Independent System Operator Corporation California ISO Q1 2017 Report on Market Issues and Performance July 10, 2017 Prepared by: Department of Market Monitoring TABLE OF CONTENTS Executive

More information

Residual imbalance energy settlement and ramp rate changes for self-scheduled variable energy resources

Residual imbalance energy settlement and ramp rate changes for self-scheduled variable energy resources Market Issues Bulletin Residual imbalance energy settlement and ramp rate changes for self-scheduled variable energy resources March 10, 2015 www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400

More information

Best Practices in Conducting Grid Integration Studies

Best Practices in Conducting Grid Integration Studies GREENING THE GRID Best Practices in Conducting Grid Integration Studies ENHANCING CAPACITY FOR LOW EMISSION DEVELOPMENT STRATEGIES (EC-LEDS) Agenda and Learning Objectives Part 1: Why conduct a grid integration

More information

The Optimisation of the supply-demand balance, the role of interconnections, and the impact of nuclear shutdown in Germany for EDF

The Optimisation of the supply-demand balance, the role of interconnections, and the impact of nuclear shutdown in Germany for EDF The Optimisation of the supply-demand balance, the role of interconnections, and the impact of nuclear shutdown in Germany for EDF 08 June 2011 Philippe TORRION Executive Vice President Optimisation and

More information

I-SEM Interconnectors Project

I-SEM Interconnectors Project Moyle EWIC I-SEM Interconnectors Project Financial Transmission Rights Auction: Initial Trial Report VERSION: 1.0 STATUS: Final for Publication DATE: 29 th SEPTEMBER 2017 Contents Introduction... 3 Objectives

More information

Solar Power Realities

Solar Power Realities Solar Power Realities Supply-Demand Characteristics, Storage and Capital Costs by Peter Lang Abstract This paper provides a simple analysis of the capital cost of solar power and energy storage sufficient

More information

The Impacts of Climate Change on Portland s Water Supply

The Impacts of Climate Change on Portland s Water Supply The Impacts of Climate Change on Portland s Water Supply Richard Palmer and Margaret Hahn University of Washington Department of Civil and Environmental Engineering Joe Dvorak, Dennis Kessler, Azad Mohammadi

More information

Operations Performance Metrics Monthly Report

Operations Performance Metrics Monthly Report Operations Performance Metrics Monthly Report December 215 Report Operations & Reliability Department New York Independent System Operator Prepared by NYISO Operations Analysis and Services, based on settlements

More information

Renewable Integration at ERCOT

Renewable Integration at ERCOT Renewable Integration at ERCOT Dan Woodfin Director of System Operations ERCOT CIGRE Chile September 12, 2016 The ERCOT Region The interconnected electrical system serving most of Texas, with limited external

More information

Gas-Electric Infrastructure Challenges. WPUI Gas Program September 17, September 13, 2012 Madison, WI

Gas-Electric Infrastructure Challenges. WPUI Gas Program September 17, September 13, 2012 Madison, WI Gas-Electric Infrastructure Challenges WPUI Gas Program September 17, 2012 MISO EPA/Gas related efforts - Timeline EPA Rules & Regulations MISO EPA Impact Study, Oct 2011 Gas Consultant Phase 1 Study,

More information

PJM Reserve Market. PJM State & Member Training Dept. PJM /27/2015

PJM Reserve Market. PJM State & Member Training Dept. PJM /27/2015 PJM Reserve Market PJM State & Member Training Dept. Objectives Students will be able to: Identify the process and procedures for participating in the Real Time Reserve Market Reserves Overview What are

More information

Charles D. Corbin & Gregor P. Henze

Charles D. Corbin & Gregor P. Henze Assessing Impact of Large-Scale Distributed Residential HVAC Control Optimization on Electricity Grid Operation and Renewable Energy Integration May 11, 2015 Charles D. Corbin & Gregor P. Henze Department

More information

2016 Fall Reliability Conference MRO

2016 Fall Reliability Conference MRO 2016 Fall Reliability Conference MRO CAISO s Coordination, Tracking, and Monitoring Distributed Energy Resources Amber Motley; Manager, Short Term Forecasting November 2 nd, 2016 California ISO Overview

More information

Certification and Training Requirements

Certification and Training Requirements PJM Manual 40 Certification and Training Requirements Revision: 03 Effective Date: 1/25/2008 Prepared by System Operations Division PJM 2008 PJM 2008 1 Table of Contents PJM Manual 40 Certification and

More information

2017 IRP Advisory Group. July 21, 2017 IRPAG

2017 IRP Advisory Group. July 21, 2017 IRPAG 2017 IRP Advisory Group Today s Agenda 2 General Rate Case Caution Need to avoid the possibility of unintentionally violating ex-parte communication rules Please refrain from bringing up any rate case

More information

California Grid Operations: Current Conditions and Future Needs

California Grid Operations: Current Conditions and Future Needs California Grid Operations: Current Conditions and Future Needs Jim Detmers Vice President, Operations Global Climate & Energy Project November 1, 2007 STANFORD UNIVERSITY Our objective today is identify

More information

WWSIS - 3: Western Frequency Response and Transient Stability Study

WWSIS - 3: Western Frequency Response and Transient Stability Study WWSIS - 3: Western Frequency Response and Transient Stability Study GE Energy Nicholas W. Miller (PM) Miaolei Shao Slobodan Pajic Rob D Aquila NREL Kara Clark (PM) NERC ERSTF Briefing Atlanta December

More information

RENEWABLE ENERGY INTEGRATION IN TAMILNADU

RENEWABLE ENERGY INTEGRATION IN TAMILNADU RENEWABLE ENERGY INTEGRATION IN TAMILNADU Generator Installed Capacity in MW CGS Nuclear 6% PURCHASE (LTOA, MTOA) 18% TN Hydro 2308 TN Thermal 4320 TN Gas 516 TN IPP 746 CGS Thermal 15% CPP 3% TN IPP 3%

More information

LEER/TLR 5 Drill Procedure General Coordination Procedures and Drill Scenario

LEER/TLR 5 Drill Procedure General Coordination Procedures and Drill Scenario LEER/TLR 5 Drill Procedure General Coordination Procedures and Drill Scenario General The participants of the Lake Erie Emergency Redispatch (LEER) procedure will perform drills of various scenarios of

More information

BC Hydro Generation system operation Columbia Basin Regional Advisory Committee

BC Hydro Generation system operation Columbia Basin Regional Advisory Committee BC Hydro Generation system operation Columbia Basin Regional Advisory Committee Renata Kurschner Director, Generation Resource Management 11 September 2014 Generation System Operation Coordination of provincial

More information

Marc de Croisset FBR CAPITAL MARKETS & CO. Coal-to-Gas Switching: Distilling the Issue

Marc de Croisset FBR CAPITAL MARKETS & CO. Coal-to-Gas Switching: Distilling the Issue Marc de Croisset. 646.885.5423. mdecroisset@fbr.com FBR CAPITAL MARKETS & CO. Coal-to-Gas Switching: Distilling the Issue September 20, 2012 Disclosures Important disclosures can be found at the end of

More information

Presentation on Draft SCED RFP

Presentation on Draft SCED RFP Presentation on Draft SCED RFP Pre-RFP Release Conference October 9, 2014 Presenters: Eric Espenhorst, Seattle City Light Erin Apperson, Puget Sound Energy Robb Davis, BPA Roger Bentz, BPA Kevin Holland,

More information

Germany s Energiewende Current and imminent challenges for the Transmission System Operator in Germany

Germany s Energiewende Current and imminent challenges for the Transmission System Operator in Germany Germany s Energiewende Current and imminent challenges for the Transmission System Operator in Germany Jens Jacobs Transmission System Operation Brauweiler Budapest, 04 December 2014 Agenda Germany s Energiewende

More information

January 3, 2018 MEMORANDUM. Council Members. John Ollis, Power System Analyst. SUBJECT: Marginal Carbon Emissions Rate Study Draft BACKGROUND:

January 3, 2018 MEMORANDUM. Council Members. John Ollis, Power System Analyst. SUBJECT: Marginal Carbon Emissions Rate Study Draft BACKGROUND: Henry Lorenzen Chair Oregon Bill Bradbury Oregon Guy Norman Washington Tom Karier Washington W. Bill Booth Vice Chair Idaho James Yost Idaho Jennifer Anders Montana Tim Baker Montana January 3, 2018 MEMORANDUM

More information

PORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS

PORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS PORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS Edwin Castro CNEE Guatemala Viena, september 2009 What is the reason to develop this model? In our own electricity market

More information

Net Demand Variability (NDV) Summary

Net Demand Variability (NDV) Summary Net Demand Variability (NDV) Summary Executive Summary: This document provides a summary of the Net Demand Variability (NDV) work presented to the Energy and Ancillary Service (EAS) workgroup in WG meetings

More information

Market System Evaluation. March 2017

Market System Evaluation. March 2017 Market System Evaluation March 2017 Executive Summary MISO s ability to execute its strategy is predicated upon having secure systems providing the tools and information required. Last fall we initiated

More information

Briefing on 2018 Policy Initiatives Roadmap and Annual Plan

Briefing on 2018 Policy Initiatives Roadmap and Annual Plan Briefing on 2018 Policy Initiatives Roadmap and Annual Plan Greg Cook Director, Market and Infrastructure Policy EIM Governing Body Meeting General Session January 23, 2018 The ISO previously committed

More information

FRCC 2007 SYSTEM OPERATOR TRAINING SEMINARS. Reliability Coordinator Processes and Tools

FRCC 2007 SYSTEM OPERATOR TRAINING SEMINARS. Reliability Coordinator Processes and Tools FRCC 2007 SYSTEM OPERATOR TRAINING SEMINARS Reliability Coordinator Processes and Tools Objectives Describe how the FRCC Security Process addresses planning/coordination of the Bulk Electric System Describe

More information

Operating Procedure PURPOSE... 1

Operating Procedure PURPOSE... 1 Table of Contents PURPOSE... 1 1. RESPONSIBILITIES... 2 2. SCOPE/APPLICABILITY... 2 2.1. Background... 2 2.2. Scope/ Applicability... 2 3. PROCEDURE DETAIL... 3 3.1. Order of Steps... 3 3.2. Restricted

More information

Coal, Carbon, and the Future of the Global Energy Mix

Coal, Carbon, and the Future of the Global Energy Mix Coal, Carbon, and the Future of the Global Energy Mix By Richard Morse Woods Institute Energy Seminar March 4, 2009 Agenda 1. Background 2. Fundamentals of the Global Trade 3. Coal in the West: Impact

More information

Standard TPL Transmission System Planning Performance Requirements

Standard TPL Transmission System Planning Performance Requirements A. Introduction 1. Title: Transmission System Planning Performance Requirements 2. Number: TPL-001-4 3. Purpose: Establish Transmission system planning performance requirements within the planning horizon

More information

Educating System Operators in the New Millennium! Background. Course Level. Target Audience. NERC Continuing Education Hours

Educating System Operators in the New Millennium! Background. Course Level. Target Audience. NERC Continuing Education Hours Background The class will be delivered over a 3-day period. The class is comprised of three training modules covering the areas of: Communications, Critical Thinking, and Restoration. The course consists

More information

Hedging Coal Price Risk in a Deregulated Power Market

Hedging Coal Price Risk in a Deregulated Power Market Hedging Coal Price Risk in a Deregulated Power Market Ginny Farrow Manager Rail Car Fleet NCCI Spring Conference Greensboro, NC April 12, 2007 Safe Harbor Statement This Presentation contains forward-looking

More information

TOP TOP TOP 003 3

TOP TOP TOP 003 3 TOP 001 3 TOP 002 4 TOP 003 3 September 20, 2016 Fall Workshop Allen Klassen, Westar Mike Hughes, SPP RE Use of Presentation For simplicity, some wording from the standard has been shortened, paraphrased,

More information

Virtual Storage. Mark O Malley University College Dublin. Grid + Storage Workshop

Virtual Storage. Mark O Malley University College Dublin. Grid + Storage Workshop Virtual Storage Multi-energy systems Mark O Malley mark.omalley@ucd.ie University College Dublin Grid + Storage Workshop Royal Academy of Engineers, London, March 15 th 2016 Outline Energy System Integration

More information

ANNUAL ENERGY PERFORMANCE OF SOLAR THERMAL SYSTEMS IN BRAŞOV, ROMANIA

ANNUAL ENERGY PERFORMANCE OF SOLAR THERMAL SYSTEMS IN BRAŞOV, ROMANIA Bulletin of the Transilvania University of Braşov Series I: Engineering Sciences Vol. 5 (54) No. 2-212 ANNUAL ENERGY PERFORMANCE OF SOLAR THERMAL SYSTEMS IN BRAŞOV, ROMANIA C. ŞERBAN 1 E. EFTIMIE 1 Abstract:

More information

Tariffs January 1, 2017

Tariffs January 1, 2017 Tariffs January 1, 2017 Nova Scotia Power Inc. Tariffs & Regulations Approved by the Nova Scotia Utility and Review Board pursuant to The Public Utilities Act, R.S.N.S., 189,c.380 as amended Tariffs For

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

BP Wind Energy s Perspective on Internal Controls. Carla Holly, Regulatory Compliance Manager October 8, 2013

BP Wind Energy s Perspective on Internal Controls. Carla Holly, Regulatory Compliance Manager October 8, 2013 BP Wind Energy s Perspective on Internal Controls Carla Holly, Regulatory Compliance Manager October 8, 2013 BP Wind Energy BP Wind Energy is a principal owner and operator of wind power facilities with

More information

2750 Monroe Blvd Audubon, PA

2750 Monroe Blvd Audubon, PA 2750 Monroe Blvd Audubon, PA 19403-2497 October 21, 2014 Mr. Jonathan Feipel Executive Director Illinois Commerce Commission 527 East Capitol Avenue Springfield, Illinois 62701 Dear Mr. Feipel: This report

More information

2017 Contact Center Overflow Vendor Request for Proposals Responses to RFP Questions

2017 Contact Center Overflow Vendor Request for Proposals Responses to RFP Questions 2017 Contact Center Overflow Vendor Request for Proposals Responses to RFP Questions May 5, 2017 All questions are addressed below: Q1: Will the vendor s geographic location(s) or potential location(s)

More information

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Administration Division Public Works Department Anchorage: Performance. Value. Results. Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,

More information

ANTICIPATING AND ADDRESSING SECURITY CHALLENGES IN AN EVOLVING POWER SYSTEM

ANTICIPATING AND ADDRESSING SECURITY CHALLENGES IN AN EVOLVING POWER SYSTEM ANTICIPATING AND ADDRESSING SECURITY CHALLENGES IN AN EVOLVING POWER SYSTEM January 2017 PRESENTED BY JENNY RIESZ SLIDE 1 AGENDA 1. Introduction to the NEM 2. Future Power System Security Program 3. Identifying

More information

SPP EIS Market Training. Markets 301

SPP EIS Market Training. Markets 301 SPP EIS Market Training Markets 301 SPP.org 1 Revised 02/26/2010 Contents Market Concepts Energy Imbalance Defined Market Benefits Locational Imbalance Pricing Scheduling Native Load Scheduling Market

More information

Overview of the Legal Framework. New Policy Initiatives. Renewable Energy Certificate Mechanism

Overview of the Legal Framework. New Policy Initiatives. Renewable Energy Certificate Mechanism 1 Overview of the Legal Framework New Policy Initiatives Renewable Energy Certificate Mechanism 2 3 Tariff regulations of the Regulatory Commissions to be guided by promotion of generation of electricity

More information

Demand Response. Overview. Recommendations

Demand Response. Overview. Recommendations Section 6 Demand Response Demand Response Markets require both a supply side and a demand side to function effectively. The demand side of wholesale electricity markets is underdeveloped. Wholesale power

More information