River Modelling for Flood Risk Map Prediction: A Case Study of Kayu Ara River Basin, Malaysia

Size: px
Start display at page:

Download "River Modelling for Flood Risk Map Prediction: A Case Study of Kayu Ara River Basin, Malaysia"

Transcription

1 River Modelling for Flood Risk Map Prediction: A Case Study of Kayu Ara River Basin, Malaysia Sina Alaghmand* 1, Rozi b. Abdullah 2, and Ismail Abustan 2 Abstract This paper presents a simple methodology for river flood risk map prediction in an urbanized area. River flood risk map is a function of hazard, vulnerability and exposure. Hence, in this case, water depth and flow velocity (river flood hazard), land-use type, road accessibility and debris flow (vulnerability and exposure) were incorporated. Furthermore, a systematic methodology was proposed in order to develop and predict river flood risk map for a range of defined scenarios. Therefore, a total of 6 scenarios were identified including three rainfall magnitude (20 year, 50 year and 100 year ARI) and two river basin development conditions (existing and ultimate). The risk components were combined in GIS interface and categorized based on a proposed risk value classification. This case study confirms the efficiency of the proposed method to some extent. However, more detailed analysis need to be undertaken towards a well-developed and applicable framework. Index Terms Flood hazard map, Flood risk map, HEC-RAS, HMS-HMS, Kayu Ara River Basin. I. INTRODUCTION Starting in the year 2000s, extreme rainfall events with high intensity is no longer a new issue in Malaysian urban cities, especially in the West Coast area. This phenomenon is formed mostly through convection process [1]. Hence, flooding is one of the major natural hazards affecting communities across Malaysia and has caused damages worth millions of dollars every year. For instance, the required allocation for flood mitigation projects has increased almost 600% (RM 6000 million) for the 8 th Malaysian Plan compared to RM 1000 million during the 7 th Malaysian Plan [2]. Natural risk can be defined as the probability of harmful consequences or expected loss (of lives, people injured, property, livelihoods, economic activity disrupted or environment damaged) resulting from interactions between natural or human-induced hazards and vulnerable conditions [3]. Risk is sometimes taken as synonymous with hazard, but risk has additional implication of the chance and probability a particular hazard actually occurring. In fact, hazard refers to the probability of a potentially dangerous phenomenon occurring in a given location within a specified period of time [4]. Therefore, risk does not exist if exposure to a harmful situation does not or will not occur [5-6]. River flood mapping is the process of determining inundation extents and depth by comparing river water levels with ground elevation. The process requires the understanding of flow dynamics over the river and the 1 Discipline of Civil Engineering, School of Engineering, Monash University Malaysia, Bandar Sunway, Selangor, Malaysia, sina.alaghmand@monash.edu 2 School of Civil Engineering, Universiti Sains Malaysia, Penang, Malaysia adjacent floodplain, topographic relationships and the sound judgments of the modeler. In fact, river flood mapping is the foundation of river flood risk prediction, which can be produced using water depth, flood extent, flow velocity and flood duration maps [7]. All the existing methods for flood mapping can be grouped into three major categories namely analytical, historical and physiographic methods [8]. These three methods use same procedure to delineate floodplain boundaries by determining the flood elevation at each river cross section. The boundaries are then interpolated between the cross section. The three methods differ only in the way they determine the water surface profile. River flood mapping involves three main components as follows [9]: i. GIS interface as pre-processor (to extract geospatial data) and post-processor (to visualize model outputs) (i.e. HEC-GeoHMS and HEC-GeoRAS). ii. Hydrological model, which develops rainfall-runoff hydrograph from a design rainfall or historic rainfall event (i.e. HEC-HMS). iii. Hydraulic model, which routes the runoff through river channel to determine water profiles and flow velocity (i.e. HEC-RAS). The increasing availability of powerful GIS software packages offer new opportunities for engineers to perform flood mapping incorporated with hydrological and hydraulic models [7]. This is essential as flood modelling is inherently spatial and hydrological and hydraulic models have large spatially distributed data requirements [10]. In recent years, efforts have been made to integrate hydrological and hydraulic models and GIS to enhance the model outputs, which led to the establishment of a new branch of hydraulics and hydrology, namely, hydro-informatics. In general, there are four methods for incorporating of river basin models into GIS. They are classified as stand-alone system, loose coupling system, tight coupling system and embedded system. In this regard, HEC-GeoRAS and HEC-GeoHMS, which were utilized in this study, are among tight coupling system. This paper presents a simple methodology to generate river flood risk map in an urban area. To this aim, water depth and flow velocity (river flood hazard), land-use type, road accessibility and debris flow (vulnerability and exposure) were incorporated. Moreover, the proposed methodology was utilized for a case study in Kuala Lumpur for numbers of defined scenarios. A. Method II. MATERIAL AND METHOD The proposed methodology in this research included five main components; hydrological modelling, hydraulic modelling, river flood visualization, river flood hazard mapping and river flood risk mapping. Note that, in this 96

2 research, flood mapping, flood hazard mapping and flood risk mapping were differentiated. Flood mapping consists of visualization of hydraulic model results in forms of water depth and flow velocity, whereas flood hazard mapping represents combination of water depth and flow velocity to define various level of flood hazard. Finally, flood risk map was the resultant of hazard map, land-use, road accessibility and debris flow risk. This research involves integration of two numerical models: HEC Hydrologic Modelling System (HEC-HMS) as a hydrologic model to simulate rainfall-runoff process and HEC River Analysis System (HEC-RAS) as a hydraulic model to route the runoff through river to determine water surface profiles and flow velocity. In order to assess the effects of rainfall event magnitude (ARI) and also river basin land-use development condition on the river flood hazard maps, six scenarios were defined. These include three different ARI (20, 50 and 100 years) and two land-use development conditions (existing and ultimate). In all the defined scenarios rainfall events with 60 minutes duration are taken into account. Note that, in order to differentiate between the various developments conditions, different percentages of imperviousness were defined for each development conditions (Table I). TABLE I: PERCENTAGE OF IMPERVIOUSNESS AREA IN DIFFERENT DEVELOPMENT CONDITIONS Development Condition Existing Ultimate Sub-river basin 1 26% 90% Sub-river basin 2 26% 90% B. Study area Sub-river basin 3 66% 90% Sub-river basin 4 36% 90% Sub-river basin 5 66% 90% Kayu Ara river basin is the case study in this research, which is located in Kuala Lumpur, Malaysia. The study area covers an area of km 2 and is geographically surrounded within N 3 6 to N 3 11 and E to E Kayu Ara river basin is a well-developed urban area with different land-use and also high population density, and also, 10 rainfall stations and one water level station at the outlet were available (Figure 1a). Fig. 1. Location of rainfall and water level stations in Kayu Ara river basin, Geospatial data extracted using HEC-GeoHMS. III. RESULTS AND DISCUSSION A. Hydrological modelling HEC-HMS was used as the hydrological model in this research, which was linked to GIS using HEC-GeoHMS extension to extract geospatial input data (Figure 1b). To develop a reliable numerical model establishing the credibility of the model is essential. It includes sensitivity analysis, calibration and validation processes. Sensitivity analyses were applied to highlight the most sensitive parameters in the hydrological model. The results of sensitivity analysis showed that imperviousness, lag-time and peaking coefficient were the most sensitive parameters. Moreover, the recorded time series data with 10 minute intervals was available since Among the recorded rainfall and water level time series, 18 rainfall events were selected for calibration and 18 rainfall events for validation. The established hydrological model for Kayu Ara was used to simulate the rainfall-runoff process based on rainfall design hyetograph extracted from MSMA guideline [11]. Therefore, IDF polynomial equation for, three ARI (20, 50 and 100 years) were used to derive the design rainfall for 60 minutes events as an input to HEC-HMS hydrological model (Figure 2). The modeled runoff hydrograph for each scenario, produced by the validated hydrological model, are shown in Figure 3. ARI 20 year ARI 50 year 97

3 ARI 100 year Fig. 2. Hyetographs of the design rainfall for the defined scenarios. Fig. 4. Water depth and flood extend distribution for ultimate development condition: ARI 20 year, ARI 50 year and ARI 100 years Fig. 3. Simulated runoff hydrographs for rainfall events for the six defined scenario; Existing development condition, Ultimate development condition. B. Hydraulic modelling and flood visualization The modeled runoff hydrographs were used as the main input for hydraulic model. The hydraulic modelling in this research was conducted for the last 5.1 km of Kayu Ara river. The hydraulic model, HEC-RAS, were incorporated with GIS using HEC-GeoRAS extension to prepare geospatial data. Therefore, 25 surveyed cross-sections at 200 m interval were used to create Digital Elevation Model (DEM) of the main channel. The calibration process of HEC-RAS consisted of a total of 20 events. The flood events for calibration were selected from the historical data since 1996 at the water level station, which was located at the outlet of Kayu Ara river basin. In the validation process, HEC-RAS simulated the flood events using the calibrated parameters. A total of 10 events, other than calibration rainfall events, were employed to validate the model. Furthermore, results of the hydraulic model were visualized using HEC-GeoRAS. The generated flood extend maps, flood water depth and flow velocity distribution for the ultimate development condition scenarios are represented in Figures 4 and 5. Fig. 5. Flow velocity distribution for ultimate development condition: ARI 20 year, ARI 50 year and ARI 100 years. C. Flood hazard mapping Flood hazard map covers the geographical areas which could be flooded according to different scenarios [12]. The magnitude of the damage depends on the flood characteristics such as water depth and flow velocity [13]. In this study, water depth and flow velocity are considered as two main 98

4 parameters associate with river flood hazard. In order to produce the flood hazard maps for Kayu Ara river basin NSW flood development manual [14] was applied. With some modification, four river flood hazard categories were determined consisting of low, medium, high and severe. These are shown in Figure 7. Furthermore, the water depth and flow velocity maps which were generated in the previous section were overlaid and analyzed to classify flood hazard for the defined scenarios. These are represented in Figures 7 and 8. Fig. 6. Flood hazard Categories [14] Fig. 8. Flood hazard map for ultimate development condition at Kayu Ara river basin: ARI 20 year, ARI 50 year and ARI 100 years. D. Flood risk mapping Risk can be defined as the probability of a loss, and this depends on three elements including hazard, vulnerability, and exposure. If any of these three elements in risk increases or decreases, then the risk increases or decreases, respectively. Exposure refers in the context of floods only to the question whether people or assets are physically in the path of flood waters or not, vulnerability may be defined as the conditions determined by physical, social, economic, and environmental factors or processes, which increase the susceptibility of a community to the impact of hazards. This concept is demonstrated in Figure 9. Fig. 7. Flood hazard map for existing development condition at Kayu Ara river basin: ARI 20 year, ARI 50 year and ARI 100 years. Fig. 9. River flood risk definition [13] Given Figure 9, to produce flood risk map for the study area four main factors were included, those can fulfil three components of risk definition. The first one was flood hazard map which was created by combining water depth and flow velocity. Then, the flood hazard map was classified in four 99

5 classes, low, medium, high and extreme hazard. For each class one value was defined that shows its level in term of flood risk (Table II). TABLE II: RISK VALUE FOR FLOOD HAZARD CLASSES Flood hazard class Low Medium High Extreme Risk value The second factor which involves in flood risk estimation is land-use type, which contributes to the vulnerability factor. For instance, in land-use map, residential and commercial areas maintain higher risk in comparison with other land-uses such as roads, water bodies, parks, forests and open areas. The land-use map was classified in two classes, residential and commercial and non-residential and non-commercial. Therefore, in land-use map pixels with residential and commercial class are assigned 4 and non-residential and commercial are assigned 1 (figure 10b). The third factor for preparation of flood risk map was accessibility to main road. A vulnerability analysis considers the population and structures at risk within the flood inundated area. In term of vulnerability, the emergency responses may be required, which includes the need for evacuation and emergency services. In river flood event the accessibility to main road is important at least for two purposes; evacuation of people from inundated area and emergency services. In fact, locating far from the main road may lead to slower emergency response during flood inundation and consequently higher risk (Figure 10c). The fourth factor which is included in the proposed methodology is debris flow risk. As the depth of floodwater increases debris begin to float. For instance, if the flood velocity is significant, buildings can be destroyed and cars and caravans can be swept away. In certain areas, the buildup of debris and the impact of floating objects can cause significant structural damage to buildings and bridges at the downstream. Hence, fast moving floodwaters carrying debris expose a greater threat to both people and structures, than those with no debris. In this case, debris risk was considered as a function of distance from the source of the flood. In order to classify the risk value for debris flows for Kayu Ara river basin, the distance from the most upstream is considered and assumed by moving towards downstream amount of debris, and consequently, the debris risk is increasing (Figure 10d). All the above mentioned maps were converted into raster format with 1 m pixel size. In each map, proper values were assigned for each pixel and combined. Then, the result map (flood risk) was created based on the summarized risk values of river flood hazard, land-use type, main road accessibility and debris flow. For instance, minimum value for the flood risk map is 4 which reflects the combination of the pixels with Low class in flood hazard map, non-residential and commercial class in land-use type map, m class in main road accessibility and m class in debris flow hazard map. On the other hand, maximum is 16 represents pixels with Extreme class in flood hazard map, residential and commercial class in land-use type map, > 300 m class in main road accessibility and > 4500 m class in debris flow hazard map. Finally, the flood risk map was categorized into four classes based on the value of each pixel; Low (values 4,5 and 6), Medium (values 7, 8 and 9), High (values 10, 11 and 12) and Extreme (values 13, 14, 15 and 16). Figure 12 shows summarized the proposed methodology for flood risk map prediction. Figures 13 and 14 represent the flood risk maps for Kayu Ara river basin. Flood hazard map Land-use map Main road accessibility map (d) Debris flow hazard map (e) Flood risk map Fig. 10. Summary of proposed methodology for flood risk map prediction. Fig. 11. Flood risk map for existing development condition at Kayu Ara river basin: ARI 20 year, ARI 50 year and ARI 100 years

6 Fig. 12. Flood risk map for ultimate development condition at Kayu Ara river basin: ARI 20 year, ARI 50 year and ARI 100 years. IV. CONCLUSION The following conclusions can be considered according to results of this research: i. An increase in river basin land-use development condition leads to increase of imperviousness of the river basin and volume and peak discharge of the generated runoff hydrograph. ii. HEC-GeoRAS and HEC-GeoHMS are powerful tools as pre-processor for preparation of geospatial input data and also as a post-processor for visualization of the hydraulic model results for HEC-RAS and HEC-HMS models, respectively. iii. The generated water level by hydraulic model is significantly sensitive to river basin land-use development condition and magnitude (ARI) of rainfall event. iv. Flood water depth and flow velocity are the most important elements of flood hazard mapping. However, the generated flood hazard pattern distribution is more influenced by water depth in comparison with flow velocity. vi. The proposed methodology for flood risk map prediction in an urban area is a simple technique which can contribute to the research area. This case study confirms the efficiency of the method to some extent. However, more detailed analysis need to be undertaken towards a well-developed and applicable framework. ACKNOWLEDGMENT This work was funded by Universiti Sains Malaysia under Short-term Research Grant. REFERENCES [1] Embi, A.F. and D. N. Mohd, The Changing Microclimate in Urban Areas The Urban Heat Island Connection [2] Abdullah, K., Flood Problem and Storm water Management Manual for Malaysia (USMM). Keynote Address:Flood Problem and Storm water Management Manual for Malaysia (USMM), in Seminar on Introduction to Storm water Management Manual for Malaysia. 2000: Kelantan. Malaysia. [3] ACS, Understanding Risk Analysis. 1998, Washington, USA: American Chemical Society. [4] Alexander, D., Natural Disasters. 1993, New York, USA: Chapman & Hall. [5] Omen, G.S., Kessler, A.C., Anderson, N.T., Chiu, P.Y., Doull, J., Goldstein, B., Lederberg, J., McGuire, S., Rall, D. and Weldon, V.V., Framework for Environmental Health Risk Management. 1997, The Presidential/Congressional Commission on Risk Assessment and Risk Management: Washington, USA. [6] Sinnakaudan, S.K., A. Ab Ghani, M.S.S. Ahmad, and N.A. Zakaria, Flood risk mapping for Pari River incorporating sediment transport. Environmental Modelling & Software, (2): p [7] Alaghmand, S., R. Abdullah, I. Abustan, M.A.M. Said, and B. Vosoogh, Gis-based river basin flood modelling using HEC-HMS and MIKE11 - Kayu Ara river basin, Malaysia. Journal of Environmental Hydrology, : p [8] Smith, K. and R. Ward, Floods: Physical Processes and Human Impacts. 1998, Chichester, USA: John Wiley & Sons Ltd. [9] Snead, D.B., Development and Application of Unsteady Flood Models Using Geographic Information Systems, in Civil Engineering. 2000, The University of Texas at Austin: Austin, USA. [10] Horritt, M.S. and P.D. Bates, Evaluation of 1D and 2D numerical models for predicting river flood inundation. Journal of Hydrology, (1-4): p [11] DID, Urban Stormwater Management Manual for Malaysia. 2000, Kuala Lumpur, Malaysia: Department of Irrigation and Drainage Malaysia. [12] EXCIMAP, Atlas of Flood Maps. 2007, European Exchange Circle on Flood Mapping. [13] APFM, Urban Flood Risk Management, A Tool for Integrated Flood Management. 2008, The Associated Program on Flood Management: Australia. [14] NSW, Floodplain Development Manual: the management of flood liable land. 2005, Department of Infrastructure, Planning and Natural Resources. New South Wales Government: Australia Sina Alaghmand was born in July 1983 in Iran. He received his BSc in irrigation engineering from Gorgan University of Agricultural Sciences and Natural Resources in Then, he moved to School of Civil Engineering of Universiti Sains Malaysia to study river engineering, where he obtained his MSc in Sina received his PhD in Civil (Water resources) Engineering at University of South Australia in He has an extensive research experience in wide range of water resources engineering. This includes hydrological and hydraulic modellings for flood map predictions, which he wrote a thesis on this topic during his MSc study (the present paper). Moreover, he has comprehensive research experience on surface-groundwater interactions and floodplain salinity interception, which was his PhD research topic. He has published more than 15 peer-reviewed journal papers and numbers of conference papers. Currently, he is a lecturer at Discipline of Civil Engineering at Monash University Malaysia. Also, he holds an adjunct research fellow position at University of South Australia. Dr. Sina Alaghmand has been recipient of numbers of academic honors and awards during his academic career. These include five scholarships for his BSc, MSc and PhD, Gold medal for his MSc research (UNESCO-IHP Malaysia) and recognition for his PhD research (Goyder Institute for Water Research and Australian Water Association)

Impacts of Rainfall Event Pattern and Land-Use Change on River Basin Hydrological Response: a Case in Malaysia

Impacts of Rainfall Event Pattern and Land-Use Change on River Basin Hydrological Response: a Case in Malaysia International Proceedings of Chemical, Biological and Environmental Engineering, Vol. 93 (2016) DOI: 10.7763/IPCBEE. 2016. V93. 23 Impacts of Rainfall Event Pattern and Land-Use Change on River Basin Hydrological

More information

GIS-BASED RIVER BASIN FLOOD MODELLING USING HEC- HMS AND MIKE11 - KAYU ARA RIVER BASIN, MALAYSIA

GIS-BASED RIVER BASIN FLOOD MODELLING USING HEC- HMS AND MIKE11 - KAYU ARA RIVER BASIN, MALAYSIA JOURNAL OF ENVIRONMENTAL HYDROLOGY The Electronic Journal of the International Association for Environmental Hydrology On the World Wide Web at http://www.hydroweb.com VOLUME 20 2012 GIS-BASED RIVER BASIN

More information

Development of Flood Inundation Map for Bago River Basin

Development of Flood Inundation Map for Bago River Basin Development of Flood Inundation Map for Bago River Basin Thet Hnin Aye - Student, Department of Civil Engineering, Yangon Technological University, Dr Win Win Zin - Supervisor, Department of Civil Engineering,

More information

The impact of campus development on the flash flood potential: A case study at watershed USM Main Campus, Pulau Pinang, Malaysia

The impact of campus development on the flash flood potential: A case study at watershed USM Main Campus, Pulau Pinang, Malaysia The impact of campus development on the flash flood potential: A case study at watershed USM Main Campus, Pulau Pinang, Malaysia ARNIZA FITRI JAMALUDDIN, MSc Student, River Engineering and Urban Drainage

More information

Introduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b*

Introduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b* The Effect of Land Changes Towards in Sg. Pandan Perwira Bin Khusairi Rahman 1,a* and Kamarul Azlan bin Mohd Nasir 1,b 1 Faculty of Civil Engineering, Universiti Teknologi Malaysia, Malaysia a * wirakhusairirahman@gmail.com,

More information

Assessment of the Climate Change Impact on a Dry Detention Pond at Kota Damansara, Malaysia

Assessment of the Climate Change Impact on a Dry Detention Pond at Kota Damansara, Malaysia Assessment of the Climate Change Impact on a Dry Detention Pond at Kota Damansara, Malaysia Yuk San LIEW 1*, Fang Yenn TEO 1,2, Aminudin AB. GHANI 3 1 National Hydraulic Research Institute of Malaysia

More information

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire May 4, 2010 Name of Model, Date, Version Number Dynamic Watershed Simulation Model (DWSM) 2002

More information

Flood Modelling For Peri Urban Areas in Adyar River

Flood Modelling For Peri Urban Areas in Adyar River Flood Modelling For Peri Urban Areas in Adyar River Saranya VP 1 Assistant Professor, Department of Civil Engineering, Bannari Amman Institute of Technology, Erode, India 1 ABSTRACT: Water is essential

More information

Title Advanced Hydraulic Modeling to Support Emergency Action Plans

Title Advanced Hydraulic Modeling to Support Emergency Action Plans Title Advanced Hydraulic Modeling to Support Emergency Action Plans Abstract Freese and Nichols, Inc. (FNI) developed an Emergency Action Plan (EAP) for a Levee Improvement District (LID) located in a

More information

ASSESSMENT OF DRAINAGE CAPACITY OF CHAKTAI AND RAJAKHALI KHAL IN CHITTAGONG CITY AND INUNDATION ADJACENT OF URBAN AREAS

ASSESSMENT OF DRAINAGE CAPACITY OF CHAKTAI AND RAJAKHALI KHAL IN CHITTAGONG CITY AND INUNDATION ADJACENT OF URBAN AREAS Proceedings of the 4 th International Conference on Civil Engineering for Sustainable Development (ICCESD 2018), 9~11 February 2018, KUET, Khulna, Bangladesh (ISBN-978-984-34-3502-6) ASSESSMENT OF DRAINAGE

More information

River flood inundation mapping in the Bago River Basin, Myanmar

River flood inundation mapping in the Bago River Basin, Myanmar Hydrological Research Letters 9(4), 97 102 (2015) Published online in J-STAGE (www.jstage.jst.go.jp/browse/hrl). DOI: 10.3178/hrl.9.97 River flood inundation mapping in the Bago River Basin, Myanmar Win

More information

Estimation of Hydrological Outputs using HEC-HMS and GIS

Estimation of Hydrological Outputs using HEC-HMS and GIS Nigerian Journal of Environmental Sciences and Technology (NIJEST) www.nijest.com ISSN (Print): 2616-051X ISSN (electronic): 2616-0501 Vol 1, No. 2 July 2017, pp 390-402 Estimation of Hydrological Outputs

More information

A Hydrologic Study of the. Ryerson Creek Watershed

A Hydrologic Study of the. Ryerson Creek Watershed A Hydrologic Study of the Ryerson Creek Watershed Dave Fongers Hydrologic Studies Unit Land and Water Management Division Michigan Department of Environmental Quality May 8, 2002 Table of Contents Summary...2

More information

Alberta Rainfall Runoff Response

Alberta Rainfall Runoff Response Alberta Rainfall Runoff Response Introduction The runoff response to a rainfall event is a function of many complex hydrologic processes. Some of the major factors in the rainfall-runoff process are basin

More information

Flood Inundation Mapping of Floodplain of the Jamuna River Using HEC-RAS and HEC-GeoRAS

Flood Inundation Mapping of Floodplain of the Jamuna River Using HEC-RAS and HEC-GeoRAS 1 @2016 Journal of PU, Part: B Vol. 3 No:2, July 2016 pp 24-32 PRESIDENCY UNIVERSITY ISSN: 2224-7610 Flood Inundation Mapping of Floodplain of the Jamuna River Using HEC-RAS and HEC-GeoRAS ABSTRACT *M.

More information

Flood Inundation Mapping of Floodplain of the Jamuna River Using HEC-RAS and HEC-GeoRAS. M. M. Rahman* 1, M. M. Ali 2

Flood Inundation Mapping of Floodplain of the Jamuna River Using HEC-RAS and HEC-GeoRAS. M. M. Rahman* 1, M. M. Ali 2 Paper ID: WRE-42 14 International Conference on Recent Innovation in Civil Engineering for Sustainable Development () Department of Civil Engineering DUET - Gazipur, Bangladesh Flood Inundation Mapping

More information

APPENDIX 4 ARROYO MODELING

APPENDIX 4 ARROYO MODELING APPENDIX 4 ARROYO MODELING The existing HEC-HMS model can serve as a baseline for further development and analysis of major arroyos in the city. The model would need to be updated and expanded to consider

More information

UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE

UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE Bodo Hellberg, Stormwater Action Team, Auckland Regional Council Matthew Davis, Stormwater Action Team, Auckland Regional Council ABSTRACT This paper focuses

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH-Y Regulation No. 1110-2-1464 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design HYDROLOGIC ANALYSIS OF WATERSHED RUNOFF Distribution Restriction

More information

International Conference on Water Resources (ICWR 2009) May 2009/ Bayview Hotel, Langkawi, Kedah, Malaysia

International Conference on Water Resources (ICWR 2009) May 2009/ Bayview Hotel, Langkawi, Kedah, Malaysia International Conference on Water Resources (ICWR 2009) 26 27 May 2009/ Bayview Hotel, Langkawi, Kedah, Malaysia Urban Stormwater Drainage System Study using Numerical Modeling Liew Yuk San a,b*, Zalilah

More information

Hydrologic Calibration:

Hydrologic Calibration: Hydrologic Calibration: UPDATE OF EFFECTIVE HYDROLOGY FOR MARYS CREEK October 2010 Agenda Background Hydrologic model Calibrated rainfall Hydrologic calibration 100 year discharges, Existing Conditions

More information

Hydrology and Hydraulic Modeling for Flash Floods Risk Assessment and Mapping

Hydrology and Hydraulic Modeling for Flash Floods Risk Assessment and Mapping Hydrology and Hydraulic Modeling for Flash Floods Risk Assessment and Mapping A Methodology Proposal Konstantinos Papatheodorou Eleni A. Tzanou Konstantinos Ntouros Flash Flood Assessment From Regional

More information

INTEGRATED FLOOD MANAGEMENT IN SAMOA

INTEGRATED FLOOD MANAGEMENT IN SAMOA INTEGRATED FLOOD MANAGEMENT IN SAMOA From Science to Policy Amataga Penaia 1, Ausetalia Titimaea 1, Jude Kohlhase 1, Filomena Nelson 1, Netatua Pelesikoti 2, Michael Bonte-Grapentin 2, Litea Biukoto 2,

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Impact of Increased Stormwater Runoff on Urban Drainage Systems

Impact of Increased Stormwater Runoff on Urban Drainage Systems Impact of Increased Stormwater William E. Spearman, III, PE APWA Stormwater Summit San Antonio, TX September 12, 2007 Contact Information: William E. Spearman, III, PE Member, APWA National Water Resources

More information

A&M WATERSHED MODEL USERS MANUAL WATER RESOURCES ENGINEERING

A&M WATERSHED MODEL USERS MANUAL WATER RESOURCES ENGINEERING TWRI Special Report 90-1 A&M WATERSHED MODEL USERS MANUAL by: Wesley P. James Phillip W. Winsor, John F. Bell Melvin G. Spinks, Alfred J. Garcia Dan Pridal, John Warinner Kelly Kaatz, Veronica Morgan Mike

More information

Development of a GIS Tool for Rainfall-Runoff Estimation

Development of a GIS Tool for Rainfall-Runoff Estimation Development of a GIS Tool for Rainfall-Runoff Estimation Ashraf M. Elmoustafa * M. E. Shalaby Ahmed A. Hassan A.H. El-Nahry Irrigation and Hydraulics Department, Ain Shams University, Egypt NARSS, Egypt

More information

Uncertainty in Hydrologic Modelling for PMF Estimation

Uncertainty in Hydrologic Modelling for PMF Estimation Uncertainty in Hydrologic Modelling for PMF Estimation Introduction Estimation of the Probable Maximum Flood (PMF) has become a core component of the hydrotechnical design of dam structures 1. There is

More information

GIS Applications In Flood Forecasting Using HEC-RAS

GIS Applications In Flood Forecasting Using HEC-RAS Term paper presentation GIS Applications In Flood Forecasting Using HEC-RAS Prepared by Abdullah Abbas Instructor Dr. Baqer Al-Ramadan OUTLINES Introduction - Flooding: Cause And Effect - Meaning And functions

More information

Flood Management in Mahanadi Basin using HEC-RAS and Gumbel s Extreme Value Distribution

Flood Management in Mahanadi Basin using HEC-RAS and Gumbel s Extreme Value Distribution https://doi.org/10.1007/s40030-018-0317-4 ARTICLE OF PROFESSIONAL INTEREST Flood Management in Mahanadi Basin using HEC-RAS and Gumbel s Extreme Value Distribution Prabeer Kumar Parhi 1 Received: 24 April

More information

Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand

Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand Control and mitigation of floods along transbasin diversion channel of Mekong tributaries and Nan river, Thailand Tawatchai Tingsanchali* School of Civil Engineering, Asian Institute of Technology, P.O.Box

More information

Stormwater: Too Simple?

Stormwater: Too Simple? Stormwater: Too Simple? Getting Closer to Advertised Level of Service Brandon Klenzendorf, Ph.D., P.E. 13 December 2017 - CWEA Fall Seminar Introduction Traditional approaches to solving stormwater problems

More information

SECTION III: WATERSHED TECHNICAL ANALYSIS

SECTION III: WATERSHED TECHNICAL ANALYSIS Trout Creek Watershed Stormwater Management Plan SECTION III: WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling An initial step this study of the Trout Creek watershed was the selection of a stormwater

More information

Flood Management in Mahanadi Basin using HEC-RAS and Gumbel s Extreme Value Distribution

Flood Management in Mahanadi Basin using HEC-RAS and Gumbel s Extreme Value Distribution J. Inst. Eng. India Ser. A (December 2018) 99(4):751 755 https://doi.org/10.1007/s40030-018-0317-4 ARTICLE OF PROFESSIONAL INTEREST Flood Management in Mahanadi Basin using HEC-RAS and Gumbel s Extreme

More information

Flow and sediment yield simulations for Bukit Merah Reservoir catchment, Malaysia: a case study

Flow and sediment yield simulations for Bukit Merah Reservoir catchment, Malaysia: a case study 2170 IWA Publishing 2012 Water Science & Technology 66.10 2012 Flow and sediment yield simulations for Bukit Merah Reservoir catchment, Malaysia: a case study Zorkeflee Abu Hasan, Nuramidah Hamidon, Mohd

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe:

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to describe: The different approaches for estimating peak runoff for urban drainage network

More information

SOUTHEAST TEXAS CONTINUING EDUCATION

SOUTHEAST TEXAS CONTINUING EDUCATION EXAM No. 118 FLOOD - RUNOFF ANALYSIS 1. Information gained from flood - runoff analysis includes which one: A. Stage, discharge, volume. B. Measure depth, volume. C. Velocity, depth, storm occurrence.

More information

International Journal of Scientific & Engineering Research, Volume 5, Issue 7, July-2014 ISSN Sruthy Nattuvetty Manoharan

International Journal of Scientific & Engineering Research, Volume 5, Issue 7, July-2014 ISSN Sruthy Nattuvetty Manoharan ISSN 2229-5518 210 Sruthy Nattuvetty Manoharan Department of Civil Engineering Government Engineering College, Thrissur Thrissur, 680009 sruthy.n.m@gmail.com a spatially distributed excess rainfall. It

More information

Simulation of Event Based Runoff Using HEC-HMS Model for an Experimental Watershed

Simulation of Event Based Runoff Using HEC-HMS Model for an Experimental Watershed International Journal of Hydraulic Engineering 213, 2(2): 28-33 DOI: 1.5923/j.ijhe.21322.2 Simulation of Event Based Runoff Using HEC-HMS Model for an Experimental Watershed Reshma T *, Venkata Reddy K,

More information

I. THE ROLE OF FLOOD HAZARD MAPS TO MITIGATE FLOOD DAMAGE IN MALAYSIA

I. THE ROLE OF FLOOD HAZARD MAPS TO MITIGATE FLOOD DAMAGE IN MALAYSIA I. THE ROLE OF FLOOD HAZARD MAPS TO MITIGATE FLOOD DAMAGE IN MALAYSIA A.1 Flood Status in Malaysia Malaysia has along history of flooding, the country being exposed to monsoon winds and heavy conventional

More information

Training Course Brochure Building Capacity in Rural & Urban Water Management

Training Course Brochure Building Capacity in Rural & Urban Water Management Training Course Brochure 2015 Building Capacity in Rural & Urban Water Management Introduction The WastePro Academy seeks to encourage the use of desktop software applications in the water and environmental

More information

Upstream structural management measures for an urban area flooding in Turkey

Upstream structural management measures for an urban area flooding in Turkey doi:10.5194/piahs-370-45-2015 Author(s) 2015. CC Attribution 3.0 License. Upstream structural management measures for an urban area flooding in Turkey Z. Akyurek 1, B. Bozoğlu 1, S. Sürer 2, and H. Mumcu

More information

5/25/2017. Overview. Flood Risk Study Components HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES. Hydraulics. Outcome or Impacts

5/25/2017. Overview. Flood Risk Study Components HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES. Hydraulics. Outcome or Impacts HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES C. Landon Erickson, P.E.,CFM Water Resources Engineer USACE, Fort Worth District April 27 th, 2017 US Army Corps of Engineers Overview Flood

More information

GEOMORPHIC EFECTIVENESS OF FLOODS ON LOWER TAPI RIVER BASIN USING 1-D HYDRODYNAMIC MODEL,HEC-RAS

GEOMORPHIC EFECTIVENESS OF FLOODS ON LOWER TAPI RIVER BASIN USING 1-D HYDRODYNAMIC MODEL,HEC-RAS GEOMORPHIC EFECTIVENESS OF FLOODS ON LOWER TAPI RIVER BASIN USING 1-D HYDRODYNAMIC MODEL,HEC-RAS Darshan Mehta 1, Raju Karkar 2, Lalji Ahir 3 Assistant Professor, CED, S.S.A.S.I.T, Surat, Gujarat, India

More information

Prediction of Flood Area Based on the Occurrence of Rainfall Intensity

Prediction of Flood Area Based on the Occurrence of Rainfall Intensity Prediction of Flood Area Based on the Occurrence of Rainfall Intensity Agus Suharyanto Abstract Flood is one of natural hazard often occurs in many areas. During raining season flood is occur in many areas

More information

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E. \ Memorandum SSPEED Center at Rice University Department of Civil & Environmental Engineering 6100 Main MS-317 Houston, Texas 77005-1827 sspeed.rice.edu tel: 713-348-4977 To Andy Yung, P.E. CFM; Lane Lease,

More information

APPLICATION OF 1-D HEC-RAS MODEL IN DESIGN OF CHANNELS

APPLICATION OF 1-D HEC-RAS MODEL IN DESIGN OF CHANNELS APPLICATION OF 1-D HEC-RAS MODEL IN DESIGN OF CHANNELS Darshan J. Mehta * Mr. Manthan Ramani Mr. Maulik Joshi Asst. Prof., CED, S.S.A.S.I.T, Surat U.G, Student, CED, S.S.A.S.I.T, Surat U.G, Student, CED,

More information

FLOOD FORECASTING MODEL USING EMPIRICAL METHOD FOR A SMALL CATCHMENT AREA

FLOOD FORECASTING MODEL USING EMPIRICAL METHOD FOR A SMALL CATCHMENT AREA Journal of Engineering Science and Technology Vol. 11, No. 5 (2016) 666-672 School of Engineering, Taylor s University FLOOD FORECASTING MODEL USING EMPIRICAL METHOD FOR A SMALL CATCHMENT AREA CHANG L.

More information

CLIMATE CHANGE ADAPTATION AND RISK REDUCTION TECHNOLOGY AND STRATEGIES TO IMPROVE COMMUNITY RESILENCE (CARTS) PROJECT DRAFT TERMS OF REFERENCE

CLIMATE CHANGE ADAPTATION AND RISK REDUCTION TECHNOLOGY AND STRATEGIES TO IMPROVE COMMUNITY RESILENCE (CARTS) PROJECT DRAFT TERMS OF REFERENCE CLIMATE CHANGE ADAPTATION AND RISK REDUCTION TECHNOLOGY AND STRATEGIES TO IMPROVE COMMUNITY RESILENCE (CARTS) PROJECT DRAFT TERMS OF REFERENCE CONSULTANCY SERVICES FOR THE PREPARATION OF A FLOODWATER CONTROL

More information

JOURNAL OF APPLIED SCIENCES RESEARCH

JOURNAL OF APPLIED SCIENCES RESEARCH Copyright 2015, American-Eurasian Network for Scientific Information publisher JOURNAL OF APPLIED SCIENCES RESEARCH ISSN: 1819-544X EISSN: 1816-157X JOURNAL home page: http://www.aensiweb.com/jasr Published

More information

Modeling of River Hydraulic Behavior for Site Selection the Outlets of Surface Water System (Case Study: Rasht City, Iran)

Modeling of River Hydraulic Behavior for Site Selection the Outlets of Surface Water System (Case Study: Rasht City, Iran) American-Eurasian J. Agric. & Environ. Sci., 7 (2): 149-156, 2010 ISSN 1818-6769 IDOSI Publications, 2010 Modeling of River Hydraulic Behavior for Site Selection the Outlets of Surface Water System (Case

More information

PWD s Systematic Watershed-wide Approach to Stormwater Mgmt.

PWD s Systematic Watershed-wide Approach to Stormwater Mgmt. PWD s Systematic Watershed-wide Approach to Stormwater Mgmt. Jeffrey Featherstone, PhD Director, Center for Sustainable Communities, Temple University Paul DeBarry, PE, PH, GISP, D.WRE Director, Geospatial

More information

IJSER. within the watershed during a specific period. It is constructed

IJSER. within the watershed during a specific period. It is constructed International Journal of Scientific & Engineering Research, Volume 5, Issue 7, July-014 ISSN 9-5518 306 within the watershed during a specific period. It is constructed I. INTRODUCTION In many instances,

More information

Sustainable Urban Drainage Systems (SUDS)

Sustainable Urban Drainage Systems (SUDS) nd International Conference on Managing Rivers in the 1 st Century: Solutions Towards Sustainable River Basins Sustainable Urban Drainage Systems (SUDS) NOR AZAZI ZAKARIA, Director, River Engineering and

More information

Numerical Assessment of On-Site Storage Facilities to Mitigate Pluvial Inundation Damage in Urban Area

Numerical Assessment of On-Site Storage Facilities to Mitigate Pluvial Inundation Damage in Urban Area Numerical Assessment of On-Site Storage Facilities to Mitigate Pluvial Inundation Damage in Urban Area Kenji KAWAIKE* and Hajime NAKAGAWA* *Disaster Prevention Research Institute, Kyoto University (Received:

More information

Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area

Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area Bruce McEnroe, Bryan Young, Ricardo Gamarra and Ryan Pohl Department of Civil, Environmental, and Architectural

More information

1 n. Flow direction Raster DEM. Spatial analyst slope DEM (%) slope DEM / 100 (actual slope) Flow accumulation

1 n. Flow direction Raster DEM. Spatial analyst slope DEM (%) slope DEM / 100 (actual slope) Flow accumulation 1 v= R S n 2/3 1/2 DEM Flow direction Raster Spatial analyst slope DEM (%) Flow accumulation slope DEM / 100 (actual slope) 0 = no cell contributing 215 = 215 cell contributing towards that cell sqrt (actual

More information

A framework for comprehensive stormwater management practices in eastern and southern Australia

A framework for comprehensive stormwater management practices in eastern and southern Australia A framework for comprehensive stormwater management practices in eastern and southern Australia John R Argue*, David Pezzaniti** and Guna Hewa *** *Adjunct Professor of Water Engineering ** Senior Research

More information

Applying ArcGIS in Water Resources Engineering

Applying ArcGIS in Water Resources Engineering Applying ArcGIS in Water Resources Engineering At this point the reader should have a feel for how ArcGIS technology may be applied in various real world examples, from business applications to science

More information

CNRGT54 SUBSURFACE DRAINAGE MODULE PERFORMANCE STUDY IN MANAGING URBAN STORMWATER (CASE STUDY: TAIPING HEALTH CLINIC TYPE 2)

CNRGT54 SUBSURFACE DRAINAGE MODULE PERFORMANCE STUDY IN MANAGING URBAN STORMWATER (CASE STUDY: TAIPING HEALTH CLINIC TYPE 2) CNRGT4 SUBSURFACE DRAINAGE MODULE PERFORMANCE STUDY IN MANAGING URBAN STORMWATER (CASE STUDY: TAIPING HEALTH CLINIC TYPE 2) Lai Sai Hin, KEE Li Choo*, Zakaria Nor Azazi, Ab Ghani Aminuddin, Chang Chun

More information

Prepared for: City of Jeffersonville. November Prepared by

Prepared for: City of Jeffersonville. November Prepared by JEFFERSONVILLE STORMWATER MASTER PLAN HYDRAULICS APPENDIX JEFFERSONVILLE, INDIANA Prepared for: City of Jeffersonville November 2011 Prepared by Christopher B. Burke Engineering, Ltd. 115 W. Washington

More information

Comparison of Rational Formula Alternatives for Streamflow Generation for Small Ungauged Catchments

Comparison of Rational Formula Alternatives for Streamflow Generation for Small Ungauged Catchments ENGINEER - Vol. XXXXIV, No. 04, pp, [29-36], 2011 The Institution of Engineers, Sri Lanka Comparison of Rational Formula Alternatives for Streamflow Generation for Small Ungauged s W.M.D.Wijesinghe and

More information

Estimation of Infiltration Parameter for Tehri Garhwal Catchment

Estimation of Infiltration Parameter for Tehri Garhwal Catchment Estimation of Infiltration Parameter for Tehri Garhwal Catchment Ashish Bhatt 1 H L Yadav 2 Dilip Kumar 3 1 UG Student, Department of civil engineering, G B Pant Engineering College, Pauri, UK-246194 2,3

More information

Ata Amini, Thamer Mohammad Ali, Abdul Halim B. Ghazali, Azlan A. Aziz & Shatirah Mohd. Akib

Ata Amini, Thamer Mohammad Ali, Abdul Halim B. Ghazali, Azlan A. Aziz & Shatirah Mohd. Akib Impacts of Land-Use Change on Streamflows in the Damansara Watershed, Malaysia Ata Amini, Thamer Mohammad Ali, Abdul Halim B. Ghazali, Azlan A. Aziz & Shatirah Mohd. Akib Arabian Journal for Science and

More information

A part of BMT in Energy and Environment Kosciusko Avenue Main Drain Catchment Drainage / Flood Study Draft Report

A part of BMT in Energy and Environment Kosciusko Avenue Main Drain Catchment Drainage / Flood Study Draft Report A part of BMT in Energy and Environment Kosciusko Avenue Main Drain Catchment Drainage / Flood Study Draft Report R.M7299.003.00.DraftReport January 2011 Kosciusko Avenue Main Drain Catchment Drainage

More information

Term Project GIS in Water Resources C E 394 K. Oscar Galvis (odg252) Fall 2016

Term Project GIS in Water Resources C E 394 K. Oscar Galvis (odg252) Fall 2016 Term Project GIS in Water Resources C E 394 K Oscar Galvis (odg252) Fall 2016 Estimation of the Economic s of IH 35 Bridge Deterioration Due to Floods in Onion Creek Introduction to the problem Bridges

More information

Impact Study of a check dam on Ground Water Recharge

Impact Study of a check dam on Ground Water Recharge Impact Study of a check dam on Ground Water Recharge 1 P.Arun Raja, C. Dinesh, B.Jagadeesan 1,, UG Student, Department of Civil Engineering, Mamallan Institute of Technology, Kanchipuram, INDIA Abstract:

More information

Modernization of High Hazard Dams in Austin, Texas. TFMA Spring Conference May 23, 2007

Modernization of High Hazard Dams in Austin, Texas. TFMA Spring Conference May 23, 2007 Modernization of High Hazard Dams in Austin, Texas TFMA Spring Conference May 23, 2007 Modernization of High Hazard Dams in Austin, Texas City of Austin Glen Taffinder, P.E. Stormwater Pond Dam Safety

More information

GISHYDRO: Developing Discharges and Watershed Parameters

GISHYDRO: Developing Discharges and Watershed Parameters GISHYDRO: Developing Discharges and Watershed Parameters A Case Study with Baltimore City Watersheds by Mathini Sreetharan, Ph.D., P.E., CFM, Dewberry, VA Kim Dunn, P.E., CFM, Dewberry, PA Baltimore City

More information

HYDRO EUROPE ISIS Report. Team

HYDRO EUROPE ISIS Report. Team HYDRO EUROPE 2011 ISIS Report Team 6 23.02.2011 Team members: Liza ASHTON, Thibault DESPLANQUES, Jens Harold DRASER, Manuel GOMEZ (supervisor), Kyung Tae LEE, Maxime NARDINI, Jieun PARK, Jiyoung PARK &

More information

1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER

1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER 1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER 1.1 Introduction The Hydrologic Model of the Upper Cosumnes River Basin (HMCRB) under the USGS Modular Modeling System (MMS) uses a

More information

ANALYSIS ON CURVE NUMBER, LAND USE AND LAND COVER CHANGES IN THE JOBARU RIVER BASIN, JAPAN

ANALYSIS ON CURVE NUMBER, LAND USE AND LAND COVER CHANGES IN THE JOBARU RIVER BASIN, JAPAN ANALYSIS ON CURVE NUMBER, LAND USE AND LAND COVER CHANGES IN THE JOBARU RIVER BASIN, JAPAN Jeffry Swingly Frans Sumarauw 1, 2 and Koichiro Ohgushi 1 1 Department of Civil Engineering and Architecture,

More information

What s so hard about Stormwater Modelling?

What s so hard about Stormwater Modelling? What s so hard about Stormwater Modelling? A Pugh 1 1 Wallingford Software Pty Ltd, ann.pugh@wallingfordsoftware.com Abstract A common misconception of stormwater modelling is that it is simple. While

More information

Vulnerability of Infrastructure due to Climate Change

Vulnerability of Infrastructure due to Climate Change 1 Vulnerability of Infrastructure due to Climate Change A Case Study of London, Ontario Elisabeth Bowering and Angela Peck M. E. Sc. Candidates Slobodan P. Simonovic, Professor The University of Western

More information

DATA AND ACTIVITIES NECESSARY FOR THE PREPARATION OF FLOOD HAZARD MAPS

DATA AND ACTIVITIES NECESSARY FOR THE PREPARATION OF FLOOD HAZARD MAPS Abstract code: CP7 Development and implementation of a methodology of flood hazard mapping in Bulgaria, as required by Directive 2007/60 / EC S. Balabanova 1, V. Yordanova 1, V. Stoyanova 1 1 National

More information

Little Bear Brook Flood Hazard Assessment and Redevelopment Area Regional Stormwater Management Analysis. Progress Meeting

Little Bear Brook Flood Hazard Assessment and Redevelopment Area Regional Stormwater Management Analysis. Progress Meeting Little Bear Brook Flood Hazard Assessment and Redevelopment Area Regional Stormwater Management Analysis Progress Meeting June 30, 2014 Princeton Hydro, LLC and SWM Consulting, LLC Project Team West Windsor

More information

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar Hydrology and Water Management Dr. Mujahid Khan, UET Peshawar Course Outline Hydrologic Cycle and its Processes Water Balance Approach Estimation and Analysis of Precipitation Data Infiltration and Runoff

More information

The Land & Infrastructure Resiliency Assessment (LIRA) Project Economic Flood Hazard Assessment

The Land & Infrastructure Resiliency Assessment (LIRA) Project Economic Flood Hazard Assessment The Land & Infrastructure Resiliency Assessment (LIRA) Project Economic Flood Hazard Assessment Robert Armstrong / Cameron Kayter Agri-Environment Services Branch LIRA Background Subcomponent of Climate

More information

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 Phasing of Meetings April Meeting May Meeting October Review of Tax Day Storm Event and Immediate Actions Taken By City Review of Coordination

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Storm Sewer Design - Introduction

Storm Sewer Design - Introduction Class 4 [1] Storm Sewer Design - Introduction As urban drainage can not be expected to accommodate all rainfall events, the first step in the design procedure is to select an appropriate design storm.

More information

Introduction to HEC HMS. Daene C. McKinney

Introduction to HEC HMS. Daene C. McKinney CE 374 K Hydrology Introduction to HEC HMS Daene C. McKinney Hydrologic Engineering Center U.S. Army Corps ofengineers (USACE) Hydrologic Engineering Center (HEC) Formed 1964 to institutionalize the technical

More information

Armstrong Creek West Precinct. Review of Stormwater Management Strategy

Armstrong Creek West Precinct. Review of Stormwater Management Strategy Armstrong Creek West Precinct Review of Stormwater Management Strategy 31 October 2011 Report by: Valerie Mag, B.E. Civil (Hons), M. Eng. Sci. Stormy Water Solutions stormywater@optusnet.com.au Ph 9511

More information

Modeling the Hydrologic Impacts of Control Structures Utilizing LiDAR, ICPR, and GIS Technologies

Modeling the Hydrologic Impacts of Control Structures Utilizing LiDAR, ICPR, and GIS Technologies Modeling the Hydrologic Impacts of Control Structures Utilizing LiDAR, ICPR, and GIS Technologies Keanan Bell NorthStar June 12, 2015 Project began in 2010 as a Hydrology Assessment and Conceptual Restoration

More information

FLOOD Analysis And Development of Groundwater Recharge and Discharge Estimate Maps using GIS

FLOOD Analysis And Development of Groundwater Recharge and Discharge Estimate Maps using GIS FLOOD Analysis And Development of Groundwater Recharge and Discharge Estimate Maps using GIS Dr. Ghulam Nabi Assistant Professor Center of Excellence in Water Resources Engineering, g University of Engineering

More information

San Luis Obispo Creek Watershed Hydrologic Model Inputs

San Luis Obispo Creek Watershed Hydrologic Model Inputs Jeff Werst San Luis Obispo County Department of Public Works 1050 Monterey Street San Luis Obispo CA 93408 December 14, 2007 Subject: San Luis Obispo Creek Watershed Hydrology and Hydraulic Model Dear

More information

SECTION IV WATERSHED TECHNICAL ANALYSIS

SECTION IV WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling SECTION IV WATERSHED TECHNICAL ANALYSIS An initial step in the preparation of this stormwater management plan was the selection of a stormwater simulation model to be utilized. It

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

Long-Term Rainfall Analysis for Estimating Water Quality Volume for Major Towns in Malaysia

Long-Term Rainfall Analysis for Estimating Water Quality Volume for Major Towns in Malaysia LongTerm Rainfall Analysis for Estimating Water Quality Volume for Major Towns in Malaysia Mazlina ALANG OTHMAN *, Aminuddin A.B. GHANI, Keng Yuen FOO, Chun Kiat CHANG River Engineering and Urban Drainage

More information

3.5 Hydrology & Hydraulics

3.5 Hydrology & Hydraulics 3.5 Hydrology & Hydraulics 3.5.1 Purpose The purpose of this section is to provide results from the analysis and assessment of the impact of the proposed Carmichael Rail Alignment (Option 11 Revision 1)

More information

Hydrotechnical Design Guidelines for Stream Crossings

Hydrotechnical Design Guidelines for Stream Crossings Hydrotechnical Design Guidelines for Stream Crossings Introduction Design of stream crossings and other in-stream highway facilities requires estimation of design highwater elevation and mean channel velocity.

More information

Note that the Server provides ArcGIS9 applications with Spatial Analyst and 3D Analyst extensions and ArcHydro tools.

Note that the Server provides ArcGIS9 applications with Spatial Analyst and 3D Analyst extensions and ArcHydro tools. Remote Software This document briefly presents the hydrological and hydraulic modeling software available on the University of Nice Server with Remote Desktop Connection. Note that the Server provides

More information

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT THE GOVERNMENT OF MALAYSIA PRIME MINISTER S DEPARTMENT ECONOMIC PLANNING UNIT THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT VOL. 5: TECHNICAL

More information

Reservoir on the Rio Boba

Reservoir on the Rio Boba Reservoir on the Rio Boba Michael J. Burns II Guillermo Bustamante J. James Peterson Executive Summary The National Institute of Water Resources in the Dominican Republic (INDRHI) plans to construct a

More information

Technical Memorandum

Technical Memorandum Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Kathy Arnold From: Greg Hemmen, P.E. Company: Rosemont Copper Company Date:

More information

Integrating HEC HMS generated flow hydrographs with FLO-2D. Nanda Meduri, PE, PMP, CFM Seth Lawler Venkata Dinakar Nimmala, CFM

Integrating HEC HMS generated flow hydrographs with FLO-2D. Nanda Meduri, PE, PMP, CFM Seth Lawler Venkata Dinakar Nimmala, CFM Integrating HEC HMS generated flow hydrographs with FLO-2D Nanda Meduri, PE, PMP, CFM Seth Lawler Venkata Dinakar Nimmala, CFM Focus of this Presentation Introduction Methodology Challenges & Solutions

More information

Available online at ScienceDirect. Procedia Engineering 125 (2015 )

Available online at   ScienceDirect. Procedia Engineering 125 (2015 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 125 (2015 ) 263 269 The 5th International Conference of Euro Asia Civil Engineering Forum (EACEF-5) Evaluation of drainage channels

More information

Assessing the Risk of 100-year Freshwater Floods in the Lamprey River Watershed of New Hampshire Resulting from Changes in Climate and Land Use

Assessing the Risk of 100-year Freshwater Floods in the Lamprey River Watershed of New Hampshire Resulting from Changes in Climate and Land Use Assessing the Risk of 100-year Freshwater Floods in the Lamprey River Watershed of New Hampshire Resulting from Changes in Climate and Land Use Presented by: Ann Scholz, PE, CPSWQ Advisor: Dr. Robert Roseen,

More information

RIVER MODELLING FOR FLOOD RISK MAP PREDICTION: CASE STUDY OF SUNGAI KAYU ARA SINA ALAGHMAND

RIVER MODELLING FOR FLOOD RISK MAP PREDICTION: CASE STUDY OF SUNGAI KAYU ARA SINA ALAGHMAND RIVER MODELLING FOR FLOOD RISK MAP PREDICTION: CASE STUDY OF SUNGAI KAYU ARA by SINA ALAGHMAND Dissertation submitted in fulfilment of the requirements for the degree of Master of Science Universiti Sains

More information

SPATIAL-TEMPORAL ADJUSTMENTS OF TIME OF CONCENTRATION

SPATIAL-TEMPORAL ADJUSTMENTS OF TIME OF CONCENTRATION JOURNAL O LOOD ENGINEERING J E 1(1) January June 2009; pp. 21 28 SPATIAL-TEMPORAL ADJUSTMENTS OF TIME OF CONCENTRATION Kristin L. Gilroy & Richard H. McCuen Dept. of Civil and Environmental Engineering,

More information