RP2 FAB Performance Plans assessment

Size: px
Start display at page:

Download "RP2 FAB Performance Plans assessment"

Transcription

1 RP2 FAB Performance Plans assessment PRB/21 meeting 3 rd September 2014, EUROCONTROL HQ, Brussels Performance Review Body designated by the European Commission

2 Union-wide view SAF: All States/FABs and NM have adopted the Union-wide targets for Effectiveness of Safety Management and the application of the RAT methodology ENV: average horizontal en-route flight efficiency of the actual trajectory - adopted by NM and all FABs have adopted their respective reference values Performance Review Body 2

3 Union-wide view (Cont d) CAP (en-route): Average en-route ATFM delay per flight Target (min) Aggregation of FAB targets Difference with the Union-wide target Cost of additional delay ( 83/minute) 116M 127M 129M 124M 110M Capacity En-route 6 revision 3 accept Performance Review Body 3

4 Union-wide view (Cont d) CE (En-route Determined Unit Costs trends): Performance Review Body 4

5 Union-wide view (Cont d) CE (Terminal Determined Unit Costs trends): Performance Review Body 5

6 CE summary 30 en-route CZs 20 revision 10 accept 19 revision 36 TANS CZs 16 accept 1 cannot assess Performance Review Body 6

7 Network Manager Assessment Process: PRB has provided the EC and NM with informal comments on the NPP6 on 13 August 2014 Following the NMB Task Force meetings (5 and 23 September 2014) and the NMB/11 meeting (8 October 2014), the NPP will be consolidated and endorsed for formal submission to the EC soon after NMB/11 PRB will provide its formal assessment results after the NPP has been officially submitted to the EC Capacity: 0.5 min/flt annually in SES area Environment: Filed flight plan (4.1% by 2019 in SES area) Actual trajectory (2.6% by 2019 in SES area) Performance Review Body 7

8 BALTIC FAB (1/2) SAF ENV BALTIC CAP CE 1 1 For en-route only. Currently the cost-efficiency assessment can only be carried out at charging zone level, and for RP2 there are no FABs with a common charging zone and a single unit rate. Performance Review Body 8

9 BALTIC FAB (2/2) CE: Aggregated en-route trend at FAB level In 2013, the FAB en-route costs (140.2 M 2009) represent 2.3% of the total SES en-route costs. By 2019, these are planned (156.3 M 2009) to be 2.5%. The Baltic FAB planned unit cost in 2019 ( ) is -45.5% lower than the Union-wide aggregated DUC ). Performance Review Body 9

10 BlueMed FAB (1/2) SAF ENV BlueMed CAP CE 1 1 Currently the cost-efficiency assessment can only be carried out at charging zone level, and for RP2 there are no FABs with a common charging zone and a single unit rate. Performance Review Body 10

11 BlueMed FAB (2/2) CE: Aggregated en-route trend at FAB level In 2013, the FAB en-route costs (760.8 M 2009) represented 13% of the total SES en-route costs. By 2019, these are planned to be more than 14% ( M 2009). The BlueMed FAB planned unit cost in 2019 ( ) is slightly lower (-3.2%) than the Union-wide aggregated DUC ( ). Performance Review Body 11

12 DANUBE FAB (1/2) SAF ENV DANUBE CAP CE 1 1 Currently the cost-efficiency assessment can only be carried out at charging zone level, and for RP2 there are no FABs with a common charging zone and a single unit rate. Performance Review Body 12

13 DANUBE FAB (2/2) CE: Aggregated en-route trend at FAB level In 2013 the total FAB en-route costs (some M 2009) represented some 3.3% of the total SES en-route costs and by 2019, these are planned to be M 2009 the total SES costs). The Danube planned en-route unit cost ( ) is much lower (-44.1%) than the Unionwide aggregated en-route DUC ( ). Performance Review Body 13

14 Denmark-Sweden FAB (1/2) SAF ENV DK-SE CAP CE 1 1 Currently the cost-efficiency assessment can only be carried out at charging zone level, and for RP2 there are no FABs with a common charging zone and a single unit rate. Performance Review Body 14

15 Denmark-Sweden FAB (2/2) CE: Aggregated en-route trend at FAB level In 2013, the FAB en-route costs (264.3 M 2009) represent 4.4% of the total SES en-route costs. By 2019, these are planned (242.9 M 2009) to be 3.9%. the DK-SE FAB planned unit cost in 2019 ( ) is -6.2% lower than the Union-wide aggregated DUC ( ). Performance Review Body 15

16 FABCE (1/2) SAF ENV FABCE CAP CE 1 1 Currently the cost-efficiency assessment can only be carried out at charging zone level, and for RP2 there are no FABs with a common charging zone and a single unit rate. Performance Review Body 16

17 FABCE (2/2) CE: Aggregated en-route trend at FAB level In 2013, the FAB en-route costs (482.2 M 2009) represented 8.0% of the total SES en-route costs. By 2019, these are planned (513.8 M 2009) to be 8.3%. the FAB CE unit cost planned for 2019 ( ) is -14.9% lower than the Union-wide aggregated DUC ( ). Performance Review Body 17

18 FABEC (1/2) SAF ENV FABEC CAP CE 1 1 Currently the cost-efficiency assessment can only be carried out at charging zone level, and for RP2 there are no FABs with a common charging zone and a single unit rate. Performance Review Body 18

19 FABEC (2/2) CE: Aggregated en-route trend at FAB level In 2013, the FAB en-route costs (2,428.3 M 2009) represent 40.2% of the total SES en-route costs. By 2019, these are planned to amount to 2,548.3 M 2009 which is 41.4% total SES enroute. The FABEC unit cost is expected to amount to in 2019 which is +27.7% higher than the Union-wide aggregated DUC ( 51.26). Performance Review Body 19

20 NEFAB (1/2) SAF ENV NEFAB CAP CE 1 1 Currently the cost-efficiency assessment can only be carried out at charging zone level, and for RP2 there are no FABs with a common charging zone and a single unit rate. Performance Review Body 20

21 NEFAB (2/2) CE: Aggregated en-route trend at FAB level In 2013, the FAB en-route costs (178.9 M 2009) represent 3.0% of the total SES en-route costs. By 2019, FAB en-route costs (181.4 M 2009) are planned to be 2.9%. The NEFAB planned unit cost in 2019 ( ) is -31.7% lower than the Union-wide aggregated DUC ( ). Performance Review Body 21

22 SW FAB (1/2) SAF ENV SW CAP CE 1 1 Currently the cost-efficiency assessment can only be carried out at charging zone level, and for RP2 there are no FABs with a common charging zone and a single unit rate. Performance Review Body 22

23 SW FAB (2/2) CE: Aggregated en-route trend at FAB level In 2013 the FAB en-route costs (767.4 M ) represent 12.7% of the total SES en-route costs. By 2019, these are planned (743.1 M ) to be 12.1%. The SW FAB planned unit cost in 2019 ( ) is +3.2% higher than the Union-wide aggregated DUC ( ). Performance Review Body 23

24 UK-Ireland FAB (1/2) SAF ENV UK - IE CAP CE 1 1 Currently the cost-efficiency assessment can only be carried out at charging zone level, and for RP2 there are no FABs with a common charging zone and a single unit rate. Performance Review Body 24

25 UK-Ireland FAB (2/2) CE: Aggregated en-route trend at FAB level In 2013, the FAB en-route costs (some M 2009) represented 13.6% of the total SES enroute costs and by 2019, these are planned to be some M 2009 (or a share of 11.5% of the total SES costs). The FAB UK-Ireland planned unit cost in 2019 ( ) is lower (-8.9%) than the Unionwide aggregated en-route DUC level ( ). Performance Review Body 25

PRB Annual monitoring report Volume 4 - Safety

PRB Annual monitoring report Volume 4 - Safety PRB Annual monitoring report 2014 Volume 4 - Final 1.0 30/09/2015 European Union, 2015 COPYRIGHT NOTICE AND DISCLAIMER This report has been prepared for the European Commission by the Performance Review

More information

The Network Strategy Plan. Brian Flynn

The Network Strategy Plan. Brian Flynn The Network Strategy Plan Brian Flynn Head OMR, Directorate of Network Management 13 th February 2013 The Network Manager and the NSP The Network Manager (Function) has been created by the Single European

More information

Post-ops performance adjustment process

Post-ops performance adjustment process Post-ops performance adjustment process 1 Introduction Background Commission Implementing Regulation (EU) 390/2013 (Performance regulation) and associated Commission Implementing Decision 2014/132/EU setting

More information

Commission hearing on the preparation for RP3

Commission hearing on the preparation for RP3 Commission hearing on the preparation for RP3 14th December 2016 Brussels Discussion document Introduction The performance scheme is at the heart of Single European Sky (SES) policy and is a major driver

More information

ANS performance review in Europe

ANS performance review in Europe A performance oriented approach Ralph RIEDLE Chairman of Performance Review Commission EUROCONTROL 13 September 2016 The stakes are high! ANS generates. Value.. Safety Efficient flow of air traffic Costs.

More information

PRB advice to the Commission in the setting of Union-wide performance targets for RP2

PRB advice to the Commission in the setting of Union-wide performance targets for RP2 PRB advice to the Commission in the setting of Union-wide performance targets for RP2 Final Report Edition date: 27/09/2013 European Union, 2013 COPYRIGHT NOTICE AND DISCLAIMER This report has been prepared

More information

PRB Advice to the Commission in the setting of Union-wide performance targets for RP3

PRB Advice to the Commission in the setting of Union-wide performance targets for RP3 PRB Advice to the Commission in the setting of Union-wide performance targets for RP3 Final report Version N 1.0 Date 30 th September 2018 Performance Review Body of the Single European Sky Rond-Point

More information

Implementation of the Single European Sky and its extension to Third countries

Implementation of the Single European Sky and its extension to Third countries Implementation of the Single European Sky and its extension to Third countries Needs and expectations of the stakeholders with regard to the Network Manager Massimo GARBINI Network Management Board Chairman

More information

Version number 2.1. Approved by NMB at its 15 th session on 12 April 2016

Version number 2.1. Approved by NMB at its 15 th session on 12 April 2016 Version number 2.1 Reference NMD/D/4518 Approved by NMB at its 15 th session on 12 April 2016 version 2.1 12 April 2016 page 3 of 26 Contents 1 Introduction... 5 2 Cooperative Decision Making Processes...

More information

Assessing ATM performance with simulation and optimisation tools: The APACHE Project

Assessing ATM performance with simulation and optimisation tools: The APACHE Project Assessing ATM performance with simulation and optimisation tools: The APACHE Project Xavier Prats, Cristina Barrado (UPC) Andrija Vidosavljevic, Daniel Delahaye (ENAC) Fedja Netjasov, DusanCrnogorac (UB

More information

COMMISSION STAFF WORKING DOCUMENT

COMMISSION STAFF WORKING DOCUMENT EUROPEAN COMMISSION Brussels, 1.3.2018 SWD(2018) 62 final COMMISSION STAFF WORKING DOCUMENT on the ex-post evaluation of the Single European Sky Performance and Charging Schemes in Reference Period 1 and

More information

Better pricing for ATM?

Better pricing for ATM? Better pricing for ATM? Madrid, 26 November 2014 Tatjana Bolić, Desirée Rigonat, Lorenzo Castelli, Radosav Jovanović, Andrew Cook, Graham Tanner Contents of the presentation Background Objectives Policy

More information

Network Manager Review

Network Manager Review Network Manager Review CDM@DSNA Seminar 26 th November Joe Sultana Director Network Management EUROCONTROL Network Performance in 218 Average daily traffic Jan Sep 218 3.6% Traffic Increase (Jan-Sep) Increase

More information

Network Manager nominated by the European Commission EUROCONTROL. Network Manager Annual Report 2015

Network Manager nominated by the European Commission EUROCONTROL. Network Manager Annual Report 2015 Network Manager nominated by the European Commission EUROCONTROL June 2016 FOREWORD BY THE CHAIRMAN OF THE NETWORK MANAGEMENT BOARD, SIMON HOCQUARD I am proud to have been Chair of the Network Management

More information

InterFAB OPS Workshop 2 May 2016 Langen

InterFAB OPS Workshop 2 May 2016 Langen InterFAB OPS Workshop 2 May 2016 Langen Juha Holstila Deputy Manager Finavia Service Development NEFAB ATS Project Manager juha.holstila@finavia.fi NEFAB Target Concept 2015 Norway, Finland, Estonia and

More information

FAB CONSULTATION FAB CENTRAL EUROPE COMMENT RESPONSE DOCUMENT (CRD) 26/06/2012

FAB CONSULTATION FAB CENTRAL EUROPE COMMENT RESPONSE DOCUMENT (CRD) 26/06/2012 Ref. Ares(2012)940616-03/08/2012 FAB CONSULTATION COMMISSION REGULATION (EU) 176/2011 FAB CENTRAL EUROPE COMMENT RESPONSE DOCUMENT (CRD) 26/06/2012 OBSERVATIONS FROM European, EASA, AEA, EBAA, ERA, ELFAA,

More information

Evaluation of Functional Airspace Block (FAB) initiatives and their contribution to performance Improvement

Evaluation of Functional Airspace Block (FAB) initiatives and their contribution to performance Improvement Performance Review Commission Evaluation of Functional Airspace Block (FAB) initiatives and their contribution to performance Improvement NEFAB UK-IR NUAC Baltic FAB EC FAB CE Danube SW Portugal-Spain

More information

PUBLIC LIMITE EN COUNCIL OF THE EUROPEAN UNION. Brussels, 22 May /07 Interinstitutional File: 2005/0235 (CNS) LIMITE AVIATION 92

PUBLIC LIMITE EN COUNCIL OF THE EUROPEAN UNION. Brussels, 22 May /07 Interinstitutional File: 2005/0235 (CNS) LIMITE AVIATION 92 Conseil UE COUNCIL OF THE EUROPEAN UNION Brussels, 22 May 2007 PUBLIC 9769/07 Interinstitutional File: 2005/0235 (CNS) LIMITE AVIATION 92 REPORT from : General Secretariat of the Council to : Council No.

More information

Single Sky II and the aviation package

Single Sky II and the aviation package Single Sky II and the aviation package Achieving more sustainable and better performing aviation SCG 11-13 May 2009 SES and Modernisation of Air Traffic Control European Commission What Challenges is SES

More information

ATM cost-efficiency targets. A guide for European ANSPs and NSAs H ELIOSA DVISER. Analysis & commentary for decision makers in aviation

ATM cost-efficiency targets. A guide for European ANSPs and NSAs H ELIOSA DVISER. Analysis & commentary for decision makers in aviation ATM cost-efficiency targets A guide for European ANSPs and NSAs H ELIOSA DVISER Analysis & commentary for decision makers in aviation Right now, ANSPs are starting to prepare their business plans covering

More information

Operations: Safety. Eric De Causemacker, NSA BE 11 April 2011

Operations: Safety. Eric De Causemacker, NSA BE 11 April 2011 Operations: Safety Eric De Causemacker, NSA BE 11 April 2011 Safety Performance Plan Safety Key Performance Indicators Effectiveness of SMS Severity Classification of the Risk Analysis Tool Just Culture

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING DOCUMENT. Annex to the

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING DOCUMENT. Annex to the COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 22.3.2007 SEC(2007) 363 COMMISSION STAFF WORKING DOCUMENT Annex to the COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL 'Towards

More information

Civil-military ATM performance based partnership

Civil-military ATM performance based partnership ATC Global China EUROCONTROL Workshop Civil-military ATM performance based partnership Driving Excellence in ATM Performance Goran REDZEPOVIC EUROCONTROL / PRISMIL Programme Manager Beijing, 19 September

More information

Single European Sky Interoperability Regulation

Single European Sky Interoperability Regulation Single European Sky Interoperability Regulation EUROPEAN COMMISSION SINGLE EUROPEAN SKY WORKSHOP Sophia Antipolis, France 17.-18. December 2008 EU Single Aviation Market based on high common EU standards

More information

State of play of CAP measure Agri-environment payments in the European Union

State of play of CAP measure Agri-environment payments in the European Union State of play of CAP measure Agri-environment payments in the European Union Alexandros Papakonstantinou EN RD Contact Point CEDIA Seminar 1 st October 2010 THE ROLE OF RURAL DEVELOPMENT POLICY IN DELIVERING

More information

FAB CE ANSPs Strategy

FAB CE ANSPs Strategy FAB CE FAB CENTRAL EUROPE Implementation Phase FAB CE ANSPs Strategy 2016-2020 Document drafted by the SC Strategy task force F e b r u a r y 2 0 1 6 Reference No.: SC_D03 Edition Number: 01.02 Edition

More information

Final Project Report. Abstract. Document information

Final Project Report. Abstract. Document information Final Project Report Document information Project Title QM-7 Integrated Sequence Building/Optimisation of Queues Project Number 05.06.07 Project Manager DFS Deliverable Name Final Project Report Deliverable

More information

CAP CONTEXT INDICATORS

CAP CONTEXT INDICATORS CAP CONTEXT INDICATORS 2014-2020 33. FARMING INTENSITY 2017 update CONTEXT INDICATOR 33: FARMING INTENSITY Intensification is an important restructuring process that has characterised European agriculture

More information

SUPERIOR NETWORK SOLUTIONS

SUPERIOR NETWORK SOLUTIONS AMF BEST PRACTICE SUPERIOR NETWORK SOLUTIONS Organisation The UK s Airspace Management Function combines the resources of the Airspace Management Cell (AMC UK) and the Strategic & Pre Tactical planning

More information

Network Manager User Forum Wrap-up 28/01/2016

Network Manager User Forum Wrap-up 28/01/2016 Network Manager User Forum Wrap-up 28/01/2016 Plenary Session Why we are here To help you to achieve your operational performance We are part of the ATM value chain that can help airspace users to achieve

More information

COMMISSION STAFF WORKING DOCUMENT Accompanying the document

COMMISSION STAFF WORKING DOCUMENT Accompanying the document EUROPEAN COMMISSION Brussels, 14.12.2017 SWD(2017) 445 final PART 2/2 COMMISSION STAFF WORKING DOCUMENT Accompanying the document REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE

More information

Commission hearing on the preparation for RP3

Commission hearing on the preparation for RP3 Commission hearing on the preparation for RP3 14th December 2016 Brussels Report A Introduction The Performance Scheme and Charging Schemes are at the heart of Single European Sky (SES) policy and are

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 27 April 2004 (OR. en) 5565/1/04 REV 1. Interinstitutional File: 2003/0214 (AVC) AVIATION 17 OC 44

COUNCIL OF THE EUROPEAN UNION. Brussels, 27 April 2004 (OR. en) 5565/1/04 REV 1. Interinstitutional File: 2003/0214 (AVC) AVIATION 17 OC 44 COUNCIL OF THE EUROPEAN UNION Brussels, 27 April 2004 (OR. en) Interinstitutional File: 2003/0214 (AVC) 5565/1/04 REV 1 AVIATION 17 OC 44 LEGISLATIVE ACTS AND OTHER INSTRUMTS Subject : Council Decision

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT MANDATE TO CEN/CENELEC/ETSI FOR THE DEVELOPMENT OF

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT MANDATE TO CEN/CENELEC/ETSI FOR THE DEVELOPMENT OF EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY AND TRANSPORT DIRECTORATE F - Air Transport Air Traffic Management Brussels, 12 July 2006 M/390 EN MANDATE TO CEN/CENELEC/ETSI FOR THE DEVELOPMENT OF

More information

Local and network impact assessment of ACDM

Local and network impact assessment of ACDM Local and network impact assessment of ACDM ATM R&D Seminar Denis HUET EUROCONTROL 27 June 2017 Implementation of A-CDM in Europe 23 full A-CDM airports in Europe. Acceleration since 2013. Represents 38%

More information

Evaluation of ICZM in Europe results from the Baltic Region and Recommendations

Evaluation of ICZM in Europe results from the Baltic Region and Recommendations CCB 2011 Annual Conference in Jurmala, Latvia, 6 8 May Evaluation of ICZM in Europe results from the Dr. Gesche Krause Leibniz Center for Tropical Marine Ecology (Bremen, Germany) The ICZM Process In 2002

More information

ASM/ATFCM/ATC PROCESSES AND PROCEDURES WORK PLAN (60 Tasks)

ASM/ATFCM/ATC PROCESSES AND PROCEDURES WORK PLAN (60 Tasks) ASM/ATFCM/ATC PROCESSES AND PROCEDURES WORK PLAN (60 Tasks) Work area 0 Objective and description of task Manage the ASM activities in OPL/PRO. Planned start date 2012 Planned end date Duration 72 months

More information

PATTERNS OF THE AGRICULTURAL INCOME AND IMPACT OF STRUCTURAL CHANGES POST-ENLARGEMENT AMONG EU STATES

PATTERNS OF THE AGRICULTURAL INCOME AND IMPACT OF STRUCTURAL CHANGES POST-ENLARGEMENT AMONG EU STATES CES Working Papers Volume VII, Issue 2A PATTERNS OF THE AGRICULTURAL INCOME AND IMPACT OF STRUCTURAL CHANGES POST-ENLARGEMENT AMONG EU STATES Mirela-Adriana RUSALI * Abstract: The article presents the

More information

A Submission on the CAA/IAA Draft UK-Ireland RP2 Performance Plan Consultation Document

A Submission on the CAA/IAA Draft UK-Ireland RP2 Performance Plan Consultation Document A Submission on the CAA/IAA Draft UK-Ireland RP2 Performance Plan Consultation Document 4 th April 2014 www.prospect.org.uk www.pcs.org.uk Structure of Document Throughout this document, for ease of cross-referencing,

More information

REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES OF THE SYNCHRONOUS AREA CONTINENTAL EUROPE

REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES OF THE SYNCHRONOUS AREA CONTINENTAL EUROPE REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES OF THE SYNCHRONOUS AREA CONTINENTAL EUROPE ON THE ALL TSOS PROPOSAL FOR THE DETERMINATION OF LFC BLOCKS FOR THE SYNCHRONOUS AREA CONTINENTAL EUROPE IN

More information

User Forum Evolution of Network Management Operation Center NMOC. Lenti Giovanni. Head of NOS 24 January 2013

User Forum Evolution of Network Management Operation Center NMOC. Lenti Giovanni. Head of NOS 24 January 2013 User Forum 2013 Evolution of Network Management Operation Center NMOC Lenti Giovanni Head of NOS 24 January 2013 SESAR: the performance targets A future European ATM system than can: Enable a 3-fold traffic

More information

Development of a NERL CO 2 term for CP3

Development of a NERL CO 2 term for CP3 Development of a NERL CO 2 term for CP3 Presentation Outline chronology of development of a NERL flight metric, including SES II timetable criteria and analysis of candidate metrics roadmap approach and

More information

Council of the European Union Brussels, 9 March 2018 (OR. en)

Council of the European Union Brussels, 9 March 2018 (OR. en) Conseil UE Council of the European Union Brussels, 9 March 2018 (OR. en) Interinstitutional File: 2016/0399 (COD) 6932/18 LIMITE 'I/A' ITEM NOTE From: To: Presidency INST 96 JUR 109 CODEC 343 JUSTCIV 55

More information

SESAR development and deployment

SESAR development and deployment SESAR development and deployment Global Challenges to Improve Air Navigation Performance Asilomar Conference Grounds, Pacific Grove, CA 13 February 2015 Rolf TUCHHARDT European Commission, DG MOVE SESAR

More information

WFD Stakeholder Meeting 4 May 2006: Classification/Environmental Standards. Rob Hitchen WFD Team, Defra

WFD Stakeholder Meeting 4 May 2006: Classification/Environmental Standards. Rob Hitchen WFD Team, Defra WFD Stakeholder Meeting 4 May 2006: Classification/Environmental Standards Rob Hitchen WFD Team, Defra Reminder - What is Classification? WFD requires that water bodies are classified (ie. assigned a status

More information

Subject matter and scope

Subject matter and scope PCP Active APT AOP05 REG ASP MIL APO USE INT IND NM Subject matter and scope Implement Airport CDM (A-CDM) to enhance the operational efficiency of airports and improve their integration into the Air Traffic

More information

ATMGE/ 21 Budapest, September Agenda Item 2 - ASBU Monitoring and Reporting. Ana Paula FRANGOLHO EUROCONTROL EUROCONTROL

ATMGE/ 21 Budapest, September Agenda Item 2 - ASBU Monitoring and Reporting. Ana Paula FRANGOLHO EUROCONTROL EUROCONTROL ATMGE/ 21 Budapest, 14-18 September 2015 Agenda Item 2 - ASBU Monitoring and Reporting Ana Paula FRANGOLHO EUROCONTROL EUROCONTROL WHO AM I? Ana Paula FRANGOLHO Background/CV in a nutshell: About 16 years

More information

Performance Based Approach for ASBUs Implementation

Performance Based Approach for ASBUs Implementation Performance Based Approach for ASBUs Implementation Air Navigation Bureau AN Implementation Section Cairo/23 26 November 2015 2000 2002 2003 2005 2007 2008 2009 2012 2013 PERFORMANCE BASED APPROACH AVIATION

More information

SESAR The European ATM Improvement Programme. Regional ANC 2012 Preparatory Symposium Michael STANDAR Moscow March 2012

SESAR The European ATM Improvement Programme. Regional ANC 2012 Preparatory Symposium Michael STANDAR Moscow March 2012 SESAR The European ATM Improvement Programme Regional ANC 2012 Preparatory Symposium Michael STANDAR Moscow 20-21 March 2012 SES II: builds on five pillars Performance Safety (EASA) Technology (SESAR)

More information

CAP CONTEXT INDICATORS

CAP CONTEXT INDICATORS CAP CONTEXT INDICATORS 2014-2020 40. WATER QUALITY 2017 update CONTEXT INDICATOR 40: WATER QUALITY Water quality is assessed through the Gross Nutrient Balance and nitrates in freshwater The nitrogen surplus

More information

IRENA Indicator Fact Sheet

IRENA Indicator Fact Sheet Indicator Definition IRENA indicator 07 - Area under organic farming The share of the organic farming area in the total Utilised Agricultural Area (UAA) indicates the area under organic farming. Indicator

More information

ICB Industry Consultation Body A high level vision for achieving the Single European Sky

ICB Industry Consultation Body A high level vision for achieving the Single European Sky ICB Industry Consultation Body A high level vision for achieving the Single European Sky January 2015 Foreword from the ICB Chairman When I was selected Chairman of the ICB, I set out to transform the

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Brussels, 27.2.2017 COM(2017) 88 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

More information

Assessing ATM Performance Interdependencies through Bayesian Networks

Assessing ATM Performance Interdependencies through Bayesian Networks Assessing ATM Performance Interdependencies through Bayesian Networks Preliminary results Andrea Ranieri, Andrada Bujor Advanced Logistics Group, Indra ICRAT 2014, Istanbul 29 th May 2014 ALG is part of

More information

NORTH EUROPEAN FUNCTIONAL AIRSPACE BLOCK NEFAB Feasibility Study. Cost Benefit Analysis v NEFAB CBA Page 1 of 57

NORTH EUROPEAN FUNCTIONAL AIRSPACE BLOCK NEFAB Feasibility Study. Cost Benefit Analysis v NEFAB CBA Page 1 of 57 NORTH EUROPEAN FUNCTIONAL AIRSPACE BLOCK NEFAB Feasibility Study Cost Benefit Analysis v. 3.0 NEFAB CBA Page 1 of 57 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 3 1.1 Introduction 3 1.2 Description of approach

More information

Council of the European Union Brussels, 3 March 2017 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union

Council of the European Union Brussels, 3 March 2017 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union Council of the European Union Brussels, 3 March 2017 (OR. en) 6932/17 PECHE 87 DELACT 42 COVER NOTE From: date of receipt: 2 March 2017 To: No. Cion doc.: Subject: Secretary-General of the European Commission,

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 27 October /06 Interinstitutional File: 2006/ 0018(COD) ENT 124 ENV 569 CODEC 1173 OC 826

COUNCIL OF THE EUROPEAN UNION. Brussels, 27 October /06 Interinstitutional File: 2006/ 0018(COD) ENT 124 ENV 569 CODEC 1173 OC 826 COUNCIL OF THE EUROPEAN UNION Brussels, 27 October 2006 14419/06 Interinstitutional File: 2006/ 0018(COD) ENT 124 ENV 569 CODEC 1173 OC 826 REPORT from : General Secretariat to : Permanent Representatives

More information

Master Plan edition 2

Master Plan edition 2 SESAR s first with Updated developments The Roadmap for Sustainable Air Traffic Management European ATM Master Plan edition 2 Executive Summary - Military October 2012 European Union The Roadmap for Sustainable

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 9/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum capacity and efficiency through global collaborative

More information

CAP CONTEXT INDICATORS

CAP CONTEXT INDICATORS CAP CONTEXT INDICATORS 2014-2020 45. EMISSIONS FROM AGRICULTURE 2017 update CONTEXT INDICATOR 45: EMISSIONS FROM AGRICULTURE 1. GHG emissions from agriculture GHG emissions from agriculture represent 9.8%

More information

A-CDM Benefits & Network Impact Study

A-CDM Benefits & Network Impact Study A-CDM Benefits & Network Impact Study A-CDM Information Exchange Preliminary Findings Denis HUET Simon PICKUP 22 nd September 2015 Agenda Study Objectives Airport Factsheets Local Benefits Network Assessment

More information

HUMAN RESOURCES ANALYSIS IN THE BLUE MED FAB ENVIRONMENT

HUMAN RESOURCES ANALYSIS IN THE BLUE MED FAB ENVIRONMENT BLUE MED is co-funded by the EC DG TREN within the TEN-T Framework Issue 3 - June 2008 HUMAN RESOURCES ANALYSIS IN THE BLUE MED FAB ENVIRONMENT The competence, qualification, expertise and skills of staff

More information

Stakeholder Consultation Workshop on the Draft Regulatory Material.

Stakeholder Consultation Workshop on the Draft Regulatory Material. Stakeholder Consultation Workshop on the Draft Regulatory Material. 16 May 2008, Brussels, EUROCONTROL European 1 Organisation for the Safety of Air Navigation Agenda Item 1: Welcome and Introduction Workshop

More information

NEFAB Project Feasibility Study Initiative 6 Harmonisation of Operational Rules and Procedures

NEFAB Project Feasibility Study Initiative 6 Harmonisation of Operational Rules and Procedures NEFAB Project Feasibility Study Initiative 6 Harmonisation of Operational Rules and Procedures Page 1 of 20 TABLE OF CONTENTS 1. EXECUTIVE SUMMARY... 3 2. DESCRIPTION OF THE INITIATIVE... 5 3. RATIONALE

More information

NUAC Programme Definition Phase Supplementary Report

NUAC Programme Definition Phase Supplementary Report NUAC Programme Definition Phase Supplementary Report The feasibility of a joint enterprise for the carrying out of Air Navigation Services in Danish and Swedish airspace August 2007 Version: 02.00 / 2007.08.24

More information

The SESAR Joint Undertaking is a EU body created by the EU Council (REG 219/2007)

The SESAR Joint Undertaking is a EU body created by the EU Council (REG 219/2007) EUROPEAN COMMISSION The SESAR family The SESAR Joint Undertaking is a EU body created by the EU Council (REG 219/2007) Its founding members are the European Community and the Eurocontrol Organisation Members

More information

ERGP (14) 24 report on QoS and end-user satisfaction ERGP REPORT 2014 ON THE QUALITY OF SERVICE AND END-USER SATISFACTION

ERGP (14) 24 report on QoS and end-user satisfaction ERGP REPORT 2014 ON THE QUALITY OF SERVICE AND END-USER SATISFACTION ERGP REPORT 2014 ON THE QUALITY OF SERVICE AND END-USER SATISFACTION 1 Content Page 0. Executive summary 10 1. Background 14 2. Objectives 15 3. Methodology 16 4. Current situation regarding quality of

More information

European RPAS Roadmap RPAS Activities in SESAR 2020

European RPAS Roadmap RPAS Activities in SESAR 2020 European RPAS Roadmap RPAS Activities in SESAR 2020 Connecting the dots DEPLOYMENT DEFINITION DEVELOPMENT Why we need to act What needs to be done When it needs to be done THE MASTER PLAN DEFINES THE PRIORITIES

More information

COMMISSION STAFF WORKING DOCUMENT

COMMISSION STAFF WORKING DOCUMENT EN EN EN EUROPEAN COMMISSION Brussels, 26.8.2010 SEC(2010) 978 final COMMISSION STAFF WORKING DOCUMENT on the implementation of the Forest Focus scheme according to Regulation (EC) No 2152/2003 of the

More information

Guidance for NERL in preparing its business plan for Reference Period 3

Guidance for NERL in preparing its business plan for Reference Period 3 Consumers and Markets Group Guidance for NERL in preparing its business plan for Reference Period 3 CAP 1625 Published by the Civil Aviation Authority, 2018 Civil Aviation Authority, Aviation House, Gatwick

More information

FABCE s Experience of the NSA HR Applications

FABCE s Experience of the NSA HR Applications Agencija za civilno letalstvo Slovenija Civil Aviation Agency Slovenija National Supervisory Authorities (NSA) Human Resources Applications Workshop FABCE s Experience of the NSA HR Applications Wednesday

More information

Council of the European Union Brussels, 10 November 2016 (OR. en)

Council of the European Union Brussels, 10 November 2016 (OR. en) Conseil UE Council of the European Union Brussels, 10 November 2016 (OR. en) Interinstitutional File: 2016/0186 (COD) 13660/16 LIMITE NOTE CULT 101 AELE 77 EEE 41 CODEC 1506 From: Permanent Representatives

More information

MAT Report Principles and Layout

MAT Report Principles and Layout MAT Report Principles and Layout Document information Edition date 28th of January 2015 Edition number 03.00.00 Abstract In order to provide a global view of the progress of Maturity within the SESAR Programme,

More information

Capacity Planning and Assessment Additional considerations

Capacity Planning and Assessment Additional considerations Capacity Planning and Assessment Additional considerations Air Traffic Services System Capacity Seminar/Workshop Nairobi, Kenya, 8 10 June 2016 Raffaele Russo EUROCONTROL Operations Planning Summary Winter

More information

(Only the Danish, Dutch, English, Estonian, Finnish, French, German, Italian, Latvian, Maltese, Polish and Swedish texts are authentic) (2014/395/EU)

(Only the Danish, Dutch, English, Estonian, Finnish, French, German, Italian, Latvian, Maltese, Polish and Swedish texts are authentic) (2014/395/EU) 26.6.2014 EN L 186/103 COMMISSION DECISION of 24 June 2014 concerning the placing on the market for essential use of biocidal products containing copper (notified under document C(2014) 4062) (Only the

More information

10763/1/14 REV 1 ADB/mk 1 DG B 4A

10763/1/14 REV 1 ADB/mk 1 DG B 4A COUNCIL OF THE EUROPEAN UNION Brussels, 16 June 2014 10763/1/14 REV 1 SOC 472 ECOFIN 618 EDUC 210 COVER NOTE from: to: Subject: The Employment Committee Permanent Representatives Committee (Part I) / Council

More information

Administration de la Navigation Aérienne (ANA) ANA ANNUAL REPORT

Administration de la Navigation Aérienne (ANA) ANA ANNUAL REPORT Administration de la Navigation Aérienne (ANA) ANA Edition: 1.0 August 2017 Administration de la Navigation Aérienne (ANA) 2 Page left blank Administration de la Navigation Aérienne (ANA) 4 Page left

More information

2017 LSSIP Kick-Off Event

2017 LSSIP Kick-Off Event Item 3.4 - How can the LSSIP mechanism serve multiple purposes: SESAR Deployment Predrag Vranjkovic 16 October 2017 Content 1. Pilot exercise activities [ SJU SDM PJ20] 2. Our involvement and interaction

More information

ACCHANGE. Union Bargaining model in ATC. Stef Proost (KULeuven+TML) joint work with Amihai Glazer (UCIrvine) Thomas Blondiau (TML)

ACCHANGE. Union Bargaining model in ATC. Stef Proost (KULeuven+TML) joint work with Amihai Glazer (UCIrvine) Thomas Blondiau (TML) ACCHANGE Union Bargaining model in ATC Stef Proost (KULeuven+TML) joint work with Amihai Glazer (UCIrvine) Thomas Blondiau (TML) Motivation 1 Air traffic control in Europe is presently organized by 37

More information

Trends and projections in Europe 2018

Trends and projections in Europe 2018 Trends and projections in Europe 2018 Tracking progress towards Europe s climate and energy targets (First release, 26 October 2018) Introduction 1 Introduction 1.1 Objective This early release of the

More information

CAP CONTEXT INDICATORS

CAP CONTEXT INDICATORS CAP CONTEXT INDICATORS 2014-2020 44. ENERGY USE IN AGRICULTURE, FORESTRY AND THE FOOD INDUSTRY 2017 update BE BG CZ DK DE EE IE EL ES FR HR IT CY LV LT LU HU MT NL AT PL PT RO SI SK FI SE UK CONTEXT INDICATOR

More information

Nordic synchronous area Proposal for limits for the exchange of FCR between the TSOs in accordance with Article 163(2) of the Commission Regulation

Nordic synchronous area Proposal for limits for the exchange of FCR between the TSOs in accordance with Article 163(2) of the Commission Regulation of FCR between the TSOs in accordance with Article 163(2) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation 10 September

More information

GAZ-SYSTEM Regional Cooperation:

GAZ-SYSTEM Regional Cooperation: GAZ-SYSTEM Regional Cooperation: - BEMIP - North-South Gas Interconnections in CEE ENTSOG TYNDP Workshop Brussels, 17 th March 2011 Characteristics of gas transmission system in Poland Transmission system

More information

REVIEW OF ECONOMIC GROWTH FACTORS OF RURAL AREAS IN THE EUROPEAN UNION

REVIEW OF ECONOMIC GROWTH FACTORS OF RURAL AREAS IN THE EUROPEAN UNION 244 REVIEW OF ECONOMIC GROWTH FACTORS OF RURAL AREAS IN THE EUROPEAN UNION Mirela Adriana Rusali PhD, Scientific Researcher II, Institute of Agricultural Economics The Romanian Academy Abstract: Growth

More information

Appendix 4 Business Model

Appendix 4 Business Model NUAC Programme Definition Phase Final Report Appendix 4 Business Model FEBRUARY 2007 Version: 01.00 / 21.02.2007 Appendix 4 - Business Model Page 0 of 38 Definition Phase Final Report NUAC Programme Establishing

More information

Evaluation of the National Renewable Energy Action Plans

Evaluation of the National Renewable Energy Action Plans www.aebiom.org Evaluation of the National Renewable Energy Action Plans Jean-Marc Jossart Copenhagen, 6 October 2010 About AEBIOM European Biomass Association Represents and promotes interests of bioenergy

More information

Official Journal of the European Union L 153/9

Official Journal of the European Union L 153/9 14.6.2007 Official Journal of the European Union L 153/9 COMMISSION REGULATION (EC) No 653/2007 of 13 June 2007 on the use of a common European format for safety certificates and application documents

More information

Overview of NRNs activities in supporting evaluation of RDPs Outcomes of a survey

Overview of NRNs activities in supporting evaluation of RDPs Outcomes of a survey Overview of NRNs activities in supporting evaluation of RDPs Outcomes of a survey Jela Tvrdonova, Evaluation Manager jela@ruralevaluation.eu Good Practice Workshop, 30 Nov 01 Dec 2017, Athens Content Background

More information

Fixing Directors' Remuneration in Europe. Governance, Regulation and Disclosure

Fixing Directors' Remuneration in Europe. Governance, Regulation and Disclosure Fixing Directors' Remuneration in Europe Governance, Regulation and Disclosure Prof. Guido Ferrarini Dr. Maria Cristina Ungureanu University of Genoa Roundtable on Directors Remuneration European Commission,

More information

Collaborative Decision Making (CDM) Update

Collaborative Decision Making (CDM) Update Collaborative Decision Making (CDM) Update 1 FAA CDM Office CDM Domestic combined with International Operations, includes International Data Sharing One Manager Two Full Time Team Leads, Two Part-Time

More information

ACI EUROPE POSITION on AVIATION AND CLIMATE CHANGE

ACI EUROPE POSITION on AVIATION AND CLIMATE CHANGE ACI EUROPE POSITION on AVIATION AND CLIMATE CHANGE June 2007 EU action on Aviation & Climate Change Responsible, constructive and pragmatic action needed to tackle the impact of aviation on climate change

More information

Better Pricing Strategies for ATM?

Better Pricing Strategies for ATM? Better Pricing Strategies for ATM? Tatjana Bolić, Desirée Rigonat, Lorenzo Castelli Dipartimento di Ingegneria e Architettura Università degli Studi di Trieste Trieste, Italy Radosav Jovanović Division

More information

ANNEX ANNEX. to the. Report from the Commission to the Council and the European Parliament

ANNEX ANNEX. to the. Report from the Commission to the Council and the European Parliament EUROPEAN COMMISSION Brussels, 8.3.2018 COM(2018) 118 final ANNEX ANNEX to the Report from the Commission to the Council and the European Parliament on the effects of Articles 199a and 199b of Council 2006/112/EC

More information

Jørgen Waaler, CEO March 21 st :00-09:30

Jørgen Waaler, CEO March 21 st :00-09:30 Jørgen Waaler, CEO March 21 st 2018 09:00-09:30 Agenda Summary 2017 StrongPoint market solutions, positions & drivers StrongPoint Cub Systems Value drivers 2018-2020 Q & A Mission Driving retailers productivity

More information

North European Functional Airspace Block Avinor, Norway EANS, Estonia Finavia, Finland LGS, Latvia. NEFAB Project SAFETY CASE REPORT. Version 3.

North European Functional Airspace Block Avinor, Norway EANS, Estonia Finavia, Finland LGS, Latvia. NEFAB Project SAFETY CASE REPORT. Version 3. NEFAB Project SAFETY CASE REPORT Version 3.01 Page 1 of 40 Revision history Version Date Description Approved 3.0 3.01 14/12/2011 Page 2 of 40 TABLE OF CONTENTS 1. INTRODUCTION... 4 1.1. AIM... 4 1.2.

More information

NEGOTIATING THE NEW WORLD OF WORK WHAT ROLE FOR COLLECTIVE BARGAINING?

NEGOTIATING THE NEW WORLD OF WORK WHAT ROLE FOR COLLECTIVE BARGAINING? NEGOTIATING THE NEW WORLD OF WORK WHAT ROLE FOR COLLECTIVE BARGAINING? Thorsten Schulten European Trade Union Institute International Conference: Shaping the new world of work 27-29 June 2016, Brussels

More information

European energy infrastructure policy

European energy infrastructure policy European energy infrastructure policy 2018 CEF Energy Virtual Info Day 9 April 201 2018 CEF Energy Virtual Info Day 9 April 2018 Milosz Momot Team Leader - Networks and Regional initiatives - DG Energy,

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 6.10.2005 COM(2005)473 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the appropriateness of establishing rules on

More information

RP3 ATCEUC position paper

RP3 ATCEUC position paper "[air navigation control, [ ] is a task involving the exercise of public authority and is not of an economic nature, since that activity constitutes a service in the public interest which is intended to

More information