1 FORM 1 & 1A [Vide Paragraph 6 of tification dated 14 th September 2006] FOR ENVIRONMENTAL CLEARANCE OF MUKHYAMANTRI GRUH YOJANA LOWER INCOME GROUP (LIG) SCHEME [High Rise Residential Flats & Shops] TO BE SET-UP AT T.P. NO. 1, F.P. NO. 145, VILLAGE: HARNI, TALUKA & DISTRICT: VADODARA DEVELOPERS RAJKAMAL BUILDERS INFRASTRUCTURE PVT. LTD. OPP. SEVEN SEAS MALL, NR. ARVIND BAUG, FATEGUNJ, VADODARA MAY 2016

2 FORM 1 & ANNEXURES

3 (I) BASIC INFORMATION FORM 1 [Vide Paragraph - 6 of tification dated 14 th September 2006] High Rise Residential Flats & Shops 1 Name of the Project : Mukhyamantri Gruh Yojana Lower Income Group (LIG) Scheme High Rise Residential Flats & Shops to be developed by M/s. Rajkamal Builders Infrastructure Pvt. Ltd. 2 Survey. in the schedule : 8(a)-[Building and Construction projects] of the Schedule of EIA tification, Proposed capacity/ area/ length /tonnage to be handled/ command area / lease area / number of wells to be drilled. : Description Area Plot area : 11, m 2 Total Built-up area : 35, m 2 Total FSI area : 30, m 2 Total. of Units : 462 Flats 31 Shops 4 New/ Expansion / Modernization : New Project 5 Existing capacity / Area etc. : t Applicable Please refer Annexure 1: Area Statement 6 Category of the project i.e. A or B 7 Does it attract the general condition? If yes, then specify. 8 Does it attract the specific condition? If yes, then specify. : Category B, Project Activity. 8(a) : : 9 Location : Please refer Annexure 2 & 3: Location of Project Site Plot/Survey/Khasra. : T.P.. 1, F.P.. 145, Village : Harni Tehsil : Vadodara District : Vadodara State : Gujarat 10 Nearest railway station / airport along with distance in kms. : Railway St.: Vadodara Approx. 5.2 Km Airport: Vadodara Approx. 1.5 Km Form 1 1 of 18

4 High Rise Residential Flats & Shops 11 Nearest town, city, district Headquarters along with distance in kms. 12 Village panchayats, Zilla parishad, municipal corporation, local body (complete postal addresses with telephone nos. to be given : Vadodara - the proposed project is within limits of the Vadodara Municipal Corporation (VMC). : VMC East Zone Nr. Sawad Community Hall, Harni Warasia Road, Near Shweta Park Char Rasta, Vadodara 22. Phone : (91)-(265) Name of the applicant : Mr. Navin K. Patel Vice President Please refer Annexure 8: List of Directors 14 Registered Address : M/s. Rajkamal Builders Infrastructure Pvt. Ltd. Opp. Seven Seas Mall, Nr. Arvind Baug, Fategunj, Vadodara Address for correspondence Name : Mr. Navin K. Patel Designation (Owner/partner/CEO) : Vice President Address : M/s. Rajkamal Builders Infrastructure Pvt. Ltd. Opp. Seven Seas Mall, Nr. Arvind Baug, Fategunj, Vadodara. Pin code : rajkamal.baroda@gmail.com Telephone. : / (M) Fax. : Details of Alternative Sites examined, if any. Location of these sites should be shown on a topo sheet. : t Applicable 17 Interlinked Projects : t Applicable 18 Whether separate application of interlinked project has been submitted? : t Applicable 19 If yes, date of submission : t Applicable 20 If no, reason : t Applicable Form 1 2 of 18

5

6 High Rise Residential Flats & Shops (II) ACTIVITY 1) Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr.. Information/Checklist confirmation Yes / Details there of (with approximate quantities/rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The proposed construction project is to be developed on an open land area hence a permanent change in land use will occur. However the same will not be environmentally adverse. Various construction activities, construction material handling & storage, construction waste disposal etc. will bring change to the site topsoil. However, construction wastes are inert in nature and will be used for levelling, roads, pavements etc. at project site itself. 1.2 Clearance of existing land, vegetation and buildings? It may be noted that there will not be any change in land use, land cover, or topography during the operational activities. t applicable due to the fact that the proposed project is to be developed on an open land area. 1.3 Creation of new land uses? Yes Creation of new land use will not bring change in topography, land use, water bodies etc. 1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Please refer Annexure 4: Geo Technical Investigation Report. 1.5 Construction works? Yes Various construction activities, construction material handling & storage, construction waste disposal etc. will bring change to the site topsoil. However, construction wastes are inert in nature and will be used for levelling low lying areas and development of greenbelt area at project site itself. Form 1 4 of 18

7 High Rise Residential Flats & Shops 1.6 Demolition works? demolition work will be required to carry out, since the proposed project is to be developed on an open land area. 1.7 Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations. 1.9 Underground works including mining or tunnelling? Yes t applicable because local contractors /workers will be given preference for various construction activities. Since local workers/ contractors are easily available, there will be no requirement for housing for construction workers. The proposed project is to be developed on an open land area. Various construction activities, construction material handling & storage, construction waste disposal etc. will bring change to the site topsoil. However, construction wastes are inert in nature and will be used for levelling low lying areas and excavated soil will be used for the development of greenbelt area at project site itself. t Applicable 1.10 Reclamation works? t Applicable 1.11 Dredging? t Applicable 1.12 Offshore structures? t Applicable 1.13 Production & manufacturing processes? 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes t Applicable Storage of goods and materials to be used for various construction activities will bring changes to the site topsoil; however, the effect would be very marginal. Approximately 282 KL/day of sewage to be generated during the operation phase will be discharged to VMC drainage system. Approximately 1,179 Kg/day of municipal waste to be generated during the operation phase will be collected by VMC for ultimate disposal to landfill site. Form 1 5 of 18

8 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? 1.21 Impoundment, damming, culverting, realignment or other changes to hydrology of watercourses or aquifers? High Rise Residential Flats & Shops Therefore, this activity would not have adverse impact on topography, land use, changes in water bodies etc. Since, local workers will be employed; no housing facilities will be required for operational workers. The proposed project is to be developed within Harni area of Vadodara City where existing transport facilities are enough to take care of increased traffic. new road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports is envisaged. Existing transportation facilities will be used for the proposed project. t Applicable such activities are required to be carried out. t Applicable because water will be obtained through VMC during operation phase and purchase from local water tanker suppliers during construction phase Stream crossings? t Applicable 1.23 Abstraction or transfers of water from ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? t Applicable because water will be obtained through VMC during operation phase and purchase from local water tanker suppliers during construction phase. t Applicable because, Excess run off water will be diverted to Three (3) percolation wells within the project site. Sewage to be generated from proposed project will be discharged to VMC drainage system. Form 1 6 of 18

9 1.25 Transport of personnel or materials for construction, operation or decommissioning 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? Yes High Rise Residential Flats & Shops Most of the construction materials will be bought from local suppliers. It may be noted that local people will be given preference for all the activities related to the proposed project. Hence, transport of personnel or materials for construction, operation or decommissioning will not bring change to topography, land use, water bodies etc. t Applicable t Applicable As the proposed project is to develop High Rise Residential Flats (3 room + kitchen) & Shops, there will be permanent influx of people. However, it will not bring any change in the topography, land use, water bodies etc Introduction of alien species? t Applicable 1.30 Loss of native species or genetic diversity? t Applicable 1.31 Any other actions? t Applicable Form 1 7 of 18

10 High Rise Residential Flats & Shops 2) Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply) Sr.. Information/Checklist confirmation Yes / Details there of (with approximate quantities/rates, wherever possible) with source of information data 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit: KLD Yes Yes The proposed project is to be developed on 11,130 m 2 (1.1 ha) of open land area. Narmada water will be obtained through Vadodara Municipal Corporation (VMC). Please refer Annexure 5: Details of Water Consumption & Wastewater Generation 2.3 Minerals (MT) t Applicable 2.4 Construction material stone, aggregates, sand / soil (expected source MT) 2.5 Forests and timber (Source MT) 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW). 2.7 Any other natural resources (use appropriate standard units) Yes Yes Yes Most of the construction materials will be bought from local suppliers. Most of the carpentry work will be carried out by use of processed engineering wood/ particle board instead of wood. Power will be sourced from M/s. Madhya Gujarat Vij Company Ltd. (MGVCL). Approximately 50 KW of power will be required during construction phase whereas the same during operation phase would be approximately 2 MW. t Applicable Form 1 8 of 18

11 High Rise Residential Flats & Shops 3) Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or environment or raise concerns about actual or perceived risks to human health. Sr.. Information/Checklist confirmation Yes / Details there of (with approximate quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., t Applicable t Applicable t Applicable t Applicable 3.5 Any other causes other causes identified Form 1 9 of 18

12 High Rise Residential Flats & Shops 4) Production of solid wastes during construction or operation or decommissioning (MT/month) Sr.. Information/Checklist confirmation Yes / Details there of (with approximate quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes t Applicable 4.2 Municipal waste (domestic and/or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Yes Please refer Annexure 6: Details of Municipal Waste Used oil and used bags/liners to be generated due to various construction activities will be sold to authorized recyclers. 4.4 Other industrial process wastes t Applicable 4.5 Surplus product t Applicable 4.6 Sewage sludge or other sludge from effluent treatment t Applicable 4.7 Construction or demolition wastes Yes Construction waste will be generated due to various construction activities, construction material handling & storage etc. However, the same would be inert in nature and will be used for levelling low lying areas and development of greenbelt at project site itself. 4.8 Redundant machinery or equipment t Applicable 4.9 Contaminated soils or other materials t Applicable 4.10 Agricultural waste t Applicable 4.11 Other solid wastes t Applicable Form 1 10 of 18

13 High Rise Residential Flats & Shops 5) Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Sr.. Information/Checklist confirmation Yes / Details there of (with approximate quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources t Applicable 5.2 Emissions from production processes t Applicable 5.3 Emissions from materials handling including storage or transport Yes High levels of Suspended Particulate Matters (SPM) may be noted due to various construction activities & handling and storage of construction materials. However, continuous water sprinkling will be done and temporary windshield barriers will be provided by the use of bamboos and GI sheets to prevent the said problem. 5.4 Emissions from construction activities including plant and equipment. 5.5 Dust or odour from handling of materials including construction materials, sewage and waste. Yes Yes During construction activities concentration of SPM in ambient air will slightly increase for that particulate time only. Due to the handling of construction materials, concentration of SPM in ambient air will increase for that particulate time only. There will not be any odour problem during the handling of construction materials. During construction phase adequate sanitary facilities will be provided for the construction workers. 5.6 Emissions from incineration of waste t Applicable 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) t Applicable 5.8 Emissions from any other sources t Applicable Form 1 11 of 18

14 High Rise Residential Flats & Shops 6) Generation of ise and Vibration and Emission of Light and Heat Sr.. Information/Checklist confirmation Yes / Details there of (with approximate quantities/rates, wherever possible) with source of information data 6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Adequate sound enclosures will be provided to all the equipments and machineries generating high noise during construction phase. Also, earplugs and earmuffs will be provided to all workers working in such areas. 6.2 From industrial or similar processes t Applicable Green belt area will be developed and maintained within the site premises which will help to abate noise pollution. 6.3 From construction or demolition. Yes During construction activities, construction equipments, including dozer, scrapers, power tools etc will be the major sources of noise generation. However, noise will be limited for that particular time. Nevertheless, care/steps will be taken to reduce/avoid such noise pollution and keep the noise level within the prescribed limit. 6.4 From blasting or piling t applicable because no such activities will be carried out. 6.5 From construction or operational traffic Yes ise will be generated due to construction as well as operational traffic; however the quantum would be very marginal and may happen for short period only. 6.6 From lighting or cooling systems. t Applicable 6.7 From any other sources t Applicable Form 1 12 of 18

15 High Rise Residential Flats & Shops 7) Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea Sr.. Information/Checklist confirmation Yes / Details there of (with approximate quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water t Applicable t applicable due to the fact that the wastewater to be generated from proposed project will be discharged to the drainage line of Vadodara Municipal Corporation (VMC). t Applicable 7.4 From any other sources t Applicable 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? t Applicable Form 1 13 of 18

16 High Rise Residential Flats & Shops 8) Risk of accidents during construction or operation of the Project, which could affect human health or the environment. Sr.. Information/Checklist confirmation Yes / Details there of (with approximate quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances. t Applicable 8.2 From any other causes t Applicable 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Floods are not likely to occur as water bodies are far away. Earthquake resistance structure will be builtup as per relevant IS code. Please refer Annexure 7: Structural Design Certificate Form 1 14 of 18

17 High Rise Residential Flats & Shops 9) Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. Sr.. Information/Checklist confirmation Yes / Details there of (with approximate quantities/rates, wherever possible) with source of information data 9.1 Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) Housing development Extractive industries Supply industries Other 9.2 Lead to after-use of the site, which could have an impact on the environment. 9.3 Set a precedent for later developments. 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Development of supporting facilities like petrol pumps, hotels etc. is likely to occur in surrounding area. t Applicable t Applicable t Applicable Form 1 15 of 18

18 High Rise Residential Flats & Shops (III) ENVIRONMENTAL SENSITIVITY Sr.. Areas Name / Identity 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value. ne Aerial distance (within 15 Kms.) from the proposed project location boundary t Applicable 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters ne ne ne t Applicable t Applicable t Applicable 5 State, National boundaries ne t Applicable 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas ne t Applicable 7 Defence installations ne t Applicable 8 Densely populated or built-up area 9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality or scarce resources. (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) Vadodara Yes ne The project site is within limits of the Vadodara Municipal Corporation (VMC). Hospitals, schools, institutes, places of worship, community places etc. are present. It may be noted that the proposed project consists of apartments & shops. Therefore, it would not have any adverse impact on such places. t Applicable Form 1 16 of 18

19 High Rise Residential Flats & Shops 11 Areas already subjected to pollution or environmental damage. (Those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard, which could cause the project to present environmental problems. (Earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) ne ne t Applicable Floods are not likely to occur as water bodies are far away. Earthquake resistance structure will be built-up as per relevant IS code. Please refer Annexure 7: Structural Design Certificate Form 1 17 of 18

20

21 Mukhya Mantri Gruh Yojana Lower Income Group (LIG) Scheme ANNEXURES OF FORM 1 Annexure Page Description.. 1 Area Statement 2 2 Location of Project Site 3 3 Satellite imagery showing project site and surroundings of 4 1 km, 5 km and 10 km radius 4 Geo Technical Investigation Report 6 5 Details of Water Consumption and Wastewater Generation 7 6 Details of Municipal Waste 8 7 Structural Design Certificate 9 8 List of Directors 10 9 VMC letter showing work order given to M/s. Rajkamal 11 Builders Infrastructure Pvt. Ltd. 10 Zoning Certificate T.P. scheme map (part plan) showing location of project site 13 Annexures of Form 1 1 of 13

22 Mukhya Mantri Gruh Yojana Lower Income Group (LIG) Scheme Annexure 1: Area Statement Description Area (m 2 ) Total Plot Area 11, Total Proposed Built-up Area 35, Total Proposed FSI Area 30, Total Proposed Parking Area 4, Total Common Plot Area Approx. Greenbelt Area 1,000 Annexures of Form 1 2 of 13

23 Mukhya Mantri Gruh Yojana Lower Income Group (LIG) Scheme Annexure 2: Location of Project Site Annexures of Form 1 3 of 13

24 Mukhya Mantri Gruh Yojana Lower Income Group (LIG) Scheme Annexure 3: Satellite image of the Project Site Google Image showing location of project site Google image showing project site and its surroundings within 1 km Annexures of Form 1 4 of 13

25 Mukhya Mantri Gruh Yojana Lower Income Group (LIG) Scheme Google image showing project site and its surroundings within 5 km Google image showing project site and its surroundings within 10 km Annexures of Form 1 5 of 13

26 Mukhya Mantri Gruh Yojana Lower Income Group (LIG) Scheme Annexure 4: Geo Technical Investigation Report Please see the attached Geo Technical Investigation Report Annexures of Form 1 6 of 13

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43 Mukhya Mantri Gruh Yojana Lower Income Group (LIG) Scheme Annexure 5: Details of Water Consumption & Wastewater Generation During Construction: Source of Water Supply: Purchase from local water tanker suppliers Sr.. Description Water Consumption, KL/day Wastewater Generation, KL/day 1 Domestic (100 Workers x 50 L/day) Construction & Sprinkling Activities Total (1+2) 20 4 Mode of Disposal: The domestic wastewater will be discharged via septic tank into soak pit system. During Operation: Source of Water Supply: Narmada water through VMC Sr.. 1 Domestic 462 Flats 31 Shops Description Water Consumption, KL/day 347* Wastewater Generation, KL/day 2 Gardening ** 278 Total (1+2) *462 Flats x 5 Persons/Flat x 150 Lit/Person/Day = ~ 347 KL/day **31 Shops x 3 Persons/Shop x 50 Lit/Person/Day = 4.6 ~ 5 KL/day 4 Mode of Disposal: The domestic wastewater will be discharged through VMC drainage system. Annexures of Form 1 7 of 13

44 Mukhya Mantri Gruh Yojana Lower Income Group (LIG) Scheme Annexure 6: Details of Municipal Waste During Construction: Sr.. Description Waste Generation, Kg/day 1 Domestic (100 Workers x 250 g/person/day) 25 Mode of Disposal: The domestic waste will be stored in bins in proper manner before its collection by the VMC. During Operation: Sr.. Description Waste Generation, Kg/day 1 Domestic 462 Flats 31 Shops 1, Total 1,179 *462 Flats x 5 Persons/Flat x 500 gm/person/day = 1,155 Kg/day **31 Shops x 3 Persons/Shop x 250 gm/person/day = 23.2 ~ 24 Kg/day Mode of Disposal: Garbage generated from each individual unit will be emptied daily in to the community bins (80 lit capacity) provided at various locations. These community bins will be emptied daily by the VMC. Community Bins: Residential Total no. of units = 462 Community bin required = 462 units X 10 lit / unit = 4620 lit Provision made = 80 lit capacity X 58 bins = 4640 lit Commercial Community bin required = 1, m 2 floor area/100 m 2 = Community bin required = x 20 lit = lit = lit/80 lit (1 bin capacity) = 3.2 s. Bin Provision made = 4 s. Bin (80 lit capacity of each bin) Annexures of Form 1 8 of 13

45 Mukhya Mantri Gruh Yojana Lower Income Group (LIG) Scheme Annexure 7: Structural Design Certificate Annexures of Form 1 9 of 13

46 Mukhya Mantri Gruh Yojana Lower Income Group (LIG) Scheme Annexure 8: List of Directors Sr.. Name of Director Address Contact. 1 Mafatlal B. Patel 54, Park Hill, Nr. Heaven Park, Ambawadi, Ahmedabad Shankerlal D. Patel 3 Somabhai D. Patel 4 Mahendrakumar H. Patel 5 Sandeepbhai R. Patel 6 Pranavbhai S. Patel 7 Nishantbhai M. Patel 369, Saraswatinagar Society, Ambawadi, Ahmedabad , Park Hill Society, B/h. Shelbi Hospital, Ramdevnagar, Satellite, Ahmedabad , Park Hill Society, Nr. Heaven Park, Ambawadi, Ahmedabad , Rachana Society, Satellite Road, Ahmedabad /74, Saraswatinagar, Nr. Himalaya Park, Nr. Azad Society, Ahmedabad , Park Hill Society, Nr. Heaven Park, Ramdevnagar, Satellite, Ahmedabad / Annexures of Form 1 10 of 13

47 Mukhya Mantri Gruh Yojana Lower Income Group (LIG) Scheme Annexure 9: VMC Letter Annexures of Form 1 11 of 13

48 Mukhya Mantri Gruh Yojana Lower Income Group (LIG) Scheme Annexure 10: Zoning Certificate Annexures of Form 1 12 of 13

49 Mukhya Mantri Gruh Yojana Lower Income Group (LIG) Scheme Annexure 11: T.P. scheme map (part plan) showing location of project site Please see the attached T.P. scheme map (part plan) showing location of project site Annexures of Form 1 13 of 13

50 FORM 1A & ANNEXURES

51 High Rise Residential Flats & Shops FORM 1A [Vide Paragraph - 6 of tification dated 14 th September 2006, only for construction projects listed under item 8 of the Schedule] (1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity) 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surrounding? (Proposed land use must conform to the approved Master Plan /Development Plan of the area. Change of land use if any and the statutory approval from the competent authority to be submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indication levels and contours) to appropriate scales. If not available attached only conceptual plans 1.2 List out all the major project requirement in terms of the land area, built-up area, water consumption, power requirement, connectivity, community facilities, parking needs etc 1.3 What are the likely impacts of the proposed activity on the existing facilities adjacent to the proposed site? (Such as open spaces, community facilities, details of the existing land use, disturbance to the local ecology). 1.4 Will there be any significant land disturbance resulting in erosion, subsidence & instability? (Details of soil type, slope analysis, vulnerability to subsidence, seismicity etc may be given). The proposed project is to develop High Rise Residential Flats (3 rooms + kitchen) & Shops as hence; it will be consistent with the surrounding land use. Please refer Attached folders for plans of the proposed project Annexure A: Location of Project Site Please refer Annexure B: Project Highlights Please refer Annexure C: Assessment of Impacts (Construction phase) There will not be any land disturbance resulting in erosion, subsidence & instability. 1.5 Will the proposal involve alteration of natural drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site) 1.6 What are the quantities of earthwork involved in the construction activity cutting, filling, reclamation etc. (give There will not be any change in natural drainage system. Whatever the quantity of construction wastes will be generated due to construction activities like excavation; Form 1A 1 of 15

52 High Rise Residential Flats & Shops details of the quantities of earthwork involved, transport of fill materials from outside the site etc.) construction material handling & storage construction waste disposal etc. will bring changes to the site topsoil. However, construction wastes are inert in nature and will be used for levelling of low lying areas and development of greenbelt area at proposed site itself. 1.7 Give details regarding water supply, waste handling etc during the construction period. Narmada water will be obtained through Vadodara Municipal Corporation (VMC) during operational phase and purchase from local water tanker suppliers during construction phase. Please refer Annexure D: Details of Water Consumption & Wastewater Generation Annexure E: Details of Municipal Waste 1.8 Will the low-lying areas and wetland get altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity) 1.9 Whether construction debris and waste during construction cause health hazard? (Give quantities of various type of wastes generated during construction including the construction labour and the means of disposal) t applicable Construction activities like excavation, construction materials handling & storage, construction waste disposal etc. will bring change to the site topsoil. However, construction waste as well as the excavated soil are inert in nature and will be collected and utilized in levelling and filling up low-lying areas and development of greenbelt area at proposed site itself. Municipal waste to be generated during construction as well as operational phase will be collected by VMC for ultimate disposal to landfill site. Please refer Annexure E: Details of Municipal Waste Form 1A 2 of 15

53 High Rise Residential Flats & Shops (2) WATER ENVIRONMENT 2.1 Give the total quantity of water requirement for the proposed project with the break-up of requirements for various uses. How will the water requirement met? State the sources and quantities and furnish a water balance statement. 2.2 What is the capacity (dependable flow or yield) of the proposed source of water? 2.3 What is the quality of water required, in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality) 2.4 How much of the water requirement can be met from the recycling of treated wastewater? (Give the details of quantities, sources and usage) 2.5 Will there be diversion of water from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption) 2.6 What is the incremental pollution load from wastewater generated from the proposed activity? (Give details of the quantities and composition of wastewater generated from the proposed activity) 2.7 Give details of the water requirements met from water harvesting? Furnish details of the facilities created. Please refer Annexure D: Details of Water Consumption & Wastewater Generation Approximately 356 KL/day Narmada water will be obtained through Vadodara Municipal Corporation (VMC). Narmada water will be obtained through Vadodara Municipal Corporation (VMC). water recycling is envisaged. such diversion will take place. Please refer Annexure D: Details of Water Consumption & Wastewater Generation Provision will be made for rainwater harvesting through 3 nos. of percolation wells which will be recharged to the ground aquifers. Please refer Annexure F: Structure of Percolation Well Form 1A 3 of 15

54 High Rise Residential Flats & Shops 2.8 What would be the impact of the land use changes occurring due to the proposed project due to the runoff characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long terms basis? Would it aggravate the problems of flooding or water logging in any way? 2.9 What are the impacts of the proposal on the ground water? (Will there be tapping of ground water, give the details of ground water table, recharging capacity and approvals obtained from competent authority, if any) 2.10 What precautions / measures are taken to prevent the run-off from construction activities polluting land and aquifers? (Give details of quantities and the measures taken to avoid the adverse impacts) How is the storm water from within the site managed? (State the provision made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels) 2.12 Will the deployment of construction labourers particularly in the peak period lead to unsanitary conditions around the project site (justify with proper explanation) 2.13 What on-site facilities are provided for the collection, treatment capabilities with technology and facilities for recycling and disposal? t applicable likely impact on ground water due to the fact that Narmada water will be obtained through Vadodara Municipal Corporation (VMC). Excess run off water will be diverted to storm water drainage system of Vadodara Municipal Corporation (VMC). Storm water from the site will be diverted to storm water drainage system of Vadodara Municipal Corporation (VMC). such conditions are likely to occur, as local labourers/workers will be employed for various construction activities. However, proper sanitary facilities will be provided on-site to avoid such nuisance. It may be noted that the wastewater generated will be discharged into VMC drainage system. The municipal waste generated during construction & operational phase will be collected and adequate measures will be taken for its storage before it is collected by VMC for its ultimate disposal to landfill site. Form 1A 4 of 15

55 High Rise Residential Flats & Shops 2.14 Give details of dual plumbing system if treated waste used is used for flushing of toilets or any other use. t applicable Form 1A 5 of 15

56 High Rise Residential Flats & Shops (3) VEGETATION 3.1 Is there any threat of the project to the biodiversity? (Give a description of the local ecosystem with its unique features, if any) 3.2 Will the construction involve extensive cleaning or modification of vegetation? (Provide a details account of the trees and vegetation affected by the project) 3.3 What are the measures proposed to be taken to minimize the likely impacts on important site features (Give details of proposal for tree plantation, landscaping, creation of water bodies etc. along with a layout plan to an appropriate scale) t applicable The proposed project includes provision for greenbelt. Approximately 1,000 m 2 of Greenbelt area will be developed including 100 nos. of trees to improve site aesthetics. Form 1A 6 of 15

57 High Rise Residential Flats & Shops (4) FAUNA 4.1 Is there likely to be any displacement of fauna both terrestrial and aquatic or creation of barriers for their movement? Provide the details. 4.2 Any direct or indirect impacts on the avifauna of the area? Provide details 4.3 Prescribe measures such as corridors, fish ladders etc. to mitigate adverse impacts on fauna. t applicable t applicable t applicable Form 1A 7 of 15

58 High Rise Residential Flats & Shops (5) AIR ENVIRONMENT 5.1 Will the project increase atmospheric concentration of gases and result in heat islands? (Give details of background air quality levels with predicated values based on dispersion models taking into account the increased traffic generation as a result of the proposed constructions) 5.2 What are the impacts on generation of dust, smoke, odorous fumes or other hazardous gases? Give details in relation to all the meteorological parameters. 5.3 Will the proposal create shortage of parking space for vehicles? Furnish details of the present level of transport infrastructure and measures proposed for improvement including the traffic management at the entry and exit to the project site. 5.4 Provide details of the movement patterns with internal roads, bicycle tracks, pedestrian pathways, footpaths etc., with areas under each category. 5.5 Will there be significant increase in traffic noise and vibrations? Give details of the sources and the measures proposed for mitigation of the above. t applicable Please refer Annexure C: Assessment of Impacts Please refer Annexure G: Details of Parking Facilities Well planned internal roads ranging from 4 m to 7.5 m width will be provided within the project site for internal traffic movement. During construction, construction equipments, including dozer, scrapper, concrete mixer, generators, vibrators and power tools and vehicle will be the major noise sources. Most of the construction activities are expected to produce noise levels within the prescribed limit. Also noise to be generated will be of short duration. Therefore, no significant impact is envisaged on the construction force. To reduce noise generation during the transportation activities, the vehicles will be kept periodically serviced and maintained as per the requirement of the latest trend in automobile industry. Form 1A 8 of 15

59 High Rise Residential Flats & Shops All the vibrating parts will be checked periodically and serviced to reduce the noise generation. Approximately 1,000 m 2 of Greenbelt area including 100 s. of trees will be developed within the project site which acts as a noise absorbent media. 5.6 What will be the impact of DG sets and other equipment on the noise levels and vibration in and ambient air quality around the project site? Provide details. Installation of D.G. Set is not envisaged. Further, greenbelt will be developed to abate the noise levels. Form 1A 9 of 15

60 High Rise Residential Flats & Shops (6) AESTHETICS 6.1 Will the proposed constructions in any way result in the obstruction of a view, scenic amenity or landscapes? Are these considerations taken into account by the proponents? 6.2 Will there be any adverse impacts from new constructions on the existing structures? What are the considerations take into account? 6.3 Whether there are any local considerations of urban form and urban design influencing the design criteria? They may be explicitly spelt out. 6.4 Are there any anthropological or archaeological sites or artifacts nearby? State if any other significant features in the vicinity of the proposed site have been considered. t applicable t applicable due to the fact that the proposed project is to be carried out on open land. All plans are approved by Vadodara Municipal Corporation (VMC). It may be noted that all construction will be done as per the approved plans. t applicable Form 1A 10 of 15

61 High Rise Residential Flats & Shops (7) SOCIO-ECONOMIC ASPECTS 7.1 Will the proposal result in any changes to the demographic structure of local population? Provide the details. 7.2 Give details of the existing social infrastructure around the proposed project. 7.3 Will the project cause adverse effects on local communities, disturbance to sacred sites or other cultural values? What are the safeguards proposed? t applicable as the proposed project is a construction project. The project site is within the limits of Vadodara Municipal Corporation (VMC). Hospitals, schools, institutes, places of worship, community places etc. are within arm s reach. adverse effect will be caused due to the proposed project. Form 1A 11 of 15

62 High Rise Residential Flats & Shops (8) BUILDING MATERIALS 8.1 May involve the use of building materials with high-embodied energy. Are the construction materials produced with energy efficient processes? (Give details of energy conservation measures in the selection of building materials as their energy efficiency) 8.2 Transport and handling of materials during construction may result in pollution, noise and public nuisance. What measures are taken to minimize the impacts? We are planning to use lowest embodied energy coefficient building material and minimize all over energy consumption. Transport and handling of materials during construction may result in minor increase in concentration of suspended particulate matter (SPM) as well as noise. The said effects would be for a short span of time and temporary. Tarpaulin sheets will be covered on the material during the transportation. Adequate stockpile height will be maintained. Water sprinkling will be done at regular intervals. To avoid dusting due to wind temporary windshield barrier will be provided with the help of galvanized sheets and bamboos. Personal Protective Equipments such as nose masks, earplugs/earmuffs, helmets, safety shoes etc. of Indian Standards will be provided to all workers. 8.3 Are recycled materials used in roads and structures? State the extent of savings achieved? 8.4 Give details of the methods of collection, segregation and disposal of the garbage generated during the operation phase of the project. We plan to use fly-ash paver block/ bricls for paving purposes. Please refer Annexure E: Details of Municipal Waste Form 1A 12 of 15

63 High Rise Residential Flats & Shops (9) ENERGY CONSERVATION 9.1 Give details of the power requirements, source of supply, back-up source etc. What is the energy consumption assumed per square foot of built-up area? How have you tried to minimize energy consumption? 9.2 What type of, and capacity of, power back up to you plan to provide? 9.3 What are the characteristics of the glass you plan to use? Provide specifications of its characteristics related to both short wave and long wave radiation? 9.4 What passive solar architectural features are being used in the building? Illustrate the applications made in the proposed project. 9.5 Does the layout of streets and buildings maximize the potential for solar energy devices? Have you considered the use of streetlight, emergency lighting and solar hot water systems for use in the building complex? Substantiate with details. 9.6 Is shading effectively used to reduce cooling / heating loads? What principals have been used to maximize the shading of Walls on the East and West and Roof? How much energy saving has been effected? 9.7 Do the structures use energy-efficient space conditioning, lighting and mechanical systems? Provide technical details. Provide details of the transformers and motor efficiencies, lighting intensity and air-conditioning load assumptions? Are you using CFC and HCFC free chillers? Provide specifications. Power requirement will be sourced from M/s. Madhya Gujarat Vij Company Ltd. The total power requirement during operation phase will be approximately 2 MW. There will be no provision of power back up system. Wherever glass is required to be used, we shall be using non- reflective (absorptive) type of glass so as to ensure minimal reflection & there by minimal heating of the surrounding atmosphere. t Applicable At present there are no plans to use solar energy devices, but future plans, if any, will be notified. t Applicable Most of the lighting for common area will be provided by the use of LED. Due to the said provision, approximately 85% less electricity would be consumed compared to the conventional FTLs and bulbs. We will be using highly efficient transformers and motors and CFC and HCFC free units will be used for space conditioning. Form 1A 13 of 15

64 High Rise Residential Flats & Shops 9.8 What are the likely effects of the building activity in altering the microclimates? Provide a self-assessment on the likely impacts of the proposed construction on creation of heat island and inversion effects? 9.9 What are the thermal characteristics of the building envelope? (a) Roof (b) external walls and (c) fenestration? Give details of the material used and the U- values or the R-values of the individual components What precautions and safety measures are proposed against fire hazards? Furnish details of emergency plans If you are using glass as wall material provides details and specifications including emissivity and thermal characteristics What is the rate of air infiltration into the building? Provide details of how you are mitigating the effects of infiltration To what extend the non-conventional energy technologies are utilized in the overall energy consumption? Provide details of the renewable energy technologies used. There is likely hood of alteration of micro climate due to the fact that using Glazingnon-reflecting float glass so as to ensure minimal reflection & there by minimal heating of the surrounding atmosphere. We will select the building material having lower U-value and the insulating material having higher R-value to have optimum energy performance. We will maximize the use of light and silent colours in the building envelope so that UV absorption is reduced and associated cooling requirements are minimized. t Applicable Glass will not be used as wall material. t Applicable At present there are no plans to use solar energy, but future plans, if any, will be notified. Form 1A 14 of 15

65 High Rise Residential Flats & Shops (10) ENVIRONMENTAL MANAGEMENT PLAN The mitigation measures for reducing the adverse environmental impacts together constitute a part of EMP. The environmental issues, which need management, plan for the construction and operation phases are summarized below: Description Control arrangement / Mitigative measures During Construction Mechanical Erection Vehicle movement Dusting during storage and handling Wastewater Solid Waste Fume generation due to welding and allied activities will be negligible and restricted to project site. All workers will be trained to use welding shields and follow safer practice. All vehicles will be properly serviced and will be required to carry valid PUC certificate. Tarpaulin sheet covers will be used on the material during transportation. se masks will be provided to all workers. Domestic wastewater generated will be discharged via septic tank into soak pit system. Construction debris will be used for levelling low lying areas, roads, pavements and excavated soil will be used for the development of greenbelt area within the project site itself. Domestic solid waste will be collected by VMC for ultimate disposal to landfill site. Used oil & used bags /liners will be sold to authorized recyclers. During Operation Wastewater Municipal waste Greenbelt Domestic wastewater generated during operation phase will be discharged in to the drainage line of VMC. The municipal solid waste will be stored on site before it is collected by VMC for ultimate disposal to landfill site. Greenbelt will be developed and maintained. Form 1A 15 of 15

66 Mukhya Mantri Gruh Yojana Lower Income Group (LIG) Scheme ANNEXURES OF FORM 1A Annexure Page Description.. A Location of Project Site 2 B Project Highlights 3 C Assessment of Impacts (Construction phase) 4 D Details of Water Consumption and Wastewater Generation 5 E Details of Municipal Waste 6 F Structure of Percolation Well 7 G Details of Parking Facilities 8 Annexures of Form 1A 1 of 9

67 Mukhya Mantri Gruh Yojana Lower Income Group (LIG) Scheme Annexure A: Location of Project Site Key Plan Google Image showing location of project site Annexures of Form 1A 2 of 9

68 Mukhya Mantri Gruh Yojana Lower Income Group (LIG) Scheme Annexure B: Project Highlights Description Details Total Plot Area 11, m 2 Total Proposed Built-up Area 35, m 2 Total Proposed FSI Area 30, m 2 Total Proposed Parking Area 4, m 2 Total Common Plot Area m 2 Approx. Greenbelt Area 1,000 m 2 Total s. of Units Water Requirement During Construction Water Requirement During Operation Wastewater Generation During Construction Wastewater Generation During Operation Power Requirement During Construction Power Requirement During Operation 462 Residential Flats 31 Shops 20 KL/Day 356 KL/Day 4 KL/Day 282 KL/Day 50 KW 2 MW Annexures of Form 1A 3 of 9

69 Mukhya Mantri Gruh Yojana Lower Income Group (LIG) Scheme Annexure C: Assessment of Impacts (Construction phase) Activity Site Material Green Belt Excavation Construction Transportation Employment Cleaning Handling Development Parameter Air (-ve) S.T. (-ve) S.T. (-ve) S.T. (-ve) S.T. (-ve) S.T. - (+ve) L.T. Water - - (-ve) S.T (+ve) L.T. ise (-ve) S.T. (-ve) S.T. (-ve) S.T. (-ve) S.T. - - (+ve) L.T. Soil (-ve) S.T. (-ve) S.T. (-ve) S.T (+ve) L.T. Flora (+ve) L.T. Fauna (+ve) L.T. Aesthetics (-ve) S.T. (-ve) S.T. (-ve) S.T (+ve) L.T. Socio-economic (+ve) L.T. - Cultural (+ve) L.T. - Health & Safety (-ve) S.T. (-ve) S.T. (-ve) S.T. (-ve) S.T. (-ve) S.T. (+ve) L.T. (+ve) L.T. te: (+ve) Positive (-ve) Negative S.T. Short Term L.T. Long Term te: We will barricade our plot with GI sheets during construction to ensure safety, security & control of fugitive dust. Annexures of Form 1A 4 of 9

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity)

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity) [Vide Paragraph - 6 of Notification dated 14 th September 2006, only for construction projects listed under item 8 of the Schedule] (1) LAND ENVIRONMENT (Attach panoramic view of the project site and the

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1 (I) Serial Number Basic Information Item APPENDIX I (See paragraph-6) FORM 1 Details 1. Name of the project/s Soapstone Mining (ML. 15/95) 2. S.. in the schedule B1- Mining of Mineral 3. Proposed capacity/area/length/tonnage

More information

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra FORM 1 & 1 A Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT At Palladium Grand II, S. 17/1A/2, Dhanori, Pune, Maharashtra By M/s. Raojee Constructions FORM 1 Palladium Grand II RESIDENTIAL & COMMERCIAL

More information

Salient Features of Proposed Project Namely Surya Emerald proposed to be developed by M/s. Surya Buildcon

Salient Features of Proposed Project Namely Surya Emerald proposed to be developed by M/s. Surya Buildcon Salient Features of Proposed Project Namely Surya Emerald proposed to be developed by M/s. Surya Buildcon 1 Project Name and Location Address Surya Emerald Proposed to be developed by M/s. Surya Buildcon

More information

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd & Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 To be submitted By Project Proponent To Madhya Pradesh State Environmental

More information

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information: S.. Item Details 1 Name of the project/s: M/s. Sri Lakshmi Enterprises 2 S.. in the schedule 1 (a) 3. Proposed capacity/area/length/tonnage to

More information

FORM 1 BASIC INFORMATION S.NO.

FORM 1 BASIC INFORMATION S.NO. FORM 1 BASIC INFORMATION S.NO. Item Details 1 Name of the Project M/s AVA Stones (P) Ltd, Director: Sri.Bimal Kumar Agarwal Colour Granite Mine. 2 S.. in the schedule 1(a) 3 Proposed capacity/ area/ length/

More information

APPENDIX I. (See paragraph 6) FORM 1

APPENDIX I. (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Name of the Project Size of the project (in terms of total area) CRZ classification of the area Expected cost of the project Contact Information

More information

FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram

FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY Asst.Director of Mines and Geology, Rajamahendravaram Ordinary Sand Land Details : Govt Land Extent : 3.9634 Ha. VILLAGE

More information

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease

More information

APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1 (I) Serial Number Basic Information Item APPENDIX I (See paragraph-6) FORM 1 Details 1. Name of the project/s Soapstone, Red Ocher and China Clay (ML. 81/82) 2. S.. in the schedule 1 (a) - Mining of Mineral

More information

FORM-I for seeking clearance for project attracting CRZ notification

FORM-I for seeking clearance for project attracting CRZ notification AnnexureIV FORM-I for seeking clearance for project attracting CRZ notification Basic information: SEA CLIFF RESORTS TOURISM PROJECT (.1682/A3/15/KCZMA/S&TD) Name of the Project: THE SEACLIFF Location

More information

(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2

(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project 2 S. number in schedule 8(a) 3 Proposed capacity/area/length/tonnage to be handled/command area/lease area/number

More information

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik FORM-I (I) Basic Information Item Details. 1. Name of the Project Proposal for Sand Quarry in Kas Village, Taluka Trimbakeshwar, District Nasik, State Maharashtra over an area of 1.5400 Ha at Damanganga

More information

M/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I

M/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I FORM - I (I) Basic Information S.. Item Details 1 Name of the project/s M/s.Karthika Mines & Minerals Pvt.Ltd. Colour Granite Quarry, 10.00 Ha. 2 S.. in the schedule 1 (B) 3 Proposed capacity Area-10.00

More information

APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance)

APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) Name of the Project: KRUTI ONELLA Sahyog Rekha Infraproject LLP Location / site alternatives Survey no.

More information

APPENDIX- I FORM- 1. (I) Basic Information:

APPENDIX- I FORM- 1. (I) Basic Information: (I) Basic Information: APPENDIX- I FORM- 1 Item Details 1. Name of Project Sand Stone Mining Project, M.L..-08/1987, Area 150.926 Ha., located n/v -Gubrenda, Tehsil -Karauli, District Karauli, (Rajasthan)

More information

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item Details 1 Name of the Project WHITE LILLIES (Residential Project) 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage

More information

Appendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

Appendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN Appendix I Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN AREA: 1.0 HECT (NON FOREST LAND) ML 219/1997 PRODUCTION CAPACITY: 50,000 TPA

More information

FORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006

FORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006 FORM 1 APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006 (I) Basic Information: S. Item Details 1. Name of the Project/s : Expansion

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project Sarpanch, Gram Panchayat chando chando Sand Mine 2 S.. in schedule Category B, Project or Activity 1(a)

More information

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project Commercial Project 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage to be handled/command area/lease

More information

FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai

FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai FORM 1 (I) Basic Information Sr. Item Details. 1 Name of the Project WHITE CITY METAL 2 S.. in the Schedule 8 (b) 3 Proposed capacity/area /length/tonnage to Plot area: 45,800.00 sq.mt. be handled/command

More information

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. No Item Details 1 Name of the Project/s Sri A. Narasimulu 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to be handled/command

More information

APPENDIX I (See paragraph 6) Form 1 (I) Basic Information

APPENDIX I (See paragraph 6) Form 1 (I) Basic Information APPENDIX I (See paragraph 6) Form 1 (I) Basic Information Sr.. Item Details 1 Name of the Project/s Proposed expansion in Environment Clearance for Residential and Commercial project by Manikchand Kumar

More information

APPENDIX - I (See paragraph 6) FORM 1

APPENDIX - I (See paragraph 6) FORM 1 APPENDIX - I (See paragraph 6) FORM 1 (I) Basic Information Item Details 1 Name of the project/s M/S Jashnani Constructions Pvt. Ltd. Proposed residential building project at Shahapur, Thane 2 S.. in the

More information

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd & Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment tification dtd 14-09-2006 & 01-12-09 To be submitted By SHRI SANJAY SINGH S/O SHRI MAHENDRA SINGH RATHORE To Madhya

More information

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds- Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for Form -1 [Vide tification dated 1 st December 2009] FOR PROPOSED COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI

More information

APPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2

APPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project Residential Project 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage to be handled/command area/lease

More information

APPENDIX I. (See Paragraph 6) FORM 1

APPENDIX I. (See Paragraph 6) FORM 1 APPENDIX I (See Paragraph 6) FORM 1 (I) Basic Information Item Details 1 Name of the Project Satva Shiva Gold 2 S. in the Schedule 8(a) 3 Proposed capacity/ area/ length/ tonnage to be handled/ command

More information

FORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju

FORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju FORM I TERMS OF REFERENCE For QUARRY OF ROAD METAL (6.265 Ha) Of Sri K Kasi Raju PROP: K.Kasi Raju Extent: 6.265 Ha of Budawada (V), Chimskurthy (M), Prakasam (Dt), Andhra Pradesh (I) BASIC INFORMATION

More information

Form I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens

Form I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens Form I for Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens at T.P.S. 2, F.P.. 182/P, Sub Plot-A, OP. 43, R.S.. 85/P Vesu-Bhartana-Vesu, Tal: Choryasi Dist: Surat, Gujarat

More information

FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE

FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (22309.63 SQ. M) AT ANAMOL LIFE STYLE RESIDENTIAL CUM COMMERCIAL BUILDING S. No. 206, O.P. NO. 129, F.P. NO. 129 OF D.T.P.S. NO. 241, NANA CHILODA, GANDHINAGAR,

More information

FORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a)

FORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a) FORM 1 (I) Basic Information Item Details 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a) 3 Proposed capacity/ area/ length/ tonnage to be handled/command area/lease area/number

More information

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT QUERY 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? Attach Maps

More information

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E)) FORM 1 (As per new tification of MoEF dated 01-12-2009 vide S.O 3067 (E)) (I) BASIC INFORMATION S.. Item Details 1. Name of the project/s M/s. S.L.N.S. Granites Mining of Colour Granite 4.90 Ha 2. S..

More information

UPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD.

UPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD. Annexure - III UPDATED FORM I For Amendment to Environmental Clearance (Environmental Clearance issued by MOEF vide. F.. J-11011/366/2007-IA-II (I) Dated, 15.04.2008.) SUBMISSION To Ministry of Environment

More information

Sri.T.N.Balasubramanya

Sri.T.N.Balasubramanya Sri.T.N.Balasubramanya (Earlier: M/s.Global Golden Rocks) Extent: 5 Ha Colour Granite Quarry Sy.No.65 of Lattigam Village, Nandigam Mandal, Srikalulam District, Andhra Pradesh UPDATED FORM-I FORM 1 (As

More information

UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana)

UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana) UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana) Venkateswara Mines & Minerals (Earlier: Sri Bode Vijayasen Reddy), Kannaraopet Village, Nallabelli Mandal, JayashankarBhupalpally

More information

Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a)

Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a) FORM I (I) Basic Information S.. Item Details 1. Name of the project Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S.. in the schedule 8(a) 3. Proposed capacity/area/length/tonnage

More information

Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh.

Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh. Application for Prior Environmental Clearance (Form 1) For Proposed Colour Granite Mine over an Extent of 3.000 Hectares, in Sy. : 143 of Bharthupuram village, Nandigam Mandal, Srikakulam District, Andhra

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 APPENDIX I (See paragraph - 6) FORM 1 (I)Basic Information S. Item Details 1 Name of the project 1.79Acr nakti Limestone Mines (Minor Mineral) 2 S.. in schedule Category B, Project or Activity 1(a) (As

More information

FORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD.

FORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD. FORM 1 Basic Information Item Details 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD. located at Survey : 64 ne Lagu, Sabarmati Nadi Patt Village:

More information

FORM 1 (Application for Environment Clearance)

FORM 1 (Application for Environment Clearance) (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) Name of the Project: Location / site alternatives under consideration: Size of the Project: Shreedhar Sparsh

More information

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s.

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s. FORM I [Vide M.o.E.F & C.C tification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE At. 100/1, 100/2, 100/3, 100/4, 100/5, 100/6B, 101/1, 101/2, 101/3, 101/4, 101/5B,

More information

No 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a)

No 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a) APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. Item Details No 1 Name of the Project/s 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to Mine lease area is 8.91 Ha,

More information

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR Near Village Tehsil District State Capacity Lease Area Category of Project Project Cost KANTBARA BIJOLIYA Bhilwara Rajasthan 36561 TPA of

More information

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I FORM- I Page 0 of 14 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Bhidauni Khadar Ordinary Sand Mining Project 2. S.. in the schedule 1(a) mining

More information

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (AI) (viii) (ix) (x) Basic Information Name of the Mining Lease

More information

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (II) (viii) (ix) (x) Basic Information Name of the Mining Lease

More information

FORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I.

FORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I. FORM- I Page 0 of 15 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Sati & Garhi Sand Ghat on Ulai River of District- Jamui. 2. S.. in the schedule

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project Ambey Mahila Swa Sahayata Samuh 2 S.. in schedule Category B, Project or Activity 1(a) (As per EIA tification

More information

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1 FORM-1 SRUSHTI SEWA, NAGPUR 1 FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Sand, Stone and Bajri Mining Project 2. Serial. in the schedule 1(a) Mining of Mineral 3. Proposed capacity

More information

Appendix I. Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

Appendix I. Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN Appendix I Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 27/1990 ( R ) 53/2009 PROPOSED PRODUCTION

More information

FORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State

FORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s M/s. Squadm Mines & Minerals Pvt. Ltd - Road Metal & Building Stone 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project 3.274 Ha Kapsada Limestone Mines (Minor Mineral) of M/s I.V.R.C.L Limited 2 S.. in schedule Category B,

More information

UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas

UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE At: Brahmanipali, Dustrict: Sambalpur, Odisha Sri Fakir Rohidas Prepared By Centre for Envotech and Management Consultancy Pvt. Ltd. Bhubaneswar

More information

Municipal solid / hazardous waste

Municipal solid / hazardous waste (10) ENVIRONMENTAL MANAGEMENT PLAN The mitigation measures for reducing the adverse environmental impacts together constitute a part of EMP. The environmental issues, which need management, plan for the

More information

Haridarshan Residency ( Row Type House & School Building )

Haridarshan Residency ( Row Type House & School Building ) Survey.. 18, Moje: : Shekhpur, Tal: Kamrej, Dist.: Surat, Gujarat 394 130 FORM 1 AND BASIC INFORMATION FOR OBTAINING ENVIRONMENTAL CLEARANCE FOR NEW PROJECT OF Haridarshan Residency Block. 18, Village:

More information

ITHC/PRJ/18-19/EIA/138 1 IND TECH HOUSE CONSULT

ITHC/PRJ/18-19/EIA/138 1 IND TECH HOUSE CONSULT Application for Extension of Environmental Clearance (EC) UPDATED (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt. 01.12.2009. Basic

More information

M/S Overseas Min Tech Consultants, Jaipur 1

M/S Overseas Min Tech Consultants, Jaipur 1 (I) Basic Information: APPENDIX I (See paragraph 6) FORM 1 S.. Item Details 1. Name of Project Proposed Soapstone Mining Project, Khasra 60, 61, 63, Area: 11.1830Hect., Production: 17508 TPA, Near Village:

More information

Form 1, Form 1(A) and Proposed ToR for Residential Project Pramukh Aura at Chala, Taluka: Vapi & District: Valsad, Gujarat.

Form 1, Form 1(A) and Proposed ToR for Residential Project Pramukh Aura at Chala, Taluka: Vapi & District: Valsad, Gujarat. PYRAMID INFRA Form 1, Form 1(A) and Proposed ToR for Residential Project Pramukh Aura at Chala, Taluka: Vapi & District: Valsad, Gujarat. JANUARY 2018 CONTENTS 1 SCOPING... 4 1.1 FORM 1... 4 1.2 FORM 1(A)...

More information

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E)) FORM 1 (As per new Notification of MoEF dated 01-12-2009 vide S.O 3067 (E)) I) BASIC INFORMATION Item Details 1 Name of the project/s Sri.Gandi Suryanarayana color Granite 2 S. No. in the schedule Item

More information

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project Limestone Mine 2. S.. in the schedule S.. 1(a) mining of mineral is 3. Proposed capacity/area/length/tonnage

More information

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects. (I) Basic Information FORM-1 Item Details 1 Name of the Project Harbour Heights 2 S.. in the Schedule 8(b) Townships and Area Development projects. 3 Proposed capacity/area /length/tonnage to be Total

More information

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification. At Thengamputhur Village, Tamil Nadu by

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification. At Thengamputhur Village, Tamil Nadu by Annexure-IV Form-I for seeking clearance for project attracting CRZ notification Basic Information: Name of the Project :- Location or site alternative under consideration: - Construction of Beach Resort

More information

Renewal of Environmental Clearance for Commercial Complex City Square 2 S. No. in the Schedule 8 (a), Building & Construction project

Renewal of Environmental Clearance for Commercial Complex City Square 2 S. No. in the Schedule 8 (a), Building & Construction project 1 SCOPING 1.1 FORM 1 The scoping for the project has been done based on Form-I, as per EIA tification, dated September 14, 2006 amended as on date. The scoping details are as follows: I. Basic Information

More information

Form 1, Form 1(A) and Proposed ToR for Residential Project at Chala, Taluka: Vapi & District: Valsad, Gujarat.

Form 1, Form 1(A) and Proposed ToR for Residential Project at Chala, Taluka: Vapi & District: Valsad, Gujarat. MR. SUBHASH KOTADIA Form 1, Form 1(A) and Proposed ToR for Residential Project at Chala, Taluka: Vapi & District: Valsad, Gujarat. MARCH 2018 CONTENTS 1 SCOPING... 4 1.1 FORM 1... 4 1.2 FORM 1(A)... 17

More information

Proposed Multiplex & Commercial Complex FORM I

Proposed Multiplex & Commercial Complex FORM I I. BASIC INFORMATION FORM I. Item Details 1 Name of the project Proposed Construction of Multiplex cum Commercial Complex 2 no. in the schedule 8 (a) 3 Proposed area Area Details: Total land area: 13,218.80

More information

FORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates

FORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s 9.890 ha. of Proposed Colour Granite Mine of Sri S. Senthil Kumar 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed

More information

.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s

.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s .APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information. Item Details 1. Name of the project/s Peddayekkaluru White Shale Mine M/s. Swathi Mines 2.. in the schedule Proposed capacity/area/length/ tonnage

More information

A 'N 'E B 'N 'E C 'N 'E D 'N 'E

A 'N 'E B 'N 'E C 'N 'E D 'N 'E Gata. 12, Gata. 164, 352 & 1295/5 Basic Information FORM- 1 S.. Item Details 1. Name of the project/s Sand/Moram Mining 2. S.. in the schedule 1(a)i 3. Proposed capacity/area/length/tonnage to be handled

More information

FORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific

FORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s 6.490 ha. of Proposed Colour Granite Mine of M/s. Alief Exports 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed

More information

FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR

FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR MANUFACTURING MAN MADE FIBER (PARTIALLY ORIENTED YARN (POY), FULLY DRAWN YARM (FDY), TEXUTURISED YARN, TWISTED YARN - OTHER THAN RAYON THROUGH

More information

FORM 1. Amendment in Environment Clearance Of Redevelopment Project Redevelopment Project

FORM 1. Amendment in Environment Clearance Of Redevelopment Project Redevelopment Project FORM 1 Amendment in Environment Clearance Of Redevelopment Project Redevelopment Project At C.S. 990 situated at 243-G Patthe Bapurao Marg (Falkland Road), at Girgaon, Division D ward, Mumbai 400 004.

More information

JAI MAA SHARDA STONE CRUSHING

JAI MAA SHARDA STONE CRUSHING JAI MAA SHARDA STONE CRUSHING Prop. Hukum Singh (M.. 9425585252) Near-Pahunadukan Kedarpur Ambikapur, (C.G.) To, The Member Secretary, SLEIAA(State Level Environment Impact Assessment Authority), Ministry

More information

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA), Tamil Nadu

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA), Tamil Nadu Form 1 as per EIA tification 2006 for Chockampatti Earth Quarry of Thiru.T.Poosai Durai, Chockampatti Village, Kadayanallur Taluk, Tirunelveli District, Tamil Nadu State. Application Form for Obtaining

More information

Application for Prior Environmental Clearance (EC)

Application for Prior Environmental Clearance (EC) Application for Prior Environmental Clearance (EC) (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt.01.12.2009. Basic Information

More information

(I) Basic Information:

(I) Basic Information: (I) Basic Information: Item Details 1 Name of the project Proposed River Bed Ordinary Sand Mining At River Sharda, Village- Mudi, Gata - 443, Tehsil- Dhaurahra, District-Khiri, State-Uttar Pradesh. (Leased

More information

Ambey Mahila Swa Sahayata Samuh President. Smt. Tuleshwari Vill- Gangikot Post: Gangikot Teh.- Surajpur Dist: Surajpur (C.G.

Ambey Mahila Swa Sahayata Samuh President. Smt. Tuleshwari Vill- Gangikot Post: Gangikot Teh.- Surajpur Dist: Surajpur (C.G. Ambey Mahila Swa Sahayata Samuh +91-9617439314 President. Smt. Tuleshwari Vill- Gangikot Post: Gangikot Teh.- Surajpur Dist: Surajpur (C.G.) To, The Member Secretary, SLEIAA (State Level Environment Impact

More information

Details required for submitting Fresh EC Application. (Category B2 Projects: Mining of Minor Minerals)

Details required for submitting Fresh EC Application. (Category B2 Projects: Mining of Minor Minerals) Details required for submitting Fresh EC Application (Category B2 Projects: Mining of Minor Minerals) 1. Project Sector (Non-Coal Mining) 2. Project Type (New, Expansion, Modernization) If Project Type

More information

Proposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1

Proposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1 Proposed Ordinary Sand Mining Project at Gata.- 8Ka/195, Village- Ratauli, (I) Basic Information: Sl. Item Details. 1 Name of the project Proposed Ordinary Sand Mining Project in Sharda River at Gata.-

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information APPENDIX I (See paragraph - 6) FORM 1 SN Contents 1 Name of Project : Mining of Soapstone at Village-Kimoli, Tehsil & Dist -Bageshwar, Uttarakhand with an area 4.984 ha. 2 S. in Schedule

More information

UPDATED FORM I 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT

UPDATED FORM I 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT UPDATED FORM I Of 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT APSEZ, Atchutapuram, Visakhapatnam district, Andhra Pradesh By RAIN CALCINER LIMITED Prepared By B.S.

More information

Residential & Commercial Project with PTC Tenements (SRA Scheme) M/S Darshan Developers Pvt. Ltd FORM-1

Residential & Commercial Project with PTC Tenements (SRA Scheme) M/S Darshan Developers Pvt. Ltd FORM-1 FORM-1 (I) Basic Information Item Details. 1 Name of the Project Residential & Commercial Project with PTC Tenements Under SRA Scheme 2 S.. in the Schedule 8 (b) Proposed capacity/area Total plot area:

More information

Revised FORM - I & PRE-FEASIBILITY REPORT

Revised FORM - I & PRE-FEASIBILITY REPORT Hind Energy & Coal Beneficiaton (India) Ltd. [Change in Technology from Dry to Wet Type of Coal Washery in EC issued by MoEF letter vide no. J-11015/364/2009-IA-II(M) dated 21st May 2014] at Hindadih Village,

More information

M/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District

M/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District Application for Prior Environmental Clearance (Form 1) For Proposed Road Metal / Building Stone/ Robo/Manufacture Sand Mine Over An Extent Of 9.712 Hectares, in Sy.. 743 of Somandepalli Village, Somandepalli

More information

No construction activity started

No construction activity started Sr. Particulars Details No. 1. Proposal is for New Project 2. Type of Project Residential Flats and Shops 3. Project / Activity No. 8(a) [8(a) or 8(b)] 4. Name of the project Kaveri Soham Vistara 5. Name

More information

RATNAAKAR SHELTER LLP

RATNAAKAR SHELTER LLP FORM 1 Slum Rehabilitation Scheme Aventus Heights At C.T.S 1A (pt) of village Deonar, Taluka Kurla, at Plot 49, Survey no.93 (pt.), Road 5/6 Shivaji Nagar, Govandi East, Mumbai- 400 043. By M/s. RATNAAKAR

More information

APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1 (I) Basic Information APPENDIX I (See paragraph-6) FORM 1. Item Details 1 Name of the Project/s M/s Cane Agro Energy India Limited 2 S.. in the Schedule 5(g) 3 Proposed capacity/area/length/tonnge to be

More information

9 Plot/Survey/Khasra No S.No: 153/1, 153/2, 171/1, 171/2A, 172/1B1, 172/1B2, 172/C1, 172/1C2, 172/2A, 172/2B, 172/2C & 180/1.

9 Plot/Survey/Khasra No S.No: 153/1, 153/2, 171/1, 171/2A, 172/1B1, 172/1B2, 172/C1, 172/1C2, 172/2A, 172/2B, 172/2C & 180/1. FORM I I. BASIC INFORMATION Item Details 1 Name of the project Proposed construction of residential building by M/s. CASA GRANDE AXIOM PRIVATE LIMITED. 2 no. in the schedule 8 (a) 3 Proposed area Area

More information

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project FORM I I. BASIC INFORMATION. Item Details 1 Name of the project Proposed Mixed Use Development Project SPR Binny 2 no. in the schedule 8 (b) 3 Proposed area Area Details: Total land area: 200243.50 Sqm

More information

FORM I (OPENCAST LATERITE MINE ha)

FORM I (OPENCAST LATERITE MINE ha) SHAIK IMAM SURVEY. 172, 173 & 174, SIDDLOOR VILLAGE, VIKARABAD MANDAL AND DISTRICT, TELANGANA STATE FORM I (OPENCAST LATERITE MINE- 6.176 ha) SUBMITTED BY Sri Shaik Imam R/o 8-2-579/B, Road No. 8, Banjara

More information

Indicative Checklist for construction projects of EC [Category 8(a)]:

Indicative Checklist for construction projects of EC [Category 8(a)]: Indicative Checklist for construction projects of EC [Category 8(a)]: Sr. Checklist point Remark Yes/No Pg. no./ annexure 1. Covering letter signed by the applicant Yes Form-1 Page 1 page 13 2. Completed

More information

FORM min Village. Chowgund, Tehsil. Doru District. Anantnag State

FORM min Village. Chowgund, Tehsil. Doru District. Anantnag State Khasra.- 1273-min, Area: 4.459 Ha, Basic Information FORM- 1 S.. Item Details 1. Name of the project/s Limestone Mine 2. S.. in the schedule 1(a)i 3. Proposed capacity/area/length/tonnage to be/ handled

More information

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification Annexure-IV Form-I for seeking clearance for project attracting CRZ notification Basic Information: Name of the Project :- Location or site alternative under consideration: - CRZ Clearance for Resort project

More information

JSW DHARAMTAR PORT LIMITED

JSW DHARAMTAR PORT LIMITED JSW DHARAMTAR PORT LIMITED FORM-I FOR PROPOSED EXPANSION OF THE DHARAMTAR JETTY FACILITY VILLAGE DOLVI, PEN TALUKA, RAIGAD DISTRICT, MAHARASHTRA Submitted to: Ministry of Environment and Forests New Delhi

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee