NEW JERSEY DEPARTMENT OF TRANSPORTATION
|
|
- Easter Annis Pitts
- 6 years ago
- Views:
Transcription
1 NEW JERSEY DEPARTMENT OF TRANSPORTATION FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Authorized and Unauthorized Projects (All funds $ millions) PROJECT NAME Burlington PHASE PROG MODIFIED AUTH AUTH BALANCE Bispham Street Bridge over Rancocas Creek (DB #D0806) OTHER CON $0.000 $1.000 $0.000 $1.000 Burlington County Roadway Safety Improvements (DB #D0302) STPSTU CON $0.000 $0.856 $0.856 $0.000 Burlington County Roadway Safety Improvements C00S(524) $ /04/2013 Burlington County Roadway Traffic Signal Upgrade and System Interconnect (DB #D1303) STPSTU CON $1.030 $0.000 $0.000 $0.000 County Route 528 Roundabout (DB #D1204) HSIP CON $0.000 $1.000 $1.451 $0.451 Burlington County Route 528 Roundabout 0234(007) $ /18/2013 Hanover Street Bridge over Rancocas Creek, CR 616 (DB #D9902) STPSTU ROW $0.000 $0.050 $0.000 $0.050 Route 130, Columbus Road/Jones Street (DB #02397) NHS PE $0.000 $0.300 $0.663 $0.363 Route 130, Columbus Road/Jones Street 0017(175) $ /03/2013 Route 130, Crystal Lake Dam (DB #02309) NHPP ROW $0.000 $0.300 $0.123 $0.177 Route 130, Crystal Lake Dam (ROW) 0017(177) $ /18/2013 Route 9, Bridge over Jobs Creek (DB #11368) BRIDGE PE $0.500 $0.500 $0.724 $0.224 Route 9, Bridge over Jobs Creek 0001(268) $ /12/2013 Smithville Road Bridge over Rancocas Creek, CR 684 (DB #D9903) BRIDGEOFF DES $0.000 $0.500 $0.477 $0.023 Smithville Road Bridge over Rancocas Creek, CR 684 C00S(545) $ /17/2013 Smithville Road Bridge over Rancocas Creek, CR 684 (DB #D9903) STPSTU DES $0.000 $0.000 $0.000 $0.000 South Pemberton Road, CR (DB #D9912A) DEMO ROW $0.000 $2.783 $2.783 $0.000 South Pemberton Road, CR (ROW) (HPP) 0222(104) $ /24/2013 South Pemberton Road, CR (DB #D9912A) STPSTU ROW $0.000 $6.332 $6.080 $0.252 South Pemberton Road, CR (ROW) (STP) 0222(104) $ /24/2013 South Pemberton Road, CR 530, 1 (DB #D9912) STPSTU DES $0.000 $0.500 $0.000 $0.500 Burlington Subtotal $1.530 $ $ $ /10/2014
2 NEW JERSEY DEPARTMENT OF TRANSPORTATION FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Authorized and Unauthorized Projects (All funds $ millions) PROJECT NAME Camden PHASE PROG MODIFIED AUTH AUTH BALANCE Ben Franklin Bridge Walkway Cameras and Call Stations (DB #D1304) STPSTU CON $0.400 $0.000 $0.000 $0.000 Berlin Road Streetscape Improvements, Camden County (DB #D1009) DEMO CON $0.000 $0.648 $0.000 $0.648 Camden County Bus Purchase (DB #D0601) CMAQ EC $0.100 $0.000 $0.000 $0.000 Camden County Bus Purchase (DB #D0601) STPSTU EC $0.000 $0.000 $0.000 $0.000 Camden County Roadway Safety Improvements (DB #D0410) STPSTU CON $0.000 $0.500 $0.472 $0.028 Camden County Roadway Safety Improvements 4072(109) $ /17/2013 Clements Bridge Road Streetscape (CR 573), s 13 (DB #D0801) DEMO CON $0.000 $0.264 $0.000 $0.264 CSX Clean Diesel Locomotive (DB #D1306) CMAQ CON $1.000 $1.000 $1.000 $0.000 CSX Genset South C00S(542) $ /18/2013 Haddon Avenue/Franklin Avenue, Intersection Improvements, CR 561/692 (DB #D0804) STPSTU CON $0.000 $2.000 $0.655 $1.345 Haddon Avenue/Franklin Avenue, Intersection Improvements, CR 561/ (110) $ /11/2013 Pearl Street Bulkhead Replacement (DB #D1007A) STPSTU CON $0.600 $0.000 $0.000 $0.000 River Road Improvements, Cramer Hill (DB #D0902) DEMO DES $0.000 $0.250 $0.250 $0.000 River Road Improvements, Cramer Hill (DES) 4273(106) $ /18/2013 Route 30, Blue Anchor Dam (DB #93266) NHS CON $ $0.000 $0.000 $0.000 Route 30, Evesham Road Intersection Improvements (DB #93263) NHS CON $6.805 $0.000 $0.000 $0.000 Route 30, Various locations from East of Brand Ave. to East of London Ave., Pavement (DB #10335) NHS CON $0.000 $0.000 $0.000 $0.000 Route 70, Route 38 to Cropwell Road (DB #11338) NHPP PE $0.000 $2.800 $2.381 $0.419 Route 70, Route 38 to Cropwell Road 0018(158) $ /12/2013 Route 130, Brooklawn Circles (DB #99312) NHPP ROW $0.000 $3.145 $3.145 $0.000 Route 130, Brooklawn Circles (ROW) 0017(178) $ /20/2013 Route 130, Brooklawn Circles (DB #99312) NHS CON $3.685 $0.000 $0.000 $0.000 Route 130, Brooklawn Circles (DB #99312) NHS ROW $0.000 $0.000 $0.000 $0.000 Route 130, Camden County, Drainage (DB #08366) NHS DES $1.000 $0.000 $0.000 $0.000 Route 130, Camden County, Drainage (DB #08366) NHS PE $0.000 $0.000 $0.000 $ /10/2014
3 NEW JERSEY DEPARTMENT OF TRANSPORTATION FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Authorized and Unauthorized Projects (All funds $ millions) PROJECT NAME Camden PHASE PROG MODIFIED AUTH AUTH BALANCE Route 168, I295 Interchange Improvements (DB #X227A2) STP DES $2.000 $0.000 $0.000 $0.000 Route 168, Newton Lake Dam (DB #01323) STP DES $0.000 $1.900 $2.003 $0.103 Route 168, Newton Lake Dam 4057(112) $ /26/2012 Route 168, Newton Lake Dam (DB #01323) STP ROW $0.200 $0.200 $0.131 $0.069 Rt 168 Newton Lake Dam (ROW) 4057(114) $ /18/2013 Route 295/42, Missing Moves, Bellmawr (DB #355A) HPP20 CON $8.900 $0.000 $0.000 $0.000 Route 295/42, Missing Moves, Bellmawr (DB #355A) IMAINT CON $ $0.000 $0.000 $0.000 Route 295/42/I76, Direct Connection, Contract 1 (DB #355B) DEMO CON $0.000 $2.969 $2.969 $0.000 Route 295/42/I76, Direct Connection, Contract 1 (partial AC conversion for reallocated demo) 2952(136) $ /20/2012 Route 295/42/I76, Direct Connection, Contract 1 (DB #355B) IMAINT CON $ $0.000 $2.110 $2.110 Route 295/42/I76, Direct Connection, Contract 1 (Utilities) 2952(138) $ /12/2012 Route 295/42/I76, Direct Connection, Contract 1 (DB #355B) NHPP CON $0.000 $ $ $0.000 Route 295/42/I76, Direct Connection, Contract (136) $ /14/2013 Route 295/42/I76, Direct Connection, Contract 1 (DB #355B) NHS CON $0.000 $ $ $0.000 Route 295/42/I76, Direct Connection, Contract 1 (AC Conversion) 2952(136) $ /14/2013 Route 295/42/I76, Direct Connection, Contract 2 (DB #355C) IMAINT CON $0.000 $0.000 $0.000 $0.000 Route 295/42/I76, Direct Connection, Contract 2 (DB #355C) NHPP CON $0.000 $ $ $8.518 Route 295/42/I76, Direct Connection, Contract 2 (NHP) 2952(137) $ /19/2013 Route 295/42/I76, Direct Connection, Contract 2 (DB #355C) STPSTU CON $0.000 $8.518 $8.518 $0.000 Route 295/42/I76, Direct Connection, Contract 2 (STP) 2952(137) $ /19/2013 Camden Subtotal $ $ $ $ /10/2014
4 NEW JERSEY DEPARTMENT OF TRANSPORTATION FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Authorized and Unauthorized Projects (All funds $ millions) PROJECT NAME Gloucester PHASE PROG MODIFIED AUTH AUTH BALANCE CR 553 Buck Road, Section 2, Resurfacing (DB #D1301) STPSTU CON $2.500 $2.500 $1.923 $0.577 CR 553 Buck Road, Section 2, Resurfacing 0144(110) $ /17/2013 CR 678, Harrison Street (Mantua or Berkley Road), Resurfacing (DB #D1302) STPSTU CON $1.500 $1.500 $1.059 $0.441 CR 678, Harrison Street (Mantua or Berkley Road), Resurfacing 0164(102) $ /17/2013 Egg Harbor Road, HurffvilleCross Keys Road to HurffvilleGrenloch Road, CR 630 (DB #D0503) STPSTU CON $7.000 $3.500 $3.134 $0.366 Egg Harbor Road, HurffvilleCross Keys Road to HurffvilleGrenloch Road, CR (107) $ /16/2013 Gloucester County Bus Purchase (DB #D9807) CMAQ CON $0.070 $0.000 $0.000 $0.000 Gloucester County MultiPurpose Trail Extension (DB #D1203) STPSTU DES $0.000 $0.296 $0.296 $0.000 Gloucester County MultiPurpose Trail Extension C00S(354) $ /29/2013 Route 77, SwedesboroHardingville Road, Intersection Improvements (CR 538) (DB #97049) Route 77, SwedesboroHardingville Road, Intersection Improvements (CR 538) (DB #97049) Route 130, Raccoon Creek Bridge Replacement and Pavement Rehabilitation (DB #98344) Route 130, Raccoon Creek Bridge Replacement and Pavement Rehabilitation (DB #98344) STP CON $0.000 $0.000 $0.000 $0.000 STP DES $0.000 $0.350 $0.000 $0.350 BRIDGE CON $ $0.000 $0.000 $0.000 BRIDGE ROW $0.000 $0.932 $0.000 $0.932 Route 168, Bridge over Big Timber Creek (DB #09327) BRIDGE DES $0.700 $0.000 $0.000 $0.000 Route 168, Bridge over Big Timber Creek (DB #09327) BRIDGE PE $0.000 $1.200 $0.726 $0.474 Route 168, Bridge over Big Timber Creek 4057(113) $ /14/2013 Route 322, Kings Highway (CR 551) (DB #97112B) NHS PE $0.400 $0.000 $0.000 $0.000 Gloucester Subtotal $ $ $7.138 $ /10/2014
5 NEW JERSEY DEPARTMENT OF TRANSPORTATION FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Authorized and Unauthorized Projects (All funds $ millions) PROJECT NAME Mercer PHASE PROG MODIFIED AUTH AUTH BALANCE Mercer County Bus Purchase (DB #D1011) STPSTU EC $0.198 $0.000 $0.000 $0.000 Mercer County Roadway Safety Improvements (DB #D0412) STPSTU CON $0.500 $0.000 $0.000 $0.000 Mercer County Signal Project, CR 533 (DB #D0702) STPSTU CON $3.500 $0.000 $0.000 $0.000 PrincetonHightstown Road Improvements,CR 571 (DB #D0701) STPSTU CON $0.800 $0.000 $0.000 $0.000 Route 1 Business, Brunswick Circle to Lake Drive (DB #04316) STPTE CON $4.302 $0.000 $0.000 $0.000 Route 1, Southbound, Nassau Park Boulevard to I95, Safety Improvements (DB #01330A) NHS ROW $0.000 $0.000 $0.000 $0.000 Route 1, Southbound, Nassau Park Boulevard to I95, Safety Improvements (DB #01330A) NHS UTI $1.300 $0.000 $0.000 $0.000 Route 29, Drainage Improvements (DB #07319) STP DES $0.500 $0.000 $0.000 $0.000 Route 31, Bridge over CSX Railroad (DB #08355) BRIDGE ROW $0.000 $0.000 $0.000 $0.000 Route 31, Pennington Circle Safety Improvements (DB #159A) HSIP DES $0.800 $0.000 $0.000 $0.000 Route 130, Westfield Ave. to US Rt. 1, Pavement (DB #11309) NHS CON $0.000 $0.000 $0.000 $0.000 Route 206, South Broad Street Bridge over Assunpink Creek (DB #L064) NHS DES $0.000 $0.000 $0.000 $0.000 Route 206, Whitehorse Circle (CR 533, 524) (DB #95040) HSIP DES $0.500 $0.000 $0.000 $0.000 Route 206, Whitehorse Circle (CR 533, 524) (DB #95040) HSIP PE $0.000 $0.000 $0.000 $0.000 Route 29, Cass Street to Calhoun Street, Drainage (DB #07319B) STP PE $0.350 $0.000 $0.000 $0.000 Route 295, Northbound Approach to Route 1 Exits, ITS Improvements (DB #06358) IMAINT DES $0.500 $0.000 $0.000 $0.000 Trenton Amtrak Bridges (DB #99362) STPSTU DES $0.000 $0.000 $0.000 $0.000 Trenton Amtrak Bridges (DB #99362) STPSTU ROW $0.600 $0.000 $0.000 $0.000 Mercer Subtotal $ $0.000 $0.000 $ /10/2014
6 NEW JERSEY DEPARTMENT OF TRANSPORTATION FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Authorized and Unauthorized Projects (All funds $ millions) PROJECT NAME Various PHASE PROG MODIFIED AUTH AUTH BALANCE Bridge Deck/Superstructure Replacement Program (DB #03304) BRIDGE EC $4.000 $4.000 $4.478 $0.478 Route 70 WB over Route 38 Bridge Deck 0018(157) $ /13/2012 Bridge Inspection, Local Bridges (DB #X07E) BRIDGE EC $2.300 $0.000 $0.000 $0.000 Bridge Inspection, Local Bridges (DB #X07E) BRIDGEOFF EC $0.000 $0.831 $0.830 $0.001 Bridge Inspection, Local Bridges (BROFF) NBIS(760) $ /04/2013 Bridge Inspection, Local Bridges (DB #X07E) NHPP EC $0.000 $0.064 $0.064 $0.000 Bridge Inspection, Local Bridges (NHPP) NBIS(760) $ /04/2013 Bridge Inspection, Local Bridges (DB #X07E) STP EC $0.000 $0.886 $0.882 $0.004 Bridge Inspection, Local Bridges (STP) NBIS(760) $ /04/2013 Bridge Inspection, State NBIS Bridges (DB #X07A) BRIDGE EC $2.600 $0.000 $0.000 $0.000 Bridge Inspection, State NBIS Bridges (DB #X07A) BRIDGEOFF EC $0.000 $0.340 $0.310 $0.030 Bridge Inspection, State NBIS Bridges (BROFF) NBIS(759) $ /04/2013 Bridge Inspection, State NBIS Bridges (DB #X07A) NHPP EC $0.000 $1.587 $1.521 $0.066 Bridge Inspection, State NBIS Bridges (NHPP) NBIS(759) $ /04/2013 Bridge Inspection, State NBIS Bridges (DB #X07A) STP EC $0.000 $0.483 $0.536 $0.053 Bridge Inspection, State NBIS Bridges (STP) NBIS(750) $ /04/2013 Bridge Painting Program (DB #X08) NHPP EC $0.000 $6.000 $6.242 $0.242 Bridge Painting Contract (033) $ /05/2013 Crash Reduction Program (DB #X242) HSIP EC $0.720 $0.720 $0.000 $0.720, Future Projects (DB #D026) STPSTU ERC $1.596 $0.000 $0.000 $0.000 Local Aid Consultant Services (DB #10347) STPSTU EC $0.200 $0.200 $0.000 $0.200 Local CMAQ Initiatives (DB #X065) CMAQ EC $0.920 $0.000 $0.000 $0.000 Local Project Development Support (DB #06326) STPSTU PLS $0.180 $0.180 $0.180 $0.000 Local Project Development Support C00S(421) $ /11/2013 Local Safety/ High Risk Rural Roads Program (DB #04314) HSIP ERC $1.000 $0.000 $0.000 $ /10/2014
7 NEW JERSEY DEPARTMENT OF TRANSPORTATION FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Authorized and Unauthorized Projects (All funds $ millions) PROJECT NAME Various PHASE PROG MODIFIED AUTH AUTH BALANCE Metropolitan Planning (DB #X30A) PL PLS $3.272 $3.272 $2.686 $0.586 FY14 Central Staff Activities (PL) C00S(500) $ /17/2013 Metropolitan Planning (DB #X30A) STPSTU PLS $1.000 $1.606 $1.501 $0.105 FY14 Central Staff Activities (STP) C00S(502) $ /17/2013 FY14 SubRegional Planning Activities C00S(503) $ /17/2013 Ozone Action Program in New Jersey (DB #D0407) CMAQ EC $0.040 $0.040 $0.040 $0.000 Ozone Action Program in New Jersey C00S(513) $ /17/ /10/2014
8 NEW JERSEY DEPARTMENT OF TRANSPORTATION FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Authorized and Unauthorized Projects (All funds $ millions) PROJECT NAME Various PHASE PROG MODIFIED AUTH AUTH BALANCE RailHighway Grade Crossing Program, Federal (DB #X35A1) RHC EC $1.800 $2.800 $2.834 $0.034 Wolfert Station Rd Grade Crossing C00S(345) $ /14/2012 Burlington Ave Grade Crossing C00S(343) $ /27/2012 Harmony Road Grade Crossing C00S(428) $ /27/2012 SH 130 Grade Crossing C00S(449) $ /07/2013 Station Ave Grade Crossing C00S(453) $ /05/2013 Commerce Street Grade Crossing C00S(474) $ /02/2013 Ellis Street Grade Crossing C00S(452) $ /16/2013 Lumberton Road Grade Crossing C00S(448) $ /16/2013 7th & Bulson Grade Crossing C00S(447) $ /16/2013 North Washington Ave Grade Crossing C00S(450) $ /16/2013 Jessup Road Grade Crossing C00S(488) $ /24/2013 Gateway Blvd (SH 45) Grade Crossing C00S(489) $ /12/2013 Asbury Station Rd Grade Crossing C00S(485) $ /03/2013 Olive St Grade Crossing C00S(523) $ /09/2013 Jessup Rd Grade Crossing C00S(517) $ /12/2013 Harmony Rd Grade Crossing C00S(484) $ /06/2013 Commerce St Grade Crossing C00S(541) $ /12/2013 RideECO Mass Marketing EffortsNew Jersey (DB #D0406) CMAQ EC $0.040 $0.040 $0.040 $0.000 RideECO Mass Marketing EffortsNew Jersey C00S(499) $ /17/2013 RIMIS II Implementation (DB #01300) STPSTU EC $0.100 $0.246 $0.000 $ /10/2014
9 NEW JERSEY DEPARTMENT OF TRANSPORTATION FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Authorized and Unauthorized Projects (All funds $ millions) PROJECT NAME PHASE PROG MODIFIED AUTH AUTH BALANCE Various Safety Service Patrol (DB #X181) EB EC $2.640 $2.190 $2.268 $0.078 Safety Service Patrol South C00S(437) $ /07/2013 Safety Service Patrol (DB #X181) OTHER EC $0.000 $0.450 $0.450 $0.000 Safety Service Patrol South (Other) C00S(437) $ /07/2013 Traffic Operations Center (South) (DB #X82) EB EC $4.000 $4.000 $4.427 $0.427 Traffic Operations Center (South) C00S(440) $ /07/2013 Rt 1 Adaptive Traffic Signal Contract 1 () 0033(290) $ /04/2013 Transportation and Community Development Initiative (TCDI) (DB #D0204) STPSTU EC $1.080 $0.080 $0.000 $0.080 Transportation Management Associations (DB #11383) STPSTU EC $2.000 $2.000 $1.750 $0.250 Transportation Management Associations UPWP C00S(498) $ /24/2013 Various Subtotal $ $ $ $0.976 Subtotal $ $ $ $ /10/2014
10 NEW JERSEY DEPARTMENT OF TRANSPORTATION FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Statewide Authorized and Unauthorized Projects (All funds $ millions) PROJECT NAME PHASE AUTH BALANCE ADA Curb Ramp Implementation (DB #11344) STP EC $1.000 $1.000 $0.000 $1.000 Betterments, Bridge Preservation (DB #X72A) BRIDGE EC $0.000 $0.000 $0.000 $0.000 Betterments, Bridge Preservation (DB #X72A) IMAINT EC $5.000 $0.000 $0.000 $0.000 Betterments, Bridge Preservation (DB #X72A) NHPP EC $0.000 $5.000 $5.864 $0.864 Bridge Preventative Maintenance 2013 C00S(403) $ /08/2013 Bridge Preventative Maintenance Contract C00S(455) $ /03/2013 Bicycle & Pedestrian Facilities/Accommodations (DB #X185) CMAQ ERC $5.000 $5.000 $4.037 $0.963 FY1213 Bike/Ped Program Year 2 BIKE(148) $ /19/2012 Bridge Deck/Superstructure Replacement Program (DB #03304) BRIDGE EC $5.000 $0.000 $0.000 $0.000 Bridge Deck/Superstructure Replacement Program (DB #03304) BRIDGE ERC $0.000 $4.000 $0.000 $4.000 Bridge Management System (DB #X70) BRIDGE EC $0.400 $0.400 $0.403 $0.003 Bridge Management System C00S(423) $ /11/2013 Bridge Painting Program (DB #X08) STP EC $ $ $ $1.304 Maintenance Bridge Painting C00S(367) $ /20/2013 Maintenance Bridge Painting C00S(475) $ /03/2013 Bridge Scour Countermeasures (DB #98316) BRIDGE ERC $6.000 $1.000 $0.000 $1.000 Culvert Replacement Program (DB #09316) STP ERC $1.000 $1.000 $3.028 $2.028 Rt 46 Hatchery Brook Culvert Replacment 0050(129) $ /09/2013 Rt 57 Pohatcong Creek Culvert Replacement 0044(111) $ /04/2013 DBE Supportive Services Program (DB #X142) STP EC $0.500 $0.500 $0.400 $0.100 NSTI 2013 NSTI(013) $ /30/2013 DBE Supportive Services FY (123) $ /19/2013 Disadvantaged Business Enterprise (DB #X197) STP EC $0.100 $0.100 $0.000 $ /6/2014
11 NEW JERSEY DEPARTMENT OF TRANSPORTATION FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Statewide Authorized and Unauthorized Projects (All funds $ millions) PROJECT NAME PHASE AUTH BALANCE Drainage Rehabilitation & Improvements (DB #X154D) EB EC $4.000 $4.000 $0.000 $4.000 Ferry Program (DB #00377) FERRY ERC $ $ $0.000 $ Highway Safety Improvement Program Planning (DB #09388) HSIP EC $4.000 $4.000 $3.507 $0.493 Highway Safety Improvement Program Rail (Year 1) C00S(454) $ /28/2013 HSIP Safety and Electrical Engineering FY13 C00S(461) $ /21/2013 Intelligent Transportation Systems (DB #03305) EB ERC $1.000 $1.000 $5.313 $4.313 ITS Engineering FY13 C00S(442) $ /08/2013 ITS Resource Center C00S(426) $ /30/2013 Intersection Improvement Program (DB #98333) HSIP ERC $1.000 $1.000 $0.000 $1.000 Median Crossover Protection Contract #12 (DB #12367) NHS DES $0.831 $0.831 $1.168 $0.337 Median Crossover Protection Contract #12 C00S(471) $ /05/2013 Median Crossover Protection Contract #12 (DB #12367) NHS PE $0.100 $0.100 $0.000 $0.100 Motor Vehicle Crash Record Processing (DB #X233) EB EC $4.000 $4.000 $3.123 $0.877 Motor Vehicle Crash Records C00S(418) $ /11/2013 National Boating Infrastructure Grant Program (DB #01342) NBIG EC $1.600 $1.600 $0.000 $1.600 New Jersey Scenic Byways Program (DB #X200C) SCENIC ERC $2.000 $2.000 BYWAY $0.760 $1.240 NJ Scenic Byways Statewide Directional and Wayfinding Signage SB12(001) $ /21/2013 New Jersey Scenic Byways Statewide Trail Blazer Signs SB12(003) $ /17/2013 New Jersey Scenic Byways Program (DB #X200C) STPTE ERC $0.250 $0.250 $0.000 $0.250 Park and Ride/Transportation Demand Management Program (DB #X28B) CMAQ EC $8.000 $0.000 $0.000 $0.000 Pavement Preservation (DB #X51) EB EC $5.000 $1.813 $1.183 $0.630 Pavement Preservation Crack Sealing Statewide 2013 C00S(482) $ /11/ /6/2014
12 NEW JERSEY DEPARTMENT OF TRANSPORTATION FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Statewide Authorized and Unauthorized Projects (All funds $ millions) PROJECT NAME PHASE AUTH BALANCE Pavement Preservation (DB #X51) NHPP EC $0.000 $3.187 $5.785 $2.598 Pavement Preservation South C00S(470) $ /11/2013 Pedestrian Safety Corridor Program (DB #06401) HSIP EC $0.500 $0.500 $0.500 $0.000 Pilot Pedestrian Education Program C00S(386) $ /21/2013 Planning and Research, FederalAid (DB #X30) SPR PLS $ $ $ $7.531 SPR Research 0010(044) $ /11/2013 Research Supplemental Year (042) $ /11/2013 SPR Planning 0010(043) $ /11/2013 Local Technical Assistance Program (LTAP) LTAP(013) $ /14/2013 Planning and Research, FederalAid (DB #X30) STP PLS $6.000 $6.000 $8.305 $2.305 Pavement Planning Program (SPR) C00S(422) $ /11/2013 SPR Local Project Development Support C00S(421) $ /26/2013 Bridge Management System C00S(425) $ /30/2013 PreApprenticeship Training Program for Minorities and Women (DB #X135) STP EC $0.500 $0.500 $0.213 $0.287 OJT Supportive Services FY (124) $ /19/2013 Recreational Trails Program (DB #99409) REC TRAILS ERC $1.411 $1.411 $1.792 $0.381 FY12 Statewide Rec Trails Admin Expense LR12(966) $ /25/2013 FY12 Statewide Rec Trails Program L942(968) $ /25/2013 FY12 Statewide Rec Trails Motorized Grant M0T2(969) $ /25/2013 DEP Rec Trails 38 Motorized Trail Projects (DEP project) M943(968) $ /20/2013 DEP Rec Trails 1 Motorized Trail (DEP project) M0T3(969) $ /20/ /6/2014
13 NEW JERSEY DEPARTMENT OF TRANSPORTATION FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Statewide Authorized and Unauthorized Projects (All funds $ millions) PROJECT NAME PHASE AUTH BALANCE Restriping Program & Line Reflectivity Management System (DB #X03A) STP EC $ $0.000 $0.000 $0.000 Resurfacing, Federal (DB #99327A) NHS ERC $7.000 $7.000 $5.756 $1.244 Route 72/Route 70 to CR 532, Burlington County 0019(121) $ /14/2013 I80 EB Resurfacing MP 45.6 to 53 (DES) 0805(100) $ /08/2013 Rt 18 NB Rt 138 to Deal Rd (DES) 0029(170) $ /16/2013 Rt 130 Main St to Rt 1 (DES) 0017(173) $ /10/2013 Rt 55 NB Leaming Mill Rd to New York Ave, Pavement 0003(146) $ /12/2013 Rt 38 MP 06.1 Pavement (DES) 0020(118) $ /19/2013 Rt 22 EB/WB Middle Brook to Westfield Rd (DES) 0040(187) $ /23/2013 Right of Way FullService Consultant Term Agreements (DB #05340) STP ROW $0.200 $0.200 $0.000 $0.200 Route 35, Restoration, Berkley Twp. to Toms River Twp. (MP 04) (DB #9147A) Route 40/322, Median Closures, Ivins Avenue to Spruce Avenue (DB #196A5A) Route 40/322, Median Closures, Ivins Avenue to Spruce Avenue (DB #196A5A) NHS CON $0.000 $0.000 $0.000 $0.000 BRIDGE CON $0.600 $0.000 $0.000 $0.000 STP CON $0.000 $0.600 $0.000 $0.600 Rutgers Transportation Safety Resource Center (TSRC) (DB #04364) EB EC $1.300 $1.300 $1.650 $0.350 Rutgers Transportation Safety Resource Center (TSRC) C00S(424) $ /11/2013 Safe Corridors Program (DB #04313) HSIP ERC $2.500 $2.500 $0.000 $ /6/2014
14 NEW JERSEY DEPARTMENT OF TRANSPORTATION FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Statewide Authorized and Unauthorized Projects (All funds $ millions) PROJECT NAME PHASE AUTH BALANCE Safe Routes to School Program (DB #99358) SRTS ERC $5.587 $5.587 $2.617 $2.970 Little Egg Harbor (SRTS) C00S(154) $ /17/2012 TMA SRTS Greater Mercer C00S(531) $ /04/2013 TMA SRTS Meadowlink Ridesharing C00S(535) $ /04/2013 TMA SRTS Hudson TMA C00S(533) $ /04/2013 TMA SRTS Keep Middlesex Moving C00S(534) $ /04/2013 TMA SRTS TransOptions C00S(537) $ /04/2013 TMA SRTS RideWise of Raritan Valley C00S(536) $ /04/2013 TMA SRTS HART Commuter Information Services C00S(532) $ /04/2013 TMA SRTS Cross County Connection C00S(530) $ /04/2013 Mount Holly SRTS C00S(226) $ /11/2013 Sign Structure Rehabilitation Program (DB #X239A) STP CON $2.000 $0.000 $0.000 $0.000 Sign Structure Rehabilitation Program (DB #X239A) STP DES $1.000 $1.000 $0.000 $1.000 Sign Structure Replacement Contract (DB #11427) STP CON $7.200 $7.200 $5.847 $1.353 Sign Structure Replacement Contract C00S(481) $ /09/2013 State Police Safety Patrols (DB #04312) EB EC $2.000 $2.000 $0.000 $2.000 Statewide Incident Management Program (DB #X230) EB EC $5.800 $3.631 $3.631 $0.000 Statewide Incident Management Program C00S(438) $ /08/ /6/2014
15 NEW JERSEY DEPARTMENT OF TRANSPORTATION FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Statewide Authorized and Unauthorized Projects (All funds $ millions) PROJECT NAME PHASE AUTH BALANCE Statewide Traffic Management/Information Program (DB #06324) EB EC $4.000 $6.169 $9.257 $ NJ and SWIFT Systems C00S(459) $ /26/2013 FY13 TRANSCOM Operational Support C00S(460) $ /21/2013 Statewide Traffic Management/Information Program INRIX Data C00S(510) $ /18/2013 ITS Maintenance FY13 C00S(508) $ /01/2013 Traffic Monitoring Systems (DB #X66) EB PLS $ $ $ $0.000 Traffic Monitoring Systems C00S(416) $ /11/2013 Traffic Signal Replacement (DB #X47) HSIP EC $2.500 $0.500 $0.000 $0.500 Traffic Signal Timing and Optimization (DB #04320) STP EC $1.700 $2.900 $4.838 $1.938 Traffic Signal Timing and Optimization C00S(441) $ /08/2013 Rt. 130 Adaptive Signal Contract #1 0017(174) $ /18/2013 Training and Employee Development (DB #X244) STP EC $1.800 $0.000 $0.000 $0.000 Transportation and Community System Preservation Program (DB #02393) DEMO ERC $0.000 $4.000 $0.000 $4.000 Transportation Demand Management Program Support (DB #X43) CMAQ PLS $0.230 $0.230 $0.174 $0.056 FY13 TDM Work Program C00S(414) $ /26/2012 Transportation Enhancements (DB #X107) STPTE ERC $ $ $1.710 $8.290 TE Project Management C00S(419) $ /11/2013 TE Program C00S(420) $ /11/2013 Youth Employment and TRAC Programs (DB #X199) STP EC $0.250 $0.250 $0.356 $ Urban Gateway Enhancement Program C00S(524) $ /05/2013 Statewide Subtotal $ $ $ $ /6/2014
16 T143 ADA Platforms/Stations Funding is provided for the design and construction of necessary improvements to make 's rail stations, and subway stations compliant with the Americans with Disabilities Act (ADA) including related track and infrastructure work. Funding is requested for upgrades and transit enhancements throughout the system including, but not limited to Perth Amboy and Ridgewood stations. This program also provides funding for other accessibility improvements at non key stations The total project cost for Ridgewood Station ADA Improvements is anticipated to be $41 million and Perth Amboy High Level Platform Construction is anticipated to be $25 million. AWARD $ /11/2012 $3.000 TOTALS $3.000 $3.000 $0.000 T05 Bridge and Tunnel Rehabilitation This program provides funds for the design, repair, rehabilitation, replacement, painting, inspection of tunnels/bridges, and other work such as movable bridge program, drawbridge power program, and culvert/bridge/tunnel right of way improvements necessary to maintain a state of good repair. AWARD $ /11/2012 $ $ /11/2012 $1.394 $ /11/2012 $0.295 TOTALS $ $ $0.000 Page 1 12/19/ :04:35 AM
17 T32 Building Capital Leases Funding is provided for capital improvements and lease payment obligations at operating and office installations. AWARD STATE CAP $ /11/2012 $3.990 STATE CAP $ /11/2012 $0.399 STATE CAP $ /11/2012 $1.311 TOTALS $5.700 $5.700 $0.000 Page 2 12/19/ :04:35 AM
18 T111 Bus Acquisition Program This program provides funds for replacement of transit, commuter, and suburban buses for as they reach the end of their useful life as well as the purchase of additional buses to meet service demands. Federal lease payments are provided for 1371 Cruiser buses. Pay as yougo funding is provided for over 2300 buses replacements over the next 10 years. PRIOR YEAR ING Description Fund Year Amount Oblgtd Date Oblgtd Amt Pending Award Amt Comments Bus Acquisition Program SECT $ /2/2013 $ $0.000 NJ Bus Acquisition Program SECT $ /10/2013 $ $0.000 NJ Unoblgtd Amt AWARD SECT 5307 CAP $ /28/2013 $2.895 NJ 90 X100 SECT 5307 CAP $ /28/2013 $9.513 NJ 90 X100 SECT 5307 CAP $ /28/2013 $ NJ 90 X100 STATE CAP $ /11/2012 $ STATE CAP $ /11/2012 $8.968 STATE CAP $ /11/2012 $ TOTALS $ $ $0.000 Page 3 12/19/ :04:35 AM
19 T06 Bus Passenger Facilities/Park and Ride This program provides funds for the bus park and ride program, improvements to bus passenger facilities and the purchase and installation of bus stop signs and shelters systemwide. AWARD SECT 5307 ERC $2.000 $2.000 SECT 5339 ERC $2.000 $2.000 $ /11/2012 $0.056 $ /11/2012 $0.184 $ /11/2012 $0.560 TOTALS $4.800 $0.800 $4.000 T08 Bus Support Facilities and Equipment This program provides funds to maintain 's bus fleet including but not limited to, bus tires, engines and transmissions and other parts, support vehicles\equipment (for bus operations), maintenance equipment, and bus mid life overhaul needs. Also included is midlife rehabilitation of bus facilities, other capital improvements to various support facilities and bus mid life overhauls. AWARD SECT 5339 ERC $0.250 $0.250 $ /11/2012 $3.101 $ /11/2012 $1.018 $ /11/2012 $0.310 TOTALS $4.679 $4.429 $0.250 Page 4 12/19/ :04:35 AM
20 T09 Bus Vehicle and Facility Maintenance/Capital Maintenance Funding is provided for acquisition/installation/rehabilitation of major components associated with capital equipment and facilities in accordance with TTF requirements and expanded eligibility criteria. AWARD STATE EC $ /11/2012 $ STATE EC $ /11/2012 $8.027 STATE EC $ /11/2012 $2.443 TOTALS $ $ $0.000 T68 Capital Program Implementation Funding is provided for capital project management activities associated with capital program/project delivery including finance, procurement and DBE/SBE activities. AWARD $ /11/2012 $1.712 $ /11/2012 $ $ /11/2012 $5.628 TOTALS $ $ $0.000 Page 5 12/19/ :04:35 AM
21 T515 Casino Revenue Fund State law provides 8.5% of the Casino Tax Fund to be appropriated for transportation services for senior and disabled persons. This element also supports capital improvements that benefit the senior and disabled populations. The law provides 85% of these funds to be made available to the counties through for capital, operating, and administrative expenses for the provision of locally coordinated para transit services. The amount each county receives is determined by utilizing an allocation formula based on the number of residents 60 years of age and over as reflected in the most recent U.S. Census Report. AWARD CASINO REVENUE CAP $ /11/2012 $5.665 $2.235 CASINO REVENUE CAP $ /11/2012 $ $6.803 CASINO REVENUE CAP $ /11/2012 $1.724 $0.680 TOTALS $ $ $9.718 T13 Claims support Funding is provided for claims related to capital projects, expert witnesses, court settlement, and other costs to defend 's interests as a result of litigation. AWARD STATE EC $ /11/2012 $1.400 STATE EC $ /11/2012 $0.460 STATE EC $ /11/2012 $0.140 TOTALS $2.000 $2.000 $0.000 Page 6 12/19/ :04:35 AM
22 T16 Environmental Compliance Funding is provided for compliance with environmental regulations at both bus and rail facilities includes but is not limited to replacement of leaking fuel tanks, clean up of contaminated soil and ground water, oil/water separators, asbestos removal, and fueling station improvements at various facilities. AWARD $ /11/2012 $0.690 $ /11/2012 $2.100 $ /11/2012 $0.210 TOTALS $3.000 $3.000 $0.000 T87 Hudson Bergen LRT System Funding is provided for annual Hudson Bergen Capital Asset Replacement improvements, and other improvements along the Hudson Bergen Light Rail Line. COUNTY: Hudson MUNICIPALITY: Various AWARD $ /11/2012 $5.390 TOTALS $5.390 $5.390 $0.000 Page 7
23 T20 Immediate Action Program Funding is provided for emergency project needs under the rail, bus, and headquarters programs; contract change orders; consultant agreement modifications; and other unanticipated work identified during the course of the year, thus allowing the agency to be responsive to emergency and unforeseen circumstances which arise unexpectedly. AWARD $ /11/2012 $1.968 $ /11/2012 $7.516 $ /11/2012 $0.587 TOTALS $ $ $0.000 T905 Interoperational Communications Resiliency Funding is provided for upgrades to telecommunications systems and facilities to ensure critical personnel have the ability to communicate and have the necessary command and control capabilities during future storms, and service recovery period following storms, including upgrades to NJ TRANSIT s police capabilities. AWARD SECT 5324 ERC $ $ TOTALS $ $ Page 8
24 T199 Job Access and Reverse Commute Program The Job Access and Reverse Commute Program, funded through the Transportation Equity Act for the 21st Century (TEA 21), is intended to support transportation services to connect welfare recipients and other transit dependents to jobs and related employment activities. JARC program funds are matched with Local and/or TANF funds. PRIOR YEAR ING Description Fund Year Amount Oblgtd Date Oblgtd Amt Pending Award Amt Unoblgtd Amt Job Access Reverse Commute Program MATCH 2012 $0.920 $0.920 Job Access Reverse Commute Program SECT $0.920 $0.920 Job Access Reverse Commute Program MATCH 2012 $2.800 $2.800 Job Access Reverse Commute Program SECT $2.800 $2.800 Job Access Reverse Commute Program MATCH 2012 $0.280 $0.280 Job Access Reverse Commute Program SECT $0.280 $0.280 Comments AWARD MATCH SWI $0.920 $0.920 MATCH SWI $2.800 $2.800 MATCH SWI $0.280 $0.280 SECT 5316 SWI $2.800 $2.800 SECT 5316 SWI $0.280 $0.280 SECT 5316 SWI $0.920 $0.920 TOTALS $8.000 $8.000 Page 9
25 T535 Lackawanna Cutoff MOS Project Funding is provided for FY 2008 New Starts earmarks for the Lackawanna Cutoff Rail project, which will provide an 88 mile, single track commuter rail line with passing sidings between Scranton, Pennsylvania and Port Morris, New Jersey where it will connect with 's Boonton/Morristown Line. COUNTY: Morris, Sussex, Warren MUNICIPALITY: Various AWARD SECT 5307 ERC $2.200 $2.200 TOTALS $2.200 $2.200 T95 Light Rail Infrastructure Improvements Funding is provided for Light Rail improvements including, but not limited to, communication systems upgrade, accessibility improvements and other infrastructure rehabilitation support and passenger facility improvements. Funding is also provided for NEC Infrastructure. COUNTY: Various MUNICIPALITY: Newark City AWARD $ /11/2012 $0.200 $ /11/2012 $3.850 TOTALS $4.050 $4.050 $0.000 Page 10
26 T904 Light Rail Resiliency Funding is provided to improve the resiliency of Hudson Bergen Light Rail and Newark City Subway. Newark Light Rail was flooded at Penn Station during Superstorm Sandy, and Hudson Bergen Light Rail experienced washouts, downed catenary and debris throughout. Resiliency projects include raising substations, improving drainage, installing pumps and other flood mitigations. Funding is also provided for resiliency of ferry facilities adjacent to Light Rail at Hoboken Terminal. AWARD SECT 5324 ERC $ $ TOTALS $ $ T550 Light Rail Vehicle Rolling Stock Funding is provided for annual lease payments for Hudson Bergen Light Rail, Newark City Subway and Newark City Subway Extension vehicles. AWARD SECT 5307 ERC $ /28/2013 $6.760 NJ 90 X100 $ /11/2012 $ TOTALS $ $ $0.000 Page 11
27 T53E Locomotive Overhaul Funding is provided for the cyclic overhaul of locomotives based on manufacturer replacement standards to support the equipment through its useful life. AWARD STATE CAP $ /11/2012 $4.700 STATE CAP $ /11/2012 $0.296 STATE CAP $ /11/2012 $0.062 TOTALS $5.058 $5.058 $0.000 T610 Lyndhurst Intermodal Station Improvements COUNTY: Bergen MUNICIPALITY: Lyndhurst Township Funding is provided for the Lyndhurst station construction to make the station ADA accessible.toll Credit will be used as the non federal match. An explanation of toll credit can be found in the introduction section of the STIP.This project is funded under the provisions of Section 13 of P.L. 1995, c.108. AWARD SECT 5307 ERC $4.000 $4.000 TOTALS $4.000 $4.000 Page 12
28 T901 Meadows Maintenance Complex (MMC)/Rail Operations Center (ROC) Resiliency Funding is provided to improve the resiliency of the Meadows Maintenance Complex and s Rail Operations Center, Kearny, NJ. The MMC is NJ TRANSIT s primary maintenance facility, and the adjacent Rail Operations Center controls s entire network. While the yard will be evacuated for future storms, the MMC and ROC buildings and shops must weather future storms in place. Potential resiliency projects include flood walls, berms, spare parts solutions, hardening of the ROC and/or relocation of the facility. Toll Credit will be used as the non federal match. An explanation of toll credit can be found in the Introduction Section of the STIP. AWARD SECT 5324 ERC $ $ TOTALS $ $ T122 Miscellaneous Funding is provided for the continuation of the mandated vital records program and other miscellaneous administrative expenses such as, but not limited to, match funds for special services grants and physical plant improvements incurred throughout the year. AWARD $ /11/2012 $0.115 $ /11/2012 $0.035 $ /11/2012 $0.350 TOTALS $0.500 $0.500 $0.000 Page 13
29 T600 NEC Elizabeth Intermodal Station Improvements COUNTY: Union MUNICIPALITY: Elizabeth City Funding is provided for the reconstruction of the passenger platforms and station building at Elizabeth Rail Station, including, but not limited to new elevators and stairs, ticket and operational office space, and retail space.toll Credit will be used as the non federal match. An explanation of toll credit can be found in the introduction section of the STIP.This project is funded under the provisions of Section 13 of P.L. 1995, c.108. AWARD SECT 5307 ERC $3.000 $3.000 SECT 5339 ERC $6.000 $6.000 TOTALS $9.000 $9.000 T44 NEC Improvements Funding is provided for improvements to Northeast Corridor (NEC) rail service including both right of way and maintenance of equipment to ensure the NEC is in a state of good repair. Also included are improvements to NEC stations, including Penn Station New York. and RAK enter into a joint benefit agreement to manage how joint benefit funds are spent. AWARD $ /11/2012 $2.750 $ /11/2012 $ TOTALS $ $ $0.000 Page 14
30 T552 New Freedom Program This program provides funding to encourage services and facilities improvements to address the transportation needs of persons with disabilities that go beyond those required by the American with disabilities Act. The program provides for associated capital and operating costs to help people with disabilities participate more fully in the workforce and in community life. PRIOR YEAR ING Description Fund Year Amount Oblgtd Date Oblgtd Amt Pending Award Amt Unoblgtd Amt New Freedom Program SECT $0.526 $0.526 New Freedom Program SECT $1.605 $1.605 New Freedom Program SECT $0.160 $0.160 Comments AWARD SECT 5317 ERC $0.526 $0.526 SECT 5317 ERC $0.160 $0.160 SECT 5317 ERC $1.605 $1.605 T906 TOTALS $2.291 System Repairs/Restoration $2.291 Funding is provided to operate and restore s rail, bus, light rail and ferry systems, including costs for substitute service that was provided when rail service was unavailable. s system was heavily damaged by Superstorm Sandy, experiencing washouts, bridge damage, facility impacts, and rolling stock damage. Funding is provided to reimburse for costs already incurred and future costs to repair damage. Toll Credit will be used as the non federal match. An explanation of toll credit can be found in the Introduction Section of the STIP. AWARD SECT 5324 ERC $ $ TOTALS $ $ Page 15
31 T55 Other Rail Station/Terminal Improvements Funding is provided for the design, land acquisition and construction of various stations, parking and related facilities, and upgrades throughout the system including related track and rail infrastructure work. Also included are station and facility inspection and repair, customer service station bike locker installation systemwide, and STARS Program. Funding for Elizabeth Rail Station Reconstruction and North Elizabeth Station Repairs are also included. The total project cost of the Elizabeth Rail Station Reconstruction is $53 million. PRIOR YEAR ING Description Fund Year Amount Oblgtd Date Oblgtd Amt Pending Award Amt Unoblgtd Amt Other Rail Station/Terminal Improvements (Hudson Bergen CMAQ 2010 $3.000 $3.000 Other Rail Station/Terminal Improvements (Hudson Bergen CMAQ 2009 $ $ Other Rail Station/Terminal Improvements (Lackawanna Cu NEW STARTS 2011 $1.000 Other Rail Station/Terminal Improvements (Metropark Plat CMAQ 2010 $1.000 $1.000 Other Rail Station/Terminal Improvements (New Brunswick HPP $9.061 $9.061 $1.000 Comments Not NJT Money. AWARD $ /11/2012 $ $ /11/2012 $0.512 $ /11/2012 $0.108 TOTALS $ $ $0.000 Page 16
32 T620 Perth Amboy Intermodal Station Improvements Funding is provided for the construction of high level platforms in order to enhance access to commuter trains in conformance with ADA regulations. COUNTY: Middlesex MUNICIPALITY: Perth Amboy City AWARD SECT 5307 ERC $1.048 $1.048 SECT 5339 ERC $5.050 $5.050 TOTALS $6.098 $6.098 T121 Physical Plant Funding is provided for demolition of out of service facilities, energy conservation program, work environment improvements, replacement of antiquated administrative support equipment, purchase of material warehouse equipment, replacement of non revenue vehicles, and other minor improvements to various bus/rail facilities. AWARD $ /11/2012 $0.384 $ /11/2012 $1.169 $ /11/2012 $0.116 TOTALS $1.669 $1.669 $0.000 Page 17
33 T135 Preventive Maintenance Bus This program provides funding for the overhaul of buses including preventive maintenance costs in accordance with federal guidelines as defined in the National Transit Database Reporting Manual and federal law. PRIOR YEAR ING Description Fund Year Amount Oblgtd Date Oblgtd Amt Pending Award Amt Comments Preventive Maintenance Bus STP 2012 $ /14/2012 $ $7.402 NJ 95 x ($25m). Unoblgtd Amt AWARD SECT 5307 CAP $ /28/2013 $9.871 $0.091 NJ 90 X100. SECT 5307 CAP $ /28/2013 $ $0.455 NJ 90 X100. SECT 5307 CAP $ /28/2013 $ $1.203 NJ 90 X100. SECT 5339/5307 CAP $1.000 $1.000 STP CAP $ /5/2013 $ NJ 95 X024. TOTALS $ $ $2.749 Page 18
34 T39 Preventive Maintenance Rail This program provides funding for the overhaul of rail cars and locomotives and other preventive maintenance costs in accordance with federal funding guidelines as defined in the National Transit Database Reporting Manual and federal law. PRIOR YEAR ING Description Fund Year Amount Oblgtd Date Oblgtd Amt Pending Award Amt Unoblgtd Amt Comments Preventive Maintenance Rail SECT $ /29/2013 $3.919 $6.978 NJ (3.919M) Preventive Maintenance Rail SECT $ /28/2013 $ $2.770 NJ 90 X100. Preventive Maintenance Rail SECT $ /29/2013 $0.026 $ NJ (O.O26) Preventive Maintenance Rail STP 2012 $ /7/2012 $ $ NJ 95 x Preventive Maintenance Rail SECT $ /28/2013 $0.521 $0.000 NJ 90 X100. Preventive Maintenance Rail SECT $ /29/2013 $0.266 $1.476 NJ (.266k) AWARD SECT 5307 CAP $ /28/2013 $2.462 NJ 90 X100. SECT 5307 CAP $ /28/2013 $0.521 NJ 90 X100 SECT 5307 CAP $ /28/2013 $ $2.770 NJ 90 X100 SECT 5309 CAP $0.000 SECT 5309 CAP $0.000 SECT 5309 CAP $0.000 SECT 5337 CAP $ /12/2013 $3.337 NJ :NJ (1.861) SECT 5337 CAP $ /16/2013 $ $ (64.828);01 (69.300) SECT 5337 CAP $ /16/2013 $ NJ540001($4.508):NJ ($2.479):NJ ($13.002) STP CAP $ /5/2013 $ NJ 95 X024 TOTALS $ $ $3.142 Page 19
35 T106 Private Carrier Equipment Program This program provides State funds for the Private Carrier Capital Improvement Program. AWARD STATE CAP $ /11/2012 $3.000 TOTALS $3.000 $3.000 $0.000 T34 Rail Capital Maintenance The Rail Capital Maintenance project includes Rail Maintenance of Way (MOW) activities and Rail Maintenance of Equipment (MOE) activities in accordance with TTF eligibility requirements. AWARD STATE CAP $ /11/2012 $ STATE CAP $ /11/2012 $3.744 STATE CAP $ /11/2012 $0.792 TOTALS $ $ $0.000 Page 20
36 T903 Rail Infrastructure Resiliency Funding is provided to make s rail stations and adjacent yards and tracks more resilient to future storms. Hoboken Terminal/Yard and Secaucus Junction were impacted by Superstorm Sandy, as were other stations throughout s system. Funding is provided for flood mitigation at those locations, including the potential filling of Long Slip in Hoboken Yard, constructing flood walls, flood proofing, and improving stormwater detention systems. Funding is provided for improvements to crew quarters in Bayhead, Hoboken and other locations to ensure the availability of crews post storms. Funding is also provided for rail stations resiliency system wide. Toll Credit will be used as the non federal match. An explanation of toll credit can be found in the Introduction Section of the STIP. AWARD SECT 5324 ERC $ $ TOTALS $ $ Page 21
37 T112 Rail Rolling Stock Procurement This program provides funds for the replacement of rail rolling stock, including engineering assistance and project management, to replace overaged equipment including rail cars, revenue service locomotives, and expansion of rolling stock fleet (cars and locomotives) to accommodate projected ridership growth and other system enhancements over the next ten years. Funding is provided to support vehicles\equipment (for rail operations). PRIOR YEAR ING Description Fund Year Amount Oblgtd Date Oblgtd Amt Pending Award Amt Unoblgtd Amt Rail Rolling Stock Procurement (Multi Levels) CMAQ 2010 $ $ Comments Rail Rolling Stock Procurement (Multi Levels) CMAQ/STP 2009 $ /24/2013 $ $0.000 NJ 95 X026 AWARD CMAQ CAP $ /20/2013 $ NJ 95 X and 01. CMAQ CAP $ /20/2013 $ NJ 95 X and 01. CMAQ CAP $ /20/2013 $0.930 NJ 95 X023 SECT 5307 CAP $ /28/2013 $ $0.001 NJ 90 X100. SECT 5307 CAP $ /28/2013 $1.053 NJ 90 X100 SECT 5307 CAP $ /28/2013 $4.979 NJ 90 X100 STATE CAP $ /11/2012 $1.221 STATE CAP $ /11/2012 $5.771 STATE CAP $ /11/2012 $ TOTALS $ $ $0.001 Page 22
38 T900 Rail Rolling Stock Resiliency Funding is provided for Rail Rolling Stock Resiliency projects. The largest two yards in the State of New Jersey available to Meadows Maintenance Complex and Hoboken Yard have experienced severe flooding, and will require evacuation in future impending storms. Funding is provided to construct or purchase/lease temporary and permanent yard locations, re inspection facilities and access tracks. Potential project elements include new or upgraded yards in Linden and New Brunswick, and Westbound Waterfront Connection to improve the ability to evacuate trains from the yards to the Northeast Corridor. Funding is also provided for yard resiliency projects system wide and emergent storage. Near term improvements also include the Garwood Industrial Track. AWARD SECT 5324 ERC $ $ TOTALS $ $ Page 23
39 T902 Rail Station Resiliency Funding is provided to make s rail stations and adjacent yards and tracks more resilient to future storms. Hoboken Terminal/Yard and Secaucus Junction were impacted by Superstorm Sandy, as were other stations throughout s system. Funding is provided for flood mitigation at those locations, including the potential filling of Long Slip in Hoboken Yard, constructing flood walls, flood proofing, and improving stormwater detention systems. Funding is provided for improvements to crew quarters in Bayhead, Hoboken and other locations to ensure the availability of crews post storms. Funding is also provided for rail stations resiliency system wide. Toll Credit will be used as the non federal match. An explanation of toll credit can be found in the Introduction Section of the STIP. AWARD SECT 5324 ERC $ $ TOTALS $ $ Page 24
40 T37 Rail Support Facilities and Equipment This program provides funds for rehabilitation and construction activities for yard improvements systemwide, improvements at support facilities necessary to perform maintenance work at rail yards including rail capacity improvements including passing sidings, interlockings and electric traction improvements, signal and communication improvements at support facilities and the installation of pedestal tracks necessary to perform maintenance work at rail yards. Funding is provided for systemwide crew quarters, the Meadows Maintenance Complex upgrade/expansion work required to support the new rail fleet, Hoboken Wheel Tru Machine Replacement. AWARD METRO NORTH ERC $ /4/2013 $0.690 $ /11/2012 $0.117 $ /11/2012 $1.858 $ /11/2012 $0.024 TOTALS $2.689 $2.689 $0.000 T107 River LINE LRT COUNTY: Camden, Burlington, Mercer MUNICIPALITY: Various This element provides funding for the River LINE LRT project from Camden to Trenton for capital asset replacement and annual EDA debt service payments required until FY19. Project cost of the River LINE is $1.0 billion. AWARD $ /11/2012 $ TOTALS $ $ $0.000 Page 25
41 T150 Section 5310 Program This program provides funds for the purchase of small buses or van type vehicles for agencies that serve the elderly and persons with disabilities. Formerly known as Section 16 Program. PRIOR YEAR ING Description Fund Year Amount Oblgtd Date Oblgtd Amt Pending Award Amt Comments Section 5310 Program (Elderly & Persons w/disabilities) CMAQ 2011 $ /15/2012 $0.800 $0.000 NJ 65 X002 Section 5310 Program (Elderly & Persons w/disabilities) Ca CMAQ 2011 $ /15/2012 $0.100 $0.000 NJ 65 X002 Section 5310 Program (Elderly & Persons w/disabilities) Ca STP STU 2011 $ /15/2012 $0.255 $0.000 NJ 65 X002 Section 5310 Program (Elderly & Persons w/disabilities) Gl CMAQ 2011 $ /15/2012 $0.070 $0.000 NJ 65 X002 Section 5310 Program (Elderly & Persons w/disabilities) M STP STU 2011 $ /15/2012 $0.130 $0.000 NJ 65 X002 Unoblgtd Amt Section 5310 Program (Elderly & Persons w/disabilities) M CMAQ 2011 $0.800 $0.800 Section 5310 Program CMAQ/SECT $ /5/2012 $0.170 $0.000 NJ 65 x Section 5310 Program SECT $1.104 Section 5310 Program SECT $3.360 Section 5310 Program CMAQ/SECT $0.450 Section 5310 Program SECT $0.336 $0.479 $0.625 $3.030 $0.330 $0.450 $0.000 $0.337 ($0.001) IN TEAM IN TEAM IN TEAM IN TEAM Secton 5310 Program (Elderly & Persons w/disabilities) SECT $ /22/2013 $0.604 $0.500 Actual. NJ 16 X008 Secton 5310 Program (Elderly & Persons w/disabilities) SECT $ /22/2013 $3.832 ($0.472) Actual. NJ 16 X008 Secton 5310 Program (Elderly & Persons w/disabilities) SECT $ /22/2013 $0.363 ($0.027) Actual. NJ 16 X008 AWARD SECT 5310 CAP $1.104 $1.104 SECT 5310 CAP $3.360 $3.360 SECT 5310 CAP $0.336 $0.336 STP STU CAP $0.396 $0.396 TOTALS $5.196 $5.196 Page 26
FY 2014 TRANSPORTATION CAPITAL PROGRAM New Jersey Transit Projects
ADA Platforms/Stations Project ID Number: T143 ing is provided for the design and construction of necessary improvements to make NJ TRANSITʹs rail stations, and subway stations compliant with the Americans
More informationFY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Transit Projects
Project ID Number: T143 ADA--Platforms/Stations ing is provided for the design and construction of necessary improvements to make NJ TRANSIT's rail stations, and subway stations compliant with the Americans
More informationDesign, CM and Construction Opportunities TRANSACTION. April 2017
Design, CM and Construction Opportunities TRANSACTION April 2017 1 Opportunities CAPITAL S Strategic investments: State-of-Good-Repair Rolling stock Infrastructure Technology Asset Management Portal Bridge
More informationNew Jersey Department of Transportation. Local Freight Impact Fund Handbook. Procedures and Criteria for Local Freight Impact Fund Grant Program
New Jersey Department of Transportation Local Freight Impact Fund Handbook Procedures and Criteria for Local Freight Impact Fund Grant Program Page 1 of 10 Overview The New Jersey Department of Transportation
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)
More informationAREAWIDE BRIDGE REPLACEMENT AND REHABILITATION
CECIL COUNTY 2018 TRANSPORTATION IMPROVEMENT PROGRAM AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION DESCRIPTION: On-going program to provide major upgrades to state owned bridges that are structurally
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
Route 3, Route 46, Valley Road and Notch/Rifle Camp Road Interchange, Contract B DBNUM: 059B / UPC: 123020 From Notch/Rifle Camp Road to just east of the Valley Road Intersection, Route 46 will be widened
More informationNJ State Rail Plan. New Jersey Short Line Railroad Association Briefing September 12, 2012
NJ State Rail Plan New Jersey Short Line Railroad Association Briefing September 12, 2012 Why a Rail Plan? Meets federal mandates Advances rail funding Provides a framework for investment Summarizes and
More informationProject Purpose. Federal Railroad Administration
Project Purpose To preserve the current functionality of Amtrak s Northeast Corridor service and NJ TRANSIT s commuter rail service between New Jersey and Penn Station New York by repairing the deteriorating
More informationTCATS October 12-Michigan Works 5:30-7pm. NATS October 19-Niles District Library 6-7:30pm
Goal Development Workshop TCATS October 12- Works 5:30-7pm NATS October 19-Niles District Library 6-7:30pm SAFETEA-LU Goals 2035 TwinCATS Goals 2030 TwinCATS Goals 1. Support the economic vitality of the
More informationPUBLIC HEARING April 24, 2017
PUBLIC HEARING April 24, 2017 1 Agenda SDEIS Public Review Environmental Process Overview Project Highlights Comments to Stenographer 2 3 SDEIS Public Review Public Hearing Schedule Monday, April 24, 2017
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
Route 23, Alexander Road to Maple Lake Road DBNUM: 11424 / UPC: 114240 Initiated from the Pavement Management System, this project will resurface within the project limits. ADA upgrades and guiderail repair
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
South Inlet Transportation Improvement Project DBNUM: 09361 / UPC: 093610 The Casino Redevelopment Authority (CRDA) has identified certain road improvements to be performed in Atlantic City on certain
More informationThe Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.
4 Goals & Objectives INTRODUCTION The 2015-2040 MTP preserves and promotes the quality of life and economic prosperity of the MAB by providing a transportation system consistent with the regional goals.
More informationADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012
ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle
More informationMONITORING IMPLEMENTATION AND PERFORMANCE
12 MONITORING IMPLEMENTATION AND PERFORMANCE The FAST Act continues the legislation authorized under MAP-21, which created a data-driven, performance-based multimodal program to address the many challenges
More informationS-09: Auburn Station Access Improvements
Project Number S-09 Subarea South King Primary Mode Commuter Rail Facility Type Infrastructure Improvements Length Version Number ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE
More informationNEW JERSEY STATE RAIL PLAN NJ TRANSIT New Jersey Department of Transportation
NJ TRANSIT New Jersey Department of Transportation NJ TRANSIT AND NJDOT TEAM Developing State Rail Plan NJ TRANSIT contract Over the next six months Most planning information already exists Data must be
More informationTRANSPORTATION 101 Today and Tomorrow. Moving People and Goods
TRANSPORTATION 101 Today and Tomorrow Moving People and Goods What is the Transportation Commission? An independent, seven-member body of citizens appointed by the Governor for six-year terms and representing
More informationCITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE
CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES 3.20.2017 PREPARED FOR: CITY OF JACKSONVILLE 55 Railroad Row White River Junction, VT 05001 802.295.4999
More informationTransit, Intercity Bus, Taxi 8-1
8-1 Introduction Public transit is a critical element of any transportation system. It both provides an alternative form of transportation to the traditional use of the automobile and provides mobility
More information2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014
2040 Transportation Policy Plan Conversion to Performance Based Planning Basis 25 th Annual CTS Transportation Research Conference May 21, 2014 1 About the plan Long-range transportation plan for the Twin
More informationCaltrain Rapid Rail Plan
TRANSPORTATION RESEARCH RECORD 1677 Paper No. 99-1328 31 Caltrain Rapid Rail Plan ANDREW BUTLER NASH The results of Caltrain s Rapid Rail Study are described. The purpose of the study was to develop a
More informationSUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)
Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is
More informationAlberta Transportation Gas Tax Fund and Public Transit Fund Outcomes Report December 2009
Alberta Transportation Gas Tax Fund and Public Transit Fund Outcomes Report December 2009 FINAL 1 Table of Contents Slide Number Executive Summary 3 Understanding the Outcomes Report 5 Measuring results
More informationPUBLIC TRANSPORTATION PLAN
PUBLIC TRANSPORTATION PLAN Introduction Public transportation is a vital element of the total transportation services provided within a metropolitan area. Not only does public transportation provide options
More informationSafety. Introduction. Total System
Safety Introduction Ohio is the 35 th largest state in the nation based on geographic size, however it carries the 5 th largest total traffic volume and the 4 th largest truck traffic volume. With such
More informationDelaware Valley Freight Planning
Delaware Valley Freight Planning 2015 Mid-Atlantic Regional Planning Roundtable DVRPC Office of Freight and Aviation Planning OCTOBER 29, 2015 WILMINGTON, DE Delaware Valley Regional Planning Commission
More informationMaintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013
Maintenance, Construction & Secondary Roads Terry Gibson, PE Chief Engineer February 20, 2013 State versus local responsibility Division structure Allocations Flexibility in funding Implications of not
More informationAIR QUALITY AND CLIMATE CHANGE EVALUATION GUIDANCE
AIR QUALITY AND CLIMATE CHANGE EVALUATION GUIDANCE The following guidance provides additional details regarding the process followed by PSRC to evaluate projects for potential air quality benefits. As
More informationExecutive Summary October 2017
Executive Summary The King of Prussia Rail Draft Environmental Impact Statement/Draft Section 4(f) Evaluation (DEIS) describes and summarizes the transportation and environmental benefits and impacts of
More informationTRANSPORTATION TRANSPORTATION 9-1
TRANSPORTATION Community Vision 2028 Because we place such high value on our natural surroundings, we responsibly plan for, manage, and mitigate the impacts of growth on those surroundings. Kezziah Watkins
More informationTechnical Memorandum MULTIMODAL NEEDS. Prepared for: Oklahoma Department of Transportation. Prepared by:
Technical Memorandum MULTIMODAL NEEDS Prepared for: Oklahoma Department of Transportation Prepared by: May 2015 Technical Memorandum The Technical Memos were written to document early research for the
More informationTier 1 Recommendations October 30, 2017
Tier 1 Recommendations October 30, 2017 Page Left Intentionally Blank Bristol District B.2 B.9 Need Tier 1 District Needs Need Description Within the Bristol MPO, the I-81 interchanges in Abingdon have
More informationNJ TRANSIT BOARD CUSTOMER SERVICE COMMITTEE MEETING AGENDA OPEN TO MEMBERS OF THE PUBLIC
NJ TRANSIT BOARD CUSTOMER SERVICE COMMITTEE MEETING AGENDA OPEN TO MEMBERS OF THE PUBLIC WEDNESDAY, NOVEMBER 15, 2017 1:30 PM ONE PENN PLAZA EAST 9 TH FLOOR BOARD ROOM NEWARK, NJ 07105 NJ TRANSIT BOARD
More informationPLAN 2040 Regional Transportation Plan Update. Final Recommendations. Transportation and Air Quality Committee March 13, 2014
PLAN 2040 Regional Transportation Plan Update Final Recommendations Transportation and Air Quality Committee March 13, 2014 TIP/RTP Update Milestones Official public comment period closed February 21 Final
More informationFunding Intelligent Transportation Systems in the Los Angeles Region
Funding Intelligent Transportation Systems in the Los Angeles Region 2017 ITS California Annual Meeting Ed Alegre, PTP Los Angeles County Metropolitan Transportation Authority (Metro) Los Angeles Region
More informationA THRIVING MIDDLE GEORGIA
Plan for A THRIVING MIDDLE GEORGIA Regional Opportunities and Action Items Part I January 8, 2015 Update since December 16 Meetings in each of the 11 counties. Topics include: future development patterns
More informationMPO Glossary & Acronyms
MPO Glossary & Acronyms 2016 Jonesboro Metropolitan Planning Organization (MPO) Terms Continuing, Cooperative, and Comprehensive American Association of State Highway and Transportation Officials American
More informationGreenDOT Advisory Group
GreenDOT Advisory Group Massachusetts Department of Transportation Kick-Off Meeting 1 Leading the Nation in Transportation Excellence www.mass.gov/massdot GreenDOT Policy Development and Implementation
More informationRequest for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2
Addendum Number 1 Request for Proposals No. 17-001 Various On-call Professional Design and Engineering Services To all prospective firms under specifications for Request for Proposals (RFP) No. 17-001,
More informationNovember 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe:
November 8, 2006 Mr. Glenn Rowe, P.E. Pennsylvania Department of Transportation Bureau of Highway Safety and Traffic Engineering Commonwealth Keystone Building 400 North Street, 6 th Floor Harrisburg,
More informationPreliminary Look. CRTC Annual Meeting January 16, 2018
Preliminary Look CRTC Annual Meeting January 16, 2018 Building off of One Region Forward Regional Voices 2050 Plan Intent Develop and modernize a transportation system for the region over the next three
More information6. Contract/Program Person/Title Jignasa Desai-McCleary, Chief, Procurement & Support Services
A. General Info 1. Recipient of funding New Jersey Transit Corporation 2. Federal Funding Agency? (e.g. HUD, FEMA) Federal Transit Administration 3. State Funding (if applicable) Not applicable 4. Award
More informationMiami-Dade Transit. Alice N. Bravo, P.E. Director. Miami-Dade Transit 1
Miami-Dade Transit Alice N. Bravo, P.E. Director Miami-Dade Transit 1 Miami-Dade Transit MDT is the largest transit agency in the State of Florida, and one of the largest departments within Miami-Dade
More informationLAND USE POLICIES BY COMMUNITY DESIGNATION
137 2040 138 Land Use Policies by Community Designation As discussed earlier in Thrive MSP 2040, the Council assigns a community designation to each city and township. This designation indicates the overall
More informationSubarea Mobility Enhancements. 5.1 Transit and Pedestrian Improvements
Section Five Section 5: Subarea Mobility Enhancements 5.1 Transit and Pedestrian Improvements From the outset of the master planning process, one of the primary goals was to integrate transit and pedestrian-oriented
More informationMetro Blue Line Improvements & Project Update
Metro Blue Line Improvements & Project Update February 9, 2018 MBL Operational Improvements - External Metro & LADOT coordination to identify traffic signal and intersection treatments aimed at increasing
More informationStaff Priority and UPWP Committee Priority List 3/25/2016. ID Proposed Study Name Project Category Tentative Project Cost
Staff and UPWP Committee List 3/25/2016 Projects with Only (No Bottom Non- ) C-2 Safety and Operations at Selected Intersections: FFY 2017 Roadway Network Performance $65,000 Purpose: The purpose of this
More informationAny municipality meeting the following basic requirements may apply:
Warren County New Jersey Strategic Growth Plan Any municipality meeting the following basic requirements may apply:. A seasonal or year-round population between 4,000 and 50,000.. Commitment to employ
More informationMetro-North s Response to Hurricane Irene. Chris Bennett, Vice President AECOM Toby Ritz, Chief Engineer MNR Capital Programs New York
Metro-North s Response to Hurricane Irene Chris Bennett, Vice President AECOM Toby Ritz, Chief Engineer MNR Capital Programs New York The Port Jervis Line Line is operated under a service agreement with
More informationSOUTHEAST FLORIDA REGIONAL COMPACT CLIMATE CHANGE. Sustainable Communities & Transportation Planning
SOUTHEAST FLORIDA REGIONAL COMPACT CLIMATE CHANGE Draft Regional Climate Action Plan Sustainable Communities & Transportation Planning SP-1 Develop criteria in collaboration with municipal and county planning
More informationSouth Sounder Capital Improvements Program
South Sounder Capital Improvements Program Subarea South King/Pierce Primary Mode Commuter Rail Facility Type Infrastructure Improvement Length Version Draft ST3 Plan Date Last Modified March 28, 2016
More informationTransportation Asset Management Applications in Transit & Rail Organizations Part I
Transportation Asset Management Applications in Transit & Rail Organizations Part I Transportation Asset Management Applications in Transit & Rail Organizations, Part I Focus on overall approaches to asset
More informationJim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project
Memorandum Date: January 15, 2014 To: CC: From: Subject: Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project Paul Danielson, P.E. Project Manager, Southwest Light Rail
More informationTransit Service Guidelines
G R E AT E R VA N CO U V E R T R A N S P O RTAT I O N A U T H O R I T Y Transit Service Guidelines PUBLIC SUMMARY REPORT JUNE 2004 Greater Vancouver Transportation Authority TRANSIT SERVICE GUIDELINES
More informationUtah s Most Critical Surface Transportation Projects to Support Economic Growth and Quality of Life. March Washington, DC
Utah s Most Critical Surface Transportation Projects to Support Economic Growth and Quality of Life March 2015 Washington, DC 202-466-6706 Founded in 1971, TRIP of Washington, DC, is a nonprofit organization
More informationTHE REGION S PLAN POLICY FRAMEWORK. August 2015
THE REGION S PLAN POLICY FRAMEWORK August 2015 2 What is The Policy Framework? Cover photo credit: Sinan Sinharoy for Atlanta BeltLine, Inc. Atlanta is one of the world s most dynamic metropolitan areas,
More informationODOT Asset Management Plan 0
ODOT Asset Management Plan 0 Table of Contents Executive Summary... 1 ODOT s Experience with Asset Management... 1 A New Way of Doing Business... 2 ODOT s Investment Plans... 3 Moving Forward... 5 1.0
More informationConnecting Cleveland 2020 Citywide Plan TRANSPORTATION & TRANSIT
Connecting Cleveland 2020 Citywide Plan TRANSPORTATION & TRANSIT TRANSPORTATION & TRANSIT OVERVIEW Like many cities that developed in the 19 th and early 20 th centuries, Cleveland grew because of its
More informationMaine Turnpike Authority FINAL 4-year Capital Investment Plan ( )
Total preliminary Value for Project shown in initial year is for project duration. Projects have been listed in each year there are major Preliminary 4.8 Beech Ridge Road Underpass Repairs York $410,000
More informationAppendix K: Project Prioritization Criteria
Appendix K: Project Prioritization Criteria NJTPA PROJECT PRIORITIZATION CRITERIA: HIGHWAY AND STATE BRIDGE PROJECTS ENVIRONMENT MAX 129 H.Env.1 Will it improve air quality? Max - 60 High: Reduce Vehicle
More informationIOWA TRANSPORTATION BY THE NUMBERS:
IOWA TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility MARCH 2013 202-466-6706 www.tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization
More informationLong Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need
Environmental Impact Statement (EIS) Revised Purpose and Need June 23, 2017 1.0 What is the Proposed Action? The consists of potential improvements to the Long Bridge and related railroad infrastructure
More information22.1 INTRODUCTION 22.2 ANALYSIS METHODOLOGY REGULATORY CONTEXT
Chapter 22: Environmental Justice 22.1 INTRODUCTION Federal agencies are required to identify disproportionately high and adverse effects of their actions on minority and low-income populations (environmental
More informationI-91 Viaduct Public Information Briefing
I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:
More informationP.L Fixing America s Surface Transportation (FAST) Act
P.L. 114-94 Fixing America s Surface Transportation (FAST) Act Key Highway Provisions and Freight Provisions Dan Walston Transportation Planner FHWA PA Division 2 FAST Act Signed by President Obama on
More informationGENERAL NOTES FOR WORK ZONE SAFETY SET UP GUIDE
FORWARD It shall be the responsibility of the person in charge to institute the placing of all appropriate cautionary devices and controls as may be required for the particular job. Traffic protection
More informationNEW JERSEY DEPARTMENT OF TRANSPORTATION. New Jersey Statewide Strategic Freight Rail Plan
NEW JERSEY DEPARTMENT OF TRANSPORTATION New Jersey Statewide Strategic Freight Rail Plan OVER-ARCHING PROJECT PURPOSE In short, the plan is intended to: Identify Issues That Constrain Freight Rail Operations
More informationStone Consulting, Inc. Industrial Railroad Projects
Stone Consulting, Inc. Industrial Railroad Projects 324 Pennsylvania Avenue West, P. O. Box 306, Warren PA 16365 Phone: (814) 726-9870 Fax: (814) 726-9855 Stone Consulting, Inc. Industrial Railroad Projects
More informationCTA Blue Line Forest Park Branch Feasibility/Vision Study Village of Forest Park Board of Directors. Tuesday, October 13, 2015
CTA Blue Line Forest Park Branch Feasibility/Vision Study Village of Forest Park Board of Directors Tuesday, October 13, 2015 1 Purpose & Study Process Purpose of the study The 55-year old Forest Park
More informationEXECUTIVE SUMMARY 2.0. Meadowlands Vision 2040 A Roadmap to Economic Success. The Greater Meadowlands Region. Priority Actions, Goals & Objectives
2.0 Meadowlands Vision 2040 A Roadmap to Economic Success EXECUTIVE SUMMARY Priority Actions, Goals & Objectives The Meadowlands Regional Chamber (MRC), an economic development advocate for over 40 years,
More informationITEM 8 Action May 17, 2017
ITEM 8 Action May 17, 2017 Approval of Maryland Department of Transportation (MDOT) Additional Project Submission for the Out-Of-Cycle Air Quality Conformity Analysis for the Amendment to the 2016 CLRP
More informationKennedy Station Online Consultation
Kennedy Station Online Consultation 1 Surface Light Rail Transit 2 Metrolinx LRV 4 doors per car (2 single, 2 double) Up to 3 cars per consist 3 Light Rail Vehicles (LRVs) New LRVs will feature: 100% low
More informationRapid City Area Metropolitan Planning Organization OPERATIONS PLAN
Rapid City Area Metropolitan Planning Organization OPERATIONS PLAN Prepared for the Rapid City Area Metropolitan Planning Organization Endorsed by the Executive Policy Committee of the Rapid City Area
More informationProject Plan for TAX INCREMENTAL FINANCE DISTRICT #41 (UNIVERSITY-WHITNEY) City of Madison
Project Plan for TAX INCREMENTAL FINANCE DISTRICT #41 (UNIVERSITY-WHITNEY) City of Madison Prepared by: Department of Planning and Community and Economic Development Economic Development Division Office
More informationWith the challenges facing Washington s transportation
CHAPTER 5 REACHING THE VISION HOW WILL WE GUIDE OURSELVES MOVING FORWARD? With the challenges facing Washington s transportation system, the project team and partners identified four focus areas that consistently
More informationMeadowlands. Mobility New Jersey. Meadowlands. Commission
Meadowlands Mobility 2030 New Jersey Meadowlands Commission NJMC Master Plan Technical Study Meadowlands Mobility 2030 Governor James E. McGreevey Chairman Susan Bass Levin Commissioners James A. Anzevino
More informationRoute 670 Connector Road
SMART SCALE Application Route 670 Connector Road Status: Scored ID: F2-0000001167-R02 General Point of Contact Information Point of Contact Name Bart Point of Contact Phone (434) 985-1486 Point of Contact
More informationCENTRAL PUGET SOUND REGIONAL TRANSIT AUTHORITY GREEN BONDS
CENTRAL PUGET SOUND REGIONAL TRANSIT AUTHORITY GREEN BONDS SECOND-PARTY REVIEW BY SUSTAINALYTICS July 27 th, 2015 www.sustainalytics.com Vikram Puppala (Toronto) Manager, Advisory Services vikram.puppala@sustainalytics.com
More informationIX. STRATEGIC PLAN ELEMENT
IX. STRATEGIC PLAN ELEMENT The Strategic Plan Element provides the action and implementation plan for the New Brunswick Master Plan. New Brunswick is a fully developed, older urban area in central New
More informationRegion of Waterloo Stage 1 Light Rail Transit Project. Definitions, Acronyms, Cited References Article 1 Definitions.
Region of Waterloo Stage 1 Light Rail Transit Project Definitions, Acronyms, Cited References Article 1 Definitions Table of Contents 1.0 Definitions... 1-1 ARTICLE 1 DEFINITIONS 1.0. Definitions. In the
More informationExecutive Summary S.1 INTRODUCTION
Executive Summary S.1 INTRODUCTION The Federal Railroad Administration (FRA) and New Jersey Transit Corporation (NJ TRANSIT) as joint lead agencies are preparing an Environmental Impact Statement (EIS)
More informationNotice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report
Notice of Preparation For Link Union Station (Link US) Project Joint Environmental Impact Statement and Environmental Impact Report Date: May 27, 2016 To: Subject: Project Title: From: All Interested Agencies,
More informationHigh-Speed Rail - Chicago to St. Louis Alton Regional Multimodal Transportation Center Project
High-Speed Rail - Chicago to St. Louis Alton Regional Multimodal May 2012 Draft Report: Alternatives Screening Version 1.0 1.0 Introduction This document outlines the alternatives screening process used
More informationVRE AT WORK PREPARING VIRGINIA RAILROADING FOR ITS NEXT QUARTER CENTURY
VRE AT WORK PREPARING VIRGINIA RAILROADING FOR ITS NEXT QUARTER CENTURY T. R. ( Tom ) Hickey Chief Development Officer April 4, 2017 1 1 TONIGHT S PRESENTATION Introduction Safety Briefing VRE Overview
More informationGeometric Design: Past, Present, and Future
A2A02: Committee on Geometric Design Chairman: Daniel B. Fambro Geometric Design: Past, Present, and Future DANIEL B. FAMBRO, Texas A&M University JOHN C. COLLINGS, Delcan Corporation ROBERT DELLA VEDOVA,
More informationFactor Potential Effects Mitigation Measures
Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table
More informationConstruction Project Briefing
Construction Project Briefing August 12, 2009 CHICAGO TRANSIT AUTHORITY Today s Presentation Brown Line Capacity Expansion Project Subway Escalators Project Dearborn Subway Tie Replacement Project Systemwide
More informationAnnual CSAH Needs Update for 2017
Annual CSAH Needs Update for 2017 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segments and project data using the SANeeds system.
More informationWELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017
WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule
More informationProject Plan for TAX INCREMENTAL FINANCE DISTRICT #41 (UNIVERSITY-WHITNEY) City of Madison
Project Plan for TAX INCREMENTAL FINANCE DISTRICT #41 (UNIVERSITY-WHITNEY) City of Madison Prepared by: Department of Planning and Community and Economic Development Economic Development Division Office
More informationAnnual Transportation Performance Report 2012
Annual Transportation Performance Report 2012 Page intentionally left blank... March 2014 Dear People and Businesses of Minnesota, I am pleased to share with you the 2012 Annual Transportation Performance
More informationAn Overview of Tax Increment Financing and Economic Development
An Overview of Tax Increment Financing and Economic Development A Presentation to the City of Saco, Maine November 14, 2016 www.camoinassociates.com What is Tax Increment Financing (TIF)? A financing method
More informationGLX Project AUGUST 2 4 FMCB MEETING
GLX Project Green Line Extension Project AUGUST 2 4 FMCB MEETING Presentation Overview 1) Project Essentials 2) Funding the Green Line Extension Project 3) The Construction Manager/General Contractor Procurement
More information407 TRANSITWAY. Planning & Preliminary Design
FROM EAST OF HIGHWAY 400 TO KENNEDY ROAD GWP #252-96-00 Public Information Centre #2 June 24 th and 29 th, 2010 Purpose of Public Information Centre #2 The first Public Information Centre (PIC #1) was
More informationFY CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT
FY 15-20 CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT Department of Public Works Robert B. Boxer, Director PROJECT MODEL PROFESSIONAL SERVICES STUDIES FEASIBILITY CLAIMS 1- PROJECT DEFINITION 2-
More informationAppendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance
APPENDICES Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance D.1 Functional classification identifies the role a highway or street plays in the transportation
More informationSyracuse General Redevelopment Plan Study Areas #1-3
2010 Syracuse General Redevelopment Plan Study Areas #1-3 JEO Consulting Group, Inc. SYRACUSE GENERAL REDEVELOPMENT PLAN STUDY AREAS 1-3 Introduction/Background INTRODUCTION The Syracuse General Redevelopment
More information