1 District 1 Duluth/Virginia Contact: Beth Petrowske beth.petrowske@state.mn.us Location: Murphy City Description: Raise grade and re, replace culvert Total Cost: $450,000 Impact: Intermittent, single-lane, flagger-controlled, improved Location: South of Ely between Forest Roads 553 and 424 Description: Reconstruct 5 miles of, 2013 remaining work: reestablish turf, stripe road Total Cost: $7,147, Cost: $70,000 Date: Nov 2011-June 2013 Impact: Short-term lane restrictions Location: Tower and Ely Description: Reconstruct 25.5 miles of, repair shoulders Total Cost: $9,327, Cost: $7 million Date: July 2013-Aug 2014, daytime lane mndot.gov/d1/projects/hwy1-25miles/ Location: Tower and Ely Description: Re 2.5 miles of, install pedestrian ramps Total Cost: $2,114,500 Impact: Daytime lane, improved safety mndot.gov/d1/projects/hwy / Hwys 1, 2, 65, 73, 169 Location: Various Description: Repair, replace culverts Total Cost: $1.8 million Impact: Daytime lane Benefit: Improved Hwy 2 Location: Boundary Ave in Duluth Description: Re Hwy 2 Total Cost: $3,144, Cost: $375,000 Date: May 2012-June 2013 (5-7 days total work remaining) Impact: Daytime lane, improved Hwys 2, 18, 210 Location: Various Description: Replace signs Total Cost: $600,000 Impact: Intermittent shoulder Benefit: Improved safety Hwys 2, 53, 61, 200, 210 Location: Various Description: Install centerline rumble strips Total Cost: $845,000 Impact: Intermittent single-lane Benefit: Improved safety 1 Location: 4 miles east of Rainier (Jackfish Bay) and 5.5 miles east of Rainier (Tilson Creek) Description: Replace Jackfish Bay and Tilson Creek Bridges Total Cost: $2,029, Cost: $300,000 Date: July 2012-June 2013 Impact: Single-lane traffic across the bridge Benefit: New bridges 8 Location: East of Hwy 47 to CR 61 Description: Replace culvert Total Cost: $500,000 Date: June-Nov 2013 Impact: Intermittent lane, Benefit: Improved Location: Hwy 210 to just east of 130 th Ave in Fond du Lac 1 Description: Repair storm sewer and pavement, bituminous paving and ADA improvements (curb ramp) Total Cost: $306,570 Impact: Single lane in each direction Benefit: Repair damage to structures from 2012 flood Location: West Duluth Description: Replace storm sewer, curb, gutters, sidewalks and pavement Impact: NB lane closure and detour, single-lane SB, improved mndot.gov/d1/projects/hwy23/ Hwy 33 Location: Carlton, St. Louis counties Description: Re Hwy 33, repair culverts Total Cost: $6,324,000 Impact: Intermittent, single-lane, improved Hwy 53 Location: 4.5 miles south of to just south of Cook Description: Expand Hwy 53 to 4 lanes Total Cost: $32.8 million 2013 Cost: $25 million Date: Jan 2013-Sept 2014 Impact: Cross-overs, single-lane, Benefit: Improved capacity, safety mndot.gov/d1/projects/hwy53-virginiacook/ Location: 26th Ave E to the Lester River in Duluth Description: Replace catch basin and repair/replace pipe Total Cost: $190,000 Impact: Parking lane, brief single-lane Benefit: Improved (2012 flood damage repairs) Location: Lake County Description: Reconstruct Baptism River Rest Area, Tettegouche State Park headquarters Total Cost: $3 million 2013 Cost: $2.5 million Date: July 2012-July 2013 Impact: Rest area is closed; park is open Benefit: Improved facilities, access Location: Little Marais Description: Reconstruct 5.27 miles of and shoulders, install new culverts Total Cost: $7.6 million 2013 Cost: $3.7 million Date: July 2013-Oct 2014 Impact: Intermittent detour, intermittent single-lane flaggercontrolled traffic, single-lane bypass in Sept-Oct 2013 Benefit: Smoother pavement, improved safety mndot.gov/d1/projects/hwy61littlema rais/ Location: London Rd in Duluth Description: Repair historic bluestone arch structures under Hwy 61/London Rd Total Cost: $1.2 million 2013 Cost: $800,000 -June 2014 Impact: Parking lane Benefit: Preserves historic structures (2012 flood damage repairs) Location: Silver Creek Tunnel to Kennedy Creek Description: Re and install centerline rumble strips Total Cost: $3,983, Cost: $50,000 Date: Aug 2012-June 2013, improved safety mndot.gov/d1/projects/hwy61northg ooseberrypk/

2 Hwys 61, 169, 53, I-35 Location: Various Description: Re segments of Hwys 61, 169, 53, I-35 Total Cost: $1.8 million Impact: Daytime lane Hwy 65 Location: 11 miles south of the Koochiching County line to 5 miles south of Description: Replace 4 box culverts near the Littlefork River Total Cost: $3,787,000 Date: June-Nov 2013 Impact: Lengthy detour, Benefit: Improved, driver sight-distances mndot.gov/d1/projects/hwy65littlefor k/ Hwy 65 Location: Near Pliny Description: Re 15 miles of Hwy 65, install new culverts Total Cost: $5,413,682 with and pilot, improved mndot.gov/d1/projects/hwy65pliny/ Hwy 73 Location: 9.4 miles south of Hwy 2 to Hwy 2 Description: Re Hwy 73 Total Cost: $4.83 million Date: May-Sept 2013 Impact: Single-lane with mndot.gov/d1/projects/hwy73/ 23 Location: Near Sandstone Description: Repair bridge and approaches, construct new sidewalks Total Cost: $1,982,000 Impact: Single-lane, temporary signals Benefit: Extends bridge life, improved accessibility mndot.gov/d1/projects/hwy123/ Location: 3.6 miles east of Hwy 65 to Hwy 73 Jct near Nashwauk Description: Re, replace culvert Total Cost: $6,138,000 Impact: Single-lane in each direction, improved Location: 3rd St N to 13th St S in Grand Rapids Description: Reconstruct and widen, construct turn-lanes Total Cost: $6,464, Cost: $100,000 Date: April 2012-June 2013 Impact: Short-term lane, improved accessibility mndot.gov/d1/projects/hwy169poke/ Location: CR 438 to the Pike River Bridge Description: Reconstruct, construct turn-lanes Total Cost: $3,588, Cost: $1.8 million Date: Sept 2012-July 2013 Impact: Single-lane,, detour mndot.gov/d1/projects/hwy1169hills/ 94 Location: Duluth Description: Improve accessibility between Arlington Ave and Blackmon Ave Total Cost: $262,500 Impact: Brief sidewalk Benefit: Improved safety, accessibility Hwy 210 Location: Jay Cooke State Park Description: Construct new bridge and approaches Total Cost: $4 million Date: June-Nov 2013 Impact: Hwy 210 is closed in this area due to 2012 flood Benefit: Restore full-access to major park features, help mitigate future washouts mndot.gov/d1/projects/hwy210hwy2fl ood/ Hwy Location: Thomson Bridge in Carlton County Description: Apply epoxy chip-seal to deck, paint beams on new bridge Total Cost: $3,250,078 (includes emergency flood construction, repairs) 2013 Cost: $100,000 Date: May 2012-June 2013 Impact: Intermittent single-lane and flagger-controlled traffic Benefit: Smoother bridge deck, improved accessibility and mndot.gov/d1/projects/hwy210bridge / I-35 Location: 4 locations, Hwy 70 to Carlton CR 4 Description: Install cable median barrier Total Cost: $3,675,000 Impact: Intermittent, single-lane Benefit: Improved safety I-35 Location: Esko to Proctor Description: Reconstruct I-35 from east of Esko to Proctor Total Cost: $30,107, Cost: $15 million Date: May 2012-Nov 2013 Impact: Single-lane in each direction from May to late-fall, improved and safety mndot.gov/d1/projects/i35southofduluth /i35lton/ I-35 Location: Scanlon Description: Re and paint 4 bridges Total Cost: $3.9 million Impact: I-35 intermittent, single-lane closure, CR 13 and CR 138 detours Benefit: Smoother bridge decks, approaches I-535 Location: Blatnik Bridge in Duluth Description: Maintain bridge components, replace light system, paint Total Cost: $12,945, Cost: $5 million Date: May 2012-Oct 2013 Impact: Single-lane traffic in each direction Benefit: Extends the life of the bridge mndot.gov/d1/projects/blatnikbridge/ District 2 Bemidji / Crookston Contact: TJ Melcher tj.melcher@state.mn.us Location: Blackduck River, 10 miles east of Redby Total Cost: $1.06 million Benefit: Smoother and safer bridge Location: Mud river,.5 miles east of Redby Total Cost: $4.5 million Hwy 2 Location: Bagley to Fosston Description: Sealcoat Total Cost: $524,000 and Hwy 2 Location: Crookston Description: Repair concrete slabs and joints Total Cost: $717,000 Impact: Daily lane Hwy 2 Location: East Grand Forks Description: Install battery backup system in traffic signals Total Cost: $33,000

3 Hwy 2 Location: Railroad underpass in Crookston Description: Construct lift station and replace storm sewer Total Cost: $250,000 Benefit: Improved beneath road Hwy 2 (Business) Location: Sorlie Bridge to 2nd Ave NE in East Grand Forks Description: Upgrade pedestrian crossing, construct more accessible s (ADA compliant) Total Cost: $300,000 Impact: One week detour and daily lane Benefit: Improved accessibility Hwy 9 Location: Ada to the Norman/Polk county line Description: Re 14 miles and replace culvert Total Cost: $5,021,777, improved beneath road Hwy 32 Location: Greenwood St in Thief River Falls Description: Install signal, grade and replace sidewalk (project led by Thief River Falls) Total Cost: $875,000 Impact: Intermittent lane Location: 1st St in Thief River Falls Description: Replace traffic lights and pedestrian ramps Total Cost: $252,336 Impact: Daily lane Benefit: Safer, more accessible Location: Clearwater River, 1 mile north of Plummer Total Cost: $1,112,583 Location: Poplar River, 5 miles north of Erskine Total Cost: $775,000 Impact: Bypass lane for s, detour for truck traffic Location: Bemidji Description: Install battery backup system in traffic signals Total Cost: $34,000 Location: Kabekona Description: Sealcoat Total Cost: $650,000 Date: Aug 2013 and Location: Park Rapids Description: Install battery backup system in traffic signals Total Cost: $33,000 Hwy 89 Location: Hwy 2 to Beltrami CR 26 Description: Re 12 miles Total Cost: $1.19 million and Hwy 89 Location: South fork of Roseau River, 5 miles south of Wannaska Total Cost: $787,855 3 Hwy 92 Location: Clearwater CR 19 in Bagley to CR 35 Description: Re 10 miles and replace culvert Total Cost: $2.8 million Date: July-Oct 2013 Hwy 200 Location: Hwy 64 to Hubbard CR 39 Description: Re 2 miles and replace bridge Total Cost: $3.57 million, improved beneath road Hwy 200 Location: Long Lake Park to Description: Sealcoat Total Cost: $524,000 s and Hwy 200 Location: Near Halstad Description: Repair concrete slabs and joints Total Cost: $717,000 Hwy 220 Location: East Grand Forks Description: Repair concrete slabs and joints Total Cost: $717,000 Impact: Daily lane Benefit: Smoother and safer highway Hwy 310 Location: Roseau to the Canadian border Description: Re 11 miles and replace culvert Total Cost: $3.19 million Impact: Daily lane, restrictions and delays, improved beneath road Hwy 317 Location: Red River Description: Repaint bridge Total Cost: $1.5 million ($750,000 MnDOT share) Date: TBD Impact: Daily lane Benefit: Extend life of bridge Hwy 371 Location: Walker Bay Blvd in Walker Description: Construct turn lane and replace culvert (project led by Cass County) Total Cost: TBD ($30,000 MnDOT share) and improved beneath road Description: Install rumble strips on edge of road Total Cost: $270,000 Impact: Shoulder Description: Replace culvert Total Cost: $750,000 Impact: Shoulder closure Benefit: Improved beneath the road Description: Sealcoat Total Cost: $1.23 million and Benefit: Smoother and safer highway

4 District 3 Baxter/St. Cloud Contact: JP Gillach james.gillach@state.mn.us Hwy 6 Location: Willow Lake Roadside Parking Area, 9 miles north of Remer Description: Repair masonry, re parking area Total Cost: $775,000 Impact: Rest area closed during construction Benefit: Restore rest area Location: Airport Rd in Staples Description: Paint overpass, establish turf, landscape Total Cost: $7.8 million Date: April-May 2013 Impact: Intermittent lane and shoulder Benefit: Preserve new overpass, control erosion Location: CR 2 in Rice Description: Construct new interchange Total Cost: $17.9 million 2013 Cost: $3.5 million Date: July 2013-Nov 2014 Impact: intermittently reduced to a single lane, local road and detours, businesses remain accessible throughout construction Benefit: Improved safety and mobility mndot.gov/d3/hwy10rice/ Location: Norfolk Ave to Jarvis Ave in Elk River and shoulders, install new guardrail, upgrade pedestrian accessibility, replace/repair culverts and structures, upgrade signals, improve turn lanes Total Cost: $5.2 million Date: Summer/fall 2013 Impact: Intermittent lane, delays Benefit: Improved safety and mobility, smoother ride, improved 5 Location: CR 120 in St. Cloud/Sartell Description: Construct new diverging diamond interchange Total Cost: $10 million 2013 Cost: $6.5 million Date: July 2012-Nov 2013 Impact: 5 intermittently reduced to single lane during non-rush hours, ramp, CR 120 closed at Hwy 15 Benefit: Increased safety and mobility mndot.gov/d3/hwy15ddi/ 5 Location: S Jct of to 12th St N in St. Cloud Description: Upgrade traffic signal systems, install accessible pedestrian ramps and sidewalks (ADA compliant) Total Cost: $750,000 Date: Summer/fall 2013 Impact: Minimal Benefit: Improved mobility and safety Location: East of Bock Description: Replace Bogus Brook bridge Total Cost: $400,000 Date: Sept-Oct 2013 Benefit: Maintain mobility, reduce inconvenience by closing road after peak summer travel season, improved safety Location: Near Paynesville Description: Upgrade road signs Total Cost: $400,000 Impact: Shoulder Benefit: Improved safety Hwys 23, 65 Location: Ann River bridge to north /65 Jct in Mora Description: Re 3 miles of road, repair median, repair underground utilities, install accessible pedestrian ramps and signals (ADA compliant), improve Total Cost: $866,000 with, detour Benefit: Smoother ride, improved safety, reduced short-term maintenance costs, repair utilities during road construction to reduce inconvenience Hwy 28 Location: in Sauk Centre to Stearns/Pope county line east of Westport Description: Re 9 miles of road and shoulders, repair or replace culverts, guardrail Total Cost: $1,998,000 Date: April-June 2013 Impact: Intermittent lane with, pilot Benefit: Improved safety, smoother ride Hwy 65 Location: Grandy Description: Install accessible pedestrian ramps (ADA compliant), improve sidewalks Total Cost: $75,000 Impact: Minimal Benefit: Improved safety Location: Long Prairie to Bertha, excludes 3/4 mile in Browerville Description: Re 24 miles of road and shoulders, add turn/bypass lanes, repair or replace culverts, close 5 tunnel cattle crossings Total Cost: $5.5 million with and pilot Benefit: Improved motorist and pedestrian safety and mobility, smoother ride, improve overall Location: Garrison Description: Repave roads/parking spaces, remove concrete covering historic stone pavers, repair system, install accesible pedestrian ramps (ADA compliant), repave/repair walkways and benches, relocate information booth, repair stone curb Total Cost: $1.2 million Date: May-Sept 2013 Impact: Intermittent lane/parking Benefit: Restore rest area Location: Milaca to Onamia Description: Re 17 miles of road, shoulders, turn lanes; repair or replace culverts Total Cost: $5.2 million Date: April-June 2013 Impact: Segments reduced to single lane Benefit: Improved safety, smoother ride Location: North of Onamia, along Mille Lacs Lake near Wigwam Bay and Shah-bush-kung Bay Description: Construct left turn lanes at Wagidaaki Dr, Noopiming Rd and Pine Center Rd/CR 25 Date: April-May 2013 Impact: Intermittent lane with Benefit: Improved safety and mobility Location: Zimmerman to Long Siding, extend turn lanes, add turn lanes, close crossovers, improve Total Cost: $5.4 million Impact: Intermittent lane, no scheduled during weekend rush periods Benefit: Improved safety and mobility, smoother ride, extended road life, improved Hwy 210 Location: Baxter to Pillager Description: Repair 7.5 miles of road Total Cost: $2 million Date: June-July 2013 Impact: Single-lane traffic with, pilot 4

5 Hwy 371 Location: Nisswa Description: Reconstruct 1 mile of Hwy 371; relocate signal; install pedestrian tunnel; reconstruct city frontage road, sidewalks, curbs, gutters, storm/sanitary sewer-- partnership project with city of Nisswa and Crow Wing County Total Cost: $7 million ($4.5 million MnDOT share) 2013 Cost: $3.7 million Date: July 2012-Oct 2013 Impact: Single-lane traffic in each direction, local road, temporary signal at Nisswa Ave Benefit: Improved safety, mobility for motorists and pedestrians, minimize inconvenience by improving local road system, utilities in one project mndot.gov/d3/hwy371nisswa/ Location: St. Cloud to Clearwater Description: Re 7.5 miles of lanes, ramps and shoulders; repair or replace culverts, guardrail and cable median barrier Total Cost: $16.4 million 2013 Cost: $12 million Date: Sept 2012-July 2013 Impact: Single-lane traffic April-July; ramp ; delays and long backups during peak travel periods Benefit: Smoother ride, improved mndot.gov/d3/i94/ Location: WB St. Michael to Monticello, EB CR 19 to CR 37 in Albertville Description: Repair and re road, shoulders and ramps Total Cost: $8.4 million and ramp during non-rush hours Benefit: Smoother ride mndot.gov/d3/i94/commute.html District 4 Detroit Lakes/ Morris Contact: Jerimiah Moerke jerimiah.moerke@state.mn.us Hwy 7 Location: in Appleton to Hwy 40 in Milan Description: Re 9 miles, install accessible pedestrian ramps (ADA compliant) Total Cost: $2.5 million Date: Sept-Oct 2013, detour, more accessible s Hwys 7, 12 Location: Hwy 7: CR 53 to in Ortonville; 2: Hwy 7 to Hwy 75 in Ortonville Description: Re 6 miles, install accessible pedestrian ramps (ADA compliant) Total Cost: $2.5 million, detour, more accessible s Hwy 9 Location: Benson to 4 Description: Re 17 miles, replace Mud Creek bridge Total Cost: $5 million, safer bridge Hwy 9 Location: Wilkin County Ditch 31 north of Breckenridge Benefit: Improved system, smoother bridge Location: 2 miles east of Hwy 78 to 1 mile east of Bluffton Description: Re 18 miles of WB 5 Total Cost: $4.5 million Location: Detroit Lakes to Boyer Lake Description: Re 8 miles of WB Total Cost: $8,103,690 Impact: Two-lane, two-way traffic Location: East of Detroit Lakes Description: Install box culvert Total Cost: $885,833 with crossovers Benefit: Future Heartland Trail connection Location: Hawley Description: Modify Clay CR 31/33, install signal system Total Cost: $2.25 million ($800,000 MnDOT share) Location: Lake Park Description: Improve access, construct south frontage road Total Cost: $750,000 Impact: Occasional lane Location: Lake Park Description: Install additional lighting Total Cost: $150,000 ($75,000 MnDOT share) Date: TBD Location: Perham to New York Mills Description: Re 7 miles of EB Total Cost: $1.5 million Hwys 10, 75 Location: Moorhead Description: Re from the Red River Bridge to 8th Street, replace 6 traffic signals, install crosswalk at /8th Street and 10th Ave., improve pedestrian accessibility at several s (ADA compliant), install fiber optic cable Total Cost: $4,764,996 Date: May-Sept 2013, more accessible s mndot.gov/d4/projects/downtownmo orhead/ Hwys 12, 59 Location: 2: Ortonville to Benson; : Stevens/Swift county line to 2 Description: Seal coat road Total Cost: $1.3 million (with flagger/pilot ) Benefit: Increase life of highway Hwy 28 Location: Browns Valley and Beardsley Description: Install accessible pedestrian ramps (ADA compliant) Total Cost: $100,000 Date: June-July 2013 Benefit: More accessible s Hwy 28 Location: Chokio Description: Re in Chokio Total Cost: $150,000 Date: Aug 2013 Location: to Elbow Lake Description: Re 16 miles Total Cost: $5,758,264, lane (with flagger/pilot )

6 Hwys 59, 87 Location: : Callaway to Mahnomen; Hwy 87 east of Frazee Description: Replace and repair culverts Total Cost: $500,000 Impact: -lane ; Hwy 87-detour Benefit: Improved systems beneath roads Location: Clay CR 12 to Clay/Wilkin county line Description: Re 12 miles Total Cost: $3.25 million (with flagger/pilot ) Location: Doran to Wilkin CR 20 Description: Re 19 miles Total Cost: $5 million (with flagger/pilot ) Location: 2 in Ortonville to east Jct of Hwy 7 Description: Re 9 miles Total Cost: $1.8 million, lane Hwy 78 Location: Battle Lake to Perham Description: Reconstruct Lake Street in downtown Battle Lake, re 26 miles, install accessible pedestrian ramps (ADA compliant) Total Cost: $6 million Impact: Closure in Battle Lake, detours and lane (with flagger/pilot ), more accessible s Hwy 78 Location: Near Ashby Description: Reconstruct Hwy 78 bridge over Date: May-Sept 2013 Impact: -crossovers with 2-lane, 2-way traffic; Hwy 78-detour Benefit: Smoother bridge Location: Downer to Hwy 34 in Barnesville Description: Re 9 miles of EB Total Cost: $10 million Date: June-Oct 2013 Impact: 2-lane, 2-way traffic Location: Near Ashby Description: Repair headwall at Pelican Creek bridge Total Cost: $100,000 Impact: Possible shoulder Benefit: Improved system Location: Near Fergus Falls Description: Install high tension cable median barrier (14 miles) Total Cost: $2 million Impact: Lane and shoulder Location: Near Moorhead, near Alexandria Description: Install high tension cable median barrier (7 miles near Moorhead, 10 miles near Alexandria) Total Cost: $2,253,129 Impact: Lane and shoulder Location: Otter Tail CR 21 north of Fergus Falls Description: Re bridge decks over CR 21 Total Cost: $1.5 million 2013 Cost: $750,000 Date: July 2013-Aug 2014 Impact: Crossovers with 2-lane, 2- way traffic Benefit: Smoother bridge Description: Install rumble stripes Total Cost: $550,000 6 s District 6 Rochester / Owatonna / Winona Contact: Kristin Kammueller kristin.kammueller@state.mn.us Hwy 3 Location: Faribault to Northfield Total Cost: $3,934,049 4 Location: Rochester Description: Repair bridge over Total Cost: $1.6 million Impact: 4 closed, detour 6 Location: Houston Description: Install accessible pedestrian ramps (ADA compliant) Total Cost: $143,750 Impact: Intermittent lane and shoulder Benefit: More accessible 6 Location: to Lanesboro Total Cost: $1,974,786 /pilot, short-term detour during culvert replacements 6 Location: Lanesboro to Rushford Total Cost: $6.5 million Impact: 6 closed, detour 6 Location: Spring Valley to Preston Total Cost: $5,241,048 /pilot, 2 short-term detours during culvert replacements 9 Location: Hwy 3 to Cannon Falls Total Cost: $4,183,427, short-term detour during culvert replacements Hwy 21 Location: Hwy 60 to Hwy 3 in Rice County Total Cost: $1.8 million Date: July-Oct 2013 Hwy 26 Location: Iowa border to 6 in Houston County Total Cost: $5,826,565 Hwy 30 Location: Hwy 56 to Hwy 63 in Dodge and Olmsted counties Total Cost: $4,026,105 Impact: Daily lane clsoures with, 2 short-term detours during culvert repairs

7 Hwy 42 Location: 4 to Plainview Description: Repair culverts Total Cost: $250,000 Impact: Intermittent lane and shoulder Benefit: Improved system beneath the highway Hwy 43 Location: to in Winona County Total Cost: $2.9 million Hwy 43 Location: Mankato Ave to Mark St in Winona Total Cost: $369,931 Date: Fall 2013 Hwy 44 Location: to Spring Grove Total Cost: $5.7 million, short-term detour during culvert repairs Location: Cannon Falls Description: Construct interchange and frontage road system Total Cost: $14,312, Cost: $8 million Date: July Impact: Intermittent lane Benefit: Improved safety and mobility on and around highway mndot.gov/d6/projects/hwy52cannonfa lls/index.html Location: Goodhue County Description: Construct safety improvements at the Hwy 52/Goodhue County Rd 9 Date: Sept-Oct 2013 Impact: Intermittent lane Location: Near Pine Island Description: Construct new interchange and frontage road system Total Cost: $34.3 million 2013 Cost: $13,276,844 Date: Impact: Temporary lane Benefit: Safer highway mndot.gov/elkrun/ Location: North of Zumbrota Description: Construct safety improvements at the / Goodhue County Road 68 Total Cost: $400,000 Impact: Intermittent lane Location: Rochester Description: Construct folded diamond interchange at and 65th St Total Cost: Locally funded Impact: Intermittent lane Benefit: Safer highway Hwy 56 Location: Kenyon to Randolph Description: Re Hwy 56 Total Cost: $6.4 million Date: June-Oct 2013 Impact: Hwy 56 closed, detour Hwy 57 Location: Wanamingo Description: Install accessible pedestrian ramps (ADA compliant) Total Cost: $143,750 Impact: Intermittent lane and shoulder Benefit: More accessible Hwy 58 Location: to Goodhue County Road 5 7 Total Cost: $4.8 million Hwy 60 Location: Faribault Description: Replace Hwy 60 bridge over Crocker's Creek Total Cost: $3 million Date: July-Oct 2013, short-term detour during culvert replacement Location: Red Wing Description: Replace bridge over Nymphara Lane Total Cost: $3.5 million Date: TBD Impact: Long-term lane Hwy 63 Location: Zumbro Falls Description: Replace Hwy 63 bridge over stream Total Cost: $500,000 Date: July-Nov 2013 Impact: Hwy 63 closed, detour Hwy 65 Location: Iowa border to I-35 Total Cost: $2,248,594 Hwy 69 Location: Iowa border to 3 Total Cost: $4,923,803 Hwy 80 Location: 6 to in Fillmore County Total Cost: $1.3 million Date: Fall 2013 /pilot Hwy 247 Location: Hwy 63 to Hwy 42 in Olmsted and Wabasha counties Total Cost: $3,437,807 I-35 Location: Faribault to Owatonna Total Cost: $10 million Date: July-Oct 2013 I-35 Location: Rice County Description: Install Intelligent Transportation System devices Total Cost: $1.2 million Date: March-Sept 2013 Impact: Periodic lane and shoulder Benefit: Safer highway with better emergency response Location: Dexter to Mower County Road 1 Total Cost: $2 million Date: July-Nov 2013 Impact: Long-term lane closrues Location: 5 to Mower County Road 19 Total Cost: $7,645,369 Date: April-July 2013 Impact: Long-term lane Location: Hwy 76 to the Winona County Road 12 overpass Total Cost: $2.7 million Impact: Daily lane

8 Location: Winona County over the Mississippi River Total Cost: $187,543, Cost: $40 million Date: Impact: Minimal traffic impacts during 2013 and improved / interchange mndot.gov/d6/projects/dresbachbridge /index.html Location: Dodge, Fillmore, Goodhue, Houston, Wabasha and Winona counties Description: Seal coat various highways Total Cost: $2 million Date: July-Nov 2013 Impact: Periodic lane and shoulder Benefit: Increased life of highway District 7 Mankato / Windom Contact: Rebecca Arndt rebecca.arndt@state.mn.us Hwy 5 Location: Arlington to Green Isle Description: Replace pavement Total Cost: $3.05 million Hwy 5 Location: Gaylord to Arlington Total Cost: $3.2 million, delays 3 Location: Waseca, 3rd Ave NE to CR 5 way, revise signal, improve accessibility Total Cost: $1,134,708 Date: June-July 2013, delays, updated signal system, more accessible sidewalks 4 Location: Hwy 22 to Waseca/Steele county line Description: Add cable median barrier at interchanges, add shoulder rumble strips Total Cost: $1.4 million 4 Location: Mankato, at Victory Drive Description: Install signal at ramp Total Cost: $300,000 Date: June 2013 Benefit: Safer entrance ramp 4 Location: North Mankato, Lookout Drive to CR 6 Description: Construct interchange with CR 41 and pave 4 lanes of road Total Cost: $16.3 million 2013 Cost: $7,847,506 Date: May 2012-Oct 2013, delays Benefit: Safer highway and mndot.gov/d7/projects/14northmankato / 4 Location: Waseca to Owatonna Description: Landscape at interchanges Total Cost: $148,861 Date: April-June 2013 Benefit: Beautification and erosion control Hwys 14, 169 Location: Mankato bypass Description: Install changeable message signs Total Cost: $265,000 Date: July 2013 Benefit: Provide safety and travel information to motorists 8 Hwy 22 Location: Robarts Creek north of St. Peter Description: Repair box culvert Total Cost: $736,000 Date: Aug 2013, delays Benefit: Improved highway Location: to Jasper Description: Replace pavement Total Cost: $10 million Hwy 30 Location: Darfur to Hwy 4 Total Cost: $2.97 million, delays Location: Worthington, north of Description: Construct turn lanes Total Cost: $1.9 million 2013 Cost: $1.9 million Date: Benefit: Economic development Hwy 60 Location: Butterfield to St. James Description: Construct 2 lanes Total Cost: $18.8 million 2013 Cost: $5 million Date: July 2013-Oct 2014, delays Benefit: Completes gap in Hwy 60 4-lane expressway mndot.gov/d7/projects/hwy60stjames / Hwy 60 Location: St. James bypass Description: Install interchange lighting Total Cost: $420,000 Date: July 2013 Hwy 60 Location: Worthington, UP Railroad to Description: Finish railroad bridge and pave 4 lanes of road Total Cost: $45 million 2013 Cost: $9.2 million Date: May 2010-Oct 2013 Benefit: Completes Hwy 60 4-lane connection mndot.gov/d7/projects/hwy60/ Hwy 68 Location: Mankato, west of over UP Railroad Location: Windom Industrial Park Description: Construct turn lanes Total Cost: $750,000 Benefit: Economic development Location: Luverne, replace culvert, increase accessibility Total Cost: $1.2 million (MnDOT share), delays Benefit: Safer, smoother road and more pedestrian accessibility Location: Blue Earth Description: Reconstruct with roundabouts Total Cost: $10.4 million s Benefit: Safer, smoother road and improved pedestrian accommodations mndot.gov/d7/projects/169blueearth/ Location: at Blue Earth to CR 6 Total Cost: $850,000 Date: Sept-Nov 2013, delays

9 Location: EB Luverne to Magnolia Total Cost: $3.3 million, delays Location: WB Worthington to Jackson CR 5 Total Cost: $3.3 million, delays Location: Worthington Weigh Station Description: Improve parking and building faciltiies Total Cost: $1.07 million Impact: Weigh station closed Benefit: Improved parking and building facilities District 8 Willmar / Marshall / Hutchinson Contact: TJ Melcher tj.melcher@state.mn.us Hwy 4 Location: South fork of Crow River to northern limits of Cosmos Description: Reconstruct 1 mile, relocate utilities, replace sewer and water, upgrade pedestrian crossing, construct more accessible s [ADA compliant], signs and lighting. Total Cost: $4.48 million Benefit: Safer and more accessible road and Hwy 7 Location: Milan to Montevideo Description: Re 15 miles Total Cost: $2.3 million Date: July Location: Downtown Litchfield Description: Sealcoat 1,056 feet of road Total Cost: $156,324 mndot.gov/d8/hwy12litchfield/ 2 Location: Meeker CR 34 in Litchfield to CR 24 in Darwin Description: Re 5 miles Total Cost: $2.09 million and mndot.gov/d8/hwy12litchfield/ 2 Location: North Jct Hwy 22 to North Jct Highway 24 in Litchfield Description: Re 1 mile Total Cost: $329,331 mndot.gov/d8/hwy12litchfield/ 5 Location: Hwy 212 to Denver Ave in Hutchinson Description: Re 10 miles; McLeod County to construct roundabout at CR 115 (Airport Rd) Total Cost: $3.24 million Date: May-Sept Location: Ivanhoe to Marshall Description: Re 19 miles Total Cost: $2.32 million and 9 9 Location: Lyon CR 7 to 4th St in Marshall Description: Re 1 mile and repair bridge Total Cost: $1.65 million and bridge Location: Jasper to Pipestone Description: Re 11 miles Total Cost: $4.4 million and Hwy 40 Location: Milan to Jane's Bridge, 3.5 miles west of Milan Description: Re 4 miles Total Cost: $512,843 Date: Oct 2013 Location: Garvin Park Description: Replace guardrail Total Cost: $352,000 and Location: 4 to Lyon CR 6 Description: Re 12 miles Total Cost: $1.8 million and Hwy 67 Location: in Redwood Falls to Hwy 68 Description: Re 13 miles Total Cost: $2.1 million Date: Oct-Nov 2013 Hwy 68 Location: Canby to Porter Description: Re 7 miles Total Cost: $766,790 Date: May 2013 Location: Hwy 7 to Willmar Description: Re 11 miles and repair bridge Total Cost: $3.8 million Date: July-Sep 2013 Impact: Daily lane and bridge Location: Kandiyohi CR 24 to north Jct Description: Re 3 miles and lenghten NB turn lane Total Cost: $536,207 Impact: Daily lane Location: Willmar Bypass Description: Install cable median barrier Total Cost: $750,000 Date: Fall 2013 Impact: Shoulder Location: 5 miles south of Pipestone Description: Replace 3 culverts Total Cost: $1.05 million Benefit: Improve system beneath road Location: Yellow Medicine CR 3 in Canby to Hwy 67 Description: Re 7 miles Total Cost: $1.65 million

10 Hwy 212 Location: Danube to east Jct Hwy 71 Description: Re 5 miles Total Cost: $1.9 million Hwy 212 Location: Glencoe to west Jct Hwy 5 Description: Re 7 miles Total Cost: $1.9 million Hwy 267 Location: Iona to Hwy 30 Description: Re 5 miles Total Cost: $759,105 Description: Install signs Total Cost: $243,320 Impact: Brief delays Description: Sealcoat roads Impact: Intermittent lane with pilot 10

Program Title: 550 Acre Land Acquisition along the Rum River and Cedar Creek in Anoka County

Program Title: 550 Acre Land Acquisition along the Rum River and Cedar Creek in Anoka County Request for Funding Form Lessard-Sams Outdoor Heritage Council Fiscal Year 2011 Program or Project Title: 550 Acre Land Acquisition along the Rum River and Cedar Creek in Anoka County Date: 10/01/09 Manager

More information

Nicollet. Brown. Blue Earth. March TH 14 West Interregional Corridor: North Mankato to New Ulm

Nicollet. Brown. Blue Earth. March TH 14 West Interregional Corridor: North Mankato to New Ulm 15 Nicollet 111 12 99 15 Brown 14 23 Minnes 68 ota Rive r Blue Earth March 2003 TH 14 West Interregional Corridor: North Mankato to New Ulm 169 S.P. XXXX-XX Kittson Roseau Lake of the Woods Marshall Pennington

More information

Annual Report on Major Highway Projects. December 2012

Annual Report on Major Highway Projects. December 2012 December 2012 (per Minn. Stat. 174.56, Subd. 1-3) December 2012 Prepared by the Office of Capital Programs and Performance Measure Page 2 Section 1 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899

More information

A Reference guide to Minnesota electric and natural-gas utilities

A Reference guide to Minnesota electric and natural-gas utilities This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp A Reference guide to

More information

A Reference guide to Minnesota electric and natural-gas utilities

A Reference guide to Minnesota electric and natural-gas utilities A Reference guide to Minnesota electric and natural-gas utilities 1965-2005 Introduction... 2 Section I: Electric Utilities... 3 Overview... 3 Introduction to Electric Tables... 4 Table 1: Minnesota Historical

More information

A Reference guide to Minnesota electric and natural-gas utilities

A Reference guide to Minnesota electric and natural-gas utilities A Reference guide to Minnesota electric and natural-gas utilities 1965-2002 TABLE OF CONTENTS PAGE INTRODUCTION...1 SECTION I: ELECTRIC UTILITIES Overview...3 Introduction to Electric Tables...4 Table

More information

Types of Historic Bridges in Minnesota

Types of Historic Bridges in Minnesota MnDOT Local Historic Bridge Study WEB NARRATIVES: TOPIC 2 (FIELD GUIDE) Types of Historic Bridges in Minnesota Minnesota has more than 20,000 bridges. Of these, about 1% are considered significant to our

More information

North Dakota Apparent Bids November 17, 2017 until 10:00 AM Letting ID: Cut Off Time: 09:30:00 AM

North Dakota Apparent Bids November 17, 2017 until 10:00 AM Letting ID: Cut Off Time: 09:30:00 AM Proposal Description Bidder ID Bidder Name & Address Bid Amount 003 20171117003 STRUCTURE 7275 GLADEN CONSTRUCTION INC 40739 US HIGHWAY 71 LAPORTE, MN 56461 $721,951.30 BOTTINEAU REPLACEMENT & 178 RILEY

More information

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016 Rehabilitation of West Main Street Culvert and Shirley Street Bridge Town of Ayer November 22, 2016 Agenda Outline Introductions Project Goals and Objectives Existing Conditions Review Design Considerations

More information

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA 2008/09 $52.0 M 85% SELF-PERFORMED Widen 12 miles of Interstate 10 to six lanes including the reconstruction

More information

Minnesota Statewide Freight Bottlenecks

Minnesota Statewide Freight Bottlenecks Minnesota Statewide Freight Bottlenecks Transportation Performance Measures Reporting for MAP21 Compliance Oct. 1, 2018 2018 Minnesota Statewide Freight Bottlenecks Report Report Prepared by: Minnesota

More information

2017 Waste Pesticide Collection Program Legislative Report

2017 Waste Pesticide Collection Program Legislative Report 2017 Waste Pesticide Collection Program Legislative Report Stan Kaminski, 651-201-6562 625 Robert St. N., St. Paul, MN 55155 www.mda.state.mn.us March 15, 2018 1 Table of Contents Executive Summary...

More information

Appendix C: Long-Range Highway and Transit Capital Project List

Appendix C: Long-Range Highway and Transit Capital Project List Appendix C: Long-Range and Transit Capital Project List C.1 Appendix C was developed at the request of the U.S. Department of Transportation Federal and Federal Transit Administrations and consists of

More information

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016 Rt. 29 Solutions Project Delivery Advisory Panel February 18, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Feb

More information

Chapter 2 WHERE ARE WE NOW?

Chapter 2 WHERE ARE WE NOW? T Chapter 2 WHERE ARE WE NOW? A current snapshot of Minnesota s population, economy, and environment along with information about the existing multimodal transportation system SEPTEMBER 2012 MINNESOTA

More information

T E N T A T I V E S C H E D U L E O F L E T T I N G S

T E N T A T I V E S C H E D U L E O F L E T T I N G S LETTING DATE: JANUARY 26, 2018 PoDI and Agreements: 10/26/17 Complex Process B: 11/3/17 Typical Process B: 11/17/17 PoDI SUBMITTAL TO FHWA: 12/12/17 PROJECTS GO ON SALE (4 WEEK AD): 12/29/17 1 3108-70

More information

Coordinating Minnesota s Transportation Assets and Climate Change and Extreme Weather Vulnerability

Coordinating Minnesota s Transportation Assets and Climate Change and Extreme Weather Vulnerability Coordinating Minnesota s Transportation Assets and Climate Change and Extreme Weather Vulnerability Duane R. Hill, PE District Engineer, District One Minnesota Department of Transportation What is a Transportation

More information

Environment and Natural Resources Trust Fund 2010 Request for Proposals (RFP)

Environment and Natural Resources Trust Fund 2010 Request for Proposals (RFP) LCCMR ID: 067B2 Project Title: Environment and Natural Resources Trust Fund 2010 Request for Proposals (RFP) Strategically Reshaping DNRs Energy and GHG Emissions Footprint LCCMR 2010 Funding Priority:

More information

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle

More information

CHAPTER 3 SCOPE SUMMARY

CHAPTER 3 SCOPE SUMMARY CHAPTER 3 SCOPE SUMMARY GENERAL The SDDOT is an active member of AASHTO to share common national design standards for the state highway system. The AASHTO Task Force on Geometric Design has completed the

More information

Minnesota River Basin Turbidity TMDL

Minnesota River Basin Turbidity TMDL Minnesota River Basin Turbidity TMDL Hydrological Simulation Program/FORTRAN Modeling Results: Scenario 4 Chuck Regan Barr Engineering Scenario 4: Key Elements Perennial Vegetation Increase in the Chippewa

More information

ANALYSIS OF PUBLIC SERVICE ENTERPRISES

ANALYSIS OF PUBLIC SERVICE ENTERPRISES ANALYSIS OF Name of County Pop. TABLE 4 ANALYSIS OF HEALTH SERVICES ENTERPRISE OPERATIONS NON Principal BECKER 30,646 NURSING HOME [3] 2,638,520 2,477,880 160,640 12,501 --- 173,141 --- --- --- --- 37,664

More information

MnDOT Flash Flood Vulnerability and Adaptation Assessment Pilot Project DISTRICT 6 VULNERABILITY ASSESSMENT

MnDOT Flash Flood Vulnerability and Adaptation Assessment Pilot Project DISTRICT 6 VULNERABILITY ASSESSMENT MnDOT Flash Flood Vulnerability and Adaptation Assessment Pilot Project DISTRICT 6 VULNERABILITY ASSESSMENT NOVEMBER 2014 This document is part of a series of short reports based on the full Flash Flood

More information

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( )

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( ) Total preliminary Value for Project shown in initial year is for project duration. Projects have been listed in each year there are major Preliminary 4.8 Beech Ridge Road Underpass Repairs York $410,000

More information

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director Ohio Contractor Association Annual Work Forecast Program John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director John R. Kasich, Ohio Governor Jerry Wray, ODOT Director ODOT S

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 1, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION DECEMBER 1, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated November 15, 2016 BEAVER COUNTY SR 588(B18) #91922 PROPOSAL:$22.80 PLANS:$18.04 12X18:$22.14 24X36:$319.80 X-SEC:$3.52 12X18:$4.32 24X36:$62.40 The description and location of the project is as

More information

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees CR 9 (Bradt Hollow Road) Over Fox Creek Bridge Replacement Project Replacement of a 156 ft. long x 32ft. wide, 3 span pre stressed concrete box beam bridge over Fox Creek in the Town of Berne. The bridge

More information

Highway 15 Project Hutchinson, MN

Highway 15 Project Hutchinson, MN Highway 15 Project Hutchinson, MN Adjacent Properties and Businesses Meeting Hutchinson Area Chamber of Commerce 1 Agenda Topic 1) Introduce the project scope 2) Project goals and benefits 3) Project timeline

More information

STATE OF MINNESOTA. Analysis of Municipal Liquor Store Operations. Office of the State Auditor. Rebecca Otto State Auditor

STATE OF MINNESOTA. Analysis of Municipal Liquor Store Operations. Office of the State Auditor. Rebecca Otto State Auditor STATE OF MINNESOTA Office of the State Auditor Rebecca Otto State Auditor Analysis of Municipal Liquor Store Operations For the Year Ended December 31, 2016 Description of the Office of the State Auditor

More information

Minnesota Transportation Maps

Minnesota Transportation Maps Minnesota Transportation Maps MN Official Highway Map Front SLOW DOWNLOAD): http://www.dot.state.mn.us/statemap/2017/map-front.pdf MN Official Highway Map Back SLOW DOWNLOAD): http://www.dot.state.mn.us/statemap/2017/map-back.pdf

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List October 2018 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center Traffic Management Guide to Concrete Overlay Solutions December 5, 2014 ACPA Annual Meeting Dale S. Harrington P.E. Representing CP Tech Center Traffic Management- Concrete Overlays Traffic Management

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Downtown & Mid-Corridor Project Status Update Meeting Holman United Methodist Church Thursday, July 23, 2009 Phase 1 Project Description 8.6 mile corridor from Downtown

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 Updated June 30, 2014 LUZERNE COUNTY SR 309(W02) #102354 PROPOSAL:$25.20 PLANS:$6.24 The description and location

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION AUGUST 10, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION AUGUST 10, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated July 21, 2017 ALLEGHENY COUNTY SR 0000 #109397 PROPOSAL:$28.56 The description and location of the project is as follows: This work is the 3-year term maintenance if intelligent transportation

More information

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 1 Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 2 During this public meeting, we will explain the 75 th Street Corridor Improvement

More information

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016 Cleveland Opportunity Corridor Project Section 3 Subcontractor Informational Meeting August 12, 2016 Agenda Welcome and Opening Remarks Project Overview Prequalifications & Work Types Procurement Overview

More information

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida November 7, 2014 SUBMITTED BY: Dewberry Bowyer-Singleton 520 South

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) As of February14, 2018 SNYDER COUNTY SR 2007(012) #93607 PROPOSAL:$16.56 PLANS:$4.40 12X18:$5.40 24X36:$78.00 The description and location of the project are as follows: The work is the furnishing and

More information

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison T E C H N I C A L M E M O R A N D U M US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison PREPARED FOR: Mn/DOT District 7 PREPARED BY: CH2M HILL DATE: March 27, 2007 This technical

More information

Culvert deep under Everson-Goshen Road may be partially blocked, raising upstream water levels. Fall work. Winter flood damage to Graveline Road.

Culvert deep under Everson-Goshen Road may be partially blocked, raising upstream water levels. Fall work. Winter flood damage to Graveline Road. WHATCOM COUNTY PU BLIC W O RKS D EPARTM EN T Jon Hutchings DIRECTO R ADMINISTRATION CIVIC CENTER 322 N. Commercial Street, Suite 210 Bellingham, WA 98225-4042 Telephone: (360) 778-6230 FAX: (360) 778-6231

More information

District 3 10-Year Capital Highway Investment Plan ( )

District 3 10-Year Capital Highway Investment Plan ( ) District 3 -Year Capital Highway Investment Plan (2019-2028) Cover Picture OCTOBER 2018 Prepared by Office of Transportation System Management DISTRICT 3 -YEAR CHIP OVERVIEW District 3 s -Year Capital

More information

IMPROVING I 81 IN MARYLAND

IMPROVING I 81 IN MARYLAND IMPROVING I 81 IN MARYLAND April 25, 2017 Stephen A. Bucy, P.E. Improving I 81 in Maryland Overview: Facts SHA s Comprehensive I 81 Strategy Current Phase 1 Widening Project Update Closing Improving I

More information

STIP Project Description Guidance Revised December 14, 2015

STIP Project Description Guidance Revised December 14, 2015 General Guidance The guidance below applies to all local and MnDOT projects shown in the STIP. STIP Project Description Guidance The project description must clearly identify the specific route, point

More information

Safety. Introduction. Total System

Safety. Introduction. Total System Safety Introduction Ohio is the 35 th largest state in the nation based on geographic size, however it carries the 5 th largest total traffic volume and the 4 th largest truck traffic volume. With such

More information

CHAPTER 18 TEMPORARY ROADS AND BRIDGES

CHAPTER 18 TEMPORARY ROADS AND BRIDGES Change #1 - Revised 12/12 CHAPTER 18 TEMPORARY ROADS AND BRIDGES 18.0 INTRODUCTION These guidelines are to be used to design temporary roads and bridges where traffic will be maintained at the construction

More information

PUBLIC SERVICE ENTERPRISES TABLES

PUBLIC SERVICE ENTERPRISES TABLES PUBLIC SERVICE ENTERPRISES TABLES Table 3 Analysis of Health Services Enterprise Operations NON Revenues Becker 32,256 Sunnyside Care Center [3] 3,201,349 3,056,793 144,556 13,573 59,498 98,631 --- ---

More information

Building Concrete Overlays on Two Lane Roads Under Traffic U.S /2 PCC Unbonded Chickasaw / Fayette County, Iowa

Building Concrete Overlays on Two Lane Roads Under Traffic U.S /2 PCC Unbonded Chickasaw / Fayette County, Iowa Building Concrete Overlays on Two Lane Roads Under Traffic U.S. 18 4 1/2 PCC Unbonded Chickasaw / Fayette County, Iowa Partnerships for Progress in Transportation Louisiana Transportation Conference February

More information

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017 VT 14 East Montpelier Bridge Project Informational Meeting February 22, 2017 Welcome & Introductions VTrans Mark Sargent, Project Manager Wayne Symonds, Structures Program Manager Chris Barker, Resident

More information

Berkshire Region TIP Project Data Form

Berkshire Region TIP Project Data Form BASIC INFORMATION: 1. TIP ID #: 2. MUNICIPALITY: 3. ROUTE# AND/OR NAME: Berkshire Region TIP Project Data Form 4. PROJECT TYPE (CHECK BEST DEFINITION OF PROJECT): Intersection Improvement Road Resurfacing

More information

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc. 2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction

More information

WELCOME IL 47. Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016

WELCOME IL 47. Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016 WELCOME IL 47 Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016 MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Range of Alternatives

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List February 2017 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

54 th Annual Concrete Paving Workshop March 13, 2015

54 th Annual Concrete Paving Workshop March 13, 2015 54 th Annual Concrete Paving Workshop March 13, 2015 Completed in 1970 North of St. Paul 1961 Maryland Ave to Little Canada Rd 1967 Maryland Ave to downtown St.Paul 1970 Little Canada Rd to 35E/35W Split

More information

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015 WELCOME Public Meeting for I-35 / I-44 Interchange October 6, 2015 TEAM INTRODUCTIONS PURPOSE OF THIS MEETING is to present the alternative alignments for the I-35/I-44 and I-35/NE 63rd Street Interchanges

More information

PUBLIC SERVICE ENTERPRISE TABLES

PUBLIC SERVICE ENTERPRISE TABLES PUBLIC SERVICE ENTERPRISE TABLES Aitkin Long Lake Conservation Center 775,049 951,195 (176,146) 69,895 2,000 (108,251) --- --- 1,888 --- 37,693 --- --- --- 775,049 951,195 (176,146) 69,895 2,000 (108,251)

More information

STATE OF MINNESOTA. Analysis of Municipal Liquor Store Operations. Office of the State Auditor. Rebecca Otto State Auditor

STATE OF MINNESOTA. Analysis of Municipal Liquor Store Operations. Office of the State Auditor. Rebecca Otto State Auditor STATE OF MINNESOTA Office of the State Auditor Rebecca Otto State Auditor Analysis of Municipal Liquor Store Operations For the Year Ended December 31, 2017 Description of the Office of the State Auditor

More information

Appendix C. Wetland Impact Assessment and Two-Part Finding. I-94 St. Michael to Albertville Minnesota Department of Transportation

Appendix C. Wetland Impact Assessment and Two-Part Finding. I-94 St. Michael to Albertville Minnesota Department of Transportation Appendix C Wetland Impact Assessment and Two-Part Finding I-94 St. Michael to Albertville Minnesota Department of Transportation Office of Environmental Stewardship 395 John Ireland Blvd. St. Paul, MN

More information

*See explanations of footnotes at the end of the Enterprise Fund Section.

*See explanations of footnotes at the end of the Enterprise Fund Section. ADA 1,741 JOHN WIMMER CLINIC [26] --- --- --- --- --- --- --- --- --- --- --- --- --- --- APPLETON 2,088 CLINIC [99] FAILED TO REPORT IN TIME FOR THIS PUBLICATION HRA [*] --- 6,636 (6,636) 2,697 --- (3,939)

More information

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 12, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING JULY 12, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated July 9, 2018 BUCKS COUNTY SR 1017(SC1) #15341 PROPOSAL:$22.80 This project is for the applying of seal coat to existing bituminous roadway on various state routes (32.33 segment miles) in Bucks

More information

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. Welcome Public Meeting August 2, 2017 5:00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. www.glenwoodsouthbridge.net Welcome to the South Bridge Environmental Assessment Public Meeting Why Are We Here Tonight?

More information

PUBLIC SERVICE ENTERPRISE TABLES

PUBLIC SERVICE ENTERPRISE TABLES PUBLIC SERVICE ENTERPRISE TABLES Aitkin Revenue Expense Income Revenue Expense Net Income Taxes Long Lake Conservation Center 652,519 886,371 (233,852) 18,439 --- (215,413) --- 1,888 --- --- 9,507 ---

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

Gain input from manufacturers and carriers to inform MnDOT s work in this region and support economic strength in Greater Minnesota Project

Gain input from manufacturers and carriers to inform MnDOT s work in this region and support economic strength in Greater Minnesota Project Gain input from manufacturers and carriers to inform MnDOT s work in this region and support economic strength in Greater Minnesota Project structured to build ongoing relationships among MnDOT, regional

More information

TH 169/TH 494 DESIGN BUILD PROJECT

TH 169/TH 494 DESIGN BUILD PROJECT TH 169/TH 494 DESIGN BUILD PROJECT PROJECT OVERVIEW Eliminates traffic signals at Highwood/Townline, South Ramp termini, and North Ramp termini. Adds WB 494 to SB 169 flyover ramp. Adds direct NB 169 to

More information

Bridge Asset Management City of Battle Creek Planning and Projects

Bridge Asset Management City of Battle Creek Planning and Projects Bridge Asset Management City of Battle Creek Planning and Projects Michigan Bridge Conference, March 20, 2013 Gregory B. Rickmar P.E., Public Works Department, City of Battle Creek Alan Halbeisen, P.E.

More information

PUBLIC WORKS DEPARTMENT DESIGN & CONSTRUCTION DIVISION OCTOBER 2015 UPDATE

PUBLIC WORKS DEPARTMENT DESIGN & CONSTRUCTION DIVISION OCTOBER 2015 UPDATE PUBLIC WORKS DEPARTMENT DESIGN & CONSTRUCTION DIVISION OCTOBER 2015 UPDATE TJERNE PLACE CHAIN LAKE ROAD TO WOODS CREEK ROAD This project involves extending Tjerne Place from Chain Lake Road to Woods Creek

More information

Zoo Interchange Reconstruction

Zoo Interchange Reconstruction May 14, 2013 Roberto Gutierrez, PE WisDOT Chris Hager, PE - WisDOT Zoo Interchange Reconstruction Overview of Presentation overview WisDOT Southeast Region I-94 North-South I794/I-94 restriping Hoan bridge

More information

Multi-modal Plan Aviation Plan Highway Investment Plan. Implications of Vision Funding Outlook. Collaboration

Multi-modal Plan Aviation Plan Highway Investment Plan. Implications of Vision Funding Outlook. Collaboration State and Federal Transportation Funding in Minnesota: Long Term Vision Short-Term Challenges Philip Schaffner Peggy Reichert, ACIP Minnesota Department of Transportation 1 Overview Long Range Vision for

More information

PUBLIC SERVICE ENTERPRISE TABLE

PUBLIC SERVICE ENTERPRISE TABLE PUBLIC SERVICE ENTERPRISE TABLE Aitkin Long Lake Conservation Center 586,545 804,032 (217,487) 21,145 3,909 (200,251) --- --- --- --- 367,570 --- --- --- 586,545 804,032 (217,487) 21,145 3,909 (200,251)

More information

Preventive Maintenance Project & Treatment Selection

Preventive Maintenance Project & Treatment Selection Preventive Maintenance Project & Treatment Selection 19 th Annual TERRA Pavement Conference February 12, 2015, St. Paul, MN Mark Watson, MnDOT Maintenance Outline Introduction Network Level Project Level

More information

Willmar Wye Public Open House #4 and Public Hearing

Willmar Wye Public Open House #4 and Public Hearing Willmar Wye Public Open House #4 and Public Hearing February 23, 2017 www.dot.state.mn.us/d8/willmarwye Agenda Time Topic 5:00 pm Open House Opportunity for the public to ask questions of project staff

More information

Purple Line Extension. Beverly Hills Community Meeting August 22, 2016

Purple Line Extension. Beverly Hills Community Meeting August 22, 2016 Purple Line Extension Beverly Hills Community Meeting August 22, 2016 1 3 Purple Line Extension Project Alignment 2 Section 2 and 3 Status Under Construction Forecasted Schedule Section 1 Section 2 Section

More information

Information for File # RJH

Information for File # RJH Information for File #2011-01629-RJH Applicant: Matthew Ternes Corps Contact: Ryan Huber, U. S. Army Corps of Engineers, 211 North Broadway, Suite 221, Green Bay, Wisconsin 54303; ryan.j.huber@usace.army.mil;

More information

Report on 2015 SCORE Programs. A summary of recycling and waste management in Minnesota

Report on 2015 SCORE Programs. A summary of recycling and waste management in Minnesota Report on 2015 SCORE Programs A summary of recycling and waste management in Minnesota April 2017 Legislative charge In 1989, the Legislature adopted comprehensive waste reduction and recycling legislation

More information

Public Works designs, manages and builds more than $4 billion in construction projects across San Francisco. DOING BID ON OUR PROJECTS. JOIN THE CITY TEAM. BUSINESSwith BUILDINGS PLAYGROUNDS STREET RESURFACING

More information

RESOURCE DIRECTORY. Contents

RESOURCE DIRECTORY. Contents RESOURCE DIRECTORY A Guide to Acronyms...3 General Resource Management Information via the Web...4 Natural Resource Management and Stewardship: Information and Educational Materials...4 Developing Forest

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

Roadway Surfaces and Traffic Control Elements

Roadway Surfaces and Traffic Control Elements Roadway Surfaces and Traffic Control Elements Lines of Business: General Liability, Public Officials Liability www.tridentinsurance.net Risk Control Strategy/Key Issues: To establish and document a program

More information

ODOT DISTRICT CONSTRUCTION PROGRAM

ODOT DISTRICT CONSTRUCTION PROGRAM ODOT DISTRICT 5 2017 CONSTRUCTION PROGRAM SERVING COSHOCTON, FAIRFIELD, GUERNSEY, KNOX, LICKING, MUSKINGUM, AND PERRY COUNTIES. JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR SONJA R. SIMPSON,

More information

City of Prior Lake. Energy Savings Performance Contracting Services

City of Prior Lake. Energy Savings Performance Contracting Services City of Prior Lake Energy Savings Performance Contracting Services February 2015 Agenda City of Prior Lake s Goals About Honeywell Program Overview Energy Conservation Measures Financial Summary 2 City

More information

Retaining Wall Replacement along Theodore Fremd Avenue at Blind Brook

Retaining Wall Replacement along Theodore Fremd Avenue at Blind Brook Retaining Wall Replacement along Theodore Fremd Avenue at Blind Brook City of Rye Westchester County City Council Public Meeting Presentation September 16, 2009 Presentation Outline Project Overview Existing

More information

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report Function : Transportation Activity : Road & Street Facilities Category : Arterial Roads Pinellas County Capital Improvement Program, FY2011 - FY2016 Project No: 1618 Title: 118th Avenue Expressway Cost

More information

CHAPTER 3: DETAILS and ADA

CHAPTER 3: DETAILS and ADA CHAPTER 3: DETAILS and ADA ADA PLAN REVIEW CHECKLISTS When there is ADA work in a project the ADA Plan Review Checklists NEED to be filled out and submitted. The ADA Plan Review Checklist #1 Shall be submitted

More information

CLA /10.54, PID Project Description:

CLA /10.54, PID Project Description: Project Description: The proposed project will consist of widening IR 70 to three lanes from Enon Road (SLM 06.75) to the US 68 interchange ramps (SLM 10.55). IR 70 is a component of the Strategic Highway

More information

Public Works Department Five Year Capital Improvement Plan FY PROPOSED

Public Works Department Five Year Capital Improvement Plan FY PROPOSED Public Works Department Five Year Capital Improvement Plan FY 2019-2023 PROPOSED Capital Improvement Plan Summary STREET DIVISION PROJECTS 141 Asphalt Sidewalk Replacement Program Funding Source Adopted

More information

District 2 10-Year Capital Highway Investment Plan ( )

District 2 10-Year Capital Highway Investment Plan ( ) District 2 0-Year Capital Highway Investment Plan 208-2027 Cover Picture DRFT JUNE 207 Prepared by Office of Transportation System Management DISTRICT 2 0-YER CHIP OVERVIEW District 2 Overview District

More information

ADMINISTRATIVE AMENDMENTS TO THE TIP AND RTP

ADMINISTRATIVE AMENDMENTS TO THE TIP AND RTP TAC Agenda Item 6B Mailout - 03/09/16 ADMINISTRATIVE AMENDMENTS TO THE TIP AND RTP Background The Transportation Policy Council (TPC) has authorized the Metropolitan Planning Organization (MPO) Director

More information

Constructability Guidelines

Constructability Guidelines Constructability Guidelines The Constructability Guidelines offer a list of items that should be considered by Constructability function personnel during the Concept Development Phase through the Final

More information

Rt. 29 Solutions Project Delivery Advisory Panel. October 1, 2015

Rt. 29 Solutions Project Delivery Advisory Panel. October 1, 2015 Rt. 29 Solutions Project Delivery Advisory Panel October 1, 2015 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Sep

More information

Minnesota Conservation Improvement Program Energy And Carbon Dioxide Savings Report for

Minnesota Conservation Improvement Program Energy And Carbon Dioxide Savings Report for This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Minnesota Conservation

More information

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND RAIL-HWY PROJECT DEVELOPMENT GUIDE AND New procedures for Railroad Right-of-Entry Agreements & Bid Documents (SP Item 007) Bridge Division Webinar - July 18, 2013 GUIDE TO RAILROAD PROJECT DEVELOPMENT

More information

Information for File # ARC

Information for File # ARC Information for File # 2015-02993-ARC Applicant Corps Contact St. Louis-Lake Counties Regional Rail Authority Andrew R. Chambers Address 600 South Lake Avenue, Suite 211, Duluth, MN 55802 E-Mail Andrew.R.Chambers@usace.army.mil

More information

REVISED ADVERTISING SCHEDULE

REVISED ADVERTISING SCHEDULE INFRASTRUCTURE REVISED ADVERTISING SCHEDULE CONSTRUCTION AND MATERIAL SUPPLY TENDERS Manitoba Infrastructure Contract Services Branch 1630 215 Garry Street Winnipeg, MB R3C 3P3 204 945 3637 The Construction

More information

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.

More information

Statewide Air Monitoring: Coverage and Gaps

Statewide Air Monitoring: Coverage and Gaps Kari Palmer February 2008 Statewide Air Monitoring: Coverage and Gaps MPCA Air Monitoring Criteria pollutants (pollutants with standards) Air toxics Special studies Criteria Pollutants Included in the

More information

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) ADA South, Contract 1 w/o ROW DBNUM: 15420 / UPC: 154200 This contract will bring projects into compliance with current ADA design requirements that could not be completed within original design or construction

More information

Grain Production Projections

Grain Production Projections n N r JOO..; f Grain Production Projections by County and District, Minnesota, 1980 and 1985 Michael Martin Reynold Dahl Station Bulletin 518-1977 Agricultural Experiment Station University of Minnesota

More information

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs G2-0 LIST OF ACTIVE MTODs DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200- GRADING 219.101 Light Duty Straw

More information